HomeMy WebLinkAbout2425 Colorado Ave update to LB provided by applicant ST AIDAN'S SITE VISIT
Presented December 13, 2024
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Financial Outlook
12/13/24St Aidan's Episcopal Church
○ St. Aidan’s is a faith-based organization dependent upon the generosity of its congregation, grants and a small
endowment to fund its ministry
○ St. Aidan’s is expecting a balanced budget in 2025
• In subsequent years expenses are expected to exceed revenue in increasing amounts
○ By 2035:
• Contribution Revenue is expected to decrease by 45% … and
• Total Revenue is expected to decrease by 14%
• Ministry Expense is expected to increase by 45% …. and
• Building Operation and Maintenance Expense is expected to increase by 13% …. and
• Total Expense is expected to increase by 36%
○ This inescapable reality will lead to our closure, and signiÀFDQWVWUHVsZKHWKHULQWKHQH[WGHFDGHRUWKHUHDIWHU
○ As a faith-based organization, our ministry is based on location and context, and our current building does not meet our needs
for the ministry we are called to do
○ We are a congregation that serves the Boulder community using the resources we have to do that. The building is only part of
those resources
St Aidan's Financial Outlook
Supplemental Information -
1/6/25
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Financial Chart
12/13/24St Aidan's Episcopal Church
○ In 2035 Total Expenses are expected to be 169% of Total Revenue
St Aidan's Financial Outlook
1/6/25
Supplemental Information -
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Site Aerial
12/13/24St Aidan's Episcopal Church
SCALE: 1" = 30'
1 Site Image
3 0 30'60'
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Site Plan
12/13/24St Aidan's Episcopal Church
17,630.75 sq ft
CONCRETE SIDEWALK
2425 COLORADO AVE
59,848 sf
CENTERLINE OF COLORADO AVE
60' RIGHT OF WAY15' DRIVEWAY EASEMENT10' RIGHT OF WAY EASEMENT
2429 COLORADO AVE
44,499 sf
2489 COLORADO AVE
2491 COLORADO AVE
2490 UNIVERSITY HEIGHTS AVE2460 UNIVERSITY HEIGHTS AVE 2500 UNIVERSITY HEIGHTS AVE2440 UNIVERSITY HEIGHTS AVE1290 FOLSOM ST
1270 FOLSOM ST
1202 FOLSOM ST
10' RIGHT OF WAY EASEMENT
25' SETBACK
25' SETBACK
25' SETBACK
25' SETBACK
10' SETBACK10' SETBACK10' SETBACK10' SETBACKSCALE: 1" = 20'
1 Site Plan
4 0 10'20'40'
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Boulder Land Use Overview
12/13/24St Aidan's Episcopal Church
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Boulder Land Use Enlarged
12/13/24St Aidan's Episcopal Church
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Zoning Map Figure Ground
12/13/24St Aidan's Episcopal Church
RH-5
RH-5
RM-2
RH-3
P
RL-1
P
RL-1
RH-5
BT-1
BT-1
BR-1
P
RL-1
Future multi-story
parking garage
University
Heights
Extended
Zoning Map
University Heights
Figure Ground Zoning Map
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Existing 3D
12/13/24St Aidan's Episcopal Church
Massing Perspective
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
West Lot Subdivision
12/13/24St Aidan's Episcopal Church
12345678910111213141516
123456789101112
123456789101112131415
EXISTING CHURCH STRUCTURE
1 FLOOR
SFD SFD
SFD
SFD SFD
SCALE: 1" = 20'
1 Site Plan
9 0 10'20'40'
Site max under on RL-1
Maintain existing church, subdivide
West lot into 5 or 6 parcels (min. 7,000
sf each) and develop each with a SFD
and potential to add accessory
dwelling units.
15,000-18,000 sfResidential Area:
Plan Yields
15,000-18,000 sfTotal Area:
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Scheme 1
12/13/24St Aidan's Episcopal Church
12345678910
12345678910111213141516171819
12345678910
12345678910
12345678910111213
123456789101112
BUILDING PRESERVED - USE UNKNOWN
COLUM-
BARIUM
RESIDENTIAL
ST AIDANS
3 STORIES
SCALE: 1" = 20'
1 Site Plan
10 0 10'20'40'
Scheme 1
Save both Southern ends
St Aidan's:
33,300 sfResidential Area:
Plan Yields - New Construction
43,000 sfTotal Area:
East LotWest Lot
33,300 sf
9,700 sf 9,700 sf
Total
Pros/Opportunities:
Cons/Constraints:
-St Aidans can develop appropriately sized space
-Oak tree can remain
-Church structure is retained
-Parking requirements for a church of this size requires signiÀFDQW
parking on the west lot
-Parking requirements reduce residential yield
-Location of residential building divides the current 'campus' of
religious buildings
-Columbarium location is surrounded by unknown uses
-Church structure presents "church iconography" only and is not
sustainable
-Holy facade is dwarfed by new development
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Scheme 2
12/13/24St Aidan's Episcopal Church
12345678910111213141516
12345678910111213141516171819
12345678910111213141516
1234567891011121314
1234567891011121314
NEW
SUPPORTIVE
SPACES FOR
CHURCH
ST AIDANS
RESIDENTIAL
3 STORIES
BUILDING PRESERVED -
USE UNKNOWN
COLUM-
BARIUM
*POTENTIAL
COLUMBARIUM
RELOCATION*
SCALE: 1" = 20'
1 Site Plan
11 0 10'20'40'
Scheme 2
Save 1957 Southern end
St Aidans:
49,500 sfResidential Area:
Plan Yields - New Construction
East LotWest Lot
49,500 sf
9,600 sf 9,600 sf
59,100 sfTotal Area:
Total
Pros/Opportunities:
Cons/Constraints:
-St Aidans can develop appropriately sized space
-St Aidans has outdoor space for creation care
-Oak tree can remain
-Residential building has adequate sized outdoor area
-Less sf dedicated to unknown use
-Potential for shared supportive spaces (ÁH[VSDFHNLWFKHQHWF
-Large residential building divides the current 'campus' of religious
buildings
-Columbarium location is currently backed by unknown use on one
side
-While preserved, the church structure becomes obscured by built
volumes on both sides of it
jvD LLC
1910 7th Street, Third Floor
Boulder, Colorado 80302
Scheme 3
12/13/24St Aidan's Episcopal Church
12345678910111213141516
123456789101112131415161718
1234567891011
1234567891011121314
1234567891011 12345678910111213141516
ST
AIDANS
OFFICE /
SUPPORT
MULTI
FAITH
COLUM-
BARIUM
RESIDENTIAL
3 STORIES
SCALE: 1" = 20'
1 Site Plan
12 0 10'20'40'
Scheme 3
Tear everything down
Church:
4,000 sfMultifaith/ÁH[
Plan Yields East LotWest Lot
4,000 sf
2,900 sf 2,900 sf
OfÀFH
Residential Area:
66,600 sfTotal Area:
58,800 sf 58,800 sf
2,900 sf 2,900 sf
Total
Pros/Opportunities:
-St Aidans can develop appropriately sized space
-St Aidans has outdoor space for creation care
-Church is set back from street noise and easily accessible from
parking lot
-Oak tree can remain
-Residential building has adequate sized outdoor area
-Central courtyard protected from street edge and drive aisles
-No sf dedicated to unknown use
-Potential for shared spaces (ÁH[VSDFHNLWFKHQSURJUDPHWF
Cons/Constraints:
-SigniÀFDQWFKDQJHIRU6W$LGDQ
VFRQJUHJDWLRQ
The Rev.Mary Kate Réjouis,Rector
The Rev.Steve A.Wengrovius,Priest Associate
The Rev.Amanda Barker,Curate
October 10,2024
Attention:City of Boulder Landmarks Board
Subject:St Aidan’s Episcopal Church Demolition Permit Application HIS2024-00206
Dear members of the Landmarks Board,
We write to you regarding the Historic Preservation Demolition Review for Buildings Older than 50
Years that St.Aidan’s Episcopal Church submitted on August 30,2024.Since 1948,St Aidan’s has
served CU students and the wider community,first as a ministry to CU students in the post WWII
era,and later as an Episcopal congregation across the street from CU-Boulder.We have grown up
with Boulder.Our mission is to “worship Christ and to shine his light to CU,Boulder,and the
world.”We have been in our current location since 1957,though St.Aidan’s thrives and existed
before this current church building.
We currently fulfill this mission with about 110 households.Each week,we serve a dinner for
CU students that welcomes 30-40 students to Bread+Belonging,and especially a welcome
and safe place for the LGBTQIA+community,as well as for students that are food insecure.
We par tner with many in the community to use our space well,including,but not limited to:
The CU Basic Needs Center Mobile Food Pantries,Boulder Food Rescue and Food Not
Bombs,Pedaling Minds Bicycle Camps and programs,many musicians,music students,and
CU-related music groups.We work with other religious communities to support the poor in
the community and the world.We offer religious life for those of any age who choose it,with
active communities for Sunday morning worship,fellowship,and learning,in-person and
online,and also early Wednesday mornings.We exhibit in our ministries the practices of joy,
kindness,forgiveness,mercy,love and inclusion.Our life together includes burying the dead
and welcoming the newly born,tending the sick,caring for immigrants and helping the
disenfranchised of this world find a voice,all of this because our mission as a congregation
and the people of God in this particular place is to be peacemakers and to share the love we
understand in the Gospel.
Our role as St Aidan’s leadership is to lead in the present and do our best to guarantee the
congregation’s sustainability for the next 100 years and beyond.To that end,in addition to our
thriving life as a congregation,we have spent the past three years in deeper reflection.We have
engaged in a process as a congregation to reflect on our vision and values,and we have
embarked on a strategic real estate planning journey to determine how our real estate assets can
best serve the needs of St.Aidan’s future generations.
What became clear from this congregational process,which began in 2022,is that:
●We want to stay in this location,which is ideal for the fulfillment of our stated mission.Our
life as a faith community offers a community good in this particular place and will
continue to do so.
St.Aidan's Episcopal Church
2425 Colorado Ave,Boulder CO 80302
303-443-2503 |www.saintaidans.org
1
The Rev.Mary Kate Réjouis,Rector
The Rev.Steve A.Wengrovius,Priest Associate
The Rev.Amanda Barker,Curate
●Our building,built for a church of the 1950s and 1960s,no longer fits our needs.
○Our largest space,the church sanctuary,is five times the size we need for our
average Sunday attendance.Outside of special events,it is only used one day a
week.
○We were once located on a quiet street (2425 Pennsylvania Ave).As Pennsylvania
became Colorado Avenue,and is a Core Arterial Network of the city of Boulder,it is
now busy at all times of day,and the noise from the street is palpable when we use
indoor or outdoor spaces of the building for worship,prayer,and gatherings.
●The annual operating costs of maintaining our current building are becoming prohibitive;
we regularly deal with plumbing and heating failures,leaking roofs,while parishioners and
guests suffer from our lack of air-conditioning during the summer months.
○Further,our Energy Star rating is 38%,meaning 62%of buildings like ours use less
energy per square foot.
○Greenhouse Gas emissions (GHG),is 62.8 metric tons per year.To be carbon
neutral,we would need to plant 3,000 trees to offset our emissions.
●Among our values are care of God’s creation and providing a place of rest and respite on
our grounds,and we need to respect our natural environment and improve our resource
sustainability.
We believe that we are at a pivotal point in our evolution as a congregation,and now is the right
time to carefully craft a real estate solution that both serves the greater community in accordance
with our mission,and assures the financial sustainability of the parish.In Gone For Good:
Negotiating the Coming Wave of Church Property Transition (Mark Elsdon,Ed,Wm.B.
Eerdmans Publisher,2024)writer Eileen Lindner estimates that “...over 100,000 church
properties will be sold by the end of this decade [2030].”St.Aidan’s is doing hard,transformative
work now so that we can continue to do the mission that God has called us to do for decades and
centuries to come in a changing world.Boulder is a better place when a diverse community of
non-profits,faith-based institutions,and organizations that serve multiple generations is present
and active.
We are excited by development possibilities that will help us meet our needs and also serve the
community more deliberately than our current building.We welcome,and have been actively
exploring,partnering for a common good with other organizations.Such mission-driven
development partnerships would benefit St.Aidan’s and the community.Where we presently are
in our feasibility study,we understand that the partnerships that would serve the most needs and
provide the most benefit would entail the construction of a smaller,more efficient sanctuary for
St.Aidan’s,along with other facilities that meet the needs of partners and the community.
We did not begin this process with demolition as our goal.Our church building is deeply
meaningful to us.We love our church,and its beauty,and that it has held the prayers and hopes
and faithful work of generations.The church,to the faithful,is always more than the building.
Though we grieve that we may lose this beautiful part of our life together,we also trust that the
St.Aidan's Episcopal Church
2425 Colorado Ave,Boulder CO 80302
303-443-2503 |www.saintaidans.org
2
The Rev.Mary Kate Réjouis,Rector
The Rev.Steve A.Wengrovius,Priest Associate
The Rev.Amanda Barker,Curate
church,writ large,is called to serve the needs of the community.Those needs,and the needs of
the church,are changing.
There are aspects and components of the current building that are deeply meaningful,and we
would expect to move and retain them.Foremost among these is our Columbarium,a place
where the cremated remains of people are interred.Any changes we make will include caring for
the columbarium first,which we are able to do because the remains are above ground,and
enclosed.Those who have died are with us,in greater love,and we plan to care for the
communion of saints as we move forward.We treasure the beauty of our stained glass,especially
the Lynn Wolfe (1917-2019)“Creation Night”and “Creation Day”windows,and we already know
that we would use these,and other religiously important items,in a new space.Our bell rings out
from its tower for prayer each week and we want it to continue to do so.
The history of our construction,elaborated by jvDesousa Architects,is neither unique nor
groundbreaking.Those who built St.Aidan’s did the best they could with what they had,in the
1950s and 60s.They sought to build a home for the ministries and mission of St.Aidan’s,just as
we hope to do so now,looking toward the future.The church is the people of God who find their
spiritual home in our community of St.Aidan’s,and we know this is our home,and we know that
we need to change for the next generations and centuries.
As we are now exploring the feasibility of development on our property,it is clear now that our
mission in service to CU and Boulder is better served without our current building.Our
development needs to include a more creation-friendly,efficient and right-sized footprint for St.
Aidan’s congregation,and will also include building(s)that support our financial sustainability and
are consistent with our mission as a church.
Thank you for your consideration,
The Rev.Mary Kate Rejouis,Rector and Campus Chaplain +St.Aidan's Episcopal Church
Pam Greene,Partnerships Lead
Bal Patterson,Partnerships Lead
Paul Voakes,Senior Warden
St.Aidan's Episcopal Church
2425 Colorado Ave,Boulder CO 80302
303-443-2503 |www.saintaidans.org
3
St. Aidan’s Architectural History
Wednesday, October 30, 2024
The structure at 2425 Colorado Avenue was constructed in two phases. Refer to the diagram in attached
Appendix A.
1957
The first phase, constructed in 1957, was designed by Fisher, Fisher and Davis.
This phase included a small chapel, sacristy, an oce for the rector, support spaces and a bell tower. Also a
part of this phase was a covered arcade that enclosed an outdoor space. The arcade was open - like a
breezeway - on the south and west sides. On the north side it was enclosed on one side by the exterior wall
of the building. On the east side the arcade was within the enclosure of the structure - separated from the
outdoor space by a wall of glass and separated from the chapel space by a colonnade of slender posts that
matched the exterior columns.
The structure had an asymmetric sloped roof over the chapel, while the remainder of the structure was flat
roofed. The bell tower was topped by an open wood framed “cube”.
The structure was definitely “modern” in architectural character. The wood frame element on top of the bell
tower was an especially modern expression of a traditional church spire or tower.
Fisher and Fisher was a Denver-based firm with a large portfolio of work ranging from single family residences
to hospitals. The firm is most well known for large commercial structures in downtown Denver constructed
during the period 1910-1937, many of which have been landmarked.
The firm’s name changed briefly during the period 1956 - 1959 to Fisher, Fisher and Davis due to a
partnership with Rodney Davis. Records list only a single structure during this period: Colorado Department of
Employment oce located at 1251 E. 12th Avenue in Denver. That building is traditional in character and is
not landmarked.
Sources:
https://archives.denverlibrary.org/repositories/3/resources/8492
https://web.archive.org/web/20170706024401/http://www.historycolorado.org/sites/default/files/files/OAHP/
Guides/Architects_fisher.pdf
St. Aidan’s Episcopal Church page of 14
jv DeSousa LLC
ARCHITECTURE | PLANNING
1910 Seventh Street, Third Floor, Boulder, Colorado 80302 tel 720.301.0500jv@jvdesousa.com
jvD
1965
An addition to the original structure was constructed and opened in 1965. The addition, larger than the
original, was designed and documented by a combination of Everett/Ziegel and Heinzman and Ingalls
Architects. Refer to drawings in attached Appendix B.
The addition included new space to the east and northwest of the original structure. To the east was a new
primary sanctuary space nearly five times the size of the original chapel. An outdoor courtyard separated the
two worship spaces. At the south side of the courtyard an enclosed arcade served as the narthex or primary
entry facing Colorado Avenue (then Pennsylvania Avenue). The new sanctuary was organized around a central
nave running north/south. The entrance to the sanctuary from the narthex to the west - at the rear corner of
the sanctuary - was atypical of traditional christian church plans that would be entered axially. Along the east
wall of the original chapel a “colonnade” formed the west side of the courtyard. On the north side of the
courtyard is a parlor with fireplace and beyond that classrooms for preschoolers and support spaces. An
addition at the northwest corner of the structure included additional space for classrooms for early primary
school age children.
The sanctuary space is covered by a steeply pitched roof. The lower portion of the roof is 10:12 to match the
roof over the existing chapel. The upper portion is sloped 26:12. Between the upper and lower roofs a ribbon
of windows admits light so that the upper roof appears to float over the lower roof. The wood beams
supporting the roof spring from columns defining side aisles of the sanctuary space. The remainder of the
added structure was topped with a flat roof.
At the time of the addition the wood frame cube on top of the bell tower was replaced with a sloped roof,
26:12 in pitch to match the upper portion of the sanctuary roof. The south side of the existing chapel was
renovated - adding brick veneer to match the new addition to further tie the two structures together in a
unified composition.
The addition is clad primarily in veneer brick over cmu walls. Piers, both in the sanctuary space and the
colonnade are brick. The sloped roof is constructed of 4x T&G wood planks spanning between beams. The
planks are exposed on the underside with underlayment and shingle roofing on the top.
The character of the structure is clearly modern, although it lacks the more mid-century lightweight delicacy
of the original structure and its arcade. It does contain a soaring space with expressed structure but does not
have the more dynamic, expressive external form of some other better known mid-century churches
constructed in Boulder during this same period.
The drawings for the construction of the addition clearly show Heinzman and Ingalls Architects as the
architect-of-record for the project. Interestingly, the stamp on the drawings bears the name of the firm and
two dierent license numbers, one of which belonged to William Heinzman, but no signature as is currently
required. The titleblock shows that Heinzman was responsible for the review and approval of the document.
The names Everett/Ziegel appear in the titleblock above that of Heinzman & Ingalls.
Members of the St. Aidan’s congregation can confirm that both Arthur Everett and Alan Ziegel were members
of the St. Aidan’s church. The church also possesses the original design documents for the interior of the
structure. Refer to Appendix C. These drawings carry only the names of Everett and Ziegel and are not
stamped. It is possible that Everett and Ziegel took part in the design process as collaborators with
Heinzman’s firm and then completed the interior documentation on their own. Leveraging the skills of its
congregation like this might have reduced the capital required to construct a new worship space for a rapidly
growing congregation.
It is also interesting to note that the construction drawings for the building were completed in mid-March of
1965 and the structure opened to the congregation in December of that year. The construction time for the
structure was less than eight months. Boulder’s population grew rapidly in the mid 1960s immediately
following the opening of IBM’s facility to the north of the city. St. Aidan’s congregation must have grown
St. Aidan’s Episcopal Church page of 24
similarly and created the need both for the addition and for it to be constructed quickly. The rapid
construction time is reflected in the very simple construction systems used in the building. It is built of the
most prosaic materials. In its understated construction and appearance the structure represents the
congregation’s belief that the church as a place of prayer and worship is more than a building.
The structures, both the 1957 original and the 1965 addition, would be challenging to renovate without either
significant change to their exterior or the loss of their interior character. Portions of the structure are
uninsulated - both walls and roofs. The portions lacking insulation are the same parts that might be
considered most architecturally worthy of preservation. Improving the performance of the thermal envelope
and mechanical systems of these portions of the structure would require substantial modifications, the cost of
which might exceed the value of the building itself.
St. Aidan’s Episcopal Church page of 34
St. Aidan’s Demolition Request
St. Aidan’s is requesting to demolish the church to meet its evolving mission and fulfill the desires of the
congregation. The demolition request has been made because:
the structure no longer meets the needs of the congregation,
renovation, while possible, will not produce the flexible and multi-denominational spaces needed for the
future, and
the cost of ongoing maintenance has become an obstacle to providing mission aligned services to the
university community
St. Aidan’s is committed to continuing to serve both the community, as a congregation of the Episcopal
Church, and the spiritual needs of the University of Colorado campus. A church is a living entity composed of
people and a location and a building. Because of the changing demographics and the evolution of spiritual life
throughout American society, there is a parallel need to change the physical environment that contains and
supports the spiritual mission of loving God and our neighbor. St. Aidan’s has made a priority of financial
sustainability in order to fulfill their mission where they are.
Moving forward St. Aidan’s needs a smaller sanctuary space, a columbarium, and support spaces including
oces, restrooms and a kitchen. And as its mission changes the church needs inclusive spaces, open to
multiple uses that can serve not just members of St. Aidan’s congregation but university students of multiple
faiths looking for spiritual community. The future of religious communities is in mutually beneficial and
respectful partnerships, as St. Aidan’s has already established with Lutheran Campus Ministry (ELCA) for the
past decade. St. Aidan’s also acknowledges that our current building is not ADA compliant, and though
religious buildings are exempt, it is a goal to welcome all people.
The large sanctuary space, the most prominent architectural element, was added to the east of the original
chapel in 1965. It is used once a week and for occasional funerals and concerts. Its capacity far exceeds the
number of congregants attending a typical Sunday service. The form and configuration of the structure was
specifically designed in keeping with traditional Christian norms and for traditional Christian services. Looking
into the future this configuration will become limiting and may exclude some portions of the community that
St. Aidan’s wants to serve.
The design team has undertaken an initial assessment of the existing structure and believes that renovation of
it would not produce the spaces that St. Aidan’s needs without significantly impacting its architectural
character. The large steeply sloped roof, clerestory and solid masonry end walls would all require substantial
modification.
The structure, constructed in 1957 and added to in 1965, was built with traditional lightweight materials and
systems that are aging. Ongoing maintenance costs are now taking a very large portion of the congregation’s
budget. As the structures continue to age, maintenance costs continue to rise and the community
congregation size continues to decrease the church finds itself in an unsustainable position - reliant on
decreasing revenues to cover increasing costs.
Envisioning a future of evolving, inclusive service to the community, St. Aidan’s sees a need to demolish the
existing structures to allow redevelopment tailored to the future needs of a broader mission serving a
changing congregation and room for community partnerships that benefit the wider community, CU and St.
Aidan’s.
St. Aidan’s Episcopal Church page of 44
DWDWFFSECOND GRADETHIRD GRADERECTOR SECRETARYKITCHENVEST.KINDERGARTENOFFICECONFERENCE ROOMWOMENBOILER ROOMMENTOILETJANITORSACRISTYCOATSVESTIBULECHAPELCORRIDORYARDSTORAGETOYSTORAGETOYSTORAGEROBE ROOM ROBE ROOMCHOIR ROBINGNURSERYCLASSROOM 4YRS.CLASSROOM 3YRS.CORRIDORPARLORWORKSACRISTYSACRISTYBATHCOLONNADECOURTNARTHEXNAVECOATSBELL TOWERSTAIR #1STAIR #2SANCTUARYBAPTISTRYPULPITUPPERMECHANICALSTORAGESTORAGECOURTYARDOFFICEWORK AREACLOSETSTORAGEDWDWFFKITCHENVEST.TTKINDERGARTENOFFICECONFERENCEROOMWOMENBOILERROOMMENTOILETJANITORSACRISTYCOATAASVESTIBULECHAPELCOATAASBELLTOWEROFFICEWORKAREACLOSETSTORAGECORRIDORYAYYRDSTORAGETOYSTORAGETOYSTORAGEROBEROOMROBEROOMCHOIRROBINGNURSERYCLASSROOM4YRS.CLASSROOM3YRS.CORRIDORPAPPRLORWORKSACRISTYSACRISTYBATAAHCOLONNADENARTHEXNAVAAESTATTIR#1SSSSSSTAAATTIR##2SANCTUARYBAAAAPPTISTRYPULPITUPPERMECHANICALSTORAGESECONDGRADETHIRDGRADERECTORSECRETATTRYSTORAGEBuilt in 1957Designed byFisher, Fisher, and DavisBuilt in 1965Designed in partnership betweenEverettand Zeigeland Architect of recordHeinzman & IngallsST AIDANS EPISCOPAL CHURCHOriginal bell tower renovatedin 1965 to change roofSouth Elevation 1957South Elevation 2024South Elevation 2024COLORADO AVE(Previously Pennsylvania Ave)NAPPENDIX A
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX B
APPENDIX C
APPENDIX C
APPENDIX C
APPENDIX C
APPENDIX C
APPENDIX C
APPENDIX D
APPENDIX D
$$33(1',;'
$$33(1',;'
$$33(1',;'
$$33(1',;'
$$33(1',;'