Loading...
Item 4A - 1CITY OF BOULDER PLANNING BOARD AGENDA ITEM MEETING DATE: July 11, 2023 AGENDA TITLE Continuation of Planning Board's consideration of a Site and Use Review to redevelop the property at 1345 28th St. with three 4-story buildings containing 303 student housing residential apartments in a mix of studio, one-, two-, three-, and four-bedroom configurations within the Business - Transitional 1 (BT-1) zoning district. The proposal involves a modification to allow four-story buildings, approximately 53-feet in height where a maximum of three-stories and 35-feet in height is permitted by-right, a 52.2% vehicle parking reduction to allow for 348 parking spaces where 728 are required, a Use Review for a residential use on the ground floor, and an amendment to the Boulder Valley Regional Center (BVRC) Transportation Connections Plan. Reviewed under case no. LUR2022-00021. Applicant: Jason Doornbos, LCD Acquisitions, LLC Owner: RHH Operating LLC REQUESTING DEPARTMENT / PRESENTERS Brad Mueller, Director Planning & Development Services Charles Ferro, Senior Planning Manager Shannon Moeller, Planning Manager OBJECTIVE Define the steps for Planning Board consideration of this request: 1.Planning Board hears applicant and staff presentations. 2. Hold quasi-judicial public hearing. 3. Planning Board action to approve, approve with conditions, or deny. SUMMARY Project Name: The Standard at Boulder 1 of 160 Location: 1345 28th Street Size of Property: 689,526 square feet (15.8-acres) Zoning: Business - Transitional 1 (BT-1) Comprehensive Plan: Transitional Business; Park, Urban and Other; High Density Residential EXECUTIVE SUMMARY The purpose of this item is for the Planning Board to review and take action on the Site and Use Review application and proposed amendment to the BVRC Connections Plan for a proposed redevelopment of the Millennium Harvest House Hotel property at 1345 28th St. with three (3) 4-story buildings for student housing residential apartments. Staff is recommending approval of the Site and Use Review application finding the proposal consistent with relevant Boulder Valley Comprehensive Plan (BVCP) policies, the Site Review criteria and Use Review criteria as outlined in within this memorandum, subject to conditions of approval. Planning Board approval of the Site and Use Review application is required at a public hearing due to the requests for height modification and a parking reduction for a residential use (see ‘Project Description’ and ‘Process’ section below for more details). A public hearing is also required for the Planning Board decision on the amendment to the BVRC Transportation Connections Plan. The applicant’s proposed plans can be found in Attachment A and a written statement within Attachment B. The full list of staff responses to the Site Review and Use Review criteria for the approval recommendation by staff can be found in Attachment D. STAFF RECOMMENDATION Staff has found that the proposed project meets criteria of Section 9-2-14, B.R.C. 1981 and Section 9-2-15, B.R.C. 1981 and is recommending that Planning Board approve the application and the amendment to the BVRC Transportation Connections Plan in the form of the following motion: Suggested Motion Language: Motion to approve Site and Use Review application #LUR2022-00021 and the proposed amendment to the BVRC Transportation Connections Plan, adopting the staff memorandum as findings of fact, including the attached analysis of review criteria. KEY ISSUES 1.Is the proposed project, on balance, consistent with the Site Review Criteria of the Land Use Code section 9-2-14(h), B.R.C. 1981 including findings related to consistency with the BVCP policies? 2 of 160 2. Are the proposed modifications to the land use code including the proposed building stories and height and vehicular parking reduction consistent with the applicable Site Review criteria? 3. Is the proposed ground floor residential use consistent with the Use Review Criteria of the Land Use Code section 9-2-15(e), B.R.C. 1981? 4. Does Planning Board support the proposed amendment to the BVRC Transportation Connections Plan? PUBLIC FEEDBACK Consistent with Section 9-4-3, “Public Notice Requirements,” B.R.C. 1981, staff provided notification to all property owners within 600 feet of the subject location of the application, and signs have been posted by the applicant. Written public comments received are included as Attachment F. BOARD FEEDBACK At the time of the Concept Plan Review call-up discussion on Nov. 30, 2021, City Council referred the proposal to the Design Advisory Board (DAB) and the Transportation Advisory Board (TAB) as part of the Site Review process. Design Advisory Board (DAB): At its Dec. 14, 2022 meeting, DAB reviewed the proposal and provided feedback on key issues on the proposed building and site design. The board packet and meeting minutes are available in the 12.14.22 DAB Meeting archive. The applicant revised the proposal following the Board’s feedback and provided a response document located in Attachment G. Transportation Advisory Board (TAB): At its Feb. 13, 2023 meeting, TAB reviewed the proposal and provided feedback on the proposed alternative transportation approach and on the request to amend the BVRC Transportation Connections Plan. The Board was supportive of the amendment request and provided feedback on the proposed TDM. The board packet and meeting minutes are available in the 2.13.23 TAB Meeting archive. BACKGROUND Site Size & Location: The 15.8-acre property is located west of and adjacent to 28th Street, south of Arapahoe Avenue. The University of Colorado main campus is located west of the site, across Folsom Street. Boulder Creek runs through the site. Refer to Figure 1 below. 3 of 160 The project site is located on the southern edge of the Boulder Valley Regional Center (BVRC), one of the city’s three regional activity centers identified within the Boulder Valley Comprehensive Plan. The site contains a hotel constructed in 1958. Refer to Figure 2. The modernist structure was designed by Ralph D. Peterson, a Denver architect, but has been substantially altered since its construction and has been approved for demolition (HIS2021-000990). Figure 2: Postcard Image ca. 1959 The site also contains a fish observatory, proposed to remain; “cottages” used for non- residential uses south of the creek of which two are proposed to remain; and tennis courts which are proposed to be removed. 4 of 160 Figure 3: Existing Conditions - 28th Street Frontage Boulder Valley Comprehensive Plan (BVCP) Land Use Designation: As shown in Figure 4 on the following page, the majority of the site is designated as Transitional Business on the land use map of the Boulder Valley Comprehensive Plan (BVCP), which typically includes areas along major streets. Desired uses in these areas includes a mix of uses, including housing. The description from the BVCP is below. Figure 4: BVCP Land Use Designation The site is bisected by a Parks designation (Park, Urban and Other), which contains the multiuse path along Boulder Creek. The PK-U/O designation is intended for a variety of active and passive recreation purposes and/or flood control purposes. 5 of 160 The areas south of the creek are designated High Density Residential. Area and Master Plans: Boulder Valley Regional Center (BVRC). The portion of the site north of the creek is located within the Boulder Valley Regional Center (BVRC). The BVRC is defined in the 2020 Boulder Valley Comprehensive Plan (BVCP) as a high intensity regional commercial center planned for a variety of uses. The redevelopment of the site is subject to the BVRC Design Guidelines, which communicate the city’s design goals and objectives to create, maintain, and enhance a high-quality regional commercial center through redevelopment. A Transportation Connections Plan for the BVRC was adopted in 1997. This plan was revised in 2002 and defines the future transportation network in the area for all modes of travel. Greenways Master Plan. Boulder Creek runs through the site. The City of Boulder Greenways system is comprised of a series of corridors along riparian areas including Boulder Creek and 14 of its tributaries. The city’s Greenways Program extends the stewardship of the city to these important riparian areas to integrate multiple objectives, including habitat protection, water quality enhancement, storm drainage and floodplain management, trails, recreation and cultural resources. The Greenways Master Plan provides a framework to implement the program through coordinating planning, construction, maintenance activities and funding sources of multiple city departments and outside agencies. The original Greenways Master Plan was adopted by City Council in 1989 and most recently updated in 2011. Boulder Creek Restoration Master Plan. The Boulder Creek Restoration Master Plan was adopted in 2015. The plan provides planning guidance to improve resiliency along Boulder Creek from the confluence with Fourmile Creek, in Boulder Canyon, to the confluence with the Saint Vrain Creek in the City of Longmont. The plan provides general guidance for stream and ecological restoration among other multiple objectives. Within the City of Boulder, Boulder Creek resembles an urban stream corridor. General guidance for Boulder Creek is also located in the Open Space and Mountain Parks’ Grassland Ecosystem Management Plan. Boulder Creek Management Plan. The Parks and Recreation Department is in the process of initiating a Boulder Creek Management Plan that will outline capital 6 of 160 improvements along the Boulder Creek corridor. The plan will incorporate environmental and ecological stewardship of the creek corridor with responsible recreation and enjoyment by the public. Following completion of a stream assessment, the planning process will most likely begin in 2024. Zoning: The project site is zoned Business - Transitional 1 (BT-1), which is defined as: “Transitional business areas which generally buffer a residential area from a major street and are primarily used for commercial and complementary residential uses, including without limitation, temporary lodging and office uses” (Section 9-5-2(c), B.R.C. 1981) (Figure 5). Figure 5: Zoning Districts Site History & Prior Reviews: The property was annexed to the city in 1967. As mentioned above, the existing structure was built in 1958 prior to annexation. Based on city records, two nonconforming use reviews were approved in the 1970s to expand the bar lounge, convert three rooms to recreation rooms, and for an addition to existing coffee shop (#NC-75-34, #NC-75-20). Special Review #SR-77-6 was approved in 1977 for an expansion to the hotel and a new sports facility. The expansion included 43 additional guest rooms, expansion of bar and restaurant, and addition of tennis and racquetball courts. The Special Review as accompanied by a Planned Unit Development (PUD) (#P-77-58) and Height Review (#H-77-09) for the addition of third and fourth stories to the building and substantial roof appurtenances to the south and west wings of the hotel building. The PUD also approved additional hotel rooms, conversion of guest cabins to offices, and bubble covers for six tennis courts. 7 of 160 A subsequent Planned Unit Development review (#P-78-54) was approved in 1978 and amended the number of units in south wing from 54 to 55 and expanded the three-court tennis bubble to a five-court bubble. The last significant discretionary review was Site Review #LUR2000-SI023 that approved the addition of 14,000 square feet of building area to the hotel for conference space and a 42% parking reduction (536 parking spaces where 913 spaces were required). Approval of the proposed Site Review would supersede these prior approvals. The site contains a fish observatory with portholes in a subterranean amphitheater along the creek. The observatory was constructed as part of the Boulder Creek Path expansion in the late 1980s and was funded by the Parks and Recreation Department, the local chapter of Trout Unlimited, and local businesses. Figure 6: Fish Observatory 2021 Concept Plan: The proposal was reviewed by Planning Board as part of a Concept Plan Review and Comment at its Nov. 4, 2021 meeting (case number LUR2021-00033), which provided initial feedback on the proposal prior to the submittal of more detailed plans. At the time of the Concept Plan Review call-up discussion on Nov. 30, 2021, City Council referred the proposal to the Design Advisory Board (DAB) and Transportation Advisory Board (TAB) as part of the Site Review process. Information regarding the advisory boards’ feedback is located at the beginning of this memo. Floodplain Development Permit: On May 9, 2023, Floodplain Development Permit FLD2022-00081 was approved by the city for the Conditional Letter of Map Revision (CLOMR) required for the work associated with this proposed Site Review. Staff reviewed the CLOMR application and associated hydraulic modeling and found that it complied with all FEMA and City floodplain regulations. The CLOMR must also be reviewed by FEMA. A standard wetland permit will also be required. 8 of 160 Approval of the floodplain development permit by the city is necessary to ensure that the proposal addresses all floodplain requirements; this approval does not affect the Planning Board’s review of the Site Review application. Surrounding Neighborhood: As described above, the property is located at the southern boundary of the Boulder Valley Regional Center. The BVRC is defined in the 2020 Boulder Valley Comprehensive Plan (BVCP) as a high intensity regional commercial center planned for a variety of uses. The site functions as a transition area between the high-intensity commercial district along 28th Street to the north and the university and residential uses to the south and west. The commercial area to the north is auto oriented with major shopping facilities, offices, and financial institutions. The Alcove on Arapahoe Shopping Center is located directly to the north, which contains a variety of retail, service and restaurant uses. Safeway serves as the anchor tenant. To the west of the site at 1444 Folsom Street is an apartment building constructed in the same era as the Millennium Harvest House in the Residential - High 5 (RH-5) zone district. The small property to the southwest (1400 Folsom St.) contains a mixed-use building with one residence and offices. Other apartment buildings constructed in the 1950s are located along Folsom Street to the west. To the northwest are CU athletic fields and university housing for graduate students and families. The CU main campus is located to the southwest and is easily accessible by the Boulder Creek path. To the south across the creek is a congregate care facility within a nine-story tower and four-story building originally constructed in 1975 (The Carillon at Boulder Creek). Also across the creek is the University Village at Boulder Creek Apartments constructed in 2002, which serve as student housing. The apartments are dispersed in four buildings up to 53 feet in height. Further south are single family homes constructed in the 1950s. Small scale office buildings and single-family homes are located directly across 28th Street. To the southeast across 28th Street is the Gold Run condominium development. Figure 7: Boulder Creek Path 9 of 160 Figure 8: Surrounding Uses Floodplain: The site is significantly impacted by the high-hazard zone, conveyance zone, and 100-year floodplain of Boulder Creek which impacts the majority of the site and limits the placement of proposed buildings and changes to existing parking areas. Refer to Figure 9. In particular, new proposed buildings are required to be located outside of the high hazard zone and the lowest floor must be elevated to at or above the flood protection elevation. New parking is not permitted within the high hazard and conveyance zones. Scott Carpenter Park Twenty Ninth Street Mall CU Main Campus Alcove on Arapahoe Shopping Center CU Research Labs University Family housing ½ MILE RADIUS Gold Run Condominiums 10 of 160 Figure 9: Floodplain Transit Context: Access: The site is highly accessible to transportation facilities and other destinations like grocery stores, parks, restaurants, and transit stops. The site is located adjacent to 28th Street (US 36), which is classified as a principal arterial roadway. The proposal includes two limited movement access points from 28th Street and the existing cross access through a neighboring property to Folsom Street. Connections: The site is well connected for bicyclists and pedestrians. Several multi-use paths and on-street bike lanes provide access east-west and north-south from the site. As noted above, the Boulder Creek multi-use path runs through the site. The path runs east- west from 55th Street in East Boulder to Boulder Canyon to the west. A multi-use path runs north-south along 28th Street to the north and another runs east-west along the north side of Arapahoe Avenue. An on-street bike lane is located along Folsom Street. Refer to Figure 10 for a map of multi-modal connections in the vicinity. Boulder Creek 11 of 160 Transit Service. As shown in Figure 11, the site is served by public transit. Several transit stops are located less than a quarter mile away on Arapahoe Avenue and Folsom Street. The JUMP transit route provides high frequency bus service along Arapahoe Avenue to downtown Boulder to the west and Lafayette, and Erie to the east. The HOP transit line is also easily accessible along Folsom Street, which provides service to the CU main campus, downtown Boulder, and the Twenty Ninth Street commercial area. Figure 10: Existing Transportation Connections 12 of 160 PROJECT DESCRIPTION The proposal includes development of three 4-story buildings approximately 53-feet in height, containing 303 apartments in a mix of studio, one-, two-, three-, and four-bedroom configurations. The development is designed to serve the city’s student population. The proposal includes numerous transportation improvements including updates and realignment of the existing Boulder Creek multi-use path, new north-south multi-use path through the site, and the extension of Olson Drive as a new right-of-way connection at the north end of the site. South of the creek, two of the three existing small “cottages” used for non-residential uses including the Dream Makers Preschool and office space for community serving organizations (Lake Eldora Racing Team [LERT] and Single Track Mountain Bike Adventures [SMBA]) would remain, as well as parking and open space amenities. Access to and open space surrounding the creek would be enhanced and would include amenities including pickleball, a dog park, and half-court basketball, along with opportunities to enjoy the creek and surrounding open areas. The existing fish observatory is proposed to remain. The applicant’s proposed plans are found in Attachment A, their written statement in Attachment B, and the proposed Transportation Demand Management Plan is in Attachment C. The proposed plan for the site is shown in Figure 12, below: Figure 11: Transit Service 13 of 160 Figure 12- Proposed site plan. Site Design: The site design locates the buildings in the central area of the site, outside of the High Hazard and Conveyance flood zones, in the same general location as the existing hotel structure. Three 4-story buildings feature long “arms” that reach south to the creek, creating programmed internal court yards and walkways between buildings. Parking is concentrated in surface parking lots, one on the east side of the site and one on the west side fronting 28th Street. Two of the existing cottages south of the creek that serve existing daycare and community-serving office uses would remain, as would parking south of the creek. Access. Vehicle access will remain on 28th Street. At the north end of the site, the existing east-west access drive will be improved as dedicated right-of-way (Olson Drive) fulfilling the requirement for the southern half of this connection as planned in the Boulder Valley Regional Center Transportation Connections Plan (BVRC TCP). The existing multi-use path along Boulder Creek would be realigned to better align with the creek bridge, and two new multi-use path connections would be created north-south through the site, one at the west end and one through the center. There is an existing multi-use path along 28th Street that would be maintained. The proposal also includes a request to modify the BVRC TCP in regards to the north-south multi-use path 14 of 160 connections, as described in Key Issue #4. The proposal includes numerous pathways and sidewalks for pedestrian access throughout the site. Open Space. The proposal includes open space in the form of private and public usable open spaces. Private open space is designed primarily for the residents of the apartments and consists of private balconies and rooftop decks, interior courtyards programmed with amenities like a pool, outdoor kitchens/grills, seating, and landscaping and separated via fencing; and a fenced dog run. Publicly accessible open spaces include areas surrounding the creek, such as open lawn, a soft trail along the creek edge, and an improved and stabilized creek access. A half-court basketball court, four pickleball courts, and a dog park are proposed. The existing fish observatory north of the creek would remain. A minimum of 346,800 square-feet of open space (approximately 50.2% of the gross site area / 53% of net site area) is required to support the proposal based on the number of dwelling units proposed; 371,792 square feet of open space is provided. Open spaces include natural and landscaped areas, active and passive recreational areas, and decorative paved areas, as described above. Landscaping. The site currently contains mature trees throughout the site, including areas that require elevation/grading per floodplain requirements and areas that would be disturbed during deconstruction of the existing building and construction of the proposed development. During the site review process, the applicant conducted an extensive evaluation of the existing trees on the site and considered how the proposal could incorporate as many existing mature trees into the design as possible. Refer to the applicant’s tree preservation exhibit in Attachment H. In light of the site constraints, approximately 279 of the 472 existing trees on the site are proposed to be removed, with over half of the trees to be removed in poor health or dead. The proposal would provide 440 new trees being planted, for a total of 611 trees on the site, more than existing conditions. Additionally, the applicant will provide a comprehensive tree management/maintenance plan as part of the technical document review, as noted in the conditions of approval. In addition to existing and proposed trees, the proposal includes areas to be landscaped appropriately to the area of the site, including rain gardens, pollinator areas, and riparian areas. A diverse mix of plant species are proposed. A turf lawn is limited to select publicly- accessible, active-use spaces. Bike Parking: The proposal provides for bike parking significantly more than minimum requirements. A total of 614 bike parking spaces are required per code (157 short term, 457 long term) to serve the proposed dwelling units and existing daycare and office uses south of the creek, and a total of 1,133 bike parking spaces are provided (172 short term, 961 long term). The proposed short term bike parking is located near building entrances, and the proposed long-term bike parking is located primarily within each building and in long- term covered bike storage areas in the proposed courtyards. E-bike charging is provided at interior bike parking storage rooms. 15 of 160 Vehicle Parking: The proposal involves a request for a 52.2% vehicle parking reduction to allow for 348 parking spaces where 728 are required. New parking is not permitted within the high hazard and conveyance flood zones, so parking is provided in areas where parking currently exists to the east and west of the proposed building and south of the creek. Parking is also not permitted to be located underground due to floodplain constraints. Refer to the TDM section below for a discussion of the proposed transportation demand management plan in support of the reduction request. TDM: In support of the proposed vehicle parking reduction, the applicant has provided a Transportation Demand Management (TDM) Plan to encourage the use of alternative transportation modes. The TDM plan includes strategy elements for both the multi-family residential uses on the site, as well as the non-residential uses located in cottages south of the creek. The residential uses are proposed to include off-campus student housing with approximately 303 units and 944 bedrooms, and amenities including a clubroom, fitness center, and bike storage. The non-residential uses expected to remain include existing small daycare and office uses south of Boulder Creek, in the existing cottages. The Dream Makers Preschool occupies approximately 850 square-feet of one cottage, serves about 15 children, and has four employees. The Lake Eldora Racing Team (LERT) and Single Track Mountain Bike Adventures (SMBA) occupy approximately 400 square-feet of one cottage and have five employees. The organizations provide youth cyclists with high quality mountain bike teams and summer camps and ski racing during the winter. The parking use characteristics for these groups vary as many participants are often dropped off or bike to the site to meet and ride to off-site locations for programming. The TDM plan includes the city’s “core elements” typically included in such a strategy, and “package elements” specific to the site and uses. Elements of the TDM Plan include: • $75 per year alternative transportation fund for residents that do not bring a vehicle. The fund can be used to pay for items such as car share membership costs (e.g. Colorado Care Share and Zip Car), or TNC companies (e.g. Uber or Lyft rides), among others. • Unbundled residential parking managed through the provision of separate leases and fees and lease language regarding parking. • Eco Passes for employees and for any residents not already receiving an Eco Pass as a student for a period of three years. • Infrastructure improvements to sidewalks and the Boulder Creek multi-use path. • Exceeding required minimum short- and long-term bike parking requirements on site. • A bike share program for residents with trailer and basket options available with approximately ten bikes. (CU students are provided with free B-Cycle membership.) 16 of 160 • Marketing material and evaluation tools to increase awareness and effectiveness of alternative transportation tools. Overall, the proposed alternative transportation strategy intends to increase the percentage of alternative travel modes and to decrease parking demand for the proposed residential land use on the site. The site design includes an approximately 52.2-percent parking reduction request per code, and a 30-percent reduction of the calculated parking demand based on the parking analysis provided by the Fox Tuttle Transportation Group. For more details, refer to the TDM plan in Attachment C. Building Design: The proposed buildings are four stories and approximately 53-feet in height containing 303 apartments in a mix of studio, one-, two-, three-, and four-bedroom configurations and amenities including a clubroom, fitness center, and bike storage. The buildings are required to be located outside of the high hazard zone and the lowest floor must be elevated to at or above the flood protection elevation. The building design is contemporary with flat roofs. Upper stories are setback along the creek to create rooftop decks on the third story. Balconies, vertical expressions of circulation, and horizontal changes in materials break up the building massing. The materiality strategy responds to the various edges of the site and includes three tones of brick, thermally treated wood, metal panel, and a Continuous Insulation (CI) system. Storefront windows define building entries and communal amenity spaces. Refer to Attachment A for the applicant’s architectural plans. Refer to Figure 13 for elevations of the buildings from the east, north, south, and west. Building 1 East Elevation – Along 28th St North Elevations – Along Olson Drive South Elevations – Along Creek Building 3 West Elevation – Along Parking 17 of 160 Figure 13- Elevations Proposed Height Modification: In order to permit a proposed building height and number of stories greater than the 35-foot height and three-story maximum in the zoning district, the project is subject to the adopted Community Benefit requirements of Section 9-2- 14(h)(2)(K) “Additional Criteria for a Height Bonus and Land Use Intensity Modifications,” B.R.C. 1981, for the floor area in the 4th floor above the zoning district height limit. This additional floor area is referred to as "bonus floor area" in the code and the percentage of the total building floor area that is considered bonus floor area is what is used to determine the required number of "bonus units" (e.g., residential units above the 25% Inclusionary Housing requirement). While all residential projects are subject to providing at least 25% of the units as permanently affordable or the in-lieu fee or another equivalent, the aforementioned requirement increases that percentage for bonus units from 25% to 36%. The number of units considered "bonus units" is the number that is the percentage of all units of the building that equals in number the percentage of "bonus floor area" in the building. This results in the number of additional permanently affordable units that must be in the building or included in the total calculation for in lieu fees. The in-lieu fee payment would ultimately be due prior to issuance of a building permit and helps fund permanently affordable housing in the city of Boulder. DAB Review: At its Dec. 14, 2022, meeting, DAB reviewed the proposal and provided feedback on key issues on the proposed building and site design. The applicant revised the proposal following the Board’s feedback and provided a response document located in Attachment G. Adjustments included adding and adjusting building entries at the north and west edges of the site to enhance a pedestrian-friendly and accessible design, adjusting interior programming and incorporating balconies at the northwest corner of the western building to enhance this corner, relocating back-of-house elements such as waste collection rooms and transformers, and adding additional detail to renderings and elevations to better depict the proposal. Uses: The residential apartments are designed to serve the city’s university student population. The applicant has provided an operating plan in Attachment I to inform the community as to the standards of operation of the property and share guiding principles. A Use Review is required to provide ground-floor residential as described in Key Issue #3 below. The uses south of the creek in two of the existing “cottages” are proposed to continue, and include a small daycare and office uses. PROCESS Site Review: The applicant is requesting approval of a Site Review application as described in the “Project Description” section above. A Site Review is required because of the 18 of 160 proposed modifications and because the site exceeds the minimum threshold in 9-2-14(b) “Scope,” B.R.C. 1981 for which a mandatory site review is required. The following modifications to the Land Use Code are requested: • Vehicle parking reduction of 52.5% to allow for 348 parking spaces where 728 are required. • Height and story modifications to permit 4-story buildings of approximately 53- feet in height (53’-5” Building 1; 53’ Building 2; 53’-4” Building 3) where a maximum of 3-stories and 35-feet in height is permitted by-right. Use Review: The applicant is requesting approval of a Use Review application. Per the specific use standards in section 9-6-3(d), B.R.C. 1981, attached dwelling units in the BT- 1 zoning district are allowed by right if the use is not located on the ground floor facing a street, with the exception of minimum necessary ground level access. Because the proposal includes ground floor residential uses facing a street, a Use Review is required. Refer to Key Issue #3 below. ANALYSIS / KEY ISSUES 1. Is the proposed project, on balance, consistent with the Site Review Criteria of the Land Use Code section 9-2-14(h), B.R.C. 1981 including findings related to consistency with the BVCP policies? Staff finds that the proposal to add substantial additional housing units and the associated improvements to the existing site is on balance consistent with the goals, objectives, and recommendations of the BVCP and designed in a manner that is consistent with the Site Review criteria Section 9-2-14(h), B.R.C. 1981. Refer to the full analysis with the Site Review criteria provided in Attachment D. 2. Are the proposed modifications to the land use code including the proposed building stories and height and vehicular parking reduction consistent with the applicable Site Review criteria? The proposal is eligible to request the proposed increase in building height and number of stories greater than the 35-foot height and three-story maximum in the zoning district through the Site Review process, and the project is subject to the adopted Community Benefit requirements of Section 9-2-14(h)(2)(K) “Additional Criteria for a Height Bonus and Land Use Intensity Modifications,” B.R.C. 1981, which requires that permanently affordable housing or in-lieu fees for the “bonus floor area” increases from 25% to 36%. If the Site Review proposal is approved, the in-lieu fee payment would be due prior to issuance of a building permit and would help fund permanently affordable housing in the city of Boulder. The proposal is eligible to request a vehicular parking reduction through the Site Review process; as described in the ‘TDM’ section above and in Attachment C, the proposal includes numerous methods to reduce the use of vehicular transportation including unbundled parking, an alternative transportation fund for residents that do 19 of 160 not bring a vehicle., infrastructure improvements, bike parking in excess of minimum requirements, Eco Passes for residents and employees not already receiving one, and other items. Staff has found that the proposal would meet the Site Review criteria of Section 9-2- 14, B.R.C. 1981. Full responses to the criteria can be found in Attachment D. 3. Is the proposed ground floor residential use consistent with the Use Review Criteria of the Land Use Code section 9-2-15(e), B.R.C. 1981? In 2019 the Use Tables within the land use code were changed under adopted Ordinance 8337, including allowed uses within the BT-1 zone district. Attached dwelling units became allowed by right if the use was not located on the ground floor facing a street, with the exception of minimum necessary ground level access. Because the proposal includes ground floor residential uses facing a street, a Use Review is required. Staff finds that the request to provide ground floor residential use in this location is appropriate and consistent with the Use Review criteria. Refer to the complete analysis in Attachment D. 4. Does Planning Board support the proposed amendment to the BVRC Transportation Connections Plan? The site is subject to the BVRC Transportation Connections Plan that includes planned connections through the site (Figure 14). The BVRC guidelines are intended to create smaller block sizes with a more fine-grained transportation network. The plan aims to add connections for all travel modes, including new public streets, inter- connecting private drives, public sidewalks, off-street paths, on-street bike lanes, street crossings, and short links between abutting properties. The proposal will implement many of the planned connections and improvements, including: • Construction of the southern half of a new planned east-west street at the north end of the site, Olson Drive, including vehicular access, sidewalks and tree lawn; • Updates to the Boulder Creek path; • Construction of two new planned north-south multi-use path connections through the site (shown in yellow) at the west end of the site and through the middle of the site, and maintaining the existing north-south multi-use path connection along 28th Street. The BVRC Transportation Connections Plan depicts one additional planned multi-use path connection through the site, shown as the curved dashed yellow line that would have fronted the curved shape of the hotel building; given the changes to the site 20 of 160 layout and building design, this multi-use path connection is proposed to not be provided as part of the redevelopment. The proposal requires an amendment to the BVRC Transportation Connections Plan, which the applicant is requesting. Plan amendments require review and recommendation by TAB, and a decision by the Planning Board, subject to City Council call-up. At its Feb. 13, 2023 meeting, TAB reviewed and was supportive of the request to amend the BVRC Transportation Connections Plan. Figure 14. BVRC Connections Plan 21 of 160 Per the BVRC, the approving authority shall consider the following when reviewing a proposed Plan Amendment: • change of circumstance • physical hardship • practical hardship • equivalency Staff finds that the requested amendment is consistent with the above-listed considerations regarding change of circumstance and equivalency. The change in the overall site design from the existing hotel use to the proposed residential apartments use necessitates a change to the circulation design. The proposal will continue to provide numerous transportation connections through the site via the other three existing and/or proposed north-south multi-use path connections provided by the project, as well as several other circulation paths that are planned for the site that are not defined as multi-use paths. Refer to Figure 15 for a site circulation plan. STAFF FINDINGS AND RECOMMENDATION Planning staff finds that the application meets the Site and Use Review criteria found in Land Use Code section 9-2-14(h), and 9-2-15(e)B.R.C., 1981 and is recommending that Planning Board approve the application and the amendment to the BVRC Transportation Connections Plan in the form of the following motion: Figure 15. Site Circulation Plan 22 of 160 Suggested Motion Language: Motion to approve Site and Use Review application #LUR2022-00021 and the proposed amendment to the BVRC Transportation Connections Plan, adopting the staff memorandum as findings of fact, including the attached analysis of review criteria. RECOMMENDED CONDITIONS OF APPROVAL: Site Review 1.The Applicant shall ensure that the development shall be in compliance with all plans prepared by the Applicant on June 9, 2023, the written statement dated June 9, 2023, and the Transportation Demand Management (“TDM”) Plan dated April 7, 2023, all on file in the City of Boulder Planning Department, except to the extent that the development may be modified by the conditions of this approval. 2.Prior to building permit application, the Applicant shall submit, and obtain City Manager approval of, a Technical Document Review application for the following items: a.Final architectural plans, including material samples and colors, to ensure compliance with the intent of this approval and compatibility with the surrounding area. The architectural intent shown on the plans prepared by the Applicant on June 9, 2023 is acceptable. Planning staff will review plans to assure that the architectural intent is performed. b.A final site plan which includes detailed floor plans and section drawings. c.A final utility plan meeting the City of Boulder Design and Construction Standards. d.A final storm water report and plan meeting the City of Boulder Design and Construction Standards. e.Final transportation plans meeting the City of Boulder Design and Construction Standards and CDOT Access Code Standards, for all transportation improvements. These plans must include, but are not limited to: plan and profile drawings for Olson Drive and the multi-use path, street cross-sectional drawings, detailed drawings to describe the improvements to the existing two site accesses along 28th St (US-36), signage and striping plans in conformance with Manual on Uniform Traffic Control Devices (MUTCD) standards, transportation detail drawings, geotechnical soils report, and pavement design report. 23 of 160 f. CDOT access permit meeting the CDOT Access Code Standards, for all transportation improvements within the CDOT right-of-way including the construction of improvements to the two existing site accesses located along 28th Street (US-36). g. A detailed landscape plan, including size, quantity, and type of plants existing and proposed; type and quality of non-living landscaping materials; any site grading proposed; and any irrigation system proposed, to ensure compliance with this approval and the City's landscaping requirements. Removal of trees must receive prior approval of the Planning Department. This plan must include a comprehensive tree management/maintenance plan to ensure successful installation and long- term health, viability, and sustainability of the installed/existing trees. Removal of any tree in City right of way must also receive prior approval of the City Forester. h. A detailed outdoor lighting plan showing location, size, and intensity of illumination units, indicating compliance with section 9-9-16, B.R.C.1981. i. A detailed shadow analysis to ensure compliance with the City's solar access requirements of section 9-9-17, B.R.C. 1981. j. An address plat following the city’s addressing policy to create a new address. 3. Prior to a building permit application, the Applicant shall submit for and receive approval of a Land Use Review application for a Preliminary Plat and a Technical Document Review application for a Final Plat, and execute a subdivision agreement meeting the requirements of Chapter 9-12, “Subdivision,” B.R.C. 1981, and which provide, without limitation and at no cost to the City, for the following, unless otherwise approved by the City Manager: a. The elimination of the existing parcels lines. b. The dedication, to the City, of all right-of-way and easements shown on the approved plans or necessary to serve the development. c. The vacation of all easements where vacation is necessary for construction of the development. d. A financial guarantee, in a form acceptable to the Director of Public Works, in an amount equal to the cost of constructing all public improvements necessary to serve the development. 24 of 160 e. The construction of all public improvements necessary to serve the development. 4. Prior to issuance of any building permit, the Applicant shall submit a financial guarantee, in a form acceptable to the Director of Public Works, in an amount equal to the cost of providing eco-passes to the residents of the development for three years after the issuance of a certificate of occupancy for each dwelling unit as proposed in the Applicant’s Transportation Demand Management (TDM) plan. 5. Prior to the issuance of the certificate of occupancy for the first building of this approval, the parties will execute documentation necessary to have this approval supersede the conditions of approval contained in any previous approvals, including but not limited to, the following: • Nonconforming Use Reviews #NC-75-34 and #NC-75-20 • Special Review #SR-77-6 • Planned Unit Development #P-77-58 and Height Review #H-77-09 • Planned Unit Development #P-78-54 • Site Review #LUR2000-SI023 6. The Applicant shall be responsible for maintaining all stormwater quality improvements and stormwater detention improvements, including but not limited to permeable parking lot paving. 7. Prior to a building permit application, the Applicant shall provide the City with a reciprocal easement agreement between the Applicant and FW Co-Arapahoe Village LLC c/o Regency Centers Corporation that allows for access along the southern boundary of the property generally known as 2500 Arapahoe Avenue for the public to travel from 28th Street to Folsom Avenue in a form acceptable to the city manager. Use Review (Ground Floor Residential in BT-1) 1. The Applicant shall ensure that the development shall be in compliance with all plans prepared by the Applicant on June 9, 2023, the written statement dated June 9, 2023, and the Transportation Demand Management (“TDM”) Plan dated April 7, 2023, all on file in the City of Boulder Planning Department, except to the extent that the development may be modified by the conditions of this approval. 2. The Applicant shall not expand or modify the approved use, except pursuant to Subsection 9-2-15(h), B.R.C. 1981. By: Brad Mueller, Secretary to the Planning Board 25 of 160 ATTACHMENTS Attachment A – Applicant’s proposed plans Attachment B – Applicant’s written statement Attachment C – Applicant’s Transportation Demand Management (TDM) Plan Attachment D – Staff responses to review criteria Attachment E – Development Review Committee (DRC) comments Attachment F – Written Public Comments Attachment G – Applicant’s response to DAB comments Attachment H – Applicant’s tree exhibit Attachment I – Applicant’s operating plan Attachment J – Applicant’s parking study 26 of 160 PROJECT TEAM: 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 COVER SHEET | A00 Owner/Client Contract The Standard at Boulder Contact: Rob Turk 315 Oconee Street Athens GA, 30601 706-715-6943 Architect SAR+ Contact: Kevin Eronimous 1550 Wynkoop St., Suite 100 Denver CO, 80202 720-350-4964 Interior Design B2 Interior Design Contact: Whitney Prescia 2242 Monitor St., Suite 120 Dallas TX, 75207 719-281- 8329 Civil Engineer JVA Contact: Cody Gratny 1319 Spruce Street Boulder CO, 80302 303-565-4966 Structural Engineer JVA Contact: Mark Flood 1319 Spruce Street Boulder CO, 80302 303-565-4904 Landscape Architect Wenk Contact: Greg Dorolek 1130 31st. Street, Suite 101 Denver CO, 80205 303-628-0003 Mechanical/Plumbing Engineer Galloway Contact: Alicia Thorpe 5265 Ronald Reagan Blvd. Suite 210 Johnstown CO, 80534 970-800-3300 Electrical Engineer MV Consulting Contact: Marcus Vahling 4640 N. Pecos St., Unit F Denver CO, 80211 303-325-3271 Lighting Consultant LS Group Contact: Sarah Erickson 2727 W 2nd Ave. Denver CO, 80219 720-938-2442 Sustainability Consultant Group14 Contact: Susan Reilly 1325 E 16th Avenue Denver CO, 80218 720-221-1073 Envelope Consultant Lerch Bates Contact: Rick Shimonek 6275 Joyce Dr. Suite 200 Arvada CO, 80403 1345 28TH STREET A34 CONCEPTUAL RENDERINGS A35 CONCEPTUAL RENDERINGS A36 CONCEPTUAL RENDERINGS A37 CONCEPTUAL RENDERINGS A42 3D VIEWS AND DETAILS A43 3D VIEWS AND DETAILS A44 3D VIEWS AND DETAILS A45 3D VIEWS AND DETAILS A46 3D VIEWS AND DETAILS A47 3D VIEWS AND DETAILS A48 WALL SECTIONS AND DETAILS A49 WALL SECTIONS AND DETAILS A60 MECHANICAL SCREENING STUDY A61 MECHANICAL SCREENING STUDY A62 MECHANICAL SCREENING STUDY A00 COVER SHEET A11 SITE PLAN A12 LEVEL 1 PLAN A13 LEVEL 2 PLAN A14 LEVEL 3 PLAN A15 LEVEL 4 PLAN A16 ROOF PLAN A17 FLOOR AREAS A18 SHADOW ANALYSIS A20 BUILDING MATERIALS A21 BUILDING ELEVATIONS A22 ELEVATIONS BUILDING 1 A23 ELEVATIONS BUILDING 1 COURTYARD A24 ELEVATIONS BUILDING 2 A25 ELEVATIONS BUILDING 2 EAST COURTYARD A26 ELEVATIONS BUILDING 2 WEST COURTYARD A27 ELEVATIONS BUILDING 3 A28 ELEVATIONS BUILDING 3 COURTYARD A30 BUILDING SECTIONS A31 BUILDING SECTIONS A33 HEIGHT MODIFICATION - PROXIMAL BUILDING HEIGHT SHEET INDEX:PROJECT LOCATION: PROJECT DATA: SITE CORRECTIONS | 2023.06.09 Attachment A (1) - Applicant's Proposed Plans 27 of 160 331 D AFUP UP UP UP UP UP UP UP UP ARCHITECTURAL SITE PLAN 1. DIMENSIONS TO PROPERTY LINE (PL) ARE SHOWN FOR ZONING SETBACKS ONLY. REFERENCE CIVIL FOR BUILDING PLACEMENTS. 2. FOR UNIT LABELS AND UNIT FLOOR AREAS, REFER TO INCLUSIONARY HOUSING UNIT INFORMATION EXCEL SPREADSHEET. PRIMARY RESIDENT/VISITOR BUILDING ENTRY PRIMARY RESIDENT BUILDING ENTRY BIKE ROOM BUILDING ENTRY TRASH / MAINTENANCE ACCESS BICYCLE ACCESS RAMP BUILDING 3 5290.1' USGS BUILDING HEIGHT LOW POINT BUILDING 2 5288.5' USGS BUILDING HEIGHT LOW POINT BUILDING 1 5287.7' USGS BUILDING HEIGHT LOW POINT 25'-0"25'-0"25'-0"1 0 0 Y E A R F L O O D H I G H H A Z A R D (E) APARTMENTS (E) RETAIL (E) RETAIL B O U L D E R C R E E K BUILDING 3 Floodplain Elevation (FPE): 5297.2 Finish Floor Elevation (FFE): 5297.4 84'-1" TO PL 140'-9" TO PL BLDG 3321'-11" TO PLBLDG 337'-9" TO PLLEVEL 4 ROOF DECK LEVEL 4 ROOFDECKFOLSOM ST.28TH ST.WATER ENTRY WATER ENTRY WATER ENTRY OLSON DRIVE BLDG 238'-1" TO PLBLDG 166'-8" TO PLBLDG 2409'-0" TO PLBLDG 1332'-5" TO PLROW DEDICATION, RE: CIVIL PROPERTY LINE EXISTING TO REMAIN LEASED COMMERCIAL BEAR RESISTANT WASTE ENCLOSURE Trash/ Recycling/ Compost AT GRADE, THERMALLY-TEMPERED POOL EQUIPMENT ROOM ~10'X20' WITH ADJACENT OVERHEAD TRELLIS. BUILDING 1 Floodplain Elevation (FPE): 5293.6 Finish Floor Elevation (FFE): 5293.8 BUILDING 2 Floodplain Elevation (FPE): 5295.3 Finish Floor Elevation (FFE): 5295.5 25' -0"POOL EQUIPMENT ROOM 5289.1 USGS BUILDING HEIGHT LOW POINT FENCE WITH ACCESS GATES TO SCREEN ELECTRICAL EQUIPMENT, EQUIPMENT TO BE MOUNTED ABOVE BASE FLOOD ELEVATION FENCE WITH ACCESS GATES TO SCREEN ELECTRICAL EQUIPMENT, EQUIPMENT TO BE MOUNTED ABOVE BASE FLOOD ELEVATION FENCE WITH ACCESS GATES TO SCREEN ELECTRICAL EQUIPMENT, EQUIPMENT TO BE MOUNTED ABOVE BASE FLOOD ELEVATION 0'120'60' NN 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 SITE PLAN | A11 Attachment A (1) - Applicant's Proposed Plans 28 of 160 WHWHWHWH1 0 0 Y E A R F L O O D H I G H H A Z A R D B O U L D E R C R E E K BUILDING 3 Floodplain Elevation (FPE): 5297.2 Finish Floor Elevation (FFE): 5297.4 Studio 1 Bed 2 Bed 3 Bed 4 Bed Amenity B.O.H. Circulation BIKE WASTE STUDY WASTE BIKE ENTRY CORRIDOR WATER ENTRY BIKE CLUBROOM FIREPLACE FITNESS WASTE BULLPEN 162'-0"46'-0"258'-0"42'-0"158'-0" PERCH248'-10"201'-6"25'-0"269'-0"33'-1"341'-9"ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF PRIMARY RESIDENT / VISITOR BUILDING ENTRY PRIMARY RESIDENT BUILDING ENTRY PRIMARY RESIDENT / BIKE ROOM BUILDING ENTRY TRASH / MAINTENANCE ACCESS BICYCLE ACCESS RAMP 58'-0" COURTYARD 46'-0"58'-0" MULTI-USE PATH 46'-0"58'-0" COURTYARD 42'-0"58'-0" COURTYARD 42'-0"58'-0" N/S CONNECTION 42'-0"58'-0" COURTYARD 42'-0"58'-0" ROW DEDICATION, RE: CIVIL PROPERTY LINE BUILDING 3 BUILDING 2 BUILDING 1 WATER ENTRY ELEC / IDF JAN MECH MECH ELEC MECH ELEC MECH IDF LEASING 3-STREAM Trash/Recycling/Compost 3-STREAM Trash/Recycling/Compost 3-STREAM Trash/Recycling/Compost MECHELEC / IDFPACKAGE MAIL ROOM BREAK ROOMJAN MECH MECH MECHPOOLEQUIPMENTMEN'S RESTROOM WOMEN'S RESTROOM GOLF SIMULATOR CORRIDORHOLDING COMPOST ELEC COMPOST COMPOST MECHMECH IDF JAN STUDY ROOM SAUNA MDF BUILDING 2 Floodplain Elevation (FPE): 5295.3 Finish Floor Elevation (FFE): 5295.5 BUILDING 1 Floodplain Elevation (FPE): 5293.6 Finish Floor Elevation (FFE): 5293.8 20'-0"10'-0" BIKE Electrical outlets provided for e-bike charging at interior bike rooms, typical. Electrical outlets provided for e-bike charging at interior bike rooms, typical. MAINTENANCE SHOP ELECWATER ENTRY 0'96'48' NN 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 LEVEL 1 PLAN | A12 Courtyard opens to creek Multi-use path View through building East-west bar with north- south bars towards creek Precedent Image Precedent Image Precedent Image Precedent Image Precedent Image Attachment A (1) - Applicant's Proposed Plans 29 of 160 WHWH STUDY STUDY 248'-10"269'-0"33'-1"ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ROW DEDICATION, RE: CIVIL PROPERTY LINE Studio 1 Bed 2 Bed 3 Bed 4 Bed Amenity B.O.H. Circulation ELEC / IDF JAN MECH STUDY MECH ELEC MECH JAN IDF MECH STUDY MECH ELEC / IDF WASTE STUDY ELEC / IDF MECH JANSTUDY ELEC / IDF STORAGE STUDY MECH STORAGEWASTESTUDY STO 162'-0"46'-0"258'-0"42'-0"158'-0" 58'-0" COURTYARD 46'-0"58'-0" MULTI-USE PATH 46'-0"58'-0" COURTYARD 42'-0"58'-0" COURTYARD 42'-0"58'-0" N/S CONNECTION 42'-0"58'-0" COURTYARD 42'-0"58'-0" BUILDING 3 BUILDING 2 BUILDING 1201'-6"21'-5"3'-7"279'-5"253'-7"341'-9"STUDY ELEC WASTE ELU <475 SF JAN 0'96'48' NN 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 LEVEL 2 PLAN | A13 1/32" = 1'-0" LEVEL 2 ENTITLEMENT Express circulation to break up massing and help wayfinding Rhythm and repetition at bars facing creek Precedent Image Precedent Image Precedent Image Attachment A (1) - Applicant's Proposed Plans 30 of 160 WH 279'-5"253'-7"248'-10"201'-6"21'-5"3'-7"269'-0"33'-1"341'-9"ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ROW DEDICATION, RE: CIVIL PROPERTY LINE Studio 1 Bed 2 Bed 3 Bed 4 Bed Amenity B.O.H. Circulation ELEC / IDF JAN MECH STUDY MECH STUDY ELEC MECH JANIDFMECH STUDY MECH ELEC / IDFWASTESTUDY STUDY WASTE STUDY ELEC MECH JAN STUDY ELEC STORAGE STUDY MECH STORAGE JAN STORAGE 162'-0"46'-0"258'-0"42'-0"158'-0" 58'-0" COURTYARD 46'-0"58'-0" MULTI-USE PATH 46'-0"58'-0" COURTYARD 42'-0"58'-0" COURTYARD 42'-0"58'-0" N/S CONNECTION 42'-0"58'-0" COURTYARD 42'-0"58'-0" BUILDING 3 BUILDING 2 BUILDING 1 STUDY ELU <475 SF ELEC WASTE 0'96'48' NN 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 LEVEL 3 PLAN | A14 1/32" = 1'-0" LEVEL 3 ENTITLEMENT Smaller scale as building blends into nature facing creek Balconies create human scale and break up massing Express entrances with circulation slots Precedent Image Precedent Image Precedent Image Precedent Image Attachment A (1) - Applicant's Proposed Plans 31 of 160 WHWH 257'-3"226'-10"248'-10"182'-11"25'-0"269'-0"33'-1"321'-11"ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ELU <475 SF ROW DEDICATION, RE: CIVIL PROPERTY LINE Studio 1 Bed 2 Bed 3 Bed 4 Bed Amenity B.O.H. Circulation ELEC ELEC / IDF / PVJAN MECH STUDY MECH STUDY ELEC MECH JAN IDF MECH STUDY MECH ELEC / IDF / PVSTUDYSTORAGE STUDY WASTE STUDY ELEC / IDF MECH JAN STUDY ELEC / IDF STUDY MECH STORAGE JAN WASTEELEC / PV 162'-1"46'-0"258'-0"42'-0"158'-0" 58'-0" COURTYARD 46'-0"58'-0" MULTI-USE PATH 46'-0"58'-0" COURTYARD 42'-0"58'-0" COURTYARD 42'-0"58'-0" N/S CONNECTION 42'-0"58'-0" COURTYARD 42'-0"58'-0" BUILDING 3 BUILDING 2 BUILDING 1 STUDY LEVEL 4 AMENITY ROOF DECK ELU <475 SF WASTE 0'96'48' NN 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 LEVEL 4 PLAN | A15 1/32" = 1'-0" LEVEL 4 ENTITLEMENT Architecture and landscape meet seamlessly Quiet roof decks face creek and Flatirons Precedent Image Precedent Image Precedent Image Precedent Image Attachment A (1) - Applicant's Proposed Plans 32 of 160 WHWHWH BUILDING 3 HIGHEST POINT ABOVE GRADE BUILDING 2 HIGHEST POINT ABOVE GRADE BUILDING 1 HIGHEST POINT ABOVE GRADE PHOTOVOLTAIC SOLAR PANELS LAYOUT/EXTENT TBD BUILDING 3 BUILDING 2 BUILDING 1257'-3"226'-10"248'-10"182'-11"25'-0"269'-0"33'-1"321'-11"58'-0" COURTYARD 46'-0"58'-0" MULTI-USE PATH 46'-0"58'-0" COURTYARD 42'-0"58'-0" COURTYARD 42'-0"58'-0" N/S CONNECTION 42'-0"58'-0" COURTYARD 42'-0"58'-0" ROW DEDICATION, RE: CIVIL PROPERTY LINE STAIR OVERRUN STAIR OVERRUN STAIR OVERRUNELEVATOR OVERRUNELEVATOR OVERRUNELEVATOR OVERRUNMECHANICAL EQUIPMENT SCREEN OPENNESS FACTOR <50% MECHANICAL EQUIPMENT SCREEN OPENNESS FACTOR <50% 162'-0"46'-0"258'-0"42'-0"158'-0" LEVEL 4 AMENITY ROOF DECK PHOTOVOLTAIC SOLAR PANELS LAYOUT/EXTENT TBD MECHANICAL EQUIPMENT SCREEN OPENNESS FACTOR <50% MECHANICAL EQUIPMENT SCREEN OPENNESS FACTOR <50% PHOTOVOLTAIC SOLAR PANELS LAYOUT/EXTENT TBD PHOTOVOLTAIC SOLAR PANELS LAYOUT/EXTENT TBD BUILDING HEIGHT 1. BUILDING HEIGHT IS MEASURED FROM LOW POINT (RE: SITE PLAN) TO TOP OF ROOF SHEATHING, PER 9-7-5 BUILDING HEIGHT (B) AND 9-7-7 BUILDING HEIGHT APPURTENANCES (A)(1). A. PARAPETS ARE MEASURED FROM T.O. ROOF SHEATHING AT PERIMETER WALL TO TOP OF PARAPET COPING CAP. B. PER 9-7-7 (A)(5) A PARAPET WALL MAY EXCEED THE HEIGHT REQUIREMENTS OF THIS TITLE BY UP TO 18" IF THE PARAPET IS NECESSARY TO ACCOMMODATE ROOFTOP DRAINAGE OR TO PROVIDE FIRE PROTECTION. C. PARAPET WALLS ONLY EXCEED THE HEIGHT REQUIREMENTS BY LESS THAN 18". 2. FOR LOCATION AND EXTENT OF SCREENING AT ROOFTOP MECHANICAL EQUIPMENT, REFER TO ROOF PLAN A. THE EXTENT AND HEIGHT OF THE SCREEN IS THE MINIMUM APPROPRIATE TO ADEQUATELY SCREEN THE MECHANICAL EQUIPMENT PER 9-9-7 (A)(4)(C). B. THE PROPOSED SCREENING IS MINIMUM TO AVOID INCREASING THE APPARENT HEIGHT OF THE WALLS OF THE BUILDING PER 9-7-7 (A)(4)(D). 0'96'48' NN 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 ROOF PLAN | A16 1/32" = 1'-0" ROOF ENTITLEMENT Rooftop Solar (layout and extent TBD) Level 4 setback on south facade facing creek Precedent Image Precedent Image Attachment A (1) - Applicant's Proposed Plans 33 of 160 32,100 SF BUILDING 1 - LEVEL 1 42,202 SF BUILDING 2 - LEVEL 1 36,988 SF BUILDING 3 - LEVEL 1 ** GENERAL NOTE: FLOOR AREA AS DEFINED IN SECTION 9-16-1 OF THE BOULDER MUNICIPAL CODE AS MEASURED TO THE OUTSIDE SURFACE OF THE EXTERIOR FRAMING, WHICH INCLUDES STAIRWAYS, ELEVATORS, AND THE PORTIONS OF ALL EXTERIOR ELEVATED ABOVE GRADE CORRIDORS, BALCONIES, AND WALKWAYS THAT ARE REQUIRED FOR PRIMARY OR SECONDARY EGRESS (EGRESS PATHS AS DEFINED IN CHAPTER 10-5 OF THE "BUILDING CODE"). ATRIUM SPACES, COURTYARD SPACES, AND STAIRWAY OPENINGS AT THE UPPERMOST FLOOR OF THE BUILDING, AND FLOOR AREA THAT MEETS THE DEFINITION OF UNINHABITABLE SPACE HAVE BEEN EXCLUDED BUILDING 1 - LEVEL 1 BUILDING 2 - LEVEL 1 BUILDING 3 - LEVEL 1 231 SF BUILDING 1 - LEVEL 1 29,563 SF BUILDING 1 - LEVEL 2 42,282 SF BUILDING 2 - LEVEL 2 37,094 SF BUILDING 3 - LEVEL 2 BUILDING 1 - LEVEL 2 BUILDING 2 - LEVEL 2 BUILDING 3 - LEVEL 2 31,702 SF BUILDING 1 - LEVEL 3 42,282 SF BUILDING 2 - LEVEL 3 37,094 SF BUILDING 3 - LEVEL 3 BUILDING 1 - LEVEL 3 BUILDING 2 - LEVEL 3 BUILDING 3 - LEVEL 3 31,702 SF BUILDING 1 - LEVEL 4 38,586 SF BUILDING 2 - LEVEL 4 34,861 SF BUILDING 3 - LEVEL 4 BUILDING 1 - LEVEL 4 BUILDING 2 - LEVEL 4 BUILDING 3 - LEVEL 4 0'120'60' NN 1345 28TH ST, BOULDER, CO 80302 | SITE REVIEW #5 | 2023.06.09 FLOOR AREAS | A17 LEVEL 1 - GSF SITE REVIEW LEVEL 2 - GSF SITE REVIEW LEVEL 3 - GSF SITE REVIEW LEVEL 4 - GSF SITE REVIEW Attachment A (1) - Applicant's Proposed Plans 34 of 160 2 45 6 7 8 1 3 11 1 2 67 89 10 1314 15 16 19 22 2526 2728 29 33 34 4043 44 4749 5051 12 1 2 3 4 567 8 911 13141516 17 19 212223 24 25 27 2930 3132 3336 39 41 43 46 47 12 34 5 6 7 89 10 11 12 13141516 1719 21 2324 2627 28 313233 34 3538 41 4344 4546 47 495051 52 5356 57 5960 6162 63 RH-5 BT-1 BR-1 SA AREA II SA AREA III SA AREA III RH-5 BT-1 BR-1 SA AREA II SA AREA III SA AREA III RH-5 BT-1 BR-1 SA AREA II SA AREA III SA AREA III RH-5 BT-1 BR-1 SA AREA II SA AREA III SA AREA III RH-5 BT-1 BR-1 SA AREA II SA AREA III SA AREA III RH-5 BT-1 BR-1 SA AREA II SA AREA III SA AREA III RH-5 BT-1 BR-1 SA AREA II SA AREA III SA AREA III RH-5 BT-1 BR-1 SA AREA II SA AREA III SA AREA III PROPOSED BUILDING *NOTE: TIMES ARE RELATIVE TO LOCAL SOLAR NOON, AND ARE NOT ADJUSTED FOR DAYLIGHT SAVINGS 35' MASS AT THE REQUIRED SETBACK (MEASURED FROM BUILDING 1 -LEVEL 1) SHADOW A shadow analysis, as described in the solar analysis instructions provided by the city manager, that shows the shadow cast by a thirty-five foot building located at the required setback and the shadow cast by the proposed building. RH-5 BT-1 BR-1 SA AREA II SA AREA III SA AREA III FROM PL 20'-0"FROM PL20'-0"FROM PL 20'-0"FROM PL20'-0"Step 1 Step 2 Step 3 Step 4 Roof Element (y) Elevation of Roof Element (y) Elevation of Grade at Property line (x) Relative Height of Roof Element (h)Length of Shadow (L) 10:00 AM 2:00 PM 10:00 AM 2:00 PM 10:00 AM 2:00 PM 1 5334.33 5295.23 - 39.10 37.37 2 5334.33 5295.24 - 39.09 37.34 3 5344.89 5295.25 - 49.64 65.30 4 5344.89 5295.06 - 49.83 65.80 5 5344.89 5295.06 - 49.83 65.80 6 5344.89 5294.03 - 50.86 68.53 7 5344.89 5294.03 - 50.86 68.53 8 5344.89 5292.01 - 52.88 73.88 - - - - - - - - - - - - - - - - Notes: 1- Protected property adjacent to the site is to the west of Building 3. 2- Afternoon shadows do not shade protected property to west, and therefore 2:00 PM shadows are excluded from the worksheet. 3- Solar Analysis Worksheet Shadows (L) are shown in orange on DEC 21 - 10:00 AM view. 4- Adjusted Length of Shadow (L) assumes the Solar Fence Height (25') is subtracted from the Relative Height of Roof Element (h). 5- The "elevation of roof elements" and "elevation at grade at property line" are listed as USGS elevations. 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 SHADOW ANALYSIS | A18 JUNE 21 - 10AM DEC 21 - 12PM DEC 21 - 2PM MAR/SEPT 21 - 12PM MAR/SEPT 21 - 2PM DEC 21 - 10AM JUNE 21 - 12PM JUNE 21 - 2PM MAR/SEPT 21 - 10AM 35' MASS - JUNE 10AM 35' MASS - JUNE 12PM 35' MASS - JUNE 2PM 35' MASS - MAR/SEPT 10AM 35' MASS - MAR/SEPT 12PM 35' MASS - MAR/SEPT 2PM 35' MASS - DEC 2PM35' MASS - DEC 12PM35' MASS - DEC 10AM NN Attachment A (1) - Applicant's Proposed Plans 35 of 160 BRICK 1 -DARK (BRK 1) INTERSTATE BRICK MOCHA, MATTE, MODULAR CORRUGATED METAL PANEL BERRIDGE METAL PANEL MTL 1 -ZINC GRAY HR-16 NARROW -DARK MTL 2 -CITYSCAPE HS-8 WIDE -LIGHT THERMALLY TREATED WOOD (WD 1, WD 2) CLEAR PINE CLADDING; RE: BUILDING ELEVATIONS FOR ORIENTATION BRICK 2 -MEDIUM (BRK 2) INTERSTATE BRICK CEDAR, MATTE, MODULAR CI SYSTEM (CIS) PAREX GRAY-WHITE ACRYLIC COATING SAND FINE FINISH BRICK 3 -LIGHT (BRK 3) INTERSTATE BRICK, SAWGRASS, MATTE, MODULAR GLAZING VITRO LOW-E GLASS *USED AT PUNCHED OPENING WINDOWS, STOREFRONTS, CURTAIN WALLS METAL RAILING * USED AT CANTILEVERED AND INSET BALCONIES MATERIAL PALETTE BOARD FORM CONCRETE (CP-1) * USED AT GROUND LEVEL (AT-GRADE) BALCONIES PHOTO EXHIBIT OF MATERIAL BOARD 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 BUILDING MATERIALS | A20 Attachment A (1) - Applicant's Proposed Plans 36 of 160 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 Attachment A (1) - Applicant's Proposed Plans 37 of 160 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 Attachment A (1) - Applicant's Proposed Plans 38 of 160 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 Attachment A (1) - Applicant's Proposed Plans 39 of 160 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 Attachment A (1) - Applicant's Proposed Plans 40 of 160 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 Attachment A (1) - Applicant's Proposed Plans 41 of 160 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 Attachment A (1) - Applicant's Proposed Plans 42 of 160 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 Attachment A (1) - Applicant's Proposed Plans 43 of 160 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 T.O. 1/16" = 1'-0" BUILDING 3 - WEST COURTYARD ELEVATION LEVEL 4 -BLDG 3 136'-11 59/64" MAX HEIGHT -BLDG 3 5,345.05' LOW POINT -BLDG 3 5,290.05' LEVEL 1 -BLDG 3 103'-7 59/64" (5297.41') LEVEL 2 -BLDG 3 115'-7 59/64" LEVEL 3 -BLDG 3 126'-3 59/64" ROOF SHEATHING -BLDG 3 149'-6 59/64" T.O. PARAPET -BLDG 3 152'-0 43/64" Attachment A (1) - Applicant's Proposed Plans 44 of 160 MAX HEIGHT -BLDG 3 5,345.05' LOW POINT -BLDG 3 5,290.05'LOW POINT -BLDG 1 5,287.65' MAX HEIGHT -BLDG 1 5,342.65' LOW POINT -BLDG 2 5,288.45' MAX HEIGHT -BLDG 2 5,343.45' MULTI-USE PATH NORTH / SOUTH CONNECTION PARKING PARKING 28TH EXISTING BUILDING60'-0"EXISTING 5 STORY HOTEL FOR SCALE EXISTING 4 STORY HOTEL FOR SCALE EXISTING BUILDING44'-6"BUILDING 1BUILDING 2BUILDING 3 58'-0" COURTYARD 42'-0"58'-0"42'-0"58'-0" COURTYARD 42'-0"58'-0" COURTYARD 42'-0"58'-0"46'-0"58'-0" COURTYARD 46'-0"58'-0" LEVEL 4 -BLDG 3 136'-11 59/64" MAX HEIGHT -BLDG 3 5,345.05' LOW POINT -BLDG 3 5,290.05' LEVEL 1 -BLDG 3 103'-7 59/64" (5297.41') LEVEL 2 -BLDG 3 115'-7 59/64" LEVEL 3 -BLDG 3 126'-3 59/64" BUILDING 3 COURTYARD 53'-3 41/128" (53'-3 1/4") TO ROOFMAXIMUM HEIGHT55'-0"12'-7"10'-8"10'-8"12'-0"T.O. ROOF SHEATHING -BLDG 3 149'-6 59/64" T.O. PARAPET -BLDG 3 152'-0 43/64" _______ A30 5 Sim 2'-5 3/4" PARAPETLEVEL 1 -BLDG 1 100'-0" (5293.75') LEVEL 2 -BLDG 1 113'-4" LEVEL 3 -BLDG 1 124'-0" LOW POINT -BLDG 1 5,287.65' MAX HEIGHT -BLDG 1 5,342.65' LEVEL 4 -BLDG 1 134'-8" LEVEL 1 -BLDG 2 101'-9" (5295.50') LEVEL 2 -BLDG 2 113'-9" LEVEL 3 -BLDG 2 124'-5" LEVEL 4 -BLDG 2 135'-1" LOW POINT -BLDG 2 5,288.45' MAX HEIGHT -BLDG 2 5,343.45'MAXIMUM HEIGHT55'-0"MAXIMUM HEIGHT55'-0"CLUBROOM FIREPLACE MULTI-USE PATH BUILDING 1BUILDING 2 STUDY STUDY STUDY BIKE Studio 1 Bed 2 Bed 4 Bed Amenity Circulation53'-4 51/256" (53'-4 1/4") TO ROOF52'-11 77/128" (52'-11 1/2") TO ROOF12'-7"10'-8"10'-8"13'-4"12'-7"10'-8"10'-8"12'-0"COURTYARDCOURTYARD COURTYARD T.O. ROOF SHEATHING -BLDG 1 147'-3" T.O. ROOF SHEATHING -BLDG 2 147'-8" T.O. PARAPET -BLDG 1 150'-2 3/4" T.O. PARAPET -BLDG 2 150'-10" _______ A30 4 Sim 2'-11 3/4" PARAPET3'-2" PARAPETBUILDING HEIGHT 1. BUILDING HEIGHT IS MEASURED FROM LOW POINT (RE: SITE PLAN) TO TOP OF ROOF SHEATHING, PER 9-7-5 BUILDING HEIGHT (B) AND 9-7-7 BUILDING HEIGHT APPURTENANCES (A)(1). A. PARAPETS ARE MEASURED FROM T.O. ROOF SHEATHING AT PERIMETER WALL TO TOP OF PARAPET COPING CAP. B. PER 9-7-7 (A)(5) A PARAPET WALL MAY EXCEED THE HEIGHT REQUIREMENTS OF THIS TITLE BY UP TO 18" IF THE PARAPET IS NECESSARY TO ACCOMMODATE ROOFTOP DRAINAGE OR TO PROVIDE FIRE PROTECTION. C. PARAPET WALLS ONLY EXCEED THE HEIGHT REQUIREMENTS BY LESS THAN 18". 2. FOR LOCATION AND EXTENT OF SCREENING AT ROOFTOP MECHANICAL EQUIPMENT, REFER TO ROOF PLAN A. THE EXTENT AND HEIGHT OF THE SCREEN IS THE MINIMUM APPROPRIATE TO ADEQUATELY SCREEN THE MECHANICAL EQUIPMENT PER 9-9-7 (A)(4)(C). B. THE PROPOSED SCREENING IS MINIMUM TO AVOID INCREASING THE APPARENT HEIGHT OF THE WALLS OF THE BUILDING PER 9-7-7 (A)(4)(D). LEVEL 1 -BLDG 1 100'-0" (5293.75') LEVEL 2 -BLDG 1 113'-4" 5'-0" CONCRETE 6'-0" PARKING AREA VEHICLE CHARGING EQUIPMENT WINDOW TREATMENTS AT RESIDENTIAL UNITS SIDEWALK PLANTING AREA LEVEL 1 -BLDG 3 103'-7 59/64" (5297.41') LEVEL 2 -BLDG 3 115'-7 59/64" CONCRETE 6'-0"2'-0" SIDEWALK PLANTING AREA PARKING AREA WINDOW TREATMENTS AT RESIDENTIAL UNITS VEHICLE CHARGING EQUIPMENT 0'48'24' 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 BUILDING SECTIONS | A30 1" = 30'-0" SECTION - ENTITLEMENT - ALL BUILDINGS 1/16" = 1'-0" SECTION - ENTITLEMENT - BLDG 3 1/16" = 1'-0" SECTION - ENTITLEMENT - BLDGS 1 AND 2 1/8" = 1'-0" BLDG 1 BASE OF WALL - EASTSIDE 1/8" = 1'-0" BLDG 3 BASE OF WALL - WESTSIDE Attachment A (1) - Applicant's Proposed Plans 45 of 160 LEVEL 1 -BLDG 1 100'-0" (5293.75') LEVEL 2 -BLDG 1 113'-4" LEVEL 3 -BLDG 1 124'-0" LOW POINT -BLDG 1 5,287.65' MAX HEIGHT -BLDG 1 5,342.65' LEVEL 4 -BLDG 1 134'-8" 2 Bed 4 Bed Amenity Circulation CREEK BUILDING 1 MAXIMUM HEIGHT55'-0"12'-7"10'-8"10'-8"13'-4"FITNESS CLUBROOM FIREPLACE ENTRY CORRIDOR T.O. ROOF SHEATHING -BLDG 1 147'-3" T.O. PARAPET -BLDG 1 150'-2 3/4"53'-4 51/256" (53'-4 1/4") TO ROOFBUILDING 1 2'-11 3/4" PARAPETLEVEL 1 -BLDG 2 101'-9" (5295.50') LEVEL 2 -BLDG 2 113'-9" LEVEL 3 -BLDG 2 124'-5" LEVEL 4 -BLDG 2 135'-1" LOW POINT -BLDG 2 5,288.45' MAX HEIGHT -BLDG 2 5,343.45' CREEK BUILDING 2 MAXIMUM HEIGHT55'-0"52'-11 77/128" (52'-11 1/2") TO ROOF12'-7"10'-8"10'-8"12'-0"STUDY T.O. PARAPET -BLDG 2 150'-10" Studio 1 Bed 2 Bed 4 Bed Amenity BUILDING 2 3'-2" PARAPETLEVEL 4 -BLDG 3 136'-11 59/64" MAX HEIGHT -BLDG 3 5,345.05' LOW POINT -BLDG 3 5,290.05' LEVEL 1 -BLDG 3 103'-7 59/64" (5297.41') LEVEL 2 -BLDG 3 115'-7 59/64" LEVEL 3 -BLDG 3 126'-3 59/64" CREEK BUILDING 3 53'-3 41/128" (53'-3 1/4") TO ROOFMAXIMUM HEIGHT55'-0"T.O. ROOF SHEATHING -BLDG 3 149'-6 59/64" T.O. PARAPET -BLDG 3 152'-0 43/64"12'-7"10'-8"10'-8"12'-0"BUILDING 3 2'-5 3/4" PARAPETBUILDING HEIGHT 1. BUILDING HEIGHT IS MEASURED FROM LOW POINT (RE: SITE PLAN) TO TOP OF ROOF SHEATHING, PER 9-7-5 BUILDING HEIGHT (B) AND 9-7-7 BUILDING HEIGHT APPURTENANCES (A)(1). A. PARAPETS ARE MEASURED FROM T.O. ROOF SHEATHING AT PERIMETER WALL TO TOP OF PARAPET COPING CAP. B. PER 9-7-7 (A)(5) A PARAPET WALL MAY EXCEED THE HEIGHT REQUIREMENTS OF THIS TITLE BY UP TO 18" IF THE PARAPET IS NECESSARY TO ACCOMMODATE ROOFTOP DRAINAGE OR TO PROVIDE FIRE PROTECTION. C. PARAPET WALLS ONLY EXCEED THE HEIGHT REQUIREMENTS BY LESS THAN 18". 2. FOR LOCATION AND EXTENT OF SCREENING AT ROOFTOP MECHANICAL EQUIPMENT, REFER TO ROOF PLAN A. THE EXTENT AND HEIGHT OF THE SCREEN IS THE MINIMUM APPROPRIATE TO ADEQUATELY SCREEN THE MECHANICAL EQUIPMENT PER 9-9-7 (A)(4)(C). B. THE PROPOSED SCREENING IS MINIMUM TO AVOID INCREASING THE APPARENT HEIGHT OF THE WALLS OF THE BUILDING PER 9-7-7 (A)(4)(D). 0'48'24' 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 BUILDING SECTIONS | A31 1/16" = 1'-0" ENTITLEMENT SECTION - BLDG 1 1/16" = 1'-0" ENTITLEMENT SECTION - BLDG 2 1/16" = 1'-0" ENTITLEMENT SECTION - BLDG 3 Attachment A (1) - Applicant's Proposed Plans 46 of 160 UP UP UP UP UP UPUP UP UP 1 B O U L D E R C R E E K 2 3 5 4FOLSOM ST.28TH ST.TAFT DR. OLSON DRIVE TYP 100'-0" FROM PL ROW DEDICATION, RE: CIVIL PROPERTY LINE 1. 2. 3. 4. 5. HEIGHT MODIFICATION -WRITTEN STATEMENT A written statement and drawings which describes the way in which the proposal accommodates pedestrians, including without limitation uses proposed for the ground level, percent of transparent material at the ground level, and signage and graphics. The proposed design accommodates pedestrians by integrating more active uses on the ground level, scaling down the building massing, maintaining appropriate ground level transparency, and providing pedestrian-oriented graphics and signage. The more public building along 28th Street (Building 1) will house the leasing and primary amenity zones for the project. The main point of entry fronts 28th Street – the entry will be clad with a welcoming wood material and it will have a large expanse of glazing into a two- story leasing space. Designed to work with the constraints of the site, the project is planned to activate and improve the creek, strengthen engagement to natural surroundings, and improve connectivity to existing multi-use paths and neighborhoods. The multi-use path will be fronted with active amenity program uses including: the gym, club house and active, outdoor “perch”. Refer to architectural plans for program uses. The massing strategy helps step the building down to a pedestrian scale, particularly towards the creek. Refer to 'Proposed Concept' massing diagrams in the Written Statement. The buildings are carefully situated in the landscape to accommodate the floodplain and will step down with the grade, helping to break down the scale and create various outdoor rooms. With the rhythm of mass-open, or building- courtyard, the project seeks to visually open itself up to the path and create an engaging experience to the community. The upper-level setbacks at the south elevation reduce the perceived height of the building. The ground level transparency creates interest and interaction at the ground level for adjacent pedestrians. Refer to architectural building elevations for the ground level transparency percentages on elevations fronting the public way. The amenity uses offer large expanse of glazing; the main entry at Building 1 provides views through the building to connect to the outdoor courtyard. Each unit balcony offers a cadence at the ground floor with ample glazing. The architectural building elevations indicate placeholder building signage, which will be reviewed in separate submittals. PROXIMAL BUILDINGS APPROXIMATE HEIGHT AND BUILDING STORIES 1. HARVEST MANOR APARTMENTS INC 1444 FOLSOM ST 19'-0" 2 STORIES 2. FLOWER CHILD 2580 ARAPAHOE AVE 24'-0" 1 STORY 3. SAFEWAY 2798 ARAPAHOE AVE 23'-0" 1 STORY 4. UNIVERSITY VILLAGE AT BOULDER CREEK 2275 TAFT DR 49'-0" 4 STORIES 5. THE CARILLON AT BOULDER CREEK 2525 TAFT DR 94'-0" 9 STORIES A list of the height of each principal building located or known to be proposed or approved within one hundred feet of the proposed project. 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 HEIGHT MODIFICATION - PROXIMAL BUILDING HEIGHT | A33 1" = 100'-0" SITE PLAN - NEIGHBORING BUILDINGS NN Attachment A (1) - Applicant's Proposed Plans 47 of 160 NFOLSOM STREET28TH STREETBOULDER CREEK 1345 28TH ST, BOULDER, CO 80302 | SITE REVIEW #5 | 2023.06.09 CONCEPTUAL RENDERINGS | A34 1 3 2 VIEW FROM CREEK LOOKING WEST02 VIEW FROM 28TH01 AERIAL VIEW ABOVE CREEK LOOKING NORTHWEST03 Attachment A (1) - Applicant's Proposed Plans 48 of 160 NFOLSOM STREET28TH STREETBOULDER CREEK 1345 28TH ST, BOULDER, CO 80302 | SITE REVIEW #5 | 2023.06.09 CONCEPTUAL RENDERINGS | A35 2 1 3 VIEW LOOKING NORTH IN BUILDING 1 COURTYARD02 VIEW LOOKING NORTH IN BUILDING 2 COURTYARD01 VIEW LOOKING SOUTH FROM BUILDING 2 COURTYARD03 Attachment A (1) - Applicant's Proposed Plans 49 of 160 NFOLSOM STREET28TH STREETBOULDER CREEK 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 CONCEPTUAL RENDERINGS | A36 VIEW LOOKING WEST FROM BUILDING 1 TO BUILDINGS 2 AND 302 VIEW LOOKING WEST ON BUILDING 1 EAST01 VIEW LOOKING AT BUILDING 2 AND BUILDING 3 NORTH03 2 1 3 Attachment A (1) - Applicant's Proposed Plans 50 of 160 NFOLSOM STREET28TH STREETBOULDER CREEK 1345 28TH ST, BOULDER, CO 80302 | SITE REVIEW #5 | 2023.06.09 CONCEPTUAL RENDERINGS | A37 2 1 VIEW LOOKING EAST ON BUILDING 3 WEST02 VIEW LOOKING AT BUILDING 3 NORTHEAST CORNER01 3 VIEW LOOKING AT BUILDING 3 NORTH ENTRY03 Attachment A (1) - Applicant's Proposed Plans 51 of 160 CONC SLAB ISOLATION JOINT FILLERVARIESINTERIOREXTERIOR GLAZED ALUMINUM CURTAIN WALL SYSTEM JOINT SEALANT, MATCH WINDOW FRAME COLOR JOINT SEALANT, MATCH ADJACENT EXTERIOR FINISH COLOR FOAM BOARD INSULATION TO DEPTH PER CODE REQUIREMENT PREFINISHED METAL FLASHING, FINISH TO MATCH CURTAIN WALL, OVER INSULATION AND BEHIND PAVING CARRY WPING UP TO TOP OF CONCRETE SLAB AND FOUNDATION WALL, TYP. DRAINAGE PANEL GEOTEXTILE FABRIC OVER DRAINBOARD, WRAP TOP OF FABRIC OVER THICKNESS OF DRAINAGE PANEL AT TOP TERMINATION PREFINISHED METAL SILL FLASHING WITH HEMMED DRIP EDGE FLEXIBLE FLASHING, LAP OVER EDGE OF FOUNDATION AND AWRB FOAM BOARD INSULATION AT HEADER WHERE PERMITTED STRUCTUALLY JOINT SEALANT AND BACKER ROD INTERIOR EXTERIOR 5/8" TYPE X GYP WALLBOARD 1/2" AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING SELF-ADHERED FLEXIBLE FLASHING OVER THROUGH-WALL METAL FLASHING WOOD SIDING PANEL ATTACHED TO SUB-FRAMING WOOD SHIM / NAILER RETURN ALUMINUM FRAMED CURTAIN WALL SYSTEM PREFINISHED METAL FLASHING WITH HEMMED EDGE SELF-ADHERED FLEXIBLE FLASHING OVER AWRB AT ROUGH OPENING JOINT SEALANT AND BACKER ROD GLAZED ALUMINUM CURTAIN WALL SYSTEM WOOD SIDING PANEL JOINT SEALANT, MATCH WINDOW FRAME COLOR INTERIOR EXTERIOR1/2"5/8" GWB RETURN AT WINDOW JAMBS WOOD SHIM / NAILER AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING SELF-ADHERED FLEXIBLE FLASHING OVER AWRB AND EXTEND INSIDE ROUGH OPENING PREFINISHED METAL SIDING TRIM FOAM BOARD INSULATION TO DEPTH PER CODE REQUIREMENT INTERIOR EXTERIOR ALUMINUM FRAMED STOREFRONT SYSTEM JOINT SEALANT, MATCH WINDOW FRAME COLOR JOINT SEALANT, MATCH ADJACENT EXTERIOR FINISH COLOR PREFINISHED METAL FLASHING TO MATCH CURTAIN WALL, OVER INSULATION 3"CARRY WPING UP TO TOP OF CONCRETE SLAB AND FOUNDATION WALL, TYP. DRAINAGE PANEL GEOTEXTILE FABRIC OVER DRAINBOARD, WRAP TOP OF FABRIC OVER THICKNESS OF DRAINAGE PANEL AT TOP TERMINATION LANDSCAPE MATERIAL PREFINISHED METAL SILL FLASHING WITH HEMMED DRIP EDGE FLEXIBLE FLASHING, LAP OVER EDGE OF FOUNDATION AND AWRB FOAM BOARD INSULATION AT HEADER WHERE PERMITTED STRUCTUALLY WITH DRIP AND END DAMS METAL WALL PANEL ALUMINUM FRAMED STOREFRONT SYSTEM JOINT SEALANT AND BACKER ROD INTERIOR EXTERIOR JOINT SEALANT, MATCH WINDOW FRAME COLOR 5/8" TYPE X GYP WALLBOARD 2" WOOD SHIM / NAILER PREFINISHED METAL FLASHING WITH HEMMED EDGE AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING SELF-ADHERED FLEXIBLE FLASHING OVER THROUGH-WALL METAL FLASHING RETURN Z-GIRT SUBFRAMING SYSTEM HSS8x4x1/4 STUB W/ CAP PLATE, RE: STRUCTURE SHOP-FABRICATED WOOD TRUSS WOOD SIDING PANEL GIRT SYSTEM WOOD SIDING SYSTEM PRECAST STRUC CONC, RE: STRUC STRUC STL FRAMING, RE: STRUC WINDOW WALL ASSEMBLY CONTINUOUS FLEXIBLE FLASHING AROUND STUB PENETRATIONS AT EXTERIOR WALL PREFINISHED METAL THROUGH- WALL FLASHING WITH HEMMED EDGE 1/2"WRAP SELF-ADHERED FLEXIBLE FLASHING AT WINDOW WALL ROUGH OPENINGS, OVER WOOD BLOCKING AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING EXTERIORINTERIOR 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 3D VIEWS AND DETAILS | A42 BUILDING 1 MAIN ENTRANCE AND LEASING 3" = 1'-0" CURTAIN WALL SILL @ WOOD3 3" = 1'-0" CURTAIN WALL HEAD @ WOOD4 3" = 1'-0" CURTAIN WALL JAMB @ WOOD2 3" = 1'-0" STOREFRONT SILL @ METAL PANEL5 3" = 1'-0" STOREFRONT HEAD @ METAL PANEL6 5 1 2 3 4 1 1/2" = 1'-0" BALCONY INSET @ WINDOW WALL1 6 Attachment A (1) - Applicant's Proposed Plans 52 of 160 WOOD SIDING PANEL GIRT SYSTEM WOOD SIDING SYSTEM 1/2" MAX. FOAM BOARD INSULATION HSS8x4x1/4 STUB W/ CAP PLATE, RE: STRUCTURE SHOP-FABRICATED WOOD TRUSS PRECAST STRUC CONC, RE: STRUC CI SYSTEM WITH ACRYLIC COATING, ROUGH SAND FINISH RE: STRUCTURAL2"CONTINUOUS FLEXIBLE FLASHING AROUND STUB PENETRATIONS AT EXTERIOR WALL SEALANT JOINT AT CI SYSTEM AND STUB INTERFACE EXTEND CI SYSTEM ABOVE STEEL SUPPORT, BEHIND PRECAST CONC. DECK PREFINISHED METAL THROUGH- WALL FLASHING WITH HEMMED EDGE SIDING BEGINS 2" MIN. ABOVE TOP OF CONCRETE DECK INTERIOR EXTERIOR PARAPET CLEATS SHALL BE SECURED 24" O.C. MAX WITH FASTENERS WITH NEOPRENE WASHERS. SLOTTED HOLES SHALL BE PROVIDED AT ATTACHMENT POINT TO ALLOW FOR HORIZONTAL THERMAL MOVEMENT. COPING LAPS SHALL BE SEALED PARAPET COPING SHALL COMPLY WITH ANSI SPRI ES-1 SECTION 4.3 FOR LOW SLOPE ROOF EDGE SECUREMENT. CONTINUOUS PARAPET COPING CLEAT SECURED AT 24" O.C. TPO MEMBRANE ROOFING EXTENDED OVER TOP OF NAILER AND SEALED TO FACE OF AWRB TOP OF PARAPET 1/2"AWRB 1/2" WD PANEL SHEATHING FLEXIBLE FLASHING AT INSIDE AND OUTSIDE CORNERS OF WD NAILER PREFINISHED PARAPET COPING SEALANT CI SYSTEM WITH ACRYLIC COATING, ROUGH SAND FINISH FROM T.O. PARAPET COPING TO T.O. ROOF SHEATHINGPARAPET HEIGHT1/2" WD PANEL SHEATHING AWRB HIGH-DENSITY XPS BOARD INSULATION SELF-ADHERED FLEXIBLE FLASHING OVER PREFINISHED THROUGH-WALL FLASHING CI SYSTEM WITH ACRYLIC COATING, ROUGH SAND FINISH PREFINISHED METAL THROUGH WALL FLASHING AT EXTERIOR WALL TRANSITIONS, SECURED TO CLEAT BLOCKING / WOOD NAILER FLASHING CLEAT, FASTEN TO NAILER 5" INTERIOR EXTERIOR CI SYSTEM WITH ACRYLIC COATING, ROUGH SAND FINISH INTERIOR 1/2" EXTERIOR 1/2" WD PANEL SHEATHING WOOD SIDING SYSTEM WOOD SIDING PANEL GIRT SYSTEM AWRB FOAM BOARD INSULATION , CONTINUOUS WRAP AT BOTH ASSEMBLIES PREFINISHED METAL TRIM CLOSURE PIECE AT TERMINATION WOOD SIDING SYSTEM SLOPE _______ A43 3 8"DECORATIVE METAL RAILINGS PNTD HSS8x4x1/4 TUBE STEEL BEAM RE: STRUCTURE PRECAST DECK SHOP-FABRICATED WOOD TRUSS AWRB, OVER WD PANEL SHEATHING, CONTINUOUS BETWEEN EXTERIOR WALL SYSTEMS 3" METAL EMBED PLATE, INSET 1/2" INTO CONCRETE DECK AT EACH TUBE STEEL POST , AND AT END WALLS (BEYOND) INTERIOR EXTERIOR 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 3D VIEWS AND DETAILS | A43 STAIR CIRCULATION EXPRESSED ON EXTERIOR, SET BACK TOWARDS CREEK 1 1/2" = 1'-0" BALCONY INSET @ WOOD3 3" = 1'-0" PARAPET COPING @ CI SYSTEM W12 3" = 1'-0" CI SYSTEM TO BRICK TRANSITION DETAIL1 4 2 3 1 5 3" = 1'-0" CI SYSTEM TO WOOD INSIDE CORNER41 1/2" = 1'-0" TYPICAL PARTIALLY-INSET BALCONY5 Attachment A (1) - Applicant's Proposed Plans 53 of 160 FOAM BOARD INSULATION AT HEADER WHERE PERMITTED STRUCTUALLY JOINT SEALANT AND BACKER ROD INTERIOR EXTERIOR JOINT SEALANT 5/8" TYPE X GYP WALLBOARD 1 1/2" WINDOW WALL ASSEMBLY AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING SELF-ADHERED FLEXIBLE FLASHING OVER THROUGH-WALL METAL FLASHING WOOD SIDING PANEL ATTACHED TO SUB-FRAMING WOOD SHIM / NAILER PREFINISHED METAL FLASHING WITH HEMMED EDGE FOAM BOARD INSULATION JOINT SEALANT, MATCH WINDOW FRAME COLOR INTERIOR EXTERIOR WOOD SIDING PANEL GIRT SYSTEM WOOD SIDING PANEL 1 1/2" WINDOW WALL ASSEMBLY WOOD SHIM / NAILER AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING SELF-ADHERED FLEXIBLE FLASHING OVER AWRB AND EXTEND INSIDE ROUGH OPENING 5/8" GWB RETURNS AT WINDOW SILLS, TYP. PREFINISHED METAL THROUGH WALL FLASHING, HEMMED EDGE WITH JOINT SEALANT AT UNDERSIDE INTERIOR EXTERIOR1 1/2"WOOD SIDING PANEL JOINT SEALANT, MATCH WINDOW FRAME COLOR 5/8" GWB RETURN AT WINDOW JAMBS WOOD SHIM / NAILER AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING SELF-ADHERED FLEXIBLE FLASHING OVER AWRB AND EXTEND INSIDE ROUGH OPENING PREFINISHED METAL SIDING TRIM WINDOW WALL SYSTEM WOOD SIDING SYSTEM INTERIOR EXTERIOR 1 1/2"PREFINISHED METAL TRIM CLOSURE PIECE AT TERMINATION AWRB, CONTINUOUS WRAP AT BOTH ASSEMBLIES FACE BRICK FOAM BOARD INSULATION 2" JOINT SEALANT AND BACKER ROD1/2"SELF-ADHERED FLEXIBLE FLASHING OVER PREFINISHED METAL FLASHING PREFINISHED METAL THROUGH WALL FLASHING AT EXTERIOR WALL TRANSITIONS, SECURED TO CLEAT 1/2" WD PANEL SHEATHING AWRB HIGH-DENSITY XPS BOARD INSULATION1 1/2"FACING BRICK SELF-SEALING MASONRY VENEER ANCHOR 4" BLOCKING / WOOD NAILER FLASHING CLEAT, FASTEN TO NAILER WOOD PANEL SIDING INTERIOR EXTERIOR 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 3D VIEWS AND DETAILS | A44 EXPRESSION OF ENTRY AT BUILDING 2 OFF MULTI-MODAL PATH 3" = 1'-0" WINDOW WALL HEAD @ WOOD3 3" = 1'-0" WINDOW WALL SILL @ WOOD23" = 1'-0" WINDOW WALL JAMB AT WOOD4 2 3 4 5 3" = 1'-0" BRICK TO WOOD INSIDE CORNER5 3" = 1'-0" WOOD TO BRICK EXTERIOR WALL TRANSITION DETAIL1 1 Attachment A (1) - Applicant's Proposed Plans 54 of 160 GROUT SOLID UP TO THROUGH-WALL FLASHING FOAM BOARD INSULATION DRAINAGE PANEL CONTINUOUS COVER OF DRAINBOARD WITH GEOTEXTILE FABRIC CAVITY MORTAR CONTROL SYSTEM FACING BRICK FOAM BOARD INSULATION AWRB EXTERIOR WALL AS SCHEDULED MAINTAIN CONTINUITY OF INSULATION TO DEPTH PER CODE REQUIREMENT CARRY FLUID-APPLIED WATERPROOFING UP BRICK LEDGE TO TOP EDGE OF FLOOR CAVITY VENT AND WEEP DEPTH OF FOUNDATION VARIES1'-4"DIM. VARIESSELF-ADHERED FLEXIBLE FLASHING OVER THROUGH-WALL FLASHING SELF-ADHERED FLEXIBLE FLASHING OVER TRANSITION FROM AWRB TO BELOW-GRADE WATERPROOFING PREFINISHED METAL THROUGH-WALL FLASHING UNDER CAVITY VENT, PLACE 2 COURSES ABOVE GRADE, TYP. UNDERSLAB VAPOR BARRIER SLOPE 8"HSS W/ CAP PLATE, RE: STRUCTURE HANGER BY TRUSS SUPPLIER PRECAST DECK1'-0"1" MAXAWRB, OVER WD PANEL SHEATHING, CONTINUOUS BETWEEN EXTERIOR WALL SYSTEMS CONTINUOUS FLEXIBLE FLASHING AROUND STUB PENETRATIONS AT EXTERIOR WALL METAL EMBED PLATE, INSET 1/2" INTO CONCRETE DECK AT EACH TUBE STEEL POST DECORATIVE METAL RAILINGS 3" EXTEND FOAM BOARD INSULATION ABOVE STEEL SUPPORT, BEHIND PRECAST CONC. DECK JOINT SEALANT AT TUBE PENETRATIONS MASONRY VENEER EXTERIOR WALL ASSEMBLY STRUCTURAL LINTEL, HOLD BRICK ABOVE PRECAST DECK SELF-ADHERED FLEXIBLE FLASHING OVER PREFINISHED METAL THROUGH-WALL FLASHING PREFINISHED METAL THROUGH- WALL FLASHING WITH HEMMED DRIP EDGE CAVITY VENT AND WEEP CAVITY MORTAR CONTROL SYSTEM AWRB FACING BRICK CAVITY WALL VENT TPO MEMBRANE ROOFING EXTENDED OVER TOP OF NAILER AND SEALED TO FACE OF AWRB TOP OF PARAPET HIGH-DENSITY XPS BOARD INSULATION FLEXIBLE FLASHING AT INSIDE AND OUTSIDE CORNERS OF PARAPET CAP, TYP. CONTINUOUS PARAPET COPING CLEAT SECURED AT 24" O.C. PREFINISHED PARAPET COPING FROM T.O. PARAPET COPING TO T.O. ROOF SHEATHINGPARAPET HEIGHTCAVITY MORTAR CONTROL SYSTEM CAVITY VENT AND WEEP MTL FABRICATION, LOOSE LINTEL, RE: STRUC FACING BRICK INTERIOR EXTERIOR ALUMINUM WINDOW 6" WOOD SHIM / NAILER 5/8" GWB RETURN AT WINDOW SILLS, TYP. SELF-ADHERED FLEXIBLE FLASHING OVER AWRB AND EXTEND INSIDE ROUGH OPENING PREFINISHED METAL THROUGH WALL FLASHING, HEMMED EDGE WITH JOINT SEALANT AT UNDERSIDE JOINT SEALANT BOTH SIDES AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING PREFINISHED METAL FLASHING AND DRIP EDGE FACING BRICK, ROWLOCK COURSE FACING BRICK ALUMINUM WINDOW 6" 1"JOINT SEALANT INTERIOR EXTERIOR JOINT SEALANT, MATCH WINDOW FRAME COLOR GROUT SOLID AND SLOPE AT ANGLE ABOVE TOP RUNNING COURSE OF BRICK15°FOAM BOARD INSULATION, FROM 1 1/2" THK, TYP. 1" BEHIND ROWLOCK WOOD SHIM / NAILER JOINT SEALANT, BOTH SIDES 5/8" GWB RETURN AT WINDOW SILLS, TYP. SELF-ADHERED FLEXIBLE FLASHING OVER AWRB AND EXTEND INSIDE ROUGH OPENING AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING PREFINISHED METAL THROUGH WALL FLASHING, HEMMED EDGE WITH JOINT SEALANT AT UNDERSIDE 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 3D VIEWS AND DETAILS | A45 BUILDING STEPS DOWN IN SCALE AS IT APPROACHES CREEK 1 1/2" = 1'-0" GROUND PLANE INTERSECTION @ BRICK WALL2 1 1/2" = 1'-0" FULL-PROJECTING BALCONY13" = 1'-0" PARAPET COPING @ BRICK33" = 1'-0" CASEMENT WINDOW HEAD @ BRICK5 3" = 1'-0" WINDOW SILL @ BRICK4 14 5 3 2 Attachment A (1) - Applicant's Proposed Plans 55 of 160 ALUMINUM WINDOW 3" METAL WALL PANEL INTERIOR EXTERIOR WOOD SHIM / NAILER AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING SELF-ADHERED FLEXIBLE FLASHING OVER AWRB AND EXTEND INSIDE ROUGH OPENING 5/8" GWB RETURNS AT WINDOW SILLS, TYP. PREFINISHED METAL THROUGH WALL FLASHING, HEMMED EDGE WITH JOINT SEALANT AT UNDERSIDE Z-GIRT SUBFRAMING SYSTEM FOAM BOARD INSULATION AT HEADER WHERE PERMITTED STRUCTUALLY WITH DRIP AND END DAMS METAL WALL PANEL ALUMINUM WINDOW JOINT SEALANT AND BACKER RODINTERIOREXTERIOR 5/8" TYPE X GYP WALLBOARD 3" AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING SELF-ADHERED FLEXIBLE FLASHING OVER THROUGH-WALL METAL FLASHING WOOD SHIM / NAILER SELF-ADHERED FLEXIBLE FLASHING OVER AWRB AT ROUGH OPENING Z-GIRT SUBFRAMING SYSTEM PREFINISHED METAL THROUGH-WALL FLASHING WITH HEMMED EDGE 1"3 7/32"INTERIOR EXTERIOR ALUMINUM WINDOW METAL WALL PANEL METAL WALL PANEL TRIM WOOD SHIM / NAILER AWRB, EXTEND OVER WOOD SHIM/NAILER AT WINDOW OPENING SELF-ADHERED FLEXIBLE FLASHING OVER AWRB AND EXTEND INSIDE ROUGH OPENING JOINT SEALANT AND BACKER ROD BOTH SIDES 5/8" GWB RETURN AT WINDOW JAMBS 1"FOAM BOARD INSULATION WOOD SIDING SYSTEM WOOD SIDING PANEL GIRT SYSTEM INTERIOR EXTERIOR PREFINISHED METAL TRIM CLOSURE PIECE AT WOOD SIDING TERMINATION AWRB, CONTINUOUS WRAP AT BOTH ASSEMBLIES METAL WALL PANEL TRIM METAL WALL PANEL Z-GIRT SUBFRAMING SYSTEM SELF-ADHERED FLEXIBLE FLASHING OVER Z-GIRT AND THROUGH-WALL METAL FLASHING DRAINAGE PANEL AWRB MAINTAIN CONTINUITY OF INSULATION CARRY WIPING TO TOP OF SLAB CONC SLAB ISOLATION JOINT FILLER METAL WALL PANEL VARIESCONTINUOUS COVER OF DRAINBOARD WITH GEOTEXTILE FABRIC SELF-ADHERED FLEXIBLE FLASHING, PLACE OVER TRANSITION FROM FOUNDATION WATERPROOFING TO AWRB FOAM BOARD INSULATION TO CODE REQUIRED DEPTH PREFINISHED METAL THROUGH-WALL FLASHING WITH HEMMED EDGE PREFINISHED SHEET METAL SILL FLASHING, FINISH TO MATCH METAL PANEL UNDERSLAB VAPOR BARRIER 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 3D VIEWS AND DETAILS | A46 PATH BETWEEN BUILDINGS 2 AND 3, LOOKING TOWARD BIKE ROOM 3" = 1'-0" WINDOW SILL @ METAL PANEL1 3" = 1'-0" WINDOW HEAD @ METAL PANEL23" = 1'-0" CASEMENT WINDOW JAMB @ METAL PANEL4 3 2 4 5 3" = 1'-0" METAL PANEL TO WOOD INSIDE CORNER5 1 1/2" = 1'-0" GROUND PLANE INTERSECTION @ METAL PANEL3 1 Attachment A (1) - Applicant's Proposed Plans 56 of 160 1/2" WD PANEL SHEATHING AWRB HIGH-DENSITY XPS BOARD INSULATION INTERIOR EXTERIOR SELF-SEALING MASONRY VENEER ANCHOR FACING BRICK 1 1/2" INTERIOR EXTERIOR SELF-SEALING MASONRY VENEER ANCHOR HIGH-DENSITY XPS BOARD INSULATION AWRB 1/2" WD PANEL SHEATHING FACING BRICK STEEL HSS 8X4; RE: STRUCTURE CORRUGATED DECK WITH STEEL EDGE PLATE 2X4 WOOD SLAT SURROUND HSS STEEL CAP TO MATCH METAL FRAMING AT EACH 2X4 WOOD SLAT STEEL HSS 8X4 BEYOND; RE: STRUCTURE CORRUGATED DECK WITH STEEL EDGE PLATE 2X4 WOOD SLAT SURROUND METAL FRAMING AT EACH 2X4 WOOD SLAT WOOD SLAT SURROUND AT FULLY-PROJECTING, SOUTH-FACING BALCONIES BRICK PATTERNING AND PROJECTING COURSES RELATE TO WINDOW LANGUAGE ABOVE 1345 28TH ST, BOULDER, CO 80302 | SITE REVIEW #5 | 2023.06.09 3D VIEWS AND DETAILS | A47 3" = 1'-0" SECTION DETAIL -EXTERIOR BRICK13" = 1'-0" PLAN DETAIL -EXTERIOR BRICK2 3" = 1'-0" BALCONY SURROUND DETAIL33" = 1'-0" PLAN DETAIL -BALCONY SURROUND4 Attachment A (1) - Applicant's Proposed Plans 57 of 160 LEVEL 1 -BLDG 1 100'-0" (5293.75') LEVEL 2 -BLDG 1 113'-4" LEVEL 3 -BLDG 1 124'-0" LOW POINT -BLDG 1 5,287.65' MAX HEIGHT -BLDG 1 5,342.65' LEVEL 4 -BLDG 1 134'-8" T.O. PARAPET -BLDG 1 150'-2 3/4"18" MAX1'-3 15/16"MECHANICAL LOUVER, METAL PAINTED TO MATCH EXTERIOR CLADDING BRK 2 WD 1 MTL 2 MTL 1 MAXIMUM HEIGHT55'-0"LEVEL 1 -BLDG 1 100'-0" (5293.75') LEVEL 2 -BLDG 1 113'-4" LEVEL 3 -BLDG 1 124'-0" LOW POINT -BLDG 1 5,287.65' MAX HEIGHT -BLDG 1 5,342.65' LEVEL 4 -BLDG 1 134'-8" _______ A48 1 CORRIDOR 14C CORRIDOR 13C CORRIDOR 12C CORRIDOR 1109 STUDY 14S.4 STUDY 12S.4 STUDY 13S.3 _______ A48 2 _______ A48 3 ~ 12'-2" AFFT.O. PARAPET -BLDG 1 150'-2 3/4" PREFINISHED SHEET METAL SILL FLASHING, FINISH TO MATCH METAL PANEL FOAM BOARD INSULATION DRAINAGE PANEL FLUID APPLIED WPING COVER TOP OF DRAINBOARD WITH GEOTEXTILE FABRIC AWRB, FLUID APPLIED, SEALED PER MANUFACTURER RECOMMENDATIONS FLEXIBLE FLASHING OVER TRANSITION FROM AWRB TO WATERPROOFING MAINTAIN CONTINUITY OF INSULATION TO DEPTH PER CODE REQUIREMENT OPTION TO USE ADHERED SHEET CARRY WRAPPING UP TO TOP OF CONCRETE SLAB AND FOUNDATION WALL, TYP. CONC SLAB ISOLATION JOINT FILLER WOOD SIDING PANEL GIRT SYSTEM WOOD SIDING SYSTEM VARIES6-8" TYP.Z-GIRT SUB-FRAMING, ATTACH PREFINISHED METAL FLASHING AT BASE FRAMING PREFINISHED SHEET METAL BASE, FINISH TO MATCH METAL PANEL SELF-ADHERED FLEXIBLE FLASHING OVER Z-GIRT AND METAL FLASHING UNDERSLAB VAPOR BARRIER GRANULAR FILL PER GEOTECH REPORT TPO MEMBRANE ROOFING EXTENDED OVER TOP OF NAILER AND SEALED TO FACE OF AWRB FOAM BOARD INSULATION WOOD SIDING PANEL AWRB WOOD SIDING PANEL GIRT SYSTEM PREFINISHED PARAPET COPING CONTINUOUS PARAPET COPING CLEAT SECURED AT 24" OC FLEXIBLE FLASHING AT INSIDE AND OUTSIDE CORNERS OF WD NAILER TOP OF PARAPET FROM T.O. PARAPET COPING TO T.O. ROOF SHEATHINGPARAPET HEIGHTWOOD SIDING PANEL WOOD SIDING PANEL GIRT SYSTEM PREFINISHED METAL THROUGH- WALL FLASHING WITH HEMMED DRIP EDGE SELF-ADHERED FLEXIBLE FLASHING OVER THROUGH-WALL METAL FLASHING CONTINUOUS AWRB, CONTINUES BETWEEN DIFFERENT EXTERIOR WALL ASSEMBLIES WOOD SIDING SOFFIT WOOD SIDING PANEL GIRT SYSTEM AT SOFFITS METAL WALL PANEL, WITH METAL PANEL TRIM PIECE AT TERMINATION METAL WALL PANEL GIRT SYSTEM 1345 28TH ST, BOULDER, CO 80302 | SITE REVIEW #5 | 2023.06.09 WALL SECTIONS AND DETAILS | A48 1/4" = 1'-0" BUILDING 1 -EAST ELEVATION5 1/4" = 1'-0" BUILDING 1 -SECTION 14 1 1/2" = 1'-0" GROUND PLANE INTERSECTION @ WOOD1 3" = 1'-0" PARAPET COPING @ WOOD2 3" = 1'-0" WOOD SOFFIT DETAIL @ BUILDING OVERHANG3 Attachment A (1) - Applicant's Proposed Plans 58 of 160 LEVEL 1 -BLDG 1 100'-0" (5293.75') LEVEL 2 -BLDG 1 113'-4" LEVEL 3 -BLDG 1 124'-0" LOW POINT -BLDG 1 5,287.65' MAX HEIGHT -BLDG 1 5,342.65' LEVEL 4 -BLDG 1 134'-8" T.O. PARAPET -BLDG 1 150'-2 3/4"18" MAX1'-3 15/16"MAXIMUM HEIGHT55'-0"MTL 2 WD 2 MTL 1 MECHANICAL LOUVER, METAL PAINTED TO MATCH EXTERIOR CLADDING MECHANICAL EQUIPMENT SCREEN OPENNESS FACTOR <50% SIGNAGE SHOWN FOR REFERENCE ONLY, TO BE REVIEWED IN SUBSEQUENT SUBMITTAL LEVEL 1 -BLDG 1 100'-0" (5293.75') LEVEL 2 -BLDG 1 113'-4" LEVEL 3 -BLDG 1 124'-0" LOW POINT -BLDG 1 5,287.65' MAX HEIGHT -BLDG 1 5,342.65' LEVEL 4 -BLDG 1 134'-8" B1.2 1408 B1.2 1308 _______ A49 1 ~ 12'-4" AFFT.O. PARAPET -BLDG 1 150'-2 3/4" LEVEL 2 -BLDG 1 113'-4" GALVANIZED Z-FLASHING SEAL TO TOP OF CHANNEL AND UNDERSIDE OF SHEET METAL ROOF GALVANIZED SHEET METAL ROOF HSS TUBE SUPPORT, SLOPED TO BUILDING, RE: STRUCTURAL WOOD SIDING PANEL 3/4" RESILIENT CHANNEL FOR SIDING ATTACHMENT RESILIENT CHANNEL HANGER, EYELET ATTACHMENT TO UNDERSIDE OF TUBE STEEL DOUBLE CHANNELS STRUCTURAL SUPPORT, WELDED CONNECTION RE: STRUCTURAL ENTRY SIGN "THE STANDARD" WELDED TO CHANNEL FRAME CURTAIN WALL SYSTEM STEEL TAB CONNECTION (BEYOND) TO VERTICAL SUPPORTS, RE: STRUCTURAL, PLAN DETAILS SLOPE METAL WALL PANEL METAL WALL PANEL TRIM METAL WALL PANEL TRIM 5/8" TYPE X GWB WRAP AT COLUMNS HSS TUBE COLUMN, RE: STRUCTURAL WRAP AWRB AND SELF- ADHERED FLEXIBLE FLASHING INTO ROUGH OPENING WRAP AWRB AND SELF- ADHERED FLEXIBLE FLASHING INTO ROUGH OPENING CURTAIN WALL SYSTEM CURTAIN WALL SYSTEM1/2"5/8" TYPE X GWB WRAP AT COLUMNS METAL STUD WALL, GWB FINISH METAL WALL PANEL 1/2" JOINT AT STUD WALL AND CURTAIN WALL INTERFACE WRAP AWRB AND SELF- ADHERED FLEXIBLE FLASHING INTO ROUGH OPENING HSS TUBE COLUMN, RE: STRUCTURAL METAL WALL PANEL TRIM CURTAIN WALL SYSTEM 1345 28TH ST, BOULDER, CO 80302 | SITE REVIEW #5 | 2023.06.09 WALL SECTIONS AND DETAILS | A49 1/4" = 1'-0" BUILDING 1 -EAST ELEVATION5 1/4" = 1'-0" BUILDING 1 -SECTION 14 1 1/2" = 1'-0" SECTION DETAIL @ ENTRY CANOPY1 1 1/2" = 1'-0" PLAN DETAIL -COLUMN WRAP @ ENTRY21 1/2" = 1'-0" PLAN DETAIL -ENTRY CANOPY SUPPORT3 Attachment A (1) - Applicant's Proposed Plans 59 of 160 MECHANICAL SCREENING STUDY Existing ground-level perspective views taken from various points around the property to inform optimal locations for condenser units on the roof to reduce visibility from grade and minimize required screening. The condenser units have been located as from the south edge of the property as possible to minimize visibility. For extent of rooftop mechanical equipment that would need to be screened from view, refer to associated site sections and 3D views on subsequent sheets. See Architectural Roof Plan on A16 for extent of screening proposed. 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 MECHANICAL SCREENING STUDY | A60 Attachment A (1) - Applicant's Proposed Plans 60 of 160 331 D A FBVIEW 5A VIEW 5B BOULDER CREEK MECHANICAL EQUIPMENT SCREEN OPENNESS FACTOR <50% SAFEWAY VIEW 2BVIEW 2A MECHANICAL EQUIPMENT SCREEN VIEW 4 BOULDER CREEK HARVEST MANOR VIEW 3 MECHANICAL EQUIPMENT SCREEN OPENNESS FACTOR <50% VIEW 1 28TH STREET 5 A61 ______ 2 A61 ______ 4 A61 ______ 3 A61 ______ 1 A61 ______ VIEW 5A VIEW 1 VIEW 2A VIEW 3 VIEW 4 VIEW 2B VIEW 5B HARVEST MANOR 28TH STSAFEWAY FOLSOM STREET28TH STREETFLOWER CHILD UNIVERSITY VILLAGE (4 STORIES)(9 STORIES)(4 STORIES) THE CARILLON BUILDING HEIGHT 1. BUILDING HEIGHT IS MEASURED FROM LOW POINT (RE: SITE PLAN) TO TOP OF ROOF SHEATHING, PER 9-7-5 BUILDING HEIGHT (B) AND 9-7-7 BUILDING HEIGHT APPURTENANCES (A)(1). A. PARAPETS ARE MEASURED FROM T.O. ROOF SHEATHING AT PERIMETER WALL TO TOP OF PARAPET COPING CAP. B. PER 9-7-7 (A)(5) A PARAPET WALL MAY EXCEED THE HEIGHT REQUIREMENTS OF THIS TITLE BY UP TO 18" IF THE PARAPET IS NECESSARY TO ACCOMMODATE ROOFTOP DRAINAGE OR TO PROVIDE FIRE PROTECTION. C. PARAPET WALLS ONLY EXCEED THE HEIGHT REQUIREMENTS BY LESS THAN 18". 2. FOR LOCATION AND EXTENT OF SCREENING AT ROOFTOP MECHANICAL EQUIPMENT, REFER TO ROOF PLAN A. THE EXTENT AND HEIGHT OF THE SCREEN IS THE MINIMUM APPROPRIATE TO ADEQUATELY SCREEN THE MECHANICAL EQUIPMENT PER 9-9-7 (A)(4)(C). B. THE PROPOSED SCREENING IS MINIMUM TO AVOID INCREASING THE APPARENT HEIGHT OF THE WALLS OF THE BUILDING PER 9-7-7 (A)(4)(D). ROOFTOP CONDENSER UNITS MECHANICAL EQUIPMENT SCREEN NOTE: PROPOSED AND EXISTING TO REMAIN TREES ARE NOT SHOWN IN SCREENING STUDIES. 1345 28TH ST, BOULDER, CO 80302 | SITE CORRECTIONS | 2023.06.09 MECHANICAL SCREENING STUDY | A61 VIEW 5 - FROM SOUTH OF CREEK TOWARDS BUILDING 1 VIEW 2 - FROM NORTH LOOKING SOUTH VIEW 4 - FROM SOUTH OF CREEK VIEW 3 - FROM FOLSOM ROAD VIEW 1 - FROM 28TH ST FRONTAGE ROAD SIDEWALK Attachment A (1) - Applicant's Proposed Plans 61 of 160 331 D A FBVIEW 1 VIEW 2 VIEW 3VIEW 4 VIEW 5 VIEW 6VIEW 7 VIEW 8 SAFEWAY HARVEST MANORFOLSOM STREET28TH STREET(4 STORIES)(9 STORIES)(4 STORIES) THE CARILLON UNIVERSITY VILLAGE FLOWER CHILD ROOFTOP CONDENSER UNITS MECHANICAL EQUIPMENT SCREEN NOTES: 1.3D PERSPECTIVE VIEWS ARE TAKEN FROM A PEDESTRIAN VIEWPOINT (6' ABOVE GRADE). 2.PROPOSED AND EXISTING TO REMAIN TREES ARE NOT SHOWN IN SCREENING STUDIES. 1345 28TH ST, BOULDER, CO 80302 | SITE REVIEW #5 | 2023.06.09 MECHANICAL SCREENING STUDY | A62 VIEW 2 - FROM 28TH STREET LOOKING WEST AT BUILDING 1VIEW 1 - FROM NORTH LOOKING SOUTH TO BUILDING 2 VIEW 7 - FROM BOULDER CREEK PATH LOOKING EASTVIEW 6 - FROM BOULDER CREEK LOOKING NORTH TO BUILDING 3 COURTYARD VIEW 5 - FROM BOULDER CREEK LOOKING NORTH TO BUILDING 2 COURTYARDVIEW 4 - FROM BRIDGE AT BOULDER CREEK LOOKING NORTHWEST VIEW 3 - FROM BOULDER CREEK LOOKING NORTH TO BUILDING 1 VIEW 8 - FROM FOLSOM ST. LOOKING SOUTHEAST ADJACENT BUILDING, HARVEST MANOR ELEVATOR OVERRUN Attachment A (1) - Applicant's Proposed Plans 62 of 160 LEGENDPROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAEASEMENTRIGHT OF WAYWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFEREXISTING CONTOURSSTEEL EDGERHANDRAILGUARDRAIL STAIRSSTEEL EDGER8" CONC BAND AT BUILDINGCONCRETE CHEEKWALLSTONE CURBCONCRETE BANDCONCRETE WALLSTONE SLAB WALLCONC PAVING W/ SCORING (ROW & M.U.P.)CONC PAVING W/ SCORINGCONC PAVING (SAND FINISH) W/ SCORINGEXPANSION JOINT / CONTROL JOINTPEDESTRIAN CONCRETE PAVERSVEHICULAR CONCRETE PAVERSPERMEABLE VEHICULAR PAVERSCRUSHER FINES PAVINGSTONE SLABSSTABILIZED CREEK ACCESSWOOD BENCHCOURTYARD FENCEDOG RUN FENCEPOOL FENCEPICKLEBALL COURT FENCETREE GRATE BICYCLE RACK - TYPE ABICYCLE RACK - TYPE BBICYCLE RACK - TYPE C(WALL MOUNTED)STREET LIGHTPARKING LOT LIGHTPEDESTRIAN LIGHT POLEBOLLARD LIGHTWALL LIGHTPENDANT/SCONCELED STRIP LIGHTPLANTING AREARAIN GARDENPOLLINATOR PLANTINGSELECTIVE PLANTING REVEGETATIONRIPARIAN SHRUBLANDEXISTING TREESBUILDING SIGNEVSE INSTALLEDEV READYEV CAPABLEPARGPPRURSDA FB1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09Overall Landscape Plan | L1.0N0 25 50100 FTBOULDERCREEK01OVERALL LANDSCAPE PLAN1"=50'-0"28TH STREET 100 YEAR FLOODPLAINBOULDER CREEK PATHNORTH CREEKPARKEXISTING BOULDERCREEK BRIDGEEXISTING FISHOBSERVATORYHIGH HAZARDPROPERTY LINEL1.1L1.2BUILDING 1BUILDING 2BUILDING 3PROPERTY LINEOLSON DRIVEENTRY PLAZAPRIVATECOURTYARDPRIVATECOURTYARDPRIVATEPOOLCOURTYARDL1.3SOUTH CREEKPARKPRIVATECOURTYARDL$ND6&$3EN27E61. LANDSCAPING SCHEDULE: (A) NOTHING SHALL BE PLANTED BETWEEN OCTOBER 15 AND MARCH 1 WITHOUT PRIOR WRITTEN APPROVAL OF THE CITY. STOCK, OTHER THANCONTAINER-GROWN STOCK, SHALL NOT BE PLANTED BETWEEN JUNE 1 AND SEPTEMBER 1 WITHOUT PRIOR WRITTEN APPROVAL OF THE CITY. BARE ROOT STOCK SHALL NOT BEPLANTED AFTER APRIL 30 OR IF PLANTS HAVE BEGUN TO LEAF OUT. (B) NOTHING SHALL BE PLANTED DURING FREEZING OR EXCESSIVELY WINDY, HOT, OR WET WEATHER ORWHEN THE GROUND CONDITIONS CANNOT BE PROPERLY WORKED FOR DIGGING, MIXING, RAKING, OR GRADING. (C) NOTHING SHALL BE PLANTED UNTIL THE ADJACENT SITEIMPROVEMENTS, PAVEMENTS, IRRIGATION INSTALLATION AND FINISH GRADING IS COMPLETED. THE CONTRACTOR SHALL TEST THE IRRIGATION SYSTEM IN THE PRESENCE OF THEDIRECTOR. THE IRRIGATION SYSTEM SHALL BE IN APPROVED, OPERATING CONDITION PRIOR TO ANY PLANTING.2. SITE PREPARATION AND ALL PLANTING FOR ALL NEW PLANTING AREAS OR DISTURBED AREAS SHALL BE COMPLETED, AT A MINIMUM, IN ACCORDANCE WITH THE CITY OF BOULDERDESIGN AND CONSTRUCTION STANDARDS. SITE PREPARATION SHALL INCLUDE TILLING THE SOIL TO A MINIMUM DEPTH OF SIX INCHES BELOW THE FINISHED GRADE, TOGETHERWITH SOIL AMENDMENTS THAT ARE APPROPRIATE TO ENSURE THE HEALTH AND SUSTAINABILITY OF THE LANDSCAPING TO BE PLANTED.3. ALL NEW PLANTING BEDS AND A 3-FOOT DIAMETER RING AT THE BASE OF NEW TREE WITHIN SOD OR SEEDED AREAS SHALL BE MULCHED WITH ORGANIC MULCH AT LEAST 4" DEEP.WEED BARRIER FABRIC SHALL NOT TO BE USED IN ANY NEW PLANTING AREAS.4. GRAVEL, ROCK MULCH, OR CRUSHER FINES SHALL BE REMOVED FROM UNDER STREET TREES AND REPLACED WITH ORGANIC MULCH. NEW ROCK OR GRAVEL MAY NOT BE USED INNEW PLANTING AREAS AND MAY ONLY BE USED AS A SPECIFIC ORNAMENTAL FEATURE IN LIMITED AREAS (SUCH AS AT THE BOTTOM OF A DRAINAGE SWALE OR DRY RIVER BED)OR AS A PEDESTRIAN PATH OR PATIO.5. AN AUTOMATIC IRRIGATION SYSTEM SHALL BE INSTALLED FOR ALL NEW LANDSCAPING AND NEW OR EXISTING STREET TREES IF ONE DOES NOT CURRENTLY EXISTING. INSTALL ASMART SYSTEM THAT ADJUSTS FOR RAINFALL, SOIL MOISTURE, AND OTHER WEATHER FACTORS FOR ALL NEW IRRIGATION ZONES.6. PROTECTIVE MAINTENANCE: AN APPLICANT FOR CONSTRUCTION APPROVAL SHALL PROVIDE MAINTENANCE AND CARE FOR ALL EXISTING TREES REQUIRED TO BE PROTECTED INTHE PUBLIC RIGHT-OF-WAY ADJACENT TO ANY PROJECT OR CONSTRUCTION SITE DURING CONSTRUCTION ACTIVITIES AND THE PUBLIC IMPROVEMENT WARRANTY PERIOD TOENSURE THAT EXISTING TREES SURVIVE AND ARE NOT DAMAGED. REFER TO CHAPTER 3 OF THE DESIGN AND CONSTRUCTION STANDARDS FOR ALL TREE PROTECTIONREQUIREMENTS.7. ALL NEW TREES SHALL BE LOCATED A MINIMUM OF 10' FROM ANY EXISTING WATER OR SEWER UTILITY LINES OR FROM LIGHT POLES OR OVERHEAD UTILITY POLES. ALL NEWUTILITY LINES SHALL BE LOCATED A MINIMUM OF 10' FROM ANY EXISTING PUBLIC STREET TREE.:5,77EN67$7E0EN7SITUATED ALONG THE BOULDER CREEK PATH, ADJACENT TO THE CU BOULDER MAIN CAMPUS, THE STANDARD AT BOULDERPROJECT WILL PLAY AN IMPORTANT ROLE IN CREATING A DESTINATION ALONG BOULDER CREEK PATH, CONVERTINGUNDERUTILIZED OPEN SPACE WITHIN THE FLOODPLAIN TO USABLE OPEN SPACE THAT ALIGNS WITH THE BOULDER CREEK MASTERPLAN.CURRENTLY, THE EXISTING BOULDER CREEK PATH MIXES PEDESTRIANS, PARK USERS, AND BIKERS TOGETHER CREATINGCONFLICTS BETWEEN HIGHER SPEED BIKERS AND LEISURELY PARK USERS. THE PROJECT REALIGNS THE BOULDER CREEK PATH,PEELING AWAY FROM THE CREEK'S EDGE, PROVIDING SEPARATION OF CYCLISTS AND PEDESTRIANS SIMILAR TO RECENTIMPROVEMENTS AT THE CIVIC AREA PARK. THE REALIGNMENT OF THE PATH RESOLVES SAFETY ISSUES AND CREATES A MOREUSABLE CONTINUOUS CREEK PARK EDGE COMPLETE WITH AN INFORMAL PASSIVE LAWN, LEISURE SPACE ALONG THE CREEK BANK,AND CREEK ACCESS OFFERING DIVERSE OPPORTUNITIES FOR MICRO-CLIMATES (SUN AND SHADE). THE CREEK BANK EDGE IS ASOUGHT-AFTER SPACE, WITH SEATING BENEATH THE MATURE RIPARIAN TREE CANOPIES THAT PROVIDE SHADE AND COMFORT INTHE SUMMER MONTHS.THE PROJECT MEETS THE DESIGN INTENT OF THE BOULDER VALLEY REGIONAL CENTER PLAN, ALLOWING FOR NORTH-SOUTH PUBLICACCESS THROUGH THE SITE. A DESIGNATED MULTI-USE PATH IS DESIGNED THROUGH A COURTYARD BETWEEN BUILDINGS 1 AND 2AND MANAGES BIKE SPEEDS WITH SLIGHTLY CURVED PATHS. THE PLAN CREATES HIGH-QUALITY OPEN SPACE WITH THE BUILTENVIRONMENT, AND INCLUDES VEGETATED RAIN GARDENS WITH GROVES OF TREES THAT PROVIDE STORMWATER QUALITYTREATMENT AND CREATES A NATURAL SEPARATION BETWEEN THE PUBLIC CREEK PARK AND THE FOUR PRIVATE BUILDINGCOURTYARDS.THE PROJECT POSITIVELY CONTRIBUTES TO THE FUNCTIONALITY, SUSTAINABILITY, AND AESTHETICS OF BOULDER CREEK AND THEMULTI-USE PATH WITH A CREEK PARK FOR LOCALS AND VIBRANT NEIGHBORHOOD FOR RESIDENTS.63 of 160 50'-0"50'-0"DA FBLEGENDPROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAEASEMENTRIGHT OF WAYWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFEREXISTING CONTOURSSTEEL EDGERHANDRAILGUARDRAIL STAIRS WITH HANDRAILSSTEEL EDGER8" CONC BAND AT BUILDINGCONCRETE CHEEKWALLCONCRETE BANDCONCRETE WALLSTONE SLAB WALLMSE BLOCK WALLCONCRETE PAVING W/ SCORING (ROW & M.U.P.)CONC. PAVING W/ SCORINGCONC. PAVING (SAND FINISH) W/ SCORINGEXPANSION JOINT / CONTROL JOINTPEDESTRIAN CONCRETE PAVERSVEHICULAR CONCRETE PAVERSPERMEABLE VEHICULAR PAVERSCRUSHER FINES PAVINGWHEEL STOPGRAVEL PAVINGSPORT COURT POST-TENSIONCOURTYARD FENCEDOG RUN FENCEPOOL FENCEPICKLEBALL COURT FENCEPARGPPSTONE SLABSSTABILIZED CREEK ACCESSWOOD BENCHTREE GRATE BICYCLE RACK - TYPE ABICYCLE RACK - TYPE BBICYCLE RACK - TYPE C(WALL MOUNTED) STREET LIGHTPARKING LOT LIGHTPEDESTRIAN LIGHT POLEBOLLARD LIGHTWALL LIGHTPENDANT/SCONCELED STRIP LIGHTPLANTING AREARAIN GARDENPOLLINATOR PLANTINGSELECTIVE PLANTING REVEGETATIONRIPARIAN SHRUBLANDEXISTING TREESBUILDING SIGNEVSE INSTALLEDEV READYEV CAPABLEDOUBLE EVSE-INSTALLED SET IN RAISED CONCRETE CURBDOUBLE EV-READY SET IN RAISED CONCRETE CURBDOUBLE EV-CAPABLE SET IN RAISED CONCRETE CURBRURS1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09MATCHLINE L1.2MATCHLINE L1.1BUILDING 2BUILDING 3OLSON DRIVEPARGPAPAPARGRGRGPALandscape Plan | L1.1N0 15 3060 FT01LANDSCAPE PLAN ENLARGEMENT1"=30'-0"BOULDERCREEK100 YEAR FLOODPLAIN BOULDER CREEK PATHTURF LAWNHIGH HAZARDPROPERTY LINE 12' WIDE MULTI-USEPATH8' WIDE CONC.SIDEWALK(2) BIKE RACKTYPE A, TYP.(16) SPACES6' WIDECONCRETEWALKWAYVEHICULARCONCRETEPAVERS, TYP.12' WIDEBOULDER CREEKMULTI-USE PATH8' WIDEPEDESTRIANCONC. WALKWAYFENCED DOGRUN / PETRELIEFCOVERED LONG-TERMBIKE STORAGE: BIKERACK TYPE C, TYP. OF(28) SPACESMEETS LIGHTING &SECURITYREQUIREMENTS PERSECTION 9-9-6(g)(4)COVERED LONG-TERMBIKE STORAGE: BIKERACK TYPE C, TYP. OF(36) SPACESMEETS LIGHTING &SECURITYREQUIREMENTS PERSECTION 9-9-6(g)(4)PAPAPAPAPRIVATECOURTYARDPRIVATECOURTYARDPAPATRANSFORMERAND SCREENING16' WIDE ACCESSEASEMENTPROPOSED R.O.W.PROPERTY LINE /ZONE LOT BOUNDARY,TYP.LOCKEDCOURTYARDFENCE ANDGATE, TYP.PUBLICCORRIDORSTONE BENCHSLABS, TYP.STONE PAVEMENTEDGE, TYP.STABILIZED CREEKACCESSSTONE SLAB WALL, TYP.PEDESTRIAN CONCPAVERS, TYP.16' WIDE ACCESSEASEMENTPEDESTRIANCONCRETEPAVERS, TYP.OVERHEADSTRUCTUREOUTDOORKITCHEN,WITH GRILLSACCESSIBLERAMPSLOPEDWALKWAYSLOPEDWALKWAYSLOPEDWALKWAYSLOPEDWALKWAYCONCRETETERRACES, TYP.ACCESSIBLERAMPSTONEBENCH, TYP.9' WIDE UTILITYEASEMENTPAPAPACONC PAVINGWITH SANDFINISH, TYP.STONE BENCH,TYP.WOODBENCH, TYP.CONC. STAIRSWITH HANDRAILAND RUNNELSTAIRRUNNELPA(4) BIKE RACKSTYPE A, TYP.(32) SPACESWETLANDSBOUNDARY OUTERBUFFER EXTENTSWETLANDSBOUNDARY INNERBUFFER EXTENTSWETLANDSBOUNDARYMATCHLINE L1.1MATCHLINE L1.3BIKE RACKCONCRETEPAD (BELOW),TYP.LOCKEDCOURTYARDFENCE ANDGATE, TYP.(1) BIKE RACKSTYPE A, TYP.(8) SPACESSTONEBENCH, TYP.WOODBENCH,TYP.WOODBENCH,TYP.STONEBENCH, TYP.WOODBENCH, TYP.BOLLARDLIGHT, TYP.BOLLARDLIGHT, TYP.BOLLARDLIGHT, TYP.SIGHT TRIANGLE, TYP.PEDESTRIAN LIGHTPOLE, TYP.(27) EV CAPABLE TYP.(52) SPACES(6) EV READY TYP.(12) SPACES(2) EVSE INSTALLED TYP.(3) SPACESPARKING LOT LIGHT, TYP.PAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPARURUPAGRAVELPAVINGMSE BLOCKRETAINING WALLTO PROTECTEXISTING TREESPAPAPAKEY MAPNNTSL1.2L1.1L1.3MSE BLOCKWALL(2) BIKE RACKSTYPE B, TYP.(16) SPACESPAPAPAPEDESTRIANCONC. PAVERS,TYPPEDESTRIANCONC. PAVERS,TYPPEDESTRIANCONC. PAVERS,TYP.CONC.PAVINGPEDESTRIANCONC.PAVERS,TYP.PEDESTRIANCONC.PAVERS,TYP.CONC. PAVINGWITH SANDFINISHCONC.PAVINGWITH SANDFINISHCONC.PAVING WITHSAND FINISHCONC.STAIRS &HANDRAILPAPAMAIN ENTRYRADIUSMAIN ENTRYRADIUSCONC. STAIRS &HANDRAILSTONE BENCH,TYP.CONC.PAVINGWITH SANDFINISHCONC.STAIRS WITHHANDRAILAND RUNNELCONC. PAVINGWITH SAND FINISH3' CRUSHER FINESBANDFLAGSTONEBROWN COLOREDCONC IN ESMNTRAISEDCONCRETEPLANTERRGCONCRETETERRACES, TYP.CONC. STAIRS &HANDRAILCONCRETETERRACES, TYP.POST-TENSIONBASKETBALLHALF COURT8' WIDE CONCRETEPATH CONNECTION TOEXISTING SIDEWALK64 of 160 DAFB 50'-0"50'-0"50'-0"50'-0"DA FBLEGENDPROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAEASEMENTRIGHT OF WAYWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFEREXISTING CONTOURSSTEEL EDGERHANDRAILGUARDRAIL STAIRS WITH HANDRAILSSTEEL EDGER8" CONC BAND AT BUILDINGCONCRETE CHEEKWALLCONCRETE BANDCONCRETE WALLSTONE SLAB WALLMSE BLOCK WALLCONCRETE PAVING W/ SCORING (ROW & M.U.P.)CONC. PAVING W/ SCORINGCONC. PAVING (SAND FINISH) W/ SCORINGEXPANSION JOINT / CONTROL JOINTPEDESTRIAN CONCRETE PAVERSVEHICULAR CONCRETE PAVERSPERMEABLE VEHICULAR PAVERSCRUSHER FINES PAVINGWHEEL STOPGRAVEL PAVINGSPORT COURT POST-TENSIONCOURTYARD FENCEDOG RUN FENCEPOOL FENCEPICKLEBALL COURT FENCEPARGPPSTONE SLABSSTABILIZED CREEK ACCESSWOOD BENCHTREE GRATE BICYCLE RACK - TYPE ABICYCLE RACK - TYPE BBICYCLE RACK - TYPE C(WALL MOUNTED) STREET LIGHTPARKING LOT LIGHTPEDESTRIAN LIGHT POLEBOLLARD LIGHTWALL LIGHTPENDANT/SCONCELED STRIP LIGHTPLANTING AREARAIN GARDENPOLLINATOR PLANTINGSELECTIVE PLANTING REVEGETATIONRIPARIAN SHRUBLANDEXISTING TREESBUILDING SIGNEVSE INSTALLEDEV READYEV CAPABLEDOUBLE EVSE-INSTALLED SET IN RAISED CONCRETE CURBDOUBLE EV-READY SET IN RAISED CONCRETE CURBDOUBLE EV-CAPABLE SET IN RAISED CONCRETE CURBRURSMATCHLINE L1.2MATCHLINE L1.1BOULDERCREEK1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09100 YEAR FLOODPLAIN HIGH HAZARD BUILDING1BUILDING2OLSON DRIVEPRIVATECOURTYARDPOOLDECKPRIVATEPOOLCOURTYARDEXISTING FISHOBSERVATORYEXISTING BRIDGETO REMAINPAPAPARGPAPAPAPAPAPAPA12' WIDEMULTI-USEPATHCLUBHOUSEPERCH/PATIO12'-0"EXISTING SIDEWALKTO REMAIN28TH STREETRGRGLandscape Plan | L1.201LANDSCAPE PLAN ENLARGEMENT1"=30'-0"N0 15 3060 FT(1) BIKE RACK TYPE A,TYP. (8) SPACESGLASS RAILINGENHANCED CONCRETEPAVING WITH SAND FINISHAND DECORATIVE SCORINGWOOD BENCH,TYP.SPAPOOL60" HEIGHT POOLFENCE AND GATESBIKE RACKTYPE B, TYP.(6) SPACESPAVEHICULAR PAVER DROP-OFF/RIDE SHARE LOADING ZONEENTRY PLAZAFLUSH CURB WITH CHANGE INPAVEMENT AND VEHICULARBARRIERSPAPAPAPAPAPAPA PA8' WIDE SIDEWALKPROPERTY LINEPROPOSED R.O.W.PROPERTY LINE /ZONE LOT BOUNDARY,TYP.EXISTING TREE TOREMAIN, TYP.REPLACE PORTION OFEXISTING SIDEWALK6' WIDE CONCRETEPATH CONNECTION TOEXISTING SIDEWALKPAPAPAPAMATCHLINE L1.2MATCHLINE L1.1BOULDERCREEKBOULDERCREEKBOULDER CREEK PATHPROPER T Y L I N E PAPAPAPAPAPAPAPAPAPARGPAPAPAEXISTING BRIDGETO REMAINPA6' WIDECONCRETEWALKWAYOUTDOORJUMBOTRONPAPAVEHICULAR CONCRETEPAVERS, TYP.PAPPRUPPPP TRANSFORMERAND SCREENINGTRANSFORMERS& SCREENINGBOLLARDS, TYP.STONE BENCH, TYP.RAISED PEDESTRIANCROSSING, RE:CIVIL16' WIDEACCESSEASEMENTEXISTINGLIGHTPOLE TOREMAINRELOCATED EXISTINGLIGHTPOLESTONE SLABWALL, TYP.SLOPEDWALKWAYSLOPEDWALKWAYOUTDOORKITCHENOVERHEADTRELLISACCESSIBLERAMP60" HEIGHTPOOL FENCEAND GATESSTONE SLABSTEPS, TYP.PAACCESSIBLERAMPPASTAIRRUNNELCONCRETESTAIRS WITHHANDRAILSAND STAIRRUNNELCONC STAIRS WITHHANDRAILS AND STAIRRUNNEL(6) BIKE RACKTYPE A, TYP.(18) SPACES(3) BIKE RACK TYPE B, TYP.(12) SPACES(3) BIKERACK TYPEA, TYP. (24)SPACESVEHICULAR PERMEABLEPAVERS, TYP.RAISED PEDESTRIANCROSSING, RE:CIVILWETLANDSBOUNDARY OUTERBUFFER EXTENTSWETLANDSBOUNDARY INNERBUFFER EXTENTSWETLANDSBOUNDARYMATCHLINE L1.2MATCHLINE L1.3RGRGRGRAISED PEDESTRIANCROSSING, RE:CIVIL6' WIDE CONCRETEPATH ACCESS TOEXISTING STAIRSLOCKEDCOURTYARDGATEWAY FENCEAND GATE, TYP.CONC. PAVINGWITH SAND FINISH8' WIDEENHANCEDCONCRETEPED WALKWAYWOOD BENCH,TYP.RUSTREETLIGHT, TYP.PLACEHOLDERSIGNAGE, TYP.BIKE RACK CONCRETEPAD (BELOW), TYP.BOLLARDLIGHT, TYP.SIGHTTRIANGLE,TYP.SIGHT TRIANGLE, TYP.(8) EV CAPABLE TYP.(16) SPACES(4) EVSEINSTALLED TYP.(8) SPACESWHEEL STOP, TYP.(4) EV READY,TYP.(8) SPACES(12) EV CAPABLE,TYP.(24) SPACES(8) EVREADY TYP.(16) SPACES(4) EVCAPABLE TYP.(8) SPACESPARKING LOT LIGHT, TYP.8' WIDE CONCRETEPATHPAPAPAPAPAPAPAPAPAPAPAPAKEY MAPNNTSL1.2L1.1L1.3BUILDING SIGN,PLACEHOLDER - TOBE REVIEWED INSUBSEQUENTSUBMITTALSPAPPPAPACONC. STAIRS& HANDRAILSTONE BENCH,TYP.RADIUS TOMAIN ENTRANCEPAPAPAPEDESTRIAN CONC.PAVERS, TYP.PEDESTRIAN CONC.PAVERS, TYP.CONCRETETERRACES,TYPCONC. STAIRS &HANDRAILS, TYP.PAPEDESTRIANCONC. PAVERSTYP.UTIL. BOX,RE: CIVILPED. CONC.PAVERSTRELLISRE: ARCHPOOLEQUIP.BLDGPAEXISTING SIDEWALKTO REMAINRIPRAPRE: CIVIILPAPAPAWOOD TERRACETYP.ENHANCEDCONCRETEPAVING WITHSAND FINISHCONC PAVINGWITH SANDFINISH(6) EV CAPABLE, TYP.(12) SPACES(4) EV INSTALLED,TYP.(8) SPACES(2) EV CAPABLE,TYP.(4) SPACESMAIN ENTRYRADIUSMAIN ENTRYRADIUSMAIN ENTRYRADIUS WOOD BENCH,TYP.CONCRETEPLANTERWALL, TYP.36" HEIGHTGATE FORFIRE EGRESSCONC STAIRS& HANDRAILCONCSTAIRS &HANDRAILSPA GUARDRAIL ONPEDESTRIAN SIDE OFRAIN GARDEN2' CONC RETAININGWALLPA PAEXISTINGMEMORIALBENCHES TOREMAINPEDESTRIAN CONC.PAVERS, TYP.FLAGSTONEBROWN COLOREDCONC IN ESMNTRGCRUSHER FINESPAVING65 of 160 DA FBDA FBLEGENDPROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAEASEMENTRIGHT OF WAYWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFEREXISTING CONTOURSSTEEL EDGERHANDRAILGUARDRAIL STAIRS WITH HANDRAILSSTEEL EDGER8" CONC BAND AT BUILDINGCONCRETE CHEEKWALLCONCRETE BANDCONCRETE WALLSTONE SLAB WALLMSE BLOCK WALLCONCRETE PAVING W/ SCORING (ROW & M.U.P.)CONC. PAVING W/ SCORINGCONC. PAVING (SAND FINISH) W/ SCORINGEXPANSION JOINT / CONTROL JOINTPEDESTRIAN CONCRETE PAVERSVEHICULAR CONCRETE PAVERSPERMEABLE VEHICULAR PAVERSCRUSHER FINES PAVINGWHEEL STOPGRAVEL PAVINGSPORT COURT POST-TENSIONCOURTYARD FENCEDOG RUN FENCEPOOL FENCEPICKLEBALL COURT FENCEPARGPPSTONE SLABSSTABILIZED CREEK ACCESSWOOD BENCHTREE GRATE BICYCLE RACK - TYPE ABICYCLE RACK - TYPE BBICYCLE RACK - TYPE C(WALL MOUNTED) STREET LIGHTPARKING LOT LIGHTPEDESTRIAN LIGHT POLEBOLLARD LIGHTWALL LIGHTPENDANT/SCONCELED STRIP LIGHTPLANTING AREARAIN GARDENPOLLINATOR PLANTINGSELECTIVE PLANTING REVEGETATIONRIPARIAN SHRUBLANDEXISTING TREESBUILDING SIGNEVSE INSTALLEDEV READYEV CAPABLEDOUBLE EVSE-INSTALLED SET IN RAISED CONCRETE CURBDOUBLE EV-READY SET IN RAISED CONCRETE CURBDOUBLE EV-CAPABLE SET IN RAISED CONCRETE CURBRURS1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09Landscape Plan | L1.3KEY MAPNNTSN0 15 3060 FT01LANDSCAPE PLAN ENLARGEMENT1"=30'-0"02LANDSCAPE PLAN ENLARGEMENT1"=30'-0"N0 15 3060 FTMATCHLINE L1.1MATCHLINE L1.3MATCHLINE L1.2MATCHLINE L1.3MATCHLINE SEE BELOWMATCHLINE SEE ABOVEMATCHLINE SEE BELOWMATCHLINE SEE ABOVE L1.2L1.1L1.3PICKLEBALL COURTSCRUSHER FINES PAVINGBOULDERCREEKBOULDERCREEKBOULDERCREEKPROPER T Y L I N EPROPERTY LINEPROPERTY LINEPROPERTY LINEBOULDER CREEK PATHFENCED DOGPARKTURF LAWNEXISTING BUILDINGTO REMAINRSPPPPPAPPPAPARGWETLANDSBOUNDARY OUTERBUFFER EXTENTSWETLANDSBOUNDARY INNERBUFFER EXTENTSWETLANDSBOUNDARYPAPICKLEBALL COURTSDOG PARKSTONE BENCH, TYP.WOOD BENCH, TYP.INFORMAL PLAY ELEMENTS, TYP.CONCRETEPAVING, TYP.9' WIDE CONCRETEWALKWAY, TYP.PEDESTRIAN CONC.PAVERS, TYP.(6) PICNIC TABLES, TYP.DOG PARKENTRANCE GATE6' WIDE CONCRETEWALKWAY, TYP.CONCRETE PAVINGPICKLEBALL FENCING, TYPWETLANDSBOUNDARY OUTERBUFFER EXTENTSWETLANDSBOUNDARY INNERBUFFER EXTENTSWETLANDSBOUNDARY6' WIDE CONCRETEWALKVEHICULARTURNAROUNDRE: CIVILRURUPADROPOFFPARKING LOT LIGHT, TYP.GRAVEL PAVING, TYP.9' WIDE WALKWAY CONNECTIONTO SOUTH PROPERTY(2) BIKE RACK TYPEB, TYP. (12) SPACESPARKING LOT LIGHT, TYP.STONE BENCHSLABS, TYP.RURURURURURUPARUPAPAPAPAPAPAEXISTINGBRIDGE TOREMAINPAEXISTING SIDEWALKTO REMAINEXISTING FENCETO REMAINPEDESTRIAN CONC.PAVERS, TYP.PAPPPPCRUSHER FINESPEDESTRIAN CONCPAVERS, TYP.CONC BAND, TYP.PAPAPPPACONCRETE BANDSCRUSHER FINESPAVINGSTONE SLABBENCH(6) WOOD BENCH, TYP.RURUCONCRETE WALKWAYDOG PARKMAINTENANCE GATEPAPA6' WIDE CONCRETEWALKWAY, TYP.66 of 160 DA FB9.50 O.C.9.50 O.C.9.50 O.C.9.50 O.C.9.50 O.C.9.50 O.C.NTSKEY PLAN28TH STREETBOULDERCREEK010203040501 ENTRY PLAZA LOOKING SOUTH-WEST02 MULTI-USE PATH CORRIDOR LOOKING SOUTH03 MULTI-USE PATH CORRIDOR LOOKING NORTH04 BOULDER CREEK PATH AT CREEK PARK LOOKING WEST05 BOULDER CREEK PATH AT CREEK PARK LOOKING EAST1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09OLSON DRIVELandscape Renderings | L1.406 MULTI-USE PATH LOOKING SOUTH BETWEEN BUILDINGS 1&207 NORTH ENTRANCE LOOKING SOUTH BETWEEN BUILDINGS 2&3060767 of 160 DA FBNTSKEY PLAN28TH STREETBOULDERCREEK1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09OLSON DRIVELandscape Renderings | L1.509 THE POOL COURTYARD08 BOULDER CREEK LOOKING EAST080910 THE HANGOUT COURTYARD12 THE GATHERING COURTYARD101111 THE QUIET COURTYARD1213 BUILDING 3 NORTH ENTRY1368 of 160 XXXXDA FBLEGENDPROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFERENHANCED PLANTINGTURFPLANTING AREARAIN GARDENSELECTIVE PLANTING REVEGETATIONPOLLINATOR PLANTINGRIPARIAN SHRUBLANDPROPOSED TREESEXISTING TREESPARGPPRURITREES QTY BOTANICAL / COMMON NAMECONTAM18ACER MIYABEI 'MORTON' TM / STATE STREET MIYABE MAPLEB & BAM7 2 ACER MIYABEI 'MORTON' TM / STATE STREET MIYABE MAPLEB & BAN25ACER NEGUNDO / BOX ELDER15 GALAN1 2 ACER NEGUNDO / BOX ELDER5 GALAN3 16ACER NEGUNDO 'SENSATION' / BOX ELDERB & BAC2 2 ACER PLATANOIDES 'COLUMNARE' / COLUMNAR NORWAY MAPLEB & BAB 11 ACER SACCHARUM 'BAILSTA' / FALL FIESTA® SUGAR MAPLEB & BAG10ACER TATARICUM 'GARANN' TM / HOT WINGS TATARIAN MAPLEB & BAH 17 ALNUS HIRSUTA 'HARBIN' / PRAIRIE HORIZON® MANCHURIAN ALDERB & BAT3 10ALNUS INCANA TENUIFOLIA / THINLEAF ALDER15 GALAT42ALNUS INCANA TENUIFOLIA / THINLEAF ALDERB & BAS5AMELANCHIER ALNIFOLIA / SERVICEBERRYB & BCF312CARPINUS BETULUS 'FASTIGIATA' / PYRAMIDAL EUROPEAN HORNBEANB & BCS8CATALPA SPECIOSA / NORTHERN CATALPAB & BCO11CELTIS OCCIDENTALIS / COMMON HACKBERRYB & BCP220CELTIS OCCIDENTALIS 'JFS-KSU1' / PRAIRIE SENTINEL® HACKBERRYB & BCC5CERCIS CANADENSIS / EASTERN REDBUDB & BCK 4 CLADRASTIS KENTUKEA / AMERICAN YELLOWWOODB & BCA5CORNUS ALTERNIFOLIA / PAGODA DOGWOODB & BCT25CORYLUS COLURNA / TURKISH FILBERTB & BFT 7 FAGUS SYLVATICA 'TRICOLOR' / TRICOLOR EUROPEAN BEECHB & BGP 2 GINKGO BILOBA 'PRINCETON SENTRY' / PRINCETON SENTRY MAIDENHAIR TREEB & BGT 27 GLEDITSIA TRIACANTHOS 'SHADEMASTER' / HONEY LOCUSTB & BGK13GYMNOCLADUS DIOICA 'ESPRESSO' / KENTUCKY COFFEE TREEB & BKP10KOELREUTERIA PANICULATA / GOLDEN RAIN TREEB & BMA9MAACKIA AMURENSIS / AMUR MAACKIAB & BPH25POPULUS DELTOIDES / EASTERN COTTONWOOD15 GALPH1 22 POPULUS DELTOIDES / EASTERN COTTONWOOD5 GALPH311POPULUS DELTOIDES / EASTERN COTTONWOODB & BPA210POPULUS X ACUMINATA / LANCELEAF COTTONWOOD15 GALPA16POPULUS X ACUMINATA / LANCELEAF COTTONWOOD5 GALPA3 13POPULUS X ACUMINATA / LANCELEAF COTTONWOODB & BPM3 8PRUNUS MAACKII / AMUR CHOKECHERRYB & BQB11QUERCUS BICOLOR / SWAMP WHITE OAKB & BQM2QUERCUS MUEHLENBERGII / CHINKAPIN OAKB & BQH30QUERCUS ROBUR 'CRIMSON SPIRE' / ENGLISH OAKB & BSA 14 SALIX AMYGDALOIDES / PEACH LEAF WILLOW15 GALTA26TILIA AMERICANA / AMERICAN LINDENB & BTI 2 TILIA TOMENTOSA GREEN MOUNTAIN / SILVER LINDENB & BUA2 9ULMUS AMERICANA `ACCOLADE' / ACCOLADE ELMB & BUA6ULMUS AMERICANA `ACCOLADE' / ACCOLADE ELMB & BUD7 ULMUS DAVIDIANA JAPONICA 'DISCOVERY' / DISCOVERY ELMB & BN0 25 50100 FTBOULDERCREEK01OVERALL PLANTING PLAN1"=50'-0"28TH STREET 100 YEAR FLOODPLAIN CREEK PARKEXISTING BOULDERCREEK BRIDGEEXISTING FISHOBSERVATORYHIGH HAZARDPROPERTY LINEL2.1L2.2BUILDING 1BUILDING 2BUILDING 3PROPERTY LINEOLSON DRIVE1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09Overall Planting Plan | L2.0MINIMUM PLANT SIZES - R.O.W.SIZEDECIDUOUS TREES2" CALEVERGREEN TREES6' HTORNAMENTAL TREES1.5" CALSHRUBS5 GALCONTAINERTREE DIVERSITY TABLE- OLSON DRIVEFAMILYGENUSSPECIES EXISTING/PROPOSED PERCENTAGESAPINDACEAE ACERMIYABEIPROPOSED3/24 = 12.5%SAPINDACEAE ACERSACCHARUM PROPOSED3/24 = 12.5%BIGNONIACEAE CATALPA SPECIOSAPROPOSED2/24 = 8.3%CANNABACEAE CELTISOCCIDENTALIS PROPOSED3/24 = 12.5%BETULACEAE CORYLUS COLURNA PROPOSED3/24 = 12.5%FABACEAE GYMNOCLADUS DIOICUS PROPOSED3/24 = 12.5%PINACEAE PINUSPONDEROSA EXISTING1/24 = 4.2%FAGACEAE QUERCUS BICOLOR PROPOSED4/24 = 16.67%ULMACEAE ULMUSDAVIDIANAPROPOSED2/24 = 8.3%BOULDER CREEK PATHENTRY PLAZAPRIVATECOURTYARDPRIVATECOURTYARDPRIVATECOURTYARDPRIVATEPOOLCOURTYARDMULTI-USE PATHMULTI-USE PATHWATER CONSERVATION AND XERISCAPE NOTE:IN ORDER TO MAINTAIN THE WATER WISE STANDARDSEXPLAINED, THE ASSOCIATED DESIGN INCORPORATES THEFOLLOWING XERIC PRINCIPLES. HIGH WATER USE TURF ISMINIMIZED TO LARGE, PUBLICLY ACCESSIBLE, ACTIVE-USESPACES. THE SMALLER COURTYARD AREAS ARE TO BEVEGETATED WITH PLANTS APPROPRIATE FOR THE CLIMATE- NATIVE AS REASONABLY PERMISSIBLE. MOREOVER, THEYARE TO BE ORGANIZED AND GROUPED SUCH THAT PLANTSOF SIMILAR WATER NEEDS REMAIN TOGETHER. THESECOURTYARDS ARE TO BE EFFECTIVELY MULCHED WITHAPPROVED GROUND COVER. MAINTENANCE PLANS CAN BERECOMMENDED TO THE RESPONSIBLE PARTIES TO BESTPROTECT PLANTS AND PRESERVE WATER.L2.3TREE DIVERSITY TABLE- 28TH STREETFAMILYGENUSSPECIES EXISTING/PROPOSED PERCENTAGESAPINDACEAE ACERMIYABEIPROPOSED2/23 = 8.7%SAPINDACEAE ACERNEGUNDO EXISTING2/23 = 8.7%BETULACEAE ALNUSINCANA PROPOSED2/23 = 8.7%BIGNONIACEAE CATALPA SPECIOSAPROPOSED1/23 = 4.3%CANNABACEAE CELTISOCCIDENTALIS PROPOSED1/23 = 4.3%BETULACEAE CORYLUS COLURNA PROPOSED2/23 = 8.7%FABACEAE GYMNOCLADUS DIOICUS PROPOSED1/23 = 4.3%FABACEAE GLEDITSIA TRIACANTHOS EXISTING2/23 = 8.7%SALICACEAE POPULUS ACUMINATA PROPOSED1/23 = 4.3%SALICACEAE POPULUS DELTOIDES PROPOSED1/23 = 4.3%SALICACEAE SALIXAMYGDALOIDES EXISTING/PROPOSED2/23 = 8.7%MALVACEAETILIACORDATA EXISTING6/23 = 26.1%MAINTENANCE NOTE:LIMIT USE OF PESTICIDES AND FERTILIZERS TO AREASNORTH OF THE DEVELOPMENT. USE SELECTIVEHERBICIDES, SPOT-SPRAYING TECHNIQUES AND TARGETTHE MOST VULNERABLE LIFE STAGE OF THE WEED IFHERBICIDE USE IS NECESSARY.ALL PLANTINGS ABUTTING OR DRAINING IN THE DIRECTIONOF BOULDER CREEK SHALL BE MAINTAINED WITHOUT THEUSE OF CHEMICAL AGENTS. AVOID INSECTICIDE USE INFAVOR OF OTHER MANAGEMENT TOOLS, SUCH ASPHYSICAL CONTROLS, BIOLOGICAL CONTROLS AND APLANT HEALTH CARE APPROACH.PLANTING SCHEDULE69 of 160 XXXXXX(4) TA(1) AS(2) QB(1) AM(2) MA(1) CO(2) CT(2) CC(2) UA(1) GT(1) MA(1) CF3(1) CA(1) AS(2) AB(2) TA(1) QB(3) CF3(1) PH3(1) PA3(1) CO(1) PH1(1) CT(2) TA(1) TA(1) KP(1) KP(1) KP(1) KP(1) FT(1) FT(4) CP2(2) CP2(1) CP2(2) QH(3) QH(4) QH(1) QH(1) PA2(1) AN3(1) AN3(1) CS(1) AM(4) CF3(2) QH(5) QH(1) KP(1) CT(2) QH(2) KP(1) CT(1) KP(1) CT(2) UA2(1) SA(1) PH3(1) PH3(1) UA(4) CF3(1) UD(1) FT(1) MA(1) AS(1) CT(1) MA(1) PH1(3) GT(3) CT(1) AM(1) CT(3) AH(3) AH(2) AH(3) AH(1) CS(1) CT(1) AM(1) CK(1) CP2(2) CK(4) CP2(2) UD(3) GT(2) AB(2) QB(2) AB(2) CO(2) GK(1) AN342'-4"30'-0"31'-1"33'-1"33'-0"33'-0"19'-10"SEWER32'-11"5'-0"DRIVE10'-0"SEWER14'-6"GAS13'-2"SEWER31'-0"33'-0"20'-0"SEWER12'-9"WATERDA FB(6) PB(6) EI(30) AM3(14) RS(6) PB(34) KX(34) PL(35) CK2(47) PL(4) PB(21) KX(1) RS(10) RG(8) GW(4) AA3(15) AP(9) AP(8) AM3(1) EI(9) RG(6) RGTREESAMAM7AN2AN1AN3AC2ABAGAHAT3AT4ASCF3CSCOCP2CCCKCACTFTGPGTGKKPMAPH2PH1PH3PA2PA1PA3PM3QBQMQHSATATIUA2UAUDPROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFERENHANCED PLANTINGTURFPLANTING AREARAIN GARDENSELECTIVE PLANTING REVEGETATIONPOLLINATOR PLANTINGRIPARIAN SHRUBLANDPROPOSED TREESEXISTING TREESLEGENDPARGPPRURIBOTANICAL / COMMON NAMECONT CALACER MIYABEI 'MORTON' TM / STATE STREET MIYABE MAPLEB & B 2.5"CALACER MIYABEI 'MORTON' TM / STATE STREET MIYABE MAPLEB & B 3"CALACER NEGUNDO / BOX ELDER15 GALACER NEGUNDO / BOX ELDER5 GALACER NEGUNDO 'SENSATION' / BOX ELDERB & B 2"CALACER PLATANOIDES 'COLUMNARE' / COLUMNAR NORWAY MAPLEB & B 2.5"CALACER SACCHARUM 'BAILSTA' / FALL FIESTA® SUGAR MAPLEB & B 2.5"CALACER TATARICUM 'GARANN' TM / HOT WINGS TATARIAN MAPLEB & B 2.5"CALALNUS HIRSUTA 'HARBIN' / PRAIRIE HORIZON® MANCHURIAN ALDERB & B 2.5"CALALNUS INCANA TENUIFOLIA / THINLEAF ALDER15 GALALNUS INCANA TENUIFOLIA / THINLEAF ALDERB & B 2"CALAMELANCHIER ALNIFOLIA / SERVICEBERRYB & B 2.5"CALCARPINUS BETULUS 'FASTIGIATA' / PYRAMIDAL EUROPEAN HORNBEANB & B 2"CALCATALPA SPECIOSA / NORTHERN CATALPAB & B 2.5"CALCELTIS OCCIDENTALIS / COMMON HACKBERRYB & B 2.5"CALCELTIS OCCIDENTALIS 'JFS-KSU1' / PRAIRIE SENTINEL® HACKBERRYB & B 2.5"CALCERCIS CANADENSIS / EASTERN REDBUDB & B 2.5"CALCLADRASTIS KENTUKEA / AMERICAN YELLOWWOODB & B 2.5"CALCORNUS ALTERNIFOLIA / PAGODA DOGWOODB & B 2"CALCORYLUS COLURNA / TURKISH FILBERTB & B 2.5"CALFAGUS SYLVATICA 'TRICOLOR' / TRICOLOR EUROPEAN BEECHB & B 2.5"CALGINKGO BILOBA 'PRINCETON SENTRY' / PRINCETON SENTRY MAIDENHAIR TREEB & B 2.5"CALGLEDITSIA TRIACANTHOS 'SHADEMASTER' / HONEY LOCUSTB & B 3"CALGYMNOCLADUS DIOICA 'ESPRESSO' / KENTUCKY COFFEE TREEB & B 2.5"CALKOELREUTERIA PANICULATA / GOLDEN RAIN TREEB & B 2.5"CALMAACKIA AMURENSIS / AMUR MAACKIAB & B 2.5"CALPOPULUS DELTOIDES / EASTERN COTTONWOOD15 GALPOPULUS DELTOIDES / EASTERN COTTONWOOD5 GALPOPULUS DELTOIDES / EASTERN COTTONWOODB & B2"CALPOPULUS X ACUMINATA / LANCELEAF COTTONWOOD15 GALPOPULUS X ACUMINATA / LANCELEAF COTTONWOOD5 GALPOPULUS X ACUMINATA / LANCELEAF COTTONWOODB & B2"CALPRUNUS MAACKII / AMUR CHOKECHERRYB & B2.5"CALQUERCUS BICOLOR / SWAMP WHITE OAKB & B2.5"CALQUERCUS MUEHLENBERGII / CHINKAPIN OAKB & B2.5"CALQUERCUS ROBUR 'CRIMSON SPIRE' / ENGLISH OAKB & B2.5"CALSALIX AMYGDALOIDES / PEACH LEAF WILLOW15 GALTILIA AMERICANA / AMERICAN LINDENB & B2.5"CALTILIA TOMENTOSA GREEN MOUNTAIN / SILVER LINDENB & B2.5"CALULMUS AMERICANA `ACCOLADE' / ACCOLADE ELMB & B2"CALULMUS AMERICANA `ACCOLADE' / ACCOLADE ELMB & B2.5"CALULMUS DAVIDIANA JAPONICA 'DISCOVERY' / DISCOVERY ELMB & B2"CALXXX1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09MATCHLINE L2.2MATCHLINE L2.1KEY MAPNN0 15 3060 FT01TREE PLANTING PLAN ENLARGEMENT1"=30'-0"BOULDERCREEK100 YEAR FLOODPLAINBOULDER CREEK PATHTURF LAWNHIGH HAZARDBUILDING 2BUILDING 3OLSONDRIVEPROPERTY LINE Planting Plan | L2.1PAPAPAPAPAPATREE SCHEDULEWATER CONSERVATION AND XERISCAPE NOTE:IN ORDER TO MAINTAIN THE WATER WISE STANDARDS EXPLAINED, THE ASSOCIATED DESIGN INCORPORATES THE FOLLOWING XERICPRINCIPLES. HIGH WATER USE TURF IS MINIMIZED TO LARGE, PUBLICLY ACCESSIBLE, ACTIVE-USE SPACES. THE SMALLER COURTYARD AREASARE TO BE VEGETATED WITH PLANTS APPROPRIATE FOR THE CLIMATE - NATIVE AS REASONABLY PERMISSIBLE. MOREOVER, THEY ARE TO BEORGANIZED AND GROUPED SUCH THAT PLANTS OF SIMILAR WATER NEEDS REMAIN TOGETHER. THESE COURTYARDS ARE TO BE EFFECTIVELYMULCHED WITH APPROVED GROUND COVER. MAINTENANCE PLANS CAN BE RECOMMENDED TO THE RESPONSIBLE PARTIES TO BEST PROTECTPLANTS AND PRESERVE WATER.MATCHLINE L2.1MATCHLINE L2.3PAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPARGRGRGRGRURURGRURUPAPAPAPAPAPAPAPAPAPAPAEXISTING HONEYLOCUSTTO REMAINEXISTINGRED OAKL2.1L2.2L2.3PLANTING PLANENLARGEMENTRE: 01/L2.4PARIRIPONDEROSA PINE,DBH: 18"PAPAPAPAPAPAPP70 of 160 XXXXXXXXXXXX19'-11"WATER(1) QB(1) AM(1) CO(1) CS(1) AM(1) CS(1) AM(1) CT(1) CT(1) GK(1) GK(1) AH(1) CA(1) CA(1) GT(2) AG(1) GT(1) GK(1) CS(1) GT(1) GT(2) AG(2) TA(2) CC(1) MA(1) AM(2) TI(2) GK(1) AN3(1) UA(1) AG(1) UD(2) CO(2) CT(1) CK(1) MA(1) CO(1) AB(1) AB(1) AB(2) AG(1) AG(1) AH(2) AS(1) AH(1) PH3(1) PH3(1) PA3(1) PA1(2) PH1(1) PA3(1) AM7(1) AM7(1) PM3(1) PM3(1) PM3(1) PM3(1) PM3(1) CP2(1) FT(1) CP2(2) CP2(2) CP2(2) QH(2) QH(2) QH(6) GT(1) PA2(1) AN2(1) AN1(1) PA2(1) FT(1) AN3(1) AN3(2) QH(3) QH(1) CT(1) KP(1) CT(1) CT(1) CT(2) AG(1) SA(2) SA(1) PH1(1) PA3(1) UA2(1) UA2(1) UA2(2) PA3(1) PA1(1) SA(1) SA(2) PH1(2) SA(1) AT3(2) AT3(1) PM3(2) PM3(1) UD(1) CO(1) CO(2) CP2(1) CT(2) MA(2) PH1(7) TA(1) AB(1) GK(1) CO(1) CT(1) QB(1) AB(1) GK(1) CS(1) AC2(1) AC2(1) AN2(2) CO(2) GK(3) AH(2) CT35'-0"14'-4"SEWER33'-0"33'-0"33'-0"33'-1"30'-3"19'-8"FIRE10'-0"WALK13'-7"LIGHT19'-0"DRIVE.10'-0"DRIVE10'-0"WATER10'-5"STORM11'-0"WATER10'-0"GAS23'-11"STORM17'-11"STORM12'-3"STORM12'-9"FIRE8'-4"GAS10'-0"SEWER3'-0"FO3'-0"ELEC2'-2"FO2'-11"ELEC28'-3"35'-10"29'-10"38'-8"28'-1"PROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFERENHANCED PLANTINGTURFPLANTING AREARAIN GARDENSELECTIVE PLANTING REVEGETATIONPOLLINATOR PLANTINGRIPARIAN SHRUBLANDPROPOSED TREESEXISTING TREESLEGENDPARGPPRURIDA FB(6) PB(6) EI(30) AM3(14) RS(6) PB(34) KX(34) PL(35) CK2(47) PL(4) PB(21) KX(1) RS(10) RG(8) GW(4) AA3(15) AP(9) AP(8) AM3(1) EI(9) RG(6) RGBOTANICAL / COMMON NAMECONT CALACER MIYABEI 'MORTON' TM / STATE STREET MIYABE MAPLEB & B 2.5"CALACER MIYABEI 'MORTON' TM / STATE STREET MIYABE MAPLEB & B 3"CALACER NEGUNDO / BOX ELDER15 GALACER NEGUNDO / BOX ELDER5 GALACER NEGUNDO 'SENSATION' / BOX ELDERB & B 2"CALACER PLATANOIDES 'COLUMNARE' / COLUMNAR NORWAY MAPLEB & B 2.5"CALACER SACCHARUM 'BAILSTA' / FALL FIESTA® SUGAR MAPLEB & B 2.5"CALACER TATARICUM 'GARANN' TM / HOT WINGS TATARIAN MAPLEB & B 2.5"CALALNUS HIRSUTA 'HARBIN' / PRAIRIE HORIZON® MANCHURIAN ALDERB & B 2.5"CALALNUS INCANA TENUIFOLIA / THINLEAF ALDER15 GALALNUS INCANA TENUIFOLIA / THINLEAF ALDERB & B 2"CALAMELANCHIER ALNIFOLIA / SERVICEBERRYB & B 2.5"CALCARPINUS BETULUS 'FASTIGIATA' / PYRAMIDAL EUROPEAN HORNBEANB & B 2"CALCATALPA SPECIOSA / NORTHERN CATALPAB & B 2.5"CALCELTIS OCCIDENTALIS / COMMON HACKBERRYB & B 2.5"CALCELTIS OCCIDENTALIS 'JFS-KSU1' / PRAIRIE SENTINEL® HACKBERRYB & B 2.5"CALCERCIS CANADENSIS / EASTERN REDBUDB & B 2.5"CALCLADRASTIS KENTUKEA / AMERICAN YELLOWWOODB & B 2.5"CALCORNUS ALTERNIFOLIA / PAGODA DOGWOODB & B 2"CALCORYLUS COLURNA / TURKISH FILBERTB & B 2.5"CALFAGUS SYLVATICA 'TRICOLOR' / TRICOLOR EUROPEAN BEECHB & B 2.5"CALGINKGO BILOBA 'PRINCETON SENTRY' / PRINCETON SENTRY MAIDENHAIR TREEB & B 2.5"CALGLEDITSIA TRIACANTHOS 'SHADEMASTER' / HONEY LOCUSTB & B 3"CALGYMNOCLADUS DIOICA 'ESPRESSO' / KENTUCKY COFFEE TREEB & B 2.5"CALKOELREUTERIA PANICULATA / GOLDEN RAIN TREEB & B 2.5"CALMAACKIA AMURENSIS / AMUR MAACKIAB & B 2.5"CALPOPULUS DELTOIDES / EASTERN COTTONWOOD15 GALPOPULUS DELTOIDES / EASTERN COTTONWOOD5 GALPOPULUS DELTOIDES / EASTERN COTTONWOODB & B 2"CALPOPULUS X ACUMINATA / LANCELEAF COTTONWOOD15 GALPOPULUS X ACUMINATA / LANCELEAF COTTONWOOD5 GALPOPULUS X ACUMINATA / LANCELEAF COTTONWOODB & B 2"CALPRUNUS MAACKII / AMUR CHOKECHERRYB & B 2.5"CALQUERCUS BICOLOR / SWAMP WHITE OAKB & B 2.5"CALQUERCUS MUEHLENBERGII / CHINKAPIN OAKB & B 2.5"CALQUERCUS ROBUR 'CRIMSON SPIRE' / ENGLISH OAKB & B 2.5"CALSALIX AMYGDALOIDES / PEACH LEAF WILLOW15 GALTILIA AMERICANA / AMERICAN LINDENB & B 2.5"CALTILIA TOMENTOSA GREEN MOUNTAIN / SILVER LINDENB & B 2.5"CALULMUS AMERICANA `ACCOLADE' / ACCOLADE ELMB & B 2"CALULMUS AMERICANA `ACCOLADE' / ACCOLADE ELMB & B 2.5"CALULMUS DAVIDIANA JAPONICA 'DISCOVERY' / DISCOVERY ELMB & B 2"CALTREESAMAM7AN2AN1AN3AC2ABAGAHAT3AT4ASCF3CSCOCP2CCCKCACTFTGPGTGKKPMAPH2PH1PH3PA2PA1PA3PM3QBQMQHSATATIUA2UAUDXXXXXXXXXXXXDAFB (6) PB(6) EI(30) AM3(14) RS(6) PB(34) KX(34) PL(35) CK2(47) PL(4) PB(21) KX(1) RS(10) RG(8) GW(4) AA3(15) AP(9) AP(8) AM3(1) EI(9) RG(6) RGMATCHLINE L2.2MATCHLINE L2.11345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09BOULDERCREEKKEY MAPN100 YEAR FLOODPLAIN HIGH HAZARD BUILDING1BUILDING 2OLSONDRIVE28TH STREETN0 15 3060 FT01TREE PLANTING PLAN ENLARGEMENT1"=30'-0"Planting Plan | L2.2LINDEN,MUNICIPALID: 54902DBH: 4"PAPAPAPAPAPAPAPALINDEN,MUNICIPALID: 54889DBH: 8"LINDEN,MUNICIPALID: 54891DBH: 7"LINDEN,MUNICIPALID: 54896DBH: 5"LINDEN,MUNICIPALID: 54904DBH: 6"HONEYLOCUST,MUNICIPALID: 54907DBH: 7"EXISTING FISHOBSERVATORYEXISTINGBRIDGE TOREMAINMATCHLINE L2.2MATCHLINE L2.3PAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPAPARURGRGRGENHANCEDPLANTING,TYP.ENHANCEDPLANTINGTYP.ENHANCEDPLANTINGTYP.TURFRGPAPPRURURURUWATER CONSERVATION AND XERISCAPE NOTE:IN ORDER TO MAINTAIN THE WATER WISE STANDARDS EXPLAINED, THE ASSOCIATED DESIGN INCORPORATES THE FOLLOWING XERICPRINCIPLES. HIGH WATER USE TURF IS MINIMIZED TO LARGE, PUBLICLY ACCESSIBLE, ACTIVE-USE SPACES. THE SMALLER COURTYARDAREAS ARE TO BE VEGETATED WITH PLANTS APPROPRIATE FOR THE CLIMATE - NATIVE AS REASONABLY PERMISSIBLE. MOREOVER, THEYARE TO BE ORGANIZED AND GROUPED SUCH THAT PLANTS OF SIMILAR WATER NEEDS REMAIN TOGETHER. THESE COURTYARDS ARE TO BEEFFECTIVELY MULCHED WITH APPROVED GROUND COVER. MAINTENANCE PLANS CAN BE RECOMMENDED TO THE RESPONSIBLE PARTIESTO BEST PROTECT PLANTS AND PRESERVE WATER.PAPAPAPAPARGSYNTH.TURFTREE PLANTING ON 28TH STREET TO BE POTHOLED & HAND DUG DURING INSTALLATION DUE TO EXISTING FIBER OPTIC AND ELECTRICAL LINES. DO NOT USE MECHANICAL EXCAVATION METHODS.L2.1L2.2L2.3PLANTING PLANENLARGEMENTRE: 02/L2.4PLANTING PLANENLARGEMENTRE: 03/L2.5PLANTINGPLANENLARGEMENTRE: 04/L2.5PLANTINGPLANENLARGEMENTRE:05/L2.6TREE SCHEDULERGPAENHANCEDPLANTING,TYP.PAPAPP11'-3"PARGRURIRIRIRUPAPAPAPA71 of 160 DAFBDA FB(3) GT(2) CS(2) UA(1) TA(1) GT(1) TA(1) TA(1) GT(1) UD(1) QB(1) UD(1) QB(1) AM(1) CC(1) TA(1) AM(1) GT(2) GK(1) CA(1) QB(1) CA(2) GK(1) AM(3) PH1(1) PH3(3) PH1(1) PA2(3) PH1(2) PA2(1) PA3(1) GT(3) AM(2) TA(2) TA(1) GT(2) GT(1) PH2(1) PH2(1) AM(1) AM(2) PH2(1) KP(1) FT(1) FT(2) QM(1) PA2(2) PA1(2) PA2(1) AN2(1) AN1(2) GP(1) PA1(1) SA(1) SA(1) AT3(1) SA(1) AT3(2) PH1(2) SA(2) AT3(1) PA3(2) UA2(1) UA2(1) UA2(3) AN3(1) AN3(2) PA3(2) PH3(1) PH3(1) AT3(1) PA1(1) PH1(1) SA(2) AT3(1) AM(3) AN3(2) AT4(1) PA2(1) AN2(1) PH3(1) PH1(1) PA3(1) AM(1) PH2(1) AN2(3) AN3(1) PA3(1) PH3(1) PA3PROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFERENHANCED PLANTINGTURFPLANTING AREARAIN GARDENSELECTIVE PLANTING REVEGETATIONPOLLINATOR PLANTINGRIPARIAN SHRUBLANDPROPOSED TREESEXISTING TREESLEGENDPARGPPRURITREESAMAM7AN2AN1AN3AC2ABAGAHAT3AT4ASCF3CSCOCP2CCCKCACTFTGPGTGKKPMAPH2PH1PH3PA2PA1PA3PM3QBQMQHSATATIUA2UAUDBOTANICAL / COMMON NAMECONT CALACER MIYABEI 'MORTON' TM / STATE STREET MIYABE MAPLEB & B 2.5"CALACER MIYABEI 'MORTON' TM / STATE STREET MIYABE MAPLEB & B 3"CALACER NEGUNDO / BOX ELDER15 GALACER NEGUNDO / BOX ELDER5 GALACER NEGUNDO 'SENSATION' / BOX ELDERB & B 2"CALACER PLATANOIDES 'COLUMNARE' / COLUMNAR NORWAY MAPLEB & B 2.5"CALACER SACCHARUM 'BAILSTA' / FALL FIESTA® SUGAR MAPLEB & B 2.5"CALACER TATARICUM 'GARANN' TM / HOT WINGS TATARIAN MAPLEB & B 2.5"CALALNUS HIRSUTA 'HARBIN' / PRAIRIE HORIZON® MANCHURIAN ALDERB & B 2.5"CALALNUS INCANA TENUIFOLIA / THINLEAF ALDER15 GALALNUS INCANA TENUIFOLIA / THINLEAF ALDERB & B 2"CALAMELANCHIER ALNIFOLIA / SERVICEBERRYB & B 2.5"CALCARPINUS BETULUS 'FASTIGIATA' / PYRAMIDAL EUROPEAN HORNBEANB & B 2"CALCATALPA SPECIOSA / NORTHERN CATALPAB & B 2.5"CALCELTIS OCCIDENTALIS / COMMON HACKBERRYB & B 2.5"CALCELTIS OCCIDENTALIS 'JFS-KSU1' / PRAIRIE SENTINEL® HACKBERRYB & B 2.5"CALCERCIS CANADENSIS / EASTERN REDBUDB & B 2.5"CALCLADRASTIS KENTUKEA / AMERICAN YELLOWWOODB & B 2.5"CALCORNUS ALTERNIFOLIA / PAGODA DOGWOODB & B 2"CALCORYLUS COLURNA / TURKISH FILBERTB & B 2.5"CALFAGUS SYLVATICA 'TRICOLOR' / TRICOLOR EUROPEAN BEECHB & B 2.5"CALGINKGO BILOBA 'PRINCETON SENTRY' / PRINCETON SENTRY MAIDENHAIR TREEB & B 2.5"CALGLEDITSIA TRIACANTHOS 'SHADEMASTER' / HONEY LOCUSTB & B 3"CALGYMNOCLADUS DIOICA 'ESPRESSO' / KENTUCKY COFFEE TREEB & B 2.5"CALKOELREUTERIA PANICULATA / GOLDEN RAIN TREEB & B 2.5"CALMAACKIA AMURENSIS / AMUR MAACKIAB & B 2.5"CALPOPULUS DELTOIDES / EASTERN COTTONWOOD15 GALPOPULUS DELTOIDES / EASTERN COTTONWOOD5 GALPOPULUS DELTOIDES / EASTERN COTTONWOODB & B 2"CALPOPULUS X ACUMINATA / LANCELEAF COTTONWOOD15 GALPOPULUS X ACUMINATA / LANCELEAF COTTONWOOD5 GALPOPULUS X ACUMINATA / LANCELEAF COTTONWOODB & B 2"CALPRUNUS MAACKII / AMUR CHOKECHERRYB & B 2.5"CALQUERCUS BICOLOR / SWAMP WHITE OAKB & B 2.5"CALQUERCUS MUEHLENBERGII / CHINKAPIN OAKB & B 2.5"CALQUERCUS ROBUR 'CRIMSON SPIRE' / ENGLISH OAKB & B 2.5"CALSALIX AMYGDALOIDES / PEACH LEAF WILLOW15 GALTILIA AMERICANA / AMERICAN LINDENB & B 2.5"CALTILIA TOMENTOSA GREEN MOUNTAIN / SILVER LINDENB & B 2.5"CALULMUS AMERICANA `ACCOLADE' / ACCOLADE ELMB & B 2"CALULMUS AMERICANA `ACCOLADE' / ACCOLADE ELMB & B 2.5"CALULMUS DAVIDIANA JAPONICA 'DISCOVERY' / DISCOVERY ELMB & B 2"CAL1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09KEY MAPNPlanting Plan | L2.3TREE SCHEDULEWATER CONSERVATION AND XERISCAPE NOTE:IN ORDER TO MAINTAIN THE WATER WISE STANDARDS EXPLAINED, THE ASSOCIATEDDESIGN INCORPORATES THE FOLLOWING XERIC PRINCIPLES. HIGH WATER USE TURF ISMINIMIZED TO LARGE, PUBLICLY ACCESSIBLE, ACTIVE-USE SPACES. THE SMALLERCOURTYARD AREAS ARE TO BE VEGETATED WITH PLANTS APPROPRIATE FOR THE CLIMATE- NATIVE AS REASONABLY PERMISSIBLE. MOREOVER, THEY ARE TO BE ORGANIZED ANDGROUPED SUCH THAT PLANTS OF SIMILAR WATER NEEDS REMAIN TOGETHER. THESECOURTYARDS ARE TO BE EFFECTIVELY MULCHED WITH APPROVED GROUND COVER.MAINTENANCE PLANS CAN BE RECOMMENDED TO THE RESPONSIBLE PARTIES TO BESTPROTECT PLANTS AND PRESERVE WATER.N0 15 3060 FT01LANDSCAPE PLAN ENLARGEMENT1"=30'-0"02LANDSCAPE PLAN ENLARGEMENT1"=30'-0"N0 15 3060 FTMATCHLINE L2.1MATCHLINE L2.3MATCHLINE SEE BELOWMATCHLINE SEE ABOVEMATCHLINE SEE BELOWMATCHLINE SEE ABOVE MATCHLINE L2.2MATCHLINE L2.3BOULDERCREEKPROPERTY LINERUBOULDERCREEKBOULDERCREEKPROPERTY LINEPROPERTY LINEPROPERT Y L I N E EXISTINGPEDESTRIANBRIDGETURF LAWNBOULDER CREEK PATHDOG PARKPARURGEXISTINGBUILDINGEXISTINGBUILDING EXISTINGPEDESTRIANBRIDGERURUPAPAPAPAPAPAPARUPARURURUPPPPPPPPPAPAPAPAPAPAPARUL2.1L2.2L2.3PLANTINGPLANENLARGEMENTRE: 05/L2.6PARIRIPAPPRIRIHONEYLOCUST,MUNICIPAL ID:54907DBH: 7"WILLOW,MUNICIPAL ID:XXXDBH: 9"PPRUPPPAPALINDEN,MUNICIPALID: 54910DBH: 4"BOXELDER,MUNICIPALID: 54909DBH: 4.5"HONEYLOCUST,MUNICIPALID: 54908DBH: 8"72 of 160 DA FB5'-0"DRIVE(6) RG(6) PB(6) EI(25) AM3(30) AR(6) RG(6) PB(6) MR(12) GW(6) EI(6) CF2(6) MR(12) GW(6) EI(20) AM3(30) AR(6) RG(16) PA4(4) RG(9) GW(14) PA4(5) AF(8) AF(10) EI(2) AB(2) QB(1) AM(1) CT(1) UD(1) CT(1) AM(1) AM(2) AB(7) GW42'-4"15'-4"GAS31'-1"33'-1"33'-0"10'-0"SEWER14'-6"GAS31'-0"20'-0"SEWERLEGENDPROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFERENHANCED PLANTINGTURFPLANTING AREARAIN GARDENSELECTIVE PLANTING REVEGETATIONPOLLINATOR PLANTINGRIPARIAN SHRUBLANDPROPOSED TREESEXISTING TREESRGPARUPPRI10'-0"CTR.(6) RG(6) CF2(6) EI(20) AM3(26) AR(6) RG(6) PB(4) EI(4) RG(16) PA4(12) AF(8) GW(4) RG(16) PA4(6) EI(6) MR(6) EI(12) AF(9) GW(12) GW(10) PB(10) MR(3) RG(2) CS(1) GK(2) CO(1) AB(1) GK(1) UD(2) GK(1) AB(1) GK(1) CS(1) AH(1) CO(12) GW(2) QB(12) GW(1) CT(10) AF33'-0"33'-0"32'-11"19'-8"FIRE10'-0"WALK13'-7"LIGHT19'-0"CTR.10'-0"DRIVE11'-0" WATER10'-0"GAS12'-9"FIRE13'-2"SEWER18'-6"SEWERSHRUBS QTY BOTANICAL / COMMON NAMESIZE SALT TOLERANCECF26CARYOPTERIS X CLANDONENSIS 'FIRST CHOICE' / FIRST CHOICE BLUEBEARD5 GALEI28ERICAMERIA NAUSEOSA VAR. NAUREOSUS / BABY BLUE RABBITBRUSH5 GALMR12 MAHONIA REPENS / CREEPING MAHONIA5 GALPB12 PRUNUS PUMILA BESSEYI / WESTERN SAND CHERRY5 GALRG22 RHUS AROMATICA 'GRO-LOW' / GRO-LOW FRAGRANT SUMAC5 GALPERENNIALSQTYBOTANICAL / COMMON NAMESIZE SALT TOLERANCEAM345ACHILLEA X 'MOONSHINE' / MOONSHINE YARROW5 GALAR65 AGASTACHE RUPESTRIS / THREADLEAF HYSSOP5 GALAF8 ARTEMISIA FRIGIDA / FRINGED WORMWOOD5 GALGW33 GAURA LINDHEIMERI 'WHIRLING BUTTERFLIES' / WHIRLING BUTTERFLIES GAURA 5 GALPA416 PENNISETUM ALOPECUROIDES / FOUNTAIN GRASS5 GALPLANT SCHEDULE ENLARGEMENT 1SHRUBS QTY BOTANICAL / COMMON NAMESIZE SALT TOLERANCECF26CARYOPTERIS X CLANDONENSIS 'FIRST CHOICE' / FIRST CHOICE BLUEBEARD5 GALEI22 ERICAMERIA NAUSEOSA VAR. NAUREOSUS / BABY BLUE RABBITBRUSH5 GALMR16MAHONIA REPENS / CREEPING MAHONIA5 GALPB16 PRUNUS PUMILA BESSEYI / WESTERN SAND CHERRY5 GALRG13RHUS AROMATICA 'GRO-LOW' / GRO-LOW FRAGRANT SUMAC5 GALPERENNIALSQTYBOTANICAL / COMMON NAMESIZE SALT TOLERANCEAM320 ACHILLEA X 'MOONSHINE' / MOONSHINE YARROW5 GALAR26AGASTACHE RUPESTRIS / THREADLEAF HYSSOP5 GALAF24 ARTEMISIA FRIGIDA / FRINGED WORMWOOD5 GALGW45GAURA LINDHEIMERI 'WHIRLING BUTTERFLIES' / WHIRLING BUTTERFLIES GAURA5 GALPA416 PENNISETUM ALOPECUROIDES / FOUNTAIN GRASS5 GALPLANT SCHEDULE ENLARGEMENT 21345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09KEY MAPNStreetscape Planting Plan | L2.4N0 5 1020 FT01ENLARGEMENT- OLSON DRIVE WEST1"=10'-0"02ENLARGEMNET - OLSON DRIVE CENTER1"=10'-0"MATCHLINE RE: 01/L2.4 MATCHLINE RE: 02/L2.4 MATCHLINE RE: 01/L2.4MATCHLINE RE: 02/L2.4 MATCHLINE RE: 02/L2.4 MATCHLINE RE: 01/L2.5 OLSON DRIVEOLSON DRIVEN0 5 1020 FTPAPA0102PAPAPAPAPINUS PONDEROSA,DBH: 18"73 of 160 DAFB(6) PB(6) EI(30) AM3(14) RS(6) PB(34) KX(34) PL(35) CK2(47) PL(4) PB(21) KX(1) RS(10) RG(8) GW(4) AA3(15) AP(9) AP(8) AM3(1) EI(9) RG(6) RGLEGENDPROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFERENHANCED PLANTINGTURFPLANTING AREARAIN GARDENSELECTIVE PLANTING REVEGETATIONPOLLINATOR PLANTINGRIPARIAN SHRUBLANDPROPOSED TREESEXISTING TREESRGPARUPPRI(6) RG(6) PB(6) EI(25) AM3(30) AR(6) RG(6) MR(9) GW(6) EI(6) CF2(6) MR(9) GW(6) EI(6) CF2(4) RG(6) PB(6) EI(30) AM3(6) RG(6) CF2(1) QB(1) AM(1) CO(1) CS(3) CT(1) CT(1) QB14'-4"SEWER33'-0"33'-0"33'-0"33'-1"10'-0"SEWER10'-0"WATER30'-3"8'-4" GAS10'-0"SEWER18'-6"SEWER(14) RS(6) PB(34) KX(34) PL(35) CK2(47) PL(4) PB(21) KX(1) RS(38) RG(5) AP(1) EI(1) CF2(10) RG(8) GW(4) AA3(8) GW(36) MR(29) RG(10) CK3(2) AA3(3) GW(15) AP(9) AP(8) AM3(24) SL(25) PVH(1) EI(1) EI(4) AM3(10) AP(4) AM3(3) AM3(8) AP(4) AM3(9) AP(5) AM3(9) RG(12) DF(11) RG(1) CF2(4) AP(9) AP(4) AM3(9) AP(3) AM3(12) MR(3) AM3(4) AP(6) AP(1) CF2(1) EI(12) DF(4) AA3(10) GW(3) AM3(15) GW(34) JS(4) DF(5) GW(3) AA3(6) DF(3) SO2(4) AA3(4) GW(21) AP(5) MR(10) PVH(14) SL(4) AA3(8) CS2(10) SO2(3) CK3(7) CK3(8) GW(2) AA3(10) CK3(1) EI(3) AM3(3) AP(9) SL(8) AP(5) AP(7) AM3(4) AP(14) SL(5) AP(11) AM3(12) JS(7) GW(12) DF(8) GW(4) AA3(8) SO(5) AM3(4) AP(16) RG(7) AP(2) AM3(3) AM3(5) AP(1) CF2(1) CF2(4) AM3(8) SO2(6) CS2(12) DF(8) SO2(6) CK3(4) AA3(8) GW(2) AA3(8) GW(4) AA3(21) SL(14) PVH(4) AM3(6) AP(5) AP(1) CF2(9) MR(83) RC(49) PL(39) MR2(52) PL(41) MR2(56) PL(30) RC(4) MR(65) RC(8) MR(44) RS(44) RS(44) RS(60) PL(2) AA3(8) MR(9) DF(3) AA3(4) SO2(4) GW(8) SO2(10) CK3(6) CS2(7) GW(3) CS228'-3"35'-10"29'-10"27'-4"STORM11'-4"STORM31'-1"SHRUBS QTY BOTANICAL / COMMON NAMESIZEAA350ARONIA MELANOCARPA 'AUTUMN MAGIC' / AUTUMN MAGIC BLACK CHOKEBERRY5 GALCF229CARYOPTERIS X CLANDONENSIS 'FIRST CHOICE' / FIRST CHOICE BLUEBEARD5 GALCK353CORNUS SERICEA 'KELSEYI' / KELSEY'S DWARF RED TWIG DOGWOOD5 GALCS229CYTISUS PURGANS 'SPANISH GOLD' / SPANISH GOLD BROOM5 GALDF82DASIPHORA FLORIBUNDA / SHRUBBY CINQUEFOIL5 GALEI38ERICAMERIA NAUSEOSA VAR. NAUREOSUS / BABY BLUE RABBITBRUSH5 GALJS51JUNIPERUS SABINA 'SCANDIA' / SCANDIA JUNIPER5 GALMR94 MAHONIA REPENS / CREEPING MAHONIA5 GALPB21 PRUNUS PUMILA BESSEYI / WESTERN SAND CHERRY5 GALRG142 RHUS AROMATICA 'GRO-LOW' / GRO-LOW FRAGRANT SUMAC5 GALSO8SYMPHORICARPOS OCCIDENTALIS / WESTERN SNOWBERRY5 GALSO241 SYMPHORICARPOS ORBICULATUS / CORALBERRY5 GALGRASSESQTYBOTANICAL / COMMON NAMESIZECK236CALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER' / KARL FOERSTER FEATHER REED GRASS1 GALMR280MUHLENBERGIA REVERCHONII / SEEP MUHLY1 GALPVH100PANICUM VIRGATUM 'HEAVY METAL' / HEAVY METAL SWITCH GRASS1 GALSL122SCHIZACHYRIUM SCOPARIUM / LITTLE BLUESTEM1 GALPLANT SCHEDULE ENLARGEMENT 3 AND 4PERENNIALSQTYBOTANICAL / COMMON NAMESIZEAP187ACHILLEA MILLEFOLIUM 'PAPRIKA' / PAPRIKA COMMON YARROW1 GALAM3134ACHILLEA X 'MOONSHINE' / MOONSHINE YARROW5 GALAR30AGASTACHE RUPESTRIS / THREADLEAF HYSSOP5 GALAF12 ARTEMISIA FRIGIDA / FRINGED WORMWOOD5 GALGW130GAURA LINDHEIMERI 'WHIRLING BUTTERFLIES' / WHIRLING BUTTERFLIES GAURA5 GALKX38KNIPHOFIA X 'POCO SUNSET' / POCO SUNSET HOT POKER5 GALPA416 PENNISETUM ALOPECUROIDES / FOUNTAIN GRASS5 GALPL329PEROVSKIA ATRIPLICIFOLIA 'LITTLE SPIRE' / LITTLE SPIRE RUSSIAN SAGE1 GALRC178RATIBIDA COLUMNIFERA / YELLOW PRAIRIE CONEFLOWER1 GALRS103RUDBECKIA FULGIDA 'LITTLE GOLDSTAR' / LITTLE GOLDSTAR CONEFLOWER1 GAL1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09KEY MAPNStreetscape Planting Plan | L2.5N0 5 1020 FT03ENLARGEMENT - OLSON DRIVE EAST1"=10'-0"04ENLARGEMENT - 28TH STREET NORTH1"=10'-0"TREE PLANTING ON 28TH STREET TO BE HAND DUG DURING INSTALLATION DUE TO EXISTINGFIBER OPTIC AND ELECTRICAL LINES. DO NOT USE MECHANICAL EXCAVATION METHODS.MATCHLINE RE: 02/L2.4MATCHLINE RE: 03/L2.5 MATCHLINE RE: 03/L2.5MATCHLINE RE: 04/L2.5N0 5 1020 FTMATCHLINE RE: 03/L2.5MATCHLINE RE: 04/L2.5 MATCHLINE RE: 04/L2.5 MATCHLINE RE: 05/L2.6 28TH STREETOLSON DRIVE0304(1)RGRGRG74 of 160 DAFB(1) GK(1) GK(1) CS(1) CT(1) CS(1) GTLEGENDPROPERTY LINE / ZONE LOT BOUNDARY100 YEAR FLOODPLAINHIGH HAZARD AREAWETLANDS BOUNDARYWETLANDS INNER BUFFERWETLANDS OUTER BUFFERENHANCED PLANTINGTURFPLANTING AREARAIN GARDENSELECTIVE PLANTING REVEGETATIONPOLLINATOR PLANTINGRIPARIAN SHRUBLANDPROPOSED TREESEXISTING TREESRGPARUPPRI(6) MR(36) PL(19) MR2(23) PL(17) MR2(20) PL(17) MR2(29) RC(3) MR(13) MR(71) RC(24) PL(12) MR2(8) AP(6) AM3(16) MR(2) AM3(4) JS(2) AP(1) AM3(4) AU(34) PVH(4) RG2(1) AM3(1) EI(13) JS(2) AM3(1) JS(1) EI(5) AM3(1) EI(2) AM3(2) AP(3) AP(2) PC2(13) PB(5) AP(4) AM3(1) CF2(1) EI(5) JS(2) AM3(1) EI(6) AM3(2) AP(5) AM3(2) AP(1) CF2(15) MR(32) PVH(26) SL(28) SL(10) RG(5) RC2(7) RG2(3) AU(22) SL(11) PB(30) DF(5) PB(4) CR(25) PVH(5) RG2(9) PB(11) PB(3) CR(2) AU(2) AU(2) PC2(2) AU(25) DF(3) AP(7) AM3(2) CF2(3) AP(6) MR2(9) PL(14) DF(7) RC2(9) CF2(79) RC(33) JS(12) RG(33) MR(1) GK(1) GK(1) CS(1) CT(1) CS(1) GT(3) RC2(6) PB(34) DF(3) CR(6) EI(26) MR2(26) AP(3) PB(21) SL(22) AP(33) AM327'-5"SHRUBS QTY BOTANICAL / COMMON NAMESIZEAU14 AMELANCHIER UTAHENSIS / UTAH SERVICEBERRY5 GALCF221 CARYOPTERIS X CLANDONENSIS 'FIRST CHOICE' / FIRST CHOICE BLUEBEARD 5 GALCR13CHRYSOTHAMNUS NAUSEOSUS / RUBBER RABBITBRUSH5 GALDF105DASIPHORA FLORIBUNDA / SHRUBBY CINQUEFOIL5 GALEI18ERICAMERIA NAUSEOSA VAR. NAUREOSUS / BABY BLUE RABBITBRUSH5 GALJS58JUNIPERUS SABINA 'SCANDIA' / SCANDIA JUNIPER5 GALMR134MAHONIA REPENS / CREEPING MAHONIA5 GALPB58PRUNUS PUMILA BESSEYI / WESTERN SAND CHERRY5 GALPC25PRUNUS VIRGINIANA / CHOKECHERRY5 GALRG23RHUS AROMATICA 'GRO-LOW' / GRO-LOW FRAGRANT SUMAC5 GALRG225RIBES AUREUM / GOLDEN CURRANT5 GALRC224 RIBES CEREUM / WAX CURRANT5 GALGRASSESQTYBOTANICAL / COMMON NAMESIZEMR297MUHLENBERGIA REVERCHONII / SEEP MUHLY1 GALPVH94PANICUM VIRGATUM 'HEAVY METAL' / HEAVY METAL SWITCH GRASS1 GALSL97SCHIZACHYRIUM SCOPARIUM / LITTLE BLUESTEM1 GALPERENNIALSQTYBOTANICAL / COMMON NAMESIZEAP94 ACHILLEA MILLEFOLIUM 'PAPRIKA' / PAPRIKA COMMON YARROW1 GALAM384 ACHILLEA X 'MOONSHINE' / MOONSHINE YARROW5 GALPL112PEROVSKIA ATRIPLICIFOLIA 'LITTLE SPIRE' / LITTLE SPIRE RUSSIAN SAGE1 GALRC181 RATIBIDA COLUMNIFERA / YELLOW PRAIRIE CONEFLOWER1 GALPLANT SCHEDULE ENLARGEMENT 51345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09KEY MAPN Streetscape Planting Plan | L2.6N0 5 1020 FT05ENLARGEMENT - 28TH STREET CENTER1"=10'-0"TREE PLANTING ON 28TH STREET TO BE HAND DUG DURINGINSTALLATION DUE TO EXISTING FIBER OPTIC AND ELECTRICAL LINES.DO NOT USE MECHANICAL EXCAVATION METHODS.28TH STREETMATCHLINE RE: 04/L2.5MATCHLINE RE: 05/L2.6 05B O U L D E R C R E E KPARG RU75 of 160 01ROW TREE PLANTINGNTS02TREE PROTECTION NTS03CONCRETE WALK AND MULTI-USE PATHSNTS04CONCRETE WALK AND MULTI-USE PATH JOINTSNTS05BIKE RACKS - TYPE A/ SHORT TERMNTS07BIKE RACKS- TYPE C/ LONG TERM EXTERIORNTS06BIKE RACKS - TYPE B/ SHORT TERMNTS1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09Landscape Details | L3.076 of 160 03COURTYARD FENCE AND GATENTS01COVERED LONG-TERM BIKE STORAGENTS02TRELLIS/TV WALLNTS1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09Landscape Details | L3.177 of 160 01CONCRETE PAVING (SAND FINISH) WITH SCORINGNTS04PEDESTRIAN CONCRETE PAVERS NTS07PEDESTRIAN CONCRETE PAVERSNTS02VEHICULAR / PERMEABLE VEHICULAR CONCRETE PAVERSNTS05PEDESTRIAN CONCRETE PAVERSNTS08LINEAR PLANK PAVERSNTS03PEDESTRIAN CONCRETE PAVERNTS06CRUSHER FINES PAVINGNTS09GRAVEL PAVINGNTS1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09Landscape Details | L3.278 of 160 355353462193468461460458457292291293455456454452450288448285286352283446282284279443442278281277276349348-X347275440274272262261263260-X258259257256252255253254247244250249345344245342241231228230229340226225223331330329325409030408029406026025335332232341022021400020251248246395310009389010007008304381303378372371366-X367-X365006-X001361360003358357-X004324302464-X463-X465-X470-X469-X467-X466-X290-X459-X289-X453-X451-X449-X287-X447-X351350445-X191-X444-X441-X346-X438-X439-X273-X437-X435-X436-X267-X264-X265-X266-X434343-X243-X426-X427-X428-X227-X425-X424-X423-X224-X422-X421-X328-X327-X326414-X410-X413-X411-X412-X031-X319-X318-X317-X028-X316-X336-X334-X333430-X315-X314-X404-X313-X312-X405-X023-X403-X402-X311-X401-X396-X309-X394-X393-X392-X390-X305-X388-X387-X385-X386-X384-X383-X382380-X379-X376-X374-X373-X375-X370-X369-X368-X002-X363-X364-X301-X362-X359-X005-X169-X377308-X307-X391-X306-X123106100099098093092091097096095070073074075104103105107112110114115066065061060059058043047044140137157158159160161155154156090083089040037036035135046042101039167138139079078077111109118119120121122124125126127128129130131132133134141142143144145146148149150152151082080076072071069102108113049048050054051055056064062063045041038032153018017014015033171174176177034187271270269268197199200202203204205206207208209210211212215217218234237201163164172013190299300162175216214213235236220012196188166239067165294019168085088084068117186354322323337338356016057173189192221222233242295296297298320321339397398399415416417418419420433471472136429087240182238086011407-X024N0 20 4080 FT1"=40'-0"TREE REMOVAL & PROTECTION PLAN: EXISTING CONDITIONS01001001TREE REMOVAL & PROTECTION LEGENDEXISTING TREE TO BE REMOVED BY LICENSEDTREE SERVICE EXISTING TREE TO REMAIN BOULDER CREEK1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09TREE PROTECTIONTree Inventory and Protection Plan | L4.0TREE NUMBER / IDINDICATES A TREE INTENDED FOR REMOVAL######-XNOTES:1. SEE SHEETS L4.2 & L4.3 FOR TREEINVENTORY, TREE PROTECTION DETAIL,AND TREE REMOVAL/PROTECTION NOTES28TH STREETEXISTING CONTOURS00100179 of 160 DA FB355353462193468461460458457292291293455456454452450288448285286352283446282284279443442278281277276349348-X347275440274272262261263260-X258259257256252255253254247244250249345344245342241231228230229340226225223331330329325409030408029406026025335332232341022021400020251248246395310009389010007008304381303378372371366-X367-X365006-X001361360003358357-X004324302464-X463-X465-X470-X469-X467-X466-X290-X459-X289-X453-X451-X449-X287-X447-X351350445-X191-X444-X441-X346-X438-X439-X273-X437-X435-X436-X267-X264-X265-X266-X434343-X243-X426-X427-X428-X227-X425-X424-X423-X224-X422-X421-X328-X327-X326414-X410-X413-X411-X412-X031-X319-X318-X317-X028-X316-X336-X334-X333430-X315-X314-X404-X313-X312-X405-X023-X403-X402-X311-X401-X396-X309-X394-X393-X392-X390-X305-X388-X387-X385-X386-X384-X383-X382380-X379-X376-X374-X373-X375-X370-X369-X368-X002-X363-X364-X301-X362-X359-X005-X169-X377308-X307-X391-X306-X123106100099098093092091097096095070073074075104103105107112110114115066065061060059058043047044140137157158159160161155154156090083089040037036035135046042101039167138139079078077111109118119120121122124125126127128129130131132133134141142143144145146148149150152151082080076072071069102108113049048050054051055056064062063045041038032153018017014015033171174176177034187271270269268197199200202203204205206207208209210211212215217218234237201163164172013190299300162175216214213235236220012196188166239067165294019168085088084068117186354322323337338356016057173189192221222233242295296297298320321339397398399415416417418419420433471472136429087240182238086011N0 20 4080 FT1"=40'-0"TREE REMOVAL & PROTECTION PLAN: PROPOSED CONDITIONS01BOULDER CREEK1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09Tree Inventory and Protection Plan | L4.1NOTES:1. SEE SHEETS L4.2 & L4.3 FOR TREEINVENTORY, TREE PROTECTION DETAIL,AND TREE REMOVAL/PROTECTION NOTESOLSON DRIVE28TH STREETTREE MITIGATIONTOTAL # LISTED TREES472# REMOVED SINCE ORIGINAL ARBORIST REPORT8OFFSITE TREES14TOTAL # EXISTING TREES ON SITE450TOTAL TREES TO BE REMOVED279TO BE REMOVED - HEALTH CONDITION 1 & 2158TO BE REMOVED - HEALTH CONDITION 3 & 4121EXISTING TREES TO REMAIN171TOTAL NEW TREES440+TOTAL EXISTING TREES & NEW TREES611PROPOSED TREESTREE REMOVAL & PROTECTION LEGENDEXISTING TREE TO BE REMOVED BY LICENSEDTREE SERVICE EXISTING TREE TO REMAIN TREE PROTECTIONTREE NUMBER / IDINDICATES A TREE INTENDED FOR REMOVAL######-XEXISTING CONTOURS00100180 of 160 DTL./SHT. #SURVEYSURVEYSURVEYSURVEYCIVILCIVILCIVILEXISTING TREE INVENTORY LIST1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 # Common Name Species DBH Health Private/ Remove/ ID # Public RetainTree Inventory | L4.2 # Common Name Species DBH Health Private/ Remove/ ID # Public Retain # Common Name Species DBH Health Private/ Remove/ ID # Public Retain # Common Name Species DBH Health Private/ Remove/ ID # Public Retain # Common Name Species DBH Health Private/ Remove/ ID # Public Retain81 of 160 TREE REMOVAL AND PROTECTION NOTES1.CONTRACTOR SHALL FIELD VERIFY ALL DEMOLITION WITH OWNER'SREPRESENTATIVE PRIOR TO CONSTRUCTION.2. CONTRACTOR SHALL CONTACT ALL UTILITY LOCATOR SERVICES ANDVERIFY ALL SERVICE LINES AND EQUIPMENT LOCATIONS WITHIN THE LIMITSOF WORK PRIOR TO COMMENCING DEMOLITION OPERATIONS. CALL UTILITYNOTIFICATION CENTER OF COLORADO TO LOCATE SITE UTILITIES AT1-800-922-1987 OR 303-534-6700 3 DAYS PRIOR TO COMMENCING THE WORK.3. CONTRACTOR SHALL BE AWARE THAT UNDERGROUND IMPROVEMENTS MAYEXIST THAT ARE NOT SHOWN IN THE CONSTRUCTION PLANS INCLUDING,BUT NOT LIMITED TO, LIGHTING CONDUITS & IRRIGATION. THE CONTRACTORSHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE IF THESEUNKNOWN IMPROVEMENTS ARE FOUND OR DAMAGED.4. CONTRACTOR SHALL PUT IN PLACE ALL TREE PROTECTION FENCING,BARRICADES, SIGNAGE, AND EROSION CONTROL MEASURES AS DESCRIBEDIN THE SPECIFICATIONS PRIOR TO COMMENCING DEMOLITION OPERATIONS.5. CONTRACTOR SHALL THOROUGHLY REMOVE AND DISPOSE OF ALL PLANTMATERIALS EXISTING WITHIN AREAS SHOWN FOR DEMOLITION.6. CONTRACTOR SHALL COORDINATE SITE DEMOLITION OPERATIONS WITH ALLOTHER TRADES PERFORMING WORK ON THE PROJECT.7. CONTRACTOR SHALL REPLACE OR REPAIR TO ORIGINAL CONDITION ALLBUILDINGS, UTILITIES, AND SITE IMPROVEMENTS NOT DESIGNATED FORREMOVAL THAT ARE DAMAGED AS A RESULT OF CONSTRUCTIONOPERATIONS AT NO ADDITIONAL COST TO OWNER.8. CONTRACTOR SHALL REPAIR ELECTRICAL SYSTEMS, CONDUIT,CONNECTIONS IF DISRUPTED BY CONSTRUCTION OR REMOVALS AT NOADDITIONAL COST TO OWNER.9. FIELD VERIFY LOCATION OF TREE PROTECTION FENCE WITH OWNER'S REP.PRIOR TO CONSTRUCTION.10. CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING AND MAINTENANCEFOR ALL TREES WITHIN PROJECT LIMITS.11. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTINGTREES, BUILDINGS, AND SITE IMPROVEMENTS CAUSED BYCONSTRUCTION.12. ALL WORK WILL BE SUBJECT TO NOISE ORDINANCE REGULATIONS.13. REMOVAL OF TREES MUST BE PERFORMED BY A BOULDER LICENSED TREESERVICE. TREE REMOVAL PERMIT IS REQUIRED FROM CITY FORESTERPRIOR TO REMOVAL OF TREES WITHIN THIS PROJECT.14. REFER TO 01/L4.3 FOR TREE PROTECTION DETAIL.15. ALL TREE PROTECTION STANDARDS OF CH 3 AND 10 OF THE DESIGN ANDCONSTRUCTION STANDARDS SHALL BE MET WITH PARTICULAR ATTENTIONGIVEN TO GRADING IMPACTS, LIMITATIONS OF STOCKPILING, SOILCOMPACTION PREVENTION AND VEHICULAR ROUTES. TREE PROTECTIONFENCING SHALL BE INSTALLED PRIOR TO ANY SITE DISTURBANCE ANDREMAIN IN PLACE FOR THE DURATION OF THE PROJECT. ONLY HANDDIGGING MAY OCCUR WITHIN THE DRIPLINE OF ANY TREE TO BEPRESERVED. PROVIDE SUFFICIENT IRRIGATION THROUGHOUTCONSTRUCTION TO MAINTAIN THE LONG TERM HEALTH OF THE TREES.1. BOULDER COUNTY IS CURRENTLY UNDER AN ASH TREE QUARANTINEFOLLOWING THE DISCOVERY OF THE EMERALD ASH BORER, ADESTRUCTIVE PEST THAT THREATENS THE TREES.2. THE QUARANTINE PROHIBITS MOVING UNTREATED ASH TREES ORTHEIR PARTS OUT OF THE COUNTY AND SURROUNDING AREAS.3. THE EMERALD ASH BORER IS AN INVASIVE SPECIES RESPONSIBLEFOR KILLING MORE THAN 50 MILLION ASH TREES ACROSS 21 U.S.STATES SINCE 2002, ACCORDING TO OFFICIALS.4. THE QUARANTINED AREA INCLUDES ALL OF BOULDER COUNTY ANDMORE.5. ITEMS THAT FALL UNDER THE QUARANTINE INCLUDE LOGS, GREENLUMBER, NURSERY STOCK, WOOD CHIPS, MULCH, STUMPS, ROOTS,BRANCHES, AND FIREWOOD, ACCORDING TO THE NEWS RELEASE.EXCEPTIONS TO THE QUARANTINE INCLUE SEEDS, LEAVES,KILN-DRIED, PROCESSED FIREWOOD, AND FINISHED WOODPRODUCTS WITHOUT BARK, ACCORDING TO THE STATE'S ORDER.6. ASH TREES MUST BE REMOVED BY A LICENSED TREE ARBORIST.THE FOLLOWING SITES WILL BE ACCEPTING ASHTREE MATERIALS WITHIN THE QUARANTINED AREA:FOR MORE INFORMATION ABOUT THE EMERALD ASHBORER AND THE QUARANTINE, VISIT EABcolorado.com·DENVER REGIONAL LANDFILL, 1441 WELD COUNTY ROAD 6, ERIE·FRONT RANGE LANDFILL, 1830 WELD COUNTY ROAD 5, ERIE·REPUBLIC LANDFILL, 8900 COLO. 93, GOLDENNTSTREE PROTECTION011345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09Tree Removal and Protection Notes | L4.3CONDITION DESCRIPTIONASH TREE QUARANTINE1 - (DEAD):LITTLE TO NO INDICATION OF LIFE.2 - (POOR):THE TREE IS IN DECLINE AND LIKELY WILL NOT RECOVER. FOLIAGE QUALITY ANDCOLOR IS POOR. DEAD OR MISSING BRANCHES COMPRISE OVER 50 PERCENT OFTHE TREE CANOPY. THERE MAY BE SERIOUS STRUCTURAL DEFICIENCIES IN THETREE.3 - (FAIR):THE VIGOR IS NORMAL OR REDUCED. THERE IS AN ACCUMULATION OF DEADBRANCHES. DEFECTS ARE PRESENT IN THE CANOPY THAT MAY OR MAY NOT BECORRECTABLE. THERE MAY BE AN ACTIVE PEST INFESTATION. THE CANOPY HASBEEN REDUCED OR IS ASYMMETRICAL.4 - (GOOD):THE VIGOR IS NORMAL FOR THE TREE SPECIES WITH MINOR TWIG DIEBACK.DEFECTS ARE MINOR AND EASILY CORRECTED. THE CANOPY MAY HAVE MINORASYMMETRY WHICH COULD BE DUE TO PRUNING FOR CLEARANCE.82 of 160 DA FBDA FB01OPEN SPACE DIAGRAM1"=20'-0"DECORATIVE PAVING: (colored/textured concrete, concrete pavers, crushers fines, etc.)BOULDER CREEKPLANTING AREA: ON PROPERTYPLANTING AREA: SCREENING & PARKING LOTOUTDOOR RECREATION AREAS (sport courts, pool, playground, dog run, fish observatory)DEDICATED R.O.W. (not included in Open Space Calculations)1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09N0 25 50100 FT28TH STREET MULTI-USE PATHOpen Space Diagram | L5.1DEDICATED R.O.W.FUTURE R.O.W.PROPERTY LINEDOG RUNLAWNTAFT STREETDOGRUNHALFCOURTBOULDER CREEK PA TH PRIVATECOURTYARDOLSON DRIVEPRIVATECOURTYARDPRIVATECOURTYARDPICKLEBALLEXISTING BRIDGETO REMAINBOULDER CREEK PATHBOULDER CREEKEXISTINGBUILDINGS TOREMAINPOOLEXISTING R.O.W.OPEN SPACE LEGENDOPEN SPACE CALCULATIONS WETLAND BOUNDARYOUTER BUFFER WETLAND BOUNDARYINNER BUFFERCREEK WETLAND WETLAND BOUNDARYOUTER BUFFER WETLAND BOUNDARYINNER BUFFERCREEK WETLANDLAWNLAWNEXISTINGPLAYGROUNDMSE BLOCK WALLTO PRESERVEEXISTING TREES83 of 160 D D 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 DEMOLITION PLAN | C002 84 of 160 D D D AFBD AFBC101 C103 C102 C104 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 OVERALL GRADING & DRAINAGE PLAN | C100 85 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 DETAILED GRADING & DRAINAGE PLAN | C101 86 of 160 D 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 DETAILED GRADING & DRAINAGE PLAN | C102 87 of 160 D D D AFBD AFB1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 DETAILED GRADING & DRAINAGE PLAN | C103 88 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 DETAILED GRADING & DRAINAGE PLAN | C104 89 of 160 D D D AFBD AFB1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 OVERALL UTILITY PLAN | C200 90 of 160 D D D AFBD AFBC301 C304 C302 C303 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 OVERALL HORIZONTAL CONTROL PLAN | C300C305 91 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 DETAILED HORIZONTAL CONTROL PLAN | C301 92 of 160 D 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 DETAILED HORIZONTAL CONTROL PLAN | C302 93 of 160 D AFBD D D AFB1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 DETAILED HORIZONTAL CONTROL PLAN | C303 94 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 DETAILED HORIZONTAL CONTROL PLAN | C304 95 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 EXISTING NB 28TH STREET LEFT TURN LANE | C305 96 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 OLSON ROAD PLAN & PROFILE | C400 97 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 OLSON ROAD PLAN & PROFILE | C401 98 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 WEST MU PATH PLAN & PROFILE | C402 99 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 SOUTH MU PATH PLAN & PROFILE | C403 100 of 160 D AF BD AF B1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 SOUTH MU PATH PLAN & PROFILE | C404 101 of 160 DD 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 CENTER MU PATH PLAN & PROFILE | C405 102 of 160 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 TYPICAL ROADWAY SECTIONS | C500 103 of 160 D D 1345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.091345 28th St, Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 EASEMENT EXHIBIT | EX-1 104 of 160 9.50 O.C. 9.50 O.C. 9.50 O.C. 9.50 O.C. 9.50 O.C. 9.50 O.C. D A FBDWDW@ 15"USB@ 15"USB@ 15"USB@ 15" USB@ 15" USB @ 15" USB @ 15"USB@ 15"USBE1.0A 1 E1.0B 1 E1.0C 1 E1.0D 1 E1.0E 1 E1.0F 1 E1.0H 1 E1.0G 1 NN Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 Site Lighting Key Plan | E1.0 1" = 40'-0"E1.0 1 Site Lighting Key Plan 105 of 160 0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.1 0.7 1.4 1.7 1.7 1.7 0.9 0.2 0.8 0.1 0.0 0.0 0.3 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1 0.0 0.6 0.0 0.1 1.2 0.1 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.1 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.2 1.4 0.1 0.0 2.6 0.1 0.0 1.9 0.1 2.8 0.1 0.0 1.2 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.0 0.0 1.0 0.0 0.0 1.9 0.0 0.0 0.0 2.3 2.0 0.9 0.0 3.4 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.7 0.1 0.2 0.7 0.2 0.2 0.2 0.6 0.9 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.3 0.0 0.0 2.0 4.7 3.1 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.7 0.0 0.0 0.0 0.0 0.1 0.2 2.2 2.6 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.3 1.3 1.3 1.2 1.2 1.2 1.2 1.3 1.3 1.2 1.2 1.3 1.2 1.5 1.5 1.6 1.6 1.5 1.5 1.4 1.4 1.4 1.4 1.4 1.4 1.3 1.4 1.5 1.7 1.5 1.8 1.5 1.8 1.5 1.7 1.5 1.7 1.6 1.7 1.7 1.7 1.6 1.5 1.3 1.3 1.2 1.3 1.3 1.4 1.3 1.4 1.2 1.3 1.4 1.4 1.6 1.5 1.5 1.5 1.2 1.2 1.0 1.1 0.8 0.9 0.0 0.1 0.1 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 3.3 3.1 0.0 0.1 0.1 0.1 0.1 2.8 1.6 0.1 2.7 2.8 0.1 2.4 0.1 0.1 0.0 0.0 0.0 0.0 2.8 0.0 0.0 2.3 0.0 0.2 2.3 0.2 0.2 0.5 0.9 0.9 0.7 0.2 0.1 0.0 0.0 0.1 0.1 0.2 0.3 0.4 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.71.0 2.0 0.1 0.1 0.1 0.3 0.5 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.1 0.2 0.0 0.0 0.2 0.0 0.1 0.1 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.1 0.2 0.0 0.0 0.1 0.0 0.1 0.1 0.0 0.1 0.2 0.0 0.1 0.3 0.0 0.1 0.2 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.3 0.1 0.2 0.3 0.2 0.2 0.3 0.2 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.3 0.4 0.4 0.4 0.3 0.5 0.5 0.4 0.3 0.2 0.2 0.2 0.5 0.5 0.4 0.3 0.2 0.2 0.1 3.1 3.1 3.2 0.7 0.5 0.9 1.6 2.0 1.1 0.5 0.6 1.1 2.3 1.5 0.9 0.5 0.8 1.5 2.8 2.3 0.2 0.6 1.2 2.3 2.5 2.9 3.1 3.5 3.2 1.2 1.0 0.8 0.7 0.7 0.7 1.1 1.0 0.8 0.8 0.7 0.7 1.1 1.0 0.9 0.9 0.9 1.1 1.3 1.2 1.0 0.9 1.2 1.8 1.3 1.1 1.0 0.9 1.3 2.1 1.1 1.0 0.9 0.9 1.2 1.7 1.1 1.0 0.8 0.8 0.9 1.0 1.2 1.0 0.9 0.8 0.7 0.6 1.3 1.1 0.9 0.8 0.8 0.8 1.4 1.2 1.0 0.9 1.1 1.3 1.5 1.3 1.1 1.0 1.3 2.0 1.6 1.3 1.1 1.0 1.3 2.2 1.5 1.3 1.1 1.0 1.2 1.5 1.4 1.3 1.1 1.0 0.9 0.9 1.5 1.3 1.1 1.0 0.9 0.7 1.6 1.4 1.2 1.0 1.0 1.0 1.6 1.4 1.1 1.0 1.2 1.6 1.6 1.3 1.1 1.0 1.3 2.2 1.6 1.3 1.1 1.0 1.3 1.9 1.5 1.3 1.1 1.0 1.0 1.2 1.3 1.1 1.0 0.9 0.8 0.8 1.2 1.0 0.9 0.8 0.8 0.8 1.1 1.0 0.9 0.9 1.1 1.4 1.3 1.1 1.0 1.0 1.4 2.2 1.4 1.2 1.0 1.0 1.6 2.6 1.2 1.1 1.0 1.1 1.7 2.5 1.1 1.0 0.9 1.0 1.6 2.5 1.2 1.0 0.8 0.9 1.3 2.1 2.3 0.8 1.3 1.7 1.8 1.8 1.9 1.6 1.6 0.6 0.1 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.2 0.3 0.1 0.1 0.1 1.2 1.0 0.8 0.8 1.0 1.3 1.3 1.2 1.4 1.4 1.5 1.5 1.5 1.3 2.2 1.7 0.3 0.0 0.0 0.2 0.5 0.7 1.1 2.2 2.5 1.5 0.8 0.6 0.9 1.2 0.9 0.7 0.6 0.6 0.7 0.8 1.2 1.0 0.4 0.4 0.4 0.4 0.4 0.7 0.9 0.2 0.0 0.0 0.2 0.6 1.0 1.4 2.4 2.6 1.7 1.1 0.8 0.3 0.1 0.1 0.4 0.8 1.1 1.0 0.8 0.6 0.5 0.4 0.4 0.6 1.7 1.6 0.3 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.4 0.3 0.4 0.3 0.4 0.5 0.6 0.6 0.4 0.3 0.2 0.1 0.0 0.1 0.1 0.2 0.3 0.9 0.7 0.6 0.4 0.3 0.3 0.6 2.6 2.4 0.1 0.0 0.0 0.1 0.2 0.5 0.8 1.2 2.4 2.1 1.0 0.8 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 0.7 0.5 0.4 0.2 0.2 0.6 2.6 2.3 0.1 0.0 0.0 0.0 0.1 0.5 0.9 1.2 1.9 2.1 1.5 1.0 0.8 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.1 0.8 0.1 0.1 0.5 0.1 0.2 2.0 0.2 0.6 1.7 0.7 0.5 0.1 0.1 X11 X11 X10 X10 X10 X03 X03 X05 X05 X05 X05 X07 X03 X07 X04 X04 X04 X12 X12 X19 X19X19 X19 X12 X22-HS X22-HS X22-HS X22-HS X21 X21 X21 X21 X03 X03 X03 X11 X11 X11 X24 EXISTING FIXTURE TO REMAIN AS SHOWN. X13 X13 X13 X03 X03 X19 X19 X03 X19 X19 X13 X13 X13 NN Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 Site Photometric Plan Area A | E1.0A 1/16" = 1'-0"E1.0A 1 Site Photometric Plan - Area A X02 MOUNTED TO UNDERSIDE OF SOFFIT/PATIO, HEIGHT RESPECTIVE OF SOFFIT/PATIO. X03 MOUNTED AT GRADE. X04 MOUNTED TO WALL AT 16'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X05 RECESSED IN WALL AT 1'-0" ABOVE FINISHED GRADE. X06 MOUNTED AT 8'-0" ABOVE FINISHED GRADE. X07 RECESSED IN WALL AT 0'-8" ABOVE FINISHED GRADE. X08 MOUNTED TO UNDERSIDE OF TRELLIS, HEIGHT RESPECTIVE OF TRELLIS HEIGHT. X09 MOUNTED IN PLANTERS, PLANTER HEIGHT RESPECTIVE OF FINISHED GRADE. X10 MOUNTED IN TREES AT 9'-0" ABOVE FINISHED GRADE. X11 MOUNTED TO TRELLIS AT 8'-0" ABOVE FINISHED GRADE. X12 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X13 MOUNTED AT 1'-6" ABOVE FINISHED GRADE. X14 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X15 MOUNTED AT 10'-0" ABOVE FINISHED GRADE. X16 MOUNTED TO SURFACE OF TABLE TOP, HEIGHT RESPECTIVE OF TABLE. X17 MOUNTED AT 13'-0" ABOVE FINISHED GRADE. X19 MOUNTED TO WALL AT 10'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X20 RECESSED IN UNDERSIDE OF CANOPY AT 12'-4" A.F.F. X21 MOUNTED TO WALL AT 12'-0" ABOVE FINISHED GRADE. X22 MOUNTED AT 20'-0" ABOVE FINISHED GRADE. X22-HS MOUNTED AT 20'-0" ABOVE FINISHED GRADE. EXISTING SITE PEDESTRIAN POLES (X23/X24/X25) ARE INCLUDED IN PHOTOMETRIC CALCULATION AND ARE RESPONSIBLE FOR LIGHT LEVELS AS DETAILED IN THE PUBLIC ROW. X19 MOUNTED AT 9' 7" A.F.F. 106 of 160 0.0 0.0 0.1 0.4 1.4 0.4 0.0 0.0 0.1 0.3 0.6 0.0 0.0 0.1 0.0 3.1 0.1 0.1 0.8 3.8 0.2 0.1 0.3 0.3 0.2 0.4 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.1 0.1 0.1 0.1 0.2 0.5 0.6 0.5 0.5 0.7 0.6 0.8 0.7 0.5 1.3 1.5 1.1 2.2 1.9 2.4 1.4 1.5 1.2 2.0 0.3 2.3 0.2 1.9 0.1 0.4 0.1 0.5 0.0 0.0 0.0 2.0 0.0 2.1 1.9 1.8 1.0 1.0 0.2 0.4 0.3 0.4 0.5 0.5 0.3 0.0 0.0 2.5 0.0 0.0 0.0 0.2 0.1 0.2 0.1 0.0 0.0 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 2.02.8 2.2 0.1 0.4 0.1 0.1 0.8 0.1 0.1 0.1 0.1 0.1 0.3 0.1 0.0 0.0 0.0 0.3 0.9 0.2 1.5 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 2.9 0.0 0.3 0.0 0.1 0.0 0.6 0.0 0.1 0.0 0.2 0.0 0.3 0.0 0.0 0.0 1.3 0.4 0.0 0.2 0.7 0.2 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.3 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 1.5 0.1 2.6 0.3 1.9 1.7 1.3 1.6 0.9 1.8 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 1.62.7 1.11.7 0.1 0.1 0.1 0.2 0.1 0.1 0.2 0.1 0.5 0.6 0.7 1.4 1.0 2.6 1.5 0.4 0.4 0.1 0.3 0.2 0.9 0.3 1.0 1.1 1.2 0.9 0.0 0.6 1.2 0.6 1.4 2.5 1.0 0.4 1.1 1.5 0.9 0.2 0.3 0.9 1.4 1.0 0.7 0.2 0.3 0.8 1.0 1.1 1.1 1.0 0.8 0.7 0.1 0.2 0.4 0.5 0.5 0.2 0.2 0.3 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.7 0.8 0.9 0.5 0.4 0.3 0.4 0.4 0.6 0.3 0.5 0.5 0.6 0.3 0.5 0.5 0.5 0.4 0.6 0.4 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.1 0.1 0.2 0.2 0.2 0.2 3.5 3.1 3.0 3.6 3.3 3.3 3.0 3.2 3.1 3.3 3.0 1.5 1.3 1.3 1.6 1.2 1.6 1.5 1.4 1.7 1.6 1.2 2.8 1.2 1.0 0.9 1.1 0.9 1.0 1.0 1.0 1.3 1.6 1.3 0.9 0.5 0.4 0.4 0.3 0.3 0.3 0.4 1.5 2.0 0.7 1.3 0.1 0.2 0.1 0.2 0.5 0.6 0.2 0.3 0.3 0.5 0.6 0.7 0.5 0.3 0.4 1.0 1.9 2.2 2.0 1.2 1.3 0.6 0.3 0.2 0.1 0.1 0.1 0.1 0.2 2.5 0.9 0.9 1.8 2.7 2.1 2.7 1.7 0.7 0.9 1.1 2.0 1.8 1.1 0.9 1.0 1.2 1.6 2.5 2.3 1.5 0.8 0.5 0.3 0.1 0.0 0.0 0.1 0.6 1.8 1.1 2.0 2.6 2.0 1.2 0.9 0.7 0.6 0.7 0.9 1.3 1.1 0.8 0.6 0.6 0.9 1.2 1.8 2.9 1.7 1.1 0.8 0.3 0.1 0.0 0.0 0.1 0.6 1.8 1.2 0.3 0.5 0.5 0.5 0.3 0.2 0.2 0.1 0.1 0.2 0.3 0.3 0.2 0.1 0.2 0.3 0.4 0.5 0.7 0.7 0.5 0.3 0.2 0.1 0.0 0.0 0.0 0.1 0.6 1.2 0.9 2.2 1.2 0.2 0.3 0.6 0.8 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.8 0.9 1.6 0.1 0.3 0.5 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.8 1.5 0.2 0.3 0.5 0.6 1.0 1.7 2.0 2.1 2.3 2.5 2.9 1.6 1.0 0.7 2.7 1.8 X10X10 X10 X10 X10 X04 X04X04 X03 X19 X19 X07 X04X04 X04 X09 X09 X09 X09 X09 X09 X09 X09 X07 X07 X07 X07 X07 X07 X04 X04 X12 X12 X13 X13 X13 X13 X07X07 X07X07 X19 X19X19X19X19 X19 X12X12 X12 X13 X04 X13 X13 X13 X15 X15 0.8 1.0 2.2 1.50.9 0.6 0.9 0.30.20.1 0.1 0.2 0.3 0.4 0.4 X19 X02 X08 X08X08 X08 X08 X10 X09 X09 X13 X12 X13 X13 X13 X12 X04 X12 X19 X13 X13 X13 X15 X07X07 X07 X07 NN Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 Site Photometric Plan Area B | E1.0B 1/16" = 1'-0"E1.0B 1 Site Photometric Plan - Area B 'X04' MOUNTED AT 21'-0" A.F.G. 'X19' MOUNTED AT 12'-0" A.F.G. 0.3 0.3 0.3 0.4 0.2 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 4.3 3.0 2.6 1.2 1.4 2.7 2.01.1 1.81.10.3 2.41.3 0.40.1 0.1 0.1 0.1 2.2 4.1 1.6 4.61.7 0.6 0.5 0.7 0.8 0.6 0.3 0.3 0.3 2.9 1.3 1.4 4.8 0.8 0.5 1.70.7 X02 MOUNTED TO UNDERSIDE OF SOFFIT/PATIO, HEIGHT RESPECTIVE OF SOFFIT/PATIO. X03 MOUNTED AT GRADE. X04 MOUNTED TO WALL AT 16'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X05 RECESSED IN WALL AT 1'-0" ABOVE FINISHED GRADE. X06 MOUNTED AT 8'-0" ABOVE FINISHED GRADE. X07 RECESSED IN WALL AT 0'-8" ABOVE FINISHED GRADE. X08 MOUNTED TO UNDERSIDE OF TRELLIS, HEIGHT RESPECTIVE OF TRELLIS HEIGHT. X09 MOUNTED IN PLANTERS, PLANTER HEIGHT RESPECTIVE OF FINISHED GRADE. X10 MOUNTED IN TREES AT 9'-0" ABOVE FINISHED GRADE. X11 MOUNTED TO TRELLIS AT 8'-0" ABOVE FINISHED GRADE. X12 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X13 MOUNTED AT 1'-6" ABOVE FINISHED GRADE. X14 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X15 MOUNTED AT 10'-0" ABOVE FINISHED GRADE. X16 MOUNTED TO SURFACE OF TABLE TOP, HEIGHT RESPECTIVE OF TABLE. X17 MOUNTED AT 13'-0" ABOVE FINISHED GRADE. X19 MOUNTED TO WALL AT 10'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X20 RECESSED IN UNDERSIDE OF CANOPY AT 12'-4" A.F.F. X21 MOUNTED TO WALL AT 12'-0" ABOVE FINISHED GRADE. X22 MOUNTED AT 20'-0" ABOVE FINISHED GRADE. X22-HS MOUNTED AT 20'-0" ABOVE FINISHED GRADE. EXISTING SITE PEDESTRIAN POLES (X23/X24/X25) ARE INCLUDED IN PHOTOMETRIC CALCULATION AND ARE RESPONSIBLE FOR LIGHT LEVELS AS DETAILED IN THE PUBLIC ROW. 2.9 X19 MOUNTED AT 8' 0" A.F.F. 107 of 160 9.50 O.C. 9.50 O.C. 9.50 O.C. 9.50 O.C. 9.50 O.C. 9.50 O.C.DWDW@ 15"USB@ 15"USB@ 15"USB@ 15" USB@ 15" USB @ 15"USB@ 15"USB0.3 0.4 0.2 0.1 0.1 0.1 0.1 0.1 0.2 0.5 0.4 0.4 0.1 0.1 0.5 0.8 0.8 2.0 1.3 2.0 1.0 2.4 1.5 2.6 0.8 1.0 1.0 0.9 0.6 0.6 0.7 0.6 1.4 0.4 1.7 0.4 0.4 2.8 0.3 0.2 2.5 0.2 0.6 0.2 0.2 0.3 0.00.00.00.00.00.5 0.9 1.5 1.1 1.4 0.7 0.8 1.0 1.1 0.5 0.1 0.3 2.6 0.4 0.3 1.9 2.8 1.6 1.9 2.2 2.6 2.7 2.3 1.8 1.3 1.0 0.8 0.7 0.7 1.8 2.0 2.2 2.4 2.4 2.1 1.6 1.3 1.0 0.9 0.8 0.8 1.9 1.9 2.0 2.1 2.1 1.8 1.4 1.2 1.1 0.9 0.8 0.8 2.0 2.0 2.1 2.1 1.9 1.6 1.3 1.1 1.1 1.0 0.8 0.7 2.2 2.1 2.1 2.2 2.0 1.6 1.3 1.1 1.0 0.9 0.7 0.6 1.7 1.5 1.7 1.8 1.8 1.6 1.3 1.2 1.0 0.8 0.6 0.5 1.1 1.2 1.4 1.7 1.8 1.6 1.3 1.1 0.9 0.7 0.5 0.5 1.2 2.2 1.4 2.0 1.1 1.5 1.0 0.3 0.4 0.4 0.4 0.5 0.6 0.9 1.1 1.2 0.4 0.4 0.3 0.4 0.5 0.7 1.0 1.4 1.6 0.8 0.7 0.3 0.5 0.6 0.7 1.3 1.6 1.8 0.9 0.9 0.3 0.4 0.7 0.9 1.3 1.7 2.1 1.0 1.0 0.3 0.4 0.8 1.1 1.4 2.0 2.5 1.3 1.4 0.3 1.4 1.7 1.3 1.6 1.1 1.1 5.92.9 2.1 0.3 1.5 1.6 1.7 2.5 2.8 2.4 2.5 0.4 0.5 0.6 0.9 1.5 1.7 0.2 0.1 0.1 0.2 0.4 0.7 0.9 0.8 0.4 0.2 0.1 0.1 0.2 0.2 0.4 0.5 0.5 0.5 0.6 0.9 0.9 0.6 0.5 0.5 0.4 0.3 0.2 0.3 0.6 0.5 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.8 0.9 0.9 1.0 0.9 0.5 4.4 1.2 0.9 0.7 0.7 0.8 1.0 1.3 1.1 0.7 0.6 0.4 1.3 0.4 0.4 0.5 0.6 0.9 1.4 1.4 1.3 2.6 1.0 0.6 1.2 1.3 1.6 2.0 1.5 1.9 1.4 1.1 0.8 0.6 0.5 0.6 2.4 2.1 0.5 0.2 0.1 0.1 0.1 0.1 0.2 0.3 0.4 1.3 1.9 0.5 0.4 0.8 0.5 0.7 0.6 1.2 2.0 0.6 0.5 0.6 0.5 0.4 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.5 0.5 0.1 0.1 0.1 0.5 0.5 0.1 0.1 0.0 1.2 1.1 1.3 2.2 1.2 1.4 1.2 1.2 0.11.50.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.4 0.4 0.3 0.0 0.1 0.5 0.5 0.4 0.0 0.2 0.6 0.6 0.5 0.1 0.2 0.8 0.7 0.6 0.1 0.3 1.0 0.8 0.6 0.1 0.1 0.3 1.0 0.8 0.6 0.1 0.1 0.2 0.8 0.7 0.6 0.0 0.0 0.1 0.6 0.6 0.5 0.0 0.0 0.1 0.5 0.5 0.4 0.0 0.0 0.1 0.3 0.3 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 3.4 3.2 3.6 3.6 3.3 3.7 1.1 1.0 0.8 0.8 0.8 0.9 1.0 1.0 0.8 0.6 0.6 0.8 0.3 0.5 0.7 1.0 1.0 0.9 0.8 0.8 0.8 0.8 0.8 0.7 0.6 0.7 0.4 0.6 0.6 0.5 1.0 0.9 0.9 0.8 0.8 0.8 0.8 0.7 0.7 0.7 0.7 0.2 0.2 0.3 0.3 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.8 0.7 0.7 0.7 0.9 0.9 0.8 1.0 0.9 0.8 0.8 0.9 1.0 1.2 1.1 0.9 0.7 0.7 0.8 0.9 0.9 0.8 1.1 1.0 0.8 0.8 0.9 1.2 1.5 1.3 0.9 0.6 0.7 0.9 1.0 0.9 0.8 1.1 1.0 0.9 0.9 1.0 1.4 1.8 1.6 0.9 0.5 0.6 0.8 0.9 0.9 0.9 1.1 1.0 1.0 1.0 1.2 1.6 2.1 1.8 0.9 0.4 0.6 0.7 0.8 1.0 0.9 1.0 1.0 1.0 1.1 1.3 1.7 2.2 1.9 0.9 0.4 0.6 0.7 0.9 1.1 1.1 0.9 0.9 1.0 1.1 1.3 1.7 2.0 1.9 1.0 0.5 0.6 0.8 1.0 1.3 1.4 0.8 0.8 1.0 1.1 1.4 1.7 2.0 1.8 1.2 0.6 0.6 0.7 1.0 1.2 1.4 0.7 0.8 0.9 1.1 1.4 1.8 2.0 1.8 1.2 0.7 0.5 0.7 0.9 1.1 1.1 0.7 0.8 0.9 1.1 1.4 1.8 2.0 1.7 1.1 0.6 0.5 0.6 0.7 0.9 0.9 0.8 0.8 0.9 1.1 1.4 1.8 2.0 1.7 1.0 0.5 0.4 0.5 0.6 0.7 0.7 0.9 0.9 1.0 1.1 1.3 1.8 2.2 1.8 0.8 0.3 0.4 0.4 0.5 0.5 0.5 1.0 1.0 0.9 1.0 1.2 1.7 2.1 1.8 0.7 0.2 0.3 0.3 0.3 0.3 0.2 1.1 1.1 0.9 0.9 1.1 1.5 1.9 1.7 0.7 0.2 0.2 0.2 0.1 0.1 0.1 1.2 1.1 0.9 0.9 1.0 1.3 1.6 1.4 0.8 0.3 0.1 0.1 0.1 0.1 0.1 1.4 1.3 1.1 1.0 1.0 1.2 1.3 1.2 0.8 0.4 0.2 0.2 0.1 0.1 0.1 1.8 1.7 1.4 1.2 1.1 1.1 1.1 0.9 0.7 0.5 0.3 0.3 0.3 0.3 0.2 2.0 1.8 1.6 1.4 1.3 1.1 1.0 0.7 0.5 0.4 0.4 0.5 0.5 0.5 0.4 1.4 1.3 1.3 1.4 1.4 1.3 0.9 0.6 0.4 0.4 0.5 0.6 0.7 0.7 0.6 0.9 0.8 1.0 1.4 1.6 1.5 1.0 0.5 0.3 0.4 0.6 0.7 0.9 0.9 0.8 1.1 1.5 1.9 1.8 1.1 0.5 0.4 0.5 0.7 0.9 1.1 1.2 1.1 1.3 1.7 2.3 2.2 1.2 0.5 0.5 0.7 0.9 1.1 1.3 1.4 1.4 1.4 1.9 2.5 2.5 1.5 0.7 0.7 0.9 1.1 1.2 1.4 1.5 1.5 1.0 1.2 1.5 1.9 2.5 2.6 1.9 1.2 1.1 1.1 1.2 1.3 1.4 1.4 1.3 1.0 1.2 1.6 2.0 2.5 2.6 2.2 1.7 1.4 1.4 1.4 1.4 1.4 1.3 1.1 0.9 1.2 1.6 2.1 2.5 2.7 2.5 2.2 1.9 1.8 1.7 1.5 1.4 1.2 0.9 1.0 1.3 1.7 2.1 2.6 2.9 2.9 2.9 2.7 2.3 2.0 1.6 1.4 1.5 1.9 2.4 2.8 2.8 2.3 1.7 1.3 1.0 1.2 1.6 0.7 0.9 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.2 0.2 0.1 0.1 0.7 0.3 0.1 0.5 0.2 0.1 1.5 1.5 1.1 1.3 1.3 1.0 0.8 0.5 0.3 0.1 0.1 X20 X07 X07 X07 X07 X07 X02 X02 X16 X16 X16 X08 X08 X08 X08 X08 X15 X15 X15 X15 X15 X15 X15 X15X15 X13 X22-HS X22 X22 X22-HS X22-HS X22-HS X21 X21 X19 X22 X22 X07 X07 X07 X07 X07 X07 X19 X19 0.60.61.1 4.4 1.30.60.50.50.81.83.9 X12 X12 X23 EXISTING FIXTURE TO BE RELOCATED AS SHOWN X04 X12 X04 X09 NN Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 Site Photometric Plan Area C | E1.0C 1/16" = 1'-0"E1.0C 1 Site Photometric Plan - Area C 'X04' MOUNTED AT 21'-0" A.F.G. X02 MOUNTED TO UNDERSIDE OF SOFFIT/PATIO, HEIGHT RESPECTIVE OF SOFFIT/PATIO. X03 MOUNTED AT GRADE. X04 MOUNTED TO WALL AT 16'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X05 RECESSED IN WALL AT 1'-0" ABOVE FINISHED GRADE. X06 MOUNTED AT 8'-0" ABOVE FINISHED GRADE. X07 RECESSED IN WALL AT 0'-8" ABOVE FINISHED GRADE. X08 MOUNTED TO UNDERSIDE OF TRELLIS, HEIGHT RESPECTIVE OF TRELLIS HEIGHT. X09 MOUNTED IN PLANTERS, PLANTER HEIGHT RESPECTIVE OF FINISHED GRADE. X10 MOUNTED IN TREES AT 9'-0" ABOVE FINISHED GRADE. X11 MOUNTED TO TRELLIS AT 8'-0" ABOVE FINISHED GRADE. X12 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X13 MOUNTED AT 1'-6" ABOVE FINISHED GRADE. X14 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X15 MOUNTED AT 10'-0" ABOVE FINISHED GRADE. X16 MOUNTED TO SURFACE OF TABLE TOP, HEIGHT RESPECTIVE OF TABLE. X17 MOUNTED AT 13'-0" ABOVE FINISHED GRADE. X19 MOUNTED TO WALL AT 10'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X20 RECESSED IN UNDERSIDE OF CANOPY AT 12'-4" A.F.F. X21 MOUNTED TO WALL AT 12'-0" ABOVE FINISHED GRADE. X22 MOUNTED AT 20'-0" ABOVE FINISHED GRADE. X22-HS MOUNTED AT 20'-0" ABOVE FINISHED GRADE. EXISTING SITE PEDESTRIAN POLES (X23/X24/X25) ARE INCLUDED IN PHOTOMETRIC CALCULATION AND ARE RESPONSIBLE FOR LIGHT LEVELS AS DETAILED IN THE PUBLIC ROW. 108 of 160 0.9 0.2 0.4 0.9 2.9 0.3 1.0 1.7 0.2 0.6 0.2 2.0 0.1 0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.80.00.00.00.00.00.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.8 3.7 0.0 3.0 0.1 0.0 0.0 0.0 0.1 0.7 1.0 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.2 4.0 3.9 0.0 0.0 2.6 0.2 0.1 2.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 1.1 1.0 1.1 1.3 1.3 0.0 1.2 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.1 0.31.00.6 0.0 0.0 0.0 0.0 0.0 1.1 0.3 0.3 0.2 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.6 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.3 0.0 0.1 0.3 0.0 0.1 0.8 0.0 0.2 1.3 0.0 0.2 1.3 0.0 0.1 1.2 0.0 0.1 1.4 0.0 0.1 1.4 0.0 0.2 1.5 0.1 0.2 1.3 0.0 0.1 1.1 0.0 0.1 1.2 0.0 0.1 1.1 0.0 0.1 1.0 0.1 0.2 1.1 0.1 0.2 3.1 0.0 2.2 1.3 0.9 1.2 2.1 1.5 0.9 0.5 0.7 1.4 2.5 2.5 1.3 0.7 4.0 4.3 3.9 3.3 3.9 3.0 3.4 4.1 3.0 3.5 3.2 3.2 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 0.0 0.0 0.0 2.4 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 1.0 1.9 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.6 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 2.6 0.0 0.0 0.0 0.0 2.3 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3 0.3 0.3 0.2 2.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.5 0.5 0.4 0.3 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.7 0.5 0.5 0.4 0.4 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.7 0.6 0.6 0.7 0.9 0.7 0.1 0.0 0.0 0.0 0.0 0.0 0.0 1.1 0.9 0.7 0.8 1.1 1.6 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 1.0 0.8 0.9 1.3 2.1 0.0 0.0 0.0 0.0 1.5 1.2 1.0 1.0 1.3 1.8 0.0 0.0 0.0 0.0 1.5 1.3 1.1 1.1 1.1 1.2 1.6 1.3 1.1 1.0 1.0 1.0 1.6 1.3 1.1 1.0 1.1 1.4 1.5 1.3 1.1 1.0 1.4 2.0 1.4 1.2 1.0 1.0 1.4 2.1 1.3 1.1 0.9 1.0 1.2 1.5 1.2 1.0 0.9 0.9 0.9 0.9 1.2 1.1 1.0 0.9 0.8 0.7 1.4 1.2 1.0 0.9 0.9 0.9 1.4 1.2 1.0 1.0 1.2 1.5 1.2 1.1 0.9 0.9 1.3 2.1 1.2 1.0 0.9 0.9 1.3 1.9 1.2 1.0 0.8 0.8 1.0 1.2 X03 X03 X03 X07 X07 X07X07 X03 X22-HS X22-HS X21 X21 X21 X19 X03 X03 X07 X07(3) (3) X19 X08 X08 X08 X08 X08 X03 X22-HS X03 X03 X03 X03 NN Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 Site Photometric Plan Area D | E1.0D 1/16" = 1'-0"E1.0D 1 Site Photometric Plan - Area D X02 MOUNTED TO UNDERSIDE OF SOFFIT/PATIO, HEIGHT RESPECTIVE OF SOFFIT/PATIO. X03 MOUNTED AT GRADE. X04 MOUNTED TO WALL AT 16'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X05 RECESSED IN WALL AT 1'-0" ABOVE FINISHED GRADE. X06 MOUNTED AT 8'-0" ABOVE FINISHED GRADE. X07 RECESSED IN WALL AT 0'-8" ABOVE FINISHED GRADE. X08 MOUNTED TO UNDERSIDE OF TRELLIS, HEIGHT RESPECTIVE OF TRELLIS HEIGHT. X09 MOUNTED IN PLANTERS, PLANTER HEIGHT RESPECTIVE OF FINISHED GRADE. X10 MOUNTED IN TREES AT 9'-0" ABOVE FINISHED GRADE. X11 MOUNTED TO TRELLIS AT 8'-0" ABOVE FINISHED GRADE. X12 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X13 MOUNTED AT 1'-6" ABOVE FINISHED GRADE. X14 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X15 MOUNTED AT 10'-0" ABOVE FINISHED GRADE. X16 MOUNTED TO SURFACE OF TABLE TOP, HEIGHT RESPECTIVE OF TABLE. X17 MOUNTED AT 13'-0" ABOVE FINISHED GRADE. X19 MOUNTED TO WALL AT 10'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X20 RECESSED IN UNDERSIDE OF CANOPY AT 12'-4" A.F.F. X21 MOUNTED TO WALL AT 12'-0" ABOVE FINISHED GRADE. X22 MOUNTED AT 20'-0" ABOVE FINISHED GRADE. X22-HS MOUNTED AT 20'-0" ABOVE FINISHED GRADE. EXISTING SITE PEDESTRIAN POLES (X23/X24/X25) ARE INCLUDED IN PHOTOMETRIC CALCULATION AND ARE RESPONSIBLE FOR LIGHT LEVELS AS DETAILED IN THE PUBLIC ROW. 109 of 160 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.0 0.10.4 0.9 2.0 0.0 1.4 1.5 0.3 0.0 3.9 0.0 0.0 0.0 0.0 2.2 1.8 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.1 3.1 3.3 0.1 1.3 0.0 0.2 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 2.2 0.5 0.0 0.0 0.4 1.1 2.3 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 1.9 0.1 1.0 2.9 1.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.1 0.3 0.0 0.0 0.0 0.0 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.8 0.0 0.0 0.3 0.1 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.1 0.1 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0.0 0.0 7.8 3.8 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 2.0 2.9 0.0 0.0 0.0 0.1 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.2 4.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 3.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 4.4 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 3.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.8 3.7 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.4 2.7 0.1 0.0 0.0 0.0 0.0 0.0 1.9 5.9 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 3.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 X03 X03 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 0.0 X03 0.0 X07 X07 X07X07 X03 X09 0.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.20.4 0.4 0.0 0.0 0.0 0.9 0.2 0.8 0.3 0.1 0.4 1.3 4.6 2.41.10.1 0.00.0 0.00.0 0.00.00.00.00.00.00.0 0.1 0.0 0.20.1 0.7 0.3 0.0 1.2 X12 0.00.0 0.0 0.0 X10 X09 X03 X03 X03 X03 X03 X03 X03 X03 X03 X03 NN Boulder, CO 80302 | SITE CORRECTIONS | 2023.06.09 Site Photometric Plan Area E | E1.0E 1/16" = 1'-0"E1.0E 1 Site Photometric Plan - Area E X02 MOUNTED TO UNDERSIDE OF SOFFIT/PATIO, HEIGHT RESPECTIVE OF SOFFIT/PATIO. X03 MOUNTED AT GRADE. X04 MOUNTED TO WALL AT 16'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X05 RECESSED IN WALL AT 1'-0" ABOVE FINISHED GRADE. X06 MOUNTED AT 8'-0" ABOVE FINISHED GRADE. X07 RECESSED IN WALL AT 0'-8" ABOVE FINISHED GRADE. X08 MOUNTED TO UNDERSIDE OF TRELLIS, HEIGHT RESPECTIVE OF TRELLIS HEIGHT. X09 MOUNTED IN PLANTERS, PLANTER HEIGHT RESPECTIVE OF FINISHED GRADE. X10 MOUNTED IN TREES AT 9'-0" ABOVE FINISHED GRADE. X11 MOUNTED TO TRELLIS AT 8'-0" ABOVE FINISHED GRADE. X12 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X13 MOUNTED AT 1'-6" ABOVE FINISHED GRADE. X14 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X15 MOUNTED AT 10'-0" ABOVE FINISHED GRADE. X16 MOUNTED TO SURFACE OF TABLE TOP, HEIGHT RESPECTIVE OF TABLE. X17 MOUNTED AT 13'-0" ABOVE FINISHED GRADE. X19 MOUNTED TO WALL AT 10'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X20 RECESSED IN UNDERSIDE OF CANOPY AT 12'-4" A.F.F. X21 MOUNTED TO WALL AT 12'-0" ABOVE FINISHED GRADE. X22 MOUNTED AT 20'-0" ABOVE FINISHED GRADE. X22-HS MOUNTED AT 20'-0" ABOVE FINISHED GRADE. EXISTING SITE PEDESTRIAN POLES (X23/X24/X25) ARE INCLUDED IN PHOTOMETRIC CALCULATION AND ARE RESPONSIBLE FOR LIGHT LEVELS AS DETAILED IN THE PUBLIC ROW. 110 of 160 D AFB0.5 1.5 2.1 2.6 2.6 3.0 1.8 2.2 2.6 2.6 1.9 1.8 2.7 2.9 2.4 2.5 2.5 1.4 0.8 4.5 4.5 4.1 3.5 4.8 4.7 4.7 4.1 0.6 0.6 0.5 0.1 4.5 4.0 4.1 3.2 4.0 3.4 3.7 3.6 3.9 3.9 4.7 3.7 3.4 3.4 3.4 3.2 1.4 2.7 2.0 2.5 2.3 0.2 2.0 0.1 0.2 2.4 2.1 2.9 2.1 2.2 2.6 2.1 0.1 0.1 0.6 1.6 1.3 2.9 2.6 2.2 1.7 0.5 0.1 0.0 2.5 0.0 0.0 0.0 0.2 0.1 0.2 0.1 0.5 0.3 0.1 0.1 3.2 8.70.7 0.1 3.8 1.5 2.5 2.7 2.1 2.5 2.8 2.9 0.6 0.8 0.1 0.3 0.1 0.80.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.1 2.4 2.9 2.6 1.9 1.6 1.4 1.2 1.3 1.6 1.1 0.8 0.7 0.8 1.0 1.7 2.3 0.2 0.4 0.5 0.6 0.9 1.2 0.9 0.0 3.0 1.2 0.5 0.2 0.8 0.4 1.0 0.5 1.3 0.9 1.1 1.5 1.2 0.9 1.2 0.8 0.8 0.9 0.5 0.7 0.7 0.4 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.6 0.6 0.7 0.8 0.8 1.1 1.0 0.8 0.7 0.8 0.9 1.0 1.8 1.5 1.2 1.1 0.9 0.9 0.9 1.0 1.2 1.4 1.9 1.8 1.5 1.2 1.1 1.0 0.9 1.0 1.1 1.3 1.5 1.9 1.7 1.4 1.1 0.9 0.9 0.9 1.0 1.1 1.2 1.4 1.7 1.5 1.3 1.0 0.8 0.7 0.8 0.8 0.9 1.1 1.1 1.0 2.5 2.1 1.7 1.4 1.2 0.9 0.7 0.6 0.6 0.7 0.8 0.9 1.0 0.9 2.6 2.2 1.7 1.3 1.1 0.8 0.7 0.5 0.5 0.6 0.7 0.8 0.9 0.8 2.1 1.6 1.2 1.0 0.8 0.7 0.6 0.5 0.6 0.7 0.8 0.8 0.7 0.6 1.9 1.5 1.2 1.0 0.9 0.8 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.6 1.4 1.2 1.0 1.0 0.9 0.9 0.9 0.9 0.8 0.7 0.6 0.3 0.4 1.0 1.0 1.0 1.2 1.2 1.1 0.8 0.6 0.6 0.4 0.4 1.2 1.1 1.0 1.0 1.1 1.3 1.5 1.3 0.9 0.5 0.6 0.5 0.6 1.2 1.1 1.0 1.0 1.1 1.5 1.8 1.6 0.8 0.5 0.6 0.8 0.6 1.0 1.0 1.2 1.1 0.9 1.0 1.2 1.7 2.1 1.7 0.8 0.4 0.6 0.8 0.7 1.0 1.2 1.1 1.0 0.9 0.9 1.1 1.6 2.1 1.7 0.7 0.3 0.5 0.8 1.0 1.1 1.4 1.1 1.0 0.9 0.9 1.1 1.4 1.8 1.6 0.8 0.4 0.5 0.7 0.9 1.3 1.6 1.0 1.0 0.9 0.9 1.0 1.2 1.4 1.3 0.8 0.5 0.5 0.6 0.8 1.5 1.6 1.0 1.0 0.9 0.9 0.9 1.1 1.2 1.1 0.8 0.5 0.4 0.5 0.8 1.2 1.3 1.1 1.1 1.0 0.9 0.9 1.0 1.0 0.9 0.7 0.5 0.4 0.4 0.4 0.6 0.9 1.2 1.1 0.9 0.9 0.9 0.9 0.9 0.8 0.7 0.5 0.3 0.2 0.5 0.5 0.7 1.2 1.1 0.9 0.9 0.9 1.0 1.0 1.0 0.7 0.4 0.2 0.1 0.1 0.2 0.3 1.1 1.0 0.9 0.8 0.9 1.1 1.2 1.1 0.8 0.4 0.2 0.1 0.1 0.2 0.2 0.9 0.9 0.8 0.8 0.9 1.2 1.5 1.4 0.9 0.4 0.2 0.2 0.2 0.2 0.2 0.8 0.8 0.8 0.8 1.0 1.5 1.9 1.7 0.9 0.3 0.3 0.4 0.4 0.3 0.3 0.7 0.8 0.8 0.9 1.1 1.6 2.1 1.9 0.8 0.3 0.4 0.8 0.9 1.0 1.0 0.8 0.8 0.8 0.9 1.1 1.5 2.0 1.8 0.9 0.3 0.4 0.6 0.7 1.1 1.3 0.9 0.9 0.8 0.8 0.9 1.3 1.6 1.5 0.9 0.4 0.5 0.6 0.8 1.0 1.4 1.1 1.0 0.8 0.8 0.8 1.1 1.3 1.2 0.9 0.6 0.6 0.7 1.0 1.1 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.2 0.3 0.3 0.4 0.3 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.4 0.4 0.3 0.1 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.4 0.4 0.4 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.7 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.7 0.9 1.1 0.8 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.6 1.5 1.7 1.9 1.9 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.8 2.2 2.1 1.8 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 2.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.2 0.1 0.0 0.4 0.2 0.1 0.8 0.5 0.2 1.1 0.7 0.4 1.3 0.8 0.6 0.9 0.6 0.7 0.7 0.8 0.8 0.8 0.7 0.6 0.5 0.5 0.3 0.1 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 4.4 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 X19 X14 X14 X13 X13 X13 X13 X17 X10 X22-HS X22-HS X22-HS X22 X22X21 X21 X17X17 X17 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.2 0.00.00.00.0 0.0 0.0 0.2 0.0 0.0 0.0 0.7 0.90.50.10.00.30.0 0.2 0.7 1.2 0.0 0.0 0.1 0.0 0.3 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 X10 0.2 0.1 0.1 0.1 0.3 0.2 0.9 0.5 1.0 0.6 1.2 0.8 1.5 0.7 0.0 0.0 0.6 0.1 X22-HS EXISTING FIXTURE TO BE RELOCATED AS SHOWN X23 (2) X13 X14 X14 X14 X14 X08 X08 X08X08 X08 X08 X08X08 X17 X03 X17 X03 NN Boulder, CO 80302 | SITE REVIEW #5 | 2023.06.09 Site Photometric Plan Area F | E1.0F 1/16" = 1'-0"E1.0F 1 Site Photometric Plan - Area F X02 MOUNTED TO UNDERSIDE OF SOFFIT/PATIO, HEIGHT RESPECTIVE OF SOFFIT/PATIO. X03 MOUNTED AT GRADE. X04 MOUNTED TO WALL AT 16'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X05 RECESSED IN WALL AT 1'-0" ABOVE FINISHED GRADE. X06 MOUNTED AT 8'-0" ABOVE FINISHED GRADE. X07 RECESSED IN WALL AT 0'-8" ABOVE FINISHED GRADE. X08 MOUNTED TO UNDERSIDE OF TRELLIS, HEIGHT RESPECTIVE OF TRELLIS HEIGHT. X09 MOUNTED IN PLANTERS, PLANTER HEIGHT RESPECTIVE OF FINISHED GRADE. X10 MOUNTED IN TREES AT 9'-0" ABOVE FINISHED GRADE. X11 MOUNTED TO TRELLIS AT 8'-0" ABOVE FINISHED GRADE. X12 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X13 MOUNTED AT 1'-6" ABOVE FINISHED GRADE. X14 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X15 MOUNTED AT 10'-0" ABOVE FINISHED GRADE. X16 MOUNTED TO SURFACE OF TABLE TOP, HEIGHT RESPECTIVE OF TABLE. X17 MOUNTED AT 13'-0" ABOVE FINISHED GRADE. X19 MOUNTED TO WALL AT 10'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X20 RECESSED IN UNDERSIDE OF CANOPY AT 12'-4" A.F.F. X21 MOUNTED TO WALL AT 12'-0" ABOVE FINISHED GRADE. X22 MOUNTED AT 20'-0" ABOVE FINISHED GRADE. X22-HS MOUNTED AT 20'-0" ABOVE FINISHED GRADE. EXISTING SITE PEDESTRIAN POLES (X23/X24/X25) ARE INCLUDED IN PHOTOMETRIC CALCULATION AND ARE RESPONSIBLE FOR LIGHT LEVELS AS DETAILED IN THE PUBLIC ROW. 111 of 160 0.2 0.3 0.3 0.4 0.5 0.6 0.6 0.5 0.4 0.4 0.4 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.3 0.4 0.5 0.5 0.5 0.5 0.4 0.5 0.5 0.5 0.4 0.2 0.2 0.1 0.1 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.2 0.2 0.3 0.3 0.4 0.4 0.4 0.4 0.5 0.6 0.7 0.7 0.6 0.5 0.5 0.5 0.7 0.9 0.9 0.6 0.5 0.4 0.3 0.3 0.4 0.5 0.7 1.0 0.9 0.6 0.5 0.4 0.2 0.1 0.2 0.3 0.4 0.5 0.7 1.0 0.8 0.6 0.5 0.4 0.4 0.4 0.5 0.6 0.9 0.9 0.7 0.5 0.4 0.3 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.4 0.4 0.7 0.9 1.0 0.9 0.9 1.0 1.1 1.2 1.5 1.7 1.6 1.3 1.1 0.9 0.7 0.8 1.0 1.1 1.4 1.7 1.6 1.3 1.0 0.8 0.5 0.3 0.4 0.7 0.9 1.1 1.5 1.7 1.6 1.3 1.1 0.9 0.8 0.9 1.0 1.3 1.6 1.7 1.3 1.0 0.9 0.6 0.4 0.5 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.4 0.8 1.2 1.2 1.1 1.2 1.4 1.4 1.3 1.5 1.6 1.5 1.3 1.2 1.1 1.0 1.0 1.1 1.2 1.4 1.5 1.5 1.3 1.1 1.0 0.7 0.5 0.6 0.8 1.1 1.3 1.5 1.7 1.6 1.4 1.3 1.2 1.1 1.1 1.1 1.3 1.4 1.5 1.3 1.0 0.9 0.6 0.5 0.7 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.6 1.2 1.5 1.6 1.6 1.7 1.6 1.5 1.5 1.5 1.4 1.2 1.2 1.2 1.1 1.1 1.1 1.2 1.3 1.4 1.4 1.2 1.1 1.0 0.9 0.8 0.8 0.9 1.1 1.3 1.5 1.6 1.6 1.4 1.4 1.4 1.4 1.2 1.1 1.1 1.2 1.2 1.0 0.8 0.7 0.6 0.6 0.7 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.9 1.8 2.1 2.0 1.9 1.8 1.7 1.6 1.5 1.3 1.2 1.1 1.1 1.2 1.2 1.1 1.2 1.4 1.4 1.4 1.2 1.1 1.0 0.9 0.9 0.9 1.0 1.1 1.3 1.6 1.7 1.7 1.6 1.6 1.6 1.6 1.3 1.1 1.1 1.1 1.0 0.8 0.6 0.5 0.6 0.6 0.6 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.7 1.8 2.4 2.2 2.0 1.9 1.8 1.7 1.5 1.2 1.1 1.0 0.9 1.0 1.1 1.2 1.2 1.4 1.4 1.3 1.2 1.0 0.9 0.8 0.8 1.0 1.1 1.2 1.4 1.6 1.7 1.8 1.7 1.7 1.7 1.6 1.4 1.2 1.1 1.0 0.8 0.6 0.4 0.4 0.4 0.5 0.5 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.4 1.2 2.0 2.2 2.1 2.1 2.1 2.0 1.6 1.3 1.1 0.8 0.6 0.8 1.0 1.2 1.3 1.5 1.6 1.4 1.2 1.1 0.8 0.6 0.6 0.9 1.1 1.3 1.5 1.7 1.8 1.9 1.9 1.9 1.7 1.6 1.5 1.2 1.1 0.9 0.6 0.3 0.2 0.2 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.4 1.2 1.9 2.0 2.1 2.3 2.1 1.5 1.1 0.9 0.6 0.4 0.5 0.8 1.1 1.3 1.6 1.8 1.5 1.1 0.9 0.6 0.4 0.4 0.7 1.0 1.2 1.6 1.9 1.8 1.8 1.9 1.9 1.8 1.8 1.6 1.3 1.1 0.8 0.4 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 1.0 1.1 1.1 1.1 1.0 0.6 0.5 0.3 0.2 0.2 0.2 0.3 0.4 0.5 0.8 0.8 0.6 0.4 0.4 0.2 0.2 0.2 0.3 0.4 0.5 0.7 0.9 0.8 0.8 1.0 1.0 1.2 1.4 1.2 0.9 0.7 0.5 0.3 0.1 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.4 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 X22-HSX22-HSX22-HS X22-HS X22-HSX22-HS X22-HS X22-HS X22-HS X25 EXISTING FIXTURE TO REMAIN AS SHOWN. NN Boulder, CO 80302 | SITE REVIEW #5 | 2023.06.09 Site Photometric Plan Area G | E1.0G 1" = 20'-0"E1.0G 1 Site Photometric Plan - Area G X02 MOUNTED TO UNDERSIDE OF SOFFIT/PATIO, HEIGHT RESPECTIVE OF SOFFIT/PATIO. X03 MOUNTED AT GRADE. X04 MOUNTED TO WALL AT 16'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X05 RECESSED IN WALL AT 1'-0" ABOVE FINISHED GRADE. X06 MOUNTED AT 8'-0" ABOVE FINISHED GRADE. X07 RECESSED IN WALL AT 0'-8" ABOVE FINISHED GRADE. X08 MOUNTED TO UNDERSIDE OF TRELLIS, HEIGHT RESPECTIVE OF TRELLIS HEIGHT. X09 MOUNTED IN PLANTERS, PLANTER HEIGHT RESPECTIVE OF FINISHED GRADE. X10 MOUNTED IN TREES AT 9'-0" ABOVE FINISHED GRADE. X11 MOUNTED TO TRELLIS AT 8'-0" ABOVE FINISHED GRADE. X12 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X13 MOUNTED AT 1'-6" ABOVE FINISHED GRADE. X14 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X15 MOUNTED AT 10'-0" ABOVE FINISHED GRADE. X16 MOUNTED TO SURFACE OF TABLE TOP, HEIGHT RESPECTIVE OF TABLE. X17 MOUNTED AT 13'-0" ABOVE FINISHED GRADE. X19 MOUNTED TO WALL AT 10'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X20 RECESSED IN UNDERSIDE OF CANOPY AT 12'-4" A.F.F. X21 MOUNTED TO WALL AT 12'-0" ABOVE FINISHED GRADE. X22 MOUNTED AT 20'-0" ABOVE FINISHED GRADE. X22-HS MOUNTED AT 20'-0" ABOVE FINISHED GRADE. EXISTING SITE PEDESTRIAN POLES (X23/X24/X25) ARE INCLUDED IN PHOTOMETRIC CALCULATION AND ARE RESPONSIBLE FOR LIGHT LEVELS AS DETAILED IN THE PUBLIC ROW. 112 of 160 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.4 0.5 0.8 0.8 0.5 0.4 0.3 0.2 0.1 0.2 0.3 0.4 0.5 0.7 0.8 0.6 0.4 0.3 0.2 0.1 0.2 0.3 0.4 0.5 0.7 0.8 0.7 0.5 0.4 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.0 1.3 1.6 1.6 1.2 1.0 0.8 0.5 0.3 0.4 0.7 1.0 1.2 1.5 1.6 1.3 1.0 0.8 0.6 0.4 0.4 0.7 1.0 1.2 1.5 1.7 1.4 1.1 0.9 0.7 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 1.1 1.3 1.5 1.5 1.2 1.1 0.9 0.6 0.5 0.6 0.9 1.0 1.2 1.4 1.4 1.2 1.0 0.9 0.6 0.5 0.6 0.9 1.1 1.3 1.5 1.6 1.4 1.2 1.1 0.8 0.5 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.0 1.1 1.2 1.2 1.1 1.0 0.9 0.8 0.7 0.8 0.9 0.9 1.0 1.0 1.0 0.9 0.8 0.7 0.6 0.6 0.7 0.9 1.0 1.2 1.3 1.4 1.4 1.2 1.1 0.9 0.7 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.9 1.0 1.1 1.2 1.2 1.1 1.1 1.0 0.9 0.9 0.9 0.8 0.8 0.8 0.8 0.7 0.6 0.6 0.6 0.6 0.7 0.9 1.0 1.1 1.3 1.4 1.4 1.3 1.2 1.0 0.8 0.6 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.7 0.9 1.0 1.1 1.2 1.2 1.2 1.1 1.1 1.0 0.9 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.7 0.8 1.0 1.2 1.3 1.4 1.5 1.4 1.2 1.1 0.9 0.6 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.6 0.8 1.0 1.1 1.3 1.3 1.3 1.2 1.2 1.1 0.9 0.6 0.5 0.5 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.8 1.0 1.3 1.4 1.6 1.8 1.7 1.4 1.2 0.9 0.5 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 1.0 0.8 1.0 0.7 0.9 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.7 0.9 0.8 0.9 0.7 1.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.8 1.0 1.2 1.5 1.6 1.5 1.3 1.2 1.1 0.9 0.7 0.6 0.7 0.7 0.8 0.8 0.8 0.9 0.8 0.8 0.9 1.1 1.4 1.6 1.9 2.1 1.9 1.5 1.1 0.8 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 1.2 0.9 1.2 0.8 1.0 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.0 1.0 1.0 1.0 0.8 1.0 0.2 0.0 0.0 0.0 1.8 3.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.6 0.8 1.0 1.3 1.5 1.3 1.0 0.9 0.9 0.8 0.8 0.8 0.9 1.0 1.0 0.9 1.0 1.1 1.0 0.9 0.9 1.1 1.2 1.2 1.3 1.4 1.2 0.7 0.5 0.3 0.2 0.1 0.0 0.0 0.0 0.0 1.3 2.6 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.3 1.6 0.1 0.0 0.0 0.0 0.0 0.0 1.0 2.0 0.3 0.0 0.0 0.0 0.2 0.9 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 3.2 4.5 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.4 0.5 0.4 0.3 0.3 0.5 0.7 0.9 1.0 1.2 1.3 1.3 1.1 1.2 1.3 1.1 1.0 1.0 1.1 1.1 1.0 0.9 0.8 0.6 0.3 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.2 4.7 5.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 3.1 5.6 0.1 0.0 0.0 0.0 0.0 0.0 4.0 5.1 0.5 0.0 0.0 0.0 2.3 5.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.4 4.5 3.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.6 0.9 1.1 1.4 1.7 1.5 1.2 1.3 1.3 1.3 1.2 1.3 1.5 1.4 1.2 1.0 0.8 0.5 0.2 0.1 0.4 1.2 0.8 0.2 1.1 1.0 0.3 1.3 1.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 1.3 1.8 0.0 0.0 0.0 0.0 0.0 0.0 1.3 1.3 2.4 2.1 0.0 0.0 1.9 2.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 4.5 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.5 0.7 0.9 1.1 1.0 0.7 0.7 0.9 1.0 1.0 1.3 1.6 1.5 1.1 0.9 0.7 0.4 0.1 0.1 0.2 0.5 0.3 0.1 0.5 0.4 0.2 0.5 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 4.0 2.6 0.0 0.0 0.5 4.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.2 0.3 0.4 0.5 0.7 0.6 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 4.9 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 4.7 4.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 4.5 2.1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 4.0 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 3.5 1.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 4.5 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 X22-HS X22-HS X22-HS X22-HS X22-HS X22-HS X03 X22-HS X03 X03 X03 X03 X03X03 X03 X03 X03 X03 X03X03X03X03 X22-HS NN Boulder, CO 80302 | SITE REVIEW #5 | 2023.06.09 Site Photometric Plan Area H | E1.0H 1" = 20'-0"E1.0H 1 Site Photometric Plan - Area H X02 MOUNTED TO UNDERSIDE OF SOFFIT/PATIO, HEIGHT RESPECTIVE OF SOFFIT/PATIO. X03 MOUNTED AT GRADE. X04 MOUNTED TO WALL AT 16'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X05 RECESSED IN WALL AT 1'-0" ABOVE FINISHED GRADE. X06 MOUNTED AT 8'-0" ABOVE FINISHED GRADE. X07 RECESSED IN WALL AT 0'-8" ABOVE FINISHED GRADE. X08 MOUNTED TO UNDERSIDE OF TRELLIS, HEIGHT RESPECTIVE OF TRELLIS HEIGHT. X09 MOUNTED IN PLANTERS, PLANTER HEIGHT RESPECTIVE OF FINISHED GRADE. X10 MOUNTED IN TREES AT 9'-0" ABOVE FINISHED GRADE. X11 MOUNTED TO TRELLIS AT 8'-0" ABOVE FINISHED GRADE. X12 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X13 MOUNTED AT 1'-6" ABOVE FINISHED GRADE. X14 MOUNTED AT 12'-0" ABOVE FINISHED GRADE. X15 MOUNTED AT 10'-0" ABOVE FINISHED GRADE. X16 MOUNTED TO SURFACE OF TABLE TOP, HEIGHT RESPECTIVE OF TABLE. X17 MOUNTED AT 13'-0" ABOVE FINISHED GRADE. X19 MOUNTED TO WALL AT 10'-0" ABOVE FINISHED GRADE, UNLESS OTHERWISE NOTED. X20 RECESSED IN UNDERSIDE OF CANOPY AT 12'-4" A.F.F. X21 MOUNTED TO WALL AT 12'-0" ABOVE FINISHED GRADE. X22 MOUNTED AT 20'-0" ABOVE FINISHED GRADE. X22-HS MOUNTED AT 20'-0" ABOVE FINISHED GRADE. EXISTING SITE PEDESTRIAN POLES (X23/X24/X25) ARE INCLUDED IN PHOTOMETRIC CALCULATION AND ARE RESPONSIBLE FOR LIGHT LEVELS AS DETAILED IN THE PUBLIC ROW. 113 of 160 Calculation Summary Label CalcType Units Avg Max Min Avg/Min Max/Min Hangout Courtyard Illuminance Fc 0.47 2.4 0.0 N.A.N.A. Pool Area Illuminance Fc 1.60 8.7 0.0 N.A.N.A. Pool Perimeter Illuminance Fc 3.03 8.7 0.1 30.30 87.00 Gathering Courtyard Illuminance Fc 0.31 2.9 0.0 N.A.N.A. Quiet Courtyard Illuminance Fc 0.33 2.9 0.0 N.A.N.A. Parking East Illuminance Fc 0.79 4.4 0.0 N.A.N.A. Parking West Illuminance Fc 0.74 3.3 0.0 N.A.N.A. Pedestrian Corridor Illuminance Fc 0.85 4.6 0.0 N.A.N.A. Pedestrian Corridor_2 Illuminance Fc 0.47 4.1 0.0 N.A.N.A. Site North Illuminance Fc 0.60 4.9 0.0 N.A.N.A. Site South Illuminance Fc 0.13 7.8 0.0 N.A.N.A. South Parking Illuminance Fc 0.14 4.9 0.0 N.A.N.A. Boulder, CO 80302 | SITE REVIEW #5 | 2023.06.09 Exterior Calculation & Lighting Fixture Schedules | E1.2 ARCHITECTURAL LIGHTING FIXTURE SCHEDULE TYPE MANUFACTURER MODEL DESCRIPTION LUMENS CCT X02 CSL DOWNLIGHT: GSD-1-30-90-R-*-*-50-FR-NL ROUGH-IN PAN; GSD-1-PAN Gyroshift downlight, 1in, 3000K, 90CRI, round trim, trim and reflector color TBD, 50deg beam angle, frosted media, no lens media. Pan and hanger bar for 1in downlight. 802 3000 X03 TECH 700BARK2-830-36-*-UNV-PC Arkay Two bollard, 80 CRI 3000K, 36in length, finish TBD, 120-277V, photocell option. <varies> 3000 X04 ARCLUCE FIXTURE: P-TU0103*A ACC: X-TU-WPCUS-* Tul;a one-way sconce, 25deg optic, 3000 CCT, finish TBD, 120V. Wall plate tule, finish TBD. 439 3000 X05 TARGETTI FIXTURE: ZEL-41-FW-*-L2-30 ACC: 1E3447 Zedge line, universal dimming, floor washer, finish TBD, 9W, 3000K. PVC installation back box. 245 3000 X07 AURORALIGHT LSW8-BR-W-F-30-*-*Meridian LED step / wall light, brass faceplate, 40deg wide optic, frosted lens, 3000K, mount TBD, finish TBD. <varies> 3000 X08 AURORALIGHT LSW8-FL-BR-W-F-30-H-*-*Meridian LED, brass faceplate, 4deg wide optic, frosted lens, 3000K, hex baffle accessory, mount TBD, finish TBD. 138 3000 X09 VISTA PRO PR-4201-*-2.5-W-T3 Model 4201 landscape path light, finish TBD, 2.5W T3 warm LED T3 lamp. <varies> 3000 X10 VISTA PRO TR-5003-TR-*-2.5-W-60-FR Landscape up / accent light, tree mount junction box, 5003 model, finish TBD, 2.5W, warm CCT, 60deg wide flood distribution, frosted lens accessory. 97 3000 X11 TECH 700OPASH-L930-D-*-UNV Ash outdoor pendant, LED low output 90 CRI 3000K, clear lens, finish TBD, 120-277V. 400 3000 X12 NLS TRC-1-T2-16L-35-30K8-UNV-SGL-*-PC-1 2 Trac 1 pole light, type II distribution, 16 LEDs, 350mA / 18W, 3000K 80 CRI, 120-277V, single configuration, finish TBD, photocell option, 12ft pole height. 2412 3000 X13 Q-TRAN AND-SW-*-WET-30K-SO-ENC/TL-*-*-*- *-PERPLAN Flexible LED encapsulated fixture, mounting TBD, IP67, 3000K, 1w/ft, enclosed translucent lens, wire type TBD, caps TBD, length per plan. <varies> 3000 X14 TEGAN EX5-K-C-35-DL-*-Kore EX5 LED downlight, 35 deg beam, finish TBD.247 2700 X15 CELESTIAL HYA-STL-AC-G*27-*Hydra STL series 120V exterior LED light string, 2700K, globe type TBD, socket spacing TBD. 1380 2700 X16 VISTA PRO AC-4005-*-4.5-W-60-HL Landscape light, architectural canopy mounting, finish TBD, 4.5W LED, warm color temp, 60deg wide flood, honeycomb louver.. 120 3000 X17 LIGMAN UOD-50001-21W-VW-W30-*-120/277V- DIM-A80121 Odessa 1 small flood light, 21W 1673 lumens, very wide 47deg beam, 3000K, finish TBD, 120-277V, 0-10V dimming, honeycomb louvre. 1673 3000 X19 TECH 700WSPIT-S-*-LED830 Pitch single wall sconce, finish TBD, LED 80 CRI 3000K 120V.<varies> 3000 X20 Q-TRAN FL3SW-1.5-30-ENC-STD-TL-*-BW-BW-* -*-SST-*-PERPLAN FlUR encapsulated linear fixture, 1.5W/ft, 3000K, IP67, standard efficiency, translucent lens, input/output TBD, bare wire in, bare wire out, wire color TBD, wire type TBD, standard mounting, finish TBD, length per plan. 58 3000 X21 LITHONIA LIGHTING WDGE2 LED-P2-30K-80CRI-T4M-MVOLT WDGE2 LED architectural wall sconce, 3000K, 80CRI, type IV medium distribution, 120-277V. 2000 3000 X22 NLS LIGHTING VSR-1-T4-32-700-30K-UNV-DP6-BLK VSR-1 site lighting, type 4 micro optics, 32 LEDs, 700 milliamps, 3000K, 120-277V, single pole mounting, black. 7896 3000 X22-HS NLS LIGHTING VSR-1-T4-32-700-30K-UNV-DP6-BLK- HSS VSR-1 site lighting, type 4 micro optics, 32 LEDs, 700 milliamps, 3000K, 120-277V, single pole mounting, black, house side shield. 7896 3000 X23 EXISTING EXISTING Existing light, see plan for details.EXISTING EXISTING X24 EXISTING EXISTING Existing light, see plan for details.EXISTING EXISTING X25 EXISTING EXISTING Existing light, see plan for details.EXISTING EXISTING 114 of 160 Boulder, CO 80302 | SITE REVIEW #5 | 2023.06.09 Exterior Lighting Cut Sheets | E1.3 X02 X03 X04 X05 X06 115 of 160 Boulder, CO 80302 | SITE REVIEW #5 | 2023.02.03 Exterior Lighting Cut Sheets | E1.4 X07 X08 X09 X10 X11 X12 116 of 160 Boulder, CO 80302 | SITE REVIEW #5 | 2023.06.09 Exterior Lighting Cut Sheets | E1.5 X13 X14 X15 X16 X17 X19 117 of 160 Boulder, CO 80302 | SITE REVIEW #5 | 2023.06.09 Exterior Lighting Cut Sheets | E1.6 X20 X21 X22 X22-HS 118 of 160 1345 28th Street Shears Adkins Rockmore Architects Site Review Written Statement Boulder, CO June 9, 2023 Landmark Properties+ Attachment B - Applicant Written Statement 119 of 160 2A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Index Introduction Circulation Plan Millennium Har vest House Landscape Plan Traffi c Demand Management, Access & Circulation Waste Management Historic Context Public Realm Improvements Context Map Parking and Flood Zones Height Modifi cations Site and Parcel Information Private / Public Designation Market Demand Proposed Concept Management Services and Community Staffi ng Relationship to University of Colorado A3 A13 A4 A15 A14 A5 A6 A7 A8 A9 A10 A16 A11 A17 A12 Community Engagement A18 Site Review Criteria A19 Use Review Criteria A20 Development Schedule A21 A26 A27 Attachment B - Applicant Written Statement 120 of 160 Carillon 3A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Introduction Existing Site Looking Northwest Existing Site Looking Southeast Existing Site Looking Southwest Existing Site Aerial Existing Drone Point Cloud Located at 1345 28th St., the Millennium Hotel was developed in 1959 under the Hilton Harvest House PUD. The property has experienced facility additions and renovations through the years and other property improvements including the tennis courts and outdoor facilities. The Boulder Creek path traverses the site between Folsom and 28th Street. The site permits both residential uses and non-residential uses. The Standard at Boulder seeks to redevelop the roughly 15.9 acre property into a residential development that signifi cantly enhances the Boulder Creek path and its’ community amenities. 28th StreetFolsom StreetSafewayFlower Child Attachment B - Applicant Written Statement 121 of 160 4A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T The Millennium Harvest House was originally constructed as a hotel in 1959 and has since experienced several alterations in the 1970s, 1980s, and in 2000 and 2011. The Millennium Harvest House was a social hub in Boulder in the 1950s-1980s and even hosted Scott Carpenter for a welcome home ceremony after his orbital fl ight in space on the Mercury-Atlas 7. The Standard at Boulder intends to honor the socially vibrant past of the Millennium hotel site and extend its relevance into the 21st century. In the decades since its origination, the Millennium has become in increasing need of redevelopment as the building is in poor condition. The hotel no longer retains its original character and design integrity, and therefore no longer functions as the social hub it could be. The City of Boulder Historic Preservation staff approved a Historic Preservation Demolition application in April 2021 and renewed the approval in September 2022, as the staff have determined that the Millennium Hotel is not potentially eligible for landmark designation. The Standard at Boulder produced, as requested by staff, a professional report that documents the property’s social history, which has been donated to the Carnegie Library. The site’s connection to Boulder Creek has made it an impor tant outdoor gathering place for the Boulder community. Many concerts, Friday Afternoon Clubs, and CU events have been held here over its life. NOWTHEN& Millennium Harvest House Attachment B - Applicant Written Statement 122 of 160 5A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE TBroadway In 1910 during the City Beautiful Movement, Frederick Law Olmsted Jr. (son of New York City‘s landscape architect for Central Park) was commissioned to develop an improvement plan for the City of Boulder. The plan responded to a transformation of the City from its historic mining town roots into a new focus on the university town we know today. Rather than focusing on the temporary mining lifestyle, the improvement plan offered the committed, long-term residents a sense of community with a life style they enjoyed. Olmsted’s plan recommended that the City purchase both sides of the creek to be used for recreation. The creek as a public amenity is still appreciated by Boulder residents today.28th StreetArapahoe Ave SITE Pearl Str e e t Fishing Tubing / Float-to-Work Day Multi-Use Path March 1910 | City of Boulder Plan of Improvements | Proposed by Frederick Law Olmsted Jr. “[Boulder Creek] is a vein of life delivered from the mountains.” - James Dziezynski for RootsRated Historic Context on the Creek Attachment B - Applicant Written Statement 123 of 160 SITE 6A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Context Map RH-2 RL-1 RH-5 RH-5 RH-5 RL-1 RM-2 RL-1 BT-1 BT-1 RM-2 BR-1 BT-2 COLORADO AVENUE ARAPA HOE AVE FOLSOM FIELD STADIUM ATHLETICS PRACTICE FIELD EAST RIDGE SCOTT CARPENTER PARK ARAPAHOE VILLAGE PKU / O PKU/O PKU/O PKU/O NEWTON COURT GOLD RUN CONDOS28TH STREETFOLSOM STTAFT DR UNIVERSITY HEIGHTS AVE PEN N S Y L V A N I A A V E View of Flatirons View of Foothills P P P P P P P P P P P P P PP Zoning BVCP and Land Use The property has three Boulder Valley Comprehensive Plan land use designations, including Transitional Business (TB), Park Urban Other (PK-U/O), and High Density Residential (HR). The property is located in the Boulder Valley Regional Center, which is described in the BVCP as being established in 1979 as an urban renewal district and is “a primarily commercial area, providing retail at a range of scales, restaurants, offi ces and hotels in the geographic center of Boulder.” Adjacency to existing private and University housing, and to campus, reinforce the appropriate site use of complementary residential uses. The property is located in the Business Transitional 1 (BT-1) zoning district. This project aligns with the zoning district described as: areas which generally buffer a residential area from a major street and are primarily used for commercial and complementary residential uses, including without limitation, temporary lodging and offi ce uses. Attachment B - Applicant Written Statement 124 of 160 7A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Flood Zones The property is located within the 100-year fl oodplain, with the outer portions of the site in the High Hazard fl ood zone along with the conveyance zone. Portions of the existing building are located within the High Hazard zone. The regulations of the High Hazard don’t allow for fl ood proofi ng, therefore the proposal includes removal of the hotel building and replacement with new buildings that are outside of the High Hazard and are elevated above the fl oodplain elevation. New building construction is not allowed in the High Hazard zone, with the exception of balconies and overhangs, and is limited by use in the 100-year fl oodplain, which has signifi cantly infl uenced the Site Review design. The Standard at Boulder has coordinated with the city’s Utilities, Greenways, and Floodplain Permitting departments on planned fl ood mitigation projects in the area. No planned mitigation efforts are currently funded or scheduled by the city to begin. The project will need to complete fl oodplain development permits during the entitlements and Technical Document phases in order to support the proposed project design. The project has engaged fl oodplain modeling experts to aid in this permitting process. The project team has submitted a Conditional Letter of Map Revision application based on coordination with City staff. The property includes 15 tennis courts on either side of Boulder Creek that were constructed in 1977 and are located in the High Hazard fl ood zone. They are operational under a grandfathered, seasonal permit that allows them to function in the fl ood zone but ultimately cannot remain in redevelopment due to current fl oodplain regulations. The tennis courts are proposed for removal and will be replaced with passive and active recreational and public realm uses. The entire property is within the 100-yr fl oodplain and a majority of the site is High Hazard and Conveyance zones. The City code does not permit any new parking within these High Hazard / Conveyance zones. Many competing needs from the City have infl uenced proposed parking supply on this project. For example, the construction of Olson Drive and stormwater quality treatment needs have removed proposed parking from the original concept. The parking stall per unit ratio varies by unit type; the proposed project parking is 348 stalls per 944 beds. It is anticipated that not all residents will need an automobile, and the project has adjusted parking standards to refl ect that. Vehicle parking is provided along the perimeter of the property while short and long-term bicycle parking will be provided according to city code 9-9-6(g). Existing parking counts south of the creek will be maintained for the project. Flood Zones - Existing Aerial [100-year fl oodplain, conveyance, and high-hazard] Flood Zones - Existing Aerial [100-year fl oodplain and conveyance] Flood Zone - Proposed Building Linework [100-year fl oodplain, conveyance, and high-hazard] HIGH HAZARD 100-YEAR FLOODPLAINCONVEYANCE BOULDER CREEK Tennis Courts and the Floodplain Vehicle Parking and the Floodplain Parking Parking Req'd: 728 Parking Supplied:348 Parking Reduction (from code):52% Parking in High Hazard / Conveyance Existing 516 Proposed 9 246 Refer to TDM. Parking Reduction (from demand) is less than 30% Standard/Compact 503 ADA 13 Standard 190 Compact 47 ADA Attachment B - Applicant Written Statement 125 of 160 8A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Height Modifi cations The topography of the property varies throughout and gradually slopes downward to the east towards 28th Street. This sloping topography, along with the 100-year fl oodplain creates signifi cant building height constraints due to the base reference from which height is measured, as well as the required fl ood protection elevation level (which also varies across the site). Roughly 3 feet in building height is lost due to the fl ood protection elevation level when compared to the City’s standard building height measurement methods. Of the 15.9 acre property, approximately only 5 acres are suitable for development due to the fl oodplain, thus further constraining the building envelope for any buildings. The existing hotel is 60 feet in height according to a City Staff memo to the Planning Board from 2001. This height was approved by the Hilton Harvest House PUD. At the time of approval, the disposition notes that “Planning Department recommends approval of the Height Exception, #P-77-9, and Planned Unit Development, #P-77-58, fi nding that the height of the building will not disrupt views or create a bulk which will be out of scale with the site or the surrounding properties.” These aforementioned constraints result in challenges if only 3 stories were allowed for the proposed building. A height variance will be requested in order to achieve 3-4 stories and provide for adequate fl oor to ceiling height at each level. Please see the submitted architectural building elevations depicting the proposed building height’s relationship to the fl ood protection elevation level and existing/actual grade. See also architectural drawings for ground level transparency calculations, shadow analysis, and proximal building heights. These overlay diagrams illustrate the mass of the existing buildings in gold, with the proposed buildings from Concept in gray. While the height of the new buildings is held to less than 55’, the overall height is very similar due to the new buildings needing to be raised up above the fl oodplain. Overlay Massing Diagrams Attachment B - Applicant Written Statement 126 of 160 9A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Site and Parcel Information ” Refer to Architectural drawings for Project Data Summary. CHAUTAUQUA PARK CU BOULDER CU EAST CAMPUSCC UNIVERSITY HILL DOWNTOWN BOULDER BOU L D E R C R E E K 29TH ST MALL U S 3 6 SITE Attachment B - Applicant Written Statement 127 of 160 10A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T The site is a key gateway to Boulder with its proximity to CU Boulder and U.S. Hwy 36. The current buildings are outdated and the site is currently underutilized. Redevelopment of the site has the opportunity to bring vibrancy to the area through a development that is focused on the public realm and activation of Boulder Creek. This project seeks to provide for the growing demand for quality purpose-built student housing generated by a steady increase in enrollment and the need of students to be centrally located in Boulder. The creation of 303 units of student housing in Studios, 1, 2, 3, and 4 bedroom unit confi gurations will serve to alleviate student pressure on housing supply in the Boulder market and provide a professionally managed environment for students. This housing solution is in direct proximity to CU Boulder and is also ideally located along a multi-use path corridor and near shopping, recreation, and transit. The majority of the property is located in the High Hazard and Conveyance fl ood zones and the remainder of the site is in the 100-year fl ood plain, limiting the site’s buildable area. The proposed building footprint generally follows the built area of the existing hotel structure. Designed to work with the site, the project is planned to activate and improve the creek, strengthen engagement to Proposed Concept natural surroundings, and improve connectivity to existing multi-use paths and neighborhoods. The building massing has a strong east to west circulation spine with extensions of the building towards the south, reducing in scale towards the creek. The buildings are carefully situated in the landscape to accommodate the fl oodplain and will step down with the grade, helping to break down the scale and create various outdoor rooms. With the rhythm of mass-open, or building-courtyard, the project seeks to visually open itself up to the path and create an engaging experience to the community. Reorientation of the multi-use path is planned to allow for safer thru-site circulation and to allow for improved access to the creek, creating a larger public use area than currently exists. The proposed development is predominantly residential, and in close proximity to the University of Colorado (CU). Located in central Boulder, within walking distance to two of the three Regional Centers identifi ed in the Boulder Valley Comprehensive Plan (the Boulder Valley Regional Center and CU), and along key transportation corridors such as 28th Street and the Boulder Creek path, the property is well suited to house a variety of individuals contributing to the Boulder community. Neighborhood retail is located directly north of the site, with a grocery store and many other service retail and restaurants within 5 minute walking distance. 1. Initial Concept 3. Arc in Response to Creek 5. Breaks in Linear Facade 7. Courtyards 2. Open the Mass 4. Reduce Perceived Height 6. Connective Walkways 8. Public Park Preliminary Concept Sketch Attachment B - Applicant Written Statement 128 of 160 11A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Relationship to University of Colorado North Boulder Creek SITE The property is located within close proximity to the CU Boulder Main Campus. Residents will easily be able to access Main and East Campuses by multi-use paths via bike or walking and enjoy the many amenities provided on campus and nearby. CU Boulder Main Campus 30-Year Vision | Proposed Framework Olson Drive Taft DriveFolsom StAttachment B - Applicant Written Statement 129 of 160 bikes5. 6. 3.WASTE PICK-UPbikesCirculation Plan Circulation, Connections and Site Details 28th StreetFolsom StreetPer 9-2-14 (d) (8), circulation plan showing the internal traffi c and circulation systems, off-street parking areas, service areas, loading areas and major points of access to public rights-of-way. Olson Drive 12A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T OFF-STREET PARKING OFF-STREET PARKING bldg 3 waste maint. room bldg 2 waste bldg 1 waste bldg 1 bike bldg 1 bike 50ft rad i u s BLDG 1&2 LOADINGBLDG 3 LOADINGBLDG 1 BLDG 2BLDG 3 bikes bikesbikes bikesbikesbikespath to TaftFols o m cros s w a l k Boul d e r C r e e k Und e r p a s s 1. 4. 3. 2. WASTE TRUCK ROUTE (re: civil for auto turn exhibits) DELIVERIES ROUTE (re: civil for auto turn exhibits)1. 2. INTERBUILDING WASTE ROUTE Reversing shown Reversing shown with dashed line.g Reversing shown with dashed line.with dashed line.Reversing shown with dashed line.Reversing shown with dashed line.Primary Resident Building Entry Vehicular Access Pedestrian Site Access Accessible Routes Multi-use Path Bike Route Bus Route(s) Bus Stop(s) Floodplain Vehicular Route Trash / Maintenance Access Bike Room Building Entry Interbuilding Trash Route Bike parking within 50ft from building entries Primary Resident / Visitor Building Entry Long-term, covered bike parking (re: landscape) Short-term bike parking (re: landscape) Attachment B - Applicant Written Statement 130 of 160 Waste Management Trash, Recycling, and Compost The property will have 3-stream waste: trash, recycling, and compost. The waste truck haulers will pick-up all waste from building 3. In Buildings 1 and 2, there will be holding areas within the buildings for containers which building maintenance staff will transfer to the collection area at the NW corner of Building 3. Trash Rooms & Access for Buildings 1,2,3 Residents Route to Room: - All Buildings Level 1: o Mainstream waste and Recycle chutes: Residents’ accessible path of travel to access point is at Level 2 via elevator. o Level 1 on all buildings will have accessible path of travel to vestibules containing compost/food waste. - All Building Levels 2-4 Access: o Residents will have access to Mainstream waste and Recycle chutes on level 2 to 4. - Building 1 Level 1: o Building 1 Level 1 will have “valet style” waste pick-ups with maintenance staff picking up tenant trash. Trash Pick-Ups: - Trash will be transported by maintenance staff on pick-up days along a maintenance path (highlighted on attached exhibits). - Maintenance will use rolling bins to transport trash from Buildings 1 and 2 to Building 3 staging area at NW corner of building. Maintenance will have access to gators (housed in the maintenance shop on West side of Building 3) if necessary. o Level 1 rooms in Buildings 1 and 2 will be serviced by maintenance as needed to prevent overfl ow. - The hauler’s pick-up location for mainstream waste, recycling, and compost is located at the NW corner of building 3 in a striped loading zone designated for staging. Trash will be serviced by a Front load truck that will have access to the 2-yard Compacted Mainstream containers and 3-yard non compacted recycle containers along with compost waste. Refer to architectural fl oor plans for more plan context. Building 3 Waste Room Building 2 Waste Room Building 1 Waste Room Level 1 .8,42 4*()510195/( Levels 2,3,4 Level 1 .8,42 4*()510195/( Levels 2,3,4 Level 1 .8,42 4*()510195/( Levels 2,3,4 13A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Attachment B - Applicant Written Statement 131 of 160 The site has excellent vehicular, pedestrian, bicycle and transit access. Vehicle access points will remain as is with two access points along 28th Street. This site is impacted by planned connections that were adopted by City Council as part of the Boulder Valley Regional Center Transportation Connections Plan (BVRC TCP). These planned connections include: • Three north / south multi-use path connections through the site providing connectivity between the Boulder Creek Path and a planned east / west street as well as future connectivity into the property north of the site. Pedestrian access and circulation will be provided along the eastern edge of the building connecting to the existing and planned paths, as seen in the Circulation Plan of this document. The multi-use paths should be twelve feet wide within a sixteen-foot-wide public access easement dedicated to the city (Page 11 of the BVRC TCP). • Improving the existing east / west vehicle access street across the site at the north end of the site to the design standards of a Base Street. The improved street should provide access into the site and would be served by a right-in / right-out access point from 28th Street on the East, and a connection to Folsom on the West. The project team met with City staff to discuss the three multi use path improvements, It was discussed that the westernmost path and the central path (connecting to the Safeway shopping center) were the preferred connections, and that the third connection was not necessary. Staff supports the removal of the eastern-most planned multi-use connection, given the proximity of the existing and planned paths that will be constructed by the project. The removal of a multi-use path from the project will require an update to the Boulder Valley Regional Center’s connection plan, which the applicant will request as part of the Site Review process. Based on discussions with the City Transportation and Fire departments, the project is pursuing keeping one access point onto 28th Street. The southern access point would remain in its current location and arrangement. The existing north access point will be converted into a Right of Way. The proposed local connection along the northern property line will need to be phased due to the fact that it would span the property line and the proposed project does not own the neighboring property to the north. This project would implement the southern portion of the roadway in the interim, which would be 20’ of roadway, 8’ tree lawn, and 8’ sidewalk. The City Transportation staff indicated that they would be open to not implementing a full roadway for this interim condition. At the time that the north property redevelops, the northern portion of the Right of Way would be implemented. There would be a dedicated access easement across the northern property to allow east-west connection with vehicles coming through the existing site. Three new access points onto the proposed local connector will be needed to support the development.BVRC Transportation Connection Plan The Site Review proposal includes a robust Travel Demand Management (TDM) Plan that supports and demonstrates the ability for this property to be an alternate transportation- friendly site with a 52-percent parking reduction from code minimum. The parking reduction from code minimum translates to less than 30-percent parking reduction from a conservative demand study. The main elements of the TDM Plan include: • $75 per year alternative transportation fund for residents that do not bring a vehicle. • Short and long term bike storage on-site. • Infrastructure improvements to surrounding sidewalks and the Boulder Creek multi-use path. • Signifi cant marketing material and evaluation tools to increase awareness and effectiveness of alternative transportation tools. • Limited, paid and managed parking for some residents, separate from their lease. • A bike share program for residents with trailer and basket options available with approximately ten bikes. Transportation Demand Management, Access and Circulation 14A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Travel Demand Management Plan SITE Attachment B - Applicant Written Statement 132 of 160 15A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Boulder Creek Path Activation and Public Realm Improvements A key component of this project includes signifi cant improvements along the creek to create both passive and active recreation areas for both the residents of the project as well as the general public. The Boulder Creek Path will be signifi cantly enhanced and amenitized to create a sense of place for this vital link of the entire Boulder multi-use path network. The Site Review plan proposes enhancing the public user experience along the Boulder Creek Path by creating additional public and semi-private amenities along the creek and around the buildings that are safe, active, and promote healthy living for site residents and visitors. An enhanced pedestrian passive edge along the creek is created by re- aligning the multi-use path trail into the site and creating a better connection to the existing creek bridge. Peeling the pathway away from the creek’s edge engages trail users with the public lawn and simultaneously encourages slowing of bicycle traffi c along the trail, thus improving shared bike and pedestrian movement. A slower pedestrian edge engages users with the creek at several access or overlook points, celebrating the current in-creek recreation and providing new opportunities for creek activation. The goal of the creek park is to develop a destination along the Boulder Creek Path that is open and accessible to the public and designed for all ages and abilities. The park enhances how visitors arrive on site and creates a more versatile space with increased pathway connections to adjacencies and creek access. A goal of the project is to protect mature and healthy trees along the creek corridor to maintain an established tree canopy for shade comfort. Additional shade trees and riparian-like vegetation will be strategically located throughout the site to create comfortable spaces for recreation and enjoyment. Public Realm Improvements Upstream Project at Civic Center Attachment B - Applicant Written Statement 133 of 160 1” = 50’ The project proposes enhancing the public user experience along the Boulder Creek Path by creating additional public and semi-private amenities along the creek and around the buildings. It serves the public interest by improving the existing multi-use path, integrating it into public and semi-public landscape elements, and enhances the overall experience along Boulder Creek. An enhanced pedestrian passive edge along the creek is created by re-aligning the multi-use path trail into the site and creating a better connection to the existing creek bridge from both sides. Peeling the pathway away from the creek’s edge engages trail users with the public amenities and simultaneously encourages slowing of bicycle traffic along the trail improving shared bike and pedestrian movement. A slower pedestrian edge engages users with the creek. The goal of the creek park is to develop a destination along the Boulder Creek Path that is open and accessible to the public and designed for all ages and abilities. N 0 50 100 200 Creek Access Open Lawn Creek Edge Path Boulder Creek PathFOLSOM STREET28TH STREETOLSON DRIVE SAFEWAY BOULD E R C R E E K 100 Year Floodplain1 proposed building 2 multi-use path 3 creek edge trail 4 creek stabilized access 5 clubhouse perch 6 gathering plaza 7 seating areas along multi-use path 8 open lawn 9 existing bridge 11 private courtyards 12 half-court basketball 13 north entry 14 pedestrian path 15 private pool courtyard 16 existing fish observatory 17 rain garden planting 18 covered bike parking 19 pickleball courts 20 existing buildings 21 dog park 10 shared urban corridor with multi-use path 1 1 1 2 2 3 4 6 8 8 8 3 9 16 10 511 1111 11 14 18 18 12 13 1313 14 15 17 17 17 17 17 17 17 17 17 17 7 7 7 7 17 17 19 20 20 21 14 Illustrative Landscape Plan 16A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Attachment B - Applicant Written Statement 134 of 160 Private/Public Designation FOLSOM STREET28TH STREETOLSON DRIVE SAFEWAY BUILDING 3 BUILDING 2 BUILDING 1 PRIVATE COURTYARDPRIVATE COURTYARDPRIVATE COURTYARDAPRIVATE COURTYARDPRIVATE UNIT BALCONY, TYP. FENCED DOG RUN EXISTING DAYCARE PLAYGROUND EXISTING BUILDINGS T A F T D RIV E 1” = 50’N 0 50 100 200 LEGEND private space courtyard fence and gate Boulder multi-use path circulation public space 17A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Private Space Four private courtyards interior to the building layout will be designated for resident use only, clearly delineated by fencing with keyed access on the south ends. The primary private residential spaces are visually defined by large rain garden planting areas that run from west to east along the south legs of the buildings. The large swath of planting buffers private courtyards from publicly accessible park and allows for transitional space between the designated zones. Additional private amenities include a fenced dog run on the north side of the creek as well as an existing fenced daycare playground south of the creek. Public Space The remainder of the site will largely consist of publicly accessible space. The Boulder Creek Trail and Boulder Creek itself are immense public amenities that the project seeks to enhance and build upon to provide a better park experience. By revising the Boulder Creek Path alignment, the project creates safer circulation along the path for cyclists and pedestrians and additionally allows for larger areas of public park open space along the creek. Designated creek access to safe water entry locations is a project priority to improve creek access, bank stabilization, and reduce erosion of slopes. Additional public program elements include grass lawns, pickleball courts, seating areas, dog park, and the existing fish observatory. The pickleball courts incorporate an element of recreation at a smaller scale in lieu of the existing tennis courts. Since dogs are allowed on site at the Standard at Boulder location the larger dog park accommodates any on site dog needs within a designated location and can provide for public use of dog park as well. Operations Proposed maintenance and operation of the spaces is included within the Good Neighbor Agreement. The pickleball cour t and dog park will be available for community use from dawn to dusk. The project will provide limited removal of trash from the pickleball courts and dog park areas. Safety lighting elements are located minimally at primary pathways in order to limit light pollution along the creek corridor. Attachment B - Applicant Written Statement 135 of 160 There is signifi cant market demand for purpose-built student housing in Boulder given the growing student body and limited supply of available housing products. The University of Colorado only requires freshmen to live on campus, which creates a large pool of student renters in the Boulder market who spread out among traditionally single-family neighborhoods, market-rate apartment complexes and purpose-built student housing assets. The majority of students living off campus are currently living in the “shadow market”, which means that they are residing in converted residences not purposely built for students and many times managed by an absentee landlord. As such, there is a lack of central management and oversight that has the potential to lead to, among other things, behavioral issues and lack of maintenance. The Standard at Boulder presents an alternative to the shadow market by capturing a meaningful number of student renters and placing them in a professionally managed environment. By placing students in a well-managed environment with a clear set of rules and regulations that are tied to their lease, we are able to better ensure good behavior and adherence to our community living standards, thus avoiding a party-like atmosphere at our properties. There are currently 25 hotels with roughly 3,000 rooms in Boulder. Market occupancy at Boulder hotels between 2014-2019 hovered between 71% and 73% in any given year, thus suggesting that there are available rooms in the market that can absorb the loss of Millennium’s 269 guest rooms. Additionally, the opening of new hotels such as the Hill Hotel (189 guest rooms) and the CU conference center (250 guest rooms) will add additional capacity to the market to make up the lost beds at Millennium Harvest House. 18A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Market Demand The property will be overseen by on-site property management and governed by community rules and regulations that are incorporated into residents’ leases, as agreed to in the draft Good Neighbor Agreement. Market Demand Attachment B - Applicant Written Statement 136 of 160 19A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T The Standard at Boulder has proactively included a draft Good Neighbor Agreement to demonstrate its commitment to managing the proper ty effectively and being a positive contribution to the neighborhood. The Standard at Boulder’s in-house management team currently manages over 55,000 beds between the Company’s owned portfolio and 3rd-party managed assets. The Standard at Boulder’s management services are focused on providing and delivering an exceptional resident, neighbor and owner experience through disciplined management practices and resident oversight. Property management services are the foundation upon which the company was built and remains one of its core competencies. Management Services The Standard at Boulder employs experienced industry professionals with a focus on employee development and training at all levels. Each manager is committed to building a community where residents feel they belong and assist in enhancing the overall quality of life for every resident. Managers, Maintenance team, and Community Assistants are available on site during offi ce hours (typically staffed seven days a week) to assist future and current residents with any questions, concerns, or needs they may have. Furthermore, The Standard at Boulder utilizes a 24 hour community hotline to allow residents, neighbors, and other interested parties access to the management team during non-offi ce hours. The Standard at Boulder encourages all Community Managers and property leaders to actively participate in their local apartment association and Chamber of Commerce as this is an excellent way to keep the property connected within the local community. As an off-campus housing provider for students across the nation, The Standard at Boulder expects its on-site associates to be involved at the University and community levels while working to build meaningful relationships in the markets in which we operate. Community Staffi ng A typical staffi ng model includes: • Community Manager • Resident Ser vices Manager • Leasing & Marketing Manager • Maintenance Supervisor • Maintenance Technician(s) • Groundskeeper(s) • Community Assistant(s) – Average of 1 per 100 beds Our on-site property management staff is dedicated to resident satisfaction not only for our own residents but the community around us. By providing responsive on-site management, we are able to manage potential issues before they become problems which leads to better student behavior which, in turn, leads to fewer issues with the surrounding community. Resident Management: The Standard at Boulder intends to provide the following security and safety protocols: • Pending approval from the Boulder Police Department, The Standard at Boulder will commit to offering a unit at a below market rate to a Courtesy Offi cer who will live on-site. The Courtesy Offi cer will conduct routine rounds of the community and be available in the event of a disturbance on site. • After hours answering service and on-call schedules are put into place to ensure a team member is available to address any issues that may come up from maintenance emergencies, resident lock out, addressing lease violation or security concerns, etc. Staff members are trained to address after hours concerns and escalate to maintenance, managers, and Security based on the nature of the issue. • The Standard at Boulder will install cameras covering all common area amenities, access-controlled entrances, high traffi c areas, hallways and elevators (both elevator lobbies and the elevators themselves). • The Standard at Boulder will utilize electronic-fob access for all building access points to residents. Fobs will also be used to secure elevator access and unit front doors. In addition to the measures described above, The Standard at Boulder takes additional measures intended to ensure the behavior of residents, security of the property, and interaction with the neighborhood the asset is located within: • The Community Rules & Regulations addendum is part of the residential leases to ensure residents understand their responsibility for themselves, their guests, and the facility with regards to their behavior and overall community policies. See below for a handful of key policies from this document: o All parties/gatherings of fi fteen or more guests must be registered with the Landlord and comply with local laws and ordinances. Failure to do so will result in an escalating fi ne structure with the possibility of eviction should this be a reoccurring issue. Residents are required to comply with all noise and disturbance regulations for registered parties. o Noise complaints are registered with the property and the offenders face an escalating series of fi nes with the possibility of eviction. o Residents are required to keep balconies and patios clean and uncluttered by not hanging items from the unit or using the balcony for storage. Violations of this clause will result in written warnings and/or a fi ne in addition to any clean-up costs or repairs required as a result of said violation. o All household trash and garbage must be placed directly in (not around or in the vicinity of) the applicable trash chute, bin, dumpster, or compactor located on the site. Residents are prohibited from disposing of furniture/boxes/construction debris on site and will be liable for the cost of any additional clean-up or repairs required as a result of any violation of these provisions. • The Standard at Boulder has written policies and an emergency management plan to direct staff in appropriate response measures. • The Standard at Boulder performs criminal background screening on residents and employees. Link to The Standard at Boulder Rules and Regulations: https://indd.adobe.com/view/ba9f2b25-ffb1-4476-b378-65ad03dc0b83 Management Services and Community Staffi ng Attachment B - Applicant Written Statement 137 of 160 20A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Since Concept Review, The Standard at Boulder coordinated meetings with multiple individual neighbors and nearby organizations to share information about the Standard at Boulder and seek feedback prior to Site Review. The team met with or reached out to: • The Carillon Boulder senior housing property manager • Owners of the Safeway shopping center • Harvest Manor property management • Small business owners • Rocky Mountain Tennis Center (RMTC) • Individual property owner in Gold Run • University of Colorado In general, meeting participants seemed excited and hopeful about the Millennium property being redeveloped and expressed interest in a variety of topics including Boulder Creek improvements, additional residents in the area, tennis and parking management. As a result of feedback from Planning Board and City Council, as well as community outreach, The Standard at Boulder has drafted a Good Neighbor Agreement to address key concerns and to ensure that impacts are either mitigated or managed accordingly. The project has considered the community’s feedback in several ways: • Confi rming The Standard at Boulder’s commitment to well- managed tenant agreements that establish standards and disciplinary actions for behaviors and parking. • Planning for a robust transportation demand management (TDM) program that encourages alternative modes of transportation and enforces parking permits and towing as necessary. • Understanding the importance of tennis in the Boulder community, while communicating the regulatory constraints that restrict continued use of the “bubble” (indoor usage) due to fl ood safety regulations. • Coordinating access, loading, deliveries and future road connections with Safeway shopping center to the north. The Standard at Boulder will continue to work with neighbors throughout the Site Review process, during construction and post completion. The Carillon Harvest Manor Safeway shopping center Gold Run University of Colorado small business owners SITERMTC community engagement property line Communit y Engagement Attachment B - Applicant Written Statement 138 of 160 SITE REVIEW CRITERIA TEAM RESPONSE 1. Boulder Valley Comprehensive Plan (A) The proposed site plan is consistent with the land use map and the service area map and, on balance, the policies of the Boulder Valley Comprehensive Plan. The land use map for the property designates three land uses: Transitional Business (TB), Park Urban Other (PK- U/O), and High Density Residential (HR). The proposed use includes student-focused residential with ground fl oor amenity space such as a leasing offi ce, study space, and resident communal areas like a communal kitchen and gym. The property is located in the Boulder Valley Regional Center , and will as a gateway into the city of Boulder and is in close proximity to CU Boulder. The project conforms with many BVCP policies: 1.11 Jobs: Housing Balance 2.01 Unique Community Identify 2.09 Neighborhoods as Building Blocks 2.15 Compatibility of Adjacent Land Uses 2.18 Boulder Valley Regional Center & 28th Street 2.23 Boulder Creek, Tributaries & Ditches as Important Urban Design Features 2.24 Commitment to a Walkable & Accessible City 2.25 Improve Mobility Grid & Connections 2.26 Trail Corridors / Linkages 2.33 Sensitive Infi ll & Redevelopment 2.36 Physical Design for People 2.37 Environmentally Sensitive Urban Design 2.41 Enhanced Design for All Projects 3.01 Incorporating Ecological Systems into Planning 3.05 Maintain & Restore Natural Ecological Processes & Natural Disturbances 3.13 Water Conservation 3.22 Floodplain Management 3.23 Non-Structural Approach to Flood Management 4.01 Climate Action: Reduce Greenhouse Gas Emissions 4.03 Energy Conservation & Renewable Energy 4.07 Energy-Effi cient Land Use 4.08 Energy-Effi cient Building Design 4.09 Building Construction Waste Minimization 5.18 Support for the University of Colorado & Federal Labs 6.01 All-Mode Transportation System & Safe and Complete Streets 6.03 Low Stress Walk and Bike Network 6.07 Integrated Transportation Demand Management (TDM) Programs 6.13 Access Management & Parking 6.14 Transportation Impacts Mitigated 7.11 Balancing Housing Supply with Employment Base (B) The proposed development shall not exceed the maximum density associated with the Boulder Valley Comprehensive Plan residential land use designation. Additionally, if the density of existing residential development within a three-hundred-foot area surrounding the site is at or exceeds the density permitted in the Boulder Valley Comprehensive Plan, then the maximum density permitted on the site shall not exceed the lesser of: The site is designated as BT-1 and there is no maximum residential density under this designation. The proposed project is within the allowable Intensity Standards of the BT-1 designation. (i) The density permitted in the Boulder Valley Comprehensive Plan, or, (ii) The maximum number of units that could be placed on the site without waiving or varying any of the requirements of chapter 9-8, “Intensity Standards,” B.R.C. 1981. (C) The proposed development’s success in meeting the broad range of BVCP policies considers the economic feasibility of implementation techniques require to meet other site review criteria. The project is committed to balancing as many BVCP policies as possible while keeping implementation feasibility in mind. The property is constrained by the fl oodplain and is along a highly-valued community amenity of Boulder Creek, and the project is best considering the economics to improve the overall quality of the property and create the development in a way that is economically practical. 2. Site Design Projects should preser ve and enhance the community’s unique sense of place through creative design that respects historic character, relationship to the natural environment, multi-modal transportation connectivity and its physical setting. Projects should utilize site design techniques which are consistent with the purpose of site review in subsection (a) of this section and enhance the quality of the project. In determining whether this subsection is met, the approving agency will consider the following factors: This project is creatively designed to enhance the Boulder Creek natural and built environment, improve the multi-use path along the creek, and encourage a stronger sense of place along Boulder Creek for both residents and the general public. A key component of this project includes signifi cant improvements along the creek to create both public and semi-private passive and active recreation areas. (A) Open Space: Open space, including, without limitation, parks, recreation areas, and playgrounds: 21A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Site Review Criteria Attachment B - Applicant Written Statement 139 of 160 (i) Useable open space is arranged to be accessible and functional and incorporates quality landscaping, a mixture of sun and shade and places to gather; Reorientation of the multi-use path allows for safer thru-site circulation and improved creek access, creating a larger public use area than currently exists consisting of both shaded tree edges and useable open lawn. (ii) Private open space is provided for each detached residential unit;There are no detached units proposed. (iii) The project provides for the preservation of or mitigation of adverse impacts to natural features, including, without limitation, healthy long-lived trees, signifi cant plant communities, ground and surface water, wetlands, riparian areas, drainage areas and species on the federal Endangered Species List, “Species of Special Concern in Boulder County” designated by Boulder County, or prairie dogs (Cynomys ludiovicianus), which is a species of local concern, and their habitat; The project team has worked closely with staff to limit adverse impacts to natural features along Boulder Creek including riparian habitat and plant communities and maintain as many healthy mature trees on the property as possible, particularly along Boulder Creek. (iv) The open space provides a relief to the density, both within the project and from surrounding development;The open space creek park amenities act as a buffer and thoughtful transition between Boulder Creek and the built environment, providing a relief to the density with expansive softscape lawn areas and riparian-like rain garden plantings. Tree canopies and vegetation are included along the site’s perimeter to provide screening from adjacencies. (v) Open space designed for active recreational purposes is of a size that it will be functionally useable and located in a safe and convenient proximity to the uses to which it is meant to ser ve; The proposal provides a signifi cant amount of passive and active useable public open space, including programmed active recreational space and enough fl at, usable, lawn space for informal, spontaneous recreation like fl ag football or frisbee. (vi) The open space provides a buffer to protect sensitive environmental features and natural areas; and (vii) If possible, open space is linked to an area- or city-wide system. As mentioned, the open space with rerouted Boulder Creek Trail, expansive lawn, and lush plantings acts as a buffer between the Boulder Creek natural habitat and built environment, developed to protect sensitive environmental features and natural areas. (B) Open Space in Mixed Use Developments (Developments that contain a mix of residential and nonresidential uses) (i) The open space provides for a balance of private and shared areas for the residential uses and common open space that is available for use by both the residential and non-residential uses that will meet the needs of the anticipated residents, occupants, tenants, and visitors of the property; and The open space balances public open space along Boulder Creek that transitions seemlessly into private open space areas for residents in internal courtyards and space. (ii) The open space provides active areas and passive areas that will meet the needs of the anticipated residents, occupants, tenants, and visitors of the property and are compatible with the surrounding area or an adopted plan for the area. The open space was designed to encourage active areas for recreation and includes a multi-use path for alternate transportation, complemented by passive areas of landscape design to buffer the natural to built environment and is well-suited for all users of the property. (C) Landscaping: (i) The project provides for aesthetic enhancement and a variety of plant and hard surface materials, and the selection of materials provides for a variety of colors and contrasts and the preservation or use of local native vegetation where appropriate; Approximately 54% of the property is open space and has been design to enhance the aesthetic of the open space, Boulder Creek, and built environment on the site. A variety of plant material is planned including native wet meadow plant communities along the riparian edge, drought-tolerant native vegetation throughout the site, and shade-tolerant groupings within shaded corridors. The project site landscape plans to incorporate hard surface materials complimentary of the building such as concrete pavers, faux wood, crusher fi nes paving, enhanced concrete, and stone paving. (ii) Landscape design attempts to avoid, minimize, or mitigate impacts to important native species, plant communities of special concern, threatened and endangered species and habitat by integrating the existing natural environment into the project; The design team has coordinated with the city on preserving and planning for natural vegetation areas, especially along Boulder Creek, by preserving the majority of the existing creek bank conditions, and improving opportunity for ecological habitat into the property with lush planting areas and rain gardens. (iii) The project provides signifi cant amounts of plant material sized in excess of the landscaping requirements of sections 9-9-12, “Landscaping and Screening Standards” and 9-9-13, “Streetscape Design Standards,” B.R.C. 1981; and The project team hasn’t designed the understory planting plan yet throughout the site, though will be able to consider plant material in excess of requirements as Site Review submissions continue. (iv) The setbacks, yards, and useable open space along public rights-of-way are landscaped to provide attractive streetscapes, to enhance architectural features, and to contribute to the development of an attractive site plan. There has been great attention to all setbacks, yards and usable open space along right-of-way and is thoughtfully landscaped with tree canopies and understory plant material to enhance the site’s perimeter conditions. (D) Circulation: Circulation, including, without limitation, the transportation system that serves the property, whether public or private and whether constructed by the developer or not: (i) High speeds are discouraged or a physical separation between streets and the project is provided;The proposed circulation and transportation system generally aligns with the Boulder Valley Regional Center transportation plan with the addition of an east/west connector to provide vehicular access along the northern edge of the property. Connections are designed to discourage high speeds. (ii) Potential confl icts with vehicles are minimized;Pedestrians are drawn to open areas of the property near Boulder Creek, and there is separation between roadways and parking to the pedestrian-designed areas to minimize potential confl icts. (iii) Safe and convenient connections are provided that support multi-modal mobility through and between properties, accessible to the public within the project and between the project and the existing and proposed transportation systems, including, without limitation, streets, bikeways, pedestrian ways and trails; The project integrates the public multi-use path along Boulder Creek and proposes a re-alignment of the path that will integrate it into the site and improve its condition. There are three north/south multi-use path connections through the site that improves bike and walking access in and around the property and to Folsom where bus access is located. (iv) Alternatives to the automobile are promoted by incorporating site design techniques,land use patterns, and supporting infrastructure that supports and encourages walking, biking, and other alternatives to the single-occupant vehicle; The proposal is strategically designed as a limited-vehicle / limited-parking site, with a signifi cant emphasis on safety, multi-modal access, and walkability. (v) Where practical and benefi cial, a signifi cant shift away from single-occupant vehicle use to alternate modes is promoted through the use of travel demand management techniques; A Transportation Demand Management plan is included in the submission to suppor t and promote alternative transportation opportunities. 22A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Site Review Criteria Attachment B - Applicant Written Statement 140 of 160 (vi) On-site facilities for external linkage are provided with other modes of transportation, where applicable;The proposal fulfi lls missing or improved connections identifi ed in the Boulder Valley Regional Center transportation plan. The proposal includes rerouting and improving the Boulder Creek multi-use path that connects the entire multi-use path system along the creek. (vii) The amount of land devoted to the street system is minimized; and There is minimal land devoted to the street system. (viii) The project is designed for the types of traffi c expected, including, without limitation, automobiles, bicycles, and pedestrians, and provides safety, separation from living areas, and control of noise and exhaust. A traffi c study is included in the submission, and the project team is confi dent that the design supports the expected traffi c from all forms of transportation. (E) Parking: (i) The project incorporates into the design of parking areas measures to provide safety, convenience, and separation of pedestrian movements from vehicular movements; 18 Parking is limited on this property due to fl oodplain constraints and is located along the perimeter of the property, which is convenient for residents, separate from the majority of pedestrian movements on site, and meets the fl oodplain requirements. (ii) The design of parking areas makes effi cient use of the land and uses the minimum amount of land necessary to meet the parking needs of the project; The project team believes the TDM Plan, Parking Study, and Traffi c Study support the parking reduction on this project and is able to reduce the amount of land dedicated to parking as a result. (iii) Parking areas and lighting are designed to reduce the visual impact on the project, adjacent properties, and adjacent streets; and The parking area will be buffered with landscaped areas to reduce the visual impact and is utilizing an effi cient design that limits land use designated to parking. (iv) Parking areas utilize landscaping materials to provide shade in excess of the requirements in Subsection 9-9-6 (d), “Parking Area Design Standards,” and Section 9-9-14, “Parking Lot Landscaping Standards,” B.R.C. 1981. The project balances parking, landscape and fl oodplain requirements, and the design proposed is the project team’s suggested approach to balancing competing needs for suffi cient parking, appropriate parking landscape areas, and fl oodplain constraints. (F) Building Design, Livability, and Relationship to the Existing or Proposed Surrounding Area: (i) The building height, mass, scale, orientation, and confi guration are compatible with the existing character of the area or the character established by an adopted plan for the area; The building height, mass, scale and orientation are compatible with the existing character in the area (see response to (F)(ii). In fact, the property is in the Boulder Valley Regional Center boundary and the proposal meets or exceeds each of these objectives in the plan: • 3.1.E. Lay out the site to support pedestrian circulation • 3.1.G Preserve and capitalize on views to the west • 3.1.F Useable open space should be integral to the plan • 3.1.K. Provide vehicular and pedestrian links • 3.2.A. Internal drives should connect public streets • 3.2.B. Connect with adjacent parking lots or drives • 3.3.A. Provide a complete pedestrian network • 3.3.B. Provide interior pedestrian links to adjacent properties • 3.5.A Try to minimize parking needs • 3.6.A Provide useable outdoor open space; • 3.6.B Locate and design open space to encourage use; • 5.1.A Break down the mass of the building • 5.1.C. Transition to adjacent buildings • 5.1.E Intermingle the building interior and exterior • 5.2.A Orient the building to the street • 5.2.C Emphasize building entrances • 5.2.D Avoid large blank walls • 5.2.E Provide pedestrian interest on the ground level • 5.2.F Design all sides of the building • 5.2.G Standardized designs and foreign styles are discouraged • 5.2.I Use human-scale materials • 5.2.J Select high-quality exterior materials. (ii) The height of buildings is in general proportion to the height of existing buildings and the proposed or projected heights of approved buildings or approved plans for the immediate area; The existing structure on the property is 60-feet, and the height of the proposed project is 55-feet and is of similar height, mass, and scale to the Carillon (south), Safeway (north), 29th Street Mall (northeast), and CU Boulder Main Campus (southwest). (iii) The orientation of buildings minimizes shadows on and blocking of views from adjacent properties;The orientation of the building is constrained by the fl oodplain, but does not block views of adjacent properties. (iv) If the character of the area is identifi able, the project is made compatible by the appropriate use of color, materials, landscaping, signs, and lighting; The character of the area is identifi ed by the Boulder Valley Regional Plan, see response to (F)(i). (v) Projects are designed to a human scale and promote a safe and vibrant pedestrian experience through the location of building frontages along public streets, plazas, sidewalks and paths, and through the use of building elements, design details and landscape materials that include, without limitation, the location of entrances and windows, and the creation of transparency and activity at the pedestrian level; The project’s design is sensitive to the human scale with street facing activation, shaped outdoor space, conscious ground fl oor uses, and integrated landscaped and pedestrian areas. 23A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Site Review Criteria Attachment B - Applicant Written Statement 141 of 160 (vi) To the extent practical, the project provides public amenities and planned public facilities;The project will enhance the public elements along Boulder Creek for everyone to enjoy and utilize, which will be carefully blended with private open space areas as well. (vii) For residential projects, the project assists the community in producing a variety of housing types, such as multifamily, townhouses and detached single family units, as well as mixed lot sizes, number of bedrooms and sizes of units; The project includes a variety of 1, 2, 3 and 4 bedrooms to attract a variety of residents, particularly marketed toward student housing. (viii) For residential projects, noise is minimized between units, between buildings, and from either onsite or offsite external sources through spacing, landscaping, and building materials; The massing and scale support limited noise between units. (x) A lighting plan is provided which augments security, energy conservation, safety, and aesthetics;The lighting is an important aesthetic, safety, and energy conservation element to the design. The project team has carefully considered lighting placement for residents to access exterior areas of the property while ensuring the lighting isn’t a barrier to enjoying the enhanced Boulder Creek. (xi) The project incorporates the natural environment into the design and avoids, minimizes, or mitigates impacts to natural systems;The project has carefully considered, and coordinated with staff on, how to integrate the design into the natural environment along Boulder Creek. Measures will be taken to minimize and avoid impacts to natural systems such as reduced light trespass into the creek corridor by strategically placed pathways lights that reduce light spill, and focusing planting strategies on native plant communities. (xii) Buildings minimize or mitigate energy use; support on-site renewable energy generation and/or energy management systems; construction wastes are minimized; the project mitigates urban heat island effects; and the project reasonably mitigates or minimizes water use and impacts on water quality. The project will incorporate the Boulder Energy Conservation Code requirements and seeks opportunities to continue minimizing energy use through light covered roofi ng, photovoltaic panels, shading structures, and energy effi cient mechanical and electrical systems. Construction wastes will be minimized and there will be consideration of water quality during construction for the project’s proximity to Boulder Creek. (xiii) Exteriors of buildings present a sense of permanence through the use of authentic materials such as stone, brick, wood, metal or similar products and building material detailing; The design uses glazing, brick, metal panel, and wood cladding to bring a sense of permanence to the building, combined with physical permanence with breaks in the building for landscaped outdoor plazas. (xiv) Cut and fi ll are minimized on the site, the design of buildings conforms to the natural contours of the land, and the site design minimizes erosion, slope instability, landslide, mudfl ow or subsidence, and minimizes the potential threat to property caused by geological hazards; Cut and fi ll is expected to be limited as the property is generally level, and the new design is suited toward the existing natural contours onsite. Proper techniques will be used to minimize erosion and instability during construction. (xv) In the urbanizing areas along the Boulder Valley Comprehensive Plan boundaries between Area II and Area III, the building and site design provide for a well-defi ned urban edge; and 19 Not applicable as the property is not near Area II or III. (xvi) In the urbanizing areas located on the major streets shown on the map in Appendix A Of this title near the Boulder Valley Comprehensive Plan boundaries between Area II and Area III, the buildings and site design establish a sense of entry and arrival to the City by creating a defi ned urban edge and a transition between rural and urban areas. Not applicable as the property is not near Area II or III. (G) Solar Siting and Construction: For the purpose of ensuring the maximum potential for utilization of solar energy in the City, all applicants for residential site reviews shall place streets, lots, open spaces, and buildings so as to maximize the potential for the use of solar energy in accordance with the following solar siting criteria: (i) Placement of Open Space and Streets: Open space areas are located wherever practical to protect buildings from shading by other buildings within the development or from buildings on adjacent properties. Topography and other natural features and constraints may justify deviations from this criterion. The design of the open space areas are centralized around the Boulder Creek, as the majority of property is in the high hazard fl oodplain. The design has carefully considered the orientation of the building and its plaza areas to encourage a mix of sun and shade areas. (ii) Lot Layout and Building Siting: Lots are oriented and buildings are sited in a way which maximizes the solar potential of each principal building. Lots are designed to facilitate siting a structure which is unshaded by other nearby structures. Wherever practical, buildings are sited close to the north lot line to increase yard space to the south for better owner control of shading. While the location and orientation of the building is mostly informed by fl oodplain constraints, the design supports maximizing solar potential. The roof form is fl at and will be coordinated with mechanical equipment to maximize solar potential. (iii) Building Form: The shapes of buildings are designed to maximize utilization of solar energy. Buildings shall meet the solar access protection and solar siting requirements of section 9-9-17, “Solar Access,” B.R.C. 1981. The form of the building has considered all aspects for balancing the utilization of solar energy, the special attention giving to the open space and Boulder Creek, and developing a proposal that meets the solar access protection and siting requirements. (iv) Landscaping: The shading effects of proposed landscaping on adjacent buildings are minimized.The landscape design has minimized, to the extent possible, shading effects. The project is also preserving existing trees that may generate some shade in the open space areas, but not any shade generation anticipated near the building or adjacent structures any moreso than existing conditions. (H) Additional Criteria for Poles Above the Permitted Height: No site review application for a pole above the permitted height will be approved unless the approving agency fi nds all of the following:Not applicable as no poles are proposed above the permitted height. (i) The light pole is required for nighttime recreation activities, which are compatible with the surrounding neighborhood, or the light or traffi c signal pole is required for safety, or the electrical utility pole is required to serve the needs of the City; and (ii) The pole is at the minimum height appropriate to accomplish the purposes for which the pole was erected and is designed and constructed so as to minimize light and electromagnetic pollution. (I) Land Use Intensity Modifi cations: (i) Potential Land Use Intensity Modifi cations: (a) The density of a project may be increased in the BR-1 district through a reduction of the lot area requirement or in the Downtown (DT), BR-2, or MU-3 districts through a reduction in the open space requirements. (b) The open space requirements in all Downtown (DT) districts may be reduced by up to one hundred percent. (c) The open space per lot requirements for the total amount of open space required on the lot in the BR-2 district may be reduced by up to fi fty percent. (d) Land use intensity may be increased up to 25 percent in the BR-1 district through a reduction of the lot area requirement. Not applicable as the property is in the BT-1 district. 24A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Site Review Criteria Attachment B - Applicant Written Statement 142 of 160 Site Review Criteria (ii) Additional Criteria for Land Use Intensity Modifi cations: A land use intensity increase will be permitted up to the maximum amount set forth below if the approving agency fi nds that the criteria in paragraph (h)(1) through subparagraph (h)(2)(H) of this section and following criteria have been met: 20 (a) Open Space Needs Met: The needs of the project’s occupants and visitors for high quality and functional useable open space can be met adequately; (b) Character of Project and Area: The open space reduction does not adversely affect the character of the development or the character of the surrounding area; and (c) Open Space and Lot Area Reductions: The specifi c percentage reduction in open space or lot area requested by the applicant is justifi ed by any one or combination of the following site design features not to exceed the maximum reduction set forth above: (i) Close proximity to a public mall or park for which the development is specially assessed or to which the project contributes funding of capital improvements beyond that required by the parks and recreation component of the development excise tax set forth in chapter 3-8, “Development Excise Tax,” B.R.C. 1981: maximum one hundred percent reduction in all Downtown (DT) districts and ten percent in the BR-1 district; (ii) Architectural treatment that results in reducing the apparent bulk and mass of the structure or structures and site planning which increases the openness of the site: maximum fi ve percent reduction; (iii) A common park, recreation, or playground area functionally useable and accessible by the development’s occupants for active recreational purposes and sized for the number of inhabitants of the development, maximum fi ve percent reduction; overdeveloped facilities within the project designed to meet the active recreational needs of the occupants: maximum fi ve percent reduction; (iv) Permanent dedication of the development to use by a unique residential population whose needs for conventional open space are reduced: maximum fi ve percent reduction; (v) The reduction in open space is part of a development with a mix of residential and non-residential uses within an BR-2 zoning district that, due to the ratio of residential non-residential uses and because of the size, type, and mix of dwelling units, the need for open space is reduced: maximum reduction fi fteen percent; and (vi) The reduction in open space is part of a development with a mix of residential and non-residential uses within an BR-2 zoning district that provides high quality urban design elements that will meet the needs of anticipated residents, occupants, tenants, and visitors of the property or will accommodate public gatherings, important activities, or events in the life of the community and its people, that may include, without limitation, recreational or cultural amenities, intimate spaces that foster social interaction, street furniture, landscaping, and hard surface treatments for the open space: maximum reduction 25 percent. The proposed project is within the allowable Intensity Standards of the BT-1 designation. (J) Additional Criteria for Floor Area Ratio Increase for Buildings in the BR-1 District: (i) Process: For buildings in the BR-1 district, the fl oor area ratio (“FAR”) permitted under table 8-2, section 9-8-2, “Floor Area Ratio Requirements,” B.R.C. 1981, may be increased by the city manager under the criteria set forth in this subparagraph. Not applicable as the project is not located in the BR-1 district. (ii) Maximum FAR Increase: The maximum FAR increase allowed for buildings thirty-fi ve feet and over in height in the BR-1 district shall be from 2:1 to 4:1. (iii) Criteria for the BR-1 District: The FAR may be increased in the BR-1 district to the extent allowed in subparagraph (h)(2)(J)(ii) of this section if the approving agency fi nds that the following criteria are met: (a) Site and building design provide open space exceeding the required useable open space by at least ten percent: an increase in FAR not to exceed 0.25:1. 21 (b) Site and building design provide private outdoor space for each offi ce unit equal to at least ten percent of the lot area for buildings 25 feet and under and at least 20 percent of the lot area for buildings above 25 feet: an increase in FAR not to exceed 0.25:1. (c) Site and building design provide a street front facade and an alley facade at a pedestrian scale, including, without limitation, features such as awnings and windows, well- defi ned building entrances, and other building details: an increase in FAR not to exceed 0.25:1. (d) For a building containing residential and non-residential uses in which neither use comprises less than 25 percent of the total square footage: an increase in FAR not to exceed 1:1. (e) The unused portion of the allowed FAR of historic buildings designated as landmarks under chapter 9-11, “Historic Preservation,” B.R.C. 1981, may be transferred to other sites in the same zoning district. However, the increase in FAR of a proposed building to which FAR is transferred under this paragraph may not exceed an increase of 0.5:1. (f) For a building which provides one full level of parking below grade, an increase in FAR not to exceed 0.5:1 may be granted. (K) Additional Criteria for Parking Reductions: The off-street parking requirements of section 9-9-6,, “Parking Standards,” B.R.C. 1981, may be modifi ed as follows: (i) Process: The city manager may grant a parking reduction not to exceed fi fty percent of the required parking. The planning board or city council may grant a reduction exceeding fi fty percent. The project requests a parking reduction of 52%, to be considered by Planning Board or City Council. (ii) Criteria: Upon submission of documentation by the applicant of how the project meets the following criteria, the approving agency may approve proposed modifi cations to the parking requirements of section 9-9-6, “Parking Standards,” B.R.C. 1981 (see tables 9-1, 9-2, 9-3 and 9-4), if it fi nds that: (a) For residential uses, the probable number of motor vehicles to be owned by occupants of and visitors to dwellings in the project will be adequately accommodated; (b) The parking needs of any non-residential uses will be adequately accommodated through on street parking or off-street parking; (c) A mix of residential with either offi ce or retail uses is proposed, and the parking needs of all uses will be accommodated through shared parking; (d) If joint use of common parking areas is proposed, varying time periods of use will accommodate proposed parking needs; and (e) If the number of off-street parking spaces is reduced because of the nature of the occupancy, the applicant provides assurances that the nature of the occupancy will not change. The applicant has provided several reports to support the parking reduction request, including a Transportation Demand Management plan, Traffi c Study, and Parking Study. The project team believes the reports establish that parking can be adequately accommodated on site with the requested reduction. (L) Additional Criteria for Off-Site Parking: The parking required under section 9-9-6, “Parking Standards,” B.R.C. 1981, may be located on a separate lot if the following conditions are met: Not applicable as no off-site parking is proposed. (i) The lots are held in common ownership; (ii) The separate lot is in the same zoning district and located within three hundred feet of the lot that it serves; and (iii) The property used for off-site parking under this Subsection continues under common ownership or control. 25A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Attachment B - Applicant Written Statement 143 of 160 Use Review Criteria USE REVIEW CRITERIA TEAM RESPONSE 1. Consistency with Zoning and Non-conformity The use is consistent with the purpose of the zoning district as set forth in Section 9-5-2, “Zoning Districts Established”, B.R.C. 1981, except in the case of a non-conforming use; The property is located in the Business Transitional-1 (BT-1) zoning district, which has the following description in the code: Transitional business areas which generally buffer a residential area from a major street and are primarily used for commercial and complementary residential uses, including without limitation, temporary lodging and offi ce uses. The primary use of the proposed project is residential and aligns with the zoning district. The project is required to complete a Use Review, as attached dwelling units are allowed as by-right in the zoning district, except when located on the ground fl oor facing a street. The project proposed ground level dwelling units, however, there is signifi cant distance from the units to 28th Street and there is landscape and parking buffers as well. 2. Rationale The use either: (A) Provides a direct ser vice or convenience to or reduces adverse impacts to the surrounding uses or neighborhood; (B) Provides a compatible transition between higher intensity and lower intensity uses; (C) Is necessary to foster a specifi c city policy, as expressed in the BVCP, including without limitation, historic preservation, moderate income housing, residential and non-residential mixed uses in appropriate location, and group living arrangements for special populations; OR (D) Is an existing legal non-conforming use or a change thereto that is permitted under subsection (e) of this section. The proposed use is designed for student housing and is well-suited for the nearby CU Main and East Campuses. The project is surrounded by commercial and high density uses such as the Safeway shopping center to the north, senior housing to the south, and 29th Street mall across the 28th to the north. The Boulder Valley Regional Center encourages residential uses and this proposal fulfi lls many aspects of BVCP and BVRC goals. The use directly supports the surrounding neighborhood, particularly CU Boulder Main Campus, by providing student housing and increases functionality to surrounding neighborhoods with the improvements to the Boulder Creek open space and multi-use space. The proposed open space improvements directly supports the surrounding community and the uses are well-suited to directly support the neighborhood. 3. Compatibility The location, size, design, and operating characteristics of the proposed development or change to an existing development are such that the use will be reasonably compatible with and have minimal negative impact on the use of the nearby properties; The proposed development will replace a large, 269-room hotel and is designed to limit impacts to surrounding properties with its open space design along Boulder Creek and compact building design. In addition, the proposal designs a connection to the Safeway property to the North, which will facilitate alternative modes of transportation in between the shopping center and the Boulder Creek Path. 4. Infrastructure As compared to development permitted under Section 9-6-1, “Permitted Uses of Land”, B.R.C. 1981, in the zone, or as compared to the existing level of impact of a nonconforming use, the proposed development will not signifi cantly or adversely affect the infrastructure of the surrounding area, including without limitation, water, wastewater, and storm draining utilities and streets. The proposed development is not expected to signifi cantly or adversely affect infrastructure in the surrounding area. The project will enhance fl oodplain safety and enhance public infrastructure elements along Boulder Creek. 5. Character of Area The use will not change the predominant character of the surrounding area.The proposed development aligns with the existing character of the surrounding area with a mix of commercial and high density residential nearby and meets the design guidelines in the Boulder Valley Regional Center (see response in Site Review Criteria to (F)(i) 6. Conversion of Dwelling Units to Non-Residential Uses Conversion of Dwelling Units to NonResidential Uses: There shall be a presumption against approving the conversion of dwelling units in the residential zoning districts set forth in Subsection 9-6-1(d), B.R.C. 1981, to non-residential uses that are allowed pursuant to a use review, or through the change of one non-conforming use to another nonconforming use. The presumption against such a conversion may be overcome by a fi nding that the use to be approved serves another compelling social, human services, governmental, or recreational need in the community including, without limitation, a use for a day care center, park, religious assembly, social service use, benevolent organization use, art or craft studio space, museum, or an educational use. Not applicable as the conversion of dwelling units to non-residential uses is not proposed. 26A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Attachment B - Applicant Written Statement 144 of 160 27A 2023.06.09 • SIT E CORRECTIONS WRITT EN STATE M ENT • 13 4 5 28TH STREE T Development Schedule Attachment B - Applicant Written Statement 145 of 160 Travel Demand Management Plan THE STANDARD AT BOULDER Boulder, Colorado Prepared for The Standard at Boulder, LLC 315 Oconee Street Athens, GA 30601 Prepared by LSC Transportation Consultants, Inc. 1889 York Street Denver, CO 80206 (303) 333-1105 May 6, 2022 Revised: August 19, 2022 Revised: December 2, 2022 Revised: February 2, 2023 Revised: April 7, 2023 LSC #210641 Attachment C - Applicant's TDM Plan 146 of 160 Introduction This Travel Demand Management (TDM) Plan has been prepared for The Standard at Boulder redevelopment in Boulder, Colorado. The site is located south of Arapahoe Avenue, west of 28nd Street (US 36), and east of Folsom Street. The existing hotel is propo- sed to be redeveloped as off-campus student housing with 944 bedrooms to be supported by several amenities including a clubhouse, fitness center, and bike storage. In addition, a small daycare and other minor office uses will continue to operate on the area of the site south of Boulder Creek. Three-quarter and right-in-only access exists to 28th Street (US 36) and full movement access exists to Folsom Street via cross access through a neighboring property. The right- in-only access is proposed to be expanded to right-in/right-out through coordination with CDOT. The location of the site with respect to the surrounding land uses and roadway system is shown in Figure 1. The conceptual site plan is shown in Figure 2. This TDM Plan supports a 30 percent alternative travel mode reduction for trip generation and a 31 percent parking reduction from the calculated maximum parking demand in the Parking Analysis prepared by the Fox Tuttle Transportation Group (FTTG) (Parking Ana- lysis) which will support the project meeting the criteria for a parking reduction discussed in Subsection 9-9-6(f), “Motor Vehicle Parking Reductions”, of the Boulder Revised Code, 1981. The formal reduction from code is 52 percent. The applicant team feels the 31 percent parking reduction request can be achieved with the typical TDM measures such as providing bus passes, making connections to bike and pedestrian facilities, and providing access to transit considering the proposed land use and site location along with additional measures that are being proposed such as an alternative transportation fund and lease language restricting vehicle ownership. Parking Supply vs. Demand The Parking Analysis finds the site could require as many as 493 residential parking spaces and 9 non-residential parking spaces for a total of 502 parking spaces. The appli- The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 1 Attachment C - Applicant's TDM Plan 147 of 160 cant is proposing 348 on-site parking spaces which results in a parking reduction request of about 31 percent from demand and 52 percent from code. The 348 proposed parking spaces are the maximum that can be provided on the site due to floodplain constraints. The Parking Analysis, Parking Management Plan, and this TDM Plan provide the appropriate support for approving the requested parking reduction per the Boulder Revi- sed Code. Existing Alternate Travel Modes Description The following existing conditions contribute to the transportation demand management goals of the City of Boulder. The site is well-positioned to make good use of these existing opportunities. Existing Transit Service The Regional Transportation District (RTD) is the governing body responsible for fixed- route transit (public transportation) service throughout the Denver metropolitan area, in- cluding Boulder. Figure 3 shows the existing bus stops and transit routes within the vicinity of the site, including the following routes: • 205 •AB2 • FF4 • FF6 • BOLT • BOUND •CLIMB •FLEX • HOP •JUMP Demand-responsive services are available to both seniors and persons with disabilities through Via (formerly Special Transit). Established in 1979, this non-profit provides safe and affordable rides in accessible buses to people with limited mobility. Rides are sche- duled in advance, and have a 30-minute pick-up window. In addition the University operates the Buff Bus between the various campuses. The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 2 Attachment C - Applicant's TDM Plan 148 of 160 Existing Bicycle and Pedestrian Network The City of Boulder maintains an extensive bicycle and pedestrian network throughout the City. Figure 4 shows bicycle and pedestrian routes within the vicinity of the site. The Boulder Creek multi-use path passes through the site and provides regional pedestrian and bicycle connectivity. In addition, many of the streets in the project vicinity have attached or detached sidewalks. The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 3 Attachment C - Applicant's TDM Plan 149 of 160 SITEMapFigure 1VicinityScale: 1"=600'Approximate ScaleThe Standard at Boulder TDM (LSC #210641)The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023LSC Transportation Consultants, Inc.Page 4Attachment C - Applicant's TDM Plan150 of 160 The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 5Attachment C - Applicant's TDM Plan151 of 160 AB2 Colorado Ave 9th StCollege Ave Ave 20th St13th StEuclid Ave Arapahoe Ave B r o a d wa y 28th St30th StFolsom St Canyon Blvd P e a r l S t S p r u c e S t S p r u c e S t W al n u t St t 29th St MallBOULDER JUNCTION AT DEPOT SQUARE University of Colorado B ld Mount ZionLutheran School Casey Middle BoulderHigh nsntary Sacred Heartof Jesus WhittierInternationalElementary Boulder Watershed School 15 36 J J J FF6 Y FF4 FF4 FF1 AB1 204 206 225 204 209209 205 205 FLEX FLEX FLEX FLEX BOUND STMP JUMP HOP HOP BOLT BOLT BOUND HOP HOP HOP DASH SKIP SKIP CLIMB HOP STMP 206•236•FF6•AB2FF4•FLEX•BOLT 236 A AB2 Colorado Ave 9th StthCollege AveeACgvev 20th St20Sth S SEuclid Avd Avve Arapahoe AvevoAhA B r o a d wa yyy B r o a d wa y 28th St230th StFFolsomStCanyon BlvdCanyon y P e a r l S tPeaPearl S t p r u c e S te S p r u c e S tSpceSpruce S W al n u t StWnSt 29th St MallMallMallttBOULDER JUNCTIONDUBOUUUNJUTIO AT DEPOT SQUAREDEDE University of Colorado oU i it Co or B ld t ZiontZionneran Schoolerlol BoulderHigh stary WhittierWWrWhternationalIntionalElementaryElemenlementaryS ulder r atershed Schooloatersh 15 36 J J J FF6 FF4 FF4 FF1 AB1 204 20 6 225 204 209209 205 205 FLEX FLEX FLEX FLEX BOUND STMP JUMP HOP HOP BOLT BOLT BOUND HOP HOP HOP DASH SKIP CLIMB STMP 206•236•FF6•AB2FF4•FLEX•BOLT 236 Ave 13th St3tS p rSp MounnLuthee Casey Middlesey idd Sacred HeartacSacredHeartHof JesusesusJ BoWa Y SKIP HOP SITEThe Standard at Boulder TDM Plan (LSC #210641)April 7, 2023LSC Transportation Consultants, Inc.Page 6Attachment C - Applicant's TDM Plan 152 of 160 University of ColoradoBoulderMain Campus University of Colorado Boulder East Campus Boulder SITE LEGEND: On-Street Bike Lane Designated Bike Route Multi-Use Path Paved Shoulder Climbing LaneThe Standard at Boulder TDM Plan (LSC #210641)April 7, 2023LSC Transportation Consultants, Inc.Page 7Attachment C - Applicant's TDM Plan 153 of 160 Transportation Demand Management (TDM) Strategy for Multi-Family Residential Units The City of Boulder’s draft residential development toolkit packages are shown in Table 1. The site is proposed to include off-campus student housing with 944 bedrooms to be supported by several amenities including a clubhouse, fitness center, and bike storage. The “core elements” section of the table shows elements required of all new residential developments, including orientation packets, participation in TDM evaluation programs, and pedestrian, bike, and transit enhancements. Two “package elements” are available under City of Boulder standards, Package A and Package B. Package A is the most advantageous for the site considering the available transit routes in the area. Package A includes establishing a NECO Pass Program, meeting the short-term and long-term bicycle parking requirements, and management of on-street parking where applicable. Table 2 shows the actions The Standard at Boulder developer intends to take to increase the percentage of alternative travel modes and to decrease parking demand for the propo- sed residential land use. The applicant proposes to include the following language in their lease document: Resident acknowledges that parking is available in the designated parking areas at the facility for the use of Residents who have leased an individual parking space for the Monthly Parking Fee ("Parking Space"). If Resident has elected to lease a Parking Space in the facility, Resident shall pay the amount listed below each month along with monthly Rent Installment. If no Parking Confirmation or Monthly Parking Fee is listed below resident will not have access to a Parking Space in the facility. In the event that Resident does not elect to lease a Parking Space, Resident hereby acknowledges that Resident will not be parking a vehicle at the facility and either; a) does not have a vehicle in Boulder; or b) Resident has arranged to store their vehicle on private property through a separate and unrelated agreement. This TDM Plan by LSC and the Parking Analysis and Parking Management Plan by Fox Tuttle Transportation Group (FTTG) support an alternative travel mode reduction of 30 percent and a parking reduction of 31 percent from the calculated parking demand and 52 percent from the parking required per code. This information supports the proposed parking reduction consistent with the Boulder Revised Code. The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 8 Attachment C - Applicant's TDM Plan 154 of 160 Transportation Demand Management (TDM) Strategy for Daycare/Office Uses The City of Boulder’s draft commercial development toolkit packages are shown in Table 3. The site currently includes a small daycare and other minor office uses on the area of the site south of Boulder Creek. These uses are expected to remain. The “core ele- ments” section of the table shows elements required of all new office/commercial develop- ments, including meeting the short- and long-term bicycle parking code; participation in eGo car share and B-Cycle bike share where appropriate, pedestrian and bicycle enhance- ments; consideration of showers and changing facilities; and establishing a transportation information center. The most advantageous package for the site is Package A which requires the establish- ment of a BECO bus pass participation program for employees. Table 4 shows the actions The Standard at Boulder developer intends to take to increase the percentage of alternative travel modes utilized by the existing non-residential portions of the site. These existing uses include the Lake Eldora Racing Team (LERT), Single Track Mountain Bike Adventures (SMBA), and Dream Makers Preschool. The LERT and SMBA groups are served by the space with minimal day to day peak-hour activity and the preschool has four employees and serves about 15 children. Details of $75 Per Year Alternative Transportation Fund Residents that sign a lease not allowing on-site parking (see suggested lease language above) will be eligible for a $75 per year alternative transportation fund. The $75 alternative transportation fund will allow students to access alternative modes of transportation including ride share programs like Uber and Lyft as well as car share programs such as Colorado Car Share and Zip Car. For context, Colorado Car Share offers a $12/month membership option and per hour costs from $5.00/hour. These rates are further discounted for students, thus enhancing the value of the $75 fund. Zip Car offers a student membership option for $35/year with per hour costs from $11/hour. As such, the $75 fund will allow residents to subsidize the cost of joining and using these The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 9 Attachment C - Applicant's TDM Plan 155 of 160 programs. Furthermore, the property will provide information about transit services in the orientation packets and the building manager will have an on-site employee serve as the transportation coordinator to assure that residents are fully aware of the various TDM measures available to them. The transportation coordinator will work with the City and University’s micro-mobility program to advertise and promote new micro-mobility options as they become available in the City such as Lime Scooters when they are available west of 28th Street. CU students receive ECO bus passes for both local and regional trips and are eligible for a free B-Cycle membership and free local rides. Lastly, students have access to the Buff Bus which the University operates between the various campuses. All of these benefits provide residents with transportation options aside from personal vehicles which enhance their mobility in and around the Boulder area. The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 10 Attachment C - Applicant's TDM Plan 156 of 160 The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 11 Pkg A Pkg B Pkg A Pkg B Pkg A Pkg B Pkg A Pkg B Orientation Packets  Evaluation  Pedestrian Enhancements  Bike Enhancements  Transit Enhancements  Alternative Transportation Subsidy Fund  Carshare Subsidy  Bikeshare Subsidy  NECO Pass Program Participation  Meet Short-Term Bicycle Parking Code  Exceed Short-Term Bicycle Parking Code  Meet Long-Term Bicycle Parking Code  Exceed Long-Term Bicycle Parking Code  Managed On-Street Parking  Unbundled Parking CORE ELEMENTSTDM Toolkit Element MULTI-FAMILY ELEMENTSPACKAGE ELEMENTSTable 1 City of Boulder Residential Development Toolkit Packages Single Family ≤10 Units Single Family 11 or More Units Multi-Family ≤10 Units Multi-Family 11 or More Units Residential Toolkit Packages Attachment C - Applicant's TDM Plan 157 of 160 The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 12 Actions for Package A Orientation Packets An orientation packet will be provided to each new resident which includes brochures, maps, and other resources to inform residents of their transportation options. This packet will include RTD bus information, the City of Boulder bicycle and pedestrian map (or similar), and information on special events. This packet will be provided initially by the developer at the time of sale or by a lessor thereafter. Evaluation Through sales or lease agreement, the site's residents will agree to participate in annual on- line or paper surveys regarding their use and satisfaction with transportation demand management programs. The evaluation is expected to be administered by the property management - the City of Boulder will provide the survey questions using Survey Monkey or similar on-line tools.The developer will secure agreement to participate, with the expectation that 10-20% of residents will actually participate based on typical survey return rates. The City of Boulder will be responsible for data analysis and summarization. Pedestrian Enhancements Improvements will be made to the existing sidewalks around the site as needed to connect the site to the existing sidewalks on 28th Street (US 36), Arapahoe Avenue, and Folsom Street and to the regional Boulder Creek multi-use path adjacent to the site. Bike Enhancements The site will have connections to the existing sidewalks and paths in the vicinity of the site including the on-street bike lanes on Folsom Street west of the site and to the regional Boulder Creek multi-use path adjacent to the site. The applicant proposes to implement a bike share program for residents with trailer and basket options available. The program will include about ten bikes. In addition, CU students have a free membership with free local rides to B- Cycle Transit Enhancements Information about transit service will be provided in the orientation packets, also described above. The building manager will have an on-site employee serve as the transportation coordinator to assure residents are fully aware of the various TDM measures that are available.PACKAGE ELEMENTSNECO Pass Program Particiaption The site proposes to participate in the NECO Pass program. The applicant will pay the cost of providing NECO passes to employees for a period of three years. Residents will likely be provided with a NECO Pass through their relationship with CU. Any residents that don't receive this benefit will also be provided a NECO pass by the applicant for a period of three years. The applicant will need feedback from the City regarding the cost of the program. Meet Short-Term Bicycle Parking Requirement The site is proposing 172 short-term bicycle parking spaces which exceeds the requirement of 157 short-term bicycle parking spaces. Meet Long-Term Bicycle Parking Requirement The site is proposing 961 long-term secure and covered bicycle parking spaces which exceeds the requirement of 457 long-term bicycle parking spaces. This area will accommodate the parking and charging of electric bikes. Managed On- Street Parking The applicant is proposing 348 vehicle parking spaces which is less than the maximum parking requirement of 502 parking spaces which is a 31% reduction from the calculated demand and 52 percent from code. The 502-space demand is supported in the separate Parking Analysis by Fox Tuttle Transportation Group. All spaces will meet the City's SUMP principles with spaces being paid separately from the bedroom rent beginning at $75 per month. A percentage of the parking spaces will provide electric vehicle charging. 338 of the 348 parking spaces will be dedicated to residents and staff. The applicant is proposing a $75 per year alternative transportation fund available to residents that sign a lease agreement stating they will have no vehicles locally unless acceptably stored via other options. This is detailed further in the report narrative.PACKAGE ELEMENTSCORE ELEMENTSTable 2 The Standard at Boulder TDM Plan TDM Toolkit Element Attachment C - Applicant's TDM Plan 158 of 160 The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 13 CAGID Pkg A Pkg B Pkg C Pkg A Pkg B Pkg C Pkg A Pkg A Pkg B Pkg C Meet Short‐Term  Bicycle Parking Code  Meet Long‐Term  Bicycle Parking Code  Ratio of MOV Mode  Share  Pedestrian  Enhancements  Bike Enhancemetns  Showers ‐ Conditional  Changing Facilities ‐  Conditional  Transportation  Information Center/  Access/Employee  Transportation  Coordinator (ETC)  Network  Transit Enhancements  ‐ Conditional    Business Eco Pass  Program (BECO Pass) ‐  3 years * Alternative  Transportation  Subsidy Fund   Lease Requirements  for BECO Pass ‐ 3  years   Managed Off‐Street  Parking ‐ Conditional CORE ELEMENTSPACKAGE ELEMENTSTable 3 Commercial Development Toolkit Matrix of Packages TDM Toolkit Element Commercial Toolkit Packages ‐ Multiple Business/Developer Within CTN Buffer Outside CTN Buffer Uni‐Hill Multiple Business Development ‐ Developer Attachment C - Applicant's TDM Plan 159 of 160 The Standard at Boulder TDM Plan (LSC #210641)April 7, 2023 LSC Transportation Consultants, Inc.Page 14 Outside CTN Buffer Package A Meet Short-Term Bicycle Parking Code A total of 12 short-term bicycle parking spaces is being provided south of Boulder Creek which exceeds the code requirement of 5 short-term bicycle parking spaces. These spaces are included in the totals in Table 2. Meet Long-Term Bicycle Parking Code A total of 3 long-term bicycle parking spaces is being provided south of Boulder Creek which meets the code requirement of 3 long-term bicycle parking spaces. These spaces are included in the totals in Table 2. Ratio of MOV Mode Share The site will include ridesharing information in its employee orientation packets. This may include eGo Car sharing, B-Cycle bike sharing, DRCOG's RideArrangers, and ride sharing with Uber/Lyft. Pedestrian Enhancements The existing buildings south of Boulder Creek are currently served by sidewalks. Bike Enhancements Employees will have access to the proposed bike share program. Showers - Conditional Showers for employees are not proposed at this time. Changing Facilities - Conditional The existing and proposed restrooms will serve as suitable changing facilities. Transportation Information Center/ Access/Employee Transportation Coordinator (ETC) Network The site will include transportation information in its employee packets/employee orientation process. The information will also be available in interior brochure racks within the building. The developer proposes to work with future tenants to assure each has an on-site employee to serve as an employee transportation coordinator (ETC). BECO Pass Participation The applicant will provide and fund BECO-Passes to site employees for three years. Coordination will be needed with the City to determine the appropriate size of the program. Managed Off-Street Parking - Conditional The applicant is proposing 348 vehicle parking spaces which is less than the maximum requirement of 502 parking spaces which is a 31% reduction from demand and 52 percent from code. The 502-space demand is supported in the separate Parking Analysis by Fox Tuttle Transportation Group. Ten of the parking spaces are dedicated to the non-residential uses south of Boulder Creek as shown in the Parking Management Plan. The applicant has chosen not to charge for the use of these ten spaces because one is a non-profit and another a small locally owned daycare which have not historically paid for parking. Table 4 The Standard at Boulder TDM Plan ‐ Commercial TDM Toolkit Element CORE ELEMENTSPACKAGE ELEMENTSAttachment C - Applicant's TDM Plan 160 of 160