Loading...
04.10.24 OSBT PacketOpen Space Board of Trustees April 10, 2024 This meeting will have virtual attendance only for members from the public. MEETING AGENDA (Please note that times are approximate.) I.(6:00)Call to Order and Roll Call II. (6:05)Matters from the Board A.Welcoming new Trustee and Oath of Office B.OSBT Office Elections C.Outgoing Board Member proclamation D.Trustee questions on Written Information items III. (6:45)Approval of the Minutes IV. (6:50)Public Comment for Items not Identified for Public Hearing V.(6:55)Matters from the Department A.Volunteerism, Service Learning and Partnerships Update and Declaration to Honor OSMP Volunteers During National Volunteer Week April 21-27, 2024 (40 min) B.Marshall Mesa Trailhead Improvements and Colorado Division of Reclamation, Mining and Safety (DRMS) Project Update (45 min) C.Update on South Mesa Trailhead Renovation (30 min) D.Director Verbal Updates (5 min) VI. (8:55)Adjourn Written Information A.Wildfire Resilient Landscapes: Update on OSMP's Wildland-Urban Interface (WUI) Fuels Management efforts B.Funded Research Program Update C.CO Highway 7 (Arapahoe Road) Multi-Modal Corridor Study D.Draft 2025 Work Plan and Budget Open Space Board of Trustees Members: Harmon Zuckerman (2023-2025) Michelle Estrella (2021-2026) Jon Carroll (2022-2027) Brady Robinson (2023-2028) Sarah Glynn (2024-2029) Open Space Board of Trustees *TENTATIVE Board Items Calendar (Updated March 25, 2024) May 8, 2024 June 12, 2024 June OSBT Field Trip (Date TBD) July 10, 2024 Matters from the Board: • Trustee questions on Written Memo items or public comment (10 min) Action Items: Matters from the Department: • Update on the North Foothills (HWY 36) Bikeway feasibility study (45 min) • Wildfire Resilient Landscapes: Update on Wildland Urban Interface (WUI) Wildfire Mitigation Pilot Program (40 min) • 2025 Budget Update: First touch with the OSBT (40 min) • Sawhill Ponds Improvement Projects Update (30 min) • Director verbal updates (5 min) Matters from the Board: • Trustee questions on Written Memo items or public comment (10 min) Action Items: • Assigning Management Area Designations to specific Open Space and Mountain Parks properties that are without a designation: Groups 2 and 3 (40 min) Matters from the Department: • 2025 budget Update: 2nd touch with OSBT (45 min) • Bear Habitat Suitability and On-leash trail regulations evaluation (30 min) • Climbing Access Trail Management Update (30 min) Theme: OSMP Agricultural Program Date and Location TBD Matters from the Board: • Trustee questions on Written Memo items or public comment (10 min) Action Items: • Recommendation for 2025 budget (50 min) • Fort Chambers-Poor Farm Site Management Plan (45 mins) Matters from the Department: • Boulder to Erie Regional Trail (BERT) Update (45 min) *All items are subject to change. A final version of the agenda is posted on the webpage the week of the OSBT meeting. OPEN SPACE BOARD OF TRUSTEES Action Minutes Meeting Date March 13, 2024 Record of this meeting can be found here: https://bouldercolorado.gov/government/watch-board- meetings (video start times are listed below next to each agenda item). BOARD MEMBERS PRESENT Dave Kuntz, Chair Michelle Estrella, Vice-Chair Jon Carroll Brady Robinson Harmon Zuckerman OSMP STAFF MEMBERS PRESENT Dan Burke Jeff Haley Jennelle Freeston Heather Swanson Lauren Kilcoyne Leah Russell Sam McQueen Bethany Collins Don D’Amico GUESTS Representatives from Cheyenne and Arapaho Tribal Nations: Chester Whiteman, Fred Mosqueda and Ben Ridgley Janet Michels, Senior Council, City Attorney’s Office Teresa Tate, City Attorney, City Attorney’s Office Joe Taddeucci, Director, Utilities Brandon Coleman, Civil Engineer Manager, Utilities AGENDA ITEM 1 – Call to Order and Roll Call The meeting was called to order at 6:00 p.m. AGENDA ITEM 2 – Fort Chambers/Poor Farm (1:00) Dan Burke, Open Space and Mountain Parks Director, Kacey French, Planning and Design Senior Manager, and Katie Knapp, Principal Planner, presented this item. Staff and the board welcomed designated representatives from Cheyenne and Arapaho Tribal Nations to join this meeting and discussion. AGENDA ITEM 3 – Approval of the Minutes (1:00:00) Michelle Estrella moved the Open Space Board of Trustees to adopt the minutes from February 14, 2024. seconded. This motion passed four to zero; Jon Carroll abstained as he was absent last meeting. AGENDA ITEM 4 – Public Participation for Items not Identified for Public Hearing (1:02:42) Hal Hallstein spoke about the disposal process for open space land. AGENDA ITEM 5 – Matters from the Board (1:12:44) The board asked about the “Shanahan Tall Oatgrass Project Update.” Questions asked were about resource impacts related to cattle being on the land, effects of fire on tall oat grass, if grazing has more of a lasting impact than prescribed burns, and if there has been any change in native grass growth yet in this area. The board reviewed their response to City Council’s inquiry of what “what two to three community issues or opportunities are on OSBT's minds in 2024.” Michelle Estrella moved the Open Space Board of Trustees to request staff submit these priorities to City Council on their behalf. Jon Carroll seconded. This motion passed unanimously. Staff and the board acknowledged Dave Kuntz for his tenure on the Board. While the March OSBT meeting is his last meeting, his proclamation will be read during the April OSBT meeting. AGENDA ITEM 6 – Continuation of the February 22, 2024 Public Hearing to consider a request from the City of Boulder’s Utilities department to use and manage an approximately 2.2-acre portion of the Van Vleet Open Space property to construct, access, operate and maintain elements of the South Boulder Creek Flood Mitigation Project, pursuant to the disposal procedures of Article XII, Section 177 of the City of Boulder Charter, and related matters (1:29:47) Bethany Collins, Real Estate Senior Manager, Joe Taddeucci, Director of Utilities, Brandon Coleman, Utilities Civil Engineer Manager, and Don D’Amico, Senior Resource Project Manager, presented this item. The meeting held on Feb. 22 consisted of a staff presentation, clarifying questions from City Council and OSBT, and public testimony. During this meeting, the OSBT discussed remaining thoughts and considerations from the February meeting and deliberated on the staff recommendation regarding this matter. Motion Jon Carroll moved the Open Space Board of Trustees to adopt Resolution 2024-01 and approve and recommend that City Council approve the request from the City of Boulder’s Utilities Department to use and manage an approximately 2.2-acre portion of the Van Vleet Open Space property to construct, access, operate and maintain elements of the South Boulder Creek Flood Mitigation Project, pursuant to the disposal procedures of City Charter, Article XII, Sec. 177. Michelle Estrella seconded. This motion passed unanimously. Harmon Zuckerman moved the Open Space Board of Trustees recommend a statement emphasizing to staff the importance of public access and recreation in the project area: Recognizing the intense public desire for continued use of the "CU South" property, OSBT recommends to OSMP staff that it pursue avenues to keep recreational access open on the 119 acre OS-O Site prior to and until restoration and/or construction on the OS-O Site begins. After the restoration of the OS-O Site, site planning and public access should be a priority. OSBT therefore recommends that public recreational access be restored as soon as practicable and at levels which appropriately balance conservation, restoration, and recreational needs. To facilitate the foregoing, OSMP should work with the University of Colorado to keep recreational access open to CU’s remaining lands. The OS-O Site represents not only a great opportunity for riparian restoration and reconnection of the South Boulder Creek floodplain, but also a great recreational and interpretive opportunity for the public. Allowing the public to observe, at close range, the restoration of floodplain and the native ecosystem on the OS-O Site, and also to invite the public to recreate there, as the public has for decades, is vital to achieving the balance of open space land for open space purposes which is specified in the Charter. Michelle Estrella seconded. This motion passed 4-1; Dave Kuntz dissented noting he supported the concept but felt it needed further vetting. AGENDA ITEM 7 – Request for a recommendation to City Council on the proposed annexation of approximately 4.06 acres of land located at 5600 Table Mesa Drive, currently managed as open space within Area III and designated as Open Space-Acquired (OS-A) under the Boulder Valley Comprehensive Plan (3:21:30) Bethany Collins, Real Estate Senior Manager, presented this item. The board asked why US 36 was included in the annexation and how the annexation statue allows for annexation of streets and right-of-way adjacent to the portion of property being added. Harmon added that removing the multi-jurisdictional aspect of this is good. Public Comment Lynn Segal spoke against this annexation. Motion Jon Caroll moved the Open Space Board of Trustees to recommend that City Council approve the annexation of approximately 4.06 acres of land located at 5600 Table Mesa Drive (LUR2024- 00001), currently managed as open space within Area III and designated as Open Space-Acquired (OS-A) under the Boulder Valley Comprehensive Plan. Harmon Zuckerman seconded. This motion passed unanimously. ADJOURNMENT – The meeting adjourned at 9:50 p.m. These draft minutes were prepared by Leah Russell MEMORANDUM TO: Open Space Board of Trustees FROM: Dan Burke, Director, Open Space and Mountain Parks Jennelle Freeston, Deputy Director of Community Connections Debbie Cushman, Volunteerism and Service Learning Program Manager Kris Weinberger, Volunteerism and Service Learning Program Manager Natasha Steinmann, Volunteerism and Service Learning Senior Program Manager Beau Clark, Trails Program Manager DATE: April 10, 2024 SUBJECT: Volunteerism, Service Learning and Partnerships Update and Declaration to Honor OSMP Volunteers During National Volunteer Week April 21-27, 2024 Introduction The purpose of this memo and the upcoming presentation to the Open Space Board of Trustees (OSBT) on April 10 is twofold: to share Volunteerism, Service Learning and Partnerships (VSLP) workgroup key 2023 accomplishments; and a declaration to honor Open Space and Mountain Parks (OSMP) volunteers in celebration of National Volunteer Week 2024. Master Plan Alignment VSLP staff involve the community in hands-on land management and conservation work that supports OSMP Master Plan priorities. In 2023, the VSLP team continued working and developing partners in stewardship within the larger community to implement the OSMP Master Plan. The OSMP Master Plan guides VSLP programming for the department. The main policy guidance is under the focus area CCEI: Community Connections, Education, and Inclusion with this community value statement: Together, we build an inclusive community of stewards and seek to find our place in open space. In 2023, the Volunteer, Service Learning and Partnership team offered programs and projects that primarily originate from and are informed by the following CCEI outcomes and strategies: •CCEI.B) FULFILLING COMMUNITY INVOLVEMENT •CCEI.C) LIFETIME CONNECTIONS WITH NATURE •CCEI.E) ENGAGED YOUTH INSPIRED BY NATURE •CCEI.F) PROMOTING EQUITY AND INCLUSION •CCEI.1) WELCOME DIVERSE BACKGRONDS AND ABILITIES •CCEI.2) ENHANCE COMMUNICATION WITH VISITORS •CCE1.3) CONNECT YOUTH TO THE OUTDOORS •CCEI.7) CULTIVATE LEADERS IN STEWARDSHIP •CCEI. 8) HEIGHTEN COMMUNITY UNDERSTANDING OF LAND MANAGEMENT EFFORTS Agenda Item 5A Page 1 On-the-ground VSLP programs and projects also support the achievement and progress towards outcomes and strategies from the other Master Plan focus areas: Ecosystem Health and Resilience (EHR), Agriculture Today and Tomorrow (ATT), Responsible Recreation, Stewardship and Enjoyment (RRSE), and Financial Sustainability (FS). Examples of how implementation is being achieved will be further covered in the 2023 VSLP Annual Report (Attachment A). Volunteer Services Highlights In 2023, volunteers helped to inform visitors, engage youth, connect with the land through hands-on projects, monitor wildlife, and protect the resources that make OSMP a special place. Over 1,707 volunteers contributed 19,537 hours, equaling $671,291 in value which is the equivalent to 13 full time staff (FTE). As mentioned above, OSMP volunteers contributed their time and unique talents to support OSMP’s Master Plan goals and departmental priorities. For example, ambassador volunteers made over 65,000 public contacts, welcoming and assisting visitors at trailheads, on trails and at the Ranger Cottage and Flagstaff Nature Center, which supports CCEI.2, as well as OSMP’s goal to have uniformed presence on the land. The 2023 Volunteer Satisfaction Survey indicated that the majority of volunteers were highly or moderately satisfied with volunteering and gave their overall satisfaction of a 4.6 out of 5-star rating. This is consistent with previous years. Nancy Lindo, OSMP volunteer said, “The respect and admiration I have for the OSMP land, staff, and volunteers has grown exponentially since I got involved. I would highly recommend that each person who enjoys recreating on OSMP land should spend a few hours a year giving back to these areas that we love. The more involved we are, the more care we will take to preserve these areas for future generations.” At the April 10 OSBT meeting, VSLP staff will be covering a number of 2023 volunteerism highlights, such as: •A Dog Ambassador Pilot Program that trained 9 volunteers, along with 7 dogs to focus on outreach specifically to dog guardians about dog behavior, safety and interactions. This program joined the other 130 Visitor Ambassadors, Trail Ambassadors and Bike Ambassadors who shared with the public advice and safety recommendations for trail use and natural resource protection, as well as reported problems to staff such as down trees and infrastructure damage. •Raptor and Bat Monitors spent many field hours out on the land counting and reporting on animal presence and behavior. This information is utilized by OSMP ecologists to make resource management decisions. Raptor monitors give one of the highest hourly amounts of all the volunteer groups! •Natural Resource Stewardship groups in the Skunk Canyon area as well as near Boulder Community Hospital pulled invasive weeds to increase native species resiliency. •Education Naturalists led school and community programs on specific topics while sharing their passion of OSMP. •Wellness Volunteers, including one yoga volunteer, accessible bike helpers and three trained naturalists who work with OSMP’s Pathways partnership program at Boulder Community Health shared nature as a healing environment for the community. •Two volunteer photographers documented over 10 one-day volunteer projects and RTW Crew operations, as well as started photographing OSMP program volunteers in action. •Trails staff offered community One-Day Volunteer Trail Projects, serving corporations and organizations, and 18 “Trail work Tuesdays & Wednesdays.” The Trails team also focused on construction of the North Sky Trail as well as closing undesignated trails system-wide with volunteer groups. Trails staff work closely with local groups such as Boulder MountainBike Alliance (BMA), Agenda Item 5A Page 2 Flatirons Climbing Council (FCC), Volunteers for Outdoor Colorado (VOC), Boulder Climbing Council (BCC) and more. •Requests for One-Day Volunteer Projects (ODVP) from businesses and organizations increased both from requests as well as from OSMP generated community-based public projects such as riparian area litter cleanups, native seed collections, and forestry projects. •Several individuals made longer-term commitments to steward the land. Check out the most recent OSMP Volunteer Spotlight that features volunteers who went above and beyond. •The Equity and Inclusion Field Based Agricultural Wellness Programming for Teens won the City of Boulder’s innovation values award. This multilayered partnership program involves Avani Diliger, MEd, MA, LPC, BC-DMT, CACIII, ADS, Founder and Executive Director of Boulder Natural Highs, and OSMP Agriculture Tenants, Daphne Kingsley and Cameron Genter, from Light Root Community Farm. This is a hands-on opportunity for teens to cultivate, grow and harvest an herbal apothecary for a holistic approach to wellness and recovery while also learning about the OSMP agricultural program. Service-Learning Highlights 112 Junior Rangers worked 614 crew hours (that’s over 6,390 individual hours contributed!) on high priority OSMP projects including 1.08 miles of new trail construction, cleared the trail corridor of 2,200 linear feet of existing trail, created, removed, or repaired 15,576 feet of fence, and more. The Junior Ranger Program continued a partnership with Nature Kids Boulder to provide family programming in Spanish & English to help introduce youth and their families to the Junior Ranger Program – resulting in more applications and hires from underrepresented communities. Finally, Junior Ranger staff continued collaborating with Parks and Recreation’s Youth Services Initiative (YSI) program to offer a paid summer opportunity for middle school age youth. The Bridgehouse Ready to Work and Ready to Work Light contract crews (RTW/RTWL) worked 188 project days, supporting OSMP’s water resources, vegetation management, forestry, trailheads, restoration, and agricultural teams. Key accomplishments included clearing over 13 miles of ditch to support water resources and agricultural priorities, removing thousands of feet of barbed wire, planting hundreds of forbes for restoration, and removing pounds of invasive species and hundreds of tons of cattails. Partnership Highlights VSLP staff coordinated with the citywide partnership resource team as well as the OSMP partnership core team to share resources to support OSMP partnerships. One highlight is that the Boulder Open Space Conservancy (BOSC), OSMP’s official 501c3 partner, raised a total of $57,000 for OSMP in 2023. The donations raised were: $30,000 for the Mt. Sanitas restoration project, $3,800 for the Maddy Lignell Junior Ranger Memorial Fund, $22,200 for re-wilding and climate resilience, and $1,000 for Volunteer Services. Declaration for National Volunteer Week Below is the Declaration for National Volunteer Week and Open Space and Mountain Parks staff asks the Open Space Board of Trustees join them in honoring these dedicated people during National Volunteer Week with a declaration at the forthcoming April OSBT meeting: Agenda Item 5A Page 3 The Open Space Board of Trustees joins the staff of the City of Boulder Open Space and Mountain Parks Department in recognizing all our volunteers during National Volunteer Week 2024. We salute the hundreds of Open Space and Mountain Parks volunteers who contributed their talents and efforts in helping the department carry out its City Charter Purpose for Open Space. This community of volunteers is an inspiration as their contributions help to protect the resources and provide for enjoyable experiences, making Boulder’s Open Space and Mountain Parks a special place. Attachments: •Attachment A: Volunteerism, Service Learning and Partnerships 2023 Annual Report Agenda Item 5A Page 4 Attachment A Agenda Item 5A Page 5 Attachment A Agenda Item 5A Page 6 Attachment A Agenda Item 5A Page 7 Attachment A Agenda Item 5A Page 8 Attachment A Agenda Item 5A Page 9 Attachment A Agenda Item 5A Page 10 EHR.8 Reduce impacts from noise, light and nearby land uses EHR.9 Reduce and offset OSMP greenhouse gas emissions ATT.6 Support the success of ranchers and farmers ATT.7 Integrate native ecosystems and agriculture ATT.8 Further reduce or eliminate pesticide use ATT.9 Enhance enjoyment and protection of working landscapes RRSE.6 Support a range of passive recreation experiences RRSE.7 Build new trails as guided by past and future plans RRSE.8 Provide welcoming and inspiring visitor facilities and services RRSE.9 Develop a learning laboratory approach to recreation CCEI.5 Foster wellness through immersion in the outdoors CCEI.6 Inspire environmental literacy and new involvement in OSMP CCEI.7 Cultivate leaders in stewardship CCEI.8 Heighten community understanding of land management efforts CCEI.9 Preserve and protect Boulder’s cultural heritage EHR.1 Preserve and restore important habitat blocks and corridors EHR.2 Update and continue implementing system plans guiding ecosystem management EHR.3 Address the global climate crisis here and now ATT.1 Reduce maintenance backlog for agriculture and water infrastructure ATT.2 Increase soil health and resilience ATT.3 Address conflicts between agriculture and prairie dogs RRSE.1 Assess and manage increasing visitation RRSE.2 Reduce trail maintenance backlog CCEI.1 Welcome diverse backgrounds and abilities CCEI.2 Enhance communications with visitors EHR.4 Reduce undesignated trails EHR.5 Extend on-trail requirements EHR.6 Control invasive species EHR.7 Develop a learning laboratory approach to conservation ATT.4 Protect water resources in a warmer future ATT.5 Encourage diverse and innovative agricultural operations RRSE.3 Update guidelines and standards for quality trail design and construction RRSE.4 Encourage multimodal access to trailheads RRSE.5 Manage passive recreation activities requiring a permit CCEI.3 Connect youth to the outdoors CCEI.4 Support city-wide engagement with federally recognized American Indian Tribes and Indigenous Peoples Attachment A Agenda Item 5A Page 11 MEMORANDUM TO: Open Space Board of Trustees FROM: Dan Burke, Director, Open Space and Mountain Parks Jeff Haley, Deputy Director of Visitor Experience and Infrastructure Bethany Collins, Senior Manager, Real Estate Services Ilene Flax, Senior Landscape Architect DATE: April 10, 2024 SUBJECT: Marshall Mesa Trailhead Improvements and Colorado Division of Reclamation, Mining and Safety (DRMS) Project Update ________________________________________________________________________ Open Space and Mountain Parks (OSMP) staff are currently developing renovation plans for the Marshall Mesa trailhead located near the intersection of CO Highway 93 and CO Highway 170/Eldorado Springs Drive as shared with the Open Space Board of Trustees (OSBT) in September 2023. Renovation is planned to follow Colorado Division of Reclamation, Mining and Safety (DRMS) mitigation work, as shared with OSBT in February 2024. This memo provides an update on both projects and a staff presentation will be provided to the OSBT at the April 10 regular meeting including a staff presentation from DRMS. DRMS Mitigation During 2022 and 2023 DRMS conducted subsurface investigations to determine the nature and extent of the underground coal fire near the City of Boulder’s Marshall Mesa Trailhead (Attachment A). The detailed finding of these investigations can be found in the Marshall Mine Underground Coal Fire Report of Investigations Sept. 2023, located on the DRMS website. In summary, the subsurface investigation findings indicate subsurface heat (>80°F) is being generated from the upper coal bed in three subsurface areas of the site. Based on these findings, availability of DRMS funding, and history of mitigation efforts at the site, DRMS is recommending a mitigation effort to remove, to the extent possible, potential hazards that may be associated with the current and previous subsurface coal activity. Additionally, DRMS recommends that, where possible, burned and unburned coal, adjacent to areas with elevated subsurface temperatures, should be mitigated to prevent future subsurface ignition and subsidence. The recommended mitigation to be led by DRMS is total excavation of approximately five acres (>35 feet deep) of the coal seam areas with elevated subsurface temperatures by excavating to the bottom of the coal seam, blending and cooling any material exceeding 80°F, and then replacing the material back into the excavation (Attachment B). No fill or topsoil would be imported or exported to/from the site. This recommended mitigation action is similar to the mitigation approach recently used at the nearby Lewis mine site. While DRMS has no regulatory requirement to perform this work, they are the state authority on this type of mitigation and receive federal infrastructure investment funding from Office of Surface Mining Reclamation and Enforcement to mitigate abandoned coal mine problems statewide. Permitting DRMS and their contractor access to perform this work would not convey any property interest in the city-owned land or create any additional monitoring or reporting requirements for DRMS or the city. Agenda Item 5B Page 1 It should be noted, the city is not the owner of the underground minerals that are the focus of this mitigation proposal, but it is the city’s understanding that DRMS has been in contact with the owner of the mineral rights regarding this mitigation proposal. Following excavation, the mitigated areas will either be graded to resemble the natural surrounding topography or graded in preparation for the Marshall Mesa Trailhead improvements. The existing and proposed trailhead renovation is located within portions of the recommended DRMS mitigation area. The timing and extent of the mitigation work allows collaborative project planning, design and permitting to take place. Schedule The initial permit application for the combined DRMS excavation and grading and the OSMP trailhead improvement project is expected to be made to the Boulder County Community Planning and Permitting Department in April 2024. This submittal includes: •DRMS mitigation plans; •Trailhead design plans; •Trailhead access driveway relocation plans; •Stormwater quality plans, including initial Goodhue Ditch coordination; •Cultural, mineral, and ecological resource reports; and •Fire protection cistern in collaboration with the Mountain View Fire Protection District (MVFPD). There will be a public hearing as part of the Boulder County Limited Impact Special Use Review (LISUR) standard process. Following the LISUR process, DRMS will obtain all necessary permits and contracts to perform the mitigation, which is expected to begin in Q4 of 2024. OSMP will complete construction documents, procurement and permitting for trailhead improvements, with an anticipated start in Q1 or Q2 of 2025 following the DRMS-led mitigation. Trailhead Design The trailhead renovation concept plans leverage adjacent projects to include consideration of the following elements (Attachment C). Vehicles •Vehicles will access the site through a new driveway that provides a graceful arrival sequence to the parking area and connects the park-and-ride as well as visitors arriving by bike or pedestrians better than the current design. •Unlike the existing configuration of the trailhead, the new trailhead parking will be in one area to support intuitive wayfinding for visitors. In addition to an improved layout that reduces the stress of finding a parking spot, the number of parking spaces has been increased based upon demonstrated demand and data collection throughout many years to ensure adequate parking is provided to visitors. •The parking area layout will support multi-modal access including shuttle bus drop off and pickup areas. This will include a shade shelter and seating for gathering and waiting. •Designated spaces for accessible parking, ranger parking, and equestrian parking. •Parking spaces are deeper than typical to support bike hitch racks without impacting circulation. •Parking and staging for maintenance of the trailhead and trail system. Agenda Item 5B Page 2 •In surveys, over 34% of visitors arrived at the trailhead by bicycle. Although many visitors will continue their bike experience on the trails, trailhead design includes comfortable and ample bike parking to support this multi-modal access of the system. The bike racks follow the standard city designs for the “U” style rack with the appropriate spacing and dimensions to accommodate all bikes. Trail System •The trailhead will provide improved connections to the Marshall Mesa trail system including a single-track sustainable trail leading from the trailhead south to connect to the Marshall Valley Trail and Coal Seam Trail. This new connection will provide educational and interpretive information regarding trail etiquette and provide visitors with an entry level experience of the types of trail conditions and features that might be experienced on the trail system and how to walk or ride safely with other users in mind. •The accessible route burned in the recent Marshall fire will not be reconstructed as it existed previously; it had been a short, destination-less segment. Instead, an accessible nature loop is envisioned in the area north of the trailhead. This location supports accessible grades, includes shaded areas that are critical for people experiencing disabilities, and can provide a quiet, contemplative experience away from the road and main trail network. •A short trail connection between the CDOT park-and-ride and the trailhead will provide a safe and compelling route. •Safe pedestrian routes around the trailhead will support wayfinding and intuitive connections that are separated from vehicles. Visitor Infrastructure •The vault restroom that burned in the Marshall fire will be replaced with the new OSMP standard concrete vault structure. This recommended structure is an integrated building and vault that is highly durable and resilient to fire, and moderately resilient to flooding. FEMA will provide funding for a new structure. •Shade is an increasingly vital safety concern in our changing climate and one of the most desired needs according to feedback from the community and visitors. The site renovation will include a shade shelter for gathering, waiting, and picnicking at the trailhead as a destination or before and after a recreation activity on the trails. •Benches and seating areas will be in appropriate locations around the trailhead to support visitor use, comfort, and engagement. •Marshall Mesa is increasingly popular as a biking facility, with 59% of visitors reporting biking as their primary activity. Visitor infrastructure will include a bike repair station and an area for staging groups of bikes before heading onto the trails. The existing steel structure that exists on the site now with interpretive signs will remain and be integrated into the new design to support bike gathering. Vegetation Trailheads staff have been developing a “climate-ready” landscape palette with plantings that are native, fire-wise, and water-wise. Many xeriscape guidelines apply, including the right plant for the right place to provide a variety of benefits to the trailhead area. Agenda Item 5B Page 3 •Vegetation management is currently underway in anticipation of the disturbance to reduce the spread of invasive plants. •Successful revegetation following any disturbance is key to project success. Re-establishment of a functional grassland ecosystem will require vigilant staff effort. •Trailhead grading will direct stormwater runoff to landscaped areas that are supported by this additional water. •Trees that provide shade as a critical element in our changing climate. •Plants that exhibit a variety of adaptations to living with fire including serotinous cones, smoke responsive germination, bark characteristics, and deep root systems. Education and Outreach Education and outreach at the Marshall Mesa trailhead are supported by the visitor infrastructure described above. In addition, the level of service for this area indicates the need for guided and/or self- guided trails and nature discovery experiences. •As explored in CU Boulder’s Eco-healing studio project, the Marshall Mesa trailhead resonates following the Marshall Fire. Our community is increasingly aware of the healing qualities of spending time in nature, and this place is empowered to address and support recovery. •The newly designed accessible nature trail is an excellent opportunity for interactive site interpretation that may include eco-healing; coal mining and the mitigation work; and climate ready landscapes. •Signage to support wayfinding and interpretation. Closures During construction, the trailhead will be closed to parking and visitor access from the initial mobilization for DRMS mitigation work through the final trailhead construction period, approximately one year. The reality is that the entire area south of Marshall Road will be within the construction zone and not allow access from the CDOT park and ride or Marshall Road. The Eldorado park-and-ride will remain operating at the CDOT park and ride, but there will be no trail access from this point. However, within the open space, only the short section of trail between the closed trailhead and the Marshall Valley Trail will be closed. If it does not cause problems, the Marshall Valley Trail will remain open from the Coal Seam intersection allowing for full use of the Dirty Bismark loop. If this causes conflicts, additional trail closures may be required. The trail loop will be accessible from: •The access point along Marshall Road east of the existing trailhead and Cherryvale (no vehicle parking at this location). •Greenbelt Plateau Trailhead; •Flatirons Vista Trailhead (includes a restroom); •Mayhoffer/Singletree/ 66th Street Access Point; •Oerman- Roche Trailhead (Boulder County); and •Coalton Trailhead (Boulder County) (includes a restroom). Attachments: •Attachment A – Marshall Mesa Property Map •Attachment B – DRMS Excavation Plan •Attachment C– Marshall Mesa Trailhead Illustrative and Site Plan Agenda Item 5B Page 4 !i Stanger Roseview Richardson I Thomas, Hogan, Parrish (T.H.P.) - East Parker CE Neuhauser City Limits Rudd - East Rudd - West SFoothillsHwyMarshall Rd EldoradoSpringsDrCoalSeamM arsh allValleyMarshallMesaCommunityDitchCommunityD itc h Communit y D it c h ¬«93 ¬«170 ¬«170 S Cherryvale RdEldoradoSpringsDrM a r s h a l l R d MarshallRd Davids o n DitchCommunity D itc hGoodhue DitchSouthB o u ld e r C reekUser: cassidyj Date: 2/7/2024 Document Path: E:\MapFiles\Property\City Limits\Location_MarshallMesa_2024.mxd Attachment A-Property Map I 0 0.045 0.09 0.135 0.18Miles Legend !i OSMP Trailhead with Designated Parking Hiking Trail Multi-Use Trail Subject OSMP Fee Ownership OSMP Easement Marshall MesaTrailhead Agenda Item 5B Page 5 xx xx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxMA R S H A L L D R .S FOOTHILLS HWY 93S FOOTHILLS HWY 93MARSHALL DR.DAVIDSON DITCH ELDORADO SHUTTLE PARKING 1682 MARSHALL DR. LIMITS OF DISTURBANCE SOUTH AREA EXCAVATION LIMITS NORTH AREA EXCAVATION LIMITS LIMITS OF DISTURBANCE OWNER: CITY OF BOULDER >>>>>>>>>>>>S-FENCE STOCKPILE (TYP) EXISTING CISTERN TO BE REMOVED FIRE WATER TANK CONSTRUCTION ENTRANCE 1689 1689 169016901680 17001690 1690 EXISTING HISTORIC PAVILION TO REMAIN. EXISTING MAJOR CONTOUR (10' INTERVAL) CHKD: DRWN: PROJ: DESN:www.tetratech.comMARK DATE DESCRIPTIONBY2/1/2024 11:45:34 AM - C:\USERS\LAURA.WEATHERL\DC\ACCDOCS\TETRA TECH INC\117-8295005 MARSHALL\PROJECT FILES\CAD\SHEETFILES\C-02 EXCAVATION PLAN.DWG - WEATHERL, LAURA1 A B C D E F 2 3 4 5 6 7 Bar Measures 1 inch, otherwise drawing not to scale Copyright: Tetra Tech117-8295005MARSHALL FIRE MITIGATION - 50%BOULDER COUNTY, COLORADOSTATE OF COLORADO DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION, MINING AND SAFETY1100 South McCaslin BlvdSuperior, CO 80027Phone: +1 (303) 448-7453N 0 SCALE: 50' 100'200' 1'' = 100'C-02EXCAVATION PLANB.BIJOLD L. WEATHERL B.BIJOLD LEGEND ACCESS ROUTE 1. ACCESS TO SITE WILL BE FROM MARSHALL DR. A CONSTRUCTION ENTRANCE WILL BE CREATED ACROSS THE STREET FROM THE EXISTING DRIVEWAY FOR THE ELDORADO SHUTTLE PARKING AREA AT 1682 MARSHALL DR. 2. DISTURBANCE TO THE AREA SHALL BE KEPT TO A MINIMUM. 3. EQUIPMENT OPERATION, MATERIAL STORAGE STAGING, OFFROAD TRAVEL, AND/OR OTHER PROJECT IMPACTS OUTSIDE OF CLEARED AREAS IS PROHIBITED. GENERAL NOTES: EXISTING MINOR CONTOUR (10' INTERVAL) PROPERTY BOUNDARY LIMIT OF DISTURBANCE EXCAVATION LIMITS 2017 MITIGATION AREA EXCAVATION LIMITS STOCKPILE LOCATION ATTACHMENT B Agenda Item 5B Page 6 Marshall Mesa Trailhead Renovation Illustrative Site Plan April 2024 North NTS Horse trailer Horse trailer parkingparking Bike plazaBike plaza Planted water Planted water quality islandsquality islands Vault Vault restroomrestroom Accessible and Accessible and Ranger parkingRanger parking Shuttle stop Shuttle stop and drop offand drop off Shade shelter Shade shelter and picnic areaand picnic area System trailsSystem trails Nature trailNature trail Maintenance Maintenance stagingstaging Trail to park Trail to park and ride lotand ride lot ParkingParking KioskKiosk Interactive site Interactive site interpretationinterpretation CrosswalkCrosswalk 170170 9393 GatheringGathering spacespace ATTACHMENT C Agenda Item 5B Page 7 LISUR SUBMITTAL (NOT FOR CONSTRUCTION) -MARCH 8, 2024 ATTACHMENT CAgenda Item 5B Page 8 MEMORANDUM TO: Open Space Board of Trustees FROM: Dan Burke, Director, Open Space and Mountain Parks Brian Anacker, Science and Climate Resilience Sr. Manager Paul Dennison, Wildland Fire Sr. Program Manager DATE: April 10, 2024 SUBJECT: Written Information: Wildfire Resilient Landscapes: Update on Wildland-Urban Interface (WUI) Fuels Management Executive Summary In 2024, Open Space and Mountain Parks (OSMP) will enhance its already extensive fuels management in the Wildland Urban Interface (WUI) by adding a new pilot initiative: the WUI Perimeter Mowing Program. This program will begin in 2024 by targeting a narrow 30-foot strip of OSMP land that is adjacent to four priority communities within the WUI and aims to achieve four main objectives: (1) raise community awareness about wildfire risks, (2) reduce those risks by mitigating hazardous fuels, (3) evaluate the effectiveness of different treatment methods (e.g., mowing, grazing, tree limbing) on OSMP public lands, and (4) assess the program's overall efficacy and scalability to inform the development of a permanent WUI Perimeter Mowing Program. The main fuel reduction technique will be the mowing of grasses down to 4-6 inches in height one to two times per year but may also involve limited treatment of woody vegetation as needed. By integrating community engagement, strategic risk assessment, and vegetation treatment techniques, the WUI Perimeter Mowing Program endeavors to increase Boulder's resilience to wildfire, building upon an already strong foundation for sustainable wildfire management practices in the Wildland Urban Interface. In addition to this written memo in the OSBT April packet, OSMP staff will present an update on the WUI Perimeter Mowing Program at the May business meeting. Introduction OSMP conducts many activities that reduce wildfire risk to the Wildland Urban Interface (WUI), including extensive livestock grazing, landscape-scale forest thinning, ditch fuels management, invasive, non-native vegetation mitigation, and prescribed burning. These activities are primarily conducted to increase ecological health across the fire-adapted landscapes, but they also have the co-benefit of wildfire risk reduction to adjacent structures and homes in the Boulder community. The Marshall Fire identified a need to take an even more targeted approach to fuels reduction immediately adjacent to residential communities. In fact, other agencies in the Boulder Valley have already designed and implemented mowing programs in WUI areas to reduce fuels and lower wildfire risk to residents. The need for enhanced vegetation management on public and Written Information - Item A - Page 1 private land adjacent to homes is also prioritized as a strategy in the forthcoming Community Wildfire Protection Plan (CWPP). In Spring 2024, OSMP will begin a new pilot program to implement and assess wildfire risk reduction strategies in the WUI. The WUI is a wildfire management term defined as areas where human development meets undeveloped wildlands. The WUI represents a space where wildfire poses elevated risk to life, residential property, and other values. Many areas in the WUI involve residential communities abutting OSMP lands. Wildfire risk modeling in the 2024 CWPP has identified many of these parts of the WUI as priority areas for risk reduction project planning and implementation; several of these areas are the focus of the WUI Perimeter Mowing Program. The pilot OSMP-WUI Perimeter Mowing Program fits into broader wildfire mitigation strategies described in the CWPP, and other projects will be planned and implemented to amplify the benefits of the WUI Perimeter Mowing Program. These complimentary lines of effort (many of which are led by other city departments and agencies) involve fuels reduction on private land, home hardening to reduce structural ignitability, community preparedness programs, and others. The pilot WUI Perimeter Mowing Program has four main objectives: 1)Raise Community Awareness: To promote engagement with the community and other partners to accomplish a better shared understanding of risk in the WUI, and to initiate action on public and private lands to reduce that risk. 2)Reduce Risk: To mitigate wildfire risk in the Wildland Urban Interface by reducing hazardous fuels. 3)Evaluate Prescriptions: To evaluate the effectiveness of various treatment approaches in managing grass and other vegetation on public land, to reduce risk and determine how to integrate community-level treatments with new and ongoing risk reduction efforts happening at the landscape level. 4)Evaluate Program Efficacy: To assess the feasibility and potential scale of a permanent WUI Perimeter Mowing Program. Site Selection A variety of analysis tools and subject matter experts assisted in the selection of four pilot treatment areas. Assessing areas for potential treatment during the program pilot involved the following criteria: 1. Treatments should occur in areas of higher relative risk according to CWPP wildfire risk models and local expertise. 2. Treatments should occur in areas where OSMP lands are generally nearest to residential structures—given that treatments are generally less effective the farther they are from a home or community. 3. Treatments should occur in areas where thedensity of homes benefitting from treatment ishighest. Written Information - Item A - Page 2 Figure. 1. This figure illustrates a three-step flow chart for selecting potential treatment areas. Step 1 involves using risk as defined by the Community Wildfire Protection Plan (CWPP) to identify potential treatment areas. Step 2 refines these areas further based on their proximity to structures. Step 3 applies an additional layer of refinement by considering the density of structures within the areas. Figure. 2. The photograph is of the North treatment area in the Dakota Ridge Northbriar Neighborhood highlighting the Wildland Urban Interface. It features an open space grassland in the foreground, bordered by a wooden fence. In the background, there's an adjacent neighborhood with lawns, planted trees and shrubs, and buildings. Wildfire hazards, proximity of homes to OSMP land, and dense communities are characteristic of this pilot area and the other three areas selected for pilot treatment. Wildfire risk modeling and local expertise informed the identification of Areas of Concern included in the 2024 City of Boulder Community Wildfire Protection Plan (expected to be published in June 2024). These Areas of Concern provided boundaries that helped in the identification of pilot treatment areas. Written Information - Item A - Page 3 Figure 3. The map shows the Community Wildfire Protection Plan (CWPP) planning area in bold, red outline. Inside the planning area, draft Areas of Concern are shown in pink polygons and labeled AC-01 through AC-16. More Areas of Concern are on the western edge of the City of Boulder. The Areas of Concern were used to guide the selection of sites for inclusion in the pilot WUI Perimeter Mowing Program. Additional geospatial analysis determined which communities within the CWPP Areas of Concern met the additional criteria: proximity to city land, grassland vegetation, and relatively high home density (see Attachments). The site selection process yielded four pilot treatment areas that will be treated during 2024: 1.North (Dakota Ridge North Briar) 2. Wonderland 3. Chautauqua (between Bluebell Road and the adjacent cottages) 4. South (Devil’s Thumb and Shanahan Ridge) Written Information - Item A - Page 4 Figure 4. The map shows the four pilot treatment areas for the WUI Perimeter Mowing Program, indicated by black circles. The extent of the map is set to the western edge of Boulder. Open space land is shown in light green. The names of the pilot treatment areas are: North, Wonderland, Chautauqua, and South. The exact land to be treated is indicated Written Information - Item A - Page 5 by thinner, black lines. See the appendices for a “zoomed in” look at teach pilot treatment area. Outreach Community outreach and engagement efforts have already commenced, and will continue with a press release, direct mailers to residents adjacent to the treatment areas, and informational events hosted by the Wildland Fire Sr. Program Manager, who will also oversee program implementation. There already have been and there will continue to be opportunities for onsite conversations and information sharing with adjacent homeowners when staff is out in the field as part of program implementation; feedback to date has been overwhelmingly positive. Because this is a new, small scale pilot project with little to no perceived ecological impacts, our community engagement efforts will be light and focused on informing immediate neighbors only. OSMP Rangers and Outreach staff will be prepared to respond to any community inquiries. During CWPP engagement, homeowners in the WUI have expressed strong support for hazardous fuels reduction on public and private land. Implementation The primary fuel model in the OSMP lands immediately adjacent to the pilot treatment areas is grass. The implementation approach for grass management is perimeter mowing, aiming to reduce fuel height on city land, beginning as near to private land as is feasible and extending 30’ from the property line, wherever possible. Exclusion and avoidance areas will be observed to protect rare and sensitive plant species, wildlife habitats, and other sensitive natural or manmade features. Implementation timing will vary by site, and will take into consideration species composition, prevailing weather conditions and fuel dryness, occurrence of other land management activities (e.g. grazing), and other factors. In most of the project areas, two entries for mowing treatment are expected to accomplish project objectives, one entry in June or July, and a second entry in September or October. The implementation method will be completed by mowing using hand crews operating brush cutters. The contracted Bridge House Ready to Work (RTW) Crews will perform the fine fuels cutting work. OSMP will provide leadership and direct oversight along with supervision. RTW Crews at OSMP serve over 12 workgroups currently and the WUI Perimeter Mowing Program increased this contracted workforce’s capacity by adding 16 more project days to their 2024 season calendar. The target post-implementation conditions will be grasses that are 4-6 inches tall within the treated areas. This is expected to moderate fire behavior by reducing flame height and rate of fire spread. OSMP staff will monitor the treatment areas to ensure that objectives are being met, and to assess the treatment impacts more generally for changes in plant species composition, including any unintended change in non-native plant species. Written Information - Item A - Page 6 Some woody vegetation management will also be included in the fuels reduction treatments, and areas requiring a tree removal or thinning prescription will be evaluated by OSMP’s Vegetation Stewardship Senior Manager and Forestry Operations Supervisor. The majority of OSMP lands that are part of the Colorado State Forest Service’s definition of the Home Ignition Zone (see Figure 5) are predominantly grass fuel models. However, opportunities to expand the focus of forest health projects to emphasize wildfire risk reduction are being evaluated as part of a comprehensive fuels management plan for OSMP lands in the WUI. Figure 5. The diagram depicts a home surrounded by two square-shaped zones, representing Home Ignition Zones 1 (0-5 feet from home) and 2 (5-30 feet from home). The 30-foot square reflects standard Home Ignition Zone guidance, which recommends managing vegetation within 30 feet of homes and outbuildings. Therefore, a minimum target treatment buffer of 30 feet from all structures was established for the implementation of the WUI Perimeter Mowing Program. Conclusion Many subject matter experts and land management practitioners are involved in the development, implementation, and monitoring of the pilot WUI Perimeter Mowing Program. Much remains to be learned about wildfire risk in the WUI. Effective risk reduction, particularly in grasslands, remains an emerging area of research and experimentation. OSMP will use an adaptive management approach to closely monitor implementation and outcomes at every stage of the pilot program, with the goal of identifying opportunities to improve the program and integrate it with comprehensive wildfire management strategies. Attachments •Attachment A – WUI Perimeter Mowing Program, North. Final boundaries of treatment areas are subject to change. •Attachment B – WUI Perimeter Mowing Program, Wonderland. Final boundaries of treatment areas are subject to change. •Attachment C – WUI Perimeter Mowing Program, Chautauqua. Final boundaries of treatment areas are subject to change. Written Information - Item A - Page 7 •Attachment D – WUI Perimeter Mowing Program, South. Final boundaries of treatment areas are subject to change. Written Information - Item A - Page 8 Attachment A. Written Information - Item A - Page 9 Attachment B. Written Information - Item A - Page 10 Attachment C. Written Information - Item A - Page 11 Attachment D. Written Information - Item A - Page 12 MEMORANDUM TO: Open Space Board of Trustees FROM: Dan Burke, Director, Open Space and Mountain Parks Ann Lezberg, Sr. Ecologist Brian Anacker, Science and Climate Resilience Sr. Manager DATE: April 10, 2024 SUBJECT: Written Information: Funded research program update ___________________________________________________________________ Funded Research Program The OSMP Funded Research Program is a small grants program (each award is ca. $12,000) that runs on an annual cycle. The main goal of the program is to work with the science community to learn more about Open Space and Mountain Parks (OSMP) land and visitors in ways that address both the short and long-term management needs of the department. The Funded Research Program is directly related to the following OSMP Master Plan strategies: •EHR.7: Develop a Learning Laboratory Approach to Conservation •RRSE.9: Develop a Learning Laboratory Approach to Recreation The Funded Research Program is also indirectly linked to another 17 strategies (not listed here). In 2024, we received 10 proposals for consideration for funding. Staff reviewed the proposals for their organization, management merit, intellectual merit, methods, personnel qualifications, schedule, and resources. Five projects were selected for funding (Table 2). Two projects (Brown and Courkamp) were jointly funded with Boulder County Parks and Open Space, Jefferson County Open Space, and the City of Longmont. Table 2. These five proposals were selected for funding in 2024. Field work will take place in 2024. PI Name Affiliation Title of Proposal Ahler, Sam CU Boulder Charred or chewed: grassland flammability and palatability traits along the Colorado Front. Written Information - Item B - Page 1 Brown, Cynthia CSU Impacts of residual Indaziflam on establishment of native species from seed. Jointly funded with Boulder County Parks and Open Space, Jefferson County Open Space, and the City of Longmont. Courkamp, Jacob CSU The effects of cheatgrass management with indaziflam on live fuel moisture content in rangeland plant communities along the Colorado Front Range. Jointly funded with Boulder County Parks and Open Space, Jefferson County Open Space, and the City of Longmont. Field research not conducted on OSMP land. Martin, Owen CU Boulder From spatiotemporal characterization to ecological insight: leveraging flash patterns to explore behavioral trends in Colorado Photuris fireflies. McKnight, Diane CU Boulder Assessing the status and ecosystem impact of the invasive diatom Didymosphenia genimata in South Boulder Creek. The community will have the opportunity to hear from some of these researchers, and those funded in prior years, at the biennial (every other year) Front Range Open Space Research Symposium in 2025. Written Information - Item B - Page 2 MEMORANDUM To: Open Space Board of Trustees From: Dan Burke, Director, Open Space and Mountain Parks Lauren Kilcoyne, Deputy Director of Central Services Bethany Collins, Real Estate Senior Manager Marc Pedrucci, Senior Property Agent Date: April 10, 2024 Subject: Written Information: CO Highway 7 (Arapahoe Road) Multi-Modal Corridor Study ________________________________________________________________________ The purpose of this memo is to update the Open Space Board of Trustees (OSBT) on the Multi-Modal Corridor Study for CO Highway 7 Segment B (63rd St. to US 287). The corridor study is being led by the Colorado Dept. of Transportation (CDOT) along with stakeholders including local governments and the Regional Transportation District (RTD). The lead project design consultant is Muller Engineering. The Corridor Vision would create a safer, sustainable, and equitable corridor for the future. Improvements for the corridor include: •An initial regional bus service with an ultimate BRT (Bus Rapid Transit) •A corridor bikeway •Bike and pedestrian connections •First-and-final mile connections (scooter, bikeshare, ride share, shuttles, etc.) The OSBT last received updates on the earlier iteration of this project (Planning and Environmental Linkages Study) in 2019. The project scope of this next stage includes two phases: Phase I was a Multi-Modal Feasibility Study and Phase II will take the project to a 15% Design Level. The Feasibility Study (Phase I) included an existing conditions analysis, establish design criteria, create alternatives (typical sections), evaluation of alternatives, public feedback, and design recommendations. Phase I is complete, with a preferred alternative that is now being taken to 15% design in Phase II. Phase II has looked at several design considerations including stormwater drainage/detention, existing irrigation and utility infrastructure, right-of-way pinch points, the urban tie-ins, and some components of the roadway’s design (road profile, access points, etc.). The current schedule for Phase II is submittal of Design Package for review in April, address comments in May, and submittal of revised 15% Design in June. At present there is no funding available to advance the project beyond the 15% Design Level. There will be an online public presentation on April 15 for informational purposes only (no public comments will be taken). This will be the final public presentation milestone for this phase of the project. Previous public outreach events to solicit and obtain public feedback were conducted in the fall of 2023 in multiple ways including an online presentation, in-person community/stakeholder advocacy groups, and an in-person community event in the Boulder area. While brought in late in Phase I, OSMP Real Estate staff have attended the Technical Team meetings as a stakeholder in this project, providing input into the alternatives analysis and potential impacts to open space lands along the corridor. Given the amount of OSMP-managed land along both sides of CO Highway 7 between 63rd and 95th Street (Attachment A), the preferred alternative advanced by CDOT out of Phase I (Attachment B) – which generally proposes to expand the existing right-of-way Written Information - Item C - Page 1 from 60’ to 153’ – would require considerable right-of-way acquisitions by CDOT, triggering the city’s disposal process. The timing of a potential disposal request is unknown. Attachments: •Attachment A: Corridor with OSMP-managed Properties •Attachment B: Preferred Alternative 2 (Option B) Depiction Written Information - Item C - Page 2 Autrey Teller Farm - Open Space Lewis Anderson MartinsonBell II Eddy Spicer Aweida I Bixler, Ralph Swartz King - Hodgson I Aweida II Hill CE Bixler, Hannah Ute Industrial Park Isenhart-Jones Watt Burke I Hunter-Kolb Rosenblatt-Ryan Biddle Manchester Sombrero Marsh Pherson CE Merle-Smith Baseline / 75th Bell I Paclamar Farms (Brooks) Klein - West Kolb Brothers Methvin (Brandt) Overfelt CE Gisle - Life Estate Cohagen CE Cohagen King - Hodgson II CE Valmont Butte Hill - Life Estate Flatirons Industrial Park Eccher Oliver Williamson / Moore / Holmes Sawhill Ponds Fell Burke II Webb - Open Space Klein - East Woodley Cottonwood Farms Eddy CE Bartlett DR Stengel - King Sombrero Marsh II Unkefer - Bell CE Short And Milne Clough Teller Lake (1/3 Dexter)Straty / Cline Valmont Industrial Park Colorado Open Land III - Sec. 22, SW-C Arapahoe Rd N 95th StA r a pahoe Ave C t e s y R d Arapahoe RdArapahoe Rd ¬«7 ¬«42 ¬«7 ¬«7 Baseline Rd V a l mont R d N 75th StN 95th St63rdSt 76th StCherryval eRdBaseline Rd Valmont Lake Res Hillcrest Res Leggett Res Baseline Reservoir Short Milne Pond Sombrero Marsh Teller Lake Res No 1 Hartman ResDryCreekGreenDitch EnterpriseDitc h M cG innDitc h But t e M i llDitch D ry C re ekDavidsonDitchCottonwoodDitch 2 E a s tB o u ld e rDitchM arshallvilleDitchAndrewsD it chSo u t h Boulder C a no n D itch A g itatorDitchGoodhueDitch Bull H eadG ulchButte Mill Ditch User: cassidyj Date: 4/1/2024 Document Path: E:\MapFiles\Property\Jake\Arapahoe Corridor\Location_Arapahoe.mxd OSMP Location MapArapahoe Road Corridor-63rd Street to 95th Street I 0 0.2 0.4 0.6 0.8Miles Legend Subject OSMP Fee Ownership OSMP Easement Perennial Stream Intermittent Stream Main Ditch Lateral Ditch Attachment A Written Information - Item C - Page 3 Multi-Use Path Alternative 2 Option B: Multi-Use Path with Buses on Shoulder and Two-Way Left Turn Lane Bus on Shoulder GP Lane Two-Way Left GP Lane Bus on Shoulder Turn Lane Attachment B Written Information - Item C - Page 4 MEMORANDUM TO: Open Space Board of Trustees FROM: Dan Burke, Director, Open Space and Mountain Parks Lauren Kilcoyne, Deputy Director of Central Services Samantha McQueen, Business Services Senior Manager Cole Moffatt, Senior Accountant DATE: April 10, 2024 SUBJECT: Written Information: Draft 2025 Work Plan and Budget ________________________________________________________________________ EXECUTIVE SUMMARY The purpose of this update is to begin providing the Open Space Board of Trustees (OSBT) with information that will help in its upcoming reviews and recommendations of the Open Space and Mountain Parks (OSMP) Department’s 2025-2030 Capital Improvement Program (CIP) and 2025 operating expenditures. In this memo, staff provides an overview of economic conditions and 2023 revenue collections; details the OSMP budget structure; and provides the OSBT with an overview of the 2025 operating and capital budget development processes. A five-part series of OSBT meeting agenda items relating to the budget is as follows: In January, OSMP staff presented strategic, high-level budget guidance to the OSBT. This month’s written information item will include an introduction to the 2025 budget. In May, staff will present a draft CIP budget and introduce operating budget structure for review. In June, staff will give updates on the draft CIP budget and operating budget, as well as out-year revenue projections. The July OSBT meeting will include a public hearing for the community to comment on the proposed 2025-2030 CIP and 2025 operating budget. After public comment, the OSBT will make a recommendation. DRAFT 2023 REVENUE COLLECTIONS OSMP staff review draft revenue collections each year and partner with the city’s Finance Department to develop realistic scenarios for funding the CIP and operating budgets in future years. The Finance Department expects to present financial forecast information at a May City Council Study Session. At the June OSBT business meeting, OSMP staff plan to present out-year revenue projections from the Finance Department to assist with review and recommendation of the CIP and operating budget. The following section details draft 2023 revenue collections and explains how economic conditions will be factored into the 2025-2030 CIP and 2025 operating budget. After declining revenues as a result of COVID-19 led to budget reductions in 2020 and 2021, the 2022 budget was the first to return to pre-COVID staffing levels, including full seasonal and temporary hiring, incorporating additional investments in Tier One Master Plan strategies in the operating budget, and increasing the annual CIP to a level that was consistent with pre-COVID averages. As the cost to maintain services increased, the 2023 budget included additional investments in the operating budget to account for higher costs of goods and services. The 2024 budget focused on programming additional revenues to pay for cost increases to maintain existing levels of service delivery, accelerate priority investments, and fund several previous CIP projects with an ongoing maintenance focus in the operating budget instead. As noted above, OSMP staff are partnering with the Finance Department to understand our financial landscape for the upcoming budget years. The department depends heavily on sales and use taxes as a Written Information - Item D - Page 1 form of revenue. In 2022, sales and use tax categories represented 93% of the Open Space Fund’s overall revenue. Draft sales and use tax revenues show an increase of 2.54% from 2022 to 2023, excluding audits. In contrast, these same sales and use tax categories increased 11.42% from 2021 to 2022. The department expects similar slow revenue growth in these categories over the next several years and will propose the 2025-2030 CIP and 2025 operating budget with this financial landscape in mind. As noted above, more detailed revenue projections from the Finance Department are expected in time for the June business meeting. Since 2024 budget approval, revenue collections have met expectations, though final 2023 revenue and expenditure numbers have not yet been released to departments. It is anticipated that actual revenues will be finalized in advance of the June OSBT business meeting. Staff will share updates with the OSBT during the presentation of the draft 2025-2030 CIP and 2025 operating budget. Draft 2023 revenues are presented in Table 1. These numbers remain in draft form as the Finance Department completes audits and accruals. The 2023 revenues that have posted to the Open Space Fund as of March 20, 2024, are as follows: Table 1: Draft 2023 Revenues Description of Revenue 2022 Actual Revenue 2023 Draft Revenue Percent Change Retail Sales Tax 27,066,027 27,474,977 1.51 Construction Use Tax 2,575,328 3,299,682 28.13 Consumer / Business Use Tax 2,415,080 2,053,220 -14.98 Motor Vehicle Use Tax 1,211,366 1,286,186 6.18 Interest: Pooled Investments 301,545 607,577 101.49 Federal & State Grants 677,072 468,340 -30.83 Sales Tax Audits 16,306 322,466 1877.60 Parking Charges 299,866 320,764 6.97 Business Use Tax Audits 110,022 299,012 171.78 Intergovernmental Charges 245,384 285,384 16.30 Residential & Caretaker Leases 213,983 262,223 22.54 Agricultural Leases 178,576 196,656 10.12 Penalties/Interest: Audit/Compliance 73,424 188,331 156.50 Facility Rentals 118,337 155,075 31.05 Penalties/Interest: Non-Audit 80,825 81,784 1.19 Voice & Sight Dog Tags 77,579 70,723 -8.84 Contributions & Donations 72,655 56,900 -21.68 Special Activity Permits 53,638 47,722 -11.03 Miscellaneous Revenues* 37,297 35,679 -4.34 Energy Efficiency Improvements 10,039 3,860 -61.55 Oil/Gas Leases 2,922 1,411 -51.72 Insurance Proceeds 71,588 212 -99.70 TOTAL $35,908,860 $37,518,184 4.48% *Miscellaneous revenues include small payments to the Open Space Fund for transactions like refunds. Written Information - Item D - Page 2 The draft 4.48% increase in Open Space Fund revenue in 2023 meets expectations for revenue forecasts set during the 2024 budget process. While collections are still in draft form, total 2023 revenue collections to date of $37.52M are in line with the $36.66M programmed into the Open Space Fund for 2023. Additional revenue may be posted to the Open Space Fund as the Finance Department completes audits and accruals. There were changes to revenue collections in several categories from 2022 to 2023. Notably, revenues increased in financial audit categories. Staffing levels increased between those years on the team that performs audits in the Finance Department. With the ability to perform more audits, the Open Space Fund received more revenue collections in these categories. Insurance proceeds also notably decreased from 2022 to 2023. Proceeds are collected from insurance as contracts and damages are assessed, which vary year to year. OSMP expects to receive additional insurance proceeds in future years. After assessment of Marshall Fire recovery costs and needs, OSMP staff partnered with the Finance Department to seek funding through FEMA and insurance proceeds. Much of the damage sustained could be paid with insurance proceeds, and revenues may be received in future years. Staff continue to work with FEMA to seek reimbursement for other costs related to Marshall Fire recovery. Changing revenues were also seen in the Parking Charges, Facility Rentals, Voice & Sight Dog Tags, and Special Activity Permits categories. Revenues in these programs will be studied as part of the OSMP Comprehensive Fee Review. As discussed during the February business meeting, results from the consultant-led study are expected this summer. OSMP staff will share more information around these revenue categories in the coming months. OSMP BUDGET STRUCTURE This section provides funding and structure reminders as reference as we move through the 2025 budget process. First, OSMP is grateful for the support of the community in passing the 2019 ballot measure to extend a 0.15 percent sales tax to the Open Space Fund for 20 years. As of 2021, the Open Space Fund is made up of the following three sales tax increments: • 0.40 percent sales tax which has no sunset; • 0.33 percent sales tax which was reduced to 0.22 percent on Jan. 1, 2019, to be reduced to .10 percent Jan. 1, 2035, then exists in perpetuity; and • 0.15 percent sales tax which expires Dec. 31, 2039. In addition to revenues collected in the Open Space Fund, the Parks & Recreation Department, Utilities Department, and OSMP were historically appropriated funds through the Lottery Fund since 2011. The appropriation was managed in alignment with an agreement coordinated by the Finance Department. As part of that agreement, if revenues shifted significantly or departmental needs changed, appropriations to departments could change. To utilize the funds in areas of significant need, the Lottery Fund will no longer be appropriated to departments based on the legacy agreement from 2011 and will be appropriated at the direction of a citywide Executive Budget Team and the City Manager’s Office. OSMP did not appropriate money from the Lottery Fund in the 2024 budget year and does not expect to receive Lottery Funds again in the 2025 budget. Staff will inform the OSBT if that expectation changes. OSMP staff also serve on a citywide team to allocate dollars from the Climate Tax Fund to priority projects for wildfire resiliency efforts. The cross-functional city team has started to convene to determine 2025 needs and staff will update the OSBT throughout the budget process as priorities are determined. Written Information - Item D - Page 3 The annual budget process seeks to develop a budget that reflects financial realities and upholds our commitment to stewarding the land system, implements the 2019 OSMP Master Plan, the city’s Sustainability, Equity & Resilience (SER) Framework, the citywide Strategic Plan, and furthers other priority commitments. As a reminder, the overall OSMP department budget is made up of: • Operating Expenditures – The operating budget accounts for core and ongoing service activities, including day-to-day maintenance and management, safety and enforcement, monitoring, strategic and resource planning, wildland fire programming, community engagement and visitor outreach, education and events, media and web services, permitting and fees management, administrative and financial support, and more. Operating expenditures include dollars for staff salaries, cost allocation, and non-personnel funding for smaller scale, less expensive, or more continuous projects and programs related to ecosystem health, agriculture and water, recreation, and others. •Debt Service – This includes annual payments of principal and interest related to long-term debt associated with past land, water, and mineral acquisitions. For OSMP, this includes general obligation bond issuance and Boulder Municipal Property Authority (BMPA) notes. • Capital Improvement Program (CIP) – The CIP is an annual updated plan of capital expenditures that may involve the purchase, construction, or major maintenance of capital assets. While the city definition primarily focuses on facilities and streets, for OSMP the CIP is used to support larger scale land management and acquisition efforts across functions and services. Planning, design, engineering, or architectural fees are often a part of a capital project. 2025 CAPITAL AND OPERATING BUDGET DEVELOPMENT PROCESS OSMP continues to utilize the robust work planning system that was outlined during the 2024 budget process. CIP and operating budgets drive our work plan as a department. OSMP’s cross-functional leadership team, comprised of the department’s Director, four Deputy Directors, as well as budget and project planning representatives, has convened to work on prioritizing, ranking, and recommending 2025 CIP projects and operating budget changes to the OSBT. Projects and requests for operating budget changes were submitted by staff through the work plan system in late 2023 into early 2024, and draft prioritized recommendations will be included in the May packet to the OSBT. Staff anticipates that the city’s Finance Department will provide updated out-year revenue projections in advance of the June OSBT meeting, and these will be used to finalize financial targets for the CIP and operating budgets. The department will continue to connect and prioritize CIP projects and operating budget details to Master Plan strategies. As noted above, OSMP expects slow revenue growth heading into the 2025 fiscal year. The 2025 work plan will still make progress on implementing department approved plans as well as delivering core service activities supporting the important work required to protect, maintain, and sustain our open space system. Projects and programs that are a part of the department’s core mission include day- to-day and capital maintenance of facilities, trailheads and trails; agricultural lands management; safety and enforcement; ecosystem monitoring, maintenance and restoration; climate resilience, including wildfire resilience; ongoing strategic property acquisitions; conservation easement compliance; data management and geographic/mapping information; strategic and resource planning; community engagement and visitor outreach, education and events; providing media services, web- based information and social media; permitting and fees management; providing support for the OSBT; delivering on equity initiatives; and more. To prepare the 2025 budget, OSMP staff will share budget information with the OSBT across five meetings and will seek a recommendation for the CIP and operating budget together in July. OSMP staff discussed strategic budget guidance with the OSBT at the January business meeting. This date is Written Information - Item D - Page 4 incorporated into the annual budget planning calendar. The timeline to discuss 2025 CIP and operating budget is as follows: Table 2: 2025 Budget Planning Milestones Milestone Date OSBT Strategic Budget Guidance Update January 17 OSBT Draft 2025 Work Plan & Budget Written Update April 10 OSBT Draft 2025 CIP & Operating Budget Introduction May 8 Financial Forecast & Budget Update to City Council May 11 OSBT Draft 2025 CIP & Operating Budget Update June 12 OSBT 2025 CIP & Operating Budget Public Hearing and Recommendation July 10 Planning Board City CIP Hearing Mid-August TBD City Council Budget Study Session September 12 City Council Budget Consideration (1st Reading) October 3 City Council Budget Consideration (2nd Reading) October 17 Written Information - Item D - Page 5