Brief Project Background
Key Drivers for the Concept Plan
Concept Plan Overview
Next Steps
Questions & Feedback
Agenda
Purpose: To inform + share out what community input was for the Civic Area
Final Concept Plan and collect feedback from boards + City Council before
moving into the next phase of design + implementation
1.
Brief Project Background
6RIOS Boulder Civic Area Phase 2
RTD Bus Station
1400 Block
BVSD Land
Ownership Boulder
Creek Path
CU Campus
Conference Development
The HillPlanning Study
CU Housing Study
Downtown
The
Arboretum
Pearl St.
Civic Area
Expanded Shuttle Service with
• Civic Area
• Pearl Street
• CU
FlagstaMountainff
Site Context
RIOS Boulder Civic Area Phase 2
CIVIC AREA PHASE 2 I 2024
12
Phase 2 Scope Outline:Enlargement
Public
Library
South
Public
Library
North 11th Street BridgeBroadway
Bou
l
d
e
r
C
r
e
e
k
P
a
t
h13th StreetBus Gate
Extens
ion
The A
rbo
retum
Canyon Bo
u
l
e
v
a
r
d
Arapahoe A
v
e
n
u
e
Project
Scope
Age-Well
Building
Park
CentralNew
Britain
Bandshell
The
Atrium
BMoCA
Operations
Tea House
Municipal Building11th Street9th Street
Phase 1: Co
m
p
l
e
t
e
d
West Booke
n
d
IT 14th Street
Project Scope
Adjacent Site Connections/
Not in Scope
Arapahoe
A
v
e
11th Street
Canyon B
l
v
d
.Llincoln Pl
Project Scope
The Civic Area Phase 2 Project is
building on the 2015 Park Plan,
continuing the transformation
of this important public space
into a vibrant hub of urban life,
cultural events, and natural
connections while honoring
the full history of the area and
serving the Boulder community.
RIOS Boulder Civic Area Phase 2 CIVIC AREA I 2023 5
2023 2024 2025 2026 2027
Q1 Q1 Q1 Q1 Q1Q2Q2Q2Q2 Q2Q3Q3Q3Q3 Q3Q4Q4Q4Q4 Q4
Scoping and Project Management
Planning Analysis
Concept Plan & Schematic Design
Design Development +
Construction Documentation
Construction: REFINED P2 SCOPE
Maintenance + Safety Program
Space Activation
Window 1: Planning Analysis
• Park Planning Process: Inform
• Existing Park Perception: Consult
• Future Park Activation: Consult
Window 2: What We Heard/Design Ideas
• Design ideas feedback
• Market analysis/use process
Window 3:
Concept
Design Options
• Design and Space Activation: Consult
Window 4: Schematic Design/Renaming
• Final Park Design and Next Steps: Inform
•Park Renaming: Consult
WE ARE HERE
Window 5: Construction Kickoff
•Groundbreaking: Inform
Window 6:
Park Opening
• Ribbon Cutting Event: Inform
City Council and Board Touch Points
•All dates subject to change pending
market shifts and schedule delays
Project
Timeline
2.
Key Drivers for the Concept Plan
RIOS Boulder Civic Area Phase 2
What went into the Concept Plan
Engagement
Analysis Policy
Multiple community events,
stakeholder meetings, pop-up
tabling, and youth engagement
Comprehensive assessment
of City policy documents from
the last 10 years
Site assessment to understand
opportunities, constraints, and
design goals
RIOS Boulder Civic Area Phase 2
Engagement
Analysis Policy
What went into the Concept Plan: Policy
•Civic Area Plan, 2015
• City of Boulder Engagement Strategic Framework, 2018
• Racial Equity Plan, 2021
• Community Cultural Plan, 2015
• Parks and Recreation Department Plan 2022
• The Downtown Urban Design Guidelines, 2002
• City of Boulder Facilities Plan, 2021
• Boulder’s Parks and Recreation Plan Update, 2022
• Transportation Master Plan, 2019
• Historic Places Plan, 2023
• Boulder Downtown Station Expansion Plan, 2023
• Downtown Boulder Vision Plan, 2022
• Boulder Social Streets on 13th pop-ups evaluation (draft)
• Central Park Cultural Landscape Assessment, 2023 (draft)
• Draft Boulder Civic Area East Bookend Existing Conditions Report, 2018
• Andrews Arboretum Promenade Study, 2018
• Cable Transit Study, 2020
RIOS Boulder Civic Area Phase 2
The Civic Heart of Boulder1
2
3
4
5
6Life & Property Safety
Outdoor Culture & Nature
Celebration of History & Assets
Enhanced Access & Connections
Place for Community Activity & Arts
Sustainable & Viable Future7
City Center. Unified Public Space.
Inclusive Space for All.
Flood Safety. Secure, Protected, and
Safe Environment for All.
Cohesive Green Space. Creek Access.
Outdoor Recreation.
Integrated & Inclusive History.
Celebrate Historic Assets.
Connected & Multi-modal. Universal Access.
Cultural Hub. Arts and Entertainment.
Consistent Activation.
Environmentally & Economically
Sustainable.
Policy: 2015 Park Plan’s Guiding Principles
The 2015 Civic Area
Park Plan establishes
seven main principles
(summarized here)
to guide design and
development, inclusive
of values identified
by a rigorous planning
process, public
engagement effort, and
City Council approval.
RIOS Boulder Civic Area Phase 2
Improve Existing
Disconnections
Pull in Boulder’s
Energy
Embrace Natural to
Cultural Spectrum
Create Welcoming
Gateways
Leverage the Creek
and its Personalities
Celebrate Boulder’s
Unique “Funky” Culture
What went into the Concept Plan: Analysis
Engagement
Analysis Policy
RIOS Boulder Civic Area Phase 2
What went into the Concept Plan: Engagement
Engagement
Analysis Policy
•Engagement Window 1: Community Values & Park Perception
−How community uses the park now
−How they’d like to use it in the future
−Confirmed community values
•Engagement Window 2: What We Heard & Design Ideas
−Shared two design diagrams created from community ideas
and priorities
−Asked the community to vote on their favorite features
•Engagement Window 3: Concept Design Options
−Installed a family-friendly temporary nature discovery area in
Central Park
−Shared the concept design, formed from feedback heard
during Windows 1 & 2
−Asked the community to vote on their favorite features shown
in the design
RIOS Boulder Civic Area Phase 2
•The City of Boulder Engagement Strategic Framework, Racial
Equity Instrument (REI), and equity groups including families with
children experiencing disability has guided the project to ensure
historically excluded community members are meaningfully
represented in Phase 2 recommendations
•At every stage of design, engagement, and analysis, historically
excluded groups are being consulted to ensure their
representation in the project through an engagement process
overseen by (2) Downtown Community Connectors
•Worked closely with city’s Community Connectors in Residence
•Collaborated with Growing Up Boulder for in depth engagement
with the youth community from diverse backgrounds
•During data analysis, feedback from historically excluded groups
is separated to bring visibility and elevate these voices
Engagement: Equity-Driven Process
Engagement
Analysis Policy
RIOS Boulder Civic Area Phase 2
Public Open
House for
Concept Plan
Feedback &
Kids Concert in
Central Park
Boulder
High School
Engagement
Sessions
w/ Growing
Up Boulder
(GUB)
Walking
Field Trips
with Boulder
Day Nursery
Design
Charrette
with CU
Environmental
Design
Students
Boulder
High School
Zonta Club
Engagement
Sessions w/
GUB Construction of
Wild Woods
Temporary Nature
Play Area for Space
Activation – Built
w/ CU Design
Students’ Ideas
Pop-Ups
(2 Library
+3 Rec.
Center)13
31
6 5
Online
Questionn-
aire
Community
Connectors
in Residence
Milestone
MeetingRoll & Stroll
w/ Disability
Community
Walking
Field
Trips with
Whittier
Elementary
Community
Organization
Meetings
2
2
MARCH - JULY: YOUTH ENGAGEMENT JULY - AUGUST: PUBLIC ENGAGEMENT
Window 3: By the Numbers
RIOS Boulder Civic Area Phase 2
This graphic highlights
the top 10 favorite
features that
community members
selected from across
the entire project.
*NOTE: Concept plan
is in progress. More
detailed design to
come in 2026.
NEW
CONFERENCE
CENTER
PARKING
STRUCTURE
THE
ATRIUM
S&T BLDG
LIBRARY TATE
BLDG
NEW
EAST BOOKEND
DEVELOPMENT
LIBRARY BROADWAY14th STREET9th STREETCANYON BLVD
ARAPAHOE AVE
B
O
U
L
D
E
R
C
R
E
E
K
P
A
T
H
22RIOSBoulder Civic Area Phase 2 Reimagining Concept Design Package 07.23.2025
N
0’100’200’400’
Farmers Market
& Festival Street
Beer Garden
& Market Hall
Nature Play
with Splash Pad
Accessible Elevated
Boardwalk
Experiential
Lighting
Top 10
Boardwalk
Swing Forest
Accessible Shallow Kids Creek
Boulder Beach
Nature Hub with Restrooms
Top 5Window 3: Favorite Features
3.
Concept Plan Overview
24RIOS Boulder Civic Area Phase 2
Concept Plan
NEW
CONFERENCE
CENTER
PARKING
STRUCTURE
THE
ATRIUM
S&T BLDG
TEAHOUSE
LIBRARY TATE
BLDG
NEW
EAST BOOKEND
DEVELOPMENT
NEW
DEVELOPMENT
LIBRARY BROADWAY14th STREET9th STREETCANYON BLVD
GRAND
V
I
E
W
A
V
E
ARAPAHOE AVE
B
O
U
L
D
E
R
C
R
E
E
K
P
A
T
H
N
0’100’200’400’
BandshellBandshell
Market DistrictMarket District
Farmers Market + Festival StreetFarmers Market + Festival Street
NatureNature
HubHub
Boulder Boulder
BeachBeach
North Creek ConnectionNorth Creek Connection
West EndWest End
The Arboretum The Arboretum
PathPath
RIOS Boulder Civic Area Phase 2
Four Zones
THE ATRIUM:
YEAR ROUND
MARKET
HALL LIBRARY
LIBRARY
EXISTING
PLAYGROUND
EXISTING
PHASE I PARK
SISTER
CITIES
PLAZA
PARKING
PARKING
14TH STREET9TH STREETCANYON BLVD
ARAPAHOE AVE
TEAHOUSE
S&T BLDG
Beer Garden & Market Hall
Teahouse Garden
New, Connected Green Park
Shaded Areas & Canopy
Enhanced
Bandshell Nature Play
+ Splash Pad
Creek
Viewing
Deck
Farmers Market
& Festival Street
“The Porch”
Wayfinding Signage
Nature Hub
w/Restrooms, Info Kiosk,
Youth Programming,
Food & Beverage
Boulder Beach
Food Truck Plaza Swing Forest
Tubing
Eddy +
Rental
Return
Accessible
Shallow
Kids Creek
The South
ShoreArt
Tunnel
Nature Discovery
Contemplative
Garden
Park Patio & Creek Steps
Café Mobility
HubEntry Plaza
Artful Elements
North Creek Overlook
Riparian Garden
Overlook
Outdoor Classroom
Youth Hub w/ Skate Feature
Boardwalk
Fishing Access
****
NEW EAST BOOKEND
DEVELOPMENT WITH PARKING
NEW EAST BOOKEND
DEVELOPMENT
MARKET DISTRICT New Pedestrian Bridge
Youth Hub Youth Hub
Art / Signage / StorytellingArt / Signage / Storytelling
**
PENFIELD TATE II
MUNICIPAL
BUILDING
NEW
CONFERENCE CENTER
PARKING STRUCTURE
Foraging Gardens
Elevated Boardwalk
Experiential Lighting
Mini Cafe
FUTURE FOOD
AND BEVERAGE
DEVELOPMENT
Viewing Tower
Climate Education Gardens
**
Alpine Garden & Fitness Stairs
ZONE 2
Boulder
Beach
ZONE 1
West End
ZONE 3
East End
ZONE 4
The Arboretum
Path
To better facilitate conversations with the community,To better facilitate conversations with the community,
four zones were identified to breakdown the number offour zones were identified to breakdown the number of
features and distinct areas within the park from West to East.features and distinct areas within the park from West to East.
N
RIOS Boulder Civic Area Phase 2
Access PathAccess Path
NewNew
BridgeBridge
BoardwalkBoardwalk
LIBRARY
LIBRARY
ContemplativeContemplative
GardenGarden
Fishing AccessFishing Access
NatureNature
DiscoveryDiscovery
Art TunnelArt Tunnel
ARAPAHOE AVE.9TH STREETCANYON BLVD
NatureNature
DiscoveryDiscovery
CONCEPT PLAN: ZONE 1
West End
•Nature immersion
•Enhanced circulation
•Native plantings
•Nature discovery for youth
•Improved creek access
•Raised paths
•New pedestrian bridge
28RIOS Boulder Civic Area Phase 2
New Pedestrian Bridge
Boardwalk
Art Tunnel
Nature Discovery
Contemplative GardenFishing Access
CONCEPT PLAN: ZONE 1
West End
RIOS Boulder Civic Area Phase 2
CONCEPT PLAN: ZONE 2
Boulder Beach
•“Boulder Beach” nature and recreational hub
•Convert asphalt to flexible green space
•Enhanced creek access
•Entry plaza at Canyon Blvd and 11th Street
•Cafe offering
•Patio steps to the water
•Accessible kids’ creek
•Tubing eddy
•Food truck plaza
•Swing forest
•Nature Hub with restrooms and programming
•Shade shelter
Phase 1 ParkPhase 1 Park
(ex.)(ex.)
North CreekNorth Creek
OverlookOverlook
The South ShoreThe South Shore
NatureNature
HubHub
FoodFood
TruckTruck
PlazaPlaza
Boulder BeachBoulder Beach Boulder BeachBoulder Beach
Swing ForestSwing Forest
TubingTubing
EddyEddy
Pearl StreetPearl Street
ConnectionConnection
EntryEntry
PlazaPlaza
MobilityMobility
HubHubParkPark
Patio &Patio &
CafeCafe
Sister CitySister City
GardensGardens
CreekCreek
StepsSteps
Enhanced CreekEnhanced Creek
AccessAccessAccessibleAccessible
ShallowShallow
Kids CreekKids Creek
Phase 1Phase 1
PlaygroundPlayground
(ex.)(ex.)
LIBRARY
TATE BLDG
ARAPAHOE AVE.
CANYON BLVD
29RIOS Boulder Civic Area Phase 2
Nature Hub
Food Truck
Plaza
Boulder Beach
The South Shore
Creek Walk
Park Patio &
Creek Steps
CONCEPT PLAN: ZONE 2
Boulder Beach
30RIOS Boulder Civic Area Phase 2
Enhanced Creek Access
Park Patio & Cafe
Creek Steps
CONCEPT PLAN: ZONE 2
Park Patio
RIOS Boulder Civic Area Phase 2
CONCEPT PLAN: ZONE 3
East End
•Vibrant park and urban space
•Pedestrian-first Festival Street along 13th
•Expanded Farmers Market
•Enhanced Bandshell and flexible green
•Future food and cultural spaces
•Creek viewing deck and connected green
•Improved mobility and creek access
•Beer garden and “The Porch” seating and plaza
•Teahouse garden
•Shaded areas
•Nature play and splash pad
EnhancedEnhanced
Band shellBand shell
The PorchThe Porch
GatewayGateway
GatewayGateway
GatewayGateway
Beer GardenBeer Garden
ATRIUM:
YEAR-ROUND MAR-
KET HALL
CreekCreek
ViewingViewing
DeckDeck
NewNew
BridgeBridge
ExpandedExpanded
FlexibleFlexible
GreenGreen
PrivatelyPrivately
OwnedOwned
ParcelsParcels
NEW EAST BOOKEND
DEVELOPMENT
TEAHOUSE
Farmers MarketFarmers Market
Festival StreetFestival Street
SplashSplash
PadPad
NatureNature
PlayPlay S&T BUILDING
NEW EAST BOOKEND
DEVELOPMENT WITH
PARKING
MobilityMobility
Hub Hub
EnhancedEnhanced
TransitTransit
CorridorCorridor
ARAPAHOE AVE.
CANYON BLVD
BROADWAY14TH STREET
31RIOS Boulder Civic Area Phase 2
Decorative Crosswalks
“The Porch” Seating
Market &
Festival StreetShaded Area &
Canopy
Beer Garden &
Market Hall
Existing Heritage Trees
Integrated Art
CONCEPT PLAN: ZONE 3
East End
32RIOS Boulder Civic Area Phase 2
13th St. with
Farmers Market
CONCEPT PLAN: ZONE 3
East End
RIOS Boulder Civic Area Phase 2
CONCEPT PLAN: ZONE 4
The Arboretum Path
•Welcoming, dynamic and multi-modal path
•Diverse gardens
•Elevated boardwalk and viewing tower
•Youth-oriented gathering spaces
•Distinctive lighting
•Placemaking and storytelling
N
ExperientialExperiential
LightingLighting
Viewing Tower/Viewing Tower/
Outdoor ClassroomOutdoor Classroom
ForagingForaging
GardensGardens
ElevatedElevated
BoardwalkBoardwalk
MiniMini
CafeCafe
Future F&BFuture F&B
DevelopmentDevelopment
Climate EducationClimate Education
GardensGardens
**
**
**
Alpine Garden andAlpine Garden and
Fitness StairsFitness Stairs
Art / Signage / StorytellingArt / Signage / Storytelling
Youth HubYouth Hub**
CU Conference CenterCU Conference Center
Pocket Park and Gate-Pocket Park and Gate-
way (Accessible)way (Accessible)
OutdoorOutdoor
ClassroomClassroom
Youth Hub withYouth Hub with
Skate FeatureSkate Feature
Riparian GardenRiparian Garden
OverlookOverlook
33RIOS Boulder Civic Area Phase 2
Climate Education
Gardens
Accessible Elevated
Pedestrian Boardwalk
Enhanced Bike Path
Viewing Tower &
Outdoor Classroom
CONCEPT PLAN: ZONE 4
The Arboretum Path
RIOS Boulder Civic Area Phase 2
The Arboretum Path: Experiential Lighting
Viewing Tower &
Outdoor Classroom
Experiential Lighting
Foraging Gardens
Accessible Elevated
Pedestrian Boardwalk
4.
Next Steps
RIOS Boulder Civic Area Phase 2
• Q1 2026 – Schematic/Design Development
−Continue design within the boundary of the recommended Phase 2 area
−Collaborate with the DDA and Commercial Blue Print Effort to create a Civic Area park management model
• Q1 2026 – Park Renaming and Branding Effort
−Engage community in a conversation about identity of the space including the colors, materials, and name
−Depending on feedback, renaming could be proposed in 2026 in alignment with city policy
• Q3 2026 – Final Design Share-out
−The team will share-out final design of the Phase 2 Implementation Plan to be constructed in 2027
• Q1 2027 – Construction Begins
−Construction of Phase 2 is scheduled to begin in 2027.
• Park Management Plan
−After ribbon cutting to open Phase 2, implement a Park Management Plan with guidance for Rules and Park
Policy, new space activation programming with key partners, and a new operations and maintenance plan
Next Steps
5.
Questions & Feedback
Thank you!
Additional Info
The project team met with Downtown Community Connectors, Community Connectors in Residence,
and people in the disability community to gather additional comments about the concept plan. These
discussions focused on Civic Area as a space that will:
•Tell the stories of the land and people who have previously lived in the area, and have these stories be
a major focal point of the design and park experience
•Build community and be welcoming for all
•Serve the local community more than just tourists
•Serve the land and ecology in the park in its design and management, balancing this with recreational
uses
•Serve people in the accessibility community
RIOS Boulder Civic Area Phase 2
Historically Excluded Groups
RIOS Boulder Civic Area Phase 2
Roll & Stroll Accessibility Takeaways
Design Suggestions
•Lie-back stations in nature for
looking up
•View points for people sitting in
mobility devices
•Bandshell accessible seating - not
forced front and center
•Pull-outs from main paths to get into
nature
•Spaciousness (in paths, play, seating,
parking) - helps with maneuvering
•Accessible fishing dock
•Crusher fines nature paths (avoid
mulch for mobility devices)
•Min. 10’ height in parking garages
•Adult size changing tables
Sensory Experiences
•Touching the water
•Hearing the birds
•Feeling the trees/textures
•Getting close to things to see and
touch
•Dappled Light
•Movement stimulation (like bumpy
paths and swings)
•High contrast colors, specifically on
black backgrounds
•Pure sounds
•Sensory Trail
Nature Play
•Raised sand box
•Some stump seats should be large
and have backs
•Railings into climbing pit and
climbing structure
•Low climbing surfaces for crawling
•More overhang on maker tables
•Non-steep slides with long ending at
the bottom
•Adult size changing tables
•Uneven surfaces cause balance
challenges
•Low barriers at thresholds (one foot
balancing is difficult)
Programming
•Early access (30 minutes to an hour)
at Farmers Market for disability
community
•Accessible equipment for rent at the
Nature Hub
•Volunteer escorts at Bandshell
events for directing foot traffic
RIOS Boulder Civic Area Phase 2
For Engagement Window 3, the project team worked with
Growing Up Boulder on sixteen (16) youth-oriented events and
activities.
The project team engaged with:
•66 Children 0-5 yrs (Boulder Day Nursery)
•54 Parents/caregivers (Boulder Day Nursery)
•36 School-age Youth (Whittier Elementary, 9-10 years)
•30 Tweens (Boulder Country Day Middle School; 11-12 years)
•130 Teens (Boulder High: Zonta Club 14-18 yrs, Language Arts
students, 17-18 years)
•17 Teachers (3 BHS, 4 Whittier, 10 BDN)
About half of these events focused on gaining feedback on youth
ideas for Civic Area and specific park features for Civic Area. The
other half focused on activating Civic Area with kids and families.
Youth Engagement
RIOS Boulder Civic Area Phase 2
Children at Boulder Day Nursery visited the Wild Woods Nature Discovery Area three times with GUB.
The school then conducted many of their own field trips to the space.
•A questionnaire also showed 55% of parents now visit Wild Woods one or more times per week
and prefer this type of play experience over traditional playgrounds because they believe their
children are more engaged.
•Teachers also reported they had never used the area near the bandshell until they were exposed to
it through programs with Growing Up Boulder both before and after Wild Woods was built.
•Now 30% of teachers use it weekly, and 65% of teachers use it monthly.
Children ages five to ten gave direct feedback about how they want to use the park space. Based on a
visual preference survey, results show they are most excited about:
•Splash pad
•Adventure play
•Outdoor movie nights
•Creek play
•Nature-based art activities
•Ice cream stand
Youth Engagement
Kids Age 0-10
RIOS Boulder Civic Area Phase 2
From the 130 teens engaged between February and March of 2025, results consistently emphasize five
interconnected priorities that should guide development of the area:
•Community Connection & Inclusivity: Creating spaces that foster meaningful social interaction across
diverse groups
•Relaxation & Comfort: Balancing active recreation with comfortable environments for downtime and
reflection; variety of seating options
•Affordability & Accessibility: Ensuring economic accessibility for all teens through low-cost food and
recreation options and activities
•Safety & Extended Hours: Enhancing usability beyond daylight hours through strategic lighting and design
•Novel Activities & Experiences: Providing unique recreational opportunities currently unavailable in
Boulder
Specific features developed through Boulder High Student proposals include a teen-run cafe, outdoor seating
area, ice skate/rollerblade venue, greenhouse, open green space, and movie night area.
The project team also worked with CU Environmental Design students to create a temporary nature
discovery area in Central Park. Three students who submitted design proposals during Window 2 of
engagement were selected to co-create the Central Park installation with the project team. The end result –
the Wild Woods Nature Discovery Area – combined ideas from all three of the student proposals.
Youth Engagement
Teens + CU Students
RIOS Boulder Civic Area Phase 2
•Connecting the lawn and
creating a bridge over one
area of the irrigation ditch in
the Civic Area would improve
continuity, accessibility, and
usability within the Central
Park space.
•This modification would
enhance circulation, support a
wider range of public uses and
expand the Farmers Market
functionality.
•Community members voted
to connect the green lawn in
Central Park while keeping the
ditch open by the Teahouse.
Nature PlayNature Play
Splash PadSplash PadExtended Extended
Creek Access Creek Access
+Overlook+Overlook
Extended Extended
Creek Access Creek Access
+Overlook+Overlook
Expanded Expanded
Green SpaceGreen Space
MaintainMaintain
Existing DitchExisting Ditch
Extended Farmers Extended Farmers
Market PlazaMarket Plaza
Extended Farmers Extended Farmers
Market PlazaMarket Plaza
Maintain Existing DitchNew, Connected
Green Park
OR
67% of Votes from
Entire Community
70% of Vote from
Historically Excluded Groups
Window 3 Feedback: The Ditch
Recreation +
Restroom Opportunities
Publicly Accessible Restrooms
Creekside
Boardwalk
Fishing Access
Enhanced
Creek AccessAccessible
Shallow
Kids Creek
Tubing
Eddy +
Rental
Return
“The
Shore”
Shallow
Creek Play
New
Expanded
Green
Space
New
Expanded
Green
Space
Nature Play
w/Splash
Pad
Nature Discovery
Nature Play
Skate
Feature at
Youth Hub
Festival
Street
Boardwalk
+Viewing
Tower/
Outdoor
Classroom
Experiential
Lighting
Alpine Park w/
Fitness Stairs
Swing
ForestNature Play
in Existing
Phase 1
Playground
Nature
Discovery
Nature Discovery Enhanced
Creek Access
Enhanced
Creek Access
Accessible Shallow Kids CreekTubing EddyCreekside Creekside BoardwalkBoardwalkSkate Skate FeatureFeatureNature Nature DiscoveryDiscoveryExpanded Expanded Green SpaceGreen SpaceSwing Swing ForestForest