HomeMy WebLinkAbout7 - Peer Review Costs for 2010 Budget Development CITY OF BOULDER WATER RESOURCES ADVISORY BOARD AGENDA ITEM MEETING DATE: April 20, 2009 AGENDA TITLE: Feedback on Peer Review Costs for 2010 Budget Development I PRESENTER/S: Joanna Crean, Public Works Administrator 6 EXECUTIVE SUMMARY On October l7, 2008 the American Water Works Association (AWWA)/ Water Environment Federation (WEF) peer review of the Utilities water and wastewater operations was completed. A report was provided to WRAB and staff which identified both strengths and opportunities for improvement. Staff has been working with WRAB on the guiding principles and prioritization method for developing an implementation plan. An initial prioritization of the opportunities for improvement was presented to WRAB at the Jan. 12, 2009 meeting. Feedback was incorporated and a proposed implementation plan was distributed to City Council in a Weekly Information Packet (WIP) memorandum on April 9, 2009 (see Appendix A). At the April 20, 2009 WRAB meeting, staff will ask WRAB for input on the proposed implementation plan as outlined in the W1P and feedback on the refined cost estimates for Tier 1 and Tier 2 items as summarized in Appendix B. This information will be incorporated into the draft 2010 budget which will initially be discussed at the May VI AB meeting. SPECIFIC ITEMS FOR WRAB'S CONSIDERATION: As WRAB reviews the prioritization information in Appendix A and B, please consider the following questions: 1. Does WRAB need any additional information about the peer review? 2. Does WRAB have any questions related to how the peer review factors into the 2010 budget? 3. Does WRAB have any other ideas for funding options (as outlined in Appendix A) beyond the 0 percent (reduce fiscally constrained), 3 percent (fiscally constrained) and 5 percent water/6 percent wastewater/ 3 percent stormwater (action plan)? NEXT STEPS Staff is currently in the process of further evaluating some of the opportunity for improvements in order to determine the capital investment needed to implement some of the items. For example, further automation of treatment plant operations to reduce ongoing costs and achieve a reduction in staffing may require an investment in instrumentation and telecommunications equipment. Once the financial impact is better understood, staff will complete the cost analysis to determine the feasibility to move forward with these items. This information will be presented to WRAB during the second quarter of 2009 as part of the 2010 budget discussions. Alternatives AGENDA ITEM 4 7 PAGE ] will be discussed with respect to funding, including future rate impacts, and the feedback will be incorporated into the 2010 budget. Cost estimates for Tier 3 items are anticipated to be discussed with WRAB in 2011 as part of the 2012 budget process. ATTACHMENTS • Appendix A: Weekly Information Item to City Council - Update on Utilities Peer Review Implementation o Attachment A: Fiscal Impacts and Community Sustainability Assessments o Attachment B: Guiding Principles for Prioritizing Opportunities for Improvement o Attachment C: List of Tier 1 Opportunities for Improvement Items • Appendix B: Surnmary of Refined Cost Estimate of Prioritized Tier I and Tier 2 Opportunities for Improvement Items i AGENDA ITEM # 7 PAGE 2 APPENDIX A: WEEKLY INFORMATION PACKET MEMORANDUM To: Mayor Appelbaum and City Council Members From: Jane S. Brautigam, City Manager Stephanie Grainger, Deputy City Manager Maureen Rait, Executive Director of Public Works Ned Williams, Director of Public Works for Utilities Joanna Crean, Public Works Administrator Date: April 9, 2009 Subject: Information Item: tJpdate on Utilities Peer Review Implementation EXECUTIVE SiJMMARY: In response to the recommendations of the Blue Ribbon. Commission, department and program reviews are being conducted to comprehensively evaluate the use of public funds. A peer review of the Public Works Department's Utilities Division (water and wastewater) was conducted by the American Water Works Association (AWWA) / Water Environment Federation (WEF) and completed in October 2008. The peer review report identified areas of strength and opportunities for improvement. Staff and the Water Resource Advisory Board (WRAB) have been working together to prioritize the opportunities for improvement to develop an implementation plan. The prioritization information will be used with the Utilities business plan to develop the 2010 operating budget and capital improvement program. The intent is to minimize a utility rate increase for 2010 and achieve ongoing savings. This may require additional one-time capital investments combined with potential reductions in services and programs. BACKGROUND: AWWA/WEF (provided through QualServe) conducted a peer review of the Utilities Division and submitted a final report to the city. (For the full report, visit www.boulderwater.net and click on "What's new with Boulder Utilities.") The peer review of the water and wastewater operations included a 420-question self-assessment survey that, in part, created the basis for a week-long peer review of the water and wastewater utilities. The Peer Review Team, composed of four volunteer utility professionals from across the country, toured the utility facilities, interviewed staff, analyzed operations based upon their professional expertise, and generated a final report of their experienced views. Prior to the on-site visit, each peer review professional spent 60 to 80 hours respectively reviewing documents provided by the utilities staff. Additional background information including Fiscal Impacts and Community Sustainability is in Attachment A. ANALYSIS: The peer review report identifies areas of strength and opportunities for improvement. Some of the opportunities for improvement identified by the peer review report are already being implemented while others will take longer to implement. In order to prioritize the opportunities for improvement and develop an implementation plan, Utilities staff. with input from WRAB, developed guiding principles and compiled additional information related to resource needs, 1 benefits and costs, internal and external impacts, and service levels. Based on these factors, each opportunity for improvement was then grouped into one of three tiers (highest priority is Tier 1, then Tier 2, and lowest priority is Tier 3). The tiers represent the implementation plan priority. Attachment B provides more detail on the tiers, guiding principles for prioritization and defmitions used in collecting the additional information. After the initial prioritization, the Tier 1 items were further prioritized based on the following: 1. Savings that can be achieved with resources that are within the existing 2009 or draft 2010 budget (fiscally constrained with 3 percent rate increase) 2. No additional savings, but still valuable and worthwhile items and resources are within existing 2009 or draft 2010 budget 3. Probably future savings, but additional resources needed in 2010 to evaluate and implement The Tier 2 items were also prioritized, but potentially for a 2010-2014 implementation timeframe. A summary of the Tier 1 and Tier 2 prioritization is provided in the tables below and a list of the Tier 1 items is included in Attachment C. A majority of the Tier 1 items (26) are funded in the existing 2009 budget or draft 2010 budget. These items include those that have savings. (9 items) and those that do not have savings (17 items). The remaining Tier 1 items (4) are partially funded through the existing 2009 budget or draft 2010 budget, but these items also requirf. additional resources in order to evaluate and implement. TABLE I: SUMMARY OF TIER 1 PRIORITIZATION (implementation 2009-2010) Number Cost included Cost of Savings Priority Level of Items within 2009 or Additional Reflected in Draft 2010 Resources 2009 or Draft Budget Needed 2010 Budget 1 - Savings achieved with resources 9 $194,240 $0 $400,500 within 2009 or draft 2010 budget _ 2 - No additional savings, but 17 $81,820 $0 $0 worthwhile items 3 - Probable savings, but additional 4 $11,460 $219,800 $195,750 resources needed TOTAL 30 $287,520 $219,800 $596,250 TABLE II: SUMMARY OF TIER 2 PRIORITIZATION (implementation 2010-2014 Number Cost included Cost of Savings Priority Level of Items within 2010- Additional Reflected in 2014 Planning Resources 2010-2014 Period Needed Planning Period 1 - Savings achieved with resources 4 $28,800 $0 $37,000 within draft 2011-2014 budget 2 - No additional savings, but 28 $151,700 $2,500 $0 worthwhile items 3 -Probable savings, but additional 6 $66,180 $114,400 $174,000 resources needed TOTAL 38 $246,680 $116,900 $211,000 2 2010 BUDGET PROCESS: The Tier 1 and Tier 2 opportunities for improvement that were identified in the peer review will be further discussed and evaluated as part of the 2010 budget process by comparing these "opportunity for improvement items" to other items such as capital improvement projects, enhancements of existing programs, operating budget adjustment requests or regulatory requirements- Three different revenue options (based on different rate increase alternatives) will be evaluated in the 2010 budget process. Trade-off discussions and reallocation of funds will occur for each of the different revenue options. These revenue options (reduced fiscally constrained, fiscally constrained and action plan) are summarized in Table III along with the potential impact to the opportunity for improvement items. Based on the initial prioritization of the opportunities for improvement items, it is anticipated that the Tier l items would continue to be funded in the fiscally constrained option (3 percent rate increase). TABLE III:- RE, VENUE (UTILITY RATE INCREASE) OPTIONS & IMPACTS "Reduced Fiscally "Fiscally Constrained" Revenue "Action Plan" Constrained" Revenue (3% water, wastewater and Revenue (0% water, wastewater and stormwater) (5% water, 6% stormwater) wastewater, 3% stormwater 0i1jectives of Continue to provide basic Intended to cover standard These rate increases Revenue services while recognizing that inflationary increases in costs were projected in Option no increase in revenue means related to personnel, insurance, the 2009 budget reducing funding to projects and chemicals, power/energy and process and were services in order to fund project construction costs. intended to expand increased costs for personnel and enhance (insurance, salaries) and materials services and/or (chemicals, power). programs. Potential No rate increase effectively Trade-off and reallocation of Additional capital Overall means budget reductions to some priorities may result in fewer improvement Impact current programs and capital capital improvement projects and/or projects could be projects because of increased scale back or elimination of funded and costs of personnel and materials. programs. Reallocation of finding programs/services from discretionary or desirable could be expanded. items in business plan. Additional revenue from rate increase will be allocated to costs related to inflation, Potential Some Tier 1 items may not Tier 1 items should be funded or Tier 1 and Tier 2 Impact to continue to be funded. Tier 1 receive the additional resources, items would be "Opportunities items that require additional although it may require a longer funded. Tier 3 for resources may not be funded. timeframe. Tier 2 items would items would most Improvement" Some Tier 2 items that are within likely be funded within the 2011- likely not begin Items the draft 2010 budget may not be 2014 timeframe, although funding until fi.inded depending on trade-off additional rate increase may be approximately and reallocation discussions. required if a capital project requires 2015. a revenue bond. NEXT STEPS: Staff is currently in the process of further evaluating some of the opportunity for improvements in order to determine the capital investment needed to implement some of the items. For example, further automation of treatment plant operations to reduce ongoing costs and achieve a reduction in staffing may require an investment in instrumentation and telecommunications equipment. Once the financial impact is better understood, staff will complete the cost analysis to determine the feasibility to move forward with these items. This information will be presented to WRAB during the second quarter of 2009 as part of the 2010 budget discussions. Alternatives will be discussed with respect to funding, including future rate impacts, and the feedback will be incorporated into the 2010 budget. Cost estimates for Tier 3 items are anticipated to be discussed with WRAB in 2011 as part of the 2012 budget process. If you have any questions regarding the peer review or would like specific cost information, please contact Joanna Crean, project manager at (303) 441-3038 or creanj@bouldercolorado.gov. ATTACHMENTS: • Attachment A: Fiscal Impacts and Community Sustainability Assessments • Attachment B: Guiding Principles for Prioritizing Opportunities for Improvement • Attachment C. List of Tier I Opportunities for Improvement Items 4 ATTACHMENT A: FISCAL IMPACTS AND COMMUNITY SUSTAINABILITY ASSESSMENTS FISCAL IMPACT: Each of the 89 opportunity for improvement items identified in the peer review report was grouped into one of three tiers (highest priority is Tier 1, then Tier 2, and lowest priority is Tier 3). The tiers represent the implementation plan priority. Out of the 30 Tier 1 items, a majority of the items (26) can be implemented within the existing 2009 budget and draft 2010 budget. The remaining items would require approximately $200,000 of additional resources to implement and would require ongoing, annual costs of $40,000. However, these Tier I items require more detailed evaluation to further determine the total amount of resources needed to implement as well as the ongoing benefits (i.e., dollar savings). It is anticipated that ongoing savings related to implementing the Tier 1 items that would not require additional resources would be approximately $400,000 annually. While there is a fiscal benefit to implementing the Tier I items that require additional resources (4items), there is still a cost that needs to be balanced against the current projects and budget. As the 2010 budget is developed, these Tier 1 items will be weighted against current projects and funding. Trade offs will be made and/or some projects may be delayed in order to reallocate the additional resources needed to implement these Tier 1 items. COMMUNITY SUSTAINABILITY ASSESSMENTS AND IMPACTS: • Economic: By implementing some of the opportunities for improvement identified in the peer review report, there is the potential to reduce water outages which impacts the business community. Implementing other opportunities for improvement will support business needs by more quickly alerting customers to potential water service disruptions. Depending on the 2010 budget discussions, there is the possibility of eliminating or minimizing a utility rate increase. • Environmental: Implementation of some opportunities for improvement related to repairing pipelines has the potential to increase hydropower generation which will offset greenhouse gases. An opportunity for improvement related to the Wastewater Treatment Plant has the potential to provide ongoing power savings and reduce the city's electrical demands and carbon footprint. • Social: By implementing some of the opportunities for improvement there is the potential to improve communications to a diverse range of customers. There is also the potential to improve work relations and productivity. ATTACHMENT B: GUIDING PRINCIPLES FOR PRIORITIZING "OPPORTUNITIES FOR IMPROVEMENT" This document explains the guiding principles and additional information needed to help prioritize the opportunities for improvement identified in the peer review report. • BUSINESS CATEGORY The peer review report is divided into 26 business process categories. The business process categories are common functions conducted at a utility, such as Engineering, Customer Service, Water Treatment, etc. Each of the business process categories consists of many "best practices" which are described as actual behaviors or work activities that are performed consistently by employers at a high-achieving utility. While all business process categories are high priority, each category consists of combinations of work activities (services) including essential, desirable, and discretionary services as described in the Boulder Business Plan section below. • OPPORTUNITY FOR IMPROVEMENT - Each opportunity for improvement is listed in the draft prioritization spreadsheet in the same way that it appears in the peer review report (grouped by business category). In summary, the opportunities for improvement may: • Reduce cost without reducing a basic standard of service, • Reduce cost with an acceptable reduction in service standard, • Be a business or professional Best Management Practice (BMP), and/or • Upgrade a service standard. • NARRATIVE - This section explains staff s interpretation of the "opportunity for improvement" related to the existing conditions. Also, noted in this section is how staff might implement the item. • IMPLEMENTATION PLAN PRIORITY -Each opportunity for improvement is grouped by tier as described below. o Tier I - Items in the Tier I category will be acted upon beginning in 2009 and continuing in 2010 (if they haven't already been started). Items are grouped as Tier 1 if they are a considered a "quick win" or have a high fiscal benefit in comparison to resources needed to accomplish. Tier 1 items are preferably considered "essential" but may be "desirable" or "discretionary" services (as defined in the Boulder Business Plan and described below). ■ "Tier 1" includes opportunities for improvement that are: • Preferably essential but may be desirable or discretionary services, • "Quick wins" defined as within existing budget and accomplish in 2009, • Fiscal benefits which are greater than resources needed to accomplish, • Preferably short-term timeline to complete but may be moderate, long-term, or on-going (note, that an item may need more evaluation and scope work done initially), and/or • Identified as having internal and external impacts, o Tier 2 - Items in the Tier 2 category may be started in 2010 depending on resources and progress made on Tier 1 items. It is anticipated that all Tier 2 items will be completed between 2010 and 2014. Items are grouped as Tier 2 if they are a considered a "medium win" or have an equal fiscal benefit in comparison to resources needed to accomplish. Tier 2 items are preferably considered "desirable" but may be "discretionary" or "essential" services. ■ "Tier 2" includes opportunities for improvement that are: 1 • Preferably desirable but may be discretionary or essential services, • "Medium wins" defined as between 2 to 5 years to complete and moderate resources needed to accomplish, • Fiscal benefits which are equal to the resources needed to accomplish, • Preferably moderate-term timeline to complete but may be short-term, long- term, or on-going, and/or • Preferably having internal and external impacts but may only have internal impacts. o Tier 3 - Items in the Tier 3 category will be acted upon beginning in 2015 (or sooner, if Tier 1 and most of Tier 2 items are completed and resources are available). Items are grouped as Tier 3 if they are a considered a "long win" or have a high resource need in comparison to the fiscal benefit. Tier 3 items are preferably considered "discretionary" but may be "desirable" or "essential" services. ■ "Tier 3" includes opportunities for improvement that are: • Preferably discretionary but may be desirable or essential services, • "Long wins" defined as over 5 years to accomplish and high resources needed, • Resource needs to accomplish which are greater than fiscal benefits, • Preferably long-term timeline to complete but may be moderate, short-term, or on-going, and/or • Identified as only internal impacts. • B USi NESS PLAN - INVESTMENT STRATEGY - The mission, ,f the UT ;1 i, ies Division is to provide duality water services, as desired by the community, in a manner which emphasizes efficient management of fiscal and natural resources, and protects human and environmental health. In order to achieve this goal, the Utilities Division evaluates the current funding of services based on the following investment strategy: Essential Services include the operation, maintenance and administration of existing systems that ensure highly reliable water and wastewater treatment/delivery and stormwater/flood conveyance in a manner that meets federal and state regulatory criteria or industry standard levels of best practice. These services ensure that customers and employees are in a safe environment, that a basic "customer care" service standard (ie, responsiveness, financial or permits) is provided with minimal disruptions. Maintaining quality of life is addressed as a result of these services. These services ensure the health and safety of people and property and collect sufficient funds to maintain these services- Desirable Services include the expansion of the water and wastewater treatment and delivery systems or the stormwater/flood conveyance systems that are intended to respond to impacts of future growth or development, meet federal or state goals, or which support city council adopted goals and values. These services might enhance quality of life by providing a lrigher level of service or ability to access information than is routinely provided by regulatory criteria or industry standards. Discretionary Services - include enhancements of water and wastewater treatment or delivery systems and stormwater/flood conveyance systems that enhance or help others (but not required to) perform their business. These services may provide information to the industry for analysis and comparisons in order to develop future regulations, or may include another way for customers to 2 access information. These services may provide a special convenience to a small number of customers. Each opportunity for improvement was evaluated based on whether it was an essential, desirable or discretionary service within the context of the business plan. o Response to "Business Plan - Services" includes one of the following choices: ■ Essential ' Desirable ■ Discretionary • WORK PLAN STATUS -The current work plan status for each opportunity for improvement is identified in the spreadsheet. For improvements listed as already "in progressinformation related to what percent is complete and when it is estimated to be complete is included. o Response to "Work Plan Status" includes one of the following choices: ■ In progress • % complete • Estimated date of completion ■ Work has not begun but in work plan. ■ Work has not begun and not planned. • TIMELINE TO COMPLETE - This is an estimate of how long it will take to complete an Opportunity for improvement item, assuming that adequate resources would be provided to mplete. o Response to "Timeline to Complete" includes one of the following choices: ■ Short-term (0-2 years), ■ Moderate (2-5 years), ■ Long-term 5 years) ■ Ongoing • RESOURCES NEEDED TO ACCOMPLISH -This is an estimate of the resources needed to accomplish the identified opportunity for improvement. Resources include money and/or staff. o Response to "Resources Needed to Accomplish" includes one of the following: ■ Additional Resources • Minimal (less than $25,000) • Moderate ($25,000 - $100,000) • High $100,000) Within existing budget • SAVINGS - This identifies the potential resource savings (benefit) and whether it is already reflected in the 2009 budget or whether it may be reflected in a future budget. The savings is-also identified as one=time or ongoing. • NON-FISCAL BENEFIT - This identifies the potential non-monetary benefit (e.g., risk avoidance). • INTERNAL AND EXTERNAL IMPACTS - This identifies if the opportunity for improvement item would have an internal and/or external impact. o Response to "Internal Impacts" includes one of the following choices: 3 ■ Workgroup • Multiple Workgroups (1-2 workgroups) ■ Utility Wide (+3 workgroups) o Response to "External Impacts" includes one of the following choices: (more details related to determining community sustainability impacts can be found at httt~:,lintralveb.ci.boulder•.co.rrs:'ctnncler'k% 'omnrrcriitrStrscaitaalailitt,rl,ssEss~tuntTools.htr~r) ■ Economic - defined as the overall economic impacts on the business community which could impact city revenues; promotes a diverse and sustainable economy that supports needs of all segments of the community; may also include intergovernmental relations or issues. ■ Environmental defined as the overall impacts based on environmental concerns such as transportation, climate, energy, greenhouse gas emissions, recycling; considers balance of renewable and non-renewable -resources; may also include intergovernmental relations or issues Social - defined as the overall impacts on the needs of diverse communities (e.g., different ethnicities and cultures, abilities, age, income, family demographics, W.ul,.,r-i opresented residents); engaged broad segments of cuni, aunty for input; may also include intergovernmental relations or issues. r 4 ATTACHMENT C: LIST OF TIER 1 OPPORTUNITIES FOR IMPROVEMENT ITEMS Listed below is each Tier 1 "opportunity for improvement" item identified in the peer review final report. The numbering of each item below is not reflective of a particular order but rather it provides a way to identify each item for discussion purposes. 1. Full staff meetings are held annually with upper inanagement. It may be of value to all employees to attend full staff meetings semi-annually. 2. The roles and responsibilities for WRAB and utility staff need to be better defined. The WRAB should perform at a policy level and staff at the technical detail oriented level. Both the WRAB and staff needs to be mindful of the WRAB's need for information that is necessary to make policy decisions. 3. Expand use of employee development plan within the evaluation system. 4. Enact policy to adopt "near OSHA" standards. 5. Improve safety & health program within all divisions. 6. Supervisors need to observe practices of subordinates. 7. Senior management needs to actively promote a safety culture. 8. Trainers need to be well versed and experienced in their subjects. Topics should be varied to ensure all aspects of safety requirements are covered. 9. Flexibility in replacement of lines should be used to establish priorities. 10. 1ligh pressure pipeline right-of-ways not regularly inspected & maintained. 11. Produce as-built drawings in a timelier manner so GIS maps can be accurately updated with new facilities. This will provide the information to field crews and allow them to work more efficiently. 12. Digitize project records to ensure information is not lost and provide methods to easily access this information. 13. Develop and implement procedure to ensure management and the public information office is informed of shut-off, SSOs, breaks and other emergency problems so they may be properly informed. 14. Develop and implement procedure to ensure management and the public information office is informed of shut-offs, SSOs, breaks and other emergency problems that impact customers. 15. Provide a system to include field collected data into the analysis and prioritization of line replacement or rehabilitation. 16. Consider conducting an energy audit to review new electrical demands as well as review current sources and uses of energy. 17. Integration of work groups will provide greater effectiveness in operating the plant. 18. Plant management is working to establish goals and a mission statement for the plant. 19. Management needs to make a business case for purchasing of environmental lab equipment and continue to review analytical request to ensure only necessary and relevant work is completed. 20. Reallocation of staffing must be considered in order to operate the process economically and effectively. 21. Limited communication between maintenance staff and operations management. 22. Maintenance Computerized Maintenance Management System (CMMS) not happening. 1 23. Operations staff appears heavy. 24/7 monitoring of distribution system by a dedicated operator seems excessive. 24. Business case for night monitoring of distribution system, and both plants from Betasso should be developed. 25. Field's new GIS is slow, hard to read and not accurate. The older system is static and very accurate. 26. Corrosion resistant bolts not always used on buried applications. 27. Field reports not recorded in electronic records/maps. 28. Group needs to objectively analyze existing work load as to what needs to be accomplished and what is desirable to be done. 29. Group needs to objectively make a business case for new programs/projects. 30. Some work groups consistently over-run their budgets. Some years this may be unavoidable but it is suggested these work groups be required to stay in budgeted amounts or provide written justification on why the budget must be exceeded. 2 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for Narrative Tier Priority Total Costs 'T'otal Savings 4 Improvement Level Within 2009 Costs Reflected Budget or Additional in 2009 or Draft 2010 Resources Future I3ud ;et Butlgct 16 ConSide: conducting ar'i Construction completed at 1,1'WTP in June 2008 1 1 - Savings $38,000 $0 $13.000 energy audit to review new and have yet to optimize process of certain achieved electrical demands as well major electrical loads such as aeration blowers with as review current sources and centrifuges. An energy audit is warranted resources and uses of energy. and will likely result in some recommendations within 2009 that could provide ongoing power savings. or draft 2010 budget 23 Operations staff appears At Betasso WTP, one operator monitors the 1 1 - Savings $2,400 $0 $80,000 heavy. 24/7 monitoring of SCADA system which includes the plant achieved distribution system by a functions, hydro operations and pressure zones with dedicated operator seems for the water distribution system. A second resources excessive operator regulates and/or adjusts raw water within 2009 sources, water treatment process (chemicals, or draft sedimentation process, filtration process, 2010 residuals recovery, chemical feeders, pumps budget and valves to control liquid stream) and solids treatment processes. Operators also walk the facilities/campus to check for abnormal conditions to identify, locate, and resolve treatment problems and respond to emergencies. An evaluation will be conducted to staff levels could be reduced through remote monitoring/operations, or by relying upon less coverage. Comparisons with other water agencies will be evaluated. (related to R24) 24 Business case for night Betasso VVTP has two operators on duty per 12 1 1 Savings $39,100 $0 $80,000 monitoring of distribution hr shift, 24/7. The 63rd St WTP has one achieved system, and both plants operator on duty per 12 ltr shift, 24/7. All with from Betasso should be operators are available for emergencies and are resources developed alert to security of treatment plants, distribution within 2009 reservoirs, pump and valve stations, and hydro- or draft electric stations. Staff will evaluate the use of 2010 more automated and remote operations and budget what if any, equipment, instrumentation and communication devices may be required in order to rely less on human operations and more on equipment. (Related to #23) 4/8/2009 1 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER I AND 2 ITEMS Item Opportunity for Narrative Tier Priority 'total Costs 'hotal Savings 4 Improvement Level Within 2009 Costs Renected Budget or Additional in 2009 or Draft Ht110 Resources Future Budget Budget q rlcxibility in replacericn: T;nc c:tv uses a dafa based decision tool to 11e1p 1 1 - Savings S20,000 SO $40,000 of lines should be used to with the prioritization of waterline replacement achieved establish priorities. projects. Factors include pipe age, material with type, diameter and soil type. The decision tool resources is one of many factors used to prioritize within 2009 replacement projects and the judgment of or draft engineering, operations and maintenance staff 2010 continues to play an import ant role in any final budget decisions. A recent review-of the decision tool provided several recommendations for improvement that staff intends to implement. The CIP process provides flexibility in re- evaluating and prioritizing projects on an annual basis. 11 Produce as-built drawings The topic is being discussed by staff and 1 1 - Savings $37,500 $0 $50,000 in a timelier manner so sev,.ral ideas to help with the tirnclier achieved GIS maps can be development of as-built drawings and updating with accurately updated with of GIS maps have been put forward. There is a resources new facilities. This will lag time between the construction of facilities within 2009 provide the information to and the development of as-built drawings and or draft field crews and allow them updating of GIS maps. For this reason, design 2010 to work more efficiently drawings and the development of a budget corresponding "work-in-progress" layer has been discussed. It is anticipated that further consideration and a decision regarding this issue will be made during the I"quarter of 2009. 12 Digitize project records to A project tracking database and procedures for 1 1 - Savings $32,500 $0 $50,000 ensure information is not scanning and archiving of electronic files has achieved lost and provide methods been implemented to capture critical with to easily access this information and provide easy access to and resources information. query of these records. within 2009 or draft 2010 budget 19 Management needs to Currently, the Laboratory conducts all metals 1 I - Savings $1,440 $0 $80,000 make a business case for analysis to support WWTF liquid stream and achieved purchasing of biosolids monitoring (both compliance and non- with environmental lab compliance monitoring) and some drinking resources equipment and continue to water metals analysis. A "business case within 2009 review analytical request evaluation" process will be conducted to or draft to ensure only necessary evaluate the possible cost/benefit of the metals 2010 and relevant work is analysis work to see if this activity should be budget completed. conducted in-house or outsourced. 4/8/2009 2 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for Narrative Tier Priority Total Costs Total Savings # Improvement Level 1Yithin 2009 Costs Reflected Budget or Additional in 2009 or Draft 2010 Resources Furnre Budget Budget Maintenance A CLAIMS system has been purchase bV NVdter 1 l - Savin-s 51 ?;700 $0 55.000 Computerized Treatment in 2008 and is called "last achieved Maintenance and Maintenance." Staff is currently entering data with Management System into the system and started to use the system in resources (CMMS) not happening December 2008. WTP staff will maintain the within 2009 CMMS. (related to 462 and #63) or draft 2010 budget 26 Corrosion resistant bolts In 2008, anti-corrosion bolts were purchased I I - Savings $10,600 SO 52,500 not always used on buried and used while making repairs. The city's achieved applications. design standards need to be edited so that new with installations have this requirement. Will work resources with Planning and Development Services' staff within 2009 to revise design standards so that anti-corrosion or draft bolts are used during routine installations and 2010 construction of watermains. budget 1 Full staff meetings are The Directors of Public Works (Maureen Rait, 1 2 -No 5480 $0 $0 held annually with upper Ned Williams and Tracy Winfrce) hold full additional management. It may be of work group meetings at each Public Works site savings, but value to all employees to on an annual basis. Expand to semi-annual worthwhile attend full staff meetings meetings. items semi-annually. 2 The roles and WRAB roles and responsibilities (as are all city 1 2 - No $1,200 $0 $0 responsibilities for WRAB boards and commissions) are defined in the city additional and utility staff need to be code. City staff is working with city council to savings, but better defined. The WRAB improve board member orientation, training and worthwhile should perform at a policy selection processes in order to improve the items level and staff at the effectiveness for all city boards. Consider technical detail oriented reviewing the city code responsibilities with level. Both the WRAB and WRAB/staff in 2009 as to appropriate scope staff needs to be mindful and balance of board activities in order to of the 'vVRAB's need for further define and clarify the relationship information that is between WRAB and staff. necessary to make policy decisions. 3 Expand use of employee Each supervisor/employee should detail a 1 2 -No $1,200 $0 510 development plan within development plan in the employee's 2009 additional the evaluation system. annual Performance Evaluation. savings, but worthwhile items 41612009 3 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for Narrative 'T'ier T'riority Total Costs "T'otat Savings t€ Improvement Level, Within 2009 Costs Reflected Budget or Additional in 2009 or Draft2010 Resources Future Budt.;et Budget b Supervisors need to Currently, supervisors actively spend time in 1 - No $17,250 $0 $0 observe practices of the field as well as attend safety trainings additional subordinates alongside staff: Improper safety practices are savings, but captured and debriefed with staff. If necessary, worthwhile training is modified or requested to prevent items incidents. All supervisors need to have a front- line role in safety and lead by example. All employees are expected to play a role in safety and it should be a uniform category in performance evaluations. If injury losses increase in the future, may need to consider increasing resources for this Health and Safety program. 13 Develop and implement if emergency occurs during work hours, a 1 2 -No $1,200 $0 $0 procedure to ensure " eater info" e-mail goes out which includes additional management and the Public Works' Communications staff. If it's a savings, but public information office large main break, Communications staff is worthwhile is informed of shut-off, contacted directly by a supervisor. Off-hours, items sanitary sewer overflows Communications will get phone call only if (SSOs), breaks and other something really significant happens, and a emergency problems so water info e-mail may or may not go out the they may be properly next day. Week-end responses are not informed. consistent. Currently no set standard for the division on communication procedures (including creek spills, power outages at the plant, main breaks, etc.) Staff will establish procedures for communicating urgent/emergency issues and write a Utilities Division policy. This would be distributed and supervisors would train staff. (related to #14) 15 Provide a system to Field observations for gravity mains (storm and 1 2 - No $7,400 $0 $0 include field collected data sewer) and manholes is currently recorded in additional into the analysis and Utilities Maintenance and Management System savings, but prioritization of line (UMMS.) Observations come from TV-ing worthwhile replacement or mains and manhole observations. In addition, items rehabilitation. the condition of hydrants is recorded during hydrant inspections and main breaks and break causes are tracked and entered in UMMS. The Utilities Planning and Project Management workgroup is going to implement a separate asset management system for which Utilities Maintenance workgroup will provide UMMS data for inclusion in making replacement/rehabilitation decisions. The field reports will be modified to capture pipe and manhole condition, then the UMMS system will be modified to capture and sort by maintenance need priority in order to prioritize maintenance work. 418/2009 4 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for Narrative Tier Prioritv Total Costs Total Savings # Improvement Level Within 2009 Costs Reflected Budget or Additional in 2009 or Draft 2010 Resources Future Budget Budget 17 integration of work groups This is an exirenick lnipur.am but loin-teen 1 2 - Nu $17.000 $0 $0 will provide greater Goal of the WWTP. The four workgroups at additional effectiveness in operating W WTP (Operations, Maintenance, Resource savings, but the plant. Recovery, and Admin) often work worthwhile independently. More cooperation and items collaboration between workgroups would provide a consistently high performing IN'WTP. Will consider teambuilding skills and training and cross-workgroup collaboration. 18 Plant management is Goals and mission statement were in progress 1 2 -No $960 $0 $0 working to establish goals during Peer Review week. Since that time, additional and a mission statement mission, goals, values, and expectations have savings, but for the plant. been finalized in a document by Coordinator worthwhile and Supervisors. Consistent and regular follow items up to sue how well the goals and mission statement are being utilized is needed. Performance reviews should include many of the elements listed in the document. t 21 Limited communication Daily meetings are held each morning at both 1 2-No $U $0 $0 between maintenance staff plants that include mechanics, e-tecbs, additional and operations operators, supervisors and SCADA savings, but management. Administrator (Hydro at Betasso) staff to worthwhile discuss plant issues and needs. Management items walks site and checks in with staff. Quarterly meetings are held with maintenance to prioritize projects and to check-in about what may be needed for each project. Reviews are held every six months with each individual. Additional meetings are held as needed. Consider the need for communication training and additional resources, if warranted. May also need to consider a separate Maintenance Supervisor position that is separate from a Treatment Operations Supervisor. 25 Field's new G1S is slow, Mobile computers were deployed in the second 1 2 - No $2,400 $o $0 hard to read and not and fourth quarter of 2008. The computerized additional accurate. The older system mapping is the most up to date and accurate savings, but is static and very accurate. utilities mapping that exists in the city. The worthwhile maintenance crews must complete "utility field items reports" whenever they notice mapping inaccuracies. This, along with better dissemination of as-builts, are the only way the mapping will improve. Staff will evaluate ways to improve speed and readability of the system. 4/5/2009 5 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Itern Opportunity for Narrative 'T'ier Priority 'T'otal Costs `total savintrs # Improvement Level Within 2404) Costs ltefleetcd Budget or Addilianal in 20119 or 1)raft 2010 Resources Future Budd-et Budget 27 Field reports not recorded June 2008, the Utilities Program Planner started 1 2 - No $2,400 $0 $0, in electronic records/maps to scan all submitted "utility field reports." The additional scanned field reports are hotlinked to a field savings, but report tracking database created and worthwhile administered by the Program Planner. This items database can be made available to other city employees upon requesting access from the Program Planner. 28 Group needs to objectively The program is responsible for required 1 2 - No $7,200 $0 $0 analyze existing work load compliance programs and reporting and non- additional as to what needs to be regulatory monitoring--both used in supporting savings, but accomplished and what is water treatment and operations. The group worthwhile desirable to be done. needs to prioritize required programs with other items program needs and evaluate shared responsibilities and resources. Through WQES, the program will be developing a work plan in 2009 to assist with these decisions. 29 Group needs to objectively The Drinking Water Quality program is a 1 2 - No $4,800 $0 $0 make a business case for support group to water resources, engineering, additional now programs/projects treatment and operations and has the savings, but opportunity for involvement at many levels. worthwhile Staff plans to interact more with the other items groups to better define how the program can provide support and help prioritize programs/projects and leverage resources for projects. In doing so, staff will conduct a cost/benefit analysis to determine if work activities are more appropriately done in house (may need to purchase equipment) or out- sourced. An analysis is currently being done with respect to source water nutrient analysis. (related to #19) 4 Enact policy to adopt Comment is primarily related to treatment 1 2 -No $2,400 $0 $0 "near OSHA" standards plants, water distribution, and wastewater additional collection staff. OSHA standards should be savings, but applied for activities such as confined space worthwhile entry, excavations/trenches, lock/out tag/out, items chemical handling, traffic safety, etc. Currently, in the water distribution and waste water collection maintenance workgroups, most OSHA regulations are being followed. Treatment plants are following many OSHA standards. It is proposed that the city adopt a written policy that states utilities establish a goal of conforming to all OSHA standards and do an inventory and assessment of facilities and practices to identify and correct any deficiencies. 41812009 6 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER I AND 2 ITEMS Item Opportunity for Narrative Tier Priority Total Costs Total Savings y Improvement Level Within 2009 Costs Reflected Budget or Additional in 2009 or Draft 2010 Resources Future Bud-et Budget 20 Reallocation of staffing Since 2003, staff responsibilities have shifted 1 2 - No $15,000 $0 $0 must be considered in from driving city trucks to land apply biosolids additional order to operate the to operational responsibilities inside the WWTP savings, but process economically and (with contract track hauling.) As of June 2008, worthwhile effectively. the dewatering system has been expanded with items on-site, high performance centrifuges as wel I as more complex support systems such as biosolids screening, centrate return, and odor control. Staffing needs/levels will be evaluated in 2009-2010 to determine an optimal staffing level for the Resources Recovery functions with the idea that staffing will be redistributed either via work-sharing or reallocation. 4 3 Some work groups Some work groups go over budget and it is 1 2 - No S900 $0 $0 consistently over-run their handled in one of the following ways: 1) try to additional budgets. Some years this cover the overage from some other area with savings, but may be unavoidable but it their workgroup, 2) talk to another coordinator worthwhile is suggested these work looking for coverage, and 3) communicate the items groups be required to stay overage to Ned and/or Carol to develop a plan in budgeted amounts or for coverage at the fund level. Staff will pro-ide written develop a procedure in 2009 for reporting justification on why the budget status and projected year-end status. budget must be exceeded. The justification in writing should occur between the second and third quarter of the fiscal year. 14 Develop and implement Public Works Communications group is alerted 1 2-No S0 $0 $0 procedure to ensure for all urgent situations such as water main additional management and the breaks and sewer main backups. Otherwise, it's savings, but public information office a case-by-case judgment to alert the PIOs. Need worthwhile is informed of shut-offs, to keep the CMO aware of emerging situations items SSOs, breaks and other and possible press-related issues. Staff will emergency problems that establish procedures for communicating impact customers. urgent/emergency issues and write a Utilities Division policy. (related to 413) 5 Improve safety & health Safety and health are essential and part of the 1 3 - $4,800 $50,000 SO program within all 'oh description of almost all utility staff. Probable divisions Stewart Ellenberg, the risk manager for the city savings, but of Boulder, is working with his staff to schedule additional training opportunities for specific workgroups. resources If injury losses increase in the future, may need needed to consider increasing resources for this Health and Safety program. 41312GC9 7 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for- N,,, ~ ative Tier Priority 'I`utal Costs Total Savings t' Improvement Level Within 2009 (.:nsts Rellecled I1ud-et or Additional in 2009 or Draft 2010 Resourecs Future Budget Budget 7 Senior management needs Currently, supervisors actively spend time in 1 - $5,760 $20,000 $0 to actively promote a the field as well as attend safety trainings Probable safety culture alongside staff. Improper safety practices are savings, but captured and debriefed with staff. If necessary, additional training is modified or requested to prevent resources incidents. If injury losses increase in the future, needed may need to consider increasing resources to this Health and Safety program and hold conferences, seminars, and workshops to more actively promote a safety culture. 10 High pressure pipeline High pressure transmission pipelines have two 1 3 - $900 $149,800 $195,750 right-of-ways not regularly categories--raw water and treated water. Raw Probable inspected & maintained. water pipeline right-of-ways are regularly savings, but inspected, at least annually. Treated water additional transmission line inspection and maintenwice is resources not assigned to any one work group, so needed attention to these pipelines varies and is done on an "as needed" basis by Water Treatment, Hydro, Utilities Maintenance or Project Management. Consider a more organized and frequent inspection program of treated water transmission pipelines and more inspections of valves on the raw water pipelines. These functions could be combined into a single program under a single work group (see Item No_ 69). Maintenance of the water transmission pipelines should be specifically assigned to one group and resources provided. An O&M plan for treated water transmission pipelines should be developed. 8 Trainers need to be well Kevin Krayna, risk managers office, works 1 3 - $0 $0 versed and experienced in closely with supervisors to ensure that proper Probable their subjects. Topics and effective safety training is being provided. savings, but should be varied to ensure Kevin also attends the training for quality additional al l aspects of safety control purposes. Need to ensure that all resources requirements are covered. training is done in a professional manner and needed need to continue to update the list of available trainers on a pre-qualified vendor list to call. TIER 1 TOTAL $287,520 $219,800 $596,250 32 Develop objectives and Currently rely upon on-the-job training and 2 1 - Savings $2,400 $0 $10,000 methods for knowledge working along-side of out-going employee for a achieved sharing including a job short time. There has also been a large effort to with succession plan for critical move all hard copy documents to storage in resources areas of the utility. digital files. Some work groups are developing within draft Standard Operating Procedures (SOPs). 2011-2014 Utilities Division completed a "pilot" program budget in 2008 for succession planning awareness. 4/8/2009 8 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for Narrative Tier Priority Total Costs 'T'otal Savings Pr Improvement Level Within 2009 Costs Reflected Budget or Additional in 2009 ur Draft 2010 Resources Future Budget Buthet 34 Need to track efforts, set Goals and expectations are communicated in 2 1 - Savings S2,400 $0 5-2,000 goals and determine annual Performance Evaluations. Various work achieved expectations. This will performance data are reported in the annual with help set the course for all Utilities Report. The annual report is posted on resources employees. the intraweb and shared with staff. within draft 2011-2014 budget 46 Continued expansion of' The city's enterprise GIS system is fully 2 1 - Savings $24,000 $0 $25.000 GIS enterprise system with integrated with the maintenance (UNIMS) achieved integration of maintenance database. Each active asset in UMMS has a with management system will hotlink to the Utilities Viewer ArclMS website resources improve work place enabling users to view the mapped location and within draft efficiency. GIS data behind all assets. Plans are in place to 2011-2014 continue and improve this integration with the budget roll-out of an ArcServer application. Plans for the future expansion of this integration include mapping of'multi-point and multi-line maintenance types (valve operations, sewL:r and storm line cleaning, hydrant inspection; hydrant repair, etc) and mapping of maintenance based on structured queries (i.e. over selected date ranges etc.). Currently, staff is in the early stages of creating a utilities GIS server solution to implement these expansions. It is in the 2009 work plan to begin. 63 There are 4 industrial Use of the CMMS called "Past Maintenance" 2 1 - Savings $0 $0 $0 mechanics (including load started in December 2008. Routine tasks and achieved mechanic) working on equipment projects are considered for with plant maintenance, new outsourcing as budgets allow. Outsourcing now resources and replacement projects, includes HVAC, painting, pumps and motors, within draft regulators, cleaning tasks, pipe valve replacement, electrical work, doors, 2011-2014 residuals handling and windows, and locks, paving, janitorial, roofing, budget developing the CIvIMS. sludge cleaning and hauling. (Related to 1122 Routine tasks and and 462) equipmen, )rojects might be cousidered for outsourcing so that the CMMS can be fully developed, priorities can he clearly identified and the right tasks performed per plan. 33 Develop procedures and!or City policies and department policies are on the 2 2 - No $1,200 $U $0 training to ensure policies intraweb. 44'ork group policies, if any, are additional are enforced fairly across available at each work site. savings, but the utility. Coordinators/supervisors may initiate contact worthwhile with other supervisors/coordinators to assess items consistency across work groups. 4/8/2009 9 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for :Narrative 'T'ier Priority Total Costs 'total Savings 4 Improvement Level Within 2009 Costs Reflected Budget or Additional in 2009 or Draft 2010 Resources Future Budget Budget 36 Crack or review the plan Annual flood drills and exercises are debriefed 2 2 -No $ ".400 $0 $o for goals & improvements. and plans and procedures are modified additional accordingly. Employee rosters are updated savings, but annually. Areas for improvement are assigned worthwhile accordingly (ex: paging system improvement). items 37 Extend strengths to all In house "experts" arc available to train others 2 2 - No S3,400 $0 $0 sections of utility. within utilities. Key responders within the additional division routinely take part in emergency drills, savings, but exercises and training. A more comprehensive worthwhile and formal training program for all employees items could be developed in the future, if warranted. 44 Have approved vendor list Annual Pricing and Contract Agreement 2 2-No $1,200 $0 $0 include those services that Catalog does not currently include vendors that additional may be required at supply metering pumps, motors or other savings, but treatment plants. maintenance equipment that is needed at the worthwhile treatment plants. The pricing and contract items agreement catalog is updated annually and staff will make sure treatment plants have input to vendors included in annual contracts. Only vendors reasonably expected to be used each year should be included in the annual contracts. An alternative is for the treatment plants to maintain a list of vendors who can supply the appropriate parts to simplify identifying them when needed. 45 Shorten the lead time Annual Pricing and Contract Agreement 2 2-No $0 s0 $0 required for purchasing Catalog does not currently include vendors that additional equipment costing greater supply metering pumps, motors or other savings, but than $50,000. maintenance equipment that is needed at the worthwhile treatment plants. Finance is working with the items attorney's office to consolidate contracts (for material purchases) into the PO to streamline the purchasing process for materials. Finance is also considering developing a checklist in 2009 for bid packets. 4/8/2009 10 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for Narrative Tier Priority Total Costs Total Savings # Improvement Level Within 2009 Casts Reflected Bucket or Additional in 2000 or Draft 2010 Resources Future. Budact Bucket 47 Updating UN/E\AS program The maintenance database, called UIVIMS 2 2 - No $14,800 $0 $0 to include work order (Utilities Maintenance Management System), additional system within presently has a functioning work order system. savings, but maintenance must be However, work orders are only created for worthwhile implemented to improve hydrant and valve maintenance activities. The items not only management of current work order function is too limited for work but provide better it's use in the day-to-day maintenance of the access to data for capital sewer mains because it is missing other pipe improvement decisions. reliabilitation methods (e.g., slip lining,, chemical treatment, etc.). UMMS administrators and the database developer are aware the work order system needs improvement. This task is already on the work plan for a future release of UMMS, anticipated by the end of 2009. 48 Reinforce that information The installation of fiber optic cable to the 2 2 -No $600 $0 $0 technology infrastructure Betasso WTP and 75th St. W WTP will be additional is a critical operation of completed in the first quarter of 2009. This will savings, but the utility and that the greatly improve the information technological worthwhile appropr=iate level of support to these facilities. Discussions will be items response time must be scheduled with the city's IT Department to maintained. further discuss and clarify lead and support roles. 50 Implement E-care to The current priority for the billing office has 2 2 -No $28,000 $0 $0 provide customers on-line been implementing the 2008 water budget additional access to their accounts. changes and processing customer credits. The savings, but June 2008 changes should be programmed into worthwhile CIS and credits processed by the end of 2008. items Staff will work with the billing vendor to schedule E-care for the first half of 2009. This will allow customers on-line access to their accounts and to be able to pay bills online. Staff will work with Advanced Utility Systems to implement the e-care module. 4/8/2009 11 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER I AND 2 ITEMS Item Opportunity for Narrative Tier Priority Tutai Costs Total Savings H Improvement Level Within 2009 Costs Reflected Budget or Additional in 2009 or Draft 21110 Resources Future Budget Budget 52 Develop procedures to The meter reading software is called 2 2 -No $360 $0 $0 ensure any software or CONNECT and it is currently located at the additional hardware changes will not yards. CONNECT reads a file generated by the savings, but interfere with data utility billing system (CIS) which contains the worthwhile exchange between billing meters "to be" read and creates a file with the items and meter reading systems. meters reads which is uploaded into CIS and used to generate bills. In the past software or hardware changes to CONNECT have occurred and interrupted (either miscalculated or omitted reads) the data used to genet ate bills, The changes are not always communicated to the billing office and they become aware as billing issues surface. Utility billing staff, IT staff and Meter Reading staff will meet and agree to implementation control procedures and coordinate all future changes between the two groups. 5$ May need to improve Control of accidental releases and reporting are 2 2-No $2,400 $0 $0 communication with SIU's of primary importance to Pretreatment additional for response to accidental staff. Significant Industrial Users (SIUs) are savings, but releases. required by permit, local, and federal worthwhile regulations to prevent unauthorized releases to items the sanitary sewer and to establish spill control and reporting plans. Annually, pretreatment staff review during site inspections the potential for spills to the sanitary sewer. This review also includes a check of the SIU spill control plan. During this annual inspection, Pretreatment staff will also review the communication plan with each SIU and emphasis the requirement of quick notification and response. 61 Boulder Canyon hydro A feasibility study of options for Boulder 2 2-No $37,700 $0 $Q needs to be evaluated to Canyon Hydra was completed in 2005. It was additional determine if it should be detennined that it would be cost-effective to savings, but upgraded or abandoned. replace the existing turbine with a 4.9 MW unit. worthwhile No further analysis can be completed until the items FERC exemption from licensing process is complete in 2009 for the Boulder Canyon Hydro Project and a new power sales agreement is negotiated with Xcel. Work can proceed on a final determination of whether or not to install a new turbine at Boulder Canyon Hydro in 2010. 4/8/2009 12 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for Narrative Tier Priority Total Costs Total Saving's Improvement Level Within 2009 Costs Reflected Budoct or Additional in 2009 or Draft 2010 Resources Future Budget Bud-et 6 Ivl~rintcnancc staff pullckl 'I he two plants and pump slations use 4 2 2 -No 9;>,040 $0 $0 in too many directions. mechanics, 2 E-techs, and a SCADA additional administrator. Daily meetings are held each savings, but morning at both plants that include mechanics, worthwhile c-techs, operators, supervisors, SCADA items Administrator ( I lydro at Betasso) to discuss plants issues and needs. Quarterly maintenance meetings are held. Supervisors and the workgroup decide what would be the best action plan to accomplish the work. which may include outsourcing. Coordinator/supervisors may need to better define work priorities and schedules for maintenance activities, along with providing some communications training. The recently implemented Computerized Maintenance Management System (CMMS), called "Fast Maintenance", will also allow for planning and prioritization of maintenance activities. (related to 422 and il6 _3) 64 Changes in procedures or Continual improvement, training, meeting and 2 2 -No $0 $0 $0 standard practices need to field visits between supervisors and staff are additional be fully cc ardinated with currently underway to discuss and savings, but all work groups involved. communicate changes in procedures and worthwhile practices. Monthly "all employee workgroup" items meetings are held and staff are allowed to provide feedback on all operations in order to become more effective and efficient. 65 Management has Administrative functions have increased and 2 2 -No 5600 SO S0 decreased interface with field time is at a premium. Past practice and additional field crews. preference of crews was to NOT ]rave the savings, but supervisor in the field as much. Finding the worthwhile "middle road" is possible and items coordinator/supervisors need to evaluate how best to interface and communicate with field crews. 66 Thrust restraint methods New methods will be investigated and 2 2-No $11,£00 $0 S0 used by field crews arc associated costs considered for this operation. additional outdated. The city's design standards will also be savings, but reviewed and edited by the Utilities worthwhile Planning/Project Management, Maintenance items and P&DS work groups for new irstallations. 4/8/2009 13 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item )Irpriittar~tvfor '.Narrative Tier Priority 'rota costs Total Savings # Improvement Level Within 2009 (:osts Reflected Budget or Additional in 21109 or Draft 2010 Resourecs Future Bud"et Budget 67 Cathodic protection Utilities Planning/Project Management staff are 2 2 -No $2,600 $0 $0 practices not employed evaluating existing steel pipelines (recent and additional (attachment of anodes older). With assistance from a cathodic savings, but when opportunity exists, protection/corrosion control consultant, a worthwhile isolation, bonding, etc.), program is being developed to replace anodes items and test stations on older pipelines and to implement monitoring of all test stations into O&M practices for all large diameter steel pipelines. 30 Management staff needs to The Directors of Public Works (Maureen Rait, 2 2 - No $1,800 `o(} $0 improve their visibility Ned Williams and Tracy Winfree) hold full additional amongst the maintenance work group meetings at each Public Works site savings, but and operations staff. Field on an-annual basis. Other staff meet with worthwhile visits and possibly operations and maintenance staff on a project or items quarterly meetings are program specific basis. In 2009, upper Utility recommended. management staff (Director, Coordinators) will get out in the field more often. 4l Financial training & Currently, the Utilities Financial Manager 2 2-No ~ ,200 s0 _ $(i communication with meets with new coordinators and gives them an additional employees may help work overview of the utilities budget and the city's savings, but groups stay within their budget process. The Utilities Financial Manager worthwhile budget. also meets with new supervisors and items workgroups as requested, sends out monthly budget status reports to coordinators and provides updates as part of the annual budget process. Accountability for staying within budgets is addressed through performance evaluations. 42 The outstanding debt is Outstanding debt: Water - $47M paid off in 2 2-No $16,200 $0 $0 rather high (-$85 million). 2021; Sewer - $42M paid off in 2025; Flood - additional Boulder should look for $SM paid off in 2018. "Pay as you go" would savings, but more ways to "pay as you require 1) additional revenues and/or 2) reduced worthwhile go" until bond retirement expenditures from the current budget, Money items dates are nearer. from any option would go to fund balance until enough was saved for the next large CIP project. Projected bonds: Water - $36M in 2014; Sewer - $12M in 2010; Flood - $5M in 2011. Utilities is reevaluating it's debt level with the city's finance director and private financial advisor. The Utilities' current debt obligation meets all landing requirements and satisfies the city's designated reserve requirements. Bond rating agencies have provided a fairly high (AA+, Aa2) rating for the revenue bonds. (Related to -974 4/8/2009 14 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Oppnrtunit* for Narrative Tier Priority Total Costs Total SavincZs # Improvement Level 1't ithin 2009 Costs Reflected Budget or Additional in 2009 or Draft 2010 Ronurres Future Budget Budget 41) Develop hro.hurc to orient lnfonnatior. B 1%ailaHe 1_):~ the v;eh rc2ardin~ 2 3 - No $67200 $0 $0 ne~~ custornerti utility billing, water budgets and payment additional options. In 2009, Communications and TJTB savings, but staff will work together to create an appropriate worthwhile custorer friendly brochure that could be items mailed to new customers. (Related to #51) 53 Chanucs to the water Changes to water budgets have been made in 2 2-No $1,200 $0 so budget billing criteria response to customer concerns and have been additional should be minimized until approved by WRAB and council. The June savings, but the effect of these rates 2005 changes were programmed into CIS and worthwhile have on revenues is filly credits processed at the end of 2005. items realize 54 iVfav need to improve Currently, contact key customers when there is 2 2 - No Sl ,200 $0 $0 outreach to managers of an urgent situation (water service outage or additional key customers. water quality problem) that involves the savings, but customer. Will initiate contact with key worthwhile customers or groups (like the Chamber of items Commerce) when performing studies (PIF, - - monthly rates, TPT, etc) that affect them. 69 No air-vac valvr: Responsibility for maintenance of the air-vac 2 2 - No $2,400 $0 $0 maintenance. valves has not been clearly defined. Multiple additional wort: groups have performed maintenance on savings, but air-vac valves in the past. Need to evaluate if worthwhile the responsibility should be with the pressure items system maintenance staff simply based upon where the valves are located, or with another work group and more clearly and formally designate maintenance responsibilities. (Related to 4110) 57 Geo-assigning of work A planned overhaul of the l?MMS work order 2 2 - No $2,400 52,500 $0 orders once integrated system includes tasks that will allow the additional with GIs will improve utilities maintenance supervisors/other staff to savings, but effectiveness of work. generate a work order for an asset/s by worthwhile interactively selecting that assets from a GIs items mapping application. This will not be possible until the ArcGIS Server (server-based GIS platform) is deployed. Server GIS provides users with live access to GIs Data and a set of customized GIS tools that will enable users to interact with real-time GIS datasets via the web. However, the deployment of'a server GIs product is estimated to he done by the end of 2009 or early 2010. 4/8/2009 5 I APPENDIX E: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for Narrative "Pier Priority `T'otal costs `rot.o Savings # Improvement Level Within 2009 Costs Reflected Budget or Additional in 2009 or Draft 2010 Resources future Midget Budget 39 Develop an executive It is envisioned that master plans will be 2 2 - No $0 $0 summary of all master developed for each enterprise utility. The additional plans that prioritizes master plan will provide an executive summary savings, but projects. This could assist of priority projects, programs and needs. The worthwhile in formulating and first such master plan will be for the items communicating the Wastewater Utility and it is anticipated this will utility's CIP. be presented to the WR,413 in spring 2009. 40 Utility should establish The Utilities Division has a mission statement 2 2 - No $0 $0 vision, values and goals to and guiding principles. It is appropriate that additional guide employees in mission and values (guiding principles) be savings, but improving the utility's reviewed periodically and that all employees worthwhile performance. Employees are provided an opportunity to participate. items should be involved in the Goals are typically developed through the establishment of the master planning process. Master plans will be utility's vision, values, and updated on a regular (5-10 year cycle) basis and goals. Milestones should milestones will be set through the annual be set to monitor progress budget process. Work groups arc also in accomplishing the goals encouraged to develop mission statements and to implerieru 'e utility's gc ils specific to their activities. vision. ~51 Consider a brochure to Information is available on the web regarding 2 2 -No $0 SO $0 welcome new customers utility billing, water budgets and payment additional and inform th:m of options. In 2009, Communications and UTl3 savings, but utility's billing and staff will work together to create an appropriate worthwhile payment options with customer friendly brochure that could be items contact information. mailed to new customers. (Related to #49) 55 An enhanced work order The UMMS 2008 work plan included tasks to 2 2 -No $0 $0 $0 system within the utility enhance the work order functions and process. additional maintenance program will The goal is to complete the enhancements by savings, but improve the effectiveness the end of 2009, depending on contractor worthwhile of work. availability. items 31 Considering the succession Some supervisory training available through 2 3- $1,200 $31;200 $50,000 plan, efforts should be Human Resources (HR). More training could Probable nade to pm ide internal bo developed to focus on developing cmployees savings, but leadership and sup(,rvtsory for promotional opportunities and hiring-for- additional training. success practices. resources needed 35 Implement a program to A general, city-wide orientation is performed 2 3- $0 $31,200 $'1,000 orient employees to all the for all new employees during their first week at Probable aspects of utility work. Then, each work group provides an on- savings, but operations. This will help the-job orientation. A more focused "Utility additional employees understand the Division" orientation could be formally resources L relatiotisliii) of their work developed and implemented. needed to the overall mission of the utility. 4/8/2009 16 APPENDIX B: SUMMARY OF REFINED COST ESTIMATE AND PRIORITIZATION OF TIER 1 AND 2 ITEMS Item Opportunity for Narrative Tier Priority Total Costs Total Savint's # Improvement Level Within 2009 Costs Reflected Budget or Additional in 2009 or Draft 2010 Resources Future Budget Iludhel 'I lie utility should consider- It is envisioned that master plans will be 2 ; $50,000 $25,000 8100,000 developing an executive developed for each enterprise utility. The Probahle summary of all master master plan will provide an executive summary savings, but plans that prioritize of priority projects, programs and needs. The additional projects. This could assist first such master plan will be for the resources in formulating and Wastewater Utility and it is anticipated this will needed communicating the be presented to the WRAB in spring 2009. utility's CIP. 56 Upgrading camera The workgmup is currently in the process of 2 3 - $500 $2,000 $10,000 equipment will provide for acquiring Granite XP software in order to Probable better collection and further evaluate, categorize and characterize the savings, but analysis of data. conditions of the sewer mains. This system will additional provide a more uniform analysis of the pipe resources conditions. It is anticipated that the new needed software will be installed and usea'?le by staff by Jul), 2009. 59 Continue to work with Since 2002, the city has been part of 2 3- 52.880 55,000 $12,000 researchers on projects cooperative studies with CU Boulder and the Probable that effect water quality in USGS on emerging contaminants in savings, but the city. wastewater. The studies have focused on additional emerging contaminant removal in the 75th resources Street WWTF and emerging contaminant needed impact to aquatic life in Boulder Creek. To date; the city's support has been in-kind and focused on site access, power for the research trailer and staff support for sampling and field work. These efforts are anticipated to continue through at least 2010. Results from this research will help the city address possible future regulatory requirements for emerging contaminants. 68 Aging wort: force. Utilities Division completed a succession plan 2 3 $6,300 520,000 $0 "pilot" project in 2008 related to an aging work Probable force and possible retirements. One response savings, but has been that Joe Cowan has taken a leadership additional role in developing a program with the BVSD resources and AWWA to teach and train local vo-tech needed students about skills and abilities for jobs in the utilities maintenance field. TIER 2 TOTAL $246,680 $116,900 S2]11()00 TIER I AND TIER 2 TOTAL $534,200 $336,700 $807,250 4/8/2009 17