HomeMy WebLinkAbout8 - Fourmile Canyon and Wonderland Creek Major Drainageway flood mitigation planning update CITYOFBOULDER WATER RESOURCES ADVISORY BOARD AGENDA ITEM MEETING DATE: August 17, 2009 AGENDA TITLE: Fourmile Canyon and Wonderland Creek Major Drainageway flood mitigation planning update PRESENTER/S: Kurt Bauer, Engineering Project Manager Bob Harberg, Utilities Planning and Project Management Coordinator EXECUTIVE SUMMARY: The purpose of this agenda item is to provide an update on the Fourmile Canyon Creek and Wonderland Creek flood mitigation planning effort including current staff recommendations. The Major Drainageway Phase A plan, prepared by Love and Associates in June 2007, developed, evaluated, and recommended flood mitigation conceptual-level alternatives along both Wonderland and Fourmile Canyon Creeks. The work was jointly sponsored by the Urban Drainage and Flood Control District and the City. The report recommendations have been reviewed through an extensive public involvement process. Based on feedback from the public involvement process, staff believes there is general concurrence on the flood mitigation approach for all stream areas with the exception of Wonderland Creek between 26th St. and Foothills Parkway. In this area there are questions regarding the following two approaches: 1. Containment of the entire 100-year flood flows at public expense, thus mitigating all potential property damage due to the 100-year storm event 2. Containment of the high hazard flood zone at public expense, coupled with voluntary private financing of floodproofing private property owners' structures. Staff has evaluated these approaches as summarized in this agenda item, including staff's preliminary recommendations, and is seeking WRAB input and feedback. AGENDA ITEM # 8 PAGE 1 BACKGROUND: The Phase A study area includes the Fourmile Canyon Creek floodplain from the mouth of the canyon to its confluence with Boulder Creek and the Wonderland Creek floodplain from downstream of Wonderland Lake to its confluence with Goose Creek (Figure 1). The study identified reaches of Fourmile Canyon Creek west of 19`h Street where flow spills to Wonderland Creek during large events. It was determined to be unfeasible to eliminate the spills and as a result, all future mitigation measures along Wonderland will be sized to convey this increased flow caused by the spill from Fourmile Canyon Creek. A broad range of alternatives were evaluated along specific reaches of both Fourmile Canyon Creek and Wonderland Creek. The alternatives included: doing nothing, construction of detention facilities, trans-basin diversions, acquisition of flood prone properties, high hazard zone containment and floodproofing of structures, channel modifications to provide 50-year conveyance capacity, and channel modifications to provide 100-year conveyance capacity. Providing flood water detention and constructing trans-basin diversions were eliminated from further consideration early on because of the cost and legal liabilities associated with these alternatives. For each of the remaining alternatives, estimates of probable construction cost, maintenance requirements, residual flood damage estimates, and a benefit/cost analysis was developed. The report has gone through an extensive public involvement process including the following most recent meetings: ■ Greenways Advisory Committee (September 19, 2007) ■ Public Open House (September 27, 2007) ■ Water Resources Advisory Board (October 15, 2007, December 17, 2007, and January 28, 2008) ■ Planning Board (February 21 and March 20, 2008) ■ Public Hearing with City Council (November 10, 2008) ■ City Council Special Study Session (April 28, 2009) In January 2008 WRAB passed a motion with a 4-0 vote to recommend approval of the Phase A plan as modified by staff with the following recommendations and guiding principles as this project continues to future phases and more detailed concept design: 1. Protect life safety by addressing structures in the high hazard zone through: a) Acquiring properties from willing sellers b) Constructing flood improvements at time of redevelopment of properties along Fourmile Canyon Creek west of Broadway and Wonderland Creek near 30th. c) Constructing high hazard zone containment and other improvements as funding is available, including coordinating with the county on expediting improvements located jointly in the city and county. 2. The intent of the overall approach is to minimize disruption to private property and riparian areas. This implies that flooding during 100-year events will not be contained in a channel minimizing impacts to downstream properties. Many AGENDA ITEM # 8 PAGE 2 3. During the next phase all potentially impacted properties and persons including students and parents should be notified of proposed approach and tradeoffs of minimizing property impacts versus the potential for flood damages. 4. Public education of flood risks should be emphasized including signage and flood markers and response plans for impacted schools. 5. Opportunities for facilitating and encouraging private flood proofing should be explored. 6. Continue to maintain high level of public involvement and feedback. 7. This non-structural approach requires active regulatory flood plain management in order to preserve flood conveyance areas. On April 28, 2009 staff presented information to City Council during a Study Session to address issues raised during the November 2008 public hearing. Council members generally expressed support for the approach to flood mitigation planning and felt that existing policies were appropriate, with the following comments related to the Phase A report: ■ The current approach to flood mitigation should continue and is mostly in the right direction. ■ Consider doing the least amount of work necessary with the structural improvement approach to mitigate flood hazards. ■ Flood mitigation work proposed along Fourmile Canyon Creek east of 281h should be reconsidered and possibly scaled back. ■ Alternatives that leave drainageways in their natural state should be a priority. ■ Mitigation measures should be kept as "green" as possible, i.e. minimize use of asphalt and concrete. ■ The need to disturb natural areas for the benefit of a few homes was questioned. ■ Removal of structures from the 100-year floodplain was questioned if the removal/mitigation was only to reduce property damage. Focus removal efforts on structures in the high hazard and conveyance zone. ■ City council members requested that proposed mitigation costs be presented to distinguish the cost of containing high hazard flood flows versus containing all 100-year flood flows. ANALYSIS: Council's comments can be summarized through the following key issue - should the City implement high hazard containment and floodproofing or construction of a 100-year channel system? This key issue relates to three remaining stream reaches, all located along Wonderland Creek. The reaches still under evaluation are located between 26th Street and Foothills Parkway as shown in Figure 1. The existing floodplain is extensive in this segment of the creek with 111 structures (417 individually owned dwelling units) located in the 100-year floodplain and 24 structures (181 individually owned dwelling units) located in the High AGENDA ITEM # 8 PAGE 3 Hazard Zone. Annual premiums are just over $154,000 to insure structures within this reach. Estimated potential flood damages averaged on an annual basis exceed $2.6 million. Figure 2 graphically presents existing conditions. Figure 3 graphically summarizes the HHZ Containment and Floodproofing alternative for this stream segment. This alternative includes: ■ Construction of an overflow underpass and associated channel at 281h Street ■ Channel modifications to reduce the high hazard zone from Kalmia Street to the Diagonal and upstream from Foothills Parkway ■ Four new culvert crossings ■ Separation of Wonderland Creek from the Boulder and Whiterock Ditch This alternative would remove all 24 structures currently in the high hazard zone at an estimated public cost of just over $9.5 million and a private cost of $6.8 million. The private costs reflect the cost of property owners to floodproof their structures. Figure 4 graphically summarizes the 100-year Channel alternative for this stream segment. The alternative includes: ■ Channel modifications along the entire reach to provide adequate conveyance for the 100-year flows ■ Eight culvert upgrades or replacements ■ Construction of a bridge underpass and overflow channel ■ Separation of Wonderland Creek from the Boulder and Whiterock Ditch This alternative would remove all 111 structures from the 100-year flood hazard at an estimated public cost of just over $19.5 million. The following presents a comparison between the two alternatives. 100-Year Containment HHZ Containment and Floodproofing Cost $19.5 million public $9.5 million public $0 rivate $6.8 million private Damage Reduction $3.8 million (HHZ only) (present worth) $66 million $54 million (voluntary flood roofin Removes all structures (111) from Removes all structures (24) from Structures 100-year flood hazard HHZ Zone. 61 structures remain in 100-year flood lain Maintenance Costs $1 million $1.7 million Insurance Premiums $154,000 annual savings $69,000 annual savings 0.4 (HHZ only) Benefit / Cost Ratio 3.4 3.6 (HHZ and voluntary floodproofing) Staff conducted a more detailed evaluation of the alternatives to identify the cost of proposed flood mitigation measures in relationship to the specific benefits of structures and dwelling units removed. Attachment 1 and associated Figure 5 present this analysis AGENDA ITEM # 8 PAGE 4 for the High Hazard Containment alternative. Attachment 2 and associated Figure 6 present this analysis for the 100-year Containment alternative. Staff conducted an open house on Wednesday, August 5 to solicit public input on whether to recommend high hazard containment and floodproofing or 100-year containment for Wonderland Creek reaches 5, 4, and 3. The meeting agenda is as follows: ■ 6:30 - 7 p.m. open house ■ 7 - 7:30 p.m. presentation ■ 7:30 - 8 p.m. questions ■ 8 - 8:30 p.m. open house The open house included large-format figures graphically presenting existing conditions, HHZ Containment alternative, 100-year Containment alternative, and a comparative listing of differences between the alternatives. Staff were available to discuss the alternatives, answer questions, and document comments. Following the initial open house session, staff used a PowerPoint presentation to provide a summary of the planning effort, present the alternatives, and provide a summary comparison. A question and answer period followed the presentation. A final open house session concluded the meeting. Citizens were encouraged to provide comments either to staff or on comment sheets. Staff will provide an update on the outcome of the public open house that was held on Wednesday, August 5. PRELIMINARY STAFF RECOMMENDATIONS: The staff preliminary recommendation is a modified 100-year Containment alternative for Wonderland Creek between 26th Street and Foothills Parkway. The following describes the recommended modification. The 100-year Containment Alternative includes a new bridge and channel modifications between the downstream side of the Diagonal Highway and the upstream side of Iris Avenue. These features have an estimated cost of just over $3.3 million. These proposed features would remove one commercial structure from the 100-year floodplain. The High Hazard Containment and Floodproofing alternative includes a new culvert and lesser channel modifications for this same reach of stream. The estimated cost for these features is approximately $1.5 million. Under this alternative, the one commercial structure would be removed from the high hazard zone but would remain within the 100- year floodplain. The estimated cost difference between the alternatives in this section of the stream is approximately $1.8 million. Staff believes that the cost difference to remove one structure from the 100-year floodplain justifies recommending consideration of the High Hazard Containment alternative for Wonderland Creek between the downstream side of the Diagonal Highway and the upstream side of Iris Avenue. Staff recommends the 100-year Containment Alternative for the remaining reaches of Wonderland Creek between 26th Street and Foothills Parkway for the following reasons. Although at a higher public cost than the high hazard containment alternative, the 100- AGENDA ITEM # 8 PAGE 5 year Containment alternative would remove all 110 structures currently located in the 100-year floodplain. Removing structures from the 100-year floodplain will result in annual savings of approximately $152,000 on flood insurance premiums and avoid the potential of over $2 million in average annual flood damages ($66 million present worth cost at 3% interest and 50 years.) In addition, the 100-year Containment alternative does not rely on voluntary actions from the public to implement floodproofing of individual structures. The cost of voluntary floodproofing of individual structures is significant ($25-$50K per property) and will not eliminate mortgage required flood insurance. As a result, staff believes that most homeowners will not choose to implement floodproofing measures. Figures 5 and 6 and Attachments 1 and 2 show the location and itemized costs associated with the two alternatives for this segment of Wonderland Creek. The following presents a comparison between the three alternatives. 100-Year HHZ Containment Modified 100-Year Containment and Floodproofing Containment $19.5 million public $9.5 million public $17.6 million public Cost $0 private $6.8 million private $0 private' Damage Reduction $3.8 million (HHZ only) z (present worth) $66 million $54 million (voluntary $65.5 million flood roofin Removes all structures Removes all structures Removes 110 structures (111) from 100-year (24) from HHZ Zone, 61 from 100-year floodplain Structures flood hazard structures remain in 100- (one remains), removes year floodplain all structures (24) from HHZ zone Maintenance Costs $1 million $1.7 million $1.1 million' Insurance $154,000 annual savings $69,000 annual savings $152,000 annual savings' Premiums Benefit / Cost 0.4 (HHZ only) 3.4 3.6 (HHZ and voluntary 3.7 Ratio floodproofing) One commercial property would require floodproofing z Estimated based on ratio values In addition, the original intent was that once the Phase A report was accepted by Council, staff would work with the consultant to develop Phase B of the flood mitigation study. This second phase of the project would develop preliminary design of recommended alternatives. The Phase B report would be reviewed as part of the city's Community and Environmental Assessment Process (LEAP). The Phase A recommended improvements, however, total greater than $32,000,000 in public expenditures and therefore will be implemented in phases over many years. The Phase B preliminary design and the associated CEAP will likely no longer be relevant when many of the recommended improvements would be implemented, many years from now. As a result, staff will not prepare a Phase B preliminary design report and associated CEAP. Specific projects will instead be developed using the Phase A report as a planning guide. Under this approach, design and CEAP would be developed for individual mitigation projects located along Wonderland and Fourmile Canyon Creeks. An example of this approach is the AGENDA ITEM # 8 PAGE 6 Wonderland Creek Improvements Project that has begun for the reach of Wonderland Creek from Foothills Parkway upstream to 34th Street. NEXT STEPS: ■ Public hearing with the WRAB on September 21, 2009 and request for a final recommendation to Planning Board and Council. ■ Public hearing with the Planning Board - October 2009 ■ Public hearing with the City Council -late 2009 or early 2010 ATTACHMENTS: Figure 1: Location of Evaluated Reaches Figure 2: Existing Conditions Figure 3: High Hazard Containment and Floodproofing Alternative Figure 4: 100-year Containment Alternative Figure 5: HHZ Containment Itemized Cost Key Attachment 1: HHZ Containment Itemized Costs Figure 6: 100-Year Containment Itemized Cost Key Attachment 2: 100-Year Containment Itemized Costs AGENDA ITEM # 8 PAGE 7 F a iure 1: Stream Reaches in Question v = - ~ '=r ~ i` ~ t ~ ti, -~2.Yi ~.-d Grfj ~~0 F'~}.tr,:• ~ t Z r ~ ~ ~ ~ ~6 r ~i ~ iii' ~ = z -~tf~^~A~J",~.t t' G#~ti t~i!y~•'kis - i A~~ ~~drs tn' r"' S 1, St t,§~~~~ t k - t ~ ~ • ~ Iti! IJ )r -•a rj~+t~ -?•r-... jSr lt•~ i •i MBA St' - rT + v r f 1 UVI Lee Hill Stream Reaches City Limits Lf fr st r Jtly r.ty p iSe~ •.i\, 4I r ~ ` ~'+t ~ r f a y~y ~'t • ~ ~ r?a / ti I - - , tir~{~~a .~J 0. , lS~t 81/J ~ „I I ~ ~~IF k ~,•c~i yr ~1-r^v I'ta Yam,ou,r,~Av Sr I,. Greek Study Streams 1~ f !t f r t:~f 7 (7 r r = i ~.P- 'Si++f _.1 ~ }11~~~'tita~~d_yyt..r^ ~ tY•-'7' f '~g-z~ - _ r~ fft a~ V? f'y +y I.~, ?'t• 'T: ~~/,~°ir 4 .<er"+~. jCj-,r,'f, Jae~a~ iS~• •i ~1b.,J t } r ~ \ r ly i .y _ 1 f ? ~ r~ c c ~ °~~~•1 rr; nty~r ~ +f`I? 1 - E.'^^f ter- „ L t P + { !l i ~fY , 4 ;~li' , w r~_ eis3r1~ia•I tJ•~".ti4 ..r- j~. .l •j'Jt T ~ r ~ ~t 1 ty z -t! q7 ~ , GeV 5+' Et : , PT i'XN_ r 1 ri3 ~ ~ { 3s •f~.. t SI ► K r n s, . h~dk tita " rl i r + 4J r J,'~ 5 f s~rt~ 1 r{~r y ,G - J«11zy~ j~ f u t r 11t tit w. w~ . ~ ~ - ~ `iw•JC" Cj.+.c;~~4~ + , l ~ } Li ~?i/F~r,~.} ~~•.d '3A!'d~ ~v:3l~irr~? "iT -t•~S' ",'f'S ~.F~G:~•~~iJ2yr~Rd(' _ _ ~ s_ `6t1~'i • rr i 'y rr f l'' -~4G J,c fT• t ! a IlfjY~r _ ~ ~ .'~stT ^ ~,~a~ R."..F~' ' .~-•r , , :r •l~l(. t%• a tt 1~~'~t q-~j'~}~j' o`f~?i°b._~jyE~'ti t(n'~~`! , ,r2. , ~ Y.T} ~r~rq ~ e .i• rs~ 7 Yi~~ i 0 • y - Hurt' 14N+,r,+ ff ~ , 3 ! '~ri .n Y ti ~ i rR`•~"Ofrr '4~tID. y ~`{'.wc.. l,t7r - 0~or r, _ --r .S•'"'I ~r.,t+ I/r ~ i f- ~e~•S } ~i ~1 T i' r. ,r tie C'.l~.' r 7w1.y?' C ,T-{r~„e , jj I ~r ,c hl'i f~ i~.tz ~~t § '~.ph',EJ~•}f f+~ it 4~ < i~ - - 9 r tr~'1r r 'r - s,_ S fa r' +;t5~z ~,sJ.-4gr~i~i•j1 ~ ..I Ftttj ;d .c-,*r 1,.~•; ;rid{' w• F -x ,'"~1 e, r. r, .y '~,f •:-f-] I •h :v p l y f' 7 f'~`Li? a Ir~t t r;' - _ cv - - yY - ✓,-f• f .<Zt=iJ3J t., }77'' ..!u,3 1 r:-` rY f ¢ F y'Cq srva~ ^"r» f- ~.s! q' +C, 7t yT' .T t F ~~•.y~ .t ~{I 04 r~r 7, f jm~~~_Li'; .l` ;.`~ir.A rf si. ~;lh?n~ ' :A'nTac'- IY.1. •t.~v ~t 4 r~~5t T -S r :.3 'F ~~,-4; t -rrf IS RdR'y,, ~L*, ~.4 S"'" :r ' . ri'f"° - K K, x./ 4~A, t... •t~ .v iJ 1~ it 1~ {.~~~ui~t 1-'' ''n~_ • ++`s - J. A[~d ~ 7~ , rl a ,tti....tnfi ~y - r '1Gr,i i -"~-p~ 4y 1 ' -t.rw F::• ~ ~ •I ~ ~.~}4,, ! - Y ~ ,3?fiL Tt~'_ 1- M+~ y. - ,f'ir' •L^ - t ,.,r~ l ' . `,11 r ~.a . _ hl T~ y jrn -~'.i~' 172+sr*~rt*•~~''~!7; a w y csa•.', 7~ C'~~''S. ~.~.Fka,~~ ai'.,f `4+ ~ ~T ~ ~ - L ct,-t ~ 3~ , 1 . 'ii a *,F. a .G.:r ,r t+ivi.+Q !.+'.fr 'L7 • : C r - ? _ ` W r (fir x•' ° '~'4' ' - t~ +L't~(•~L ~e[ ~l~.! r' S ~ -C7r ~-rl ,T r .'2R .vai-. x . r ''s ~ 1 - X v . ,::+..x. il. i.•/J/~;iryl' b+ ,Z~ 1 r 1~"r„4.,.. } , J',vi: I 1D;~ r 1 , 4. _ b• r9 • n~l `*f~j "r"~'1?•'1 ~E7 J-y'pja(}rjd~r, f - ,~s. T ,.r. ri-r sh fjL* ' fir' yl` ~~rj^ r~ - fr ♦ r l'y \ K_ 1 71 1-S~4j>incr)• tFt?fir', 'tom.>~,`.,~'~ S~ i_ i ~lff~a',~./r•~. _ _ Ci s,~`~"P:{`-` s i y~' (tt✓ a Ste. ~ l { ".I ~ 'r ~ '~'I t ,.(f',rr,[,'rtf:'.1L"13sh1!"~/J~Is J fa~zl``L!M1a['~+v-.. jl~:+r•'tp~ rYt f., 'Tr,~-ira ~'F U1I la_r_}.L.r,. 'r~~ •S~A. - `k,1nSF.v~•I', l .~f ' ''I 'v t, ~r-Xh~ adfa f`O~~ ~1. x - `i\ 1,~a•'+ _ K _ i. • •r t I R 'aj 'i, i. C1 r, . 'S' Y.s •~'~`•S7 j ~I J Reaches 5 4 an13 ' ~ s ~{s Ili ltni ~"!'N. ~ ~ti.ayil~.n5ai~r-wf t'!~,~ r~ ~1~t1 `t y,~.FC ~~1 : ! hr - `.r ~ C C`J ,.r U? - ~ t,i J,?.;1 , C S, ~ t' `lYtlOllt' . ~j'Fe,..,.~,r.~. '•ta ,B_,;rr ,e~'.i~, r. m J= r C~it''?, ~ a¢,-; i1 ,wJ''~~~ Vp~~,.. •l~.t., I.y I' Va - - ,a e% •_1;f-'ti. 'p`vS` r.+•~r-t,:,~,taS;~•° 1 •,i:i `~;'I :''I"i-~~ y'1. 4-.I. 1~~.~ f-,..,;.rlrb~.dr:t , li ~~vF 4 f .s • - r~~' ~ s tr:.i r~.L•.z 4r ~r .C; s •f ,c Al ,~1r. :,y e r rf}.c.y. rjr I!•.•r, j7p.C.I;I~', a;f•-.~. ~r;Y_~4„ -s}, ?~3j t~. 'iC~•v_4: J:ry~( •,.~~~'ili 1, '~!^~''I., t, u„R~' ~?4rr ~•j' •4~`~i~s~"' r , i s- ark b.t tip: .3 Jlyp' i `a'iS'f!'' 1++1{.~ .CD`I.l . ~t' i1}'rt it -'!•fVa filont,Rd .r? +1~ u !ay"'`p ~Q~V (tr !•J. W'~:` " uite Mill Rd't ..rr 1"a' ~i...X' .I:~ .elill,aF'~ ,,.c:: 's _ cWAt~' 1 U ..~'?-.ns•' _ - 'r r :3i + { ~rn[y~ .~f kU'1;i 'f C. .ir Zs ;..ice} d9e*~ s56 f.'~f~i~`. 1~, sJs t e •i `t j. °`k. i.?i°s.:' :'7z - l fi- , - swa'. ftos. Ir~u ~!l11.''t~`Jd, S"r4''- -{+s7 J. "G ,r rs,F"y_'~. a'P ~7~1 C 1't: r- ~'~'.~_f I/J'~ ~I~,i h1 f`: i,..~F'l.e - { r. ~ ~r' 1 •i?. ~s, ~i~,- ~ I cy,a ,Y' I IIE3al58 R1rAVr.~~~ F.}.v~ •,t--r~ - - +'$st J ~ ~ i ~ f ~ r '1,.. _ y § 11. ~sK~.~~yl' - T" ~l ~tik '!~k _-•t'y~rV"-t~tj f~~i4 •~y~~.~ ~i~ ,c C~I~. ~TIA °~S`~= ~r ~r ~t• j,~~a~G''~r ~ti t0/' ~ - I 'c^. J~.-.~ _ t-. • ~ Fit t } Lr t ~ T ' a t ~ 2 ~ ~t ,..o..~r• ~Je.+ IC7r C-rrrrr rt, , ~r r1 { .yy l ~`S'`. ~ , ,•],CflL^'~ T 5, Q "n~"'t ~ ~•I~, ,<_i 1Sn T' i I :far `~c.c/~L ° r aY•r y t7't iF fj rat 1 ~ tM s E _~SR i' t; ~ ; ~ +L L -'t'vf 'r1 a r.+' = ~t:~ .•w.[ f ~ ~y~°" ~R •tF ~ Zar ''J 7 .f':;f,J ~'^i A•" i ~~i~„ R13 ,T~_e.~ q r 0 4 tta ~ r` ~yt E -t- ~r'• I-i,]J_/ y ~ y~~/•(/r 1 - - - - .-~dT.,.: ?'.k'+_I:.:. ~✓3":_ .~.al~~ ::~_r,nf:;s`':•R'~iN~y~t9. r''•v,.r1.CJ~ ~"•-r ~ti~t 'y'-..~ rL r: _J ~ •IT~'r~! ~i r~t4 _ - _-'.•~iEK:61~ +-Y-' _-5+--~~I ,n ~ / :2 is .i~_ .a. ~ Figure 2: Existing Conditions Pea 0 4~±!' r f Ia ` x_11 sir ~c~~_ar"~s ~~erIt~olair ri~" ,Noritiood~A eA °L1 , K 24 Structures (181 units) in High Hazard Zane rJ'~•~S~r~:t• ~ ~ ~ ~ •i1~ ~ ~~Palo~ Parkway - , - = I t .t K-4" '4':'r 'iu j"` e'` ' ~r Sri '6"~`t~ll, r WWO ~k 1T i. S~~~..1~+`i-f ~'~.~T-„I~I~~. M. ~ ~,•L 4 rJ r.~~~yTtj(y(~ .r-: =Y~v ri}.•}.. ~ - ~ }1 r~ , % _rU ' I[ f ,Y'_7 f. 'i" ' !5~ fr'• rt 1 [ C , Y p f . A rf' s "rnn FF n. •'~l~Q Iy: ~r ` 4; ` + N + 1. ~ ~ - J. ~?U~ , . r` Y-1 ~ i •P' ~ ~ ~I ~ ~ ~1~~+`i V.+Ir. T=~' j,IP ',;'17C~. ~ rr "1~ ',~►r ' t . L;' ~ ~ s•: ~.~*w~,-•. i s' ~ + gip'. + ~J R.,~ X _ r"':' sue' .+1:+q -'y •ti _ ti F 1 . • t - °S•± r' t ~~'•sj~+'!'~ J, tf ! ~ j. l _ ft ~ C7 t" • ~ t c . ~ - 1 ~ ~ ~ '''~.r~ ~ft J r j / F• ~ •y ~ r" ~ j r•~ w •.'r- " r": ~ rr~ l SRI ter- ~ i • 1~rz71~ ~ i' .!F^!'t?~~~~y ~n 'y »f , +t~JiE+ R F, r i " ~ 4, y o - LF •~c' t ! t t~ 1=~ 16 1''t 4"' ` a~- t a'••, _ ~I t p 7"~% s a [r~s .~;y - A w; ! q x r, + f J j • ~ r. ' '.t' C rj~`a ~t1'I.~: .M j- - !a r Qjs, t~. r + • Jr r ~j{~ f _J••J+JJ {r~ .p .r i, Kafm a,Av ~ x~`•''`..'1'1 w a, r` r _ - ~ ~ t e-1 r L/ S``. ~ QiagonalM. HigfMay ON2 1. ' 1-_x `4,'fl l;t~,~~ ~ Z• C~ ,-1~ + `T t 1 'I~ ~l• ~ ~ ~Ro .fit'>{s •r~s f-°~J• 1~.~..~.'.t ~ ii~l~~'- - ~ 1t' - t(~~ ~ 'ice -t!~ n. ~r+~S i_ I r iI e ••~I tq,Ti~` f ~ ~ ">r.++`,,~,i ~ { r/' „r ~.a ij ' s.v r' 4 _ ~ ~ 1' :i1 ~;,,1{ ~jy~-~1 ~ 'Y 7'~r ~G' ~ i 1 r c"a. - a . `3t~ksC• itr' • . *f3e•r ,I _ _ '`il , v++r..r~, 7'ii!.5_t +.~?Jltar7 ~ ' Y. a ~I ~ l x :C 177 Iris ° Ir j~' .,~M. } ' t +-r-: r~• t ':1--1 ,f 4 y •'4 - _ _ r}- Ir . t. ,,,../t' ,"a4• +r t• %`R'1' y-• !j 1!1*'O. re ,`'t .q. - C L'i -y~•! 7Cr-100-Year Floodplain High Hazard Flood Zone , + Structures in Building Located in "-`s 1~ : 4rlL " Stream Reaches r, Flcodpiain High Hazard Zone 'Y' ` I ` r I1 nth! t~ r ' f1'•w •g Y ~T, t/t. t y~ ti y •4}Q ~r~ '~.a h'~,' • p 'y(Tj 1 'J Figure 3: HHZ Containment and , Floodproofing Alternative Llmr yz sue} : h I _ :A structures remain i 1, 00 y e f 11110,0 :!:t~ Norwood+Ave 50 removed) ..<syr/:-', jq. f( stnu ture~Y ;24) p_ ,-~r~~!ec from High Hazard y 4M ~ °4 m' it 4 6`~i ~G xS`n psi ~ r y r $6.8 million '"(vate c +R ~.~-U Y. • t~•'-_Y~,- .r ~ ~~-.r. 't- ; ~ ~ ti - ~ • j, ~~r. ff)j ~ - I~RRY . i '`e .p6 N '~~1 K ~VV Y'/ 'fin. `.,3~ ate s•~s ¢ J ` I ~ Y I M 1 IM s ~Y •n Y\ Y - E. . - - ` 1 LJ 1 t i 6 f.4' • i O V E I low . ~\.n~ i~ '~-'~~'1'tr~ 1 1 .L- 1 I ~ T." . - I J J.'7~Y p r l J,,i 11 ~~~±if' y ~rr,•~,.- i .r `•Fc Af .i~'L~ I ' .f" t.'R'fl, b'!.•` s ~I r• t' Xr' ,A:Cr L' fa- 3 1 ~y ~x t. ~~~-'-y It ~10_ i' 4;\~~ Er `9.►f f ry 1 ' ~ f '"j ~ew~a" •,,v' ~4~ ~s '1 ?it' 4t ~~R. a +,t.r. z•,vi°-~'.fc ai Aver,_. _ -i++a t • 'r~4~•~~~r~.~t'r.s *41 -}may. - j'i s . s. ~ r '^'W, ~i •+"iYll•►w' • ".~~irr^.35~~£r._ ~sr - •~j r ~ _ pp 1 p / s Ca. ~1~'. ~ ;c ~~•r`~r_.t ~ ` ~ ~f,"t•~+_gL',I t~ 4_ Y S r,,cJP~~w • ~...dCs ~ P7C. -e- `.^'r .L .r~ ww - .~.i i~~'7~"., 'L~__ _-f Y tf tyt r.'r~ ref' r~ ~.b _ _ - Dtagona! Highwa mom, vr- : , 1•'a ,I, !k ytv } y-~'^,-Fi'# .F _'7 i F 100 Year Floodplain High Hazard Zone' *R- Iris f ~ New Crossing Stream Reaches 1• • F^ T z Structures Removed from HHZ Zone XStructures Removed from 100-Year Floodplain ' . ~ ~--~~s ! a~~iUT ..sa i.. l Sti'1i~L~ F'i ure 4: 104- Year Containment AI ternative ll.. t 44Y' r, .ter I l:~ a, % d p y S,,.I P c S o s lri I. •1 ■ r~ ~ E ~ 1 0.A L~ h~9 ~ 1 I~ ~ Y 1 1 '~.J~ ~ ~ ~ C-'V I i i .b ~J i,/ - ~ ~ ~a, i l ~i ~ ;~.9 ~ ~ ~ 7 3 z y r-cl ee_ , ` (111) and High Hazard Zone (241 l ' ~Y _ -.~._wa!v_?'~y'~ ■ `19,5 illio Pula , ~ F a_ i1-r r'• ~rC . ~ y ~ ! ^.T~. 1 ~ ~ 1/'~r~~ 'tf : Yom`; wJ •t . r t ,•i , ~r_ .,f s x;57.- r - ` t i. vk'~ ~~~~~~L 'i^.11~~ e ~ 4 r, Y ~ 9 X ~ ~f r ' 1. ° - e'~ -yy~' {s 9 ..~'#..a. f {.••I,e , Pi+ -3 --1 - ''~"'•i+- d' r '`!L Y.F+r.~.+-.i~ ~'77, f; r rrjl~- F. d L~{~ .k 1,,; ail ~f.1 * 5,ra;~ C~ k t'• i,YJ t 4.. r. t i rh W.J l 'f~•I JF' y"J. f ' ' k' :i ev bw. tom,. 'i ---Avenue _r..r.._ ) «lll y , , . _ , y~~ _ _ya 6_ f y q F7 r r .'!~-t•'. . "7'ry f;'tif1~~'flMl!~~ M._.~'..~ '•'r ~L.r~~ 6. c. 4>. ~1 ~.7~ :LA?. rc " - + ~i~P~ ti'~\+q I 1 < 3~tl r f~ t7 + s~:~•irr~~ j ~py''7~'it_~ ~``.5~`' ~ ~ J? -~w,~;, f a I ' I ~ .w~^.~ _ . - ~i • II .'A~ ^~y ±t .G Diagonal,'II way ~ Mir 4~t ` , ! V - t i iiyn/ "-sue r T I4 100-Year Floodplain and High Hazard Zone ar• x~ 1 ~~V!!//+ 91'q' r 'r riF+.~ ~:'s~ys:t..arw ~.a3t' =~rIS~~;+. '..j--'. ~ Stream Reaches - t Structures Removed from High Hazard Zone a F (?,,.~'-'Q I "'w` t , T, ~('+''t~`~~ rK4t~' ~1 _ as d . ,v - -'I , J ' f °".l - Structures Removed from 100-Year Floodplain = i,~ _F,, a.T~ ' ~y~ _V1/ C.Llll~~i`~ ~ ( r _ ~1 ail New Crossings ?y~ # .~a. ;p `~3t ' ' 1' t - - .•1...11.- y ~ liJ r.~rr~~~.~)IS~~~ y 16 F 0 iure 5: Wonderland Creek HHZ Containment Cost Key 1 Norwood Ave Numbers refer to specific 1. L - 7T in o Proposed system upgrades Itemized on Attachment 1 e_ 2,3 C1. ; O Kalmia Avenue -J cok - - 4 I ~ 13-15 Diagonal Highway c . Y 9 a o I fS 1 100-Y ear Flood lain Hi h Hazard Zone Ir P 9 k New Grossin 9 Stream Reaches - Structures Removed from HHZ Zone IN ! 1-2 ~ }a! r, i- • ,et e, ~T Structures Removed from 100-Year Floodplain d T 1E +~r rmt~7p 41M - - - _ I 111 _ + a ! 7 Figure 6: Wonderland Creek .r 100-Year Containment Cost Key r ~ 1 Norwood Ave + . iR ' 1. I Numbers refer to specific 4)5 Proposed U x. system upgrades - - Itemized on Attachment 2 N _ r •r .9 0 - mI .N Kalmia Avenue - - _ _ 12-15 Y > a 6-w Pii TIl, t7-7 '-1-;I Diagonal Highway /r NET[- FT T 7 -2325 0 W / 21 - _ 100-Year Floodplain and High Hazard Zane L 221 I f Iris; Stream Reaches L it - Structures Removed from High Hazard Zone `i7 - structures Removed from 100-Year Floodplain y S-4~ - New Crossings - - - I' ( [pG1 26 _ 27 % ,28 Wonderland Creek Reaches 5, 4, 3 Attachment 1 Comparison of Alternatives 100-Year Channel Alternative Reach Item Item Raw Cost Contingency Total Removed from 100-year Flood lain Location Number Item Location Crossing Channel Wetlands Drops ROW Subtotal (40%) Cost Structures Dwelling Units 26th to downstream side of 28th 1 26th $747,600 $747,600 2 Winding Trail $560,700 $560,700 3 26th to Winding Trail $532,586 $532,586 4 Winding Trail to 28th $105,172 $105,172 5 Winding Trail to 28th $110,000 $110,000 6 26th to 28th $126,740 $126,740 7 26th to 28th $509,800 $509,800 8 28th $407,400 $407,400 1$3,099,998 $1,239,999 $4,340,000 51 146 Downstream side of 28th to 9 28th to Kalmia $465,528 $465,528 downstream side of Kalmia 10 28th to Kalmia $294,650 $294,650 11 Kalmia $77,700 $77,700 1 $837,878 $335,151 $1,173,000 0 0 Downstream side of Kalmia to 12 Kalmia to Diagonal $2,340,000 $2,340,000 Diagonal Highway 13 Kalmia to Diagonal $100,000 $100,000 14 Kalmia to Diagonal $168,290 $168,290 15 Kalmia to Diagonal $294,650 $294,650 16 Modify Ped Bridge $150,000 $150,000 17 Fire Access $541,800 $541,800 1$3,594,740 $1,437,896 $5,033,000 17 97 Diagonal Hwy to downstream side 18 Diagonal Hwy to Iris $307,331 $307,331 of Iris 19 Diagonal Hwy to Iris $70,000 $70,000 20 Diagonal Hwy to Iris $371,200 $371,200 21 Bank Bridge $1,633,800 $1,633,800 22 34th and Iris $2,520,000 $2,520,000 1$4,902,331 $1,96D,932 $6,863,000 10 47 Downstream side of Iris to 23 Iris to Foothills Parkway $507,451 $507,451 Foothills Parkway 24 Iris to Foothills Parkway $82,660 $82,660 25 Iris to Foothills Parkway $371,200 $371,200 26 Spring Creek $94,500 $94,500 27 Railroad $396,900 $396,900 28 Ditch crossing $25,000 $25,000 $1,477,711 $591,084 $2,069,000 33 97 Grand Total $19,478,000 111 387 Attachment 2 Wonderland Creek Reaches 5, 4, 3 Comparison of Alternatives HHZ Containment I Floodproofing Alternative Reach Item Item Raw Cost Contingency Total Removed from 100 year Floodplain Location Number Item Location Crossing Channel Wetlands Drops ROW Subtotal (40%) Cost Structures Dwelling Units 26th to downstream side of 28th $0 $0 $0 $0 6 47 Downstream side of 28th to 1 28th $407,400 $407,400 downstream side of Kalmia 2 28th to Kalmia $237,696 $237,696 3 28th to Kalmia $161,000 $161,000 1 $806,096 $322,438 $1,129,000 0 0 Downstream side of Kalmia to 4 Modify ped bridge $150,000 $150,000 Diagonal Highway 5 Modify fire access $541,800 $541,800 6 Kalmia to Diagonal $240,000 $240,000 7 Kalmia to Diagonal $83,400 $83,400 8 Kalmia to Diagonal $161,000 $161,000 11 $1,176,200 $470,480 $1,647,000 9 15 Diagonal Hwy to downstream side 9 Bank culvert $655,200 $655,200 of Iris 10 34th and Iris $2,520,000 $2,520,000 11 Diagonal to Iris $115,752 $115,752 12 Diagonal to Iris $280,000 $280,000 1$3,570,952 $1,428,381 $4,999,000 4 46 Grand Total Downstream side of Iris to 13 Iris to Foothills $70,500 $70,500 Public Cost $9,501,000 Foothills Parkway 14 Iris to Foothills $86,800 $86,800 15 Iris to Foothills $280,000 $280,000 Grand Total 16 Spring Creek $373,800 $373,800 Private Cost $6,815,004 17 Railroad $396,900 $396,900 18 Ditch Crossing $25,000 $25,000 Total all 1 $1,233,000 $493,200 $1,726,000 31 97 Costs $16,316,000 50 205