HomeMy WebLinkAbout6 - Boulder Reservoir Master Plan Update
CITY OF BOULDER
WATER RESOURCES ADVISORY BOARD
AGENDA ITEM
MEETING DATE: April 19, 2010
AGENDA TITLE: Boulder Reservoir Master Plan Update
PRESENTERS:
Michelle Wind, Drinking Water Program Supervisor
Alice Guthrie, Recreation Superintendent
Bret Linenfelser, Water Quality and Environmental Services Coordinator
EXECUTIVE SUMMARY:
In August 2009, staff presented an initial summary of the Boulder Reservoir Master Plan
(BRMP) development process including a draft vision statement and goals. The Parks and
Recreation Department is leading the BRMP development with assistance from Utilities
Department staff and other City Departments. At the August 2009 WRAB meeting the role of
the Utilities Department was discussed, which included advising WRAB, the Parks and
Recreation Advisory Board (PRAB) and City Council on Utilities Department goals, policies and
challenges that need to be addressed in the BRMP as they relate to recreational use and natural
land management at the Boulder Reservoir.
Utilities Department staff will present a status update on the BRMP focusing on water quality
and water management related issues that will be considered in the BRMP. This Agenda Item is
informational, and staff is not requesting a recommendation from WRAB. Staff will introduce
draft policy options for water quality related issues that will be evaluated as part of the BRMP
and request input and comment from WRAB. Specific items for discussion will include draft
policy options for boating and general recreational activities, including swimming, at Boulder
Reservoir. Future water quality monitoring to evaluate potential recreational impacts to Boulder
Reservoir water quality will also be discussed. Recent public comments regarding water quality
impacts on Boulder Reservoir from current recreational activities were addressed with City
Council through the March 2, 2010 Weekly Information Packet (WIP). The WIP is provided in
Attachment 1. On May 11, 2010, City Council will hold a study session on the policy options
for the BRMP. Staff will analyze the options and conduct public outreach in June, then return to
City Council on July 20 (tentative date) for direction on the preferred policy and management
options for the plan.
SUMMARY OF BOULDER RESERVOIR MASTER PLAN STATUS:
The BRMP will establish management goals and objectives for the Parks and Recreation
Department in the management of both land and water-related activities at the Boulder
Reservoir, including Tom Watson Park and Coot Lake. These goals and objectives will guide
long-term recreational activities and investment strategies at Boulder Reservoir. An
interdepartmental BRMP team, led by the Parks and Recreation Department, has been developed
which includes representatives from multiple City Departments, including the Utilities
Department.
WRAB Agenda Item, Page I
The BRMP process includes the following three phases:
Phase I: Vision, Goals and Key Challenges (completed)
Phase II: Policy and Plan Options (in progress)
Phase III: Draft and Final Master Plan (July -September 2010)
The team completed Phase I in 2009 (Attachment 2). Phase II involves the development and
analysis of alternatives for key elements of the plan. The preliminary management areas and
uses are described in Attachment 3. In 2010 staff will perform an alternatives analysis for all
options confirmed by City Council, which will include evaluating impacts on water resources,
including water quality. Attachment 4 includes how staff proposes to evaluate the alternatives.
Staff has recently drafted policy options as part of Phase II, and a specific policy related to water
quality is boating and boating-related aquatic nuisance species (Attachment 5). Boating on
Boulder Reservoir has drawn public attention due to noise and potential water quality impacts
from motorized boats. Water quality impact concerns are related to fuel-related pollution to
drinking water and direct impact to swimmers in Boulder Reservoir.
In August 2009, a Boulder Reservoir user survey was conducted to solicit input from the public
at the Reservoir and other facilities in the study area. The complete survey can be found on the
City's website (www.bouldercolorado.gov/Boulder Reservoir/brmp/User Surve.pdf).
Select responses related to water quality and water resource management included:
■ Rating of the reservoir water condition varied by the interview location of the users. A `very
good' rating ranged from 25% of respondents at the south shore beach to 67% of respondents
at Coot Lake/Tom Watson. For all locations, the condition of the water in the reservoir was
rated as follows:
(Very Good) 2 3 4 (Very Bad) Don't Know
30% 29% 22% 3% 2% 14%
■ Regarding conflicts observed (e.g., noise, traffic, boating), 5% of respondents identified
pollution/water quality as a conflict.
■ 1% of respondents commented to `reduce oil from swimmers in water', and all these
respondents were from the north shore area.
The City Council received the survey information for the December 2009 study session when
City Council provided feedback on the draft vision and goals. More detailed information on
water quality testing was included in the March 2, 2010 WIP (Attachment 1).
NEXT STEPS:
Staff is requesting comment and input from the WRAB on the BRMP as it relates to water
quality, including boating options to consider for Boulder Reservoir. Comments and input will
be forwarded to PRAB and City Council for consideration at future meetings.
WRAB Agenda Item, Page 2
Future public meetings include:
■ April 26, 2010 Parks and Recreation Advisory Board Study Session
■ May 11, 2010 City Council Study Session
■ July 20, 2010 City Council meeting
■ Sept. - Dec. 2010 Final acceptance of BRMP
In the third quarter of 2010, staff will ask the WRAB to review a draft Boulder Reservoir Master
Plan and consider a recommendation to City Council on acceptance of the final master plan.
ATTACHMENTS:
1. City Council WIP (March 2, 2010)
2. Boulder Reservoir Master Plan Vision and Goals
3. Preliminary Management Areas
4. How Options Will Be Evaluated
5. Boating Policy Options
WRAB Agenda Item, Page 3
ATTACHMENT 1
MARCH 2, 2010 CITY COUNCIL
WEEKLY INFORMATION PACKET
MEMORANDUM
To: Mayor Osborne and City Council
From: Jane Brautigam, City Manager
Paul Fetherston, Deputy City Manager
Maureen Rait, Executive Director of Public Works
Ned Williams, Director of Public Works for Utilities
Kirk Kincannon, CPRP, Director of Parks and Recreation
Alice Guthrie, Recreation Superintendent, Parks and Recreation
Bret Linenfelser, Water Quality Coordinator, Utilities
Michelle Wind, Drinking Water Program Supervisor, Utilities
Bev Johnson, Project Manager for the Boulder Reservoir Master Plan
Date: March 2, 2010
Subject: Information Item: Update on the Boulder Reservoir Master Plan
EXECUTIVE SUMMARY:
The purpose of this memorandum is to provide information about water quality monitoring in
Boulder Reservoir and an update on the Boulder Reservoir Master Plan Project schedule.
Concerns have been expressed by the public about water quality impacts of motorized boating on
the Boulder Reservoir. The primary water quality concerns associated with fuel-powered boating
include the introduction of volatile organics (BTEX) from gasoline and polycyclic aromatic
hydrocarbons (PAH) from oil into the raw water. Results of the city's water quality monitoring
in 2009 showed no evidence that BTEX compounds are in the water supply, based on current
analytical techniques and detection limits. The city will continue to monitor for BTEX
compounds during the 2010 boating season. If BTEX compounds are detected, the city could
consider modifying motorized boating activities on the reservoir to address the water quality
issue. PAH compounds typically sink and would be found in reservoir sediment. The city,
however, does not monitor the quality of the sediments for any PAH compounds due to sampling
and analytical complications and the fact that there are very few two-cycle engines (primary
source of PAH) in use on Boulder Reservoir.
The city's recreational boating policy will be addressed in the Boulder Reservoir Master Plan
and will include a protocol for water quality monitoring and a response plan in the case of fuel
spills or detection of BTEX in the water. Staff has begun the second phase of the project which
involves development and selection of options to address major policy areas including boating,
event management, access, parking, circulation and trail use.
The next public meeting on the master plan is scheduled for Wednesday, April 7, 2010
from 5:30 to 8:30 p.m. at the Calvary Bible Church, 3245 Kalmia Ave. The purpose of this
meeting will be to gather input from the general public and reservoir stakeholders on the
preliminary policy options. City Council will have the opportunity to discuss the policy options
WRAB Agenda Item, Page 4
at a study session on Tuesday, May 11, 2010. Several additional public meetings (including
board and council hearings) will be scheduled over the next seven months to allow the public to
weigh in on the preferred options and the draft and final master plan.
ANALYSIS:
Concerns have been raised about the potential impacts of motorized boating on water quality and
public health in the reservoir and the drinking water from the Boulder Reservoir Water
Treatment Facility (BRWTF). Motorized boating has the potential to impact water quality by
introducing fuel-related chemicals to the water in the reservoir. Specifically, the two primary
water quality concerns associated with fuel-powered boating on the reservoir are:
1. Introduction of Benzene, Toluene, Ethyl Benzene and Xylene (BTEX) from gasoline.
2. Introduction of Polvcvclic Aromatic Hydrocarbons (PAHs) from oil.
The Colorado Water Quality Control Commission establishes water quality standards for state
surface waters to ensure water is suitable for beneficial uses (e.g., drinking water supply and
recreation) and treated drinking water standards to enforce the standards set by the federal Safe
Drinking Water Act (SDWA). Under the SDWA and State of Colorado Primary Drinking Water
Regulations, BTEX compounds are regulated in drinking water but PAH compounds are not
regulated. Under the SDWA, drinking water Maximum Contaminant Level (MCL) standards
and goals were developed for BTEX. The city follows federal and state water quality standards
for either BTEX or PAH compounds.
MCL standards, goals, health concerns and analytical detection limits for BTEX compounds are
listed in the table below. Method detection limits for the BTEX compounds are less than MCL
and MCL goals except in the case of benzene. Cancer causing compounds like benzene always
have an MCL goal of zero. State of Colorado Basic Standards and Methodologies for Surface
Water also identifies standards for BTEX and 13 PAHs. The surface water standards include the
MCLs and lower standards for fish consumption.
BTEX Compound Drinking Water MCLs and Health Concerns
MCL MCL Goal Surface Water Standard Method
Compound (mg/L) (mg/L) for Water Supply and Fish Reporting 2 Health Concern
Ingestions (mg/L) Limit (mg/L)
Benzene 0.005 0.0 0.0022 0.0005 Cancer
Ethyl Benzene 0.7 0.7 0.53 0.0005 Kidney and Liver
function
Kidney, Liver and
Toluene 1.0 1.0 0.51 0.0005 Nervous System
function
Xylene 10.0 10.0 0.001 Nervous System
function
lower limit of cluantitation
2 mg/L = milligrams per liter concentration.
The city's Department of Public Works - Utilities Division (Utilities) monitors Boulder Reservoir
water quality to help inform the operation of the BRWTF and to evaluate potential impacts of
recreation and other activities on or around Boulder Reservoir. Utilities monitors water quality on a
monthly basis in the reservoir tributaries near the water treatment facility intake. Monitoring includes
WRAB Agenda Item, Page 5
physical (e.g., temperature, oxygen, pH, clarity), chemical (e.g., nutrients, metals, alkalinity, organic
carbon), and biological (e.g., E. coh, algae) components. This source water monitoring is not
required or regulated. In addition, Utilities monitors finished drinking water for all constituents
regulated under the Colorado Primary Drinking Water Regulations.
In 2009, Boulder Reservoir water samples were collected for BTEX analysis prior to the boating
season, before and after the 4th of July weekend and in September, just after the Labor Day weekend.
Samples were collected just below the water surface at the following locations: 1) marina area; 2)
above the water intake structure for the BRWTF; 3) raw water influent pipe to the BRWTF; and 4)
finished (treated) water from the BRWTF.
Results of the BTEX analyses were "non detectable" for all samples collected in 2009. This means
the 2009 monitoring showed no evidence that BTEX compounds are in the water supply based on
current approved analytical techniques and detection limits. The city will continue to monitor for
BTEX compounds during the 2010 boating season.
The cities of Fort Collins and Westminster monitor for BTEX in Horsetooth and Standley reservoirs
and have detected these compounds, at times, where boats are launched. Neither Fort Collins or
Westminster detect these compounds in the surface water above their reservoir intakes or in the raw
water entering the treatment facility; so under normal boat operations, it is unlikely that Boulder
would observe BTEX compounds in Boulder Reservoir above the treatment facility intake. BTEX
compounds could be detected in Boulder Reservoir, most likely near the marina where boats launch
and engines are started. BTEX compounds are volatile and evaporate when exposed to air. BTEX
compounds also have a tendency to float, and the Boulder Reservoir water treatment intake near the
reservoir bottom provides another barrier against these compounds entering the treatment facility. If
BTEX compounds are detected, motor boat operations could be temporarily modified to determine
the source, increase monitoring frequency, and to temporarily monitor treatment operations (e.g.,
shut down or change source).
PAH can be introduced into the water from oil-burning two-cycle engine emission. PAH is
considered to be a health concern because it is a known carcinogen. The U.S. Environmental
Protection Agency has designated 16 PAH compounds as priority pollutants, but none of these
compounds are regulated in drinking water.
There is a tendency for PAH compounds to sink and accumulate in lake sediments. Currently, the
city does not monitor the quality of Boulder Reservoir sediments for any regulated or unregulated
PAH compounds due to sampling and laboratory analytical complications and the fact that there are
very few two-cycle engines in use on Boulder Reservoir. All newer outboard motor boats are four-
cycle engines and create less pollution than older two-cycle engines.
NEXT STEPS:
The next public meeting on the master plan is scheduled for Wednesday, April 7, 2010 from 5:30 to
8:30 p.m. at the Calvary Bible Church, 3245 Kalmia Ave. The purpose of this meeting will be to
gather input from the general public and reservoir stakeholders on the preliminary policy options,
including options for motorized boating policy. City Council will have the opportunity to discuss the
policy options at a study session on Tuesday, May 11, 2010. Several additional public meetings
(including board and council hearings) will be scheduled over the next seven months to allow the
public to weigh in on the preferred options and the draft and final master plan.
WRAB Agenda Item, Page 6
ATTACHMENT 2
BOULDER RESERVOIR MASTER PLAN VISION AND GOALS
Vision for the Boulder Reservoir Area:
Recognizing that the Boulder Reservoir is first and foremost a source of clean water and
valuable natural resources, the community envisions a reservoir where high quality and
appropriate recreation activities are managed and sustained in a manner consistent with
preserving and enhancing the environment.
Goals for the Boulder Reservoir Master Plan:
1. Balance multiple city goals in the sustainable development and use of the reservoir area
including:
• Waste reduction;
• Carbon emissions reduction;
• Water conservation; and
• Reduction of single occupancy auto trips, encouragement of alternative transportation
options and management of parking.
2. Provide for a range of high-quality recreational uses, events, facilities and services that
support the local community.
3. Identify sensitive wildlife and plant species and protect, enhance and restore their natural
habitat.
4. Develop and implement strategies and partnerships to reduce and manage the risks of
aquatic nuisance species infestation.
5. Identify and minimize water pollutant sources from recreational uses.
6. Promote and support the safety of visitors to the reservoir area.
7. Develop and implement a business model for long-term sustainable management of the
reservoir area, including the use of public/private partnerships.
8. Endeavor to be a good neighbor to adjacent properties.
9. Promote visitor and community awareness and stewardship of the reservoir through on-
going education and outreach.
10. Ensure the security and maintenance of the facilities and infrastructure in the reservoir
area.
11. Collaborate with other agencies and departments to effectively leverage resources to
accomplish mutual goals.
WRAB Agenda Item, Page 7
ATTACHMENT 3
BOULDER RESERVOIR MASTER PLAN PROJECT
PRELIMINARY MANAGEMENT AREAS
What are Management Areas?
Management areas are land use categories that identify key objectives and permitted uses for
different areas around the reservoir. They are based on the physical opportunities and constraints
of the study area. The primary purposes of a management area approach are to create: 1) a
common understanding of the priority uses and management objectives for each area around the
reservoir, and 2) a framework for developing and prioritizing strategies for facility improvements
and service delivery.
What is Passive Recreation?
Passive recreation is defined as non-motorized activities that:
• Offer constructive, restorative, and pleasurable human benefits that foster an appreciation
and understanding of the natural environment and its purposes
• Do not significantly impact natural, cultural, scientific or scenic values of the land
• Require only minimal facilities and services directly related to safety and minimizing
passive recreational impacts
Examples of passive recreational uses include hiking, dog-walking, bird watching, bicycling
(non-motorized), and horseback riding
What is Active Recreation?
Active recreation is defined as activities that require infrastructure or built facilities, or do not fit
the criteria for passive recreation.
Examples of active recreational uses include boating, softball, tennis, and volleyball.
WRAB Agenda Item, Page 8
t~ Open Space and Mountain Parks
IVI
Open Space and Mountain Parks 1B
Coot Lake
I
t hOr ~ T m Watsbn~~
l Park I
North
Dam '
Boulder Reservoir
r
.West Shore
6Zrg St.
ter Treatnient t
3
} Facility
South
South 1Sh~'
t Danz r
i
kSub.ivisian. _
13 *
UICCG~
South Shore - Active Use Area
Management Emphasis:
• Provision of high quality facilities and services to support a diversity of water and land based
recreational uses
• Provision of facilities and services for large and small, public and private organized events, outdoor
entertainment, recreational programs and camps.
• Management of aquatic nuisance species inspection program
Recreational Uses:
Picnicking, swimming, motorized and non-motorized boating, running, biking, special events, programs and
camps, skydive landing, fishing, commuter bike route, volleyball courts, food concessions, public
restrooms, playground, horseshoes, group shelter, ropes course, boat inspection and boat storage, and
outdoor performance venues.
North Shore/Coot Lake - Passive Use Area
Management Emphasis:
• Balancing increasing levels of passive recreational use with wildlife habitat and resource protection
• Maintenance and enhancement of trails, trailheads and other facilities to support passive recreational use
and adjacent multi-use trail system connections
• Protection and enhancement of sensitive wetland areas
WRAB Agenda Item, Page 9
Passive Recreational Uses:
Hiking, running, biking, horseback riding, dog walking, wildlife viewing, picnicking, public restrooms,
fishing and access to a potential Lyons-to-Boulder regional trail system
North and South Dams - Limited Use Area
Management Emphasis:
• Provision of a pedestrian and bicycle link between the north and south shores
• Support for the security of the water utility and fire training facilities
• Management of access to the South Shore recreational facilities
• Road access for permitted special events
• Protection and enhancement of wildlife and wetland habitat areas
Recreational Uses:
Pedestrian and bicycle trail connection, fishing and wildlife viewing
West Shore - Habitat Conservation Area
Management Emphasis:
• Protection, enhancement and restoration of wetland, grassland and aquatic habitat
areas and functioning ecological systems
• Protection of nesting areas for bird species of concern
• Protection of drainage areas to minimize water pollutant sources
Recreational Uses:
Wildlife viewing, fishing and aeromodelling
Tom Watson Park - Active Use Area
Management emphasis:
• Provision of high quality facilities and services to support active and passive
recreational uses.
• Management of wetland and prairie dog habitat
Uses:
Softball, volleyball, tennis, hiking, bicycling, picnicking, group shelter, basketball,
pottery kiln, playground, handball, parking, group and special events, public
restrooms, storage building and prairie dog conservation
VVRAB Agenda Item, Page 10
ATTACHMENT 4
HOW STAFF PROPOSE TO EVALUATE OPTIONS
1. How does each option help to achieve the city's environmental, economic and
social sustainability goals?
2. How does each option help to achieve the vision and goals for Boulder Reservoir
Area?
3. What are the impacts to capital facilities and infrastructure of each option?
(relative to capital needs identified or planned under current master plans)?
4. What are the services or operating needs resulting from each option?
5. What additional facilities and services would be needed to meet current service
standards under each option?
6. What would the cost of those added facilities and services be and would current
revenue sources adequately pay for those facilities?
7. What are the impacts to other existing or planned services (transportation,
utilities, police, fire, open space, etc.)?
WRAB Agenda Item, Page I I
ATTACHMENT 5
BOULDER RESERVOIR MASTER PLAN PROJECT
BOATING POLICY OPTIONS
Objectives for Boating Policy
• Provide for a diversity of water-based recreational activities
• Balance water quality protection with boating opportunities
• Reduce risk of Aquatic Nuisance Species (ANS) infestation
• Manage visitor conflicts and ensure safety of all visitors on the water
• Protect sensitive aquatic and wetland habitat areas
Strategies to Meet Objectives
• Limit types of watercraft and engines allowed
• Limit number of boats on the water at any one time
• Balance "no-wake" and "wake allowed" time periods and locations
• Control watercraft access
Option 1: Status Quo
No limitation on engine size
Current "No Wake" periods:
o Tuesdays, 5:30 am - 10:00 am (city adaptive ski programs)
o Wednesdays, 5:30 am - 9:00 am
o Thursdays, 5:30 pm - 9:00 pm
Limitations on number of motor boats on the water at any one time at discretion of
staff based on:
o Safety
o Weather
o Programming or other events taking place
Option 2: Limitations
Limitation on engine size: Maximum 500 hp
Limitation on number of watercraft
on water at one time: Maximum 20* - Class I watercraft
(No limitation on all other watercraft)
*roughly equivalent to one boat/ 15 ac of surface water
Limitation on size and type of
watercraft allowed: Class A and Class I watercraft only
Motorized Personal Watercraft prohibited
- except Lake Patrol and City programs
- current permits grandfathered in
WRAB Agenda Item, Page 12
Additional "No-Wake" periods added to current
Expanded "No-Wake" zone into jet ski cove
Option 3: Prohibitions
Either:
• All watercraft
or
• Fuel-powered watercraft only
Under All Options...
• No refueling on the water
• No watercraft launching from the North Shore
• No watercraft in Coot Lake (including belly boats)
• Water quality monitoring thresholds
• Phase out of two-stroke engines that do not meet current EPA exhaust emission
standards (Two-stroke engines that meet EPA standards would be permitted)
• "Jet Ski Cove" eliminated and "No Wake" area at Dry Creek inlet expanded
WRAB Agenda Item, Page 13