Loading...
HomeMy WebLinkAboutComplete WRAB packet 1-27-14WATER RESOURCES ADVISORY BOARD MEETING MEETING DATE: Monday, 27 January 2014 MEETING TIME: 7:00 p.m. MEETING LOCATION: Yards Conference Room 5050 E. Pearl Agenda Highlights: 1. Call to Order (7:00 p.m.) 2. Approval of the 16 December 2013 Meeting Minutes (7:00 p.m.) 3. *Public Comment (7:15 p.m.) 4. Information Item – Review of 2013 Operations. (8:00 p.m.) 5. Information Item - Water Utility CIP Preview (8:40 p.m.) 6. Matters (9:30 p.m.) a. From the Board b. From Staff 7. Future Schedule (9:40 p.m.) 8. Adjournment (9:45 p.m.) * Public Comment Item Information: Contact the WRAB Secretary, Laurel Olsen-Horen (303) 441-3203 or olsenl@bouldercolorado.gov . Packets are available in the reference section of the Main Library and on-line at http://www.bouldercolorado.gov, Departments, Public Works, Utilities, Water Resources Advisory Board. Agenda item times are approximate. WATER RESOURCES ADVISORY BOARD Upcoming Agenda Items – All Items Tentative Revised 1-2014 January 27, 2014 • Matters Item – Flood Recovery Update • Information Item – Review of 2013 Operations • Update on AWWA Benchmarking (Harberg/Baird) February 24, 2014 • Matters Item – Flood Recovery Update • Wastewater Treatment Asset Management (Douville) • Matters Item – City Council Retreat Follow Up March 17, 2014 (Chuck’s last meeting) • Matters Item – Flood Recovery Update • Information Item Water Supply/Climate Change (Taddeucci) • Pre and Post Fire Watershed Planning (Taddeucci/Linenfelser) April 21, 2014 • Swear in new board member • Information Item – Overview of Water Supply & Drought Response Triggers (Taddeucci/Skeie) • Information Item – Overview of 2015 Capital Improvement Program Upcoming Items/Not Scheduled • Public Works Design and Construction Standards (Schum) • Commercial/Industrial/Institutional Water Budgets (Sands) • EcoDistricts Project (Sands) • Water Conservation Futures Study (Sands) WRAB Minutes 16 December 2013 Page No. 1 CITY OF BOULDER, COLORADO BOARDS AND COMMISSIONS MEETING MINUTES Name of Board / Commission: Water Resources Advisory Board Date of Meeting: 16 December 2013 Contact Information of Person Preparing Minutes: Laurel Olsen-Horen 303.441.3203 Board Members Present: Chuck Howe, Dan Johnson , Vicki Scharnhorst, Mark Squillace, Ed Clancy Board Members Absent: Staff Present: Jeff Arthur, Director of Public Works for Utilities Bob Harberg, Principal Engineer – Utilities Bret Linenfelser, Water Quality and Environmental Services Manager Annie Noble, Flood and Greenways Engineering Coordinator Katie Knapp, Engineering Project Manager Ken Baird, Financial Manager Laurel Olsen-Horen, Board Secretary Meeting Type: Regular Agenda Item 1 – Call to Order [7:05 p.m.] Agenda Item 2 – Approval of the 18 November Meeting Minutes: [7:05 p.m.] Motion to approve the 18 November meeting minutes as amended: Squillace; Seconded by: Clancy Motion Passes; 4:0 – board member Johnson abstained Agenda Item 3 – Public Participation and Comment [7:11 p.m.] Public Comment: Scott Hoffenberg: Mr. Hoffenberg gave a power point presentation (with a focus on the current engineering of the creek bed) which began with photos of culverts starting with Flagstaff Road and following downstream of Gregory Creek from there. Many of the trash racks on the culverts are what caused such catastrophic flooding in homes along the creek. Justin Hoffenberg: Mr. Hoffenberg continued the power point presentation showing the difference in sizing of the culverts (from Flagstaff Road to Boulder Creek) shown in the previous public comment. Along the upper and lower sections of Gregory Creek, the culverts are rather small whereas the culverts in the middle section are much larger and since flows increase as water moves downstream it doesn’t make sense to have small culverts near the lower end of the creek. The angle of the trash racks on some of the culverts is too steep (and not angled to current flood mitigation standards of 3:1) which added to the buildup of debris during the flood event. Also the trash racks are to have clear opening at least three-times the culvert opening area, which the ones on Gregory creek do not. In the 2010 LOMR, were the affects of sediment transmission considered during the revision? The answer was no as sediment was not consider to be an issue for Gregory Creek due to the steepness and speed of the creek. However, the sediment was a huge issue along the creek. Roger Koenig: Mr. Koenig continued the power point presentation given by the above presenters with a focus on the big picture of flood hazard in the State of Colorado and how it affects Gregory Canyon Creek. Mr. Koenig provided a copy of the Flood Hazard Mitigation Plan for Colorado which summarizes CO’s vulnerability to flooding and outlines strategies to manage and reduce the impact of flood hazards. Boulder has a continuing history of flooding. Mr. Koenig read some statistics from the Flood Hazard Mitigation document. Gregory Creek is known to have engineering problems. WRAB has a responsibility of advocating to City Council embrace the two-step plan of action (provided in the presentation) as a priority. First to maintain and repair and second, fund bottom up flood mitigation for Gregory Creek. Ed von Bleichert: Mr. von Bleichert continued the power point presentation given by the above presenters. The neighborhood is aware of the on-going recovery efforts the city is facing. Mr. von Bleichert discussed the financial aspect in regards to the funding issues faced by the city for use on recovery. There are five funding sources within Utilities, three of which are enterprise funds; water, wastewater and stromwater and flood management. Neighbors would like to know more about how the fees could be used to raise some money needed to work on mitigation. Some next steps for how the Gregory Creek neighbors can be of use to the city and assist in the process. Gregory Creek is primarily a CIP issue, but are there other sources of funding available? The neighbors have been working together to collect information and would like for WRAB to work with the community to demonstrate that need. When can we see significant funding in the CIP for Gregory Creek? Stewart Machle: Thank you for removing the stump from the creek. The neighbors would like to find WRAB Minutes 16 December 2013 Page No. 2 ways to work with the city. Mr. Machle’s major concern surrounds erosion issues which impact safety, and something needs to be done prior to spring run-off. The residents are being tasked with paying for and repairing damaged structures as part of the recovery, but are being told they must do any mitigation to the city’s standards; that seems unfair. One safety concern is the rock wall near Mr. Machle’s property is falling down. There is a large erosion patch occurring on private property, but working with the city to build to city standards is a difficult process. Helen El Mallakh: Ms. El Mallakh provided a power point presentation on what went wrong on Willowbrook Road. The culvert failed so catastrophically and by doing so, there was no water in the creek due to water flows being diverted to properties rather than the creek bed. The Gregory Canyon Gulch is not taken into consideration for mitigation. If there is a large spring runoff and no maintenance done to this gulch, more water is going to adversely affect the neighborhood. The boar d asked staff to answer some of the questions presented during public comment. General Staff Response: Council is prioritizing maintaining the drainage ways prior to spring run-off. The actual restoration of some of the areas in the city will take longer. The city is currently working on a bid to get sediment removed from the drainage ways. The city’s focus will be on city owned and maintained land. Private property owners impacted with a drainage way running thru their property would need to apply for a floodplain and wetland permit. Community dialogue in response to staff: The neighbors would like to know specifically, what is the responsibility of the residents vs. what is the city’s responsibility. The neighbors are planning to convene after the new year and will be discussing the issue of granting easements to the city. Agenda Item 4 – Public hearing and WRAB Consideration of a Recommendation to City Council Regarding the 2014 City Council Work Plan and Goals [8:14 p.m.] Jeff Arthur presented the item to the board. Executive Summary from the Packet Materials: City Council has requested that each city board and commission respond to three questions related to 2014 work program and goals. Responses will be considered during the annual City Council retreat scheduled for January 12-13, 2014. The questions were forwarded to WRAB members with a request to provide input for inclusion in the December agenda materials. Responses are included as Attachment A and are intended to allow for more efficient discussion and consensus building around a recommended motion. Public Comment: None WRAB Discussion Included: • Develop a brochure or outreach tool to provide people basic information on how to deal with flood recovery (i.e. permitting process, public vs. private responsibilities) • What is the city doing with the vast amount of information collected at the open houses and from various forms of communication with community members? Staff response: The data collected will help us calibrate floodplain modeling and mapping. • How will the modelers use the information gathered around sediment? Staff response: The city has never done debris-flow modeling. The modeling is probability based analysis and what the probability of deviation for water flow is. • Board members amended the provided draft document as part of their discussion. Motion: Made by: Squillace; Seconded by: Clancy: Motion to approve the draft document as amended. Vote: 5:0 Agenda Item 5 – Matters [9:22 p.m.] From the Board: Board member Howe brought up the below matter(s): • The annual Natural Hazards conference in June will have a preliminary session on lessons learned from the Boulder flood. • Foundation for Water Education has a sequence of pamphlets for everything from conservation to water law. WRAB Minutes 16 December 2013 Page No. 3 Board member Scharnhorst brought up the below matter(s): • City of Boulder was featured in the American Water Works Association Opflow magazine and it speaks to the resiliency of our water system and how we had only 10 of the city’s 28,600 metered customers loose water during the flood. Kudos to staff! Board member Johnson brought up the below matter(s): • The city finally has appeased the FERC in testing a gate up at Barker. From Staff: [9:26 p.m.] • Impacts of cost escalation are becoming apparent and trends may be clearer as more of the recovery occurs throughout the state. • Sump pumps are continuing to run due to an elevated ground water table. The city may be more flexible in allowing for residents to resolve any icing issues caused by pumping. Agenda Item 6 – Discussion on Future Schedule [9:31 p.m.] Jeff Arthur presented the item to the board. Executive Summary from the Packet Materials: As part of the Nov. 18, 2013 WRAB packet, staff provided a memorandum outlining flood impacts, capital improvement plan considerations, policy issues, and financial considerations for each of the three utilities enterprises (Attachment A) to help guide a discussion of future schedule. This memorandum is intended to provide additional information regarding upcoming items that are expected to require WRAB consideration in 2014. Staff is seeking input on the potential items and any additional items that may warrant consideration next year. WRAB Discussion Included: • What is the likely turnout from the public for the CIP discussions? Staff response: There is an assumption the 2015 CIP discussion will involve more public interaction due to individuals wishing to bring up flood recovery issues. • WRAB meetings at various water treatment plants would help to better understand the items on the CIP. • Meetings in the neighborhoods to bring in more public input. • Board members shared topics which carry priority weight for items to discuss in the CIP. Agenda Item 9 – Adjournment [9:53 p.m.] There being no further business to come before the Board at this time, by motion regularly adopted, the meeting was adjourned at 9:53 p.m. Motion to adjourn by: Squillace; Seconded by: Scharnhorst Motion Passes 5:0 Date, Time, and Location of Next Meeting: The next WRAB meeting will be Monday, 27 January 2014 due to the Martin Luther King Jr. Holiday at 7:00 p.m., in the West Conference Room, 1st floor of the municipal building, 1777 Broadway unless directed by staff or the board. APPROVED BY: ATTESTED BY: _________________________________ ___________________________________ Board Chair Board Secretary _________________________________ ___________________________________ Date Date An audio recording of the full meeting for which these minutes are a summary, is available on the Water Resources Advisory Board web page. AGENDA ITEM #___IV_____PAGE____1____ C I T Y O F B O U L D E R WATER RESOURCES ADVISORY BOARD INFORMATION ITEM MEETING DATE: January 27, 2014 AGENDA TITLE: Information Item – 2013 Year in Review PRESENTER/S: Jeff Arthur, Director of Public Works for Utilities Bob Harberg, Utilities-Principal Engineer Joe Taddeucci, Water Resources Manager Bret Linenfelser, Water Quality Environmental Services Manager Ken Baird, Utilities Financial Manager Steve Folle, Co-Acting Water Treatment Manager Mike Emarine, Co-Acting Water Treatment Manager Joe Cowan, Utilities Maintenance Supervisor Peter Rosato, Transportation Maintenance Supervisor Russ Sands, Water Conservation Program Manager Joanna Crean, Public Works Project Coordinator I. PURPOSE A significant portion of the work performed by the Utilities Division relates to the day-to-day operations and maintenance of existing infrastructure. While the WRAB has a very limited role in these activities, recommendations on capital improvements, master plans, and policy issues have a significant impact on operations. This memorandum provides an overview of 2013 operations to provide the WRAB with additional context for upcoming agenda items where the board will be asked to make recommendations. II. OVERALL MISSION The mission of the Utilities Division of the Public Works Department is to provide quality water services, as desired by the community, in a manner which protects human and environmental health and emphasizes sound management of fiscal and natural resources. This includes the following services: • Potable Water Treatment and Distribution • Water Resources and Hydroelectric Management • Wastewater Collection and Treatment • Stormwater Collection and Conveyance • Water Quality Protection and Enhancement AGENDA ITEM #___IV_____PAGE____2____ • Infrastructure Planning, Construction and Maintenance • Administration and Emergency Planning/Response III. PRECIPITATON AND TEMPERATURE Boulder experienced record breaking precipitation in 2013. Total snowfall was 125.6 inches, compared to an average of 90.7 inches. Early to mid-winter was very dry, and March snowpack readings in the North Boulder Creek watershed were significantly below average. Most of the 2013 snowfall occurred during the months of April and May. Boulder’s reservoirs filled and spilled, and no drought stage declarations were needed during 2013. At the beginning of the 2013-2014 winter (September – December), the snow water equivalent at the University Camp Snotel site was 5.8 inches which is the historical average. Total Boulder precipitation for the year was 30.14 inches, compared to an average of 20.69 inches. The previous record for annual total precipitation (29.93 inches) was set in 1995. Although low rainfall for May – September indicated Boulder could experience a year of lower than average precipitation, almost 15 inches of rain were recorded in Boulder between September 9 and 13. This eclipsed the previous record of precipitation from a single storm event of 7.37 inches of rain on May 5-8, 1969. Over half of Boulder’s 2013 precipitation fell between September 9 and 16. The historical rains of September 2013 also had unprecedented effects on the city’s source water system. With a peak inflow to Barker reservoir of 408 cubic feet per second (cfs) on September 13, Barker Reservoir refilled and spilled on September 15. This is the first recorded incidence of Barker Reservoir spilling in September and the first recorded incidence of Barker Reservoir spilling more than once per year. The National Oceanic Atmospheric Administration (NOAA) reported Boulder’s mean temperature for 2013 was 50.73 degrees compared to a high of 56.02 in 1954 and a low of 48.91 in 1993. IV. FINANCIAL OVERVIEW Water Use Based on Billed Consumption Billed water consumption in 2013 was the second lowest in over 20 years. Compared to 2012, consumption decreased by over twelve percent. This was due to the unusually hot and dry year in 2012 and record precipitation in 2013. Specifically, precipitation in 2013 was the highest it has been in over 100 years due to the September flood and also a wetter than normal springtime. Because of the flood, it appears that outdoor watering stopped after early September. While it changes from year to year depending on weather, it’s estimated that people stopped outdoor watering around one month earlier than usual. As a result, consumption for the month of October was down 35 percent compared to the average of previous years. These trends are demonstrated in Figure 1 comparing yearly consumption by month. AGENDA ITEM #___IV_____PAGE____3____ Figure 1: Billed Monthly Water Usage in 2013 Revenues The lower billed consumption resulted in revenue for water use coming in $1.1M less than anticipated. Fortunately, Plant Investment Fees (PIFs) were at about $1.5M more than projected. This was due to large development projects such as 3100 Pearl and the Peloton. Both the Wastewater and Stormwater/Flood Management Funds were also helped by the higher than expected PIFs, and all the utilities funds ended the year slightly above revenue projections. Expenses In December 2013, an adjustment was made to the budget to increase available funds, mostly due to the flood response. These appropriations came from fund balance. A portion of these expenses should eventually be reimbursed by FEMA. The remainder will be covered through rates or re-prioritizing of operating or capital expenses. V. OPERATION OVERVIEW: WATER RESOURCES Operations Snowpack The city relies upon snowmelt runoff to fill and store water in its upper Boulder Creek basin reservoirs each year. As of March 1, 2013 the snow water equivalent readings (SWE)1 1 Snow Water Equivalent (SWE) is the amount of water contained within the snowpack. It can be thought of as the depth of water that would theoretically result if you melted the entire snowpack instantaneously. were almost 40 percent below average. However, heavy late spring snows in April and May improved the SWE to normal conditions as shown in Figure 2. AGENDA ITEM #___IV_____PAGE____4____ Figure 2: 2013 March – May North Boulder Creek Watershed Snow Water Equivalent Streamflows Figure 3 includes 2013 and historical average stream flow conditions upstream of Barker Reservoir. The 2013 peak snowmelt runoff season greatly exceeded the historical average. During the September flood streamflows at Nederland were less than during spring runoff but were still noticeably higher than average. Peak flood flows reached 408 cubic feet per second (cfs) at 2 a.m. on Sept 13. The September flood also resulted in an unusual water rights administration situation on Boulder Creek. With the exception of a brief period from Nov. 7-Dec 1, a prolonged “free river” condition has existed since the flooding, which means water availability has exceeded active water rights diversions. AGENDA ITEM #___IV_____PAGE____5____ Figure 3: 2013 Middle Boulder Creek Streamflows at Nederland Reservoir Storage Levels and Colorado Big Thompson (CBT) Water Usage The snowfall and runoff from the 2012-2013 winter allowed the city to fill its mountain storage reservoirs during the spring. After being partially drawn down, Barker Reservoir again filled and spilled during September. This is the only recorded incidence of Barker Reservoir spilling more than once in a single year or spilling in September. Due to the reservoir refill late in the year, the city’s total mountain reservoir storage on December 31, 2013 was 16,120 acre-feet, compared to 13,790 acre-feet on December 31, 2012. The city used a total of 10,307 acre-feet of CBT water in water year 2013 (October 1, 2012 to September 30, 2013). Figure 4: 2013 Water Supply Conditions in Comparison to 2012 DATE BOULDER MOUNTAIN RESERVOIR STORAGE (ACRE-FEET) 05/29/2013 15,673 05/29/2012 15,814 Difference in 2013 -141 BOULDER MOUNTAIN RESERVOIR STORAGE (ACRE-FEET) 10/25/2013 17,133 10/25/2012 13,160 Difference in 2013 +3,973 COLORADO-BIG THOMPSON SYSTEM STORAGE (ACRE-FEET) 05/29/2013 487,167 05/29/2012 646,480 Difference in 2013 -159,313 COLORADO-BIG THOMPSON ANNUAL ALLOTMENT (ACRE-FEET) April 2013 12,609 (60%) April 2012 21,015 (100%) Difference in 2013 - 8,406 SNOW WATER EQUIVALENT AT UNIVERSITY CAMP SNOTEL SITE 05/29/2013 11.6 05/29/2012 5.4 Difference in 2013 +6.2 AGENDA ITEM #___IV_____PAGE____6____ Hydropower, Irrigation Ditches and Agricultural Leasing The city received $1,944,812 in hydropower revenue for 2013 compared to projected revenue of just over $2 million. Total generation for 2013 was about 42 million kilowatt hours (kWh) or enough to meet the average annual needs of approximately 7,000 households. Boulder Canyon Hydroelectric (BCH) resumed commercial operation on June 12, 2013 under a new power purchase agreement with Tri-State Generation and Transmission Association. Actual generation and revenue from BCH was about 12 million kilowatt hours and $460,000. The September flood actually increased BCH generation in subsequent months because more water than usual was available for power generation. During the September 2013 flood, all eight hydroelectric plants were tripped off-line and temporarily ceased generation. The BCH power plant office flooded, but no significant equipment damage occurred at any of the facilities. The Water Utility is a shareholder in several irrigation ditch companies. Sections of most of the irrigation ditches in and around the city were damaged or compromised as a result of the September flooding. Anderson and Farmers Ditch Companies, which include Utilities staff as board members, are taking the lead in flood related repairs for their respective ditches. The work will be done during the 2013-2014 winter with the goal of being operational for the 2014 irrigation season. In 2013, the city leased 5,600 acre-feet for agricultural uses and no drought-related curtailment was required in the city’s leasing program. Water Conservation Although water use restrictions were not required in 2013, regional drought conditions resulted in substantial public concern, particularly prior to the late spring snowfalls. Staff participated in a drought panel presentation to Water Congress, created a new ad campaign, targeted mailing to high water users and designed a “drought meter” for a newly launched Colorado Water Conservation Board drought webpage. The city also continued to collaborate regionally, issuing joint water conservation press releases and placing joint ads. The city was recognized with a 2013 EPA WaterSense Excellence award for a “Drought Busters” program developed with the Center for Resource Conservation (CRC) and subsequently adopted by other cities. Capital Improvements In 2013, capital improvements projects in the source water system primarily focused on the Barker facilities, including continued maintenance work on the Barker Gravity Pipeline and performing a pressurized test and inspection of outlet gate number 7 at Barker Dam. At Albion Dam, a temporary solution to unplug one of two clogged outlet pipes was achieved using divers during the late summer. A planned fall inspection of the Albion outlet works had to be delayed until 2014 as the September rainfall prevented the complete draining of the reservoir prior to winter freezing and icing. The Kossler south dam refacing project also had to be delayed until 2014 to allow time for required design revisions. Using updated topographic survey data, AGENDA ITEM #___IV_____PAGE____7____ computer modeling of design flood conditions revealed that higher water elevations needed to be accommodated in the Kossler design. Upcoming Key Issues Completion of the Albion Dam outlet works inspection and the Kossler south dam refacing projects that were delayed in 2013 are now planned for completion in 2014. Another key focus for 2014 will be revisiting impacts of climate change on water supply including an update to the Water Conservation Futures Study. In the city’s hydroelectric program, five of the city’s existing power purchase agreements (PPAs) will expire between 2015 and 2017. The city has the option to extend these agreements, most of which are for a 30-year term. Staff will research potential hydropower sale options, including city use of the power under a municipilization scenario, to make sure the city obtains the most favorable PPA terms in the future. Evaluation of specific PPA options will begin in 2014. VI. OPERATION OVERVIEW: WATER TREATMENT & DISTRIBUTION Operations Due to the record breaking precipitation, the total water production during 2013 was 5,733 million gallons (MG), which is the second lowest total water production in the last 10 years. The Betasso Water Treatment Facility (Bessato), which has a capacity of 40 million gallons per day (MGD) and treats water from the Boulder Creek watershed, treated 75 percent of the total water use in the city. The Boulder Reservoir Water Treatment Facility (BRWTF), which has a capacity of 16 MGD and treats water from the Colorado Big Thompson (CBT) water system, treated 25 percent of the total water used in the city. BRWTF operations were significantly impacted by the September flooding. The facility experienced a power outage early in the storm event and ultimately remained offline until October 1 due to turbidity issues in Boulder Reservoir and damage to the Boulder Feeder Canal from Carter Lake. Following a 10-day testing period to ensure operability, the facility was shut down due to low demand. The facility is expected to resume operation in early 2014. Betasso suffered minimal damage due to the 2013 flood, although it operated on the emergency generator for approximately three days before power was restored. Power and communications to the SCADA system were lost at seven critical reservoirs and flow control stations for weeks, however no water quality or quantity disruptions or violations occurred due to the flood (or in the whole of 2013). Obtaining chemical deliveries and emergency generator fuel posed great challenges, and many deliveries and plant personnel were re-routed through Nederland via 1-70 and down Sugarloaf Rd (which is hazardous for 18 wheelers) until CO Highway 119 was re- opened. In 2013, the drinking water system met all regulatory compliance requirements. Staff distributed the required Consumer Confidence Report electronically for the first time and conducted regulatory monitoring for 30 unregulated contaminants (UCMR3) to provide occurrence data and basis for future regulations. Staff initiated a collaborative pre- and post-fire watershed planning project that includes a systematic analysis for forest/watershed protection. Boulder Reservoir AGENDA ITEM #___IV_____PAGE____8____ water quality thresholds were developed to integrate with Parks and Recreation Site Management Plan. Staff implemented the IWLive model for real-time water distribution system modeling capabilities and made improvements to remote monitoring at storage tanks and pump stations. Maintenance activities in the distribution system were increased this year by adding a contractor to assist with fire hydrant maintenance and valve operations. During the post-flood period, a contractor was able to perform inspection and maintenance services to 931 fire hydrants and 1,441 fire hydrant and mainline valves. Increased construction activity in 2013 had a significant impact on the demand for utility locates with approximately 12,000 requests. Capital Improvements During 2013, several improvements and studies were done at the BRWTF. One was implementing improvements and modifications to the carbon dioxide system to provide more consistent acid feed capabilities. Another was performing an Arc Flash Hazard Analysis and Relay Coordination assessment of the electrical system. A study and final design of a flash mix pumping system for the combined filter effluent was completed and submitted to the Colorado Department of Public Health and Environment (CDPHE) for review and approval. Receiving approval in late 2013, bidding and installation of this system will take place in 2014. At Betasso, the consulting firm Brown and Caldwell (BC) was selected to perform a study to identify options to alleviate the residuals issues. The first phase of work performed included reviewing existing reports and process data in order to fully characterize current residuals production. General descriptions of each alternative were presented together with sizing and cost information by various equipment manufacturers. On-site pilot trials will be conducted in 2014 following study recommendations. In 2012, the city contracted with Malcolm Pirnie, the Water Division of ARCADIS (ARCADIS) to assist in the investigation of methods to improve the Betasso filter productivity during high color events. In 2013, the priority was to set up a pilot for these trials. In 2014, the goal is to utilize the pilot for identification of future filter improvements, assessment of ferric chloride for arsenic removal, and spring runoff optimization. Upcoming Key Issues Water quality conditions at Boulder Reservoir after the flood have significantly diminished, requiring additional attention to the quality of water delivered to the BRWTF. When the facility resumes operations, a weekly taste and odor test will be conducted. Information will then be used to answer questions from the public or make changes to the treatment processes. For the near-term, the upcoming issues related to Betasso include finalizing the residuals study (Brown and Caldwell), the filter performance study (ARCADIS), and continuing to identify and prioritize plant needs for the 2016 capital project. Related to water quality, CDPHE is initiating a stakeholder process to update the Colorado Primary Drinking Water Regulations and city staff will be part of the process. City staff will also work on implementing an online form for backflow prevention reporting directly by customers AGENDA ITEM #___IV_____PAGE____9____ and testers, and further implementing utility standard operating procedure document management in Laserfiche. VII. OPERATION OVERVIEW: WASTEWATER TREATMENT & COLLECTIONS Operations The Wastewater Treatment Facility (WWTF) operated with no effluent permit violations in 2013, treating an average of 15 MGD of wastewater. Due to the extreme precipitation and associated flooding in September, the WWTF flows were unprecedented and significantly increased the overall annual average. Staff successfully transitioned away from gaseous chlorine and sulfur dioxide for disinfection as the new UV disinfection system was commissioned. Throughout the year, the UV system has been optimized and a dose of 1/3 to 1/2 of the original value has been accomplished, which should yield ongoing operations and maintenance savings. A $1,080,000 grant from the State of Colorado was received to help fund planning, optimization, design, and construction of nutrient removal improvements, specifically nitrogen. The third full year of using electric power generated from Solar PV occurred during 2013 at the WWTF, with the overall system production to date exceeding 5 million kWh. When combining solar power with power generated by the cogeneration system, approximately 1/3 of the electrical power needs for the WWTF were generated by renewable technology in 2013. The September flood had a significant impact on the wastewater collection system including surcharges and deposition of sand, rock, and debris throughout the nearly 400-miles of collection system piping. Utilities engineering and maintenance staff continue to work closely with contractors to assess and inspect (TV) the collection system to determine maintenance and cleaning priorities to prevent blockages and backup events. In late 2013, staff began using localized Cast in Place Pipe (CIPP) repairs to address isolated breaks and holes in city mains. Each repair can be done at a third of traditional costs, in half the amount of time. In addition, staff has also started to use an injectable grout in manholes to reduce infiltration and inflow. Staff has completed the Pipe Assessment and Certification Program (PACP) and will be re-evaluating problematic root and grease lines for the purpose of prioritizing cleaning efforts. This should help optimize the frequency of cleaning and minimizing future backups. Regulatory efforts focused on Boulder Creek data collection to address future nutrient regulatory requirements, refinement of restrictive ammonia effluent limits and compliance with Boulder Creek aquatic life criteria. Staff actively participated in multiple State-directed work groups focusing on implementation of future nutrient regulations, implementation and modification of arsenic water quality standards, implementation of the impaired waters listing for the next 303(d) list and revised sediment criteria. Efforts continued to regulate industrial discharges through the Industrial Pretreatment Program through the renewal of permits for major dischargers such as the University of Colorado. The WWTF and BRWTF laboratories continued to expand in-house analytical capabilities and completed over 50,000 analyses in 2013. Capital Improvements The $8M upgrade project to modernize the headworks and digester facilities, and install the UV disinfection system, was completed in 2013. This project was a significant step forward in addressing a major safety risk (the use of chlorine gas and sulfur dioxide gas), and replacing AGENDA ITEM #___IV_____PAGE____10____ aging mechanical and electrical infrastructure. Additionally, a Strategic Plan for the Process Automation System (PAS) at the WWTF was completed to serve as a roadmap and implementation tool to upgrade the hardware and software components to the instrumentation and control systems. Within the wastewater collection system, approximately 19,700 feet of 8”, 12”, 21”, and 24” mains were lined by a contractor at a cost of $547,000. City crews were able to rehabilitate 281 manholes. Additionally, the manholes in Arapahoe Avenue from 14th Street to Folsom Street were rebuilt in conjunction with the transportation project in that corridor. Upcoming Key Issues With adequate hydraulic and process capacity, the focus moving forward for the WWTF will be regulatory issues and aging infrastructure. Regulatory drivers in 2014 include nitrogen (daily maximum ammonia and nitrate, as well as Regulation 85 total inorganic nitrogen), and an associated design project will identify treatment modifications to meet these limits. Two other key capital issues are upgrades at the IBM Lift Station to address several concerns including emergency flow storage, as well as a determination of the path forward for the aging cogeneration system. The status of city-wide electric utility municipalization may factor into decisions about cogeneration. Key operational issues for 2014 will involve organizational changes and associated technology to support unattended operation at night as a departure from 24/7 coverage. The city is moving forward with the development and implementation of a more aggressive, proactive wastewater collection system operations, maintenance, and renewal plan. Part of this approach will include using significant contractor resources to perform sewer cleaning and inspection as part of a new condition assessment program. Typically, such a condition assessment is scheduled with a five-year recurrence interval; however, due to the September 2013 flood the initial condition assessment cycle will need to be expedited to two years in order to assess flood damage. Additional water quality studies will be conducted in 2014 focusing on sources of arsenic, fate and transport of nutrients in Boulder Creek and evaluation of ammonia toxicity in Boulder Creek. These efforts are necessary to support future compliance requirements of the WWTF integrated into state-directed regulatory work groups. VIII. OPERATION OVERVIEW: STORMWATER & FLOOD MANAGEMENT Operations The city’s stormwater and flood management utility prepares the city for significant rainfall events through floodplain mapping, risk assessments, floodplain regulations, public education, flood insurance, flood preparedness, master planning, stormwater quality programs, and maintenance. Operations were significantly impacted and reprioritized to respond to the September flood. Flood control maintenance operations include vegetation control in and around waterways, mowing of native grass channels and embankments, as well as cleaning and inspection of trash AGENDA ITEM #___IV_____PAGE____11____ racks for ditch company agreements and culverts under roadways. This work includes both planned and responses to calls from the community. The 2013 year was a busy season due to the late and wet spring conditions which made for a shortened window of maintenance before water began flowing in creeks and ditches. The wet weather also increased the mowing cycle frequency and added to the growth of vegetation. Due to the September flood, the number of calls for service from the community significantly increased. Staff responded by removing sediment and debris from trash racks, culvert, channels, paths, bridges and other structures throughout the system. In 2013, the city implemented a new Constituent Relationship Management (CRM) tool called Inquire Boulder to track service requests which will enable the city to improve data comparison from year to year. City Council approved a “Critical Facilities” ordinance requiring certain land uses to meet higher regulatory standards for development in floodplains. This ordinance was the result of a multi- year process that removed numerous requirements contained in initial drafts to address concerns from potentially regulated businesses. The state-issued Municipal Separate Storm Sewer System (MS4) stormwater permit was substantially revised in a draft released by the state in late 2013. Substantial effort was spent on providing comment and revisions to the draft revised permit. A new MS4 permit is expected in mid-2014 and will likely include additional regulatory requirements for stormwater discharges. The development of a more robust drainageway asset management system integrated with the existing maintenance management system, along with updated condition assessments was fortuitously completed prior to the September 2013 flood disaster. This documentation should prove valuable in applying for damage reimbursement from FEMA as well as the planned on- going use of this information from planning purposes. Capital Improvements Floodplain mapping studies to identify hazards and support mitigation efforts generally involve a multi-year study and process prior to submittal to FEMA for review and adoption. For instance: • New topographic base mapping using LiDAR technology was recently completed and will be used in future mapping projects. • Twomile Creek/Upper Goose is currently being remapped. • A mapping study of Boulder Creek is currently in review by FEMA. • Mitigation planning for South Boulder Creek is ongoing. • The Goose Creek Restoration Project was implemented to improve wildlife habitat and water quality along Goose Creek between 47th St. and Boulder Creek. • A mitigation project on Wonderland Creek, upstream of the Kings Ridge neighborhood, had been designed and slated for construction prior to the flood. In 2013 the city installed approximately 3,500 feet of new stormwater collection and conveyance sewers under Arapahoe Avenue from 14th Street to Folsom Street and approximately 1,000 feet of storm sewers along Pearl Street as part of the Boulder Junction Project. Upcoming Key Issues AGENDA ITEM #___IV_____PAGE____12____ The September 2013 flood will continue to influence both operations and capital efforts for 2014. Significant sediment and debris removal will be required to restore capacity of both local and major drainage systems. Longer term efforts will be required to restore habitat and features such as drop structures and sediment traps. Additional key issues will include prioritization and funding of mitigation projects, consideration of property acquisition to reduce hazards and/or allow mitigation, and consideration of changes to regulations and design standards to provide a higher level of protection from future floods. A new MS4 stormwater permit will be issued in 2014 and staff will continue to actively participate in the state-directed permit development process. Additional regulatory requirements, including reporting, water quality monitoring and stricter enforcement will likely be part of the new permit. As a result, changes will need to be made to the Boulder Revised Code, city ordinances and city Design and Construction standards in order to comply with new permit requirements. AGENDA ITEM # V; PAGE 1 C I T Y OF B O U L D E R WATER RESOURCES ADVISORY BOARD INFORMATION ITEM MEETING DATE: January 27, 2014 AGENDA TITLE: Informational Item –Water Utility Capital Improvement Program (CIP) Preview PRESENTERS: Jeff Arthur, Director of Public Works for Utilities Robert Harberg, Principal Engineer-Utilities Steve Buckbee, Engineering Project Manager Kevin Clark, Engineering Project Manager EXECUTIVE SUMMARY This information item is intended to provide an update regarding Water Capital Improvement Program (CIP) issues ahead of the formal budget process by providing:  Background information  Flood update  Project updates  Schedule of key milestones The formal CIP budget discussion will begin in April with a WRAB recommendation scheduled in June. Therefore, no formal action by the WRAB is requested at this time. BACKGROUND The Utilities Division’s primary focus is to provide quality water services, as desired by the community, in a manner which emphasizes efficient management of fiscal and natural resources, and protects human and environmental health. Capital investment in infrastructure is core in carrying out the utilities’ mission of delivering safe and reliable water to our customers and ensuring that water is available for fire protection. In October 2011, the city developed a consolidated Water Utility Master Plan (WUMP) that addresses source water, water treatment, and the distribution system. The WUMP incorporates an evaluation of the treated and source water system conditions and recommendations for the next 20- year planning period. The 6 year Water CIP relies on the WUMP for guidance along with evaluation of other issues identified during routine operation and inspection of the City’s water system. Several issues have AGENDA ITEM # V; PAGE 2 been identified along with a preliminary identification of potential impacts to the CIP. Most of the changes are unrelated to the 2013 flood since the damages have already been repaired or are in the process of being repaired using money that was appropriated in 2013.. ANALYSIS Distribution System Rehabilitation The City of Boulder has been systematically replacing undersized and corroded water mains for a number of years. Most of the undersized mains that were providing water transmission have now been replaced with 6 and 8-inch pipe so the emphasis has shifted to replacing corroded and break prone pipes. The Utilities Project Management staff is using a data based decision method to determine which pipes should be replaced. The data based decision method considers pipe age, material, break history, size, pressure, location, if a water dependent business is affected, difficulty of repair, and soil type as factors in determining which pipes to replace. Numeric values assigned to each factor are summed for each pipe segment to determine its rating. Those pipes with the highest totals are considered for replacement. The final decision on whether or not to replace a pipe segment still depends upon engineering judgment. Unique social and environmental factors that are not easily quantified must be taken into consideration in determining the pipes segments to renew. This tool continues to evolve and adapt each year. With the passage of ballot question 2 D last November, Transportation has received a multi- million dollar budget increase to inspect, restore and rehabilitate transportation infrastructure through 2029. In order to replace problematic mains prior to roadway improvements, an annual increase of $1 million in the Water Utility budget for additional water main replacement is being considered. Transmission System Inspection and Rehabilitation Several leaks occurred on water transmission lines during 2013. Of note is the 26” main between Sunshine Hydroelectric Facility and 4th & Mapleton that carries about half of the City’s treated water on an annual basis. Another is an 18” line that connects 101 Pearl PRV station and Chautauqua Reservoir. After an inspection of the 26” main, money for rehabilitation/inspection of the upper 30” section of main between Betasso Water Treatment Facility and Sunshine Hydroelectric Facility has been re-prioritized to the lower 26” section. Additional CIP money is being considered for the problem 18” main and continued inspection of the upper 30” section of main between Betasso Water Treatment Facility and Sunshine Hydroelectric Facility. Area II Annexation Infrastructure Annexation of Boulder Valley Comprehensive Plan Area II properties that have been affected by the flood is being considered. Preliminary estimates of $5-$6 Million would allow construction of utilities necessary to serve the nearly 200 properties that are currently lacking City water and/or sanitary sewer service along with any needed transportation infrastructure upgrades. This funding is being considered for the years 2015 and 2016. AGENDA ITEM # V; PAGE 3 Treated Water Stranded Facilities Gunbarrel water storage tank painting was scheduled for this year. An inspection of the tank this fall revealed steel corrosion issues inside the tank. An increase to the project scope and budget will be requested in 2014 to address the budget shortfall. The above grade walls for Kohler water storage tank were replaced in 2013. As a result, funding for the roof replacement in 2015 and 2016 will likely be reduced. Betasso Water Treatment Facility (BWTF) Preliminary design for the BWTF capital improvement project will begin in mid 2014. Construction is scheduled to begin in 2016 and extend through 2017. Some problems to be addressed are: • At flows in excess of 30 to 35 MGD, the pretreatment is inadequate to sustain effective treatment. • During periods of high concentrations of color and total organic carbon in the source water, the filter run time is limited due to turbidity breakthrough. • The residuals thickening, dewatering, and drying processes are insufficient to treat the dilute concentration of the solids. • Replacement of assets at the end of their useful life. • Increased chemical storage. • A new backup generator and increased fuel storage. Two studies were initiated to evaluate a couple of the major problems listed above. In 2012, Malcolm Pirnie/ARCADIS began working on the capacity issues encountered during spring runoff when color is high. Staff is currently working with the consultant, Brown & Caldwell, to follow through on the 2012 report recommendations and assist with pilot plant tests through mid 2014. The initial assessment has been completed and thickening technologies will be selected for pilot testing in 2014. The results and recommendations from these two studies will be used to help inform and develop the overall scope of the upcoming CIP project at the BWTF. The schedule for the BWTF planning and improvements over the next year include completing the two studies in progress and selection of the Capital Improvement Project design consultant, along with refinement of the scope and cost. Some dates have been pushed back since the July 15, 2013 WRAB meeting. The timeline has been pushed back to accommodate possible reprioritization associated with the flood and effort and resources need to address flood repairs. • Spring Runoff Optimization Study - Late Summer 2014 • Preliminary Residuals Study (recommendations for pilot project) - Late 2013 • Selection of BWTF Capital Improvement Project design consultant – Summer 2014 • Revised cost estimate and WRAB check in on preliminary design direction - Winter 2014 • Final Residuals Study Report - Fall 2014 AGENDA ITEM # V; PAGE 4 Boulder Reservoir Water Treatment Facility (BRWTF) A backup power generation study is currently underway to determine the feasibility of providing for and contracting a temporary generator on site during emergencies or when treatment cannot be interrupted by a power outage. Plant electrical deficiencies were also found during and an electrical study in 2013 and will be addressed in 2014 with existing funding. The proposed 2020 BRWTF bond projected is slated to address canal intake improvements, pretreatment improvements for taste and odor, increased chemical storage, standardized instrumentation, assets at the end of their useful life and permanent backup power facilities. Wittemyer Ponds In terms of the source water system components, the only city owned facility significantly impacted by the September 2013 flood was the Wittemyer Pond facility. The flood waters breached numerous embankment berms and significant repairs will be required to allow for storage and delivery of water through the system including repairs to the Howell Ditch component. The cost of the repairs is estimated to be about $125,000 and these will be completed in 2014. The repair work should be eligible for FEMA reimbursement. Barker Dam Outlet During the recent lower outlet gate test and inspection at Barker Dam (December 2013), it was discovered that pin-hole leakage though a corrosion nodule is occurring through the Gate No. 10 frame. This gate is the lowest outlet gate having the greatest hydraulic head pressure bearing upon it and is also the oldest gate which was not replaced in the 1947 Barker Dam Rehabilitation (i.e. this gate is 1907 vintage making it over 105 years old.). The gate will be inspected from the downstream side on a quarterly schedule (i.e. dewatered and inspected every 3 months) to monitor the overall leakage and track the progression of the corrosion pin-hole as applicable until a removable bulkhead can be designed and installed. Additional budget is being considered to investigate and repair the newly discovered leak in the Gate No. 10 Gate Frame. Current budget estimates are $50,000 in 2015 for alternative bulkhead design and $100,000 in 2016 for installation of a removable bulkhead. Kossler Dam The city completed the Hazard Classification study for Kossler Dam and has confirmed that it has moved from a Low Hazard Dam to a High Hazard Dam due to development in the downstream inundation areas. In addition, a newly completed topographic survey has discovered that there is a backwater effect on the spillway hydraulic capacity caused by the county road being approximately 1 foot higher than the spillway crest. The city is updating the Kossler Dam Face Rehabilitation Project design drawings to reflect the additional freeboard allowance to meet dam safety requirements for a high hazard structure. Construction has been delayed from the originally scheduled fall 2013 completion to the winter of 2014/2015. An additional $150,000 budget is being considered to complete the spillway study and update the planned Dam Rehabilitation design. AGENDA ITEM # V; PAGE 5 Albion Dam Outlet Repair The Albion Dam outlet was plugged in the winter of 2012 due to concrete material falling off (i.e. concrete spalling) the upstream face of the dam above the trash rack and outlet pipe system. In 2013, divers successfully removed the concrete debris and placed a pipe stub to allow the outlet system to properly function until the reservoir can be drained for a more permanent repair. Unfortunately, the September 2013 flood event filled the reservoir to overflowing and thus the next phase of the repair was not implemented. An additional $150,000 budget is being considered for this repair work in 2014. Silver Lake Dam Outlet Inspection The State Engineer Office has requested the city to perform an inspection of Silver Lake Dam outlet. Since this is a very important source, the city does not want to drain the reservoir and lose valuable water supply storage in order to perform this inspection in the dry and will therefore schedule a diving consultant to perform the inspection of the upstream components with the reservoir at operational level. An additional $75,000 budget is being considered to perform this inspection in 2015. Goose Lake Outlet Inspection The State Engineer Office has requested the city to perform an inspection of Goose Lake Dam outlet. Since this reservoir is fairly small, the city can drain the reservoir with close coordination of supply and demand on the system in a typical year with proper planning. Once drained, the city can perform this inspection in the dry. An additional $20,000 budget is being considered to perform this inspection in 2015. Lakewood Hydro Reprioritization of repairs to the Lakewood Hydro turbine and generator system are being considered including moving the $100,000 currently budgeted in 2015 out to the year 2016. An additional budget augmentation of $30,000 in year 2016 is also being considered for more extensive part replacements. Silver Lake Hydro Due to ongoing repair requirements in keeping the Silver Lake Hydro b ypass valve operational, $150,000 of funding in 2015 for a major rebuild of the valve is being considered. Betasso Hydro In 2013 the lower needle on the Betasso Turbine assembly was determined to be non-operational. An additional budget of $100,000 in year 2014 is being considered for immediate repairs to allow for a full range of operational flows and power generation. Considering the age of the unit scheduled refurbishment of the major mechanical items may be required by the year 2017. An additional budget of $250,000 is being considered in year 2017 for the major items. AGENDA ITEM # V; PAGE 6 NEXT STEPS Budget Schedule The current schedule of major budget milestones is provided below. Elements involving the WRAB are highlighted in bold italics. WRAB Preliminary CIP Budget Discussion - April 21, 2014 Budget Guidelines to Departments - April 2014 WRAB Draft CIP Review - May 19, 2014 Proposed Budget Submittal to City Manager - May 2014 WRAB Recommendation on CIP/Budget - June 16, 2014 Departmental Budget Review by City Manager - May/June 2014 Planning Board Recommendation on CIP - August 2014 City Council Study Session on CIP - August 2014 City Council Study Session on Budget - September 2014 City Council Consideration/Adoption of Budget – October/November 2014