07.16.24 DMC Presentation 2Capital Improvement Projects in
Downtown Garages
Community Vitality
July 16, 2024
CAGID Assets
2. Table of Contents
•Put bullet points in here if
you have text.
•Ooh / Ahh
•Add image or chart to white
space
Highly utilized
Library, BMOCA, Tea House,
Atrium
Managed, Paid Parking
Throughout Downtown
Civic + Library
Lots,Diagonal Parking
Work Completed
•Restriped the lots!
Up Next
•Restriping Diagonal
Paid Parking Stalls
•Put bullet points in here if
you have text.
•Ooh / Ahh
•Add image or chart to white
space
Most likely to fill up
11th + Spruce Lot
Work Completed
•Milled and Striped the Lot
2. Table of Contents
•Put bullet points in here if
you have text.
•Ooh / Ahh
•Add image or chart to white
space
Highest Utilized Garage
Built in 1989
Spaces: 390
Elevators managed by CV: 2
Has EV Chargers
1100 Spruce Garage
Work Completed
•Concrete Repairs
•Replaced Column in
Basement
•Façade Replacement
•Added Drains to
move water away
from walkways
•Jetted Drains
•Tree Grates
Work In Progress
•Solar Panel Gutter
•Facility Assessment
•2025 CMGC Project Prep
Spruce Garage – Façade Work
Spruce Garage – Tree Grates + Irrigation
•Put bullet points in here if
you have text.
•Ooh / Ahh
•Add image or chart to white
space
Built in 1999
Spaces: 686
Elevators managed by CV:2
Has EV Chargers
1500 Pearl Garage
Work Completed
•Freeze Mitigation
•Domestic Pipes
•Wet Fire Suppression
•Heat
•Tenants operating in
their spaces
•Vandalism Repairs
Work In Progress
•HVAC
•Dry Fire Suppression
•Facility Assessment
•Doors around ground
level of building
•Wall Assessment
•Vandalism Prosecution
1500 Pearl Garage and Tenant Spaces –
Freeze Mitigation
1500 Pearl Garage and Tenant Spaces –
Freeze Mitigation
1500 Pearl Garage and Tenant Spaces –
Freeze Mitigation
2. Table of Contents
•Put bullet points in here if
you have text.
•Ooh / Ahh
•Add image or chart to white
space
Lowest Utilized Garage
Built in 1981/1989
Spaces: 302
Elevators managed by CV: 1
Has EV Chargers
RTD Garage
Work Completed
•Ramp Repairs
•Concrete Repairs
•Traffic Coat
•Weed Mitigation
and working with
RTD to fix irrigation
Work In Progress
•Landscaping outside of
RTD station
RTD Ramp Repairs
RTD Traffic Coat
•Put bullet points in here if
you have text.
•Ooh / Ahh
•Add image or chart to white
space
Most Likely to Fill Up
Built in 1977
Spaces: 260
Elevators managed by CV: 0
Has EV Chargers
Randolph Garage
Work Completed
•Concrete Repairs
•Ramp Repairs
•Irrigation to Trees
Up Next
•Traffic Coating
Randolph Concrete Repairs
Randolph Concrete Repairs
2. Table of Contents
•Put bullet points in here if
you have text.
•Ooh / Ahh
•Add image or chart to white
space
Highest Utilized Garage
Built in 2003
Spaces: 556
Elevators managed by CV: 2
Has EV Chargers
St. Julien Garage
Work Completed
•Concrete Repairs
•Jetted Drains to
move standing
water off concrete
Work In Progress/Up Next
•Traffic Coat
•Stairwell Enhancements
•Safety Enhancements
St. Julien Concrete Repairs
St. Julien Concrete Repairs
Next Steps
Prepare for a CMGC strategy on 1100 Spruce in 2025 then St. Julien 2026
Use the Facilities Assessment to prioritize the work garages, then post an
RFB for design/construction
Evaluate Facility Utilization to Meet Changing Community Needs
Explore opportunities for our existing parking products/facilities to ensure they’re
fulfilling their highest and best use to serve the downtown community
Continue with existing Capital Improvement Projects
To protect the work that we’ve done in recent years and
continue to enhance our assets in the short term
Questions?