Loading...
4A - Call Up: Floodplain Development Permit (LUR2011-00012) 13th St between Arapahoe and Canyon MEMORANDUM TO: Planning Board FROM: Katie Knapp, Civil Engineer, Floodplain and Wetlands Permitting DATE: March 11, 2011 SUBJECT: Call Up Item: Floodplain Development Permit (LUR2011-00012) Bicycle Racks in Flood Conveyance Zone This decision may be called up before Planning Board on or before March 24, 2011 A Floodplain Development Permit was approved by Planning and Development staff on March 10, 2011. The project involves installation of bicycle racks in the flood conveyance zone. The proposed project includes installing bicycle racks in various locations in Boulder. within the flood conveyance zone. The proposed bicycle racks will be structurally anchored to concrete foundations so that they will not become debris during a 100-year flood event. The applicant has demonstrated that the project will not adversely impact the floodplain or cause a rise in the floodwater elevation during the 100-year flood event. A copy of the floodplain development permit is attached. This floodplain development permit was approved by Planning and Development Services staff on March 10, 2011, and the decision may be called up before Planning Board on or before March 24, 2011. There is one Planning Board meeting scheduled within the required 14-day call-up period on March 17, 2011. Questions regarding this floodplain development permit should be directed to Katie Knapp in Planning and Development Services at 303-441-3273 or knappkLabouldercolorado.gov. Attachments: A. Floodplain Development Permit 3 Agenda Item 4A Page 1 of 2 CITY OF BOULDER Planning and Development Services .4' 1739 Broadway, Third Floor • P.O. Box 791, Boulder, CO 80306-0791 phone 303-441-1880 • fax 303-441-4241 • web boulderplandevelop.net Land Use Review Floodplain Development Permit Date Issued: March 10, 2011 Expiration Date: March 10, 2014 (Pursuant to Subsection 9-3-6(e), B.R.C. 1981) Permit Number: LUR201 1-0001 2 Contact Information MOLLY WINTER 303 413 7317 Project Information Location: 13TH ST BTW ARAP & CANYON Legal Description: Description of Work: Relocation/removal of bike racks in the high hazard zone. Type of Floodplain Permit: Floodplain Review W/O Analysis Creek Name: Boulder Flood Protection Elevation: Not applicable Conditions of Approval The proposed project/activity is approved on the basis that it satisfies applicable requirements of Chapter 9-3-3, "Floodplain Regulations," Boulder Revised Code 1981. Other floodplain requirements as set forth in Chapter 9-3-3 which are not specifically outlined in the conditions of approval below remain applicable to this project/activity. The applicant shall obtain a site inspection and approval from the City of Boulder Floodplain and Wetlands Administrator upon completion of the projects. Improvements shall be constructed in accordance with the plans submitted as part of the floodplain development permit application. Inspections To schedule an inspection, call 303-441-3280 and refer to your permit number (LUR201 1-000 1 2). Flood Foundations Inspection Final Floodplain Inspection 4 Agenda Item 4A Page 2 of 2