HomeMy WebLinkAbout08.04.21 LB PresentationPublic
Participation
at Board
meetings
•The city has engaged with community
members to co-create a vision for
productive, meaningful and inclusive civic
conversations.
•This vision supports physical and emotional
safety for community members, staff and
council as well as democracy for people of
all ages, identities, lived experiences, and
political perspectives.
•More about this vision and the full rules of
decorum can be found on the “Participate
in City Council Meetings” page of the city’s
website: https://bouldercolorado.gov/city-
council/participate-in-city-council-
meetings
1
Public
Participation
at Board
meetings
The following are examples of rules of decorum found in the Boulder Revised Code and other guidelines that support this vision. These will be upheld during this meeting.
•All remarks and testimony shall be limited to matters related to city business.
•No participant shall make threats or use other forms of intimidation against any person.
•Obscenity, dehumanizing language, racial epithets, and other speech and behavior that disrupts or otherwise impedes the ability to conduct the meeting are prohibited.
•Participants are required to sign up to speak using the name they are commonly known by,and individuals must display their whole name before being allowed to speak online. Currently, only audio testimony is permitted online.
2
Raise Hand:
Alt Y for PC
Option Y for Mac
*9 for phone
3
Landmarks
Board
Meeting
August 4, 2021
4
Agenda
1.Call to Order
2.Approval of minutes from the June 2, 2021 meeting
3.Public Participation for Non-Public Hearing Items
4.Discussion of Landmark Alteration, Demolition Applications issued and pending
•2130 22nd St. -Stay of Demolition expires Sept. 26, 2021
•515 Alpine Ave. -Stay of Demolition expires Oct. 31, 2021
•Statistical Report for June and July
5.Public Hearings
A.945 14th St. –LAC
B.1149 12th St. and 1128 Pennsylvania Ave. –LAC
C.1503 and 1513 20th St. -Demolition
6.Matters from the Landmarks Board, Planning Department, and City Attorney
Discussion, as of substance, to repeal and reenact the General Design
Guidelines, including changes to Section 2.7 “Pools”
Sub-committee status reports
7.Debrief Meeting / Calendar Check
8.Adjournment
5
2130 22nd St. –Stay of Demolition
6
•Potential Alternative
•Landmark Application
•Ldrc Review of Proposed
Addition
•Stay Expires September 26th.
6
515 Alpine Ave. –Stay of Demolition
•Site Visit June 29
•Stay expires Oct. 31, 2021
•A look ahead:
•Aug. 3 (today): Update
•Sept. 1: Last opportunity to
schedule initiation hearing at the
regular meeting
•Oct. 6: Last regularly scheduled
meeting before the stay of
demolition expires
7
7
/
Link to dynamic map
8
Statistical
Report
0
10
20
30
40
50
60
Jan Feb March April May June July August Sept Oct Nov Dec
2019 2020 2021
9
6/30/2020: 26 applications
7/31/2020: 41 applications 6/30/2021: 25 applications
7/31/2021: 33 applications
Historic Preservation Applications Received 2019 and 2020 vs. 2021
Statistical
Report
27 27
34
39
35
40
28
35
27
36
29
23
19
22
43
23
34
25
33
0
5
10
15
20
25
30
35
40
45
50
Jan Feb March April May June July August Sept Oct Nov Dec
2015-2019 Average 2021
10
5-year average for June: 40 applications
5-year average for July: 28 applications
6/30/2021: 25 applications
7/31/2021: 33 applications
Historic Preservation Applications Received Monthly
Statistical
Report
27 27
34
39
35
40
28
35
27
36
29
23
42
30 30
19
36
26
41
33
27
16
25
29
19
22
43
23
34
25
33
0
5
10
15
20
25
30
35
40
45
50
Jan Feb March April May June July August Sept Oct Nov Dec
2015-2019 Average 2020 2021
11
5-year average for June: 40 applications
5-year average for July: 28 applications
6/30/2021: 25 applications
7/31/2021: 33 applications
Historic Preservation Applications Received Monthly
Agenda
Item 5A
Public hearing and consideration of a Landmark Alteration
Certificate application for a 11.88 kW roof mounted solar PV
system at 845 14th St., a contributing property in the
University Place Historic District, pursuant to Section 9-11-
18 of the Boulder Revised Code 1981, and under the
procedures prescribed by chapter 1-3, "Quasi-Judicial
Hearings," B.R.C. 1981 (HIS2021-00052).
Owners: Vicki and Joel Marks
Applicant: Chelsea Bours, Photon Brothers
12
Quasi-Judicial
Public
Hearing
Procedure
1.All speaking are sworn in
2.Board members note any ex parte contacts
3.Staff presentation; Board may ask questions of staff
4.Applicant presentation; Board may ask questions of applicant
5.Public hearing opened for public comment; the Board may ask
questions
6.Applicant response
7.Public hearing closed; Board discussion
8.A motion requires an affirmative vote of at least 3 members to
pass. Motions must state findings, conclusions, and
recommendation
9.A record of the hearing is kept by staff
13
Criteria for
Review
9-11 -18 (b) & (c),
B.R.C. 1981
The proposed work:
1.Preserves, enhances, or restores and does not damage exterior
architectural features of the property;
2.Does not adversely affect the historic, architectural value of the
property;
3.Architecture, arrangement, texture, color, arrangement of color,
and materials are compatible with the character of the property;
4.The Landmarks Board considers the economic feasibility of
alternatives, incorporation of energy-efficient design, and
enhanced access for the disabled.
14
Landmarks
Board
Options
Approve
Subject to 14-day City Council Call-Up
Deny
•Subject to 45-day City Council Call-Up
Provide applicant opportunity to withdraw
application
Application withdrawn; case closed.
15
Application
Process
16
March 9
Application
Submitted
March 17
LDRC review:
referred to the
Landmarks
Board
July 7
Landmarks
Board
Application
Complete
August 4
Landmarks
Board Hearing
Location
17
Property
History
18
• Located in University Place Historic District (700 & 800 blocks of 14
th Street)
significant for association with the growth of the University of Colorado and need for
faculty & staff housing during the first decades of the 20th C.
•Constructed in 1911 for Lawrence Wooster, head of the psychology department and
CU regent, and Fannie B. Cole, teacher and active in civic and social groups.
Property
Description
19
Property
Description
20
•Side gabled Craftsman-Bungalow
•Widely overhanging eaves, exposed rafters, and triangular knee braces.
•Squared, projecting bay window on façade has shed roof.
•Off-center inset porch.
•West shed roof addition to house appears to have constructed outside of the
1890-1941 period-of significance for the University Place Historic District
Public
Visibility
21
Proposal
22
Site Plan
23
Staff rendering
Site Plan
24
2020 existing & approved site Plan
Rear Yard
25
Proposal
26
Proposal
27
Proposal
28
Proposal
29
Design Guideline Analysis
9-11 -18, B.R.C. 1981
30
General
Design
Guidelines
31
General
Design
Guidelines
32
General
Design
Guidelines
33
University
Place
Historic
District
Design
Guidelines
34
Recommended
Motion
The Landmarks Board adopts the staff memorandum dated August 4,
2021, as the findings of the board and, with conditions, approves a
Landmark Alteration Certificate for location of an 11.88 kW Photo-
Voltaic system at 845 14th Street as shown on plans dated December
10th, 2020, finding that the proposal meets the Standards for
Issuance of a Landmark Alteration Certificate in Chapter 9-11 -18,
B.R.C. 1981 and is generally consistent with the General Design
Guidelines and the University Place Historic District Design
Guidelines.
35
Conditions
of Approval
1.Installing a photo-voltaic system in compliance with the approved plans dated December 10, 2020, except as modified by these conditions of approval.
2.Aapplicant shall explore alternatives to the placement of panels on the east roof area of the historic house including, but not limited to locating them on the existing carport, the approved new accessory building, and/or the c.1940 south shed roof addition to the historic house. If any (or cumulatively all) alternative locations would have the capability to generate the same amount of solar power as the eighteen panels proposed for the east facing roof of the historic house, they should be installed in these locations –details shall be reviewed and approval by the Landmarks Design Review Committee (LDRC).
3.If these explored alternatives are found to not have the capability to generate the same amount of solar power as the eighteen panels proposed for the east face of the historic house, the LDRC shall review and approve final details for installation of the panels on the east facing
roof of the historic house.
36
Findings
The Landmarks Board finds that the project meets the standards for issuance of a Landmark
Alteration Certificate set forth in Section 9-11-18, “Standards for Landmark Alteration
Certificate Applications,” B.R.C. 1981. In reaching this conclusion, the Board considers the
information in the staff memorandum dated August 4th, 2021, and the evidence provided to
the Board at its August 4th, 2021 meeting. Specifically, the Board finds, provided the stated
conditions are met, that:
The installation of an 11.88 kW photo-voltaic system will not damage the historic character
or the immediate streetscape in the historic district and is generally consistent with the
General Design Guidelines and the University Place Historic District Design Guidelines.
The proposed work will not adversely affect the historic, architectural, or aesthetic value of
the contributing property or affect the special historic character of the University Place
Historic District. § 9-11-18(b)(1).
• The architectural style, arrangement, texture, color, arrangement of color, and materials
used on the proposed construction will be compatible with the character of the
contributing property and the University Place Historic District. § 9-11-18(b)(2).
37
Applicant Presentation
38
39
40
Agenda
Item 5B
Public hearing and consideration of a Landmark Alteration
Certificate application for a 1,155 sq. ft. addition, 935 sq. ft.
two story atrium and glass walkway between two pending
landmarks at 1149 12th St. and 1128 Pennsylvania Ave.,
pursuant to Section 9-11-18 of the Boulder Revised Code
1981 and under the procedures prescribed by chapter 1-3,
“Quasi-Judicial Hearing,” B.R.C. 1981 (HIS2021-00113 and
HIS2021-00114).
Owner: Phi Alumnae of Delta Gamma, Inc.
Applicant: Danica Powell, Trestle Strategy Group
41
Quasi-Judicial
Public
Hearing
Procedure
1.All speaking are sworn in
2.Board members note any ex parte contacts
3.Staff presentation; Board may ask questions of staff
4.Applicant presentation; Board may ask questions of applicant
5.Public hearing opened for public comment; the Board may ask
questions
6.Applicant response
7.Public hearing closed; Board discussion
8.A motion requires an affirmative vote of at least 3 members to
pass. Motions must state findings, conclusions, and
recommendation
9.A record of the hearing is kept by staff
42
Criteria for
Review
9-11 -18 (b) & (c),
B.R.C. 1981
The proposed work:
1.Preserves, enhances, or restores and does not damage exterior
architectural features of the property;
2.Does not adversely affect the historic, architectural value of the
property;
3.Architecture, arrangement, texture, color, arrangement of color,
and materials are compatible with the character of the property;
4.The Landmarks Board considers the economic feasibility of
alternatives, incorporation of energy-efficient design, and
enhanced access for the disabled.
43
Landmarks
Board
Options
Approve
Subject to 14-day City Council Call-Up
Deny
•Subject to 45-day City Council Call-Up
Provide applicant opportunity to withdraw
application
Application withdrawn; case closed.
44
Application
Process
45
May 5
Application
Submitted
May 12
LDRC review:
referred to the
Landmarks
Board
July 7
Landmarks
Board
Application
received
August 4
Landmarks
Board Hearing
Location
46
Property
Description
1128 Pennsylvania Ave.
47
Property
Description
1128 Pennsylvania Ave.
48
1128 Pennsylvania Ave. Constructed c.1900, remodeled and added to 1935
• Ornate Tudor-Revival house approximately 15,000 sq. ft. of existing floor
area.
• Steeply pitched side-gable roof.
• Masonry walls with random ashlar stone coursing.
• Three cantilevered gable dormers sided with stucco and half-timbering.
• Multi-light casement windows; some 3-over-1 windows.
• Wide rusticated stone lintels and sills.
• Gable entrance portico with stucco and half-timbering and decorative
vergeboard.
• Squared bay on both ends.
• Stone chimney.
• Courtyard area at east side of building.
• Building is relatively well-preserved and likely eligible for individual landmark
designation and
listing in the National Register of Historic Places (2005 survey).
Property
Description
1149 12th St.
49
Property
Description
1149 12th St.
50
1149 12th St. , Constructed 1897
•Front gambrel roof with shingled end with central triple window
flanked by paired, engaged columns and pilasters, topped by
decorative crown and cameo window with torch
•Regularly coursed stone
•Inset porch with solid stone walls, supported by squared columns
•Bay window on south elevations
•Windows have flat arches, stone sills and many have lattice in
upper sash
•Large pedimented and shingled wall dormers on north and south
•Well -preserved example of late-nineteenth century Colonial-Revival
design notable for its architectural details, including its stone walls,
shingled gambrel end with triple and cameo windows, latticed
window panes, bay window, pedimented dormers and inset porch
supported by squared columns (Historic Building Inventory Form,
1990).
•Building is potentially eligible for listing in the National Register of
Historic Places (Cultural Resource Re-Evaluation Form, 2004).
Property
History
1128 Pennsylvania Ave.Nichols House (prior to remodel and additions by
Huntington) c.1930
51
Property
History
1128 Pennsylvania Ave.
52
1128 Pennsylvania Ave. –Nichols House later Delta Gamma Sorority House
•Founded in 1873 at Lewis College in Mississippi and established at the
University of Colorado in 1886, the Delta Gamma Sorority purchased
property in 1918 from Walter H. Nichols.
•Original Nichols House faced east and had a large circular front porch.
•In 1920, an addition was added to the south elevation and in 1935 the
building underwent a major Tudor-Revival remodeling after designs by
prominent local architect Glen H. Huntington –two stories were added to
the building and the exterior was covered with stone, stucco, and
halftimbering.
•A new wing added on the south elevation and patio incorporated the New
Anderson Ditch, which runs through the property. In 1952, the Delta
Gamma sorority purchased the property to the south (1149 12th Street) and
turned it into an annex.
Property
History
1149 12th St.
53
Property
History
1128 Pennsylvania Ave.
54
1149 12th St. –Delta Gamma Annex
•Constructed in 1897 this well-preserved Colonial-Revival house is eligible
for individual landmark designation and for listing in the National Register
of Historic Places;
•In 1910, this was a boarding house run by Anna E. Warner (above), a widow
with two children, Edward and Annelliel. Lodgers included Amy Gordon,
Georgia Field and Barbara Dolak. Field was a graduate of Smith College and
was enrolled in the Graduate School at the University of Colorado in the
English Literature. By 1914, she had become an instructor at the university.
Ms. Dolak had resided at this house until at least 1908.
•By 1952, Phi Alumnae of Delta Gamma had purchased the property.
Property
Description
55
1128 Pennsylvania Ave.
1149 12th St.
Property
Description
56
Photos
57
Photos
58
Property
Description
59
Proposal
60
Existing &
Proposed
Site Plans
61
Proposed Site Plan
62
62
East
Elevation
(facade)
63
East elevations (as seen from 12th Street)
The elevations depict existing and proposed elevations for both additions.
64
64
East
Elevation
(facade)
65
•1,052 sq. ft., 23’ tall flat roof atrium addition in existing courtyard Steel and
glass curtain wall system intended to create transparency/visibity
•Second-story glass connector linking sorority house and annex
•East bay entrance and east wall openings.
•Fenestration of north and south walls of courtyard, though flat roof shown
to intersect with and truncate second -level eaves and dormers.
•Reconfigured deck at south wing of sorority house
•Brick wall at east face shown to be replaced with new walls
Main House South elevations
The elevations depict existing and proposed elevations for both additions.
66
66
East
Elevation
(facade)
67
East
Elevation
(facade)
68
West
Elevation
(alley)
69
West elevations (as seen from alley)
The elevations depict existing and proposed elevations for the Annex addition.
70
70
West
Elevation
(alley)
71
•970 sq. ft. steep gable-roof addition shown to be constructed against
existing Gambrel roof house to a height of about 38’ (approximately 3’
higher than existing annex house).
•Addition is shown to be constructed on concrete piers (10 parking spaces
beneath).
•Two flat roof bays project from the north and south walls reflecting the
curtain wall design of the proposed atrium and connects into the sorority
house via a proposed 150 sq. ft. elevated and enclosed walkway.
•Gable addition clad in in stucco steel and glass curtain walls on stone
and/brick clad concrete piers.
Annex North elevations
The elevations depict current and proposed elevations for both additions.
72
72
West
Elevation
(alley)
73
West
Elevation
(alley)
74
Design Guideline Analysis
9-11 -18, B.R.C. 1981
75
General
Design
Guidelines
76
General
Design
Guidelines
77
General
Design
Guidelines
78
Recommended
Motion
The Landmarks Board adopts the staff memorandum dated
August 4, 2021, as the findings of the board and deny approval
of a Landmark Alteration Certificate to construct a 1,053 sq.
ft. addition, 970 sq. ft. two story atrium and glass walkway
between 1128 Pennsylvania Ave. and 1149 12th St. as shown on
plans dated September 11th2020, finding that the proposal
does not meet the Standards for Issuance of a Landmark
Alteration Certificate in Chapter 9-11-18, B.R.C. 1981 and is
generally inconsistent with the General Design Guidelines.
79
Findings
The Landmarks Board finds that the applicant has failed to demonstrate that the
project meets the standards for issuance of a Landmark Alteration Certificate set
forth in Section 9-11-18, “Standards for Landmark Alteration Certificate
Applications,” B.R.C. 1981. In reaching this conclusion, the Board considered the
information in the staff memorandum dated August 4, 2021, and the evidence
provided to the Board at its August 4, 2021, meeting. Specifically, the Board finds
that:
1. The proposed addition linking the houses will not preserve the historic character
of the pending landmark properties and is not consistent with the General Design
Guidelines.
2. The proposed work will adversely affect the special character or special historic,
architectural, or aesthetic interest or value of the pending landmark properties. §
9-11-18(b)(1).
3. The architectural style, arrangement, texture, color, arrangement of color, and
materials used on the proposed addition will be incompatible with the character
of the pending landmark properties. § 9-11-18(b)(2).
80
Applicant Presentation
81
Landmark Alteration Certification
Application
Applicant Presentation
1128 Pennsylvania Avenue,Boulder Colorado
August 4,2021
82
Vicinity Map -1128 Pennsylvania Ave.and 1149 12th St.
Pennsylvania Ave.
CollegeAve.12thSt.11thSt.North
1128
Pennsylvania
1149 12th St.
Context
83
Project location: southeast corner of Pennsylvania
Avenue and 12th Street;1128 Pennsylvania is located on
the corner, and 1149 12th is the adjacent home directly
south of 1128 Pennsylvania; applicant will request the
parcels be joined through a lot-line elimination process in
site review
Application type:Landmark Alteration Certification,one
for each of the two buildings
Landmark status:none currently;property owner has
submitted a designation application pending site review
Z oning:RH-5
Property size:20,040 square-feet (combined)
83
An additionto the second
floor of the annex building
●1,155 square-feet of
additional study and
meeting space.
●Visible to the alley and
12th Street and located
above the current parking
●Constructed with stucco
cladding and a shingled
roof.
A glass walkway
●Connect the annex
addition to the main
house
●Increase safety for the
residents to access both
buildings and better
supervision of the annex
Addition to the main
house
Addition to
the Annex
building
An additionto the main
house
●935 square-feet of
enclosed open space
in the form of a
●2-story,energy efficient
atriumfeature
●Visible addition from
12th Street
●Intended to be mostly
glass
●Is separate from the
current exterior walls
and is connected to
the main house
through an existing
entryway onto the
existing patio.
Proposal
84
We have read the staff report for this complicated project,and we are seeking collaboration
from the Landmarks Board and staff in finding a solution and look forward to your feedback.
84
85
85
5
86
The design team arrived at a blended mix of forms that
are differential, yet complementary, to the historic
elements of 1128 Pennsylvania and 1149 12th.
Providing the additions with a distinct and subtle design
is a nod to the historic importance of this property,
something that Delta Gamma honors. Safety,
sustainability, and function are also important
considerations in the design of the additions. We are
excited to talk in more detail at the Landmarks Board
meeting about how we arrived at the design principles
of these additions,including the form of the additions.
As with many older homes in Boulder,some elements
of the properties do not meet current code
requirements for landscaping, parking, and potentially
occupancy. The Delta Gamma houses will be making a
concerted effort to bring the properties closer to
conformity and has chosen to enter a voluntary
landmarking process to demonstrate its interest in
maintaining the properties as an example of high quality
design in Boulder.
Addition to the main house
Addition to
the Annex
building
Our intent is to be collaborative with the city in an effort to build the additions at Delta Gamma while navigating the many requirements and
interests for the property during the regulatory process.Delta Gamma has voluntarily submitted a Landmarks designation application for this
property and is pleased to receive input from the Landmarks Board on the proposed additions prior to submitting a Site Review application.
Proposal -View from 12th Street
6
87
Addition to the Main House
“Atrium feature”
Design Rationale
●Atrium feature is intended to complement
and be deferential to the historic aspects
of the main house
●“Tucks”the A trium into the current patio,
not to be seen from Pennsylvania and with
minimal visibility from 12th
●Encloses the space in glass that echoes
the window design of the main house and
“disappears”into the facade
●Adds appropriatevolume that best suits
the scale of the space and alignment with
first two stories on the main house
Historic considerations
●The “front door”to the main house and the
address faces Pennsylvania Ave, and the
A triumfeature cannot be seen from the
primaryor front door elevation
●Constructs the addition to be separate
from the exterior walls of the main house
●Is setback from the corner of main house
●Maintains the character defining features
of the main house intact 7
88
Addition to the Main House
Revised to a“conservatory”
Original concept
Revised concept 89
89
Addition to the Main House
Revised to a“conservatory”
Original concept
Revised concept 90
90
Addition to the Main House
Revised to a“conservatory”
Original concept
Revised concept 91
91
Addition to theAnnex
“Annex addition”
Design Rationale
●Traditional roof form compliments the roof
forms along the west elevation of the main
house, while the addition itself is
contemporary in design.
●The usability and volume of the interior
space is important to conduct meetings and
make the most of the square-footage,so the
ultimate roof form is important in
maximizing available space. In studying
alternateroof forms,the gable shown
yielded the best volume for the space, as
well as being the most aesthetically
pleasing.
●[Glass walkway design theory]
11
Historic considerations
●Addition is elevated from the ground level,
maintain permeability
●Faces the alley and is minimally visible from
12th
●Is designed distinctfrom the historic
buildings
●Rem oves minimal facade,windows and a
balcony (non-historic) from the current
Annex
92
93
BACKUP SLIDES
93
Existing Site Plan
94
94
Proposed Site Plan
95
95
Existing Level 1 Plan
96
96
Proposed Level 1 Plan
97
97
Existing Level 2 Plan
98
98
Proposed Level 2 Plan
99
99
West elevations (as seen from alley)
The elevations depict existing and proposed elevations for the Annex addition.
100
100
East elevations (as seen from 12th Street)
The elevations depict existing and proposed elevations for both additions.
101
101
North elevations (as seen from Pennsylvania Avenue)
The elevations depict existing and proposed elevations for both additions.
102
102
Main House South elevations
The elevations depict existing and proposed elevations for both additions.
103
103
Annex North elevations
The elevations depict current and proposed elevations for both additions.
104
104
Both Additions -Renderings
The renderings below depict the Annex and Connector additions as seen from 12th Street (landscaping altered to fully
visualize the additions)
View looking southeast
of both houses from
12th Street
View looking east of
both houses from 12th
Street 24
105
Atrium feature -entry/exit points (landscaping altered to fully visualize the additions)
View looking north
from Atrium inside
Main House
View looking west
from Main House living
area (Atriumto the
south)25
106
Atrium feature -interior rendering
Conceptual point of view from the northeast corner of the proposed addition looking southwest (landscaping altered to
fully visualize the additions)
107
107
Atrium feature - 3D aerial
Conceptual aerial looking west with views of both additions (landscaping altered to fully visualize the additions)
108
108
Atrium feature -photo with proposed addition included
View from the corner of Pennsylvania /12th Street toward the primary elevations of the property
109
109
Atrium feature -photo with proposed addition included
View from 12th Street toward the proposed addition
110
110
Annex Addition -Renderings
The renderings below depict the Annex and Connector additions as seen from the alley (landscaping altered to fully
visualize the additions)
View from the alley looking northeast toward both houses
Current photo of the main house (left)and Annex (right)
from the alley
View from the alley looking east toward both houses
Balcony,added in 1994,
proposed for removal
2nd floor window
proposed for removal
111
111
View from the alley
Photos represent the current views from the alley toward the houses.Hardscape parking lot to the west of the Annex
(right photo)will be improved with the addition.
112
112
General Design Guidelines - alignment with proposed additions
Summary overview of how the proposed additions meet the guidelines
-Aligned with existing setbacks in the area
-Additions are appropriately proportioned to the size
of the existing buildings
-Maintains main entry and walkway on P ennsylvania
2.0 Site Design
Building Alignment,Orientation,and Spacing
Streetscape
-The project will comply with landscaping standards
as required in the site review process and in
coordination with the historic preservation team
Alleys
-Access for parking is maintained
-The proposed Annex addition maintains the ground
level permeability
Parking
-Parking in the rear (alley access) is not a proposed
change
-No new curb cuts are proposed
Sidewalks
-Sidewalks will be maintained in current condition
(except if requiredin site review)
Fences and P ools
-Not applicable
-No new components of this nature are proposed
-Existing porches will be maintained
-Existing, non-original 2nd story balcony on the Annex
is proposed to be removed
3.0 Alterations
Roofs,Skylights,and Solar P anels
- No changes to the existing roof form
Roof Decks,Balconies,Decks and P orches
Dormers
-Not applicable
Exterior Materials
-Some existing exterior materials will be removed to
create the proposed additions;however,the project
intends to preserve exterior materials to the full
extent possible during construction
-New finish materials are compatible, but not
replicates of,existing materials
Windows, Storm Windows,and Shutters
-Some existing windows are proposed for removal for
the Annex addition and glass walkway
-All other windows,storm windows and shutters will
be maintained unless required by the Energy Code
Doors and Storm Doors
-No changes to the front doors of either homes
-The existing Main House entry from Courtyard will
open to the new Atrium addition with the proposed
renovations. A new glass entry door system is
proposed to enter the south elevation of the Atrium 32
addition.
113
114
-Character-defining features of the historic building are maintained
-Minimum loss of historic fabric on west elevation of the Annex and
south elevation of the main house for the Annex addition
-Atrium feature allows for removal in the future without damaging
the historic structure
General Design Guidelines - alignment with proposed additions
Summary overview of how the proposed additions meet the guidelines
4.0 Additions
Protection of Historic Structures and Sites
Distinction from Historic Structures
-The design of both additions are complimentary of the historic
style of the homes,yet is distinguished with its own design
characteristics
-Atrium feature was designed to “disappear”into the facade of the
historic home
-Annex addition was designed to be distinct and contemporary,yet
mirror the roof lines of the main house to unify the styles of the two
homes
Compatibility with Historic Structures
-Neither addition visually overpowers the existing homes
-Mass,scale,materials and color are compatible with the scale of
the existing homes
Compatibility with Historic Site and Setting
-Additions have been designed to maintain existing character of the
site,including the Anderson Ditch and surrounding landscaping
-Annex’s front door faces 12th St,and the proposed addition’s view
from 12th St is limited to the glass walkway between the buildings
and the roof peak of the addition
-Annex addition will increase the view from the alley,as it is
currently hardscape parking from the alley to the building
-Atrium feature is proposed for the elevation facing 12th St,however
it is “tucked”into the existing patio area of the facade
as historic
chosen to
voluntarily enter the LAC process as if the properties
were landmarked as it is the intention of the property
owner to landmark the property after site review.
6.0 New Primary Structures and 7.0 Garages &
Other Accessory Structures
None proposed
Key Building Elements
-No changes to roofs or dormers
-The majority of windows will be maintained.The
windows on the south elevation of the main house and
removed towestelevationoftheAnnexwillbe
construct the Annex addition.
5.0 Additions to Non-Historic Structures
These properties are not yet designated
landmarks.However,the applicant has
114
115
General Design Guidelines - alignment with proposed additions
Summary overview of how the proposed additions meet the guidelines
1.Miscellaneous
P aint and P aint Colors
-No brick or original structure painting is proposed
-Annex addition will be stucco,and the paint color will be a
single body color that compliments color scheme of the
existing homes
Energy Efficiency
-The projects will be evaluated for Boulder Energy
Conservation Code (BECC)requirements during the site
review and TEC document phases of development.The
applicant will coordinate with historic preservation and
energy code specialists to meet the intent of this section
of the guidelines as well as the BECC
Mechanical and Utility Facilities
-No new mechanical or utility facilities are currently
proposed on the exterior of the homes.Additional study
will need to take place to determine if suck facilities are
required
Signs,Lighting,Artwork and Public Improvements
- No changes
Americans with Disabilities Act
-Project will follow ADA requirements as well as the design
guidelines to the extent possible for accessibility
requirements
115
About Delta Gamma:The Delta Gamma sorority was
founded at CU Boulder in 1886 and is the oldest,
continuously occupied residential chapter house in Delta
Gamma’s history.Delta Gamma is the proud owner of a
group home located at 1128 Pennsylvania Avenue (main
house)and 1149 12th Street (annex)in the University Hill
area and intends to build two additions to the property that
increases communal space for studying and gathering.The
focus of the addition is to increase common areas and bring
together the unique and important historic nature of the
houses with modern,energy efficient technology and a focus
on environmental sustainability.
The Phi Chapter (Boulder chapter)of Delta Gamma has
adapted its residential footprint over the past century to
respond to changing needs of the chapter,beginning with
the purchase of 1128 Pennsylvania in 1908 and expanding
with the purchase of 1149 12th Street in 1952.Both
purchases and multiple modifications to the homes over the
past 100-years has been in support of the needs of Delta
Gamma sorority members that need a safe,accommodating
residence during their college journey.
Delta Gamma sisterhood is founded on the ability to create
strong bonds and has long held itself to high academic
standards that have demonstrated the need to increase
communal and study space at the Delta Gamma homes in
Boulder.The proposed additions,alongside interior
renovations and technology improvements,will bring the
Delta Gamma house into the 21st century needs of the
sorority while preserving the historic integrity of the property.
View of Main House Addition from corner of 12th Street &Pennsylvania Avenue
116
116
Agenda
Item 5C
Public hearing and consideration of a demolition application
for two primary buildings and an accessory building
constructed in 1880 and 1955. located at 1503 20th St.,
pursuant to Section 9-11-23 of the Boulder Revised Code,
1981., and under the procedures prescribed by chapter 1-3,
"Quasi-Judicial Hearings," B.R.C. 1981 (HIS2021-00036).
Owner: Paritosh Rohilla
Applicant: Matthew Schexnyder, Arcadea Architecture
117
Quasi-
Judicial
Public
Hearing
Procedure
118
1.All speaking are sworn in
2.Board members note any ex parte contacts
3.Staff presentation; Board may ask questions of staff
4.Applicant presentation; Board may ask questions of applicant
5.Public hearing opened for public comment; the Board may ask
questions
6.Applicant response
7.Public hearing closed; Board discussion
8.A motion requires an affirmative vote of at least 3 members to
pass. Motions must state findings, conclusions, and
recommendation
9.A record of the hearing is kept by staff
Purpose of
Review
9-11 -23 (a)
B.R.C. 1981
Prevent the loss of buildings that may have
historic or architectural significance
Provide the time necessary to initiate designation
as an individual landmark or to consider
alternatives for the building.
119
Criteria for
Review
9-11 -5 (c)
B.R.C. 1981
The Landmarks Board “shall consider and base its decision
upon any of the following criteria:
1.The eligibility of the building for designation as an
individual landmark consistent with the purposes and
standards in Sections 9-11 -1 and 9-11 -2, B.R.C. 1981;
2.The relationship of the building to the character of the
neighborhood as an established and definable area;
3.The reasonable condition of the building; and
4.The reasonable projected cost of restoration or repair.
In considering the condition of the building and the projected
cost of restoration or repair as set forth in paragraphs (f)(3) and
(f)(4) …, the board may not consider deterioration caused by
unreasonable neglect.
120
Process
February 16
Application
Submitted
February 24
Landmarks
Design Review
Committee
May 26
Landmarks
Board complete
application
accepted
August 4
Landmarks
Board Hearing
121
Application
Process
•Approve the Demolition
Approval valid for 180 days
•Place a Stay-of-Demolition on the Application
Provide time to consider alternatives to demolition
Stay would expire Nov. 21, 2021.
Initiate Landmark Designation
Schedule an initiation hearing
122
Landmarks
Board
Options
Property
Location
123
Property
Description
1503 20th St.
124
East and north elevations
Property
Description
1503 20th St.
125
East elevation
Property
Description
1503 20th St.
126
North elevation
Property
Description
1503 20th St.
127
North along 20th St.
Property
Description
1503 20th St.
128
South elevation
Property
Description
1503 20th St.
129
North elevation
Alterations
ALTERATIONS –1503 20TH ST., C.1880
Constructed around 1880, with additions likely constructed pre-1940 and alterations since 1970
Original narrow lap siding has been replaced with vertical siding, likely in the 1 970s
Majority of windows appear to have been replaced; original multi-light windows remain on second story of east elevation and in gabled dormers.
Wood shingles replaced with asphalt shingles (common alteration, as wood
shingles are no longer permitted)
130
Property
Description
1513 20th St.
131
East elevation
Property
Description
1513 20th St.
132
South elevation
Property
Description
1513 20th St.
133
West elevation
Alterations
ALTERATIONS –1513 20TH ST., 1955
Remodeled in the 1990s.
Front-facing gables reframed to provide a steeper pitch; four dormers added
Window and door openings appear to be maintained; windows and doors have been replaced
Brick painted
134
Property
History
135
Willits Map, 1887
Property
History
136
Benford Bryan’s Bird’s Eye View of Boulder, 1909
Property
History
137
•Located outside of city limits until the 1950s
•City directories in 1913 and 1916, list the building as vacant.
Known owners:
•1918: C.G. House
•1921: M.J. Leahy
•1923 -1945:Edison and Martha Pilmore
•1947 –1953: Dolores Kiser
•1953 –1958 HF and Faye Wonrow,
•1953 and 1974: short term renters including Waldo Black, Joseph Matysek
and George Zaltzer.
•1979 -1993 Alfred Franz
The property was bought and sold in 1991, 1993, 1999, 2004, 2007, 2016 and
the current owners purchased the property in 2020.
Criteria for Review
9-11 -1 and 9-11 -2 B.R.C. 1981
138
CRITERION 1:
ELIGIBILITY FOR
LANDMARK
DESIGNATION
Historic
Significance
139
140
CRITERION 1:
ELIGIBILITY FOR
LANDMARK
DESIGNATION
Architectural
Significance
141
CRITERION 1:
ELIGIBILITY FOR
LANDMARK
DESIGNATION
Environmental
Significance
142
CRITERION 2:
RELATIONSHIP TO
THE CHARACTER
OF THE
NEIGHBORHOOD
143
CRITERION 3:
CONDITION OF
THE BUILDING
144
CRITERION 4:
PROJECTED COST
OF RESTORATION
OR REPAIR
Recommended
Motion
The Landmarks Board issue a stay-of-demolition for the buildings
located at 1503 and 1513 20th St. for a period not to exceed 180 days
from the day the permit application was accepted by the city manager
in order to explore alternatives to demolishing the building, and adopt
the findings of the staff memorandum dated August 4, 2021.
145
Findings
A stay of demolition for the property at 1503 and 1513 20th St. is appropriate based on the criteria set forth in Section 9-11-23(f), B.R.C. 1981 in that:
The property may be eligible for individual landmark designation based upon its historic, architectural and environmental significance;
The property contributes to the character of the neighborhood as an intact representative of the area’s past;
It has not been demonstrated to be impractical or economically unfeasible to rehabilitate the building.
A 180-day stay period would expire on Nov. 21, 2021.
146
Applicant Presentation
147
1503 -1513 20TH STREET
BOULDER, COLORADO
HISTORIC DEMOLITION PERMIT APPLICATION
AUGUST 4, 2021
CASE NUMBER:HIS2021-00036
OWNER: PARITOSH ROHILLA, ET AL
ARCHITECT:ARCADEA ARCHITECTURE
148
PURPOSE STATEMENT
The applicant would like to redevelop the property to provide additional, affordable
priced units of rental housing in this conveniently located area of the city.
If redeveloped to its full potential,the property could provide needed, modernized
housing options,open space,right-of-way improvements,and other benefits.
The actual, architectural, and historical value of existing structures do not seem to
warrant the extensive measures necessary to preserve the buildings.
149
PROJECT CONSTRAINTS
•The conditions of the existing buildings do not lend themselves to additional remodel
or upgrades.
•1503 is not a great example of architecture from its period;perhaps the age of the
structure is only incentive to preserve the structure.
•2230 20th St.(a few blocks away)recently landmarked;fit to landmark due to evident
architectural and historical value; these structures do not have the same merits.
•The current configurations of the structures create several non-confirming conditions
that also limit significant improvement to the structures or site.
•Residential occupancy in 100-year flood plain and situated below estimated
flood protection elevation
•1503 encroaching over property line
•Combustible construction and unprotected openings at zero-lot line
•Non-conforming parking, driveway,and landscape configurations that cannot be
reconfigured to meet standards
•Lack of typical ROW improvements
•Shared site access from adjacent lot without permanent easement
•Maintaining one or more of the structures prohibits the applicant from achieving the
by-rights floor area and unit density on the property,as these structures do not offer
the highest and best use of the available buildable area.
•1503 has been subject to numerous,significant alterations over time which arguably
diminish the historic character of the structure.
•Based on physical inspection and a builder’s cost model, it is estimated that it would
cost more than two times as much to stabilize and bring 1503 up to standards as it
would cost to demolish and build a new structure of the same floor area and level of
finish.
•Significant flood insurance costs upward of $10,000 per year w/ $35,000 deductible.
150
1503-1513 20TH ST.- SITE PLAN
SCALE:1”=30’15’30’60’
N
KEY:
EXISTING BUILDING
150320THGARAGE
1513 20TH
151
1503-1513 20TH ST.- SITE PLAN
SCALE:1”=30’15’30’60’
N
KEY:
EXISTING BUILDING
1503 20TH
RELOCATED
3’NORTH
BUILDING SEPARATION
REDUCED FROM
15’ TO ~12’; DRIVE RE-
DUCED FROM 12’ TO <9’
APPROX. 26’ DRIVE
LANE WITH PARKING
(NON-CONFORMING:
DOES NOT MEET LAND-
SCAPE STRIP, BACKING
DISTANCE, DRIVE AISLE
WIDTH)
ACCESSIBLE RAMP
NEEDED AS BLDG
RAISED TO FLOOD DE-
SIGN ELEVATION
BUILDING RELOCATED
3’OFF INTERIOR LOT
LINE
EXISTING SHARED DRIVE
ACCESS ON ADJACENT
PROPERTY
152
INSPECTION REPORT &RECOMMENDATIONS
•The structure at 1503 is in the 100-yr floodplain. Assuming the owner takes on any
significant improvements on the site,it is recommended and may be required that the
structure be raised to above flood elevation.
•To comply with flood protection elevation (FPE),all mechanical,HVAC equipment must
be moved above FPE.Alternatively,equipment may remain below FPE (in cellar/crawl)
in waterproof vault.
•The structure at 1503 currently encroaches over the south property line. If the building
is to be raised to address the previous conditions, it is recommended that the owner
have the building relocated approximately 3’north to the zoning setback for interior
lot lines.
•Assuming that 1503 is raised to 2’ above grade to conform to flood design,
approximately 24 linear feet of ramp will be installed to access the finished floor
elevation.
•Other corrective actions will be necessary to stabilize the existing structures.
•Roof sagging and other structural issues
•Wood destroying organisms
•Deteriorated masonry chimney
•Grading
•Other issues
153
ESTIMATED COST OF WORK
•The conditions and corrective actions outlined in the previous section establish
a conceptual scope of work for stabilizing and remediating the structures on the
property.The owner contracted with Magnolia Building Company to review this scope
of work and conduct an independent physical assessment of the structures.
•Based on available reports and physical assessment, the estimated cost of work is
approximately $804,000 at current market cost. This price includes materials, labor,
and contractor overhead.
•Based on industry standards,10%should be added for design and engineering.
•The total estimated cost of stabilizing 1503 would be approximately $884,400.
•TheActual Structure Value (per assessor)of the structure on the property is
$1,285,160.The prorated structure value of 1503 based on finished floor area is
$405,840.Based on this value, the estimated cost of work would be more than 200% of
the value of the structure.
•Using the cost per square foot another metric, the cost of stabilizing 1503 will be
approximately $700 per square foot. By comparison, market-rates for new, residential
construction are typically $250-300 per square foot.
•The projected costs do not include renovated finishes and amenities needed to bring
the property up to current market standards for rental housing.
154
CONCLUSION
The property offers and excellent location for high-quality, attainably priced housing. The
existing structures limit the potential of providing these up-to-date housing options and
accessory benefits.
We would like to see this site offer housing for next fifty years or more. And we are
looking forward to engaging in a thoughtful and meaningful reinvestment in the future of
this property and neighborhood.
155
1503 20TH ST.-EAST ELEVATION (FACING 20TH STREET)
1503 20TH ST.-SOUTH ELEVATION #1
156
1503 20TH ST.-SOUTH ELEVATION #2
1503 20TH ST.-WEST ELEVATION
157
1503 20TH ST.-NORTH ELEVATION #1
1503 20TH ST.-NORTH ELEVATION #2
158
1503 20TH ST.-GARAGE -NORTH EAST CORNER
1503 20TH ST.-GARAGE -SOUTH ELEVATION
159
1503 20TH ST.-GARAGE -NORTH WEST CORNER
1503 20TH ST.-GARAGE -NORTH ELEVATION
160
1513 20TH ST.-EAST ELEVATION (FACING 20TH STREET)
1513 20TH ST.-SOUTH ELEVATION #1
161
1513 20TH ST.-SOUTH ELEVATION #2
1513 20TH ST.-WEST ELEVATION #1
162
1513 20TH ST.-WEST ELEVATION #2
1513 20TH ST.-NORTH ELEVATION
163
Matters
•Discussion, as of substance, the repeal
and reenactment of the General Design
Guidelines, including changes to Section
2.7 “Pools”
•Sub-committee status reports
•Landmarks Board Retreat
164
Recommended
Motion
The Landmarks Board approves, as of substance, the
repeal and reenactment of the General Design
Guidelines, including changes to Section 2.7 “Pools”.
165