Loading...
7 - University Hill Build-out Analysis University Hill Build-out Analysis of BMS and UHGID December 18, 2008 ovERVIEw • Past and Recent Plans and Studies • Purpose of This Presentation a) clarify and compare build-out options within the BMS zone and UHGID areas only b) identify potential next steps • Study Area Definition Staff analyzed only the build-out options within the BMS zone and UHGID • This Report Completes This Phase of Work This report completes the phase of work to conduct a "build- out analysis" as proposed in the March 2008 Joint Study Session memorandum. If Planning Board believes further analysis, as well as refinement of the Options, is needed, a second phase to this project would either need to wait until mid 2009, or delay the start of other existing work program items such as the Multi-modal Corridor Study to the second half of the year. University Hill Build-out Analysis of BMS and UHGID December 18, 2008 "at the highest level of intensity are the city s three regional centers. They form a triangle at Boulder's geographic center: the Historic Downtown, the Boulder Valley Regional Center (BVRC), and the University of Colorado (CU) with the University Hill business district. The University Hill Business District also serves as a neighborhood center for the surrounding neighborhood. Each of these centers has a distinct function and character." Boulder Valley Comprehensive Plan 1 niversity Hill Build-out Analysi of S J~':_~~.1 ~ 571 1`"~ .,r . `s~- - BMS and UHGID ti, ti s-~nr~ III ~ eccm 8, 2Q0 ~ 1 +rll ~ t _i l i r 1~ ~ , ~r! i ' ~ , 1 r-,;-y~ ~ _ ~~ti~~ ~ r± `y'S' ~-liti~y ~ i - _ ` . ~ _ ~'h 1 ti• I ,,~,,~.r.~ti, ~ p, Boulder Valley ~w; Regional Center ~ a I-,. , _ y{, 1~^I,~1,~.}~:,~"1~1' University S-'_~i'!l;r- Hill and CU a I r' w`t~'~ ti;~:,~.~,~ ~y ~ Downtown ~rL I r' ~Il'1,~ I "'t.~~ I 1 Ilr. 1 :y~ ~;71 i ~r ~ 1 ~ 1, ~ ~~.~{~-~••;~~~5. ~ ~ r,~r*m~n t~ ~ Re+~ ~~1 Fars ~.t~, r,~ _',.;:-:v _ ~ w•~.I~~r,~yn;•t ~.:~s,ry c;H,rtr ~~h1j+t ' -:r: r ~I?'. r. :,l•. ' .T~r't-:.!.I .1~'~~. ~--~Ir' ~ ~ ~ ~11'JY;P~'~M'Y r1]PMM`.l_~lr~~. ~ ~ ~tiruc'tu~~ ~{ap ~ I~ 6~al~drrYile~ Gr>~ie~:n~rlkn~ B~~itr Gl~wldo University Hill Build-out Analysis of BMS and UHGID December 18, 2008 Problem Statement: ¦ Economic Factors ¦ Urban Design Factors ¦ Historic Preservation Factors ¦ Social Factors Altlzouglz the Co»zprelzeizsive Plan describes University Hill as serving both regional and neiglzborizood ficnctior7s as it Izas Izistorically, i~z recent years it has become a place for sticde~zts only with little that woicld attract a regional market or neighborhood residents. Witlz little reinvest~ient by property owners, a limited Unix of roses, a ti»ze-worn image, and a combinatio~z of factofs tlTat resrclt i~z an icntivelcome and at ti»zes dangeroacs atmosphere, University Hill needs Izelp. With over ten years of plans and sttcdies to draw inspiration from, little substantial change Izas taken place. A clear strategy is needed to spark interest in property improvements and provide an appropriate balance of renovatio~z, ~zew developme~zt, preservation, and additions, an attractive mix of loses, antl an attractive public real~sz. Sicc•I7 change is needed if Uiziversity Hill is to once again firlfill its dical purpose of serving as a regional center and serving arerc residents cos a neiglzborizood center. University Hill Build-out Analysis of BMS and UHGID December 18, 2008 Proposed Goal Foster a vibrant and welcoming area, one that serves the neighborhood and the university community with a diverse mix of uses to attract a wider range of residents and visitors. Proposed Objectives A. Use M1x Encourage multiple, different and new uses B. Historic Preservation Preserve historic quality C, Area Character Encourage the area s unique character as a neighborhood and regional center D. Larger sites Encourage selective larger land assemblages to invigorate development E. Centralized Parking Appropriate level of parking, account for transit service, addresses congestion, enhance UHGID's viability F, ran Public pace Integrate: enjoyable urban outdoor spaces: e1g ors Address concerns. of the University Hill residents to protect and strengthen neighborhood livability H. Feasibility Encourage plans. that allow for -the feasible redevelopment of the area Uni Hill Total Existing Built Sgft (Source: Primarily county data, as recorded in 2000/01 DUHMD database) University GRAND TOTAL ~s;s~•~,,~ BLOCK TOTAL 270,825 sgft ~ ~ 33,566 sgft , pkg lot 0 0 1.0,222 °i~, (outside HGID UHGID) k p g~leasant Gas stn (outside UHGID) 3,108 BLOCK TOTAL BLOCK TOTAL 28,143 sgft - 14;2$ll 5,580 sgft ,960 8,795 I 5,~~~ - - Pent~syl ania U loc (outside UHGID) 3,000 BLOCK TOTAL 1,s~6. ~ a 220 ' ' ~ BLOC K TOTAL 55,148 s ft 5;764 ~ ry q f ~ - 13,oas ty~, 83,285 sgft 8,500 ~ 3,796 0~~. 5, 386 'G 8,377 6;365 ` 5;100 j ~3,84D 10,`1$1`_; I 3,026- { i 7,789 9.017 f COIIPC~e BLOCK TOTAL - - - ~<<.A>sa s~i ,362 14,001 sgft .g37g 4: ~ ~ ~ BLOCK TOTAL ~ 51,102 sgft Legend o Building Footprints uHg IoD UHGID (+3 parcels outside UHGID: CU&UHGID pkg lots + gas stn) Total existing building sgft (mostly cnty data) 0 - 4,999 ® 5,000 - 9,999 _ 10,000 - 14,999 - 15,000 - 27,595 Existing Condition on 37 parcels within BMS and UHGID General Study Area Address Site Area Existing Bldg. Build out under (RRC 11/20/06 Memo) Above Grade existing zoning 1 1335 Bovis 7,685 5,575 14,217 2 1313-1325 Bovis 22,884 17,769 42,335 3 1311-1301 Bovis 13,565 10,222 25,095 4 0 Broadway CU Lot 11,769 0 7,885 5 i 135 Art Hardie 12,875 13,049 23,819 6 1127 house 6,914 5,386 12,791 7 1121 6,849 10,131 12,671 8 1111 CU bookst 13,230 15,702 24,476 9 1155 Pleasant 5t. UHGID Lot 12,957 0 23,970 10 0 UHGID 9,498 0 6,364 11 1219-1221 Penna. 5,121 3,960 9,474 12 1301 coffee shop 3,723 5,580 6,888 13 1275 Gas station 14,980 3,108 10,037 14 1211-1213 bike shop 8,084 14,280 14,955 15 1203-1207 6,606 6,795 12,221 16 1165 Sink 10,642 10,746 19,688 17 1155 3,578 3,000 6,619 18 1149 2,970 1,326 5,495 19 1143 6,302 5,764 11,659 20 1135 13th St Fox 8,177 8,500 15,127 21 1129 Tulagi's 6,365 8,377 11,775 22 1121 5,860 5,100 10,841 23 1119 3,263 3,026 6,037 24 1101-1107 nw corner 9,563 9,309 17,692 25 1089 Flatirons 9,589 9,375 17,740 26 1083 3,174 4,626 5,872 '27 1144 4,731 8,220 8,752 28 1130-1134 2,184 3,796 4,C40 29 1120-1134 4,574 6,355 8,462 30 1118 2,240 3,840 4,144 31 1110-1116 5,650 7,789 10,453 32 1100 6,235 9,017 11,535 33 1352-1370 College Ave Jones Drug 11,391 17,557 21,073 34 1350 1,594 1,302 2,949 35 1324-1326 2,710 4,648 5,014 store, police 36 1310 10,034 27,595 18,563 37 0 14th St UHGID lot 18,991 0 35,133 Total square feet 296,557 270,825 505,859 Floor Area Ratio (FAR) 0.91 ? a ? J: a UHGID Parking l ~ 0 1 Lot Outside UHGID ~ Gas Station boundary ' ~ outside UIiGIll ` Boundary Plea a t UC Parking Lot located n Outside 4,a ' ~ ~ UHGID ennsy vanla I~ ~ Boundary o i ~ ~ ~ ll c~ ~ Q ~ IQ , ~ College ~ ;~r E ~-y ~ ~ UHGID Parking L-.1 ~ ;I Lot Inside UHGID outside ~`1 ~ ~ I , BMS Bowrdary ~ ~ ~ ~ ~ ~ ~ i Q ~ L ~ ~ d' M ~ ~ ~ ~ Q Q ucli - Existing Zoning and Parking District 1.85 FAR allowed for parcels located inside the UHGID Boundary .67 FAR allowed for parcels located outside the UTIGID Boundary UHGID Boundary ` - - - - BMS zone University Hill Build-out Analysis of BMS and UHGID December l8, 2008 Summary of Three Options for Potential Redevelopment of University Hill Total Current Build-out OptlOn Optlon OptlOn parcel buitding under area s above existing 1 2 3 grade zoning Expand Hill Broadway Micro-zone BMS to Commerei locate most density and parking along Broadway include al Context UHGID Study IOtS and (HCCS) make Locate most 2.0 2.2 2.35 moderate density and FAR On FAR On FAR changes to parking along ~ ~ existing l3`" and south of B way B Way + On context (i~ College + 1.85 1,85 B'way ].85 FAR all all + 1.85 other other all other Sq. rt, a96,ss~ a~o,s2s 505,859 557,663 574,228 577,356 606,013 649,863 rAR Approx 0.91 1.70 1.85 range of 1.95 2.04 2.19 1.4 to 3.9 L~~'-~~~\ 1~ I n~"1~1~~ c, ~r~i.~~. ~t ~y~i v,. - .t~ 'i: ~ 'i-~ ~ ~ _ ~ Cl }',.'l~' I r'~IG~~ ~ ~ ~ ,.'c 'r I; 11.. T~ \ ~t I.~r`~ I. I ~~I I i5i i:~ ~ U ~ ~a,~ .mot / --r? I~~, y ~=~~~~ly Y_i;,~li~ t: I-!keg, i~~ ~ ~ w~:- ~I t eus,.en~cro ill , P i ~ 1 ~i ~,ai -'•z .I ~ J : L~ I~~:' , ~ ~ ~ ,1 r r 9ti ~ ~ ~ .~la' I`L i ~ `L /`'g~ ~r }fr t.j:y ~d' ~ l~ 1~ ,.~~tSI -a i.-^ ,r il. ylr~ ~ ~ 1'~r _~~~.r~'~ - ° y' 17~ ~''c-----lllilli ~~L'zJ I.~i - - Option Option Option 1 2 3 Expand BMS to Hill Commercial Broadway Micro-zone include UHGID Context Study (HCCS) Option 1 Expand BMS to include UHGID ¦ Build-out to 1.85 FAR ¦ Co-terminus boundaries ¦ Exempt requirement that 50% below grade FAR ¦ Clarify BMS standards to not preclude buildings larger than 15,000 square feet; although they are subject to approval through Site Review ¦ Broadway "Green Edge" and Plaza ¦ Develop 2-3 story structures on Broadway frontage with up to 4 story structure set back from street ¦ Retain character on 13th Street allow development with 2-3 story above and setback from existing facade - 1:i.~\ o - - C oEta L~ - ~~a _ L-' i IDttodr C sacs ~„a CRGID ~ , p - , - ~ boutnlaifesw• Q ~t----~-~ ~ ' ' \ DI 0 0~ l 1 -,-1 .n" ~ I r o 0 0 0!~ I\ L~ 1 1 L: I ~ I _ ~ _ At 1.85 FAR development would more than double the current 270,825 square feet to 557,663 square feet Option 1 Expand BMS to include UHGID r i _ L - J~ _--~r i ' - , _ ~ ~ / ~ ~I ~ _ ~ r _ . _ i ~ - - - 13m - - r ~ ~ ~ ~ ~ ' V ; ~ ~ ~ « ' ~ ~ bn / .u / / ~ J 'f i ~ ~ ~ Option 1 Expand BMS to include UHGID University Hill Parking Demand Option 1 Existing Parking Supply 160 on Street spaces Exist. Build. 1.85 285 Off-street =445 spaces (RRC Total site above Report) area grade FAR 269,557 270,825 557,660 50% residential @ 1,000 sf./space 279 50% non-residential @ 2.25N,000 sf. 627 TOTAL 906 75% residential @ 1,000 sf./space 418 25% non-residential @ 2.25//1,000 sf. 394 TOTAL 732 25% residential @ 1,000 sf./space 139 75% non-residential @ 2.2511,000 sf. 941 TOTAL 1,080 O lion 1: Parkin Su I O lions Not A licable BROADWAY MICRO-ZONE UHGID + B'Way Micro zone HCCS ESTIMATE Average 2 Two levels below grade 6 levels on UHGID sites (4 levels below grade on sites parking on Broadway above + 2 levels below identified in HCCS report reds 0 n-Street 160 160 160 Off-Street below reds 705 1.111 1.066 Total Parkin su 1 865 1,271 NA 1,246 LL ~ r,"•t~c L psi,-.I'~(~ L.l J, 1 } I ~ ~~4, --t1 r. ~r. I~`~f~i1~'i:1~`~' \ / 'r~-ems- - i i l(~i `~3, ~i-1r~~_~~+:~~ \ :.r--'+_ ~ 1 ~?_I ~J j~-1'4J'~~~ L~ 7-Vl ~J ~ i W i ['S'1 41' ' ' ~?~5~•ti 4-`(S 1~~.` ~.~.y~ [y~ ( Iln.lna \Ulo:•r. ~ , 3~~,.ho \Il.ia n.. ~ t!~I ~ lY?~\,~\ I cM.~ c~:d c.u cat PT -J L~ Cl ~ a•<n ms ca~taac lI -1 I f ~I _ II LJ - ~ ~ aTa- ~.,~J LI 1.1 ~ ~ n., ~ ~ L\ \ , •,f,-."`..... viii L,. a., 1. ~ - ~ ~ . Option 2 The Hill Commercial Context Study (HCCS) Key Features: ¦ Most redevelopment on the south and west sides ¦ Least amount of development on Broadway ¦ Estimated development approximately 574,228 square feet ¦ Approximately 1.4 to 3.9 FAR within BMS and UHGID ~t FIGURE 2~: Ilhistralivo Concept Plat uNl~'ERSI,T~Y,.AVE. ~ ~ ^ ~ -k ~ Study area 1_. - I ~ 1 , I• , t ~ y 'y within BMS ~ - - - and UHGID ~ ~ ~ general ~ Q~ i ' <-~..~~-`';P~~s~,vr° ~ ~ ° combined ~ j~~ r ~ { ~ ~ boundaries ~ ~ ~~r ~~y '_~9-~- ' r.~. ~UNIVERSIiY~a, 'w, rCNh~3rwANIA " ~lf;•Cv yyam~., NI~` ~ - { ~ ~ ~ 1 ,'ti-~.'jf I .ms's . .`r. r ' f " ~j~a.S `1 r{' I..u ~ 1. °fi`::,- . ~ ` 11 _ n11 ~!!Fy5 ~~t ~I ~ I 1 _ n •l 'N "s r '.,v ;i"~~~', :f .ih I' I f ,i'0., '~€7f-j~'~-~ .~W 1 MI 11 ~ y'1 CL~' I I "'1. ll ~I~ y l ~ r ' ,-EUCLID A\[~~rrr~i. _ i-' tip' - - - Option 2 The Hill Commercial Conxext Study (HCCS) Although the HCCS presents a concept that includes areas outside the BMS zone and UHGTD, this report presents an analysis of the BMS zone and UHGID only. Analysis of the RH-5 zone that is included within the HCCS will be addressed at a later date. The HCCS also outlines a vigorous overhaul of the public realm including streets, alleyways and open spaces. This report only addresses issues related to the bulk and mass of buildings. Consideration of the public realm will be considered at a later date. , ° U l a~~~~ ~t ~ ~ ~ u ~ o A l ~ ~ _ _ ~ Piea:a-~ - ' - _ a ~T~ 4 ~ ~em~o.•Icania ~ ',i F t ~ Lo ~ ~ ~ F`-"1 I ~ P ~ ~ 1~ ~ LJ~y E ~ L Y. ~ Ca ege ~ ~ r~ ~r~ d S- r - r L ~ \ r p E i 444111 ~ ~ i ° ~ ~ Approx range of 1.4 to 3.9 FAR 2.0 FAR and above Below 2.0 FAR Option 2 The Hill Commercial Context Study (HCCS} Ft~.,:FE?r P1c~ltnvux5a•A k«Iwawt:pnsrrl Sinlr~y C7t~~~ixn ~ ~ tvi,axar eti.• nts-ntat ~w ~ C t u~nr.Ut?:il'~'tE W"iNE tNvn c_.RU.iti,~~• 1 ~ ~ ~ ~ - ~ _ _ ~ ~ F I - ~ i I , ~ k c-~ - - ' ~ ~ i ~o d l ~ Historic Preservation ¦ Land marking or designating individual properties ¦ 5 Blue parcels identified for preservation/restoration ¦ 16 Red located within B'VIS & UHGI D "To the extent practical and economically feasible, these buildings' historic character and ambiance should be reflected in their contributing facades or components could be integrated into new buildings." • Option 2 The Hill Commercial Context Study (HCCS) University Hill Parking Demand Option 2 Existing Parking Supply 160 on Street spaces 285 Exist. Build. Option 2 Total site area Off-street = 445 spaces (RRC Report) above grade HCCS 269,557 270,825 574,228 Parking Demand for Build out 50% residential @ 1,000 sf./space 287 50%non-residential @ 2.25!1,000 sf. 646 TOTAL 933 75% residential @ 1,000 sf./space 431 25%non-residential @ 2.25//1,000 sf. 323 TOTAL 754 25% residential @ 1,000 sf./space 144 75%non-residential @ 2.25!1,000 sf. 969 TOTAL 1,113 Parkin Su 1 O lions Not a licable Not A licable BROADWAY MICRO~ONE UHGID + B'Way Micro zone HCCS ESTIMATE Average 2 Two levels below grade 6 levels on UHGID sites (4 levels below grade on sites parking on Broadway above + 2 levels below identified in HCCS report grade) On Street parkin 160 160 160 Total Parkin su 1 NA 865 NA 1,271 1,246 '`G ~ i r i`~ r 1 i v lF•. ~~l~f~l tradr pn lmt - ~ ~ l ~~J l .c~' f Option 3: Broadway Micro-zones Key Features ¦ Similar to Option 1: two micro-zones Broadway Zone with three alternatives developed at 2.0 FAR, 2.2 FAR or 2.3 5 FAR ¦ 13th Street zone developed at 1.85 FAR ¦ Locate most development on Broadway ¦ Retain the historic lot and building pattern along 13th Street ¦ Explore the implementation of a potential historic district .r-t - s ~ 4 ~ II ~ 1I~ 1 r ~ J~ L ~ +s nAY _ ! _l ~ ~ _ ~I~y~-7;1i .1111 r Hi~~crt ~ ~ ~ . ~ i Gr~.v.~ - ~ 1 ~ ~ - ~ ~ C~ - - ~ 1 ~ ~ 1~ 11 ' ~ ~ ~ ~ e~ r ~ ~ r_ r.. Option 3 Broadway Micro-zones - _ ~ 1 ~ ~_r ~ r ~ i g ~ ~ ~ R ~ ~ ~ u. v ~ / / ~ ~ f ~ ~ Option 3 Broadway Micro-zones - r..~ _ ? .0 FAR: Ill order to } ~ ' .I ~ _ lllaisltaill t«~o scaly frollts I T ' ( ~ _ f~icill~ onto Broach~~ay alld - ~ . . ~ (i ~-,Jl ~ - 13 Street, provide a side ~ - - yard setback, and protiide _ - ~ , ~ luball opell spaces, partlalls 1 _~.f - IV £Y° of the bilildul~s 1'ise to four { - ~1 ~ I ~ stol'les. The lU'ball Opell l _ ~ ~ ~ Jy ; ` ~ - ~ space 1'ah0 111 t1llS Opt1011 15 - ~ - - _ the sallle as Optioll 1: 16% ~ f , _ allcl 24°/a facili~ auto - 2.o FAR- Braacl«-ay = T`., 2.2 FAR: This 1zti e1 of I' ~ _ ~ detielopnlent allot~~s a ~ , 1 ` ~ ~ - S111ll~ai, UUt SOlll~~y'll~it • - ~ _ , ~t~._; smaller, OlJell Space ratio a.S _ ~ ~ - the 2.0 FAR. BL111d111~S 1aS~ I~ ~ ~ ~<r-= their siclz yard setbaelt, ~_~s6 _ _ , Ueeollle some«-hat tlueker, a11C1 protlllCle I1101'e t0`val'Cl ,1 _ I _ - _ the suleu~alk. Thz plaza I I ! , ~ / rJ _ _ ' 1'Z11131i15 the S~llle S1ZZ. . - 2.35 FAR: The Uuildillgs in this option Ueeonle tiely ~~i - ~Ll . ~ , I_ _ ~ r t111Ck titi ltll Slllaller h~; O Scaly i~ ~ ~ rt Utlilclillas facilla onto _ - _ f - - ~ _ Broaci«~ay. The plaza area ~ 1, ~f ` relllains the same size, ~~~lule _ ~ ~ . , ~ the grzeli edge becomes ! ~ - = suUstalltiall sillaller. _t _ _ / y - ~ - y~ .v~. - _ 2~~ol~T>vJA~ Al l C~~Zo,V E ~ = - Option 3 Broadwa Micro-zones University Hill Parking Demand Option 3 Option 3 Option 3A Broadway Micro-Zone UHGID lots used for parking + Broadway Micro-Zone B'way B'way B'way B'way B'way B'way Existing Parking Supply Total Exist. Build out Build Build build Build Build 160 on Street spaces buildab Build. @ 2.0 + out @ out @ out @ out @ out @ 285 Off-street = 445 le site above 1.85 for 2.2 + 2.35 + 2.0 + 2.2+ 2.35 + spaces (RRC Report) area grade all other 1.85 all 1.85 all 1.85 all 1.85 all 1.85 all other other other other other 269,557 270,825 577,356 606,013 649,863 488,269 510,020 526,333 50% residential @ 1,000 sf./space 289 303 325 244 255 263 50% non-residential @ 2.25/1,000 sf. 650 682 731 549 574 592 TOTAL 938 985 1,056 793 829 855 75% residential @ 1,000 sf./space 433 455 487 366 383 395 25% non-residential @ 2.25//1,000 sf. 325 341 366 275 287 296 TOTAL 758 795 853 641 669 691 25% residential @ 1,000 sf./space 144 152 162 122 128 132 75% non-residential @ 2.25/1,000 sf. 974 1,023 1,097 824 861 8$8 TOTAL 1,119 1,174 1,259 946 988 1,020 Parkin Su I O tions Not A licable BROADWAY MICRO-ZONE UHGID + B'Way Micro zone HCCS ESTIMATE Two levels below grade fi levels on UHGID sites (4 Average 2 levels below parking on Broadway above + 2 levels below grade) grade on sites identified in HCCS re rt On Street ~arkinc 160 160 160 Total Parkinc su I 865 1.271 NA 1.246 i _1 u E i7~ ; ~ ern. ,r~~~ 1~ . I~~ ~~t ~i~ I' h1~41J IL! ( t ~ ,v~ ' ~ ~ b. 11 lilt ~ ~ 1 1 n r~ I_ q d .l r is 1 ~ ~ 1 ~ ~ L J _ f _ ~ i. Ll r~ I ii'~-~ ~7_ ~ + ~ C~ ~ .~F si?_k I~ ~+1 ~ la..~~.,,o;l.:..•'~ asjj 1. R ~ 3~,.....,u,.,.,, ~ III1_J I IA..~-ar..rs,~ -F' ~ f-~ - CJ 11 c.~wn,.ro.xey 1 , {.f .lu ~ , f Iv.,., rte, . . r_. I: - r ~r'-'`L- I C . isS~il_~~,~__rl _3 ,I~ (~t ~~~ti~ f..t~-~ ~ , I ,i ~~y- R rr ~ ~ l I y. 1.1 l~~ I I. ~ . Ali - I.1~f / ` L csJ lJl~ t V~ft~ rT.~~ i-~ ~,!`:.r L r: (~+r~,1~. ~`.I C~ of 1 !~-r~+- IIIL.J LI •~'1 " l L F~~ ~ I. G' ~~1 llc II '1ISJ ~ I~,'~T"g~ t5'CV` 'i" 1. I J..lrll _ ~ ~'='J ~"I I 1 i'_`.'~._1~~ JJ L~IJI~!J ',~.z`- I ~ - - University Hill Build-out Analysis of BMS and UHGID December 18, 2008 Summary of Three Options for Potential Redevelopment of University Hill Current Ruud- Option 1 OptlOn Option buildings out above under EXpand 2 3 grade exist;ng BMS to Hill Broadway Micro-zone zoning include Commerci Locate most density and parking along Broadway UHGID lots al Context and make Study moderate changes (HCCS) to existing context (a~ 1.85 FAR Locate most density and 2.1) FAR 2.2 FAR 2.35 FAR parking along on B'way on B'way on B'way ]3th and south of + 1.85 + 1,85 + 1.85 College all other all other all other sq' z~o,s2s sas,ss9 557,663 574,228 577,356 606,013 649,863 Feet FAR APProz 0.91 1.70 1.85 range of 1.95 2.04 2.19 1.4 to 3.9 .I' \G' ~ ~ J .r .rc t,l_ ! >>1\_ II LI .1.LUn.-~~~~~ `y~ {-tt ~~tt ~,~r ~ ~ i ~ jam` LL~1~f7~ U~ ~ ~ ~ bi~~tr rr~,,,,,,, z r. :;r ~ - 4 Ta.t I ~rf',\• ~V"~ ~ ~ Pw. v ~ I I~ ;IL~~ lj;~~~~ '~I j~~, r'-11 ~-c.~ r~ i ~ r--11 f l~ (u ' ~ ' .n ul i .:I j~'~ ~-r-' ' _r , f ~`:j ~ ci ~r'~F 2-~ I..: i~ ~ , I ~1 i`1rd~' 'Sy, ~t ~ :L~]T a L~ ~'l f` j.' r .i:~~ T~? IL7'~ I r.~~ T~] 1 '~Fll.~~ rr~.'1-~== f~7'IU l ~IL~ I ~~l ~ 4- ~ ~~-J ~ Option Option Option 1 2 3 Expand BMS to Hill Commercial Broadway Micro-zone include UHGID Context Study (HCCS) University Hill Build-out Analysis of BMS and UHGID December 18, 2008 This report presents the "build-out analysis" mentioned in the March 2008 Joint Study Session memo, and it completes that phase of work. If Plannin Board believes that further anal sis as well as refinement of g Y the Options, is needed, a second phase to this project would either need to wait until mid 2009, or delay the start of other existing work program items such as the Multi-modal Corridor Study to the second half of the year. Should Planning Board desire further work on University Hill., staff would propose the following questions: QUESTIONS FOR PLANNING BOARD A. Do you agree with the draft problem statement? B. Do you agree with the draft goal and objectives? C. Do you agree with the options to take to the public? D. Do you agree with the next steps? 1. Public Outreach 2. Present T'indings and Planning Board review to City Council 3. Conduct Collateral Studies with UHGID and Transportation including evaluating options against objectives 4. Prepare a memorandum outlining options including moving forward with an area planning process, potential changes to the Boulder Land Use Code and/or other relevant regulations and guidelines for Planning Boarcl and City Council.