HomeMy WebLinkAbout5A - Motion approving the 2009 Expenditures from the Permanent Parks and Recreation Fund and Motion recommending the 2009 - 2014 Parks and Recreation Capital BudgetCITY OF BOULDER PARKS AND RECREATION ADVISORY BOARD AGENDA ITEM MEETING DATE: May 19, 2008 AGENDA TITLE: Public Hearing and Consideration of a Motion Approving the 2009 Expenditures from the Permanent Parks and Recreation Fund and a Motion Recommending the 2009 - 2014 Parks and Recreation Ca ital Bud et PRESENTERS: Jan Geden, CPRP, Director of Parks and Recreation Alice Guthrie, Parks and Planning Superintendent Abbie Novak, Business and Finance Manager Teri Olander, Acting Recreation Superintendent EXECUTIVE SUMMARY The purpose of this agenda item is for the Parks and Recreation Advisory Board (PRAB) to approve the Capital Improvement Program (CIP) as it relates to expenditures from the Permanent Pazks and Recreation Fund. Additionally, the PRAB is asked to provide a recommendation on the CIP budget for the .25 Cent Sales Tax and Lottery Funds. The department's CIP budget will then be submitted to the Planning Board and City Council for their review and respective considerations and approvals. Since 2006, the department has developed its capital budget in conjunction with the citywide business plan format for budgeting. Beginning with the 2008 CIP, some projects exceeding $50,000 previously included as renovation and refurbishment projects were included in the CIP budget. From this point forwazd, all projects exceeding $50,000 will be included in the CIP. The only exception would be emergency repairs that are needed during the budget year. The proposed allocation of the CIP budget includes average annual projected increases in the Permanent Parks and Recreation, .25 Cent Sales Tax and Lottery Funds. IMPACTS Fiscal: $10.7M. This amount reflects the total uses of funds projected for 2009 in the Permanent Parks and Recreation, .25 Cent Sales Tax and Lottery Funds. Note that target budget projections have still not been released by the city Budget Office but aze expected mid-May, and therefore a112009 capital figures are still preliminary. Additionally, the funds aze able to support all identified CIP projects that total $3,728,000 ($1.7M in Permanent Parks and Recreation Fund, $1.6M in .25 Cent Sales Tax Fund, and $360K in the Lottery Fund) that aze currently included in the CIP Project Summary Sheets (Attachments A-1, A-2, A-3). PUBLIC FEEDBACK No public comment was received at the April PRAB meeting. The May PRAB meeting also provides an opportunity for public comment on the department's proposed capital projects in the recommended 2009 CIP budget. The public will also have the opportunity to comment during the Planning Board's CIP review in June and City Council's discussions and review of the 2009 AGENDA ITEM # VA ;PAGE 1 recommended budget at several subsequent study sessions and public hearings. ANALYSIS The department's capital budget consists of CIP projects and renovation, refurbishment and major maintenance projects. CIP projects aze defined as any major project with a cost greater than $50,000 for purchase or construction, or major replacement of physical assets. CIP projects aze potentially subject to a Community and Environmental Assessment Process (CEAP) review that evaluates any potential environmental, traffic or social impacts to Boulder residents, neighborhoods and businesses. These projects aze budgeted within the framework of the city of Boulder's CIP Budget. Renovation, refurbishment and major maintenance projects consist of restoring and/or enhancing the service life of existing capital assets, either through refurbishment or replacement. These projects aze budgeted within the city of Boulder Operating Budget. Although these items technically are capital expenditures, they are budgeted differently than new CIP projects and are included here for context. The department has aligned its capital and operating budgets with the master plan recommendations. The capital budget presented at this time reflects the goals and priorities identified in the master plan. The department has prioritized its recommendations based on the master plan goals of 1) maintaining and protecting our pazks and recreation facilities and programs and 2) becoming economically sustainable. Capital Budget Funding The following Fund Financials (Attachments B-1, B-2, B-3) for the capital budget have been revised and are included for review: Permanent Parks and Recreation Fund (Fund 230) .25 Cent Sales Tax Fund (Fund 118) Lottery Fund (Fund 111) Permanent Pazks and Recreation Fund (Fund 2301 The source of the Permanent Pazks and Recreation Fund comes from the 0.9 mill levy of assessed valuation of all taxable property in the city, gifts and donations, proceeds of sale of pazk property or equipment, any appropriations from City Council, and revenues from a one time development excise fee (DET) assessed on each new residential unit constructed in or annexed to the city with the exception of affordable housing units. The fund is utilized for the acquisition of pazk land, permanent improvements or major maintenance of pazk and recreation facilities. The funds received from the Open Space Mountain Pazks (OSMP) Department for the purchase of the Kentucky and Papini properties will go into this fund amounting to approximately $670,000 per yeaz for three years, beginning in 2009. Per city charter, the PRAB's role is to approve expenditures from the fund. AGENDA ITEM # VA ;PAGE 2 .25 Cent Sales Tax Fund (Fund 1181 The source of the .25 Cent Sales Tax Fund comes from a dedicated sales tax that was approved by voters in 1995. The ballot language for this fund is included as Attachment C. The fund is utilized for the payment of principal, interest and premium if any, on bonds, and then for development, operation, and maintenance of the land and improvements purchased and constructed with the proceeds of the bonds, for renovation and refurbishment or replacement of park and recreation facilities. The PRAB's role regazding the .25 Cent Sales Tax Fund is to provide feedback to the department on its planned uses of these funds. Lottery Fundine (Fund 1111 The Colorado State Lottery is the source of the Lottery Funding. By State of Colorado statute, the city of Boulder receives revenues from the Lottery's Conservation Trust Fund on a per capita basis. The monies are to be used for land acquisitions, equipment purchases, facility development, natural lands maintenance, park maintenance and renovation or restoration of local facilities. In the 2009 capital budget, the funds aze allocated to Habitat Restoration and Urban Parks Renovation and Refurbishment (R&R). The Lottery Fund allocation is based on the 2001 PRAB and Open Space Board of Trustees (OSBT) joint recommendation to City Council. The departments agreed that portions of the annual appropriation would be earmarked for the department to pay off debt service and for the OSMP Department to fund Mountain Parks projects ($100,000) and Tributary Greenways projects ($150,000). Thereafter, the remaining Lottery funding would be split 50/50 between departments. In an effort to improve a $300,000 funding shortfall identified in the 2007 Recreation Division's budget, the PRAB and OSBT agreed that the OSMP Department would forego its allocation of Lottery funding for two yeazs (2007 and 2008). In 2009, the agreement will expire and revert to the original interdepartmental agreement between the deparhnent and the OSMP Department. Anew Lottery Fund agreement will need to be formalized among all three entities during 2008. The department submitted a budget issue asking if City Council supports the existing agreement between with the department for the allocation of the Lottery Fund monies. The department could utilize additional Lottery funds to supplement unmet needs not currently included in the capital budget. The PRAB's role regarding Lottery Funding is to provide feedback to the department on its planned uses of these funds. 2009 CIP Projects Per the discussion at the April business meeting, staff adjusted its planned CIP projects and budget. Revisions are noted in bold and italic. The department is preparing for the following capital projects in 2009 (Attachment A). Also included for information is a revised status report of projects approved in the 2008 CIP (Attachment D). Existing Facility -Enhancement and Upgrades • Flatirons Golf Course Improvements (Fund 230): Funding will be used for future improvements to the golf course including, but not limited to, renovation and replacement AGENDA ITEM # VA ;PAGE 3 of irrigation systems, cart paths, tees, greens, other golf course land improvements, driving range, event center and pro shop facilities. Ongoing efforts will ensure that assets are sustained, operations can continue and current revenue streams aze maintained or increased. Recreation Facility Improvements (Fund 118, 230): Funding is reserved for design, development and renovation of existing and new recreation facilities and buildings, including outdooz pools, recreation centers and sports fields. The department is accumulating funding to address major repairs, such as pool reconstruction. Ongoing efforts will ensure that health and safety needs aze satisfied, accessibility is assured, assets aze sustained, operations can continue and current revenue streams aze maintained or increased. • Iris Center Remodel (Fund 118): Funding will be used to reconfigure the first floor of the building to create additional space for administrative staff. Efforts have been coordinated with the city's Facility and Asset Management (FAM) staff. Existing Facility -Rehabilitation, Repair and/or Deficiency Correction • Boulder Reservoir (Fund 230): Funding will be used to address deferred capital needs and major capital improvements andlor facility renovation. Specific projects will include entry way improvements from 51st Street; gatehouse renovations; signage improvements; mazina, main office, concession and restroom renovations; docks and walkways replacement; and permanent picnic shelters Ongoing efforts will ensure that assets are sustained, operations can continue, and current revenue streams are maintained or increased. Additionally, $100,000 is being allocated for the Reservoir Master Planning process. Per the department's master plan goal, staff will prepare a plan that includes operational and financial strategies and event, wildlife and water resource management. • Wonderland Lake Pazk (Fund 230): This project will be continued through 2009 as the plan includes three phases of reconstruction of the Wonderland Pazk path, including six feet wide sections of concrete and four feet wide sections of asphalt, depending on path location. Path reconstruction will include a comprehensive repair of six inch deep concrete along the entire path totaling approximately 2250 squaze yazds. Replacement is necessary to restore cracks, slopes and trip hazards throughout the path, ensuring health and safety issues aze addressed and accessibility is assured. • Lighting Ordinance Implementation (Fund 230): The department is finalizing a lighting study that will identify lighting that is not compliant with the city's lighting ordinance, as well as identify unnecessary lighting and opportunities for energy conservation. Based on the recommendations in the study, staff will identify specific high leverage projects (based on safety and return on investment) to implement on an annual basis. Projects will ensure the department's compliance with the city's lighting ordinance. • Playground and Irrigation System Renovation (Fund 118): Upon completion of the master plan, the department committed to renovating one playground and one irrigation system per year. Formerly, the department identified the projects and funded them from the Urban Parks R&R budget. As part of the effort to provide cleazer information on lazge projects, the department is including these annual projects in the CIP. The specific playground and park irrigation system that will be renovated will be decided on an annual basis and communicated to the PRAB. This allows the department to make the decision AGENDA ITEM q VA ;PAGE 4 based on the most up-to-date information. Projects aze necessary to comply with goals and commitments identified in the department's master plan. Sports Field Irrigation Replacement (Fund 118): The irrigation systems at the sports fields have been analyzed and the department has identified a need to replace the irrigation system at Pleasant View Fields in 2009. The current system does not allow for proper coverage of the turf and is inefficient for irrigation needs. The original system includes valves that are no longer manufactured, leaving it virtually impossible to repair. A new computerized clock, including a weather station, has been installed and will be compatible with the new irrigation system and will improve water consumption efficiency. System replacement will ensure that operations can continue, water budgets will be met and cunent revenue streams aze maintained or increased. New Construction -Growth-related Site or Facility Additions • East Boulder Community Pazk (Fund 230): $120,000 of the funding that has been accumulated for the completion of site development will be utilized in 2009 to revise the site concept plan. The current site development plan focuses on the development of additional multi-use fields, an identified deficiency within Boulder, by the department and the Boulder Valley School District. Pazk development will meet service standazds outlined in the department's master plan. In 2009, funding will not be allocated for site development. Valmont City Park* (Fund 118, 230): During the process of updating the concept plan for Valmont City Park (VCP), the community has expressed a desire to begin development of part of the pazk as soon as possible. In response, staff has identified funding for the proposed Phase 1 of VCP (completing the portion of the park north of Valmont Road). This would allow for construction of the bike park, dog pazk and other associated park amenities. Park development will meet service standazds outlined in the department's master plan. Mesa Memorial Pazk (Fund 118): Based on the park development priorities identified in the master plan, this pocket pazk is proposed as the next pocket park to be developed. It will allow the department to provide pazk services in a currently underserved area. The neighborhood has indicated a willingness to partner on park development as well. Park development will meet service standards outlined in the department's master plan. *During the May 2007 CIP public heazing, PRAB members expressed an interest in allocating the Unanticipated Opportunities funding under their purview (Fund 230) to Valmont City Park. Historically, Unanticipated Opportunities funding was reserved, but not limited to, land acquisition, facility acquisition, capital renovation or development, city contribution towards potential partnership agreements and energy efficiency projects. Additionally, it was mentioned during the September 24, 2007 PRAB Business Meeting that the proceeds from the sale of the Kentucky and Papini properties, equating to $2,014,000 over three years would be allocated to the development of Valmont City Park. Renovation, Refurbishment and Major Maintenance Projects The budget recommendation focuses on the work azeas below. Estimates are based on the same levels of service provided during 2008. AGENDA ITEM # VA ;PAGE 5 Urban Pazk Renovation and Refurbishment (R&R) 1. Emergency safety repairs identified throughout the year 2. Repair and upgrade to walkways and parking areas 3. Americans with Disabilities Act (ADA) accessibility improvements 4. Refurbishment of older pazk irrigation systems to improve efficiency of water use and to reduce maintenance requirements (funds project costs that exceed annual CIP appropriation) 5. Refurbishment of outdated playgrounds to improve function and to address safety and accessibility requirements (funds project costs that exceed annual CIP appropriation) 6. Refurbishment of park shelters and restrooms 7. Repair and/or replacement of bridges and shelters Recreation Facility Renovation and Refurbishment (R&Rl 1. Public Safety and Health enhancements 2. Americans with Disabilities Act (ADA) accessibility improvements 3. Energy efficiency improvements 4. Recreation facility improvement projects Maintenance 1. Removal of state listed noxious weeds from department owned and managed lands and inventory plants and animals for management and budgetary decision making 2. Wildlife management on department owned and managed lands 3. Refurbishment and grant matching funds for projects at the Columbia Cemetery, Chautauqua Pazk area, Boulder Museum of Contemporazy Art (BMOCA), the Hazbeck House and Locomotive #30/74. Revenue Trends In Januazy 2008, the City Council adopted the Blue Ribbon Commission's (BRC) Report on Revenue Stabilization. City staff is currently implementing the 2008 recommendations, all of which have an impact to the department's capital budgets: • A phased removal of the remaining restriction on the property tax that is limited by TABOR (de-Bracing): Property tax may increase at a rate higher than inflation resulting in additional funding in the Permanent Parks and Recreation Fund. • Renewal of General Fund .15 Cent Sales Tax Fund (expires 2012): Voter approval of this expiring sales tax will result in continued funding for ballfield maintenance. • Potential Increase of the Development Excise Tax (DET): An assessment is being conducted to determine how growth may promote a need for an increased tax rate, potentially resulting in additional funding in the Permanent Parks and Recreation Fund. Future Funding Considerations The recently accepted department master plan provided a list of priority items to complete if additional funding is obtained. As staff reseazches and proposes new financial sustainability strategies, they will be brought to the PRAB for consideration. Also, as development priorities aze shifted, staff will adjust the CIP accordingly, in consultation with the PRAB. AGENDA ITEM # VA ;PAGE 6 As new pazks are developed and current parks are expanded, additional maintenance funding will be required to manage these areas and facilities. Staff will estimate maintenance needs and provide a recommendation to the PRAB on how the funding might be obtained or prioritized. A DET study will assess the existing revenues generated from the collection of the DET and recommended options will be presented to City Council regazding increasing revenues from the DET. Staff has begun quantifying the deferred maintenance and renovation and refurbishment needs of the parks and recreation system. At this point, most deferred maintenance and renovation and refurbishment needs have been identified, but not a[I quantified Known projects and estimates are included in Attachment E. Over the next year, staff will be thoroughly inventorying the computer irrigation system to determine solid cost estimates. Recreation facility needs will be reviewed and updated. As part of the Capital Budget submission, all Genera[ Fund departments include an Unfunded Capital Projects list that reflects the respective Action and Vision plans. For information, the Unfunded Capital Projects list is included as Attachment F. Along with development costs, this document includes deferred maintenance funding estimates. At the April Business Meeting, the PRAB was asked to prioritize projects and recommend funding allocations for future years in the CIP. In order to balance the funds and keep a frscally responsible reserve, funding was reduced or eliminated for some projects in future years. Projects impacted included: l~iolet Neighborhood Park, Elks Neighborhood Park, Foothills Community Park and East Boulder Community Park. Follow-Up from April PRAB Business Meeting At its April meeting, the PRAB asked for information regazding the department's environmental sustainability efforts and requested site tours. Staff also recommended establishing a CIP Study Session. Environmental Sustainability Energy conservation and energy efficiency are important city-wide initiatives. The city's energy strategy is being coordinated by the Office of Environmental Affairs (Attachment G). The memo includes information on energy savings initiatives involving city operations, energy use in city operations, past and recent initiatives and actions being taken by the city organization to manage energy use and reduce its greenhouse gas (GHG) emissions. Additionally, staff is working with Facility and Asset Management (FAM) to identify specific actions the department could take. Tour Requests The PRAB requested tours of recently renovated playgrounds, playgrounds planned to be renovated, East Boulder Community Park and Violet Neighborhood Pazk. This will help PRAB to understand renovation and development needs to be able to recommend responsible funding allocations. Staff will schedule field tours over the next few months to satisfy this request. CIP Study Session AGENDA ITEM # VA ;PAGE 7 In preparation for the development of the 2010 - 2015 CIP, staff recommends holding a study session prior to the April business meeting. This will allow for substantive discussion on proposed projects and how they are aligned with the department's master plan. STAFF RECOMMENDATION Staff recommends that the PRAB consider a motion approving the 2009 expenditures from the Permanent Parks and Recreation Fund and a motion recommending the 2009 - 2014 Pazks and Recreation capital budget. NEXT STEPS The city-wide CIP budget will be submitted to the Planning Board in mid-July and City Council for their review and respective considerations and approvals. There will be a City Council Study Session on the CIP on July 22. Attachments: A. CIP Project Summary Sheets 2009 - 2014 (Fund 230, Fund 118 and Fund 111) B. Fund Financials (Fund 230, Fund 118 and Fund 111) C. Fund 118 Ballot Language D. 2008 CIP Project Status Report E. P&R Deferred Maintenance and Renovation and Refurbishment Needs F. P&R Unfunded Capital Projects List G. City of Boulder Energy Strategy AGENDA ITEM # VA ;PAGE S Fund 230 Project Summary Sheet DRAFT Permanent ParkslRecreation Fund 2009-2014 Capital Improvements Program Attachment A-1 Carryover 2008 Approved 2009 Recommended 2010 Projected 2011 Projected 2012 Projected 2013 Projected 2014 Projected Total Cost Estimate Existing Facility- Enhancements/Upgrades Flatirons Golf Course Improvements 217,430 150,000 400,000 250,000 250,000 425,000 425,000 50,000 2,167,430 ongoing Recreation Facilitylmprovements 211,200 0 0 0 1,100,000 0 0 0 1,311,200 1,100,000 Subtotal 428,630 150,000 400,000 250,000 1,350,000 425,000 425,000 50,000 3,428,630 Existing Faci ity-Rehab/Repair/Deficiency Correction Boulder Reservoir Improvements 71,950 220,000 100,000 100,000 50,000 50,000 50,000 50,000 691,950 ongoing Boulder Reservoir Master Planning 0 0 100,000 0 0 0 0 0 100,000 100,000 Harlow Platts Park (sidewalks) 0 135,000 0 0 0 D 0 0 135,000 330,000 Wonderland Lake Park (sidewalks) 0 100,000 228,000 0 0 0 0 0 328,000 400,000 Lighting Ordinance Implementation 0 0 150,000 100,000 100,000 100,000 100,000 500,000 1,050,000 TBD Subtotal 71,950 455,000 578,000 200,000 150,000 150,000 150,000 550,000 2,304,950 New Construction-Growth Relate Facility/Additions East Boulder Community Park 1,989,280 470,000 0 500,000 350,000 350,000 350,000 0 4,009,280 4,800,000 Foothills Community Park 16,565 125,000 0 0 0 0 0 500,000 641,565 3,400,000 Valmont City Park (Phase I) 770,000 770,000 770,000 250,000 250,000 250,000 3,060,000 4,000,000 Recycle Rowl63rd Street Improvements 1,000,000 0 TBD Subtotal 3,005,845 595,000 770,000 1,270,000 1,120,000 600,000 600,000 750,000 8,710,845 New Construction- Not Growth Related Violet Neighborhood Park 0 100,000 0 0 0 0 0 0 100,000 2,880,000 Subtotal 0 100,000 0 0 0 0 0 0 100,000 On-Going Projects Unanticipated Opportunities- PP&R 100,000 100,000 0 0 0 100,000 100,000 100,000 500,000 ongoing Subtotal 100,000 100,000 D 0 0 100,000 100,000 100,000 500,000 Total 3,606,425 1,400,000 1,748,000 1,720,000 2,620,000 1,275,000 1,275,000 1,450,000 13,644,425 Fund 118 Project Summary Sheet DRAFT 1995 Ballot (.25 Cent Sales Tax) 2009-2014 Capital Improvements Program Attachm,;nt A-'? Car over 2008 A roved 2009 Recommended 2010 Pro'ected 2011 Pro'ected 2012 Pro'ected 2013 Pro~ected 2014 Pro'ected Total Cost Estimate Existing Facility- Enhancements/Upgrades Recreation Center/Pool Improvements .25 sales tax 45,400 60,000 100,000 100,000 0 100,000 100,000 100,000 605,400 ongoing Iris Center Remodel 150,000 0 0 0 0 0 150,000 150,000 North Boulder Recreation Center Remodel 0 400,000 0 0 0 0 400,000 Subtotal 45,400 60,000 250,000 500,000 0 100,000 100,000 100,000 1,155,400 Existing Facility-Rehab/Repair/Deficiency Correction Iris Parking 0 75,000 0 0 0 0 0 0 75,000 75,000 PleasantView Fields Accessibility and Safety Improvements 100,000 190,000 0 0 0 0 0 0 290,000 330,000 Playground and Irrigation System Renovation 450,000 450,000 450,000 450,000 450,000 450,000 2,700,000 3,600,000 Sportsfield Irrigation Replacement 365,000 300,000 0 D 0 D 665,000 850,000 Subtotal 100,000 265,000 815,000 750,000 450,000 450,000 450,000 450,000 3,730,000 New Construction-Growth Related Facility/Additions Dakota Ridge Pocket Park 520,980 400,000 0 0 0 0 D 0 920,980 1,200,000 Valmont City Park (Phase I) 106,000 0 150,000 150,000 150,000 150,000 150,000 150,000 1,006,000 4,000,000 Subtotal 626,980 400,000 150,000 150,000 150,000 150,000 150,000 150,000 1,926,980 New Construction- Not Growth Related Mesa Memorial Pocket Park 274,470 0 405,000 0 0 0 0 0 679,470 680,000 Elks Neighborhood Park 0 0 0 0 500,000 500,000 700,000 700,000 2,400,000 3,200,000 Lighting Ordinance Compliance Study 50,000 0 0 D 0 0 0 0 50,000 50,000 Subtotal 324,470 0 405,000 D 500,000 500,000 700,000 700,000 3,129,470 On-Going Projects Unanticipated Opportunities 150,000 150,000 0 0 0 D 0 0 300,000 ongoing Subtotal 150,000 150,000 0 0 0 0 0 0 300,000 Total 1,246,850 875,000 1,620,000 1,400,000 1,100,000 1,200,000 1,400,000 1,400,000 10,241,850 Attachment A-3 Fund 111 Project Summary Sheet DRAFT Lottery Fund 2009-2014 Capital Improvements Program 2008 Approved 2009 Recommended 2010 Projected 2011 Projected 2012 Projected 2013 Projected 2013 Projected 2013 Projected Total New Construction-Growth Related Facility/Additions Dakota Ridge Pocket Park-Lottery 200,000 0 0 0 0 0 0 0 200,000 Park East Playground Renovation 0 360,000 0 0 0 0 0 0 360,000 Subtotal 200,000 360,000 0 0 0 0 0 0 560,000 On-Going Projects Tributary Greenways Program 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000 900,000 Historical Structures & Trails Stabilization & Restoration 0 525,000 425,000 425,000 425,000 425,000 425,000 425,000 2,225,000 Subtotal 150,000 675,000 575,000 575,000 575,000 575,000 575,000 575,000 3,125,000 Total 350,000 1,035,000 575,000 575,000 575,000 575,000 575,000 3,685,000 AGENDA ITEf~ #~~ ,PAGE Attachment B-1 CITY OF BOULDER DRAFT 2009 FUND FINANCIAL PERMANENT PARKS & RECREATION FUND UNAPPROPRIATED FUND BALANCE Beginning of the Year ACTUAL REVISED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED SOURCES OF FUNDS Property Tax Interest Parks Development Excise Taxes Recreation Development Excise Taxes Other Revenues OSMP Sale -Kentucky and Papini TOTAL SOURCES OF FUNDS USES OF FUNDS Operations & Construction Management Capital Refurbishment Projects To[al Operating Uses of Funds Transfers To Other Funds Cost Albcation Excise Tax Collection Debt Service Total Debt Service Capital Improvement Program Capital Projects Carryovers & Encumberences TOTAL USES OF FUNDS FUND BALANCE -END OF YEAR Designations: Pay Period 27 - 2013 Reserve Sick 8 Vacation Liability Reserve Total Designations SURPLUS/(DEFICIT) vs. RESERVE GOAL 4,824,937 5,824,937 1,705,761 1,742,417 1,805,448 966,330 807,456 641,321 1,474,965 1,511,839 1,549,635 1,588,376 1,628,085 1,668,788 1,710,507 1,753,270 267,788 220,977 211,985 190,227 183,299 184,492 181,226 181,226 246,300 380,000 224,400 228,888 233,466 238,135 242,898 247,756 61,577 95,000 56,100 57,222 58,366 59,534 60,724 61,939 8, 610 14, 235 14, 235 14, 235 14, 235 14, 235 14, 235 14, 235 671333 671333 671333 2,059,240 2,222,051 2,727,688 2,750,281 2,768,785 2,165,183 2,209,590 2,258,426 288,971 394,139 405,963 418,142 430,686 443,607 456,915 470,622 329 977 35,000 470 000 470,000 495 000 520 000 555,000 575,000 618,945 429,139 875,963 686,142 925,686 963,607 1,011,915 1,045,622 47,977 49,900 61,780 73,660 76,606 79,671 82,857 86,172 4 985 5 135 5 289 5 448 5 611 5 779 5 953 5,953 52,962 55,035 67,069 79,108 82,218 85,450 88,810 92,125 387 330 1 400 000 1 748 000 1 720 000 2 620 000 1 275 000 1 275 000 1,450,000 4,457,054 1,059,240 6,341,228 2,691,032 2,687,249 3,627,903 2,324,057 2,375,725 2,587,747 5,824,937 1,705,761 1,742,417 1,805,448 966,330 807,456 641,321 312,000 (2,120) (5,120) (8,120) (11,120) (14,120) (17,120) (20,120) (23,120) (57 084) (58,796) (60 560) (62 377) (64 248) (66 176) (68 161) (70,206) (59,204) (63,916) (68,680) (73,497) (78,368) (83,296) (88,281) (93,326) 5,765,734 1,641,844 1,673,737 1,731,952 887,961 724,161 553,041 218,674 AGENDA ITEM #, PAGE ~ 2-- CITY OF BOULDER DRAFT 2009 FUND FINANCIAL .25 CENT SALES TAX FUND UNAPPROPRIATED FUND BALANCE Beginning of the Year SOURCES OF FUNDS Sales Tax Interest Intergovernmental Revenue Grants Other Revenue TOTAL SOURCES OF FUNDS USES OF FUNDS Land Operations & Maintenance Administration Planning and Project Management Sports Field Maintenance Civic Park Complex Historical & Cultural FAM -Ongoing and Major Maintenance Capital Refurbishment Total Operating Uses of Funds Transfers To Other Funds Cost Allocation Transfer to the Recreation Activity Fund Total Transfers Debt Service Total Debt Service Capital Improvement Program Capital Projects Carryovers & Encumberances TOTAL USES OF FUNDS FUND BALANCE END OF YEAR Designations: Newcomer Legacy Pay Period 27 - 2013 Reserve Sick & Vacation Liability Reserve 2007 2008 2009 2010 2011 2012 2013 2,014 ACTUAL REVISED 2ECOMMENDEI PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED Attachment B-2 3,442,033 3,911,226 1,412,942 683,460 279,481 317,057 383,634 397,821 6,181,190 6,367,933 6,614,837 6,850,771 7,100,834 7,348,386 7,601,768 7,864,189 196,266 155,637 158,884 162,429 153,197 151,354 149,991 149,991 44,540 - - - - - - 42,061 12,000 12,000 12 000 12,000 12,000 12,000 12,000 6,464,057 6,535,570 6,785,721 7,025,200 7,266,031 7,511,740 7,763,759 8,026,180 1,437,914 1,353,544 1,394,150 1,435,975 1,479,054 1,523,426 1,569,128 1,616,202 253,928 410,640 422,959 435,648 448,717 462,179 476,044 490,326 228,572 354,086 364,709 375,650 386,919 398,527 410,483 422,797 91,853 93,638 96,447 99,341 102,321 105,390 108,552 111,809 15,276 75,000 75,000 75,000 75,000 75,000 75,000 75,000 41,147 50,000 50,000 50,000 50,000 50,000 50,000 50,OOD 419,130 431,704 444,655 457,995 471,735 485,887 500,463 515,477 469,176 405,000 459,539 466,804 473,869 480,725 488,233 488,233 2,956,996 3,173,612 3,307,459 3,396,412 3,487,615 3,581,133 3,677,904 3,769,644 148,874 157,774 202,291 246,808 254,212 261,839 269,694 277,765 300,000 - - 448,874 157,774 202,291 246,808 254,212 261,839 269,694 277,785 2,428,953 2,421,453 2,385,453 2,385,959 2,386,628 2,402,190 2,401,975 2,401,975 160,041 875,000 1,620,000 1 400,000 1,100 000 1 200,000 1,400,000 1,400,000 2,406,015 5,994,864 9,033,854 7,515,203 7,429,179 7,228,455 7,445,162 7,749,573 7,649,603 3,911,226 1,412,942 683,460 279,481 317,057 383,634 397,821 574,398 (11,000) (21,790) (32,580) (43,370) (54,160) (64,950) (75,740) (86,530) (185,746) (191,318) (197,058) (202,970) (209,059) (215,331) (221,791) (228,444) SURPLUS/(DEFICIT) VS. RESERVE GOAL 3,714,480 1,199,834 453,822 33,141 53,838 103,354 100,290 259,423 _. TTr ~ -. Attachment B-3 CITY OF BOULDER DRAFT 2009 FUND FINANCIAL UNAPPROPRIATED FUND BALANCE Beginning of the Year SOURCES OF FUNDS Intergovernmental Revenues Interest Income TOTAL SOURCES OF FUNDS USES OF FUNDS Operating Habitat Restoration - P & R Capital Refurbishment - P & R Total Operating Uses of Funds Transfers To Other Funds Cost Allocation Debt Service Total Debl Service Capital Improvement Program Capital Projects - P 8 R Tributary Greenways -Public Works Capital Projects - OSMP Total Capital Improvement Program Carryovers and Encumbrances TOTAL USES OF FUNDS UNRESTRICTED FUND BALANCE LOTTERY FUND 2007 2006 2009 2010 2011 2012 2013 2014 ACTUAL REVISED RECOMMENDED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED 1,446,105 1,506,265 648,591 419,542 395,147 375,431 360,416 350,125 989,822 926,319 930,951 935,605 940,283 944,985 949,710 954,458 74 533 59 904 40 000 40 000 40 000 40 000 40,000 40,000 1,064,355 986,223 970,951 975,605 980,283 984,985 969,710 994,458 106,102 125, 665 128,178 130, 742 133, 357 136, 024 136, 744 141, 519 259 405 354 500 36 822 294 258 291 643 288 976 286,256 283,481 365,507 480,165 165,000 425,000 425,000 425,000 425,000 425,000 304,344 169,835 58,666 200,000 360,000 - - - - - 147, 765 150, 000 150, 000 150, 000 150, 000 150, 000 150, 000 150, 000 127 913 525 000 425 000 425 000 425 000 425,000 425 000 334,344 350,000 1,035,000 575,000 575,000 575,000 575,000 575,000 843,897 1, 004,195 1, 843, 897 1, 200, 000 1, 000, 000 1, 000, 000 1, 000, 000 1, 000, 000 1, 000, 000 1,506,265 648,591 419,542 395,147 375,431 360,416 350,125 344,583 AGENDA ITEM # ~ , PAGE I Attachment C lark Five lou ote ed. f1Ls BAL60T ISSUE 2D1 i j29,400,000 80NDiNG AUTHORITY AND 0.2596 SALES- TAX INCREASE FOR PARK LAND AC• OUISITION FOA PASSIVE AND ACTIVE REC• REATIONAI USES, AND PARK AND RECREATIONAL DEVELOPMENT, AENOVA- TION, AND REFURBISHMENT .SHALL CITY OF BOULDER DEFT EE INCREASED BY 529,4o0,o0D WITH A MAXIMU M REPAYMENT COST OF 559,019;211 AND JN CONNECTION THEREWITH SHALL CITY OF 80ULOER,TAXES 8E INCREASER BY 55,800,000 ANNUALLY' (IN THE F1AST YEAR): (A) IN-THE CASE OF pEBT, (t) BYTNE ISSUANCE'ANO PAYMENT OF BONDS OF THE CITY NOT TO E%EEED THE PRINCIPAL AMOUNT OF 529,00.000, WITH NO MORE THAN THE PRINCI- PAL AMOUNT t]F St1,40q,000 TO BE SPENT FOA THE PUAPOSEOF PURCHASE OF UP TD TEN ACRES OF POCKET PARK 61TES, pF TO SIXTEEN ACRES OF NEIGHEORNOOD PARK SITES, UP 70 THREE NUN• DRED AND PIFTY_ACA6S OF MOUNTARV PARK ADDI- TIONB. ANO ND MORE THAN THE PRiNCIPALAMOUNT OF f (B,000,p00 TO' BE SPENr FOq THE PURCHASE AND PLANNING ANO PARTIAL' DEVELOPMENT OF p GITkWIDE PARK BITE OR SITES TOTALING AT LEAST 140 ACRES, Nq LESS THAN 7576 OF WHICH 19 WITHIN THE CITY OR AREA II OF THE BOULDER VALLEY COM- PREHENSIVE PLAN; AND (2) AT A NET EFFECTIVE INTEREST RATE NOT TO EXCEED B% PER ANNUM AND MATURING NOT LATER THAN JANUARY' 1, 2076; AND (9) SUCH BONGS TO SE ISSUED, DATED, ANO SOLD AT SUCH TIME OA TIMES AND IN SUCH MANNER ANO 70 CONTAIN SUCH TERMS, NOT INCON6ISTENT HEREWITH, AS THE CITY COUNCIL MAY DETERMINE; AND (.4) SUCH BONDS TD BE PAYABLE FROM THE CITY'S SALES AND USE TAX; AND ADDITIONALLY SECURED 6Y A PLEDGE OF THE' FULL FAITW AND- CREDIT OF THE CITY; ANO (b) WHICH AUTNORiZATiON SHALL INCLUD E AUTHOAI- 7~1TION TO REFUND SUCH BONDS WITHOUT Ap01• TIONAL VOTER APPROVAL SUBJECT ONLY TO THE LIMITATIONS SE7 FDRTH HEREIN; (S) IN THE CASE OF TAXES, OFfiC1Al BALLOT GENERAL MUNICIPAL ELECTION Ciry of Boulder, Colorado, Novomber 7, 1965 olry dark BALLOT IB9UE ?•D1 ceminwe (1) BY RAISING THE EXISTING GENERAL SALES AND USE TAX 8Y .2E`A, FROM 286°A70.9:5196. EFFFCTNE JANUARY 1, 1998 AND ENDING JANUARY t, 2016;. AND FpCIENT TO PA DEBT SEPVICF ON THE BOND6 DE SCRIBED ABOVE. SY RAISINt} Ap VALOREM PRpPEATY TAXES WITHOUT LIMITATION A6 TO RATE OR AMD,L(NT; AND UP TO THE full MAXIMUM RE• PAYMENT COST OF S59,Ot9,21Y AND (3) BY PLEDGING SUCH SALEB AND USE TAX FDq . THE PAYMENT OF-THE PRINCIPAL, INTEREST, qN0 •PREMIUM, IF ANY, ON THE BONGS, AND THEN fOR: DEVELOPMENT, OP• PAN 7NE I~ASURE + ERATION, AND MAIN- A6A{MST TXE NNiASURE TENANCE OF THE LAND AND IMPROVEMENTS PURCHABED OR CON- srRUCTED WITH THE-PROCEEDS OF THE BONDS; RFNOVATION AND REFURBISHMFNT OR REPLACE• MEN7 OF FOUR POOLS; RENOVATION ANp REPLACE• MEN7 OF RECREATION FACILITIES, PIAYGAOUND&, MOUNTAIN PARK TRAILS, AND THE CIVIC PARK COM- PLEX; IMPROVEMENTS- TO RECREATION CENTERS AND DEVELOPMENT OF NEW AECREATIDN PRO- JECTS TO BE DETEAMINEDIHTHEFUTURETNROU6N THE MASTER PLANNING PROCESS BY THE CITq COUN- CIL; MAINTENANCE OF THE COMMUNITY PARK SITE !N NORTH BOULDER; DEVELDPMENT OF A MOUNTAIN PARKB ENVIRONMENTAL EDUCATION PROGRAM; ANO FDR RENOVATION OF•CRY-0WNEO HISTORICAL AND CULTURAL FAgWTIES; WITH THE REMAINDER BEING DEDICATED FOA PARKSAND RECREATION P URPOSES; ANp IN CONNECTION THEREWITH SHALL THE FULL PROCEE08 OF SUCH TAXES AT SUCH RATES AND ANY EARNINGS THEREFROM BE COLLECTED AND SPENT WITHOUT LIMITATION OR CONDITION, AND WITHOUT LIMITING THE COL• LEGTION OR SPENDING OF ANY OTHER REVE- NUES OR FUNDS BY THE CITY DF BOULDER, UNDER ARTICLE X, SECTION 24 Of THE COLO• AADO GONSJITUTION OR ANY OTHER CAW? AGENDA fTEM #_ , PAGE I Attachment C PARKS AND RECREATCON SALES TAX AND BONDING INFORMATION BACKGROUND NOTES August 9, 1995 Tier One: Acquisition Neighborhood Parks • 34.5 M will be bonded for the acquisition of up to 16 acres of neighborhood parks. • The need for additional parks is widely distributed throughout the City. • Due to specific site constraints, not all or the park sites will meet the minimum size standard of five acres. If the size of the site falls tielow three developable acres, certain functions such as open grass playfields cannot be accomodated, placing the park within the pocket park category. t.This projection is based on the need to acquire parks to meet needs in existing residential areas which are presently underserved. Funding for acquisition of parks in areas of new residential growth is expected to come from development fees. In the event that the Department is able to acquire land via dedication or at a lesser cost than projected, any unallocated funds mill be applied tcward additional neighborhood or pocket park acquisition, with an emphasis on areas of higher density. The benefits of providing additional neighborhood parks and playgrounds include: • Meeting citizen desires fer a higher level of park service to neighborhoods. Public testimony during the IPP process and the North Boulder Subcommunity Planning process indicated strong support for additional, more accessible neighborhood parks, playgrounds and recreational facilities. • Mitigation of the impacts of residential and commercial growth and increased densities. Parks support the livability of affordable, higher density housing and areas of mixed use deve!apment. Parks help to define neighborhocd identity and contibute to building community connections and community character. • Support for neighborhood self-sufficiency. Citizens have expressed the desire to access more day-tc-day services within walkable and bikable distances. • Reduced pressure on the Mountain Parks and Open Space systems. Both era experiencing substantial growth in visitation resulting in significant overuse of sensitive areas with degradation of both ecological health and visitor experience. The increased availability of neighborhoed parks and recreational facilities is expected to help mitigate some of this demand. • Reducing vehicle miles traveled. More people will be able to access a neighborhood park and playground on foot or by bicycle, thereby reducing auto traffic and parking congestion. Neighborhood parks are scaled to primarily serve the immediate neighborhood, without drawing users from long distances away. While the current and proposed standards call for 1.5 park acres per 1000 population, this is intended to be used as only an approximate basis of comparison, and is not intended to sat a desired upper limit. This standard takes into account the additional availability of school facilities and other public and private recreational resources in the community. Neighborhood parks are designed to meet needs that cannot be met by Open Space, a large City ?ark site or pocket parks, and the availability of these other resources to residents dces not imply that a neighborhood park site is unnecessary. The priortization criteria used to select higher priority AGENDA ITEM ~ lTs1- ®w;.~ I Attachment C areas for park site acquisition included the following criterion intended to address issues of neighborhood need, ihcluding density: "Within the service radius is there a high percentage of children or seniors and/or a high percentage of attached housing units and/or a lower than median income?" While developed areas of the city may never have the number of park acres as areas of new residential growth, staff supports the acquisition of neighborhood parks in less densely developed areas in order to prevent similar deficiencies from occuring there in the future. If land is not acquired in advance of development it often cannot be acquired at all_ Residents in lower density neighborhoods may have less need for parkland to serve as density relief but they still need parks and playgrounds which provide opportunities for social interaction and group play, and which serve as a community focal point. Pocket Parks - 54.9 M will be banded for acquisition of up to ten acres of pocket parks, primarily targeting higher density neighborhoods in the Central and Crossroads subcommunities, with additional sites in the South and Southeast subcommunities. Pocket parks provide mitigation in areas of deficiency where afull-size neighborhood park cannot be acquired. Based on the proposed standards, there are approximately ten areas presently underserved and lacking vacant land opportunities for a larger park. Pocket parks, under the proposed definition, can range from ahalf-acre or less up to 4.9 acres in size, but wilt generally fall at the lower erd of this range An average of one-acre per site was used in these projections. While smaller pocket parks cannot meet needs for open grass play areas for team sports, they do provide neighborhood gathering places and can usually accomodate a children's play area. Parks between throe and five acres in size would generally be viewed as substandard size neighborhood parks. In addition to acquisition of additional pocket park sites, the proposed Master Plan standards call for other measures to provide improved services in areas where standard parks cannot be developed, including higher levels of programming, uses of indoor spaces, terraces, rooftops and urban plazas and designs which permit more intense use and effective capacity, and the development of cooperative agreements with the BVSD, the University of Colorado, churches, and child care centers to help increase the accessibility of park services. While the acquisition of pocket parks in areas of deficiency is the preferred compensatory measure proposed in the PRMP, pocket parks under three acres in size will not provide the necessary space for active playfields. This is one heed that no number of additional smaller parks will be able to meet for residents in some developed neighborhoods. Pocket parks can incorporate children's play areas; benches, picnic tables and other amentities which provide more passive and social opportunities. City Park • 518 M to be bonded for acquisition of a minimum of 100 acres for a site or sites for a City Park, and 5200,000 per year for infrastructure maintenance. • No less than 75% of the land would be acquired in Areas I or II. The requirement for a large parcel City Park is driven by the need to provide additional acreage td meet the currant standard for community park acreage and by the need for a location which is appropriate for the placement of active recreational facilities to meet current and future demand. There are very few remaining parcels which would be appropriate for this purpose. While there AGENDA ITEM #_ • PAGE,,. Attaclunent C are numerous arguments in favor of clustering facilities in one location, including cost effectiveness, it would be possible to break out some of the proposed facilities from others. Mountain Parks • 52 M to acquire up to 350 acres to the west of the Mountain Parks and $20,000 per year for maintenance of the added lands. The proposed amount would be used to purchase land to preserve critical wildlife migration corridors between the Mountain Parks and other public lands to the west. City staff will work Gosely with the County to determine if there are alternate means of preserving these lands from development. Whatever funds may not be required for this purpose will be designated for other land purchases which will contribute to the integrity of the Mountaih Parks system. Funding is also included for maintenance needs of the acquired lands. See Attachment X of this agenda item memo for further discussion. Tier Two: Renovation and Refurbishment -Existing Facilities • 53.4 M is needed for improvements to the indoor pools at NERC and SERC and for refurbishment needs of the outdoor pools, including replacement of the water slides. Eonds will not be issued for this purpose, thus saving on interest payments. $277,000 in funds will accrue and be disbursed on an annual basis. The outdoor pools and the indoer pools at NERC and SERC are heavily used 6y a broad spectrum of.the public. • 5178,000 annually for anticipated life cycle replacement neeca in the recreational facilitiies, based on the findings and prioritization in the Facilities Maintenance Plan. • $1.5 M in total funding is needed for refurbishments in the urban park. system, focusing on playground refurbishment needs which could not be funded through existing sources. 5130,000 annually will accrue and be spent for this purpose. • 575,000 per year for on-going needs in the intensely used Civic Park area, for which no additional funding has been provided. Due to competing demands for services td the community, the Department has never had the capacity to put aside sufficient funds for anticipated life cycle replacement needs forequipment and facilities, incuding sidewalk and parking lot repairs, irrigation system replacement, upgrading of landscape designs, updating and expansioh of playgrounds, swimming pool refurbishment, and facility remodeling. As a result, many parks, playgrounds and recreation facilities are beginning to show their age: safety concerns begin to surface; facilities lose some patronage; stop-gap repairs become increasingly expensive. A significant portion of recreation and playground equipment currently in use is well beyond its expected Iifespan. Existing funding sources wilt not be sufficient to address all the outstanding needs. The ability of the Department to take care of its existing asset base is critical to maintaining credibility with the citizens. Mountain Parks • 5168,000 annually to address refurbishment and reconstruction, projects in the Mountain Parks, including trail rehabilitation, redesign of poor trait alignments, construction of ne~ro trails, and closure and revegetation of social trails. Funding for resource management has been consistently inadequate to keep up with the needs, due to increasing visitation and mcre active uses in the Mountain Parks. The 1992 bond issue funding for capital reconstruction w'I terminate at the end of 1995, and while funds have been -AGENDA ITEM #~__. PAGE~_ Attachment C identified for this purpose in the 1996 CIP as a stop-gap measure, there is insufficient on-going funding to continue these efforts at the needed levels. It is estimated that it will require ten to fifteen years of investment to catch-up with the Heads. Tier Three: Oevelooment of Facilities and Proorams • 5210,OOD per year is required to maintain the development investment in the community park site in North Boulder. It is the Department's policy to make sure that newly acquired and developed park-sites will have adequate funding on an on-going basis. During the first two years of the proposed sales tax increase, these funds will be used to cover the cost of bond issuance and election casts, and will also be dedicated for the completion of the remaining field at Pleasantview. • 52.4 M total is needed for development of new neighborhood park sites, with annual revenues of 5200,000; S1.5 M for pocket park development, with annual revenues of 5120,000;and 52.4 M for development of existing neighborhood park sites, with 5200,000 in annual revenues. Fuhding will be directed toward development of those sites of most interest to the community. Distributing the development process over time, as sites are acquired, makes sense from the perspective of workload and monetary resources. Not paying the costs of banding fdr this funding effectively increases the revenues available for this purpose. • Associated funding for maintenance of developed sites is included, as justined above in the discussion of the Community Park Site in North Boulder. • 52 M for improvements to the NBRC and SBRC to enable these centers to receive a much needed facelift which is necessary to respond to concerns of the many users of these facilities and to maintain some parity with the attractions of the EBCC. 5150,000 per year will accrue for this purpose. • $2.25 M in funding for new active recreational facilities will be required as active park sites are acquired and in order to meet the needs identified in the proposed PRMP. The specific facilities to be funded will be drawn from the prjorities listed in the PRMP, based on an annual update and assessment in conjunction with the preparation of the CiP and annual budget. 5200,000 per year will accrue for the provision of these facilities. • Funding of 5130,000 per year is included to address needs for an expanded environmental education program in the Mountain Parks, which was identified as a high priority in the proposed PRMP. This program would help to prevent damage by reaching people with the information they need to become more effective stewards of the land by teaming how to enjoy a visit while protecting the natural resources. The proposed PRMP documents and prioritizes the need for funding the development of existing undeveloped park sites and new playgrounds, as well as recreation facilities such as play fields and indoor gymnasiums. With the acquisition of new park sites, additional development funding will be required. Funding for development has never kept pace with even the limited funding for acquisition. Without same revenue earmarked for facility development, park sites acquired through a new band issue could remain undeveloped for many years. Park sites left undeveloped for extended periods of time often come to be viewed as private open space by the immediate neighbors, which engenders resistance when park development is proposed. In other cases, undeveloped park sites ark viewed as a breach of trust, given the discrepancy between the stated purpose of the land acquisition and the failure to provided expected and needed facilities. 4(;FNIIA ITFNA ttJL.t( ~9r:~ ~~ Attachment C In each case where funding for acquistion or development of additional park land has been proposed, the associated maintenance-has been bunt intd the sales tax increase. Historically, the Department has attempted to stretch existing resources to cover the increase in maintenance responsibilities; the limits of this approach have been reached. Any further additions to the park system must have corresponding increases in the capacity to care for the sites. Tier Four. Historic and Cultural Facilities - $50,000 per year is allocated far this purpose and will be used to leverage additional grant funding for maintenance, renovation and refurbishment of these facilities. There is no exisiting funding source for this purpose. These facilities include Columbia Cemetary, Harbeck House, Chautauqua Auditorium, Dining HaII and Caretaker's Cottage, and the Boulder Art Center. Notes (9/12/95): The term "tier' is used to categorize a group of similar needs and does not imply a level of priority. In Tier Two: Renovation and Refurbishment, the capital need projected is based on needs identified for a ten year period. At the end of that time, needs would be reevaluated and projected for the remaining ten years. ,AGENDA ITEM # . parF PARKS AND RECREATION Attachment C ADVISORY BOARD , SALES TAX AND BONDING RECOMMENDATION TIERS Ongoing CAPITAL CAPITAL Needed Annually Annual Sales Annual. NEED Annual Bonded for Bonding'at 6% Yield Tax Rate Required Required 1 Acr uisition A C Q Pocket Park Sites $ - $ 4,900,000 $ 4,900,000 $ 424 1fi3 $ 424 163 , , 0,021 U Neighborhood Park Sites $ - $ 500 4 000 $ S I , , 4, D0,060 $ 389,537 $ 389,537 0.019 S i T I Cily Parks -Area II Ordinance H 5740 $ 200,000 $ 18,000,000 $ 18,OOO,OOD $ 1,558,150 $ 1,758,150 0.087 0 N Mountain Parks $ 20,000 $ 2,000,000 $ 2,0OO,OOD $ 173,128 $ 193,128 0.010 2 Renovation 8 Refurbishment of Existing Facilities 8 R Recreation Facilities $ 178,000 Poollmprovemenls $ 3,400,000 $ 277,000 $ - Urban Parks $ 1,500,000 $ 130,000 $ - $ - $ 828 000 0 041 Mountain Parks (Trails) $ 108,OD0. , . '~ Civic Park Complex $ 75,000 7 ra REVISED 8/4/95 „uVIJUKY BOARD tlrraCi]TRellt L -SALES TAX AND BONDING RECOMMENDATION Ongoing CAPITAL CAPITAL Needed Annually Annual Sales Annual NEED Annual Bonded for Bonding at Yield Tax Rate 6% Required Required :loprnent of Facilities ograms munily Park (north site) " $ 210,000 $ - $ 210,000 0.010 :lopmenl of.New Ilborhood k it $ 64,000 $ 2,400,000 $ 200,000 $ $ - par s es $ 264,000 0.013 lopmenl of New Pocket $ 40,000 $ 1;500,000 $ 120 000 $ sites . , . $ - $ 160,000 0.008 aopmenl of Existing h $ 67,000 $ 2,400,000 $ 200- 000 $ $ twrhood park sites , - $ 267,000 0.013 ovemenls to $ 2,0 0,000- 150 000. ealion Centers , - 150,000 0.007 slain Parks Environmental $ 130 000 ealion , $ - $ 130,000 0.006 Recreation Facilities $ - $ 2,250,000 $ 200,000 $ _ $ _ $ 200,000 0.010 rrical 8 Cultural Facilities $ 50 000 $ _ , $ ¢ Ce ~~~ ~ ^^^ TOTAL `^ ""''' ' ~' ~+~ ~nr_t5 r AX NEE $ 44,850,000 $. 29,400,000 n ~ , j This amount is not needed until 1998. It will be used to cover the ~ $75,000'bonding issuance costs, $12,000 electbn cost, and for the development ~ of ll~e last playing field al the Pleasant View Field slle. T9 ik REVISED 8%4/95 m ~~~ Attachment D 2008 CIP Project Status Update Project: Iris Parking Lot Resurfacing Fund: 118 Estimated Cost/Approved Funding to date: $75,000 Expended to date: $0 Current Status: On hold, pending direction from City Council. Tentatively, will be scheduled to coincide with closure of North Boulder Recreation Center, tentatively August. Project: Pleasant View Fields Accessibility and Safety Improvements Fund: 118, 230, 111 Estimated CosUApproved Funding to date: $330,000 Expended to date: $157,000 Current Status: Project is complete. Keene Concrete reported that 680 tons of concrete and asphalt were removed and taken to a recycling center and 600 tons of recycled material was used in the installation of the concrete at this site. Project: Dakota Ridge Pocket Park Fund: 118, 111 Estimated Cost/Approved Funding to date: $1,200,000 Expended to date: $4,600 Current Status: Completed project design and are preparing construction and bid documents. Project: Recreation Facility Improvements (ongoing) Fund: 118, 230 Approved Funding to date: $316,000 Expended to date: N/A Current Status: Funding is used to meet major facility maintenance needs, beyond operational (day to day) maintenance budget. Project: Flatirons Golf Course Improvements (ongoing) Fund: 230 Approved Funding to date: $367,000 Expended to date: N/A Current Status: Funding will be used for future improvements to the golf course including, but not limited to, renovation and replacement of irrigation systems, cart paths, tees, greens, other golf course land improvements, driving range, event center, and pro shop facilities. Project: Boulder Reservoir Improvements (ongoing) Fund: 230 Approved Funding to date: $290,000 Expended to date: N/A AGENDA ITEM #~~, PAGE Z3 Attachment D Current Status: Funding will be used to address deferred capital needs and major capital improvements and/or facility renovation. Specific projects will include entry way improvements from 51St Street; gatehouse renovations; signage improvements; mazina, main office, concession and restroom renovations; docks and walkways replacement; and permanent picnic shelters. Project: Harlow Platts Sidewalk Replacement Fund: 230 Estimated Cost: Approved Funding to date: $135,000 Expended to date: $0 Current Status: On hold, pending direction from City Council; will proceed upon approval. Project: Wonderland Lake Sidewalk Replacement Fund: 230 Estimated Cost: $400,000 Approved Funding to date: $100,000 Expended to date: $0 Cun•ent Status: On hold, pending direction from City Council; will proceed upon approval. Project: East Boulder Community Pazk Fund: 230 Estimated Cost: $4,800,000 Approved Funding to date: $2,459,000 Expended to date: $35,000 Current Status: Have initiated process to update concept plan. Project: Foothills Community Park Phase 3 Fund: 230 Approved Funding to date: $141,000 Estimated Cost: $3,400,000 Expended to date: $0 Current Status: Accumulating funding for Phase 3. The site plan will be reviewed and potentially revised before construction begins. Project: Violet Neighborhood Park Fund: 230 Approved Funding to date: $100,000 Estimated Cost: $2,800,000 Expended to date: $0 Current Status: 2008 funding is earmarked for any park site work needed as a result of adjacent private development or Greenways projects. Accumulating funding for pazk development. AGENDA ITEM #~-• PAGE Attachment E Parks and Recreation Deferred Maintenance and Renovation and Refurbishment Projects Park Site T e of Renovation Estima ed Cost Identified R&R funds 2008-2013 CIP Fundin Deficit Parks Ara shoe Ride Picinic Shelter roof $0 Arrowwood Brid ere lacement $100,000 $100,000 Aurora 7 Irri ation S stem $172,715 $172,715 Bike Path Kid's Fishin Pond Brid ere lacement $0 Burke Thunderbird Lake -unknown sco a $0 $0 Can on Pla round $300,000 $300,OOD Cam bell Robertson Landsca a $3,500 $3,500 Catal a Park Brid ere lacement $52,392 $52,392 $0 Chautau ua Irri ation S stem -Phase 1 $140,000 $140,OD0 $0 Irri ation S stem -Phase 2 $75,000 $75,000 $0 Road/Draina a $76,000 $76,000 $0 Slide re lacement $20,000 $20,000 $0 Sidewalk Re air & Rock Wall b bus sto $20,000 $20,000 $0 Si na a $5,000 $5,000 Bus ull-out $0 Columbine Pla round $300,000 $300,000 Dai Center Landsca a $40,000 $40,000 $0 Elmer's Twomile Observation Deck Removal $0 Harlow Platts Sidewalk Re air $135,000 $135,000 $0 Irri ation S stem $366,547 $366,547 Viele Lake Dock Re lacement $50,000 $30,000 $20,000 Par Course Re lacement $50,000 $50,000 Picinic Shelter roof $20,000 $20,000 Planters at South Boulder Rec. Center $10,000 $10,000 Martin Park Picnic Shelter 8 Restroom re lacement $0 Melod Pla round $300,000 $300,000 Irri ation S stem $27,225 $27,225 Sidewalk renovation $50,000 $50,000 Munici al Com lex Landsca a renovation $0 Bricks at West Sr Center $7,700 $7,700 $0 Pla round -Lumber Park $350,000 $350,000 North Boulder Park Draina a $20,000 $20,000 Picnic Shelter &Restroom re lacement $0 Handica exercise course $50,000 $50,000 Sidewalk re lacements $80,000 $80,000 Planter bed retainin walls $5,000 $5,000 May 2008 AGENDA ITEM # ,PAGE Z Attachment E Attachment E Parks and Recreation Deferred Maintenance and Renovation and Refurbishment Projects Park Site T e of Renovation Estima ed Cost Identified R&R funds 2008-2013 CIP Fundin Deficit Park East Pla round $395,000 $395,000 $0 Irri ation S stem $150,000 $150,000 $0 Basketball Court $40,000 $40,000 $0 Shelter renovation Park O s Parkin Lot Resurfacin Pearl Street Mall Irri anon S stem $200,000 $0 $200,000 Landsca in Renovation $125,000 $125,000 Pineview Pla round $300,000 $300,000 Irri ation S stem $37,539 $37,539 Scott Car enter Sidewalk Re air $75,000 $75,000 Tantra Park Irri anon S stem $383,817 $383,817 Picinic Shelter roof $15,000 $15,000 Sho Parkin Lot Pla round/Sidewalks/Sleddin Hill $400,000 Pond -maintenance/circulation unit Tom Watson Sanita Sewer re lacement $0 Parkin lot re-surfacin - as halt $0 Path re-surfacin - as halt $50,000 $50,000 Wonderland Lake Sidewalk Re air $328,000 $328,000 $0 All arks New ark si ns $0 Parks east of Broadwa Wildlife roof [rash cans $0 Sorts facilities Pleasant View Fields shade structures, ent wa and arkin $400,000 $400,000 East Ma leton Blfds scoreboards $100,000 $100,000 TomWatson backsto sand outfield fences $20,000 $20,000 Recreation facilities North Boulder Recreation Center front desk renovation $50,000 $50,000 East Boulder Recreation Center locker room renovation $70,000 $70,000 South Boulder Recreation Center dance room re lacement, ener efficienc $51,000 $51,000 Potte Lab lift station installation $7,000 $7,000 TOTAL $8,023,435 $1,046,092 $463,000 $4,114,343 May Zoos AGENDA ITEM # ~~ ,PAGE `~O Attachment F Attachment F Unfunded Capital List -Parks and Recreation Fund Project Year -Estimate Action I % Essential Action Plan Capital Vlslon Plan Total Operating Current Project In i Notes i Vision Plan Desirable Costs Caplfal Costs Costs Needed Funding Master Discretionary (new PIan7 for 07 -provide for Action Plan I projects). Permanent Parks ' Capital Replacement Program -Park 2009 and later Action Plan 100°h Essential $3,500,000 to be $650,000/ V Capital replacement analysis is underway for and 25 Sales Tax ( facilities system wide ~ determined year estimating deterred maintenance needs. Cost ~i estimates to date include playgrountl renovation, irrgation system replacement, shelter replacement, Permanent Parks ' Complete development of community, 2014 or later Action 100 % Essential $18,440,000 I $1.580,000 to be $7,160,000 Y Completion of community, neighborhootl and pocket antl 25 Sales Tax ~ neighborhood and pocket parks PlanNision determined ~ in P&R CIP parks is in Action Plan. Transit Village Area pocket ~ I Plan ~ park and plaza development are in Vision Plan. j Funding is anticipated to come from DET. Permanent Parks Capital Replacement Program - 2009 and later Action Plan 100% Essential $875,000 to be $300,000 / Y Capital replacement analysis is underway for and 25 Sales Tax ~ recreation facilities system wide determined year estimating detered maintenance needs. Cost estimates to date include improvements at sports fields (PleasanNiew, East Mapleton, Tom Watson) and improvements at recreation centers and other facilities (renovations and energy efficiency upgrades). Permanent Parks Aquatics improvements 2010 or later Action Plan 100% Desirable $2,100,000 to be $1,100,000 Y Pool improvements at Scoff Carpenter Pool and .25 Sales Tax determined in 2011 Permanent Parks Flatirons Golf Course Improvements 2010 or later Action 100 % Desirable $3,000,000 $1,800,000 $5,000 $2,100,000 Y Includes replacement of irrigation system, upgrades to and 25 Sales Tax PlanNision !, ~~ tees and greens, and replacement of golf operations Plan i center Permanent Parks ~ Boulder Reservoir 2010 or later ~ Action 50 % Desirable, 50% TBD TBD to be $800,000 Y Boulder Reservoir area master plan will be completed ~ and 25 Sales Tax 'i Plan/Vision Discretionary determined which will determine priorities and projects, such as Plan improvements to main office, Concessions, Restrooms, ADA accessible playground, signage, entry way improvements, docks antl walkways. Permanent Parks Replace outdoor lighting to comply with by 2018 Action Plan 100% Essential $1,300,000 $1,000,000 Y Outdoor lighting replacement must occur before 2018 and 25 Sales Tax lighting ordinance I ' to comply with lighting ordinance. Energy efficiency I upgrades are included as part of implementation. Permanent Parks Valmont City Park Development - south unknown Action 100°~ Desirable $25,000,000 to be none Y Valmont City Park first phase vrill be completed with and .25 Sales Tax side PlanNision determined .25 Cent Sales Tax funding ($4 million is allocated for Plan development of north side). Cost estimates for entire park are based on draft concept plan. Development o the park is in the vision plan of the master plan. Permanent Parks Relocation of Parks Operations Facility ; unknown Action Plan 100 % Desirable $4,200,000 $160,000/year none Y Staff is ezplortng other locations for the Park and 25 Sales Taz I Operations facility. Relocation will be necessary when south portion of Valmont City Park is developed. Permanent Parks Develop concept plan for for 191 acres 2016 or later Vision 100% Discretionary TBD TBD none Y and 25 Sales Tax of cif -owned land located in Area III Permanent Parks Build a new sports field complex with unknown Vision 100% Discretionary''. $6,000,000 TBD none V and 25 Sales Tax s nthetic turf. TOTALS 533,415,000 E34,380,000 AGENDA ITEM #~_, j7q~,E ~7 Attachment G WEEKLY INFORMATION PACKET To: Mayor Shaun McGrath and Members of City Council From: Frank Bruno, City Manager Stephanie Grainger, Deputy City Manager Maureen Rait, Executive Director of Public Works Bill Boyes, Acting Facilities and Fleet Manager Jonathan Koehn, Environmental Affairs Manager Date: May 1, 2008 Subject: Information Item: City of Boulder Operations -Energy Strategy PURPOSE: At the Apri122, 2008 Budget Study Session, the City Council requested that future budgets illustrate how energy savings are achieved in city operations. Additionally, council requested an update on energy savings initiatives involving city operations. This memo provides information about energy use in city operations, a brief summary of past and recent initiatives and outlines the actions being taken by the city organization to manage energy use and reduce its greenhouse gas (GHG) emissions. EXECUTIVE SUMMARY: In recent years, the city has experienced dramatic increases in natural gas and electricity costs. Energy rate increases have consistently exceeded annual budget guideline increases for non-personnel expenses (NPE). The average annual increase for all types of fuel purchased by the city for its vehicles has been 19.5 percent per yeaz and this trend is expected to continue. Despite these challenges, the city continues to invest in energy reduction initiatives. Since 1998, the city has completed 114 projects and spent approximately $3 million on equipment that improved the efficiency of city buildings. In 2008, $370,677 will be invested in energy savings efforts involving nine additional projects. Additionally, private-public partnerships are supporting the installation of solar photovoltaic systems at city facilities. Other city practices that reduce GHG emissions include purchasing hybrid and alternative fuel vehicles, and replacing traffic signals with high-efficiency light emitting diode (LED) lamps. An interdepartmental Energy Strategy Team is being convened by OEA and Facilities & Fleet Services staff to continue with the implementation of sustainable energy management in city operations. The 2009 budget will also highlight energy issues and illustrate how energy savings aze proposed to be achieved. FACILITIES MANAGEMENT: Facilities & Asset Management (FAM) provides services to the public and staff that use General Fund facilities and manages 37 of the' 981azger buildings in the city's overall inventory. Public Works/Utilities, Public Works/Transportation, Downtown and AGENDA ITEM #~ , I AGE Attachment G University Hill Management District, Open Space/Mountain Pazks and Housing & Human Services aze also responsible for the management of public facilities. The goal for all city facilities is to establish proven methods of facility management for its assets and promote cost-effective programs that provide safe, clean and efficient environments for customers and city staff. An energy strategy for city operations is intended to address all city facilities. The FAM Master Plan was originally accepted by the City Council in August 1996. It was updated and accepted in February 1998 to include all Parks & Recreation facilities in response to City Council direction. The major focus of the 2005 FAM Master Plan update was to promote and implement sustainable practices in accordance with the Boulder Valley Comprehensive Plan and City Council goals. The FAM Master Plan describes three levels of funding for operations and infrastructure: Fiscally Constrained (current funding), Action Plan and Vision Plan, and focuses on the major challenges related to General Fund facilities facing the city through the year 2014. The 2005 update to the FAM Master Plan prioritized the accomplishment of energy reduction efficiency projects and investment strategies, for FAM maintained facilities, as follows: Fiscally Constrained -all projects with less than three year simple payback will be completed. Action Plan -all projects with less than five year simple payback will be completed. Vision Plan -all projects with less than 10 yeaz simple payback will be completed. Funding levels for FAM continue to be fiscally constrained which means that energy efficiency improvements are made as-needed and in coordination with maintenance activities. FAM subscribes to a service that provides monthly energy consumption data, which allows staff to track the impact ofenergy-saving retrofits and identify equipment or operational problems. ENERGY AND FUEL COSTS: In recent years, the city has experienced dramatic increases in natural gas and electricity costs. Energy rate increases have consistently exceeded annual budget guideline increases for non-personnel expenses (NPE). Based on information from the federal Energy Information Administration (EIA), short-term energy projections and 2000 - 2006 actual city energy expenditures, it is projected that energy rates for 2008 will be six percent higher than 2007 rates with an additional six percent increase projected for 2009. The average annual increase (2000 - 2007) for all types of fuel purchased by the city for its vehicles has been 19.5 percent per yeaz and this trend is expected to continue. In 2000, the average price paid for unleaded gasoline was $0.97 per gallon. However, the average cost in 2007 was $2.20 per gallon. Total energy and fuel costs for the city are significant as shown below: AGENDA ITEM #I~~, PAGE ~ I Attachment G 2007 Actual Energy /Fuel Expenditures by Fund Fund Fund Title Ener¢Y Costs Fuel Costs 010 General Fund $ 662,792 $ 355,338 112 P&DS $ 2,246 $ 14,563 117 .15 Cent Sales Tax $ 3,289 $ 227 118 .25 Cent sales Tax $ 20,081 $ 20,081 120 Library $ 130,208 $ 611 130 Recreation Activity $ 614,382 $ 8,023 150 OSMP $ 46,867 $ 63,875 170 Airport $ 19,012 $ 285 180 Transportation $ 997,411 $ 149,772 230 Permanent Parks $ 0 $ 5,541 510 Water $ 525,116 $ 65,931 520 Wastewater $ 528,589 $ 34,922 530 Flood $ 79 $ 22,181 540 CAGID $ 176,316 $ 5,598 550 UHGID $ 9,152 $ 2,081 TOTAL $ 3,733,297 $ 732,149 ENERGY EFFICIENCY AND_RENEWABLE ENERGY INITIATIVES IN CITY OPERATIONS: The city has been engaged in energy reduction initiatives for over 15 years. Since 1998, the city has completed 114 projects and spent approximately $3 million on equipment that improved the efficiency of city buildings. In 2008, $370,677 will be invested in energy savings efforts involving nine additional projects. Additionally, $200,000 in one- time funds could be allocated during the first budget adjustment in 2008 for other energy- savings efforts, as noted below. Number of Yeaz Proiects Costs 1998 8 $ 240,033 1999 22 $ 276,236 2000 22 $ 203,550 2001 5 $ 173,698 2002 14 $ 724,925 2003 11 $ 186,227 2004 6 $ 453,267 2005 7 $ 164,801 2006 12 $ 421,569 2007 7 $ 86,884 2008 9 $ 370,677 Total 123 $ 3,301,867 ,AGENDA ITEM #~~ ~ PAGE Attachment G In general, higher efficiency equipment was installed to replace equipment that had reached the end of its useful life, and in some cases investments were made specifically to improve efficiency. These efforts include HVAC system replacements, lighting upgrades, additional roof insulation, and achieving a Leadership in Energy and Environmental Design (LEED) Silver rating at the North Boulder Recreation Center, the latter meeting the 2001 city adopted a policy that all new construction and significant renovations of city facilities be certified to the LEED-NC Silver Standard. The city's next LEED building will be the administration building of the new Fire Training Center, scheduled to break ground later this year. Through the energy efficiency initiatives above, the city has been able to manage growth in consumption and reduce consumption. The city's energy use is tracked as part of the city's commitment to the Chicago Climate Exchange (CCX) as a component of the CAP. The CCX is a voluntary, legally binding cap and trade pilot program. The city originally became a member in 2005 and staff tracks and reports GHG emissions from city operations annually. The city organization has achieved a 10.7 percent reduction from the program baseline. The CCX baseline is defined as the city's average annual emissions from 1998-2000. CCX members commit to a reduction schedule that requires year 2010 emission reductions of 6 percent below the baseline. This reduction is a result of city efforts to improve efficiency including facility efficiency upgrades and increasing the use of hybrid and flex fuel vehicles. Compared to the baseline, electzicity use has decreased 8.1 percent natural gas use has increased by 12.6 percent and vehicle emissions have been reduced by 41 percent In response to requested information about improvements made to the Council Chambers, it has been confirmed that lighting upgrades were completed in 1999. Anew HVAC system and computerized controls were also installed for the Council Chambers during 2005. Energy assessments of city facilities aze planned for 2008 and will include the Municipal Building and that work will inform future improvements to the facility, including the Council Chambers. In 2008, $200,000 of one-time money in the General Fund (currently being held in contingency pending approval of the 1 S` budget supplemental of 2008 in May that includes additiona12008 funding for the Boulder Mobile Manor project and the Economic Vitality program) will be allocated to FAM. If City Council approves the budget adjustment, the one-time funds will be used to help reduce the facilities maintenance backlog and pursue more energy-saving opportunities including: 1. Relamp / Reballast lighting systems at the Main Library ($30,000). 2. Upgrade HVAC Controls at the Main Library. The software was upgraded in recent years, but the hazdwaze that controls the individual dampers is obsolete and needs to be replaced ($40,000). 3. Leverage funding to take advantage of Xcel energy-saving programs such as Recommissioning and Engineering Analysis ($130,000). AGENDA ITEM #~14 , PAGE ~ I Attachment G In November 2007, City Council approved a ground lease agreement with EyeOn Solar for the purpose of constructing and operating a one megawatt photovoltaic (PV) solar power generating system at the 75th Street Wastewater Treatment Plant at no additional cost to the city. The project will generate economic savings as the Power Purchase Agreement with EyeOn Solaz will result in a fixed rate over time. The system is expected to provide approximately 20 to 25 percent of the facility's annual electricity use. The renewable energy certificates (RECs) will be assigned to Xcel Energy through the Solar Rewards program and the system is expected to be completed in 2008. During 2008, a PV system is also planned for installation at the George Reynolds Branch Library. The system is being donated by Bella Energy, the city will own the system and will receive all electricity generated by the 9.72 kW system or approximately 30 percent of the facility's annual electricity use. Again, RECs will be assigned to Xcel Energy. The city will soon be requesting bids to install two 10 kW PV systems on other city facilities. The systems are being donated by a local foundation. In addition, staff will be issuing a request for proposals to evaluate the most suitable city facilities and potential electricity generation in order to prioritize these PV installations and potential future projects. Other city practices that reduce GHG emissions include purchasing hybrid and alternative fuel vehicles, and replacing traffic signals with high-efficiency light emitting diode (LED) lamps. Currently, 35 percent of the city's fleet is made up of alternatively fueled vehicles. This includes biodiesel (B20), flex-fuel (E85) (gas/ethanol), electric and hybrids (gas/electric). The debate over biofuels has engendered community and nationwide discussion. It is an issue that calls into question the energy balance of producing the fuels, the amount of water needed to grow crops and refine the fuels, and the difficulty in quantifying the effects of nitrogen runoff and impacts on worldwide food price and availability. At the same time, many leaders in fuel and climate reseazch maintain that biofuels, specifically biodiesel and ethanol, are less carbon intensive than the petroleum-based fuels they replace. Food-based biofuels are not a sustainable solution to reduce GHG emissions. However, food-based biofuels aze expected to be replaced in the neaz future with cellulosic biofuels made from non-food feedstocks and with impressive energy balances. By supporting biodiesel and ethanol now, we are creating a demand for the next generation of fuels that will replace petroleum in the long term. Fleet Services will continue to purchase diesel-powered and flexible fuel city vehicles and equipment as a priority whenever they are offered by manufacturers. These "alternative fuel" vehicles and equipment provide the option to use either biofuels or traditional petroleum-based fuels. AGENDA ITEM #~ _ , PAGE ~Z Attachment G 2008/2009 PROPOSED ACTIONS: With the passage of the Climate Action Plan (CAP) and the CAP Tax in 2006, the city embazked on an ambitious plan to reduce GHG emissions in our community. The CAP proposed that the city adopt policies to reduce the community's natural gas and electricity use by 20 percent and 10 percent respectively and also recommends that at least 20 percent of city energy use be from renewable sources, all by 2012. This goal is similar to Governor Ritter's "Greening the Government" initiative. At the 2008 City Council retreat, the city manager proposed that the city become energy independent over the next 10 years. Developing and implementing a strategic vision and process for achieving GHG reductions, energy independence, increased renewable energy use and managing energy costs is an important focus for the organization. The city's efforts will help demonstrate leadership and reinforce our respective responsibilities in achieving these goals. The Office of Environmental Affairs (OEA) and Facilities & Fleet Services aze working with city departments to manage energy use and costs and assist departments with sustainable energy management. The work program being pursued during the next six to 18 months to meet city sustainability goals is as follows: 1. Through Xcel Energy's ConservationWise program, complete 10 to 20 energy assessments in city facilities, including the Municipal Building, and recommissioning projects at the Main Library, Public Safety Building, and the East and North Recreation Centers; 2. Complete acost-to-benefit analysis of vazious energy strategies, identified by assessments and recommissioning; 3. Evaluate the cost effectiveness of performance (financing) contracts to implement energy efficiency improvements for selected city facilities or projects; 4. Provide education and training for city employees; 5. Develop and implement a strategic plan to support longer-teen strategies needed to manage future energy demands and costs to achieve the city's energy goals; and 6. Utilize the opportunity provided by the Smart Grid by initiating pilot projects such as plug in hybrids and vehicle to grid technology, additional energy sources such as wind and solaz, and new and innovative efficiency technologies. ' ConservationWise is Xcel Energy's suite of energy conservation and energy management products that make up their demand side management efforts. These programs are geared towazds reducing consumer demand of electricity by offering cash rebates for purchasing and installing eligible energy-efficient equipment and mechanical system components. AGENDA ITECN # ~ ,PAGE ~~ Attachment G NEXT STEPS: An interdepartmental Energy Strategy Team is being convened by OEA and Facilities & Fleet Services staff to continue with the implementation of sustainable energy management in city operations and the work program noted. The 2009 budget will also highlight energy issues and illustrate how energy savings aze proposed to be achieved. For additional information regarding Facilities and Fleet Services operations and on- going energy reduction initiatives, please contact Bill Boyes, Acting Facilities & Fleet Manager at (303) 441-4125 or boyesbCn~,bouldercolorado.gov AGENDA ITEM # ~ __ , PAGE_~ 7