6 - Handouts S-~~M G
Historic Preservation Comments
1707 Walnut Street
The subject property is located just north of the Chamberlain Historic District, the middle
of Walnut forming the northern boundary of this district which was designated in 1996.
The Downtown historic district (designated in 1999) is located one block northwest of the
property. While the property is not designated as a local landmark or located in a
designated historic district, because of its proximity to the Chamberlain and Downtown
historic districts, comments as part of the site review process leave been requested from
historic preservation staff.
The proposed new construction will most directly impact properties located on the south
side of Walnut Street in the Chamberlain historic district. Plans show the proposed four-
storymodernist building will be approximately 80' north of the row of historically
contributing Queen Anne vernacular masonry houses on the south side of Walnut Street.
In terms of mass, scale, and height the proposed building is larger and than adjacent
historic properties in the Chamberlain Historic District. However, effort appears to have
been taken to break up the mass of the south elevation of the building by stepping and
setting back planes of the building. The effective street front height of the street (south)
face of the building is two-stories (22' to 25' in height) with the facade broken into five
bays ranging in width from 12' to 20'. While this pattern reflects the rhytlvn of
storefronts in the Downtown Historic District, the scale of these bays is generally
comparable in scale to the historic buildings on the south side of Walnut Street. The third
floor of the building is shown to rise to 34' in height and to be set back 8' from the
second-story.
A preliminary review of the proposed design indicates that that the proposed two-story
section of the building will clot negatively affect the character of the Chamberlain historic
district. However, historic preservation staff considers that the third-story set back should
be increased to 15' to further mitigate the mass and height of the building when viewed
from the Chamberlain Historic District. Increasing the setback to 15' is consistent with
Section 1.2.5 of the Downtown Urba~t Design Guidelines and with policy 2.33,
Presen~ation of Historic and Cultural Resources of the Boulder Valley Comprehensive
Plan.
For more information regarding this matter, please call James Hewat at 303.441.3207.
Historic Preservation
The Craftsman inspired Bungalow located at 3015 (formerly 3017) Kalmia
Avenue appears to have been constructed in 1912.The one and one-half story
house features a low pitch roof with wide overhanging eaves and exposed rafter
tails supported by Craftsman brackets, a centrally located south facing portico,
and native fieldstone walls. A c.1929 tax assessor photograph of the house
indicates that, with the exception of the enclosure of the portico, few changes to
the house have been made to the house over the course of the last sixty-five
years and the building retains a relatively high degree of historic integrity. It
survives as a good representative example of Craftsman Bungalow architecture
in Boulder, constructed as part of an agricultural complex with native stone.
In 2006, prior to annexation into the City of Boulder and demolition of adjacent
outbuildings on the property, a historic building inventory record was completed
for the property by Boulder County.
Given the historic and architectural integrity of the house, staff considers that a
condition of Site Review include submittal of a completed application to landmark
the building and a portion of the property as per policy 2.33 Preservation of
Historic and Culfural Resources of the Boulder Valley Comprehensive Plan.
landmark designation of the building would provide the property owner with the
opportunity to take advantage of the state historic preservation tax credit (20% of
the project cost up to $50,000} for costs associated with the qualified
rehabilitation of the building.
For more information regarding this matter, please call James Hewat at
303.441.3207.
Historic Preservation
Pre-Application Comments for 800 Pearl Street
06/09/2008
The building at 800 Pearl Street was constructed in 187b for Nathaniel P. I
Iill as a
sampling works far ore from mines in the mountains west of Boulder. By 1880,
the Boston & Colorado Smelting Company was operating the sampling works
and in 1892 the building was sold to W.J. Chamberlain, and operated as the W.J.
Chamberlain & Co. Sampling Works, and later as the W.J. Chamberlain-
Dillingham Ore Company. In 1919 the operations were taken over by the
Boulder Ore Sampling Company. During the 1930s the building served as the
offices of the St. Joe Milling Company. Around 1940 the building changed for a
short time serving as machinery works, furniture sales and warehouse, metal
works, and wood working. In 1949 the property reverted again to mining
activities and in 1955, Hill & Jude Assayers were operating out of the building.
By the late 1950's the Wah Chang Corporation laboratory sampled Tungsten in.
the building. From the 19b0's to 1979 the building housed motorcycle sales and
repair, and automotive repair. Since 1979 the building has been used as a
grocery store, first as a Red and White Food Store, then the Duffy IGA, and in
1985 Lolita's Market opened in the building.
Though the building has been altered a number of times over the years, the basic
form remains intact. Exterior changes include the removal of tower sometime
after 1930, the application of cementitious stucco to the exterior walls sometime
between 1935 and 1943, and the replacement of the six-over-six double-hung
windows and relocation of the entrance on the north elevation sometime
between 1943 and 19b5. A second-story window has been closed, the void
covered with a sign. A flat roof addition. at the south side of the building appears
in a c.1930 photograph of the property. Tn July of 2007, the Landmarks Board
imposed asstay-of-demolition on the property. The demolition application was
subsequently withdrawn by the property owner.
The proposal calls for an intensive re-development of the approximately 1.4,000
square foot lot including the construction of a new building to provide five new
housing units and approximately 1000 sq. ft. of new retail space. Plans are for
55' feet (approximately 2,500 sq. ft.) of the historic building to be retained and
rehabilitated far retail space as part of the development. Currently, the building
is 13U feet in length with a total square footage of b,400.
The proposed retention of the front 55' of the building does serve to maintain the
presence on the corner of 8~h and Pearl. However, staff considers that the
applicant should attempt to preserve as much of the existing building a possible.
For example, retaining the entire pitch-roof portion of the building would be
preferable to only the 55' portion proposed. Likewise, steps should be taken to
carefully consider how the adjacent new construction can integrate with the
historic building. As shown, the notion of the setting the proposed new retail
space back from the facade of the historic building seems a good solution to
highlight Lolita's on the Pearl Street block front. Keferring to the General Design
Guidelines maybe helpful as you develop plans for the redevelopment of the
building.
Histor. is preservation staff acknowledges the though the applicant has put into
considering ways to preserve this important historic building. The building's
significance derives, in part, from its form and setting as a dominant feature on
the corner of Sth and Pearl Street.
As has been mentioned before, a condition of Site Review approval will require
the applicant's submittal of a completed application to landmark the building
and a portion of the property as per policy 2.33 Preservation of Historic and
Cultural Resources of the Boulder Valley Comprehensive Plan. Staff recommends
that this occurs as soon as possible so that we can schedule a designation
hearing. This will allow the Landmarks Board to review the proposed landmark
and boundary in the context of the larger re-development of the property so that
the subsequent Planning Board review will include the Landmark Board's
comments and recommendations. Please note that the historic preservation
ordinance (9-11-5(a)) states that once a completed application made by the
property owner is received, a public hearing must be heard by the Landmarks
Board between 60 & 120 days of the application date.
For more information regardu1g this matter, please call James Hewat at
303.441.3207.
1. What would be the most effective procedure to expedite the renovation of the
existing structure while ensuring a commitment to support the full
development concept prior to final approval of the Landmark and Site
Review application?
Early input from the Landmarks Board on the demolition of the rear portions of the
building and the restoration of the rcmaizung building will be the most effective
procedure. The proposed retention of the front 55' of the building does serve to
maintain the presence on the corner of 8t~' and Pearl. However, staff considers that the
applicant should attempt to preserve as much of the existing building a possible. For
example, retaining the entire pitch-roof portion of the building would be preferable to
only the 55' portion proposed. Likewise, steps should be taken to carefully consider
how the adjacent new construction can integrate with the historic building. As
shown, the notion of the setting the proposed new retail space back from the facade of
the historic building seems a good solution to highlight Lolita's on the Pearl Street
block front. Referring to the General Design Guidelines may be helpful as you
develop plans for the redevelopment of the building. Historic preservation staff
acknowledges the thought the applicant has put into considering ways to preserve this
important historic building. The building's significance derives, in part, from its form
and setting as a dominant feature on the corner of 8th and Pearl Street. Emphasis on
the areas and ways the building will be restored will be important. See response #5
for more information and recommendations.
2. Would Tistoric Preservation staff please outline the next steps in processing
the Landmark Application and any future meetings with the Landmark's
DRC to confirm our understanding of their recommended approval process?
Staff recommends that the owner submit a Landmark Application for the building,
along with a description and justification for a landmark boundary. All applications
for Landmark designation must be heard within 60-120 days after submittal.
Submittal of a Landmark application will allow the Landmarks Board to review
the proposed alterations and landmark boundary in the context of the larger re-
development of the property. If Site Review is requested, staff will recommend
landmark designation of the building as a condition of approval as per policy 2.33 of
the Boulder Valley Comprehensive Plan. Removal of the rear addition, and any
portion of the gabled original portion will require a public hearing before the
Landmarks Board. Staff is willing to take a conceptual plan to the Landmarks DRC
for review prior to your full board submittal. This is a conceptual review much like a
concept review from Planning Board, in that no decisions or conclusions are made,
and is considered ex parte commuiucations by the Landmarks Board. Staff
recommends having your full board review for the removal of the rear portion of the
building and restoration of the remaining building prior to site review submittal, or
preparation of building permits for a by-right development. If designation is
recommended to City Council by the Landmarks Board, and the removal of rear
portions is approved, then staff suggests submitting for site xeview if requested. The
designation application would not be heard by the City Council until a final decision
is rendered on a site review application to allow the applicant to withdraw the
application for designation. If no site review is requested, the designation would be
taken to City Council within the required 100 day timeframe from the Landmarks
Board hearing.
Revised Historic Preservation
Concept Review Comments for 900 28t'' Street
05/02/2008
The revised proposal calls for an intensive re-development of the 112,000 square
foot lot including the construction of several new buildings to provide 59 new
housing units in approximately 84,000 sq. ft. of floor area. The Green Shield
Building currently contains 15,800 sq. ft. of floor area.
Revised drawings indicate the level of re-development on the lot has not been
significantly reduced. However, the mass of the building previously at the west
side of the site has been shifted and integrated into the proposed building at the
east and north, leaving the west end of the property as open space. The site plan
shows a series of four connected pavilions together comprising building B which
is to be served by a 270 space subsurface parking lot accessed from Aurora
Avenue by way of a ramped entryway set between the Green Shield Building
and the proposed "building B". the site plan also indicates that building B is to
be approximately 42' in height, eight feet higher than. the 34' high Green Shield
building.
Revised plans for 900 28th Street indicate lessen the effect on the context and
setting of the Green Shield Office Building than did the previous proposal.
Historic preservation staff acknowledges the effort the applicant has put into
preserving the landscaped park-like area immediately west of the existing
building by eliminating the 25,000 sq. ft. residential building shown in the prior
submittal. As mentioned i11 earlier written comments, the building's significance
derives, in part, from its setting and landscaping features including mature
vegetation, pathways, and stone retaining walls. The preservation of this area as
"open space" will maintain the landscape features and park-like context in which
the Green Shield building is located.
However, staff considers that the placement of the ramp to the underground
parkuzg is problematic as it will dominate the view if the Green Shield building
from the southeast. An alternative might be to locate the parking entrance at the
southeast corner of the property between building B and the office building to
the east. In addition, the real or apparent mass and scale of building B should be
reduced. In particular, the height of the south pavilion of building B should be
reduced to two stories; perhaps then stepping up to three and four stories as the
building moves north. Effort should also be made to further articulate the mass
and detailing of building B to mitigate its massing. In particular, the south facade
should be designed in a manner that addresses the pedestrians and "plaza"
facing elevations should be designed in a manner that is more human in scale.
As has been mentioned before, a condition of Site Review approval will require
the applicant's submittal of a completed application to landmark the building
and a portion of the property as per policy 2.33 Preservation of Historic and
Cultural Resources of the Boulder Valley Comprehensive Plan. Staff recommends
that this occurs as soon as possible so that we can schedule a designation
hearing. This will allow the Landmarks Board to review the proposed landmark
and boundary in the context of the larger re-development of the property so that
the subsequent Planning Board review will include the Landmark Board's
comments and recommendations. Please note that the historic preservation
ordinance (9-11-5(a)) states that once a completed application made by the
property owner is received, a public hearing must be heard by the Landmarks
Board between 60 & 120 days of the application date.
For more information regarding this matter, please call James Hewat at
303.441.3207.
August 4, 2008
Site Review Comments for the Odd Fellows Temple
1541-45 Pearl Street
LUR2008-00066
The Romanesque-Revival Odd Fellows Temple at 1541-45 Pearl Street was
constructed in 1899 for the International Order of Odd Fellows, one of the oldest
fraternal groups in the United States. Located at the east end of the Downtown
Historic District (designated in 1999), the building is considered a contributing
resource to the area and is likely also eligible for individual listing in the
National Register of Historic Places.
The building is one of the Boulder's more notable historic buildings and its
contuzued preservation is important to the heritage of the city. As the property is
contributing to the historic district and therefore protected under 1oulder's
historic preservation ordinance, there are no recommended historic preservation
conditions of Site Review approval, per policy 2.33 Preservation of 1-listoric alzd
Cultural Resources of the Boulder Valley Comprehensive Plan.
Submitted plans for the construction of the elevator tower at the north (rear)
elevation were reviewed earlier this year by the Landmarks design review
committee. The committee considered the proposed addition modest in scale and
impact, consistent with the historic preservation ordinance and applicable design
guidelines, and necessary to the functionality of the building. For these reasons
approval for the addition was granted by the committee.
If you have questions regarding this matter, please call James Hewat at
303.441.3207.
August 4, 2008
Site Review Comments for 4051 Broadway
LUR2008-00053
The applicant's submittal of a completed application to landmark the barn and a
portion of the property (as per policy 2.33 Preservation of Historic and Cultural
Resources of the Boulder Valley Comprehensive Plan), in February of 2008 has
satisfied the historic preservation condition for Site Review approval. The
application to Landmark the building was reviewed by the Landmarks Board on
June 3, 2008. An ordinance fvr the designation of the building and associated
property will be reviewed in a public hearing by the City Council for possible
designation on September 2, 2008.
Plans indicate that a portion of proposed building #1 is to be located on the
western boundary of the proposed landmark area. If the building extends over,
or is on the boundary, that portion of the building will be subject to review of a
landmark alteration certificate by the Landmarks Board. Otherwise, the Board
has no formal review of construction on the property that occurs outside of the
landmark boundary.
If you have questions regarding this matter, please call James Hewat at
303.441.3207.