HomeMy WebLinkAbout01.26.26 WRAB Agenda 6 - Water Budget Policy RecommendationsC I T Y OF B O U L D E R
WATER RESOURCES ADVISORY BOARD
INFORMATION ITEM
MEETING DATE: January 26, 2026
AGENDA TITLE: Information Item – Water Budget Policy Recommendations
PRESENTERS:
Joe Taddeucci, Director of Utilities
Joanna Bloom, Public Utilities Deputy Director
Stephanie Klingeman, Budget Analyst Principal
Kim Hutton, Water Resources Manager
Krystle Morey, Water Resources Senior Engineer
Merry Martin, City Senior Project Manager
Heather Bearnes-Loza, Water Conservation Program Manager
EXECUTIVE SUMMARY:
Boulder adopted water budgets in 2007 as a tool to help the city respond to drought and encourage
efficient water use. After 18 years of implementation, changes in customer behavior, community priorities,
and administrative demands, Boulder has been re-evaluating city’s Water Budget Policy (Attachment A)
to see if changes are needed. As discussed at the Oct ober 2025 WRAB meeting, the first phase of re-
evaluation was intended to narrow down policy options to be further analyzed in the upcoming, second
phase of the project, which is a Utilities rate study.
Based on community input and data analysis, staff are recommending keeping water budgets with minor
modifications for single-family residential and metered irrigation accounts and exploring a broader range
of alternatives for multi-family residential and commercial, industrial, and institutional (CII) accounts. The
upcoming rate study will take a deeper look into how proposed changes would impact customers and
Utilities’ ability to recover costs. The purpose of this memo is to provide the board with an overview of
staff’s findings to-date and an opportunity to ask questions before moving on with further analysis.
BACKGROUND:
Boulder’s Water Budget Policy was established in 2007 as a drought response and water conservation
tool. After 18 years of implementation, changes in customer behavior, community priorities, and
administrative demands indicate it is time to update the policy. Evaluation of the Water Budget Policy is
being conducted in advance of the Utilities rate study to establish policy direction before detailed financial
modeling begins. The Utilities rate study will incorporate Water Budget Policy recommendations and
provide a comprehensive review of water, wastewater, and stormwater rates.
This Water Budget Policy evaluation was designed to identify opportunities to simplify the policy and
improve its effectiveness. It included a review of water budgets and other billing structures used by other
communities; interviews with peer utilities; workshops and interviews with city staff responsible for
administering the policy; and analysis of water use patterns compared to budget amounts across
customer types. Community input was collected through a bilingual online feedback form, participation in
the What’s Up Boulder community event, the October 2025 Water Resources Advisory Board meeting, a
large water user workshop, and a discussion with the Community Connectors in Residence. A summary
of community feedback is provided in Attachment B.
ANALYSIS:
Multiple methods were used to evaluate the Water Budget Policy including review of best practices,
interviews, data analysis, and collection of community feedback. The evaluation identified the following
key themes which informed the policy recommendations included in this memo.
Themes
1.Boulder’s current Water Budget Policy is complex
Boulder’s current Water Budget Policy is one of the most complex implementations of water budgets out
of communities reviewed across Colorado and California – two states considered to be at the forefront of
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 1 of 29
such practices. This level of complexity makes the policy difficult for customers to understand and costly
for staff to administer. For example, the policy results in 16 different customer account types, 10 of which
are specifically for CII customers and many CII customers do not understand their account type and
associated water budget. There are numerous examples of policy complexities that when taken together,
result in significant resources needed to administer the policy. Many communities have adopted simpler
water budget approaches or billing structures that preserve water conservation price signals while being
less administratively burdensome.
2. Single family residential customers value a conservation price signal
A community feedback form for single-family customers with 948 responses identified that those
customers largely understand water budgets and related bill impacts and highly value a rate structure that
provides financial incentive to conserve.
3. Residential water budgets are set too high to be effective
Residential water use is consistently less than water budget amounts as shown in Figure 1. As a result,
water budgets are not currently achieving their intended conservation purpose for many households,
though lowering water budgets would have cost implications for some customers, so there is a balance to
be struck.
Figure 1. Single Family Residential Water Use Compared to Water Budget
4. Outdoor water budgets can be an effective tool for drought response
Outdoor water use represents the primary source of discretionary demand reductions during drought.
Boulder’s 2022 Drought Plan relies predominantly on reductions in outdoor water use, with indoor
reductions reserved for only the most severe drought conditions. A review of peer communities found that
some have experienced drought management benefits through use of water budgets. This suggests that
water budgets provide a direct, effective mechanism to manage outdoor water use in a drought.
5. Disconnects between billpayers and end users can make water budgets less effective
Typical administration and operation of multi-family residential and CII properties make water budgets
less effective because often the person receiving the bill is most often not the water user. For example, a
building owner or property manager may receive the water bill, while actual water users, such as
apartment building residents or shop owners indirectly pay for water either as part of rent, as an
aggregated utility charge, or as a water charge that is determined by the building owner or property
manager. Therefore, the person using the water may not receive information on how their use compares
to their budget. This disconnect reduces the effectiveness of price signals, especially for multi-family
residential and CII customers.
6. Businesses value a predictable billing structure that considers scale
Multi-family residential and CII customers reported valuing a billing structure that is predictable and that
considers scale of water needs. For example, the water demands tied to a large water meter are
significantly greater than a small water meter as shown in Figure 2. This preference for predictability and
scale informs why alternatives that ignore meter size or usage scale are not recommended below.
0
5
10
15
20
25
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec1,000 gallons2024 Median Water Use 2024 Median Water Budget
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 2 of 29
Figure 2. Multi-family Residential and CII Customers Water Use by Meter Size
Recommendations
Evaluation of the water budget policy included development of 13 different options across multiple
customer classes (Attachment C) that have been narrowed based on the themes identified above. Staff
recommend different approaches by customer class, as described below. These are policy level
recommendations that will need to be analyzed and further refined in the Utilities rate study to ensure
stable revenue recovery.
Single Family Residential Recommendations: The primary themes identified above guide the
recommendation to keep water budgets for single family residential customers but reduce the
volume of water budgets to align with customer demands and efficient water use; resize summer
budgets to align with current landscape watering needs; and simplify the policy to align with best
practices across other communities.
Metered Irrigation Recommendations: The primary theme identified above regarding the importance
of managing outdoor water use during drought guides the recommendation to maintain water
budgets for metered irrigation accounts but adjust the volume of water budgets to align with
current landscape watering needs.
Multi-family Residential & Commercial, Industrial, Institutional Recommendations: Based on the
primary themes identified above, including disconnects between billpayers and end users and
businesses preference for predictable, scalable billing structure lead to the recommendation to
further evaluate a range of alternatives, including an increasing tiered rate structure that
varies by meter size as well as preserving the current Water Budget Policy. Simpler rate
structures such as a single rate for all consumption or an increasing tiered rate structure that is the
same for all meter sizes are not recommended because they do not reflect differences in scale which
may create inequities across customers.
NEXT STEPS:
The proposed Water Budget Policy recommendations will be refined following feedback at the Water
Resources Advisory Board meeting, then carried into the Utilities rate study. The rate study will include
additional analysis to determine precise changes to incorporate into the final updated Water Budget
Policy. Staff will return to the Water Resources Advisory Board as part of the rate study process to review
refined alternatives and analysis. Full implementation of the updated policy and any related rate
adjustments is expected in 2027 or 2028 and may be phased depending on the scope of changes.
ATTACHMENTS:
A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
B – Water Budget Policy Community Feedback Summary
C – Water Budget Alternatives Summary
7 7 12 21 62 179 589
3,235
0
1,000
2,000
3,000
4,000
3/4"1"1.5"2"3"4"6"8"1,000 gallonsMeter Size
July 2024
Median Water
Use
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 3 of 29
STANDARD (NON-EMERGENCY) REGULATION/RULE
ESTABLISHING THE METHODOLOGY TO DETERMINE THE MONTHLY WATER BUDGET
FOR THE COMPONENT OF THE MONTHLY WATER USER CHARGES KNOWN AS THE
TREATED WATER QUANTITY CHARGE, AND TO DETERMINE THE MONTHLY
WASTEWATER USER CHARGES
BRC Section that is the subject of this Rule: Chapter 11-1 and Section 4-20-25, BRC 1981
1. This Rule incorporates the guidance, requirements, rules and regulations shown in Attachment A.
2.To the extent only of any conflict, this Rule supersedes any conflicting Rules or parts of Rules, and
this Rule supersedes in its entirety, Rule 11-1-3.A(09).
Rule 11-1-3.A(21)
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 4 of 29
ATTACHMENT A
1.Purpose and Applicability.
The monthly water user charges set forth in Section 4-20-25, B.R.C. 1981, identify two components
for the monthly charges that are billed to consumers. Section 4-20-25(a), B.R.C. 1981, sets forth the
treated water monthly service charge which is a fixed amount based on the meter size. Section 4-20-
25(b) sets forth the treated water quantity charges which vary depending on use. Beginning in
January 2007, the treated water quantity charge portion of water bills were calculated using a water
budget block rate structure such that the price of water increases as more water is used, particularly
when the amount of water used exceeds the customer’s water budget. The increasing price is
necessary not only to promote water conservation, but also is related to the additional marginal cost
associated with water development and water conservation.
The purpose of this rule is to establish a methodology that shall be utilized to determine the monthly
water budget for the treated water quantity charge, and for determining the monthly wastewater user
charges, pursuant to the city’s utility rate structure study considered by City Council on May 2, 2017.
This rule establishes a system whereby the revenue produced will meet the treated water quantity
charge portion of the revenue requirements for the water utility enterprise. This rule does not include
or apply to the treated water monthly service charges set forth at Section 4-20-25(a), B.R.C. 1981.
It is also the purpose of this rule to establish a rate structure that will promote water conservation and
the efficient use of water, support community goals, reflect the value of water, send a price signal to
customers who waste water, and avoid the costs of new water development and expanded water
treatment.
2.Definitions and Abbreviations.
“AMU” means average monthly use.
“AWC” means the average monthly water consumption as reflected on a customer’s bill from
December through March.
“CII” means Commercial/Industrial/Institutional.
“ET” means evapotranspiration (also, see ET Rate).
“ET rate” means the amount of water (in inches) a lawn will use on any specific day through the
natural processes of surface evaporation and plant transpiration (loss of water through the leaves).
The historic monthly ET rate is specifically defined in the following chart:
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 5 of 29
Historic Monthly ET Rate
Month ET
(inches)
Share of Annual
Outdoor
Allocation
January 0.00 0%
February 0.00 0%
March 0.40 1%
April 2.72 7%
May 5.10 14%
June 7.52 20%
July 7.60 20%
August 6.67 18%
September 4.43 12%
October 2.92 7%
November 0.32 1%
December 0.00 0%
Total 37.68 100%
“GPSF” means gallons per square foot. “HMU” means historical monthly use.
“Irrigable area” means the area (in square feet) that a customer is required to maintain pursuant to Title
6, Title 8 and Title 9, B.R.C. 1981, is not covered by a hard surface (such as a roof, driveway, patio or
sidewalk) and that may require some outdoor watering. Right-of-way may be included as part of a
customer’s irrigable area but the city’s geographical information system (“GIS system”) may not
automatically include city right-of-way. Customers may seek inclusion of right-of-way pursuant to
paragraph 7 below.
“Kgal” means thousand gallons.
“Monthly water budget” means the amount of water allocated to the water utility customer to meet that
customer’s anticipated water needs for the month. The monthly water budget shall be the sum of the
indoor and/or outdoor allocation for each water utility customer. The allocation shall be based on
reasonable and necessary indoor and/or outdoor use, water conservation, and other relevant factors
associated with water use in the city.
“Public ROW” means public right-of-way.
3.Block Rate Structure for Treated Water Quantity Charges.
The block rate structure established in Section 4-20-25(b)(1), B.R.C. 1981, is utilized in conjunction
with the monthly water budget in order to determine the bill for each customer on a monthly basis. The
monthly water budget represents the amount of water allocated to a customer to meet the anticipated
watering needs for the month. Customers are billed for the amount of water they use each month, not
for their budgeted amount of water. The amount billed per Kgal increases as customers use more
water. (See table below.)
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 6 of 29
Block Rate
(per Kgal) Rate
(per Kgal)
Block Size
(% of water budget)
Block 1 Each Block Rate will
be as reflected in
Section 4-20-25
(b)(1), B.R.C. 1981
¾ Base Rate 0 – 60%
Block 2 Base Rate 61 – 100%
Block 3 2 x Base Rate 101 – 150%
Block 4 3 x Base Rate 151 – 200%
Block 5 5 x Base Rate Greater than 200%
Some customers have a “looped” water system in which multiple water meters are used in an effort to
increase reliability and to provide redundancy to their water system. In these “looped” water systems,
water meter accounts will be combined for budgeting and billing purposes.
4.Customer Classes.
This rule establishes four different customer classes: single-family residential, multifamily
residential, CII and metered irrigation. CII will have four sub-customer classes: 1) CII AWC
(default option); 2) CII HMU; 3) CII indoor/outdoor, and 4) CII efficiency standard. The method
used to calculate the water budget for each of these classes and sub-customer classes is described
below. The bills for all customer classes utilize the customer’s water budget amount which is then
applied to the block rates to determine the monthly water bill.
a.Single-Family Residential
The single-family residential customer’s budget shall consist of indoor and outdoor allocations
for water. The indoor allocation for each customer with a household size of up to four people shall
be set at 6,000 gallons per month. The outdoor allocation shall be based on customer-specific
irrigable area as determined by the city’s GIS system. This system maps and calculates areas within
defined property boundaries and hard surface boundaries. The total annual outdoor allocation shall
be based on the following application rates:
•For the first 5,000 square feet of irrigable area: 15 gpsf
•For the next 9,000 square feet of irrigable area: 12 gpsf
•For irrigable area in excess of 14,000 square feet:10 gpsf.
In order to reflect varying seasonal outdoor monthly watering requirements, the total annual
allocation of water for irrigable area shall be distributed to each month based upon that month’s annual
outdoor amount as described by the historic monthly ET rate.
Customers are able to base their budget on an amount less than their total irrigable area.
Single-family residential customers may seek water budget adjustments pursuant to
paragraph 7 below.
b.Multifamily Residential
The multifamily residential customer’s budget shall consist of indoor and outdoor allocations.
The indoor allocation for each residential dwelling unit shall be set at 4,000 gallons per month. The
outdoor allocation shall be based on customer-specific irrigable area as determined by the city’s GIS
system and a total annual application rate of 15 gpsf. In order to reflect varying seasonal outdoor
monthly watering requirements, the total annual allocation of water for irrigable area shall be
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 7 of 29
distributed to each month based upon that month’s annual outdoor amount as described by the
historic monthly ET rate.
Customers are able to base their budget on an amount less than their total irrigable area and will
be allocated 15 gpsf for the total amount of the reduced area.
Multifamily residential customers may seek water budget adjustments pursuant to
paragraph 7 below.
c.Commercial/Industrial/Institutional (Non-residential)
1.CII Customer Budgets - Existing
1)CII HMU customer budgets shall be based on the most recent three-year
historical average for water use for each month and recalculated every year.
January three-year historical average would become the January water
budget, February three-year historical average would become the February
water budget, etc. HMU will result in monthly wastewater charges based on
all water used, which could include water used for irrigation.
2)CII AWC customer budgets shall be based on an indoor allocation as
determined by the customer’s most recent average winter consumption
(AWC). CII AWC customers with irrigable area associated with their
account will have an outdoor allocation based on the irrigable area (including
public ROW), using an application rate of 15 GPSF and apportioned monthly
using the historical monthly ET rate. Public ROW will automatically be
included in the irrigable area for CII AWC customers. CII AWC customers
will be billed wastewater charges on actual water used or indoor budget
allocation (AWC) whichever is lower, for the billing period.
3)CII efficiency standard customer budgets shall be determined by a specific
review of the customer’s indoor and outdoor uses based on reasonable and
documented efficiency standards as determined in the methodology described
in paragraph 6 below. CII efficiency standard customers will be billed
wastewater charges on actual water used or indoor budget allocation,
whichever is lower, for the billing period.
2.CII PIF Custom Customer Budgets - New or Redevelopment
1)New or existing CII customers who are placing an increased demand on
the city’s water system must determine the appropriate meter size and
select an annual budget. These customers will use the CII Plant
Investment Fee (PIF) custom annual budget which is based on 25, 50 or
85 percent of the AWC for a specified meter size (see table below). The
CII PIF customer may then select how this annual water budget is
distributed throughout the twelve months. This annual budget distribution
may be specified by the CII PIF customer once per year.
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 8 of 29
TABLE: Annual Water Budget Based on AWC (gallons)
Meter Size 25% AWC 50% AWC 85% AWC
¾” N/A 30,000 165,000
1” 42,000 108,000 503,000
1-1/2” 99,000 228,000 924,000
2” 183,000 483,000 1,941,000
2) Mixed-use properties water budget will be calculated based on a
combination of the amount they have purchased based on the meter size
for the CII portion of the building, and the number of dwelling units and
bedrooms for the multifamily portion of the building, as described in
these rules.
3) New CII customers that have water meter(s) larger than 2” will be
allocated an efficiency standard custom budget as indicated in
paragraph 6 below.
4) CII customers may seek water budget adjustments pursuant to
paragraph 7 below.
d. Metered Irrigation
Metered irrigation customer budgets shall be based on customer-specific irrigable area as
determined by the city’s GIS system, and an annual application rate of 15 gpsf. The budget shall
change each month based upon that month’s share of annual outdoor allocation described by the
historic ET rates, except that metered irrigation accounts will be given an additional 1% of their
annual outdoor watering budget for each month in December, January and February. The purpose of
this additional 1% is to establish a monthly water budget that is greater than zero and allows for some
limited outdoor watering. Public ROW will automatically be included and added to the irrigable area
for all metered irrigation accounts.
Customers are able to base their budget on an amount less than their total irrigable area and will
be allocated 15 gpsf for the total amount of the reduced area.
Metered irrigation customers may seek water budget adjustments pursuant to paragraph 7
below.
5. Standards and Practices Regarding Water Audits for CII Customers That Request the
Efficiency Standard Water Budget Option.
The CII efficiency standard water budget option is intended to provide a customer-specific water
budget (indoor allocation and outdoor allocation) that is determined by a specific review of the
customer’s indoor and outdoor uses, needs and facilities, by a Colorado registered professional
engineer with a focus on various components, including without limitation:
• industrial or production processes,
• bathroom and locker rooms,
• kitchen and food preparation areas,
• cooling and heating facilities,
• humidity control, and
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 9 of 29
• aquatics or pool needs.
The purpose of the customer-specific review is to develop a monthly indoor water allocation based on
reasonable and documented efficiency standards and, if needed, a monthly outdoor allocation. If a
customer has any irrigable area that is not included in a separate metered irrigation-only account, the
irrigable area size should be included for use in the CII Efficiency Standard option. The monthly
outdoor allocation shall be based on the irrigable area (including public ROW), an application rate of
15 GPSF and apportioned monthly using the historical monthly ET rate. Because plant materials,
irrigation systems components, weather, soil conditions, etc, are not needed in determining the
outdoor allocation, it is not necessary to have a landscape architect or a certified landscape irrigation
auditor involved in the audit unless there is an indoor garden or horticulture need.
The indoor water audit and evaluation shall consider the following, if applicable:
• The City is a partner with the EPA WaterSense program and information is available on the
EPA WaterSense web site. Standards related to high-efficiency plumbing fixtures will be
used for the audit. For example, while a 1.6 gallon/flush toilet is today’s regulated standard, a
high-efficiency toilet, as promoted by WaterSense, uses 1.28 gallon/flush or less and should
be used in the audit and development of the indoor budget allocation.
• Data for high-efficient, front loading clothes washers.
• Recycle and reuse process water.
• Limited or no humidification: requires documented need for equipment or medical
reasons.
• Use of automatic on/off sensors on faucets in restrooms in larger facilities.
• High-efficiency dishwashers in kitchen areas, especially in restaurants and catering
facilities.
• Use of a cover in facilities that have large, open vessels of water.
• Efficient operation of cooling towers.
• Sanitation and cleaning practices in office buildings. Use of high-efficient plumbing
fixtures and appliances. Use of sensor activated or timed faucets.
• Use of plumbing fixtures, dishwashers and ice machines in restaurants. Servers offering a
glass of water on request, but not as an automatic service. Use sensor activated or timed
faucets. Reduce water in food preparation activities.
• Efficiencies for cooling water, food preparation, boilers and chillers in supermarkets.
• Plumbing fixtures, laundry facilities and ice machines in hotels and motels. Request
guests to reuse their towels and linens to reduce laundry needs.
• Efficiencies in cafeteria food preparation, plumbing fixtures, restrooms and locker rooms in
schools.
The report shall include a recommendation for each month’s indoor water budget allocation, based
on the audit and evaluation. In addition, effective June 1, 2008, the wastewater charge for a customer
who uses the CII efficiency standard water budget option will be based on each accounts indoor
water budget allocation or actual water used, whichever is lower, for the billing period. If an account
does not have an outdoor water budget allocation, wastewater charges will be based on actual water
used as measured by the water meter.
Requests by CII customers for a water budget adjustment application requesting use of the efficiency
standard water budget option, shall include a report prepared by a Colorado registered professional
engineer which documents and describes the evaluation and audit, including a recommendation for
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 10 of 29
the CII efficiency standard monthly water budget. The city manager or his/her delegate will review
and approve, revise or deny the water budget adjustment request prior to its implementation and use.
A fee will be charged to review the CII efficiency standard water budget option request and its
associated report pursuant to Section 4-20-43(c)(7) B.R.C.
1981, which establishes a technical document review fee for a miscellaneous plan review.
6. Water Budget Adjustments.
Water budget adjustments may be granted by the city manager or his/her delegate. The city manager
or his/her delegate may consider the following:
• Number of people in household (more than four people may receive 1,000 gallons per
month per person) (single family accounts only and is renewable on an annual basis)
• Irrigable area square footage (landscaping area)
• Irrigable area of public ROW that customers are required to care for and maintain
• Number of dwelling units (multifamily accounts only)
• Number of bedrooms in a dwelling unit (multifamily accounts only). Dwelling units that have
more than two bedrooms may receive an additional 1,000 gallons per month, but the total
indoor allocation per dwelling unit may not exceed 7,000 gallons per month, which is the
equivalent of five bedrooms.
• Average Monthly Use (CII accounts only)
• Historical Monthly Use (CII accounts only)
• Average Winter Consumption (CII accounts only)
• Efficiency Standard (CII accounts only)
• Licensed in-home childcare, eldercare facility, or co-op
• Other (medical needs, etc.).
• Monthly budget allocation (CII PIF Custom accounts only)*
Customers shall submit a water budget adjustment application in order to have their request
considered by the city manager or his/her delegate. Information contained on the application may be
subject to an audit and, if necessary, additional documentation may be required in order to
substantiate the requested adjustment. This information is outlined on the water budget adjustment
application.
*Customers who have a PIF budget change request must submit their budget change request to
Planning & Development Services for approval.
When reviewing the water budget adjustment application, the city manager or his/her delegate may
consider the following information:
• Completeness of required documentation submitted with the Application
• Authenticity of supporting documents
• Duration of household size or medical need
• Historic water usage information for property
• Correct errors or changed circumstances
• Other factors relevant to making a determination.
Water budgets will not be adjusted to accommodate:
• Pools, spas, or hot tubs
• In-home businesses or hobbies that use an increased amount of water
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 11 of 29
• Gardens (gardens are included in the initial calculation of irrigable area and will not be the
basis for additional water budget adjustments).
If a water budget’s irrigable area is incorrect, the customer’s bills may be adjusted for the current year
and the customer may be credited for any excess amount pursuant to the Collections and Bill
Adjustment Policy dated January 6, 2020.
7. Water Budget Calculation Example – Single-Family Residential.
The single family residential water budget is the sum of an indoor and outdoor allocation. The
indoor allocation is 6,000 gallons per month.
The outdoor allocation is based on customer-specific irrigable area as provided by the city’s
geographical information system. This allocation changes monthly based on seasonal watering needs.
The annual outdoor allocation is calculated as follows:
• The first 5,000 square feet of irrigable area is allocated15 gallons of water per square foot
(gpsf)
• The next 9,000 square feet of irrigable area is allocated 12 gpsf
• All excess irrigable area gets 10 gpsf.
A customer with 14,400 square feet of irrigable area would have the following annual outdoor
allocation:
Irrigable Area (square feet) Gallons per Square Foot Total
Gallons
5,000 15 75,000
9,000 12 108,000
400 10 4,000
Annual Outdoor Allocation 187,000
The annual outdoor allocation is distributed throughout the year to meet changing monthly seasonal
outdoor watering needs. The table below shows the percentages by month that will be applied to the
annual outdoor allocation. These percentages were derived from historic ET data (as displayed in
paragraph 3, above).
Historic ET Rate
Month Share of Annual
Outdoor
Allocation
January 0%
February 0%
March 1%
April 7%
May 14%
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 12 of 29
June 20%
July 20%
August 18%
September 12%
October 7%
November 1%
December 0%
Total 100%
A customer with an annual outdoor allocation of 187,000 gallons would receive 20% (37,400
gallons) in June. This number will be rounded up to the nearest 1,000 gallon; therefore, this
customer would receive 38,000 gallons in June.
In June, this customer’s monthly water budget would be 44,000 gallons: the sum of the indoor
allocation (6,000 gallons) plus the outdoor allocation (38,000 gallons) 44,000 gallons.
If this customer used 70,000 gallons in June (budget is 44,000 gallons), the water usage would be
billed as follows:
Rate Block % of Budget Gallons per Rate Block Billed Water
Usage (gallons)
Block 1 0-60% of budget 0 – 27,000 27,000
Block 2 61-100% of budget 27,001 – 45,000 17,000
Block 3 101-150% of budget 45,001 – 68,000 22,000
Block 4 151-200% of budget 68,001 – 90,000 4,000
Block 5 over 200% of budget Over 90,000 0
The customer’s monthly bill uses the volume of water used in each rate block multiplied by the rate
($) for each billing block to determine the treated water quantity charge component of the monthly
water bill.
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 13 of 29
1
Wa ter Budget Community Feedback Summary
September – October 2025
City of Boulder Utilities staff opened a community questionnaire on the city’s 18 year-long
water budget policy from September to October 2025. The questionnaire was directed
toward residents in all customer categories who receive a water bill from the city and was
answered by about 1,000 people. Community members in the Single Family Residential
(SFR) category were the primary respondents. Commercial, Industrial, and Institutional
(CII), Multi-family Residential (MFR) and Manufactured Home Community (MHC)
respondents were grouped. Respondents primarily owned their own homes and received a
water bill directly, and few qualified for income-based assistance programs. City staff also
held an MFR and CII-focused workshop on October 22, 2025 to collect feedback from
those customer groups. Feedback from the workshop was incorporated into this summary.
Result Summary
Water saving behavior: Most respondents work to save water in their home, primarily
through personal actions to save indoor water and installation of at least some efficient
fixtures. Water budget impact on water saving behavior is mixed with almost half of SFR
respondents reporting that water budgets change their water use at least somewhat, while
almost half reported they did not.
Most respondents would use less water if they knew how much they use, with SFR
respondents reporting they would access daily, digital data slightly more often (daily or
monthly) than MFR/MHC + CII respondents (monthly).
Water Budget Knowledge: Most SFR respondents understand water budgets and find it at
least somewhat easy to understand how water budgets apply on their bill. Most also find it
at least somewhat easy to stay within their budget. MFR/MHC + CII respondents mostly
understand how their budgets apply to their bill, but many do not know what type of water
budget they have. Nearly half of respondents reported that their budgets fit their needs and
nearly half responded that they did not know.
Values: SFR respondents most value cost savings and penalties based on consumption.
MFR/MHC + CII respondents most value predictable costs.
Desired Changes for SFR Respondents
•Lower fixed fees or limit rate increases; Reward water conservation
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 14 of 29
2
•Allow for more accurate budgets based on individual needs
•Simplify or remove water budgets
•Improve billing clarity and transparency and provide more information
•Lower water budgets
Feedback from MFR/MHC + CII respondents
•Predictable costs are key
•Water budgets need to reflect operational needs
•Improve billing clarity and transparency and provide more information
•Billing logistics for multi-account properties need simplified or improved
•Varying opinions ranging from water budget size being too small to overly
generous
•Leak detection assistance, water management tools, and conservation support
would help, especially for large properties
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 15 of 29
3
Overview
A public questionnaire on Boulder’s water budget policy, “Your Water Bill & Usage
Feedback,” was published from September 4th to October 28th, 2025.
The questionnaire was shared via the platform Be Heard Boulder. The link was emailed
directly to Boulder water customers and shared via various city newsletters, paper copies
and the link were also shared during the community event What’s Up Boulder 2025. The
questionnaire was available in both Spanish and English. Respondents self-identified by
customer type: Single Family Residential (SFR), Commercial, Industrial, and Institutional
(CII), and Multi-family Residential (MFR) or Manufactured Home Community (MHC).
Questions were specific to either SFR customers or CII, MFR, and MHC customers as a
group.
City staff also held an MFR and CII-focused workshop on October 22, 2025 to collect
feedback from those customer groups. Participants represented various industries
including public education, higher education, property management, hospitality,
homeowners associations, commercial real estate, federal government, non-profit, hotel,
and food manufacturing.
The questionnaire and workshop are part of assessing the water budget policy. Results will
inform updates to the policy combined with expert staff feedback, feedback from
Community Connectors in Residence, policy analysis, consultation with the Water
Resource Advisory Board, and City Council process.
Questionnaire Prompt
Since 2007, the City of Boulder has a system, called water budgets, to decide how much
homes and businesses pay for water. If you stay within your budget, you pay lower rates. If
you use more than your budget, you pay higher rates. The city is reviewing this system to
see if it still meets today’s needs, community values and challenges. We will be looking for
further feedback in 2026.
Respondent Summary
•Total Respondents: 1,001
•95% of respondents are SFR residential customers with 948 SFR, 42 MFR or
MHC, and 5 CII respondents. 6 respondents did not know their customer type.
•Of those responding to the question, 96% own their home, and 7% did not
answer the question.
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 16 of 29
4
Questions by Customer Type
Single Family Residential (948 respondents)
1.Do you receive water bills directly from the City of Boulder? (multiple choice)
2.Would knowing how much water you use encourage you to use less? (multiple
choice)
3.Do you try to save water in your home? (multiple choice)
4.If so, what do you do to save water? (free form)
5.Does your home have efficient water fixtures (ex. toilets, sink faucets, shower heads
washing machines)? (multiple choice)
6.How well do you understand the idea of a “water budget” on your monthly water
bill? (multiple choice)
7.How easy is it to understand your monthly bill and how it relates to your water
budget? (multiple choice)
8.How often would you look at your water bill if you had access to daily, digital data?
(multiple choice)
9.How easy is it to stay within your monthly water budget? (multiple choice)
10. Has the water budget system changed how you use water? (multiple choice)
11. What do you value most in how people are charged for water? (multiple choice with
up to two different answers)
12. If you could change one thing about Boulder’s water billing or water budget system,
what would it be? (free form)
13. How many people live in your home? (free form)
14. Do you own or rent your home? (multiple choice)
15. Do you qualify for any income based assistance programs? (multiple choice)
5 42
948
6
0
200
400
600
800
1000
CII MFR or MHC SFR Unknown
What type of water use do you pay for?
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 17 of 29
5
Commercial, Industrial, and Institutional + Multi-family
Residential/Manufactured Home Community (42 MFR+MHC
respondents, 5 CII respondents)
1.Do you receive water bills directly from the City of Boulder? (multiple choice)
2.Would knowing how much water you use encourage you to use less? (multiple
choice)
3.Do you try to save water in your home? (multiple choice)
4.If so, what do you do to save water? (free form)
5.Does your home have efficient water fixtures (ex. toilets, sink faucets, shower heads
washing machines)? (multiple choice)
6.Do you know which of the following budget types applies to your bill? (multiple
choice)
7.How well does your water budget reflect your actual water needs? (multiple choice)
8.How easy is it to understand your monthly bill and how it relates to your water
budget? (multiple choice)
9.How often would you look at your water bill if you had access to daily, digital data?
(multiple choice)
10. What do you value most in a water rate system? (multiple choice with up to two
different answers)
11. What would you change or improve about the city’s water budget structure for
residential complexes, businesses or institutions like yours? (free form)
12. Business Info : Industry or business type, including property management (free
form)
13. How many people live in your home? (free form)
14. Do you own or rent your home? (multiple choice)
15. Do you qualify for any income based assistance programs? (multiple choice)
Demographics and Audience Reached
Sharing demographic data was optional, and only three respondents answered specific
demographic questions.
Demographic Data
Of the three respondents including demographic data, one lives in North Boulder and two
live in South Boulder. All were white, over 55, and own their own home. One reported
income from $25,000-$49,999, one $150,000 or more, and one preferred not to say.
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 18 of 29
6
Group insights from questionnaire
All respondents were asked about the following topics.
Most respondents receive their water bill directly.
Staff recognize that water budget questions are likely most applicable to people directly
receiving and paying a water bill from the City of Boulder. This was a targeted audience for
the questionnaire. Most respondents receive their bill directly, with the questionnaire
reaching a few people who do not. Six SRF respondents do not receive their water bill
directly from the city, one from the MFR category does not, and two respondents did not
know.
Most respondents own their home
Of those answering, 96% own. (935 answered with 901 owning.)
Few respondents qualify for income-based assistance
Of those answering, 93% do not qualify. (71 did not answer, 869 do not qualify, 22 qualify,
and 39 preferred not to say.)
Most respondents already work to save water in their home
93% of respondents try to save water at home. (933 respondents answered “Yes,” 68
answered “No.”)
Top five ranked reported actions
1.Shorter showers & indoor water-saving habits
2.Low-flow fixtures & efficient appliances
3.Irrigation & outdoor watering efficiency
4.Leak detection & repairs
5.Landscape changes to reduce water use
Most respondents have at least some efficient fixtures in their home
92% of respondents have at least some efficient fixtures installed in their homes. (617
respondents answered “Yes,” to having efficient fixtures, 301 have a mix of inefficient and
efficient, 28 answered “No,” and 55 were not sure.)
Most respondents would use less water if they knew how much they used
77% of respondents would use less water if they knew how much they used. (772 answered
“Yes ,” and 229 answered “No.”)
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 19 of 29
7
Questionnaire Results by Customer Grouping
Single Family Residential
Most respondents understand water budgets at least somewhat well.
Not well at all
5%
I’ve heard of it,
but don’t
understand it
well
8%
Somewhat well
26%Very well
61%
SFR: How well do you understand the idea of a
“water budget” on your monthly water bill?
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 20 of 29
8
Most respondents reported that the water budget was at least somewhat easy
to understand in relationship to their bill
Very difficult
4%
Somewhat
difficult
11%
Somewhat
easy
27%
Very easy
58%
SFR: How easy is it to understand your monthly
bill and how it relates to your water budget?
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 21 of 29
9
Most respondents find it at least somewhat easy to stay within their water
budget
I don’t try to stay
within the
budget
5%
Very difficult
7%
Somewhat
difficult
14%
Somewhat easy
33%
Very easy
34%
I'm not sure
7%
SFR: How easy is it to say within your monthly
water budget?
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 22 of 29
10
Behavior change is split with almost half of respondents reporting that water
budgets at least somewhat change how they use water and nearly half
reporting no change.
Most respondents would look at daily digital data weekly or once a month
Yes
16%
Somewhat
28%No
48%
I'm not sure
8%
SFR: Has the water budget system changed
how you use water?
0 50 100 150 200 250 300 350 400 450
Every day
Once a week
Once a month
Once a year
Never
I'm not sure
SFR: How often would you look at your water
use if you had access to daily, digital data?
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 23 of 29
11
Values for water billing varied with cost penalties and savings based on
consumption leading.
Desired changes to Boulder’s SFR water budget system were mixed and
occasionally contradictory.
Common themes are identified below.
Lower fixed fees or limit rate increases; Reward water conservation
Respondents expressed concern about high fixed fees and increasing water charges.
Respondents called out fees and expressed desire to see more money savings from
conserving water. Some feel the fixed fees make a water budget as a conservation tool
infeasible.
Allow for more accurate budgets based on individual needs
Respondents asked for budgets that reflect number of people, pets, or occupancy
changes.
0 50 100 150 200 250 300 350 400 450
Monthly bills stay about the same
Low overall bill amount
Water budgets are personalized based on
property and family characteristics even if that
means my bill is more complex
Water charges are simple and easy to
understand
Every household is charged for water the same
way
Using more than your water budget should cost
a lot more and saving water should lead to a
smaller bill
SFR: What do you value most in how people are charged
for water?
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 24 of 29
12
Simplify or remove the budget system
Respondents expressed interest in paying a set amount for each unit of water, regardless of
total use.
Improve billing clarity and transparency and provide more information
Respondents report being confused about line items, difficulty interpreting bills, and
unclear charges. Some respondents want more detail on their usage and more detail on
bills generally. Respondents also commented on a preference to more easily access their
traditional paper bills.
Many shared general frustrations about stormwater and wastewater fees, expressing
general lack of clarity on fee presence and purpose versus paying only for consumed water.
Lower water budgets
Some respondents would like budgets to be smaller to encourage water conservation.
Multi-Family Residential or Manufactured Home Community &
Commercial, Industrial, Institutional
Most MFR/MHC and CII customers do not know what type of water budget
applies to their bill.
Do you know what type of water budget applies to your bill?
I’m not sure 35
Average Winter Consumption 1
Historic Monthly Use 2
Multiple Account Types 2
Multi-Family Residential 7
Total respondents 47
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 25 of 29
13
Water budgets are reflecting actual needs for some, and many don’t know if
their water budget is working for them
Values for water billing varied with predictable costs leading.
0 2 4 6 8 10 12
Very well
Somewhat well
Not very well
Not at all
I’m not sure
MFR/MHC and CII: How well does your water budget
reflect your actual water needs?
0 5 10 15 20 25
Reduced penalties for exceeding budget
Stronger incentives for conservation
Simpler rules and billing
Accuracy in reflecting operational needs
Predictable costs
MFR/MHC and CII: What do you value most in a water
rate system?
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 26 of 29
14
Most respondents would access daily, digital data on a monthly basis
Responses vary, but a majority of customers reported that the water budget
was at least somewhat easy to understand in relationship to their bill
0 5 10 15 20 25 30
Every day
Once a week
Once a month
Once a year
Never
I'm not sure
MFR/MHC and CII: How often would you look at
your water use if you had access to daily, digital
data?
Very difficult
15%
Somewhat
difficult
19%
Somewhat easy
28%
Very easy
38%
MFR/MHC and CII: How easy is it to understand
your monthly bill and how it relates to your water
budget?
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 27 of 29
15
Feedback on Boulder’s MFR/MHC & CII water budget structure was mixed and
occasionally contradictory.
Themes are identified below with water budget fairness and general confusion about the
structure rising to the top.
•Improve billing clarity and transparency and provide more information
•Billing logistics for multi-account properties need simplified or improved
•Varying opinions ranging from water budget size being too small to overly
generous
•Leak detection assistance, water management tools, and conservation support
would help, especially for large properties
•Predictable costs are key
•Water budgets need to reflect operational needs
Attachment B - Water Budget Community Feedback Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 28 of 29
Alternative Description
Increasing
Block
Increasing block rates (also known as ascending, inclining, inverted, or tiered block rates) is a rate structure in
which the unit price of each succeeding block of water usage is charged at a higher unit rate than the previous
block, and the amount of water within the blocks remains the same each month. For example, in a structure with
Block 1 set at 0-5,000 gallons, and Block 2 set to 5,001-10,000 gallons, a customer that uses 7,000 gallons would
experience Block 1 charges for 0-5,000 gallons and higher Block 2 charges for 5,001-7,000 gallons.
Monthly
Increasing Block
A form of increasing block rates where the amount of water within the blocks changes each month based on
irrigation demands, with summer having more than winter.
Current
Water Budgets
A form of increasing block rates where the amount of water within the first two blocks is based on the estimated
efficient water needs of the individual customer. Outdoor efficient water needs are based on irrigable area.
Re-Sized &
Simplified Water
Budgets
A form of increasing block rates where the amount of water within the first two blocks are based on the estimated
efficient water needs of the individual customer and customer water use trends. Outdoor efficient water needs are
based on lot size (rather than irrigable area).
Meter Size Based
Budgets
A form of increasing block rates where the amount of water within the first two blocks is based on the typical water
use patterns for various meter sizes (3/4", 1", 1-1/2", 2", 3", 4", 6", 8").
Lot Size Based
Budgets
A form of increasing block rates where the amount of water within the first two blocks is based on the estimated
efficient water needs of the individual customer. Outdoor efficient water needs are based on lot size.
Current
Water Budgets
A form of increasing block rates where the amount of water within the first two blocks is based on the estimated
efficient water needs of the individual customer. Outdoor efficient water needs are based on irrigable area.
Re-Sized
Water Budgets
A form of increasing block rates where the amount of water within the first two blocks is based on the estimated
efficient water needs of the individual customer and customer water use trends.
Uniform A constant unit price for all metered volumetric units of water consumed on a year-round basis. (CII Only)
Increasing
Block
Increasing block rates (also known as ascending, inclining, inverted, or tiered block rates) is a rate structure in
which the unit price of each succeeding block of water usage is charged at a higher unit rate than the previous
block, and the amount of water within the blocks remains the same each month.
Meter Size
Increasing Block
A form of increasing block rates sized and applied individually for each meter size (3/4", 1", 1-1/2", 2", 3", 4", 6",
8") where the amount of water within the blocks remains the same each month.
Simplified
Budgets
A hybrid of meter size increasing blocks for smaller meter sizes (3/4", 1", 1-1/2", 2", 3") and customized water
budgets for larger meter sizes (4", 6", 8").
Current
Water Budgets
A form of increasing block rates where the amount of water within the first two blocks is based on the estimated
efficient water needs of the individual customer, volumes selected at the time of development, or historical
customer water use trends.
Notes:
- Definitions based on AWWA M1 Manual of Water Supply Practices: Principles of Water Rates, Fees, and Charges, 7th edition.
Highlighted items are recommended alternatives to carry into the Utilities rate study. These alternatives align with community input and
balance customer experience and equity, administrative resource needs, water conservation and financial performance.
Water Budget Alternatives Summary
Single Family Residential (SFR)
Metered Irrigation (MI)
Multi-Family Residential (MFR) & Commercial, Industrial, and Institutional (CII)
Attachment C - Water Budget Alternatives Summary
01.26.26 WRAB Agenda 6 - Water Budget Policy Recommendations
Page 29 of 29