Loading...
4 - Call Up: Boulder Creek Trail Bridge Replacement Floodplain Development Permit (LUR2008-00104) MEMORANDUM TO: Planning Board FROM: Katie Knapp, Civil Engineer, Floodplain and Wetlands Permitting DA'I'S: December 18, 2008 SUB.11?;CT: Call Up Item: Boulder Creek Trail Bridge Replacement Floodplain Development Permit (LUR2008-00104) This decision maybe called up before Planning Board on or before January 8, 2009 A Floodplain Development Permit was approved by Planning and Development staff on December 18, 2008. The project involves replacement of a footbridge on the Boulder Creek Trail within the conveyance flood zone of Boulder Creek. The proposed project involves removing a decaying, timber footbridge and replacing it with two 18-inch diameter concrete culverts. The existing bridge is located to the north of Boulder Creek between 19`h St. and 24`h St. The bridge crosses a drainage ditch which runs perpendicular to and drains into Boulder Creek. The existing bridge and handrails will be removed. The new culvcri crossing will not require handrails because it will have less than a 30-inch drop-off. Shoulders that are 3-feet wide will also be constructed on each side of the trail over the culvert crossing. The applicant has demonstrated that the project will not adversely impact the floodplain or cause a rise in the floodwater elevation during the 100-year flood event. A simple wetland permit (I.UR2008-00108) was also approved for this project. Simple wetland permits are not subject to Plaruling Board Gall- up. "Phis floodplain development pern~it was approved by Planning and Development Services staff on December 18, 2008, and the decision may be called up before Planning Board on or before January 8, 2009. Due to the holidays, there were no Planning Board meetings within the required 14-day call-up period, so the call-up period was extended until the date of the next Planning Board meeting on January 8, 2009. Questions regarding this floodplain development permit should be directed to Katie Knapp in Planning and Development Services at 303-441-3273 or knappk(c~bouldercolorado.gov. CITY OF BOULDER •.1~;~~' Planning and Development Services 1739 Broadway, Third Floor P.O. Box 791, Boulder, CO 80306-0791 phone 303-441-1880 fax 303-441-3241 web boulderplandevelop.net Land Use Review Floodplain Development Permit Date Issued: December 18, 2008 Expiration Date: December 19, 2011 (Pursuant to Subsection 9-9-9(e), B.R.C. 1981) Permit Number: LUR2008-00104 Contact Information CITY OF BOULDER PUBLIC WORKS 5050 PEARL ST BOULDER, CO 80301 303-413-7141 Project Information Location: 0 GRANDVIEW Legal Description: TR 416-1 LESS I-1 & I-2 36-1 N- 71 PER DEED 842045 04/16!87 BC R 000192 ARAPAHOE AV BOULDER Description of Work: Flood permit for'Footbridge at Boulder Creek path southwest of CU practice field to be replaced with a culvert. Type of Floodplain Permit: Floodplain Review W/O Analysis Creek Name: Boulder Flood Protection Elevation: Conditions of Approval The proposed project/activity is approved on the basis that it satisfies applicable requirements of Chapter 9-9, "Floodplain Regulations," Boulder Revised Code 1981. Other floodplain requirements as set forth in Chapter 9-9 which are not specifically outlined in the conditions of approval below remain applicable to this project/activity. The applicant shall obtain a site inspection and approval from the City of Boulder Floodplain and Wetlands Coordinator upon completion of the projects. Improvements shall be constructed in accordance with the plans submitted as part of the floodplain development permit application. The improvements shall be constructed to minimize and mitigate impacts to the existing wetlands in conformance with the conditions of the City of Boulder Wetland Permit issued for this project. Inspections To schedule an inspection, call 303-441-3280 and refer to your permit number (LUR2008-00104}. Final Floodplain Inspection i % I ~ i ~i ~ , , - , ~~~:a:,- i i , ~ it `~t.~-~ . ti ~ ~ ,W..K ~ , I I - _ - \ FLOODWAY ~ --~:a ~ _ - - - _~-CI BASIN BOUNDARY ~ St ACRES j ~ ~ 1 I I I I I HHZ ' ~ . I ~ ice/ ~ ~ I ~ I l REMOVE EXISTING BRIDGE. ' - ~ ~ , / REPLACE~WITH TWO-18" RCP. _ r •`y _ , _ SEE,DETAIL SHEET 2 ~ ~ - / 1,~ _ it . . ~ ~ , , ~ _ 30'JLDER CREEK' - - ~ ; 100-YR ~ ~ `$.3p~ } ~ 53C5-:= ~ _ _ _ , . _ ~ CITY OF BOULDER COLORADO ~ x_ - BouL~ER CREEK TRAIL CROSSING ~ i ~~I ~ j 2