DROUGHT RECOGNITION AND RESPONSE
DROUGHT ALERT STAGES AND WATER USE REDUCTION GOALS
Droughts vary considerably and Boulder's response must be suited to the severity of a given
drought. In developing a drought response plan it is useful to categorize Boulder's demand
reduction responses into specific stages that are associated with various levels of drought.
The range of droughts that Boulder might have to respond to, along with Boulder's demand
reduction goals, can be categorized into drought alert stages as shown in Table 3.
The range of drought associated with each alert stage was developed by modeling the
operation of Boulder's water supply system through a wide range of wet and dry periods, as
described in the following section. The details of Boulder's water use reduction goals for
each of the alert stages are presented in Volume 1 of this Drought Plan.
Table 3: Drought alert stages
Drought Alert Stage Drought Description
I Moderate
II Serious
III Severe
IV Extreme
DROUGHT RECOGNITION CONSIDERATIONS
While water supply conditions and the potential for drought are both continuously monitored
by Boulder's water managers and consultants, there are several factors that can be used to
influence how and when Boulder recognizes and reacts to droughts. Other climate
indicators that are relevant in other parts of the country have little predictive value in
Colorado. The Colorado Front Range is a location where four different major climate
systems converge. This makes weather prediction for the area notoriously difficult. The
following factors are known about the Boulder area.
♦ Snowpack accumulation becomes a relatively reliable indicator of runoff by May 1 of
each year (see Figure 21 below.)
4 To date, global factors (El Nino Southern Oscillation, Pacific Decadal Oscillation, etc.)
basically have no predictive skill with respect to droughts in Boulder Creek or the Upper
Colorado/CBT drainage area.
City of Boulder Drought Plan
Volume 2-Drought Plan Technical Information and Analysis
February 20, 2003--revised
Page 36
♦ Multi-year persistence of droughts is evident only in the years following extremely low
flow (<65% of average) years.
♦ Modeling studies suggest that, under historical and tree ring-based climate regime,
Boulder's water supply would be very infrequently impacted by droughts, only 1-in-50
year droughts or worse.
♦ May 1 is the time when Boulder has the most foreknowledge about its water supply
system because virtually all of the snowpack has usually developed by this time and
Boulder's final CBT quota for the year is known. May 1 st is also early enough for Boulder
to influence almost all outdoor uses for the ensuing irrigation season.
100% - - - - - -
90%
> C 80%
co LL
:5 E c 70%
H
U) y d N
Y N 60%
L
0 3 a~ 50%
3 C Z O
0 40%
a 30%
20% -
10% -
0% -
1-Feb 1-Mar 1-Apr 1-May
Date of Snowpack Reading
Figure 24: Seasonal value of Boulder Creek snowpack in predicting Boulder Creek
runoff volume
DROUGHT RESPONSE TRIGGERS
Based on the factors listed above, drought response triggers were developed for use on
May 1 of each year. The triggers incorporated three quantitative factors:
City of Boulder Drought Plan
Volume 2-Drought Plan Technical Information and Analysis
February 20, 2003--revised
Page 37
♦ Boulder's projected mountain storage during the ensuing May-June period based on
snowpack measurements and the projected resulting streamflows during the spring
runoff period.
♦ Boulder's portion of water projected to be available in CBT reservoirs during the ensuing
May-June period.
Boulder's unrestrained water demand.
Perhaps the most important factor in evaluating the drought stage is how full the city's
Boulder Creek basin reservoirs are likely to get during the following runoff, because
mountain storage water is likely to be Boulder's main supply in meeting its demands in a
severe drought year. The interpretation of the factors listed above should be modified as
necessary based on other appropriate data and operating experience.
The next most important factor is Boulder's portion of the total amount of water that is likely
to be in storage in the CBT project during the following runoff. Boulder owns a 7% share of
the contract delivery rights for the CBT project, which corresponds to about 50,000 acre-feet
of the usable storage capacity in the project. Boulder does not own this storage space
directly and cannot draw this entire volume of water from the project in a single year due to
CBT quota policies and capacity limits at the Boulder Reservoir treatment plant. However,
Boulder does have the right to expect water delivery in accordance with the operating
policies of the project and this represents Boulder's main 'bank account' during severe,
multiple-year droughts.
The two factors relating to storage levels in the upper and the lower part of Boulder's
municipal water supply system are equivalent in value as components of an overall drought
response trigger. If the portion of CBT storage associated with Boulder's CBT units is at or
near its maximum value, this could somewhat compensate for Boulder's mountain
reservoirs being abnormally low.,
Finally, the size of Boulder's unrestrained annual water demand should also be factored into
Boulder's drought response triggers. As Boulder's water demand increases, more storage
would be needed if unrestrained demands were to be met during a given drought. Given
the potential environmental and economic effects of providing more storage, it is more cost-
effective to plan for restraints on demand during significant drought periods.
Based on detailed modeling of the operation of Boulder's water supply system and the CBT
and Windy Gap projects over 300 years of stream flows evidenced by tree rings, the drought
response triggers in Table 4 appear to be the most appropriate. These triggers
mathematically incorporate all three of the factors listed above. However, Boulder's portion
of CBT storage is discounted by 40% because of the multi-year carryover function of this
supply.
City of Boulder Drought Plan
Volume 2-Drought Plan Technical Information and Analysis
February 20, 2003--revised
Page 38
Table 4: Suggested drought response triggers for May 1
• • Drought Alert
Storage
Greater than 0.85 None
Between 0.85 and 0.7 1
Between 0.7 and 0.55 II
Between 0.55 and 0.4 III
Less than 0.4 IV
(1) Projected storage index = (projected usable Boulder mountain storage +
40% of Boulder's portion of projected CBT storage) / Boulder's
unrestrained water demand in non-drought years.
Projected usable Boulder mountain storage is the maximum amount of projected
storage in Barker Reservoir plus the Silver Lake Watershed following the peak of the
spring runoff during the ensuing May-June period, minus 1,000 acre-feet for dead
storage allowance. This value will be based on estimates of final snowpack levels
and resulting streamflows to occur following May 1. Presently, the maximum
potential projected usable mountain storage, if all reservoirs were full, less 1000 acre-
feet of dead storage is 18,500 acre-feet.
Boulder's portion of projected CBT storage is the maximum amount of projected
available water stored in Granby, Carter and Horsetooth Reservoirs during the
ensuing May-June period, times the ratio of (Boulder's CBT units divided by the total
number of CBT units in the CBT Project), plus the net amount of any CBT water that
Boulder is carrying over in the CBT system. Presently, Boulder Utilities owns 21,015
units of CBT and there are 310,000 units, so the ratio would be 6.78%.
Boulder's unrestrained demand is the average of Boulder's annual treated water
demand (May 1 to April 30) for the last two years in which there were no drought
response-related demand reduction programs in place. For example, in the drought
year of 2002, the average demand for the period of May 1, 2000 to April 30, 2002
was used for the calculation. If a drought continues for an extended period, it may be
desirable to adjust the information for unrestrained year demand to account for
increases in population.
It should be noted that these drought response triggers are intended to be used only as a
guideline and in conjunction with other appropriate data and operating experience. The
response triggers should be modified as necessary to account for the unique characteristics
City of Boulder Drought Plan
Volume 2--Drought Plan Technical Information and Analysis
February 20, 2003--revised
Page 39
of the drought period in progress. Modifications should be made as necessary based on
actual measurements of snowpack and streamflow, observations of the operational
response of Boulder's municipal water supply system to the drought, and the
recommendations of Boulder's water system managers. While Boulder's drought response
can be decided upon and communicated to the public in early May, Boulder should continue
to monitor trends in snowpack, runoff and reservoir filling through May and June, and should
be ready to modify its drought response plan accordingly, if needed.
WATER SUPPLY RELIABILITY ASSESSMENT
SUMMARY OF APPROACH
i Hydrosphere used the Boulder Watershed Model to assess the ability of Boulder's water
supply system to meet its projected build-out demands in accordance with Boulder's water
supply reliability criteria. The model was originally developed to simulate all significant
aspects of hydrology, water rights, water storage and diversion facilities and water uses in
the Boulder Creek basin. The model utilized a 1950-1994 period of hydrologic record under
the assumption that the historical drought of 1953-1956 was a sufficiently severe drought
event against which to test the city's water supply system.
In developing this plan, the model was expanded to include a simplified sub-model of the
CBT Project and Windy Gap projects. This allowed for simulating operation of the two
projects during periods prior to their construction.
The model was modified to run against a 300-year period of record that reflects the results
of tree ring-based reconstructions of natural flows for Boulder Creek and the Colorado River
for the years 1703-1987 (actual historical data were used for 1988-2002). This expanded
data set allowed for a more robust assessment of the reliability of the city's water supply
system, including the performance of the CBT and Windy Gap projects.
The model was also refined to include the drought response triggers and associated
demand reductions shown in Table 4 above. The response triggers were evaluated on May
1 of each year in the model. The response triggers were a function of the forecasted degree
of fill of Boulder's upper Boulder Creek water system storage and CBT system storage over
the following two-month period. The demand reductions were applied to the subsequent 12-
month period. The model also simulated Boulder's invoking of drought reservations
associated with its instream flow program and its raw water delivery obligations.
KEY ASSUMPTIONS
In the modeling analyses done in this reliability assessment, several key assumptions were
made. Each assumption is treated as a 'given', including two capital expenditure items that
City of Boulder Drought Plan
Volume 2-Drought Plan Technical Information and Analysis
February 20, 2003--revised
Page 42
Table 5. This equates to some level of demand reduction once every 30 years on average
and no demand reduction great enough to cause significant permanent damage to
landscaping.
Table 5: Results of reliability assessment
Number
Drought Alert Stage i • Years of Occurrence
Full demand satisfied 290 All years but those listed below
Level 1 5 1842, 1848, 1852, 1885, 189
Level 11 3 1851, 188 1889?
Level III 2 1888, 2002
Level IV 0 None
CAVEATS AND AREAS OF UNCERTAINTY
It should be noted that this finding of adequacy is contingent upon the assumptions listed
above. Several of these assume significant capital expenditures by the city.
Sensitivity analyses show that if Boulder's modeled build-out demand is increased by an
additional 10% to 31,500 acre-feet (while still maintaining a 10% safety factor), the number
of years with required demand reductions would rise from 10 to 25 years out of 300,
equivalent to demand reductions once every 12 years on average. The 25 reductions would
include seven years with Level 2 reductions, five years with a Level 3 reduction, and one
year with a Level 4 reduction as shown in Figure 26. This level of performance would not
meet the city's reliability criteria and still maintain a 10% safety factor. The 10% safety
factor should not be considered discretionary as this safety factor addresses uncertainties
related to potential increases in water-intensive industries and 'real world vs. modeled'
operational factors of the water supply system.
A 10% increase in the city's build-out demand could result from failure to implement the
Comprehensive Water Conservation Program included in the Water Conservation Futures
Study. An 11% increase could result from allowing the Jobs and Population Project's
'Current Trends' scenario to materialize. Failure to implement the Comprehensive Water
Conservation Program or allowing the Current Trends scenario to materialize would place
water demand levels beyond the margin of error for assurance of a reliable water supply. A
comparison of supply and demand under various scenarios is shown in Figure 27.