HomeMy WebLinkAboutMeeting Packet - Parks & Recreation - 12/5/2011
PARKS AND RECREATION ADVISORY BOARD MEETING
West Senior Center Creekside Room
909 W. Arapahoe Avenue
Monday, December 5, 2011
5:00 p.m.
All agenda times are approximate
AGENDA
1. APPROVAL OF AGENDA (5:00)
II. ITE78IS FOR ACTION (5:01)
A. Continuation of Boulder Reservoir Master Plan Recommendation of
Approval (Public hearing was closed 11/28/11 - discussion continues
12/5/11).
III. NEXT BOARD MEETING: January 23, 2012
IV. ADJOURN
PARKS AND RECREATION ADVISORY BOARD
FUTURE BOARD ITEMS
(prepared March 26, 2012)
Department of Parks and Recreation Mission
The mission of the city of Boulder Parks and recreation Department is to provide safe, clean and beautiful
parks and facilities and high-quality leisure activities for the community. These services shall enhance
residents' health and well-being and promote economic vitality for long-term community sustainability. We
will accomplish this through creative leadership, environmentally sustainable practices and the responsible
use of available resources.
Regular/Ongoing Updates
• Park Development /Energy Efficiency Program Update
Next Board Meeting Items (January)
• Pottery Lab Report Discussion - January 23, 2012
• Capital Improvement Program Discussion - January 23, 2012
• Department Master Plan Update - January 23, 2012
Future Items
• Pottery Lab Public Roundtable - Date TBD (prior to January 23, 2012 PRAB
meeting)
City Council Meetings on P & R Items
• Public Hearing on the Acceptance of the Boulder Reservoir Master Plan (BRMP)
January 17, 2012
Tours and Study Sessions
• PRAB Tour - Pottery Lab and Columbia Cemetery - March or April 2012
2012 PRAB I<'Ieeting Dates
• January 23, 2012
• February 27, 2012
• March 27, 2012
• April 23, 2012
• May 28 * May be changed due to Memorial Day holiday
• June 25, 2012
• July 23, 2012
• August 27, 2012
• September 24, 2012
• October 22, 2012
• November 26, 2012
• December 19, 2012
Attachment A
Proposed Modifications to the Draft- Final BRMP
1. Web-based hyper-links will be included in the Final Plan throughout the document to
correspond with reference materials and data sources as required.
2. Chapter Name Change: Revised Chapter 3: Access, Parking and Trails to
Chapter 3: Transportation and Access
3. Transportation and Access chapter will call out a sub-heading for 'Transportation' and
paragraphs will be shifted as needed.
4. Move Chapter 3: Transportation and Access to new Chapter 4
5. Move Chapter 4: Management Areas to new Chapter 3
6. Inserted new text in Executive Summary or as a Prelude of the Executive Summary
that clarifies Intent of Master Plan and Next Steps (Site Management Plan).
Proposed text:
Master Plan Intent
The intent of the Boulder Reservoir Master Plan is to establish a long range vision, goals and
objectives for the Parks and Recreation Department managed land and activities for Boulder
Reservoir, including Coot Lake. The Plan will guide future management and investment
strategies by integrating the principles of economic, social and environmental sustainability,
including recommendations addressing water quality, natural habitat and recreational uses at
Boulder Reservoir.
Next Steps - Site Management Plan
The future Site Management Plan will focus on several areas to further refine the Master Plan
objectives. This phase of the Master Plan implementation will include all four Management
Areas of the reservoir study area and will address:
• Site Management Plan - Funded through 2012 CIP
• Market, programmatic and operational assessment - Future funding
• Detailed sustainable business model and operational plan - Future funding
• Biological species inventory - Future funding
• Traffic impact analysis and transportation alternatives assessment - Future funding
• Adaptive Management Approach based on newly defined programs - Future funding
The Site Management Plan will result in a 20-year physical site master plan illustrating, among
other things, designated passive and active use areas, building footprints, natural habitat
protected areas, recreational areas, trail alignments, parking area and possible shuttle service
access point, landscape and park amenity improvements.
1
7. Proposed text changes related to Goal/ Objectives statements
Chapter 8: Section A; Goals and Objectives (page 54)
Goal 1
1k. Determine the feasibility of providing improved bicycle, carpooling, alternative fuel
vehicle, and shuttle facilities and implement those strategies determined to be feasible
in the redesign of the South Shore.
11. Work with GO Boulder and appropriate agencies to develop a bicycle and vehicular
parking management strategy that promotes and supports alternative transportation
mode use and carpooling to the Reservoir and establish incentives for pricing strategies
to encourage car pooling and multiple occupancy visits.
1m. Encourage or require the use of shuttles for special and group events through a
permitting process that requires a percent of alternative transportation for large events
and determine the feasibility of requiring participants to use shuttles.
1n. Identify temporary shuttle pick-up and parking locations in other areas of the city for
events.
1p. Work with Boulder County Transportation to design and construct improved bicycle
lanes along 51st Street from Jay Road to the South Shore entryway.
Goal 2
2f. Implement the main entry gateway enhancements to address bicyclist and vehicular
conflicts on 51st Street.
21. Make improvements to the existing 55th Street and Coot Lake parking lots such as
parking design, access and egress upgrades, new informational boards, resurfacing, and
evaluation of parking capacity.
Goal 5
5i. Provide educational information at trailheads and kiosks about water pollutant
sources including stormwater runoff, pet waste, bodily contaminants, fuel spills, and
ANS.
Goal 8
8c. Work in conjunction with adjacent neighborhoods, Boulder County Transportation
and other affected agencies to develop acceptable transportation alternatives intended
to address vehicular traffic as a part of Special Events at the reservoir. A transportation
study would include a traffic impact analysis report and identification and assessment of
feasible transportation alternatives that may include; the potential for a second vehicle
2
access point to the South Shore considering access to the Diagonal Highway or other
secondary routes, roadway improvements along 51St Street to Jay Road, and a variety of
travel demand management strategies to help minimize the impacts of traffic resulting
from Special Events.
3
November 30, 2011
MEMORANDUM
To: Parks and Recreation Advisory Board, City of Boulder
From : Concerned Residents of Valhalla Subdivision
cc: Keith Walzakk
Re: Requested revisions to the Boulder Reservoir Master Plan
We thank the PRAB for hearing our concerns at the Nov. 28th meeting and giving us the
opportunity to request changes in the current Master Plan Draft based on those concerns. The
entire area surrounding the Reservoir is a very special place and we appreciate PRAB's
sensitivity to maintaining its environmental quality. We thank the PRAB in advance for
consideration of these changes.
Before suggesting specific modifications to the Plan we felt it would be helpful to provide a
succinct statement of our main concerns. This summary represents a "mainstream" view based
on communication within the neighborhood but does not necessarily represent the views of all.
To be clear, the primary issues are:
• The management of the current level of events has been totally inadequate leading to
significant disruption, inconvenience and environmental issues
o Traffic
o Noise
o Safety issues
o Water quality impacts
o Greenhouse gases
Restrictions, Management Plans and other measures need to be put in place to resolve
these problems
• The dramatically increased number of events proposed in the Master Plan is totally
unacceptable - the Plan is suggesting that these numbers could go up two to three times
vs current levels. And it is not just "Signature Events" that are of concern. While the
"special events"; defined as 50+, may not feel like a concern they are indeed a huge
concern. Recent history shows that many of these are very large - sometimes a 900 -
1000. Judging by the proposed numbers the plan seems to treat these as incidental but
in fact they are very consequential. Current numbers in the Plan would allow as many as
180 of these during the year.
• It is the feeling of most who live in the area that the current number of events is at or
close to the maximum that should be accommodated based on the capacity of the area to
absorb the impacts. (and this is predicated on far better management that significantly
mitigates those impacts)
• Any consideration of event volume needs to be based on a thorough and transparent
Carrying Capacity Study that considers all impacts, potential measures of mitigation and
the City's Goals of environmental protection, sustainability and balance of uses.
In general there is concern that the Plan would transform the reservoir into a very busy Event
Center to maximize its revenue potential to the City, especially during the spring and summer.
The proposed number of events reflects this and language in "Goal 7" does as well. This would
profoundly change the character of the entire area in a negative way, especially during the warm
months of the year when the demand for general recreational use at the reservoir is also at its
peak.
To address these concerns we propose the following modifications to the Master Plan
Under "Goals and Objectives" pp 54 - 58
Under Goal 1 (Sustainability; Carbon Emissions Reduction)
• Include a provision to "Eliminate excessive traffic congestion at major
events that results in large numbers of vehicles idling"
■ 1 m Require the use of shuttles for special and large group events as well
as major holiday events (eliminate "encourage")
■ Include a provision to work with Boulder Country Transportation define
and implement roadway improvements and policies that will improve
traffic flow and minimize conflict points during periods of heavy use (not
just improved bicycle lanes along 51S)
Under Goal 2
■ First item should be - Conduct a Carrying Capacity Study that would
define thresholds of activity beyond which undesirable impacts or
conditions result. Issues examined would include
o Pollutant loading and water quality impacts
o Habitat loss and wildlife impacts
o Boating levels
o Sanitation
o Transportation - general traffic to and from and within facility
o Noise
o Economic, social and property value impacts
Include recognition that study will be conducted in an objective and
transparent fashion with public input
■ 2e for examining feasibility of number of events add "within the
parameters defined by the Carrying Capacity Study"
■ 2f Implement main entry gateway enhancements.. etc including the
provision of additional gate houses
■ 2h in addition to signage mentioned work also with BC transportation to
define traffic control procedures to improve flow during times of heavy
use at this intersection.
■ additional point - Pursue the development of additional access from
C0119 with Boulder County and CDOT
Under Goal 7 Business Model
• Include a bullet that recognizes the need to balance activity load within
the parameters that come out of the Carrying Capacity Study
Under Goal 8 Endeavor to be a Good Neighbor
■ "hold periodic meetings with neighbors during busy event seasons to
share upcoming event information, reservoir needs and discuss any
issues residents may have"
• Specifically notify neighbors of any City meetings regarding Reservoir
Policy and invite attendance
• "Develop a revised Management Plan that mitigates the impacts of
major events
o Traffic
o Noise
o Environmental (wildlife, sanitation, water quality)
• Maintain a thorough and consistent approach to enforcement of the
regulations and requirements for events
Under Key Policy Recommendations (pp 59 & 60)
Special Events
• Eliminate any reference to specific numbers of the different types and
make this part of the development of the Site Management Plan (this
seems like the logical place for this anyway)
• The number of events and some other specifics of the Management Plan
would be guided by the outcome of the Carrying Capacity Study.
■ Additionally, the description of the event types needs to be refined -
there's too much range of size in the "special event" category
■ There should be some parameters placed on the types of events that are
appropriate for the Reservoir - could also be a part of the Site
Management Plan
Action Items
The above items need to be incorporated into the action item list - especially the
Carrying Capacity Study
PRAB should also be aware that some in the neighborhood request that certain power
boating restrictions in the Plan be reconsidered.
Attachment C
Staff Response to Valhalla Residents' Comments
The "Concerned Residents of Valhalla Subdivision" recommended changes are
listed in bullet form below:
Under Goal 1 (Sustainability; Carbon Emissions Reduction)
■ Include a provision to "Eliminate excessive traffic congestion at major
events that results in large numbers of vehicles idling
Recommendation - add to Goal 1 m and work to eliminate excessive traffic
congestion as a result of special events, that helps eliminate large numbers of
vehicles idling.
■ 1m Require the use of shuttles for special and large group events as
well as major holiday events (eliminate "encourage")
Recommendation - as related to the word encourage, all events no matter what
size, will be encouraged to use shuttles for their programs. Smaller events are
encouraged to use alternative transportation methods and the larger events will
be required to develop Traffic Management Plans (as exists currently), that will
require additional use of alternative transportation (i.e. shuttles) for events that
have traffic impacts on the roadway and community. As a result, uses of the two
words - encourage and require, reflect the actions planed.
■ Include a provision to work with Boulder County Transportation define
and implement roadway improvements and policies that will improve traffic
flow and minimize conflict points during periods of heavy use (not just
improved bicycle lanes along 51st)
Recommendation - add to Goal 1 p...and identify possible roadway
improvements and identify event procedures that will improve traffic ingress and
egress (flow) and minimize traffic conflict points during periods of heavy
Reservoir use.
Under Goal 2
■ First item should be - Conduct a Carrying Capacity Study that would
define thresholds of activity beyond which undesirable impacts or
conditions result. Issues examined would include
o Pollutant loading and water quality impacts
o Habitat loss and wildlife impacts
o Boating levels
o Sanitation
1
o Transportation - general traffic to and from and within facility
o Noise
o Economic, social and property value impacts
Include recognition that study will be conducted in an objective and
transparent fashion with public input
Recommendation - These identified items are currently under multiple goals
including plan Goals 1, 2 and 5, with the exception of "Economic, social and
property value impacts".
Regardinq Pollutant loadinq and water quality impacts - See Goals 5 a - 5i, as
related to managing water quality impacts and pollutants, use impacts,
monitoring, evaluation and use requirements that are to be consistent with water
quality thresholds. See also Goal 2a - Develop a Site Management Plan to
address "Operation and Management Thresholds." Such thresholds would relate
to existing water quality standards as enforced by the City of Boulder and, as
such, the City is required to follow the established acceptable levels.
Regarding Habitat loss and wildlife impacts - See Goal 2a - Develop a Site
Management Plan to address "Operation and Management Thresholds." These
"thresholds" include work on the baseline information for the existing flora and
fauna. The additional work related to the Site Management Plan and ongoing
work that is part of an adaptive management approach would result in regular
analysis and monitoring of such data, and identification of subsequent actions
that would need to be undertaken as a result of the impact. See Goal 3a and 3b
regarding protection and enhancement of wildlife and habitat.
Regarding Boating levels - See Goal 2a - Develop a Site Management Plan to
address "Operation and Management Thresholds." Currently staff enforces limits
and regulations related to use of all watercraft at the Reservoir. In addition, the
Site Management Plan will identify and establish any additional controls that will
be needed at the facility.
Regarding Sanitation - See Goal 2a - Develop a Site Management Plan to
address "Operation and Management Thresholds." The plan would include the
establishment of, or recognition and acknowledgement of, existing codes or
regulations that must be adhered to by operations of the facility. In addition the
reduced and or zero waste goals of the Department will continue to be enhanced
and enforced at the facility. Acknowledgement of the continued effort by the
Department to improve environmental actions and stewardship, of which waste
diversion and zero waste is one goal, was recognized in November 2011 by the
Department receiving the National Recreation and Park Association - Barb King
Environmental Stewardship Award.
Regarding Transportation - general traffic to and from and within facility-
2
See Goal 2a - Develop a Site Management Plan to address "Operation and
Management Thresholds." Such a plan would include the establishment of
procedures and regulations that would be followed relative to ingress and egress
impacts of the facility and during events or peak use periods. The Department
will work with Boulder County as currently identified in Goals 1 k - 1 p on
transportation impacts to the community as a result of the facility and on other
transportation goals of the plan.
Regarding Noise - See Goal 2a - Develop a Site Management Plan to address
"Operation and Management Thresholds." Such a plan would include the
establishment of, or recognition and acknowledgement of, existing codes or
regulations that must be adhered to by operations of the facility.
Regarding Economic, social and property value impacts - This request is beyond
the scope of the planned Site Management Plan. Further, information on the
economic, social and property values and impacts of adjacent or nearby parkland
has been documented to increase property values by 5% - 15%. See Measuring
the Economic Value of a City Park System, The Trust for Public Land, 2009.
■ 2e for examining feasibility of number of events add "within the
parameters defined by the Carrying Capacity Study
Recommendation - add to 2e - within the parameters and thresholds defined by
the Site Management Plan.
■ 2f Implement main entry gateway enhancements etc. including the
provision of additional gate houses
Recommendation - add to 2f - including the planned provision of the additional
gate house.
■ 2h in addition to signage mentioned work also with BC transportation to
define traffic control procedures to improve flow during times of heavy use
at this intersection.
Recommendation - add to 2h - and to modify traffic control procedures to
improve flow at this intersection during times of heavy use as a result of
Reservoir programs.
■ additional point - Pursue the development of additional access from
C0119 with Boulder County and CDOT
Recommendation - This is currently stated in Goals 2r and 8b.
Under Goal 7 Business Model
3
■ Include a bullet that recognizes the need to balance activity load within
the parameters that come out of the Carrying Capacity Study
Recommendation - under 7a add - and balance visitor capacity and activity
levels within the parameters identified in the Site Management Plan.
Under Goal 8 Endeavor to be a Good Neighbor
■ hold periodic meetings with neighbors during busy event seasons to
share upcoming event information, reservoir needs and discuss any issues
residents may have
Recommendation - Add to Goal 8 an additional objective 8d that states - Invite
the community to participate in meetings on the development of the Site
Management Plan, discuss issues related to special events and meet with the
community to share information about the Reservoir.
■ Specifically notify neighbors of any City meetings regarding Reservoir
Policy and invite attendance
Recommendation - The Department will add any individual or group to the e-
mail listserv for notice of Department meetings and activities. Neighbors who
would like this to occur should contact the Department to request they be added
to the e-mail listserv if they are not currently on the list.
■ "Develop a revised Management Plan that mitigates the impacts of
major events
o Traffic
o Noise
o Environmental (wildlife, sanitation, water quality)
■ Maintain a thorough and consistent approach to enforcement of the
regulations and requirements for events
Recommendation - The adaptive management approach that will be used by
the Department will regularly evaluate and assess existing and new/additional
management controls or actions that are required to ensure all plan goals are
met, including enforcement of regulations. See also Goals 3, 4, 5.
Under Key Policy Recommendations (pp 59 & 60)
Special Events
4
■ Eliminate any reference to specific numbers of the different types and
make this part of the development of the Site Management Plan (this seems
like the logical place for this anyway)
Recommendation - Currently the draft BRMP identifies 1,200 participants as
the number for a signature special event designation and 50 participants as the
level that designates a special event designation (see page 29 and page 60).
The Department believes that the designation should remain as identified in the
draft plan.
Please note that as related to special events; future effort is called out on pg. 60
as "The department will develop a cumulative analysis and impact report, as well
as standards and a tiered approach to event permitting to be aligned with the
Boulder Reservoir vision and mission." This specific reference is to identify the
next steps in managing special event use of the facility which would include
identifying and or creating all associated procedures and management controls.
■ The number of events and some other specifics of the Management Plan
would be guided by the outcome of the Carrying Capacity Study.
Recommendation - The number of events will relate to the overall adaptive
management plan for the facility and will be guided by the process related to an
impact report. See pg 60.
■ Additionally, the description of the event types needs to be refined -
there's too much range of size in the "special event" category
Recommendation - The Department will research an additional refinement of
event size for the Boulder Reservoir as part of the work identified on pg 60
related to special events: "The department will develop a cumulative analysis
and impact report, as well as standards and a tiered approach to event permitting
to be aligned with the Boulder Reservoir vision and mission".
■ There should be some parameters placed on the types of events that are
appropriate for the Reservoir - could also be a part of the Site Management
Plan
Recommendation - same as above "The department will develop a cumulative
analysis and impact report, as well as standards and a tiered approach to event
permitting to be aligned with the Boulder Reservoir vision and mission".
Action Items
The above items need to be incorporated into the action item list -
especially the Carrying Capacity Study
5
Recommendation -Action items are identified in the appendix of the draft
master plan. In addition, the next level of staff work will help identify further
actions and estimated expenses that are associated with the actions.
PRAB should also be aware that some in the neighborhood request that
certain power boating restrictions in the Plan be reconsidered
Recommendation - The Department believes that the identified boating
restrictions and recommendations should remain intact as recommended.
6