Loading...
HomeMy WebLinkAboutItem 5B - 705 Mapleton Ave LB Memo 02.02.2022 MEMORANDUM TO THE LANDMARKS BOARD February 2, 2022 STAFF David Gehr, Interim Director of Planning and Development Services Charles Ferro, Acting Comprehensive Planning Manager Lucas Markley, Assistant City Attorney, City Attorney’s Office James Hewat, Principal Historic Preservation Planner Clare Brandt, Interim Historic Preservation Planner Faith Hamman, Historic Preservation Intern LANDMARK ALTERATION CERTIFICATE REQUEST Public hearing and consideration of a Landmark Alteration Certificate application for exterior modifications, including adding a front porch, flat roofs, and parapet front and rear, at 705 Mapleton Ave. in the Mapleton Hill Historic District, pursuant to Section 9-11-18 of the Boulder Revised Code 1981 and under the procedures prescribed by chapter 1-3, “Quasi-Judicial Hearings,” B.R.C. 1981. Address: 705 Mapleton Ave. Owner/Applicant: Graham Carlson / Rachel Lee Case Numbers: HIS2021-00123 Case Type: Landmark Alteration Certificate Code Section: 9-11-18, B.R.C., 1981 SITE INFORMATION Historic District: Mapleton Hill Historic District Date of construction (house): 1900 Zoning: RL-1 (Residential-Low 1) Lot size: 8,318 sq. ft. Building coverage (existing): 2495 sq. ft. Building coverage (proposed): 2561 sq. ft. Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 1 of 68 Building coverage (allowed max.): 2714 sq. ft. Floor area (existing): 3,501 sq. ft. Floor area (proposed): 3,723 sq. ft. Floor area (allowed max.) 3,764 sq. ft. STAFF RECOMMENDATION Staff recommends the Landmarks Board conditionally approve the application. RECOMMENDED MOTION I move that the Landmarks Board adopt the staff memorandum dated February 2, 2022, as the findings of the board and conditionally approve a Landmark Alteration Certificate to construct 222 sq. ft. in additions, plus a new front porch and parapet front and rear at 705 Mapleton Ave. in the Mapleton Hill Historic District, as shown on plans dated December 29, 2021, finding that the proposal meets the Standards for Issuance of a Landmark Alteration Certificate in Chapter 9-11-18, B.R.C. 1981 and is generally consistent with the General Design Guidelines provided the stated conditions are met. Conditions of Approval 1. The applicant shall be responsible for completing the work in compliance with the approved plans, except as modified by these conditions of approval. 2. Prior to submitting a building permit application and final issuance of the Landmark Alteration Certificate, the applicant shall submit the following, which shall be subject to final review and approval by the Landmarks Design Review Committee (LDRC) to ensure that the final design is consistent with the General Design Guidelines, the Mapleton Hill Historic District Design Guidelines and the intent of this approval: a. Revised drawings showing: i. Overall simplification and cohesion to design approach. ii. Offset to the west wall of the front (south) portion of the house to create a corner as it connects back to middle portion, simplification of detailing to limit the stone foundation to no higher than existing stone foundation, revise front porch to all wood construction with vertical wood railing, eliminate the use of stone lintels at windows, inset window frames at least 3” from face of brick, eliminate the use of steel siding to narrow wood clapboard; iii. Reduction in height of the rear addition so it is lower than the middle and front modules, eliminate projecting upper-level walls and bays of rear Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 2 of 68 addition, revise window proportions consistent with those of the front and middle portions of the house, consider use of narrow clapboard siding in lieu of wood shingle; iv. No paint on masonry. b. Details for exterior doors, windows (including placement, style, and type), siding, roofing, lighting, paint, hardscaping, etc. SUMMARY AND BACKGROUND • 705 Mapleton Avenue was constructed around the turn of the 20th century as a one-story Bungalow with hipped roof and front gable over a modest front porch but underwent extensive remodeling in the (recent) non-historic period. The 1994 Boulder Survey of Historic Places recommended that the alterations to the house have diminished its historic integrity. • According to building permits, the majority of the additions and remodeling of the house were completed in the 1970s and 1980s. • A Landmark Alteration Certificate (LAC) for a new 616 sq. ft., one story, two-car garage was approved by the Landmarks Board on 01.03.2007; the design of the garage reflected architectural aspects of the original house design (roof pitch and detail). • Multiple LAC applications have been received over the last few years, with proposals that modify aspects of the house. • On May 6, 2021, the city received the LAC application (HIS2021-00123) to modify the exterior by adding a new front porch, flat roofs, and parapet front and rear. This application was preliminarily reviewed by the Landmark design review committee (LDRC)) on May 19, 2021 and referred to the Landmarks Board for review in a public hearing. • Staff finds that the proposal generally meets the Standards for issuance of a Landmark Alteration Certificate pursuant to 9-11-18(a) & (b)(1)-(4) B.R.C. 1981 and is largely consistent with the General Design Guidelines and the Mapleton Hill Historic District Design Guidelines. With the stated conditions, staff recommends approval by the Landmarks Board. PROPERTY DESCRIPTION • 705 Mapleton Ave is a highly visible lot located at the north corner of Mapleton Ave. and 7th St. in the Mapleton Hill Historic District. Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 3 of 68 Figure 1. Location map, 705 Mapleton Ave. in the Mapleton Hill Historic District. • The two buildings currently on the lot include the main house (constructed c.1900) and an accessory building (2007). • The main house was extensively remodeled in the “environmental style” during the 1970s and 1980s with a second story added to the Mapleton Ave. elevation, large picture windows, and other additions that have obliterated the original house. • Staff considers the building to be non-contributing to the Mapleton Hill Historic District due to the extensive alterations that occurred outside of the defined 1865-1946 period-of-significance for the Mapleton Hill Historic District. Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 4 of 68 Figure 2. 705 Mapleton Ave, facing Mapleton Ave. Real Estate Appraisal Card, 1929 (top) and Historic Building Survey, 1994 (below). Carnegie Library for Local History Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 5 of 68 Figure 3. 705 Mapleton Ave, facing Mapleton Ave. 2021 Figure 4: Current footprint showing additions on south, east, and north elevations. • Two-story additions to front and rear obscure the original house, constructed c. 1900. • Permit records indicate multiple additions and remodeling, including remodels in 1975, 1977 (a wrecking permit, mostly likely for the garage), 1980 (300 sq. ft. addition), 1987 (second story addition), and 1991. • Prior to the Historic Building Survey in 1994, the front porch was removed, and the front entry relocated to the east elevation. • A 263 sq. ft. addition to the east elevation (remodeled pre-1994) was approved by LDRC in 2016. • Brick segmental arches and original double-hung windows remain as part of the original house, as does a portion of the original roofline which is visible from 7th Street. Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 6 of 68 Figure 5. South elevation (facing Mapleton Ave). 2021 Figure 6. East elevation (interior lot line). 2020 Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 7 of 68 Figure 7. Rear (north) elevation. 2020. Figure 8. West elevation, facing 7th Street. Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 8 of 68 PROPERTY HISTORY • A clipping from the Boulder Daily Camera from 1909 notes that Mrs. Elizabeth Turrell Andrew along with her children bought 705 Mapleton Ave. from Mrs. Eugene Ogden. Elizabeth Andrew was born in Colorado in 1876. She divorced her husband, Dr. Charles F. Andrew in 1909. • In 1913, Arthur W. and Elizabeth T. Fitzgerald lived there. Fitzgerald was associated with Tedrow and Fitzgerald attorneys. PROPOSAL Site Plan • Corner lot bordering Mapleton Ave. and 7th St.; • No proposed changes to existing 2007 garage; • Brick façade treatment added to existing (modified) framing; • New 166 sq. ft. front porch proposed with 25’ front-yard setback; • Increase in floor area of house from 2,885 sq. ft. to 3,107 sq. ft. for a total of 3,723 on the lot where 3,764 sq. ft. is allowed in the Residential Low-1 (RL-1) zone; • No additional proposed changes to general footprint of the existing house on west, north or east elevations. Figure 9. 705 Mapleton Ave. existing site plan. 2021 Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 9 of 68 Figure 10. 705 Mapleton Ave. proposed site plan, 2021. South Elevation (facing Mapleton Ave.) • Proposed new brick form at the front (south); • Simplification of roof form to create a flat roof behind a false front parapet; • Dentil detail at parapet cap; • Brick painted white; • New 166 sq. ft. (6 ft deep) front porch with low-pitch hipped roof; • New front entry door; • Upper-level windows replaced with taller windows; • Lower (new porch) windows replaced with single picture window; • Existing brick (lower) and wood siding (upper) addition to the east lowered to a position below parapet and clad in dark metal; • Existing entry addition enclosed with brick façade, painted white, • Circular window reflecting the original house gable end windows (also seen on existing garage at gable ends). Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 10 of 68 Figure 11. 705 Mapleton Ave. south elevation proposed (top) and existing (below). Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 11 of 68 Figure 12. 705 Mapleton Ave. 3D model proposed (left) and existing (right) from Mapleton Ave. Figure 13. 705 Mapleton Ave. 3D model proposed (left) and existing (right) from Mapleton Ave. Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 12 of 68 Figure 14. 705 Mapleton Ave. 3D model proposed. Figure 15. 705 Mapleton Ave. 3D model proposed. West Elevation (facing 7th St.) • Proposed new brick form and front porch; • Brick painted white; • Stone window lintel and sills painted; • Simplification of roof form to flat roof behind false front parapet (front of house) and shingle addition (rear of house); • Removal of existing shed rooflines at rear; • New window cutouts at southwest corner; • Existing original windows to remain; • New natural cedar shake siding at upper rear addition; Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 13 of 68 Figure 16. 705 Mapleton Ave. west elevation proposed (top) and existing (below). Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 14 of 68 Figure 17. 705 Mapleton Ave. west elevation (proposed) with notes. Figure 18. 705 Mapleton Ave. 3D model proposed from 7th St looking toward Mapleton Ave. North Elevation (facing alley) • Proposed modification to existing rear addition to replace shed roof with flat roof; • Replace existing lap siding with natural cedar shingle shake; • Addition of skylight at flat roof; • New proposed 21 sq. ft. dormer with flat roof; • New circular window reflecting the original house gable end windows (also seen on existing garage at gable ends); • Brick painted white; • Dark grey horizontal siding at existing sunroom. Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 15 of 68 Figure 19. 705 Mapleton Ave. north elevation proposed (top) and existing (below). Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 16 of 68 Figure 20. 705 Mapleton Ave. 3D model proposed (left) and existing (right) looking toward 7th St. from the rear of the property. Figure 21. 705 Mapleton Ave. 3D model proposed (left) and existing (right) looking from 7th St. toward Mapleton Ave. Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 17 of 68 Figure 22. 705 Mapleton Ave. 3D model proposed, looking from 7th St. toward Mapleton Ave. Figure 23. 705 Mapleton Ave. 3D model proposed, looking toward 7th and Mapleton from neighboring property. East Elevation • Proposed new brick form and front porch; • Brick painted white; • Stone window lintel and sills painted; • Simplification of roof form to flat roof behind false front parapet (front of house) and shingle addition (rear of house); • Proposed modification to existing rear addition to replace shed roof with flat roof; • New brick at entryway addition; • New door at read upper deck; • Replace existing lap siding with natural cedar shingle shake; Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 18 of 68 • New proposed 21 sq. ft. dormer with flat roof; • Dark grey horizontal siding at existing sunroom. • Existing original window openings to remain; • New natural cedar shake siding at upper rear addition. Figure 24. 705 Mapleton Ave. east elevation proposed (top) and existing (below). CRITERIA FOR THE BOARD’S DECISION STANDARDS FOR LANDMARK ALTERATION CERTIFICATES, 9-11-18, B.R.C., 1981 (a) The Landmarks Board and the City Council shall not approve an application for a Landmark Alteration Certificate unless each such agency finds that the proposed work is consistent with the purposes of this chapter. (b) Neither the Landmarks Board nor the City Council shall approve a Landmark Alteration Certificate unless it meets the following conditions: Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 19 of 68 1. Does the proposed application preserve, enhance, or restore, and not damage or destroy the exterior architectural features of the landmark or the subject property within a historic district? Provided the stated conditions are met, staff finds the proposed work will be generally consistent with the purposes of this chapter, in that the proposed modifications to the non- contributing house will not damage the historic character of the Mapleton Hill Historic District. The addition of a front porch will re-scale the size of the façade to be more appropriate to the district. The simplification of roof lines will make the house more complementary to the district. 2. Does the proposed application adversely affect the special character or special historic, architectural, or aesthetic interest or value of the landmark property? Provided the stated conditions are met, staff considers the proposed addition and new construction will not adversely affect the special character or special historic, architectural, and value of the property as the changes are generally consistent with the General Design Guidelines and the Mapleton Hill Historic District Design Guidelines. 3. Is the architectural style, arrangement, texture, color, arrangement of color, and materials used on existing and proposed structures compatible with the character of the landmark property? Provided the stated conditions are met, staff considers that the texture, color, arrangement of color, and materials proposed will be compatible with the designated property. (c) In determining whether to approve a Landmark Alteration Certificate, the Landmarks Board shall consider the economic feasibility of alternatives, incorporation of energy-efficient design and enhanced access for the disabled. Specific information specific to economic feasibly of alternatives, incorporation or energy- efficiency design and enhance access for the disabled was not submitted with the application. The reuse of an existing building is inherently sustainable, and the rehabilitation of the building will need to meet the City’s energy code regulations and Section 106.5 helps ensure that any alterations needed to meet the energy will not detract from the historic character of the site. Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 20 of 68 DESIGN GUIDELINE ANALYSIS The Historic Preservation Ordinance sets forth the standards the Landmarks Board must apply when reviewing a request for a Landmark Alteration Certificate (LAC). The Board has adopted the General Design Guidelines for Boulder’s Historic Districts and Individual Landmarks and the Mapleton Hill Historic District Design Guidelines to help interpret the ordinance. Design guidelines are intended to be used as an aid to appropriate design and not as a checklist of items for compliance. See Attachment A for a complete analysis of the proposal’s compliance with the design guidelines. In this case, staff considers the proposed exterior modifications and new front porch appropriate with conditions, due to these factors: • The current additions (1960 – 1994) are stylistically incompatible with the district and are inappropriately scaled. The proposal achieves a new appropriate scale without significantly changing the existing footprint of the house. • The proposal interprets elements from multi-unit Terrace architecture, rare to the Mapleton Hill Historic District (period of significance 1865-1946). • The proposal does not attempt to recreate the original façade or porch. Rather, it employs a neo-traditional design reminiscent of Terrace (multi-unit) architecture (one example of such design can be seen a 415-455 Mapleton Avenue (see figure 25). Staff is unaware of single-family housing (constructed during the 1865-1946 period-of- significance) in Mapleton Hill utilizing this architecture. The addition of a front porch is appropriate. Figure 25. 415-433 Mapleton Ave. (undated) Carnegie Library for Local History Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 21 of 68 Staff considers that the following changes to the proposal are necessary to ensure consistency with the General Design Guidelines for Boulder’s Historic Districts and Individual Landmarks (see Attachment B): • Review the proposal to ensure changes do not create a false sense of historic development (see also The Secretary of the Interior's Standards for Rehabilitation, criterion 3: Each property shall be recognized as a physical record of its time, place, and use. Changes that create a false sense of historic development, such as adding conjectural features or architectural elements from other buildings, shall not be undertaken.) • While a flat-roof form may be appropriate, consider offsetting the west wall of the front (south) portion of the house to create a corner as it connects back to middle portion, simplify the detailing to limit the stone foundation to no higher than existing foundation, revise the front porch to all wood construction with vertical wood railing, eliminate the use of stone lintels at windows, inset window frames at 3” from face of brick, eliminate the use of steel siding (consider narrow painted wood clapboard). • Reduce the height of the rear addition so it is subordinate in mass, scale, and height to the middle and front of the modules, eliminate projecting upper-level walls and bays of rear addition, revise window forms consistent to those of the front and middle portions of the house, consider use of clapboard siding in lieu of wood shingle. • Revise the plans to better achieve a cohesive design that is contextually consistent, while contemporary. • Masonry should not be painted; revise proposal to use brick on front portion of house that is complementary to, but distinct from the existing historic brick on the house. PUBLIC COMMENT Staff has received no public comment regarding this application. FINDINGS Staff recommends the Landmarks Board adopt the following findings: The Landmarks Board finds that with the stated conditions the project meets the standards for issuance of a Landmark Alteration Certificate set forth in Section 9-11-18, “Standards for Landmark Alteration Certificate Applications,” B.R.C. 1981. In reaching this conclusion, the Board considers the information in the staff memorandum dated February 2, 2022, and the Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 22 of 68 evidence provided to the Board at its February 2, 2022 meeting. Specifically, the Board finds, if the stated conditions are met, that: 1. The proposal will be generally consistent with the purposes of this chapter, in that the proposed work will not damage the historic character of the landmark property. 2. The proposed work will not adversely affect the special character or special historic, architectural, and value of the landmark property as they are generally consistent with the General Design Guidelines and will generally comply with Sections 2.0 and 3.3 of the General Design Guidelines and Section 9-11-18(b)(3) of the Boulder Revised Code 1981. ATTACHMENTS Attachment A: Applicant Materials Attachment B: Design Guideline Analysis Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 23 of 68 A City of BoulderW PJanning & Development Services HIS Historic Preservation Landmark Alteration Certificate (LAC) Application ►REQUIRED MATERIALS FOR PROPOSED EXTERIOR WORK TO ALL PROPERTIES IN DESIGNATED HISTORIC DISJRICTS AND INDIVIDUALLY LANDMARKEDB Signed application ff,9u rrent site plan and photographs of the property, including the view from the street. See page 2. 5J Other materials defined by project type and scope. See page 5 for a checklist or required materials. ► TO SUBMIT YOUR LANDMARK ALTERATION CERTIFICATE (LAC) APPLICATION •Save your materials as PDFs using the naming conventions in the Online Plan Application Guide •Email application to PDSskipatrip@bouldercolorado.gov. Put Historic Preservation in the subject line. •Questions? Contact Historic Preservation staff at 303-441-1994 or historic@bouldercolorado.gov •Si necesita ayuda para traducir esta informaci6n al espafiol, llame al 303-441-1905 ►APPLICANT CONTACT INFORMATION Phone#Email Address"ryo�-1.-t"1-fo'1,£ rl-eep ,..,ostti'Gcuch,'-kc�-utYl Address City State Zip\"101 \t;t� $1l.EtT 1 �lAi1E L =� �v11.,,� ���U>80�oi- ► OWNER CONTACT INFORMATION 0 SAME AS APPLICANT Phone#Email Address j �h��. l,,'{rl�ov, tt JV\l\�;1. wvv1 /(V�V\� City �0\11� Sta6,[) Zip 80);0t\- Signature of Owner or Authorized Agent (Applicant):�� _________ Date: __ /2-11 / 2.-{ . ► PROJECT INFORMATION THE WORK WILL NEED TO MEET THE GENERAL DESIGN GUIDELINES AND ANY DISTRICT-SPECIFIC DESIGN GUIDELINES (LINKS BELOW). ProjectAdd ress td? .MAPvrroJ �£, �vtvO�, (,-0. 8<P11'-t. Historic District D Chamberlain D Highland Lawn D West Pearl D Individual Landmark (Check one. Search the map of Landmarks and Historic Districts.) D ChautauquaD Downtown□Floral Park D Hillside D 76th StreetE( Mapleton HillD University Place Name: ProjectDescription �,axo� f'/\ot>,'�c¾iot\1 s I f\;l'DW <;:<?\AA'e-f: flJOT.A-6fl; /t,t({) fV£vJ H2..0t'Cf :po�H. ft) (L ft-: MN� U>tJ[f:--iE?t1Ti'N er s rN ((l€" FAr1i1 RESIIJ@\/cc-_ Planning & Development Services I 1739 Broadway, 3rd Floor P.O. Box 791 Boulder, CO 80306 303-441-1880 bou lderpland eve lop. net Page 1 of 5 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 24 of 68 ►EXISTING CONDITIONS FOR ALL APPLICATIONS �TT ACHED AS SEPARATE PDF location Map /Site Plan (paste here or attach as separate PDF) -survey, /LC or screenshot of aerial map showing adjacent streets. Photographs of each side/ elevation of the building (paste here or attach as separate PDF) front side Updated March 2021 rear side Planning & Development Services 11739 Broadway, 3rd Floor P.O. Box 791 Boulder, CO 80306 303-441-1880 bou lderplandevelop.net Page 2 of 5 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 25 of 68 ►REQUIRED MATERIALS �TT ACHED AS SEPARATE PDF Color chips, samples and/or cut sheets for painting and/or roofing work (paste here or attach as separate PDF) STOP HERE IF THE SCOPE OF WORK IS LIMITED TO THESE ITEMS (CHECK ALL THAT APPLY): □Roofing□Painting location of proposed work detailed on plan or mockup (paste here or attach as separate PDF) STOP HERE IF THE SCOPE OF WORK IS LIMITED TO THESE ITEMS (CHECK ALL THAT APPLY): D LandscapingD Antenna or mechanical unitD Commercial awningD Commercial signD Commercial patio Updated More,\ 2021 Planning & Development Servic�s I 1739 Broadway, 3rd Floor P.O. Box 791 Boulder, CCD 80306 303-441-1880 boulderpland�velop.net Page 3 of 5 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 26 of 68 Scaled elevations (for fences, show a// dimensions including spacing between pickets*) ��� � f��l'l",C f'J>F-7- existing proposed existing proposed existing proposed existing proposed STOP HERE IF THE SCOPE OF WORK IS LIMITED TO THESE ITEMS (CHECK ALL THAT APPLY): D Deck D Fence located at front of houseD Outdoor kitchen D Fence at side or rear of house*D In-ground pool or spa D Fence taller than 5� * *Side and rear fences with max height of 5' with min r spacing between pickets can be reviewed by staff. Updated Morch 2021 Planning & Development Services 11739 Broadway, 3rd Floor P.O. Box 791 Boulder, CO 80306 303-441-1880 bou lderplandevelop.net Page 4 of 5 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 27 of 68 ► CHECKLISTS FOR OTHER SCOPES OF WORK For the following scopes of work, check all that apply and include separate PDFs of the required documentation: D Solar panels D Completed application, pages 1-4 D Solar renderings (3'completed pages 1 -4 D New free-standing building 340 sq. �-or smaller D New free-standing building larger than 340 sq. �- 53"Demolition and new construction �Scaled architectural plans I project drawings: Side by side existing and proposed, with annotated (measurable) scale. (3"Addition �arch 8"'1nitial code review for new construction. See section below. (3"'Doors 531:ompleted pages 1 -4 G'Windows (3Skylights O Doors /windows replacement worksheet This supplement will be sent to the email address included on page 1 once the LAC application is accepted. ►INITIAL CODE REVIEW FOR NEW CONSTRUCTION This review is intended to identify potential zoning and building code issues for new construction only. Please fill out to the best of your ability. The verification of this form is a customer service review and does not constitute a formal review of all applicable codes and regulations. All sections of the Boulder Revised Code must still be adhered to prior to performing any work. Property information can be found on https:/lbouldercolorado.gov/planninq/property-report Proposed work is within required setbacks �s D No Existing Proposed new Total a�er construction Allowed maximum Building coverage (sq.�-)Z�q� ¢ b�f -z.0'7 I� 2-7,q JD Floor area (sq. �-) ?;t;of rj.1.-1-,,2-f!_ 1> 7,z:� if 37 "7'-f f Height {f,,om /�wf'-w/;11 25') i<o'-15 ry�i:,,11 2-5' -2 s-/-;/' 3s-l Will the proposed require a variance or exemption? (check all that apply):D Setback variance (Section 9-7-2, B.R.C., 1981)D Bulk plane requirements (Section 9-7-9, B.R.C., 1981)D Side yard wall articulation standards (Section 9-7-10, B.R.C., 1981) D Exemption from maximum building coverage for accessory buildings in the rear setback (Section 9-7-ll(d), B.R.C., 1981)D Solar exception (Section 9-9-17, B.R.C., 1981) Planning & Development Services 11739 Broadway, 3rd Floor P.O Box 791 Boulder, CO 80306 303-441-1880 bou lderpland eve lop. net Page5of5 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 28 of 68 December 9, 2021 (rev.1/1/2022) City of Boulder Landmarks Board (LB) LB – Written Statement 705 Mapleton Avenue - Request For A Landmarks Alteration Certificate (LAC) for exterior modifications, added square footage and new front porch for a non-contributing single family residential structure in the Mapleton Hill Historic District On Behalf of Graham Carlson Introduction: Thank you for your consideration of a LAC to allow the modification of an existing structure at 705 Mapleton Avenue. This narrative aims to present a convincing case for a more comprehensive and cohesive exterior update to a home that has lost its way during its long 100yrs plus history. 705 Mapleton was constructed in the early 1900’s (according to a 1994 Historic Building Inventory Record). The home was associated with a historic person of interest, as likely were many residents who helped establish Boulder during this pivotal time in the town’s history. The home was a single story (modest) residence and shared many architectural design and construction details similar to neighboring homes of this time period. The home was red brick with dark double hung windows, white trim, a shingle hip roof and a small gable-end front porch. (South elevation view of 705 Mapleton from Mapleton Avenue, circa 1929) This narrative will not attempt to recreate an extensive timeline of the evolution of this home (since it has likely already been provided by Historic Preservation Staff), but will mention that this home has undergone character altering additions and remodels almost every decade starting in the 1960’s and continuing through today (2021). Major remodels in the 1980’s, 1990’s and 2017 705 Mapleton Ave, Boulder Page 1 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 29 of 68 are responsible for drastically changing the character of the original home including additional square footage, loss of Mapleton Avenue street character, window and door replacements and changes to roof forms on both the south (Mapleton) and north (alley) elevations. It appears that the most significant character altering remodel occurred in the late 1970’s adding single sloped roof forms at the north and south elevations; ensuring the loss of any historic character. (South elevation view of 705 Mapleton from Mapleton Avenue, 2021) Homeowner’s Intent And Reasons For This Request: The current homeowner bought this residence in 2019, after the 2017 remodel which added a finished basement and made modest (but not extensive) alterations to the exterior entry, window and door language. While our original design conversations focused on the interior program, the exterior was always an issue of discomfort and displeasure. The home felt disconnected from the historic character of Mapleton Hill and lacked any clear connection to the neighborhood. Today the homeowners are seeking to maintain the remaining historic elements of the home (of which little remains) and provide a more complementary contextual form and corresponding architectural language that is deserving of this Mapleton Hill Historic District, Mapleton Avenue and 7th street corner location. It is worth noting that a previous LAC was issued for this home in 2020 (submitted by our clients with a different architect). While that application satisfied most interior home desires, the exterior remained a sore spot for the reasons noted above. While this home cannot return to its original character it is worth celebrating and contributing to the neighborhood again. A small addition to the home is planned as part of this project along the east interior lot line, a tertiary elevation - all within current Form and Bulk Standards – and as such it is our understanding that it will not require a variance discussion. 705 Mapleton Ave, Boulder Page 2 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 30 of 68 (Short) History + Context: The property comprises Lots 37 and 38, Block 3, in the Mapleton Hill Historic District and is a non-contributing residence. It consists of a main 2-story single family residence and detached single story garage. The home is in the RL-1 zoning district of the City of Boulder and was approved in 1999 for an Administrative Setback Variance to grant a front yard setback of 24 feet where 25 feet is required. The height limit for this lot (per City of Boulder definitions) is 35’. As best as could be ascertained, the following lists modifications that were made to this home since its conception. This information is not extensive and has been compiled from City of Boulder and Carnegie Library records: 1921 : City of Public Works - Lay Drain Permit 1959 : Water/sewer Permit 1929 : Boulder County Real Estate Appraisal [ Exhibit A : “Historic Building Inventory, c. 1929.”] 1952 : Reroofing Permit 1960 : Building Permit - Insulate, install 3 windows in rear brick wall, reroof flat roof 1967 : Building Permit - Description of work is indecipherable (Addition?) 1970’s : Remodel (per 1999 variance Written Statement) (1974, 1975, 1977 Wrecking Permit) 1980 : Building Permit - Addition/ Bedroom-Study-Bath 1985 : Reroofing permit 1987 : Building Permit - Bedroom Addition 2nd floor 1991 : Building Permit - Reconfigure 3 bedrooms into 2 1994 : Historic Building Inventory Record - house is listed, per National Register Eligibility, as “Not Contributing to District”. - Per this same document, the house is noted as (Historical Significance) having been associated with significant persons, events or patterns. (Architectural Significance) Represents work of a master, high artistic values and represents a type, period or method of construction. - Alterations to this house have diminished its historic integrity. 1998 : Exterior railing Replacement 1999 : Administrative Setback Variance (ADR1999-00090) to replace sliding glass doors with bay window in front yard setback (+1’ into setback (24’ where 25’ is required) - no change is sf) 2007 : Building Permit Application for detached 2-car garage off alley (PMT2007-00378) 2009 : Electrical Permit to install 3.36kw flush mount and grid-tied solar array (HIS2009-00050) 2017 : Building Permit (PMT2017-00012) - NE addition and basement finish, Interior remodel, Historic approval through HIS2016-00326 2020 : LAC - HIS2020-00147 - Remodel of non-contributing house Design Proposal: As referenced above, this home at 705 Mapleton has evolved many times during its lifetime. It could be said that the facade maps a timeline of “improvements” from these time periods and yet this showcase does not easily or appropriately induct this home into the fabric of the Mapleton Hill Historic District. Rooflines and overall proportions, in both form and window language, are awkward and unforgiving - presenting stark elevations with little attention to 705 Mapleton Ave, Boulder Page 3 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 31 of 68 detailing or complementary forms for a home in one of the most prominent historic areas of the City of Boulder. Horizontal lap siding is boring and dated and while some attempts have been made to be cohesive with exterior coloring and choice of materials, the home still feels like a sore thumb. This home doubled in size during an earlier remodel and has since been made into a dull 2-story mass. At best, this property is challenging. We are not dealing with a blank slate and are bound by historic guidelines, jurisdictional design criteria, finances and an erratic design language that has allowed all historic proportions/considerations to become obscured. After numerous conversations with a City of Boulder Historic Preservation Staff member and a review of the Mapleton Hill Historic District Design Guidelines (MHHDDG), our team feels we have arrived at an exciting and contextually appropriate update for this home. While we can’t go back in time and erect a single-story home, we must acknowledge the value of the home as it currently exists (square footage, building lot coverage). Our team has taken the home as it is and offered a design proposal that is beneficial to the homeowner, neighboring Mapleton Hill residents and supports the ongoing efforts to establish the evolving visual character of the Mapleton Hill historic landscape. This proposal leans on the MHHDDG suggestion that the environment of Mapleton Hill, “demonstrates a wide combination of elements, styles, and motifs,that harmonize to create a lively environment and an animate, fresh fabric” (p. 3). After traveling the neighborhood it is clear that this diverse fabric is what unites this historic district. There are many varieties of home styles harking back to the original character and a few less popular architectural styles that keep the district feeling both old and new at the same time. This fresh, wide combination of styles is part of the charm of Mapleton Hill. 705 Mapleton Avenue, as it exists today, has little to work with. The remaining historic elements are sandwiched between 2-story masses, the roof language is erratic and non-cohesive, and what remains is a home that is busy and chaotic. The proposed design presents a clarity of forms, one that attempts to negotiate existing forms by simplifying visual character. The proposed design is arguably more historically appropriate and stylistically more interesting than what currently exists. In our proposal (please reference pages A0.1 - A4.2 in the attached LAC Application), the south mass, the entry and primary elevation, is a 2-story brick form. This material choice is a historically appropriate material. The massing is an effort to simplify rooflines and forms. A front porch is proposed to address Mapleton Avenue and reunite this home with more connection and context of the streetscape, as well as soften the facade. The rear existing 2-story mass transitions to a secondary feature that both complements and recedes in significance (via materiality and detailing). The Mapleton Hill Historic Design Guidelines define suggests: “based on the visual characteristics of the historic district as it exists today” (p.1). We suggest that if all architectural styles adhered stylistically to the most similar (gable roof massing), or most represented design forms (hip roof form) in the district then the diversity would not exist, nor would the intrigue of Mapleton Hill. This holds true for both historic and newly remodeled or constructed residences. Our case below will show how the proposed design, and parapet flat roof design, is not only 705 Mapleton Ave, Boulder Page 4 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 32 of 68 appropriate and present in the direct vicinity of 705 Mapleton Avenue but is also an exciting choice to continue the distinction and evolution of this important historic district. Mapleton Hill Historic District Design Guidelines: VI. DESIGN GUIDELINES This home is situated on the north side of Mapleton Avenue where original homes were “generally smaller and simpler in detail than those south of Mapleton Avenue” (p.5). Lots are smaller and narrower and homes were placed closer to the street. This language is true for homes north of Mapleton Avenue, yet we see homes on the north side of Mapleton Avenue still large and relatable to homes south of Mapleton Avenue. Some homes are 2-story [ Exhibit B : 2-story masonry homes with adjacency to 705 Mapleton Avenue along Mapleton Avenue between the 600 and 700 block] and not necessarily simpler in detail than south Mapleton Avenue homes. It would be inappropriate to take the current 705 Mapleton home back to a single story mass so we present our narrative by referencing “new construction” as necessary. While an addition is proposed along the east home facade, a tertiary elevation, this new square footage includes previous building coverage for the existing entry sequence and maintains side yard spacing between the home and eastern property line. Detailing on the proposed design is restrained yet complimentary to historic brick detailing including a protruded brick course and modest dentil. Window language would be a modern flush-mounted double hung window (wood or wood clad at the recommendation of the Board) with a horizontal stone header and brick sill. Page numbers (in parentheses) refer to pages in the Mapleton Hill Historic District Design Guidelines (adopted 1985 and revised 1994), unless noted otherwise. E. BUILDING ALIGNMENT The attached proposal offers a modest front porch that is allowed to exist in the front yard setback at 6 feet deep and still adhere to City of Boulder neighborhood compatibility standards. While the pattern of alignment has already been broken with previous additions, the addition of a front porch is “encouraged” even though it would “encroach into the existing alignment” (p. 8). This porch was previously approved as part of a 2020 LAC application and reinstates a visible and physical traditional approach to the house from the Mapleton Avenue street front. Guidelines in this section suggest that existing horizontal or vertical proportions of the building mass be preserved. The question for this project becomes whether to reference the historic mass or existing mass. Our proposal treats this remodel as a continuation of the existing language with reference to the original home. No design suggestion has been made without consulting the original 1900’s home design. After so many years of modifications it would be unrealistic, and cost prohibitive, to return to the historic form. We lean on immediate context (within a 3 block radius) to show precedent for 2-story, wall-dominated, parapet forms on 705 Mapleton Ave, Boulder Page 5 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 33 of 68 prominent Mapleton Hill corner lots [ Exhibit C : Flat Roof structures in the Mapleton Hill Historic District]. This design proposal is relying on the suggestions that diversity in form is contextually appropriate to maintain the diversity of this historic district and that a few courageous design suggestions are required to offer representations of “combinations of elements from a variety of historical sources” (p3.). F. MASSING 705 Mapleton gave up its historic/original character many decades ago. The single story, gable + hip mass that was built at the turn of the 20th century is barely visible on the west facade and not at all from the south Mapleton Avenue facade. The attached proposal offers an entry porch, like the original 1900’s design, on the south facing facade fronting Mapleton Avenue, thus reinstating the primary elevation. Any vertical or horizontal proportioning that may have historically existed was also significantly altered in the 1980’s. The proposed design is making an effort to offer a more appropriate form to the Mapleton Hill Historic District by “cleaning up” the 1980’s steep mono-pitch roof forms with a more historically suggestive (flat roof) parapet design. The significance of this design decision allows the homeowners to retain important interior spatial qualities without compromising existing square footage. The flat roof design also sets the stage to simplify the existing forms and allows historic language an opportunity to become more distinguished. It is the feeling of the design team that this home may more closely align with New Construction guidelines (section N) as opposed to reconciling massing between this existing highly modified home versus the original design. Incremental growth and change of forms over the years has not always helped the forms. It would be fair to say that the house has been savaged. What remains is a busy and dramatic house that neither complements or enhances the character of the Mapleton Hill Historic District or this highly visible corner of Mapleton Avenue and 7th Street. G. ROOF LINES, SKYLIGHTS, AND DORMERS The opening paragraph of this guideline states that while the most represented roof forms in the MHHD are steeply-pitched hipped or gable roofs, most other types are also represented (p.9). Given the narrowness of this lot and the existing second story, both a steeply-pitched hipped or gable roof design (that align and complement the existing 7:12 roof pitch) pose challenges for this home and increased massing more than the proposed design. The parapet design for this home was reached through multiple design exercises and iterations as well as consideration alongside the historic brick and gable roof that remains in-tact. Our team feels the front and rear design strategies for a street facing square brick mass and rear shake shingle 2nd story mass allow a differing, but complementary design language. The proposed design does not challenge the historic home, or attempt to recreate a false association with massing and form which has long been abandoned. 705 Mapleton Ave, Boulder Page 6 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 34 of 68 A new entry porch is proposed to have a simple, understated flat roof. No new skylights are visible from Mapleton Avenue or 7th street, nor are any solar panels proposed that would be visible from adjacent streets or properties. An existing roof deck on the north-east corner of the home (interior and alley facing) will be retained. All proposed, visible, roofing material will be asphalt shingles - the same material used to roof the existing historic home. l. WINDOWS New window language for 705 Mapleton Ave. will draw from the original double hung window language. Window proportions will also recreate a more historic window pattern and alignment along Mapleton Avenue and 7th Street. Along Mapleton Avenue new windows will be painted wood, double hung with a narrow modern frame set virtually flush to the brick facade. New windows will retain historic proportions and alignments between levels and announce themselves as new by nature of their slim profile. Arch top detailing, visible on the 7th street historic home, will remain and be replaced at new window locations with slab stone headers and soldier course brick sills. New windows along 7th Street and alley north elevation will be more suggestive of a remodel in terms of their size and shape but will incorporate leaded glass (in the bathroom mass) as a connective detail to historic window detailing (also represented in adjacent homes to the east, 745 Mapleton Avenue). Rear windows will also be painted wood and double hung with a narrow modern profile. Window proportions will be more extreme than historic (tall and narrow) and will have little relationship to windows on the main level, thus creating a more distinctive “addition” on the 2nd story. Double hung windows reflect the window patterns of the Mapleton Hill Historic District as do small subdivided portions of leaded glass patterns. New openings are aligned with existing floor levels. There will also be a nod towards the historic home with a round portal window (part of original home gable end ventilation) at the newly enclosed south-east single story addition of the home. No changes of any kind will be made to existing historic windows, their trim or detailing, except for paint color as noted in section R. PAINT SCHEMES AND COLORS below. K. EXTERIOR MATERIALS Brick on the Mapleton Avenue, south-facing facade, is a more formal material (versus the rear massing shake shingles) and our preference is to continue utilizing brick as the main exterior material. We are proposing to paint all new and historic brick as our goal is to create cohesion. If the Board finds this suggestion controversial then we would be open to painting new brick and retaining historic red brick - although this may still present a busy exterior visual composition. 705 Mapleton Ave, Boulder Page 7 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 35 of 68 Simple brick detailing at the front mass parapet would be effective in complementing historic brick detailing from the earlier time period of Mapleton Hill yet window detailing would be simpler in nature than historic detailing (no arch, painted brick sill, modern narrow window frames) to separate new from old. Slab headers, a larger scale material than brick arches, will be introduced to signal newer alterations rather than mimicking historic conditions. New windows, in the shake siding remodel at the rear of the house, will have no trim or detailing. The selection of brick for Mapleton Avenue and shake shingles for the 7th Street facades are an effort to match historic proportions. The rear mass will naturally distinguish itself by virtue of shake siding (a historic material represented as close as an adjacent neighbor across 7th street at 643 Mapleton Avenue). Historic elements are not attempting to be replicated yet respected in their use. Shake shingles were also used on the gable end of the historic home entry porch. Considering formality of form and prominence (using Mapleton Avenue as the priority approach), hierarchy is being introduced through materiality not mass. The massing proposal along Mapleton Avenue is 20 inches lower than allowed, to reduce the scale of this wall-dominated facade. L. PORCHES AND RAILINGS This home originally had a south-facing Mapleton Avenue porch. Then the porch was removed and relocated to the eastern facade along the interior lot line. We would like to welcome a porch back to our design. While no longer asymmetrically appropriate, given the changes in mass decades ago, our new porch design will reintroduce the prominence of the south facade and compliment the historic context of front porches along Mapleton Avenue. The porch roof will be supported by freestanding wood columns and a masonry knee wall. The proposed brick railing deviates from the historic porch language of this home (wood columns and wood railings) yet is the desire of the homeowner and not atypical to the district. Many 2 story brick homes in the MHHD have brick or masonry porch railings and still allow homes to remain visible. [ Exhibit D : Examples of masonry porch railings in the Mapleton Hill Historic District.] R. PAINT SCHEMES AND COLORS Please see attached [ Exhibit E : Paint Schemes and Colors]. Our scheme is proposing a light painted brick home with a stone foundation and grey accents. Newly introduced brick at the south and east forms will be painted (see section K. EXTERIOR MATERIALS). Existing horizontal siding will remain along the east of the home. We would like to repaint all new and existing windows and trim (including fascia, soffits and window trim) at these locations to be dark grey. New windows at brick facades will have natural buff stone headers and painted brick sills. The new entry porch will draw upon this proposed color scheme with dark grey columns and fascia. 705 Mapleton Ave, Boulder Page 8 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 36 of 68 The rear mass will have natural stained shake shingles in one neutral tone. Window frames at the rear of the house will be painted a dark grey color (no trim) to create a more cohesive design scheme. This scheme aligns with the guidelines by introducing one light (natural shake shingle and buff stone) and one dark (dark grey) color and one bright color (white). S. MISCELLANEOUS This is an interesting section and gives pause when considering this home and proposed alterations. Our design team has experimented with quite a few options for this home remodel and we have considered the existing home and all of its modifications along the way. It feels clear to us that what we can see of the historic home is valuable to maintain given what little remains. And, while the additions to this home, both on the north and south elevations, may have typified architectural gestures of their time period, these gestures do not contribute to the character of the home and certainly not the character of the neighborhood. Some existing rooflines and window patterns are either bland or inappropriate to a historic district. The most glaring inconsistency with this home is the lack of street presence, or “curb appeal”, along Mapleton Avenue. This non-contributing building wants to be quiet and elegant and yet it has an important corner location. This conundrum must be navigated and offers an exciting opportunity to walk a fine line between remaining understated and blending in, as well as its corner lot location and high visibility. T. MAJOR EXTERIOR RENOVATIONS, ADDITIONS AND SECOND STORIES Every effort has been made in this proposal to respect and retain existing historic elements that have integrity. Portions of the home that have been evaluated for remodel are post-1940’s additions that have been modified beyond recognition. The impetus for this proposal originated from the current homeowners desire to offer a more complementary home back into the fold of the Mapleton Hill Historic District. (It should be noted that no exterior design modifications impact the interior footprint of this home since the approved 2020 LAC (HIS2020-00147 - Remodel of non-contributing house) application. The singular purpose of this monumental effort to take this home once again through a major City of Boulder process is to weave its aesthetics more completely into the neighborhood.) All second story remodel gestures have been applied to post 1940’s elements and are simply an attempt to simplify the external form of a home that has lost its way. With so many conflicting rooflines and proportions it has been our team’s desire to offer a simpler and more cohesive design language that doesn’t compete with the remaining historic character. Square forms allow an already existing upper level to retain viable square footage and distinguish remodel elements as differentiated from historic. 705 Mapleton Ave, Boulder Page 9 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 37 of 68 The MHHDG suggest remodels and additions be non-competitive and complementary to historic character and immediate context. And yet, this prominent location on the corner of Mapleton Avenue and 7th Street demands some attention. Design suggestions have been made to recognize the significance of corner lots (with 2 facade conditions) and the reality of Mapleton Avenue as a major historic thoroughfare in Boulder. And yet, most of the exterior of this home is not historic and should be both recognized and differentiated as such. The prominence of corner lots has been reflected upon for this proposal. On the north side of Mapleton alone (still in the MHHD) exist 2 properties with flat roofs on corner lots, one of which is on Mapleton Avenue) and a larger flat roof project on Mapleton Avenue [ Exhibit C : Flat Roof projects in the Mapleton Hill Historic District] On the south side of Mapleton, there are some successful precedents for flat roof additions (and some not so successful) that suggest that this rare design language can exist in harmony alongside historic design language. Added square footage, the portion of enclosed space taking over the existing entry sequence, is on a tertiary facade along the eastern property line. This is perhaps the only facade that is not extensively visible to the public. The north side (neighborhood) of Mapleton Avenue, while in general more modest than the southern neighborhood, also presents large scale properties along the northern boulevard and the home at 705 Mapleton Avenue still feels petite compared to that of some of its neighbors. The property adjacent to the west is a 2 story property and towers much higher on its raised lot. And properties to the east, while only presenting as a story and a half, still read at a similar height given roof slope and architectural language. [ Exhibit B : 2-story masonry homes with adjacency to 705 Mapleton Avenue along Mapleton Avenue between the 600 and 700 block] . Proposed materials for this project are visible in neighboring homes (brick, shingles) and are being used in complementary and distinctive patterns and tones to suggest a modern expression over historic. Materials on the facade are repeated across all 4 facades (existing siding, new shingles, brick). U. NEW CONSTRUCTION The innovation with this proposal is the courage to suggest a design language that is both rare and unique in the district. The flat roof parapet design is not a stranger to historic design language appropriate to the era of this district, yet is not prolific in the district. The hope is that the new proposal presents with enough intrigue (to satisfy this prominent corner lot) yet downplays the truth of its modern completion. This is no simple effort and has been considered with sincerity. As stated in the guidelines, “Each corner lot will present a unique design challenge for a highly visible building that does not disrupt the historic context.” (p. 19). The effort to present a contemporary expression of historic elements alongside simple, compatible new construction is a balance we are hoping to achieve with our design. Opportunities may exist to further simplify or distinguish the southern facade as “new construction” yet this proposal presents a new opportunity for architectural celebration on this lot. 705 Mapleton Ave, Boulder Page 10 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 38 of 68 In Closing : Our team is excited by the prospect of transforming this humdrum home into something more appropriate for the Mapleton Hill Historic District. While architecture can offer shelter, it is the union of shelter and beauty that instills the desire to construct guidelines and preserve character and language of transitioning times. How much is too much and how little isn’t worth the effort? When working with an existing home it is important to remember the occupants, both then and now, and what constitutes “appropriate”. Limitations of some sort or another always present themselves in design projects and it becomes an exciting and revolutionary challenge to meet these opportunities head-on. And so we present our project to re-envision 705 Mapleton Avenue. This home has been recreated many times before and by many hands and we hope our design suggestions are met with an open mind and value, amongst many considerations, has been achieved. Thank you for your time and we look forward to this continued dialogue. Warmly, Rachel Lee, AIA Senior Architect, Mosaic Architects + Interiors Attachments: 5 Exhibit A : Historic Building Inventory, c. 1929 Exhibit B : 2-story masonry homes with adjacency to 705 Mapleton Avenue along Mapleton Avenue between the 600 and 700 block Exhibit C : Flat Roof structures in the Mapleton Hill Historic District Exhibit D : Examples of masonry porch railings in the Mapleton Hill Historic District. Exhibit E : Paint Schemes and Colors 705 Mapleton Ave, Boulder Page 11 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 39 of 68 A0.112/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 EXISTING PHOTOS EXISTING SOUTH ELEVATION (MAPLETON AVENUE)EXISTING EAST ELEVATION (INTERIOR LOT LINE) EXISTING WEST ELEVATION (7TH STREET)EXISTING REAR ELEVATION (ALLEY)SOUTH GARAGE ELEVATION Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 40 of 68 5446.571006PIN 4RBR5448.051007PIN 4RBRWM4"/15'10"/32'12"/22'IRVIRV4 "/20' 1 0 " / 2 5 '2 4" /5 0'5 4 4 4.8 71 1 74 PIN 5 R B R 1 . 5 I N A C I L L C OC OEPGM0 .0 05 0 0S E T PIN C AL CEM5445 5445 5445 5 4 4 6.5 71 0 06PIN 4RB R5 4 4 8.0 51 0 07PIN 4RB RWM4 "/15'1 0" /3 2'1 2" /2 2'IRVIRV4 " / 2 0 '1 0" /2 5'2 4" /5 0'5 4 4 4.8 71 1 74 PIN 5 R B R 1 . 5 I N A C I L L C OC OEPGM0 .0 05 0 0S E T PIN C AL CEM5445 5445 5445 ALLEYMAPLETON AVE7TH STREET EXISTING GARAGE EXISTING HISTORIC HOME (E) SKYLIGHTS (E) ROOF DECK (E) DECK, BELOW Sidewalk Sidewalk(E) WINDOW WELL (WW)(E)WW (E)WW (E)WW ENTRY SEQUENCE front setback 25' - 0" rear setback 25' - 0"s.setback5' - 0"side setback12' - 6"ALLEYMAPLETON AVE7TH STREET NEW FRONT PORCH EXISTING GARAGE (E) DECK, BELOW Sidewalk SidewalkEXISTING HISTORIC HOME (N) FLAT ROOF (E) ROOF DECK (E) (N) FLAT ROOF *NOTE : All existing window wells to remain FAR = Floor Area Ratio (per CoB) BC = Building Coverage (per CoB) (N) SKYLIGHT (N) FLAT (E) FAR : +46sf (Conditioned) FAR : +155sf (Conditioned) FAR : +116sf (Unconditioned) front setback 25' - 0" 6' - 0"s.setback5' - 0"(BC : Not included 166sf Front Porch) BC : +66sf FAR : +21sf (Conditioned) (N) SKYLIGHT A1.112/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 SITE PLAN Scale: 1/16" = 1'-0"1 SITE PLAN - EXISTING Scale: 1/16" = 1'-0"2 SITE PLAN - PROPOSED NORTHAttachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 41 of 68 A1.212/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 ISP/ SURVEY Relative Scale Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 42 of 68 01 -MAIN LEVEL 5449' -2 5/32" 02 -UPPER LEVEL -FRONT 5457' -1 1/32" 03 -ROOF 5470' -9 15/16" MAX HIGH PT 5479' -4 13/16" A2.112/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 ELEVATIONS Scale: 1/8" = 1'-0"1 SOUTH ELEVATION - EXISTING Scale: 1/8" = 1'-0"2 SOUTH ELEVATION - PROPOSED Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 43 of 68 01 -MAIN LEVEL 5449' -2 5/32" 03 -ROOF 5470' -9 15/16" 02 -UPPER LEVEL -REAR 5458' -11 13/32" MAX HIGH PT 5479' -4 13/16" A2.212/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 ELEVATIONS Scale: 1/8" = 1'-0"1 NORTH ELEVATION - EXISTING Scale: 1/8" = 1'-0"2 NORTH ELEVATION - PROPOSED Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 44 of 68 01 -MAIN LEVEL 5449' -2 5/32" 02 -UPPER LEVEL -FRONT 5457' -1 1/32" 03 -ROOF 5470' -9 15/16" 02 -UPPER LEVEL -REAR 5458' -11 13/32" 01 -MAIN LEVEL 5449' -2 5/32" 02 -UPPER LEVEL -FRONT 5457' -1 1/32" 03 -ROOF 5470' -9 15/16" 02 -UPPER LEVEL -REAR 5458' -11 13/32" A2.312/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 ELEVATIONS Scale: 1/8" = 1'-0"1 EAST ELEVATION - EXISTING Scale: 1/8" = 1'-0"2 EAST ELEVATION - PROPOSED Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 45 of 68 01 -MAIN LEVEL 5449' -2 5/32" 02 -UPPER LEVEL -FRONT 5457' -1 1/32" 03 -ROOF 5470' -9 15/16" 02 -UPPER LEVEL -REAR 5458' -11 13/32" 01 -MAIN LEVEL 5449' -2 5/32" 02 -UPPER LEVEL -FRONT 5457' -1 1/32" 03 -ROOF 5470' -9 15/16" 02 -UPPER LEVEL -REAR 5458' -11 13/32" A2.412/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 ELEVATIONS Scale: 1/8" = 1'-0"1 WEST ELEVATION - EXISTING Scale: 1/8" = 1'-0"2 WEST ELEVATION - PROPOSED Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 46 of 68 A3.112/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 PERSPECTIVES Scale:2 SOUTHEAST PERSPECTIVE - PROPOSED Scale:1 SOUTHEAST PERSPECTIVE - EXISTING Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 47 of 68 A3.212/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 PERSPECTIVES Scale:1 SOUTHWEST PERSPECTIVE - PROPOSED Scale:2 SOUTHWEST PERSPECTIVE - EXISTING Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 48 of 68 A3.312/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 PERSPECTIVES Scale:1 NORTHEAST PERSPECTIVE - EXISTING Scale:2 NORTHEAST PERSPECTIVE - PROPOSED Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 49 of 68 A3.412/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 PERSPECTIVES Scale:1 NORTHWEST PERSPECTIVE - EXISTING Scale:2 NORTHWEST PERSPECTIVE - PROPOSED Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 50 of 68 Shaded region denotes new massing Dashed line indicates previous ridge 4 1/2"9 3/8"Dashed line of existing roofline and dormer A4.112/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 DIAGRAM 1 Scale: 1/8" = 1'-0"1 WEST ELEVATION - PROPOSED - LANDMARKS DIAGRAM Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 51 of 68 A4.212/29/21Mapleton 705 Mapleton Ave. Boulder, CO 80304 MAPLETON STREETSCAPE NEIGHBORING HOME HIGH POINTPROPOSED STREETSCAPE HIGH POINT Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 52 of 68 ... J Jf/ ,t/ Apprais[d 19 :2 1 EST A TE APPRAISAL (_,/ HOUSE No. 7 OS-STREET Yfl�CITY �__j_J.u_ LOTS J 7 -J g BLOCK 3 ADDITION rt).�� / .._:]� 4� 30 , Year Constructed tfv-'-v +c>Est. Life in Year ESTIMATE OF VALUATION \ BLDG. PART A BLDG. PA.RT B GAR.AGE No. CuBi� Feet___ - _)__Lj_ (, __ :l_Q__ ---------------�-�-�o!-'G Cost per cu . ft. _________________________________ ------�-----Total Cost ____________ $ __ ,0_;?._:i ___ $ ____ j __ �{J__ $-/._J_�--Porches __________________________________________________ -----Garag e _______________________ -o _______ /_ 3 � ____________ _ :: Ext,as ::: :::::: :::::: ::: :: : :::::::::I::::::::::::::: : ::: : : : _____ BUILDING PLAN ,:> I /,. fJ TOTAL ______ $ __ ..J.. __ +.:_?_.5-:°_ $ __ )_� _:'t')_ $ ___________ /'t_/ O X: I ;2. ')J-----�bsolesen ce ___ _______________ _______________ ____________t '2-- ':I..Q r.PhysicaIDii ::_ ___ _l __ 3 __ )__Q ____ .!_: ______ � --.J-d--- Net �!���c?:t���:���-$ _ _Lj __ �-�,$---�-_?_�-� $��----�---/'/ }j,w-o.(\ � • .'.,?_Q % Utility Dep. ---$----�--l-�-r-------------$ ___________ PRESENT VALUE __ $ __ [ __ � __ ]_ ___ $ ______________ $ __________ _ DESCRIPTION Class of Bldg. _________ (!___ _______ Basement _ ___________ f _____ ?_ b '1 Constru ction ___ �V---Roof-----------�J:5-::-__ � Char of Const. ----------------Heating _______ --�-- ---================c:::::==========:=c======H=e=i =gh=t=o=f =B=u=il=d=in=g= __ =t=_�=?..:::,: __ =_v= __ =_= __ =_= __ =_Exterior _____ -��---Plumbing _____ (.tt:R__�.__'k-__ SUMMARY ANNUAL ASSESSMENT Interior Finish _e�-��---Light_ _________ _t_ °..�.J..L9 _____ 11 _________ D_E_S_CR_I_PT_I_ON _______ _ Floors--------�*---------Priv. Garag e __ ---�----i ____ ,1_B_u_il _di_n=g _P_e _rm_1t _____________ _ Stories ___________ L_u ____ ! _______ Barns or Sheds --------�-----Original Cost, Improvements !}_n _ly _______ _11.. / :f J/ Add1t1ons and Betterments Fire Resisting ___ --:Q _________ (._ __ State of Reps I ___ <:h<..-:.c________ Owner's Estimate of Present Value Foundation ____ 5� -+----Local Imps., ---¼--�---✓----,-Pr-i -va_t _e _A _p_p -ra-1-sa_l ______________ _ ADDITIONS AND BETTERMENTS1 Immrance YEAR AMOUNT YEAR AMOUNT Mortg ag e Month ly Rental ---------------$ ------------------------------ $ __________ -----Advertised for Sale -----------------------------------S ____________________________ $________________ Transferred in 19 6 Cf Al\lOUNT YEAR LAND ThlPROVE!\IENTS TOTAL$ 1938 $ $ 1939 $ 1940 $ 1941 --1942 $ 1943 $ 1944 $ 1945 $ 1946 $7.dtfJ 1947 JCj.5& J9IJO Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 53 of 68 CLASS OF BUILDING HEIGHT ROOJ' LIGHT DE S CRIPTION ___________ ,..Ch_e..,c�k1 ____________ C,...h_e_ck1 ___________ ...,...ch_c_ck C'hec)<1 ___________________ ___;;S..;.iv_e..;;.N...;.nccm'-'b-"e111cc 1-Single Residence _______ .L__ No. of Stories__________ -�_l__ CONSTRUCTIO N Electric ity ___________________ L ROOMS STORIES2-Duplex_________________ , ____ F_ O_U_N_D _ A_T_I_O_N ____ Wood Shmgle -------------✓-Gas _________________________ _ 011_ _________________ ---------Basena't 2 3 3-Bungalow, Apt., Crt. --r------------+---1 Composition Shmgle ______ _ 4 Fl t r T Brick ___________________ _ - a O errace --------Tar and Gravel_ ________ -5-Apartment House______Concrete __________________ --7 p d p Livmg Room ______________ )_ __________ _ 6 H tel S tone ---------------------JL_ repare ap r -----------Dining Room----�--------__ / ______ _ - 0 ------------------Sheet Iron ____ -----------7-Store Building _________Wood ---------------------C Tile_______________________ opper ___________________ _ 8-_________ ---------------Concrete Tile ____________ _ PRIVATE GARAGE Dmette --------e---------1-------------+�,,,.1 Kitchen ________________ _ Size __________ L Xl _jl_c._ _fl Construction __ 3..�h--__ _ Breakfast Nook_ Bed Room ______ _ _ _l ___ ------ 2-, 9-0ffice Building ___ �---------------------------------Clay Tile _________________ _ 10-Hospital or Samtarium_----------------------------Slate _____________________ _ Floor--------_f¥ _____ a OJ,L, ----Roof _______ L)l_-)}�_ --�- ___ _ Bath Room _____ _ --------__ l__ 11-Bank Building -------------------------------------A b t Sh" J Toilet Room ____ _ s es os mg e ________ _ 12-Theatre _____________ ---BASEMENT Tin ______________________ _ 13-Warehouse_____________ J P..1 _,l..A �7;:: Heat ________ --------� � t?: 1)---Shower Room __ ---------------------------·--Sleepmg Porch _ �:=!:�::�;;�;::::::::::: �:�;�����:��i���::_ -:::16-Private Garage ________Three-Quarter __ _ ______ _17-Service Station ________Full_ ____________ -�--•.:-_G_ 18-Hot House or Gr. House ____ Cement Floor ____________ _ 19-Poultry House _________F1mshed Walls and Ceiling 20-Barns or Sheds _________ Laundry _________________ _ ---------------------------1 Sun Room _____ _ S TY�E --����� :��-�-���-�-- Gable _____________________ ____ I I IHip _______________________ J/_ S ize ___________ Const. _______ _ Flat __________________________ S ize ___________ Const.--------, Den ___________ _ Storage Room __ Office _________ _ Halls _________ _ Gambrel _________________ _ LO CALIMPR OVEME T S Mansard _________________ _ Leanto _________________ _ Street Pavmg _______________ _ __J __ A-Hey--Pav-frrg _______________ _ FINISH ---------------------------1 PLUMBING Sidewalks ___________________ _ Unfimshed _________ _ -✓--Curbing ____________________ _ ----------------------------EXTERIOK I Old Style----------------- CONSTRUCTION Common Brick ------------J('._ Modern ----. --------------, ----Storm Sewer-----------------Water _________________ --------Plastered, Plai n ________ _Plastered, Orn am ________ _ Papered _______________ _ ------------+--• Pressed Brick _________________ No. Bath Tubs ____________ ,_!__ Sani·tary Sewer ------------------P . d T" d Wire Cut Brick____________ No. Shower Baths_________ El t • •· a1nte or mte -------Frame ____________________ _ Brick _____________________ _ Glazed Brick _____________ _ Tile _____________ -----------Wood Siding _____________ _ Stone _____________________ _ Wood Shingles ___________ _ Concrete, Plain or Block __ _ Cement Stucco ___________ _ Concrete, Reinforced ______ _ Kellastone _______________ _ Steel Frame _______________ _ Stone -----· ______________ _ Corrugated Iron __________ _ ec ricicy -----------------------Softwood Floor_ No. Toilets _________________ L __ G -------_L__ as------------------------------Hardwood Floor ---------No. Lavatories ___________ _ No. Urinals ______________ _ No. Laundry Tubs ________ _ No. Sinks ____ ----�---______ L_ Sanitary Closets ________ _ Cess Pool ________________ _ Telephone ________________________ S f F h 0 twood IDIS --------- MISCELLANEOUS G ve No. HardwoodFm1sh ________ _ Tile ____________________ _ Marble or Onyx. Wall Board ____ _ C_H_A R_A_C_T_E_R _O_F _C_O_N_S_T_ • ......;.. __ 1 Terra Cotta ----------------------------------------------Sideboards __________________ _ Sheetrock _____ _ Buffet ______ -----------------Celotex ________________ _ Tile ______________________ _ Cheap _____________________ _ Medium ___________________ _ Good ______________________ _ -7-V-- HEATING Sto ve _____________________ � Book Cases _________________ _Hot Air __________________ .,_. B eam Ceilmg ------ui-n,----Incinerator ______________ J�-- Cabinet _____________________ _ Wainscoting ____________ _ Metal Ceiling ___________ _ -✓--- Fire Resist ing _____________ _ Hot Water ______________ _ OUTSIDE TRIM Steam ___________________ _ Sky Lights __ ----------------REMARKS Non-Fire Res1stmg _______ _ STATE OF REP AIRS I ::� -------------------·---7. Good _____________________ _ New --------------··------ l I •------------+-�-· / No. Fireplaces ___________ _ Wood ---------------------!(_ No. Dummy Fireplaces ___ _ Terra Cotta _______________ A G d"t d 1r on 1 10ne ______ _ Refrigerator or Cooler ______ _ Bay Wmdows _______________ _ Dormer Wmdows ___________ _ Stone ____________________ _ Galv. Iron ________________ _ ------F-0-. E-L----+--I Porches _____________________ _ Concrete _________________ _ _________________________ !_ Coal --------------------·-� ��s -------- --------------;{ Electricity _______________ _ Altic Give Numbers -------------------------- Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 54 of 68 6th St7th StMapleton Avenue 525 745 705 8116438th StExhibit B: Two-story masonry homes w/ adjacency to 705 Mapleton Ave. Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 55 of 68 Mapleton Avenue Mapleton Avenue Highland Avenue Maxwell Avenue Concord AvenueTO DEWEY TO DEWEY TO BROADWAY TO BR O A D W A Y Pine Street 7th St8th St8th St9th St9th St7th St6th St6th St5th St5th St4th StSpruce Stre e t4th St12 3 4 5 7 10 9 8 6 Highlighted flat roof structures 705 Mapleton Ave. Boundary of Mapleton Hill Historic District NO SCALE Exhibit C: Map of flat roof structures Mapleton Avenue Mapleton Avenue Highland Avenue Maxwell Avenue Concord AvenueTO DEWEY TO DEWEY TO BROADWAY TO BR O A D W A Y Pine Street 7th St8th St8th St9th St9th St7th St6th St6th St5th St5th St4th StSpruce Str e e t4th StAdditional flat roof structures Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 56 of 68 2 6 1 3 4 5 987 10 705 Mapleton Avenue 417-433 Mapleton Avenue 602 Maxwell Avenue 2408 8th Street 840 Mapleton Avenue 615 Spruce Street 605 Highland Avenue 2201 4th Street 2221 4th Street 2299 4th Street Exhibit C, part 2 Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 57 of 68 525 Mapleton Ave.624 Maxwell Ave. 745 Mapleton Ave.2441 7th St. Exhibit D: Examples of masonry porch railings in the MHHD Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 58 of 68 3D Perspective: SW Elevation Exhibit E: Paint Schemes and Colors 3D Perspective: SE Elevation Parapet cap White painted brick facade Stone window header Grey window trim Grey painted porch columns Stone porch wall cap White painted brick porch wall Grey fascia White painted brick Dark metal siding Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 59 of 68 3D Perspective: NW Elevation Exhibit E: Paint Schemes and Colors 3D Perspective: NE Elevation Natural cedar shake shingles Grey window (E) Brick window header, paint (E) Windows and window trim, paint grey (E) Stone sill Grey window box Grey window trim (tone-on-tone) (E) Doors Leaded windows White painted brick White painted brick White painted brick (E) Horizontal siding, paint grey (N) Doors, grey Attachment A - Applicant Materials Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 60 of 68 GENERAL DESIGN GUIDELINES FOR BOULDER'S HISTORIC DISTRICTS & INDIVIDUAL LANDMARKS 3.0 ALTERATIONS The difference between “alteration” and “addition” (section 4) is in the magnitude of change to the original structure. Typically, an alteration is on a smaller scale than an addition. It usually involves elements such as adding dormers, decks, and windows. An addition usually means adding more square footage and/or external walls. As with an addition, an alteration should preserve and complement the historic character of the structure. It should not replicate but should be distinguishable from and simpler in design than any historic element. For example, an added window would not have the elegantly carved frames of a historic window. In general, simpler designs are the most successful. 3.4 Porches Front porches are a common and important visual element of many historic building styles. The porch roof is generally supported by freestanding columns or by columns resting on a masonry wall. Wood railings are anchored with masonry or wood balustrades. A porch is generally open with the facade of the house plainly visible. GUIDELINES: ANALYSIS: CONFORMS .1 Original porches should be preserved. N/A N/A .2 Deteriorated original porches and porch elements, such as railings, balusters and columns, should be repaired or replaced, following recognized preservation methods so that the character of the porch is not compromised. N/A N/A .3 Maintain the height, detail and spacing of the original balustrade if replacing, extending or adding balustrades. Original balustrades shown in 1929 image are wood; proposed new porch are anchored to low masonry wall. As proposal is not to recreate original porch, this treatment may be appropriate. Consider simplifying to wood balustrades. Resolve at LDRC. Maybe .4 Enclosing a front porch negatively impacts the visual character of both the individual house and the streetscape and is inappropriate. N/A N/A .5 If a rear or side porch is to be enclosed, the following guidelines apply: •Maintain the sense of openness, scale, proportion, and separation from the structure of the house. The enclosure should not obscure the main architectural details of the porch or house. •Keep the design and materials as simple as possible rather than trying to match the building facade. N/A N/A .6 Rebuilding a missing original front porch is encouraged if evidence of the original porch can be documented. Proposal does not attempt to recreate the original porch (enclosed gable with Tuscan columns and wood railings) as the front façade of the original house is lost behind a front addition. Maybe .7 The introduction of new porches that were not present historically is inappropriate on individual landmarks and buildings that are contributing to a historic district. N/A. Non-contributing. N/A .8 Porches on new buildings or on non-contributing buildings should be compatible with the architecture of the building, incorporating traditional scale and proportions with updated design details. Scale of front porch is appropriate to front addition to the building and puts the building into scale overall in the streetscape. The hipped roof is not typical, and porches are not typical additions to the short end of Terrace-style buildings. The clustered, spindle porch posts proposed are more typical of a Queen Anne or Colonial Revival, however the lack of entablature is a very contemporary design element. Simplify the design and resolve at LDRC. Maybe .9 Large, two-story tall porches are inappropriate for front facades unless present historically. N/A N/A Attachment B - Design Guideline Analysis Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 61 of 68 3.6 EXTERIOR MATERIALS: WALLS, SIDING, AND MASONRY Brick, stone, horizontal wood-lapped siding, stucco, and wood shingles are common finish materials found in historic districts and on historic structures. Over the years, the materials used in residential construction have not changed dramatically, but the scale of materials has become larger. Narrower lap siding, smaller brick and shingles used alone or in various combinations often distinguish older homes from newer ones. Brick and stone masonry were traditionally left natural while wood surfaces were painted. GUIDELINES: ANALYSIS: CONFORMS .1 Original historic finish materials should be preserved and repaired. • Unpainted masonry surfaces, particularly those with historical significance, should not be painted. • When feasible, remove newer materials that have been applied over historic finishes and that have not achieved historic significance in their own right. Removal of non-historic materials such as stucco or permastone must be tested to assure that the original material will not be damaged in the process. • When repairing masonry use appropriate mortar, i.e., one that is softer than the surrounding masonry. The masonry at the west and east elevation, and the stone lintels and sill the only remaining aspects of the original house. Masonry should not be painted. Painting the masonry, even on portions of a non- contributing house that are not historic is inappropriate. Resolve at LDRC. No .2 New finish materials should be compatible with, but not seek to replicate, original finish materials. • Use materials that are similar in scale, proportion, texture and finish to those used historically. • Use authentic materials - materials made to look like other materials, such as concrete that is scored to look like brick, are not appropriate. New finishes adjacent to the masonry should be reviewed to find a compatible material that complements the original masonry of the historic portions of the house, but is an obvious contemporary addition. Resolve at LDRC. Maybe 3.7 WINDOWS, STORM WINDOWS, AND SHUTTERS Windows, the elements that surround them, and their relationship to one another are one of the most important character-defining elements of a historic building and should be preserved. Improper or insensitive treatment of the windows on a historic structure can seriously detract from its architectural character. The relative importance of a window depends on three factors: the location of the window on the building, the historic significance of the window, and its condition. Windows on elevations visible from public ways, particularly the façade, are especially important. A window that has a high level of historic significance, regardless of its location, may also be very important to the historic integrity of the building. The replacement of historic windows or components including glass, should be considered only as a last resort. At times, property owners consider replacement of their historic windows as a way of improving energy efficiency. Research indicates that, in most cases, the energy efficiency of an old window can be increased to that of a thermal pane replacement window by weatherstripping, insulation of weight pockets, and the application of an interior or exterior storm system. While the energy loss of a building may be reduced by replacing or repairing historic windows, windows are only one factor in the building’s energy usage. It is strongly recommended that a comprehensive energy audit be undertaken to identify areas for improvement. To increase a building’s energy efficiency, a combination of air sealing, additional wall and ceiling insulation, and the adjustment of mechanical systems is generally more effective than focusing only on the repair or replacement of a window. For more information regarding energy efficiency and energy audits for historic buildings, please contact the Office of Environmental Affairs at www.environmentalaffairs.com GUIDELINES: ANALYSIS: CONFORMS Protection of Historic Windows .1 Retain and preserve existing historic windows, including their functional and decorative features, such as frames, glass, sashes, muntins, sills, heads, moldings, surrounds and hardware. Because windows near the façade are particularly critical to the character of historic buildings, their protection may supercede the protection of historic windows elsewhere. In some cases, it may be appropriate to use window elements from rear or side elevations to repair those on the front. While the house is non-contributing, preservation the shape, the brick arch lintels and stone sills of the historic windows is important to the context within the historic district. Yes .2 Preserve original window locations; do not move windows from their historic placement. Not proposed N/A Windows in New Construction Attachment B - Design Guideline Analysis Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 62 of 68 .15 Windows in additions and new structures should reflect the window patterns and proportions of the existing structure and the district and utilize similar materials. For elevations visible from public streets, the relationship of solids to voids should also be compatible. Proposed windows on south module proposed generally reflect the patterns and proportions of the historic window openings on the visible west elevation, though single light double-hung windows may simplify design. The introduction of narrow openings and leaded windows on the west face are inconsistent with traditional window proportions proposed for the south module of the house (and on historic houses in the district. Likewise cantilevered north bay window is uncharacteristic. Window should be inset at least 3” to reinforce punched opening pattern of fenestration. Resolve at Ldrc. Maybe .16 Windows should be trimmed with materials similar in scale, proportion, finish, and character to those used traditionally. Windows styles and character vary. Simplify style and resolve at LDRC. No .17 Openings should indicate floor levels, and generally should not occur between floors. Yes Yes .18 Symmetry or asymmetry of openings should be maintained. Symmetry of south elevation (façade) is more appropriate to the district. Yes .19 Odd window shapes such as octagons, triangles, and diamonds are generally inappropriate. Circular window at south and north elevations are reflective historic house gable, but size, number and location may be inappropriate per this guideline. Resolve at Ldrc Maybe 3.8 DOORS AND STORM DOORS Front doors and primary entrances are among the most important elements of historic buildings. The original size and proportion of a front door, the details of the door, the door surround, and the placement of the door all contribute to the character of the entrance. Property Owners may wish to replace their historic doors to improve energy efficiency. Research indicates that, in most cases, however, the energy efficiency of an old door can be increased to that of a new replacement door by weather-stripping and the application of an interior or exterior storm door system. However, if a property owner wishes to request a landmark alteration certificate to replace doors on a contributing or individually landmarked building, the steps as outlined in the historic Window and Door Replacement/ Retrofit Application Guidelines must be followed. Attachment B - Design Guideline Analysis Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 63 of 68 GUIDELINES: ANALYSIS: CONFORMS .1 Whenever possible, retain and preserve all original doors and door openings. The location of the door(s) proposed for retrofit or replacement is important in assessing their significance to a historic building. In general, the more important the elevation, the less likely that replacement of a historic door will be appropriate. Elevations will be categorized as primary, secondary, or tertiary, using the methodology set out in the Window & Door Replacement Application and Survey. • Replacement of intact historic doors on primary elevations is rarely appropriate. • Replacement of intact historic doors on secondary elevations is generally inappropriate. • Replacement of intact historic doors on tertiary elevation can occur provided it does not compromise the historic integrity of the building. Placement of front door at façade is appropriate. Resolve details of door and materials at LDRC. Maybe .4 Retain and preserve the functional, proportional and decorative features of a primary entrance. These features include the door and its frame, sill, head, jamb, moldings, and any flanking windows. Codify materials and features and resolve at LDRC. Maybe .5 Historic hardware, hinges, locksets, and knobs are door features that are significant and should be preserved. N/A N/A .6 Repair damaged original doors and door assemblies whenever possible following recognized preservation methods. N/A N/A .7 If, through a Window & Door Application Survey replacement is found to be appropriate, the replacement door should match the original as closely as possible. If documentation of the original door is not available, then the appearance of the replacement door should be based on original doors on similar historic structures. N/A N/A .8 Replace wood doors with wood doors. Synthetic materials are generally inappropriate. Synthetic materials rarely duplicate the surface texture, reflective and detail qualities of original materials. The use of materials matching the historic material is recommended. Resolve at LDRC. Maybe .9 If energy conservation and heat loss are a concern, consider using a storm door instead of replacing a historic entry door. Generally, wood storm doors are most appropriate. A metal storm door may be appropriate if it is simple in design and if the frame is durably coated so that raw metal is not visible and fading and chalking are minimized. Vinyl storm doors are generally inappropriate. N/A N/A .10 Doors in additions and new structures should reflect the proportions (height and width) of doors in the existing structure and/or the district. Door proposed in proportion with entry doors. Resolve details of door and materials at LDRC. Yes .11 Doors should be trimmed with materials similar in scale, proportion, finish, and character to those used traditionally. Resolve details of door and materials at LDRC. Maybe Attachment B - Design Guideline Analysis Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 64 of 68 4.2 Distinction from Historic Structures All additions should be discernible from the historic structure. When the original design is duplicated the historic evolution of the building becomes unclear. Instead, additions should be compatible with the historic architecture but clearly recognizable as new construction. GUIDELINES: ANALYSIS: CONFORMS? .1 Distinguish an addition from the historic structure, but maintain visual continuity between the two. One common method is to step the addition back and/or set it in slightly from the historic structure. Every project is different and successful designs may incorporate a variety of approaches. See section 5.0 – Additions to Non-Historic Structures. Non-historic additions include a distinctively different roof type. N/A .2 Do not directly copy historic elements. Instead, interpret historic elements in simpler ways in the addition. See section 5.0 – Additions to Non-Historic Structures. Modifications to additions should be simplified in a contemporary style rather than compete with the historic aspects of the building (mainly the windows). N/A .3 Additions should be simpler in detail than the original structure. An addition that exhibits a more ornate style or implies an earlier period of architecture than that of the original is inappropriate. See section 5.0 – Additions to Non-Historic Structures. Modifications to addition should be simplified in a contemporary style. N/A .4 The architectural style of additions should not imitate the historic style but must be compatible with it. Contemporary style additions are possible, but require the utmost attention to these guidelines to be successful. The use of two distinct historic styles, such as adding Tudor-style half- timbering to a Classic Cottage, is inappropriate. See section 5.0 – Additions to Non-Historic Structures. Modifications to addition should be simplified in a contemporary style rather than trying to emulate different architectural styles. N/A Attachment B - Design Guideline Analysis Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 65 of 68 5.0 ADDITIONS TO NON-HISTORIC STRUCTURES This section contains guidelines for additions to buildings that have been determined to be non-contributing to a historic district. Non- Contributing buildings include those that, although constructed during the district’s period of significance, have been altered to such an extent that the historic integrity is lost and restoration is not possible. Buildings constructed outside the period of significance and that are not individually significant (Individual Landmarks or Significant Newer) are also considered Non-Contributing. In general, the guidelines for additions to non-contributing buildings are more flexible than those for historic buildings, with the exception of site design guidelines (Section 2.0 Site Design) and the respect for the mass and scale of the district. Projects will be evaluated based on these issues and the overall impact on the character of the district. While non-contributing buildings are not required to follow the guidelines in Section 4.0 Additions to Historic Structures, such projects may benefit from the design principles suggested by them. For substantial alterations to a non-historic building, see Section 6.0 New Structures. Substantial alterations are those that would require issuance of a demolition permit if the building were over 50 years of age. GUIDELINES: ANALYSIS: CONFORMS? .1 Follow the guidelines in Section 2.0 Site Design N/A .2 It is not appropriate to construct an addition that will detract from the overall historic character of the district by overwhelming existing buildings in mass and scale. The current additions (1960 – 1994) are inappropriately scaled and architecturally incompatible with the character of the Mapleton Hill Historic District. The proposal is more in keeping with the historic character of the immediate streetscape, but introduces a neo-traditional Terrace building form not common to the district and never present on the site, while maintaining portions of the original house and adding clearly contemporary elements at east and north ends. Use of painted steel siding at east was not used historically as siding material in Mapleton Hill is incompatible with house design. Likewise, use of shingle on rear (north) module seems incongruous with the rest of the building -consider using clapboard siding. Simplify materiality overall. . Resolve to better unify design at Ldrc. Use of stone lintels on Simplify detailing on front module of house to remove stone lintels with brick detailing, do not exceed height of existing stone foundation and do not continue beneath porch, modify front porch to wood construction with open railing, change materiality at east additions to clapboard siding. Maybe .3 Alterations to non-contributing buildings built in a recognizable architectural style should preserve and respect that style. Piecemeal additions (1960 – 1994) could be considered “environmental style.” However, the proposed currently does not embrace a particular style, rather uses components from multiple styles (Italianate, false front, Queen Anne, etc.). Modifications to the building should unify the design in a manner that is contextual, but clearly of its time. Resolve at the Ldrc. No 8.0 MISCELLANEOUS 8.1 Paint and Paint Colors When renovating a historic building, first consider using the original color scheme. The original paint can often be discovered by careful analysis of samples of original materials. If it is not possible to discern original paint colors, a color scheme should be based on historic precedent within the area. The multiple, bright colors used in San Francisco, for instance, were not used in Boulder. Historically, paint colors were more muted tones than those used today because they depended upon a far more limited source of pigments. Most wood-clad buildings were painted entirely, generally with one base color and one or two additional accent colors on details and trim. For masonry structures, the natural color of the brick or stone was dominant; paint was applied to wood trim elements around doors and windows and in gable ends. s a practical matter, it is suggested that quart samples of the color scheme should be applied to a section of building as a test before making final selection. A color on a 1" x 1" paint chip will look different on a whole house. GUIDELINES: ANALYSIS: CONFORMS? .1 Preserve and protect original exterior building surfaces and site features that were painted by maintaining a sound paint film on them. N/A N/A .2 Original materials such as brick and stone that are unpainted should not be painted. Masonry, historic or non-historic, should not be painted. Brick for front module should be carefully selected to ensure compatibility with, but distinction from existing brick. No Attachment B - Design Guideline Analysis Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 66 of 68 .3 When repainting, select paint colors appropriate to the historic building and district. When possible, recreate historic paint schemes based on samples of original materials. • When selecting paint schemes, a good rule of thumb is to use a single body color with a lighter and/or brighter accent color. • Historic paint colors in Boulder are conservative, emphasizing muted shades or tones rather than pure hues. • New paint colors should not be bright or garish. N/A N/A 8.2 Energy Efficiency In 2006, Boulder’s City Council adopted a Climate Action Plan to meet the Kyoto Protocol goals of substantially lower emissions of greenhouse gases. It is the city’s aim to create compatibility between historic preservation and energy efficiency goals. In the historic districts and on individually landmarked buildings it is important to ensure that energy efficiency concerns are addressed in ways that do not damage or diminish the historic character of the building, site or district. It is recommended that before any energy efficiency upgrades are made a comprehensive energy audit is conducted to determine the building’s current energy loss. In historic districts, a variety of energy-conserving site and building features illustrate the sensibility of an earlier era to climate and energy efficiency. Thoughtfully located shade trees buffer residences and sidewalks from the summer sun. Projecting porches provide shaded outdoor space and lessen the impact of the harsh sunlight on the building's interior. Operable windows and shutters allow occupants to control the introduction of sunlight and breezes within the buildings. An understanding of how such historic features enhance energy efficiency is critical to maximizing the energy efficiency of historic buildings. For more information regarding the energy audit program and energy efficiency in historic buildings, please contact the Office of Environmental Affairs at www.environmentalaffairs.com. GUIDELINES: ANALYSIS: CONFORMS? .1 Retain and preserve the inherent energy- conserving features of historic buildings and their sites, including shade trees, porches, and operable windows, transoms, shutters and blinds. Energy efficiency information was not provided in the application, but adding a shaded front porch to a south elevation is typically energy efficient. Yes .2 Increase the thermal efficiency of historic buildings by observing traditional practices, such as weather-stripping and caulking, and by introducing appropriate energy efficient features, such as storm windows and doors. See Guidelines 3.7.23 and 3.8.9 for additional direction. Energy efficiency information was not provided in the application. N/A .3 Replace deteriorated or missing wooden blinds and shutters with matching new units sized to fit the opening. See Guideline 3.7.21 for additional direction. N/A N/A .4 It is not appropriate to install solar collectors in locations that compromise prominent roofs. The installation of solar collectors may be appropriate provided it does not detract from the historic character of the property, landmark or historic district. Addition of PV solar panel was not included in the application. However, the placement of future PV panels on the flat roof should be considered in the design, and the panels could possibly be hidden behind the proposed parapet. N/A U. NEW CONSTRUCTION While new construction should fit into the character of the Mapleton Hill Historic District, there is no intent to require historic imitation. It is appropriate that new designs incorporate the elements that contribute to the character of the District, such as overall mass, rooflines, windows, porches, front entries, etc. However, innovative ways of incorporating such elements and modern expressions of detailing are strongly encouraged. Attachment B - Design Guideline Analysis Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 67 of 68 New construction in the District should be in the character of the buildings surrounding it. Because streetscapes vary in the District, new buildings facing the street should respect and be consistent with the existing block pattern. Traditional site layout, porch size and placement, front entry location, roof type, and door and window sized and patterns should be considered when proposing new in-fill construction. New building on the rear of the lot (including a house behind a house development) should be of a lesser mass and scale than the original structure and more simply detailed. New accessory buildings on the rear of a lot should be consistent with the existing pattern of small structures that are simple and utilitarian in design. New construction on corner lots requires an especially thoughtful approach. Each corner lot will present a unique design challenge for a highly visible building that does not disrupt the historic context. Attachment B - Design Guideline Analysis Item 5B - 705 Mapleton Ave LB Memo 02.02.2022 Page 68 of 68