Loading...
TAB Regional Update Subregional TIP 031422TIP Applications: Competitive Projects that Advance TMP Goals TIP Criteria Regional Impact of Proposed Project: 30% Metro Vision Regional Transportation Plan Priorities: 50% •Safety •Active Transportation •Air Quality •Multimodal Mobility •Freight •Regional Transit Project Leveraging: 10% Project Readiness: 10% Candidate Subregional TIP Projects Candidate Project Evaluation Subregional Benefit: VMT/GHG Reduction:Safety:Equity:Project Readiness: Cost- Effectiveness:Cost Located on CAN/NAMS Corridor Includes Transit Priority & Bicycle Infrastructure No. of Fatal & Serious Injury Crashes Adjacent Equity Population Design Drawings and/or High Confidence in Timeframe Potential to Leverage Partner Funds CO7/Arapahoe Ave & 55th Street Multimodal Intersection $3.5M+ CO7/Arapahoe Ave & 30th Street Multimodal Intersection $6.0M CO7/Arapahoe Ave Bridge Replacement over Boulder Creek (South Side)$3.5M CO93/Broadway & Table Mesa Transit Priority Intersection $1.5M CO93/Broadway & Regent Transit Priority Intersection $1.0M CO93/Broadway at Kittredge Loop Underpass Upgrade $3.5M US36/28th Street & Baseline Transit Priority Intersection $1.0M US36/28th Street & Iris Transit Priority Intersection $1.0M US36/28th Street & CO119/Canyon Blvd Transit Priority Intersection $1.0M US36/28th Street West Side Multi-Use Path (Winding Trail - Broadway) $4.9M CO119 Bikeway System Connectivity Improvements $2M+ West Colorado Ave Multimodal Improvements (Regent - Folsom)$2M+ 30th Street Preliminary Design (CO7/Arapahoe - CO119)$1M Table Mesa Park N Ride Undperass to Thunderbird Drive $7.5M Table Mesa Drive Protected Bike Lane (Broadway - Manhattan Drive)$10.0M Baseline Enhanced Transit Stops & Protected Bike Lanes (30th St - Foothills)TBD TBD TBD TBD Project 30th Street Preliminary Design (CO7/Arapahoe -CO119) Call #2 2022 – 2025 TIP Subregional Benefit: VMT/GHG Reduction:Safety:Equity:Project Readiness: Cost- Effectiveness:Cost Located on CAN/NAMS Corridor Includes Transit Priority & Bicycle Infrastructure No. of Fatal & Serious Injury Crashes Adjacent Equity Population Design Drawings and/or High Confidence in Timeframe Potential to Leverage Partner Funds $1M CO93/Bdwy & Table Mesa and CO93/Bdwy & Regent Transit Priority Intersections Recommendations: •Seek funding for preliminary design •Include BAT lane conversion Subregional Benefit: VMT/GHG Reduction:Safety:Equity:Project Readiness: Cost- Effectiveness:Cost Located on CAN/NAMS Corridor Includes Transit Priority & Bicycle Infrastructure No. of Fatal & Serious Injury Crashes Adjacent Equity Population Design Drawings and/or High Confidence in Timeframe Potential to Leverage Partner Funds CO93/Broadway & Table Mesa Transit Priority Intersection $1.5M CO93/Broadway & Regent Transit Priority Intersection $1.0M Call #2 2022 – 2025 TIP [Design & Construction] US36/28th Street West Side Multi-Use Path (Four Mile Canyon Creek Bridge -Broadway) Subregional Benefit: VMT/GHG Reduction:Safety:Equity:Project Readiness: Cost- Effectiveness:Cost Located on CAN/NAMS Corridor Includes Transit Priority & Bicycle Infrastructure No. of Fatal & Serious Injury Crashes Adjacent Equity Population Design Drawings and/or High Confidence in Timeframe Potential to Leverage Partner Funds $4.9M Call #2 2022 – 2025 TIP Baseline Enhanced Transit Stops and Protected Bike Lanes (30th St –Foothills Pkwy) Call #2 2022 – 2025 TIP Subregional Benefit: VMT/GHG Reduction:Safety:Equity:Project Readiness: Cost- Effectiveness:Cost Located on CAN/NAMS Corridor Includes Transit Priority & Bicycle Infrastructure No. of Fatal & Serious Injury Crashes Adjacent Equity Population Design Drawings and/or High Confidence in Timeframe Potential to Leverage Partner Funds TBD TBD TBD TBD Source: Alex Weinheimer West Colorado Ave Multimodal Improvements (Regent -Folsom) Subregional Benefit: VMT/GHG Reduction:Safety:Equity:Project Readiness: Cost- Effectiveness:Cost Located on CAN/NAMS Corridor Includes Transit Priority & Bicycle Infrastructure No. of Fatal & Serious Injury Crashes Adjacent Equity Population Design Drawings and/or High Confidence in Timeframe Potential to Leverage Partner Funds $2M+ Call #4 2024 – 2027 TIP CO7/Arapahoe Ave & 30th Street Multimodal Intersection Subregional Benefit: VMT/GHG Reduction:Safety:Equity:Project Readiness: Cost- Effectiveness:Cost Located on CAN/NAMS Corridor Includes Transit Priority & Bicycle Infrastructure No. of Fatal & Serious Injury Crashes Adjacent Equity Population Design Drawings and/or High Confidence in Timeframe Potential to Leverage Partner Funds $6.0M Call #4 2024 – 2027 TIP CO7/Arapahoe Ave Bridge Replacement over Boulder Creek (South Side) Subregional Benefit: VMT/GHG Reduction:Safety:Equity:Project Readiness: Cost- Effectiveness:Cost Located on CAN/NAMS Corridor Includes Transit Priority & Bicycle Infrastructure No. of Fatal & Serious Injury Crashes Adjacent Equity Population Design Drawings and/or High Confidence in Timeframe Potential to Leverage Partner Funds $3.5M Call #4 2024 – 2027 TIP Next Steps March: Refine Initial Evaluation & Project Definition (Purpose, Cost, Schedule) + Council Update April: Project Feedback from DRCOG Subregional Cmte . + Community Engagement May 9: TAB Recommendation May 17: City Council Endorsement