HomeMy WebLinkAbout10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review ProcessC I T Y OF B O U L D E R
WATER RESOURCES ADVISORY BOARD
INFORMATION ITEM
MEETING DATE: October 20, 2025
AGENDA TITLE: Information Item – Water Budget Policy Overview and Review
Process Initiation
PRESENTERS:
Joe Taddeucci, Director of Utilities
Joanna Bloom, Public Utilities Deputy Director
Stephanie Klingeman, Budget Analyst Principal
Kim Hutton, Water Resources Manager
Krystle Morey, Water Resources Senior Engineer
Merry Martin, City Senior Project Manager
EXECUTIVE SUMMARY:
Boulder adopted water budgets in 2007 to help the city respond to drought and encourage
efficient water use. Water budgets are applicable to one of the six charges that appear on a
customer’s monthly water bill. The system works by estimating reasonable water use for each
customer and is calculated according to specific formulas for each customer class. Water use less
than a customer’s budget is charged at a lower rate, while water use that exceeds a customer’s
water budget is charged at a higher rate. Since water budgets were first implemented 18 years
ago, changes in customer behavior, community priorities, and administrative realities have
evolved such that a review and update to the city’s Water Budget Policy (Attachment A) is
prudent. Water budgets are a valuable tool, particularly for managing drought and promoting
efficient use, but they do not equally or predictably impact all customer classes, and refinements
could optimize administration and the customer experience while still maintaining their benefits.
Evaluation and potential updates to the water budget policy will be shaped by community
feedback and will be incorporated into an upcoming rate study (2026) and implementation of
new Utility rates (2027-2028).
BACKGROUND:
In 2002, Colorado experienced an extreme regional drought, often cited as the driest year on
record1. Tree-ring records show that similarly dry years occurred centuries ago, but modern
water systems in Colorado had not been designed to withstand such severe scarcity. For Boulder,
it was the first time mandatory outdoor water use restrictions were ever implemented, which
resulted in relatively minor landscape loss across the community.
In response to the 2002 drought, there was a coordinated push at the federal, state, and local
levels to increase drought resilience, promote water-efficient practices and adapt to a drier future.
In Boulder, this included development of a citywide drought plan and widespread community
adoption of efficient indoor fixtures. These combined efforts resulted in an approximate 30
percent decline in per-capita water use in Boulder since the early 2000s, a trend consistent with
many other Front Range communities.
1 See Water Education Colorado’s Drought 2002 Issue for more information on the 2002 drought.
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 1 of 16
As part of this broader effort, Boulder adopted its Water Budget Policy in 2007. The Water
Budget Policy applies to the water usage portion of a customer’s bill. This variable charge is
based on the volume of water used each month, calculated by multiplying total consumption (in
thousands of gallons) by a rate ($/1,000 gal) established under the Water Budget Policy. On
average, this charge makes up about 35 percent of a customer’s total bill. Under the water budget
system, customers are assigned a monthly water budget based on a variety of factors depending
on customer classes, such as number of people, irrigable area, or historical use as shown in
Attachment B. For all customer classes, water use less than a customer’s budget is charged at a
lower rate, while water use that exceeds a customer’s water budget is charged at a higher rate and
may also be subject to penalties.
The intent was to set a reasonable target for water use that preserved customer choice, while
providing a tool for drought response. For example, a household might choose to maintain a
swimming pool but offset that higher use by reducing outdoor irrigation. The intent was also
that, during a declared drought, all budgets could be reduced by a set percentage, giving
customers flexibility in how they stayed within their reduced budget.
ANALYSIS:
Community attitudes toward water use have evolved since the city first adopted water budgets.
In the early 2000s, the focus was on preserving customer choice about how to use water, while
today the emphasis is on responsible water use and community-wide standards. For example,
community members expressed support for regulating landscape types during the Water
Efficiency Plan update in 2022, and on a more regional level, recent state legislation restricts
non-functional turf in commercial and multi-family developments2. Equity has also become a
stronger point of emphasis for the city, and the Water Budget Policy would benefit from holistic
review to identify and address any unintended consequences or inequities across different
customer classes.
Eighteen years of operational experience with water budgets have also highlighted customer and
administrative realities. The city’s Utility Billing specialists consistently hear feedback from
customers that the system can be difficult to understand, particularly in the case of Commercial,
Institutional and Industrial customers, leading to more bill disputes, reduced customer
confidence, and a question about whether water budgets send price signals effectively. The
reliance on historical water use to determine the Water Budget for commercial, industrial, and
institutional (CII) customers can also create inequities. For example, a property that shifts from a
low water business, such as a boutique, to a higher demand use, like a restaurant, may face
higher costs unrelated to efficiency. Similarly, a building that sits vacant in the winter or
experiences a sustained downturn (such as during COVID-19) may be penalized when normal
water use resumes.
The administrative lift of implementing and maintaining water budgets is significant. Single
Family Residential accounts are the least complex and relatively manageable, but multi-family
residential (MFR) and CII water budgets are exponentially more complicated to establish and
maintain, and also raise the most questions about whether they achieve the desired water
conservation benefits. Significant time is dedicated to processing adjustments, working with
customers to explain the policy, addressing complaints, and maintaining detailed datasets.
Additionally, customized billing software is required to manage the high level of account
customization, and limits the city’s ability to be nimble and adaptable to customer and
organizational changes.
2 See Senate Bill 24-005 and House Bill 25-1113 for more detailed information on non-functional turf restrictions.
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 2 of 16
The combination of increased water efficiency, shifting community values, customer equity
concerns, and administrative complexity are driving the need to evaluate the Water Budget
Policy. The primary goals of this evaluation are to identify aspects of the policy that are working
well, look for opportunities to simplify and improve effectiveness, and ensure the Water Budget
Policy continues to meet community needs into the future.
NEXT STEPS:
The Water Budget Policy directly affects the water bills of many different customer classes, so
the city is seeking broad community input to guide updates. In addition to feedback received
from customers over the past 18 years; previous, current, and planned community engagement
activities include:
1.Citywide questionnaire available from September 3 through October 31
2.What’s Up Boulder community event September 7
3. CII and MFR customer meeting on October 22
4. Water Resources Advisory Board meetings on October 20 and early 2026
Themes from this feedback will be used to identify aspects of the policy that are working well
and shape any potential policy changes, which will be brought to WRAB in 2026.
The Water Budget Policy evaluation represents Phase 1 of a larger effort to revise Utility rates.
Recommendations from this process will be incorporated into a comprehensive Utility Rate
Study beginning in Quarter 2 of 2026. Full implementation of the updated policy and any related
rate adjustments is expected in 2027 or 2028 and may be phased depending on the scope of
changes.
ATTACHMENTS:
A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
B – Water Budget Calculation Examples
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 3 of 16
STANDARD (NON-EMERGENCY) REGULATION/RULE
Rule 11-1-3.A(21)
BRC Section that is the subject of this Rule: Chapter 11-1 and Section 4-20-25, BRC 1981
1.This Rule incorporates the guidance, requirements, rules and regulations shown in Attachment A.
2.To the extent only of any conflict, this Rule supersedes any conflicting Rules or parts of Rules, and
this Rule supersedes in its entirety, Rule 11-1-3.A(09).
ESTABLISHING THE METHODOLOGY TO DETERMINE THE MONTHLY WATER BUDGET
FOR THE COMPONENT OF THE MONTHLY WATER USER CHARGES KNOWN AS THE
TREATED WATER QUANTITY CHARGE, AND TO DETERMINE THE MONTHLY
WASTEWATER USER CHARGES
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 4 of 16
1. Purpose and Applicability.
The monthly water user charges set forth in Section 4-20-25, B.R.C. 1981, identify two components
for the monthly charges that are billed to consumers. Section 4-20-25(a), B.R.C. 1981, sets forth the
treated water monthly service charge which is a fixed amount based on the meter size. Section 4-20-
25(b) sets forth the treated water quantity charges which vary depending on use. Beginning in
January 2007, the treated water quantity charge portion of water bills were calculated using a water
budget block rate structure such that the price of water increases as more water is used, particularly
when the amount of water used exceeds the customer’s water budget. The increasing price is
necessary not only to promote water conservation, but also is related to the additional marginal cost
associated with water development and water conservation.
The purpose of this rule is to establish a methodology that shall be utilized to determine the monthly
water budget for the treated water quantity charge, and for determining the monthly wastewater user
charges, pursuant to the city’s utility rate structure study considered by City Council on May 2, 2017.
This rule establishes a system whereby the revenue produced will meet the treated water quantity
charge portion of the revenue requirements for the water utility enterprise. This rule does not include
or apply to the treated water monthly service charges set forth at Section 4-20-25(a), B.R.C. 1981.
It is also the purpose of this rule to establish a rate structure that will promote water conservation and
the efficient use of water, support community goals, reflect the value of water, send a price signal to
customers who waste water, and avoid the costs of new water development and expanded water
treatment.
2. Definitions and Abbreviations.
“AMU” means average monthly use.
“AWC” means the average monthly water consumption as reflected on a customer’s bill from
December through March.
“CII” means Commercial/Industrial/Institutional.
“ET” means evapotranspiration (also, see ET Rate).
“ET rate” means the amount of water (in inches) a lawn will use on any specific day through the
natural processes of surface evaporation and plant transpiration (loss of water through the leaves).
The historic monthly ET rate is specifically defined in the following chart:
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 5 of 16
Historic Monthly ET Rate
Month ET
(inches)
Share of Annual
Outdoor
Allocation
January 0.00 0%
February 0.00 0%
March 0.40 1%
April 2.72 7%
May 5.10 14%
June 7.52 20%
July 7.60 20%
August 6.67 18%
September 4.43 12%
October 2.92 7%
November 0.32 1%
December 0.00 0%
Total 37.68 100%
“GPSF” means gallons per square foot. “HMU” means historical monthly use.
“Irrigable area” means the area (in square feet) that a customer is required to maintain pursuant to Title
6, Title 8 and Title 9, B.R.C. 1981, is not covered by a hard surface (such as a roof, driveway, patio or
sidewalk) and that may require some outdoor watering. Right-of-way may be included as part of a
customer’s irrigable area but the city’s geographical information system (“GIS system”) may not
automatically include city right-of-way. Customers may seek inclusion of right-of-way pursuant to
paragraph 7 below.
“Kgal” means thousand gallons.
“Monthly water budget” means the amount of water allocated to the water utility customer to meet that
customer’s anticipated water needs for the month. The monthly water budget shall be the sum of the
indoor and/or outdoor allocation for each water utility customer. The allocation shall be based on
reasonable and necessary indoor and/or outdoor use, water conservation, and other relevant factors
associated with water use in the city.
“Public ROW” means public right-of-way.
3. Block Rate Structure for Treated Water Quantity Charges.
The block rate structure established in Section 4-20-25(b)(1), B.R.C. 1981, is utilized in conjunction
with the monthly water budget in order to determine the bill for each customer on a monthly basis. The
monthly water budget represents the amount of water allocated to a customer to meet the anticipated
watering needs for the month. Customers are billed for the amount of water they use each month, not
for their budgeted amount of water. The amount billed per Kgal increases as customers use more
water. (See table below.)
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 6 of 16
Block Rate
(per Kgal)
Rate
(per Kgal)
Block Size
(% of water budget)
Block 1 Each Block Rate will
be as reflected in
Section 4-20-25
(b)(1), B.R.C. 1981
¾ Base Rate 0 – 60%
Block 2 Base Rate 61 – 100%
Block 3 2 x Base Rate 101 – 150%
Block 4 3 x Base Rate 151 – 200%
Block 5 5 x Base Rate Greater than 200%
Some customers have a “looped” water system in which multiple water meters are used in an effort to
increase reliability and to provide redundancy to their water system. In these “looped” water systems,
water meter accounts will be combined for budgeting and billing purposes.
4. Customer Classes.
This rule establishes four different customer classes: single-family residential, multifamily
residential, CII and metered irrigation. CII will have four sub-customer classes: 1) CII AWC
(default option); 2) CII HMU; 3) CII indoor/outdoor, and 4) CII efficiency standard. The method
used to calculate the water budget for each of these classes and sub-customer classes is described
below. The bills for all customer classes utilize the customer’s water budget amount which is then
applied to the block rates to determine the monthly water bill.
a. Single-Family Residential
The single-family residential customer’s budget shall consist of indoor and outdoor allocations
for water. The indoor allocation for each customer with a household size of up to four people shall
be set at 6,000 gallons per month. The outdoor allocation shall be based on customer-specific
irrigable area as determined by the city’s GIS system. This system maps and calculates areas within
defined property boundaries and hard surface boundaries. The total annual outdoor allocation shall
be based on the following application rates:
For the first 5,000 square feet of irrigable area: 15 gpsf
For the next 9,000 square feet of irrigable area: 12 gpsf
For irrigable area in excess of 14,000 square feet: 10 gpsf.
In order to reflect varying seasonal outdoor monthly watering requirements, the total annual
allocation of water for irrigable area shall be distributed to each month based upon that month’s annual
outdoor amount as described by the historic monthly ET rate.
Customers are able to base their budget on an amount less than their total irrigable area.
Single-family residential customers may seek water budget adjustments pursuant to
paragraph 7 below.
b. Multifamily Residential
The multifamily residential customer’s budget shall consist of indoor and outdoor allocations.
The indoor allocation for each residential dwelling unit shall be set at 4,000 gallons per month. The
outdoor allocation shall be based on customer-specific irrigable area as determined by the city’s GIS
system and a total annual application rate of 15 gpsf. In order to reflect varying seasonal outdoor
monthly watering requirements, the total annual allocation of water for irrigable area shall be
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 7 of 16
distributed to each month based upon that month’s annual outdoor amount as described by the
historic monthly ET rate.
Customers are able to base their budget on an amount less than their total irrigable area and will
be allocated 15 gpsf for the total amount of the reduced area.
Multifamily residential customers may seek water budget adjustments pursuant to
paragraph 7 below.
c. Commercial/Industrial/Institutional (Non-residential)
1. CII Customer Budgets - Existing
1) CII HMU customer budgets shall be based on the most recent three-year
historical average for water use for each month and recalculated every year.
January three-year historical average would become the January water
budget, February three-year historical average would become the February
water budget, etc. HMU will result in monthly wastewater charges based on
all water used, which could include water used for irrigation.
2) CII AWC customer budgets shall be based on an indoor allocation as
determined by the customer’s most recent average winter consumption
(AWC). CII AWC customers with irrigable area associated with their
account will have an outdoor allocation based on the irrigable area (including
public ROW), using an application rate of 15 GPSF and apportioned monthly
using the historical monthly ET rate. Public ROW will automatically be
included in the irrigable area for CII AWC customers. CII AWC customers
will be billed wastewater charges on actual water used or indoor budget
allocation (AWC) whichever is lower, for the billing period.
3) CII efficiency standard customer budgets shall be determined by a specific
review of the customer’s indoor and outdoor uses based on reasonable and
documented efficiency standards as determined in the methodology described
in paragraph 6 below. CII efficiency standard customers will be billed
wastewater charges on actual water used or indoor budget allocation,
whichever is lower, for the billing period.
2. CII PIF Custom Customer Budgets - New or Redevelopment
1) New or existing CII customers who are placing an increased demand on
the city’s water system must determine the appropriate meter size and
select an annual budget. These customers will use the CII Plant
Investment Fee (PIF) custom annual budget which is based on 25, 50 or
85 percent of the AWC for a specified meter size (see table below). The
CII PIF customer may then select how this annual water budget is
distributed throughout the twelve months. This annual budget distribution
may be specified by the CII PIF customer once per year.
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 8 of 16
TABLE: Annual Water Budget Based on AWC (gallons)
Meter Size 25% AWC 50% AWC 85% AWC
¾” N/A 30,000 165,000
1” 42,000 108,000 503,000
1-1/2” 99,000 228,000 924,000
2” 183,000 483,000 1,941,000
2) Mixed-use properties water budget will be calculated based on a
combination of the amount they have purchased based on the meter size
for the CII portion of the building, and the number of dwelling units and
bedrooms for the multifamily portion of the building, as described in
these rules.
3) New CII customers that have water meter(s) larger than 2” will be
allocated an efficiency standard custom budget as indicated in
paragraph 6 below.
4) CII customers may seek water budget adjustments pursuant to
paragraph 7 below.
d. Metered Irrigation
Metered irrigation customer budgets shall be based on customer-specific irrigable area as
determined by the city’s GIS system, and an annual application rate of 15 gpsf. The budget shall
change each month based upon that month’s share of annual outdoor allocation described by the
historic ET rates, except that metered irrigation accounts will be given an additional 1% of their
annual outdoor watering budget for each month in December, January and February. The purpose of
this additional 1% is to establish a monthly water budget that is greater than zero and allows for some
limited outdoor watering. Public ROW will automatically be included and added to the irrigable area
for all metered irrigation accounts.
Customers are able to base their budget on an amount less than their total irrigable area and will
be allocated 15 gpsf for the total amount of the reduced area.
Metered irrigation customers may seek water budget adjustments pursuant to paragraph 7
below.
5. Standards and Practices Regarding Water Audits for CII Customers That Request the
Efficiency Standard Water Budget Option.
The CII efficiency standard water budget option is intended to provide a customer-specific water
budget (indoor allocation and outdoor allocation) that is determined by a specific review of the
customer’s indoor and outdoor uses, needs and facilities, by a Colorado registered professional
engineer with a focus on various components, including without limitation:
industrial or production processes,
bathroom and locker rooms,
kitchen and food preparation areas,
cooling and heating facilities,
humidity control, and
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 9 of 16
aquatics or pool needs.
The purpose of the customer-specific review is to develop a monthly indoor water allocation based on
reasonable and documented efficiency standards and, if needed, a monthly outdoor allocation. If a
customer has any irrigable area that is not included in a separate metered irrigation-only account, the
irrigable area size should be included for use in the CII Efficiency Standard option. The monthly
outdoor allocation shall be based on the irrigable area (including public ROW), an application rate of
15 GPSF and apportioned monthly using the historical monthly ET rate. Because plant materials,
irrigation systems components, weather, soil conditions, etc, are not needed in determining the
outdoor allocation, it is not necessary to have a landscape architect or a certified landscape irrigation
auditor involved in the audit unless there is an indoor garden or horticulture need.
The indoor water audit and evaluation shall consider the following, if applicable:
The City is a partner with the EPA WaterSense program and information is available on the
EPA WaterSense web site. Standards related to high-efficiency plumbing fixtures will be
used for the audit. For example, while a 1.6 gallon/flush toilet is today’s regulated standard, a
high-efficiency toilet, as promoted by WaterSense, uses 1.28 gallon/flush or less and should
be used in the audit and development of the indoor budget allocation.
Data for high-efficient, front loading clothes washers.
Recycle and reuse process water.
Limited or no humidification: requires documented need for equipment or medical
reasons.
Use of automatic on/off sensors on faucets in restrooms in larger facilities.
High-efficiency dishwashers in kitchen areas, especially in restaurants and catering
facilities.
Use of a cover in facilities that have large, open vessels of water.
Efficient operation of cooling towers.
Sanitation and cleaning practices in office buildings. Use of high-efficient plumbing
fixtures and appliances. Use of sensor activated or timed faucets.
Use of plumbing fixtures, dishwashers and ice machines in restaurants. Servers offering a
glass of water on request, but not as an automatic service. Use sensor activated or timed
faucets. Reduce water in food preparation activities.
Efficiencies for cooling water, food preparation, boilers and chillers in supermarkets.
Plumbing fixtures, laundry facilities and ice machines in hotels and motels. Request
guests to reuse their towels and linens to reduce laundry needs.
Efficiencies in cafeteria food preparation, plumbing fixtures, restrooms and locker rooms in
schools.
The report shall include a recommendation for each month’s indoor water budget allocation, based
on the audit and evaluation. In addition, effective June 1, 2008, the wastewater charge for a customer
who uses the CII efficiency standard water budget option will be based on each accounts indoor
water budget allocation or actual water used, whichever is lower, for the billing period. If an account
does not have an outdoor water budget allocation, wastewater charges will be based on actual water
used as measured by the water meter.
Requests by CII customers for a water budget adjustment application requesting use of the efficiency
standard water budget option, shall include a report prepared by a Colorado registered professional
engineer which documents and describes the evaluation and audit, including a recommendation for
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 10 of 16
the CII efficiency standard monthly water budget. The city manager or his/her delegate will review
and approve, revise or deny the water budget adjustment request prior to its implementation and use.
A fee will be charged to review the CII efficiency standard water budget option request and its
associated report pursuant to Section 4-20-43(c)(7) B.R.C.
1981, which establishes a technical document review fee for a miscellaneous plan review.
6. Water Budget Adjustments.
Water budget adjustments may be granted by the city manager or his/her delegate. The city manager
or his/her delegate may consider the following:
Number of people in household (more than four people may receive 1,000 gallons per
month per person) (single family accounts only and is renewable on an annual basis)
Irrigable area square footage (landscaping area)
Irrigable area of public ROW that customers are required to care for and maintain
Number of dwelling units (multifamily accounts only)
Number of bedrooms in a dwelling unit (multifamily accounts only). Dwelling units that have
more than two bedrooms may receive an additional 1,000 gallons per month, but the total
indoor allocation per dwelling unit may not exceed 7,000 gallons per month, which is the
equivalent of five bedrooms.
Average Monthly Use (CII accounts only)
Historical Monthly Use (CII accounts only)
Average Winter Consumption (CII accounts only)
Efficiency Standard (CII accounts only)
Licensed in-home childcare, eldercare facility, or co-op
Other (medical needs, etc.).
Monthly budget allocation (CII PIF Custom accounts only)*
Customers shall submit a water budget adjustment application in order to have their request
considered by the city manager or his/her delegate. Information contained on the application may be
subject to an audit and, if necessary, additional documentation may be required in order to
substantiate the requested adjustment. This information is outlined on the water budget adjustment
application.
*Customers who have a PIF budget change request must submit their budget change request to
Planning & Development Services for approval.
When reviewing the water budget adjustment application, the city manager or his/her delegate may
consider the following information:
Completeness of required documentation submitted with the Application
Authenticity of supporting documents
Duration of household size or medical need
Historic water usage information for property
Correct errors or changed circumstances
Other factors relevant to making a determination.
Water budgets will not be adjusted to accommodate:
Pools, spas, or hot tubs
In-home businesses or hobbies that use an increased amount of water
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 11 of 16
Gardens (gardens are included in the initial calculation of irrigable area and will not be the
basis for additional water budget adjustments).
If a water budget’s irrigable area is incorrect, the customer’s bills may be adjusted for the current year
and the customer may be credited for any excess amount pursuant to the Collections and Bill
Adjustment Policy dated January 6, 2020.
7. Water Budget Calculation Example – Single-Family Residential.
The single family residential water budget is the sum of an indoor and outdoor allocation. The
indoor allocation is 6,000 gallons per month.
The outdoor allocation is based on customer-specific irrigable area as provided by the city’s
geographical information system. This allocation changes monthly based on seasonal watering needs.
The annual outdoor allocation is calculated as follows:
The first 5,000 square feet of irrigable area is allocated15 gallons of water per square foot
(gpsf)
The next 9,000 square feet of irrigable area is allocated 12 gpsf
All excess irrigable area gets 10 gpsf.
A customer with 14,400 square feet of irrigable area would have the following annual outdoor
allocation:
Irrigable Area (square feet) Gallons per Square Foot Total
Gallons
5,000 15 75,000
9,000 12 108,000
400 10 4,000
Annual Outdoor Allocation 187,000
The annual outdoor allocation is distributed throughout the year to meet changing monthly seasonal
outdoor watering needs. The table below shows the percentages by month that will be applied to the
annual outdoor allocation. These percentages were derived from historic ET data (as displayed in
paragraph 3, above).
Historic ET Rate
Month Share of Annual
Outdoor
Allocation
January 0%
February 0%
March 1%
April 7%
May 14%
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 12 of 16
June 20%
July 20%
August 18%
September 12%
October 7%
November 1%
December 0%
Total 100%
A customer with an annual outdoor allocation of 187,000 gallons would receive 20% (37,400
gallons) in June. This number will be rounded up to the nearest 1,000 gallon; therefore, this
customer would receive 38,000 gallons in June.
In June, this customer’s monthly water budget would be 44,000 gallons: the sum of the indoor
allocation (6,000 gallons) plus the outdoor allocation (38,000 gallons) 44,000 gallons.
If this customer used 70,000 gallons in June (budget is 44,000 gallons), the water usage would be
billed as follows:
Rate Block % of Budget Gallons per Rate Block Billed Water
Usage (gallons)
Block 1 0-60% of budget 0 – 27,000 27,000
Block 2 61-100% of budget 27,001 – 45,000 17,000
Block 3 101-150% of budget 45,001 – 68,000 22,000
Block 4 151-200% of budget 68,001 – 90,000 4,000
Block 5 over 200% of budget Over 90,000 0
The customer’s monthly bill uses the volume of water used in each rate block multiplied by the rate
($) for each billing block to determine the treated water quantity charge component of the monthly
water bill.
Attachment A – Water Budget Policy: City Manager Rule 11-1-3.A(21)
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 13 of 16
Water Budget Calculation Examples
Single-Family Residential Customer Example Water Budget
Customer Details: 3 people in a home that has 3,000 sq-ft of irrigable area.
Formula: Estimated Indoor Needs + Estimated Outdoor Needs = Total Water Budget
Estimated Indoor Needs = 4 people (although 3 people live in the home, 4 is the minimum used
by default) x 1,500 gallons/month/person = 6,000 gal = 6 kgal
Estimated Outdoor Needs = 3,000 square-foot irrigable area x 15 gallons/square-foot/year
(Standard Annual Application Rate) x 20% Evapotranspiration 1 Percentage for June (see table) =
9,000 gallons = 9 kgal
Monthly Evapotranspiration Percentages
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0% 0% 1% 7% 14% 20% 20% 18% 12% 7% 1% 0%
June Water Budget = 6 kgal (Estimated Indoor Needs) + 9 kgal (Estimated Outdoor Needs) =
15 kgal
June Block 1 = 60% June Water Budget = 60% x 15 kgal = 9 kgal
June Block 2 = 40% June Water Budget = 40% x 15 kgal = 6 kgal
1 Evapotranspiration is an estimate of plant water needs based on a variety of historical climate data.
Attachment B - Water Budget Calculation Examples
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 14 of 16
Commercial (Indoor Use Only) Customer Example Water Budget
Customer Details: Typical grocery store in town that has an “Average Winter Consumption
(AWC)” account type. This establishment is served by an indoor water meter only with no
outdoor use.
Note: Commercial customers frequently have separate irrigation meters. See “Metered
Irrigation” example below.
Formula: Water Budget = Average (December Usage, January Usage, February Usage, March
Usage)
Past Usage:
Dec 2024 Jan 2025 Feb 2025 Mar 2025
28 kgal 27 kgal 29 kgal 32 kgal
Apr 2025-Mar 2026 Water Budget = Average (28 kgal, 27 kgal, 29 kgal, 32 kgal) = 29 kgal
Block 1 = 60% Water Budget = 60% x 29 kgal = 18 kgal (rounded up)
Block 2 = 40% Water Budget = 40% x 29 kgal = 12 kgal (rounded up)
Attachment B - Water Budget Calculation Examples
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 15 of 16
Metered Irrigation (Outdoor Use Only) Customer Example Water Budget
Customer Details: Typical apartment complex in town that has 24,000 square-feet of irrigable
area.
Formula: Water Budget = Irrigable Area x Standard Annual Application Rate x Monthly
Evaporation Percentage
June Water Budget = 24,000 square-foot irrigable area x 15 gallons/square-foot/year x 20%
Evapotranspiration Percentage for June (see table) = 72,000 gallons = 72 kgal
Monthly Evapotranspiration Percentages
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1% 1% 1% 7% 14% 20% 20% 18% 12% 7% 1% 1%
June Block 1 = 60% June Water Budget = 60% x 72 kgal = 44 kgal (rounded up)
June Block 2 = 40% June Water Budget = 40% x 72 kgal = 29 kgal (rounded up)
Attachment B - Water Budget Calculation Examples
10.20.25 WRAB Agenda 4 - Water Budget Policy Overview and Review Process
Page 16 of 16