Loading...
HomeMy WebLinkAboutItem 5B 3132 8th St Memo 01.08.25 MEMORANDUM TO THE LANDMARKS BOARD January 8, 2025 STAFF Brad Mueller, Director of Planning and Development Service Kristofer Johnson, Comprehensive Planning Senior Manager Chris Reynolds, Deputy City Attorney, City Attorney’s Office Marcy Gerwing, Principal Historic Preservation Planner Clare Brandt, Historic Preservation Planner Aubrey Noble, Historic Preservation Program Coordinator Meron Shiferaw, Historic Preservation Intern CONSIDERATION OF APPLICATION FOR NON-DESIGNATED BUILDINGS Public hearing and consideration of an application to demolish a house and two accessory buildings constructed c. 1920 at 3132 8th St., a non-landmarked property older than 50 years old, pursuant to Section 9-11-23 of the Boulder Revised Code, 1981, and under the procedures prescribed by chapter 1- 3, “Quasi-Judicial Hearings,” B.R.C. 1981. Address: 3132 8th St. Legal Description: LOTS 15-18 BLK 19 NEWLANDS Case Number: HIS2024-00239 Owner/Applicant: Andrew Stevens, Sopris Development Case Type: Non-Designated Demolition Code Section: 9-11-23, B.R.C., 1981 EXECUTIVE SUMMARY The purpose of this hearing is to determine whether the buildings are eligible for designation and to consider the cost, condition, and relationship to the surrounding area. Staff considers the property is eligible for designation as an individual landmark in that it shows character as part of the development of the community, and exemplifies the cultural and social heritage of the community through its association with the Long family and is a significant example of an architectural style of the past. However, staff also considers that the applicants have demonstrated that the condition and cost of rehabilitation of the house and garage are unreasonable, due to inadequate framing and foundation depth, and of the unique application of a stone veneer to the frame house. Staff recommends the Landmarks Board approve the demolition application for the house and garage. Recommended motion language and findings are located at the end of the memo (link). Item 5B - 3132 8th St Memo 01.08.25 Page 1 of 200 PUBLIC COMMENT To date, staff has not received public comment regarding this application. OPTIONS FOR THE BOARD’S DECISION Pursuant to Section 9-11-23, B.R.C. 1981, if the Landmarks Board finds that the buildings proposed for demolition meet the criteria in subsection (f), the application shall be suspended for a period not to exceed 180 days from the date it was accepted by the city manager as complete, in order to provide the time necessary to consider alternatives to the building’s demolition. If imposed, a 180-day stay period would start when the completed application was accepted by the city manager (Nov. 19, 2024 when the Landmarks Board fee was paid) and expire on May 18, 2025. If the Landmarks Board finds that the buildings do not meet the criteria set forth in section 9-11-23(f), B.R.C. 1981, the city manager shall issue historic preservation approval. BACKGROUND • On Sept. 5, 2024, the Planning & Development Services department accepted a complete application to demolish the house and two accessory buildings at 3132 8th St. • On Sept. 18, 2024, the Landmarks Design Review Committee (LDRC; Decker, Golobic, Brandt) referred the application to the full Landmarks Board, finding “probable cause to believe the buildings may be potentially eligible for landmark designation.” • On Nov. 19, 2024, the applicant paid the Landmarks Board hearing fee. PROPERTY DESCRIPTION Date of Construction: 1920 (County Records) Zoning: RL-1 (Residential-Low 1) Lot Size: 12,610 square feet (City of Boulder GIS estimate) House Size: 962 square feet (County Assessor, above ground finished area) Garage Size: 378 square feet (County Assessor) The property is located on a double lot on the east side of 8th Street between Evergreen and Forest avenues in the Newlands neighborhood. The house is located on the south side of the lot, and the garage is located to the northeast of the house. The lot contains a number of mature trees and vegetation. The lot is bordered on the east by an alley. The property is not within the boundaries of an identified potential historic district. The house was surveyed as part of the 1995 Boulder Survey of Historic Places.1 See the 3132 8th St. historic building inventory record (link). 1 Front Range Research Associates. “Boulder Survey of Historic Places.” June 1995. City of Boulder. Item 5B - 3132 8th St Memo 01.08.25 Page 2 of 200 Figure 1. Left: Map of central Boulder showing location of 3132 8th St. north of North Boulder Park in the Newlands neighborhood (location flagged). Right: Location of 3132 8th St. between Evergreen and Forest avenues on the east side of 8th Street (property outlined and flagged). eMapLink (link). BUILDING DESCRIPTION Figure 2. Southwest corner of façade of the one-story masonry house showing the polygonal stone cladding and shingled main gable, 2024. Staff photograph. The one-story vernacular building has a front-facing gable roof with a secondary gable roof on the north side of the front elevation, and a shed roof porch that extends across the façade, supported by a simple post at one corner. The main gable is clad in wood shakes and a rectangular vent in the gable end. The nestled gable had a singular double-hung window. The entrance is centered under the main gable end Evergreen Ave. 8th Street 9th Street Forest Ave. Item 5B - 3132 8th St Memo 01.08.25 Page 3 of 200 and a smaller double-hung window is located to the south. The shed roof porch is clad in asphalt shingle and has a single, simple porch support at the southwest corner. The building is clad in a distinctive polygonal stone with beaded mortar joints. Figure 3. North elevation showing the continuation of the polygonal stone cladding, decorative stone headers at the windows, and the hipped roof at the rear. Provided by applicant. Figure 4. South elevation the continuation of the polygonal stone cladding, stone chimney, and the hipped roof at the rear. Provided by applicant. Item 5B - 3132 8th St Memo 01.08.25 Page 4 of 200 The north elevation has a variety of window sizes, each with a continuous stone sill and a decorative stone headers. Window types include double-hung, and a series of four six-light windows within a single opening. A one-story, hipped roof portion of the building extends to the east, with two window openings. The south elevation includes a prominent stone chimney, and a pair of double-hung windows. A horizonal window opening is located in a hipped roof extension off the rear of the building. Figure 5. Rear elevation showing the polygonal stone cladding at the rear of the house and corrugated iron shed roof porch. The east (rear) elevation has a single door near the northeast corner and a horizontal window opening with a slider window. A shed porch roof (corrugated metal) extends across the rear elevation and is supported by simple posts. Item 5B - 3132 8th St Memo 01.08.25 Page 5 of 200 Figure 6. West elevation of garage showing distinctive polygonal stone and two wood swinging garage doors facing 8th Street. Provided by applicant. The garage was constructed before 1938 and is clad in the same distinctive polygonal stone. The west elevation (facing 8th Street) has two wood swinging garage doors. A covered opening with a stone sill is centered in the gable end. A four-pane, fixed window with a stone sill and header is centered in the gable end of the east elevation. Figure 7. Northeast corner of garage (from alley) showing the continuation of the polygonal stone facing around the building, windows in the gable ends and shed roof extension at the rear. Staff photograph. Item 5B - 3132 8th St Memo 01.08.25 Page 6 of 200 Analysis of Integrity Historic integrity is the ability of a property to convey its historical associations or attributes. The National Park Service defines seven aspects of integrity to evaluate properties (location, setting, design, materials, workmanship, feeling, and association). 2 Figure 8. Left: Circa. 1929-1956 image showing the southwest corner and façade of the house (facing 8th Street) with the polygonal stone cladding.3 Right: Similar view in 2024. Staff photograph. Figure 9. Left: 1995 image showing the one-story frame house showing the polygonal stone cladding.4 Right: Similar view in 2024. 2 U.S. Dept. of the Interior. “National Historic Landmarks Glossary of Terms.” National Park Service. Accessed November 2022. https://www.nps .gov/subjects/nationalhistoriclandmarks/glossary.htm 3 Boulder County. “3132 8th Street Real Estate Appraisal record.” 1929-1956. Call No. 880-8th-3132. Carnegie Library for Local History, Boulder. https://localhistory.boulderlibrary.org/islandora/object/islandora%3A97824. See also Attachment B - Boulder County Tax Assessor Card 4 Front Range Research Associates. “3132 8th Street historic building inventory record.” June 1995. Call no. 780 8th 3132. Carnegie Library for Local History, Boulder. https://localhistory.boulderlibrary.org/islandora/object/islandora%3A36611 Item 5B - 3132 8th St Memo 01.08.25 Page 7 of 200 Figure 10. Modified description from the Boulder County Tax Assessor Card: original description including “frame” construction was written in blue in 1929; new description including “stone” construction was written in red in 1949.5 According to County records, the house was constructed in 1920. Updates on the Tax Assessor Card show that between 1929 and 1949, the stone cladding was applied to the exterior of the house replacing the existing wood siding. The garage was added to the property (replacing a smaller structure) sometime between 1929 (when originally shown on the Tax Assessor card as a “private garage” and 1938 (when it appears with a “barn” in an aerial image). Permits on file with Planning & Development Services are very limited and include the permit to add the house to city water in 1939, digging a well in 1963, and roof replacement in 1981. The building is in its original location. The original design of the building was modified in between 1929 and 1949 through the addition of stone cladding, replacing the original horizontal lap siding. The building retains much of its historic materials, notably the stone cladding, wood siding in the gable end and many of the windows. The wood shingle roof has been replaced. The window at the front gable end has been covered with a corrugated metal sheet. The building demonstrates vernacular workmanship. The building’s ability to convey a feeling of its time has not been diminished by the change in context and the setting of the house on its property with mature trees and plants has not changed. In general, the building retains its ability to convey its association with its early residents and architecture. 5 Attachment B - Boulder County Tax Assessor Card Item 5B - 3132 8th St Memo 01.08.25 Page 8 of 200 Figure 11. Left: Aerial image from Google Maps (link) showing the existing roof plan of the house. Right: The 1929-1949 site plan 6 showing the original footprint of the house and rear covered porch added c.1956. The garage and shed were added sometime between 1929 and 1938.7 AREA HISTORY This area is the ancestral homelands and unceded territory of Indigenous Peoples who have traversed, lived in and stewarded lands in the Boulder Valley since time immemorial. When gold was discovered in the mountains nearby, 60 original shareholders of Boulder City Town Company violated the 1851 Treaty of Fort Laramie, also known as the Horse Creek Treaty, and claimed 1,280 acres alongside Boulder Creek on February 10th, 1859.8 By the summer of 1859, thousands of gold seekers were in the Boulder area, and many squatted on Indigenous lands, continuing the dramatic expansion of Euro-American occupation of Indigenous lands that soon exiled Indigenous peoples from the Boulder area.9 In 1871, a town government was organized under Boulder County regulations and included the original townsite and additions to the east, south and west.10 William Newland purchased land north of Boulder that same year. From the area survey: 11 In 1875, [William] Newland experimented with the successful raising of spring wheat, but discovered that dairy production and truck gardening were more profitable. By 1876, Newland 6 Attachment B - Boulder County Tax Assessor Card 7 “3132 8th Street Real Estate Appraisal record.” 1929-1956. Attachment B - Boulder County Tax Assessor Card 8 “Staff Land Acknowledgement.” City of Boulder. https://bouldercolorado.gov/projects/staff-land-acknowledgment 9 “Staff Land Acknowledgement.” City of Boulder. https://bouldercolorado.gov/projects/staff-land-acknowledgment 10 By 1882, the town was divided into wards, and the offices of mayor, treasurer, and aldermen were created to manage the now seventeen additions to the original townsite and the increasing population. By 1900, Boulder’s population had grown to 6,150 with twenty-eight additions added between 1890 and 1895. 11 Front Range Research Associates. “Boulder Survey of Historic Places: Newland Addition North Boulder.” June 1995. City of Boulder. 8th Street Alley Item 5B - 3132 8th St Memo 01.08.25 Page 9 of 200 was growing one of the largest crops of strawberries in the Boulder area, with eleven acres devoted to that fruit. Newland’s berries were marketed in Denver, as well as in mining camps. In 1876, his fields produced an estimated six thousand quarts of strawberries. Newland also grew grapes and apples. Newland began to carve garden lots of small acreages from his farmland to sell to others. … In 1891, the Newland Addition was platted, extending from Alpine to Grape avenues between 2nd Street and Broadway. The Newland plat was well irrigated, with both the Farmer’s Ditch and the Silver Lake Ditch flowing through. With access to irrigation, many of the owners planted orchards and truck gardens. Although the area remained relatively rural until after World War II, many builders, carpenters, and contractors saw future opportunity to build houses for themselves and family members as investment properties. Figure 12. 1938 aerial of the area showing scattered development between Forest and Evergreen avenues, west of Broadway. Subject property outlined in yellow and street names/features added by staff.12 In 1953, the city council renamed the numbered avenues in North Boulder to eliminate confusion with the numbered streets. The avenues were named after trees and shrubs in alphabetical order. PROPERTY HISTORY Land speculators purchased and sold large numbers of lots in Newland’s Addition before houses were built in the area. Both Sarah C. Pearl Davis and Mary White owned the land before Mary White sold it to Frank Howard in 1917. 12 United States Forest Service. “Aerial Photographs of Colorado. Boulder.” May 8, 1938. https://cudl.colorado.edu/luna/servlet/detail/UCBOULDERCB1~17~17~33257~102551:BOW-1-19 Item 5B - 3132 8th St Memo 01.08.25 Page 10 of 200 Frank S. Howard (1917 – 1920) Frank Howard purchased the lots from Mary White in 1917.13 The two had prior business dealings as both appear to be successful real estate investors. Earlier in 1917, Mary White and Frank Howard were together issued a permit to use city water to irrigate a lot near 21st and Goss streets to grow a garden to help with food shortages.14 Frank was born in 1865 in Wisconsin.15 He married Mary Eva Scott on April 27, 1887 and they moved to Boulder around 1899. Frank worked as the treasurer of an oil company, independent money lender and real estate agent. The family, including children Edwin and Ralph, lived at 1024 Pine St. from about 1902.16 There is no indication that they lived at 3132 8th St., which appears to have been a real estate investment. Josiah Henry “J.H.” Albertson and Mabel Mae Albertson (1920-1935) Frank Howard sold the property to J.H. Albertson in 1920 for $100.17 By 1921, married couple J.H. and Mabel lived in the house with their two children, Frank (born June 10, 1908, died Nov. 8, 1984) and William Orris (born Feb. 23, 1914, died Jan. 15, 2009).18 J.H. was born on April 28, 1876 in Battle Lake, Minnesota.19 Mabel was born Mabel Mae Mitchell on March 23, 1886 in Golden, Colorado.20 They married on April 20, 1905 in Denver.21 J.H. was a cement contractor 22 in partnership with Thomas Mitchell, J.H.’s brother-in-law (Mabel’s brother). Mitchell and Albertson Contractors constructed the Silver Lake Dam for the city 23 in addition to paving multiple alleys. It is not known whether J.H. constructed the house at 3132 8th St. or if it was built earlier than 1920. A map24 of the city of Boulder and vicinity from 1915 (Figure 13) shows a part of the Newland plat including lots 15-16-17-18 in Block 19 and a structure at lot 17, but the address does not appear in city 13 Boulder County Records. https://boulder.co.publicsearch.us/doc/181662506 14 “Everybody in His Garden Raising Food for Country.” May 29, 1917. Boulder Daily Camera. https://www.coloradohistoricnewspapers.org/?a=d&d=BDC19170529-01.2.7 15 Thirteenth Census of the United States, 1910 (NARA microfilm publication T624, 1,178 rolls). Records of the Bureau of the Census, Record Group 29. National Archives, Washington, D.C. https://www.ancestry.com/search/collections/7884/records/1964591 16 February 25, 1902. Boulder Daily Camera. 17 Boulder County Records. https://boulder.co.publicsearch.us/doc/181633951 18 Fourteenth Census of the United States, 1920. (NARA microfilm publication T625, 2076 rolls). Records of the Bureau of the Census, Record Group 29. National Archives, Washington, D.C. https://www.ancestry.com/search/collections/6061/records/62256577 19 Find a Grave. https://www.findagrave.com/memorial/124228872/josiah-henry-albertson 20 Texas Department of State Health Services; Austin Texas, USA; Texas Death Certificates, 1903–1982. https://www.ancestry.com/search/collections/2272/records/23230301 21 Marriage Records. Colorado Marriages. State Archives, Denver, Colorado. https://ancestry.com/search/collections/61366/records/900003187 22 Boulder City Directory. 1921. https://www.ancestry.com/search/collections/2469/records/1137388176 23 October 9, 1920. Boulder Daily Camera. https://www.coloradohistoricnewspapers.org/?a=d&d=BDC19201009-01.2.57.4 24 Drumm, Henry A. “Drumm's wall map of the city of Boulder and vicinity.” 1915. Carnegie Library for Local History, Boulder. https://localhistory.boulderlibrary.org/islandora/object/islandora%3A76609 Item 5B - 3132 8th St Memo 01.08.25 Page 11 of 200 directories prior to 1921. Between 1920 and 1922, J. H. purchased lots 1 through 1425 and 41 through 4826 in addition to lots 15-16 (subject property), all on block 19 (see (Figure 13). In 1927, Josiah was issued a permit to build a frame garage at 3181 9th St. (since demolished) and possibly constructed other buildings on the block. Figure 13. Cropped 1915 map drawn by Henry Drumm in 1915 showing the plats of the Newland Addition between Fifth (Evergreen) Avenue at the bottom and Sixth (Forest) Avenue near the top. The street railway line follows Fifth Avenue. Lots 23-24-25-26 at block 37 are outlined; other lots owned by J.H. Albertson 1920-1922 shaded in light blue.27 The Albertson family continued to live at the house at 3132 8th St. while J.H. gradually sold the other lots on the block. They moved to Hidalgo, Texas around 1930 and sold the property to Ira Long in 1937. Ira Mitchell Long and Minnie Jane Long; Linn L. Long and N. Darlene Long (1937 – present) Ira and Minnie Long purchased the property from J.H. Albertson in 1937.28 25 Boulder County Records. https://boulder.co.publicsearch.us/doc/181639674 26 Boulder County Records. https://boulder.co.publicsearch.us/doc/181364746 27 Drumm, Henry A. “Drumm’s wall map of the city of Boulder and vicinity.” 1915. Carnegie Library for Local History, Boulder. https://localhistory.boulderlibrary.org/islandora/object/islandora%3A76609 28 Boulder County Records. https://boulder.co.publicsearch.us/doc/181527527 Item 5B - 3132 8th St Memo 01.08.25 Page 12 of 200 Ira was born on Dec. 19, 1907 in Missouri.29 Minnie was born Minnie Jane Patrick on Oct. 16, 1904 in Kampville, Illinois. They married on April 8, 1929.30 Their son, Linn was born on August 22, 1933.31 From 1932 to after 1940, Ira worked for the city in the Public Works Department. By the 1940s, Ira was self employed and travelled to Alaska and other locations to work as a carpenter and laborer. He constructed at least four houses in the Newlands neighborhood between 1948 and 1952. Ira and Minnie purchased adjacent property 3222 8th St. (lots 19-20) from J.H. Albertson in 1941 and constructed a new house on that lot while living at 3132 8th St. In 1922, Linn Long (who was a teenager attending Boulder High School at the time) recalled helping to build the house, which includes the same polygonal stone facing. The new house was completed in 1948 and the family moved in June. They rented the house at 3132 8th St. to Thomas and Effie Lyla Kelly and their two children, Patricia and Constance 32 and others while the Long family lived next door. Both Ira and Linn were successful wrestlers, with Linn receiving a scholarship to the University of Colorado, Boulder and later wrestling for the United States Army. According to the University of Colorado:33 In 1952, Boulder native Linn Long fulfilled his childhood dream of becoming a University of Colorado athlete. While participating in baseball and wrestling, his unique love affair with the latter flourished upon his arrival at the university, which would ultimately map out the rest of his life. Humbly unaware of the legendary accomplishments to come, he quickly became one of the greatest wrestlers CU would ever see. Born in a boarding house on the 700 block of Pearl Street, Long was destined to be a Buff. His passion for wrestling began in the front room of his family's north Boulder home when he was young. His father, Ira, would put the youngster in various holds and upon begging to be released he would hear, “no, you have to work your way out.” “When I was in fifth and sixth grade we had 10 cent tickets to the Saturday morning football games, and when I entered high school I attended every Buffalo wrestling meet,” Long recalled. Participating in multiple sports throughout his career at Boulder High School he realized that “he was never going to be much taller than 5-6” and put all of his energy into wrestling. … In 1957 and 1958 he was selected to be a member of Team USA and was an alternate on the Olympic team on three occasions. … 29 National Archives at St. Louis; St. Louis, Missouri; WWII Draft Registration Cards For Colorado, 10/16/1940-03/31/1947; Record Group: Records of the Selective Service System, 147; Box: 142. https://www.ancestry.com/search/collections/2238/records/5080538 30 Ancestry.com. https://www.ancestry.com/family- tree/person/tree/166442720/person/142167638961/facts?_phsrc=Ozm368&_phstart=successSource 31 Voter Registration Lists, Public Record Filings, Historical Residential Records, and Other Household Database Listings. https://www.ancestry.com/search/collections/1788/records/299677397 32 June 5, 1948. Boulder Daily Camera. 33 Pals, Molly. “Linn Long, Hall of Fame Profile.” Dec. 1, 2014. Colorado Buffaloes. https://cubuffs.com/news/2014/12/1/general-linn-long-hall- of-fame-profile Item 5B - 3132 8th St Memo 01.08.25 Page 13 of 200 Upon graduation from CU he joined the Army and coached wrestling for two years. Long spent time traveling to Oklahoma for competition, but ultimately decided that he could make more of an impact on the wrestling community if he returned to Colorado to coach emerging collegiate wrestlers. In 1961 he would return to CU and serve as the head coach of the wrestling team for eight years. … Long has been a volunteer coach at Lyons High School since 1997. … Long’s countless individual feats, and significant role in the success of CU’s wrestling program, has earned him a place in the Colorado Athletic Hall of Fame, an honor he did not think would ever happen. He expressed that he believes more often that not “wrestling is at the end of the alphabet,” which is the reason he is grateful and excited to join the long line of remarkable Buffalo Hall of Famers. Ira died on Dec. 12, 2000 and Minnie died on July 15, 2004. Married couple Linn and Darlene Long currently own the house. Figure 14. Left: Minnie Long with neighbor Korry Antos on 8th Street.34 Right: Linn Long, center, during a wrestling coaching session.35 PURPOSE AND CRITERIA FOR THE BOARD’S DECISION Buildings proposed for demolition (as defined in Section 9-16-1, B.R.C. 1981) that are not located in a historic district or designated as a landmark but are older than 50 years old are reviewed pursuant to Section 9-11-23, B.R.C. 1981, using criteria defined by Section 9-11-1, Purpose and Legislative Intent, and Section 9-11-2, City Council May Designate or Amend Landmarks and Historic Districts. The Significance Criteria for Individual Landmarks (link) was adopted by the Landmarks Board on Sept. 17, 1975. 34 Sander, Steve. “Old Friends.” June 27, 1977. Boulder Daily Camera. 35 Pals, Molly. “Linn Long, Hall of Fame Profile.” Dec. 1, 2014. Colorado Buffaloes. https://cubuffs.com/news/2014/12/1/general-linn-long-hall- of-fame-profile Item 5B - 3132 8th St Memo 01.08.25 Page 14 of 200 STAFF ANALYSIS CRITERION 1: INDIVIDUAL LANDMARK ELIGIBILITY The following is a result of staff’s research of the property relative to the Significance Criteria for Individual Landmarks (link). HISTORIC SIGNIFICANCE: Summary: The property at 3132 8th St. meets the following significance criteria: 1. Date of Construction: 1920 Elaboration: County Records list the building constructed in 1920. The address is first listed in the city directories in 1921. 2. Association with Persons or Events: Long family Elaboration: The property has been associated with Ira and Minnie Long and their son Linn Long since 1937. Ira Long was a local contractor and amateur wrestler. He applied the decorative stone facing and likely constructed the garage. Linn Long wrestled competitively, including as a member of Team USA at the Olympics in 1957 and 1958. He was head coach of the University of Colorado, Boulder wrestling team for eight years and added to the Colorado Athletic Hall of Fame in 2014. 2. Distinction in the Development of the Community: Pre-WWII Newland development Elaboration: The property is a well-preserved and unique example of the gradual development of the Newland residential neighborhood that took place post WWII and is an unusual representation of this period of Boulder’s development. 3. Recognition by Authorities: Front Range Research Associates, Inc. Elaboration: The 3132 8th St. historic building inventory record (link) from 1995 notes that the “house is notable as an example of native stonework and its polygonal stone masonry is also significant.” ARCHITECTURAL SIGNIFICANCE: Summary: The property at 3132 8th St. meets the following significance criteria: 1. Recognized Period or Style: Vernacular frame with masonry cladding Elaboration: The house is an example of vernacular ornamentation of the building using stone veneer cladding, which was applied by long-time owner Ira Long. 2. Architect or Builder of Prominence: Ira Long applied the stone cladding to the house and likely built the garage. Elaboration: Long built at least four houses in the Newlands neighborhood (3122 8th St. in 1948, 3070 8th St. in 1951, 2958 7th St. in 1952 and 3024 8th St. (since demolished) in 1952). All are constructed in a hipped-roof box style in both wood frame and brick construction. One of the houses includes polygonal stone cladding. 3. Artistic Merit: Unusual polygonal stone facing on frame construction. Elaboration: Ira Long used an unusual polygonal stone to face the house. In 1948, he also faced 3122 8th St., the neighboring house to the south, with matching polygonal stone. None of the other houses found that are attributed to Ira Long have included the polygonal stone facing. Item 5B - 3132 8th St Memo 01.08.25 Page 15 of 200 4. Example of the Uncommon: None observed. 5. Indigenous Qualities: Use of local stone. ENVIRONMENTAL SIGNIFICANCE: Summary: The property at 3132 8th St. meets the following significance criteria: 1. Site Characteristics: Double lot in residential Neighborhood. 2. Compatibility with Site: The house retains its historic character, set back on the property with mature trees, lawn and decorative plantings near the house. 3. Geographic Importance: Visual feature mid-block Elaboration: The same faced polygonal stone is seen at the adjacent property to the south where the Longs resided. Due to the close proximity of these two unusual houses, the property is visually prominent. 4. Environmental Appropriateness: None observed 5. Area Integrity: The property is not located in an identified potential historic district. The surrounding areas has an eclectic character and a wide range of building ages. CRITERION 2: RELATIONSHIP TO THE CHARACTER OF THE NEIGHBORHOOD The neighborhood experienced enormous population growth after World War II as many ex-servicemen returned for higher educational opportunities and the student population more than doubled. Only three pre-1929 buildings remain on the block (all on double lots). Additionally, three properties have been redeveloped in the last 20 years. The remaining buildings were constructed between 1939 and 1955. Ira Long constructed at least four houses in the Newlands neighborhood between 1948 and 1952. Figure 15. 3122 8th St. (one lot to the south of the subject property), constructed by Ira Long in 1948 shows the same polygonal stone cladding in 1949 (left)36 and May 2022 (right). CRITERION 3: CONDITION OF THE BUILDING The applicant has submitted information on the condition of the building. See Attachment A – Application Materials. The materials received include: 36 Boulder County. “3122 8th Street Real Estate Appraisal record.” 1949-1966. Call No. 880-8th-3122. Carnegie Library for Local History, Boulder. https://localhistory.boulderlibrary.org/islandora/object/islandora%3A97820 Item 5B - 3132 8th St Memo 01.08.25 Page 16 of 200 • A structural report from Ascent Group Structural Engineering, which concludes: “Based on observations and the items noted above, it is our opinion that numerous and drastic repairs are required to rehabilitate both the main home and outbuilding structures to a condition that is safe for occupants. The priority of any rehabilitation would be to replace the foundations of the house and garage with a foundation system that is stabilized and able to properly support the structure above. This would be an expensive undertaking and should only be done under the direction of a qualified structural engineer. The superstructures will also require substantial repair and reinforcement, both to remedy existing damage / deficiencies and to correct damage likely to occur as a result of the installation of new foundation elements. The total cost of repairs is very difficult to estimate due to the nature of rehabilitating archaic and non-conforming structures, but in our opinion, the necessary structural core and shell repairs would likely be on the order of several hundred-thousand dollars.” • Home Inspection report provided by Dave Spielman, Scott Home Services, that outlines the 31 maintenance items, 60 repair recommendations and 7 immediate actions/evaluation recommendations. • Soils report from Geomet Engineering, which concluded that “perimeter drainage systems should be installed at this site if the structures are to have below grade spaces (basement, garden level, or crawlspace).” • Lead Paint report from Boulder Environmental, Inc., which identifies the presence of lead paint at the exterior of the buildings. • Asbestos report from Boulder Environmental, Inc., which concludes that there are asbestos- containing materials on the interior of the buildings. • Mold report from Boulder Environmental, Inc., which concludes that “Further investigation is recommended to identify and mitigate the cultivation of mold spores in the workshop of the garage.” Staff considers that the applicant has demonstrated that the house has significant structural issues, including its roof and floor structure, and the stone veneer. Staff considers these issues are not a result of neglect, but rather due to the age of the building and the unusual application of a 6” stone veneer to an existing frame building, inadequate roof and floor framing and a shallow foundation. While the stone veneer is supported by a concrete ledge, the stone is not adequately attached to the frame structure and the window and door openings are not structurally sound. The foundation is 12” deep, an inadequate depth for Boulder’s climate. Similarly, staff considers that the applicant has demonstrated that the garage has significant structural issues: the roof structure does not have a ridge beam, and the joists are visibly sagging due to the span. The garage walls are cast-in-place unreinforced concrete walls with significant cracks and no lintels or supports were observed to support the stone over the openings. The slab foundation does not adequately protect the building from settlement or erosion. Item 5B - 3132 8th St Memo 01.08.25 Page 17 of 200 CRITERION 4: PROJECTED COST OF RESTORATION OR REPAIR: The applicant has provided information regarding the projected cost of restoration or repair. The materials include the following statement (see Attachment A – Application Materials): Our professional estimate of the total costs to correct the issues identified in the main house and outbuilding are approximately $700,000 and $400,000, respectively, exclusive of any cosmetic improvements. These estimates are based on the findings and recommendations contained in the above reports, as well as our 31-year experience in the Boulder area as a general contractor, homebuilder, and remodeler. The structural engineering assessment report in particular identifies numerous issues throughout the structures, all the way from the below grade elements up to the roof structures. We anticipate that correction of these issues will be challenging and very expensive. Performing the recommended corrections is further complicated by the presence of expansive soils, as indicated in the geotechnical report, and, in the case of the outbuilding, the challenges of working around the existing slab-on-grade foundation. Furthermore, in the case of the main house, the stone veneer is not believed to have any positive connection to the framed wall structure behind it and appears to bear on a separate foundation element rather than the house foundation itself. Given this, we believe performing the corrective actions recommended by the structural engineer is likely to severely damage the stone veneer, which may necessitate it being rebuilt. In essence, we believe it may not be feasible to preserve the stone veneer finish if the work recommended by the structural engineer is undertaken – it would likely need to be fully or partially rebuilt, depending on the level of damage it sustains. The documentation concludes: Based on the issues identified and our professional estimate of expense required to remedy these issues, we strongly believe that correcting the issues identified in the existing main house and outbuilding would be unreasonably expensive and laborious, particularly in light of the size and value of the respective structures, and preservation of the stone veneer finish on the main house may not be feasible if the recommended corrective actions are performed. Staff considers that the cost of rehabilitation of the garage at $400,000, or $1,058 per square foot, is remarkably higher than the cost of an average rehabilitation project, and of new construction of an unconditioned accessory building. Similarly, staff considers the cost of rehabilitation of the shell of the house at $700,000, or $730 per square foot, is notably higher than the average rehabilitation project with a similar scope. RECOMMENDED MOTION Issue Historic Preservation Approval If the Landmarks Board finds the buildings not eligible for individual landmark designation based upon its historic, architectural, and environmental significance, or that the condition and estimated cost of restoration or repair is unreasonable, staff recommends the following motion language: Item 5B - 3132 8th St Memo 01.08.25 Page 18 of 200 I move the Landmarks Board approve the application to demolish the buildings at 3132 8th St., finding that the buildings do not meet the criteria set forth in section 9-11-23(f), B.R.C. 1981. ALTERNATE MOTION Issue a Stay-of-Demolition If the Landmarks Board finds the buildings may be eligible for individual landmark designation based upon its historic, architectural, and environmental significance, and that it has not been demonstrated that the condition and estimated cost of restoration or repair is unreasonable, staff recommends the following motion language: I move that the Landmarks Board issue a stay-of-demolition for the buildings located at 3132 8th St. for a period not to exceed 180 days from the day the application was accepted by the city manager in order to explore alternatives to demolishing the buildings. A 180-day stay period would expire on May 18, 2025 (180 days from Nov. 19, 2024, when the Landmarks Board review fee was paid). FINDINGS Staff recommends that the Landmarks Board adopt the following findings: Approval of the demolition of the house and garage at 3132 8th St. is appropriate based on the criteria set forth in Section 9-11-23(f), B.R.C. 1981 in that: 1. While the building is eligible for designation as an individual landmark consistent with the purposes and standards in sections 9-11-1, “Legislative Intent,” and 9-11-2, “City Council May Designate or Amend Landmarks and Historic Districts,” B.R.C. 1981, the applicant has demonstrated that the condition and cost of restoration or repair is unreasonable, and therefore, a stay of demolition is not appropriate. 2. The cost of restoration or repair and the conditions of the buildings are not due to unreasonable neglect. 3. The character of the neighborhood has somewhat diminished over time and the loss of this building would not constitute a significant impact on Boulder’s historic resources; ATTACHMENTS A: Application Materials B: Boulder County Tax Assessor Card Item 5B - 3132 8th St Memo 01.08.25 Page 19 of 200 N Darlene Long 08/26/2024 Linn L Long 08/26/2024 N Darlene Long 414 Karsh Dr, Longmont CO 80504 Linn L Long Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 20 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 21 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 22 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 23 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 24 of 200 3132 8th Street Boulder, CO 80304 Historic Preservation Application –Full Demolition Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 25 of 200 Property Location Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 26 of 200 Site Plan (aerial with boundary) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 27 of 200 Site Plan with Structure Locations Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 28 of 200 Main house –view from front (west side) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 29 of 200 Main house –view from back(eastside) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 30 of 200 Main house –view from left(northside) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 31 of 200 Main house –view from right (southside) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 32 of 200 Garage –view from right (west side) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 33 of 200 Garage –view from back(eastside) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 34 of 200 Garage –view from right (southside) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 35 of 200 Garage –view from left(northside) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 36 of 200 Shed –view from front (westside) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 37 of 200 Shed –view from right (southside) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 38 of 200 Shed –view from back(eastside) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 39 of 200 Shed –view from left(north side) Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 40 of 200 To: Landmarks Design Review Committee Property Address: 3132 8th Street Dear Landmarks Design Review Committee, In our efforts to gain an understanding of the feasibility and cost of preserving the structures at 3132 8th Street, we have engaged several outside consultants to evaluate the condition of these structures and provide recommendations for corrective action. The structures at 3132 8th Street include an approximately 962 square foot main house, an approximately 378 square foot detached garage and shop (outbuilding), and a roughly 6x10 corrugated metal storage shed. The consultant reports that have been produced include the following: - Structural engineer’s assessment - Home inspection - Geotechnical report - Lead based paint screening - Asbestos screening - Mold spore trap screening Our professional estimate of the total costs to correct the issues identified in the main house and outbuilding are approximately $700,000 and $400,000, respectively, exclusive of any cosmetic improvements. These estimates are based on the findings and recommendations contained in the above reports, as well as our 31-year experience in the Boulder area as a general contractor, homebuilder, and remodeler. The structural engineering assessment report in particular identifies numerous issues throughout the structures, all the way from the below grade elements up to the roof structures. We anticipate that correction of these issues will be challenging and very expensive. Performing the recommended corrections is further complicated by the presence of expansive soils, as indicated in the geotechnical report, and, in the case of the outbuilding, the challenges of working around the existing slab-on-grade foundation. Furthermore, in the case of the main house, the stone veneer is not believed to have any positive connection to the framed wall structure behind it and appears to bear on a separate foundation element rather than the house foundation itself. Given this, we believe performing the corrective actions recommended by the structural engineer is likely to severely damage the stone veneer, which may necessitate it being rebuilt. In essence, we believe it may not be feasible to preserve the stone veneer finish if the work recommended by the structural engineer is undertaken – it would likely need to be fully or partially rebuilt, depending on the level of damage it sustains. Additionally, we do not believe that the corrugated metal storage shed should be subjected to preservation. We believe this structure is of little significance, is unsightly, and is of minimal value. It is also largely not visible due to its location on the property (near the alley) and due to it being substantially obscured from view by shrubs and trees. Based on the issues identified and our professional estimate of expense required to remedy these issues, we strongly believe that correcting the issues identified in the existing main house and Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 41 of 200 outbuilding would be unreasonably expensive and laborious, particularly in light of the size and value of the respective structures, and preservation of the stone veneer finish on the main house may not be feasible if the recommended corrective actions are performed. Sincerely, Andrew Stevens Sopris Homes Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 42 of 200 Structural Condition Assessment 3132 8th Street Boulder, Colorado Dated November 1, 2024 PREPARED FOR: Sopris Development Under the Direction of Richard Edwards, P.E. ASCENT GROUP Job Number – 2024-0191 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 43 of 200 Boulder Winter Park ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 November 1, 2024 John Stevens 6420 Gunpark Drive Suite D Boulder, CO 80301 Re: 3132 8th Street Structural Condition Assessment Boulder, Colorado INTRODUCTION At your request, we visited the property at 3132 8th Street in Boulder, Colorado on October 30, 2024. The purpose of our visit was to perform a structural condition assessment of the unoccupied building to determine the feasibility of rehabilitating the structure into a safe occupiable space. The property we observed consisted of a home with a detached garage and shop. The house was initially constructed circa 1920 with an apparent rear addition and the garage being constructed at a later unknown date. The house is a single-story building with a root cellar that faces west to 8th Street. The two-car garage sits behind the house with the driveway accessing 8th Street and the shop is attached to the back of the garage. We understand the house has always been used as a residence. We are unsure if the detached garage was constructed at the same time as the house. At an unknown time, there was an addition made at the rear of the house extending the kitchen, adding a closet, and adding a root cellar. The garage also had an addition of a shop to the rear which took place at an unknown time. We understand that originally both structures had wood siding but currently have a grouted stone facade approximately 6” thick. STRUCTURAL CONDITION ASSEMMENT This Structural Condition Assessment uses the following terms concerning the condition of building components and systems. GOOD CONDITION: A component or system of the building would be deemed in good condition if it is intact, structurally sound, or functionally operational, is performing its intended purpose and has little to no visual defects. Components classified as good condition require little to no repair but may require preventative maintenance actions. FAIR CONDITION: A component or system of the building would be deemed to be in fair condition if it is generally structurally sound or functionally operational and is performing its intended purpose; however it is showing signs of wear, fatigue, duress, or deterioration exceeding normal expectations. There may be a failure of a sub-component of this system. Replacement or rehabilitation of components or systems in fair condition may be necessary for up to 25% of the component system. POOR CONDITION: A component or system of the building would be deemed to be in poor condition if it is no longer (or just barely) performing its intended purpose and is showing signs of duress that necessitates remediation. Replacement or rehabilitation will be necessary for 25% or more of the components of a system in poor condition. Failure or imminent breakdown of this system is likely and may pose a safety hazard. HOUSE ROOF SRUCTURES Description The original roof is a gable roof constructed of dimensional lumber sheathing over slopped dimensional lumber where one end bears on an exterior wall and the other against a ridge board (Figure 1). Intermittent collar ties and intermittent 2x supports from the sloped rafters to the ceiling are present but are inconsistent. Often referred to as bungalow-style roof framing, this system is heavily reliant on the ceiling joists and/or finish materials to provide overall structural stability. This system is not Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 44 of 200 Structural Condition Assessment – 3132 8th Street Page 3 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 commonly used in modern construction. The two chimneys in the house at have steel ties that extend from the top of the chimneys to the roof. The roof over the rear addition is a hip roof that mainly slopes to the east. One end bears at the rear wall of the original house and the other at the rear wall of the addition. We did not have access to observe the roof structure but assume that its construction is similar to the main roof. The rear porch roof is a monoslope corrugated roof constructed of dimensional lumber. The roof is attached to the side of the house with a ledger then slopes east away from the house before being nailed to the side of a 4x4 beam. The 4x4 beam is supported by two pipe columns that bear in a concrete slab (Figure 2). The front porch roof is a shingled monoslope roof assumed to be constructed of dimensional lumber. We did not have access to observe the roof structure but assume that its construction is similar to the main roof. Condition The roofs are in fair condition in their current state, but will likely require significant repairs and upgrades to extend the life of the structure. There is a noticeable sway along the roof ridge of the original house, which is often an indication of inadequate performance of the roof rafters, poor horizontal connections of the rafter heels to the ceiling structure, and/or overall inadequacy of the ceiling diaphragm to resist horizontal thrust generated by the weight of the roof and applied snow loads. Without repairs, this condition may continue to worsen over time and continued exposure to snow loads. Recommendations While the roof system appears to be functionally operational at this time and under current conditions, any modification of the internal structure that would impact the roof would require a qualified structural engineer to analyze the impact. Additional insulation will be necessary to bring the roof assembly into compliance with current IECC requirements, resulting in higher roof snow loads which may exceed the capacity of the existing structural components. It is our opinion that comprehensive reinforcement of the roof structure will be required to meet modern Energy Conservation Performance Standards. EXTERIOR WALLS Description The exterior walls are constructed of 2x4 studs with no observed insulation between studs. The exterior face has a wood material assumed to be dimensional lumber sheathing attached to the studs. An exterior finish consists of 6” thick grouted stone that covers the full height of all the walls. No lintels or supports were observed to support the stone over openings. Attempted removal of selected portions of the stone veneer on the south side of the structure was noted to cause movement of a large area of the stone finish, and no positive connection was noted to exist between the stone and the backup wall framing. The stone is supported vertically by a concrete ledge around the perimeter of the entire structure, suggesting that the stone veneer is not original to the structure (this will be discussed further in the “Foundation” portion of this document). Condition The wall structure is in good condition though the stone finish is in fair condition. Numerous cracks were observed in the grout between stones on all exterior walls, indicating the presence of foundation settlement and/or movement due to inadequate frost protection. Recommendation Restoring the stone finish will not be a lasting solution if the foundation is not rehabilitated as indicated later in this report. Any modifications to openings in the exterior walls should be reviewed by a qualified structural engineer to ensure proper support for the stone siding. The existing 2x4 framed wall cavity is likely inadequate to accommodate sufficient wall insulation to satisfy current IECC requirements, and the presence of exterior stone prevents the installation of supplemental exterior building envelope insulation. As a result, the exterior framed walls of the structure will likely require interior furring to provide the required R-Value for exterior wall systems, resulting in a loss of occupiable square footage. INTERIOR WALL FINISHES Description The interior of the original house and rear addition primarily has a lath and plaster finish. The front bedroom has wooden ship- lap panels installed vertically. Condition The condition of the interior wall finishes in most of the rooms is poor. Numerous cracks are present in the plaster primarily where two walls meet or at openings (Figures 3 & 4), indicating widespread foundation settlement and/or movement due to inadequate frost protection. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 45 of 200 Structural Condition Assessment – 3132 8th Street Page 4 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 Recommendation Repairing the interior finishes will not create a long-term solution unless the foundation is repaired as indicated later in this report. GROUND LEVEL FLOOR Description The ground floor level structure in the original portion of the residence was observed to be two layers of dimensional lumber sheathing over dimensional lumber framing (Figure 5). The joists are 2x10 (1 1/2" x 9 1/4" actual dimensions) at 24” on center spanning in the north-south direction and are nailed to a 2x rim, bearing on the exterior foundation walls or interior demising wall. The floor joists typically had 0” - 4” of space between the bottom of the joist and soil at the bottom of the crawlspace (Figure 6). The ground floor level structure in the addition was observed to be similar to the original structure. The joists over the root cellar are 2x6 (1 1/2" x 5 1/2" actual dimensions) @ 24” on center spanning in the east-west direction and bears on top of the eastern exterior foundation wall and western root cellar wall. The joists over under the kitchen are 2x10 (1 1/2" x 9 1/4" actual dimensions) at 24” on center spanning in the north-south direction. The joists under the kitchen had approximately 36” of space from the bottom of the joists to the bottom of the crawlspace. Condition The floor framing is in Poor Condition. The floor structure was noted to be several inches out of level in numerous areas of the original portion of the house, indicating substantial foundation movement throughout this area. We also observed evidence of water damage (figure 2), and decay was observed at the top of an exposed floor joist. The extent of fungal decay will not be able to be determined without the removal of significant portions of the floor sheathing. Recommendations Replacement or comprehensive reinforcement of the existing floor system would be required for future use of this structure, which would likely be difficult or impractical due to the lack of an accessible crawl space in which to perform the work. While a full structural design of a new floor system may be possible, the work itself is likely not feasible without also providing an accessible crawl space, as described below. FOUNDATION Description The original structure’s foundation consists of a grouted rubble wall around the perimeter of the house (Figures 7 and 8), and we assume a section down the center of the wall. The foundation wall is approximately 12” in depth in height with no spread footing. The exterior of the foundation has a 6” thick by 12” tall reinforced concrete ledge that aligns with the outer edge of the stone veneer. The ledge wraps both the original house and rear addition without a construction joint between the two portions of the structure, indicating that it was likely constructed either with the rear addition, or at a later date. The foundation in the addition consists of unreinforced cast-in-place concrete walls around the root cellar and unreinforced cast in place or grouted rubble under the kitchen extension. The walls of the root cellar are approximately 6’-0” high. (Figure 9) Condition This foundation is in Poor Condition. The depth of the foundation at the original house extends only a few inches below grade, and as a result is inadequate to protect against movement due to frost action. This is widely apparent based on the extent of the damage to interior wall finishes and the substantial sloping of the floor system throughout the structure. Recommendations For long term viability of the structure, extensive foundation work will be required to establish proper protection against frost heave (minimum 32” to bottom of footings per City of Boulder requirements) and to provide an accessible crawl space. Repairs will likely include phased removal and replacement of portions of the rubble foundation with proper concrete footings and an appropriate foundation wall system such as cast-in-place reinforced concrete. Alternatively, the entire house could be supported and raised by a qualified shoring contractor such that a new foundation can be constructed below the building. These repairs are typically expensive, time consuming, and are likely to cause additional damage to interior finishes and the exterior stone as the work is performed. In our opinion, the work necessary to repair the home’s foundation is likely to require significantly more cost than is practical to remediate a structure of this size and overall condition. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 46 of 200 Structural Condition Assessment – 3132 8th Street Page 5 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 GARAGE & SHOP ROOF STRUCTURE Description The garage roof is a gable roof constructed of dimensional lumber sheathing over pitched 2x4 rafters bearing on the north and south exterior walls and meeting at the ridge. No continuous ridge beam or ridge board is present and the rafters are fastened at the ridge by wood gussets. The roof is open and is being used as an attic (Figure 10). Occasional vertical 2x’s run from the ceiling joists to the rafters but the spacing & location is intermittent. Similar to the roof structure of the main house, the bungalow-style roof framing of the garage is reliant upon the ceiling joists for overall structural stability. The ceiling structure was observed to be 2x6 joists spanning north-south let into the concrete exterior walls with dimensional lumber sheathing on top (Figure 11). Bracing was observed between the ceiling joists. The shop roof was observed to be vaulted with a change in pitch on the north side. The structure of the shop roof was concealed by interior finished and not able to be observed. Condition The garage roof system is in poor condition. Ceiling joists are let into cast-in-place concrete walls with no protection from moisture observed, which can leave them susceptible to fungal decay. Furthermore, the ceiling joists clear-span between exterior walls, are visibly sagging, and are significantly inadequate to support any occupancy or light attic storage loading above. The shop roof structure could not be observed, but we observed substantial deflection in the vaulted ceiling which may be an indication of undersized roof framing components. Recommendation Substantial structural repairs will be required to provide a safe and occupiable building shell. The roof and ceiling system over the garage must be comprehensively reinforced or replaced in its entirety. While we were not able to visually observe the structural components of the shop roof, it is our opinion due to the deflections noted above that substantial strengthening and/or replacement will be required. Exterior Walls Description The garage walls are cast-in-place unreinforced concrete walls. The windows openings and garage door openings are created at the time of pour. The rear entrance from the garage to the shop was chipped out at an unknown date. The shop walls are assumed to be 2x studs. An exterior finish consists of 6” thick grouted stone that covers the full height of all the walls. Numerous cracks were observed in the grout at openings. No lintels or supports were observed to support the stone over openings. Condition The exterior walls are in poor condition. The garage wall has a large crack through which sunlight can be seen (Figure 12). Numerous cracks were observed in the grout between stones on all exterior walls. The transition between the garage and the shop has a large crack in the grout on the north side about 1 1/2" wide (Figure 13). These cracks are indicative of significant foundation settlement. Recommendations Repairing the concrete walls or restoring the stone finish will not be a lasting solution if the foundation is not addressed as noted below. Any modifications to openings in the exterior walls should be reviewed by a qualified structural engineer to ensure proper support for the stone siding. FLOOR SLAB AND FOUNDATION Description The garage concrete walls bear on a concrete slab that acts as both the garage slab and the foundation (Figures 14 & 15). A grease pit is in the floor of south garage bay (Figure 16). The shop walls also bear on a concrete slab that is acting as the foundation (Figure 17). Condition The foundation and slab conditions are poor. Concrete slab-on-grade foundations do not provide adequate protection against frost action and are often susceptible to erosion and settlement due to poor drainage. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 47 of 200 Structural Condition Assessment – 3132 8th Street Page 6 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 Recommendation For long term viability of the structure, extensive foundation work will be required. The foundation work should be designed by a qualified structural engineer and may include intermittent underpinning of the slabs and with new concrete walls and footings at a depth of at least 32” below grade These repairs are typically expensive and time consuming, and may cause substantial damage to the superstructure during construction due to the difficulty of working around an existing slab-on-grade foundation. In our opinion, the work necessary to repair the garage and shop foundation is likely to require significantly more cost than is practical to remediate a structure of this size and overall condition. GRADING AND SITE CONDITIONS Description The roofs have gutters that capture the rain and drain through downspouts that are directed away from the structures. The grading around the house and garage is flat with a slight to no distinct slope away from the structures. Numerous trees are on the plot including several that are directly against the garage and shop. Condition The condition of the site is fair. Recommendations Site grading and vegetation proximity should be reviewed by a qualified party. CONCLUSIONS AND RECOMMENDATIONS Based on observations and the items noted above, it is our opinion that numerous and drastic repairs are required to rehabilitate both the main home and outbuilding structures to a condition that is safe for occupants. The priority of any rehabilitation would be to replace the foundations of the house and garage with a foundation system that is stabilized and able to properly support the structure above. This would be an expensive undertaking and should only be done under the direction of a qualified structural engineer. The superstructures will also require substantial repair and reinforcement, both to remedy existing damage / deficiencies and to correct damage likely to occur as a result of the installation of new foundation elements. The total cost of repairs is very difficult to estimate due to the nature of rehabilitating archaic and non-conforming structures, but in our opinion, the necessary structural core and shell repairs would likely be on the order of several hundred-thousand dollars. Please refer to the body of this report for additional structural repair recommendations. This is not intended to be an exhaustive or comprehensive list of all required building repairs. Removal of finishes may reveal damage or hidden conditions that were not able to be observed during this initial visit. The repair recommendations made in this report are intended to be general in nature, and final repairs will require additional design services by a qualified professional engineer or specialty engineer in the case of repairs to historic structures. Please do not hesitate to contact our office if we may be of further assistance. DISCLAIMER: The general review of an existing structure is to visit the property, and through visual observation of accessible and visible portions of the building, determine whether there is evidence to suggest significant structural irregularities. The nature of the visual review requires that certain assumptions be made regarding the existing conditions of the structure. Further investigation through removing finish materials to expose hidden portions to view or non-destructive and / or destructive testing and further structural analysis are undertaken only when warranted by the site observation and specifically requested by the client. Further investigation may uncover areas or provide additional data which could result in modifications to our conclusions of the structural review. This document is therefore limited to that which we may observe and infer from the visible evidence and given information. This document does not cover problems or irregularities for which were not visible or could not be readily investigated without further testing and analysis. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 48 of 200 Structural Condition Assessment – 3132 8th Street Page 7 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 It’s been a pleasure to assist you. Please feel free to contact our office if you have any questions or additional concerns regarding this report or if you need further assistance in providing more detailed information. Sincerely, Richard Edwards P.E. Project Engineer 11/13/2024 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 49 of 200 Structural Condition Assessment – 3132 8th Street Page 8 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 Figure 1 Figure 2 Figure 4 Figure 3 Figure 7 Figure 8 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 50 of 200 Structural Condition Assessment – 3132 8th Street Page 9 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 Figure 5 Figure 6 Figure 7 Figure 8 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 51 of 200 Structural Condition Assessment – 3132 8th Street Page 10 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 Figure 9 Figure 10 Figure 11 Figure 12 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 52 of 200 Structural Condition Assessment – 3132 8th Street Page 11 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 Figure 13 Figure 15 Figure 16 Figure 14 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 53 of 200 Structural Condition Assessment – 3132 8th Street Page 12 of 12 ASCENT GROUP, INC. • 1711 Pearl Street, Suite 300 • Boulder, CO 80302 • 303.499.3022 Figure 17 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 54 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 1 of 67 SCOTT HOME SERVICES, LLC 303-373-2424 info@teamscott.com https://scotthomeinspection.com HOME INSPECTION REPORT 3132 8th St Boulder, CO 80304 Andrew Stevens 11/12/2024 Inspector Dave Spielman ASHI Certied Inspector 303-373-2424 info@teamscott.com Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 55 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 2 of 67 TABLE OF CONTENTS 1: Inspection Details 2: Exterior - Grounds 3: Foundation - Basement - Crawlspace 4: Roo ng - Attic - Ventilation 5: Plumbing System 6: Electrical System 7: Heating System 8: Interior 9: Built-In Appliances 10: Outbuilding 8 11 19 24 32 37 46 48 57 60 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 56 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 3 of 67 HOME INSPECTION REPORT Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 57 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 4 of 67 HOME INSPECTION REPORT SUMMARY 2.1.1 Exterior - Grounds - WALL COVERING, FLASHING, TRIM: Repainting needed 2.1.2 Exterior - Grounds - WALL COVERING, FLASHING, TRIM: Dryer vent repair 2.3.1 Exterior - Grounds - DOORS (EXTERIOR): Exterior door rubs on jamb 2.3.2 Exterior - Grounds - DOORS (EXTERIOR): Replace door for eciency 2.3.3 Exterior - Grounds - DOORS (EXTERIOR): No deadbolt 2.3.4 Exterior - Grounds - DOORS (EXTERIOR): Broken pane at door 2.3.5 Exterior - Grounds - DOORS (EXTERIOR): Damaged strike plate and frame 2.3.6 Exterior - Grounds - DOORS (EXTERIOR): Settlement at door 2.4.1 Exterior - Grounds - WINDOWS (EXTERIOR): Worn screens/frames 2.5.1 Exterior - Grounds - DRIVEWAYS, WALKWAYS, AND PATIO SLAB: Concrete cracks 2.5.2 Exterior - Grounds - DRIVEWAYS, WALKWAYS, AND PATIO SLAB: Concrete settling 2.6.1 Exterior - Grounds - GRADING AND DRAINAGE: Flat grade - monitor 2.7.1 Exterior - Grounds - FENCING: Fence replace 3.1.1 Foundation - Basement - Crawlspace - FOUNDATIONS, BASEMENTS AND CRAWLSPACES: Shallow stone and concrete footing 3.2.1 Foundation - Basement - Crawlspace - COLUMNS OR PIERS: Make shift supports - old house 3.3.1 Foundation - Basement - Crawlspace - FLOORS: Cut in joist 3.4.1 Foundation - Basement - Crawlspace - BASEMENT-CRAWLSPACE INSULATION: Crawlspace not insulated SUMMARY 81 31 60 7 ITEMS INSPECTED MAINTENANCE ITEM REPAIR RECOMMENDATION IMMEDIATE ACTION/EVALUATION RECOMMENDATION Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 58 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 5 of 67 3.4.2 Foundation - Basement - Crawlspace - BASEMENT-CRAWLSPACE INSULATION: Basement walls not insulated 3.5.1 Foundation - Basement - Crawlspace - CRAWLSPACE / VAPOR BARRIERS: Low clearance crawlspace, no vapor barrier 4.1.1 Roong - Attic - Ventilation - ROOF COVERINGS: Shingle damage / granular loss 4.1.2 Roong - Attic - Ventilation - ROOF COVERINGS: Damaged / missing shingles 4.1.3 Roong - Attic - Ventilation - ROOF COVERINGS: Nail sealing 4.2.1 Roong - Attic - Ventilation - CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS: Metal ue - no collar 4.2.2 Roong - Attic - Ventilation - CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS: Rain cap - spark arrestor needed 4.2.3 Roong - Attic - Ventilation - CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS: Chimney stone mortar gaps 4.2.4 Roong - Attic - Ventilation - CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS: Chimney ashing not let into mortar 4.2.5 Roong - Attic - Ventilation - CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS: Clay chimney ue - cracked 4.2.6 Roong - Attic - Ventilation - CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS: Missing step ashing 4.3.1 Roong - Attic - Ventilation - GUTTERS AND DOWNSPOUTS: Debris in gutters / downspouts 4.5.1 Roong - Attic - Ventilation - ROOF STRUCTURE, CEILING STRUCTURE AND ATTIC: Seal openings 4.6.1 Roong - Attic - Ventilation - ATTIC INSULATION AND VAPOR RETARDERS: Decient Insulation 4.6.2 Roong - Attic - Ventilation - ATTIC INSULATION AND VAPOR RETARDERS: Vermiculite 5.4.1 Plumbing System - WATER SUPPLY AND DISTRIBUTION SYSTEMS: Water not on 5.4.2 Plumbing System - WATER SUPPLY AND DISTRIBUTION SYSTEMS: Disconnected supply pipe 5.5.1 Plumbing System - TOILETS AND BIDETS: Toilet loose - evaluation needed 5.6.1 Plumbing System - FIXTURES AND FAUCETS: Water o at xture 5.7.1 Plumbing System - DRAIN, WASTE, AND VENT SYSTEMS: S-trap noted under sink 5.7.2 Plumbing System - DRAIN, WASTE, AND VENT SYSTEMS: Drum trap noted 5.8.1 Plumbing System - HOT WATER SYSTEMS, CONTROLS, CHIMNEYS, FLUES AND VENTS: Water heater not found 5.9.1 Plumbing System - GAS DISTRIBUTION SYSTEMS: Abandoned gas line 6.1.1 Electrical System - SERVICE ENTRANCE CONDUCTORS: Meter box glass broken 6.3.1 Electrical System - MAIN & DISTRIBUTION PANELS, SERVICE AND GROUNDING EQUIPMENT, AND LOCATION: Labeling needed at panel 6.3.2 Electrical System - MAIN & DISTRIBUTION PANELS, SERVICE AND GROUNDING EQUIPMENT, AND LOCATION: Di erent breaker types 6.4.1 Electrical System - BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES: Open splice Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 59 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 6 of 67 6.4.2 Electrical System - BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES: Conduit needed 6.4.3 Electrical System - BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES: Knob and tube wiring present 6.4.4 Electrical System - BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES: Knob and tube exposed in attic 6.5.1 Electrical System - FIXTURES, SWITCHES AND CONNECTED DEVICES: Missing globe 6.5.2 Electrical System - FIXTURES, SWITCHES AND CONNECTED DEVICES: Burned out bulb 6.5.3 Electrical System - FIXTURES, SWITCHES AND CONNECTED DEVICES: Hanging xture 6.5.4 Electrical System - FIXTURES, SWITCHES AND CONNECTED DEVICES: Switch not installed 6.6.1 Electrical System - RECEPTACLE OPERATION (POLARITY AND GROUNDING): Cover plate missing 6.6.2 Electrical System - RECEPTACLE OPERATION (POLARITY AND GROUNDING): Floor outlet improper 6.6.3 Electrical System - RECEPTACLE OPERATION (POLARITY AND GROUNDING): No installed receptacle 6.7.1 Electrical System - OPERATION OF GFCI (GROUND FAULT CIRCUIT INTERRUPTERS): No GFCI protection 6.8.1 Electrical System - SMOKE DETECTORS: No smoke detectors 6.9.1 Electrical System - CARBON MONOXIDE ALARMS: No CO detectors found 7.1.1 Heating System - HEATING EQUIPMENT: Old gas oor furnace 7.2.1 Heating System - DISTRIBUTION SYSTEMS (INCLUDING FANS, DUCTS, AIR FILTERS, REGISTERS): No heat in rooms 7.3.1 Heating System - SOLID-FUEL FIREPLACES, WOODSTOVES, AND CHIMNEYS: Damper stuck shut 8.1.1 Interior - CEILINGS: Moisture staining present 8.1.2 Interior - CEILINGS: Ceiling cracks 8.2.1 Interior - WALLS: Wall cracks - structural concerns 8.2.2 Interior - WALLS: Uninsulated walls/vermiculite insulation 8.2.3 Interior - WALLS: Peeling paint, possible lead paint 8.3.1 Interior - FLOORS: Vinyl ooring concerns 8.3.2 Interior - FLOORS: Wood ooring damaged and warped 8.4.1 Interior - DOORS: Door rubs ooring 8.5.1 Interior - WINDOWS: Cracked window pane 8.5.2 Interior - WINDOWS: Old single pane wood windows 8.5.3 Interior - WINDOWS: Windows not staying up 8.7.1 Interior - BATHROOM TUB / SHOWER SURROUND: Caulk tub 8.8.1 Interior - VENTING SYSTEMS (KITCHENS, BATHS, AND LAUNDRY): Recirc fans only 8.8.2 Interior - VENTING SYSTEMS (KITCHENS, BATHS, AND LAUNDRY): Exhaust fan needs cleaning 8.9.1 Interior - STEPS, STAIRWAYS, BALCONIES AND RAILINGS: Handrail needed 8.10.1 Interior - EVIDENCE OF PESTS: Evidence of rodents 9.2.1 Built-In Appliances - RANGES / OVENS / COOKTOPS: Old oven - not tested 9.3.1 Built-In Appliances - RANGE HOOD: No vent hood 9.6.1 Built-In Appliances - REFRIGERATOR: Older unit - replacement recommended 10.1.1 Outbuilding - WALL COVERING, FLASHING, TRIM: Repainting needed Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 60 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 7 of 67 10.1.2 Outbuilding - WALL COVERING, FLASHING, TRIM: Fascia needed 10.1.3 Outbuilding - WALL COVERING, FLASHING, TRIM: Replair/Replace doors 10.2.1 Outbuilding - FOUNDATIONS: Settling indicating structural concerns 10.3.1 Outbuilding - GRADING AND DRAINAGE: Trees too close 10.4.1 Outbuilding - GUTTERS AND DOWNSPOUTS: Downspout disconnected 10.5.1 Outbuilding - ROOF COVERINGS: Snow cover - Limited Inspection 10.5.2 Outbuilding - ROOF COVERINGS: Tree limbs near roof 10.5.3 Outbuilding - ROOF COVERINGS: Roof- end of life - replace now 10.5.4 Outbuilding - ROOF COVERINGS: Two or more layers 10.7.1 Outbuilding - BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES: Exterior conduit needed 10.7.2 Outbuilding - BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES: Knob and tube wiring present 10.8.1 Outbuilding - RECEPTACLE OPERATION (POLARITY AND GROUNDING): 2-prong outlets present 10.9.1 Outbuilding - OPERATION OF GFCI (GROUND FAULT CIRCUIT INTERRUPTERS): No GFCI protection 10.10.1 Outbuilding - HEATING EQUIPMENT: Old wall furnace - not tested 10.11.1 Outbuilding - WALLS AND CEILINGS: Poor condition overall 10.12.1 Outbuilding - DOORS: Door(s) rubs carpet 10.13.1 Outbuilding - WINDOWS: Cracked window pane 10.13.2 Outbuilding - WINDOWS: Old single pane wood windows Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 61 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 8 of 67 1: INSPECTION DETAILS Information section-ZTZlNWFhYWMtODQyMy01NGY5LWIzMGMtZWYyNDI5MDdjZGFj Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 62 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 9 of 67 Information/Overview HOME INSPECTION REPORT: The home inspection performed by Scott Home Inspection, a division of Scott Home Services, LLC, is a limited visualinspection to identify systems and components in need of immediate repair.  The inspection will conform to the Standards of Practice of the American Society of Home Inspectors (ASHI) and will include the following systems: roof, structure, electrical, interior plumbing, heating and cooling, exterior siding and trim, doors and windows, chimneys andreplaces, driveways, walkways and site grading. The evaluation will be based on observations that are primarily visual and non-invasive. The inspection and report are not intended to be technically exhaustive. This written report is asummary of observations and unbiased opinions and is based on the experience of the inspector.  This Inspection Report outlines and denes the areas of the home that were inspected, as well as indicating any itemsthat were not inspected, the reason they were not inspected, and general statements of what is commonly included and excluded during an inspection.  This written Inspection Report, together with a home inspection agreement, andany reports for additional services ordered, represent the nal statement on the condition of the home when inspected and the nal statement on what was included and/or excluded in the inspection.  INSPECTION CATEGORIES: 1) Maintenance Item - These are regular maintenance items typical for many homes, or items that should be monitored for performance or future concerns. In the opinion of the inspector, repair or replacement to these items is not urgent, but will likely be needed in the near future.  2) Repair Recommendation - The item, component or unit was inspected/tested, and is not functioning as intended.  Repair or replacement is needed by a qualied specialist. 3)Immediate Action/Evaluation Recommendation - The item, component or unit shows concerns that, in theopinion of the inspector, requires immediate action for safety and/or to prevent damage to the property, or needs to be further evaluated by a qualied professional.  SCOPE AND TERMS OF INSPECTION: This condential report is furnished for the use of the client only. It is not intended to be relied upon for any purposeby any other party not named on the report and Inspection Agreement. This inspection was performed in accordance with and under the terms of a Home Inspection Agreement. The agreement was signed and agreed upon before thepreparation of this report and a signed copy of the agreement is available upon request. Scott Home Inspection, a division of Scott Home Services, LLC, conducts all inspections according to the American Society of Home Inspectors (ASHI) Standards of Practice and Code of Ethics. The complete standards can be reviewed at the following location;https://www.homeinspector.org/Resources/Standard-of-Practice LIMITATIONS: Limitations exist in any home inspection. The inspector cannot see behind walls or behind hidden areas in the home. The belongings of the current occupant of the home are not moved to view areas underneath or behind suchbelongings. Additionally, the inspection is not a test for hazardous materials, such as asbestos, lead paint, mold, or other environmental hazards.  If the inspector observes materials which inspector believes may contain hazardousmaterials, the Inspector will recommend further testing and evaluation. Any comments, notes or recommendations made by the inspector are informational only, and Client understands that only proper hazardous testing candetermine whether any actual hazardous materials are present. The inspector is also not qualied to detect the presence of Chinese Drywall.  Nothing herein shall be construed so as to require the inspector to observe or to warnClient as to potential hazardous materials.  Any investigation concerning the existence or possible existence ofpotentially hazardous materials in any form is beyond the scope of the inspection services oered by Scott Home Inspection, a division of Scott Home Services, LLC.   BUILDING STANDARDS:Homes are inspected within the context of the time period in which they were built, taking into account the generallyaccepted building practices of that time period. The Inspection Report will comment on unsafe conditions, but problems will be described as defects at the Inspector's discretion.  Homes are not required to be constantly upgraded to comply with newly enacted building codes but are only required to comply with building codes or generally accepted standards which existed at the time of original construction.  An exception may exist when a home is remodeled, depending on the scope of work. New work must usually comply with building codes in eect at the time in which the remodel work is performed. We do not conrm that the work wasdone with the proper building permits for the City or County. The General Home Inspection is not a building code-compliance inspection, but an inspection for safety and systemdefects. The Inspection Report may comment on and identify as problems systems, components and/or conditionswhich may violate building codes, but conrmation of compliance with any building code or identication of any building code violation is not the goal of this Inspection Report and is beyond the scope of the inspection servicesoered by Scott Home Inspection, a division of Scott Home Services, LLC. READING YOUR INSPECTION REPORTThe inspection report from Scott Home Inspection is cloud based allowing for sharing of the report and easy navigation through sections.  Click to expand the images below to give you tips and help on reading and navigatingthrough this report. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 63 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 10 of 67 Year Built 1920 In Attendance CLIENT - INTRODUCTION ONLY Occupancy Status VACANT Style of Home SINGLE FAMILY HOME Weather Conditions CLEAR Temperature BELOW 50 DEGREES Ground/Soil Surface Condition PARTIALLY SNOW COVERED Additional Services Ordered OUTBUILDING Ask-Your-Inspector Program When you choose to have Scott Home Inspection perform your inspection, our support doesnt end with the inspection and report. Through our Ask Your Inspector program, we provide ongoing support to you via chat or email, and via our extensive knowledge base of articles and videos.  Our blog posts oer simple tips to help you maintain your home, and contain insight and perspective that onlya home inspector can bring.  Should any concerns arise, we want to be your rst call for support and questions. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 64 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 11 of 67 DESCRIPTIONS: The materials, styles and components present and observable are described as follows: Siding Material STONE, WOOD, WOOD SHINGLES/SHAKES Exterior Entry Doors WOOD Deck / Porch / Balcony CONCRETE PORCH/PATIO, COVERED PORCH, COVERED PATIO Driveway / Walkway CONCRETE OBSERVATIONS AND RECOMMENDATIONS: The following items were Inspected and Observed, with any Recommended Actions noted: Exterior Inspection Overview: A visual inspection of the exterior surfaces was performed around the home to include the exterior surface material, so t/fascia surfaces, doors and windows, and other exterior surface areas including: The exterior wall covering, trim, and ashing were visually inspected for concerns related to installation,paint/stain condition, damage and general maintenance issues. The entry doors to the home were tested and inspected by operating the doors, checking the lock and latch, inspecting the weather-stripping, inspecting any screens present and checking for any physical damage. The exterior of the windows were visually inspected for signs of cracked glass, damaged screens, caulking around edges and seams, paint or nish deterioration, and general concerns. The driveway and exterior concrete surfaces around the home were walked and inspected for surfacedeterioration, trip hazards, poor slope or drainage and any general areas of concern. The surface grading and drainage was inspected to determine if areas exist that will adversely aect the home. General Maintenance Recommendations: The outside of the home should be routinely checked.  Exteriors need regular maintenance to stay sealed against theweather.  There can be hidden damage when the exterior is not sealed or is poorly nished, damaged or decayed. Heavy vegetation should be kept trimmed since it can cause or hide damage. 2: EXTERIOR - GROUNDS Information section-MjFmN2FkMjAtOWViMi01NGMzLWI3NGItODhmODAyNTA5Nzcx Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 65 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 12 of 67 General photos The following photos document the general condition of the exterior of the home. Areas with a specic concern ordefect are noted separately, referencing the specic issue and area of concern. Recommendations 2.1.1 WALL COVERING, FLASHING, TRIM REPAINTING NEEDED EXTERIOR THROUGHOUT The paint is showing general fading on the exterior siding, and the caulking is showing minor cracking around windows and doors and at the trim in areas. Re-painting of the siding will be needed in the near future.  This is a maintenance item. Recommendation Contact a qualied painting contractor. Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 66 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 13 of 67 2.1.2 WALL COVERING, FLASHING, TRIM DRYER VENT REPAIR LEFT REAR CORNER The exterior dryer vent is too long and the cap is missing. The vent should be cut and a cover installed onto the exterior wall,  prevent possible pest and moisture entry. This should be evaluated and corrected by qualied contractor. Recommendation Contact a handyman or DIY project Maintenance Item 2.3.1 DOORS (EXTERIOR) EXTERIOR DOOR RUBS ON JAMB FRONT AND BACK DOORS The exterior door at the noted location rubs at the jamb when closing.  I recommend that the aected door be adjusted as needed to allow proper operation. Recommendation Contact a qualied professional. Maintenance Item 2.3.2 DOORS (EXTERIOR) REPLACE DOOR FOR EFFICIENCY FRONT AND BACK DOORS The door is of poor insulating quality, and is likely allowing cold air to conduct into the home.  I recommend replacing this door with a new insulated core door to improve eciency.  Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 67 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 14 of 67 Recommendation Contact a qualied door repair/installation contractor. 2.3.3 DOORS (EXTERIOR) NO DEADBOLT FRONT AND BACK DOORS The addition of a deadbolt on the exterior doors is recommended for safety. This should be corrected by a qualied contractor Recommendation Contact a qualied general contractor. Repair Recommendation 2.3.4 DOORS (EXTERIOR) BROKEN PANE AT DOOR BACK DOOR The window is missing at the exterior door. Repair is needed or a new door should be installed to repair.  This should be evaluated and corrected by a qualied contractor. Recommendation Contact a qualied window repair/installation contractor. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 68 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 15 of 67 2.3.5 DOORS (EXTERIOR) DAMAGED STRIKE PLATE AND FRAME BACK DOOR The strike-plate and frame is damaged at the door. Repair is needed for operation of the knob and latch. Recommendation Contact a handyman or DIY project Repair Recommendation 2.3.6 DOORS (EXTERIOR) SETTLEMENT AT DOOR BACK DOOR Settlement of the back patio or foundation has created a gap under the back door. Repairs are needed to create a square/level bottom to the door frame. The type of repair depends on the extent and area of damage, whether at the foundation, patio slab, or door frame.  A structural engineer should evaluate this area during the recommended structural evaluation.  A qualied professional should make repairs.  Note it may be possible to add a modied door sweep to keep drafts, pests and water out of the gap, if additional repairs are not needed or desired. Recommendation Contact a qualied professional. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 69 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 16 of 67 2.4.1 WINDOWS (EXTERIOR) WORN SCREENS/FRAMES THROUGHOUT EXTERIOR The old screen wood frames are aging and worn. Consider rescreening at the aected window screens in the near future as a maintenance item. Recommendation Contact a handyman or DIY project Maintenance Item 2.5.1 DRIVEWAYS, WALKWAYS, AND PATIO SLAB CONCRETE CRACKS WALKWAY AND DRIVEWAY The concrete has settlement cracks. This appears to be cosmetic and related to minor settlement only. I recommend caulking as gaps develop, or maintaining the caulking of sealed cracks, to seal against water entry that can contribute to settling causing further damage. For more information, see this article from Scott Home Inspection. Recommendation Contact a handyman or DIY project Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 70 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 17 of 67 2.5.2 DRIVEWAYS, WALKWAYS, AND PATIO SLAB CONCRETE SETTLING BACK PATIO The concrete has settled and cracked in areas. This appears to be cosmetic and related to settlement only, and is somewhat typical for this area. Consider mud-jacking at this time, to repair. Otherwise, appropriate sealing or maintenance of sealed cracks is recommended to prevent moisture from causing further damage.  For more information see this article from Scott Home Inspection. Recommendation Contact a qualied concrete contractor. Mud-Jacking Maintenance Item 2.6.1 GRADING AND DRAINAGE FLAT GRADE - MONITOR AROUND THE HOME Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 71 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 18 of 67 There is at grading of landscaping at the exterior foundation, which can cause or contribute to water intrusion or deterioration. No structural or moisture concerns are currently noted.  I recommend monitoring these areas for pooling water or saturated soils, and having a landscaping professional or qualied person make the necessary adjustments to the grading of the home. For more information on grading and drainage, read this article from Scott Home Inspection. Recommendation Contact a qualied landscaping contractor Grading 2.7.1 FENCING FENCE REPLACE LEFT SIDE YARD The fence is in poor overall condition, and signicant repairs or replacement will likely be needed.  Consult with a fence professional for repair/replacement options and costs. Recommendation Contact a qualied fencing contractor Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 72 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 19 of 67 DESCRIPTIONS: The materials, styles and components present and observable are described as follows: Foundation POURED CONCRETE, STONE Basement / Crawlspace OLDER CELLAR TYPE BASEMENT, PARTIAL BASEMENT WITH CRAWLSPACE Method Used To Observe Crawlspace FROM OPENING Columns or Piers FOUNDATION WALLS, SUPPORTING WALLS, DRY STACKED ROCK OR STONE Floor Structure WOOD JOISTS Basement / Crawlspace Insulation NONE Crawl Space Vapor Retarder NONE PRESENT OBSERVATIONS AND RECOMMENDATIONS: The following items were Inspected and Observed, with any Recommended Actions noted: Foundation Systems Inspection Overview: The foundation, basement, and crawlspace components were inspected where present and accessible, including thefollowing items: The visible portions of the foundation wall of the home where not covered by insulation or nishing. The insulation type and levels present where visible. The oor structure, wall structure, beams and posts where visible. Limitations can exist on any foundation inspection since much of the structural components can be hidden or buried,or covered with insulation or a nished area.  We do our best to observe all visible areas and look for any sign of structural concerns.  We are not structural engineers, and therefore, if we do see areas of concern we may recommendfurther evaluation by an engineer to assess the area of concern. FOUNDATIONS, BASEMENTS AND CRAWLSPACES: No immediate structural concerns Cellar The structure and foundation of the ceklar were visually inspected where readily accessible for signs of problems orconcerns. The exterior and interior wall coverings were also inspected for indications of settling, movement, or cracking. No indications of signicant structural concerns were observed at the time of the inspection. 3: FOUNDATION - BASEMENT - CRAWLSPACE Information section-ODZhMDFiOWQtN2I3OS01YWE3LWI5M2MtY2UxNTQ0MjliNWU2 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 73 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 20 of 67 Recommendations 3.1.1 FOUNDATIONS, BASEMENTS AND CRAWLSPACES SHALLOW STONE AND CONCRETE FOOTING CRAWLSPACE The foundation appears to be a shallow poured concrete footing, and/or dry stacked stone with no mortar visible. View of the foundation was limited by the low-clearance crawlspace that was not accessible, and by soils at the exterior that covered the foundation. The home owner has cut out areas of the Living Room oor, and dug out at the right side exterior, to view more of the foundation and oor framing; I inspected the foundation from these areas and from within the Cellar. Settlement was noted at the walls in the home that may indicate structural concerns. This home is 100 years old and the construction style is somewhat typical for the era in a smaller home.  I recommend evaluation by a structural engineer, to determine overall condition of the foundation and to recommend repairs or improvement if needed. Immediate Action/Evaluation Recommendation 3.2.1 COLUMNS OR PIERS MAKE SHIFT SUPPORTS - OLD HOUSE CRAWLSPACE The supporting columns and piers are a variety of types, which reects the age of the home and the building methods employed when the supports were installed. Some of the older supports are of questionable strength and integrity. No damage or movement was noted that indicate structural issues with the supports, but improvements can be made. Consult with a contractor experienced in structural repair to older homes, for recommendations and costs to improve or replace supports as needed.  Read this article for more information. Recommendation Contact a qualied carpenter. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 74 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 21 of 67 3.3.1 FLOORS CUT IN JOIST CELLAR There were holes drilled or cuts for plumbing or electrical in the oor joists that appear to be improper. Holes or cuts into support beams or joists cannot be larger than 1/3 of depth of the size of the beam, and/or cannot be within 2" of the edge without compromising the integrity of the joist/beam. Further evaluation by a qualied contractor is recommended at this time. Read this article for more information Recommendation Contact a qualied structural engineer. Repair Recommendation 3.4.1 BASEMENT-CRAWLSPACE INSULATION CRAWLSPACE NOT INSULATED Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 75 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 22 of 67 The crawlspace is not insulated.  While this installation was typical at the time of construction, moisture and energy related issues can occur more in this crawlspace than one that is insulated and conditioned.  It is recommended that you consider converting this to become a conditioned crawlspace, which will improve energy eciency and prevent moisture concerns.  To accomplish this, typically the following steps are taken: Insulation should be installed at the rim joists and on the foundation walls to drape over the sealed edges of the vapor barrier.  Seal o the crawlspace vents to the exterior, and consider sealing at the exterior sill plates on the foundation where accessible to minimize air leakage.  You should also investigate installing or opening a heat supply into the crawlspace, which will provide drying and air exchange. This will result in a somewhat conditioned crawlspace that will be less prone to air leakage and condensation occurring on the underside of the oor system from cold air entering in the wintertime.   Consult with an insulation specialist to verify these recommendations and to determine other repair options. Note that in a low clearance crawlspace, insulation may not be possible without signicant eort and costs. This is noted for your information. Recommendation Contact a qualied insulation contractor. 3.4.2 BASEMENT-CRAWLSPACE INSULATION BASEMENT WALLS NOT INSULATED CELLAR Insulating the basement foundation walls will improve the home's energy eciency.  Consult with an insulation professional for costs and options. For more information about insulation, read this article. Recommendation Contact a qualied insulation contractor. Maintenance Item 3.5.1 CRAWLSPACE / VAPOR BARRIERS LOW CLEARANCE CRAWLSPACE, NO VAPOR BARRIER CRAWLSPACE There is no vapor barrier on the ground in the crawlspace. A vapor barrier provides added protection from moisture that can enter or be present in the soil.  Because the crawlspace area has very little clearance and accessibility, installation of a vapor barrier would be dicult.  No concerns with moisture were currently evident.  I recommend monitoring the grade around the home and ensuring that the downspouts are kept in the lowered position, to keep moisture out of the crawlspace. Recommendation Recommend monitoring. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 76 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 23 of 67 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 77 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 24 of 67 DESCRIPTIONS: The materials, styles and components present and observable are described as follows: Roof Covering DIMENSIONAL ASPHALT SHINGLE, METAL AWNING Inspection Method WALKED ROOF Chimney (Exterior) STONE, METAL FLUE PIPE, CLAY FLUE Ventilation ROOF-TOP VENTS, GABLE VENTS Gutter And Downspout Material METAL, DOWNSPOUTS DISCHARGE ABOVE GRADE Attic Info ATTIC HATCH Method Used To Observe Attic ENTERED Roof Structure 2 X 4 RAFTERS, LATERAL BRACING, COMMON BOARD, OSB SHEATHING Attic Insulation BLOWN, ROCKWOOL, VERMICULITE, AMOUNT IS DEFICIENT AND MORE SHOULD BE ADDED OBSERVATIONS AND RECOMMENDATIONS: The following items were Inspected and Observed, with any Recommended Actions noted: Roong-Attic-Ventilation Inspection Overview: The roof system, gutters-downspouts, attic, and attic ventilation were inspected where components were fullyaccessible.    The roong material was inspected for concerns with wear and age, potential hail damage or other damage, andany ashing or roof penetration concerns. Gutters and downspouts were inspected to ensure proper drainage away from the home and foundation. Metal ue pipes and chimneys were visually inspected for physical condition and ashing concerns. The attic was inspected to determine if moisture concerns are present, assess insulation concerns, ventilationadequacy, and review any visible structural issues. The roof inspection is not intended to predict how long the roof will last or if it will leak, and is not a warranty. All roofsshould be inspected annually in order to detect and address concerns to ensure the roof will perform for the typical life span.  Expect to make minor repairs to any roof. 4: ROOFING - ATTIC - VENTILATION Information section-MDMzYjc5ZTctOTBjNy01NTc3LTlmZGEtOTk5NGE4NWQ3NzFi Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 78 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 25 of 67 ROOF COVERINGS: Partial roof snow covered - limited inspection The roof was walked and inspected where visible, but inspection was limited due to partial snow cover. The roof was infair condition overall, but some concerns were noted in visible areas. GUTTERS AND DOWNSPOUTS: Hinged gutter extensions Hinged gutter extensions are noted in the upright position.  This will allow water to run down near the foundation wall.  It is recommended that these extensions be left in the down position to ensure proper drainage around the house. VENTILATION OF ATTIC: Attic ventilation - no concerns noted The amount of ventilation in the attic or ceiling space appears adequate. Appropriate ventilation promotes the life expectancy of the roof covering and reduces heat build up which can lead to energy eciency concerns. No actions areneeded at this time. For more information, see this blog post from Scott Home Inspection. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 79 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 26 of 67 ROOF STRUCTURE, CEILING STRUCTURE AND ATTIC: Attic inspected The attic area was visually inspected, with no structural or moisture concerns noted. Recommendations 4.1.1 ROOF COVERINGS SHINGLE DAMAGE / GRANULAR LOSS There is evidence of shingle damage and wear at edges with granule loss; this can greatly reduce the life expectancy of the roof. We do not make any determination as to whether or not the damage is from hail or if an insurance company will replace the roof on an insurance claim. It is recommended that a roong professional further evaluate the condition and repair or replace as needed.  Learn more about hail damage in our article here.  Recommendation Contact a qualied roong professional. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 80 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 27 of 67 4.1.2 ROOF COVERINGS DAMAGED / MISSING SHINGLES REAR AT UPPER ROOF The roof was inspected and there are some damaged or missing shingles in areas. The damaged or missing shingles should be replaced at this time. A roong professional should evaluate and perform repairs. Recommendation Contact a qualied roong professional. Repair Recommendation 4.1.3 ROOF COVERINGS NAIL SEALING There are several exposed nails at the roof shingles that should be sealed over with roong sealant, to prevent leaking from developing. Recommendation Contact a qualied roong professional. Maintenance Item 4.2.1 CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS METAL FLUE - NO COLLAR LEFT SIDE The roof ashing for the abandoned wood stove does not have a collar installed at the roof, and there is a gap where moisture can enter around the vent pipe.  A quali ed contractor should seal or install a collar as needed, to prevent moisture from entering the attic at this area. Recommendation Contact a qualied heating and cooling contractor Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 81 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 28 of 67 4.2.2 CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS RAIN CAP - SPARK ARRESTOR NEEDED RIGHT SIDE A proper rain / spark arrestor cap should be installed on the chimney for safety when operating the replace, to prevent sparks from exiting on the roof.  It will also serve to keep animals and debris out of the chimney. Recommendation Contact a qualied chimney contractor. Maintenance Item 4.2.3 CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS CHIMNEY STONE MORTAR GAPS LEFT SIDE The stone chimney has gaps in the mortar. Further deterioration and moisture intrusion or loose stones may occur if not repaired. A professional mason should re-point the mortar and seal as needed to repair. Recommendation Contact a qualied masonry professional. Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 82 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 29 of 67 4.2.4 CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS CHIMNEY FLASHING NOT LET INTO MORTAR RIGHT SIDE The chimney ashing is not let into the brick mortar but is instead caulked to the edge of the chimney. This was an acceptable ashing method, but will require periodic maintenance to ensure caulking is adequate.  Consider having this area re-ashed with ashing that is let into the mortar, at the very least at the next roong replacement. Recommendation Contact a qualied masonry professional. Maintenance Item 4.2.5 CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS CLAY CHIMNEY FLUE - CRACKED RIGHT SIDE The chimney ue has a crack in the visible area of the ue. Cracked fules within the structure of the home is a possible re hazard. I recommend evaluation and repair or replacement as needed.  Recommendation Contact a qualied chimney contractor. Repair Recommendation 4.2.6 CHIMNEYS, FLASHINGS AND ROOF PENETRATIONS MISSING STEP FLASHING FRONT PORCH It appears that there is no "step ashing" between the roof and siding. This can contribute to damage to bottom edges of siding, as well as leaks behind the wall. A roong or siding professional should add ashing, or at a minimum seal the meeting of the siding and shingles with an appropriate caulk sealant (which will be a temporary repair requiring periodic maintenance). Recommendation Contact a qualied professional. Repair Recommendation 4.3.1 GUTTERS AND DOWNSPOUTS DEBRIS IN GUTTERS / DOWNSPOUTS The gutters and downspouts are full of leaves and debris in areas and need to be cleaned. Regular cleaning of gutters is needed, as a maintenance item, to prevent overows and to ensure proper drainage o the roof and away from the foundation of the home. This should be evaluated and corrected by qualied contractor.  Read this article for more information. Recommendation Contact a handyman or DIY project Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 83 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 30 of 67 4.5.1 ROOF STRUCTURE, CEILING STRUCTURE AND ATTIC SEAL OPENINGS Seal unintended openings into the attic, to keep pests and water from entering. Recommendation Contact a qualied professional. Repair Recommendation 4.6.1 ATTIC INSULATION AND VAPOR RETARDERS DEFICIENT INSULATION The attic system is not appropriately insulated and signi cant energy loss can be expected. Heat loss will occur more on this home than one that is properly insulated.  The recommended level of insulation is R- 49, which should be 12"-14" of insulation with blown cellulose or 18"-20" of blown berglass.  The current insulation level is well below these recommended levels and is considered decient.   I recommend consulting with an insulation contractor about installing addition insulation throughout the attic space at this time. To learn more about insulation, read this article.  Recommendation Contact a qualied professional. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 84 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 31 of 67 4.6.2 ATTIC INSULATION AND VAPOR RETARDERS VERMICULITE Portions of the insulation in the attic appear to be a product called vermiculite, which was known to contain asbestos.  Testing of this material would be required, to con rm this assessment.  Typical recommendations are to leave the insulation alone and do not disturb the product, to prevent airborne dust.  If any remodel activity is to be done, which would involve disturbing the insulation, then proper testing and mitigation would be needed at that time.  Read this article for more information. Recommendation Contact a qualied environmental contractor Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 85 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 32 of 67 DESCRIPTIONS: The materials, styles and components present and observable are described as follows: Water Source PUBLIC Water Supply (Into Home) COPPER Water Distribution (Inside Home) COPPER, NOT VISIBLE Drain Waste and Vent Material CAST IRON, LEAD, GALVANIZED Water Heater Power Source NOT FOUND Manufacturer NO WATER HEATER Washer Drain Size 2" DIAMETER OBSERVATIONS AND RECOMMENDATIONS: The following items were Inspected and Observed, with any Recommended Actions noted: Plumbing System Inspection Overview The plumbing system and components in the home were tested and inspected, including the following items: Determining the location of the main water and gas shut o valves if visible, and inspecting for any visualconcerns. General visual inspection of exposed supply and drain piping material. Testing of all xtures at sinks, showers and tubs, and visually inspecting for leaks and condition. Testing of toilets for proper operation, general condition and properly secured. Inspection of the hot water system, age, and general condition. MAIN FUEL SHUT OFF LOCATION: At gas meter Left Rear Corner The main fuel shut-o is at the gas meter outside.  No visible concerns or odor of gas leaks were noted at this time. Note that we do not operate gas valves. 5: PLUMBING SYSTEM Information section-ZTYwNGIxOWMtMGE4Yy01OTVjLWFhMjktMmE3ZTBhYzMyZjU1 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 86 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 33 of 67 MAIN WATER SHUT-OFF LOCATION: Inspected - gate valve Cellar The main water shut-o was inspected, with no visible concerns noted.  This can be used to turn all of the water o to the home in the event of a plumbing emergency or when plumbing repairs are needed.  Currently, the valve is a knob operated "gate" type valve. These types of valves can be prone to stripping or leaking when operated. Consider having a plumber install a lever operated ball valve, which is less prone to leaking whenoperated. Note: we do not operate shut o valves - the inspection is a visual review for leaks. WATER PRESSURE MEASUREMENT: Unable to test water pressure I was not able to test water pressure, as the water was o. Water pressure is recommended to remain in the range of 35-80psi. Lower water pressure may show as low ow in the home, and higher pressure may put undue stress onttings resulting in leaks. Recommendations 5.4.1 WATER SUPPLY AND DISTRIBUTION SYSTEMS WATER NOT ON The water was not on for inspection, and we were unable to determine the condition of faucets, xtures, plumbing, pressure or volume, or test the drain plumbing throughout the home. A visual inspection only of the plumbing system and xtures was done.  Further evaluation of the plumbing system is needed when the water is brought back on. Recommendation Contact a qualied plumbing contractor. Immediate Action/Evaluation Recommendation 5.4.2 WATER SUPPLY AND DISTRIBUTION SYSTEMS DISCONNECTED SUPPLY PIPE CELLAR A supply pipe is disconnected. It appears the pipe needs connected or capped in order to prevent it from releasing water when the main water supply is turned on. Recommendation Contact a qualied plumbing contractor. Repair Recommendation 5.5.1 TOILETS AND BIDETS TOILET LOOSE - EVALUATION NEEDED BATHROOM Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 87 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 34 of 67 The toilet is loose at the connection to the oor. Repair is needed to secure the toilet to the oor properly, and may also involve re-setting the toilet on a new wax seal. I recommend a plumber repair or correct as needed.  At this time, it is unknown if any moisture damage or leaking is occurring around the toilet, and if any damage is present to the sub-ooring, framing, or surrounding materials, or whether any mold is present from this leaking.  When the toilet is removed to replace the wax seal, the surrounding area should be evaluated and investigated for any moisture damage or potential mold. This should be evaluated and corrected by qualied contractor. Recommendation Contact a qualied plumbing contractor. 5.6.1 FIXTURES AND FAUCETS WATER OFF AT FIXTURE ALL FIXTURES AND FAUCETS (BATHROOM, EXTERIOR AND KITCHEN) The water supply was o at all xtures. Have a plumber evaluate and verify for proper operation or repair as needed when water is restored. Recommendation Contact a qualied plumbing contractor. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 88 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 35 of 67 5.7.1 DRAIN, WASTE, AND VENT SYSTEMS S-TRAP NOTED UNDER SINK KITCHEN "S"-trap noted in the drain line under the sink. This type of set up may allow sewer gas to enter the home and should be recon gured. A quali ed plumber should evaluate and make all needed repairs. Recommendation Contact a qualied plumbing contractor. Repair Recommendation 5.7.2 DRAIN, WASTE, AND VENT SYSTEMS DRUM TRAP NOTED CRAWLSPACE A drum trap was noted in the home. This is is an old style plumbing trap that is no longer being used, and is not up to today standards and should be replaced. A further evaluation from a quali ed plumber is recommended for evaluation and possible replacement. Recommendation Contact a qualied plumbing contractor. Repair Recommendation 5.8.1 HOT WATER SYSTEMS, CONTROLS, CHIMNEYS, FLUES AND VENTS WATER HEATER NOT FOUND I was not able to locate a water heater in this home, or the area where the water heater would have been installed. Installation in the cellar or a main oor utility closet are the likely spots, however there is no sign of a rooftop vent or gas line rough-in for a gas water heater.  The main panel did not have circuit breakers that would typically be used for an electric water heater (two-pole 240V, 30-amp circuit breaker).   There are hot and cold taps on the ktichen and bathroom sinks, at the bath tub, and at the laundry room, indicating the home is plumbed for both cold and hot water.  Further evaluation is needed to locate or install a water heater. Recommendation Contact a qualied plumbing contractor. Immediate Action/Evaluation Recommendation 5.9.1 GAS DISTRIBUTION SYSTEMS ABANDONED GAS LINE LIVING ROOM Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 89 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 36 of 67 An abandoned or unused/uncapped gas line was noted. The line should be capped or removed as needed. If the line is to remain, a plumber should ensure a proper connection to the gas service and test for leaks. Recommendation Contact a qualied plumbing contractor. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 90 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 37 of 67 DESCRIPTIONS: The materials, styles and components present and observable are described as follows: Electrical Service Conductors OVERHEAD SERVICE Electrical Service Voltage Rating 240 VOLTS Service Amperage and Panel Capacity 125 AMP Main Disconnect Location AT MAIN PANEL Panel Type CIRCUIT BREAKERS Electric Panel Manufacturer CUTLER HAMMER, EATON Branch Wire 15 and 20 AMP COPPER Wiring Methods ROMEX, CLOTH-INSULATED WIRING, KNOB AND TUBE Ground Fault Circuit Interruptor (GFCI) Protection NO Arc Fault Circuit Interruptor (AFCI) Protection NO Smoke Detectors NO SMOKE DETECTORS INSTALLED Carbon Monoxide Detectors NO CO DETECTOR(S) INSTALLED OBSERVATIONS AND RECOMMENDATIONS: The following items were Inspected and Observed, with any Recommended Actions noted: Electrical System Inspection Overview: The electrical system and components in the home were inspected to include the following: The services entrance wiring and main electrical disconnect, including noting the location of the main shut o. Inspection of the main electrical panel and wiring. Testing a representative number of switches and outlets throughout the home. Review of GFCI outlets and if present in proper locations for safety. Review of AFCI outlets or circuit breakers if present. Inspection of smoke detectors and CO detectors in the home to ensure enough are present and in the proper recommended locations. We do our best to test items that operate via a remote control, when the remote is readily accessible.  Low voltage wiring systems, built-in audio systems, and any alarm systems present are outside the scope of a home inspection andare not tested. 6: ELECTRICAL SYSTEM Information section-MTMxZjMyZDYtMDM1My01YmRkLTljMzQtN2Q3ZDhiZjZjNzU4 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 91 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 38 of 67 MAIN DISCONNECT DEVICE AND LOCATION: Located and inspected Laundry Room The main electrical disconnect was located and inspected. The main electrical service disconnect can be used to shut o all power to the home in the event of an electrical emergency or when electrical repairs are needed.  MAIN & DISTRIBUTION PANELS, SERVICE AND GROUNDING EQUIPMENT, AND LOCATION: Main panel inspected - concerns noted below Laundry Room The main electrical panel for the property was identied at the noted location.  The interior of the main electric panelwas inspected and any specic concerns will be documented below. RECEPTACLE OPERATION (POLARITY AND GROUNDING): Two-prong outlets noted There are only older 2-prong ungrounded outlets in the home.  This is noted for information, and is to be expectedbased upon the age of the home.  If grounded outlets are needed in a specic area, an electrician will need to run ground lines and install grounded outlets.  An option is to install GFCI receptacles for added safety protection.  Consultwith an electrician for repair/upgrade advice. For more information, read this article from Scott Home Inspection. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 92 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 39 of 67 Recommendations 6.1.1 SERVICE ENTRANCE CONDUCTORS METER BOX GLASS BROKEN BACK PATIO The glass cover at the electric meter is broken. Contac the Utility company for repair. Recommendation Contact your local utility company Repair Recommendation 6.3.1 MAIN & DISTRIBUTION PANELS, SERVICE AND GROUNDING EQUIPMENT, AND LOCATION LABELING NEEDED AT PANEL Labeling is incomplete or missing at the electrical panel. Proper labeling is important to ensure that power is disabled correctly to any circuits or equipment being serviced.  I recommend an electrician or quali ed person verify labeling and correct for safety reasons. Recommendation Contact a qualied electrical contractor. Maintenance Item 6.3.2 MAIN & DISTRIBUTION PANELS, SERVICE AND GROUNDING EQUIPMENT, AND LOCATION DIFFERENT BREAKER TYPES The electrical panel contains circuit breakers from various manufacturers (Siemens and GE) that are not the same as the manufacturer of the electrical panel (Eaton/Cutler-Hammer).  Incompatibilities between breaker and panel manufacturer can cause electrical arcing and performance issues.  A qualied electrician should review this item, during the next electrical service visit, to ensure the compatibility is acceptable, or replace breakers as needed.  This is a potential safety issue that should be inspected and/or corrected by a quali ed electrician. Recommendation Contact a qualied electrical contractor. Repair Recommendation 6.4.1 BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES OPEN SPLICE ATTIC An open splice in wiring is present at the noted location. This represents a shock and re safety hazard.  This wiring should be enclosed in a secure junction box for safety. This should be evaluated and corrected by qualied contractor. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 93 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 40 of 67 Recommendation Contact a qualied electrical contractor. 6.4.2 BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES CONDUIT NEEDED BATHROOM There is wiring that is not installed in conduit on the interior of the home. This wiring is susceptible to mechanical damage in this installation, and should be repaired or replaced with wiring protected in conduit. This should be evaluated and corrected by qualied contractor. Recommendation Contact a qualied electrical contractor. Repair Recommendation 6.4.3 BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES KNOB AND TUBE WIRING PRESENT THROUGHOUT INTERIOR/EXTERIOR The home has old knob and tube wiring present and in use in areas.  This wiring is very old and may be becoming brittle, and can be dangerous if improper splices are made with modern wiring types. This wiring also should not be insulated over, as the wiring does not dissipate heat well and may overheat, presenting a possible re hazard. I recommend that you consider upgrading this wiring to modern wiring types. Consult an electrician for details. Recommendation Contact a qualied electrical contractor. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 94 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 41 of 67 6.4.4 BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES KNOB AND TUBE EXPOSED IN ATTIC The attic is poorly insulated and "Knob and Tube" wiring is present.  As a safety rule Knob and Tube wiring should never have insulation covering this wire or over heating can occur. If new insulation is added, an electrician should rst replace knob and tubing wires with updated wiring. Recommendation Contact a qualied electrical contractor. Repair Recommendation 6.5.1 FIXTURES, SWITCHES AND CONNECTED DEVICES MISSING GLOBE BATHROOM, BEDROOM, KITCHEN, PORCH Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 95 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 42 of 67 The light xture is missing the glass or globe cover.  Replacement glass/globe or a new xture should be installed as needed. Recommendation Contact a qualied electrical contractor. 6.5.2 FIXTURES, SWITCHES AND CONNECTED DEVICES BURNED OUT BULB LIVING ROOM, FRONT PORCH The xture appeared to have a burnt out light bulb. A replacement bulb should be installed, and the xture veried for proper operation  Recommendation Contact a handyman or DIY project Maintenance Item 6.5.3 FIXTURES, SWITCHES AND CONNECTED DEVICES HANGING FIXTURE FRONT BEDROOM CLOSET Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 96 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 43 of 67 Light bulbs unsecured and hanging from wire are often found in very old homes, but are a safety hazard. Light xtures should be secured, and electrician should repair. Recommendation Contact a qualied electrical contractor. 6.5.4 FIXTURES, SWITCHES AND CONNECTED DEVICES SWITCH NOT INSTALLED CELLAR The light switch is not installed in a box, protected by a switch plate. This is a safety hazard. An electrician should repair. Recommendation Contact a qualied electrical contractor. Repair Recommendation 6.6.1 RECEPTACLE OPERATION (POLARITY AND GROUNDING) COVER PLATE MISSING FRONT BEDROOM A missing cover plate was noted.  A cover plate should be installed for safety. This should be evaluated and corrected by quali ed contractor. Recommendation Contact a qualied handyman. Maintenance Item 6.6.2 RECEPTACLE OPERATION (POLARITY AND GROUNDING) FLOOR OUTLET IMPROPER REAR BEDROOM The oor outlet is not the proper type for in oor installation, and should be replaced with a oor outlet with protective covers, to prevent damage.  Recommendation Contact a qualied electrical contractor. Maintenance Item 6.6.3 RECEPTACLE OPERATION (POLARITY AND GROUNDING) NO INSTALLED RECEPTACLE BATHROOM Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 97 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 44 of 67 There is not an installed receptacle at the noted location.  I recommend consulting with an electrician about installing a receptacle in this area as desired. Recommendation Contact a qualied electrical contractor. 6.7.1 OPERATION OF GFCI (GROUND FAULT CIRCUIT INTERRUPTERS) NO GFCI PROTECTION KITCHEN The outlets at the locations noted are not properly GFCI protected. GFCI outlets provide protection from electric shock and are required to be installed near sources of water, such as at kitchens, bathrooms, laundry rooms, garages, and outdoors.  An electrician should install GFCI outlets where needed for safety protection.  Read this article for more information. Recommendation Contact a qualied electrical contractor. Repair Recommendation 6.8.1 SMOKE DETECTORS NO SMOKE DETECTORS No smoke detectors are present in the home. Units need to be installed at this time for safety. Units should be present on each oor of the home and within each sleeping room/area. This helpful resource has important tips related to smoke alarm safety. Recommendation Contact a qualied electrical contractor. Repair Recommendation 6.9.1 CARBON MONOXIDE ALARMS NO CO DETECTORS FOUND Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 98 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 45 of 67 No CO detectors were found in the home at the time of the inspection.  Detectors are needed at this time, outside all sleeping areas as required. Colorado state law requires that all homes being purchased are required to have Carbon Monoxide Alarms installed by the seller.  This is a requirement for homes that have a fuel-red heating system or appliance, a replace, or an attached garage.  The CO Alarm(s) must be installed within 15 feet of the entrance to each sleeping room. This can be in a hallway outside bedrooms.  If bedrooms are located on more than one level, then a separate CO alarm must be installed outside each bedroom area on each level.  For more information, read our article on this topic. Recommendation Contact a handyman or DIY project Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 99 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 46 of 67 DESCRIPTIONS: The materials, styles and components present and observable are described as follows: Primary Heating System FORCED AIR, GAS FLOOR FURNACE   Heat System Brand SUNSHINE MANTLE COMPANY Energy Source NATURAL GAS Approximate Age > 50 YEARS OLD Number of Heat Systems (Excluding Wood) ONE Filter Type N/A Types of Fireplaces CONVENTIONAL Number of Operable Fireplaces ONE OBSERVATIONS AND RECOMMENDATIONS: The following items were Inspected and Observed, with any Recommended Actions noted: Heating System Inspection Overview: The heating system for the home was visually inspected and tested, with testing including the following: Turning on the system at the operating control and ensuring the system operated and heat was delivered from the system. Opening readily accessible panels to visually inspect the system. Inspecting the venting system, ues and chimneys, where present. Regular service of the HVAC system is important for ecient operation and to achieve maximum life from equipment;equipment can fail at any time without warning; most manufacturers recommend annual service. 7: HEATING SYSTEM Information Recommendations section-OTBmYTc2ZjYtNzJkOS01NGQ0LThkZWEtMmEyNzg4MDdlMTZl 7.1.1 HEATING EQUIPMENT OLD GAS FLOOR FURNACE KITCHEN The primary heating system appears to be an in-oor furnace. The furnace was not operable and appears to be very old and partially dismantled. There was no ue pipe to exhaust gas outside the home, a non- vented gas furnace would be a safety hazard for modern use. The location of the furnace would create heat (likely about 120-150 degrees F) directly at the large oor grate, which would be a hazard particularly for pets and young/small children.   This installation is somewhat typical for a home of this age (over 100 years old), but is not suitable for modern use. A new heating system would need to be installed, at which time it would be important to provide heat to all rooms in the home. Consult with a Heating and Cooling professional for options and costs to provide heat to this home. Some possible options may include a forced air furnace with ducting in the attic, electric baseboard heat, or split-system heat pump with distribution heads in several areas. Recommendation Contact a qualied heating and cooling contractor Immediate Action/Evaluation Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 100 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 47 of 67 7.2.1 DISTRIBUTION SYSTEMS (INCLUDING FANS, DUCTS, AIR FILTERS, REGISTERS) NO HEAT IN ROOMS There is no permanent heat source installed at most rooms in the home. This is somewhat typical of very old homes, that would have been heated with a wood stove, replace, or wall/oor heater in a single room.  If a separate heat source is required in this area, an HVAC contractor should be consulted to determine the best method to add heating. Recommendation Contact a qualied heating and cooling contractor Repair Recommendation 7.3.1 SOLID-FUEL FIREPLACES, WOODSTOVES, AND CHIMNEYS DAMPER STUCK SHUT LIVING ROOM (RIGHT SIDE CHIMNEY) The damper for replace is not opening or is seized. Repairs should be made so unit works properly. I recommend a qualied contractor inspect and repair as needed. Recommendation Contact a qualied replace contractor. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 101 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 48 of 67 DESCRIPTIONS: The materials, styles and components present and observable are described as follows: Ceiling Materials PLASTER Wall Material PLASTER Major Floor Coverings WOOD, LINOLEUM Interior Doors HOLLOW CORE, WOOD Window Types SINGLE PANE, SLIDERS, SINGLE- HUNG Cabinetry WOOD Countertop LAMINATE Exhaust Fans FAN ONLY Dryer Vent METAL Dryer Power Source 220 VOLT ELECTRIC 3-PRONG PLUG OBSERVATIONS AND RECOMMENDATIONS: The following items were Inspected and Observed, with any Recommended Actions noted: Interior Inspection Overview An inspection of the interior surfaces was performed throughout the home to include visually inspecting the ceilings, walls, oors, doors and windows of each room.  We operated and tested a representative number of doors andwindows for proper operation.  Countertops and a representative number of cabinets were inspected and tested.  Steps and stair railings were inspected for any safety concerns.  While we operate window blinds in order to access thewindows to operate and inspect them, the overall condition of window coverings and treatments is outside the scope of a home inspection. Every eort is made to inspect all interior areas but we cannot move occupant furniture or belongings.  8: INTERIOR Information section-YzZjZTk0MzctNzQ4Zi01NDYzLTg3OTYtYTUyZDBjODhkMjM3 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 102 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 49 of 67 General photos The following photos document the general condition of interior areas if applicable. Areas with a specic concern ordefect are noted separately, referencing the specic issue and area of concern. Recommendations 8.1.1 CEILINGS MOISTURE STAINING PRESENT REAR BEDROOM Moisture staining was present.  No moisture was currently present or evident in this area, and it may be that whatever leak had occurred has since been repaired. Inquire with seller for more information on this item.  Otherwise, monitor these areas for further moisture concerns, and repair as needed. Recommendation Contact a qualied drywall contractor. Maintenance Item 8.1.2 CEILINGS CEILING CRACKS SEVERAL AREAS Cracking was noted at the ceilings in areas of the house. These types of cracks are typical of minor settling or shrinkage, and should be monitored for further movement, and patched and repaired as needed. Recommendation Contact a qualied drywall contractor. Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 103 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 50 of 67 8.2.1 WALLS WALL CRACKS - STRUCTURAL CONCERNS Signicant cracking was noted in the walls in the home. These cracks may indicate a structural concern. Consult with a structural engineer for evaluation. Recommendation Contact a qualied structural engineer. Repair Recommendation 8.2.2 WALLS UNINSULATED WALLS/VERMICULITE INSULATION Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 104 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 51 of 67 A limited inspection showed that the framed walls do not appear to be insulated, and would benet from adding blown in insulation.  This can be accomplished by having an insulation contractor blow in insulation into the wall cavities, either by drilling access holes in the outside wall siding or inside plaster or drywall.  It is recommended that you consult with an insulation company to verify, and to understand the process and associated costs.  Note that vermiculite insulation was seen in the attic, and is also found in some areas of the home. Vermiculite may have been used as wall insulation, but also may have fallen through cavities in framing into the walls in areas. This material may contain asbestos, sampling is needed prior to any re-insulating or remodeling as a safety item. An Environmental Contractor should evaluate and sample, an Insulation Contractor can then advise on adding insulation. For more information on insulating existing homes, visit this useful link. Recommendation Contact a qualied insulation contractor. 8.2.3 WALLS PEELING PAINT, POSSIBLE LEAD PAINT WALLS AND CEILINGS The paint is showing general peeling and wear at the interior walls and ceilings in areas. Re-painting will be needed in the near future. Based upon the age of the home, there is a risk of lead-based paint being present, and proper handling or mitigation is needed. The EPA has new guidelines for contractors to follow when renovating or repairing homes where lead paint risks are present.  For more information, visit epa.gov/lead, or check out this article. Recommendation Contact a qualied painting contractor. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 105 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 52 of 67 8.3.1 FLOORS VINYL FLOORING CONCERNS KITCHEN AND BATHROOM The vinyl ooring is peeling up at the seams and/or is cosmetically damaged in areas, and will need to be replaced.  This should be evaluated and corrected by a quali ed contractor. Recommendation Contact a qualied ooring contractor Repair Recommendation 8.3.2 FLOORS WOOD FLOORING DAMAGED AND WARPED LIVING ROOM Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 106 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 53 of 67 The wood ooring is damaged and warped, in a manner typical of water damage. The damage is near the front door, I cannot determine the source of the water. It is possible that wet crawlspace soils have caused this damage, it is also possible that the damage is from water coming into the home at some point.  In any case, the ooring will need to be removed and the framing beneath evaluated, with repairs as needed and ooring replacement. Recommendation Contact a qualied ooring contractor 8.4.1 DOORS DOOR RUBS FLOORING FRONT BEDROOM The door rubs the ooring when opened, which makes the door di cult to operate and may lead to premature wear of the ooring. This door needs to be adjusted or trimmed at the bottom. This should be evaluated and corrected by a quali ed contractor. Recommendation Contact a qualied door repair/installation contractor. Maintenance Item 8.5.1 WINDOWS CRACKED WINDOW PANE LIVING ROOM The window is cracked at the glass pane. Cracked glass should be replaced to prevent injury or damage, or a new window should be installed to repair.  This should be evaluated and corrected by a quali ed contractor. Recommendation Contact a qualied window repair/installation contractor. Repair Recommendation 8.5.2 WINDOWS OLD SINGLE PANE WOOD WINDOWS Most of the windows in the home are older, single pane wood windows, and appear to be poorly sealed, and will have air leakage around the edges.  I recommend that you consider replacing the windows.   For more info on energy ecient windows, read this article. Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 107 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 54 of 67 Recommendation Contact a qualied window repair/installation contractor. 8.5.3 WINDOWS WINDOWS NOT STAYING UP FRONT BEDROOM The window would not stay in the open position when tested. Windows should be serviced by a qualied window contractor to ensure proper operation and security. Recommendation Contact a qualied window repair/installation contractor. Repair Recommendation 8.7.1 BATHROOM TUB / SHOWER SURROUND CAULK TUB BATHROOM I recommend re-sealing with silicone caulk along the perimeter of the tub and surround, to prevent potential moisture damage in this area. This should be evaluated and corrected by a quali ed contractor. Recommendation Contact a qualied handyman. Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 108 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 55 of 67 8.8.1 VENTING SYSTEMS (KITCHENS, BATHS, AND LAUNDRY) RECIRC FANS ONLY BATHROOM The bathroom exhaust fan appears to be a type that recirculate the air, rather than venting to the exterior. The fan may vent into the attic. I recommend investigating replacing these with units that ventilate to the exterior. This should be evaluated and corrected by a qualied contractor.  Recommendation Contact a qualied HVAC professional. Repair Recommendation 8.8.2 VENTING SYSTEMS (KITCHENS, BATHS, AND LAUNDRY) EXHAUST FAN NEEDS CLEANING BATHROOM The exhaust fan is very dusty and dirty. Cleaning is necessary for proper operation. A qualied person should evaluate and make any needed repairs. Recommendation Contact a handyman or DIY project Maintenance Item 8.9.1 STEPS, STAIRWAYS, BALCONIES AND RAILINGS HANDRAIL NEEDED CELLAR The handrail for the stairs is missing. A carpenter should install a handrail for safety. Recommendation Contact a qualied carpenter. Repair Recommendation 8.10.1 EVIDENCE OF PESTS EVIDENCE OF RODENTS KITCHEN, FRONT BEDROOM Rodent droppings and traps or bait were noted in the home in areas. It appears likely that the home has some mice present, but I am unable to determine if there is an ongoing problem. Evidence of pests in one area of the home may be an indication that they are present in other areas of the home as well.  A home inspection is not a pest-inspection, and further evaluation by a qualied pest specialist is recommended at this time. Recommendation Contact a qualied pest control specialist. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 109 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 56 of 67 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 110 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 57 of 67 DESCRIPTIONS: The materials, styles and components present and observable are described as follows: Dishwasher Brand NONE Disposer Brand NONE Exhaust / Range hood NONE Range / Oven WESTINGHOUSE Built In Microwave NONE Refrigerator FRIGIDAIRE Washer / Dryer NONE OBSERVATIONS AND RECOMMENDATIONS: The following items were Inspected and Observed, with any Recommended Actions noted: General Appliance Inspection/Testing Notes: The appliances are all turned on and run, to ensure that they operate.  The testing done is general in nature, and not exhaustive.  We do not verify appliance thermostats including their calibration, adequacy of heating elements, selfcleaning oven cycles, indicator lights, door seals, timers, clocks, timed features, ice-maker production, and other specialized features of the appliances. Note that if the occupant has dishes in the dishwasher or clothes in the washeror dryer, we do not operate them and will note the limitation in our ability to completely inspect and test these units. DISHWASHER: No dishwasher present There is not currently a dishwasher installed in the home.  This is noted for your information. FOOD WASTE DISPOSER: No food waste disposer present There is not currently a food waste disposer installed in the home.  This is noted for your information. 9: BUILT-IN APPLIANCES Information section-MDcwNjY0MDYtYjM2YS01Njk3LTg0OWUtNzEyYjAyMWE1YWM4 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 111 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 58 of 67 MICROWAVE COOKING EQUIPMENT: No microwave oven present There is not currently a microwave oven installed in the home.  This is noted for your information. CLOTHES WASHER/DRYER: No washer/dryer present There are not currently clothes washer and dryer units installed in the home. This is noted for your information. Recommendations 9.2.1 RANGES / OVENS / COOKTOPS OLD OVEN - NOT TESTED The oven is a very old electric oven/cooktop. Based on other items found in the home and the appearance of the appliance, it is likely 60-70 years old. I did not test this appliance, the home has been vacant for some time and I cannot verify safe operation. There are rodent droppings in the storage drawer.  Replacement is likely needed, however this may be considered and antique or collectible item and I recommend cleaning, testing and further evaluation if you wish to use or sell. Recommendation Contact a qualied appliance repair professional. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 112 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 59 of 67 9.3.1 RANGE HOOD NO VENT HOOD There is no exhaust hood or vent in the kitchen. This is noted for your information.  I recommend that you consider installing a range hood at this time. For more information about kitchen ventilation systems, check out this article. Recommendation Contact a qualied appliance repair professional. Maintenance Item 9.6.1 REFRIGERATOR OLDER UNIT - REPLACEMENT RECOMMENDED A limited visual inspection was performed on the refrigerator, to verify that the unit is operating and that the inside temperatures are cool/cold, indicating operation.  The door seals are inspected, and the ice maker and/or water dispenser checked, when present, for any leaks or concerns.   This is a limited inspection and is not a complete evaluation of the refrigerator.  While the unit is working, the unit is very old, and likely consumes a considerable amount of electricity.  The refrigerator was very dirty inside, and the compressor was noisy on starting. Replacement with a new, Energy Star rated unit should be considered, to improve eciency. Recommendation Contact a qualied appliance repair professional. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 113 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 60 of 67 General Photos The following photos document the general condition of the outbuilding if applicable. These photos reect areas that have no existing concerns at this time. Areas with a specic concern or defect are noted separately, referencing thespecic issue and area of concern. ROOF STRUCTURE AND ATTIC: No immediate concerns noted Front Structure The roof framing was visually inspected, with no structural or moisture concerns noted. 10: OUTBUILDING Information section-NGRlYTU0MmYtNGQ0NC00YWYzLTlkYWEtNjI2OGYyNmQ5ZDZi Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 114 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 61 of 67 ROOF STRUCTURE AND ATTIC: Vaulted ceilings present Rear structure There is no accessible attic space over the vaulted ceilings, and I am unable to evaluate structure or determineinsulation levels in these areas. No leaks or immediate structural concerns were noted with this limited visual inspection. Recommendations 10.1.1 WALL COVERING, FLASHING, TRIM REPAINTING NEEDED EXTERIOR THROUGHOUT The paint is showing general fading on the exterior siding, and the caulking is showing minor cracking around windows and doors and at the trim in areas. Re-painting of the siding will be needed in the near future.  This is a maintenance item. This should be evaluated and corrected by a quali ed contractor. Recommendation Contact a qualied painting contractor. Maintenance Item 10.1.2 WALL COVERING, FLASHING, TRIM FASCIA NEEDED LEFT SIDE Fascia is needed where the roof overhang meets the gutters, to ensure water enters the gutters. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 115 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 62 of 67 10.1.3 WALL COVERING, FLASHING, TRIM REPLAIR/REPLACE DOORS Doors are older and some are stuck,  all have single pane glass or broken and boarded up panes, and all need painting. These older doors have poor energy eciency.  Consider replacement with newer solid core doors and thermal pane glass. Repair Recommendation 10.2.1 FOUNDATIONS SETTLING INDICATING STRUCTURAL CONCERNS The foundation was not entirely visible, and appears to be a concrete slab-on-grade. Signi cant movement and cracking in exterior walls and settlement of the oor indicates structural concerns. Evaluation by a structural engineer is recommended, with repair as needed. Immediate Action/Evaluation Recommendation 10.3.1 GRADING AND DRAINAGE TREES TOO CLOSE LEFT AND RIGHT SIDES Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 116 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 63 of 67 Trees are planted near the foundation, and/or are in contact with the exterior and roof of the home.  I recommend removal of these trees to prevent damage to the foundation from root pressure, and to the exterior and roong material from abrasion.  This is a maintenance item. Recommendation Contact a qualied tree service company. 10.4.1 GUTTERS AND DOWNSPOUTS DOWNSPOUT DISCONNECTED LEFT SIDE The downspout is disconnected from the gutter, and also needs an extension to carry water a minimum of 3-5 feet away from the structure in order to minimize possibility of foundation settling.  Recommendation Contact a qualied gutter contractor Repair Recommendation 10.5.1 ROOF COVERINGS SNOW COVER - LIMITED INSPECTION METAL ROOF AT REAR The roof was not inspected due to the height, and the presence of snow on the roof.  I am unable to walk the roof, or make any determination as to the condition or quality of the roof material.  Recommendation Contact a qualied roong professional. Repair Recommendation 10.5.2 ROOF COVERINGS TREE LIMBS NEAR ROOF The tree limbs that are in contact with or hanging near the roof should be trimmed, to prevent possible damage from abrasion. Recommendation Contact a qualied tree service company. Maintenance Item Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 117 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 64 of 67 10.5.3 ROOF COVERINGS ROOF- END OF LIFE - REPLACE NOW ASPHALT SHINGLE The roof covering is older and is at the end of its service life.  Signicant granule loss and wear to the shingles was observed. As the roof continues to age, leaks can develop.  I recommend replacement of the roof covering at this time.  A roong contractor should be consulted to obtain estimates on roof replacement. Recommendation Contact a qualied roong professional. Immediate Action/Evaluation Recommendation 10.5.4 ROOF COVERINGS TWO OR MORE LAYERS SHINGLED ROOF Two or more layers of roof material are present. With the next roof change, all material will need to be stripped o.  Also, homeowners insurance coverage may be impacted by the presence of multiple layers of roong material; consult with an insurance agent or roong professional for more information. Recommendation Contact a qualied roong professional. Maintenance Item 10.7.1 BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES EXTERIOR CONDUIT NEEDED There is wiring that is not installed in conduit at the exterior. This wiring is susceptible to mechanical damage and weathering in this installation, and should be repaired or replaced with wiring protected in conduit. Recommendation Contact a qualied electrical contractor. Immediate Action/Evaluation Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 118 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 65 of 67 10.7.2 BRANCH CIRCUIT CONDUCTORS AND OVERCURRENT DEVICES KNOB AND TUBE WIRING PRESENT THROUGHOUT The building has old knob and tube wiring present and in use in areas.  This wiring is very old and may be becoming brittle, and can be dangerous if improper splices are made with modern wiring types. This wiring also should not be insulated over, as the wiring does not dissipate heat well and may overheat, presenting a possible re hazard. I recommend that you consider upgrading this wiring to modern wiring types. Consult an electrician for details. Recommendation Contact a qualied electrical contractor. Repair Recommendation 10.8.1 RECEPTACLE OPERATION (POLARITY AND GROUNDING) 2-PRONG OUTLETS PRESENT There are still many older 2-prong and ungrounded outlets in the home.  This is noted for information, and is to be expected based upon the age of the home.  If grounded outlets are needed in a speci c area, an electrician will need to run ground lines and install grounded outlets.  An option is to install GFCI receptacles for added safety protection.  Consult with an electrician for repair/upgrade advice. For more information, read this article. Recommendation Contact a qualied electrical contractor. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 119 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 66 of 67 10.9.1 OPERATION OF GFCI (GROUND FAULT CIRCUIT INTERRUPTERS) NO GFCI PROTECTION The outlets at the locations shown in the pictures were not properly GFCI protected. While this may not have been required when the home was built, GFCI outlets provide protection from electric shock and are now required to be installed near sources of water, such as at kitchens, bathrooms, laundry rooms, and outdoors.  I recommend that an electrician install GFCI outlets where needed for safety protection. Read this article for more information. Recommendation Contact a qualied electrical contractor. Repair Recommendation 10.10.1 HEATING EQUIPMENT OLD WALL FURNACE - NOT TESTED REAR STRUCTURE There is an old gas-powered wall furnace present. The furnace is very old and the pilot was not lit so the furnace was not tested. I also not verify active gas service to the furnace.  When the outbuilding is remodeled, a new heating system will need to be installed. Recommendation Contact a qualied heating and cooling contractor Repair Recommendation 10.11.1 WALLS AND CEILINGS POOR CONDITION OVERALL REAR STRUCTURE Walls and ceilings in the nished rear structure were in overall poor condition. If you wish to use this as a studio, remodeling will likely be needed. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 120 of 200 3132 8th St Andrew Stevens Scott Home Services, LLC Page 67 of 67 Recommendation Contact a qualied professional. 10.12.1 DOORS DOOR(S) RUBS CARPET BACK ROOM The door rubs the carpet when opened, which makes the door di cult to operate and may lead to premature carpet wear. This door needs to be adjusted or trimmed at the bottom. Recommendation Contact a qualied door repair/installation contractor. Repair Recommendation 10.13.1 WINDOWS CRACKED WINDOW PANE BACK ROOM The window is cracked at the glass pane. Cracked glass should be replaced to prevent injury or damage, or a new window should be installed to repair.   Recommendation Contact a qualied window repair/installation contractor. Repair Recommendation 10.13.2 WINDOWS OLD SINGLE PANE WOOD WINDOWS Most of the windows in the home are older, single pane wood windows, and appear to be poorly sealed, and will have air leakage around the edges.  Many are also stuck or painted shut, or are di cult to operate or will not latch.  Recommend that you consider replacing the windows.  This article has a helpful section on windows, and discusses repair versus replacement.  Or check out our blog about window energy eciency.  Recommendation Contact a qualied window repair/installation contractor. Repair Recommendation Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 121 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 122 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 123 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 124 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 125 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 126 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 127 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 128 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 129 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 130 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 131 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 132 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 133 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 134 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 135 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 136 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 137 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 138 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 139 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 140 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 141 of 200 November 1, 2024 Sopris Development Mr. Andrew Stevens E: A.Stevens@SoprisDevelopment.com LEAD-BASED PAINT INSPECTION REPORT OF 3132 8th Street, Boulder, Colorado Prepared By: Derek D’Avignon State of Colorado Certified Lead Inspector #10147 Lead Evaluation Firm #21158 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 142 of 200 TABLE OF CONTENTS DESCRIPTION 1.0 INTRODUCTION 2.0 SCOPE OF WORK 3.0 QUALIFICATIONS 4.0 METHOD OF TESTING 5.0 TESTING PROTOCOL 6.0 SUMMARY OF RESULTS 7.0 RECOMMENDATIONS 8.0 INSPECTION LIMITATIONS 9.0 DISCLOSURE Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 143 of 200 LEAD-BASED PAINT INSPECTION REPORT 1.0 INTRODUCTION This report presents the results of Boulder Environmental, Inc.’s lead-based paint inspection of the single-family residence located at 3132 8th Street, Boulder, Colorado. The inspection was performed on October 31, 2024 in general accordance with the EPA's Regulations on Residential Property Renovation at 40 CFR 745.80, Subpart E and the U.S. Department of Housing and Urban Development (HUD) guidelines for lead based paint inspections. Any painted surfaces excluded in this study must be presumed to be lead regulated. 2.0 SCOPE OF WORK The purpose of this inspection is to identify and assess painted components at the subject property which will be subject to demolition/renovation activities and to determine the level of lead hazard control needed at the property. The intent of this study was to identify the presence of lead-based paint above specified regulatory action levels. If lead- based paint were found, the inspection would identify the architectural components and their respective lead concentrations in such a manner that this report could be used as a basis for subsequent abatement activity. 3.0 QUALIFICATIONS Derek D’Avignon of Boulder Environmental, Inc. performed the inspection at the structure using a Niton XFB-3 (XRF) spectrum analyzer instrument. Derek D’Avignon has attended the manufacturer’s radiation safety course for operation and handling of the instrument and completed an EPA sponsored curriculum of Lead Inspector Training. Boulder Environmental, Inc. is a state of Colorado Lead Evaluation Firm #21158 and Derek D’Avignon is currently State of Colorado certified as a Lead Based Paint Inspector #10147. 4.0 METHOD OF TESTING The method employed for testing painted surfaces was with an X-ray fluorescence (XRF) analyzer. The Niton XFB-3 (XRF) spectrum analyzer, serial # 26105 was re-sourced in November 2019. The instrument was calibrated to the manufacturer's specifications and was also periodically verified against known lead samples produced by the National Institute of Standards and Testing (NIST) Standard Reference Material (SRM) 2579 lead film (1.0mg/cm2). Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 144 of 200 5.0 TESTING PROTOCOL Testing was conducted in accordance with 40 CFR Part 745 Lead; Renovation, Repair, and Painting Program; Lead Hazard Information Pamphlet; Notice of Availability; Final Rule. XRF readings were taken on representative painted surfaces on each building component in each room equivalent. HUD defines lead-based paint as lead equal to or greater than 1.0 mg/cm2. All XRF readings below the regulatory definition are considered negative and all readings at and above this level are considered positive. 6.0 SUMMARY OF RESULTS SAMPLE SUMMARY TABLE Location Component Color Substrate Lead mg/cm2 Lead- based paint? Living room Wall, north Tan Plaster 0.3 No Ceiling Tan Plaster 0.02 No Floor Stained Wood 0.06 No Door, west Stained Wood 0.01 No Door casing, west Stained Wood 0 No Window, west Stained Wood 0 No Window casing, west Stained Wood 0 No Window, west Stained Wood 0 No West bedroom Ceiling White Plaster 0.10 No Wall, north White Plaster 0.24 No Wall, north Stained Wood 0.01 No Wall, easty Yellow Fiberboard 0.24 No Door, south Stained Wood 0 No Door casing, south Stained Wood 0.04 No Window, north Stained Wood 0 No Window casing, north Stained Wood 0 No Closet wall, east White Plaster 0.03 No Closet baseboard, east White Wood 0.07 No Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 145 of 200 SAMPLE SUMMARY TABLE Location Component Color Substrate Lead mg/cm2 Lead- based paint? East bedroom Wall, south Blue Plaster 0.10 No Ceiling White Plaster 0.04 No Door, west Stained Wood 0 No Door casing, west Stained Wood 0 No Baseboard, west Stained Wood 0 No Window, east Stained Wood 0 No Window casing, east Stained Wood 0 No Closet wall, east White Wood 0.04 No Closet ceiling White Wood 0.04 No Kitchen Wall, south Gray Plaster 0.04 No Ceiling Tan Plaster 0.04 No Cabinet, west White Wood 0.11 No Cabinet door, west Stained Wood 0 No Cabinet, north White Wood 0.16 No Window, north White Wood 0.07 No Window casing, north White Wood 0.07 No Door, east White Wood 0.08 No Mud room Wall, north Tan Plaster 0.02 No Ceiling Tan Plaster 0.04 No Window, north White Wood 0.14 No Window casing, north White Wood 0.17 No Door, east White Wood 1.7 YES Door casing, east White Wood 0.09 No Door, south (stairs) White Wood 1.3 YES Door casing, south White Wood 0.11 No Stairwell wall, east White Drywall 0.11 No Bathroom Wall, north White Plaster 0.16 No Ceiling White Plaster 0.16 No House exterior west Door casing White Wood 3.3 YES Window casing White Wood 4.4 YES Screen window Black Wood 0.19 No Bedroom window White Wood 4.4 YES Porch ceiling White Wood 3.6 YES Clap-board siding White Wood 3.9 YES Shake siding White Wood 3.9 YES Eave White Wood 4.1 YES Fascia White Wood 4.3 YES Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 146 of 200 Location Component Color Substrate Lead mg/cm2 Lead- based paint? House exterior east Patio roof White Wood 0.8 No Gutter White Metal 2.4 YES Column White Metal 0.30 No Shed Exterior north wall White Metal 3.2 YES Fascia, west White Wood 2.4 YES Garage Window, north White Wood 9.1 YES Door casing, east White Wood 9.7 YES West shop Ceiling White Fiberboard 0 No Floor Gray Concrete 0.18 No Door, west Stained Wood 0.03 No Door, north White Wood 0.9 No Window, south Stained Wood 0 No Window casing, south Stained Wood 0 No Shelf, west Stained Wood 0 No East shop Ceiling White Fiberboard 0 No Wall, west Stained Wood 0 No Window, east Stained Wood 0 No Window casing, east Stained Wood 0 No Garage/ shop north exterior Window casing White Wood 4.0 YES Screen window Black Wood 3.1 YES Gutter White Metal 1.0 YES Window ceiling White Wood 4.0 YES Door White Wood 3.7 YES Door casing White Wood 4.0 YES Garage, west exterior Doors White Wood 1.3 YES 7.0 RECOMMENDATIONS Common renovation activities like sanding, cutting, and demolition can create hazardous lead dust and chips by disturbing lead-based paint, which can be harmful to adults and children. To protect against this risk, on April 22, 2008, EPA issued a rule requiring the use of lead-safe practices and other actions aimed at preventing lead poisoning. Under the rule, beginning April 22, 2010, contractors performing renovation, repair and painting projects Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 147 of 200 that disturb lead-based paint in homes, childcare facilities, and schools built before 1978 must be certified and must follow specific work practices to prevent lead contamination. EPA requires that firms performing renovation, repair, and painting projects that disturb lead-based paint in pre-1978 homes, childcare facilities and schools be certified by EPA and that they use certified renovators who are trained by EPA-approved training providers to follow lead-safe work practices. Individuals can become certified renovators by taking an eight-hour training course from an EPA-approved training provider. Federal law requires contractors that are hired to perform renovation, repair, and painting projects in homes, childcare facilities, and schools built before 1978 that disturb painted surfaces to be certified and follow specific work practices to prevent lead contamination. The work practices the contractor must follow include these three simple procedures, described below: 1. Contain the work area. The area must be contained so that dust and debris do not escape from that area. Warning signs must be put up and plastic or other impermeable material and tape must be used as appropriate to: • Cover the floors and any furniture that cannot be moved. • Seal off doors and heating and cooling system vents. These will help prevent dust or debris from getting outside the work area. 2. Avoid renovation methods that generate large amounts of lead-contaminated dust. Some methods generate so much lead-contaminated dust that their use is prohibited. They are: • Open flame burning or torching. • Sanding, grinding, planing, needle gunning, or blasting with power tools and equipment not equipped with a shroud and HEPA vacuum attachment. • Using a heat gun at temperatures greater than 1100°F. There is no way to eliminate dust, but some renovation methods make less dust than others. Contractors may choose to use various methods to minimize dust generation, including using water to mist areas before sanding or scraping; scoring paint before separating components; and prying and pulling apart components instead of breaking them. 3. Clean up thoroughly. The work area should be cleaned up daily to keep it as clean as possible. When all the work is done, the area must be cleaned up using special cleaning methods before taking down any plastic that isolates the work area from the rest of the home. The special cleaning methods should include: • Using a HEPA vacuum to clean up dust and debris on all surfaces, followed by • Wet wiping and wet mopping with plenty of rinse water. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 148 of 200 When the final cleaning is done, look around. There should be no dust, paint chips, or debris in the work area. If you see any dust, paint chips, or debris, the area must be re- cleaned. 8.0 INSPECTION LIMITATIONS This inspection was planned, developed, and implemented based on experience in performing lead-based paint inspections by Boulder Environmental, Inc. This inspection was conducted in accordance with 40 CFR Part 745 Lead; Renovation, Repair, and Painting Program; Lead Hazard Information Pamphlet; Notice of Availability; Final Rule. Boulder Environmental Inc. utilized state-of-the-art practices and techniques in accordance with regulatory standards while performing this inspection. A copy of personnel certifications and equipment licenses has been provided for your review. 9.0 DISCLOSURE Because lead-based paint was identified on this site, a copy of this report or a summary must be provided to new lessees (tenants) and purchasers of this property under Federal law (Title 24 Code of Federal Regulations (CFR), part 35 and Title 40, CFR, part 745 before they become obligated under a lease or sales contract. The complete report must also be provided to new purchasers, and it must be made available to new tenants. Property owners (lessors) and sellers are also required to distribute and educational pamphlet and include warning language in their leases or sales contracts to ensure that parents have the information they need to protect their children from lead-based paint hazards. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 149 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 150 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 151 of 200 CHC Training Environmental Compliance Certification Experts www.chctraining.com 303.412.6360 855.60.CERTIFY 1775 W. 55th Avenue Denver, Colorado 80221 United States of America Certificate of Achievement This certificate is awarded to: Derek D'Avignon Has successfully completed the required training hours and satisfactorily passed the examination for the initial course entitled: Lead-Based Paint Inspector Course Dates: Examination Date: Interim Expiration Date: Expiration Date: Course Hours: Michael A. BenedettoMichael A. Benedetto InstructorCEO & Training Program Manager Danaya N. WilsonDanaya N. Wilson Renew this CertificateVerify this Certificate Credential License ID: 69038726 CHC Training Certificate No.: I23-0074-LI-CO March 1, 2023 March 1, 2026 24.0 Colorado State Approval No. 22651 12817 W. Marlowe Ave., Morrison, CO 80465 For the purposes of accreditation under Colorado Regulation No. 19, Residential Lead-based Paint Hazard Reduction Act of 1992 (Title X), and other standards developed by the EPA pursuant to Title IV of TSCA. 6 Months From Examination Date February 27 - March 1, 2023 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 152 of 200 CHC Training Environmental Compliance Certification Experts www.chctraining.com 303.412.6360 855.60.CERTIFY 1775 W. 55th Avenue Denver, Colorado 80221 United States of America Certificate of Achievement This certificate is awarded to: Derek D'Avignon Has successfully completed the required training hours and satisfactorily passed the examination for the initial course entitled: Lead-Based Paint Inspector Course Dates: Examination Date: Interim Expiration Date: Expiration Date: Course Hours: Michael A. BenedettoMichael A. Benedetto InstructorCEO & Training Program Manager Danaya N. WilsonDanaya N. Wilson Renew this CertificateVerify this Certificate Credential License ID: 69038726 CHC Training Certificate No.: I23-0074-LI-CO March 1, 2023 March 1, 2026 24.0 Colorado State Approval No. 22651 12817 W. Marlowe Ave., Morrison, CO 80465 For the purposes of accreditation under Colorado Regulation No. 19, Residential Lead-based Paint Hazard Reduction Act of 1992 (Title X), and other standards developed by the EPA pursuant to Title IV of TSCA. 6 Months From Examination Date February 27 - March 1, 2023 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 153 of 200 1-800-424-LEAD (5323)www.epa.gov/getleadsafeEPA-740-,April 2010Important lead hazard information for families, child care providers and schools.&(57,),('),50&(57557,),('),50550/($'6$)(THE LEADSAFE CERTIFIED GUIDE TORENOVATERIGHTAttachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 154 of 200 IT’S THE LAW!Federal law requires contractors that disturb painted surfaces in homes, child care facilities and schools, built before 1978 to be certified and follow specific work practices to prevent lead contamination. Always ask to see your contractor’s certification.Federal law requires that individuals receive certain information before renovating NPSFUIBOsix squareGFFUPGQBJOUFETVSGBDFT JOa room for interior projects or more than twenty square feet of painted surfaces for exterior projects or window replacement or demolition in housing, child care facilities and schools built before 1978.• Homeowners and tenants: renovators must give you this pamphlet before starting work.• Child care facilities, including preschools and kindergarten classrooms, and the families of children under six years of age that attend those facilities: renovators must provide a copy of this pamphlet to child care facilities and general renovation information to families whose children attend those facilities.Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 155 of 200 WHO SHOULD READ THIS PAMPHLET?This pamphlet is for you if you: • Reside in a home built before 1978.• Own or operate a child care facility, including preschools and kindergarten classrooms, built before 1978, or• Have a child under six years of age who attends a child care facility built before 1978.You will learn:• Basic facts about lead and your health.• How to choose a contractor, if you are a property owner.• What tenants, and parents/guardians of a child in a child care facility or school should consider.• How to prepare for the renovation or repair job.• What to look for during the job and after the job is done.• Where to get more information about lead.This pamphlet is not for:• Abatement projects. Abatement is a set of activities aimed specifically at eliminating lead or lead hazards. EPA has regulations for certification and training of abatement professionals. If your goal is to eliminate lead or lead hazards, contact the National Lead Information Center at 1-800-424-LEAD (5323) for more information.• “Do-it-yourself” projects. If you plan to do renovation work yourself, this document is a good start, but you will need more information to complete the work safely. Call the National Lead Information Center at 1-800-424-LEAD (5323) and ask for more information on how to work safely in a home with lead-based paint.• Contractor education. Contractors who want information about working safely with lead should contact the National Lead Information Center at 1-800-424-LEAD (5323)for information about courses and resources on lead-safe work practices.1Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 156 of 200 RENOVATING, REPAIRING, OR PAINTING?• Is your home, your building, or the child care facility or school your children attend being renovated, repaired, or painted?• Was your home, your building, or the child care facility or school where your children under six years of age attend built before 1978? If the answer to these questions is YES, there are a few important things you need to know about lead-based paint.This pamphlet provides basic facts about lead and information about lead safety when work is being done in your home, your building or the child care facility or school your children attend.The Facts About Lead• Lead can affect children’s brains and developing nervous systems, causing reduced IQ, learning disabilities, and behavioral problems. Lead is also harmful to adults. • Lead in dust is the most common way people are exposed to lead. People can also get lead in their bodies from lead in soil or paint chips. Lead dust is often invisible.• Lead-based paint was used in more than 38 million homes until it was banned for residential use in 1978.• Projects that disturb painted surfaces can create dust and endanger you and your family. Don’t let this happen to you. Follow the practices described in this pamphlet to protect you and your family.23LEAD AND YOUR HEALTHLead is especially dangerous to children under six years of age. Lead can affect children’s brains and developing nervous systems, causing:• Reduced IQ and learning disabilities.• Behavior problems.Even children who appear healthy can have dangerous levels of lead in their bodies.Lead is also harmful to adults. In adults, low levels of lead can pose many dangers, including:• High blood pressure and hypertension.• Pregnant women exposed to lead can transfer lead to their fetuses. Lead gets into the body when it is swallowed or inhaled.• People, especially children, can swallow lead dust as they eat, play, and do other normal hand-to-mouth activities.• People may also breathe in lead dust or fumes if they disturb lead-based paint. People who sand, scrape, burn, brush or blast or otherwise disturb lead-based paint risk unsafe exposure to lead.What should I do if I am concerned about my family’s exposure to lead? • Call your local health department for advice on reducing and eliminating exposures to lead inside and outside your home, child care facility or school. • Always use lead-safe work practices when renovation or repair will disturb painted surfaces. • A blood test is the only way to find out if you or a family member already has lead poisoning. Call your doctor or local health department to arrange for a blood test.For more information about the health effects of exposure to lead, visit the EPA lead website at www.epa.gov/lead/pubs/leadinfo.htm or call 1-800-424-LEAD (5323).There are other things you can do to protect your family every day.• Regularly clean floors, window sills, and other surfaces.• Wash children’s hands, bottles, pacifiers, and toys often.• Make sure children eat a healthy, nutritious diet consistent with the USDA's dietary guidelines, that helps protect children from the effects of lead.• Wipe off shoes before entering house.Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 157 of 200 4WHERE DOES THE LEAD COME FROM?Dust is the main problem. The most common way to get lead in the body is from dust. Lead dust comes from deteriorating lead-based paint and lead-contaminated soil that gets tracked into your home. This dust may accumulate to unsafe levels. Then, normal hand to-mouth activities, like playing and eating (especially in young children), move that dust from surfaces like floors and window sills into the body. Home renovation creates dust.Common renovation activities like sanding, cutting, and demolition can create hazardous lead dust and chips. Proper work practices protect you from the dust. The key to protecting yourself and your family during a renovation, repair or painting job is to use lead-safe work practices such as containing dust inside the work area, using dust-minimizing work methods, and conducting a careful cleanup, as described in this pamphlet.Other sources of lead. Remember, lead can also come from outside soil, your water, or household items (such as lead-glazed pottery and lead crystal). Contact the National Lead Information Center at 1-800-424-LEAD (5323) for more information on these sources.510 20 30 40 50 60 70 80 90 100Between1940 – 1960Between1960 – 1978Before 194024%69%87%Percentage of Homes Likely to Contain LeadAge of HomesCHECKING YOUR HOME FOR LEADBASED PAINTOlder homes, child care facilities, and schools are more likely to contain lead-based paint. Homes may be single-family homes or apartments. They may be private, government-assisted, or public housing. Schools are preschools and kindergarten classrooms. They may be urban, suburban, or rural.You have the following options:You may decide to assume your home, child care facility, or school contains lead. Especially in older homes and buildings, you may simply want to assume lead-based paint is present and follow the lead-safe work practices described in this brochure during the renovation, repair, or painting job.You can hire a certified professional to check for lead-based paint. These professionals are certified risk assessors or inspectors, and can determine if your home has lead or lead hazards. • A certified inspector or risk assessor can conduct an inspection telling you whether your home, or a portion of your home, has lead-based paint and where it is located. This will tell you the areas in your home where lead-safe work practices are needed. • A certified risk assessor can conduct a risk assessment telling you if your home currently has any lead hazards from lead in paint, dust, or soil. The risk assessor can also tell you what actions to take to address any hazards.• For help finding a certified risk assessor or inspector, call the National Lead Information Center at 1-800-424-LEAD (5323).You may also have a certified renovator test the surfaces or components being disturbed for lead using a lead test kit. Test kits must be EPA-recognized and are available at hardware stores. They include detailed instructions for their use.Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 158 of 200 6FOR PROPERTY OWNERSYou have the ultimate responsibility for the safety of your family, tenants, or children in your care. This means properly preparing for the renovation and keeping persons out of the work area (see p. 8). It also means ensuring the contractor uses lead-safe work practices.Federal law requires that contractors performing renovation, repair and painting projects that disturb painted surfaces in homes, child care facilities, and schools built before 1978 be certified and follow specific work practices to prevent lead contamination.Make sure your contractor is certified, and can explain clearly the details of the job and how the contractor will minimize lead hazards during the work.• You can verify that a contractor is certified by checking EPA’s website at epa.gov/getleadsafe or by calling the National Lead Information Center at 1-800-424-LEAD (5323). You can also ask to see a copy of the contractor’s firm certification.• Ask if the contractor is trained to perform lead-safe work practices and to see a copy of their training certificate.• Ask them what lead-safe methods they will use to set up and perform the job in your home, child care facility or school.• Ask for references from at least three recent jobs involving homes built before 1978, and speak to each personally.Always make sure the contract is clear about how the work will be set up, performed, and cleaned.• Share the results of any previous lead tests with the contractor.• You should specify in the contract that they follow the work practices described on pages 9 and 10 of this brochure. • The contract should specify which parts of your home are part of the work area and specify which lead-safe work practices will be used in those areas. Remember, your contractor should confine dust and debris to the work area and should minimize spreading that dust to other areas of the home. • The contract should also specify that the contractor will clean the work area, verify that it was cleaned adequately, and re-clean it if necessary.If you think a worker is not doing what he is supposed to do or is doing something that is unsafe, you should:• Direct the contractor to comply with regulatory and contract requirements.• Call your local health or building department, or• Call EPA's hotline 1-800-424-LEAD (5323).If your property receives housing assistance from HUD (or a state or local agency that uses HUD funds), you must follow the requirements of HUD’s Lead-Safe Housing Rule and the ones described in this pamphlet.7FOR TENANTS AND FAMILIES OF CHILDREN UNDER SIX YEARS OF AGE IN CHILD CARE FACILITIES AND SCHOOLSYou play an important role ensuring the ultimate safety of your family. This means properly preparing for the renovation and staying out of the work area (see p. 8).Federal law requires that contractors performing renovation, repair and painting projects that disturb painted surfaces in homes built before 1978 and in child care facilities and schools built before 1978, that a child under six years of age visits regularly, to be certified and follow specific work practices to prevent lead contamination.The law requires anyone hired to renovate, repair, or do painting preparation work on a property built before 1978 to follow the steps described on pages 9 and 10 unless the area where the work will be done contains no lead-based paint.If you think a worker is not doing what he is supposed to do or is doing something that is unsafe, you should:• Contact your landlord.• Call your local health or building department, or • Call EPA's hotline 1-800-424-LEAD (5323).If you are concerned about lead hazards left behind after the job is over, you can check the work yourself (see page 10).Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 159 of 200 8PREPARING FOR A RENOVATIONThe work areas should not be accessible to occupants while the work occurs. The rooms or areas where work is being done may need to be blocked off or sealed with plastic sheeting to contain any dust that is generated. Therefore, the contained area may not be available to you until the work in that room or area is complete, cleaned thoroughly, and the containment has been removed. Because you may not have access to some areas during the renovation, you should plan accordingly.You may need:• Alternative bedroom, bathroom, and kitchen arrangements if work is occurring in those areas of your home.• A safe place for pets because they too can be poisoned by lead and can track lead dust into other areas of the home.• A separate pathway for the contractor from the work area to the outside in order to bring materials in and out of the home. Ideally, it should not be through the same entrance that your family uses.• A place to store your furniture. All furniture and belongings may have to be moved from the work area while the work is being done. Items that can’t be moved, such as cabinets, should be wrapped in plastic.• To turn off forced-air heating and air conditioning systems while the work is being done. This prevents dust from spreading through vents from the work area to the rest of your home. Consider how this may affect your living arrangements.You may even want to move out of your home temporarily while all or part of the work is being done.Child care facilities and schools may want to consider alternative accommodations for children and access to necessary facilities.9DURING THE WORKFederal law requires contractors that are hired to perform renovation, repair and painting projects in homes, child care facilities, and schools built before 1978 that disturb painted surfaces to be certified and follow specific work practices to prevent lead contamination.The work practices the contractor must follow include these three simple procedures, described below:1. Contain the work area. The area must be contained so that dust and debris do not escape from that area. Warning signs must be put up and plastic or other impermeable material and tape must be used as appropriate to: • Cover the floors and any furniture that cannot be moved. • Seal off doors and heating and cooling system vents.These will help prevent dust or debris from getting outside the work area.2. Avoid renovation methods that generate large amounts of lead-contaminated dust. Some methods generate so much lead-contaminated dust that their use is prohibited. They are: • Open flame burning or torching. • Sanding, grinding, planing, needle gunning, or blasting with power tools and equipment not equipped with a shroud and HEPA vacuum attachment. • Using a heat gun at temperatures greater than 1100°F.There is no way to eliminate dust, but some renovation methods make less dust than others. Contractors may choose to use various methods to minimize dust generation, including using water to mist areas before sanding or scraping; scoring paint before separating components; and prying and pulling apart components instead of breaking them. 3. Clean up thoroughly. The work area should be cleaned up daily to keep it as clean as possible. When all the work is done, the area must be cleaned up using special cleaning methods before taking down any plastic that isolates the work area from the rest of the home. The special cleaning methods should include: • Using a HEPA vacuum to clean up dust and debris on all surfaces, followed by • Wet wiping and wet mopping with plenty of rinse water.When the final cleaning is done, look around. There should be no dust, paint chips, or debris in the work area. If you see any dust, paint chips, or debris, the area must be re-cleaned.Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 160 of 200 10FOR PROPERTY OWNERS: AFTER THE WORK IS DONEWhen all the work is finished, you will want to know if your home, child care facility, or school has been cleaned up properly. Here are some ways to check.Ask about your contractor’s final cleanup check. Remember, lead dust is often invisible to the naked eye. It may still be present even if you cannot see it. The contractor must use disposable cleaning cloths to wipe the floor of the work area and compare them to a cleaning verification card to determine if the work area was adequately cleaned.To order a cleaning verification card and detailed instructions visit the EPA lead website at www.epa.gov/lead or contact the National Lead Information Center at 1-800-424-LEAD (5323) or visit their website at www.epa.gov/lead/nlic.htm.You also may choose to have a lead-dust test. Lead-dust tests are wipe samples sent to a laboratory for analysis.• You should specify in your contract that a lead-dust test will be done. In this case, make it clear who will do the testing.• Testing should be done by a lead professional.If you choose to do the testing, some EPA-recognized lead laboratories will send you a kit that allows you to collect samples and send them back to the lab for analysis.Contact the National Lead Information Center at 1-800-424-LEAD (5323) for lists of qualified professionals and EPA-recognized lead labs.If your home, child care facility, or school fails the dust test, the area should be re-cleaned and tested again.Where the project is done by contract, it is a good idea to specify in the contract that the contractor is responsible for re-cleaning if the home, child care facility, or school fails the test.11You may need additional information on how to protect yourself and your children while a job is going on in your home, your building, or child care facility. The National Lead Information Center at 1-800-424-LEAD (5323) or www.epa.gov/lead/nlic.htm can tell you how to contact your state, local, and/or tribal programs or get general information about lead poisoning prevention.• State and tribal lead poisoning prevention or environmental protection programs can provide information about lead regulations and potential sources of financial aid for reducing lead hazards. If your state or local government has requirements more stringent than those described in this pamphlet, you must follow those requirements.• Local building code officials can tell you the regulations that apply to the renovation work that you are planning.• State, county, and local health departments can provide information about local programs, including assistance for lead-poisoned children and advice on ways to get your home checked for lead.The National Lead Information Center can also provide a variety of resource materials, including the following guides to lead-safe work practices. Many of these materials are also available at www.epa.gov/lead/pubs/brochure.htm.• Steps to Lead Safe Renovation, Repair and Painting.• Protect Your Family from Lead in Your Home• Lead in Your Home: A Parent’s Reference GuideFOR ADDITIONAL INFORMATIONFor the hearing impaired, call the Federal Information Relay Service at 1-800-877-8339 to access any of the phone numbers in this brochure.Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 161 of 200 1312EPA Regional OfficesEPA addresses residential lead hazards through several different regulations. EPA requires training and certification for conducting abatement and renovations, education about hazards associated with renovations, disclosure about known lead paint and lead hazards in housing, and sets lead-paint hazard standards. Your Regional EPA Office can provide further information regarding lead safety and lead protection programs at epa.gov/lead.Region 1 (Connecticut, Massachusetts, Maine, New Hampshire, Rhode Island, Vermont)Regional Lead ContactU.S. EPA Region 1Suite 1100One Congress StreetBoston, MA 02114-2023(888) 372-7341Region 2 (New Jersey, New York, Puerto Rico, Virgin Islands)Regional Lead ContactU.S. EPA Region 22890 Woodbridge AvenueBuilding 205, Mail Stop 225Edison, NJ 08837-3679(732) 321-671Region 3 (Delaware, Maryland, Pennsylvania, Virginia, Washington, DC, West Virginia)Regional Lead ContactU.S. EPA Region 31650 Arch StreetPhiladelphia, PA 19103-2029(215) 814-5000Region 4 (Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, Tennessee)Regional Lead ContactU.S. EPA Region 461 Forsyth Street, SWAtlanta, GA 30303-8960(404) 562-9900Region 5 (Illinois, Indiana, Michigan, Minnesota, Ohio, Wisconsin)Regional Lead ContactU.S. EPA Region 577 West Jackson BoulevardChicago, IL 60604-3507(312) 886-6003Region 6 (Arkansas, Louisiana, New Mexico, Oklahoma, Texas)Regional Lead ContactU.S. EPA Region 61445 Ross Avenue, 12th FloorDallas, TX 75202-2733(214) 665-6444Region 7 (Iowa, Kansas, Missouri, Nebraska)Regional Lead ContactU.S. EPA Region 7901 N. 5th StreetKansas City, KS 66101(913) 551-7003Region 8 (Colorado, Montana, North Dakota, South Dakota, Utah, Wyoming)Regional Lead ContactU.S. EPA Region 81595 Wynkoop StreetDenver, CO 80202(303) 312-6312Region 9 (Arizona, California, Hawaii, Nevada)Regional Lead ContactU.S. Region 975 Hawthorne StreetSan Francisco, CA 94105(415) 947-8021Region 10 (Alaska, Idaho, Oregon, Washington)Regional Lead ContactU.S. EPA Region 101200 Sixth AvenueSeattle, WA 98101-1128(206) 553-1200EPA CONTACTSOTHER FEDERAL AGENCIESCPSC The Consumer Product Safety Commission (CPSC) protects the public from the unreasonable risk of injury or death from 15,000 types of consumer products under the agency’s jurisdiction. CPSC warns the public and private sectors to reduce exposure to lead and increase consumer awareness. Contact CPSC for further information regarding regulations and consumer product safety.CPSC 4330 East West HighwayBethesda, MD 20814Hotline 1-(800) 638-2772 www.cpsc.govCDC Childhood Lead Poisoning Prevention BranchThe Centers for Disease Control and Prevention (CDC) assists state and local childhood lead poisoning prevention programs to provide a scientific basis for policy decisions, and to ensure that health issues are addressed in decisions about housing and the environment. Contact CDC Childhood Lead Poisoning Prevention Program for additional materials and links on the topic of lead.CDC Childhood Lead Poisoning Prevention Branch4770 Buford Highway, MS F-40Atlanta, GA 30341(770) 488-3300www.cdc.gov/nceh/leadHUD Office of Healthy Homes and Lead Hazard ControlThe Department of Housing and Urban Development (HUD) provides funds to state and local governments to develop cost-effective ways to reduce lead-based paint hazards in America’s privately-owned low-income housing. In addition, the office enforces the rule on disclosure of known lead paint and lead hazards in housing, and HUD’s lead safety regulations in HUD-assisted housing, provides public outreach and technical assistance, and conducts technical studies to help protect children and their families from health and safety hazards in the home. Contact the HUD Office of Healthy Homes and Lead Hazard Control for information on lead regulations, outreach efforts, and lead hazard control research and outreach grant programs.U.S. Department of Housing and Urban DevelopmentOffice of Healthy Homes and Lead Hazard Control451 Seventh Street, SW, Room 8236Washington, DC 20410-3000HUD’s Lead Regulations Hotline(202) 402-7698www.hud.gov/offices/lead/Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 162 of 200 SAMPLE PRERENOVATION FORMThis sample form may be used by renovation firms to document compliance with the Federal pre-renovation education and renovation, repair, and painting regulations.Occupant ConfirmationPamphlet Receipt TI have received a copy of the lead hazard information pamphlet informing me of the potential risk of the lead hazard exposure from renovation activity to be performed in my dwelling unit. I received this pamphlet before the work began.Printed Name of Owner-occupant Signature of Owner-occupant Signature DateRenovator’s Self Certification Option (for tenant-occupied dwellings only)Instructions to Renovator: If the lead hazard information pamphlet was delivered but a tenant signature was not obtainable, you may check the appropriate box below.TDeclined – I certify that I have made a good faith effort to deliver the lead hazard information pamphlet to the rental dwelling unit listed below at the date and time indicated and that the occupant declined to sign the confirmation of receipt. I further certify that I have left a copy of the pamphlet at the unit with the occupant.T Unavailable for signature – I certify that I have made a good faith effort to deliver the lead hazard information pamphlet to the rental dwelling unit listed below and that the occupant was unavailable to sign the confirmation of receipt. I further certify that I have left a copy of the pamphlet at the unit by sliding it under the door or by (fill in how pamphlet was left).Printed Name of Person Certifying Delivery Attempted Delivery DateSignature of Person Certifying Lead Pamphlet DeliveryUnit Address Note Regarding Mailing Option — As an alternative to delivery in person, you may mail the lead hazard information pamphlet to the owner and/or tenant. Pamphlet must be mailed at least seven days before renovation. Mailing must be documented by a certificate of mailing from the post office.Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 163 of 200 Sample Pre-Renovation Form This sample form may be used by ¿rms to document compliance with the requirements of the Federal Lead-Based Paint Renovation, Repair, and Painting Program. Occupant Con¿rmation Pamphlet Receipt ___ I have received a copy of the lead hazard information pamphlet informing me of the potential risk of the lead hazard exposure from renovation activity to be performed in my dwelling unit. I received this pamphlet before the work began. Printed Name of Owner-occupant Signature of Owner-occupant Signature Date Renovator’s Self Certi¿cation Option (for tenant-occupied dwellings only) Instructions to Renovator: If the lead hazard information pamphlet was delivered but a tenant signature was not obtainable, you may check the appropriate box below. ___ Declined – I certify that I have made a good faith effort to deliver the lead hazard information pamphlet to the rental dwelling unit listed below at the date and time indicated and that the occupant declined to sign the con¿rmation of receipt. I further certify that I have left a copy of the pamphlet at the unit with the occupant. ___ Unavailable for signature – I certify that I have made a good faith effort to deliver the lead hazard information pamphlet to the rental dwelling unit listed below and that the occupant was unavailable to sign the con¿rmation of receipt. I further certify that I have left a copy of the pamphlet at the unit by sliding it under the door or by (¿ll in how pamphlet was left). Printed Name of Person Certifying Delivery Attempted Delivery Date Signature of Person Certifying Lead Pamphlet Delivery Unit Address Note Regarding Mailing Option –– As an alternative to delivery in person, you may mail the lead hazard information pamphlet to the owner and/or tenant. Pamphlet must be mailed at least 7 days before renovation. Mailing must be documented by a certi¿cate of mailing from the post of¿ce. 25 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 164 of 200 November 6, 2024 Sopris Homes LLC Mr. Andrew Stevens E: A.Stevens@SoprisDevelopment.com SUBJECT: Asbestos Survey and Bulk Sampling 3132 8th Street, Boulder, Colorado (house, garage, shed) Dear Mr. Stevens: Attached is the report for the bulk sampling of suspected asbestos-containing materials at 3132 8th Street, Boulder, Colorado. This investigation was conducted on behalf of and for the exclusive use of Sopris Homes LLC (client). This report and the findings herein shall not, in whole or in part, be disseminated or conveyed to any other party, nor used by any other party, in whole or in part, without prior written consent of Boulder Environmental Inc. Personnel knowledgeable of asbestos containing materials should always oversee demolition activities. Demolition work should be halted, and sampling performed by a state of Colorado licensed building inspector if additional materials, which are suspected of containing asbestos, are encountered. If you have any questions regarding the contents of this report, please do not hesitate to contact us. Sincerely, Derek D’Avignon CO Building Inspector #10177 Asbestos Consulting Firm #20895 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 165 of 200 ASBESTOS SURVEY AND BULK SAMPLING REPORT FOR BUILDING DEMOLITION OF 3132 8th Street, Boulder, Colorado Introduction: On October 30, 2024, Boulder Environmental Inc.’s Building Inspector, Derek D’Avignon, conducted an asbestos-containing materials survey. The purpose of the survey was to identify asbestos containing materials (ACM) and materials presumed to contain asbestos (PACM) as defined by the Environmental Protection Agency (EPA) for the purposes of eventual building demolition. Sampling: During the sampling process, suspect ACM was separated into three EPA categories. These categories are Surfacing (S) ACM, Thermal System Insulation (TSI) ACM, and Miscellaneous (M) ACM. Surfacing ACM includes all ACM that is sprayed, troweled, or otherwise applied to a surface. Thermal System Insulation includes all materials used to prevent heat loss or gain or water condensation on mechanical systems. Examples of TSI are pipe coverings, boiler insulation, duct wrap, and mud packed fitting cement. These applications are most used in fireproofing, decorative and acoustical applications. Miscellaneous materials include all ACM not listed in the thermal system insulation or surfacing categories, such as linoleum, vinyl asbestos flooring, floor tile and ceiling tile. Boulder Environmental, Inc. followed EPA recommended sampling guidelines for identification of asbestos in bulk matrices. A set of two (2), three (3), five (5), or seven (7) samples were collected for each material type and analyzed by Polarized Light Microscopy (PLM). Each sample set was systematically analyzed. Upon determination that a sample in a set contained asbestos, analysis of the remaining samples in the set was discontinued. If no asbestos was detected during the analyses, the suspect material was determined to be negative for asbestos content. Suspect materials are assigned numerical values based on an evaluation of the building materials condition at the time of the inspection. The numbers assigned are: 1. Damaged or significantly damaged thermal system insulation ACM. 2. Damaged friable surfacing ACM. 3. Significantly damaged friable surfacing ACM. 4. Damaged or significantly damaged friable miscellaneous ACM. 5. ACM with potential for damage. 6. ACM with potential for significant damage. 7. Any remaining friable ACM or friable suspected ACM. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 166 of 200 Results: The following materials were analyzed and determined to be asbestos containing utilizing polarized light microscopy (PLM). ASBESTOS-CONTAINING SAMPLES MATERIAL LOCATION SAMPLE ID CONTENT CONDITION Sheet flooring #1 (M) Kitchen, floor Kitchen, floor 10-30-DD-18 10-30-DD-19 15% Chrysotile 17% Chrysotile 6 Sheet flooring #2 and floor tile (M) Bathroom, floor Bathroom, floor 10-30-DD-20 10-30-DD-21 5% Chrysotile in floor tile Non-friable 6 Window caulk #1 (M) Living room, window Kitchen, window 10-30-DD-34 10-30-DD-35 3% Chrysotile 4% Chrysotile Non-friable 6 (TSI) thermal system insulation (S) surfacing material (M) miscellaneous The following materials were analyzed and determined to be trace asbestos containing utilizing polarized light microscopy (PLM). TRACE ASBESTOS-CONTAINING SAMPLES MATERIAL SAMPLE LOCATION SAMPLE ID Smooth plaster (S) Kitchen, ceiling Bathroom, east wall Mud room, north wall 10-30-DD-15** 10-30-DD-16** 10-30-DD-17** Window glaze #2 (M) West shop, south window East shop, south window 10-30-DD-42 10-30-DD-43 (TSI) thermal system insulation (S) surfacing material (M) miscellaneous **Sample was further analyzed by point count method. The analysis determined that the material contained 1% asbestos or less. The Environmental Protection Agency and the state of Colorado Department of Public Health and Environment do not regulate materials that have an overall asbestos content of 1% or less. However, Occupational Safety and Health Administration regulations apply to workers handling the material. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 167 of 200 The following materials were analyzed and determined not to be asbestos containing utilizing polarized light microscopy (PLM). NON-ASBESTOS-CONTAINING SAMPLES MATERIAL SAMPLE LOCATION SAMPLE ID Stomp textured plaster (S) Living room, north wall Living room, south wall Dining room, east wall 10-30-DD-1 10-30-DD-2 10-30-DD-3 Swirl textured plaster (S) Living room, ceiling Living room, ceiling Dining room, ceiling 10-30-DD-4 10-30-DD-5 10-30-DD-6 Bumpy plaster (S) West bedroom, north wall West bedroom closet, east wall West bedroom, ceiling 10-30-DD-7 10-30-DD-8 10-30-DD-9 1’x1’ Ceiling tiles (M) West bedroom, ceiling West bedroom, ceiling 10-30-DD-10 10-30-DD-11 Rough plaster (S) East bedroom, west wall East bedroom, south wall East bedroom, ceiling 10-30-DD-12 10-30-DD-13 10-30-DD-14 Sheet flooring #3 (M) Mud room, floor Kitchen, west wall 10-30-DD-22 10-30-DD-23 Tile adhesive (M) Bathroom, north wall Bathroom, south wall 10-30-DD-24 10-30-DD-25 Drywall and joint compound #1 (M) Stairwell, south wall Stairwell, west wall 10-30-DD-26 10-30-DD-27 Stone mortar (M) Living room, fireplace Exterior garage, south 10-30-DD-28 10-30-DD-29 Roofing shingles #1 (M) House roof Mud room roof 10-30-DD-30 10-30-DD-31 Window glazing #1 (M) Living room, west Kitchen, north 10-30-DD-32 10-30-DD-33 Drywall #2 (M) West shop, west wall West shop, east wall 10-30-DD-36 10-30-DD-37 Fiberboard panel (M) West shop, ceiling East shop, ceiling 10-30-DD-38 10-30-DD-39 Roofing shingles #2 (M) Garage roof Garage roof 10-30-DD-40 10-30-DD-41 (TSI) thermal system insulation (S) surfacing material (M) miscellaneous Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 168 of 200 Discussion: Sample analyses results are reported in percentages of asbestos and non-asbestos components. The EPA defines any material that contains greater than one percent (1%) asbestos, utilizing PLM, as being an asbestos containing material. Materials that are identified as “none detected” are specified as not containing asbestos. Asbestos removal permit or notification requirements: When the quantity of ACBM to be removed exceeds “> 260 LF or 160 SF or a 55- gallon drum”, a permit or notification and a ten-working day waiting period are required before a permit is valid. These circumstances also require a notification fee of $80 for a non-friable asbestos removal or a permit fee of $400 for a friable asbestos removal. These trigger levels apply to all SFRD’s which are intended to be demolished. Obtaining a State Demolition Permit: Prior to building demolition/relocation/burning, Colorado requires a state issued demolition permit. The building, or portion thereof, must be free of regulated asbestos containing materials before application for the demolition permit. There is a 10 working-day advance notification requirement for permit applications. Day 1 is the 1st business day following the postmark or hand-delivery date. (Working Day means Monday through Friday and includes holidays that falls on any of the days Monday through Friday.) An inspector accredited by the EPA and CDPHE must sign a statement (in blue ink) certifying that the building is eligible for demolition to begin the demolition permit application process. If a demolition follows a permitted or noticed asbestos abatement project within 10 business days of the completion of the abatement project, the 10 working-day advance notification requirement will be waived. Upon request, (as it typically serves your project timeline), BEI will forward the required original application, signed in blue ink, directly to the demolition contractor if you have selected one. This way you are not deemed a courier and do not incur further inconvenience prior to beginning the ten working days after CDPHE receives the fee and application necessary to obtain a demolition permit. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 169 of 200 Conclusion: Prior to application for building demolition, Boulder Environmental Inc. must verify the abatement or removal of the following asbestos containing materials: • ~ 130 square feet of sheet flooring #1 (terrazzo patterned) in the kitchen (floor and sink countertop) Workers disturbing asbestos containing materials must be OSHA/EPA trained and asbestos containing materials must be disposed of in a landfill approved by the EPA to receive asbestos waste. The following asbestos containing materials may remain in the building if they remain non-friable during conventional building demolition: • ~ 20 square feet of window caulking #1 on the house windows • ~ 15 square feet of floor tiles and associated mastic associated with sheet flooring #2 in the bathroom (floor) Non-friable asbestos containing materials as noted may remain in a building during demolition. Occupational Safety and Health Administration guidelines should be followed while disturbing or handling these materials. State of Colorado licenses and certifications for asbestos handling are not required so long as materials remain non- friable. However, we recommend having the floor tiles abated by a licensed asbestos remover prior to applying for demolition because fewer and fewer demolition contractors are being permitted to perform conventional demolition with asbestos containing floor tiles in place. Workers disturbing asbestos containing materials must be OSHA/EPA trained and asbestos containing materials must be disposed of in a landfill approved by the EPA to receive asbestos waste. The following materials were determined to contain one percent asbestos or less: • ~ 900 square feet of smooth plaster on walls and ceilings in the kitchen, bathroom, and mud room • ~ 8 square feet of window glazing on the shop windows Workers disturbing materials that contain 1% asbestos or less must be OSHA trained and follow OSHA handling guidelines while handling and disposing of such materials. The following materials were determined not to be asbestos containing: • ~ 600 square feet of stomp textured plaster on walls in the living room and dining room • ~ 250 square feet of swirl textured plaster on ceilings in the living room and dining room Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 170 of 200 • ~ 550 square feet of bumpy plaster in the west bedroom (walls and ceiling) • ~ 160 square feet of 1’x1’ ceiling tiles in the west bedroom (ceiling) • ~ 500 square feet of rough plaster in the east bedroom (walls and ceiling and closet) • ~ 110 square feet of tile adhesive on walls in the bathroom • ~ 240 square feet of marbled sheet flooring #3 in the mud room (floor) and kitchen (floor and west backsplash) • ~ 40 square feet of drywall and joint compound wall systems #1 in the stairwell (walls and ceiling) • ~ 1,800 square feet of stone mortar on the living room fireplace and exterior walls of the house and garage • ~ 1,100 square feet of roofing shingles on the house roof • ~ 300 square feet of drywall #2 in eh west shop (north, east, and west walls) • ~ 275 square feet fiberboard panel ceilings in the east and west shops (and south wall) • ~ 400 square feet of roofing shingles #2 and felt on the garage roof • ~ 8 square feet of window caulking #2 on the shop windows The results of this survey pertain only to materials tested. The laboratory reports supporting these findings above are attached. Please contact Boulder Environmental Inc. if you have any questions or concerns regarding this report. Sincerely, Chris Maron Project Manager Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 171 of 200 November 06, 2024 Sincerely, Jeanne Spencer President Subcontractor Number: Laboratory Report: RES 620067-2 Project #/P.O. #: None Given Project Description: 3132 8th St Derek Davignon Boulder Environmental, Inc. 5 Deer Trail Boulder CO 80302 Dear Derek, Eurofins Reservoirs is an analytical laboratory accredited for the analysis of Industrial Hygiene and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab Code 101896-0 for Transmission Electron Microscopy (TEM) and Polarized Light Microscopy (PLM) analysis and the American Industrial Hygiene Association (AIHA LAP, LLC), Lab ID 101533 for Phase Contrast Microscopy (PCM) analysis. This laboratory is currently proficient in both Proficiency Testing and PAT programs respectively. Eurofins Reservoirs has analyzed the following samples for asbestos content as per your request. The analysis has been completed in general accordance with the appropriate methodology as stated in the attached analysis table. The results have been submitted to your office. RES 620067-2 is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer. Eurofins Reservoirs will not discuss any part of this study with personnel other than those of the client. The results described in this report only apply to the samples analyzed, as received and with the information provided by the customer. This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without written approval from Eurofins Reservoirs. Samples will be disposed of after sixty days unless longer storage is requested. If you have any questions about this report, please feel free to call 303-964-1986. by John McIntyre 11/06/202411/06/202411/06/202411/06/2024 Eurofins Reservoirs Environmental, Inc. Eurofins Reservoirs QA Manual Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf (303) 964-1986 (866) RES-IENV https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com 4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 1 of 7 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 172 of 200 Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLLAsbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non-AAAASubSubSubSubAsbestosAsbestosAsbestosAsbestos FibrousFibrousFibrousFibrousYYYYPhysicalPhysicalPhysicalPhysicalPartPartPartPart MineralMineralMineralMineralVisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponentsEEEEDescriptionDescriptionDescriptionDescriptionEstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponentsClient Sample NumberClient Sample NumberClient Sample NumberClient Sample NumberRRRR(%)(%)(%)(%)620067 -620067 -620067 -620067 - 10-30-DD-110-30-DD-110-30-DD-110-30-DD-1 A White plaster w/ tan paint 35 NDNDNDND0 100.0 B Off-white granular plaster65 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-210-30-DD-210-30-DD-210-30-DD-2A Off-white granular plaster25 NDNDNDND0 100.0 B White plaster w/ tan/multi-colored paint75 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-310-30-DD-310-30-DD-310-30-DD-3A White plaster w/ tan/multi-colored paint20 NDNDNDND0 100.0 B Off-white granular plaster80 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-410-30-DD-410-30-DD-410-30-DD-4A White plaster w/ tan paint40 NDNDNDND0 100.0 B Off-white granular plaster60 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-510-30-DD-510-30-DD-510-30-DD-5A White plaster w/ grayish-tan/multi-colored paint35 NDNDNDNDTR 100.0 B Tan granular plaster65 NDNDNDNDTR 100.0620067 -620067 -620067 -620067 - 10-30-DD-610-30-DD-610-30-DD-610-30-DD-6A Tan granular plaster20 NDNDNDNDTR 100.0 B White plaster w/ grayish-tan/multi-colored paint80 NDNDNDNDTR 100.0620067 -620067 -620067 -620067 - 10-30-DD-710-30-DD-710-30-DD-710-30-DD-7A Beige/multi-colored paint w/ tan plaster8 NDNDNDND0 100.0 B Tan granular plaster92 NDNDNDNDTR 100.0620067 -620067 -620067 -620067 - 10-30-DD-810-30-DD-810-30-DD-810-30-DD-8A Off-white/multi-colored paint w/ tan plaster11 NDNDNDND2 98.0 B Tan granular plaster89 NDNDNDNDTR 100.0TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.Eurofins Reservoirs Environmental, Inc.Eurofins Reservoirs QA ManualEffective September 06, 2023Q:\QAQC\Eurofins Reservoirs QA Manual.pdfRES Job Number:Client:Client Project/P.O.:Client Project Description:Date Samples Received:Analysis Type:Turnaround:Date Samples Analyzed:RES 620067-2Boulder Environmental, Inc.None Given3132 8th StOctober 30, 2024EPA 600/R-93/116 - Point Count, Bulk (400)PriorityNovember 04 - November 05, 2024EUROFINS RESERVOIRS ENVIRONMENTAL, INC.NVLAP Lab Code 101896-0AIHA LAP, LLC. LAB ID 101533TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUMENA = Not AnalyzedNR = Not ReceivedND = None DetectedTR = Trace; <1 % Visual EstimateTrem-Act = Tremolite-Actinolite(303) 964-1986(866) RES-IENVhttps://www.eurofinsus.com/builtenvhttps://clients.rei.et.eurofinsus.com4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 2 of 7Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 173 of 200 Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLLAsbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non-AAAASubSubSubSubAsbestosAsbestosAsbestosAsbestos FibrousFibrousFibrousFibrousYYYYPhysicalPhysicalPhysicalPhysicalPartPartPartPart MineralMineralMineralMineralVisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponentsEEEEDescriptionDescriptionDescriptionDescriptionEstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponentsClient Sample NumberClient Sample NumberClient Sample NumberClient Sample NumberRRRR(%)(%)(%)(%)620067 -620067 -620067 -620067 - 10-30-DD-910-30-DD-910-30-DD-910-30-DD-9 A Off-white/multi-colored paint w/ tan plaster 14 NDNDNDNDTR 100.0 B Off-white granular plaster86 NDNDNDNDTR 100.0620067 -620067 -620067 -620067 - 10-30-DD-1010-30-DD-1010-30-DD-1010-30-DD-10A Off-white/tan ceiling tile100 NDNDNDND80 20.0620067 -620067 -620067 -620067 - 10-30-DD-1110-30-DD-1110-30-DD-1110-30-DD-11A Off-white/tan ceiling tile100 NDNDNDND80 20.0620067 -620067 -620067 -620067 - 10-30-DD-1210-30-DD-1210-30-DD-1210-30-DD-12A Tan granular plaster w/ blue/multi-colored paint100 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-1310-30-DD-1310-30-DD-1310-30-DD-13A Tan granular plaster w/ blue/multi-colored paint100 NDNDNDNDTR 100.0620067 -620067 -620067 -620067 - 10-30-DD-1410-30-DD-1410-30-DD-1410-30-DD-14A Tan granular plaster w/ cream/multi-colored paint100 NDNDNDNDTR 100.0620067 -620067 -620067 -620067 - 10-30-DD-1510-30-DD-1510-30-DD-1510-30-DD-15A Beige granular plaster20 ChrysotileChrysotileChrysotileChrysotileTRTRTRTRTR 100.0 Point Count Point Count Point Count Point Count<0.25<0.25<0.25<0.25 B White plaster w/ gray/multi-colored paint80 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-1610-30-DD-1610-30-DD-1610-30-DD-16A White plaster w/ gray/multi-colored paint40 NDNDNDND0 100.0 B Beige granular plaster60 ChrysotileChrysotileChrysotileChrysotileTRTRTRTRTR 100.0 Point Count Point Count Point Count Point Count<0.25<0.25<0.25<0.25 620067 -620067 -620067 -620067 - 10-30-DD-1710-30-DD-1710-30-DD-1710-30-DD-17A Beige granular plaster28 ChrysotileChrysotileChrysotileChrysotileTRTRTRTRTR 100.0 Point Count Point Count Point Count Point Count0.250.250.250.25 B White plaster w/ tan/beige paint72 NDNDNDND0 100.0TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.Eurofins Reservoirs Environmental, Inc.Eurofins Reservoirs QA ManualEffective September 06, 2023Q:\QAQC\Eurofins Reservoirs QA Manual.pdfRES Job Number:Client:Client Project/P.O.:Client Project Description:Date Samples Received:Analysis Type:Turnaround:Date Samples Analyzed:RES 620067-2Boulder Environmental, Inc.None Given3132 8th StOctober 30, 2024EPA 600/R-93/116 - Point Count, Bulk (400)PriorityNovember 04 - November 05, 2024EUROFINS RESERVOIRS ENVIRONMENTAL, INC.NVLAP Lab Code 101896-0AIHA LAP, LLC. LAB ID 101533TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUMENA = Not AnalyzedNR = Not ReceivedND = None DetectedTR = Trace; <1 % Visual EstimateTrem-Act = Tremolite-Actinolite(303) 964-1986(866) RES-IENVhttps://www.eurofinsus.com/builtenvhttps://clients.rei.et.eurofinsus.com4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 3 of 7Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 174 of 200 Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLLAsbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non-AAAASubSubSubSubAsbestosAsbestosAsbestosAsbestos FibrousFibrousFibrousFibrousYYYYPhysicalPhysicalPhysicalPhysicalPartPartPartPart MineralMineralMineralMineralVisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponentsEEEEDescriptionDescriptionDescriptionDescriptionEstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponentsClient Sample NumberClient Sample NumberClient Sample NumberClient Sample NumberRRRR(%)(%)(%)(%)620067 -620067 -620067 -620067 - 10-30-DD-1810-30-DD-1810-30-DD-1810-30-DD-18 A Tan adhesive 3 NDNDNDND0 100.0 B Tan/multi-colored sheet vinyl w/ gray fibrous backingmaterial97 ChrysotileChrysotileChrysotileChrysotile151515152 83.0620067 -620067 -620067 -620067 - 10-30-DD-1910-30-DD-1910-30-DD-1910-30-DD-19A Tan adhesive4 NDNDNDND0 100.0 B Beige/tan sheet vinyl w/ gray fibrous backing material 96 ChrysotileChrysotileChrysotileChrysotile171717173 80.0620067 -620067 -620067 -620067 - 10-30-DD-2010-30-DD-2010-30-DD-2010-30-DD-20A Brown adhesive3 NDNDNDND0 100.0 B Brown sheet vinyl w/ black fibrous backing material 97 NDNDNDND35 65.0620067 -620067 -620067 -620067 - 10-30-DD-2110-30-DD-2110-30-DD-2110-30-DD-21A Brown adhesive10 NDNDNDND0 100.0 B Red flooring w/ black fibrous backing material18 NDNDNDND20 80.0 C Black tile30 ChrysotileChrysotileChrysotileChrysotile555510 85.0 D Black felt42 NDNDNDND70 30.0620067 -620067 -620067 -620067 - 10-30-DD-2210-30-DD-2210-30-DD-2210-30-DD-22A Brown adhesive3 NDNDNDND0 100.0 B Brown adhesive8 NDNDNDND0 100.0 C Brown felt30 NDNDNDND70 30.0 D Gray/off-white flooring59 NDNDNDND30 70.0TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.Eurofins Reservoirs Environmental, Inc.Eurofins Reservoirs QA ManualEffective September 06, 2023Q:\QAQC\Eurofins Reservoirs QA Manual.pdfRES Job Number:Client:Client Project/P.O.:Client Project Description:Date Samples Received:Analysis Type:Turnaround:Date Samples Analyzed:RES 620067-2Boulder Environmental, Inc.None Given3132 8th StOctober 30, 2024EPA 600/R-93/116 - Point Count, Bulk (400)PriorityNovember 04 - November 05, 2024EUROFINS RESERVOIRS ENVIRONMENTAL, INC.NVLAP Lab Code 101896-0AIHA LAP, LLC. LAB ID 101533TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUMENA = Not AnalyzedNR = Not ReceivedND = None DetectedTR = Trace; <1 % Visual EstimateTrem-Act = Tremolite-Actinolite(303) 964-1986(866) RES-IENVhttps://www.eurofinsus.com/builtenvhttps://clients.rei.et.eurofinsus.com4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 4 of 7Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 175 of 200 Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLLAsbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non-AAAASubSubSubSubAsbestosAsbestosAsbestosAsbestos FibrousFibrousFibrousFibrousYYYYPhysicalPhysicalPhysicalPhysicalPartPartPartPart MineralMineralMineralMineralVisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponentsEEEEDescriptionDescriptionDescriptionDescriptionEstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponentsClient Sample NumberClient Sample NumberClient Sample NumberClient Sample NumberRRRR(%)(%)(%)(%)620067 -620067 -620067 -620067 - 10-30-DD-2310-30-DD-2310-30-DD-2310-30-DD-23 A Brown adhesive 6 NDNDNDND0 100.0 B Brown felt15 NDNDNDND70 30.0 C Gray/off-white flooring w/ black fibrous backing material 79 NDNDNDND35 65.0620067 -620067 -620067 -620067 - 10-30-DD-2410-30-DD-2410-30-DD-2410-30-DD-24A Beige adhesive4 NDNDNDND0 100.0 B Dark purple resinous material96 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-2510-30-DD-2510-30-DD-2510-30-DD-25A Beige adhesive5 NDNDNDND0 100.0 B Peach resinous material95 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-2610-30-DD-2610-30-DD-2610-30-DD-26A Tan/off-white drywall w/ beige paint100 NDNDNDND35 65.0620067 -620067 -620067 -620067 - 10-30-DD-2710-30-DD-2710-30-DD-2710-30-DD-27A White plaster w/ beige paint11 NDNDNDND0 100.0 B Tan/white drywall w/ beige paint89 NDNDNDND20 80.0620067 -620067 -620067 -620067 - 10-30-DD-2810-30-DD-2810-30-DD-2810-30-DD-28A Gray granular material w/ black paint100 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-2910-30-DD-2910-30-DD-2910-30-DD-29A Gray granular material w/ black paint100 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-3010-30-DD-3010-30-DD-3010-30-DD-30A Gray/multi-colored shingle100 NDNDNDND25 75.0TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.Eurofins Reservoirs Environmental, Inc.Eurofins Reservoirs QA ManualEffective September 06, 2023Q:\QAQC\Eurofins Reservoirs QA Manual.pdfRES Job Number:Client:Client Project/P.O.:Client Project Description:Date Samples Received:Analysis Type:Turnaround:Date Samples Analyzed:RES 620067-2Boulder Environmental, Inc.None Given3132 8th StOctober 30, 2024EPA 600/R-93/116 - Point Count, Bulk (400)PriorityNovember 04 - November 05, 2024EUROFINS RESERVOIRS ENVIRONMENTAL, INC.NVLAP Lab Code 101896-0AIHA LAP, LLC. LAB ID 101533TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUMENA = Not AnalyzedNR = Not ReceivedND = None DetectedTR = Trace; <1 % Visual EstimateTrem-Act = Tremolite-Actinolite(303) 964-1986(866) RES-IENVhttps://www.eurofinsus.com/builtenvhttps://clients.rei.et.eurofinsus.com4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 5 of 7Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 176 of 200 Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLLAsbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non-AAAASubSubSubSubAsbestosAsbestosAsbestosAsbestos FibrousFibrousFibrousFibrousYYYYPhysicalPhysicalPhysicalPhysicalPartPartPartPart MineralMineralMineralMineralVisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponentsEEEEDescriptionDescriptionDescriptionDescriptionEstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponentsClient Sample NumberClient Sample NumberClient Sample NumberClient Sample NumberRRRR(%)(%)(%)(%)620067 -620067 -620067 -620067 - 10-30-DD-3110-30-DD-3110-30-DD-3110-30-DD-31 A Black tar 8 NDNDNDND0 100.0 B Gray/multi-colored shingle35 NDNDNDND25 75.0 C Gray/multi-colored shingle57 NDNDNDND25 75.0620067 -620067 -620067 -620067 - 10-30-DD-3210-30-DD-3210-30-DD-3210-30-DD-32A Cream glazing w/ cream paint100 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-3310-30-DD-3310-30-DD-3310-30-DD-33A Cream glazing w/ off-white paint100 NDNDNDND0 100.0620067 -620067 -620067 -620067 - 10-30-DD-3410-30-DD-3410-30-DD-3410-30-DD-34A Gray granular material23 NDNDNDND0 100.0 B Beige granular material w/ off-white paint77 ChrysotileChrysotileChrysotileChrysotile33330 97.0620067 -620067 -620067 -620067 - 10-30-DD-3510-30-DD-3510-30-DD-3510-30-DD-35A Gray granular material23 NDNDNDND0 100.0 B Off-white glazing w/ off-white paint77 ChrysotileChrysotileChrysotileChrysotile44440 96.0620067 -620067 -620067 -620067 - 10-30-DD-3610-30-DD-3610-30-DD-3610-30-DD-36A Tan/white drywall100 NDNDNDND25 75.0620067 -620067 -620067 -620067 - 10-30-DD-3710-30-DD-3710-30-DD-3710-30-DD-37A Tan/white drywall100 NDNDNDND60 40.0620067 -620067 -620067 -620067 - 10-30-DD-3810-30-DD-3810-30-DD-3810-30-DD-38A Off-white/tan ceiling tile100 NDNDNDND85 15.0620067 -620067 -620067 -620067 -10-30-DD-3910-30-DD-3910-30-DD-3910-30-DD-39A Off-white/tan ceiling tile100 NDNDNDND85 15.0620067 -620067 -620067 -620067 - 10-30-DD-4010-30-DD-4010-30-DD-4010-30-DD-40A Green/white shingle100 NDNDNDND30 70.0620067 -620067 -620067 -620067 - 10-30-DD-4110-30-DD-4110-30-DD-4110-30-DD-41A Red/multi-colored shingle100 NDNDNDND30 70.0TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.Eurofins Reservoirs Environmental, Inc.Eurofins Reservoirs QA ManualEffective September 06, 2023Q:\QAQC\Eurofins Reservoirs QA Manual.pdfRES Job Number:Client:Client Project/P.O.:Client Project Description:Date Samples Received:Analysis Type:Turnaround:Date Samples Analyzed:RES 620067-2Boulder Environmental, Inc.None Given3132 8th StOctober 30, 2024EPA 600/R-93/116 - Point Count, Bulk (400)PriorityNovember 04 - November 05, 2024EUROFINS RESERVOIRS ENVIRONMENTAL, INC.NVLAP Lab Code 101896-0AIHA LAP, LLC. LAB ID 101533TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUMENA = Not AnalyzedNR = Not ReceivedND = None DetectedTR = Trace; <1 % Visual EstimateTrem-Act = Tremolite-Actinolite(303) 964-1986(866) RES-IENVhttps://www.eurofinsus.com/builtenvhttps://clients.rei.et.eurofinsus.com4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 6 of 7Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 177 of 200 Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLLAsbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non-AAAASubSubSubSubAsbestosAsbestosAsbestosAsbestos FibrousFibrousFibrousFibrousYYYYPhysicalPhysicalPhysicalPhysicalPartPartPartPart MineralMineralMineralMineralVisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponentsEEEEDescriptionDescriptionDescriptionDescriptionEstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponentsClient Sample NumberClient Sample NumberClient Sample NumberClient Sample NumberRRRR(%)(%)(%)(%)620067 -620067 -620067 -620067 - 10-30-DD-4210-30-DD-4210-30-DD-4210-30-DD-42 A Gray glazing w/ white paint 100 ChrysotileChrysotileChrysotileChrysotileTRTRTRTR5 95.0620067 -620067 -620067 -620067 - 10-30-DD-4310-30-DD-4310-30-DD-4310-30-DD-43A Gray glazing w/ white paint100 ChrysotileChrysotileChrysotileChrysotileTRTRTRTR5 95.0TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.John McIntyreAnalystChristina TiggemannAnalystEurofins Reservoirs Environmental, Inc.Eurofins Reservoirs QA ManualEffective September 06, 2023Q:\QAQC\Eurofins Reservoirs QA Manual.pdfRES Job Number:Client:Client Project/P.O.:Client Project Description:Date Samples Received:Analysis Type:Turnaround:Date Samples Analyzed:RES 620067-2Boulder Environmental, Inc.None Given3132 8th StOctober 30, 2024EPA 600/R-93/116 - Point Count, Bulk (400)PriorityNovember 04 - November 05, 2024EUROFINS RESERVOIRS ENVIRONMENTAL, INC.NVLAP Lab Code 101896-0AIHA LAP, LLC. LAB ID 101533TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUMENA = Not AnalyzedNR = Not ReceivedND = None DetectedTR = Trace; <1 % Visual EstimateTrem-Act = Tremolite-Actinolite(303) 964-1986(866) RES-IENVhttps://www.eurofinsus.com/builtenvhttps://clients.rei.et.eurofinsus.com4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 7 of 7Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 178 of 200 SUBMITTED BYINVOICE TOClient Sample ID NumberRES Job #: 620067CONTACT INFORMATIONSERIESASBESTOS LABORATORY HOURS: Weekdays: 7am - 7pm & Sat. 8am - 5pmREQUESTED ANALYSISVALID MATRIX CODESLAB NOTESCHEMISTRY LABORATORY HOURS: Weekdays: 8am - 5pmMICROBIOLOGY LABORATORY HOURS: Weekdays: 8am - 5pm**Turnaround times establish a laboratory priority, subject to laboratory volume and are notguaranteed. Additional fees apply for afterhours, weekends and holidays.**Laboratory AnalysisInstructions(Sample ID's must be unique)Company:Boulder Environmental, Inc.Company:Boulder Environmental, Inc.Address:5 Deer TrailAddress:5 Deer TrailBoulder, CO 80302Boulder, CO 80302Project Number and/or P.O. #:None GivenProject Description/Location:3132 8th StContact:Derek Davignon-1 PLM Priority 48 Phone:(303) 949-2965Fax:Cell:(303) 949-2965Final Data Deliverable Email Address:derek@boulderenvironmental.com (+ 3 ADDNL. CONTACTS)PLM / PCM / TEMDTL RUSH PRIORITY STANDARDAir = ABulk = BDust = DFood = FPaint = PSoil = SDustRUSH PRIORITY STANDARD*PRIOR NOTICE REQUIRED FOR SAME DAY TATSurface = SU Swab = SWTape = T Wipe = WMetalsRUSH PRIORITY STANDARDDrinking Water = DWWaste Water = WWOrganics*SAME DAY RUSH PRIORITY STANDARD**ASTM E1792 approved wipe media only**Viable Analysis**PRIORITY STANDARD**TAT DEPENDENT ON SPEED OF MICROBIAL GROWTHMedical Device AnalysisRUSH STANDARDMold AnalysisRUSH PRIORITY STANDARDSpecial Instructions:ASBESTOS CHEMISTRY MICROBIOLOGY ICO1 10-30-DD-1XB2 10-30-DD-2XB3 10-30-DD-3XB4 10-30-DD-4XB5 10-30-DD-5XB6 10-30-DD-6XB7 10-30-DD-7XB8 10-30-DD-8XB9 10-30-DD-9XB10 10-30-DD-10XB11 10-30-DD-11XB12 10-30-DD-12XB13 10-30-DD-13XBPLM - PLM Short Report (EPA/600/R-93/116)TEMPCMDUSTMETALSORGANICSVIABLESMEDICALMOLDSample Volume (L) / AreaLength(or Aliquots) x Width(or Area per Aliquot)Matrix Code# of ContainersDate Collectedmm/dd/yyTime Collectedhh:mmEREI establishes a unique Lab Sample ID, for each sample, by preceding each unique Client Sample ID with the laboratory RES Job Number.EREI will analyze incoming samples based on information received and will not be responsible for errors or omissions in calculations resulting from the inaccuracy of original data. By signing, client/company representative agrees that submission of the following samples for requested analysis as indicated on this Chain of Custody shallconsitute an analytical services agreement with payment terms of NET 30 days. Failure to comply with payment terms may result in a 1.5% monthly interest surcharge.Relinquished By:Derek DavignonDate/Time: 10/30/2024 14:30:31Sample Condition: AcceptableReceived By:Emily CreaseyDate/Time: 10/30/2024 14:33:04Carrier: HandEurofins Reservoirs Environmental, Inc.Eurofins Reservoirs QA ManualEffective September 06, 2023Q:\QAQC\Eurofins Reservoirs QA Manual.pdf(303) 964-1986(866) RES-IENVhttps://www.eurofinsus.com/builtenvhttps://clients.rei.et.eurofinsus.com4955 Yarrow St, Suite 100, Arvada, CO 80002Page 1 of 2Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 179 of 200 Client Sample ID NumberREQUESTED ANALYSIS VALID MATRIX CODES LAB NOTESLaboratory AnalysisInstructions(Sample ID's must be unique) Air = ABulk = BDust = DFood = FPaint = PSoil = SSurface = SU Swab = SWTape = TWipe = WDrinking Water = DWWaste Water = WW**ASTM E1792 approved wipe media only**RES Job #: 620067 Submitted By: Boulder Environmental, Inc. ASBESTOS CHEMISTRY MICROBIOLOGY ICO14 10-30-DD-14XB15 10-30-DD-15XB16 10-30-DD-16XB17 10-30-DD-17XB18 10-30-DD-18XB19 10-30-DD-19XB20 10-30-DD-20XB21 10-30-DD-21XB22 10-30-DD-22XB23 10-30-DD-23XB24 10-30-DD-24XB25 10-30-DD-25XB26 10-30-DD-26XB27 10-30-DD-27XB28 10-30-DD-28XB29 10-30-DD-29XB30 10-30-DD-30XB31 10-30-DD-31XB32 10-30-DD-32XB33 10-30-DD-33XB34 10-30-DD-34XB35 10-30-DD-35XB36 10-30-DD-36XB37 10-30-DD-37XB38 10-30-DD-38XB39 10-30-DD-39XB40 10-30-DD-40XB41 10-30-DD-41XB42 10-30-DD-42XB43 10-30-DD-43XBPLM - PLM Short Report (EPA/600/R-93/116)TEMPCMDUSTMETALSORGANICSVIABLESMEDICALMOLDSample Volume (L) / AreaLength(or Aliquots) x Width(or Area per AliquoMatrix Code# of ContainersDate Collectedmm/dd/yyTime Collectedhh:mmEurofins Reservoirs Environmental, Inc.Eurofins Reservoirs QA ManualEffective September 06, 2023Q:\QAQC\Eurofins Reservoirs QA Manual.pdf(303) 964-1986(866) RES-IENVhttps://www.eurofinsus.com/builtenvhttps://clients.rei.et.eurofinsus.com4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 2 of 2Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 180 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 181 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 182 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 183 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 184 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 185 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 186 of 200 7959 Ulster Court, Thornton, Colorado 80602Tel: 303.424.4647www.acclaim-enviro.comacclaim-enviro@comcast.netCERTIFIES THATDEREK R D'AVIGNONHas successfully completedThe EPA-Approved AHERA Annual Refresher CourseforINSPECTORThis course is EPA-approved under Section 206 of the Toxic Substances Control Act (TSCA), Title II, and meets the requirements of Colorado Regulation No. 8.Course Date: 08/01/2024 Exam Date: N/ACertificate No.: AE24-037-BI-R-04Expiration Date: 08/01/2025Course Hours: 4Colorado-Approved Live-Remote CourseEPA NDAAC Provider No. 1339Acclaim Environmental is committed to providing high quality asbestos training and to provide industry insight, driven by experience and delivered with trust.K. Jay Gale, PresidentAttachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 187 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 188 of 200 November 22, 2024 Sopris Homes, LLC Mr. Andrew Stevens E: a.stevens@soprisdevelopment.com SUBJECT: Mold Spore Sampling 3132 8th Street, Boulder, Colorado Dear Mr. Stevens: This investigation was conducted on behalf of and for the exclusive use of Sopris Homes, LLC (client). This report and the findings herein shall not, in whole or in part, be disseminated or conveyed to any other party, nor used by any other party, in whole or in part, without prior written consent of Boulder Environmental Inc. The following mold assessment is based on findings of the physical inspection and testing. Findings are current and accurate for the date and time they were found, but do not reflect expected or predictable mold growth and infestation on and within the property. This report addresses only those areas physically inspected and sampled. Boulder Environmental Inc. is not responsible or liable for the non-discovery of any water damage, water problems, mold contamination, or other conditions of the Subject Property which may occur or may become evident after the inspection and testing time and date. If you have any questions regarding the contents of this report, please do not hesitate to contact us. Sincerely, Chris Maron Vice President Boulder Environmental Inc. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 189 of 200 Moisture and Mold Assessment 3132 8th Street, Boulder, Colorado Introduction: On October 30, 2024, Boulder Environmental Inc.’s Chris Maron conducted a mold assessment and testing of the garage workshop at 3132 8th Street, Boulder, Colorado. Sampling: Two samples were collected at the subject property. Air-o-cell cassettes and sampling pump calibrated to 15 liters per minute were used to collect air samples. All ambient air samples were collected for 5 minutes. An outdoor ambient air sample was collected to establish background levels of mold spores naturally occurring in the area. Indoor ambient air samples were collected in the garage workshop. All samples were delivered to Eurofins Scientific Inc, 4955 Yarrow St, Suite 100, Arvada, CO 80002 for analysis. Results: Airborne spore concentrations in the workshop were notably higher than for Aspergillus/Penicillium. Many people breathe in aspergillus spores every day with no ill effect. However, exposure to large amounts of aspergillus can lead to numerous health problems, some of which are quite serious, especially in people with weakened immune systems. Guidelines for Interpretation: No accepted quantitative regulatory standards currently exist by which to assess the health risks related to mold and bacterial exposure. Molds and bacteria have been associated with a variety of health effects and sensitivity varies from person to person. Several organizations, including: the American Conference of Government Industrial Hygienists (ACGIH); the American Industrial Hygiene Association (AIHA); the Indoor Air Quality Association (IAQA); the United States Environmental Protection Agency (USEPA); the Centers for Disease Control (CDC), as well as the California Department of Health Services (CADHS), have all published guidelines for assessment and interpretation of mold resulting from water intrusion in buildings. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 190 of 200 Discussion: Elevated mold spore concentrations in both the indoor and outdoor environment are known to cause allergy symptoms and occasionally responsible for respiratory illness in immuno-compromised individuals. Elevated mold spore concentrations in the indoor environment can be from outdoor infiltration; or from indoor growth sources when elevated surface moisture and humidity exist for extended periods of time. Conditions under which indoor mold growth can occur include: • Historical flooding without proper cleanup • Moisture intrusion occurring through sub-flooring, walls, windows, or roofs • Plumbing, water line leak, toilet overflows or sewer backups • Moisture condensation within HVAC systems • Persistent elevated relative humidity above 70%, and inadequate housekeeping Mold and fungi require three basic criteria to colonize the inside of a building including: • A source of moisture • A food source • Lack of surface disturbance and/or air movement Indoor food sources for mold can be any organic material provided by a flood or sewer backup; or cellulosic materials present in the building such as carpet backing, linoleum backing, drywall paper, ceiling panels, or the buildup of plant and/or skin cell fragments or debris on inorganic surfaces. Skin cell fragments are a significant food and colonizing source in office buildings and private homes where a high occupancy exists, or adequate housekeeping is not performed. Molds colonize most readily where air disturbance is minimal. For this reason, mold colonization occurs most frequently in closed or concealed spaces such as closets, storerooms, basements, refrigeration units, or on the back or underside surface of furniture. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 191 of 200 Conclusion: Further investigation is recommended to identify and mitigate the cultivation of mold spores in the workshop of the garage. The laboratory reports supporting these findings above are attached. Please contact Boulder Environmental Inc. if you have any questions or concerns regarding this report. Sincerely, Chris Maron Project Manager Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 192 of 200 November 07, 2024 Sincerely, Jeanne Spencer President Subcontractor Number: Laboratory Report:RES 620083-1 Project #/P.O. #:None Given Project Description:3132 8th St Derek Davignon Boulder Environmental, Inc. 5 Deer Trail Boulder CO 80302 Dear Derek, Eurofins Reservoirs is an analytical laboratory accredited for the analysis of pathogenic, non-pathogenic and environmental microorganisms by the American Industrial Hygiene Association (AIHA LAP, LLC), Lab ID 101533. The laboratory is currently proficient in the EMPAT program. Eurofins Reservoirs has analyzed the following sample(s) per your request. The analysis has been completed in general accordance with the appropriate methodology as stated in the analysis table. Reported sample results were not blank corrected. Results have been sent to your office. RES 620083-1 is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer. Eurofins Reservoirs will not discuss any part of this study with personnel other than those of the client. The results described in this report only apply to the samples analyzed, as received and with the information provided by the customer. This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without written approval from Eurofins Reservoirs. Samples will be disposed of after sixty days unless longer storage is requested. If you have any questions about this report, please feel free to call 303-964-1986. by Sam Li 11/07/202411/07/202411/07/202411/07/2024 Eurofins Reservoirs Environmental, Inc. Eurofins Reservoirs QA Manual Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf (303) 964-1986 (866) RES-IENV https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com 4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 1 of 3 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 193 of 200 Client ID NumberClient ID NumberClient ID NumberClient ID Number 620083 - 9-30-CM-1I620083 - 9-30-CM-1I620083 - 9-30-CM-1I620083 - 9-30-CM-1I 620083 - 9-30-CM-1O620083 - 9-30-CM-1O620083 - 9-30-CM-1O620083 - 9-30-CM-1O Sample Volume (L)Sample Volume (L)Sample Volume (L)Sample Volume (L)75757575 75757575 % Analyzed% Analyzed% Analyzed% Analyzed Raw CountRaw CountRaw CountRaw Count Spores/m³Spores/m³Spores/m³Spores/m³% Analyzed% Analyzed% Analyzed% Analyzed Raw CountRaw CountRaw CountRaw Count Spores/m³Spores/m³Spores/m³Spores/m³ AcremoniumAcremoniumAcremoniumAcremonium 100 ND 100 ND AlternariaAlternariaAlternariaAlternaria 20 3 200 100 3 40 ArthriniumArthriniumArthriniumArthrinium 100 ND 100 ND Ascospores - Non-SpecifiedAscospores - Non-SpecifiedAscospores - Non-SpecifiedAscospores - Non-Specified 20 9 600 100 31 413 Aspergillus/Penicillium - LikeAspergillus/Penicillium - LikeAspergillus/Penicillium - LikeAspergillus/Penicillium - Like 20 156 10400 100 37 493 Basidiospores - Non-SpecifiedBasidiospores - Non-SpecifiedBasidiospores - Non-SpecifiedBasidiospores - Non-Specified 20 7 467 100 3 40 Bipolaris/Drechslera - LikeBipolaris/Drechslera - LikeBipolaris/Drechslera - LikeBipolaris/Drechslera - Like 100 ND 100 ND BotrytisBotrytisBotrytisBotrytis 100 ND 100 ND Cercospora - LikeCercospora - LikeCercospora - LikeCercospora - Like 100 ND 100 ND ChaetomiumChaetomiumChaetomiumChaetomium 100 ND 100 2 27 CladosporiumCladosporiumCladosporiumCladosporium 20 11 733 100 55 733 CurvulariaCurvulariaCurvulariaCurvularia 100 ND 100 ND EpicoccumEpicoccumEpicoccumEpicoccum 100 ND 100 ND FusariumFusariumFusariumFusarium 100 ND 100 ND GanodermaGanodermaGanodermaGanoderma 100 ND 100 ND HelicomycesHelicomycesHelicomycesHelicomyces 100 ND 100 ND MemnoniellaMemnoniellaMemnoniellaMemnoniella 100 ND 100 ND Myxomycetes/Periconia/Smuts/RustsMyxomycetes/Periconia/Smuts/RustsMyxomycetes/Periconia/Smuts/RustsMyxomycetes/Periconia/Smuts/Rusts 20 8 533 100 42 560 NigrosporaNigrosporaNigrosporaNigrospora 100 ND 100 ND Non-specified sporeNon-specified sporeNon-specified sporeNon-specified spore 100 ND 100 2 27 Oidium (powder mildew)Oidium (powder mildew)Oidium (powder mildew)Oidium (powder mildew)100 ND 100 2 27 Pestalotiopsis/PestalotiaPestalotiopsis/PestalotiaPestalotiopsis/PestalotiaPestalotiopsis/Pestalotia 100 ND 100 ND PithomycesPithomycesPithomycesPithomyces 100 ND 100 ND ScopulariopsisScopulariopsisScopulariopsisScopulariopsis 100 ND 100 ND SpegazziniaSpegazziniaSpegazziniaSpegazzinia 100 ND 100 ND StachybotrysStachybotrysStachybotrysStachybotrys 100 ND 100 ND StemphyliumStemphyliumStemphyliumStemphylium 100 ND 100 ND TetraploaTetraploaTetraploaTetraploa 100 ND 100 ND TorulaTorulaTorulaTorula 100 ND 100 ND Trichoderma - LikeTrichoderma - LikeTrichoderma - LikeTrichoderma - Like 100 ND 100 ND Ulocladium/StemphyliumUlocladium/StemphyliumUlocladium/StemphyliumUlocladium/Stemphylium 100 ND 100 2 27 AlgaeAlgaeAlgaeAlgae 100 ND 100 ND Hyphal FragmentsHyphal FragmentsHyphal FragmentsHyphal Fragments 20 16 1067 100 17 227 PollenPollenPollenPollen 100 ND 100 ND Analytical Sensitivity*Analytical Sensitivity*Analytical Sensitivity*Analytical Sensitivity*20 1 67 100 1 13 Background Debris %Background Debris %Background Debris %Background Debris %4 2 Total Spores/m³Total Spores/m³Total Spores/m³Total Spores/m³13000 2400 Raw TotalRaw TotalRaw TotalRaw Total 194 179 CommentsCommentsCommentsComments Very high levels of background materialobserved Date Samples Collected: None Given Spore Trap(s): Allergenco - D *The reported Analytical Sensitivity is calculated based on one spore detected, in the area analyzed, using the smallest percent area analyzed. Sample analyses have not been blank corrected. Sam LiAnalyst Eurofins Reservoirs Environmental, Inc. Eurofins Reservoirs QA Manual Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf RES Job Number: Client: Client Project/P.O.: Client Project Description: Date Samples Received: Analysis Type: Turnaround: Date Samples Analyzed: RES 620083-1 Boulder Environmental, Inc. None Given 3132 8th St October 30, 2024 REI MICROBIOLOGY SOP / ASTM D7391-20-M Standard November 07, 2024 EUROFINS RESERVOIRS ENVIRONMENTAL, INC. NVLAP Lab Code 101896-0 AIHA LAP, LLC. LAB ID 101533 TABLE: I ANALYSIS: SPORE TRAP, NON-VIABLE METHODOLOGY NA = Not Analyzed NR = Not Received ND = None Detected TNTC = Too Numerous To Count CBR = Cannot Be Read Min. Reporting Limit (MRL) = 1 Cell Common Allergen Water Loss Indicator (303) 964-1986 (866) RES-IENV https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com 4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 2 of 3 Spore concentrations exceeding 500 are the most concerning. The first sample was collected in the garage workshop. The second sample was collected just outside the garage to the west. Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 194 of 200 Background Debris Rating Description Interpretation 0 No Particles Detected No particles were observed on slide. The absence of particulates could indicate improper sampling, as most air samples typically contain some particulate 1 Minimal non-microbial debris present.Reported values are not affected by debris 2 Up to 25% of the slide occluded with particulate debris Particulate debris could mask the presence of spores but do not provide significant interference with the analyses 3 26 to 50% of the slide occluded with particulate debris Particulate debris could mask the presence of spores and begin to interfere with the analytical count. As a result actual values could be somewhat higher than reported. 4 51 to 90% of the slide occluded with particulate debris Particulate debris are heavy and would mask the presence of some fungal spores if present. As a result, the count could be higher than reported. CBR Cannot Be Read Sample could not be read due to excessive debris. Spores observed on the perimeter of debris are reported as present or abundant. The sample should be collected at shorter time interval or other measures taken to reduce the collection of non- microbial debris. Qualitative Reporting Limits Infrequent Occasional Moderate Abundant 1 to 10 Structures per Field of View ANALYTICAL INFORMATION Spore traps are a sampling devices that collect aeroallergens such as pollens, mold and fungal spores, fibers, dander, insect components and other air-borne contaminates. Samples are analyzed using light microscopy at 600X magnification with the entire sample trace or a percentage of the trace is counted. The results include both viable and non-viable fungal spores. This technique does not allow for the differentiation between Aspergillus and Penicillium spores. Small (1-3um) spherical fungal spores that cannot be identified and may included Aspergillus, Penicillium and Paecilomyces and others. Sample traces with greater than 500 spores per slide are difficult to count accurately due to overcrowding and should be considered estimations. Excessive non- microbial particulate debris can mask the presence of fungal spores, thereby reducing counting accuracies. All samples are graded with the following debris scale for data qualification. AIHA EMPAT #101533 Description 10+ Structures per Field of View 5 to 50 Structures per 22 x 22 mm 1 to 5 Structures per 22 x 22 mm Eurofins Reservoirs Environmental, Inc. Eurofins Reservoirs QA Manual Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf (303) 964-1986 (866) RES-IENV 4955 Yarrow St, Suite 100, Arvada, CO 80002 https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.comPage 3 of 3 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 195 of 200 SUBMITTED BY INVOICE TO Client Sample ID Number RES Job #: 620083 CONTACT INFORMATION SERIES ASBESTOS LABORATORY HOURS: Weekdays: 7am - 7pm & Sat. 8am - 5pm REQUESTED ANALYSIS VALID MATRIX CODES LAB NOTES CHEMISTRY LABORATORY HOURS: Weekdays: 8am - 5pm MICROBIOLOGY LABORATORY HOURS: Weekdays: 8am - 5pm **Turnaround times establish a laboratory priority, subject to laboratory volume and are not guaranteed. Additional fees apply for afterhours, weekends and holidays.** Laboratory Analysis Instructions (Sample ID's must be unique) Company:Boulder Environmental, Inc.Company:Boulder Environmental, Inc. Address:5 Deer Trail Address:5 Deer Trail Boulder, CO 80302 Boulder, CO 80302 Project Number and/or P.O. #:None Given Project Description/Location:3132 8th St Contact:Derek Davignon -1 Micro Standard Phone:(303) 949-2965 Fax: Cell:(303) 949-2965 Final Data Deliverable Email Address: derek@boulderenvironmental.com (+ 3 ADDNL. CONTACTS) PLM / PCM / TEM DTL RUSH PRIORITY STANDARD Air = A Bulk = B Dust = D Food = F Paint = P Soil = S Dust RUSH PRIORITY STANDARD *PRIOR NOTICE REQUIRED FOR SAME DAY TAT Surface = SU Swab = SW Tape = T Wipe = W Metals RUSH PRIORITY STANDARD Drinking Water = DW Waste Water = WW Organics*SAME DAY RUSH PRIORITY STANDARD **ASTM E1792 approved wipe media only** Viable Analysis**PRIORITY STANDARD **TAT DEPENDENT ON SPEED OF MICROBIAL GROWTH Medical Device Analysis RUSH STANDARD Mold Analysis RUSH PRIORITY STANDARD Special Instructions: 1 9-30-CM-1I X A 2 9-30-CM-1O X 75L APLMTEMPCMDUSTMETALSORGANICSVIABLESMEDICALMOLD - Spore Trap Analysis (ASTM D7391-20)Sample Volume (L) / AreaLength(or Aliquots) x Width(or Area per Aliquot)Matrix Code# of ContainersDate Collectedmm/dd/yyTime Collectedhh:mmASBESTOS CHEMISTRY MICROBIOLOGY ICO EREI establishes a unique Lab Sample ID, for each sample, by preceding each unique Client Sample ID with the laboratory RES Job Number. EREI will analyze incoming samples based on information received and will not be responsible for errors or omissions in calculations resulting from the inaccuracy of original data. By signing, client/company representative agrees that submission of the following samples for requested analysis as indicated on this Chain of Custody shall consitute an analytical services agreement with payment terms of NET 30 days. Failure to comply with payment terms may result in a 1.5% monthly interest surcharge. Relinquished By:Derek Davignon Date/Time: 10/30/2024 14:39:22 Sample Condition: Acceptable Received By:Anna Shilo Date/Time: 10/30/2024 15:27:36 Carrier: Hand Eurofins Reservoirs Environmental, Inc. Eurofins Reservoirs QA Manual Effective September 06, 2023 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf (303) 964-1986 (866) RES-IENV https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com 4955 Yarrow St, Suite 100, Arvada, CO 80002 Page 1 of 1 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 196 of 200 Attachment A - Application Materials Item 5B - 3132 8th St Memo 01.08.25 Page 197 of 200 Attachment A - Application MaterialsItem 5B - 3132 8th St Memo 01.08.25Page 198 of 200 J f I I Appraised 19 � / BOULDER COUNTY REAL ESTATE APPRAISAL OWNER J, /c..-) I . I HOUSE No. 3 / '3 :).... STREET CITY 0 LOTS I 7 Year Constructed I / Cf ,:i ;; BLOCK I ADDITION / u -<_,J-'( x..--::r ._u Est. Life in Years 1/ o ESTIMATE OF VALUATION / BLDG. PART A BLDG. PART B GARAGE ;;r-fe.J> � BUILDING PLAN _____,, .., Jc./ ( No. Cubic Feet.�----___ o/_ __ i __ 7_j__ ___ /_f_ ___ �----_;J__J _!_P._ __w.._ l,V/:;-. L/fJrr-jCost per cu. ft. ---1--__________ L�-________ '?:_'i ___________ _?_ITotal Cost_ __________ $ __ _/ _ L/ :1 _3 $ _____ (_ti.-/ -$ __ _3 ( ---- 1/41 , ---10 --...,v I r :-1 "-·'-1)-Porches _______________________________________________________ _ Garage ________________________ 2 S-_______ 3 _________________ _ , :: Extm ::: :::::: :::::: :::: :::::::::::I::::::::::::::: :::::: :: :::: TOTAL ______ $_)_ j-0 __ '/ $ _____ '[! _ 04 $ ___________----% Obsolesence ____________________________________________ _ �Physical Dep._� ------�-J-� _______ <j__q_':t_ __________ _ Net �!��:c?:t1�����!. $_.Ll_:_?�{P--1$-YL __ �-� $--���------l-1; O___ Q% Utility Dep. ___ $---__ ,_-:i_s) ___ ½:'.1$ ______________ $-----------PRESENT VALUE __ $. ____ zi:'._�Q . $ ______________ $. _________ _ DESCRIPTION Class of Bldg._ ---i-<! C, ________ Basement ______ L!-1:!_!!!�--------. .,.� .Jlc_ 3-i' 0--.,,,, Construction __ -)r-J $----✓-Roof �----------��r,�---·;,r· Char. �f Const. _i, ____ Trf'�-�D�---Heat�g _______ -� ---,;--�- '--.....____ ---- I I'/ 7 I y SUMMARY Exterior_ _ _____ }J__ �--1-Plurnbmg _________ • __ -�: _______ 1Interior Finish -t;�:;r��j/) __ Li�ht _________ --;:_,)'._-�.!"--':---_________ D_Es_c_R_IP_T_IO_N _______ _Floors __________ -;:-:--�,-----�H!. ___ Priv. Garage ____ ::.--�----·----· _B_u_i_ld_in_,,g:....P_e_r_m_i t ______________ _(h. c ;,..-B s I I••-Original Cast, Improvements _O_n....::ly _______ _Stories ______________ s--:::-__________ arns or Sheds ____ �J _" ___ _ r--Additions and Betterments Fire R esisting ____ ':;:f _______ v::_ ____ State of Reps. --=--�-::!._ _________ --------------------% -Owner's Estimate of PreRent Value Foundation ____ .�./: __ .. ,·-: .. �---L oca l Imps . ___ --,,_::-.,,A ,.-________ -P -r -iv -a -te�A-p -pr -a-i s_a _l _______________ , ADDITIONS AND BETTERMENTS Insurance Monthly R ental YEAR AMOUNT �EARi AMOUNT Mortgage \._ $ $ $ $ $ $ $ $ $ AMOUNT YEAR 1938 --1939 1940 1941 --1942 1943 1944 1945 1946 --1947 I I-/ $ "• -•�r�i. -� . --�•- ·- If Y. "' ] ,; 'I � 7 --.l. .2 .-,; .2� 1/,._ ><. .2.. 4 t 1., 1 {) ::: l Lf 1 1._'( / ' I I Height of Building_J:"f?.{J____ ______ 1 ANNUAL ASSESSMENT LAND /C ll'IIPROVEMENTS , • TOTAL / Attachment B - Boulder County Tax Assessor Card Item 5B - 3132 8th St Memo 01.08.25 Page 199 of 200