Loading...
HomeMy WebLinkAbout10.21.24 WRAB Agenda 4 - Upper Goose Creek and Twomile Canyon Creek Reach 6 UpdateC I T Y OF B O U L D E R WATER RESOURCES ADVISORY BOARD AGENDA ITEM MEETING DATE: October 21, 2024 AGENDA TITLE: Upper Goose Creek/Twomile Canyon Creek Reach 6 Update PRESENTERS: Joe Taddeucci, Director of Utilities Chris Douglass, Utilities Engineering Senior Manager Brandon Coleman, Storm/Flood Engineering Manager Debbie Fisher, Storm/Flood Project Manager EXECUTIVE SUMMARY The City of Boulder includes 16 major drainageways and has the highest flooding risk in the State of Colorado. In 2023, City Council approved a flood mitigation plan for two of these drainageways, the Upper Goose Creek and Twomile Canyon Creek watersheds. The project is needed to protect the safety of the community and improve the ecosystem of our drainageways. Community feedback heard throughout the planning process included themes such as preservation of the natural landscape and wildlife corridors, concerns about impacts to individual properties, and a sense of urgency to complete flood projects. Since that time, the community has expressed ongoing concerns over disturbance and restoration of the open channel along a portion of Goose Creek called Reach 6. To explore the possibility of avoiding disturbance to this reach of the stream and instead building the project under Edgewood Drive, the city took a closer look at a piped alternative. Unfortunately, the piped alternative does not eliminate Reach 6 stream channel disturbance as intended. The investigation determined that a piped alternative could not intercept and divert all flood water to Edgewood Drive, would involve extensive construction disturbance to front yards on both sides of Edgewood Drive, and would cost significantly more, among other issues. In part because a piped alternative would not avoid disturbance as hoped, and restoration of the existing creek would still be necessary, the project will proceed with the open channel alternative identified in the Mitigation Plan. The purpose of this memo is to provide WRAB and the community with a project update and an opportunity to ask questions about Goose Creek Reach 6. BACKGROUND The City of Boulder includes 16 major drainageways and has the highest flooding risk in the State of Colorado. Upper Goose Creek and Twomile Canyon Creek (UGT) include 295 structures in the regulatory 100-year floodplain and six structures in the High Hazard zone. Estimated damages in the UGT study area from a 100-year flood are approximately $196M. The Comprehensive Flood and Stormwater Plan, which was approved by City Council in September 2022, has a citywide focus and provides guidance to the utility department for managing stormwater and flood systems 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 1 of 36 across the city with the main goal of protecting the safety of the community and the ecosystem of our drainageways. The City’s Stormwater and Flood Management Utility uses a life-cycle approach to addressing flood risks throughout the community as identified in Figure 1. This approach starts with floodplain mapping to identify risk, followed by mitigation to select the preferred project alternatives, and then design and construction. Mapping is then updated to reflect the new floodplain with mitigation projects in place to continue the cycle, as needed. City Council approved the UGT mitigation plan on May 18, 2023. The final recommendations in this plan considered numerous project alternatives and extensive community outreach. Themes from community feedback generally included preservation of the natural landscape and wildlife corridors, concerns about impacts to individual properties, and a sense of urgency to complete flood projects. Community input is reflected in the mitigation plan and will be further refined in the design phase. Implementation of the UGT mitigation plan removes 527 structures from impact in the 100-yr flood. Following flood mapping for UGT in 2015 the city began community outreach. Open channel designs that maximize and preserve natural project features were favored by the community, while most community concerns related to individual private property impacts. Community input from this earlier phase of engagement is described in more detail in a March 18, 2019 WRAB memo. After COVID and staffing-related delays, community engagement resumed in 2021 and continued through 2023. ANALYSIS UGT WATERSHED In alignment with community feedback and recommendations from the 2022 Comprehensive Flood and Stormwater Master Plan (CFS), the approach for the open channel portions of the mitigation plan will be based on natural channel design. Where piped sections are recommended, they will typically be designed with large box culverts. The mitigation approach for UGT will restore capacity for the 100-yr flood in most areas and will also enhance restoration of existing natural drainageways and connection of those natural systems. The preferred alternative for the first reach of the upper portion of Twomile Canyon Creek was less than 100-year conveyance, and the preferences for the rest of both watersheds were to provide 100-year conveyance. Figure 1. Flood Project Lifecycle 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 2 of 36 The mitigation plan identified the chosen alternatives and level of flood conveyance for four reaches of Twomile Canyon, and six reaches of Goose Creek, as indicated in Figure 2. The recommended UGT mitigation improvements are estimated at a combined construction cost of approximately $43M with a benefit of $163M based on reduction in property damage for a cost benefit ratio of 3.8. More information is described in the March 2023 WRAB memo. Figure 2 Upper Goose Creek/Twomile Canyon Creek Watershed The first phase of the mitigation plan is the lower reach of Goose Creek, identified in Figure 2 as Reach 6. This reach has to be done first as it is the most downstream portion of both watersheds. The work has to be done generally from downstream to upstream for water to have a place to go. There are currently funds within the 6-year Stormwater and Flood capital improvement plan to implement the identified improvements to Reach 6 with additional stormwater improvements. REACH 6 This reach is currently an open channel with less than five-year capacity, situated behind the homes along the south side of Edgewood Drive. The recommended alternative in the mitigation plan is to restore the natural channel along Reach 6 to accommodate the 100-year (1% chance storm event.) A piped alternative was initially determined to be less feasible and was not explored further in the mitigation plan. Community concerns have arisen about the open channel alternative, including disturbance of and protection of the existing environment along the creek, and disruption to wildlife and private property near back yards. Subsequently, the city hired ICON Engineering to produce a detailed study, conceptual design, and report to analyze feasibility, constructability, cost, and the pros and cons of a piped alternative versus the open channel alternative. The key result of the study indicates that it is not possible to capture all the flood water in a pipe under Edgewood Drive because the stream elevation is lower than the required pipe elevation. Creek improvements would still be needed to accommodate the water that would not be diverted into the piped system under Edgewood Drive. Additionally, the multiple box culverts required under the road to convey the captured portion of the water and relocation of utilities would require disturbance to the entirety of Edgewood Drive and the adjacent residents’ front yards. After a thorough review of the results and identification of the significant shortcomings described above, staff does not recommend further development of the piped alternative. 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 3 of 36 NEXT STEPS Staff will continue to work in partnership to inform the community about the analysis and expectations for the next steps to implement the mitigation plan based on the open channel design for Reach 6. Following is a summary of key milestones in the implementation. Project Milestone Design consultant selection and contract 2025 Concept design and public outreach 2025 Refine design and public outreach 2026 Permitting 2026 Construction 2027 ATTACHMENTS A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 4 of 36 7000 S. Yosemite Street, Suite 120 | Centennial, CO 80112 | (303) 221-0802 | iconeng.com UPPER GOOSE CREEK REACH 6 – CONCEPTUAL DESIGN FOR STORM DRAIN ALTERNATIVE TO: City of Boulder – Ms. Debbie Fisher, PE, CFM, CPESC, Senior Project Manager City of Boulder Utilities – Storm/Flood FROM: ICON Engineering, Inc. – David Crooks, EI, Brian LeDoux, PE, CFM RE: Upper Goose Creek Reach 6 Conceptual Design for Storm Drain Alternative DATE: April 25th, 2024 Purpose This memorandum has been prepared to outline and assess the feasibility of an additional conceptual design alternative for Upper Goose Creek Reach 6 consisting of a closed conduit storm drain system that would run beneath Edgewood Drive from 19th Street to just downstream of 23rd Street. This alternative would provide a substitute floodplain mitigation approach to the previously approved open channel alternative as included in the Upper Goose Creek and Twomile Canyon Creek Flood Mitigation Plan Alternatives Report dated April 28, 2023, and adopted by City Council in May 2023. Background The Upper Goose Creek and Twomile Canyon Creek flood mitigation master plan project has been ongoing since 2017. After years of planning and public input the April 28th, 2023, Flood Mitigation Plan Alternatives Report by ICON Engineering, Inc. was finalized and submitted to City Council for approval. On May 18 th, 2023, there was a public hearing, and the City Council approved the master plan. The recommended plan for Upper Goose Creek Reach 6 (19th Street to 23rd Street) as outlined in the 2023 Flood Mitigation Plan Alternatives Report is a 100-year capacity open channel. This channel project consists of increasing capacity and improving the existing Upper Goose Creek Reach 6 historic channel that passes behind residential properties on the south side of Edgewood Drive. After Council approval of the Plan, some of the residents adjacent to the existing Upper Goose Creek Reach 6 channel expressed concerns that the plan would have a negative effect on the existing channel corridor and suggested a 100-year storm drain alternative. Thus, the City hired ICON Engineering, Inc. to conceptually design and assess the feasibility of a 100-year storm drain system under Edgewood Drive as an alternative to the previously approved 100-year channel improvement concept. Upper Goose Reach 6 - 100-Year Storm Drain Conceptual Design Alternative The Edgewood Drive alternative storm drain concept has been designed for both the interim and master plan conditions. The interim conditions assume that the planned Twomile Canyon Creek flood mitigation improvements are not yet in place whereas the master plan conditions assume that Twomile Canyon Creek flood mitigation improvement projects have been completed. The future Twomile Canyon Creek master plan improvements include a large storm drain system that runs from the Broadway and Iris intersection east along Iris, south on 19th, and ultimately along Floral Avenue to Upper Goose Creek. These Twomile Canyon Creek improvements will ultimately eliminate the spill flows out of Twomile Canyon Creek that currently flow into Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 5 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 2 of 12 Upper Goose Creek and the Edgewood Drive / Reach 6 area. The current interim condition spill flows out of Twomile Canyon Creek and their respective locations are detailed in Table 2 below. Hydrology The hydrologic analysis used a basis for this study is the February 16th, 2012, Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study Update Hydrology Verification Report by ICON Engineering, Inc. However, the table below and majority of the attached supporting documents are from the August 6th, 2015, Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study Update Hydraulic Report by ICON Engineering Inc. which superseded the hydrology report. Both the master plan conditions, and interim conditions storm drain concept alternatives for the Upper Goose Creek Reach 6 conceptual design utilize discharges from the 2012 report which are based on the Corrected Effective Conditions hydrologic model. These discharges are highlighted and shown in Table 1 below. Table 1: Recommended Discharges from the 2012 Hydrology Verification Report For both the master plan and interim storm drain design concepts it is assumed that the existing Upper Goose Creek Reach 6 channel will continue to convey the 5-year return interval with higher flows being diverted into the storm drain system beneath Edgewood Drive. Thus, the design flow for the master plan conditions Edgewood Drive storm drain concept is simply the total 100-year return interval flow minus the 5-year return interval flow, which is 1287 cfs. As discussed above, an interim condition design was also completed. The interim storm drain alternative concept design assumes that no flood mitigation master plan improvements are in place along Twomile Canyon Creek. Without these improvements there are several overland flow paths from Twomile Canyon Creek that travel south and are intercepted by Upper Goose Creek upstream of Reach 6. See Table 2 below for a summary of these flow path locations and values. Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 6 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 3 of 12 Table 2: Two Mile Canyon Creek Spill Flow Locations and Values (100-year) The design flow rate for the interim conditions Edgewood Drive storm drain concept alternative is the design flow rate for the master plan conditions concept plus the additional flow from the spill flows out of Twomile Canyon Creek, for a total design discharge of 1724 cfs. Excerpts from the 2015 Upper Goose Creek and Twomile Canyon Creek Flood Mapping Update Hydraulics Report showing the basins, and flow rates discussed above are attached to this conceptual design alternative memo. Hydraulics Storm Drain Sizing The hydraulic conductivity of the proposed storm drain improvements, both for the main trunk line below Edgewood Drive and outfall pipe to the existing Upper Goose Creek Reach 6 channel, was modeled in StormCAD (version 10.04.00.158). Slope and vertical sizing allowance was then determined in Civil 3D 2023 based on known utility locations within Edgewood Drive. The storm drain alignment was then exported to StormCAD with the following hydraulic input parameters: a Manning’s n-value used for the proposed storm drain network was 0.013 and the junction loss method was the absolute loss method with a head loss set to 0 across all solvers in StormCAD. For both the master plan and interim conditions flow rates, parallel storm drain box culverts were added in StormCAD until the hydraulic grade line remained below the ground surface to eliminate manhole surcharging and surface flooding during the design event. From conceptual hydraulic modeling it was determined that a series of parallel 4-foot high by 4-foot wide box culverts would be needed to convey both interim and master plan discharges. The design initially consisted of 3-foot high by 4-foot wide box culverts but for the proposed pipe system to fit within the right-of-way a 4-foot high box culvert is necessary. With this adjustment in the height, along with the proposed network fitting within the right-of-way, the existing sanitary lines will have to be lowered a foot and moved further south by 10 to 15 feet within the project area on Edgewood Drive. For the master plan conditions storm drain 6 parallel box culverts from 19th Street to Nicholl Street East and 7 parallel box culverts from Nicholl Street East to 23rd Avenue would be necessary to convey flooding flows. The master plan storm drain system would have a total width of 28 to 33 feet, for 6 and 7 parallel box culverts, respectively. For the interim conditions storm drain 8 parallel box culverts from 19th Street to 23rd Avenue would be necessary to convey flooding flows. The interim conditions storm drain system would have a total width of 38 feet. It is important to note that a taller box culvert option was explored prior to the selection of the 4-foot high by 4-foot wide parallel box culverts. With a taller box culvert the storm drain system would have to be deeper but there would be a much smaller excavation extent and less issues with conflicting Broadway Spill 53 13th Street Spill 48 19th Street Spill 275 Evergreen Ave Spill 61 Total 437 100-Year Flow Rate (cfs) Location Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 7 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 4 of 12 utilities. Unfortunately, the existing grade flattens out at the end of the proposed storm drain reach. There would not be enough ground cover at the downstream proposed storm drain to cover a deeper box culvert so significant earthwork would be required. Also, with a larger, deeper box culvert the storm water velocity would be too high for the flat slopes necessary to outfall into the existing channel and the hydraulic grade line would exceed the ground surface. When the hydraulic grade line exceeds the ground surface, there is risk of manholes becoming pressurized, potentially causing damage and injury. Additionally, water would begin to bubble out of manholes and would no longer be contained within the storm drain. Even if a deeper box culvert could work hydraulically, there would be issues with utility service lines crossing under the proposed culvert to service properties along the north side of Edgewood drive. A deeper box culvert would necessitate parallel utility mains to be installed on either side of the proposed storm drain which would add cost and time to the project. Whereas, with the shallower box culvert design, group service lines from utility laterals and existing cross street connections to the south side trunk lines can be utilized. Thus, it was determined that parallel 4-foot high by 4-foot wide box culverts were the optimal solution given the site constraints. Inlet Sizing and Placement Inlet sizing and quantities were determined using UD-inlet (version 5.03). Since this design was conceptual in nature all of the inlets used the same parameters and were not specifically designed for the locations shown in plan view. See image below for specific input values for inlet sizing along 19 th Street and in the alley between Edgewood Drive and Tyler Road west of 19 th Street: Note that the inlet quantities shown on sheet three of the attached plan and profile sheets (11) 20-ft type R inlets and (15) type C inlets were designed to capture the 1287 cfs that would be on the surface in Master Plan Conditions. As previously mentioned, there are several spill flow paths that make their way to the intersection of 19th Street and Edgewood given that no flood mitigation master plan improvements are in place along Twomile Canyon Creek, these spill flows combine for a total discharge of 437cfs. An additional 90 feet of type R inlets would need to be installed and connected to the interim conditions storm drain system at the intersection of 19 th Street and Edgewood Drive to capture this additional flow. Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 8 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 5 of 12 Conceptual Profile The conceptual design box culvert slope and size were determined in Civil 3D 2023 by adhering to the following parameters: ground coverage, utility crossing clearance and both downstream and upstream tie-in elevations. A minimum of 18” ground coverage was maintained on the proposed box culvert with a few exceptions, three of which were on the mainstem and one on the outfall pipe to the existing channel. On the mainstem, the very upstream and downstream ends where the box culvert ties-into the existing storm and open channel require some additional fill to meet this criterion. At roughly station 21+40 there is only about 16” of ground cover due to slope constraints. However, there could be additional fill here when the roadway is resurfaced. On the upstream end of the Edgewood Drive proposed storm drain the roadway will need to be raised to provide required ground cover. Due to the proposed storm drain slope constraints at the 19th Street box culvert outfall location there is one area where the ground coverage is only 12” above the relocated sanitary crossing. The proposed grade on both ends of the storm drain is shown on the profile drawing and there are proposed contours shown in plan view. A minimum of 12” clearance from crossing utilities was maintained for the proposed box culvert in all but one location. One sanitary sewer crossing at the downstream end of the Edgewood drive storm drain system has 9.6” of clearance. This exception is due to ground clearance constraints, slope constraints, and tying-into the downstream existing grade. As discussed in the challenges section of this memorandum, the parallel sanitary sewer system on Edgewood Drive needed to be lowered and shifted south to accommodate the space and clearance necessary for the proposed storm drain system. Junction boxes were placed no more than 400 feet apart per City of Boulder municipal code. Additionally, they were placed at all locations where the bend in the storm drain system exceeded 45 degrees. Finally, one was placed at the upstream end where the 19th Street / Edgewood storm drain system meets the 19th Street box culvert outfall and the proposed system ties-into the existing storm drain. The conceptual design box culvert plan and profile is illustrated on the attached three sheets. Challenges A storm drain alternative to an open channel approach results in some notable challenges which are discussed below. Phased Discharge Collection Although the conceptual design shown on the attached drawings are for the master plan flows as outlined in the Hydrology section there are two other flow rates to consider that would affect the size and placement of the proposed storm drain system and inlets. The interim conditions flows would necessitate an additional 90 feet of type R inlets that would be most effectively installed on the north side of the 19th Street and Edgewood Drive intersection. There is also the full master plan conditions which assumes that all other improvements for both Upper Goose Creek and Twomile Canyon Creek improvements are in place. For this condition, the only inlets that would need to be installed would be for local nuisance flow as there would be no major flooding flows to collect since they would already be in the storm drain system upstream of 19th Street. Accordingly, the vast majority of the inlets shown as part of this conceptual design eventually become obsolete. Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 9 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 6 of 12 Grade Changes Increasing the 19th Street road grade by nearly two feet between Edgewood Drive and Tyler Road would have significant impacts on flow patterns around this area. There is a chance that property owners adjacent to this area of fill would be negatively affected by the grade changes, particularly in the interim conditions time frame prior to full master plan improvement implementation. Impact Extents The excavation footprint of the proposed parallel box culvert networks, as shown on the design sheets, would affect the entire right of way of 19th Street north of Upper Goose Creek and the entire right of way of Edgewood Drive. This would cause notable impacts to Edgewood Property owners’ lawns, sidewalks, and driveways and would add a significant amount of coordination, cost, and general impact to this conceptual alternative. This would also cause significant traffic delays and access issues for residents along the project reach. Utility Conflicts In order to fit the entire proposed storm drain system within the right of way the existing sanitary sewer, water line and gas line systems must be relocated. Additionally, in order to provide the proper utility clearance for sanitary sewer, water, and gas lines crossing the proposed storm drain the relocated utility systems would need to be lowered as well. There are a total of 15 sanitary sewer, water line and gas line laterals that would need to be lowered along Edgewood Drive and one sanitary sewer lateral that would need to be raised to provide the proper clearance over the 19th Street outfall pipe. This increases the cost and timeline of this conceptual alternative. Additionally there are a total of five properties along the north side of Edgewood Drive that would need to be serviced from the utility laterals along 20th Street and Lorraine Court. There would have to be group service lines for sewer, water, and gas utilities that run through private property in order to serve these parcels that are not adjacent to lateral lines and cannot be serviced from the main lines that run under Edgewood Drive due to utility clearances and reducing the amount of crossing utilities under the proposed storm drain system. These group service lines would disturb homeowners’ landscaping and likely cause the removal of trees and the replacement of fences on private property, all of which would increase the cost and timeline of this conceptual alternative. As noted above, the general alignment of the conceptual storm drain system is limited by both ground cover and utility clearance. It is important to note that the only utility that elevation data was available for as part of this conceptual design layout was the sanitary sewer utility. Horizontal alignment of the water line was provided, and elevations were assumed. For the gas utility neither horizonal nor vertical data was provided but considering the extents and depth of the proposed storm drain system it was assumed that the gas utility would have to be relocated. It should be noted that the water and gas lines would require significant relocation efforts to allow for construction of the storm drain system. Considering the excavation extents of this project being the entire right-of-way there are a total of seven streetlamps, four overhead utility poles and one fire hydrant that would need to be removed and replaced as part of this project. Overhead utilities include electric, telephone, and internet. Any future design iterations that include these other utility crossings and conflicts, which are much more easily relocated relative to sanitary sewers, will likely increase the cost and timeline of this conceptual alternative. Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 10 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 7 of 12 City code specifies a minimum 10 feet horizontal clearance between parallel utility lines. With the width of the right-of-way, proposed storm drain and amount of underground parallel utility lines a variance of 6-feet (centerline to centerline) between parallel utilities would have to adopted as part of this project. Construction Phasing / Construction Disruptions This conceptual design project consists of excavating the entire right-of-way of Edgewood Drive in order to install the proposed storm drain and relocate the existing utilities. There would be extensive amounts of traffic control and service interruptions as a result of this project. Those who reside along the project reach on Edgewood Drive would be unable to park in front of their homes or in their driveways, Similarly those who reside in residences along Nicholl St West, Nicholl St East, and Lorraine Ct will experience difficulty accessing their homes as construction will affect those street intersections with Edgewood Drive. Service interruptions will include water, sewer, gas, electricity, internet, and phone. The specifics regarding duration of service interruptions and traffic control were outside of the scope of this phase of this design and are to be determined in future design iterations. Nuisance Flooding Through modeling efforts, it was determined that in current conditions, in large storm events, water ponds at about a foot of depth where 19th Street meets Upper Goose Creek Reach 6. Once water exceeds a foot of depth water overtops the roadway and flows directly into the open channel. For this conceptual storm drain alternative to intercept all of the flooding flow, before Upper Goose Creek Reach 5 master plan improvements are in place, a significant number of inlets would be necessary to capture this flow. Although these inlets would eventually get the storm water into the proposed storm drain system, it would not completely eliminate the ponding along 19th Street. Future design iterations will explore the extents of this ponding depth, which would ultimately be eliminated once Upper Goose Creek Reach 5 improvements are in place, rendering the majority of inlets proposed as part of the Edgewood Drive storm drain alternative unnecessary. It is important to note that open channel improvements would likely consist of the addition of inlets on 19th Street but that they aren’t ultimately necessary for the function of the channel improvements. Cost Considerations Even without considering utility relocation and other costs associated with the complicated nature of this alternative, storm drain flood mitigation approaches are generally more expensive than open channel modifications. Given limited resources to address City-wide flood problems, the lower cost of open channels makes them the preferred approach such that funding can be extended and more flood mitigation and drainageway restoration can be achieved throughout the City. As noted below, the interim approach to a storm drain system within the Edgewood right-of-way would cost on the order of $58M, while the open channel improvements are estimated to cost on the order of $12M. Water Quality Storm drain solutions provide less opportunity for improved water quality and heathier stream systems compared to open channel modifications. Improved water quality from an open channel approach will benefit both Upper Goose Creek and all downstream receiving waters. Energy Dissipation, Channelization, and Impacts Energy Dissipation will need to be added to the outfall locations of the proposed storm drain to reduce the erosivity of flood water entering the channel. Further analysis is needed to Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 11 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 8 of 12 determine the extents of necessary reinforcement on the end of the culverts to ensure that no erosion occurs downstream of the outfall locations. Particularly on the downstream discharge location of the proposed storm drain system, the conceptual design shows riprap reinforcement, feature boulders, bank stabilization, and channel invert establishment. These features would need to be installed to ensure flows could be conveyed from the proposed outfall to Upper Goose Creek without eroding the banks. This channelization would not only add additional cost and time to the project, but it would also disturb a local community garden causing it to be relocated. The natural function of a stream system can lead to natural energy dissipation, ultimately saving on cost. Additionally, by keeping all of the flows in the Upper Goose Creek Reach 6 channel there would be no need for channelization work on the downstream end of the proposed storm drain and the community garden would not be disturbed. Ecology and Wildlife Open channels present an opportunity to support and enhance site ecology. Channels integrate flora and fauna, as well as establish wetlands and native vegetation communities – a key component to a sustainable open channel system. Open channels create habitat for wildlife and aquatic species. The proposed storm drain network would not have any of these ancillary ecological benefits. Maintenance Compared to channel systems, the need for maintenance in a storm drain system is less visible and more difficult to access. Maintenance in a storm drain system often occurs more frequently as there are no natural maintenance processes occurring. This maintenance includes but is not limited to the removal of sediment. Additionally, piped storm drainage systems have the potential to clog as a result of sediment accumulating within the storm drain especially at bends. This not only increases the potential for frequent maintenance but also presents a larger issue which would limit conveyance capacity and cause surface flooding. Floodplain Connectivity By conveying flows greater than the 20% annual chance (5-year) storm event in a storm drain system, the opportunity for a connected floodplain does not exist. Improving the existing channel to convey larger storm events would provide floodplain connectivity within Upper Goose Creek. Resilience Unlike an open channel, the storm drain system only has capacity to convey flooding flows up to the 1%-annual-chance storm and is not as resilient in larger storm events. For storm events that exceed the 1%-annual-chance storm there is potential for ponding as these flows would not be conveyed within the storm drain system, nor will there be any channel improvements that would increase conveyance opportunity. Unlike a storm drain system, open channels offer the most flexibility in conveyance of flood flows, including the ability to collect and convey flows up to and beyond design flows. Open channels are not restricted by openings, such as inlets, which can clog during a storm and restrict flow from entering a closed conduit system. Natural Stream Function A closed conduit storm drain system along Edgewood Drive would not provide for an enhanced natural stream function within the existing open channel. An open channel approach is the best alternative to provide a natural stream function within a drainage corridor. The benefits Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 12 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 9 of 12 of a natural stream condition include: a more natural water flow regime, natural sediment transport conditions, infiltration/groundwater recharge, and exchange of surface and subsurface water in the hyporheic zone located under and adjacent to the low-flow channel which is an important and beneficial biological process. General Approach A piped storm drain alternative is not consistent with recommendations from the City of Boulder’s Comprehensive Flood and Stormwater Master Plan, Boulder County’s Comprehensive Plan, or the Mile High Flood District’s High Functioning, Low Maintenance stream approach. Where an open channel currently exists, it is the general approach of the governing regulatory organizations to address floodplain issues by modifying/enhancing an existing channel and not by pursuing other alternatives. An existing channel, particularly one that reflects a natural condition, is the closest thing to the original condition of the drainageway prior to settlement and development. Returning to a pre-settlement condition, as feasible within the current site constraints, is typically the ideal solution to achieve both flood mitigation and drainageway restoration. Opportunities A storm drain alternative to an open channel approach does have some notable opportunities which are discussed below. Preserved Corridor The Edgewood Drive storm drain concept would not require as extensive construction activity as compared to the proposed channel improvements in the existing Upper Goose Creek Reach 6 channel and associated wildlife corridor, but there would still be a need for stream improvements. These improvements will include removal of aging and dead trees within the channel corridor and stabilization of the south bank and channel invert along portions of Upper Goose Creek Reach 6. Right of Way Improvement There would be ancillary opportunities for roadway and right of way improvements as part of this conceptual alternative. Since the excavation work would be extensive there would be an opportunity for improvements to the road surface, implementation of traffic calming measures, adding a bike lane, sidewalk improvements etc. Update Utilities An additional potential benefit of the extensive excavation footprint would be the opportunity to update aging utilities that are otherwise difficult and costly to replace. Conceptual Cost Estimate Conceptual level cost estimates were developed for both the master plan and interim conditions. These costs are conceptual and provide an order of magnitude estimate for the conceptual storm drain system along Edgewood Drive. Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 13 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 10 of 12 Master Plan Conditions Conceptual Costs Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 14 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 11 of 12 Interim Conditions Conceptual Costs Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 15 of 36 MEMORANDUM P:\P\23-054_UGC_Reach_6\10_Reports\_Archive\UGC_Design_Memo.docx Page 12 of 12 Attachments:  Upper Goose Creek Reach 6 Conceptual Storm Drain Design Sheets  Pages from 2012 Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study Update Hydrology Verification Report  Pages from 2015 Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study Update Hydraulics Report  StormCAD Conduit and Manhole Output Tables for Master Plan and Interim Conditions END OF MEMORANDUM Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 16 of 36 ST ST STSTSTSTSTSTSS SS SSSSSSSSSSSS SSSSSS SS SS SS SS SS SS SS SS SS SSSSSS SSSSSSSSSSSSSS SS SSSSSSSSSSSS SSSSSS SS SS SS SS SS SS SS SS SS SSSSSS SSSSSSSSSSSSWW19TH STREET20TH STREET21ST STREETNICHOLL ST WEDGE W O O D D R UPPER GOOSE CREEK - REACH 6 UPPER G O O S E C R E E K - R E A C H 6 6' MIN I M U M C L E A R A N C E B E T W E E N PARAL L E L U T I L I T I E S 0+001+002+003+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 PROFILE OF ALIGNMENT - EDGEWOOD H: 1" = 100 V: 1" = 25 5300 5310 5320 5330 5340 5350 5360 5300 5310 5320 5330 5340 5350 5360 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 400 LF OF (6) 4' H X 4 ' W RCB C @ 1 . 4 % 349 LF OF (6) 4' H X 4 ' W R C B C @ 1 . 5 % 323 LF OF (6) 4' H X 4 ' W RCBC @ 0.9%EX SAN XINGAPPROX. TOP: 5327.1±EX SAN XINGAPPROX. TOP: 5331.3±EX SAN XINGAPPROX. TOP: 5321.9±189 LF OF (6) 4' H X 4 ' W RCBC @ 1.0% EXISTING GROUNDPROPOSED GRADE EX SAN XINGAPPROX. TOP: 5337.8±EXISTING 19TH STREET STORM PIPE OUTLET ELEVATION FIELD VERIFIED ON APRIL 5TH, 2024 194 LF OF (6) 4' H X 4 ' W RCBC @ 1 . 3 % PROPOSED RELOCATED SANITARY LINE PROPOSED RELOCATED SANITARY LINE PROPOSED RELOCATED SANITARY LINE PROPOSED UGC OUFALL BOX ELEVATION PROPOSED RELOCATED SANITARY LINE PROPOSED INLETS APPROXIMATE OUTLET ELEVATION PROPOSED HYDRAULIC GRADE LINE PROPOSED RELOCATED WATER AND GAS LINE PROPOSED RELOCATED WATER LINE PROPOSED RELOCATED WATER LINE PROPOSED RELOCATED WATER AND GAS LINES 1.2' 2.3' 1.0' 1.0' 1.8' 1.5' 1.7' 1.8' 1.5' 1.5' 2.8' 1.2' 1.0' 1.0' 2.8' 1.4' 1.1' PROPOSED RELOCATED GAS LINE 1.0' PROPOSED RELOCATED GAS LINE 1.5' LEGEND PROPERTY BOUNDARY EXISTING SANITARY SEWER EXISTING WATER LINE EXISTING STORM DRAIN CONCEPTUAL SANITARY SEWER CONCEPTUAL WATER LINE CONCEPTUAL STORM DRAIN CONCEPTUAL GAS LINE APPR.REVISIONSNo. DATE ICON PROJECT No. UPPER GOOSE CREEK REACH 6 CONCEPTUAL STORM DRAIN DESIGN 23-054 SHEET OF CITY OF BOULDER UTILITIES 1739 BROADWAY BOULDER, COLORADO 80302 Know what's below. Call before you dig. PREPARED FOR:PREPARED BY:DATE ICON ENGINEERING 7000 S YOSEMITE STREET SUITE 120 CENTENNIAL, COLORADO 80112 N 100'0 4/19/2024 1 4 TIE-INTO CONCRETE CHANNEL JUNCTION BOX FOR PARALLEL PIPE NETWORK JUNCTION BOX FOR PARALLEL PIPE NETWORK AREA DETAILED ON SHEET 3 PROPOPED SANITARY RELOCATION ALIGNMENT DIVIDER WALL TO PROVIDE INITIAL IN-CHANNEL FLOWS PROPOPED WATER RELOCATION ALIGNMENT PROPOPED GAS RELOCATION ALIGNMENT PROPOPED SANITARY, WATER AND GAS SERVICE LINE CONNECTIONS PROPOPED SANITARY, GAS AND WATER SERVICE LINE GROUP CONNECTIONS 4326 SF ADDITIONAL UTILITY EASEMENT REQUIRED CONNECT EXISTING INLETS TO PROPOSED STORM CONNECT EXISTING INLETS TO PROPOSED STORM CONNECT EXISTING INLET TO PROPOSED STORM EXISTING STORM OUTFALLS TO BE ABANDONED Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 17 of 36 PROFILE OF ALIGNMENT - EDGEWOOD H: 1" = 100 V: 1" = 25 5300 5310 5320 5330 5340 5350 5360 5300 5310 5320 5330 5340 5350 5360 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 400 LF OF (7) 4' H X 4 ' W RCBC @ 1 . 2 % 151 LF OF (7) 4' H X 4 ' W RCBC @ 0.4%EX SAN XINGAPPROX. TOP: 5314.0±EX SAN XINGAPPROX. TOP: 5312.4±PROPOSED GRADE PROPOSED RELOCATED SANITARY LINE PROPOSED RELOCATED SANITARY LINE PROPOSED RELOCATED SANITARY LINE320 LF OF (7) 4' H X 4 ' W RCBC @ 0.6%EX SAN XINGAPPROX. TOP: 5319.0±PROPOSED HYDRAULIC GRADE LINE PROPOSED RELOCATED WATER LINE PROPOSED RELOCATED WATER AND GAS LINESPROPOSED RELOCATED WATER AND GAS LINES 1.5' 2.7' 1.1' 1.5' 1.5'1.3' 1.0'0.8' 1.2' 1.7'0.9' PROPOSED RELOCATED GAS LINE 1.2' 1.6'STST STST STST STSS SS SS SS SS SS SS SS SSSSSSSSSSSSSS SS SS SS SS SSSS SSSS SS SS SS SS SS SS SS SSSSSSSSSSSSSS SS SS SS SS SSSS SSWW W W NICHOLL ST ELORRAINE CTEDGE W O O D D R EDGEWOOD DR UPPER GOOSE CREEK - REACH 6 5317'5318' 6' MINIMUM CLEARANCE BETWEEN PARALLEL UTILITIES 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+002 3 + 0 0 2 4 + 0 0 24+88LEGEND PROPERTY BOUNDARY EXISTING SANITARY SEWER EXISTING WATER LINE EXISTING STORM DRAIN CONCEPTUAL SANITARY SEWER CONCEPTUAL WATER LINE CONCEPTUAL STORM DRAIN CONCEPTUAL GAS LINE APPR.REVISIONSNo. DATE ICON PROJECT No. UPPER GOOSE CREEK REACH 6 CONCEPTUAL STORM DRAIN DESIGN 23-054 SHEET OF CITY OF BOULDER UTILITIES 1739 BROADWAY BOULDER, COLORADO 80302 Know what's below. Call before you dig. PREPARED FOR:PREPARED BY:DATE ICON ENGINEERING 7000 S YOSEMITE STREET SUITE 120 CENTENNIAL, COLORADO 80112 N 4/19/2024 2 4 NOTES: ·THIS CONCEPT HAS BEEN DESIGNED TO MASTER PLAN CONDITIONS WHICH ASSUME THAT TWOMILE CANYON CREEK IMPROVEMENTS HAVE BEEN MADE AND UPSTREAM IMPROVEMENTS TO UPPER GOOSE CREEK ARE NOT IN PLACE. THE INTERIM CONDITIONS ASSUMES THAT NEITHER THE TWOMILE CANYON CREEK OR UPPER GOOSE CREEK IMPROVEMENTS ARE IN PLACE. ·TOTAL 1%-ANNUAL-CHANCE MASTER PLAN CONDITIONS DISCHARGE FOR UPPER GOOSE CREEK AT 19TH STREET IS 1785 CFS AND THE INTERIM CONDITIONS DISCHARGE IS 2222 CFS. THE 5-YEAR RETURN INTERVAL FLOW OF 498 CFS WILL CONTINUE TO DISCHARGE TO THE EXISTING UPPER GOOSE CREEK - REACH 6 CHANNEL. THUS, THE MASTER PLAN CONDITIONS DESIGN FLOW IS 1287 CFS AND THE INTERIM CONDITIONS DESIGN FLOW IS 1724 CF. ·THE QUANTITIES SHOWN IN PROFILE VIEW [(6) AND (7)] CORRESPOND TO THE NUMBER OF PARALLEL 4' H X 4' W RCBCS THAT ARE NECESSARY TO CONVEY THE MASTER PLAN FLOWS. THESE QUANTITIES WOULD INCREASE TO (8) AND (8) RESPECTIVELY IF THE SYSTEM WERE TO BE DESIGNED TO CONVEY THE INTERIM CONDITIONS FLOW ·THE APPROXIMATE EXCAVATION AREA NECESSARY TO PLACE THE MASTER PLAN CONDITIONS PARALLEL PIPE NETWORK AND REALIGNED SANITARY SEWER IS ROUGHLY THE ENTIRE RIGHT OF WAY ALONG 19TH STREET AND EDGEWOOD DRIVE WITHIN THE PROJECT LIMITS HEADWALL AND WINGWALLS RIPRAP PROTECTION AND FEATURE BOULDERS JUNCTION BOX FOR PARALLEL PIPE NETWORK JUNCTION BOX FOR PARALLEL PIPE NETWORK APPROX. PROPOSED GRADING WHOLE FOOT CONTOURS LOW CLEARANCE / POTENTIAL CONFLICT WITH EXISTING ELECTRICAL TOWER POTENTIAL EXISTING ELECTRICAL TOWER RELOCATION AREA PROPOPED SANITARY RELOCATION ALIGNMENT 100'0 PROPOPED WATER RELOCATION ALIGNMENT PROPOPED GAS RELOCATION ALIGNMENT PROPOPED GAS, SANITARY AND WATER SERVICE LINE CONNECTIONS PROPOSED SANITARY, GAS AND WATER SERVICE LINE GROUP CONNECTIONS 383 SF ADDITIONAL UTILITY EASEMENT REQUIRED APPROX. LIMITS OF NECESSARY IMPROVEMENTS FOR CHANNEL GRADING, BANK STABILIZATION, RIVER FEATURES, REVEGETATION AND REESTABLISHMENT TO TIE-INTO EXISTING CHANNEL 5920 SF ADDITIONAL UTILITY EASEMENT REQUIRED APPROX. ALIGNEMENT OF PROPOSED CHANNEL IMPROVEMENTS APPROX. CHANNEL BANKS OF PROPOSED IMPROVEMENTS APPROX. LIMITS OF NECESSARY EXISTING CHANNEL IMPROVEMENTS FOR BANK STABILIZATION, REVEGETATION, AND REESTABLISHMENT CONNECT EXISTING INLETS TO PROPOSED STORM CONNECT EXISTING INLETS TO PROPOSED STORM EXISTING STORM OUTFALL TO BE ABANDONED EXISTING STORM OUTFALL TO BE ABANDONED Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 18 of 36 SS SSSSSS SS SS SS SS SS SSSS SS SSSSSS SS SS SS SS SS SSSSST STSTSTSTSTWWW W WWWWW 0+00 1+00 2+00 5345'5345.5'PROFILE OF ALIGNMENT - CHANNEL OUTFALL H: 1" = 50 V: 1" = 5 5335 5340 5345 5350 5335 5340 5345 5350 0+00 0+50 1+00 1+50 2+00 SEE NOTE ON THIS SHEET FOR FLOW SPLIT BETWEEN CHANNEL OUTFALL AND TRUNK LINEEX SAN XINGAPPROX. TOP: 5342.7±1.5' 1' 1.6' EXISTING UPPER GOOSE CREEK CHANNEL INVERT PROPOSED GRADE PROPOSED RELOCATED SANITARY LINE EXISTING 19TH STREET STORM PIPE OUTLET ELEVATIONFIELD VERIFIED ON APRIL 5TH, 2024 PROPOSED INLETS APPROXIMATE OUTLET ELEVATION PROPOSED HYDRAULIC GRADE LINE PROPOSED EDGEWOOD PARALELL TRUNK LINE DIVIDER WALL TO PROVIDE INITIAL IN-CHANNEL FLOWS LEGEND PROPERTY BOUNDARY EXISTING SANITARY SEWER EXISTING WATER LINE EXISTING STORM DRAIN CONCEPTUAL SANITARY SEWER CONCEPTUAL WATER LINE CONCEPTUAL STORM DRAIN CONCEPTUAL GAS LINE APPR.REVISIONSNo. DATE ICON PROJECT No. UPPER GOOSE CREEK REACH 6 CONCEPTUAL STORM DRAIN DESIGN 23-054 SHEET OF CITY OF BOULDER UTILITIES 1739 BROADWAY BOULDER, COLORADO 80302 Know what's below. Call before you dig. PREPARED FOR:PREPARED BY:DATE ICON ENGINEERING 7000 S YOSEMITE STREET SUITE 120 CENTENNIAL, COLORADO 80112 4/19/2024 3 4 NOTES: ·THIS CONCEPT HAS BEEN DESIGNED TO MASTER PLAN CONDITIONS WHICH ASSUME THAT TWOMILE CANYON CREEK IMPROVEMENTS HAVE BEEN MADE AND UPSTREAM IMPROVEMENTS TO UPPER GOOSE CREEK ARE NOT IN PLACE. THE INTERIM CONDITIONS ASSUMES THAT NEITHER THE TWOMILE CANYON CREEK OR UPPER GOOSE CREEK IMPROVEMENTS ARE IN PLACE. ·TOTAL 1%-ANNUAL-CHANCE MASTER PLAN CONDITIONS DISCHARGE FOR UPPER GOOSE CREEK AT 19TH STREET IS 1785 CFS AND THE INTERIM CONDITIONS DISCHARGE IS 2222 CFS. THE 5-YEAR RETURN INTERVAL FLOW OF 498 CFS WILL CONTINUE TO DISCHARGE TO THE EXISTING UPPER GOOSE CREEK - REACH 6 CHANNEL. THUS, THE MASTER PLAN CONDITIONS DESIGN FLOW IS 1287 CFS AND THE INTERIM CONDITIONS DESIGN FLOW IS 1724 CF. ·THE INLET QUANTITIES SHOWN IN PLAN VIEW [220FT TYPE R AND 15 TYPE C INLETS] CORRESPOND TO THE NUMBER OF INLETS THAT ARE NECESSARY TO CONVEY THE MASTER PLAN DESIGN FLOW. THERE WOULD NEED TO BE AN ADDITIONAL 90 FT OF TYPE R INLETS INSTALLED NORTH OF EDGEWOOD DR ON 19TH ST IF THE SYSTEM WERE TO BE DESIGNED TO CONVEY THE INTERIM CONDITIONS DESIGN FLOW. ·THE APPROXIMATE EXCAVATION AREA NECESSARY TO PLACE THE MASTER PLAN CONDITIONS PARALLEL PIPE NETWORK AND REALIGNED SANITARY SEWER IS ROUGHLY THE ENTIRE RIGHT OF WAY ALONG 19TH STREET AND EDGEWOOD DRIVE WITHIN THE PROJECT LIMITS N APPROX. PROPOSED GRADING HALF FOOT CONTOURS PROPOSED INLET / OUTLET BOX APPROX. FOOTPRINT ALLOWS 498 CFS (5-YEAR FLOW) TO RETURN TO CHANNEL AND CONVEYS REMAINING FLOW THROUGH EDGEWOOD TRUNK LINE 50'0 (2) 20 FT TYPE R INLETS IN SERIES (3) 20 FT TYPE R INLETS IN SERIES (4) 20 FT TYPE R INLETS IN SERIES (2) 20 FT TYPE R INLETS IN SERIES (15) TYPE C INLETS IN SERIES TIE-INTO CONCRETE CHANNEL PROPOSED SANITARY RELOCATION ALIGNMENT SANITARY SEWER DATA ENDS HERE SANITARY MAY NEED TO BE RELOCATED AND TIED-INTO EXISTING SYSTEM DEPENDING ON FIELD CONDITIONS DIVIDER WALL TO PROVIDE INITIAL IN CHANNEL FLOWS PROPOSED WATER RELOCATION ALIGNMENT PROPOSED GAS RELOCATION ALIGNMENT Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 19 of 36 TYPICAL EDGEWOOD DRIVE STORM DRAIN CROSS SECTION 5310 5315 5320 5325 5330 5335 5340 5345 5350 5310 5315 5320 5325 5330 5335 5340 5345 5350 0 20 40 60 800-20-40-60 CL27' 4'7' 37' FL-FL 7'7'21' 4.5' MIN. DEPTH TYPICAL 1.5' - 3.5' DEPTH TYPICAL 6.5' - 10' DEPTH TYPICAL 2' MIN. DEPTH TYPICAL 60' RIGHT-OF-WAY PRIVATE PROPERTY PRIVATE PROPERTY PROPOSED GROUP SERVICE LINES FOR SANITARY, GAS, AND WATER PROPOSED EDGEWOOD DRIVE STORM DRAIN EXISTING SANITARY SEWER TO BE REMOVED PROPOSED RELOCATED GAS LINE PROPOSED RELOCATED WATER MAIN PROPOSED RELOCATED SANITARY SEWER MAIN EXISTING STORM AND WATER CONFLICT WITH PROPOSED EDGEWOOD DRIVE STORM DRAIN AND ARE TO BE REMOVED APPROXIMATE DISTANCE BETWEEN HOUSE AND PROPERTY LINE UTILITY EASEMENT OVERHEAD UTILITIES, STREET LAMPS, AND FIRE HYDRANTS CURB, GUTTER, AND SIDEWALK 2 LANE ROADWAY AND BIKE LANES EXISTING GROUND SOUTHNORTH 2' MIN. DEPTH TYPICAL 4.5' MIN. DEPTH TYPICAL 1.5' MIN. DEPTH TYPICAL 6' MIN HORIZONAL CLEARANCE BETWEEN UTILITES, TYPICAL 4/19/2024 4 4 NOTES: ·THIS CONCEPT HAS BEEN DESIGNED TO MASTER PLAN CONDITIONS WHICH ASSUME THAT TWOMILE CANYON CREEK IMPROVEMENTS HAVE BEEN MADE AND UPSTREAM IMPROVEMENTS TO UPPER GOOSE CREEK ARE NOT IN PLACE. THE INTERIM CONDITIONS ASSUMES THAT NEITHER THE TWOMILE CANYON CREEK OR UPPER GOOSE CREEK IMPROVEMENTS ARE IN PLACE. ·TOTAL 1%-ANNUAL-CHANCE MASTER PLAN CONDITIONS DISCHARGE FOR UPPER GOOSE CREEK AT 19TH STREET IS 1785 CFS AND THE INTERIM CONDITIONS DISCHARGE IS 2222 CFS. THE 5-YEAR RETURN INTERVAL FLOW OF 498 CFS WILL CONTINUE TO DISCHARGE TO THE EXISTING UPPER GOOSE CREEK - REACH 6 CHANNEL. THUS, THE MASTER PLAN CONDITIONS DESIGN FLOW IS 1287 CFS AND THE INTERIM CONDITIONS DESIGN FLOW IS 1724 CF. ·THE QUANTITIES SHOWN IN SECTION VIEW (7) CORRESPOND TO THE NUMBER OF PARALLEL 4' H X 4' W RCBCS THAT ARE NECESSARY TO CONVEY THE MASTER PLAN FLOWS ON THE DOWNSTREAM END OF THE PROPOSED STORM DRAIN. THIS QUANTITY WOULD INCREASED TO (8) RESPECTIVELY IF THE SYSTEM WERE TO BE DESIGNED TO CONVEY THE INTERIM CONDITIONS FLOW ·THE APPROXIMATE EXCAVATION AREA NECESSARY TO PLACE THE MASTER PLAN CONDITIONS PARALLEL PIPE NETWORK AND REALIGNED SANITARY SEWER IS ROUGHLY THE ENTIRE RIGHT OF WAY ALONG 19TH STREET AND EDGEWOOD DRIVE WITHIN THE PROJECT LIMITS ·THE EXCAVATION WOULD INCLUDE THE UTILITY EASEMENT AREA BETWEEN THE SIDEWALK AND PROPERTY LINE. AS A RESULT (7) STREET LAMPS, (4) OVERHEAD UTILITY POLES, AND (1) FIRE HYDRANTS WOULD NEED TO BE REMOVED AND REPLACED AS PART OF THIS PROJECT. APPR.REVISIONSNo. DATE ICON PROJECT No. UPPER GOOSE CREEK REACH 6 CONCEPTUAL STORM DRAIN DESIGN 23-054 SHEET OF CITY OF BOULDER UTILITIES 1739 BROADWAY BOULDER, COLORADO 80302 Know what's below. Call before you dig. PREPARED FOR:PREPARED BY:DATE ICON ENGINEERING 7000 S YOSEMITE STREET SUITE 120 CENTENNIAL, COLORADO 80112 Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 20 of 36 Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study Update Hydrology Verification Report Prepared for: City of Boulder Public Works Department - Utilities Division 1739 Broadway, 2nd Floor Boulder, Colorado 80302 303.441.3200 Prepared by: 8100 South Akron Street, Suite 300 Centennial, CO 80112 303.221.0802 (Job No. 11-022-TGF) December 9, 2011 Revised: February 16, 2012 Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 21 of 36 @A @A @A @A @A@A@A 28TH ST19TH STBROADWAYIRIS AVE 4TH STVALMONT RD FOOTHILLS PKWYNORWOOD AVE 30TH ST!(!(Sanitas Wellness Center 701 702 704 603 703 602 601 601 702 603 701 602 704703 882 acres6.1% Impervious 630 acres41.5% Impervious 230 acres40.7% Impervious 277 acres25.3% Impervious 133 acres30.1% Impervious 77 acres48.2% Impervious43 acres33.8% Impervious ±Upper Goose Creek and Twomile Canyon Creek Flood Mapping Study Update - Hydrology Verification ReportFigure 3 - Corrected Effective Conditions Sub-Basins 1 inch = 1,500 feet Legend @A DESIGN POINT CONVEYANCE ELEMENT Twomile Canyon Creek Basin Goose Creek Basin Upper Goose Creek Reach 6 Area Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 22 of 36 Upper Goose Creek and Twomile Canyon CreekUpper Goose Creek and Twomile Canyon CreekUpper Goose Creek and Twomile Canyon Creek Flood Mapping Study UpdateFlood Mapping Study UpdateFlood Mapping Study Update Hydraulic ReportHydraulic ReportHydraulic Report Prepared for:Prepared for:Prepared for: City of BoulderCity of BoulderCity of Boulder Public Works Department Public Works Department Public Works Department --- Utilities DivisionUtilities DivisionUtilities Division 1739 Broadway, 21739 Broadway, 21739 Broadway, 2ndndnd FloorFloorFloor Boulder, Colorado 80302Boulder, Colorado 80302Boulder, Colorado 80302 303.441.3200303.441.3200303.441.3200 Prepared by:Prepared by:Prepared by: 8100 South Akron Street, Suite 3008100 South Akron Street, Suite 3008100 South Akron Street, Suite 300 Centennial, CO 80112Centennial, CO 80112Centennial, CO 80112 303.221.0802303.221.0802303.221.0802 (Job No. 11(Job No. 11(Job No. 11---022022022---TGF)TGF)TGF) August 6, 2015August 6, 2015August 6, 2015 Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 23 of 36 @A @A @A @A @A @A@A Linden Avenue North Broadway StreetKalmia Avenue Iris Avenue19th StreetJuniper Avenue Iris Avenue Hawthorn Avenue Forest Avenue 16th StreetElder Avenue Grape Avenue 19th StreetEvergreen Avenue Dellwood Avenue Spring V a l l e y R d . Floral Dr i v e Forest Ave Hawthorn Ave. Cedar Av Balsam Av 603 (Full Basin) 230 acresSteady State Inflow 5-year = 50 cfs10-year = 72 cfs25-year = 112 cfs50-year = 136 cfs100-year = 176 cfs500-year = 385 cfs 603 A 603 B 603 C603 D 603 E 69 acres 66 acres 49 acres 17 acres 30 acres Folsom Street603 D Discharge into Twomile Canyon Creek Split Flow 1 5-year = 4 cfs 10-year = 5 cfs 25-year = 8 cfs 50-year = 10 cfs 100-year = 13 cfs 500-year = 28 cfs 603 E Discharge into Upper Goose Creek 5-year = 7 cfs 10-year = 9 cfs 25-year = 15 cfs 50-year = 18 cfs 100-year = 23 cfs 500-year = 50 cfs 603 C Discharge into Upper Goose Creek 5-year = 11 cfs 10-year = 15 cfs 25-year = 24 cfs 50-year = 29 cfs 100-year = 37 cfs 500-year = 82 cfs 603 B Discharge into Twomile Canyon Creek 5-year = 14 cfs 10-year = 21 cfs 25-year = 32 cfs 50-year = 39 cfs 100-year = 51 cfs 500-year = 110 cfs 603 A Discharge into Iris Avenue Split Flow 5-year = 15 cfs 10-year = 22 cfs 25-year = 34 cfs 50-year = 41 cfs 100-year = 53 cfs 500-year = 116 cfs Goose Creek Two m i l e C a n y o n C r e e k 701 403 404 702 704 703 603 602 601 Figure 2.1 - Sub-Basin 603 Inflow Distribution Workmap Legend @A DESIGN POINTCONVEYANCE ELEMENT Basin 603 Basin 603 A Basin 603 B Basin 603 C Basin 603 D Basin 603 E 600 Feet± Upper Goose Creek Reach 6 Area Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 24 of 36 Linden Avenue North Broadway StreetKalmia Avenue Iris Avenue 19th StreetJuniper Avenue Iris Avenue Hawthorn Avenue Forest Avenue 16th StreetElder Avenue Grape Avenue 19th StreetEvergreen Avenue Dellwood Avenue S p r i n g V a l l e y R d . Floral Dr i v e Forest Ave Hawthorn Ave. Inflow Hydrograph 603 B 100-year = 51 cfs Cedar Avenue Inflow Hydrograph 603 A 100-year = 53 cfs Storm Sewer Capacity = 45 cfs NorthBroadway Street19th Street699cfs 491cfs208cfs 247cfs138cfs 106cfs 208cfs 385cfs 314cfs 237cfs 59cfs 48cfsE E326cfs 278cfs 136cfs 184cfs 323cfs 278cfs 161cfs E36cfs E13cfs 250cfs 197cfs 251cfs 55cfs 117cfs 63cfs 314cfs 261cfs 87cfs 126cfs 213cfs 275cfs 258cfs Additional Storm Sewer Capacity = 36 cfs 222cfs Inflow Hydrograph 601 100-year = 699 cfs Inflow Hydrograph 602 100-year = 139 cfs 279cfs 274cfs Inflow Hydrograph 603 D 100-year = 13 cfs E Broadway Outflow53 cfs E 13th St.Outflow48 cfs 213cfs EFloral Dr.Outflow140 cfsEGlenwood Ave.Outflow29 cfs250cfs 110cfs EGrape Ave. Outflow46 cfs 237cfs 274cfs Figure 4.10 - Twomile Canyon Creek 100-Year HEC-RAS Peak Discharges Legend Flow Path TCC TCC_13TH TCC_S1 TCC_S1_4TH TCC_S1_ELDER TCC_S1_GRAPE TCC_S1_GRAPE_2 TCC_S1_HAWTHORN TCC_S1_IRIS TCC_S2 TCC_S2_JASMINE TCC_S_4TH TCC_S_LINDEN TCC_S_SVALLEY 600 Feet± 174cfs 143cfs 4cfs 165cfs 63cfs 135cfs 113cfs EEvergreen Dr.Outflow61 cfs49cfs 109cfs Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 25 of 36 á0 áááá200 áááá400 áááá600 áááá800 áááá1000 áááá1200 áááá1400 áááá0áááá200áááá400 áááá600 áááá800áááá1000ááá0 áááá20 0á á0 áááá200áááá400ááá á600 áááá800 áááá1000áááá1200 áááá1400 áááá1600 áááá1800 áááá2000áááá2200áááá2400áááá2600áááá2800áááá3000 áááá3200ááá á3400 áááá3600 áááá3800 áááá4000áááá4200 áááá4400 áááá4600 áááá4800 áááá5000 áááá5200 áááá540 0áááá5600áááá580 0áááá6000áááá6200áááá6400áááá6600áááá6800áááá7000áááá7200áááá7400áááá7600á Cross Section 7239 Match Junction_701 Discharges Subtract 19 cfs for Storm Sewer 10-year = 212 cfs - 19 cfs = 193 cfs 25-year = 347 cfs - 19 cfs = 328 cfs 50-year = 434 cfs - 19 cfs = 415 cfs 100-year = 521 cfs - 19 cfs = 502 cfs 500-year = 661 cfs - 19 cfs = 642 cfs Cross Section 6114 Add Broadway spill from Twomile Canyon Creek 10-year (+3 cfs) = 160 cfs 25-year (+23 cfs) = 315 cfs 50-year (+31 cfs) = 410 cfs 100-year (+53 cfs) = 519 cfs 500-year (+95 cfs) = 701 cfs Cross Section 5863 Subtract 34 cfs for Storm Sewer 10-year = 126 cfs 25-year = 281 cfs 50-year = 376 cfs 100-year = 485 cfs 500-year = 667 cfs Cross Section 5547 Subtract 18 cfs for Storm Sewer 10-year = 108 cfs 25-year = 263 cfs 50-year = 358 cfs 100-year = 467 cfs 500-year = 649 cfs Cross Section 789 (Alpine Split) Subtract 28 cfs for Storm Sewer (See Discharge Workmap - Detail for Split Flow Discharges) Cross Section 2839 Add Twomile Canyon Creek Spill Flows, Inflow_702 Dischages, and Return Storm Sewer Discharges 10-year (+136 +521 +135 cfs) = 876 cfs 25-year (+215 +813 +135 cfs) = 1426 cfs 50-year (+235 +992 +135 cfs) = 1726 cfs 100-year (+275 +1220 +135 cfs) = 2117 cfs 500-year (+355 +2045 +135 cfs) = 3231 cfs Cross Section 1938 Add Twomile Canyon Creek Spill Flows (Evergreen Ave.) and Inflow_703 Discharges 10-year (20 cfs + 0 cfs) = 896 cfs 25-year (37 cfs + 19 cfs) = 1482 cfs 50-year (48 cfs + 25 cfs) = 1799 cfs 100-year (61 cfs + 44 cfs) = 2222 cfs 500-year (95 cfs + 54 cfs) = 3380 cfs Cross Section 757 Match Junction_704 Discharges 10-year = 964 cfs 25-year = 1669 cfs 50-year = 2080 cfs 100-year = 2624 cfs 500-year = 4275 cfs Cross Section 6736 Subtract 36 cfs for Storm Sewer 10-year = 157 cfs 25-year = 292 cfs 50-year = 379 cfs 100-year = 466 cfs 500-year = 606 cfs Cross Section 1435 (Alpine Split) Add 13th Street spill from Twomile Canyon Creek (See Discharge Workmap - Detail for Split Flow Discharges)14th StSunset B v16th StBluff St9th StBluff St Alpine Av 13th StBroadwayNorth St 17th St19th StElder Av Pine St Mapleton A v11th St10th St18th StHigh St Flor a l D r Edgewood D r Folsom St23rd St24th St21st St20th StForest Av Sunset B v15th St14th StBalsam Av Mesa Dr 22nd StJefferson StNicholl StWashington StEver g r e e n A v Ty l e r R d Repplier StLorr a i n e C t Concord AvFern Pl Alpine AvWashington St21st St20th St17th St14th St22nd St19th St15th St23rd St19th StFigure 4.4 - Upper Goose Creek Discharge Workmap - Overview Legend Flow Path Storm Sewer Cross Sections Alpine Split Broadway Split Hospital Split Upper Goose Creek 400 Feet± Flows addressed by Twomile Canyon Creek master plan improvements Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 26 of 36 á0 áááá200 áááá400 áááá600 áááá800 áááá1000 áááá1200 áááá1400 áááá0áááá200áááá400 áááá600áááá800áááá1000ááá0áááá20 0á á0áááá200áááá400áááá600áááá800áááá1000 áááá1200 áááá1400 áááá1600 áááá1800 áááá2000áááá2200áááá2400áááá2600áááá2800áááá3000 áááá3200ááá á3400 áááá3600 áááá3800 áááá4000áááá4200 á ááá4400 áááá4600 áááá4800 áááá5000 áááá5200 áááá540 0áááá5600áááá580 0áááá6000áááá6200áááá6400áááá6600áááá6800áááá7000áááá7200á ááá7400áááá7600á Cross Section 7239 Match Junction_701 Discharges Subtract 19 cfs for Storm Sewer 10-year = 212 cfs - 19 cfs = 193 cfs 25-year = 347 cfs - 19 cfs = 328 cfs 50-year = 434 cfs - 19 cfs = 415 cfs 100-year = 521 cfs - 19 cfs = 502 cfs 500-year = 661 cfs - 19 cfs = 642 cfs Cross Section 6114 Add Broadway spill from Twomile Canyon Creek 10-year (+3 cfs) = 100 cfs 25-year (+23 cfs) = 194 cfs 50-year (+31 cfs) = 268 cfs 100-year (+53 cfs) = 344 cfs 500-year (+95 cfs) = 473 cfs Cross Section 5863 / 871 Subtract 34 cfs for Storm Sewer 10-year = 126 cfs 25-year = 281 cfs 50-year = 376 cfs 100-year = 485 cfs 500-year = 667 cfs Cross Section 789 (Alpine Split) Subtract 28 cfs for Storm Sewer 10-year = 31 cfs 25-year = 89 cfs 50-year = 182 cfs 100-year = 248 cfs 500-year = 351 cfs Cross Section 2839Add Twomile Canyon Creek Spill Flows, Inflow_702Dischages, and Return Storm Sewer Discharges10-year (+136 +521 +135 cfs) = 876 cfs25-year (+215 +813 +135 cfs) = 1426 cfs50-year (+235 +992 +135 cfs) = 1726 cfs100-year (+275 +1220 +135 cfs) = 2117 cfs500-year (+355 +2045 +135 cfs) = 3231 cfs Cross Section 6736 Subtract 36 cfs for Storm Sewer 10-year = 157 cfs 25-year = 292 cfs 50-year = 379 cfs 100-year = 466 cfs 500-year = 606 cfs Cross Section 1435 (Alpine Split) Add 13th Street spill from Twomile Canyon Creek 10-year (+4 cfs) 25-year (+28 cfs) 50-year (+34 cfs) 100-year (+48 cfs) 500-year (+75 cfs) Cross Section 5547 Subtract 18 cfs for Storm Sewer 10-year = 66 cfs 25-year = 171 cfs 50-year = 258 cfs 100-year = 343 cfs 500-year = 488 cfs Junction 1 Combined Discharges 10-year = 84 cfs 25-year = 263 cfs 50-year = 364 cfs 100-year = 487 cfs 500-year = 696 cfs Junction 3 Discharge to Main Stem / Alpine Split Flow 10-year = 11 cfs / 59 cfs 25-year = 82 cfs / 117 cfs 50-year = 82 cfs / 210 cfs 100-year = 115 cfs / 276 cfs 500-year = 184 cfs / 379 cfs Junction 4 Discharge to Main Stem / Broadway Split Flow 10-year = 84 cfs / 42 cfs 25-year = 189 cfs / 92 cfs 50-year = 276 cfs / 100 cfs 100-year = 361 cfs / 124 cfs 500-year = 506 cfs / 161 cfs Junction 6 Discharge to Main Stem / Hospital Split Flow 10-year = 97 cfs / 60 cfs 25-year = 171 cfs / 121 cfs 50-year = 237 cfs / 142 cfs 100-year = 291 cfs / 175 cfs 500-year = 378 cfs / 228 cfs Junction 2 Combined Discharges 10-year = 53 cfs 25-year = 174 cfs 50-year = 182 cfs 100-year = 239 cfs 500-year = 345 cfs Sunset B v16th StBluff St North St Alpine Av Cedar Av 9th StBalsam Av13th StBroadway14th St15th St17th St11th St10th St16th StSunset B v Dewey Av Figure 4.5 - Upper Goose Creek Discharge Workmap - Detail Legend Flow Path Storm Sewer Cross Sections Alpine Split Broadway Split Hospital Split Upper Goose Creek 200 Feet± Flow addressed by Twomile Canyon Creek master plan improvements Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 27 of 36 5-Year 10-Year 25-Year 50-Year 100-Year 500-Year (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) Twomile Canyon Creek Linden Avenue JUNCT_601 1.38 91 186 415 533 699 997 INFLOW_601 91 186 415 533 699 997 INFLOW_601_Steady State 91 186 415 533 699 997 North Broadway Street JUNCT_602 1.59 123 235 501 643 838 1187 INFLOW_602 56 81 141 174 210 392 INFLOW_602_Steady State 32 49 86 110 139 190 Confluence with Goose Creek JUNCT_603 1.95 173 307 613 779 1014 1572 INFLOW_603 54 77 123 147 192 831 INFLOW_603_Steady State 50 72 112 136 176 385 Upper Goose Creek Balsam Avenue JUNCT_701 0.43 141 212 347 434 521 661 INFLOW_701 141 212 347 434 521 661 INFLOW_701_Steady State 141 212 347 434 521 661 19th Street JUNCT_702 1.41 499 733 1160 1426 1741 2706 INFLOW_702 393 558 849 1029 1256 2131 INFLOW_702_Steady State 358 521 813 992 1220 2045 Upstream of Confluence with Twomile Creek JUNCT_703 1.48 498 733 1179 1451 1785 2760 INFLOW_703 28 40 65 78 99 142 INFLOW_703_Steady State -1 0 19254454 Downstream of Folsom Street JUNCT_704 3.55 645 964 1669 2080 2624 4275 Note: negative or zero value steady state discharges reflect attenuation in the SWMM model, HEC-RAS discharges do not reflect attenuation. Table 2.1 - Recommended Discharges Location SWMM Element Drainage Basin Area (sq. mi.) Flow used (less 5-Year Discharge) for master plan conditions pipe sizing along Edgewood Drive Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 28 of 36 FlexTable: Conduit Table Slope (Calculated) (ft/ft) Length (User Defined) (ft) Invert (Stop) (ft) Stop NodeInvert (Start) (ft) Start Node Label 0.00565.05,340.00O-35,340.33 STM STRC-24 (Network - PR STM) CO-1 0.01324.75,337.79 STM STRC-3 (Network - PR STM) 5,338.11 STM STRC-2 (Network - PR STM) STM PIPE-9 (Network - PR STM) 0.013159.05,335.72 STM STRC-4 (Network - PR STM) 5,337.79 STM STRC-3 (Network - PR STM) STM PIPE-10 (Network - PR STM) 0.014240.35,331.71 STM STRC-5 (Network - PR STM) 5,335.07 STM STRC-4 (Network - PR STM) STM PIPE-11 (Network - PR STM) 0.010213.65,329.48 STM STRC-6 (Network - PR STM) 5,331.71 STM STRC-5 (Network - PR STM) STM PIPE-12 (Network - PR STM) 0.01559.35,327.73 STM STRC-7 (Network - PR STM) 5,328.62 STM STRC-6 (Network - PR STM) STM PIPE-13 (Network - PR STM) 0.015298.35,323.39 STM STRC-8 (Network - PR STM) 5,327.73 STM STRC-7 (Network - PR STM) STM PIPE-14 (Network - PR STM) 0.009322.85,320.46 STM STRC-9 (Network - PR STM) 5,323.29 STM STRC-8 (Network - PR STM) STM PIPE-15 (Network - PR STM) 0.012400.05,315.56 STM STRC- 10 (Network - PR STM) 5,320.36 STM STRC-9 (Network - PR STM) STM PIPE-16 (Network - PR STM) 0.010166.25,313.53 STM STRC- 11 (Network - PR STM) 5,315.19 STM STRC-10 (Network - PR STM) STM PIPE-17 (Network - PR STM) Page 1 of 276 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 4/18/2024 StormCAD [10.04.00.158] Bentley Systems, Inc. Haestad Methods Solution CenterUGC_MP_Concept_v2.stsw Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 29 of 36 FlexTable: Conduit Table Slope (Calculated) (ft/ft) Length (User Defined) (ft) Invert (Stop) (ft) Stop NodeInvert (Start) (ft) Start Node Label 0.006141.55,312.70 STM STRC- 12 (Network - PR STM) 5,313.53 STM STRC-11 (Network - PR STM) STM PIPE-18 (Network - PR STM) 0.004142.95,311.99O-15,312.60 STM STRC-12 (Network - PR STM) STM PIPE-19 (Network - PR STM) 0.010178.85,338.41 STM STRC-2 (Network - PR STM) 5,340.20 STM STRC-24 (Network - PR STM) STM PIPE-32 (Network - PR STM) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Velocity (ft/s) Flow (cfs) Manning's nDiameter (in) Section Type 5,342.005,345.670.00497.440.013Box 5,342.405,342.7413.411,287.560.013Box 5,340.215,342.4013.411,287.560.013Box 5,336.905,340.2113.411,287.560.013Box 5,333.965,336.9013.411,287.560.013Box 5,333.155,333.9613.411,287.560.013Box 5,329.045,333.1513.411,287.560.013Box 5,324.595,329.0413.411,287.560.013Box 5,320.555,324.5911.501,287.560.013Box 5,318.875,320.5511.501,287.560.013Box 5,317.445,318.8711.501,287.560.013Box 5,315.995,317.4411.501,287.560.013Box 5,342.745,345.2013.411,287.560.013Box Capacity (Full Flow) (cfs) 149.17 1,248.97 1,252.10 1,297.50 1,121.25 1,344.06 1,323.47 1,027.39 1,402.40 1,279.49 980.46 836.41 1,097.94 Page 2 of 276 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 4/18/2024 StormCAD [10.04.00.158] Bentley Systems, Inc. Haestad Methods Solution CenterUGC_MP_Concept_v2.stsw Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 30 of 36 FlexTable: Manhole Table Flow (Total Out) (cfs) Elevation (Invert) (ft) Elevation (Invert in 1) (ft) Bolted Cover?Elevation (Ground) (ft) Label 1,287.565,337.925,338.41False5,344.82STM STRC-2 (Network - PR STM) 1,287.565,337.145,337.79False5,344.02STM STRC-3 (Network - PR STM) 1,287.565,335.005,335.72False5,343.70STM STRC-4 (Network - PR STM) 1,287.565,331.795,331.71False5,338.09STM STRC-5 (Network - PR STM) 1,287.565,328.495,329.48False5,334.99STM STRC-6 (Network - PR STM) 1,287.565,326.975,327.73False5,333.62STM STRC-7 (Network - PR STM) 1,287.565,323.295,323.39False5,330.96STM STRC-8 (Network - PR STM) 1,287.565,320.365,320.46False5,328.00STM STRC-9 (Network - PR STM) 1,287.565,314.155,315.56False5,322.50STM STRC-10 (Network - PR STM) 1,287.565,313.305,313.53False5,319.60STM STRC-11 (Network - PR STM) 1,287.565,312.605,312.70False5,318.64STM STRC-12 (Network - PR STM) 1,287.565,336.215,340.33False5,345.70STM STRC-24 (Network - PR STM) Energy Grade Line (Out) (ft) Energy Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Headloss (ft) Headloss Method 5,345.545,345.545,342.745,342.740.00Standard 5,345.205,345.205,342.405,342.400.00Absolute 5,343.015,343.015,340.215,340.210.00Standard 5,339.705,339.705,336.905,336.900.00Absolute 5,336.765,336.765,333.965,333.960.00Standard 5,335.945,335.945,333.155,333.150.00Absolute 5,331.835,331.835,329.045,329.040.00Standard 5,326.655,327.395,324.595,324.590.00Standard 5,322.605,322.605,320.555,320.550.00Standard 5,320.925,320.925,318.875,318.870.00Absolute 5,319.495,319.495,317.445,317.440.00Standard 5,348.005,348.005,345.205,345.200.00Standard Station (Calculated) (ft) Inflow (Wet) Collection <Count> Inflow (Wet) Collection Flow (Known) (cfs) 21+690<Collection: 0 items>0.00 21+440<Collection: 0 items>0.00 19+850<Collection: 0 items>0.00 17+450<Collection: 0 items>0.00 Page 1 of 276 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 4/18/2024 StormCAD [10.04.00.158] Bentley Systems, Inc. Haestad Methods Solution CenterUGC_MP_Concept_v2.stsw Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 31 of 36 FlexTable: Manhole Table Station (Calculated) (ft) Inflow (Wet) Collection <Count> Inflow (Wet) Collection Flow (Known) (cfs) 15+310<Collection: 0 items>0.00 14+720<Collection: 0 items>0.00 11+730<Collection: 0 items>0.00 8+510<Collection: 0 items>0.00 4+510<Collection: 0 items>0.00 2+840<Collection: 0 items>0.00 1+430<Collection: 0 items>0.00 23+470<Collection: 0 items>1,785.00 Page 2 of 276 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 4/18/2024 StormCAD [10.04.00.158] Bentley Systems, Inc. Haestad Methods Solution CenterUGC_MP_Concept_v2.stsw Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 32 of 36 FlexTable: Conduit Table Slope (Calculated) (ft/ft) Length (User Defined) (ft) Invert (Stop) (ft) Stop NodeInvert (Start) (ft) Start Node Label 0.00565.05,340.00O-35,340.33 STM STRC-24 (Network - PR STM) CO-1 0.01324.75,337.79 STM STRC-3 (Network - PR STM) 5,338.11 STM STRC-2 (Network - PR STM) STM PIPE-9 (Network - PR STM) 0.013159.05,335.72 STM STRC-4 (Network - PR STM) 5,337.79 STM STRC-3 (Network - PR STM) STM PIPE-10 (Network - PR STM) 0.014240.35,331.71 STM STRC-5 (Network - PR STM) 5,335.07 STM STRC-4 (Network - PR STM) STM PIPE-11 (Network - PR STM) 0.010213.65,329.48 STM STRC-6 (Network - PR STM) 5,331.71 STM STRC-5 (Network - PR STM) STM PIPE-12 (Network - PR STM) 0.01559.35,327.73 STM STRC-7 (Network - PR STM) 5,328.62 STM STRC-6 (Network - PR STM) STM PIPE-13 (Network - PR STM) 0.015298.35,323.39 STM STRC-8 (Network - PR STM) 5,327.73 STM STRC-7 (Network - PR STM) STM PIPE-14 (Network - PR STM) 0.009322.85,320.46 STM STRC-9 (Network - PR STM) 5,323.29 STM STRC-8 (Network - PR STM) STM PIPE-15 (Network - PR STM) 0.012400.05,315.56 STM STRC- 10 (Network - PR STM) 5,320.36 STM STRC-9 (Network - PR STM) STM PIPE-16 (Network - PR STM) 0.010166.25,313.53 STM STRC- 11 (Network - PR STM) 5,315.19 STM STRC-10 (Network - PR STM) STM PIPE-17 (Network - PR STM) Page 1 of 276 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 4/18/2024 StormCAD [10.04.00.158] Bentley Systems, Inc. Haestad Methods Solution CenterUGC_Interim_Concept_v3.stsw Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 33 of 36 FlexTable: Conduit Table Slope (Calculated) (ft/ft) Length (User Defined) (ft) Invert (Stop) (ft) Stop NodeInvert (Start) (ft) Start Node Label 0.006141.55,312.70 STM STRC- 12 (Network - PR STM) 5,313.53 STM STRC-11 (Network - PR STM) STM PIPE-18 (Network - PR STM) 0.004142.95,311.99O-15,312.60 STM STRC-12 (Network - PR STM) STM PIPE-19 (Network - PR STM) 0.010178.85,338.41 STM STRC-2 (Network - PR STM) 5,340.20 STM STRC-24 (Network - PR STM) STM PIPE-32 (Network - PR STM) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Velocity (ft/s) Flow (cfs) Manning's nDiameter (in) Section Type 5,342.005,347.690.00619.230.013Box 5,341.525,342.1115.081,602.770.013Box 5,339.785,341.7915.111,602.770.013Box 5,336.895,339.7812.521,602.770.013Box 5,334.335,336.8912.521,602.770.013Box 5,333.625,334.3312.521,602.770.013Box 5,330.075,333.6512.521,602.770.013Box 5,326.205,330.0712.521,602.770.013Box 5,321.405,326.2012.521,602.770.013Box 5,319.405,321.4012.521,602.770.013Box 5,317.705,319.4012.521,602.770.013Box 5,315.995,317.7012.521,602.770.013Box 5,342.415,344.2012.521,602.770.013Box Capacity (Full Flow) (cfs) 149.17 1,665.29 1,669.46 1,730.00 1,495.00 1,792.08 1,764.62 1,369.86 1,602.74 1,462.27 1,120.53 955.90 1,463.92 Page 2 of 276 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 4/18/2024 StormCAD [10.04.00.158] Bentley Systems, Inc. Haestad Methods Solution CenterUGC_Interim_Concept_v3.stsw Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 34 of 36 FlexTable: Manhole Table Flow (Total Out) (cfs) Elevation (Invert) (ft) Elevation (Invert in 1) (ft) Bolted Cover?Elevation (Ground) (ft) Label 1,602.775,337.925,338.41False5,344.82STM STRC-2 (Network - PR STM) 1,602.775,337.145,337.79False5,344.02STM STRC-3 (Network - PR STM) 1,602.775,335.005,335.72False5,343.70STM STRC-4 (Network - PR STM) 1,602.775,331.795,331.71False5,338.09STM STRC-5 (Network - PR STM) 1,602.775,328.495,329.48False5,334.99STM STRC-6 (Network - PR STM) 1,602.775,326.975,327.73False5,333.62STM STRC-7 (Network - PR STM) 1,602.775,323.295,323.39False5,330.96STM STRC-8 (Network - PR STM) 1,602.775,320.365,320.46False5,328.00STM STRC-9 (Network - PR STM) 1,602.775,314.155,315.56False5,322.50STM STRC-10 (Network - PR STM) 1,602.775,313.305,313.53False5,319.60STM STRC-11 (Network - PR STM) 1,602.775,312.605,312.70False5,318.64STM STRC-12 (Network - PR STM) 1,602.775,336.215,340.33False5,345.70STM STRC-24 (Network - PR STM) Energy Grade Line (Out) (ft) Energy Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Headloss (ft) Headloss Method 5,344.555,344.555,342.115,342.110.00Standard 5,344.235,344.605,341.795,341.790.00Absolute 5,342.215,342.215,339.785,339.780.00Standard 5,339.335,339.335,336.895,336.890.00Absolute 5,336.775,336.775,334.335,334.330.00Standard 5,336.065,336.065,333.625,333.620.00Absolute 5,332.515,332.515,330.075,330.070.00Standard 5,328.635,328.635,326.205,326.200.00Standard 5,323.835,323.835,321.405,321.400.00Standard 5,321.845,321.845,319.405,319.400.00Absolute 5,320.145,320.145,317.705,317.700.00Standard 5,346.645,346.645,344.205,344.200.00Standard Station (Calculated) (ft) Inflow (Wet) Collection <Count> Inflow (Wet) Collection Flow (Known) (cfs) 21+690<Collection: 0 items>0.00 21+440<Collection: 0 items>0.00 19+850<Collection: 0 items>0.00 17+450<Collection: 0 items>0.00 Page 1 of 276 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 4/18/2024 StormCAD [10.04.00.158] Bentley Systems, Inc. Haestad Methods Solution CenterUGC_Interim_Concept_v3.stsw Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 35 of 36 FlexTable: Manhole Table Station (Calculated) (ft) Inflow (Wet) Collection <Count> Inflow (Wet) Collection Flow (Known) (cfs) 15+310<Collection: 0 items>0.00 14+720<Collection: 0 items>0.00 11+730<Collection: 0 items>0.00 8+510<Collection: 0 items>0.00 4+510<Collection: 0 items>0.00 2+840<Collection: 0 items>0.00 1+430<Collection: 0 items>0.00 23+470<Collection: 0 items>2,222.00 Page 2 of 276 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 4/18/2024 StormCAD [10.04.00.158] Bentley Systems, Inc. Haestad Methods Solution CenterUGC_Interim_Concept_v3.stsw Attachment A - 2024-04-25 Edgewood Drive Concept Design Memo 10.21.204 WRAB Agenda 4 - Upper Goose Creek/Twomile Canyon Creek Reach 6 Update Page 36 of 36