HomeMy WebLinkAbout10.21.24 WRAB Agenda 4 - Upper Goose Creek and Twomile Canyon Creek Reach 6 UpdateC I T Y OF B O U L D E R
WATER RESOURCES ADVISORY BOARD
AGENDA ITEM
MEETING DATE: October 21, 2024
AGENDA TITLE: Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
PRESENTERS:
Joe Taddeucci, Director of Utilities
Chris Douglass, Utilities Engineering Senior Manager
Brandon Coleman, Storm/Flood Engineering Manager
Debbie Fisher, Storm/Flood Project Manager
EXECUTIVE SUMMARY
The City of Boulder includes 16 major drainageways and has the highest flooding risk in the State
of Colorado. In 2023, City Council approved a flood mitigation plan for two of these drainageways,
the Upper Goose Creek and Twomile Canyon Creek watersheds. The project is needed to protect
the safety of the community and improve the ecosystem of our drainageways. Community
feedback heard throughout the planning process included themes such as preservation of the
natural landscape and wildlife corridors, concerns about impacts to individual properties, and a
sense of urgency to complete flood projects.
Since that time, the community has expressed ongoing concerns over disturbance and restoration
of the open channel along a portion of Goose Creek called Reach 6. To explore the possibility of
avoiding disturbance to this reach of the stream and instead building the project under Edgewood
Drive, the city took a closer look at a piped alternative. Unfortunately, the piped alternative does
not eliminate Reach 6 stream channel disturbance as intended. The investigation determined that
a piped alternative could not intercept and divert all flood water to Edgewood Drive, would involve
extensive construction disturbance to front yards on both sides of Edgewood Drive, and would
cost significantly more, among other issues. In part because a piped alternative would not avoid
disturbance as hoped, and restoration of the existing creek would still be necessary, the project will
proceed with the open channel alternative identified in the Mitigation Plan. The purpose of this
memo is to provide WRAB and the community with a project update and an opportunity to ask
questions about Goose Creek Reach 6.
BACKGROUND
The City of Boulder includes 16 major drainageways and has the highest flooding risk in the State
of Colorado. Upper Goose Creek and Twomile Canyon Creek (UGT) include 295 structures in the
regulatory 100-year floodplain and six structures in the High Hazard zone. Estimated damages in
the UGT study area from a 100-year flood are approximately $196M. The Comprehensive Flood
and Stormwater Plan, which was approved by City Council in September 2022, has a citywide
focus and provides guidance to the utility department for managing stormwater and flood systems
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 1 of 36
across the city with the main goal of protecting the safety of the community and the ecosystem of
our drainageways.
The City’s Stormwater and Flood Management Utility uses a life-cycle
approach to addressing flood risks throughout the community as identified
in Figure 1. This approach starts with floodplain mapping to identify risk,
followed by mitigation to select the preferred project alternatives, and then
design and construction. Mapping is then updated to reflect the new
floodplain with mitigation projects in place to continue the cycle, as needed.
City Council approved the UGT mitigation plan on May 18, 2023. The final
recommendations in this plan considered numerous project alternatives and
extensive community outreach. Themes from community feedback
generally included preservation of the natural landscape and wildlife
corridors, concerns about impacts to individual properties, and a sense of urgency to complete
flood projects. Community input is reflected in the mitigation plan and will be further refined in
the design phase. Implementation of the UGT mitigation plan removes 527 structures from impact
in the 100-yr flood.
Following flood mapping for UGT in 2015 the city began community outreach. Open channel
designs that maximize and preserve natural project features were favored by the community, while
most community concerns related to individual private property impacts. Community input from
this earlier phase of engagement is described in more detail in a March 18, 2019 WRAB memo.
After COVID and staffing-related delays, community engagement resumed in 2021 and continued
through 2023.
ANALYSIS
UGT WATERSHED
In alignment with community feedback and recommendations from the 2022 Comprehensive
Flood and Stormwater Master Plan (CFS), the approach for the open channel portions of the
mitigation plan will be based on natural channel design. Where piped sections are recommended,
they will typically be designed with large box culverts.
The mitigation approach for UGT will restore capacity for the 100-yr flood in most areas and will
also enhance restoration of existing natural drainageways and connection of those natural systems.
The preferred alternative for the first reach of the upper portion of Twomile Canyon Creek was
less than 100-year conveyance, and the preferences for the rest of both watersheds were to provide
100-year conveyance.
Figure 1. Flood Project
Lifecycle
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 2 of 36
The mitigation plan identified the
chosen alternatives and level of flood
conveyance for four reaches of
Twomile Canyon, and six reaches of
Goose Creek, as indicated in Figure
2. The recommended UGT mitigation
improvements are estimated at a
combined construction cost of
approximately $43M with a benefit of
$163M based on reduction in property
damage for a cost benefit ratio of 3.8.
More information is described in the
March 2023 WRAB memo.
Figure 2 Upper Goose Creek/Twomile Canyon Creek Watershed
The first phase of the mitigation plan is the lower reach of Goose Creek, identified in Figure 2 as
Reach 6. This reach has to be done first as it is the most downstream portion of both watersheds.
The work has to be done generally from downstream to upstream for water to have a place to go.
There are currently funds within the 6-year Stormwater and Flood capital improvement plan to
implement the identified improvements to Reach 6 with additional stormwater improvements.
REACH 6
This reach is currently an open channel with less than five-year capacity, situated behind the homes
along the south side of Edgewood Drive. The recommended alternative in the mitigation plan is to
restore the natural channel along Reach 6 to accommodate the 100-year (1% chance storm event.)
A piped alternative was initially determined to be less feasible and was not explored further in the
mitigation plan. Community concerns have arisen about the open channel alternative, including
disturbance of and protection of the existing environment along the creek, and disruption to
wildlife and private property near back yards. Subsequently, the city hired ICON Engineering to
produce a detailed study, conceptual design, and report to analyze feasibility, constructability, cost,
and the pros and cons of a piped alternative versus the open channel alternative. The key result of
the study indicates that it is not possible to capture all the flood water in a pipe under Edgewood
Drive because the stream elevation is lower than the required pipe elevation. Creek improvements
would still be needed to accommodate the water that would not be diverted into the piped system
under Edgewood Drive. Additionally, the multiple box culverts required under the road to convey
the captured portion of the water and relocation of utilities would require disturbance to the entirety
of Edgewood Drive and the adjacent residents’ front yards. After a thorough review of the results
and identification of the significant shortcomings described above, staff does not recommend
further development of the piped alternative.
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 3 of 36
NEXT STEPS
Staff will continue to work in partnership to inform the community about the analysis and
expectations for the next steps to implement the mitigation plan based on the open channel design
for Reach 6. Following is a summary of key milestones in the implementation.
Project Milestone
Design consultant selection and contract 2025
Concept design and public outreach 2025
Refine design and public outreach 2026
Permitting 2026
Construction 2027
ATTACHMENTS
A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 4 of 36
7000 S. Yosemite Street, Suite 120 | Centennial, CO 80112 | (303) 221-0802 | iconeng.com
UPPER GOOSE CREEK REACH 6 – CONCEPTUAL
DESIGN FOR STORM DRAIN ALTERNATIVE
TO: City of Boulder – Ms. Debbie Fisher, PE, CFM, CPESC, Senior Project Manager
City of Boulder Utilities – Storm/Flood
FROM: ICON Engineering, Inc. – David Crooks, EI, Brian LeDoux, PE, CFM
RE: Upper Goose Creek Reach 6 Conceptual Design for Storm Drain Alternative
DATE: April 25th, 2024
Purpose
This memorandum has been prepared to outline and assess the feasibility of an additional conceptual design
alternative for Upper Goose Creek Reach 6 consisting of a closed conduit storm drain system that would run
beneath Edgewood Drive from 19th Street to just downstream of 23rd Street. This alternative would provide
a substitute floodplain mitigation approach to the previously approved open channel alternative as included
in the Upper Goose Creek and Twomile Canyon Creek Flood Mitigation Plan Alternatives Report dated April 28,
2023, and adopted by City Council in May 2023.
Background
The Upper Goose Creek and Twomile Canyon Creek flood mitigation master plan project has been ongoing
since 2017. After years of planning and public input the April 28th, 2023, Flood Mitigation Plan Alternatives
Report by ICON Engineering, Inc. was finalized and submitted to City Council for approval. On May 18 th, 2023,
there was a public hearing, and the City Council approved the master plan. The recommended plan for Upper
Goose Creek Reach 6 (19th Street to 23rd Street) as outlined in the 2023 Flood Mitigation Plan Alternatives
Report is a 100-year capacity open channel. This channel project consists of increasing capacity and improving
the existing Upper Goose Creek Reach 6 historic channel that passes behind residential properties on the
south side of Edgewood Drive. After Council approval of the Plan, some of the residents adjacent to the existing
Upper Goose Creek Reach 6 channel expressed concerns that the plan would have a negative effect on the
existing channel corridor and suggested a 100-year storm drain alternative. Thus, the City hired ICON
Engineering, Inc. to conceptually design and assess the feasibility of a 100-year storm drain system under
Edgewood Drive as an alternative to the previously approved 100-year channel improvement concept.
Upper Goose Reach 6 - 100-Year Storm Drain Conceptual Design Alternative
The Edgewood Drive alternative storm drain concept has been designed for both the interim and master plan
conditions. The interim conditions assume that the planned Twomile Canyon Creek flood mitigation
improvements are not yet in place whereas the master plan conditions assume that Twomile Canyon Creek
flood mitigation improvement projects have been completed. The future Twomile Canyon Creek master plan
improvements include a large storm drain system that runs from the Broadway and Iris intersection east along
Iris, south on 19th, and ultimately along Floral Avenue to Upper Goose Creek. These Twomile Canyon Creek
improvements will ultimately eliminate the spill flows out of Twomile Canyon Creek that currently flow into
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 5 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 2 of 12
Upper Goose Creek and the Edgewood Drive / Reach 6 area. The current interim condition spill flows out of
Twomile Canyon Creek and their respective locations are detailed in Table 2 below.
Hydrology
The hydrologic analysis used a basis for this study is the February 16th, 2012, Upper Goose Creek and
Twomile Canyon Creek Flood Mapping Study Update Hydrology Verification Report by ICON
Engineering, Inc. However, the table below and majority of the attached supporting documents are
from the August 6th, 2015, Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study
Update Hydraulic Report by ICON Engineering Inc. which superseded the hydrology report. Both the
master plan conditions, and interim conditions storm drain concept alternatives for the Upper Goose
Creek Reach 6 conceptual design utilize discharges from the 2012 report which are based on the
Corrected Effective Conditions hydrologic model. These discharges are highlighted and shown in Table
1 below.
Table 1: Recommended Discharges from the 2012 Hydrology Verification Report
For both the master plan and interim storm drain design concepts it is assumed that the existing Upper
Goose Creek Reach 6 channel will continue to convey the 5-year return interval with higher flows being
diverted into the storm drain system beneath Edgewood Drive. Thus, the design flow for the master
plan conditions Edgewood Drive storm drain concept is simply the total 100-year return interval flow
minus the 5-year return interval flow, which is 1287 cfs.
As discussed above, an interim condition design was also completed. The interim storm drain
alternative concept design assumes that no flood mitigation master plan improvements are in place
along Twomile Canyon Creek. Without these improvements there are several overland flow paths from
Twomile Canyon Creek that travel south and are intercepted by Upper Goose Creek upstream of Reach
6. See Table 2 below for a summary of these flow path locations and values.
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 6 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 3 of 12
Table 2: Two Mile Canyon Creek Spill Flow Locations and Values (100-year)
The design flow rate for the interim conditions Edgewood Drive storm drain concept alternative is the
design flow rate for the master plan conditions concept plus the additional flow from the spill flows out
of Twomile Canyon Creek, for a total design discharge of 1724 cfs.
Excerpts from the 2015 Upper Goose Creek and Twomile Canyon Creek Flood Mapping Update
Hydraulics Report showing the basins, and flow rates discussed above are attached to this conceptual
design alternative memo.
Hydraulics
Storm Drain Sizing
The hydraulic conductivity of the proposed storm drain improvements, both for the main trunk line
below Edgewood Drive and outfall pipe to the existing Upper Goose Creek Reach 6 channel, was
modeled in StormCAD (version 10.04.00.158). Slope and vertical sizing allowance was then
determined in Civil 3D 2023 based on known utility locations within Edgewood Drive. The storm drain
alignment was then exported to StormCAD with the following hydraulic input parameters: a Manning’s
n-value used for the proposed storm drain network was 0.013 and the junction loss method was the
absolute loss method with a head loss set to 0 across all solvers in StormCAD. For both the master
plan and interim conditions flow rates, parallel storm drain box culverts were added in StormCAD until
the hydraulic grade line remained below the ground surface to eliminate manhole surcharging and
surface flooding during the design event.
From conceptual hydraulic modeling it was determined that a series of parallel 4-foot high by 4-foot
wide box culverts would be needed to convey both interim and master plan discharges. The design
initially consisted of 3-foot high by 4-foot wide box culverts but for the proposed pipe system to fit
within the right-of-way a 4-foot high box culvert is necessary. With this adjustment in the height, along
with the proposed network fitting within the right-of-way, the existing sanitary lines will have to be
lowered a foot and moved further south by 10 to 15 feet within the project area on Edgewood Drive.
For the master plan conditions storm drain 6 parallel box culverts from 19th Street to Nicholl Street
East and 7 parallel box culverts from Nicholl Street East to 23rd Avenue would be necessary to convey
flooding flows. The master plan storm drain system would have a total width of 28 to 33 feet, for 6
and 7 parallel box culverts, respectively. For the interim conditions storm drain 8 parallel box culverts
from 19th Street to 23rd Avenue would be necessary to convey flooding flows. The interim conditions
storm drain system would have a total width of 38 feet.
It is important to note that a taller box culvert option was explored prior to the selection of the 4-foot
high by 4-foot wide parallel box culverts. With a taller box culvert the storm drain system would have
to be deeper but there would be a much smaller excavation extent and less issues with conflicting
Broadway Spill 53
13th Street Spill 48
19th Street Spill 275
Evergreen Ave Spill 61
Total 437
100-Year
Flow Rate
(cfs)
Location
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 7 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 4 of 12
utilities. Unfortunately, the existing grade flattens out at the end of the proposed storm drain reach.
There would not be enough ground cover at the downstream proposed storm drain to cover a deeper
box culvert so significant earthwork would be required. Also, with a larger, deeper box culvert the storm
water velocity would be too high for the flat slopes necessary to outfall into the existing channel and
the hydraulic grade line would exceed the ground surface. When the hydraulic grade line exceeds the
ground surface, there is risk of manholes becoming pressurized, potentially causing damage and
injury. Additionally, water would begin to bubble out of manholes and would no longer be contained
within the storm drain.
Even if a deeper box culvert could work hydraulically, there would be issues with utility service lines
crossing under the proposed culvert to service properties along the north side of Edgewood drive. A
deeper box culvert would necessitate parallel utility mains to be installed on either side of the proposed
storm drain which would add cost and time to the project. Whereas, with the shallower box culvert
design, group service lines from utility laterals and existing cross street connections to the south side
trunk lines can be utilized. Thus, it was determined that parallel 4-foot high by 4-foot wide box culverts
were the optimal solution given the site constraints.
Inlet Sizing and Placement
Inlet sizing and quantities were determined using UD-inlet (version 5.03). Since this design was
conceptual in nature all of the inlets used the same parameters and were not specifically designed for
the locations shown in plan view. See image below for specific input values for inlet sizing along 19 th
Street and in the alley between Edgewood Drive and Tyler Road west of 19 th Street:
Note that the inlet quantities shown on sheet three of the attached plan and profile sheets (11) 20-ft
type R inlets and (15) type C inlets were designed to capture the 1287 cfs that would be on the
surface in Master Plan Conditions. As previously mentioned, there are several spill flow paths that
make their way to the intersection of 19th Street and Edgewood given that no flood mitigation master
plan improvements are in place along Twomile Canyon Creek, these spill flows combine for a total
discharge of 437cfs. An additional 90 feet of type R inlets would need to be installed and connected
to the interim conditions storm drain system at the intersection of 19 th Street and Edgewood Drive to
capture this additional flow.
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 8 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 5 of 12
Conceptual Profile
The conceptual design box culvert slope and size were determined in Civil 3D 2023 by adhering to the
following parameters: ground coverage, utility crossing clearance and both downstream and upstream
tie-in elevations. A minimum of 18” ground coverage was maintained on the proposed box culvert with
a few exceptions, three of which were on the mainstem and one on the outfall pipe to the existing
channel. On the mainstem, the very upstream and downstream ends where the box culvert ties-into
the existing storm and open channel require some additional fill to meet this criterion. At roughly
station 21+40 there is only about 16” of ground cover due to slope constraints. However, there could
be additional fill here when the roadway is resurfaced. On the upstream end of the Edgewood Drive
proposed storm drain the roadway will need to be raised to provide required ground cover. Due to the
proposed storm drain slope constraints at the 19th Street box culvert outfall location there is one area
where the ground coverage is only 12” above the relocated sanitary crossing. The proposed grade on
both ends of the storm drain is shown on the profile drawing and there are proposed contours shown
in plan view.
A minimum of 12” clearance from crossing utilities was maintained for the proposed box culvert in all
but one location. One sanitary sewer crossing at the downstream end of the Edgewood drive storm
drain system has 9.6” of clearance. This exception is due to ground clearance constraints, slope
constraints, and tying-into the downstream existing grade. As discussed in the challenges section of
this memorandum, the parallel sanitary sewer system on Edgewood Drive needed to be lowered and
shifted south to accommodate the space and clearance necessary for the proposed storm drain
system.
Junction boxes were placed no more than 400 feet apart per City of Boulder municipal code.
Additionally, they were placed at all locations where the bend in the storm drain system exceeded 45
degrees. Finally, one was placed at the upstream end where the 19th Street / Edgewood storm drain
system meets the 19th Street box culvert outfall and the proposed system ties-into the existing storm
drain. The conceptual design box culvert plan and profile is illustrated on the attached three sheets.
Challenges
A storm drain alternative to an open channel approach results in some notable challenges
which are discussed below.
Phased Discharge Collection
Although the conceptual design shown on the attached drawings are for the master plan flows
as outlined in the Hydrology section there are two other flow rates to consider that would affect
the size and placement of the proposed storm drain system and inlets. The interim conditions
flows would necessitate an additional 90 feet of type R inlets that would be most effectively
installed on the north side of the 19th Street and Edgewood Drive intersection. There is also
the full master plan conditions which assumes that all other improvements for both Upper
Goose Creek and Twomile Canyon Creek improvements are in place. For this condition, the
only inlets that would need to be installed would be for local nuisance flow as there would be
no major flooding flows to collect since they would already be in the storm drain system
upstream of 19th Street. Accordingly, the vast majority of the inlets shown as part of this
conceptual design eventually become obsolete.
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 9 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 6 of 12
Grade Changes
Increasing the 19th Street road grade by nearly two feet between Edgewood Drive and Tyler
Road would have significant impacts on flow patterns around this area. There is a chance that
property owners adjacent to this area of fill would be negatively affected by the grade changes,
particularly in the interim conditions time frame prior to full master plan improvement
implementation.
Impact Extents
The excavation footprint of the proposed parallel box culvert networks, as shown on the design
sheets, would affect the entire right of way of 19th Street north of Upper Goose Creek and the
entire right of way of Edgewood Drive. This would cause notable impacts to Edgewood Property
owners’ lawns, sidewalks, and driveways and would add a significant amount of coordination,
cost, and general impact to this conceptual alternative. This would also cause significant traffic
delays and access issues for residents along the project reach.
Utility Conflicts
In order to fit the entire proposed storm drain system within the right of way the existing
sanitary sewer, water line and gas line systems must be relocated. Additionally, in order to
provide the proper utility clearance for sanitary sewer, water, and gas lines crossing the
proposed storm drain the relocated utility systems would need to be lowered as well. There are
a total of 15 sanitary sewer, water line and gas line laterals that would need to be lowered
along Edgewood Drive and one sanitary sewer lateral that would need to be raised to provide
the proper clearance over the 19th Street outfall pipe. This increases the cost and timeline of
this conceptual alternative.
Additionally there are a total of five properties along the north side of Edgewood Drive that
would need to be serviced from the utility laterals along 20th Street and Lorraine Court. There
would have to be group service lines for sewer, water, and gas utilities that run through private
property in order to serve these parcels that are not adjacent to lateral lines and cannot be
serviced from the main lines that run under Edgewood Drive due to utility clearances and
reducing the amount of crossing utilities under the proposed storm drain system. These group
service lines would disturb homeowners’ landscaping and likely cause the removal of trees
and the replacement of fences on private property, all of which would increase the cost and
timeline of this conceptual alternative.
As noted above, the general alignment of the conceptual storm drain system is limited by both
ground cover and utility clearance. It is important to note that the only utility that elevation
data was available for as part of this conceptual design layout was the sanitary sewer utility.
Horizontal alignment of the water line was provided, and elevations were assumed. For the
gas utility neither horizonal nor vertical data was provided but considering the extents and
depth of the proposed storm drain system it was assumed that the gas utility would have to be
relocated. It should be noted that the water and gas lines would require significant relocation
efforts to allow for construction of the storm drain system. Considering the excavation extents
of this project being the entire right-of-way there are a total of seven streetlamps, four
overhead utility poles and one fire hydrant that would need to be removed and replaced as
part of this project. Overhead utilities include electric, telephone, and internet. Any future
design iterations that include these other utility crossings and conflicts, which are much more
easily relocated relative to sanitary sewers, will likely increase the cost and timeline of this
conceptual alternative.
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 10 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 7 of 12
City code specifies a minimum 10 feet horizontal clearance between parallel utility lines. With
the width of the right-of-way, proposed storm drain and amount of underground parallel utility
lines a variance of 6-feet (centerline to centerline) between parallel utilities would have to
adopted as part of this project.
Construction Phasing / Construction Disruptions
This conceptual design project consists of excavating the entire right-of-way of Edgewood Drive
in order to install the proposed storm drain and relocate the existing utilities. There would be
extensive amounts of traffic control and service interruptions as a result of this project. Those
who reside along the project reach on Edgewood Drive would be unable to park in front of their
homes or in their driveways, Similarly those who reside in residences along Nicholl St West,
Nicholl St East, and Lorraine Ct will experience difficulty accessing their homes as construction
will affect those street intersections with Edgewood Drive. Service interruptions will include
water, sewer, gas, electricity, internet, and phone. The specifics regarding duration of service
interruptions and traffic control were outside of the scope of this phase of this design and are
to be determined in future design iterations.
Nuisance Flooding
Through modeling efforts, it was determined that in current conditions, in large storm events,
water ponds at about a foot of depth where 19th Street meets Upper Goose Creek Reach 6.
Once water exceeds a foot of depth water overtops the roadway and flows directly into the
open channel. For this conceptual storm drain alternative to intercept all of the flooding flow,
before Upper Goose Creek Reach 5 master plan improvements are in place, a significant
number of inlets would be necessary to capture this flow. Although these inlets would
eventually get the storm water into the proposed storm drain system, it would not completely
eliminate the ponding along 19th Street. Future design iterations will explore the extents of this
ponding depth, which would ultimately be eliminated once Upper Goose Creek Reach 5
improvements are in place, rendering the majority of inlets proposed as part of the Edgewood
Drive storm drain alternative unnecessary. It is important to note that open channel
improvements would likely consist of the addition of inlets on 19th Street but that they aren’t
ultimately necessary for the function of the channel improvements.
Cost Considerations
Even without considering utility relocation and other costs associated with the complicated
nature of this alternative, storm drain flood mitigation approaches are generally more
expensive than open channel modifications. Given limited resources to address City-wide flood
problems, the lower cost of open channels makes them the preferred approach such that
funding can be extended and more flood mitigation and drainageway restoration can be
achieved throughout the City. As noted below, the interim approach to a storm drain system
within the Edgewood right-of-way would cost on the order of $58M, while the open channel
improvements are estimated to cost on the order of $12M.
Water Quality
Storm drain solutions provide less opportunity for improved water quality and heathier stream
systems compared to open channel modifications. Improved water quality from an open
channel approach will benefit both Upper Goose Creek and all downstream receiving waters.
Energy Dissipation, Channelization, and Impacts
Energy Dissipation will need to be added to the outfall locations of the proposed storm drain
to reduce the erosivity of flood water entering the channel. Further analysis is needed to
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 11 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 8 of 12
determine the extents of necessary reinforcement on the end of the culverts to ensure that no
erosion occurs downstream of the outfall locations.
Particularly on the downstream discharge location of the proposed storm drain system, the
conceptual design shows riprap reinforcement, feature boulders, bank stabilization, and
channel invert establishment. These features would need to be installed to ensure flows could
be conveyed from the proposed outfall to Upper Goose Creek without eroding the banks. This
channelization would not only add additional cost and time to the project, but it would also
disturb a local community garden causing it to be relocated.
The natural function of a stream system can lead to natural energy dissipation, ultimately
saving on cost. Additionally, by keeping all of the flows in the Upper Goose Creek Reach 6
channel there would be no need for channelization work on the downstream end of the
proposed storm drain and the community garden would not be disturbed.
Ecology and Wildlife
Open channels present an opportunity to support and enhance site ecology. Channels
integrate flora and fauna, as well as establish wetlands and native vegetation communities –
a key component to a sustainable open channel system. Open channels create habitat for
wildlife and aquatic species. The proposed storm drain network would not have any of these
ancillary ecological benefits.
Maintenance
Compared to channel systems, the need for maintenance in a storm drain system is less visible
and more difficult to access. Maintenance in a storm drain system often occurs more
frequently as there are no natural maintenance processes occurring. This maintenance
includes but is not limited to the removal of sediment. Additionally, piped storm drainage
systems have the potential to clog as a result of sediment accumulating within the storm drain
especially at bends. This not only increases the potential for frequent maintenance but also
presents a larger issue which would limit conveyance capacity and cause surface flooding.
Floodplain Connectivity
By conveying flows greater than the 20% annual chance (5-year) storm event in a storm drain
system, the opportunity for a connected floodplain does not exist. Improving the existing
channel to convey larger storm events would provide floodplain connectivity within Upper
Goose Creek.
Resilience
Unlike an open channel, the storm drain system only has capacity to convey flooding flows up
to the 1%-annual-chance storm and is not as resilient in larger storm events. For storm events
that exceed the 1%-annual-chance storm there is potential for ponding as these flows would
not be conveyed within the storm drain system, nor will there be any channel improvements
that would increase conveyance opportunity. Unlike a storm drain system, open channels offer
the most flexibility in conveyance of flood flows, including the ability to collect and convey flows
up to and beyond design flows. Open channels are not restricted by openings, such as inlets,
which can clog during a storm and restrict flow from entering a closed conduit system.
Natural Stream Function
A closed conduit storm drain system along Edgewood Drive would not provide for an enhanced
natural stream function within the existing open channel. An open channel approach is the
best alternative to provide a natural stream function within a drainage corridor. The benefits
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 12 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 9 of 12
of a natural stream condition include: a more natural water flow regime, natural sediment
transport conditions, infiltration/groundwater recharge, and exchange of surface and
subsurface water in the hyporheic zone located under and adjacent to the low-flow channel
which is an important and beneficial biological process.
General Approach
A piped storm drain alternative is not consistent with recommendations from the City of
Boulder’s Comprehensive Flood and Stormwater Master Plan, Boulder County’s
Comprehensive Plan, or the Mile High Flood District’s High Functioning, Low Maintenance
stream approach. Where an open channel currently exists, it is the general approach of the
governing regulatory organizations to address floodplain issues by modifying/enhancing an
existing channel and not by pursuing other alternatives. An existing channel, particularly one
that reflects a natural condition, is the closest thing to the original condition of the drainageway
prior to settlement and development. Returning to a pre-settlement condition, as feasible
within the current site constraints, is typically the ideal solution to achieve both flood mitigation
and drainageway restoration.
Opportunities
A storm drain alternative to an open channel approach does have some notable opportunities which
are discussed below.
Preserved Corridor
The Edgewood Drive storm drain concept would not require as extensive construction activity
as compared to the proposed channel improvements in the existing Upper Goose Creek Reach
6 channel and associated wildlife corridor, but there would still be a need for stream
improvements. These improvements will include removal of aging and dead trees within the
channel corridor and stabilization of the south bank and channel invert along portions of Upper
Goose Creek Reach 6.
Right of Way Improvement
There would be ancillary opportunities for roadway and right of way improvements as part of
this conceptual alternative. Since the excavation work would be extensive there would be an
opportunity for improvements to the road surface, implementation of traffic calming measures,
adding a bike lane, sidewalk improvements etc.
Update Utilities
An additional potential benefit of the extensive excavation footprint would be the opportunity
to update aging utilities that are otherwise difficult and costly to replace.
Conceptual Cost Estimate
Conceptual level cost estimates were developed for both the master plan and interim conditions.
These costs are conceptual and provide an order of magnitude estimate for the conceptual storm
drain system along Edgewood Drive.
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 13 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 10 of 12
Master Plan Conditions Conceptual Costs
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 14 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 11 of 12
Interim Conditions Conceptual Costs
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 15 of 36
MEMORANDUM
P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 12 of 12
Attachments:
Upper Goose Creek Reach 6 Conceptual Storm Drain Design Sheets
Pages from 2012 Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study Update
Hydrology Verification Report
Pages from 2015 Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study Update
Hydraulics Report
StormCAD Conduit and Manhole Output Tables for Master Plan and Interim Conditions
END OF MEMORANDUM
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 16 of 36
ST ST
STSTSTSTSTSTSS SS SSSSSSSSSSSS
SSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSS
SSSSSSSSSSSSSS SS SSSSSSSSSSSS
SSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSS
SSSSSSSSSSSSWW19TH STREET20TH STREET21ST STREETNICHOLL ST WEDGE
W
O
O
D
D
R
UPPER GOOSE CREEK - REACH 6
UPPER
G
O
O
S
E
C
R
E
E
K
-
R
E
A
C
H
6
6' MIN
I
M
U
M
C
L
E
A
R
A
N
C
E
B
E
T
W
E
E
N
PARAL
L
E
L
U
T
I
L
I
T
I
E
S
0+001+002+003+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00 11+00 12+00 13+00 14+00
PROFILE OF ALIGNMENT - EDGEWOOD
H: 1" = 100
V: 1" = 25
5300
5310
5320
5330
5340
5350
5360
5300
5310
5320
5330
5340
5350
5360
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00
400 LF OF (6) 4' H X 4 ' W RCB
C
@
1
.
4
%
349 LF OF (6) 4' H X 4 ' W R
C
B
C
@
1
.
5
%
323 LF OF (6) 4' H X 4 ' W RCBC @ 0.9%EX SAN XINGAPPROX. TOP: 5327.1±EX SAN XINGAPPROX. TOP: 5331.3±EX SAN XINGAPPROX. TOP: 5321.9±189 LF OF (6) 4' H X 4 ' W RCBC @ 1.0%
EXISTING GROUNDPROPOSED GRADE
EX SAN XINGAPPROX. TOP: 5337.8±EXISTING 19TH STREET STORM PIPE
OUTLET ELEVATION
FIELD VERIFIED ON APRIL 5TH, 2024
194 LF OF (6) 4' H X 4 ' W RCBC
@
1
.
3
%
PROPOSED RELOCATED SANITARY LINE
PROPOSED RELOCATED SANITARY LINE
PROPOSED RELOCATED SANITARY LINE
PROPOSED UGC OUFALL BOX ELEVATION
PROPOSED RELOCATED SANITARY LINE
PROPOSED INLETS APPROXIMATE
OUTLET ELEVATION
PROPOSED HYDRAULIC GRADE LINE
PROPOSED RELOCATED WATER AND GAS LINE
PROPOSED RELOCATED WATER LINE
PROPOSED RELOCATED WATER LINE
PROPOSED RELOCATED
WATER AND GAS LINES
1.2'
2.3'
1.0'
1.0'
1.8'
1.5'
1.7'
1.8'
1.5'
1.5'
2.8'
1.2'
1.0'
1.0'
2.8'
1.4'
1.1'
PROPOSED RELOCATED GAS LINE
1.0'
PROPOSED RELOCATED GAS LINE
1.5'
LEGEND
PROPERTY BOUNDARY
EXISTING SANITARY
SEWER
EXISTING WATER LINE
EXISTING STORM DRAIN
CONCEPTUAL SANITARY
SEWER
CONCEPTUAL WATER LINE
CONCEPTUAL STORM
DRAIN
CONCEPTUAL GAS LINE
APPR.REVISIONSNo. DATE ICON PROJECT No.
UPPER GOOSE CREEK REACH 6
CONCEPTUAL STORM DRAIN DESIGN
23-054
SHEET
OF
CITY OF BOULDER UTILITIES
1739 BROADWAY
BOULDER, COLORADO 80302
Know what's below.
Call before you dig.
PREPARED FOR:PREPARED BY:DATE
ICON ENGINEERING
7000 S YOSEMITE STREET
SUITE 120
CENTENNIAL, COLORADO 80112
N
100'0
4/19/2024
1 4
TIE-INTO CONCRETE CHANNEL
JUNCTION BOX FOR PARALLEL
PIPE NETWORK
JUNCTION BOX FOR PARALLEL
PIPE NETWORK
AREA DETAILED ON SHEET 3
PROPOPED SANITARY
RELOCATION ALIGNMENT
DIVIDER WALL TO PROVIDE
INITIAL IN-CHANNEL FLOWS
PROPOPED WATER
RELOCATION ALIGNMENT
PROPOPED GAS
RELOCATION ALIGNMENT
PROPOPED SANITARY,
WATER AND GAS SERVICE
LINE CONNECTIONS
PROPOPED SANITARY, GAS
AND WATER SERVICE LINE
GROUP CONNECTIONS
4326 SF ADDITIONAL
UTILITY EASEMENT
REQUIRED
CONNECT EXISTING INLETS
TO PROPOSED STORM
CONNECT EXISTING INLETS
TO PROPOSED STORM
CONNECT EXISTING INLET
TO PROPOSED STORM
EXISTING STORM OUTFALLS
TO BE ABANDONED
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 17 of 36
PROFILE OF ALIGNMENT - EDGEWOOD
H: 1" = 100
V: 1" = 25
5300
5310
5320
5330
5340
5350
5360
5300
5310
5320
5330
5340
5350
5360
14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00
400 LF OF (7) 4' H X 4 ' W RCBC
@
1
.
2
%
151 LF OF (7) 4' H X 4 ' W RCBC @ 0.4%EX SAN XINGAPPROX. TOP: 5314.0±EX SAN XINGAPPROX. TOP: 5312.4±PROPOSED GRADE
PROPOSED RELOCATED SANITARY LINE
PROPOSED RELOCATED SANITARY LINE
PROPOSED RELOCATED SANITARY LINE320 LF OF (7) 4' H X 4 ' W RCBC @ 0.6%EX SAN XINGAPPROX. TOP: 5319.0±PROPOSED HYDRAULIC GRADE LINE
PROPOSED RELOCATED WATER LINE
PROPOSED RELOCATED WATER AND GAS LINESPROPOSED RELOCATED WATER AND GAS LINES
1.5'
2.7'
1.1'
1.5'
1.5'1.3'
1.0'0.8'
1.2'
1.7'0.9'
PROPOSED RELOCATED GAS LINE
1.2'
1.6'STST
STST
STST STSS SS SS
SS SS
SS
SS
SS
SSSSSSSSSSSSSS
SS
SS
SS
SS
SSSS
SSSS SS SS
SS SS
SS
SS
SS
SSSSSSSSSSSSSS
SS
SS
SS
SS
SSSS
SSWW
W
W
NICHOLL ST ELORRAINE CTEDGE
W
O
O
D
D
R
EDGEWOOD DR
UPPER GOOSE CREEK - REACH 6 5317'5318'
6' MINIMUM CLEARANCE BETWEEN
PARALLEL UTILITIES
14+00 15+00 16+00 17+00 18+00 19+00 20+00
21+00 22+002
3
+
0
0
2
4
+
0
0
24+88LEGEND
PROPERTY BOUNDARY
EXISTING SANITARY
SEWER
EXISTING WATER LINE
EXISTING STORM DRAIN
CONCEPTUAL SANITARY
SEWER
CONCEPTUAL WATER LINE
CONCEPTUAL STORM
DRAIN
CONCEPTUAL GAS LINE
APPR.REVISIONSNo. DATE ICON PROJECT No.
UPPER GOOSE CREEK REACH 6
CONCEPTUAL STORM DRAIN DESIGN
23-054
SHEET
OF
CITY OF BOULDER UTILITIES
1739 BROADWAY
BOULDER, COLORADO 80302
Know what's below.
Call before you dig.
PREPARED FOR:PREPARED BY:DATE
ICON ENGINEERING
7000 S YOSEMITE STREET
SUITE 120
CENTENNIAL, COLORADO 80112
N
4/19/2024
2 4
NOTES:
·THIS CONCEPT HAS BEEN
DESIGNED TO MASTER PLAN
CONDITIONS WHICH ASSUME
THAT TWOMILE CANYON CREEK
IMPROVEMENTS HAVE BEEN MADE
AND UPSTREAM IMPROVEMENTS
TO UPPER GOOSE CREEK ARE
NOT IN PLACE. THE INTERIM
CONDITIONS ASSUMES THAT
NEITHER THE TWOMILE CANYON
CREEK OR UPPER GOOSE CREEK
IMPROVEMENTS ARE IN PLACE.
·TOTAL 1%-ANNUAL-CHANCE
MASTER PLAN CONDITIONS
DISCHARGE FOR UPPER GOOSE
CREEK AT 19TH STREET IS 1785
CFS AND THE INTERIM
CONDITIONS DISCHARGE IS 2222
CFS. THE 5-YEAR RETURN
INTERVAL FLOW OF 498 CFS WILL
CONTINUE TO DISCHARGE TO THE
EXISTING UPPER GOOSE CREEK -
REACH 6 CHANNEL. THUS, THE
MASTER PLAN CONDITIONS
DESIGN FLOW IS 1287 CFS AND
THE INTERIM CONDITIONS DESIGN
FLOW IS 1724 CF.
·THE QUANTITIES SHOWN IN
PROFILE VIEW [(6) AND (7)]
CORRESPOND TO THE NUMBER
OF PARALLEL 4' H X 4' W RCBCS
THAT ARE NECESSARY TO
CONVEY THE MASTER PLAN
FLOWS. THESE QUANTITIES
WOULD INCREASE TO (8) AND (8)
RESPECTIVELY IF THE SYSTEM
WERE TO BE DESIGNED TO
CONVEY THE INTERIM
CONDITIONS FLOW
·THE APPROXIMATE EXCAVATION
AREA NECESSARY TO PLACE THE
MASTER PLAN CONDITIONS
PARALLEL PIPE NETWORK AND
REALIGNED SANITARY SEWER IS
ROUGHLY THE ENTIRE RIGHT OF
WAY ALONG 19TH STREET AND
EDGEWOOD DRIVE WITHIN THE
PROJECT LIMITS
HEADWALL AND WINGWALLS
RIPRAP PROTECTION AND
FEATURE BOULDERS
JUNCTION BOX FOR
PARALLEL PIPE NETWORK
JUNCTION BOX FOR PARALLEL
PIPE NETWORK
APPROX. PROPOSED GRADING
WHOLE FOOT CONTOURS
LOW CLEARANCE / POTENTIAL
CONFLICT WITH EXISTING
ELECTRICAL TOWER
POTENTIAL EXISTING ELECTRICAL
TOWER RELOCATION AREA
PROPOPED SANITARY
RELOCATION ALIGNMENT
100'0
PROPOPED WATER
RELOCATION ALIGNMENT
PROPOPED GAS
RELOCATION ALIGNMENT
PROPOPED GAS, SANITARY
AND WATER SERVICE LINE
CONNECTIONS
PROPOSED SANITARY, GAS
AND WATER SERVICE LINE
GROUP CONNECTIONS
383 SF ADDITIONAL
UTILITY EASEMENT
REQUIRED
APPROX. LIMITS OF NECESSARY
IMPROVEMENTS FOR CHANNEL
GRADING, BANK STABILIZATION,
RIVER FEATURES, REVEGETATION
AND REESTABLISHMENT TO
TIE-INTO EXISTING CHANNEL
5920 SF ADDITIONAL
UTILITY EASEMENT
REQUIRED
APPROX. ALIGNEMENT OF
PROPOSED CHANNEL IMPROVEMENTS
APPROX. CHANNEL BANKS OF
PROPOSED IMPROVEMENTS
APPROX. LIMITS OF NECESSARY EXISTING CHANNEL IMPROVEMENTS
FOR BANK STABILIZATION, REVEGETATION, AND REESTABLISHMENT
CONNECT EXISTING INLETS
TO PROPOSED STORM
CONNECT EXISTING INLETS
TO PROPOSED STORM
EXISTING STORM OUTFALL
TO BE ABANDONED
EXISTING STORM OUTFALL
TO BE ABANDONED
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 18 of 36
SS
SSSSSS
SS SS SS SS
SS
SSSS SS
SSSSSS
SS SS SS SS
SS
SSSSST
STSTSTSTSTWWW W
WWWWW
0+00
1+00
2+00
5345'5345.5'PROFILE OF ALIGNMENT - CHANNEL OUTFALL
H: 1" = 50
V: 1" = 5
5335
5340
5345
5350
5335
5340
5345
5350
0+00 0+50 1+00 1+50 2+00
SEE NOTE ON THIS SHEET FOR FLOW SPLIT BETWEEN
CHANNEL OUTFALL AND TRUNK LINEEX SAN XINGAPPROX. TOP: 5342.7±1.5'
1'
1.6'
EXISTING UPPER GOOSE
CREEK CHANNEL INVERT
PROPOSED GRADE
PROPOSED RELOCATED
SANITARY LINE
EXISTING 19TH STREET STORM PIPE
OUTLET ELEVATIONFIELD VERIFIED ON APRIL 5TH, 2024
PROPOSED INLETS APPROXIMATE OUTLET ELEVATION
PROPOSED HYDRAULIC
GRADE LINE
PROPOSED EDGEWOOD PARALELL TRUNK LINE
DIVIDER WALL TO PROVIDE
INITIAL IN-CHANNEL FLOWS
LEGEND
PROPERTY BOUNDARY
EXISTING SANITARY
SEWER
EXISTING WATER LINE
EXISTING STORM DRAIN
CONCEPTUAL SANITARY
SEWER
CONCEPTUAL WATER LINE
CONCEPTUAL STORM
DRAIN
CONCEPTUAL GAS LINE
APPR.REVISIONSNo. DATE ICON PROJECT No.
UPPER GOOSE CREEK REACH 6
CONCEPTUAL STORM DRAIN DESIGN
23-054
SHEET
OF
CITY OF BOULDER UTILITIES
1739 BROADWAY
BOULDER, COLORADO 80302
Know what's below.
Call before you dig.
PREPARED FOR:PREPARED BY:DATE
ICON ENGINEERING
7000 S YOSEMITE STREET
SUITE 120
CENTENNIAL, COLORADO 80112
4/19/2024
3 4
NOTES:
·THIS CONCEPT HAS BEEN DESIGNED TO MASTER PLAN
CONDITIONS WHICH ASSUME THAT TWOMILE CANYON
CREEK IMPROVEMENTS HAVE BEEN MADE AND UPSTREAM
IMPROVEMENTS TO UPPER GOOSE CREEK ARE NOT IN
PLACE. THE INTERIM CONDITIONS ASSUMES THAT NEITHER
THE TWOMILE CANYON CREEK OR UPPER GOOSE CREEK
IMPROVEMENTS ARE IN PLACE.
·TOTAL 1%-ANNUAL-CHANCE MASTER PLAN CONDITIONS
DISCHARGE FOR UPPER GOOSE CREEK AT 19TH STREET IS
1785 CFS AND THE INTERIM CONDITIONS DISCHARGE IS
2222 CFS. THE 5-YEAR RETURN INTERVAL FLOW OF 498 CFS
WILL CONTINUE TO DISCHARGE TO THE EXISTING UPPER
GOOSE CREEK - REACH 6 CHANNEL. THUS, THE MASTER
PLAN CONDITIONS DESIGN FLOW IS 1287 CFS AND THE
INTERIM CONDITIONS DESIGN FLOW IS 1724 CF.
·THE INLET QUANTITIES SHOWN IN PLAN VIEW [220FT TYPE R
AND 15 TYPE C INLETS] CORRESPOND TO THE NUMBER OF
INLETS THAT ARE NECESSARY TO CONVEY THE MASTER
PLAN DESIGN FLOW. THERE WOULD NEED TO BE AN
ADDITIONAL 90 FT OF TYPE R INLETS INSTALLED NORTH OF
EDGEWOOD DR ON 19TH ST IF THE SYSTEM WERE TO BE
DESIGNED TO CONVEY THE INTERIM CONDITIONS DESIGN
FLOW.
·THE APPROXIMATE EXCAVATION AREA NECESSARY TO
PLACE THE MASTER PLAN CONDITIONS PARALLEL PIPE
NETWORK AND REALIGNED SANITARY SEWER IS ROUGHLY
THE ENTIRE RIGHT OF WAY ALONG 19TH STREET AND
EDGEWOOD DRIVE WITHIN THE PROJECT LIMITS
N
APPROX. PROPOSED GRADING
HALF FOOT CONTOURS
PROPOSED INLET / OUTLET BOX APPROX.
FOOTPRINT ALLOWS 498 CFS (5-YEAR FLOW) TO
RETURN TO CHANNEL AND CONVEYS REMAINING
FLOW THROUGH EDGEWOOD TRUNK LINE
50'0
(2) 20 FT TYPE R INLETS
IN SERIES
(3) 20 FT TYPE R INLETS
IN SERIES
(4) 20 FT TYPE R INLETS
IN SERIES
(2) 20 FT TYPE R INLETS
IN SERIES
(15) TYPE C INLETS
IN SERIES
TIE-INTO CONCRETE CHANNEL
PROPOSED SANITARY
RELOCATION ALIGNMENT
SANITARY SEWER DATA ENDS HERE
SANITARY MAY NEED TO BE RELOCATED
AND TIED-INTO EXISTING SYSTEM
DEPENDING ON FIELD CONDITIONS
DIVIDER WALL TO PROVIDE
INITIAL IN CHANNEL FLOWS
PROPOSED WATER
RELOCATION ALIGNMENT
PROPOSED GAS
RELOCATION ALIGNMENT
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 19 of 36
TYPICAL EDGEWOOD DRIVE STORM DRAIN CROSS SECTION
5310
5315
5320
5325
5330
5335
5340
5345
5350
5310
5315
5320
5325
5330
5335
5340
5345
5350
0 20 40 60 800-20-40-60 CL27'
4'7'
37' FL-FL
7'7'21'
4.5' MIN. DEPTH TYPICAL
1.5' - 3.5' DEPTH TYPICAL
6.5' - 10' DEPTH
TYPICAL
2' MIN. DEPTH TYPICAL
60' RIGHT-OF-WAY PRIVATE
PROPERTY
PRIVATE
PROPERTY
PROPOSED GROUP
SERVICE LINES FOR
SANITARY, GAS,
AND WATER
PROPOSED EDGEWOOD
DRIVE STORM DRAIN
EXISTING SANITARY SEWER
TO BE REMOVED
PROPOSED RELOCATED
GAS LINE PROPOSED RELOCATED
WATER MAIN
PROPOSED RELOCATED
SANITARY SEWER MAIN
EXISTING STORM AND WATER
CONFLICT WITH PROPOSED
EDGEWOOD DRIVE STORM DRAIN
AND ARE TO BE REMOVED
APPROXIMATE DISTANCE
BETWEEN HOUSE
AND PROPERTY LINE
UTILITY EASEMENT
OVERHEAD UTILITIES,
STREET LAMPS, AND FIRE
HYDRANTS
CURB, GUTTER, AND
SIDEWALK
2 LANE ROADWAY
AND BIKE LANES
EXISTING GROUND
SOUTHNORTH
2' MIN. DEPTH TYPICAL
4.5' MIN. DEPTH TYPICAL
1.5' MIN. DEPTH TYPICAL
6' MIN HORIZONAL
CLEARANCE
BETWEEN UTILITES,
TYPICAL
4/19/2024
4 4
NOTES:
·THIS CONCEPT HAS BEEN DESIGNED TO MASTER PLAN
CONDITIONS WHICH ASSUME THAT TWOMILE CANYON
CREEK IMPROVEMENTS HAVE BEEN MADE AND UPSTREAM
IMPROVEMENTS TO UPPER GOOSE CREEK ARE NOT IN
PLACE. THE INTERIM CONDITIONS ASSUMES THAT NEITHER
THE TWOMILE CANYON CREEK OR UPPER GOOSE CREEK
IMPROVEMENTS ARE IN PLACE.
·TOTAL 1%-ANNUAL-CHANCE MASTER PLAN CONDITIONS
DISCHARGE FOR UPPER GOOSE CREEK AT 19TH STREET IS
1785 CFS AND THE INTERIM CONDITIONS DISCHARGE IS
2222 CFS. THE 5-YEAR RETURN INTERVAL FLOW OF 498 CFS
WILL CONTINUE TO DISCHARGE TO THE EXISTING UPPER
GOOSE CREEK - REACH 6 CHANNEL. THUS, THE MASTER
PLAN CONDITIONS DESIGN FLOW IS 1287 CFS AND THE
INTERIM CONDITIONS DESIGN FLOW IS 1724 CF.
·THE QUANTITIES SHOWN IN SECTION VIEW (7)
CORRESPOND TO THE NUMBER OF PARALLEL 4' H X 4' W
RCBCS THAT ARE NECESSARY TO CONVEY THE MASTER
PLAN FLOWS ON THE DOWNSTREAM END OF THE
PROPOSED STORM DRAIN. THIS QUANTITY WOULD
INCREASED TO (8) RESPECTIVELY IF THE SYSTEM WERE TO
BE DESIGNED TO CONVEY THE INTERIM CONDITIONS FLOW
·THE APPROXIMATE EXCAVATION AREA NECESSARY TO
PLACE THE MASTER PLAN CONDITIONS PARALLEL PIPE
NETWORK AND REALIGNED SANITARY SEWER IS ROUGHLY
THE ENTIRE RIGHT OF WAY ALONG 19TH STREET AND
EDGEWOOD DRIVE WITHIN THE PROJECT LIMITS
·THE EXCAVATION WOULD INCLUDE THE UTILITY EASEMENT
AREA BETWEEN THE SIDEWALK AND PROPERTY LINE. AS A
RESULT (7) STREET LAMPS, (4) OVERHEAD UTILITY POLES,
AND (1) FIRE HYDRANTS WOULD NEED TO BE REMOVED
AND REPLACED AS PART OF THIS PROJECT.
APPR.REVISIONSNo. DATE ICON PROJECT No.
UPPER GOOSE CREEK REACH 6
CONCEPTUAL STORM DRAIN DESIGN
23-054
SHEET
OF
CITY OF BOULDER UTILITIES
1739 BROADWAY
BOULDER, COLORADO 80302
Know what's below.
Call before you dig.
PREPARED FOR:PREPARED BY:DATE
ICON ENGINEERING
7000 S YOSEMITE STREET
SUITE 120
CENTENNIAL, COLORADO 80112
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 20 of 36
Upper Goose Creek and Twomile Canyon Creek
Flood Mapping Study Update
Hydrology Verification Report
Prepared for:
City of Boulder
Public Works Department - Utilities Division
1739 Broadway, 2nd Floor
Boulder, Colorado 80302
303.441.3200
Prepared by:
8100 South Akron Street, Suite 300
Centennial, CO 80112
303.221.0802
(Job No. 11-022-TGF)
December 9, 2011
Revised: February 16, 2012
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 21 of 36
@A
@A
@A
@A
@A@A@A 28TH ST19TH STBROADWAYIRIS AVE
4TH STVALMONT RD FOOTHILLS PKWYNORWOOD AVE
30TH ST!(!(Sanitas Wellness Center
701 702 704
603
703
602
601
601
702
603
701
602
704703
882 acres6.1% Impervious
630 acres41.5% Impervious
230 acres40.7% Impervious
277 acres25.3% Impervious
133 acres30.1% Impervious
77 acres48.2% Impervious43 acres33.8% Impervious
±Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study Update - Hydrology Verification ReportFigure 3 - Corrected Effective Conditions Sub-Basins 1 inch = 1,500 feet
Legend
@A DESIGN POINT
CONVEYANCE ELEMENT
Twomile Canyon Creek Basin
Goose Creek Basin
Upper Goose Creek
Reach 6 Area
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 22 of 36
Upper Goose Creek and Twomile Canyon CreekUpper Goose Creek and Twomile Canyon CreekUpper Goose Creek and Twomile Canyon Creek
Flood Mapping Study UpdateFlood Mapping Study UpdateFlood Mapping Study Update
Hydraulic ReportHydraulic ReportHydraulic Report
Prepared for:Prepared for:Prepared for:
City of BoulderCity of BoulderCity of Boulder
Public Works Department Public Works Department Public Works Department --- Utilities DivisionUtilities DivisionUtilities Division
1739 Broadway, 21739 Broadway, 21739 Broadway, 2ndndnd FloorFloorFloor
Boulder, Colorado 80302Boulder, Colorado 80302Boulder, Colorado 80302
303.441.3200303.441.3200303.441.3200
Prepared by:Prepared by:Prepared by:
8100 South Akron Street, Suite 3008100 South Akron Street, Suite 3008100 South Akron Street, Suite 300
Centennial, CO 80112Centennial, CO 80112Centennial, CO 80112
303.221.0802303.221.0802303.221.0802
(Job No. 11(Job No. 11(Job No. 11---022022022---TGF)TGF)TGF)
August 6, 2015August 6, 2015August 6, 2015
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 23 of 36
@A
@A
@A
@A
@A
@A@A
Linden Avenue
North Broadway StreetKalmia Avenue
Iris Avenue19th StreetJuniper Avenue
Iris Avenue
Hawthorn Avenue
Forest Avenue 16th StreetElder Avenue
Grape Avenue
19th StreetEvergreen Avenue
Dellwood Avenue
Spring
V
a
l
l
e
y
R
d
.
Floral Dr
i
v
e
Forest Ave
Hawthorn Ave.
Cedar Av
Balsam Av
603 (Full Basin)
230 acresSteady State Inflow 5-year = 50 cfs10-year = 72 cfs25-year = 112 cfs50-year = 136 cfs100-year = 176 cfs500-year = 385 cfs
603 A
603 B
603 C603 D
603 E
69 acres
66 acres
49 acres
17 acres
30 acres Folsom Street603 D Discharge into
Twomile Canyon Creek
Split Flow 1
5-year = 4 cfs
10-year = 5 cfs
25-year = 8 cfs
50-year = 10 cfs
100-year = 13 cfs
500-year = 28 cfs
603 E Discharge into
Upper Goose Creek
5-year = 7 cfs
10-year = 9 cfs
25-year = 15 cfs
50-year = 18 cfs
100-year = 23 cfs
500-year = 50 cfs
603 C Discharge into
Upper Goose Creek
5-year = 11 cfs
10-year = 15 cfs
25-year = 24 cfs
50-year = 29 cfs
100-year = 37 cfs
500-year = 82 cfs
603 B Discharge into
Twomile Canyon Creek
5-year = 14 cfs
10-year = 21 cfs
25-year = 32 cfs
50-year = 39 cfs
100-year = 51 cfs
500-year = 110 cfs
603 A Discharge into
Iris Avenue Split Flow
5-year = 15 cfs
10-year = 22 cfs
25-year = 34 cfs
50-year = 41 cfs
100-year = 53 cfs
500-year = 116 cfs
Goose Creek
Two
m
i
l
e
C
a
n
y
o
n
C
r
e
e
k
701
403 404
702
704
703
603
602
601
Figure 2.1 - Sub-Basin 603 Inflow Distribution Workmap
Legend
@A DESIGN POINTCONVEYANCE ELEMENT
Basin 603
Basin 603 A
Basin 603 B
Basin 603 C
Basin 603 D
Basin 603 E
600
Feet±
Upper Goose Creek
Reach 6 Area
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 24 of 36
Linden Avenue North Broadway StreetKalmia Avenue
Iris Avenue
19th StreetJuniper Avenue
Iris Avenue
Hawthorn Avenue
Forest Avenue 16th StreetElder Avenue
Grape Avenue
19th StreetEvergreen Avenue
Dellwood Avenue
S
p
r
i
n
g
V
a
l
l
e
y
R
d
.
Floral Dr
i
v
e
Forest Ave
Hawthorn Ave.
Inflow Hydrograph 603 B
100-year = 51 cfs
Cedar Avenue
Inflow Hydrograph 603 A
100-year = 53 cfs
Storm Sewer Capacity = 45 cfs
NorthBroadway Street19th Street699cfs
491cfs208cfs
247cfs138cfs 106cfs
208cfs
385cfs 314cfs
237cfs
59cfs
48cfsE
E326cfs
278cfs
136cfs
184cfs
323cfs
278cfs 161cfs
E36cfs E13cfs 250cfs
197cfs
251cfs
55cfs
117cfs
63cfs
314cfs
261cfs 87cfs
126cfs
213cfs 275cfs
258cfs
Additional Storm Sewer
Capacity = 36 cfs
222cfs
Inflow Hydrograph 601
100-year = 699 cfs
Inflow Hydrograph 602
100-year = 139 cfs
279cfs
274cfs
Inflow Hydrograph 603 D
100-year = 13 cfs
E
Broadway Outflow53 cfs
E
13th St.Outflow48 cfs
213cfs EFloral Dr.Outflow140 cfsEGlenwood Ave.Outflow29 cfs250cfs
110cfs EGrape Ave. Outflow46 cfs
237cfs
274cfs
Figure 4.10 - Twomile Canyon Creek 100-Year
HEC-RAS Peak Discharges
Legend
Flow Path
TCC
TCC_13TH
TCC_S1
TCC_S1_4TH
TCC_S1_ELDER
TCC_S1_GRAPE
TCC_S1_GRAPE_2
TCC_S1_HAWTHORN
TCC_S1_IRIS
TCC_S2
TCC_S2_JASMINE
TCC_S_4TH
TCC_S_LINDEN
TCC_S_SVALLEY
600
Feet±
174cfs
143cfs
4cfs
165cfs
63cfs
135cfs
113cfs
EEvergreen Dr.Outflow61 cfs49cfs
109cfs
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 25 of 36
á0
áááá200
áááá400
áááá600
áááá800
áááá1000
áááá1200
áááá1400
áááá0áááá200áááá400
áááá600
áááá800áááá1000ááá0
áááá20
0á á0
áááá200áááá400ááá
á600
áááá800
áááá1000áááá1200
áááá1400
áááá1600
áááá1800
áááá2000áááá2200áááá2400áááá2600áááá2800áááá3000
áááá3200ááá
á3400
áááá3600
áááá3800
áááá4000áááá4200
áááá4400
áááá4600
áááá4800
áááá5000
áááá5200
áááá540
0áááá5600áááá580
0áááá6000áááá6200áááá6400áááá6600áááá6800áááá7000áááá7200áááá7400áááá7600á
Cross Section 7239
Match Junction_701 Discharges
Subtract 19 cfs for Storm Sewer
10-year = 212 cfs - 19 cfs = 193 cfs
25-year = 347 cfs - 19 cfs = 328 cfs
50-year = 434 cfs - 19 cfs = 415 cfs
100-year = 521 cfs - 19 cfs = 502 cfs
500-year = 661 cfs - 19 cfs = 642 cfs
Cross Section 6114
Add Broadway spill from
Twomile Canyon Creek
10-year (+3 cfs) = 160 cfs
25-year (+23 cfs) = 315 cfs
50-year (+31 cfs) = 410 cfs
100-year (+53 cfs) = 519 cfs
500-year (+95 cfs) = 701 cfs
Cross Section 5863
Subtract 34 cfs for
Storm Sewer
10-year = 126 cfs
25-year = 281 cfs
50-year = 376 cfs
100-year = 485 cfs
500-year = 667 cfs
Cross Section 5547
Subtract 18 cfs for Storm Sewer
10-year = 108 cfs
25-year = 263 cfs
50-year = 358 cfs
100-year = 467 cfs
500-year = 649 cfs
Cross Section 789 (Alpine Split)
Subtract 28 cfs for Storm Sewer
(See Discharge Workmap - Detail
for Split Flow Discharges)
Cross Section 2839
Add Twomile Canyon Creek Spill Flows, Inflow_702
Dischages, and Return Storm Sewer Discharges
10-year (+136 +521 +135 cfs) = 876 cfs
25-year (+215 +813 +135 cfs) = 1426 cfs
50-year (+235 +992 +135 cfs) = 1726 cfs
100-year (+275 +1220 +135 cfs) = 2117 cfs
500-year (+355 +2045 +135 cfs) = 3231 cfs
Cross Section 1938
Add Twomile Canyon Creek
Spill Flows (Evergreen Ave.)
and Inflow_703 Discharges
10-year (20 cfs + 0 cfs) = 896 cfs
25-year (37 cfs + 19 cfs) = 1482 cfs
50-year (48 cfs + 25 cfs) = 1799 cfs
100-year (61 cfs + 44 cfs) = 2222 cfs
500-year (95 cfs + 54 cfs) = 3380 cfs
Cross Section 757
Match Junction_704 Discharges
10-year = 964 cfs
25-year = 1669 cfs
50-year = 2080 cfs
100-year = 2624 cfs
500-year = 4275 cfs
Cross Section 6736
Subtract 36 cfs for Storm Sewer
10-year = 157 cfs
25-year = 292 cfs
50-year = 379 cfs
100-year = 466 cfs
500-year = 606 cfs
Cross Section 1435
(Alpine Split)
Add 13th Street spill
from Twomile Canyon Creek
(See Discharge Workmap - Detail
for Split Flow Discharges)14th StSunset B
v16th StBluff St9th StBluff St
Alpine Av
13th StBroadwayNorth St 17th St19th StElder Av
Pine St
Mapleton
A
v11th St10th St18th StHigh St
Flor
a
l
D
r
Edgewood
D
r
Folsom St23rd St24th St21st St20th StForest Av
Sunset
B
v15th St14th StBalsam Av
Mesa Dr 22nd StJefferson StNicholl StWashington StEver
g
r
e
e
n
A
v
Ty
l
e
r
R
d Repplier StLorr
a
i
n
e
C
t
Concord AvFern Pl
Alpine AvWashington St21st St20th St17th St14th St22nd St19th St15th St23rd St19th StFigure 4.4 - Upper Goose Creek Discharge Workmap - Overview
Legend
Flow Path
Storm Sewer
Cross Sections
Alpine Split
Broadway Split
Hospital Split
Upper Goose Creek
400
Feet±
Flows addressed by
Twomile Canyon Creek
master plan improvements
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 26 of 36
á0
áááá200
áááá400
áááá600
áááá800
áááá1000
áááá1200
áááá1400
áááá0áááá200áááá400
áááá600áááá800áááá1000ááá0áááá20
0á á0áááá200áááá400áááá600áááá800áááá1000
áááá1200
áááá1400
áááá1600
áááá1800
áááá2000áááá2200áááá2400áááá2600áááá2800áááá3000
áááá3200ááá
á3400
áááá3600
áááá3800
áááá4000áááá4200
á ááá4400
áááá4600
áááá4800
áááá5000
áááá5200
áááá540
0áááá5600áááá580
0áááá6000áááá6200áááá6400áááá6600áááá6800áááá7000áááá7200á ááá7400áááá7600á
Cross Section 7239
Match Junction_701 Discharges
Subtract 19 cfs for Storm Sewer
10-year = 212 cfs - 19 cfs = 193 cfs
25-year = 347 cfs - 19 cfs = 328 cfs
50-year = 434 cfs - 19 cfs = 415 cfs
100-year = 521 cfs - 19 cfs = 502 cfs
500-year = 661 cfs - 19 cfs = 642 cfs
Cross Section 6114
Add Broadway spill from
Twomile Canyon Creek
10-year (+3 cfs) = 100 cfs
25-year (+23 cfs) = 194 cfs
50-year (+31 cfs) = 268 cfs
100-year (+53 cfs) = 344 cfs
500-year (+95 cfs) = 473 cfs
Cross Section 5863 / 871
Subtract 34 cfs for Storm Sewer
10-year = 126 cfs
25-year = 281 cfs
50-year = 376 cfs
100-year = 485 cfs
500-year = 667 cfs
Cross Section 789 (Alpine Split)
Subtract 28 cfs for Storm Sewer
10-year = 31 cfs
25-year = 89 cfs
50-year = 182 cfs
100-year = 248 cfs
500-year = 351 cfs
Cross Section 2839Add Twomile Canyon Creek Spill Flows, Inflow_702Dischages, and Return Storm Sewer Discharges10-year (+136 +521 +135 cfs) = 876 cfs25-year (+215 +813 +135 cfs) = 1426 cfs50-year (+235 +992 +135 cfs) = 1726 cfs100-year (+275 +1220 +135 cfs) = 2117 cfs500-year (+355 +2045 +135 cfs) = 3231 cfs
Cross Section 6736
Subtract 36 cfs for Storm Sewer
10-year = 157 cfs
25-year = 292 cfs
50-year = 379 cfs
100-year = 466 cfs
500-year = 606 cfs
Cross Section 1435
(Alpine Split)
Add 13th Street spill
from Twomile Canyon Creek
10-year (+4 cfs)
25-year (+28 cfs)
50-year (+34 cfs)
100-year (+48 cfs)
500-year (+75 cfs)
Cross Section 5547
Subtract 18 cfs for Storm Sewer
10-year = 66 cfs
25-year = 171 cfs
50-year = 258 cfs
100-year = 343 cfs
500-year = 488 cfs
Junction 1
Combined Discharges
10-year = 84 cfs
25-year = 263 cfs
50-year = 364 cfs
100-year = 487 cfs
500-year = 696 cfs
Junction 3
Discharge to Main Stem /
Alpine Split Flow
10-year = 11 cfs / 59 cfs
25-year = 82 cfs / 117 cfs
50-year = 82 cfs / 210 cfs
100-year = 115 cfs / 276 cfs
500-year = 184 cfs / 379 cfs
Junction 4
Discharge to Main Stem /
Broadway Split Flow
10-year = 84 cfs / 42 cfs
25-year = 189 cfs / 92 cfs
50-year = 276 cfs / 100 cfs
100-year = 361 cfs / 124 cfs
500-year = 506 cfs / 161 cfs
Junction 6
Discharge to Main Stem /
Hospital Split Flow
10-year = 97 cfs / 60 cfs
25-year = 171 cfs / 121 cfs
50-year = 237 cfs / 142 cfs
100-year = 291 cfs / 175 cfs
500-year = 378 cfs / 228 cfs
Junction 2
Combined Discharges
10-year = 53 cfs
25-year = 174 cfs
50-year = 182 cfs
100-year = 239 cfs
500-year = 345 cfs
Sunset
B
v16th StBluff St
North St
Alpine Av
Cedar Av
9th StBalsam Av13th StBroadway14th St15th St17th St11th St10th St16th StSunset B
v
Dewey Av
Figure 4.5 - Upper Goose Creek Discharge Workmap - Detail
Legend
Flow Path
Storm Sewer
Cross Sections
Alpine Split
Broadway Split
Hospital Split
Upper Goose Creek
200
Feet±
Flow addressed by
Twomile Canyon Creek
master plan improvements
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 27 of 36
5-Year 10-Year 25-Year 50-Year 100-Year 500-Year
(cfs) (cfs) (cfs) (cfs) (cfs) (cfs)
Twomile Canyon Creek
Linden Avenue JUNCT_601 1.38 91 186 415 533 699 997
INFLOW_601 91 186 415 533 699 997
INFLOW_601_Steady State 91 186 415 533 699 997
North Broadway Street JUNCT_602 1.59 123 235 501 643 838 1187
INFLOW_602 56 81 141 174 210 392
INFLOW_602_Steady State 32 49 86 110 139 190
Confluence with Goose Creek JUNCT_603 1.95 173 307 613 779 1014 1572
INFLOW_603 54 77 123 147 192 831
INFLOW_603_Steady State 50 72 112 136 176 385
Upper Goose Creek
Balsam Avenue JUNCT_701 0.43 141 212 347 434 521 661
INFLOW_701 141 212 347 434 521 661
INFLOW_701_Steady State 141 212 347 434 521 661
19th Street JUNCT_702 1.41 499 733 1160 1426 1741 2706
INFLOW_702 393 558 849 1029 1256 2131
INFLOW_702_Steady State 358 521 813 992 1220 2045
Upstream of Confluence with
Twomile Creek JUNCT_703 1.48 498 733 1179 1451 1785 2760
INFLOW_703 28 40 65 78 99 142
INFLOW_703_Steady State -1 0 19254454
Downstream of Folsom Street JUNCT_704 3.55 645 964 1669 2080 2624 4275
Note: negative or zero value steady state discharges reflect attenuation in the SWMM model, HEC-RAS discharges do not reflect attenuation.
Table 2.1 - Recommended Discharges
Location SWMM Element
Drainage
Basin Area
(sq. mi.)
Flow used (less 5-Year
Discharge) for master plan
conditions pipe sizing
along Edgewood Drive
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 28 of 36
FlexTable: Conduit Table
Slope
(Calculated)
(ft/ft)
Length
(User
Defined)
(ft)
Invert (Stop)
(ft)
Stop NodeInvert (Start)
(ft)
Start
Node
Label
0.00565.05,340.00O-35,340.33
STM
STRC-24
(Network
- PR
STM)
CO-1
0.01324.75,337.79
STM STRC-3
(Network -
PR STM)
5,338.11
STM
STRC-2
(Network
- PR
STM)
STM PIPE-9 (Network - PR STM)
0.013159.05,335.72
STM STRC-4
(Network -
PR STM)
5,337.79
STM
STRC-3
(Network
- PR
STM)
STM PIPE-10 (Network - PR
STM)
0.014240.35,331.71
STM STRC-5
(Network -
PR STM)
5,335.07
STM
STRC-4
(Network
- PR
STM)
STM PIPE-11 (Network - PR
STM)
0.010213.65,329.48
STM STRC-6
(Network -
PR STM)
5,331.71
STM
STRC-5
(Network
- PR
STM)
STM PIPE-12 (Network - PR
STM)
0.01559.35,327.73
STM STRC-7
(Network -
PR STM)
5,328.62
STM
STRC-6
(Network
- PR
STM)
STM PIPE-13 (Network - PR
STM)
0.015298.35,323.39
STM STRC-8
(Network -
PR STM)
5,327.73
STM
STRC-7
(Network
- PR
STM)
STM PIPE-14 (Network - PR
STM)
0.009322.85,320.46
STM STRC-9
(Network -
PR STM)
5,323.29
STM
STRC-8
(Network
- PR
STM)
STM PIPE-15 (Network - PR
STM)
0.012400.05,315.56
STM STRC-
10 (Network
- PR STM)
5,320.36
STM
STRC-9
(Network
- PR
STM)
STM PIPE-16 (Network - PR
STM)
0.010166.25,313.53
STM STRC-
11 (Network
- PR STM)
5,315.19
STM
STRC-10
(Network
- PR
STM)
STM PIPE-17 (Network - PR
STM)
Page 1 of 276 Watertown Road, Suite 2D Thomaston, CT
06787 USA +1-203-755-1666
4/18/2024
StormCAD
[10.04.00.158]
Bentley Systems, Inc. Haestad Methods Solution
CenterUGC_MP_Concept_v2.stsw
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 29 of 36
FlexTable: Conduit Table
Slope
(Calculated)
(ft/ft)
Length
(User
Defined)
(ft)
Invert (Stop)
(ft)
Stop NodeInvert (Start)
(ft)
Start
Node
Label
0.006141.55,312.70
STM STRC-
12 (Network
- PR STM)
5,313.53
STM
STRC-11
(Network
- PR
STM)
STM PIPE-18 (Network - PR
STM)
0.004142.95,311.99O-15,312.60
STM
STRC-12
(Network
- PR
STM)
STM PIPE-19 (Network - PR
STM)
0.010178.85,338.41
STM STRC-2
(Network -
PR STM)
5,340.20
STM
STRC-24
(Network
- PR
STM)
STM PIPE-32 (Network - PR
STM)
Hydraulic
Grade Line
(Out)
(ft)
Hydraulic
Grade Line
(In)
(ft)
Velocity
(ft/s)
Flow
(cfs)
Manning's nDiameter
(in)
Section
Type
5,342.005,345.670.00497.440.013Box
5,342.405,342.7413.411,287.560.013Box
5,340.215,342.4013.411,287.560.013Box
5,336.905,340.2113.411,287.560.013Box
5,333.965,336.9013.411,287.560.013Box
5,333.155,333.9613.411,287.560.013Box
5,329.045,333.1513.411,287.560.013Box
5,324.595,329.0413.411,287.560.013Box
5,320.555,324.5911.501,287.560.013Box
5,318.875,320.5511.501,287.560.013Box
5,317.445,318.8711.501,287.560.013Box
5,315.995,317.4411.501,287.560.013Box
5,342.745,345.2013.411,287.560.013Box
Capacity (Full Flow)
(cfs)
149.17
1,248.97
1,252.10
1,297.50
1,121.25
1,344.06
1,323.47
1,027.39
1,402.40
1,279.49
980.46
836.41
1,097.94
Page 2 of 276 Watertown Road, Suite 2D Thomaston, CT
06787 USA +1-203-755-1666
4/18/2024
StormCAD
[10.04.00.158]
Bentley Systems, Inc. Haestad Methods Solution
CenterUGC_MP_Concept_v2.stsw
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 30 of 36
FlexTable: Manhole Table
Flow (Total Out)
(cfs)
Elevation
(Invert)
(ft)
Elevation (Invert
in 1)
(ft)
Bolted Cover?Elevation
(Ground)
(ft)
Label
1,287.565,337.925,338.41False5,344.82STM STRC-2 (Network -
PR STM)
1,287.565,337.145,337.79False5,344.02STM STRC-3 (Network -
PR STM)
1,287.565,335.005,335.72False5,343.70STM STRC-4 (Network -
PR STM)
1,287.565,331.795,331.71False5,338.09STM STRC-5 (Network -
PR STM)
1,287.565,328.495,329.48False5,334.99STM STRC-6 (Network -
PR STM)
1,287.565,326.975,327.73False5,333.62STM STRC-7 (Network -
PR STM)
1,287.565,323.295,323.39False5,330.96STM STRC-8 (Network -
PR STM)
1,287.565,320.365,320.46False5,328.00STM STRC-9 (Network -
PR STM)
1,287.565,314.155,315.56False5,322.50STM STRC-10 (Network -
PR STM)
1,287.565,313.305,313.53False5,319.60STM STRC-11 (Network -
PR STM)
1,287.565,312.605,312.70False5,318.64STM STRC-12 (Network -
PR STM)
1,287.565,336.215,340.33False5,345.70STM STRC-24 (Network -
PR STM)
Energy Grade
Line (Out)
(ft)
Energy Grade
Line (In)
(ft)
Hydraulic Grade
Line (Out)
(ft)
Hydraulic Grade
Line (In)
(ft)
Headloss
(ft)
Headloss Method
5,345.545,345.545,342.745,342.740.00Standard
5,345.205,345.205,342.405,342.400.00Absolute
5,343.015,343.015,340.215,340.210.00Standard
5,339.705,339.705,336.905,336.900.00Absolute
5,336.765,336.765,333.965,333.960.00Standard
5,335.945,335.945,333.155,333.150.00Absolute
5,331.835,331.835,329.045,329.040.00Standard
5,326.655,327.395,324.595,324.590.00Standard
5,322.605,322.605,320.555,320.550.00Standard
5,320.925,320.925,318.875,318.870.00Absolute
5,319.495,319.495,317.445,317.440.00Standard
5,348.005,348.005,345.205,345.200.00Standard
Station
(Calculated)
(ft)
Inflow (Wet)
Collection
<Count>
Inflow (Wet)
Collection
Flow (Known)
(cfs)
21+690<Collection: 0
items>0.00
21+440<Collection: 0
items>0.00
19+850<Collection: 0
items>0.00
17+450<Collection: 0
items>0.00
Page 1 of 276 Watertown Road, Suite 2D Thomaston, CT
06787 USA +1-203-755-1666
4/18/2024
StormCAD
[10.04.00.158]
Bentley Systems, Inc. Haestad Methods Solution
CenterUGC_MP_Concept_v2.stsw
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 31 of 36
FlexTable: Manhole Table
Station
(Calculated)
(ft)
Inflow (Wet)
Collection
<Count>
Inflow (Wet)
Collection
Flow (Known)
(cfs)
15+310<Collection: 0
items>0.00
14+720<Collection: 0
items>0.00
11+730<Collection: 0
items>0.00
8+510<Collection: 0
items>0.00
4+510<Collection: 0
items>0.00
2+840<Collection: 0
items>0.00
1+430<Collection: 0
items>0.00
23+470<Collection: 0
items>1,785.00
Page 2 of 276 Watertown Road, Suite 2D Thomaston, CT
06787 USA +1-203-755-1666
4/18/2024
StormCAD
[10.04.00.158]
Bentley Systems, Inc. Haestad Methods Solution
CenterUGC_MP_Concept_v2.stsw
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 32 of 36
FlexTable: Conduit Table
Slope
(Calculated)
(ft/ft)
Length
(User
Defined)
(ft)
Invert (Stop)
(ft)
Stop NodeInvert (Start)
(ft)
Start
Node
Label
0.00565.05,340.00O-35,340.33
STM
STRC-24
(Network
- PR
STM)
CO-1
0.01324.75,337.79
STM STRC-3
(Network -
PR STM)
5,338.11
STM
STRC-2
(Network
- PR
STM)
STM PIPE-9 (Network - PR STM)
0.013159.05,335.72
STM STRC-4
(Network -
PR STM)
5,337.79
STM
STRC-3
(Network
- PR
STM)
STM PIPE-10 (Network - PR
STM)
0.014240.35,331.71
STM STRC-5
(Network -
PR STM)
5,335.07
STM
STRC-4
(Network
- PR
STM)
STM PIPE-11 (Network - PR
STM)
0.010213.65,329.48
STM STRC-6
(Network -
PR STM)
5,331.71
STM
STRC-5
(Network
- PR
STM)
STM PIPE-12 (Network - PR
STM)
0.01559.35,327.73
STM STRC-7
(Network -
PR STM)
5,328.62
STM
STRC-6
(Network
- PR
STM)
STM PIPE-13 (Network - PR
STM)
0.015298.35,323.39
STM STRC-8
(Network -
PR STM)
5,327.73
STM
STRC-7
(Network
- PR
STM)
STM PIPE-14 (Network - PR
STM)
0.009322.85,320.46
STM STRC-9
(Network -
PR STM)
5,323.29
STM
STRC-8
(Network
- PR
STM)
STM PIPE-15 (Network - PR
STM)
0.012400.05,315.56
STM STRC-
10 (Network
- PR STM)
5,320.36
STM
STRC-9
(Network
- PR
STM)
STM PIPE-16 (Network - PR
STM)
0.010166.25,313.53
STM STRC-
11 (Network
- PR STM)
5,315.19
STM
STRC-10
(Network
- PR
STM)
STM PIPE-17 (Network - PR
STM)
Page 1 of 276 Watertown Road, Suite 2D Thomaston, CT
06787 USA +1-203-755-1666
4/18/2024
StormCAD
[10.04.00.158]
Bentley Systems, Inc. Haestad Methods Solution
CenterUGC_Interim_Concept_v3.stsw
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 33 of 36
FlexTable: Conduit Table
Slope
(Calculated)
(ft/ft)
Length
(User
Defined)
(ft)
Invert (Stop)
(ft)
Stop NodeInvert (Start)
(ft)
Start
Node
Label
0.006141.55,312.70
STM STRC-
12 (Network
- PR STM)
5,313.53
STM
STRC-11
(Network
- PR
STM)
STM PIPE-18 (Network - PR
STM)
0.004142.95,311.99O-15,312.60
STM
STRC-12
(Network
- PR
STM)
STM PIPE-19 (Network - PR
STM)
0.010178.85,338.41
STM STRC-2
(Network -
PR STM)
5,340.20
STM
STRC-24
(Network
- PR
STM)
STM PIPE-32 (Network - PR
STM)
Hydraulic
Grade Line
(Out)
(ft)
Hydraulic
Grade Line
(In)
(ft)
Velocity
(ft/s)
Flow
(cfs)
Manning's nDiameter
(in)
Section
Type
5,342.005,347.690.00619.230.013Box
5,341.525,342.1115.081,602.770.013Box
5,339.785,341.7915.111,602.770.013Box
5,336.895,339.7812.521,602.770.013Box
5,334.335,336.8912.521,602.770.013Box
5,333.625,334.3312.521,602.770.013Box
5,330.075,333.6512.521,602.770.013Box
5,326.205,330.0712.521,602.770.013Box
5,321.405,326.2012.521,602.770.013Box
5,319.405,321.4012.521,602.770.013Box
5,317.705,319.4012.521,602.770.013Box
5,315.995,317.7012.521,602.770.013Box
5,342.415,344.2012.521,602.770.013Box
Capacity (Full Flow)
(cfs)
149.17
1,665.29
1,669.46
1,730.00
1,495.00
1,792.08
1,764.62
1,369.86
1,602.74
1,462.27
1,120.53
955.90
1,463.92
Page 2 of 276 Watertown Road, Suite 2D Thomaston, CT
06787 USA +1-203-755-1666
4/18/2024
StormCAD
[10.04.00.158]
Bentley Systems, Inc. Haestad Methods Solution
CenterUGC_Interim_Concept_v3.stsw
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 34 of 36
FlexTable: Manhole Table
Flow (Total Out)
(cfs)
Elevation
(Invert)
(ft)
Elevation (Invert
in 1)
(ft)
Bolted Cover?Elevation
(Ground)
(ft)
Label
1,602.775,337.925,338.41False5,344.82STM STRC-2 (Network -
PR STM)
1,602.775,337.145,337.79False5,344.02STM STRC-3 (Network -
PR STM)
1,602.775,335.005,335.72False5,343.70STM STRC-4 (Network -
PR STM)
1,602.775,331.795,331.71False5,338.09STM STRC-5 (Network -
PR STM)
1,602.775,328.495,329.48False5,334.99STM STRC-6 (Network -
PR STM)
1,602.775,326.975,327.73False5,333.62STM STRC-7 (Network -
PR STM)
1,602.775,323.295,323.39False5,330.96STM STRC-8 (Network -
PR STM)
1,602.775,320.365,320.46False5,328.00STM STRC-9 (Network -
PR STM)
1,602.775,314.155,315.56False5,322.50STM STRC-10 (Network -
PR STM)
1,602.775,313.305,313.53False5,319.60STM STRC-11 (Network -
PR STM)
1,602.775,312.605,312.70False5,318.64STM STRC-12 (Network -
PR STM)
1,602.775,336.215,340.33False5,345.70STM STRC-24 (Network -
PR STM)
Energy Grade
Line (Out)
(ft)
Energy Grade
Line (In)
(ft)
Hydraulic Grade
Line (Out)
(ft)
Hydraulic Grade
Line (In)
(ft)
Headloss
(ft)
Headloss Method
5,344.555,344.555,342.115,342.110.00Standard
5,344.235,344.605,341.795,341.790.00Absolute
5,342.215,342.215,339.785,339.780.00Standard
5,339.335,339.335,336.895,336.890.00Absolute
5,336.775,336.775,334.335,334.330.00Standard
5,336.065,336.065,333.625,333.620.00Absolute
5,332.515,332.515,330.075,330.070.00Standard
5,328.635,328.635,326.205,326.200.00Standard
5,323.835,323.835,321.405,321.400.00Standard
5,321.845,321.845,319.405,319.400.00Absolute
5,320.145,320.145,317.705,317.700.00Standard
5,346.645,346.645,344.205,344.200.00Standard
Station
(Calculated)
(ft)
Inflow (Wet)
Collection
<Count>
Inflow (Wet)
Collection
Flow (Known)
(cfs)
21+690<Collection: 0
items>0.00
21+440<Collection: 0
items>0.00
19+850<Collection: 0
items>0.00
17+450<Collection: 0
items>0.00
Page 1 of 276 Watertown Road, Suite 2D Thomaston, CT
06787 USA +1-203-755-1666
4/18/2024
StormCAD
[10.04.00.158]
Bentley Systems, Inc. Haestad Methods Solution
CenterUGC_Interim_Concept_v3.stsw
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 35 of 36
FlexTable: Manhole Table
Station
(Calculated)
(ft)
Inflow (Wet)
Collection
<Count>
Inflow (Wet)
Collection
Flow (Known)
(cfs)
15+310<Collection: 0
items>0.00
14+720<Collection: 0
items>0.00
11+730<Collection: 0
items>0.00
8+510<Collection: 0
items>0.00
4+510<Collection: 0
items>0.00
2+840<Collection: 0
items>0.00
1+430<Collection: 0
items>0.00
23+470<Collection: 0
items>2,222.00
Page 2 of 276 Watertown Road, Suite 2D Thomaston, CT
06787 USA +1-203-755-1666
4/18/2024
StormCAD
[10.04.00.158]
Bentley Systems, Inc. Haestad Methods Solution
CenterUGC_Interim_Concept_v3.stsw
Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo
10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update
Page 36 of 36