Loading...
HomeMy WebLinkAboutItem 5A 1727 and 1737 Pearl Street Site Review LUR2018-00073 corrected PLANNING BOARD ITEM ERRATA SHEET MEETING DATE: June 25, 2020 TO: Planning Board FROM: Planning & Development Services DATE: June 24, 2020 AGENDA ITEM: 5A –Site Review at 1727 and 1737 Pearl Street Attached please find an amended memo for Agenda Item 5A, which is a staff memorandum on a Site Review application to redevelop the properties at 1727 and 1737 Pearl Street with a 28,222 square foot three-story mixed-use building containing 9,439 square feet of commercial space on the first floor and 14 residential units on the second and third floors (case no. LUR2018-00073). We apologize for any inconvenience from this late submittal. The following changes are provided: A. Applicable zone district on Page 10 (DT-2). All other information under “Density/Intensity” is correct. C I T Y O F B O U L D E R AGENDA ITEM PLANNING BOARD MEETING DATE: June 25, 2020 AGENDA TITLE: Public hearing and consideration of a Site Review to redevelop the properties at 1727 and 1737 Pearl Street with a 28,222 square foot three-story mixed-use building containing 9,439 square feet of commercial space on the first floor and 14 residential units on the second and third floors (case no. LUR2018-00073). Development includes one level of underground parking with 14 vehicular parking spaces. Applicant: Adam Wertz Property Owners: 1737 Pearl LLC and 1727 Pearl Boulder LLC REQUESTING DEPARTMENT: Planning & Development Services Mary Ann Weideman, Interim Director Charles Ferro, Development Review Manager Sloane Walbert, Case Manager OBJECTIVE: 1. Planning Board hears applicant and staff presentations. 2. Public Hearing. 3. Planning Board action to approve, approve with conditions, or deny. PROPOSAL AND SITE SUMMARY: Proposal: Proposal for a 28,222 square foot mixed-use building, three stories and 38 feet in height, with below grade parking accessed from the alley via an auto elevator. The proposed project includes 9,439 square feet of ground floor retail/restaurant space; ten residential units on the approximately 9,888 square foot second story; and four residential units on the approximately 8,680 square foot third story. As part of Site Review, the applicant has requested the following modifications from the land use code: • Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 to allow three stories for the building, where two are permitted. • Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 and Section 9-9-3, “Building Design”, B.R.C. 1981 to allow 50% of the ground floor façade facing a public street to be transparent materials, where 60% is required. • Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 to allow a 10-foot front yard setback from the street for the third story, where 15-feet is required. • Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 to allow a 0-foot side yard setback from an interior lot line for the third story, where 12-feet is required. Agenda Item 5A Page 1 of 360 Project Name: NAVY REDEVELOPMENT Location: 1727 and 1737 Pearl Street Size of Property: 0.32-acres (14,111 square feet) Zoning: Downtown 2 (DT-2) Comprehensive Plan: Regional Business (RB) KEY ISSUES: Staff has identified the following key issues to help guide the board’s discussion: 1. Does the project meet the applicable Site Review criteria in Section 9-2-14(h), B.R.C. 1981? 2. Is the proposed project consistent with the Downtown Urban Design Guidelines for the Non-Historic and Interface Areas? PROCESS The applicant has elected to undergo a Site Review. The purpose of Site Review is to allow flexibility and encourage innovation in land use development. Per Table 2-2 of the land use code a Concept Plan and Site Review are required in the DT-2 zone district for projects of one acre or 50,000 square feet of floor area. The proposal meets the thresholds for voluntary site review. The applicant has not requested any modifications to the city’s land use code that would require a mandatory Planning Board hearing. However, given the level of public interest, staff is referring this site review request to Planning Board for a public hearing and decision. Design Advisory Board. The property is subject to the Downtown Urban Design Guidelines and requires review by the Design Advisory Board (DAB). DAB reviews and applies the guidelines on all projects with a construction value over $25,000 in the Non-Historic and Interface Areas. The board reviewed the proposal against the Site Review Criteria and the applicable design guidelines at meetings on Mar. 6, 2019 and Sep. 11, 2019. The project review occurred twice due to the change in scope to include an additional parcel and increased building square footage. The agenda packet, meeting minutes, meeting audio, and other related materials are available in the city records archive for DAB at the links above. Refer to Attachment C for staff’s analysis of the current design against the DAB comments. BACKGROUND The 0.32-acre project site is located north of and adjacent to Pearl Street, between 17th and 18th Streets. Refer to Figure 1 on the following page. The site is located approximately 2.5 blocks east of the Pearl Street Mall, on the eastern edge of the Downtown area. Downtown is one of the city’s three regional activity centers identified within the Boulder Valley Comprehensive Plan with the highest level of intensity within the city The property is not within a historic district but is located within the Central Area General Improvement District (CAGID) and Downtown Boulder Business Improvement District (BID). CAGID provides parking and related improvements and maintenance in a 35-block area encompassing Downtown. The BID provides enhancements and services (economic vitality, marketing and enhanced maintenance) in the roughly the same area as CAGID to supplement services provided by the city. I. INTRODUCTION AND BACKGR OUND Agenda Item 5A Page 2 of 360 Figure 1: Vicinity Map The properties consist of Lots 10 and 11, Block 91 of the Boulder Original Town subdivision, originally platted in 1868. The properties were annexed to the city in 1946. The property at 1727 Pearl St. contains a one- and two-story structure originally constructed as two buildings pre-1940. The buildings contain retail (Little Buddha Import, Top Hat Supply) and office uses. The property at 1737 Pearl St. contains a single-story structure built ca. 1966. The original use was office; today the building contains retail (Red Letter Books) and restaurant uses. Figure 2: Existing Conditions Subject Properties 11773377 PPeeaarrll SStt Agenda Item 5A Page 3 of 360 Figure 3: Existing Conditions Figure 4: Map of Downtown Boulder Land Use Designation. As shown in Figure 5 on the following page, the site is currently designated as Regional Business on the land use map of the Boulder Valley Comprehensive Plan (BVCP). There is no maximum residential density under this designation. The description from the BVCP is below. Site 11772277 PPeeaarrll SStt Agenda Item 5A Page 4 of 360 Figure 5: BVCP Land Use Zoning. The project site is located in the Downtown 2 (DT-2) zone district, which is defined as: “A transition area between the downtown and the surrounding residential areas where a wide range of retail, office, residential, and public uses are permitted. A balance of new development with the maintenance and renovation of existing buildings is anticipated, and where development and redevelopment consistent with the established historic and urban design character is encouraged" (Section 9-5-2(c)(3)(A), B.R.C. 1981). Refer to Figure 6 on the following page for the zoning map. Agenda Item 5A Page 5 of 360 Figure 6: Zoning Districts Area Plans. The site is within the Interface Area of Downtown Boulder and is subject to the Downtown Urban Design Guidelines. The Interface Area is located on the northern, western, and eastern borders of Downtown. The Interface Area includes a wide variety of residential buildings. The area is composed of the blocks that link the core of the Downtown to the surrounding residential neighborhoods. This area requires special design sensitivities that must be addressed when commercial buildings are located adjacent to residential areas. The urban design objectives for the Non-Historic and Interface Areas, among others, are to reinforce the character of Downtown as a pedestrian place by encouraging architectural solutions that are visually pleasing, reflective of contemporary times yet stylistically appropriate to the context, and compatible in scale and character with their street. Refer to Key Issue #2 for staff’s analysis of the proposal against the Downtown Urban Design Guidelines. Surrounding Neighborhood. The project site is located in the eastern extension of the Pearl Street mall commercial district, within downtown zoning. This portion of Pearl Street contains a variety of retail, restaurant, residential, and office uses characterized by a compact urban character. The building immediately to the east of the site is a one-story brick building that contains a bicycle shop and restaurant (Full Cycle) (Figure 7). The building immediately to the west is three stories and 38 feet in height and contains retail (Sherpani), apartments, restaurant (Laughing Goat Coffeehouse), and office uses (Figure 8). The block also contains a two-story structure at the corner of 17th Street and Pearl Street. Across Pearl Street are two- and three-story buildings with a mix of restaurant, office, financial institutions, and residential uses. Figure 7: Adjacent Use to the East Agenda Item 5A Page 6 of 360 To the east of the subject site along Pearl Street between 18th and 24th Streets is a corridor of MU-3 zoning commonly known as the “East Pearl” district, which contains a variety of retail, restaurant, and office uses mixed with residential uses. To the north and south of the East Pearl corridor are primarily residential uses, with the area to the south containing primarily high and mixed- density residential uses. Figure 8: Adjacent Uses to the West The Whittier neighborhood is located to the north of the site within the Residential - Mixed 1 district, which is a historic residential neighborhood. The area to the north of the site is characterized by primarily single-family homes, constructed in the late 1800s and early 1900s. Two single family homes, two-stories in height, immediately abut the site across the alley. Refer to Figure 9. Figure 9: Adjacent Residential Uses to the North Agenda Item 5A Page 7 of 360 Land Use. The proposal is for a mixed-use development with ground floor commercial uses (9,439 square feet) and residential units located on the second and third floors. The development is proposed to contain 8 one-bedroom units (562 to 678 square feet in area) and 6 two-bedroom units (1,210 to 2,424 square feet in area). Ten units would be for rental and the remaining four units for sale. The current proposal is for retail space on the ground floor, which is a permitted use in the DT-2 zone district. However, other uses like restaurants, brewpubs, and taverns or financial institutions could be added subject to the requirements of Sections 9-6-5(b)(1), 9-6-5(b)(4), and 9-6-7(a)(4), B.R.C. 1981. Site Plan. The site design follows the traditional building orientation established by the area as a main street type, with zero foot front yard and side yard setbacks. The building is oriented toward Pearl Street and is designed to enhance the pedestrian experience with storefront windows and pedestrian scale building details. The Pearl Street façade is broken up by a paseo connecting to an interior courtyard. The third story is setback to reduce the perceived height and outdoor deck space is proposed. Through the Site Review process, the applicant is requesting modifications to the form and bulk standards of the land use code to allow a 10-foot front yard setback from the street for the third story, where 15- feet is required, and a 0-foot side yard setback from an interior lot line for the third story, where 12-feet is required. The building is setback 15 feet from the alley. A loading/delivery area, utility meters, detention/water quality planters, and trees are proposed along the alley. The existing overhead power lines will be placed underground. Architecture and Building Design. The building is three stories and 38 feet in height, with below grade parking. The building design is contemporary with neo-traditional elements. Storefront windows are proposed along Pearl Street. Commercial spaces open onto Pearl Street. The storefronts have large display windows . Traditional elements like wood column detailing and goose-neck light fixtures and signage make the project compatible with the Downtown Pearl Street character. The fenestration and proportions on the second and third floors communicate the residential use but with modern sill, jamb and lintel treatments reminiscent of the historic patterns of downtown Boulder. A two-story entry element breaks up the main façade along Pearl Street, with a paseo that continues into and through the building to a courtyard. The applicant II. Project Description Figure 10: Site Plan Agenda Item 5A Page 8 of 360 has requested a modification to the building design standards for buildings in the DT-2 zone district to allow 50% of the ground floor façade facing a public street to be transparent materials, where 60% is required. The modification meets the intent of the design standards since the open paseo will activate the pedestrian experience. Figure 11: View from Across Pearl St The third story is set-back from the front facade to reduce the perceived height. The mass is setback 10 feet from Pearl Street on the east and west edges and 15 feet in the center portion. The applicant has requested a modification to allow the 10-foot front yard setback from the street for the third story, where 15-feet is required. The variation in setbacks in this portion of the building adds visual interest and the reduction in setback does not significantly impact the perceived height of the building. The structure will be built out of cast in place concrete. Stucco (three coat system), concrete masonry units (CMU), wood look laminate cladding, and cement board siding are also used in select locations. The concrete will present a stone-like quality or depth. The color palette is proposed to be dark blue at the base and white above, with dark window mullions, railings and accent elements. The structure meets the intent of the design guidelines for the Non-Historic & Interface Areas with a building that is reflective of the character of its own time with meaningful juxtapositions and respecting the integrity, scale, and massing of historic buildings in the surrounding areas. Open Space Areas. The proposal includes the provision of an interior courtyard with access from a paseo to Pearl Street, private roof decks and balconies for the residential use, and landscaping in the alley. Each residential unit has either a private balcony, some on the exterior of the building and some facing the interior courtyard, or a rooftop deck facing Pearl Street. The courtyard is open to the sky and provides accessible open space off of Pearl Street as well as access to light and air for the residences above. The courtyard contains an ornamental tree to anchor the center of the court and provide shade and an enhanced “feature wall”. The proposed courtyard will be a flexible space with movable seating that will allow for small gatherings, etc. that will be enjoyed by the residents, occupants, and visitors. Outdoor seating for a restaurant use could spill into the interior courtyard or onto Pearl Street, with a revocable permit from the city. The alley will be landscaped with two trees and a number of shrubs that will be located in the water quality/detention planters. All open spaces will receive a mixture of sun and shade based on the building orientation. Agenda Item 5A Page 9 of 360 Figure 12: Perspective of the Courtyard Density/Intensity. The intensity of development in the DT-2 zone district is controlled by a minimum open space and a maximum floor area ratio. The proposal is for 28,222 square feet of floor area, which amounts to a 2.0:1 floor area ratio (FAR). Pursuant to Section 9-9-11(c) of the land use code any building over 35 feet but less than 45 feet in height shall provide at least 15 percent of the total land area as useable open space. The minimum open space has been exceeded with 2,611 square feet of usable open space (19 percent). In addition, 60 square feet of private open space is required for each residential unit, which is being provided as balconies and rooftop decks (Table 8-1, B.R.C. 1981). Access and Parking. As described above, the plan includes one point of ingress/egress to parking off the alley. Public access is provided on Pearl Street. Residents and their guests, and employees of the development can access the building via the alley. One vehicular parking space is required for each attached dwelling unit, for a total of 14 required spaces. No parking is required for the nonresidential uses since the site is located within CAGID. The below grade parking garage contains 13 standard size parking spaces, one compact space, and 4 tandem spaces. An auto elevator is proposed to provide access to the parking garage, which reduces area necessary for a ramp and allows for additional area for parking spaces. The 15th & Pearl Public Parking Garage is located about two blocks west of the site. Metered parking is located along Pearl, 17th, and 18th streets. The Whittier Neighborhood Permit Parking Program (NPP) is located to the north, where public parking is limited to three hours 8 a.m. to 8 p.m. Monday to Friday. Figure 13: View of Alley at 18th Street Agenda Item 5A Page 10 of 360 In terms of bicycle parking, the proposal includes 40 long-term secure spaces for residents, guests, and employees of the commercial uses in the secured parking garage, where 24 spaces are required. No short-term bike parking will be provided on the site. However, 12 short-term bike spaces will be provided adjacent to the site along Pearl Street on inverted "u" bicycle racks. Staff finds that the provision of bike parking in the public right-of-way is preferable to providing in the rear of the building off the alley, since short-term parking is intended to offer a convenient and accessible area to park bicycles for customers and other visitors. Traffic Impact Analysis. A Trip Generation and Assignment Report has been submitted by the applicant, which concludes that the proposed development can be accommodated by the existing roadway network without significant impacts to service levels (refer to Attachment A). Per the City’s Design and Construction Standards, a traffic impact study is not required for the project because the trips generated by the development will not exceed the threshold of 20 vehicle trips during the AM or PM peak hour. Parking Management. The submitted parking management plan describes the management of the auto elevator and the prevention of vehicles queuing in the alley right-of-way and obstructing vehicle circulation within the alley. A delivery/auto queueing area is provided next to the elevator entry for vehicles waiting for the elevator in the event that it is occupied. The requirement to utilize the waiting area will be communicated to the apartment renters in their leasing package and to the condominium owners in their operations manual. The development will maintain an ongoing fund for an auto elevator’s maintenance service contract to ensure that the elevator will be repaired in a timely manner, if necessary. Transportation Demand Management. The proposal includes a robust transportation demand management plan (refer to Attachment A). Since the property is located in CAGID employees of the commercial uses will be eligible for the downtown employee EcoPass program. In addition, an alternative transportation fund will be established for the residential units for a period of three years to cover the costs of EcoPasses or other programs that support and encourage alternatives to the single-occupant vehicle. The site is highly accessible, with transportation facilities and a large number of destinations that can be reached within a 15-minute walk (grocery stores, parks, restaurants, and transit stops). There are existing bus stops on Pearl Street near the intersection with 18th Street. The Downtown Boulder Bus Transit Station is less than half a mile to the southwest. This regional transit center is served by at least 15 local and regional transit lines. The site is well connected to the larger multi-modal network with detached sidewalks, designated bike routes, and bike lanes. Refer to the applicant’s submittal materials in Attachment A for more information about the proposal. Staff has identified the following key issues to help guide the board’s discussion: 1. Does the project meet the applicable Site Review criteria in Section 9-2-14(h), B.R.C. 1981? 2. Is the proposed project consistent with the Downtown Urban Design Guidelines for the Non-Historic and Interface Areas? Key Issue #1: Does the project meet the applicable Site Review criteria in Section 9-2-14(h), B.R.C. 1981? Staff finds that the proposed project, including the proposed modifications, meets all applicable Site Review criteria. The project is compatible, contextual, and in character with that of the interface area of east end of downtown along Pearl Street. The proposal meets the intent of the Regional Business land use designation with a mix of uses and a design that will III. KEY ISSUES ANALYSI S Agenda Item 5A Page 11 of 360 activate the street. The open spaces are appropriate considering the urban context and proximity to the pedestrian mall. The private balconies and decks and public courtyard are accessible, functional and meet the anticipated residents, occupants, tenants and visitors of the property. The proposed project is an urban configuration of the building adjacent to the pedestrian walkway, which enhances the pedestrian experience. Ground floor storefront windows, building entries, and detailing helps to establish continuity in the established human scale along Pearl Street. The below grade parking garage and auto elevator makes efficient use of the land and ensures the safety, convenience, and separation of pedestrian and bicyclist movements from vehicular movements. Figure 14: Aerial View from Southeast The building’s height, mass and scale, and overall appearance is compatible with the surrounding context. The intent of the DT-2 zoning is to encourage “development and redevelopment consistent with the established historic and urban design character.” The location of the site is within the established urban context. While the existing urban design character is eclectic, there are buildings in the surrounding area that have comparable characteristics. While the BVCP designates all of the downtown zoning districts (DT districts) as “Regional Business” with a high level of intensity, the interface area of East Pearl requires special design sensitivities when commercial or mixed use buildings are located adjacent to residential areas. The urban orientation of the planned three-story, 38-foot high building is compatible with the character of the area where two- and three-story buildings occur to the east and west along Pearl Street in the DT-2 district. There are several buildings within a two-block radius of the subject site that are three stories, both within the DT-2 zoning district as well as the adjacent MU-3 zoning district. Refer to Figure 15 on the following page. Likewise, the height of the proposed building is in general proportion to the height of existing buildings in the immediate area. Please refer to Attachment B for staff’s complete review and analysis of the Site Review Criteria. Agenda Item 5A Page 12 of 360 Figure 15: Three Story Buildings in Surrounding Context Agenda Item 5A Page 13 of 360 Key Issue #2: Is the proposed project consistent with the Downtown Urban Design Guidelines for the Non-Historic and Interface Areas? Staff finds that the proposal is consistent with the applicable Downtown Urban Design Guidelines. As described above, the subject site is subject to the guidelines for the Interface Area. The Interface Area is located on the northern, western, and eastern borders of Downtown and is composed of the blocks that link the core of the Downtown to the surrounding residential neighborhoods. Generally, staff finds that the proposal meets the design objectives by promoting a human- scale development that reinforces the character of Downtown as a pedestrian place and with a building design that is reflective of contemporary times yet stylistically appropriate with traditional references. Staff finds the proposal consistent with the objectives, design elements, and guidelines as follows. • The site is in an urban context and the new building will reflect that context and traditional urban design pattern by building up to the public right-of-way on Pearl Street. The building design is contemporary with traditional references. The base of the structure is emphasized with added wood details around the storefront window openings. Per the applicant, more modern storefront proportions like a tall and open first floor and large display windows are married with more traditional elements like wood column detailing at the retail level and goose-neck light fixtures and signage. The building design will activate the pedestrian experience and reinforce the character of the east end of Downtown along Pearl Street as a pedestrian place. The building will be setback 15 feet from the alley and the proposal is sensitive to the transition to the residential uses across the alley. Agenda Item 5A Page 14 of 360 • The building is set at the lot line on Pearl Street (zero setback), which maintains the historic building setback on the north side of the 1700 block of Pearl Street. The site is located on the east edge of downtown and constrained views toward the Flatirons is typical for this area and has been since the town was established. Since the building is located on the north side of the street the public realm of Pearl Street will be unshaded by the proposal. Existing mature street trees along the Pearl Street frontage will remain and provide shading of the walk and on-street parking. All planned open spaces within the development will receive a mixture of sun and shade, including the public courtyard. • Mechanical equipment and utility boxes will be located in the alley. Rooftop mechanical equipment is expected to be low in profile and will not impact the views of the upper floors of neighboring buildings. The proposal represents four-sided design. The alley elevation features emphasized building entrances, planning areas, and alley trees. Residents and their guests, and employees of the development can access the building via the alley. Overhead utility lines will be placed underground as part of the proposal. Thus, the overall appearance of the alley façade will be greatly improved from the existing condition. • The parking is provided below grade with access from an auto elevator. The entrance to the garage is integrated into the building design. The interior courtyard will be programmed for passive use but could also be utilized for active purposes for residents, occupants, tenants, and visitors to the site. Outdoor seating for a restaurant use could spill into the interior courtyard or onto Pearl Street, with a revocable permit from the city Agenda Item 5A Page 15 of 360 • The proposal is for a main street type, mixed-use building with ground floor retail and upper floor residential units designed in a contemporary style with neo-traditional elements. The poured in place concrete will have a stone-like quality or depth. The contemporary building features traditional storefront elements and sill, jamb and lintel treatments that recall historic patterns of downtown Boulder. • The proposed three-story building 38 feet in height is compatible with the character of the area where two- and three-story buildings occur to the east and west along Pearl Street in the DT-2 district. The proposal will maintain a variety of heights along the Pearl Street frontage. The third story is set-back from the front facade to reduce the perceived height. The building’s planned third story is setback 15 feet for the majority of the building’s street face along Pearl Street but punctuated with 10 foot setbacks on the third story on the east and west edges of the building. • Design details and fenestration are appropriate to the pedestrian scaled context. The use of ground floor storefront windows, wood column detailing, and traditional proportions in the building layout and fenestration helps to establish continuity in the established human scale along Pearl Street. The paseo also provides a visual connection through the building to an open court in the center of the building. There is an appropriate rhythm proposed for the building’s fenestration with a repetition or sequencing of visual interest for the pedestrian. The fenestration and proportions of the upper floors are distinct from the ground floor and communicate the residential use. Agenda Item 5A Page 16 of 360 IV. PUBLIC COMMENT AND PROCESS • Primary entrances are constructed at grade, particularly to the commercial spaces along Pearl Street. Wood column detailing on the ground level along Pearl Street maintain the traditional storefront rhythm. The ground floor height is taller than upper stories (approximately 14 feet) and clearly distinguished as described above. The building design allows for awnings to be placed along Pearl Street by individual commercial tenants. Consistent with Section 9-4-3, Public Notice Requirements, B.R.C. 1981, staff provided notification to all property owners within 600 feet of the subject location of the application, and signs have been posted by the applicant indicating the review requested. Written public notice was sent on December 4, 2018 and July 10, 2019. The applicant held two neighborhood meetings to introduce the proposal to interested persons in the surrounding neighborhood and to solicit input. The meetings were held on January 28, 2019 and October 28, 2019 at the Main Boulder Public Library. Staff received several public comment letters in response to the required public notices and sign postings for the site review, which are found in Attachment D. Planning staff finds that the application meets the Site Review criteria found in Land Use Code Section 9-2-14(h), B.R.C. 1981. Therefore, staff recommends Planning Board consideration of this matter and action in the form of the following motion: RECOMMENDED CONDITIONS OF APPROVAL 1. The Applicant shall ensure that the development shall be in compliance with all plans prepared by the Applicant on March 30, 2020, the Applicant’s written statement dated March 30, 2020, the Applicant’s Transportation Demand Management (TDM) Plan dated November 11, 2019, and the Applicant’s Parking Management Plan dated March 30, 2020, all on file in the City of Boulder Planning Department, except to the extent that the development may be modified by the conditions of this approval. 2. Prior to a building permit application, the Applicant shall submit, and obtain City Manager approval of, a Technical Document Review application for the following items: a. Final architectural plans, including material samples and colors, to ensure compliance with the intent of this approval and compatibility with the surrounding area. The architectural intent shown on the plans prepared by the Applicant on March 30, 2020 is acceptable. Planning staff will review plans to ensure that the architectural intent is performed. b. A final site plan that includes detailed floor plans and section drawings. V. PLANNING BOARD ACTION Motion to approve Site Review case no. LUR2018-00073 incorporating the staff memorandum and the attached Site Review Criteria Checklist as findings of fact, and subject to the conditions of approva l recommended in the staff memorandum. Agenda Item 5A Page 17 of 360 c. A final utility plan meeting the City of Boulder Design and Construction Standards. d. A final storm water report and plan meeting the City of Boulder Design and Construction Standards. e. Final transportation plans meeting the City of Boulder Design and Construction Standards for all transportation improvements. These plans must include but are not limited to: plan and profile drawings for the concrete alley, plan drawings for the Pearl Street sidewalk, transportation detail drawings, a geotechnical soils report, and a pavement analysis for the concrete alley pavement. f. A detailed landscape plan, including size, quantity, and type of plants existing and proposed; type and quality of non-living landscaping materials; any site grading proposed; and any irrigation system proposed, to ensure compliance with this approval and the City's landscaping requirements. Removal of trees must receive prior approval of the Planning Department. Removal of any tree in City right of way must also receive prior approval of the City Forester. g. A detailed outdoor lighting plan showing location, size, and intensity of illumination units, showing compliance with Section 9-9-16, B.R.C. 1981. h. A detailed shadow analysis to ensure compliance with the City's solar access requirements of Section 9- 9-17, B.R.C. 1981. 3. Prior to a building permit application, the Applicant shall dedicate to the City, at no cost, any easements necessary to serve the development, including but not limited to the following easement as shown on the plans prepared by the Applicant on March 30, 2020, meeting the City of Boulder Design and Construction Standards, as part of a Technical Document Review application, the form and final location of which shall be subject to the approval of the City Manager: a. A drainage easement encompassing the two proposed water quality facilities adjacent to the public alley right-of-way on the north side of the proposed building. 4. Prior to a building permit application, the Applicant shall submit a Technical Document Review Application, subject to review and approval of the City Manager, for the elimination of the lot line between Lots 10 and 11, Block 91, Boulder Original Town, City of Boulder, State of Colorado, meeting the requirements of Chapter 9-12, “Subdivision,” B.R.C. 1981, and the City of Boulder Design and Construction Standards. 5. Prior to issuance of a building permit, the Applicant shall submit a financial guarantee, in a form acceptable to the Director of Public Works, in an amount equal to the costs of providing an alternative transportation fund of $200 per dwelling unit per year to the residents of the development for a period of three years after the issuance of a certificate of occupancy for each dwelling unit, as proposed in the Applicant’s Transportation Demand Management (TDM) plan dated November 11, 2019. 6. Prior to issuance of a building permit, the Applicant shall obtain all necessary approvals and authorizations required under the Boulder Revised Code for the portion of the balconies, outdoor seating areas, and awnings encroaching into any City easement or right of way. The Applicant assumes the risk that failure to obtain the necessary approvals and authorizations may require an amendment to this approval. 7. Prior to a building permit application, the Applicant shall construct and complete, subject to acceptance by the City Manager, public improvements serving the site in conformance with the approved plans prepared by the Applicant on March 30, 2020 and the City of Boulder Design and Construction Standards, including but not limited to the following: a. Paving the concrete alley from the west property line east to the existing 16th Street concrete sidewalk (approximately 154 feet); and b. Replacing the existing Pearl Street sidewalk adjacent to the site. Agenda Item 5A Page 18 of 360 8. The Applicant shall be responsible for maintaining all stormwater quality improvements and stormwater detention improvements, including but not limited to permeable parking lot paving. Approved By: ________________________ Charles Ferro, Development Review Manager Department of Planning & Development Services Attachments Attachment A: Applicant’s Submittal Materials Attachment B: Site Review Criteria Analysis Attachment C: Analysis of Response to DAB Comments Attachment D: Public Comment Received Attachment E: Staff Development Review Committee (DRC) Comments Agenda Item 5A Page 19 of 360 www.theSTUDIOarchitecture.com -1350 Pine Street | Suite 1 | Boulder | CO | 80302 -866 | 529 | 9130 Written Statement for 1737 Pearl Street Site Review Application 06/28/2019 REVISED 07/08/2019 REVISED 03/30/2020 (See Underlined Text) CURRENT OWNERSHIP: The project is owned by 1737 Pearl LLC. The managing member is Adam Wertz, a resident of Boulder. DESCRIPTION OF PROPOSAL: 1737 Pearl Street is a 14,111 SF property on the north side of Pearl Street near the corner of 18th Street and is zoned DT-2. The property has one existing one-story building and one existing two-story building which will be demolished to make room for the new thee-story mixed-use building proposed. The existing building uses include retail and restaurant uses, Little Buddha Import, Top Hat Suppy, Red Letter Books and L’Atelier. Under the DT-2 zoning, this development proposes a total of 10 new residential units on the second floor; 4 units on the third floor; along with retail and retail service on the ground floor. A new sub grade parking garage is proposed with 14 standard size parking spaces, 4 tandem spaces, a number of storage spaces, and service and mechanical spaces. The parking garage will be accessed from the alley via an auto elevator at the ground floor. A loading/delivery area, the gas and electric service and gear, detention/water quality planters and trees are all proposed along the alley. The existing overhead power lines will be undergrounded with this proposal. ARCHITECTURAL CHARACTER: The proposed building will have a strong retail base to reinforce Pearl Street’s pedestrian environment and character. As recommended by the Downtown Design Guidelines, the vertically proportioned windows on the 2nd and 3rd floors will have modern sill, jamb and lintel treatments that recall historic patterns of downtown Boulder. A strong cornice will end the building at the top and add detail where it meets the sky. The main façade element along Pearl Street is a modern two-story piece that calls attention to the entrance of the exterior public paseo that continues into and through the building to an open public court in the center of the building that is open to the sky. This court provides accessible open space to the public off of Pearl Street as well as access to light and air for the residences above. The third story is set back from Pearl Street 10’ – 15’ to reduce the perceived mass of the building and to be sensitive to the adjacent residential zones. The color palette is anticipated to be dark blue at the base and white above. That color palette will differentiate the building from the monotonous red brick buildings around it. Dark window mullions, railings and accent elements will add detail and visual interest to the simple, elegant Pearl Street façade. DEVELOPMENT SCHEDULE: The owner anticipates beginning construction immediately upon the receipt of a building permit from the City of Boulder, and completing the building within 18 months after starting construction. COPIES OF ANY SPECIAL AGREEMENTS, CONVEYANCES, RESTRICTIONS, OR COVENANTS THAT WILL GOVERN THE USE, MAINTENANCE, AND CONTINUED PROTECTION OF THE GOALS OF THE PROJECT AND ANY RELATED PARKS, RECREATION AREAS, PLAYGROUNDS, OUTLOTS, OR OPEN SPACE: None. RESPONSE TO GENERAL CRITERIA FOR ALL SITE REVIEW APPLICATIONS (9-2-14(h)) I. Boulder Valley Comprehensive Plan: ATTACHMENT A Agenda Item 5A Page 20 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 (A) How is the proposed site plan consistent with the land use map and the service area map and, on balance, the policies of the Boulder Valley Comprehensive Plan? The site is located in the Regional Business land use district in Zone 1 of the BVCP. The DT-2 zoning and land use allows for a mix of residential and commercial uses along Pearl Street in downtown Boulder. The proposal includes a mix of residential and commercial uses to support the continued health and vibrancy of the downtown area. (B) The proposed development shall not exceed the maximum density associated with the Boulder Valley Comprehensive Plan residential land use designation. Additionally, if the density of existing residential development within a 300 foot area surrounding the site is at or exceeds the density permitted in the Boulder Valley Comprehensive Plan, then the maximum density permitted on the site shall not exceed the lesser of: (i) the density permitted in the Boulder Valley Comprehensive Plan, or, (ii) the maximum number of units that could be placed on the site without waiving or varying any of the requirements of Chapter 9-7, "Bulk and Density Standards," B.R.C. 1981. How is the proposed site plan consistent with the above density criteria? The proposed development proposes 14 new residential units on a 0.32 acre site, a density of 43.75 units per acre. The proposed development meets the density permitted in the BVCP. (C) How does the proposed development’s success in meeting the broad range of BVCP policies consider the economic feasibility of implementation techniques required to meet other site review criteria? The proposal provides much needed for-sale and rental housing in Boulder by providing 4 for-sale units and 10 rental units in the downtown area. It will also contribute to the inclusionary housing fund by providing cash-in-lieu money as opposed to on-site affordable housing. New residential units in this area will help reduce SOV trips and traffic by placing residents near services and amenities in downtown. The commercial space improvements on the ground floor will continue to improve the economic vitality of the east Pearl Street corridor. The proposed architectural character is generally consistent with the Downtown Design guidelines and a major improvement over the character of existing single story building that will be demolished. The proposal reinforces Boulder’s goal to continue its compact pattern of growth which is consistent with both the zoning and the density advocated by the land use code and BVCP. II. Site Design: Projects should preserve and enhance the community's unique sense of place through creative design that respects historic character, relationship to the natural environment, and its physical setting. Projects should utilize site design techniques which enhance the quality of the project. In determining whether this subsection is met, the approving agency will consider the following factors: (A). Open space, including, without limitation, parks, recreation areas, and playgrounds: 1. How is useable open space arranged to be accessible and functional, and how does it incorporate quality landscaping, a mixture of sun and shade and places to gather? The public court on the ground level will be a destination for pedestrians and a unique place for people to gather along East Pearl Street. A tree will anchor the center of the court and provide shade when needed, while thoughtful lighting and a unique “feature wall” will provide comfort and interest to the space. The commercial spaces will open onto Pearl Street and an exterior patio along the sidewalk could be created for potential future restaurant uses. 2. How is private open space provided for each detached residential unit? Agenda Item 5A Page 21 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 Sizeable roof decks and balconies are provided for all residential units on both floors. The balconies and roof decks that face south are either recessed in to the building mass or are provided with sun shading devices to make them more usable and enjoyable. See attached plans for more open space details, dimensions and configurations. 3. How does the project provide for the preservation of natural features, including, without limitation, healthy long- lived trees, terrain, significant plant communities, threatened and endangered species and habitat, ground and surface water, wetlands, riparian areas, and drainage areas? This proposal is in an urban area with no natural features. 4. How does the open space provide a relief to the density, both within the project and from surrounding development? The public court on the ground level will be a destination for pedestrians and a unique place for people to gather along East Pearl Street. A tree will anchor the center of the court and provide shade when needed, while thoughtful lighting and a unique “feature wall” will provide comfort and interest to the space. The commercial spaces will open onto Pearl Street and an exterior patio along the sidewalk could be created for potential future restaurant uses 5. How does the open space provide a buffer to protect sensitive environmental features and natural areas?; Not applicable. 6. If possible, how is open space linked to an area- or a city-wide system? There are a number of parks within two to three blocks of the site. Specifically, there is the Pearl Street Mall, Barker Park, Emma Gomez Martinez Park, the Spruce Pool and Fitzpatrick Park, not to mention the Whittier Elementary School grounds. (B) Open Space in Mixed Use Developments: Developments that contain a mix of residential and non-residential uses: 1. How does the open space provide for a balance of private and shared areas for the residential uses and common open space that is available for use by both the residential and non-residential uses that will meet the needs of the anticipated residents, occupants, tenants, and visitors of the property? On an urban site like this, the sidewalk along Pearl Street is the primary open space amenity for tenants and their customers. The public court that is proposed will provide a more intimate place for both residents and visitors to enjoy and experience. See above for more information related to private open space for residents and their guests. 2. How does the open space provide active areas and passive areas that will meet the needs of the anticipated residents, occupants, tenants, and visitors of the property and how is the open space compatible with the surrounding area or an adopted plan for the area? The residents will be provided with private open space on to which they may expand their living spaces outdoors. The proposed public court will be a flexible space with movable seating that will allow for small performances, small gatherings, extending the retail spaces outdoors, etc. that will be enjoyed by the residents and occupants, as well as the larger neighborhood. (C) Landscaping: 1. How does the project provide for aesthetic enhancement and a variety of plant and hard surface materials, and how does the selection of materials provide for a variety of colors and contrast and how does it incorporate the preservation or use of local native vegetation where appropriate? Agenda Item 5A Page 22 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 A variety of planters and enhanced hardscape materials will be provided at all roof decks for residential units. These will be designed to be compatible with the architecture and enhance the livability of each unit. Special attention will be given to the way they soften the outdoor space, provide privacy and create an enjoyable environment for relaxation, entertainment and dining. The landscaping in the public court will provide visual interest as the tree and ground cover changes colors throughout the year, while the patterns in the concrete will give the space a more human scale. The alley will be landscaped as well, with two trees and a number of shrubs that will be located in the water quality/detention planters. 2. How does the landscape and design attempt to avoid, minimize, or mitigate impacts to important native species, plant communities of special concern, threatened and endangered species and habitat by integrating the existing natural environment into the project? There are no important native species or plant communities of special concern on the existing building. The existing street trees along Pearl Street will remain. 3. How does the project provide significant amounts of plant material sized in excess of the landscaping requirements of Sections 9-9-12 and 9-9-13, "Landscaping and Screening Requirements," and "Streetscape Design Standards," B.R.C. 1981; Refer to the landscape drawings for specific plant quantities. We will be providing landscaping in excess of the requirements with the landscaping that is proposed along the alley and within the public court. 4. How are the setbacks, yards, and useable open space along public rights-of-way landscaped to provide attractive streetscapes, to enhance architectural features, and to contribute to the development of an attractive site plan? The 15’ building setback along the alley will be landscaped with trees, shrubs, and planters. The existing street trees on Pearl Street will remain, and landscaping is proposed within the public court. (D) Circulation, including, without limitation, the transportation system that serves the property, whether public or private and whether constructed by the developer or not: 1. How are high speeds discouraged or a physical separation between streets and the project provided? Vehicles can only access the site from the alley. There are no driveways or roads on the property. 2. How are potential conflicts with vehicles minimized? Vehicles can only access the site from the alley. 3. How are safe and convenient connections accessible to the public within the project and between the project and existing and proposed transportation systems provided, including without limitation streets, bikeways, pedestrian ways and trails? The site is accessible to pedestrians and bicyclists from the sidewalk on Pearl Street and the alley ROW. 4. How are alternatives to the automobile promoted by incorporating site design techniques, land use patterns, and supporting infrastructure that supports and encourages walking, biking, and other alternatives to the single occupant vehicle?  A TDM plan is proposed that would support and promote the use of alternative transportation in a variety of ways.  We propose to exceed both the long-term bicycle parking requirements and the short-term bicycle parking requirements established by the City. Agenda Item 5A Page 23 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 5. Where practical and beneficial, how is a significant shift away from single- occupant vehicle use to alternate modes promoted through the use of travel demand management techniques? Please refer to the TDM plan submitted with the Site Review Application 6. What on-site facilities for external linkage with other modes of transportation are provided, where applicable? Not Applicable 7. How is the amount of land devoted to the street system minimized? There is no on-site street system. 8. How is the project designed for the types of traffic expected, including, without limitation, automobiles, bicycles, and pedestrians, and how does it provide safety, separation from living areas, and control of noise and exhaust?; and Traffic entering and leaving the proposed development will do so through the alley. We have placed residential units on the 2nd and 3rd floors to separate them from noise and exhaust. 9. How will city construction standards be met, and how will emergency vehicle use be facilitated? City construction standards will be met by following the Design and Construction Standards where applicable. Emergency vehicles will have access to the project’s buildings from Pearl Street and the alley if necessary. E. Parking: 1. How does the project incorporate into the design of parking areas, measures to provide safety, convenience, and separation of pedestrian movements from vehicular movements? All of the parking is accessed from the alley. Pedestrian walkways and lighting have been carefully located to provide safe, and convenient access from the building to the parking areas. During queueing residents will wait in the delivery / auto queueing area when waiting for the auto elevator. This will be communicated to the apartment renters in their leasing package and to condo owners in their operations manual. 2. How does the design of parking areas make efficient use of the land and use the minimum amount of land necessary to meet the parking needs of the project? The proposal places the parking underground and utilizes a compact auto elevator in lieu of a typical parking ramp to reduce the amount of area dedicated to cars and vehicular circulation. 3. How are the parking areas and lighting designed to reduce the visual impact on the project, adjacent properties and adjacent streets? The parking is located below ground to reduce its visual impact from Pearl and 18th Street. Lighting has been designed with luminaires that provide for adequate safety and security while reducing light pollution that allows for an environmentally sensitive nighttime atmosphere for both the proposed development and adjacent properties. 4. How do the parking areas utilize landscaping materials to provide shade in excess of the requirements in Subsection 9-9-6(d), and Section 9-9-14, “Parking Lot Landscaping Standards,” B.R.C. 1981? No parking lot landscaping is provided since we are not building a parking lot. All lighting will meet DCS standards. (F) Building Design, Livability and Relationship to the Existing or Proposed Surrounding Area: 1. How is the building height, mass, scale, orientation, architecture and configuration compatible with the existing character of the area or the character established by adopted design guidelines or plans for the area? Agenda Item 5A Page 24 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 The proposed building character generally follows the recommendations of the Downtown Design Guidelines for the Interface Zone. The building will not exceed the maximum 38’ height allowed in DT-2 zone. The full 15’ setback along the alley will be provided. The floor area on the third floor is setback from Pearl Street to reduce the scale of the building. 2. How are the height of buildings in general proportion to the height of existing buildings and the proposed projected heights of approved buildings or approved plans or design guidelines for the immediate area: Our three story, 38’ tall proposal is compatible with the height and scale of buildings in the surrounding DT zones and adjacent buildings along Pearl Street. We are asking for a modification from the allowed two stories to three stories through the site review process, but the building will never exceed the allowed 38’ in this zone. 3. How does the orientation of buildings minimize shadows on and blocking of views from adjacent properties? The 15’ building setback along the alley will reduce shadows on the neighbors to the north, and the third floor is set back along Pearl Street to maximize view corridors along Pearl. 4. If the character of the area is identifiable, how is the project made compatible by the appropriate use of color, materials, landscaping, signs, and lighting? The surrounding area does not have an identifiable material palette, and the character is of a mostly traditional storefront architecture. The proposed building uses a simple palette of materials that emphasize the base of the structure with added wood details around the storefront window openings. More modern storefront proportions like a tall and open first floor and large display windows are married with more traditional elements like wood column detailing at the retail level and goose-neck light fixtures and signage will make this project compatible with the Downtown Pearl Street character. A slightly more modern fenestration proportion is used on the upper floors to emphasize the residential use. The character of the proposed architecture pushes more modern with the two-story accent element in the center of the Pearl Street façade that is located and detailed to emphasize the entrance to the paseo that leads to the public court. 5. How do buildings present an attractive streetscape, incorporate architectural and site design elements appropriate to a pedestrian scale, and provide for the safety and convenience of pedestrians? The proposed building uses a simple palette of materials that emphasize the retail base of the structure for a more pedestrian-friendly scale. Traditional storefront elements like a tall first floor, large display windows and goose-neck light fixtures and signs will make this project compatible with Downtown Boulder’s Pearl Street character. Lighting is designed to meet and exceed the standards of the City of Boulder and as such, will not only “fit in,” but it will enhance the character of the building and safety of pedestrians. 8. For residential projects, how is noise minimized between units, between buildings, and from either on-site or off- site external sources through spacing, landscaping, and building materials? The building’s structure is currently planned to be built out of cast in place concrete and this will reduce the transfer of sound vertically between the commercial spaces and residential units. Double stud demising walls will help with horizontal noise movement between units on upper levels. Exterior walls on the east and west will be built out of CMU and will greatly reduce any noise impacts between buildings. 9. If a lighting plan is provided, how does it augment security, energy conservation, safety, and aesthetics? The lighting plan aims to provide safe and comfortable lighting levels along the alley and along Pearl Street. Specialty lighting has been added to the window openings on Pearl Street to add a unique and beautiful addition to the East Pearl neighborhood. Motion activated lighting fixtures are proposed where appropriate to conserve energy and provide safety in that area. Agenda Item 5A Page 25 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 10. How does the project incorporate the natural environment into the design and avoid, minimize, or mitigate impacts to natural systems? The property is not in a natural environment. 11. How are cut and fill minimized on the site, and how does the design of buildings conform to the natural contours of the land, and how does the site design minimize erosion, slope instability, landslide, mudflow or subsidence, and minimize the potential threat to property caused by geological hazards? This is an urban site so there aren’t any slopes or geological hazards. (G) Solar Siting and Construction: For the purpose of insuring the maximum potential for utilization of solar energy in the city, all applicants for residential site reviews shall place streets, lots, open spaces, and buildings so as to maximize the potential for the use of solar energy in accordance with the following solar siting criteria: 1. Placement of Open Space and Streets. Open space areas are located wherever practical to protect buildings from shading by other buildings within the development or from buildings on adjacent properties. Topography and other natural features and constraints may justify deviations from this criterion. How is this criterion met? This is a previously developed site so our proposal includes an infill building that meets the intent of the zone and BVCP. 2. Lot Layout and Building Siting. Lots are oriented and buildings are sited in a way which maximizes the solar potential of each principal building. Lots are designed to facilitate siting a structure which is unshaded by other nearby structures. Wherever practical, buildings are sited close to the north lot line to increase yard space to the south for better owner control of shading. How is this criterion met? The building has been designed with an open court in the center to allow greater access to light and air for the residences above. The property does not allow for increased yard space to the south since it is adjacent to Pearl Street. 3. Building Form. The shapes of buildings are designed to maximize utilization of solar energy. Buildings shall meet the solar access protection and solar siting requirements of Chapter 9-9- 17, "Solar Access," B.R.C. 1981. How is this criterion met? See the solar study in our proposal. We have set the proposed building back from the alley 15’ to allow the properties to the north better solar access. 4. Landscaping. The shading effects of proposed landscaping on adjacent buildings are minimized. How is this criterion met? The proposed landscaping occurs within the court and along the alley, so shading on adjacent buildings will be minimized. All trees proposed are deciduous trees that will provide beneficial shade in the summer and allow for more solar access in the winter. (H) Additional Criteria for Poles above the Permitted Height. No site review application for a pole above the permitted height will be approved unless the approving agency finds all of the following: 1. The light pole is required for nighttime recreation activities, which are compatible with the surrounding neighborhood, or the light or traffic signal pole is required for safety, or the electrical utility pole is required to serve the needs of the city?; and Not Applicable Agenda Item 5A Page 26 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 2. The pole is at the minimum height appropriate to accomplish the purposes for which the pole was erected and is designed and constructed so as to minimize light and electromagnetic pollution. If applicable, how are these criteria met? Not Applicable (I) Land Use intensity Modifications: 1. Potential Land Use Intensity Modifications: a. The density of a project may be increased in the BR-1 district through a reduction of the lot area requirement or in the Downtown (DT), BR-2 or MU-3 districts through a reduction in the open space requirements We are not requesting an open space reduction. b. The open space requirements in all Downtown (DT) districts may be reduced by up to one hundred percent c. We are not requesting an open space reduction. d. The open space per lot requirements for the total amount of open space required on the lot in the BR-2 district may be reduced by up to fifty percent Not Applicable e. Land use intensity may be increased up to twenty-five percent in the BR-1 district through a reduction of the lot area requirement. Not Applicable 2. A land use intensity increase will be permitted up to the maximum amount set forth below if the approving agency finds that the criteria in paragraph (h)(1) through Subparagraph (h)(2)(H) of this section and following criteria have been met: a. Open Space Needs Met: How have the project’s occupants and visitors needs for high quality and functional useable open space been met? Not applicable. We are not requesting an open space reduction. b. Character of the Project and Area: The open space reduction does not adversely affect the character of the development or the character of the surrounding area Not applicable. We are not requesting an open space reduction. c. Open Space and Lot Area Reductions: The specific percentage reduction in open space or lot area requested by the applicant is justified by any one or combination of the following site design features not to exceed the maximum reduction set forth above: 1. Close proximity to a public mall or park for which the development is specially assessed or to which the project contributes funding of capital improvements beyond that required by the parks and recreation component of the development excised tax set forth in chapter 3-8, “Development Excise Tax,” B.R.C. 1981: maximum one hundred percent reduction in all Downtown (DT) districts and ten percent in the BR-1 district; Not applicable. We are not requesting an open space reduction. Agenda Item 5A Page 27 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 2. Architectural treatment that results in reducing the apparent bulk and mass of the structure or structure and site planning which increases the openness of the site: maximum five percent reduction; Not applicable. We are not requesting an open space reduction. . 3. A common park, recreation or playground area functionally useable and accessible by the development’s occupants for active recreational purposes and sized for the number of inhabitants of the development, maximum five percent reduction: or developed facilities within the project designed to meet the active recreational needs of the occupants: maximum five percent reduction; Not applicable. We are not requesting an open space reduction. 4. Permanent dedication of the development to use by a unique residential population whose needs for conventional open space are reduced: maximum five percent reduction: Not applicable. We are not requesting an open space reduction. 5. The reduction in open space in part of a development with a mix of residential and nonresidential uses within a BR-2 zoning district that, due to the ratio of residential to nonresidential uses and because of the size, type and mix of dwelling units, the need for open space is reduced: maximum fifteen percent reduction: and Not applicable. We are not requesting an open space reduction 6. The reduction in open space is part of a development with a mix of residential and nonresidential uses within a BR-2 zoning district that provides high quality urban design elements that will meet the needs of anticipated residents, occupants, tenants and visitors of the property or will accommodate public gatherings, important activities or events in the life of the community and its people, that may include, without limitation, recreational or cultural amenities, intimate spaces that foster social interaction, street furniture, landscaping and hard surface treatments of the open space: maximum twenty-five percent reduction. Not applicable. We are not requesting an open space reduction d. (J) Additional Criteria for Floor Area Ratio Increase for Buildings in the BR-1 district: Not applicable (K) Additional Criteria for Parking Reductions: The off-street parking requirements of Section 9-9-6, “Parking Standards,” B.R.C. 1981, may be modified as follows: Not applicable. We are not requesting a parking reduction i. Process: The city manager may grant a parking reduction not to exceed fifty percent of the required parking. The planning board or city council may grant a reduction exceeding fifty percent. ii. Criteria: Upon submission of documentation by the applicant of how the project meets the following criteria, the approving agency may approve proposed modifications to the parking requirements of Section 9-9-6, “Parking Standards,” B.R.C. 1981 (see tables 9-1, 9-2, 9-3, and 9-4), if it finds that: a. For residential uses, the probable number of motor vehicles to be owned by occupants of and visitors to dwellings in the project will be adequately accommodated: Agenda Item 5A Page 28 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 b. The parking needs of any nonresidential uses will be adequately accommodated through on-street parking or off-street parking: c. A mix of residential with either office or retail uses is proposed, and the parking needs of all uses will be accommodated through shared parking: . d. If joint use of common parking areas is proposed, varying time periods of use will accommodate proposed parking needs: and e. If the number of off-street parking spaces is reduced because of the nature of the occupancy, the applicant provides assurances that the nature of the occupancy will not change. (L) Additional Criteria for Off-Site Parking: The parking required under Section 9-9-6, “Parking Standards,” B.R.C. 1981, may be located on a separate lot if the following conditions are met: Not Applicable HEIGHT MODIFICATION: Not Applicable End of Written Statement Agenda Item 5A Page 29 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 September 30, 2019 REVISED 03/30/2020 (See underlined text) LUR2018-00073 RE: 1737 Pearl – Parking Management Plan This parking management plan is in response to City Staff comments regarding the proposed auto elevator for the 1737 Pearl Street project. I. Staff has concerns that the location and operations of the auto elevator will require waiting vehicles to queue into the alley right-of-way and obstruct vehicle circulation within the alley Response: This proposal has provided for a generous delivery/auto queueing area adjacent to the elevator entry and off of the alley that will allow vehicles to wait for the elevator in the event that it is occupied. This will be communicated to the apartment renters in their leasing package and to the condo owners in their operations manual. Deliveries for the Retail spaces will be scheduled for off-peak hours to minimize the chances that the waiting area will be occupied by a delivery truck. In the event that a delivery truck is occupying the waiting area and the elevator is in use, the waiting vehicle will have to pause in the alley until the waiting area is vacant or the elevator is ready for use. The alley does has a 20’ right-of-way which would allow other vehicles to safely pass the waiting vehicle. II. Maintenance and repair plan Response: The Ownership group intends to execute a service contract with the auto elevator manufacturer, which will include urgent service calls. Maintenance for the elevator will be performed at the required intervals per the elevator manufacturer. The property Owner’s Association will oversee the maintenance of the auto elevator and the cost. MEI elevator has an elevator repair service facility on E 42nd Ave in Denver, so response time for maintenance and repairs will be minimized. III. How will funds be set aside or collected for the maintenance and repair of the auto elevator Response: The cost of the auto elevator’s maintenance service contract will be allocated to the residential units on a pro-rata basis as part of their Owner’s Association dues. Additionally, the Owner’s Association will develop and implement a small annual budget for a ride share service in the event the auto elevator is out of service during times that restrict residents from using their vehicles. IV. How will vehicles that can’t be accommodated by the elevator and where those vehicles will park on the site Response: The elevator will be the size of a typical Boulder parking space (9’x19’) and will be able to accommodate vehicles up to 98” in height (per ADA standards for accessible van height). This system will be able to accommodate the same vehicles that could be accommodated with a typical “ramp accessed” parking garage. V. Detail the necessary supporting equipment or cabinets and where the supporting equipment will be located on site Response: A detailed specification for Holeless Freight Elevators has been included with this resubmittal. Refer to the specification for detailed information. An elevator machine room (EMR) has been provided in the parking garage level, directly adjacent to the elevator which will house the required mechanical equipment. An emergency backup generator will be provided on the roof to support the elevator functions in an emergency. Agenda Item 5A Page 30 of 360 www.theSTUDIOarchitecture.com - 1350 Pine St reet | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 Transportation Demand Management Plan for 1737 Pearl Street 12/3/2018 REVISED 07/08/2019 REVISED 09/30/2019 REVISED 11/11/2019 Introduction 1737 Pearl Street is a 14,111 SF property on the north side of Pearl Street near the corner of 18th Street and is within the CAGID boundary. The proposal for the site includes a new thee-story, mixed-use building with a total of 10 residential units on the second floor, 4 units on the third floor and retail, retail service and access to the below grade parking on the ground floor. A loading space and access to the trash room are also provided at grade off of the alley. This proposal includes adding short-term bicycle parking to the existing short-term bicycle parking on the NW corner of Pearl St. and 18th as well as some short-term bicycle parking to the Pearl Street ROW directly adjacent to the subject property. The alley will see improved paving and the addition of trees, planters, and lighting. Also, the existing overhead utility lines in the alley will be undergrounded. Existing Transit Service Figure 1, indicates the existing transit routes and bus stops adjacent to or in the vicinity of the site. The site is 0.4 miles (8 min. walk) from the Downtown Boulder Bust Transit Station which provides a wide variety of regional bus service including routes to Denver, DIA and elsewhere. Being located in Downtown Boulder, the property also has great access to demand responsive services such as peer-to-peer ridesharing, ride service hailing, food delivery, and bicycle sharing systems (Uber, Lyft, etc.). Existing Bicycle and Pedestrian Network Figure 2 shows the bike routes and pedestrian amenities in the vicinity of the site. The city of Boulder maintains an extensive bicycle and pedestrian network throughout the city. Transportation Demand Management (TDM) Strategy for Commercial and Residential uses Table 1 shows the City of Boulder’s draft commercial development toolkit packages. The “core elements” section of the table shows elements required of all new commercial developments, including: · meeting the short- and long-term bicycle parking code · participation in eGo car share and B-Cycle bike share where appropriate · pedestrian and bicycle enhancements · consideration of showers and changing facilities · establishing a transportation information center. One toolkit option is available under City of Boulder standards for the CAGID area: Package A. Package A requires participation in the BECO bus pass program for employees and management of off-street parking if appropriate. Table 2 shows the actions that the 1737 Pearl developer intends to implement to increase the percentage of alternative travel modes. Agenda Item 5A Page 31 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 1737 Pearl Figure 1 - Bus routes and transit stops in the vicinity of the 1737 Pearl site. Agenda Item 5A Page 32 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 Figure 2 (Legend) Figure 2 – Pedestrian amenities and bike routes in the vicinity of the 1737 Pearl site. 1737 Pearl Agenda Item 5A Page 33 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 Agenda Item 5A Page 34 of 360 www.theSTUDIOarchitecture.com - 1350 Pine Street | Suite 1 | Boulder | CO | 80302 - 866 | 529 | 9130 Agenda Item 5A Page 35 of 360  .UTK_RUI[YZ .UTK_RUI[YZ .UTK_RUI[YZ8383 $//(<3($5/675((7  52: 75$6+5(&<&/,1*&2032675(/2&$7('3$5.,1*0(7(5.,26. /2:32,17 )/ 5 $'-$&(176725<3/$67(5%8,/',1*$'-$&(176725<%5,&.%8,/',1*(;,67,1*75((*5$7($1'75((725(0$,17<3$'-$&(173$5.,1*/27$872(/(9$725 '2:172%$6(0(17 ,17(5,25/27/,1(72%(5(029('%<6(3$5$7(352&(669,(:75,$1*/(  5(6,'(17,$//2%%<0$,/%2;(6(;,67,1*&+$6('5$,172%(5(/2&$7('   1(:87,/,7<32/(1(:*8<:,5(1(:87,/,7<32/(1(:*8<:,5(,17(5,2538%/,&&285775((3/$17(56725<0,;('86(%8,/',1**5281')/2255(7$,/6(&21')/2255(6,'(17,$/ 81,76 7+,5')/2255(6,'(17,$/ 81,76  *$60(7(56(/(&75,&$/0(7(56$1'*($51(:3+$6(75$16)250(5 /,1(2)%8,/',1*$%29(/,1(2)%8,/',1*$%29(       287/,1(2)%$/&21<$%29(1(:5$,6('5$,1*$5'(1'(&25$7,9(3$9,1*0(7$/*8$5'5$,/72%(3(50,77('9,$)8785(5(92&$%/(3(50,77<3 &/57<3 &/5%8,/',1*6(7%$&.  )($785(:$// ),1$/'(6,*172%(6+2:1$77(&'2&0$7(5,$/672%(86(':,//%($:22'/22.0$7(5,$/$6721(9(1((5$325&(/$,17,/(25$&20%,1$7,212)7+26(1(:3(50($%/(3$9(561(:75((,1/2:3/$17(51(:&+$6('5$,1/2&$7,211(:6,1*/(3+$6(75$16)250(51(:75((,1/2:3/$17(5(/(&75,&$/0(7(56$1'*($5'(/,9(5<$87248(8($5($ (;,67,1*%,&<&/(5$&.6725(0$,17<31(:%,&<&/(5$&.67<3 7+(833(5026732,172)7+(522),1*0(0%5$1(,67+(+,*+(6732,17)257+(385326(62)&$/&8/$7,1*%8,/',1*+(,*+73(5%5&7+(3$5$3(7:$//6(;&(('7+(+(,*+7/,0,7%<12025(7+$17+($//2:$%/()25)$&,/,7$7,1*522)723'5$,1$*(*(1(5$/127(63LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$6,7('(9(/230(173/$11$9<BB3($5/67%28/'(5&2&5$6  65 6,7(3/$1*5$3+,&6&$/(1352-(&76,7(3($5/67%28/'(5&2758(1257+ 6,7(5(9,(: 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21Ύ;ϲͿt/>>WZKs/KEd,KZEZK&ϭϴd,EWZ>͕E;ϲͿt/>>WZKs//Ed,WZ>^dZdZ/',dͲK&Ͳtz:EddKd,^/d͘&hdhZKKZ/Ed/KEt/d,d,/dzK&Kh>Zt/>>ZYh/Zdd,E/>KhDEd^͘dŽƚĂůϯϳϰϬdŽƚĂů>ŽŶŐͲdĞƌŵϮϯͲϰϬdŽƚĂů^ŚŽƌƚͲdĞƌŵϭϰͲϬΎ>ŽŶŐͲdĞƌŵϮ;ϮϱйͿͲϴ^ŚŽƌƚͲdĞƌŵϳ;ϳϱйͿͲϬΎZĞƚĂŝůhƐĞƐϵ;ϭƉĞƌϳϱϬ^&͕ŵŝŶ͘ϰͿͲϴ>ŽŶŐͲdĞƌŵϮϭ;ϳϱйͿͲϯϮ^ŚŽƌƚͲdĞƌŵϳ;ϮϱйͿͲϬhǁͬŽWƌŝǀĂƚĞ'ĂƌĂŐĞϮϴ;ϮƉĞƌƵŶŝƚͿͲϯϮZĞƋƵŝƌĞĚWĞƌŵŝƚƚĞĚ WƌŽƉŽƐĞĚZĞƐŝĚĞŶƚŝĂůhŶŝƚƐϭϰZĞƚĂŝůƌĞĂ;^&Ϳϳ͕ϮϱϯŝĐLJĐůĞWĂƌŬŝŶŐ^ƵŵŵĂƌLJŚĂƌƚΎΎEŽWĂƌŬŝŶŐZĞƋƵŝƌĞĚŝŶƚŚĞ'ĞŶĞƌĂů/ŵƉƌŽǀĞŵĞŶƚWĂƌŬŝŶŐŝƐƚƌŝĐƚƐΎϭϮZĞŐƵůĂƌ͕ϭǀĂŶͲĂĐĐĞƐƐŝďůĞƐƉĂĐĞ͕ĂŶĚϭĐŽŵƉĂĐƚƐƉĂĐĞƐƉƌŽƉŽƐĞĚ͘EŽŶͲZĞƐŝĚĞŶƚŝĂůϬΎΎͲϬƚƚĂĐŚĞĚhϭϰ;ϭƉĞƌhŶŝƚͿͲϭϰΎZĞƋƵŝƌĞĚWĞƌŵŝƚƚĞĚ WƌŽƉŽƐĞĚZĞƐŝĚĞŶƚŝĂůhŶŝƚƐϭϰƵƚŽŵŽďŝůĞWĂƌŬŝŶŐ^ƵŵŵĂƌLJŚĂƌƚWĂƌŬŝŶŐƌĞĂEͬEŽDĂdžŝŵƵŵ Ϭ^&>ĂŶĚƐĐĂƉĞƌĞĂEͬEͬϬ^&KƉĞŶ^ƉĂĐĞϮ͕ϭϭϳ^&EŽDĂdžŝŵƵŵ Ϯ͕ϴϮϯ^&>ŽƚŽǀĞƌĂŐĞEͬEŽDĂdžŝŵƵŵ ϵ͕ϯϴϬ^&;ϲϲйͿŽŵŵĞƌĐŝĂůEͬEͬϵ͕ϲϱϰ^&ZĞƐŝĚĞŶƚŝĂůEͬEͬϭϴ͕ϱϲϴ^&&ůŽŽƌƌĞĂEͬϮϴ͕ϮϮϮ^& Ϯϴ͕ϮϮϮ^&ZĞƋƵŝƌĞĚWĞƌŵŝƚƚĞĚ WƌŽƉŽƐĞĚ^ŝƚĞƌĞĂ;^&Ϳϭϰ͕ϭϭϭ>ĂŶĚhƐĞ^ƵŵŵĂƌLJdĂďůĞΎĚĚŝƚŝŽŶĂůϬ͘ϱ&ZĂůůŽǁĞĚĨŽƌƉƌŽǀŝĚŝŶŐƌĞƐŝĚĞŶƚŝĂůĨůŽŽƌĂƌĞĂDŝŶ͘WƌŝǀĂƚĞKƉĞŶ^ƉĂĐĞϲϬ^&ͬhŶŝƚͲϲϬ^&ͬhŶŝƚн;ZĞƐŝĚĞŶƚŝĂůͿDŝŶ͘KƉĞŶ^ƉĂĐĞŶͬĂ ŶͬĂ ŶͬĂ;EŽŶͲZĞƐŝĚĞŶƚŝĂůͿDŝŶ͘KƉĞŶ^ƉĂĐĞϭϱй;Ϯ͕ϭϭϳ^&Ϳ Ͳ ϮϬй;Ϯ͕ϴϮϯ^ĨͿǁĞůůŝŶŐhŶŝƚƐŶͬĂŶͬĂϭϰDĂdž͘,ĞŝŐŚƚͲϯϴΖϯϴΖDĂdž͘^ƚŽƌŝĞƐͲϮϯDĂdž͘&ZΎͲϮ͘Ϭ;Ϯϴ͕ϮϮϮ^&Ϳ Ϯ͘Ϭ;Ϯϴ͕ϮϮϮ^&Ϳ^ƚĞĞƚĨŽƌdŚŝƌĚ^ƚŽƌLJDŝŶ͘&ƌŽŶƚzĂƌĚĨƌŽŵĂϭϱΖͲϭϬΖĂŶĚϭϱΖDŝŶ͘ZĞĂƌzĂƌĚϭϱΖͲϭϱΖDŝŶ͘^ŝĚĞzĂƌĚ͕ŽŵďŝŶĞĚŶͬĂŶͬĂŶͬĂDŝŶ͘^ŝĚĞzĂƌĚ͕/ŶƚĞƌŝŽƌϬΖŽƌϭϮΖͲϬΖDĂdž͘&ƌŽŶƚzĂƌĚͲϭϱΖϬΖDŝŶ͘&ƌŽŶƚzĂƌĚϬΖͲϬΖ^ĞƚďĂĐŬƐZĞƋƵŝƌĞĚWĞƌŵŝƚƚĞĚ WƌŽƉŽƐĞĚ^ŝƚĞ^ƵŵŵĂƌLJdĂďůĞ>Žƚ^ŝnjĞ ϭϰ͕ϭϭϭ^&;Ϭ͘ϯϮͿŽŶŝŶŐĂƚĞŐŽƌLJ dͲϮ^ŝƚĞĂƚĂΎDĂdžŝŵƵŵƉĞƌĐĞŶƚĂŐĞĂůůŽǁĞĚƉĞƌZKƉĞŶ^ƉĂĐĞƉĞƌǁĞůůŝŶŐhŶŝƚ;^&ͿϲϬнWĂƌŬŝŶŐ>ĂŶĚƐĐĂƉĞϬϬ ϵͲϵͲϭϰ>ĂŶĚƐĐĂƉĞĚZŝŐŚƚͲŽĨͲtĂLJϮϭϮ ϭϬй Ύ ϵͲϵͲϭϭ;ĨͿ;ϰͿWĞĚĞƐƚƌŝĂŶǁĂLJĨŽƌƌĞƐŝĚĞŶƚƐϬϬй Ύ ϵͲϵͲϭϭ;ĨͿ;ϮͿĂůĐŽŶŝĞƐ͕ĞĐŬƐ͕WĂƚŝŽƐϱϮϵ Ϯϱй Ύ ϵͲϵͲϭϭ;ĨͿ;ϭͿdžƚĞƌŝŽƌƉĂǀĞĚƐƵƌĨĂĐĞϮ͕ϬϴϮ ϵϴй ϵͲϵͲϭϭ;ĞͿ;ϱͿƐƚƌĞĞƚͬĂůůĞLJͬĚƌŝǀĞǁĂLJKƉĞŶƐƉĂĐĞĂĚũĂĐĞŶƚƚŽϬϬйϵͲϵͲϭϭ;ĞͿ;ϰͿKƵƚĚŽŽƌŐĂƌĚĞŶͬĐŽƵƌƚLJĂƌĚϬϬй ϵͲϵͲϭϭ;ĞͿ;ϯͿKƵƚĚŽŽƌĐƚŝǀŝƚLJͬZĞĐƌĞĂƚŝŽŶϬϬй ϵͲϵͲϭϭ;ĞͿ;ϮͿ>ĂŶĚƐĐĂƉĞĚƌĞĂƐϬϬй ϵͲϵͲϭϭ;ĞͿ;ϭͿKƉĞŶ^ƉĂĐĞWƌŽǀŝĚĞĚϮ͕ϴϮϯ ϭϯϯй;ΛϭϱйŽĨ^ŝƚĞƌĞĂͿdŽƚĂůKƉĞŶ^ƉĂĐĞZĞƋƵŝƌĞĚϮ͕ϭϭϳ ϭϬϬйƌĞĂ;^&Ϳ йŽĨZĞƋƵŝƌĞĚWƌŽƉŽƐĞĚhΖƐϭϰDĂdžŝŵƵŵ&Z;^&Ϳ;ΛϮ͘ϬͿϮϴ͕ϮϮϮ^ŝƚĞƌĞĂ;^&Ϳϭϰ͕ϭϭϭKƉĞŶ^ƉĂĐĞ^ƵŵŵĂƌLJdĂďůĞAgenda Item 5A Page 36 of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genda Item 5A Page 37 of 360 8383*65$65$65$65$$                %)&65$ :$7(5(175<6725$*(6725$*(6725$*(6725$*(6725$*(6)5(7$,/6725$*(6)5(7$,/6725$*((056)5(6,'(17*8(67%,.(6725$*((03/2<((%,.(6725$*(0(&+$1,&$/$872(/(97$1'(07$1'(07$1'(07$1'(0 &203$&7       7<3  7<3 35,9$7(5(6,'(173$5.,1*65$65$(03/2<((6/21*7(50%,.(3$5.,1* 63$&(69,$:$//02817('%,.(),/(5$&.6 3529,'($/2&.,1*'225$1'$'(48$7(/,*+7,1*3(5%5&('$872(/(9$725,186(,1',&$725/,*+7 5(6,'(17$1'5(6,'(176 *8(676/21*7(50%,.(3$5.,1* 63$&(69,$:$//02817('%,.(),/(5$&.6 3529,'($/2&.,1*'225$1'$'(48$7(/,*+7,1*3(5%5& &/5  7+(833(5026732,172)7+(522),1*0(0%5$1(,67+(+,*+(6732,17)257+(385326(62)&$/&8/$7,1*%8,/',1*+(,*+73(5%5&7+(3$5$3(7:$//6(;&(('7+(+(,*+7/,0,7%<12025(7+$17+($//2:$%/()25)$&,/,7$7,1*522)723'5$,1$*(*(1(5$/127(63LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH 'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$%%$6(0(17)/2253/$11$9<BB3($5/67%28/'(5&2&5$6  65 3$5.,1*/(9(/ 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21758(1257+3/$11257+ 6))/225$5($3(5%5& Agenda Item 5A Page 38 of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genda Item 5A Page 39 of 360 838383'1*65$65$65$65$         $%)&6)81,76)81,76)81,76)81,76)81,76)81,76)81,76)81,76)81,76)81,7        23(172%(/2:%$/&21<6)522)'(&.6)%$/&21<6)522)'(&.6)522)'(&.6)%$/&21<6)65$522)'(&.6)522)'(&.6)65$65$('%$/&21<6)%$/&21<6)  7+(3257,2162)7+(%$/&21,(629(5+$1*,1*7+(6(7%$&.72%(3(50,77('9,$)8785(5(92&$%/(3(50,77<3,&$/2)$//%$/&21,(63/$16<0%2/6$1'+$7&+/(*(1'$5($127&2817('$6)/225$5($3(5%5& 7+(833(5026732,172)7+(522),1*0(0%5$1(,67+(+,*+(6732,17)257+(385326(62)&$/&8/$7,1*%8,/',1*+(,*+73(5%5&7+(3$5$3(7:$//6(;&(('7+(+(,*+7/,0,7%<12025(7+$17+($//2:$%/()25)$&,/,7$7,1*522)723'5$,1$*(*(1(5$/127(63LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH 'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$6(&21')/2253/$11$9<BB3($5/67%28/'(5&2&5$6  67 6(&21')/225758(1257+3/$11257+ 6))/225$5($3(5%5&  6,7(5(9,(: 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21.(<127(6.(<9$/8(.(<127(7(;775$16/8&(17*/$66*8$5'5$,/:,7+3$,17('67((/)5$0(Agenda Item 5A Page 40 of 360 83*65$65$65$65$         6)81,7$        %)&6)81,76)81,76)81,7522)'(&.6)23(172%(/2:6(7%$&. 6(7%$&. %$/&21<6)%$/&21<6)65$*$6),5(3/$&(*$6),5(3/$&(6816+$'($%29(  65$65$('+2778%522)'(&.6)+2778%7+(3257,2162)7+(%$/&21,(629(5+$1*,1*7+(6(7%$&.72%(3(50,77('9,$)8785(5(92&$%/(3(50,77<3,&$/2)$//%$/&21,(63/$16<0%2/6$1'+$7&+/(*(1'$5($127&2817('$6)/225$5($3(5%5& 7+(833(5026732,172)7+(522),1*0(0%5$1(,67+(+,*+(6732,17)257+(385326(62)&$/&8/$7,1*%8,/',1*+(,*+73(5%5&7+(3$5$3(7:$//6(;&(('7+(+(,*+7/,0,7%<12025(7+$17+($//2:$%/()25)$&,/,7$7,1*522)723'5$,1$*(*(1(5$/127(63LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH 'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$7+,5')/2253/$11$9<BB3($5/67%28/'(5&2&5$6  65 7+,5')/225 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21758(1257+3/$11257+ 6))/225$5($3(5%5& .(<127(6.(<9$/8(.(<127(7(;7Agenda Item 5A Page 41 of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genda Item 5A Page 42 of 360 :(675(7$,/ 6(&21')/225 7+,5')/22572522)'(&.%5&/2:32,17%5&+(,*+7/,0,772(/(9522)723$5$3(73$5.,1*/(9(/          ),567)/225%2+($675(7$,/21(/(9(/2)%(/2:*5$'(3$5.,1*%8,/',1*6(7%$&.  5')/2256(7%$&. $3352;,0$7(287/,1(2)$'-$&(17%8,/',1*352326('/2&$7,212))8785($57:25.7+(3257,2162)7+(%$/&21,(629(5+$1*,1*7+(6(7%$&.72%(3(50,77('9,$)8785(5(92&$%/(3(50,77<3,&$/2)$//%$/&21,(6:(675(7$,/ 6(&21')/225 7+,5')/22572522)'(&.%5&/2:32,17%5&+(,*+7/,0,772(/(9522)723$5$3(73$5.,1*/(9(/       3523(57</,1(21(/(9(/2)%(/2:*5$'(3$5.,1*),567)/225%2+($675(7$,/%8,/',1*6(7%$&.  0$;6(7%$&.(1&52$&+0(17$//2:('3(5%5&   3523(57</,1(5')/2256(7%$&.  $3352;,0$7(287/,1(2)$'-$&(17%8,/',1*7+(3257,2162)7+(%$/&21,(629(5+$1*,1*7+(6(7%$&.72%(3(50,77('9,$)8785(5(92&$%/(3(50,77<3,&$/2)$//%$/&21,(6 7+(833(5026732,172)7+(522),1*0(0%5$1(,67+(+,*+(6732,17)257+(385326(62)&$/&8/$7,1*%8,/',1*+(,*+73(5%5&7+(3$5$3(7:$//6(;&(('7+(+(,*+7/,0,7%<12025(7+$17+($//2:$%/()25)$&,/,7$7,1*522)723'5$,1$*(*(1(5$/127(63LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH 'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$(/(9$7,2161$9<BB3($5/67%28/'(5&2&5$6  ($67(/(9$7,21  :(67(/(9$7,21.(<127(6.(<9$/8(.(<127(7(;7*/$66),%(55(,1)25&('&21&5(7( *)5& 3$1(/:,7+5(9($/6:+,7(*/$66),%(55(,1)25&('&21&5(7(&251,&(:+,7(60227+)$&('$5&+,7(&785$/%/2&.0$7&+*)5&&2/2575$16/8&(17*/$66*8$5'5$,/:,7+3$,17('67((/)5$0(0(7$/6$)(7<5$,/3$,17('&20326,7(:22'&/$'',1*'$5.%/8(522)723&21'(16(581,7(/(&75,&$/0(7(56$1'*($5 6,7(5(9,(: 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21Agenda Item 5A Page 43 of 360 :(675(7$,/ 6(&21')/225 7+,5')/22572522)'(&.*%5&/2:32,17%5&+(,*+7/,0,772(/(9522)723$5$3(73$5.,1*/(9(/        $'-$&(17%8,/',1*$'-$&(17%8,/',1*21(/(9(/2)%(/2:*5$'(3$5.,1*$%)&),567)/225%2+($675(7$,/   ('7+(3257,2162)7+(%$/&21,(629(5+$1*,1*7+(6(7%$&.72%(3(50,77('9,$)8785(5(92&$%/(3(50,77<3,&$/2)$//%$/&21,(6:(675(7$,/ 6(&21')/225 7+,5')/22572522)'(&.*%5&/2:32,17%5&+(,*+7/,0,772(/(9522)723$5$3(7 3$5.,1*/(9(/      $'-$&(17%8,/',1*$'-$&(17%8,/',1*   $%)&),567)/225%2+($675(7$,/21(/(9(/2)%(/2:*5$'(3$5.,1*('%('52&. $%29(%('52&.)($785(:$// %(<21'  ),1$/'(6,*172%(6+2:1$77(&'2&0$7(5,$/672%(86(':,//%($:22'/22.0$7(5,$/$6721(9(1((5$325&(/$,17,/(25$&20%,1$7,212)7+26( 7+(833(5026732,172)7+(522),1*0(0%5$1(,67+(+,*+(6732,17)257+(385326(62)&$/&8/$7,1*%8,/',1*+(,*+73(5%5&7+(3$5$3(7:$//6(;&(('7+(+(,*+7/,0,7%<12025(7+$17+($//2:$%/()25)$&,/,7$7,1*522)723'5$,1$*(*(1(5$/127(63LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH 'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$(/(9$7,2161$9<BB3($5/67%28/'(5&2&5$6  1257+(/(9$7,21  6287+(/(9$7,21.(<127(6.(<9$/8(.(<127(7(;7*/$66),%(55(,1)25&('&21&5(7( *)5& 3$1(/:,7+5(9($/6:+,7(*/$66),%(55(,1)25&('&21&5(7(&251,&(:+,7(35(),1,6+('0(7$/*8$5'5$,/72%(3(50,77('9,$)8785(5(92&$%/(3(50,775$16/8&(17*/$66*8$5'5$,/:,7+3$,17('67((/)5$0(0(7$/6$)(7<5$,/3$,17('0(7$/&$123<:,7+0(7$/522),1*:22')5$0(&2$7678&&2:,7+5(9($/63$,17('&20326,7(:22'&/$'',1*'$5.%/8(+25,=217$/:22'&/$'',1*0(7$/:$//3$1(/)2/',1*$/80,180'2256<67(0$/80,1806725()52176<67(0$/80,180&/$':22':,1'2:9(57,&$/%,3$57,1*67((/3$5.,1**$7(522)723&21'(16(581,7/,*+7,1*),;785(5(/,*+7,1*3/$1 6,7(5(9,(: 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21Agenda Item 5A Page 44 of 360 :(675(7$,/ 6(&21')/225 7+,5')/22572522)'(&.%5&/2:32,17%5&+(,*+7/,0,772(/(9522)3$5.,1*/(9(/  3($5/675((752: /,1(2)6,*+7/,1(2)6,*+7/,1(2)6,*+7/,1(2)6,*+7),567)/225%2+($675(7$,/0(&+$1,&$/81,766&5((1(')5209,(:0(&+$1,&$/81,76&5((1(')5209,(:81,781,781,781,7$872(/(935,9$7(5(6,'(173$5.,1*3523(57</,1(3523(57</,1($//(<52:  7+(833(5026732,172)7+(522),1*0(0%5$1(,67+(+,*+(6732,17)257+(385326(62)&$/&8/$7,1*%8,/',1*+(,*+73(5%5&7+(3$5$3(7:$//6(;&(('7+(+(,*+7/,0,7%<12025(7+$17+($//2:$%/()25)$&,/,7$7,1*522)723'5$,1$*(*(1(5$/127(63LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH 'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$6,7(6(&7,211$9<BB3($5/67%28/'(5&2&5$6 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21  %8,/',1*6(&7,21 /,1(2)6,*+7Agenda Item 5A Page 45 of 360 :(675(7$,/ 6(&21')/225 7+,5')/22572522)'(&.%5&/2:32,17%5&+(,*+7/,0,772(/(9522)723$5$3(73$5.,1*/(9(/ 5(7$,/81,7     81,765$    35,9$7(5(6,'(173$5.,1*   7+,5')/225726/$% 6(&21')/225726/$%   */$66),%(55(,1)25&('&21&5(7(-$0%352),/($/80,180&/$':22':,1'2: 6(&21')/225 7+,5')/22572522)'(&.%5&/2:32,17%5&+(,*+7/,0,772(/(9522)723$5$3(73$5.,1*/(9(/),567)/225%2+81,781,75(7$,/       6(&21')/22581,7 7+,5')/225726/$% 6(&21')/225726/$%7+(3257,2162)7+(%$/&21,(629(5+$1*,1*7+(6(7%$&.72%(3(50,77('9,$)8785(5(92&$%/(3(50,77<3,&$/2)$//%$/&21,(6 7+(833(5026732,172)7+(522),1*0(0%5$1(,67+(+,*+(6732,17)257+(385326(62)&$/&8/$7,1*%8,/',1*+(,*+73(5%5&7+(3$5$3(7:$//6(;&(('7+(+(,*+7/,0,7%<12025(7+$17+($//2:$%/()25)$&,/,7$7,1*522)723'5$,1$*(*(1(5$/127(63LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH 'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$:$//6(&7,216$1''(7$,/61$9<BB3($5/67%28/'(5&2&5$6 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21.(<127(6.(<9$/8(.(<127(7(;7*/$66),%(55(,1)25&('&21&5(7( *)5& 3$1(/:,7+5(9($/6:+,7(*/$66),%(55(,1)25&('&21&5(7(&251,&(:+,7(60227+)$&('$5&+,7(&785$/%/2&.0$7&+*)5&&2/2535(),1,6+('0(7$/*8$5'5$,/72%(3(50,77('9,$)8785(5(92&$%/(3(50,7&2$7678&&2:,7+5(9($/63$,17('&20326,7(:22'&/$'',1*'$5.%/8($/80,1806725()52176<67(0$/80,180&/$':22':,1'2:  3($5/675((7:$//6(&7,21  :,1'2:-$0%#*)5&  $//(<:$//6(&7,21Agenda Item 5A Page 46 of 360 :(675(7$,/ 6(&21')/225 7+,5')/22572522)'(&.%5&/2:32,17%5&+(,*+7/,0,772(/(9522)723$5$3(7       ),567)/225%2+($675(7$,/7+(3257,2162)7+(%$/&21,(629(5+$1*,1*7+(6(7%$&.72%(3(50,77('9,$)8785(5(92&$%/(3(50,77<3,&$/2)$//%$/&21,(6:(675(7$,/ 6(&21')/225 7+,5')/22572522)'(&.%5&/2:32,17%5&+(,*+7/,0,772(/(9522)723$5$3(7),567)/225%2+($675(7$,/23(172%(<21'      )($785(:$//),1$/'(6,*172%(6+2:1$77(&'2&0$7(5,$/672%(86(':,//%($:22'/22.0$7(5,$/$6721(9(1((5$325&(/$,17,/(25$&20%,1$7,212)7+26(:(675(7$,/ 6(&21')/225 7+,5')/22572522)'(&.%5&/2:32,17%5&+(,*+7/,0,772(/(9522)723$5$3(7      ),567)/225%2+($675(7$,/$3352;,0$7(287/,1(2)$'-$&(17%8,/',1*7+(3257,2162)7+(%$/&21,(629(5+$1*,1*7+(6(7%$&.72%(3(50,77('9,$)8785(5(92&$%/(3(50,77<3,&$/2)$//%$/&21,(63$,17('&20326,7(:22' '$5.%/8((/(9$7,21/(*(1'&20326,7(:22')5$0(*/$66),%(55(,1)25&('&21&5(7(60227+:+,7(0(7$/3$1(/ %/$&.60227+)$&('$5&+,7(&785$/&08:+,7(60227+)$&('$5&+,7(&785$/&08'$5.%/8(&2$7678&&2 60227+:+,7( 7+(833(5026732,172)7+(522),1*0(0%5$1(,67+(+,*+(6732,17)257+(385326(62)&$/&8/$7,1*%8,/',1*+(,*+73(5%5&7+(3$5$3(7:$//6(;&(('7+(+(,*+7/,0,7%<12025(7+$17+($//2:$%/()25)$&,/,7$7,1*522)723'5$,1$*(*(1(5$/127(63LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH 'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$(/(9$7,216&2/251$9<BB3($5/67%28/'(5&2&5$6  1257+(/(9$7,21 &2/25  6287+(/(9$7,21 &2/25 6,7(5(9,(: 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21  :(67(/(9$7,21 &2/25 ($676,0,/$5 Agenda Item 5A Page 47 of 360 www.theSTUDIOarchitecture.com03/30/202001Boulder, CO1737 PEARL STNAVYAERIAL VIEW FROM SOUTHEASTAgenda Item 5A Page 48 of 360 www.theSTUDIOarchitecture.com0203/30/2020Boulder, CO1737 PEARL STNAVYAERIAL VIEW FROM SOUTHWESTAgenda Item 5A Page 49 of 360 www.theSTUDIOarchitecture.com03/30/202003Boulder, CO1737 PEARL STNAVYVIEW FROM ACROSS PEARL ST.Agenda Item 5A Page 50 of 360 www.theSTUDIOarchitecture.comFEATURE WALL - FINAL DESIGN TO BE SHOWN AT TEC DOC. MATERIALS TO BE USED WILL BE A "WOOD LOOK" MATERIAL,A STONE VENEER, A PORCELAIN TILE, OR A COMBINATIONOF THOSE.03/30/202004Boulder, CO1737 PEARL STNAVYFEATURE WALL PERSPECTIVEAgenda Item 5A Page 51 of 360 KEY NOTESDEMOLITION AND RESTORATION NOTES1. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL CONSTRUCTIONDEBRIS IN A LAWFUL MANNER.2. MATERIAL OR DEBRIS SHALL NOT BE DISPOSED WITHIN THE PROJECT LIMITSUNLESS WRITTEN PERMISSION IS GRANTED BY THE PROPERTY OWNER. THEMANNER OF DISPOSAL WITHIN THE PROJECT LIMITS SHALL BE APPROVED BYA GEOTECHNICAL ENGINEER REGISTERED IN THE STATE OF COLORADO.3. CONTRACTOR SHALL PRESERVE AND PROTECT FROM DAMAGE PRIVATE ANDPUBLIC PROPERTY.4. CONTRACTOR SHALL PROTECT FROM FROM DAMAGE ALL EXISTING TREESNOT DESIGNATE FOR REMOVAL. TREE PROTECTION SHALL INCLUDE THEROOT STRUCTURE.5. DRAINAGE STRUCTURES SHALL NOT BE REMOVED UNTIL SATISFACTORYARRANGEMENTS HAVE BEEN MADE TO ACCOMMODATE DRAINAGE ANDTRAFFIC CONTROL.6. WHERE NEW CONSTRUCTION TIES INTO EXISTING CONCRETE OR ASPHALTIMPROVEMENTS, CONTRACTOR SHALL SAW CUT THE EXISTINGIMPROVEMENTS TO A TRUE LINE, WITH A VERTICAL FACE AND TO MINIMUMDEPTH OF 2-INCHES OR TO THE DEPTH OF THE REINFORCING STEEL,WHICHEVER OCCURS FIRST. IF THE EDGE IS DAMAGED DURINGCONSTRUCTION, IT SHALL BE RE-CUT PRIOR TO CONSTRUCTING THE NEWIMPROVEMENTS.7. CONTRACTOR SHALL RESTORE DAMAGED OR INJURED PROPERTY, AT THECONTRACTOR'S EXPENSE, TO A CONDITION SIMILAR OR EQUAL TO THATEXISTING BEFORE THE DAMAGE OR INJURY OCCURRED, BY REPAIRING,REBUILDING OR RESTORING THE PROPERTY.8. THE CONTRACTOR SHALL RESTORE ANY EXISTING VEGETATION AND/ORSURFACE IMPROVEMENTS BEYOND THE PROJECT LIMITS DISTURBED ORDAMAGED DURING CONSTRUCTION.EXISTING CONDITIONS SURVEY NOTES1. THE EXISTING CONDITIONS BASED ON ALTA/ACSM LAND TITLE SURVEYPREPARED BY FLATIRONS, INC. , PROJECT NUMBER 19-72,599, DATED05-14-2019.2. THE LOCATION OF THE ABOVE GROUND UTILITIES SHOWN HEREON AREBASED ON THE FIELD SURVEY BY FLATIRONS, INC.2. THE LOCATION OF THE ABOVE GROUND UTILITIES SHOWN HEREON AREBASED ON THE FIELD SURVEY BY FLATIRONS, INC. THE LOCATIONS OF THEUNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON SAID SURVEYAND INFORMATION PROVIDED BY OTHERS (WHICH MAY INCLUDE THEUTILITY OWNER OR UTILITY LOCATING SERVICES). THE SANITAS GROUP, LLCIS NOT RESPONSIBLE FOR UTILITY INFORMATION PROVIDED BY OTHERS.SANITAS GROUP, LLC RECOMMENDS THAT THE LOCATION OF THE UTILITIESBE FIELD VERIFIED PRIOR TO ANY DIGGING ON, OR ADJACENT TO THESUBJECT PROPERTY.3. EXISTING TREE LOCATIONS BASED ON FIELD SURVEY BY FLATIRONS, INC.SITE SPECIFIC DEMOLITION NOTES:1. SEE ARCHITECTURAL INFORMATION AND SPECIFICATIONS REGARDING THEDEMOLITION OF THE EXISTING STRUCTURES AND RELATED APPURTENANCES.2. TREE PROTECTION AND REMOVAL DETAILS SHALL BE COORDINATED WITHTHE PROJECT LANDSCAPE ARCHITECT. NO TREES SHALL BE REMOVED THATHAVE NOT BEEN SPECIFICALLY MARKED FOR REMOVAL BY THE PROJECTLANDSCAPE ARCHITECT AND OWNER.3. IN GENERAL, ALL INTERNAL WALK, DRIVES, AND RELATED SITEIMPROVEMENTS SUCH AS CHASE DRAINS, IRRIGATION SYSTEM, AREA DRAINS,WHEEL STOPS, SIGNS, ETC. ARE TO BE REMOVED WITHIN THE PROPERTYLIMITS.4. ALL UTILITY REMOVAL SHALL BE COORDINATED WITH THE APPROPRIATEUTILITY PROVIDER PRIOR TO THE START OF CONSTRUCTION.EXISTING ASPHALT ALLEY SECTION TO BE MAINTAINED.SAWCUT EXISTING. NOTE: CONCRETE SHALL BE CUT AT NEAREST JOINT.EXISTING ASPHALT PARKING AND LOADING AREA TO BE REMOVED.EXISTING FENCING TO BE REMOVED.EXISTING SHED TO BE REMOVED.EXISTING EXTERIOR REFRIGERATOR TO BE REMOVED.EXISTING CONCRETE SLAB TO BE REMOVED.EXISTING CONCRETE WALK TO BE REPLACEDEXISTING TREE GRATE AND STREET TREE TO BE MAINTAINED. PROVIDETREE PROTECTION (SEE CITY DETAIL THIS SHEET) IF WORKING IN RIGHTOF WAY.EXISTING 1" WATER METER TO BE REUSED FOR IRRIGATION (VERIFY ATBUILDING PERMIT - REPLACE IF REQUIRED).EXISTING 1" WATER SERVICE TO BE MAINTAINED FOR IRRIGATION(VERIFY AT BUILDING PERMIT - UPSIZE IF REQUIRED).EXISTING 4" SANITARY SEWER SERVICE TO BE REMOVED. PLUG SERVICEAT MAIN IN ACCORDANCE WITH CITY STANDARDS.EXISTING GAS SERVICE AND METER TO BE REMOVED. COORDINATEGAS SERVICE SHUTOFF WITH UTILITY PROVIDER.EXISTING OVERHEAD UTILITY SERVICES TO BE REMOVED. COORDINATEWITH UTILITY PROVIDER.EXISTING UTILITY POLE TO BE REMOVED. COORDINATE WITH UTILITYPROVIDER AGENCIES.EXISTING OVERHEAD UTILITIES TO BE UNDERGROUNDED ADJACENT TOPROJECT SITE. COORDINATE WITH UTILITY PROVIDER AGENCIES.EXISTING CURB CHASE DRAIN TO BE REMOVED.EXISTING PARKING METER KIOSK AND SIGNAGE TO BE RESET.COORDINATE LOCATION IN FIELD WITH CITY ROW INSPECTOR.EXISTING ASPHALT ALLEY TO BE DEMOLISHED AND RECONSTRUCTED.SITE REVIEWNOT FOR CONSTRUCTIONCOPYRIGHTCSheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionSanitasTheGroup801 MAIN STREET, SUITE 225LOUISVILLE, CO 80027 303.981.9238PROJECT CONTACT: CURTIS STEVENS, P.E.4913 Valkyrie Dr.BW Sons & Daughters LLCBoulder, Colorado 80301720.938.6918NAVY1737 PEARL ST. BOULDER, CO 80302STUDIO Project No:FOR REFERENCE ONLY18_009_0012/03/18 SITE REVIEW07/08/19 SITE REVIEW REVISION #109/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4CIVIL DEMOPLANSR-C1.00Agenda Item 5A Page 52 of 360 EXISTING ASPHALT ALLEY SECTION TO BE RECONSTRUCTED INCONCRETE. SEE SHEET C3.00 FOR DETAILS.SAWCUT EXISTING ASPHALT.SAWCUT EXISTING CONCRETE AT NEAREST JOINT.PROPOSED CONCRETE DRIVE & LOADING AREA.EXISTING CONCRETE WALK TO BE REPLACED.EXISTING TREE GRATE AND STREET TREE TO BE MAINTAINED.EXISTING 1" WATER METER TO BE REUSED FOR IRRIGATION(VERIFY AT BUILDING PERMIT - REPLACE IF REQUIRED).EXISTING 1" WATER SERVICE TO BE REUSED FOR IRRIGATION(VERIFY AT BUILDING PERMIT - REVISE IF REQUIRED).PROPOSED 4" DIP FIRE SPRINKLER SERVICE.PROPOSED 2" WATER SERVICE. VERIFY FINAL SERVICE SIZE ATBUILDING PERMIT.PROPOSED 2" WATER METER. VERIFY FINAL METER SIZE ATBUILDING PERMIT.EXISTING 4" SANITARY SEWER SERVICE TO BE REMOVED. PLUGAT MAIN IN ACCORDANCE WITH CITY STANDARDS.PROPOSED 6" SANITARY SEWER SERVICE. PROVIDE TWO-WAYCLEANOUT OUTSIDE BUILDING PER PLUMBING CODE.PROPOSED PRELIMINARY GAS SERVICE LOCATION. FINAL SIZEAND LOCATION TO BE COORDINATED WITH XCEL ENERGYDURING TECH DOC / FINAL CONSTRUCTION DESIGN PROCESS.PROPOSED GAS METERS. FINAL LOCATION TO BE COORD.DURING TECH DOC / FINAL CONSTRUCTION DESIGN.EXISTING GAS SERVICE AND METER TO BE REMOVED.COORDINATE GAS SERVICE SHUTOFF WITH UTILITY PROVIDER.PROPOSED ELECTRIC & TELECOM SERVICES. FINAL LOCATIONTO BE COORDINATED DURING TECH DOC / FINALCONSTRUCTION DESIGN.PROPOSED 3-PHASE TRANSFORMER PER DISCUSSIONS WITHXCEL.PROPOSED SINGLE-PHASE TRANSFORMER PER DISCUSSIONSWITH XCEL.EXISTING OVERHEAD UTILITY SERVICES TO BE REMOVED.COORDINATE WITH UTILITY PROVIDER.EXISTING UTILITY POLE TO BE REMOVED.PROPOSED UTILITY POLES PER DISCUSSIONS WITH UTILITYPROVIDERS.EXISTING OVERHEAD UTILITIES TO BE UNDERGROUNDED.COORDINATE DETAILS WITH UTILITY PROVIDER AGENCIES.EXISTING OVERHEAD UTILITIES TO BE MAINTAINED.EXISTING OVERHEAD UTILITY SERVICES TO ADJACENTPROPERTIES TO BE MAINTAINED. RESET IN FIELD BASED ONNEW UTILITY POLE LAYOUT AS NECESSARY.EXISTING CURB CHASE DRAIN TO BE REMOVED.PROPOSED CURB CHASE DRAIN. SEE SHEET C3.00.PROPOSED TRENCH DRAIN SYSTEM. SEE SHEET C3.00.EXISTING PARKING METER KIOSK AND SIGNAGE TO BE RESET TOWEST. MAINTAIN BIKE RACK CLEAR ZONE.PROPOSED RAISED RAINGARDEN. SEE SHEET C3.00.PROPOSED UTILITY POLE GUY WIRE.KEY NOTESUPUPUPUPFWPROPOSED MULTI-USEBUILDINGPROPOSED OPENCOURTYARDPROPOSED MULTI-USEBUILDINGPROPOSE D C O V E R E D CORRIDO R T O C O U R T Y A R D SIRR1. ALL WORK SHALL COMPLY WITH THE CITY OF BOULDER DESIGN ANDCONSTRUCTION STANDARDS, LATEST EDITION, AS WELL AS ALL APPLICABLE FEDERAL,STATE AND LOCAL CODES.2. ALL CONTRACTORS UTILIZING THESE PLANS ARE CAUTIONED TO COMPLY WITH THEREQUIREMENTS OF COLORADO CODE TITLE 9, ARTICLE 1.5, AS AMENDED,CONCERNING THE PROTECTION OF EXISTING UNDERGROUND FACILITIES FROMDAMAGE DUE TO EXCAVATIONS. THE LOCATION OF EXISTING UTILITIES ANDFACILITIES ARE SHOWN BASED ON INFORMATION AVAILABLE, AND COMPLETENESSIS NOT GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THELOCATION AND DEPTH OF ALL UTILITIES PRIOR TO STARTING WORK. THECONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER AT 811 TWODAYS IN ADVANCE OF STARTING WORK, AS REQUIRED BY COLORADO CODE.3. CONTRACTOR SHALL VERIFY THE DEPTH AND LOCATION OF ALL UTILITIES ANDFACILITIES PRIOR TO STARTING WORK. HAND EXCAVATION MAY BE REQUIRED.WORK SHALL BE DONE IN ACCORDANCE WITH THE STANDARDS OF THE UTILITYCOMPANIES WHOSE FACILITIES ARE IN THE PROXIMITY OF THE WORK.4. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS INCLUDING ALL DIMENSIONSAND INVERTS PRIOR TO THE START OF THE WORK. CONTRACTOR SHALL NOTIFY THEENGINEER IMMEDIATELY OF ANY VARIATIONS BETWEEN THESE PLANS AND THEACTUAL FIELD CONDITIONS.5. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR TO ANY EXISTING IMPROVEMENTSDISTURBED OR DAMAGED BY CONSTRUCTION ACTIVITIES.6. CONTRACTOR SHALL MAINTAIN AND PROTECT VEHICULAR AND PEDESTRIAN TRAFFICIN PROXIMITY OF THE WORK.7. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND SUBMITTAL APPROVALSPRIOR TO THE BEGINNING OF WORK.8. NORTHING & EASTING COORDINATES PROVIDED ON THIS PLAN ARE BASED ON THESITE SPECIFIC SURVEY COORDINATE SYSTEM. CONTRACTOR SHALL COORDINATEWITH SURVEYOR ON BASE COORDINATES IN RELATION TO PROPERTY CORNERS ANDSITE IMPROVEMENTS.9. ALL WATER AND SEWER MATERIALS AND CONSTRUCTION SHALL CONFORM TO THECITY OF BOULDER DESIGN AND CONSTRUCTION STANDARDS, LATEST EDITIONTHEREOF.10. UTILITY TAPS SHALL BE MADE BY CITY OF BOULDER PERSONNEL AT OWNER'S ORCONTRACTOR'S EXPENSE.11. MINIMUM 10-FT HORIZONTAL SEPARATION IS REQUIRED BETWEEN ALL TREES ANDUTILITIES IN THE RIGHT-OF-WAY.12. WATERLINES SHALL HAVE A MINIMUM FOUR AND A HALF (4.5-FT) OF COVER ASMEASURED FROM TOP OF PIPE TO FINAL GRADE.13. WATER AND SEWER PIPE SHALL BE BEDDED IN ACCORDANCE WITH THE CITY OFBOULDER DESIGN AND CONSTRUCTION, LATEST EDITION THEREOF.GENERAL UTILITY NOTESTHE CONTRACTOR SHALL COORDINATE WITHUTILITY PROVIDERS FOR ELECTRIC, GAS,TELECOM, AND CABLE SERVICES. DRY UTILITIESSHOWN ON THIS PLAN ARE SCHEMATIC ANDSHOWN FOR INFORMATION AND PLANNINGONLY. FINAL LAYOUT MAY VARY BASED ONUTILITY PROVIDER DIRECTIONS, SITECONDITIONS, ETC.DRY UTILITY NOTE:LEGENDEX. FENCE EX. EASEMENTADJACENT PROPERTY BOUNDARYPROPERTY BOUNDARYEX. ASPHALT PAVEMENTEX. CONCRETEPROPOSED CONCRETEPROPOSED WATER VALVEPROPOSED TEE WITH THRUST BLOCKINGFPROPOSED FIRE SERVICEPROPOSED WATER METERPROPOSED WATER SERVICEWPROPOSED HORZ. BEND WITH THRUST BLOCKINGSPROPOSED SANITARY SEWER SERVICEPROPOSED IRRIGATION SERVICEIRREX. UNDERGROUND ELECTRICAL LINEEX. LIGHT POLEEX. STORM SEWEREX. SANITARY SEWEREX. WATER LINEEX. NATURAL GAS LINEEX. FIBER OPTIC LINEEX. UTILITY MANHOLEEX. FIRE HYDRANTEX. WATER VALVEEX. OVERHEAD UTILITY LINEEX. WATER METEREX. TELECOMMUNICATIONS RISEREX. ELECTRICAL EQUIPMENTEX. TELEPHONEEX. ELECTRICAL METEREX. POWER POLESITE REVIEWNOT FOR CONSTRUCTIONCOPYRIGHTCSheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionSanitasTheGroup801 MAIN STREET, SUITE 225LOUISVILLE, CO 80027 303.981.9238PROJECT CONTACT: CURTIS STEVENS, P.E.4913 Valkyrie Dr.BW Sons & Daughters LLCBoulder, Colorado 80301720.938.6918NAVY1737 PEARL ST. BOULDER, CO 80302STUDIO Project No:FOR REFERENCE ONLY18_009_0012/03/18 SITE REVIEW07/08/19 SITE REVIEW REVISION #109/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4PRELIMINARYUTILITY PLANSR-C2.00Agenda Item 5A Page 53 of 360 KEY NOTESUPUPUPUPRETAIL SPACEMAIN LVL F.F.=5326.85'RETAIL SPACEMAIN LVL F.F.=5326.40'MAIN LVL F.F.=5327.20'MAIN LVLF.F.=5327.20'MAIN LVL F.F.=5326.90'EXISTING ASPHALT ALLEY SECTION TO BE RECONSTRUCTEDAS CONCRETE ALLEY WITH INVERTED PAN. TRANSITION ATEAST END TO TIE INTO EXISTING CONCRETE WALK. DETAILSTO BE COORDINATE AT TIME OF TECHNICAL DOCUMENTS.SAWCUT EXISTING ASPHALT.SAWCUT EXISTING CONCRETE AT NEAREST JOINT.PROPOSED CONCRETE DRIVE & LOADING AREA.EXISTING CONCRETE WALK TO BE REPLACED.EXISTING TREE GRATE AND STREET TREE TO BE MAINTAINED.PROPOSED 3-PHASE TRANSFORMER PER DISCUSSIONS WITHXCEL.PROPOSED SINGLE-PHASE TRANSFORMER PER DISCUSSIONSWITH XCEL.EXISTING OVERHEAD UTILITY SERVICES TO BE REMOVED.COORDINATE WITH UTILITY PROVIDER.EXISTING UTILITY POLE TO BE REMOVED.PROPOSED UTILITY POLES PER DISCUSSIONS WITH UTILITYPROVIDERS.EXISTING OVERHEAD UTILITIES TO BE UNDERGROUNDED.COORDINATE DETAILS WITH UTILITY PROVIDER AGENCIES.EXISTING OVERHEAD UTILITIES TO BE MAINTAINED.EXISTING OVERHEAD UTILITY SERVICES TO ADJACENTPROPERTIES TO BE MAINTAINED. RESET IN FIELD BASED ONNEW UTILITY POLE LAYOUT AS NECESSARY.PROPOSED UTILITY POLE GUY WIRE.EXISTING CURB CHASE DRAIN TO BE REMOVED.PROPOSED 12" SIDEWALK CHASE DRAIN PER CITY OFBOULDER STANDARDS.PROPOSED 6" TRENCH DRAIN WITH DECORATIVE GRATE.TIE TRENCH DRAIN INTO 12" SIDEWALK CHASE DRAIN.EXISTING PARKING METER KIOSK AND SIGNAGE TO BE RESETTO WEST AS SHOWN. MAINTAIN BIKE RACK CLEAR. ZONEREQUIREMENTS.PROPOSED RAISED RAINGARDEN. SEE PRELIMINARY TYPICALSECTION ON SHEET C3.01.PROPOSED 15-FOOT SIGHT TRIANGLE LIMITS.PROPOSED 220 S.F. PERMEABLE PAVER BAND. SEEPRELIMINARY DRAINAGE REPORT FOR REQUIREMENTS.SEE SHEET C3.01 FOR PRELIMINARY CROSS SECTION.EXISTING BIKE RACK TO REMAIN. RE: LANDSCAPE PLANS.PROPOSED BIKE RACK. RE: LANDSCAPE PLANS.PROPOSED LANDSCAPE AREA W/ 6" VERTICAL CURB BARRIER.PROPOSED OVERHEAD BALCONIES. NOTE: REVOCABLEPERMIT AND ASSOCIATED REQUIREMENTS TO BE APPLIEDFOR AND APPROVED PRIOR TO INSTALLATION OF ANYENCROACHMENTS INTO DRAINAGE EASEMENT.PROPOSED MULTI-USEBUILDINGPROPOSED OPENCOURTYARDPROPOSED MULTI-USEBUILDINGPROPOSE D C O V E R E D CORRIDO R T O C O U R T Y A R D COPYRIGHTCSheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionSanitasTheGroup801 MAIN STREET, SUITE 225LOUISVILLE, CO 80027 303.981.9238PROJECT CONTACT: CURTIS STEVENS, P.E.4913 Valkyrie Dr.BW Sons & Daughters LLCBoulder, Colorado 80301720.938.6918NAVY1737 PEARL ST. BOULDER, CO 80302STUDIO Project No:FOR REFERENCE ONLY18_009_0012/03/18 SITE REVIEW07/08/19 SITE REVIEW REVISION #109/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4SITE REVIEWNOT FOR CONSTRUCTIONPRELIMINARYGRADING PLANSR-C3.00LEGENDEX. ASPHALT PAVEMENTPROPOSED CONCRETEEX. MAJOR CONTOUREX. MINOR CONTOUREX. SPOT ELEVATIONPROPERTY BOUNDARYEX. EASEMENTEX. FENCERIGHT-OF-WAY LINEEX. UTILITY POLEEX. OVERHEAD UTILITIESEX. STORM SEWEREX. LIGHT POLEEX. MANHOLEPROPOSED STORM STRUCTURE DESIGNATORPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED STORM SEWERPROPOSED NON-PERMEABLE PAVERSRUNNING-BOND PATTERN - RE: LANDSCAPE)EXISTING STORM STRUCTURE DESIGNATORPROPOSED NON-PERMEABLE PAVERS(HERRING BONE PATTERN - RE: LANDSCAPE)PROPOSED COLORED CONCRETEAgenda Item 5A Page 54 of 360 TYPICAL RAISED RAINGARDENPLANTER CROSS SECTIONNO SCALENO SCALEPERMEABLE PAVER SYSTEM (PICP)FULL-INFILTRATION TYPICAL SECTIONCOPYRIGHTCSheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionSanitasTheGroup801 MAIN STREET, SUITE 225LOUISVILLE, CO 80027 303.981.9238PROJECT CONTACT: CURTIS STEVENS, P.E.4913 Valkyrie Dr.BW Sons & Daughters LLCBoulder, Colorado 80301720.938.6918NAVY1737 PEARL ST. BOULDER, CO 80302STUDIO Project No:FOR REFERENCE ONLY18_009_0012/03/18 SITE REVIEW07/08/19 SITE REVIEW REVISION #109/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4SITE REVIEWNOT FOR CONSTRUCTIONPRELIMINARYWQ SECTIONSSR-C3.01Agenda Item 5A Page 55 of 360 LEGENDEX. ASPHALT PAVEMENTEX. MAJOR CONTOUREX. MINOR CONTOUREX. SPOT ELEVATIONDRAINAGE BASIN BOUNDARYSTORM WATER FLOW DIRECTIONDRAINAGE BASIN DESIGNATORDRAINAGE BASIN IDBASIN AREA [AC]TIME OF CONCENTRATION [MIN]RUNOFFCOEFFICIENTSPROPERTY BOUNDARYEX. FENCEADJACENT PROPERTY BOUNDARYEX. UTILITY POLEEX. OVERHEAD UTILITIESEX. TREESDESIGN POINT1Q5 [CFS] Q100 [CFS]1.940.82EXISTING CONDITIONSRUNOFF SUMMARY TABLEDESIGN POINT20.870.43DRAINAGE BASIN STORM RUNOFF [CFS]MAJOR STORM RUNOFFMINOR STORM RUNOFFEX. CONCRETE PAVEMENT2.811.25OVERALL SITEEX. GRAVELCOPYRIGHTCSheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionSanitasTheGroup801 MAIN STREET, SUITE 225LOUISVILLE, CO 80027 303.981.9238PROJECT CONTACT: CURTIS STEVENS, P.E.4913 Valkyrie Dr.BW Sons & Daughters LLCBoulder, Colorado 80301720.938.6918NAVY1737 PEARL ST. BOULDER, CO 80302STUDIO Project No:FOR REFERENCE ONLY18_009_0012/03/18 SITE REVIEW07/08/19 SITE REVIEW REVISION #109/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4EXISTING CONDITIONSDRAINAGE PLANSR-C4.00SITE REVIEWNOT FOR CONSTRUCTIONAgenda Item 5A Page 56 of 360 UPUPUPUPLEGENDEX. ASPHALT PAVEMENTEX. MAJOR CONTOUREX. MINOR CONTOUREX. SPOT ELEVATIONDRAINAGE BASIN BOUNDARYSTORM WATER FLOW DIRECTIONDRAINAGE BASIN DESIGNATORDRAINAGE BASIN IDBASIN AREA [AC]TIME OF CONCENTRATION [MIN]RUNOFFCOEFFICIENTSPROPERTY BOUNDARYEX. FENCEADJACENT PROPERTY BOUNDARYEX. UTILITY POLEEX. OVERHEAD UTILITIESEX. TREESDESIGN POINT1Q5 [CFS] Q100 [CFS]2.380.65PROPOSED CONDITIONSRUNOFF SUMMARY TABLEDESIGN POINT20.420.21DRAINAGE BASIN STORM RUNOFF [CFS]MAJOR STORM RUNOFFMINOR STORM RUNOFFEXISTING ASPHALT ALLEY SECTION TO BE RECONSTRUCTEDWITH CONCRETE PAVEMENT.PROPOSED CONCRETE DRIVE & LOADING AREA.EXISTING CONCRETE WALK TO BE REPLACED DURINGCONSTRUCTION AS REQUIRED.EXISTING TREE GRATE AND STREET TREE TO BE MAINTAINED.EXISTING ADJACENT WALL TO REMAIN.(NOT ON PROJECT SITE)EXISTING UTILITY POLE TO BE REMOVED.EXISTING OVERHEAD UTILITIES TO BE BURIED.EXISTING SIDEWALK CHASE DRAIN TO BE RELOCATED.RELOCATED SIDEWALK CHASE DRAIN.EXISTING PARKING METER KIOSK AND SIGNAGE TO BERELOCATED.PROPOSED 6" TRENCH DRAIN WITH DECORATIVE COVER.PROPOSED RAINGARDEN. SEE TYP. SECTION ON SHEET C3.01.REFER TO PRELIMINARY DRAINAGE REPORT FOR PRELIMINARYSIZING REQUIREMENTS. SEE SHEET C3.01 FOR PRELIMINARYCROSS SECTION.PROPOSED 220 S.F. FULL-INFILTRATION PERMEABLE PAVERBAND. REFER TO PRELIMINARY DRAINAGE REPORT FORPRELIMINARY SIZING REQUIREMENTS. SEE C3.01 FORPRELIMINARY CROSS SECTION.KEY NOTESEX. CONCRETE PAVEMENTPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED CONCRETE PAVEMENTOVERALL SITE2.800.86PROPOSED RAIN GARDENRETAIL SPACEMAIN LVL F.F.=5328.85'RETAIL SPACEMAIN LVL F.F.=5328.40'MAIN LVL F.F.=5329.20'MAIN LVLF.F.=5329.20'MAIN LVL F.F.=5328.90'PROPOSED MULTI-USEBUILDINGPROPOSED OPENCOURTYARDPROPOSED MULTI-USEBUILDINGPROPOSE D C O V E R E D CORRIDO R T O C O U R T Y A R D COPYRIGHTCSheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionSanitasTheGroup801 MAIN STREET, SUITE 225LOUISVILLE, CO 80027 303.981.9238PROJECT CONTACT: CURTIS STEVENS, P.E.4913 Valkyrie Dr.BW Sons & Daughters LLCBoulder, Colorado 80301720.938.6918NAVY1737 PEARL ST. BOULDER, CO 80302STUDIO Project No:FOR REFERENCE ONLY18_009_0012/03/18 SITE REVIEW07/08/19 SITE REVIEW REVISION #109/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4PROPOSED CONDITIONSDRAINAGE PLANSR-C4.01SITE REVIEWNOT FOR CONSTRUCTIONAgenda Item 5A Page 57 of 360 UPUPUPUPAeccDbCogoPoint (AeccLand120)0010'20'NLandscape SummaryWater Quality Planter (typ)See CivilPlant ListLandscape Notes1. 1. Landscaping Schedule: (a) Nothing shall be planted between October 15 and March 1withoutprior written approval of the City. Stock, other than container-grown stock, shall not be plantedbetween June 1 and September 1 without prior written approval of the City. Bare root stock shall notbe planted after April 30 or if plants have begun to leaf out. (b) Nothing shall be planted duringfreezing or excessively windy, hot, or wet weather or when the ground conditions cannot be properlyworked for digging, mixing, raking, or grading. (c) Nothing shall be planted until the adjacent siteimprovements, pavements, irrigation installation and finish grading is completed. The contractorshall test the irrigation system in the presence of the Director. The irrigation system shall be inapproved, operating condition prior to any planting.2. Site preparation and all planting shall be completed, at a minimum, in accordance with the City ofBoulder Design and Construction Standards. Site preparation shall include tilling the soil to aminimum depth of six inches below the finished grade, together with soil amendments that areappropriate to ensure the health and sustainability of the landscaping to be planted.3. Turf grass shall be limited to a maximum of 25 percent of all landscape areas on the site.4. All planting beds and a 3-foot diameter ring at the base of each tree within sod or seeded areas shallbe mulched with organic mulch at least 4” deep.5. Gravel, rock mulch, or crusher fines shall not be used under trees or any planting areas. Rock orgravel may only be used as a specific ornamental feature in limited areas (such as at the bottom of adrainage swale or dry river bed) or as a pedestrian path or patio.6. Weed barrier fabric shall not to be used in any planting areas.7. All plants shall be grouped by water needs. A minimum of 75 percent of all landscaped areas(including any turf grass) must use low to moderate water demand plants. The landscape shall bedesigned so that, at maturity, not more than 10 percent of the landscaped area is exposed mulch.8. All landscape areas shall be watered by an automatic irrigation system. The irrigation system mustbe zoned to deliver different appropriate amounts of water to different plant zones. The site shouldbe irrigated with drip irrigation, bubbler, or micro-spray systems. All trees will be zoned separatelyfrom turf grass. All irrigation zones shall use a smart system that adjusts for rainfall, soil moisture,and other weather factors.9. Protective Maintenance: An applicant for construction approval shall provide maintenance and carefor all existing trees required to be protected in the public right-of-way adjacent to any project orconstruction site during construction activities and the public improvement warranty period to ensurethat existing trees survive and are not damaged. Refer to Chapter 3 of the Design and ConstructionStandards for all tree protection requirements. (Only applicable to existing public street trees orexisting private trees that will meet the street tree requirements of section 9-9-13 BRC 1981)10. All new trees shall be located a minimum of 10’ from any existing water or sewer utility lines or fromlight poles or overhead utility poles. All new utility lines shall be located a minimum of 10’ from anyexisting public street tree.11. Tree Inventory provided by Boulder Tree & Landscape Consulting.12. All Green Ash on site shall be maintained in good health. Should their replacement be warranteddue to decline caused by EAB or other factors they will be replace with 2" Celtis occidentalis.13. All planting bed to receive 3" of Western Red Cedar Mulch. No weed barrier is to be used undergroundcover or perennials.Landscape LegendOrnamental TreeExisting Treeto RemainShrubGroundcover/GrassConcrete PavingBike RackCs (18)1350 Pine Street, Suite 6STUDIO ARCHITECTUREBoulder, CO 80302theSTUDIOarchitecture.com866.529.9130COPYRIGHTPLOT DATE:CSTUDIO Project No:Sheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionFOR REFERENCE ONLYDRAWN BY:REVIEWED BY:SR-L1.00LANDSCAPE PLANNAVY18_009_001737 PEARL ST. BOULDER, CO 80302JWBJWB12/03/18 SITE REVIEW07/12/19 SITE REVIEW REVISION #12601 Spruce Street, Unit AJB FIELDWoRKSBoulder, CO 80302jbfieldworks.com734.6262.5467At (1)Ps (42)Raised Planter1L3.00Existing Street Trees in Grate to Remain (typ)Existing Bike Racks to Remain (2)Cm (86)3.03L2.0009/30/19 SITE REVIEW REVISION #2New Inverted "U" Bicycle Rack (3)11/11/19 SITE REVIEW REVISION #3Bf (2)Hs (70)03/30/20 SITE REVIEW REVISION #4Agenda Item 5A Page 58 of 360 1350 Pine Street, Suite 6STUDIO ARCHITECTUREBoulder, CO 80302theSTUDIOarchitecture.com866.529.9130COPYRIGHTPLOT DATE:CSTUDIO Project No:Sheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionFOR REFERENCE ONLYDRAWN BY:REVIEWED BY:SR-L2.00CITY OF BOULDERNAVY18_009_001737 PEARL ST. BOULDER, CO 80302JWBJWB12/03/18 SITE REVIEW07/12/19 SITE REVIEW REVISION #12601 Spruce Street, Unit AJB FIELDWoRKSBoulder, CO 80302jbfieldworks.com734.6262.5467STANDARD DETAILS09/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4Agenda Item 5A Page 59 of 360 1L3.00RAISED PLANTERSCALE: 1" = 1'-0"12458PLANTING MIX, COMPACTED TO 80%HOLD TOP OF SOIL 1" BELOW BOTTOM OF CAPPRECAST CONCRETE WALL CAPCONCRETE TOPING SLAB, SEE ARCHDECIDUOUS CANOPY TREE (SEE PLANTING DETAIL 3.02/L-2)3251'-3"2'-3"6'-0"4"13BRICK FACED MASONRY WALL, COLOR AND TYPE TO MATCH BUILDING41350 Pine Street, Suite 6STUDIO ARCHITECTUREBoulder, CO 80302theSTUDIOarchitecture.com866.529.9130COPYRIGHTPLOT DATE:CSTUDIO Project No:Sheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionFOR REFERENCE ONLYDRAWN BY:REVIEWED BY:SR-L3.00LANDSCAPE NAVY18_009_001737 PEARL ST. BOULDER, CO 80302JWBJWB12/03/18 SITE REVIEW07/12/19 SITE REVIEW REVISION #12601 Spruce Street, Unit AJB FIELDWoRKSBoulder, CO 80302jbfieldworks.com734.6262.5467DETAILS1'-0"6"789676" WIDE TRENCH DRAIN WITH DECORATIVE GRATEPROVIDE 3" DIA. PERFORATED PIPE WITH 1" WEEPS, 2' O.C.69GEOTEXTILE FABRIC OVER 4" GRAVEL DRAINAGE LAYER WATERPROOF INSIDE OF MASONRY WALL8'-0"09/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4Agenda Item 5A Page 60 of 360 www.theSTUDIOarchitecture.comPROJECT SITE:1727 & 1737 PEARL ST.NOTE:NO EXISTING TREES IN PROJECTSITE PER CITY OF BOULDERFORESTRY DATAN107/08/2019Boulder, CO1737 Pearl StreetNAVYTREE INVENTORYAgenda Item 5A Page 61 of 360 Agenda Item 5A Page 62 of 360 3($5/675((7  52: $'-$&(17=21('71273527(&7('%<62/$5$&&(665(48,5(0(176$'-$&(17=21(50;62/$5$&&(66$5($,,(;7(172)6+$'2:6)520 62/$5)(1&($'-$&(17=21('71273527(&7('%<62/$5$&&(665(48,5(0(176))(  86*6 38%/,&5,*+72):$<1273527(&7('%<62/$5$&&(665(48,5(0(176$//(< $  %  )752:  $//2 :('   $   $//2 :(' 3($5/675((7  52: 38%/,&5,*+72):$<1273527(&7('%<62/$5$&&(665(48,5(0(176(;7(172)6+$'2:6)520 62/$5)(1&($'-$&(17=21('71273527(&7('%<62/$5$&&(665(48,5(0(176$'-$&(17=21('71273527(&7('%<62/$5$&&(665(48,5(0(176$'-$&(17=21(50;62/$5$&&(66$5($,,$//(<))(  86*6 %  $  )752:  $//2:('    $//2:('  3LQH6WUHHW6XLWH678',2$5&+,7(&785(%RXOGHU&2WKH678',2DUFKLWHFWXUHFRP&23<5,*+73/27'$7(&678',23URMHFW1R6KHHW,VVXH 5HYLVLRQ/RJ,WLVWKHFOLHQW VUHVSRQVLELOLW\SULRUWRRUGXULQJFRQVWUXFWLRQWRQRWLI\WKHDUFKLWHFWLQZULWLQJRIDQ\SHUFHLYHGHUURUVRURPLVVLRQVLQWKHSODQVDQGVSHFLILFDWLRQVRIZKLFKDFRQWUDFWRUWKRURXJKO\NQRZOHGJHDEOHZLWKWKHEXLOGLQJFRGHVDQGPHWKRGVRIFRQVWUXFWLRQVKRXOGUHDVRQDEO\EHDZDUH:ULWWHQLQVWUXFWLRQVDGGUHVVLQJVXFKSHUFHLYHGHUURUVRURPLVVLRQVVKDOOEHUHFHLYHGIURPWKHDUFKLWHFWSULRUWRWKHFOLHQWRUFOLHQW VVXEFRQWUDFWRUVSURFHHGLQJZLWKWKHZRUN7KHFOLHQWVKDOOEHUHVSRQVLEOHIRUDQ\GHIHFWVLQFRQVWUXFWLRQLIWKHVHSURFHGXUHVDUHQRWIROORZHG1R'DWH 'HVFULSWLRQ)255()(5(1&(21/<'5$:1%<5(9,(:('%<3065$6+$'2:$1$/<6,61$9<BB3($5/67%28/'(5&2:6&5  6+$'2:$1$/<6,6$0  6+$'2:$1$/<6,630 6,7(5(9,(: 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21 6,7(5(9,(:5(9,6,21Agenda Item 5A Page 63 of 360 Flatirons, Inc.Surveying, Engineering & Geomaticswww.FlatironsInc.com16406Agenda Item 5A Page 64 of 360 Flatirons, Inc.Surveying, Engineering & Geomaticswww.FlatironsInc.com16406Agenda Item 5A Page 65 of 360 LSC TRANSPORTATION CONSULTANTS, INC. 1889 York Street Denver, CO 80206 (303) 333-1105 FAX (303) 333-1107 E-mail: lsc@lscdenver.com November 8, 2019 Mr. Adam Wertz 1737 Pearl, LLC 4913 Valkyrie Drive Boulder, CO 80301 Re: 1737 Pearl Street Parking Garage Elevator Queue Analysis Boulder, CO LSC #190210 Dear Mr. Wertz: In response to your request, LSC Transportation Consultants, Inc. has prepared this Parking Garage Entrance Queue Analysis for the proposed 1737 Pearl Street redevelopment in Boulder, Colorado. IMPACT AREA Figure 1 shows the vicinity map. Figure 2 shows the conceptual site plan which includes the location of the proposed parking garage elevator and the adjacent 20-foot public alley. PROPOSED LAND USE AND ACCESS The site is proposed to include 14 multi-family dwelling units above first floor retail space. The 10 residential units on the second floor will be for rent and the four residential units on the third floor will be for sale. Full movement residential access is proposed to the alley north of the site. The parking structure will be located under the building and will be accessed by a vertical lift vehicle elevator. There is approximately 15 feet between the elevator door and the south edge of the 20-foot public alley. The retail space is not required to provide parking spaces because the site is located in the Central Area General Improvement District (CAGID). Retail trips will likely be oriented to/from area parking garages or on-street parking. The conceptual site plan is shown in Figure 2. ALTERNATIVE TRAVEL MODES An alternate travel mode share of 20 percent is expected based on the creation of a Travel De- mand Management (TDM) plan. There are existing bus stops on Pearl Street near the inter- section with 18th Street. There are existing sidewalks on both sides of Pearl Street, 17th Street, and 18th Street. The 15th & Pearl Public Parking Garage is located about two blocks west of the site. Agenda Item 5A Page 66 of 360 Mr. Adam Wertz Page 2 November 8, 2019 1737 Pearl Street Parking Garage Elevator Queue Analysis TRIP GENERATION Table 1 from the July 30, 2019 Trip Generation and Assignment Report by LSC shows the esti- mated typical weekday, morning peak-hour, and afternoon peak-hour trip generation for the site based on the rates from Trip Generation, 10th Edition, 2017, by the Institute of Trans- portation Engineers (ITE). The residential portion of the site is expected to generate about 103 one-way vehicle-trips on the average weekday, with about half entering and half exiting the site during a 24-hour period. During the morning peak-hour, which generally occurs for one hour between 6:30 and 8:30 a.m., about 2 vehicles would enter the garage and about 5 vehicles would exit the garage. During the afternoon peak-hour, which generally occurs for one hour between 4:00 and 6:30 p.m., about 5 vehicles would enter the garage and about 3 vehicles would exit the garage. These volumes are expected to be reduced by about 20 percent due to alternative travel modes based on the creation of a Travel Demand Management (TDM) plan. The net trip generation potential after the TDM reduction is two vehicles entering and four vehicles exiting the garage during the morning peak-hour and four vehicles entering and three vehicles exiting the garage during the afternoon peak-hour. SERVICE RATE FOR VEHICLE ELEVATOR The elevator manufacturer indicates a typical range of 24 to 27 seconds for the garage door to open and close, move to the other level, and then open and close and return to the original level. This range excludes driver perception/reaction time and the time it takes to pull in and out of the elevator. A very conservative service rate of 60 seconds per vehicle was used in the queuing analysis. ARRIVAL RATE FOR VEHICLES The trip generation section above shows two entering vehicles are expected to arrive at the elevator in the morning peak-hour and four entering vehicles are expected to arrive at the ele- vator in the afternoon peak-hour. QUEUING ANALYSIS The average queue lengths were estimated using a typical M/M/C Queuing Model which esti- mates queuing based on the vehicle arrival rate compared to the vehicle service rate. The probability of no entering vehicles being served at any given time in the afternoon peak- hour is 93.34 percent. The probability of one entering vehicle being served at any given time in the afternoon peak- hour is 6.22 percent. The probability of two entering vehicles being served at any given time in the afternoon peak- hour is 0.41 percent. Agenda Item 5A Page 67 of 360 Agenda Item 5A Page 68 of 360 Table 1ESTIMATED TRAFFIC GENERATION1737 Pearl StreetBoulder, COLSC 190210; July, 2019Vehicle-Trips GeneratedTrip Generation Rates (1)PM Peak-HourAM Peak-HourAveragePM Peak-HourAM Peak-HourAverageOutInOutInWeekdayOutInOutInWeekdayQuantityTrip Generating CategoryPhase 135521030.2070.3530.3540.1067.32DU (3)14Multi-Family (2)294734428613.7136.0574.4735.467112.18KSF (5)7.677Restaurant (4)32523944964Sub-Total =6108919320% Alternative Travel Mode Reduction =26423135771Net New Trips =Notes:Source: Trip Generation, Institute of Transportation Engineers, 10th Edition, 2017(1)ITE Land Use No. 220 - Multifamily Housing (Low Rise)(2)DU - Dwelling Units(3)ITE Land Use No. 932 - High-Turnover (Sit-Down) Restaurant.(4)KSF = 1,000 square feet(5)Agenda Item 5A Page 69 of 360 Agenda Item 5A Page 70 of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d, dzK& Ě Ě ϴйͿ & & Ě н ^ĨͿ ^&Ϳ ϱΖ Ě Agenda Item 5A Page 71 of 360 LSC TRANSPORTATION CONSULTANTS, INC. 1889 York Street Denver, CO 80206 (303) 333-1105 FAX (303) 333-1107 E-mail: lsc@lscdenver.com July 30, 2019 Mr. Adam Wartz 1737 Pearl, LLC 4913 Valkyrie Drive Boulder, CO 80301 Re: 1737 Pearl Street Boulder, CO LSC #190210 Dear Mr. Wartz: In response to your request, LSC Transportation Consultants, Inc. has prepared this Trip Gene- ration and Assignment Report for the proposed 1737 Pearl Street redevelopment in Boulder, Colorado. IMPACT AREA Figure 1 shows the vicinity map. Area Roadways The major roadways in the site’s vicinity are shown on Figure 1 and are described below. • Pearl Street is an east-west, two-lane minor arterial roadway south of the site. The inter- section with 17th Street is signalized and the intersection with 18th Street is unsignalized. The posted speed limit in the vicinity of 17th Street is 20 mph with a transition to 30 mph to the east. There are detached sidewalks on both sides of the roadway. There are bus stops near the intersection with 18th Street. •17th Street is a north-south, two-lane collector roadway west of the site. The intersection with Pearl Street is signalized. No speed limit is posted in the vicinity of the site. There are sidewalks and on-street parking on both sides of the roadway. •18th Street is a north-south, two-lane local roadway east of the site. The intersection with Pearl Street is unsignalized. No speed limit is posted in the vicinity of the site. There are detached sidewalks and on-street parking on both sides of the roadway. PROPOSED LAND USE AND ACCESS The site is proposed to include about 14 multi-family dwelling units and about 7,677 square feet of restaurant space. The 10 units on the second floor will be for rent and the four units on Agenda Item 5A Page 72 of 360 Mr. Adam Wartz Page 2 July 30, 2019 1737 Pearl Street the third floor will be for sale. Full movement residential access is proposed to the alley north of the site. The restaurant space is not required to provide parking spaces because the site is located in the Central Area General Improvement District (CAGID). Restaurant trips will likely be oriented to/from area parking garages or on-street parking. The conceptual site plan is shown in Figure 2. ALTERNATIVE TRAVEL MODES An alternate travel mode share of 20 percent is expected. There are existing bus stops on Pearl Street near the intersection with 18th Street. There are existing sidewalks on both sides of Pearl Street, 17th Street, and 18th Street. The 15th & Pearl Public Parking Garage is located about two blocks west of the site. TRIP GENERATION Table 1 shows the estimated typical weekday, morning peak-hour, and afternoon peak-hour trip generation for the site based on the rates from Trip Generation, 10th Edition, 2017, by the Institute of Transportation Engineers (ITE). The site is projected to generate about 964 one-way vehicle-trips on the average weekday, with about half entering and half exiting the site during a 24-hour period. During the morning peak- hour, which generally occurs for one hour between 6:30 and 8:30 a.m., about 44 vehicles would enter and about 39 vehicles would exit the site. During the afternoon peak-hour, which generally occurs for one hour between 4:00 and 6:30 p.m., about 52 vehicles would enter and about 32 vehicles would exit the site. These volumes are expected to be reduced by about 20 percent due to alternative travel modes. TRIP DISTRIBUTION Figure 3 shows the estimated distribution of residential site-generated traffic. The restaurant space is not required to provide parking spaces because the site is located in the Central Area General Improvement District (CAGID). Restaurant trips will likely be oriented to/from area parking garages or on-street parking. TRIP ASSIGNMENT Figure 4 shows the assignment of residential site-generated traffic assuming no reduction for alternative travel modes to assure a conservative analysis. OVERALL TRAFFIC IMPACTS The project is expected to generate less than ten new residential trips during either peak-hour and the restaurant trips will be disbursed among the various public parking alternatives in the area. A traffic study should not be needed as the residential trip generation potential will be relatively low and the restaurant trips will be well disbursed. * * * * * Agenda Item 5A Page 73 of 360 Mr. Adam Wartz Page 3 July 30, 2019 1737 Pearl Street We trust this information will assist you in planning for the proposed 1737 Pearl Street redeve- lopment. Respectfully submitted, LSC Transportation Consultants, Inc. By: Christopher S. McGranahan, P.E., PTOE Principal CSM/wc Enclosure: Table 1 Figures 1 - 4 W:\LSC\Projects\2019\190210-1737PearlTG&A\Report\1737Pearl-TG&A-073019.wpd Agenda Item 5A Page 74 of 360 Table 1ESTIMATED TRAFFIC GENERATION1737 Pearl StreetBoulder, COLSC 190210; July, 2019Vehicle-Trips GeneratedTrip Generation Rates (1)PM Peak-HourAM Peak-HourAveragePM Peak-HourAM Peak-HourAverageOutInOutInWeekdayOutInOutInWeekdayQuantityTrip Generating CategoryPhase 135521030.2070.3530.3540.1067.32DU (3)14Multi-Family (2)294734428613.7136.0574.4735.467112.18KSF (5)7.677Restaurant (4)32523944964Sub-Total =6108919320% Alternative Travel Mode Reduction =26423135771Net New Trips =Notes:Source: Trip Generation, Institute of Transportation Engineers, 10th Edition, 2017(1)ITE Land Use No. 220 - Multifamily Housing (Low Rise)(2)DU - Dwelling Units(3)ITE Land Use No. 932 - High-Turnover (Sit-Down) Restaurant.(4)KSF = 1,000 square feet(5)Agenda Item 5A Page 75 of 360 Agenda Item 5A Page 76 of 360 '1 '1  $//(< 3($5/675((7  52: 75$6+ 5(&<&/,1* &203267 (;,67,1*3$5.,1* 0(7(5.,26.725(0$,1  /2 :3 2,17 )/ 5  $'-$&(176725< %5,&.%8,/',1* $'-$&(176725< %5,&.%8,/',1* (;,67,1*75((725(0$,1 /2$',1*$5($ (;,67,1*75((*5$7(725(0$,1 $'-$&(173$5.,1* /27 $872 (/(9$725 '2:172 %$6(0(17 ,17(5,25/27/,1(72%(5(029(' %<6(3$5$7(352&(66 9,(:75,$1*/(   5(6,'(17,$/ /2%%< 0$,/%2;(6 7<3,&$/ &/5(;,67,1*&+$6('5$,172%(5(/2&$7('         1(:87,/,7<32/( 1(:*8<:,5( 1(:87,/,7<32/( 1(:*8<:,5(%8,/',1*6(7%$&. ,17(5,2538%/,& &2857 75(( 3/$17(5 6725<0,;('86(%8,/',1* *5281')/2255(7$,/ 6(&21')/2255(6,'(17,$/ 81,76 7+,5')/2255(6,'(17,$/ 81,76       (;7(5,253$7,2 (;7(5,253$7,2  72(/(9$725  $&&(66 Agenda Item 5A Page 77 of 360 Agenda Item 5A Page 78 of 360 Agenda Item 5A Page 79 of 360 Civil Engineering Solutions The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 PRELIMINARY DRAINAGE REPORT For NAVY 1727 AND 1737 PEARL STREET REDEVELOPMENT Boulder, Colorado December 2018 Revised November 2019 Revised March 2020 Prepared For: BW Sons & Daughters LLC 4913 Valkyrie Drive Boulder, CO 80301 Contact: Adam Wertz Prepared By: The Sanitas Group, LLC 801 Main Street, Suite 225 Louisville, CO 80027 Contact: Curtis C. Stevens, P.E., CFM Mark Murphy, P.E., CFM Agenda Item 5A Page 80 of 360 Civil Engineering Solutions The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 PRELIMINARY DRAINAGE REPORT For NAVY 1727 AND 1737 PEARL STREET REDEVELOPMENT Boulder, Colorado TABLE OF CONTENTS 1.0 Introduction ..................................................................................................................................... 1 2.0 Existing Site Conditions .................................................................................................................... 1 3.0 Proposed Developement ................................................................................................................. 2 4.0 Design Criteria .................................................................................................................................. 2 5.0 Hydrology ......................................................................................................................................... 2 Existing Conditions ........................................................................................................................... 2 Proposed Conditions ........................................................................................................................ 4 6.0 Storm Water Detention ................................................................................................................... 6 7.0 Stormwater Quality and Erosion Control ......................................................................................... 7 8.0 Wetland Impacts .............................................................................................................................. 8 9.0 Conclusions ...................................................................................................................................... 8 10.0 References ....................................................................................................................................... 9 TECHNICAL APPENDICES Vicinity Map, FEMA Flood Map, & Soil Information ............................................................................ Appendix A Drainage Design Supporting Calculations ............................................................................... Appendix B EXHIBIT PLANS Existing Conditions Drainage Plan [SHT DR1.0] ..................................................................... Back Pocket Proposed Conditions Drainage Plan [SHT DR2.0] ................................................................... Back Pocket Agenda Item 5A Page 81 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment P a g e | 1 The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 1.0 INTRODUCTION This Preliminary Drainage Report [Report] is prepared on behalf of BW Sons & Daughters LLC for the proposed NAVY 1727 and 1737 Pearl Street Redevelopment project. The purpose of this report is to address the City of Boulder’s [City] requirements for a “Preliminary Storm Water Report and Plan” as outlined in Chapter 7 “Storm Water Design”, “Design and Construction Standards” [1]. This Report documents the existing drainage conditions present at the site and provides an analysis of the drainage conditions proposed for the NAVY 1727 and 1737 Pearl Street Redevelopment project. 2.0 EXISTING SITE CONDITIONS The proposed NAVY 1727 and 1737 Pearl Street Redevelopment project site is located on the north side of Pearl Street between 17st Street and 18th Street. The site is in the Southwest quarter of Section 30, Township 1 North, Range 70 West of the 6th P.M., County of Boulder, City of Boulder, State of Colorado. The 14,111-sf (0.324 acre) project site consists of two adjacent parcels and measures approximately 100-ft wide by 140-ft deep. The legal description is: Lots 10 and 11, Block 91, Boulder Old Town East, County of Boulder, State of Colorado. The adjacent lots are developed commercial properties. As shown on the “Existing Conditions Drainage Plan” included in the back pocket of this report, the existing 1727 Pearl Street parcel is currently developed with a multi-story commercial building and associated private gravel parking/loading area on the north side of the building. The 1737 Pearl Street parcel is currently developed with a single-story commercial building and associated private asphalt parking/loading area on the north side of the building. There is a 20-ft wide alley that lies immediately to the north of the project site. USDA Natural Resources Conservation Services classified the soils on the property as Niwot Soils (Nh) having a Group B hydrologic soil [2]. Agenda Item 5A Page 82 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment P a g e | 2 The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 The property is shown as being outside the 100-year floodplain for Boulder Creek. The 500-year floodplain does impact the site. There are no 500-year floodplain regulations that impact the proposed development as no Critical Facilities are proposed. 3.0 PROPOSED DEVELOPEMENT The proposed NAVY 1727 and 1737 Pearl Street Redevelopment project will include the demolition of all existing site improvements and the construction of a three-story mixed-use building with ground level commercial space and 14 residential units on the upper levels. Vehicular access to the site will be from the existing alley to the north. A vehicle elevator will be located on the north side of the building that will lower cars to an underground parking garage located in the basement level of the proposed building. The section of the alley adjacent to the project site as well as the alley section east to the intersection with 18th Street will be reconstructed and repaved with concrete. The proposed development will maintain historic drainage patterns with flows being directed to the southeast. The proposed development layout and grading is shown on the “Proposed Conditions Drainage Plan” included in the back pocket of this report. 4.0 DESIGN CRITERIA This Report was prepared using the criteria outlined in the City of Boulder “Design and Construction Standards”, Chapter 7 “Storm Water Design” [Criteria] [1], the Urban Drainage and Flood Control District [UDFCD] “Urban Storm Drainage Criteria Manual, Volumes 1 and 2” [4], and the Urban Drainage and Flood Control District “Urban Storm Drainage Criteria Manual, Volume 3 – Best Management Practices” [5]. 5.0 HYDROLOGY The rational method was used to calculate runoff rates for the 2-year, 5-year, 10-year and 100-year storm events. The proposed project is a mixed-use commercial/residential development and the 5- year and 100-year events are presented as the minor and major design storms, respectively. Existing Conditions The existing drainage basins are delineated on the “Existing Conditions Drainage Plan” provided in the back pocket of this report. Drainage basin delineation, storm flow directions and off-site drainage conditions were determined visually during a site visit in November 2018. The property is not Agenda Item 5A Page 83 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment P a g e | 3 The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 subject to any observable significant offsite tributary drainage. The property to the east is located downstream of the site. The property to the west drains to the northeast and into the existing alley. The project site will be designed to maintain these flow patterns. The existing site has been delineated into two primary existing drainage basins. Basin Ax consists of the existing west building and the asphalt and gravel parking areas located on the north side of the existing buildings. Also included in Basin Ax are three concrete areas located on the north side of the buildings. The roof drains to the north to downspouts that discharge to the surface on the north side of the building. Runoff on the asphalt and gravel areas sheet flows to the north to the alley. The alley slopes downward to the east towards 18th Street which slopes to the south to Pearl Street. From the intersection of 18th Street and Pearl Street runoff flows east in Pearl Street to 21st Street where runoff is intercepted by the City’s storm sewer system. Basin Bx consists of the existing east building. The existing roof slopes to the south. The roof drainage is piped to a sidewalk chase drain located in the Pearl Street sidewalk near the southeast corner of the existing building which conveys the roof drainage to the street. Pearl Street drains to the east as described above. Existing conditions storm water runoff is presented in Table 5.1. Basin description, imperviousness, weighted runoff coefficients, time of concentration and runoff values are provided for the existing drainage basin on a worksheet labeled “Rational Method Calculations” provided in Appendix A. For ease of reference, the existing conditions storm water flows are presented on the “Existing Conditions Drainage Plan” provided in the back pocket of this report. Table 5.1: Storm Runoff by Basin – Existing Conditions Basin I.D. Design Point 5-year Minor Design Storm Runoff [cfs] 100-year Major Design Storm Runoff [cfs] Ax 1 0.82 1.94 Bx 2 0.43 0.87 Agenda Item 5A Page 84 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment P a g e | 4 The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 Proposed Conditions The proposed on-site drainage basins are delineated on the “Proposed Conditions Drainage Plan” provided in the back pocket of this report. With the development proposal, the site is divided into five primary drainage basins, Basins A1 through A4, B1 and B2. Basin A1 consists of the westerly approximately 3/4 of the proposed building, with the exception of the courtyard area in the center of the building. The roof drainage from Basin A1 will be piped to one of two rain gardens that will be located on the north side of the building adjacent to the alley. Proposed permanent water quality measures for the site are discussed in Section 7.0 below. Basin A2 consists of the easterly approximately 1/4 of the proposed building. The roof drainage from Basin A2 will be piped to the second rain garden that will be located on the north side of the building adjacent to the alley. Basin A3 covers the main loading and parking garage access drive area on the north side of the building. This basin consists of concrete sloping towards the alley for 10-feet from the building wall with a proposed 4-foot wide permeable paver band located adjacent to the alley to provide water quality treatment to runoff from the adjacent concrete. See Section 7.0 for additional discussion regarding the proposed permeable pavers. Basin A4 consists of the remaining concrete and utility (transformers, etc.) on the north side of the structure that discharge directly to the alley in a historic manner as it is not feasible to release to a raingarden or permeable paver feature. Basin B1 covers the small central open courtyard area, consisting of concrete patio and a landscape planter. Runoff from Basin B1 will sheet flow to a trench drain system that will drain to the south through the courtyard access walkway and into the relocated sidewalk chase drain in the Pearl Street sidewalk. The existing sidewalk chase drain in Pearl Street will be removed and reconstructed approximately 30 feet west of the existing location to convey the courtyard drainage to Pearl Street, following historic drainage patterns. While the City of Boulder desires to eliminate sidewalk chase drains wherever possible, the lack of storm sewer in the proximity of the project site prevents the installation of standard drains and storm pipe to drain the proposed open courtyard, therefore the project proposes to maintain a chase drain in this area. The proposed site layout will significantly Agenda Item 5A Page 85 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment P a g e | 5 The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 reduce the amount of area and flow discharging to the sidewalk chase, with a proposed redevelopment discharge of 0.19 CFS and 0.38 CFS for the minor and major storm events, respectively. Basin B2 consists of the small areas of concrete along the south side of the proposed building. Runoff from Basin B2 will sheet flow south into Pearl Street. Proposed conditions storm water runoff for each basin is presented in Table 5.2. Basin description, imperviousness, weighted runoff coefficients, time of concentration and runoff values are provided for the proposed drainage basin on a worksheet labeled “Rational Method Calculations” provided in Appendix B. For ease of reference, the proposed conditions storm water flows are presented on the “Proposed Conditions Drainage Plan” provided in the back pocket of this report. A comparison of Existing and Proposed Conditions runoff rates for the site discharge points is presented in Table 5.3. Table 5.2: Storm Runoff by Sub-Basin – Proposed Conditions Basin I.D. 5-year Minor Design Storm Runoff [cfs] 100-year Major Design Storm Runoff [cfs] A1 0.84 1.71 A2 0.36 0.73 A3 0.06 0.14 A4 0.05 0.12 B1 0.19 0.38 B2 0.02 0.04 Table 5.3: Storm Runoff Comparison (With Detention) Design Point 5-year Minor Design Storm Runoff [cfs] 100-year Major Design Storm Runoff [cfs] Existing Conditions Proposed Conditions Δ Existing Conditions Proposed Conditions Δ 1 0.82 0.65 -0.17 1.94 2.38 0.44 2 0.43 0.21 -0.22 0.87 0.42 -0.45 Agenda Item 5A Page 86 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment P a g e | 6 The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 Overall 1.25 0.86 -0.39 2.81 2.80 -0.01 The proposed conditions runoff rates entering the alley at Design Point 1 will decrease during the minor storm and increase during the major storm. The runoff rates to Pearl Street at Design Point 2 will decrease for both the minor and major design storms. 6.0 STORM WATER DETENTION The proposed redevelopment of the project site will increase the overall impervious area as well as the expected peak runoff rates for both the minor and major storm events. Stormwater detention volume will be provided in the two proposed rain gardens on the north side to store the increased runoff from the site and release the runoff at the historic rate in accordance with Section 7.12 in the Criteria. A storage volume equal to 110% of the difference between the historic and proposed conditions runoff will be provided above the water quality capture volume (WQCV). Both the minor and major storm runoff rates will be controlled by a weir opening on the north side of the rain gardens where runoff will drain towards the alley, following historic drainage patterns. Due to the lack of storm sewer in the area and proximity to the foundation, the raingarden features need to be elevated. Therefore, portions of the area on the north side of the building cannot drain into the raingardens and therefore will be free released. In order to limit impacts, a band of permeable pavers is being provided between the primary loading/access area and the alley. These permeable pavers will provide water quality and reduce runoff from the adjacent concrete. To be conservative in the runoff analysis, for detention design purposes the permeable pavers are not included in the detention analysis and are assumed to be at capacity or plugged, with the raingarden release rates adjusted to control overall site releases to historic levels. See Section 7.0 for additional discussion regarding the permeable pavers. The internal courtyard will free release towards Pearl Street based on discussions with City staff as due to the lack of storm sewer in the area it is not practicable to provide detention or formal water quality for this area. The anticipated discharge rates from this area are minimal (less than 0.2 CFS for the minor storm) and there are limited sources for pollutants in this area. Per discussions with staff, the existing sidewalk chase drain will be relocated west to align with the courtyard access to provide an outlet from runoff from the courtyard. Agenda Item 5A Page 87 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment P a g e | 7 The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 The section of the alley adjacent to the project site and out east to 18th Street will be reconstructed with a concrete alley section to improve the conveyance capacity of the alley. 7.0 STORMWATER QUALITY AND EROSION CONTROL The proposed project will increase the overall impervious area and runoff coefficients for the site; therefore, the project is required to provide permanent water quality treatment. With existing and proposed conditions impervious areas of 78% and 87%, respectively, the site is designed to meet the Stormwater Quality Design Standard, Constrained WQCV Standard described in Section 7.15(C)(1)(d)(ii) in the Criteria. The Constrained WQCV Standard requires treatment and/or infiltration of the runoff from at least 50% of the treatment area, including at least 50% of the impervious area, for the 80th percentile, 0.6-inch storm event. The site proposes two raingarden features as well as a band of permeable pavers on the north side of the site to treat as much of the site runoff as possible. The proposed permanent water quality features are designed to provide treatment of the runoff for approximately 82% of the site. Recessing the raingardens into grade to allow the adjacent concrete areas to utilize them is not feasible as storm sewer is not present in the project vicinity and full infiltration of the raingarden is not feasible due to proximity to the building foundation and geotechnical requirements. The raingarden WQCV is designed to drain in 12 hours via orifices per UDFCD. The remaining portion of the north side of the site between the building and alley not covered by raingarden consists primarily of concrete and utilities. The areas on the east and west end are constrained by utility (electric and gas) facilities as well as egress requirements, therefore these areas (totaling approximately 0.013 -Acres) will free release to the alley. A small landscape area has been included on the east side of the loading area for a tree and to collect initial raingarden discharge. The westerly rain garden area was adjusted to account for a tree to be planted in the rain garden. Due to the small size of the rain garden, the largest anticipated tree diameter is 12-inches, therefore the westerly rain garden area was reduced by 1-s.f. The central portion of concrete serving as the access to the parking garage as well as for deliveries, etc. will have a permeable paver band installed to provide water quality since this area will see frequent vehicular movements. The permeable paver system will be based on a full infiltration design due to the lack of storm sewer outfall. While full infiltration of the raingardens was not possible, the anticipated small discharge rate from Basin A3 into the pavers (0.04 CFS for the 2-year storm and 0.14 CFS for the 100-year) and the fact that the Agenda Item 5A Page 88 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment P a g e | 8 The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 pavers can be placed 10-feet from the foundation; we feel the permeable pavers in this area will provide some water quality and runoff impact benefit while not creating a groundwater impact on the proposed structure or adjacent structures. The project geotechnical report indicates a 10-12- foot layer of slightly clayey sand and gravel on the site. Formal infiltration testing of the existing conditions is still to be performed but utilizing guidelines for septic system design in the area the sandy-gravel soils identified by the project geotechnical engineer would typically require a Long- Term Acceptance Rate (LTAR) of 0.8-1.0 in/hr for design purposes. Septic LTAR design rates are typically lower than field infiltration testing rates, but lacking field testing at this time we are utilizing the lower septic design rate of 0.8 in/hr. Applied over the 220 S.F. paver footprint results in a preliminary infiltration capacity of 14.67 C.F. per hour or 176 C.F. per 12-Hour WQ drain period. The required WQCV for the paver system is 12 C.F and the provided volume is 37 C.F. Applying the recommended 2x safety factor, the preliminary design is still below the 12-hr drain capacity of the system. Construction Best Management Practices [BMPs] will be installed prior to and during construction, to restrict the amount of sediment transported offsite by either wind or water. Construction BMPs include vehicle tracking control at the construction entrance, silt fencing, concrete washouts and dust control. Detailed construction stormwater management plans will be provided at the time of Technical Document Review as necessary. 8.0 WETLAND IMPACTS There are no known wetlands located on the project site. 9.0 CONCLUSIONS This Report meets the City’s requirements for Preliminary Drainage Report information as outlined in the Criteria. The Report documents the existing drainage conditions present at the site and provides an analysis of the drainage conditions and water quality measures proposed for the NAVY 1727 and 1737 Pearl Street Redevelopment project. The proposed development will not adversely affect downstream drainage facilities or properties. Agenda Item 5A Page 89 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment P a g e | 9 The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 10.0 REFERENCES [1] “Design and Construction Standards”, City of Boulder, Latest Edition. [2] Soils Map, “Web Soil Survey 3.0” , USDA Natural Resources Conservation Service, November 2018. [3] “Flood Insurance Rate Map”, Federal Emergency Management Agency, Map Number 08013CO394J, effective date 18 December 2012. [4] “Storm Drainage Criteria Manual, Volumes 1 and 2”, Urban Drainage and Flood Control District”, January 2016. [5] “Urban Storm Drainage Criteria Manual, Volume 3 – Best Management Practices” Urban Drainage and Flood Control District”, January 2016. Agenda Item 5A Page 90 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 APPENDIX A Vicinity Map & Soil Info Agenda Item 5A Page 91 of 360 Civil Engineering Solutions The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 1737 Pearl Vicinity Map Agenda Item 5A Page 92 of 360 Hydrologic Soil Group—Boulder County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/30/2018 Page 1 of 4442994244299514429960442996944299784429987442999644300054430014442994244299514429960442996944299784429987442999644300054430014476709476718476727476736476745476754476763 476709 476718 476727 476736 476745 476754 476763 40° 1' 12'' N 105° 16' 22'' W40° 1' 12'' N105° 16' 20'' W40° 1' 9'' N 105° 16' 22'' W40° 1' 9'' N 105° 16' 20'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 15 30 60 90 Feet 0 5 10 20 30 Meters Map Scale: 1:378 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. Agenda Item 5A Page 93 of 360 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Boulder County Area, Colorado Survey Area Data: Version 15, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 30, 2014—Sep 18, 2014 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Boulder County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/30/2018 Page 2 of 4 Agenda Item 5A Page 94 of 360 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Nh Niwot soils B 0.4 100.0% Totals for Area of Interest 0.4 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Hydrologic Soil Group—Boulder County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/30/2018 Page 3 of 4 Agenda Item 5A Page 95 of 360 Preliminary Drainage Report March 2020 NAVY - 1727 and 1737 Pearl Street Redevelopment The Sanitas Group, LLC 801 Main Street, Suite 225 I Louisville, CO 80027 720.346.1656 APPENDIX B Drainage Design Supporting Calculations Agenda Item 5A Page 96 of 360 Rational Method Calculations Basin A Existing Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.324 [acres] =14,111 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Asphalt: Parking 3108 100 0.87 0.88 0.90 0.93 Concrete Drives & Walks 140 96 0.85 0.87 0.90 0.92 Roofs 6734 90 0.80 0.85 0.90 0.90 Gravel (packed)4074 40 0.40 0.45 0.50 0.70 Lawns, sandy 55 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 77.48 AI = 10,932.60 [sf] Weighted Runoff Coefficients: C2 = 0.70 C5 = 0.74 C10 = 0.78 C100 = 0.85 Overall Site Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 97 of 360 Rational Method Calculations Basin Ax Existing Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.235 [acres] =10,229 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Asphalt: Parking 3108 100 0.87 0.88 0.90 0.93 Concrete Drives & Walks 140 96 0.85 0.87 0.90 0.92 Roofs 2852 90 0.80 0.85 0.90 0.90 Gravel (packed)4074 40 0.40 0.45 0.50 0.70 Lawns, sandy 55 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 72.72 AI = 7,438.80 [sf] Weighted Runoff Coefficients: C2 = 0.66 C5 = 0.70 C10 = 0.74 C100 = 0.83 Time of Concentration: Sheet Flow:Concentrated Flow: Li [ft] = 74 Lt1 [FT] = 84 Lt2 [FT] = 0 Si [%] = 1.00 St1 [%] = 1.80 St2 [%] = 0.00 ti [min] = 6.26 CV1 3= 20.00 CV2 3= 20.00 Vt1 [fps]4= 2.68 Vt2 [fps]4= 0.00 tt1 [min] = 0.52 tt2 [min] = 0.00 3 UDFCD, Table RO-2 4 UDFCD, Eqn RO-4 tt [min] = 0.52 Time of Concentration: tc=ti+tt [min] = 6.78 tc(minimum)= 5 min tc [min] = 6.8 Check for Urbanized Basins: tc=(Li+Lt1+Lt2)/180+10 [min] = 10.88 Rainfall Intensity5 I2 [in/hr]= 3.55 I5 [in/hr]= 5.00 I10 [in/hr]= 6.78 I100 [in/hr]= 9.98 5 City of Boulder "Design and Construction Standards", Figure 7-1 Runoff - Rational Method Equation6 Q2 [cfs]= 0.55 Q5 [cfs]= 0.82 Q10 [cfs]= 1.17 Q100 [cfs]= 1.94 6 UDFCD "Drainage Criteria Manual, Vol 1", Eqn RO-1 The existing west building (1727 and 1729 Pearl St) and the asphalt and gravel parking areas adjacent to the alley. Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 98 of 360 Rational Method Calculations Basin Bx Existing Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.089 [acres] =3,882 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Asphalt: Parking 0 100 0.87 0.88 0.90 0.93 Concrete Drives & Walks 0 96 0.85 0.87 0.90 0.92 Roofs 3882 90 0.80 0.85 0.90 0.90 Gravel 0 7 0.15 0.25 0.35 0.65 Lawns, sandy 0 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 90.00 AI = 3,493.44 [sf] Weighted Runoff Coefficients: C2 = 0.80 C5 = 0.85 C10 = 0.90 C100 = 0.90 Time of Concentration: Sheet Flow:Concentrated Flow: Li [ft] = 77 Lt1 [FT] = 0 Lt2 [FT] = 0 Si [%] = 1.00 St1 [%] = 0.00 St2 [%] = 0.00 ti [min] = 3.95 CV1 3= 20.00 CV2 3= 20.00 Vt1 [fps]4= 0.00 Vt2 [fps]4= 0.00 tt1 [min] = 0.00 tt2 [min] = 0.00 3 UDFCD, Table RO-2 4 UDFCD, Eqn RO-4 tt [min] = 0.00 Time of Concentration: tc=ti+tt [min] = 3.95 tc(minimum)= 5 min tc [min] = 5.0 Check for Urbanized Basins: tc=(Li+Lt1+Lt2)/180+10 [min] = 10.43 Rainfall Intensity5 I2 [in/hr]= 4.00 I5 [in/hr]= 5.70 I10 [in/hr]= 7.40 I100 [in/hr]= 10.80 5 City of Boulder "Design and Construction Standards", Figure 7-1 Runoff - Rational Method Equation6 Q2 [cfs]= 0.29 Q5 [cfs]= 0.43 Q10 [cfs]= 0.59 Q100 [cfs]= 0.87 6 UDFCD "Drainage Criteria Manual, Vol 1", Eqn RO-1 The existing east building (1737 and 1739 Pearl St) covering the southeasterly portion of the site. Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 99 of 360 Rational Method Calculations Overall Site Proposed Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:11/07/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.32 [acres] =14,111 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Permeable Pavers 220 7 0.15 0.25 0.35 0.65 Concrete Drives & Walks 2721 96 0.85 0.87 0.90 0.92 Roofs 10750 90 0.80 0.85 0.90 0.90 Raingarden 278 0 0.00 0.10 0.20 0.50 Lawns, sandy 142 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 87.18 AI = 12,302.56 [sf] Weighted Runoff Coefficients: C2 = 0.78 C5 = 0.82 C10 = 0.87 C100 = 0.89 Overall Site Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 100 of 360 Rational Method Calculations Basin A1 Proposed Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.178 [acres] =7,734 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Asphalt: Parking 0 100 0.87 0.88 0.90 0.93 Concrete Drives & Walks 0 96 0.85 0.87 0.90 0.92 Roofs 7540 90 0.80 0.85 0.90 0.90 Gravel 0 7 0.15 0.25 0.35 0.65 Raingarden 194 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 87.74 AI = 6,785.82 [sf] Weighted Runoff Coefficients: C2 = 0.78 C5 = 0.83 C10 = 0.88 C100 = 0.89 Time of Concentration: Sheet Flow:Concentrated Flow: Li [ft] = 148 Lt1 [FT] = 0 Lt2 [FT] = 0 Si [%] = 2.00 St1 [%] = 0.00 St2 [%] = 0.00 ti [min] = 4.67 CV1 3= 20.00 CV2 3= 20.00 Vt1 [fps]4= 0.00 Vt2 [fps]4= 0.00 tt1 [min] = 0.00 tt2 [min] = 0.00 3 UDFCD, Table RO-2 4 UDFCD, Eqn RO-4 tt [min] = 0.00 Time of Concentration: tc=ti+tt [min] = 4.67 tc(minimum)= 5 min tc [min] = 5.0 Check for Urbanized Basins: tc=(Li+Lt1+Lt2)/180+10 [min] = 10.82 Rainfall Intensity5 I2 [in/hr]= 4.00 I5 [in/hr]= 5.70 I10 [in/hr]= 7.40 I100 [in/hr]= 10.80 5 City of Boulder "Design and Construction Standards", Figure 7-1 Runoff - Rational Method Equation6 Q2 [cfs]= 0.55 Q5 [cfs]= 0.84 Q10 [cfs]= 1.16 Q100 [cfs]= 1.71 6 UDFCD "Drainage Criteria Manual, Vol 1", Eqn RO-1 The westerly portion of the proposed building. Roof drainage will be piped to a rain garden on the north side of the building. Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 101 of 360 Rational Method Calculations Basin A2 Proposed Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.076 [acres] =3,294 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Asphalt: Parking 0 100 0.87 0.88 0.90 0.93 Concrete Drives & Walks 0 96 0.85 0.87 0.90 0.92 Roofs 3210 90 0.80 0.85 0.90 0.90 Gravel 0 7 0.15 0.25 0.35 0.65 Raingarden 84 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 87.70 AI = 2,888.91 [sf] Weighted Runoff Coefficients: C2 = 0.78 C5 = 0.83 C10 = 0.88 C100 = 0.89 Time of Concentration: Sheet Flow:Concentrated Flow: Li [ft] = 141 Lt1 [FT] = 0 Lt2 [FT] = 0 Si [%] = 2.00 St1 [%] = 0.00 St2 [%] = 0.00 ti [min] = 4.57 CV1 3= 20.00 CV2 3= 20.00 Vt1 [fps]4= 0.00 Vt2 [fps]4= 0.00 tt1 [min] = 0.00 tt2 [min] = 0.00 3 UDFCD, Table RO-2 4 UDFCD, Eqn RO-4 tt [min] = 0.00 Time of Concentration: tc=ti+tt [min] = 4.57 tc(minimum)= 5 min tc [min] = 5.0 Check for Urbanized Basins: tc=(Li+Lt1+Lt2)/180+10 [min] = 10.78 Rainfall Intensity5 I2 [in/hr]= 4.00 I5 [in/hr]= 5.70 I10 [in/hr]= 7.40 I100 [in/hr]= 10.80 5 City of Boulder "Design and Construction Standards", Figure 7-1 Runoff - Rational Method Equation6 Q2 [cfs]= 0.24 Q5 [cfs]= 0.36 Q10 [cfs]= 0.49 Q100 [cfs]= 0.73 6 UDFCD "Drainage Criteria Manual, Vol 1", Eqn RO-1 The easterly portion of the proposed building. Roof drainage will be piped to a rain garden on the north side of the building. Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 102 of 360 Rational Method Calculations Basin A3 Proposed Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.015 [acres] =670 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Asphalt: Parking 0 100 0.87 0.88 0.90 0.93 Concrete Drives & Walks 450 96 0.85 0.87 0.90 0.92 Roofs 0 90 0.80 0.85 0.90 0.90 Permeable Pavers 220 7 0.15 0.25 0.35 0.65 Lawns, sandy 0 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 66.77 AI = 447.30 [sf] Weighted Runoff Coefficients: C2 = 0.62 C5 = 0.67 C10 = 0.72 C100 = 0.83 Time of Concentration: Sheet Flow:Concentrated Flow: Li [ft] = 10 Lt1 [FT] = 0 Lt2 [FT] = 0 Si [%] = 2.00 St1 [%] = 0.00 St2 [%] = 0.00 ti [min] = 1.96 CV1 3= 20.00 CV2 3= 20.00 Vt1 [fps]4= 0.00 Vt2 [fps]4= 0.00 tt1 [min] = 0.00 tt2 [min] = 0.00 3 UDFCD, Table RO-2 4 UDFCD, Eqn RO-4 tt [min] = 0.00 Time of Concentration: tc=ti+tt [min] = 1.96 tc(minimum)= 5 min tc [min] = 5.0 Check for Urbanized Basins: tc=(Li+Lt1+Lt2)/180+10 [min] = 10.06 Rainfall Intensity5 I2 [in/hr]= 4.00 I5 [in/hr]= 5.70 I10 [in/hr]= 7.40 I100 [in/hr]= 10.80 5 City of Boulder "Design and Construction Standards", Figure 7-1 Runoff - Rational Method Equation6 Q2 [cfs]= 0.04 Q5 [cfs]= 0.06 Q10 [cfs]= 0.08 Q100 [cfs]= 0.14 6 UDFCD "Drainage Criteria Manual, Vol 1", Eqn RO-1 Basin A3 consists of concrete loading area and permeable pavers on the north side of the property. Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 103 of 360 Rational Method Calculations Basin A4 Proposed Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.013 [acres] =564 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Asphalt: Parking 0 100 0.87 0.88 0.90 0.93 Concrete Drives & Walks 458 96 0.85 0.87 0.90 0.92 Roofs 0 90 0.80 0.85 0.90 0.90 Gravel 0 7 0.15 0.25 0.35 0.65 Lawns, sandy 106 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 77.89 AI = 439.30 [sf] Weighted Runoff Coefficients: C2 = 0.69 C5 = 0.72 C10 = 0.77 C100 = 0.84 Time of Concentration: Sheet Flow:Concentrated Flow: Li [ft] = 11 Lt1 [FT] = 0 Lt2 [FT] = 0 Si [%] = 2.00 St1 [%] = 0.00 St2 [%] = 0.00 ti [min] = 1.78 CV1 3= 20.00 CV2 3= 20.00 Vt1 [fps]4= 0.00 Vt2 [fps]4= 0.00 tt1 [min] = 0.00 tt2 [min] = 0.00 3 UDFCD, Table RO-2 4 UDFCD, Eqn RO-4 tt [min] = 0.00 Time of Concentration: tc=ti+tt [min] = 1.78 tc(minimum)= 5 min tc [min] = 5.0 Check for Urbanized Basins: tc=(Li+Lt1+Lt2)/180+10 [min] = 10.06 Rainfall Intensity5 I2 [in/hr]= 4.00 I5 [in/hr]= 5.70 I10 [in/hr]= 7.40 I100 [in/hr]= 10.80 5 City of Boulder "Design and Construction Standards", Figure 7-1 Runoff - Rational Method Equation6 Q2 [cfs]= 0.04 Q5 [cfs]= 0.05 Q10 [cfs]= 0.07 Q100 [cfs]= 0.12 6 UDFCD "Drainage Criteria Manual, Vol 1", Eqn RO-1 Basin A4 consists of concrete pavement & landscape areas with trees on the north side of the property free releasing to the alley. Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 104 of 360 Rational Method Calculations Basin B1 Proposed Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.039 [acres] =1,685 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Asphalt: Parking 0 100 0.87 0.88 0.90 0.93 Concrete Drives & Walks 1649 96 0.85 0.87 0.90 0.92 Roofs 0 90 0.80 0.85 0.90 0.90 Gravel 0 7 0.15 0.25 0.35 0.65 Lawns, sandy 36 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 93.95 AI = 1,582.75 [sf] Weighted Runoff Coefficients: C2 = 0.83 C5 = 0.85 C10 = 0.89 C100 = 0.91 Time of Concentration: Sheet Flow:Concentrated Flow: Li [ft] = 57 Lt1 [FT] = 0 Lt2 [FT] = 0 Si [%] = 2.00 St1 [%] = 0.00 St2 [%] = 0.00 ti [min] = 2.66 CV1 3= 20.00 CV2 3= 20.00 Vt1 [fps]4= 0.00 Vt2 [fps]4= 0.00 tt1 [min] = 0.00 tt2 [min] = 0.00 3 UDFCD, Table RO-2 4 UDFCD, Eqn RO-4 tt [min] = 0.00 Time of Concentration: tc=ti+tt [min] = 2.66 tc(minimum)= 5 min tc [min] = 5.0 Check for Urbanized Basins: tc=(Li+Lt1+Lt2)/180+10 [min] = 10.32 Rainfall Intensity5 I2 [in/hr]= 4.00 I5 [in/hr]= 5.70 I10 [in/hr]= 7.40 I100 [in/hr]= 10.80 5 City of Boulder "Design and Construction Standards", Figure 7-1 Runoff - Rational Method Equation6 Q2 [cfs]= 0.13 Q5 [cfs]= 0.19 Q10 [cfs]= 0.25 Q100 [cfs]= 0.38 6 UDFCD "Drainage Criteria Manual, Vol 1", Eqn RO-1 The courtyard area located in the center of the proposed building. Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 105 of 360 Rational Method Calculations Basin B2 Proposed Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Description: NRCS Soil Type:Nh, Niwot Soils NRCS Hydrologic Soil Rating:B Basin Area=0.004 [acres] =165 [sf] Surface Characteristics1 Sub-Area Imp [sf][%] C2 C5 C10 C100 Asphalt: Parking 0 100 0.87 0.88 0.90 0.93 Concrete Drives & Walks 165 96 0.85 0.87 0.90 0.92 Roofs 0 90 0.80 0.85 0.90 0.90 Gravel 0 7 0.15 0.25 0.35 0.65 Lawns, sandy 0 0 0.00 0.10 0.20 0.50 1 City of Boulder"Design and Construction Standards", Table 7-2 Weighted Percent Imperviousness :I [%] = 96.00 AI = 158.21 [sf] Weighted Runoff Coefficients: C2 = 0.85 C5 = 0.87 C10 = 0.90 C100 = 0.92 Time of Concentration: Sheet Flow:Concentrated Flow: Li [ft] = 70 Lt1 [FT] = 0 Lt2 [FT] = 0 Si [%] = 2.00 St1 [%] = 0.00 St2 [%] = 0.00 ti [min] = 2.75 CV1 3= 20.00 CV2 3= 20.00 Vt1 [fps]4= 0.00 Vt2 [fps]4= 0.00 tt1 [min] = 0.00 tt2 [min] = 0.00 3 UDFCD, Table RO-2 4 UDFCD, Eqn RO-4 tt [min] = 0.00 Time of Concentration: tc=ti+tt [min] = 2.75 tc(minimum)= 5 min tc [min] = 5.0 Check for Urbanized Basins: tc=(Li+Lt1+Lt2)/180+10 [min] = 10.39 Rainfall Intensity5 I2 [in/hr]= 4.00 I5 [in/hr]= 5.70 I10 [in/hr]= 7.40 I100 [in/hr]= 10.80 5 City of Boulder "Design and Construction Standards", Figure 7-1 Runoff - Rational Method Equation6 Q2 [cfs]= 0.01 Q5 [cfs]= 0.02 Q10 [cfs]= 0.03 Q100 [cfs]= 0.04 6 UDFCD "Drainage Criteria Manual, Vol 1", Eqn RO-1 A small strip of concrete pavement between the proposed building and the Pearl Street sidewalk. Runoff Coefficients1 The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 106 of 360 Water Quality Basin SummaryProposed ConditionsPrepared By:MLMProject:NavyReviewed By:CCSSG Project I.D.:B1256Date:07/03/19REV 3/27/20WQCV = a(0.91I3 - 1.19I2 + 0.78I)Equation 3-1, USDCM, Vol. 3Table 3-2, Drain Time Coefficients for WQCV CalculationsUSDCM, Vol. 3Drain Time (hrs)Coefficient, a120.8240.9401.0Total Required Detention VolumeV10TOTAL = 110% * VDET10V100TOTAL = 110% * VDET100WQCV [watershed-inches]V [acre-ft]V [ft3]DWQCV [inches]VDET10VDET100V10TOTALV100TOTALV10TOTALV100TOTALRGA10.17487.741930.3060.00419312.024225826628416.617.6RGA20.07687.70840.3060.0028412.0939710210714.615.2Max. Ponding DepthStormwater Detention Total Required Detention[inches]Water Quality FeatureBasinContributing Area [acres]Basin Imperviousness [%]Volume [ft3]Volume [ft3]Water Quality Capture VolumeRain Garden Area [ft2]The Sanitas Group, LLCPreliminary Storm Water ReportB1256 - NAVYAgenda Item 5A Page 107 of 360 Water Quality Basin Summary Proposed Conditions Prepared By:MLM Project:Navy Reviewed By:CCS SG Project I.D.:B1256 Date:07/03/19 REV 3/27/20 Basin Water Quality Treatment Provided Basin Area [acres] Treated Area [acres]Q5 [cfs] Q100 [cfs] Ax No 0.235 0.82 1.94 Bx No 0.089 0.43 0.87 Total Existing Conditions Runoff 1.25 2.81 A1 Yes 0.178 0.174 0.84 1.71 A2 Yes 0.076 0.076 0.36 0.73 A3 Yes 0.015 0.015 0.06 0.14 A4 No 0.013 0.05 0.12 B1 No 0.039 0.19 0.38 B2 No 0.004 0.02 0.04 Total Treated Area 0.265 Percent Treated Area 82% Total Undetained Release Rates 0.26 0.54 Percent Undetained Release Rates 21%19% Existing Conditions Proposed Conditions Runoff Rates The Sanitas Group, LLC Preliminary Storm Water Report B1256 - NAVY Agenda Item 5A Page 108 of 360 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =87.7 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.877 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.31 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area)Area = 7,565 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =193 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12.0 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =133 sq ft D) Actual Flat Surface Area AActual =193 sq ft E) Area at Design Depth (Top Surface Area)ATop =193 sq ft F) Rain Garden Total Volume VT=193 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =0.2 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =193 cu ft iii) Orifice Diameter, 3/8" Minimum DO =9/16 in Design Procedure Form: Rain Garden (RG) MLM The Sanitas Group March 27, 2020 NAVY Basin A1 UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.07 - Basin A1 - RG, RG 3/27/2020, 11:32 AM Agenda Item 5A Page 109 of 360 Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) MLM The Sanitas Group March 27, 2020 NAVY Basin A1 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.07 - Basin A1 - RG, RG 3/27/2020, 11:32 AM Agenda Item 5A Page 110 of 360 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =87.7 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.877 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.31 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area)Area = 3,294 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =84 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12.0 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =58 sq ft D) Actual Flat Surface Area AActual =84 sq ft E) Area at Design Depth (Top Surface Area)ATop =84 sq ft F) Rain Garden Total Volume VT=84 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =0.2 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =84 cu ft iii) Orifice Diameter, 3/8" Minimum DO =5/16 in LESS THAN MINIMUM. USE DIAMETER OF 3/8" Design Procedure Form: Rain Garden (RG) MLM The Sanitas Group March 26, 2020 NAVY Basin A2 UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.07 - Basin A2 - RG, RG 3/26/2020, 3:49 PM Agenda Item 5A Page 111 of 360 Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) MLM The Sanitas Group March 26, 2020 NAVY Basin A2 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.07 - Basin A2 - RG, RG 3/26/2020, 3:49 PM Agenda Item 5A Page 112 of 360 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the land use and activities, proximity to adjacent structures and soil characteristics.) B) What type of wearing course?1 2. Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, Ia Ia =66.8 % B) Tributary Area's Imperviousness Ratio (I = Ia / 100)i = 0.668 C) Tributary Watershed Area ATotal = 670 sq ft (including area of permeable pavement system) D) Area of Permeable Pavement System APPS =220 sq ft (Minimum recommended permeable pavement area = 168 sq ft) E) Impervious Tributary Ratio RT =1.4 (Contributing Imperviuos Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 12 cu ft (WQCV = (0.8 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12) * Area) G) Is flood control volume being added? H) Total Volume Needed VTotal =12 cu ft 3. Depth of Reservoir A) Minimum Depth of Reservoir Dmin =6.0 inches (Minimum recommended depth is 6 inches) B) Is the slope of the reservoir/subgrade interface equal to 0%? 1 C) Porosity (Porous Gravel Pavement < 0.3, Others < 0.40)P = 0.40 D) Slope of the Base Course/Subgrade Interface S =ft / ft E) Length Between Lateral Flow Barriers L =ft F) Volume Provided Based on Depth of Base Course V = 37 cu ft Flat or Stepped: V = P * ((Dmin - 1) / 12) * Area Sloped: V = P * ((Dmin - 6*S*L - 1) / 12) * Area 4. Lateral Flow Barriers A) Type of Lateral Flow Barriers B) Number of Permeable Pavement Cells Cells = 5. Perimeter Barrier A) Is a perimeter barrier provided on all sides of the pavement system? NAVY - 1737 Pearl Street Basin A3 Design Procedure Form: Permeable Pavement Systems (PPS) MLM The Sanitas Group March 26, 2020 UD-BMP (Version 3.07, March 2018) Choose One No Infiltration Partial Infiltration Section Full Infiltration Section Choose One YES NO Choose One YES- Flat or Stepped Installation NO- Sloped Installation Choose One Concrete Walls PVC geomembrane installed normal to flow N/A- Flat installation Other (Describe): Choose One YES NO Choose One PICP Concrete Grid Pavement Pervious Concrete Porous Gravel UD-BMP_v3.07 - Basin A3 - PPS, PPS 3/26/2020, 3:51 PM Agenda Item 5A Page 113 of 360 (Recommeded for PICP, concrete grid pavement, or for any no-infiltration section.) NO UD-BMP_v3.07 - Basin A3 - PPS, PPS 3/26/2020, 3:51 PM Agenda Item 5A Page 114 of 360 Sheet 2 of 2 Designer: Company: Date: Project: Location: 6. Filter Material and Underdrain System A) Is the underdrain placed below a 6-inch thick layer of CDOT Class C filter material? B) Diameter of Slotted Pipe (slot dimensions per Table PPs-2) C) Distance from the Lowest Elevation of the Storage Volume y =ft (i.e. the bottom of the base course to the center of the orifice) 7. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is there a minimum 30 mil thick impermeable PVC geomembrane liner on the bottom and sides of the basin, extending up to the top of the base course? B) CDOT Class B Separator Fabric 8. Outlet 1 (Assumes each cell has similar area, subgrade slope, and length between lateral barriers (unless subgrade is flat). Calculate cells individually where this varies.) A) Depth of WQCV in the Reservoir DWQCV =inches (Elevation of the Flood Control Outlet) B) Diameter of Orifice for 12-hour Drain Time DOrifice =inches (Use a minimum orifice diameter of 3/8-inches) Notes: NAVY - 1737 Pearl Street Design Procedure Form: Permeable Pavement Systems (PPS) MLM The Sanitas Group March 26, 2020 Basin A3 Choose One YES NO Choose One 4-inch 6-inch Choose One Choose One YES NO Placed above the liner Placed above and below the liner N/A UD-BMP_v3.07 - Basin A3 - PPS, PPS 3/26/2020, 3:51 PM Agenda Item 5A Page 115 of 360 Agenda Item 5A Page 116 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Project Description 1256-5-P.SPF Project Options CFS Elevation Rational User-Defined Kinematic Wave YES YES Analysis Options Sep 01, 2016 00:00:00 Sep 01, 2016 02:00:00 Sep 01, 2016 00:00:00 0 days 0 01:00:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 30 seconds Number of Elements Qty 0 4 4 1 1 0 0 2 5 1 0 0 2 2 0 0 0 Rainfall Details 5 year(s) Orifices ......................................................................... Weirs ............................................................................ Outlets ......................................................................... Pollutants .............................................................................. Land Uses ............................................................................ Return Period........................................................................ Inlets ............................................................................ Storage Nodes ............................................................. Links...................................................................................... Channels ...................................................................... Pipes ............................................................................ Pumps .......................................................................... Rain Gages .......................................................................... Subbasins.............................................................................. Nodes.................................................................................... Junctions ...................................................................... Outfalls ......................................................................... Flow Diversions ............................................................ Start Reporting On ............................................................... Antecedent Dry Days ............................................................ Runoff (Dry Weather) Time Step .......................................... Runoff (Wet Weather) Time Step ......................................... Reporting Time Step ............................................................ Routing Time Step ................................................................ Time of Concentration (TOC) Method .................................. Link Routing Method ............................................................. Enable Overflow Ponding at Nodes ..................................... Skip Steady State Analysis Time Periods ............................ Start Analysis On .................................................................. End Analysis On ................................................................... File Name ............................................................................. Description ........................................................................... 1727 & 1737 Pearl St, Boulder, CO Flow Units ............................................................................. Elevation Type ...................................................................... Hydrology Method ................................................................ The Sanitas Group Page 1 of 18 3/27/2020 Agenda Item 5A Page 117 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Runoff Rainfall Runoff Runoff Runoff Concentration Coefficient Volume (ac)(in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 A1 0.18 0.8300 0.48 0.39 0.07 0.84 0 00:05:00 2 A2 0.08 0.8300 0.48 0.39 0.03 0.36 0 00:05:00 3 A3 0.02 0.6700 0.48 0.32 0.00 0.06 0 00:05:00 4 A4 0.01 0.7200 0.48 0.34 0.00 0.05 0 00:05:00 The Sanitas Group Page 2 of 18 3/27/2020 Agenda Item 5A Page 118 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft²) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Jun-1 Junction 5327.80 5332.00 5327.80 0.00 0.00 0.65 5327.89 0.00 4.11 0 00:00 0.00 0.00 2 DP1 Outfall 5327.70 0.65 5327.79 3 RG_A1 Storage Node 5328.00 5331.00 5328.00 0.00 0.84 5329.19 0.00 0.00 4 RG_A2 Storage Node 5328.00 5331.00 5328.00 0.00 0.36 5329.07 0.00 0.00 The Sanitas Group Page 3 of 18 3/27/2020 Agenda Item 5A Page 119 of 360 B1256 - NAVY Proposed Conditions5-Year StormLink SummarySN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time ReportedID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged ConditionNode Elevation ElevationRatio Total DepthRatio(ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min)1 Orifice1-1 Channel Jun-1 DP1 5.00 5327.80 5327.70 2.0000 24.000 0.0300 0.65 374.63 0.00 1.26 0.09 0.04 0.002 RG_A1_Orifice Orifice RG_A1 Jun-15328.00 5327.800.4380.013 RG_A2_Orifice Orifice RG_A2 Jun-15328.00 5327.800.4380.014 RG_A1_Weir Weir RG_A1 Jun-15328.00 5327.800.405 RG_A2_Weir Weir RG_A2 Jun-15328.00 5327.800.21 The Sanitas Group Page 4 of 18 3/27/2020Agenda Item 5A Page 120 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Subbasin Hydrology Subbasin : A1 Input Data Area (ac) ....................................................... 0.18 Weighted Runoff Coefficient ......................... 0.8300 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.18 - 0.83 Composite Area & Weighted Runoff Coeff. 0.18 0.83 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.48 Total Runoff (in) ............................................ 0.39 Peak Runoff (cfs) .......................................... 0.84 Rainfall Intensity ........................................... 5.700 Weighted Runoff Coefficient ......................... 0.8300 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 5 of 18 3/27/2020 Agenda Item 5A Page 121 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Subbasin : A2 Input Data Area (ac) ....................................................... 0.08 Weighted Runoff Coefficient ......................... 0.8300 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.08 - 0.83 Composite Area & Weighted Runoff Coeff. 0.08 0.83 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.48 Total Runoff (in) ............................................ 0.39 Peak Runoff (cfs) .......................................... 0.36 Rainfall Intensity ........................................... 5.700 Weighted Runoff Coefficient ......................... 0.8300 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 6 of 18 3/27/2020 Agenda Item 5A Page 122 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Subbasin : A3 Input Data Area (ac) ....................................................... 0.02 Weighted Runoff Coefficient ......................... 0.6700 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.02 - 0.67 Composite Area & Weighted Runoff Coeff. 0.02 0.67 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.48 Total Runoff (in) ............................................ 0.32 Peak Runoff (cfs) .......................................... 0.06 Rainfall Intensity ........................................... 5.700 Weighted Runoff Coefficient ......................... 0.6700 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 7 of 18 3/27/2020 Agenda Item 5A Page 123 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Subbasin : A4 Input Data Area (ac) ....................................................... 0.01 Weighted Runoff Coefficient ......................... 0.7200 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.01 - 0.72 Composite Area & Weighted Runoff Coeff. 0.01 0.72 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.48 Total Runoff (in) ............................................ 0.34 Peak Runoff (cfs) .......................................... 0.05 Rainfall Intensity ........................................... 5.700 Weighted Runoff Coefficient ......................... 0.7200 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 8 of 18 3/27/2020 Agenda Item 5A Page 124 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft²) (in) 1 Jun-1 5327.80 5332.00 4.20 5327.80 0.00 0.00 -5332.00 0.00 0.00 The Sanitas Group Page 9 of 18 3/27/2020 Agenda Item 5A Page 125 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) (ft) (ft) (ft) (ft)(ft)(ft) (days hh:mm) (days hh:mm) (ac-in) (min) 1 Jun-1 0.65 0.11 5327.89 0.09 0.00 4.11 5327.81 0.01 0 00:08 0 00:00 0.00 0.00 The Sanitas Group Page 10 of 18 3/27/2020 Agenda Item 5A Page 126 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%)(ft) (ft)(cfs) 1 Orifice1-1 5.00 5327.80 0.00 5327.70 0.00 0.10 2.0000 Trapezoidal 2.000 45.000 0.0300 0.0000 0.0000 0.0000 0.00 No The Sanitas Group Page 11 of 18 3/27/2020 Agenda Item 5A Page 127 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs)(ft/sec) (min) (ft)(min) 1 Orifice1-1 0.65 0 00:08 374.63 0.00 1.26 0.07 0.09 0.04 0.00 The Sanitas Group Page 12 of 18 3/27/2020 Agenda Item 5A Page 128 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Storage Nodes Storage Node : RG_A1 Input Data 5328.00 5331.00 3.00 5328.00 0.00 0.00 0.00 Storage Area Volume Curves Storage Curve : RG_A1 Stage Storage Storage Area Volume (ft) (ft²) (ft³) 0 193 0.000 3 193 579.00 Evaporation Loss ..................................................................... Invert Elevation (ft) ................................................................... Max (Rim) Elevation (ft) ........................................................... Max (Rim) Offset (ft) ................................................................. Initial Water Elevation (ft) ......................................................... Initial Water Depth (ft) .............................................................. Ponded Area (ft²) ...................................................................... The Sanitas Group Page 13 of 18 3/27/2020 Agenda Item 5A Page 129 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm The Sanitas Group Page 14 of 18 3/27/2020 Agenda Item 5A Page 130 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Storage Node : RG_A1 (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 RG_A1_Weir Trapezoidal No 5329.08 1.08 3.25 0.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 RG_A1_Orifice Side CIRCULAR No 0.44 5328.00 0.61 Output Summary Results 0.84 0.84 0.40 0.00 5329.19 1.19 5328.97 0.97 0 00:08 0.000 0 0 0.00 Total Time Flooded (min) ......................................................... Total Retention Time (sec) ....................................................... Max HGL Depth Attained (ft) .................................................... Average HGL Elevation Attained (ft) ........................................ Average HGL Depth Attained (ft) ............................................. Time of Max HGL Occurrence (days hh:mm) ........................... Total Exfiltration Volume (1000-ft³) .......................................... Total Flooded Volume (ac-in) ................................................... Peak Inflow (cfs) ....................................................................... Peak Lateral Inflow (cfs) ........................................................... Peak Outflow (cfs) .................................................................... Peak Exfiltration Flow Rate (cfm) ............................................. Max HGL Elevation Attained (ft) ............................................... The Sanitas Group Page 15 of 18 3/27/2020 Agenda Item 5A Page 131 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Storage Node : RG_A2 Input Data 5328.00 5331.00 3.00 5328.00 0.00 0.00 0.00 Storage Area Volume Curves Storage Curve : RG_A2 Stage Storage Storage Area Volume (ft) (ft²) (ft³) 0 84 0.000 3 84 252.00 Initial Water Depth (ft) .............................................................. Ponded Area (ft²) ...................................................................... Evaporation Loss ..................................................................... Invert Elevation (ft) ................................................................... Max (Rim) Elevation (ft) ........................................................... Max (Rim) Offset (ft) ................................................................. Initial Water Elevation (ft) ......................................................... The Sanitas Group Page 16 of 18 3/27/2020 Agenda Item 5A Page 132 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm The Sanitas Group Page 17 of 18 3/27/2020 Agenda Item 5A Page 133 of 360 B1256 - NAVY Proposed Conditions 5-Year Storm Storage Node : RG_A2 (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 RG_A2_Weir Trapezoidal No 5329.00 1.00 3.25 0.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 RG_A2_Orifice Side CIRCULAR No 0.44 5328.00 0.61 Output Summary Results 0.36 0.36 0.21 0.00 5329.07 1.07 5328.81 0.81 0 00:07 0.000 0 0 0.00 Total Exfiltration Volume (1000-ft³) .......................................... Total Flooded Volume (ac-in) ................................................... Total Time Flooded (min) ......................................................... Total Retention Time (sec) ....................................................... Peak Exfiltration Flow Rate (cfm) ............................................. Max HGL Elevation Attained (ft) ............................................... Max HGL Depth Attained (ft) .................................................... Average HGL Elevation Attained (ft) ........................................ Average HGL Depth Attained (ft) ............................................. Time of Max HGL Occurrence (days hh:mm) ........................... Peak Inflow (cfs) ....................................................................... Peak Lateral Inflow (cfs) ........................................................... Peak Outflow (cfs) .................................................................... The Sanitas Group Page 18 of 18 3/27/2020 Agenda Item 5A Page 134 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Project Description 1256-10-P.SPF Project Options CFS Elevation Rational User-Defined Kinematic Wave YES YES Analysis Options Sep 01, 2016 00:00:00 Sep 01, 2016 02:00:00 Sep 01, 2016 00:00:00 0 days 0 01:00:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 30 seconds Number of Elements Qty 0 4 4 1 1 0 0 2 5 1 0 0 2 2 0 0 0 Rainfall Details 10 year(s) Orifices ......................................................................... Weirs ............................................................................ Outlets ......................................................................... Pollutants .............................................................................. Land Uses ............................................................................ Return Period........................................................................ Inlets ............................................................................ Storage Nodes ............................................................. Links...................................................................................... Channels ...................................................................... Pipes ............................................................................ Pumps .......................................................................... Rain Gages .......................................................................... Subbasins.............................................................................. Nodes.................................................................................... Junctions ...................................................................... Outfalls ......................................................................... Flow Diversions ............................................................ Start Reporting On ............................................................... Antecedent Dry Days ............................................................ Runoff (Dry Weather) Time Step .......................................... Runoff (Wet Weather) Time Step ......................................... Reporting Time Step ............................................................ Routing Time Step ................................................................ Time of Concentration (TOC) Method .................................. Link Routing Method ............................................................. Enable Overflow Ponding at Nodes ..................................... Skip Steady State Analysis Time Periods ............................ Start Analysis On .................................................................. End Analysis On ................................................................... File Name ............................................................................. Description ........................................................................... 1727 & 1737 Pearl St, Boulder, CO Flow Units ............................................................................. Elevation Type ...................................................................... Hydrology Method ................................................................ The Sanitas Group Page 1 of 18 3/27/2020Agenda Item 5A Page 135 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Runoff Rainfall Runoff Runoff Runoff Concentration Coefficient Volume (ac)(in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 A1 0.18 0.8800 0.62 0.54 0.10 1.16 0 00:05:00 2 A2 0.08 0.8800 0.62 0.54 0.04 0.50 0 00:05:00 3 A3 0.02 0.7200 0.62 0.44 0.01 0.08 0 00:05:00 4 A4 0.01 0.7700 0.62 0.48 0.01 0.07 0 00:05:00 The Sanitas Group Page 2 of 18 3/27/2020Agenda Item 5A Page 136 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft²) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Jun-1 Junction 5327.80 5332.00 5327.80 0.00 0.00 1.30 5327.93 0.00 4.07 0 00:00 0.00 0.00 2 DP1 Outfall 5327.70 1.30 5327.83 3 RG_A1 Storage Node 5328.00 5331.00 5328.00 0.00 1.16 5329.25 0.00 0.00 4 RG_A2 Storage Node 5328.00 5331.00 5328.00 0.00 0.49 5329.11 0.00 0.00 The Sanitas Group Page 3 of 18 3/27/2020Agenda Item 5A Page 137 of 360 B1256 - NAVY Proposed Conditions10-Year StormLink SummarySN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time ReportedID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged ConditionNode Elevation ElevationRatio Total DepthRatio(ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min)1 Orifice1-1 Channel Jun-1 DP1 5.00 5327.80 5327.70 2.0000 24.000 0.0300 1.30 374.63 0.00 1.59 0.13 0.07 0.002 RG_A1_Orifice Orifice RG_A1 Jun-15328.00 5327.800.4380.013 RG_A2_Orifice Orifice RG_A2 Jun-15328.00 5327.800.4380.014 RG_A1_Weir Weir RG_A1 Jun-15328.00 5327.800.815 RG_A2_Weir Weir RG_A2 Jun-15328.00 5327.800.39 The Sanitas Group Page 4 of 18 3/27/2020Agenda Item 5A Page 138 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Subbasin Hydrology Subbasin : A1 Input Data Area (ac) ....................................................... 0.18 Weighted Runoff Coefficient ......................... 0.8800 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.18 - 0.88 Composite Area & Weighted Runoff Coeff. 0.18 0.88 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.62 Total Runoff (in) ............................................ 0.54 Peak Runoff (cfs) .......................................... 1.16 Rainfall Intensity ........................................... 7.400 Weighted Runoff Coefficient ......................... 0.8800 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 5 of 18 3/27/2020Agenda Item 5A Page 139 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Subbasin : A2 Input Data Area (ac) ....................................................... 0.08 Weighted Runoff Coefficient ......................... 0.8800 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.08 - 0.88 Composite Area & Weighted Runoff Coeff. 0.08 0.88 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.62 Total Runoff (in) ............................................ 0.54 Peak Runoff (cfs) .......................................... 0.50 Rainfall Intensity ........................................... 7.400 Weighted Runoff Coefficient ......................... 0.8800 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 6 of 18 3/27/2020Agenda Item 5A Page 140 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Subbasin : A3 Input Data Area (ac) ....................................................... 0.02 Weighted Runoff Coefficient ......................... 0.7200 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.02 - 0.72 Composite Area & Weighted Runoff Coeff. 0.02 0.72 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.62 Total Runoff (in) ............................................ 0.44 Peak Runoff (cfs) .......................................... 0.08 Rainfall Intensity ........................................... 7.400 Weighted Runoff Coefficient ......................... 0.7200 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 7 of 18 3/27/2020Agenda Item 5A Page 141 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Subbasin : A4 Input Data Area (ac) ....................................................... 0.01 Weighted Runoff Coefficient ......................... 0.7700 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.01 - 0.77 Composite Area & Weighted Runoff Coeff. 0.01 0.77 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.62 Total Runoff (in) ............................................ 0.48 Peak Runoff (cfs) .......................................... 0.07 Rainfall Intensity ........................................... 7.400 Weighted Runoff Coefficient ......................... 0.7700 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 8 of 18 3/27/2020Agenda Item 5A Page 142 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft²) (in) 1 Jun-1 5327.80 5332.00 4.20 5327.80 0.00 0.00 -5332.00 0.00 0.00 The Sanitas Group Page 9 of 18 3/27/2020Agenda Item 5A Page 143 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) (ft) (ft) (ft) (ft)(ft)(ft) (days hh:mm) (days hh:mm) (ac-in) (min) 1 Jun-1 1.30 0.15 5327.93 0.13 0.00 4.07 5327.81 0.01 0 00:06 0 00:00 0.00 0.00 The Sanitas Group Page 10 of 18 3/27/2020Agenda Item 5A Page 144 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%)(ft) (ft)(cfs) 1 Orifice1-1 5.00 5327.80 0.00 5327.70 0.00 0.10 2.0000 Trapezoidal 2.000 45.000 0.0300 0.0000 0.0000 0.0000 0.00 No The Sanitas Group Page 11 of 18 3/27/2020Agenda Item 5A Page 145 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs)(ft/sec) (min) (ft)(min) 1 Orifice1-1 1.30 0 00:06 374.63 0.00 1.59 0.05 0.13 0.07 0.00 The Sanitas Group Page 12 of 18 3/27/2020Agenda Item 5A Page 146 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Storage Nodes Storage Node : RG_A1 Input Data 5328.00 5331.00 3.00 5328.00 0.00 0.00 0.00 Storage Area Volume Curves Storage Curve : RG_A1 Stage Storage Storage Area Volume (ft) (ft²) (ft³) 0 193 0.000 3 193 579.00 Evaporation Loss ..................................................................... Invert Elevation (ft) ................................................................... Max (Rim) Elevation (ft) ........................................................... Max (Rim) Offset (ft) ................................................................. Initial Water Elevation (ft) ......................................................... Initial Water Depth (ft) .............................................................. Ponded Area (ft²) ...................................................................... The Sanitas Group Page 13 of 18 3/27/2020Agenda Item 5A Page 147 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm The Sanitas Group Page 14 of 18 3/27/2020Agenda Item 5A Page 148 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Storage Node : RG_A1 (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 RG_A1_Weir Trapezoidal No 5329.08 1.08 3.25 0.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 RG_A1_Orifice Side CIRCULAR No 0.44 5328.00 0.61 Output Summary Results 1.16 1.16 0.82 0.00 5329.25 1.25 5328.98 0.98 0 00:07 0.000 0 0 0.00 Total Time Flooded (min) ......................................................... Total Retention Time (sec) ....................................................... Max HGL Depth Attained (ft) .................................................... Average HGL Elevation Attained (ft) ........................................ Average HGL Depth Attained (ft) ............................................. Time of Max HGL Occurrence (days hh:mm) ........................... Total Exfiltration Volume (1000-ft³) .......................................... Total Flooded Volume (ac-in) ................................................... Peak Inflow (cfs) ....................................................................... Peak Lateral Inflow (cfs) ........................................................... Peak Outflow (cfs) .................................................................... Peak Exfiltration Flow Rate (cfm) ............................................. Max HGL Elevation Attained (ft) ............................................... The Sanitas Group Page 15 of 18 3/27/2020Agenda Item 5A Page 149 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Storage Node : RG_A2 Input Data 5328.00 5331.00 3.00 5328.00 0.00 0.00 0.00 Storage Area Volume Curves Storage Curve : RG_A2 Stage Storage Storage Area Volume (ft) (ft²) (ft³) 0 84 0.000 3 84 252.00 Initial Water Depth (ft) .............................................................. Ponded Area (ft²) ...................................................................... Evaporation Loss ..................................................................... Invert Elevation (ft) ................................................................... Max (Rim) Elevation (ft) ........................................................... Max (Rim) Offset (ft) ................................................................. Initial Water Elevation (ft) ......................................................... The Sanitas Group Page 16 of 18 3/27/2020Agenda Item 5A Page 150 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm The Sanitas Group Page 17 of 18 3/27/2020Agenda Item 5A Page 151 of 360 B1256 - NAVY Proposed Conditions 10-Year Storm Storage Node : RG_A2 (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 RG_A2_Weir Trapezoidal No 5329.00 1.00 3.25 0.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 RG_A2_Orifice Side CIRCULAR No 0.44 5328.00 0.61 Output Summary Results 0.49 0.49 0.40 0.00 5329.11 1.11 5328.81 0.81 0 00:06 0.000 0 0 0.00 Total Exfiltration Volume (1000-ft³) .......................................... Total Flooded Volume (ac-in) ................................................... Total Time Flooded (min) ......................................................... Total Retention Time (sec) ....................................................... Peak Exfiltration Flow Rate (cfm) ............................................. Max HGL Elevation Attained (ft) ............................................... Max HGL Depth Attained (ft) .................................................... Average HGL Elevation Attained (ft) ........................................ Average HGL Depth Attained (ft) ............................................. Time of Max HGL Occurrence (days hh:mm) ........................... Peak Inflow (cfs) ....................................................................... Peak Lateral Inflow (cfs) ........................................................... Peak Outflow (cfs) .................................................................... The Sanitas Group Page 18 of 18 3/27/2020Agenda Item 5A Page 152 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Project Description 1256-100-P.SPF Project Options CFS Elevation Rational User-Defined Kinematic Wave YES YES Analysis Options Sep 01, 2016 00:00:00 Sep 01, 2016 02:00:00 Sep 01, 2016 00:00:00 0 days 0 01:00:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 0 00:05:00 days hh:mm:ss 30 seconds Number of Elements Qty 0 4 4 1 1 0 0 2 5 1 0 0 2 2 0 0 0 Rainfall Details 100 year(s) Orifices ......................................................................... Weirs ............................................................................ Outlets ......................................................................... Pollutants .............................................................................. Land Uses ............................................................................ Return Period........................................................................ Inlets ............................................................................ Storage Nodes ............................................................. Links...................................................................................... Channels ...................................................................... Pipes ............................................................................ Pumps .......................................................................... Rain Gages .......................................................................... Subbasins.............................................................................. Nodes.................................................................................... Junctions ...................................................................... Outfalls ......................................................................... Flow Diversions ............................................................ Start Reporting On ............................................................... Antecedent Dry Days ............................................................ Runoff (Dry Weather) Time Step .......................................... Runoff (Wet Weather) Time Step ......................................... Reporting Time Step ............................................................ Routing Time Step ................................................................ Time of Concentration (TOC) Method .................................. Link Routing Method ............................................................. Enable Overflow Ponding at Nodes ..................................... Skip Steady State Analysis Time Periods ............................ Start Analysis On .................................................................. End Analysis On ................................................................... File Name ............................................................................. Description ........................................................................... 1727 & 1737 Pearl St, Boulder, CO Flow Units ............................................................................. Elevation Type ...................................................................... Hydrology Method ................................................................ The Sanitas Group Page 1 of 18 3/27/2020Agenda Item 5A Page 153 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Runoff Rainfall Runoff Runoff Runoff Concentration Coefficient Volume (ac)(in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 A1 0.18 0.8900 0.90 0.80 0.14 1.71 0 00:05:00 2 A2 0.08 0.8900 0.90 0.80 0.06 0.73 0 00:05:00 3 A3 0.02 0.8300 0.90 0.75 0.01 0.13 0 00:05:00 4 A4 0.01 0.8400 0.90 0.76 0.01 0.12 0 00:05:00 The Sanitas Group Page 2 of 18 3/27/2020Agenda Item 5A Page 154 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft²) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Jun-1 Junction 5327.80 5332.00 5327.80 0.00 0.00 2.38 5327.98 0.00 4.02 0 00:00 0.00 0.00 2 DP1 Outfall 5327.70 2.38 5327.88 3 RG_A1 Storage Node 5328.00 5331.00 5328.00 0.00 1.71 5329.34 0.00 0.00 4 RG_A2 Storage Node 5328.00 5331.00 5328.00 0.00 0.73 5329.16 0.00 0.00 The Sanitas Group Page 3 of 18 3/27/2020Agenda Item 5A Page 155 of 360 B1256 - NAVY Proposed Conditions100-Year StormLink SummarySN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time ReportedID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged ConditionNode Elevation ElevationRatio Total DepthRatio(ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min)1 Orifice1-1 Channel Jun-1 DP1 5.00 5327.80 5327.70 2.0000 24.000 0.0300 2.38 374.63 0.01 1.92 0.18 0.09 0.002 RG_A1_Orifice Orifice RG_A1 Jun-15328.00 5327.800.4380.013 RG_A2_Orifice Orifice RG_A2 Jun-15328.00 5327.800.4380.014 RG_A1_Weir Weir RG_A1 Jun-15328.00 5327.801.495 RG_A2_Weir Weir RG_A2 Jun-15328.00 5327.800.69 The Sanitas Group Page 4 of 18 3/27/2020Agenda Item 5A Page 156 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Subbasin Hydrology Subbasin : A1 Input Data Area (ac) ....................................................... 0.18 Weighted Runoff Coefficient ......................... 0.8900 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.18 - 0.89 Composite Area & Weighted Runoff Coeff. 0.18 0.89 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.90 Total Runoff (in) ............................................ 0.80 Peak Runoff (cfs) .......................................... 1.71 Rainfall Intensity ........................................... 10.800 Weighted Runoff Coefficient ......................... 0.8900 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 5 of 18 3/27/2020Agenda Item 5A Page 157 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Subbasin : A2 Input Data Area (ac) ....................................................... 0.08 Weighted Runoff Coefficient ......................... 0.8900 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.08 - 0.89 Composite Area & Weighted Runoff Coeff. 0.08 0.89 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.90 Total Runoff (in) ............................................ 0.80 Peak Runoff (cfs) .......................................... 0.73 Rainfall Intensity ........................................... 10.800 Weighted Runoff Coefficient ......................... 0.8900 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 6 of 18 3/27/2020Agenda Item 5A Page 158 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Subbasin : A3 Input Data Area (ac) ....................................................... 0.02 Weighted Runoff Coefficient ......................... 0.8300 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.02 - 0.83 Composite Area & Weighted Runoff Coeff. 0.02 0.83 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.90 Total Runoff (in) ............................................ 0.75 Peak Runoff (cfs) .......................................... 0.13 Rainfall Intensity ........................................... 10.800 Weighted Runoff Coefficient ......................... 0.8300 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 7 of 18 3/27/2020Agenda Item 5A Page 159 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Subbasin : A4 Input Data Area (ac) ....................................................... 0.01 Weighted Runoff Coefficient ......................... 0.8400 Runoff Coefficient Area Soil Runoff Soil/Surface Description (acres) Group Coeff. -0.01 - 0.84 Composite Area & Weighted Runoff Coeff. 0.01 0.84 Subbasin Runoff Results Total Rainfall (in) .......................................... 0.90 Total Runoff (in) ............................................ 0.76 Peak Runoff (cfs) .......................................... 0.12 Rainfall Intensity ........................................... 10.800 Weighted Runoff Coefficient ......................... 0.8400 Time of Concentration (days hh:mm:ss) ....... 0 00:05:00 The Sanitas Group Page 8 of 18 3/27/2020Agenda Item 5A Page 160 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft²) (in) 1 Jun-1 5327.80 5332.00 4.20 5327.80 0.00 0.00 -5332.00 0.00 0.00 The Sanitas Group Page 9 of 18 3/27/2020Agenda Item 5A Page 161 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) (ft) (ft) (ft) (ft)(ft)(ft) (days hh:mm) (days hh:mm) (ac-in) (min) 1 Jun-1 2.38 0.25 5327.98 0.18 0.00 4.02 5327.82 0.02 0 00:05 0 00:00 0.00 0.00 The Sanitas Group Page 10 of 18 3/27/2020Agenda Item 5A Page 162 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Exit/Bend Additional Initial Flap ID Invert Invert Invert Invert Drop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%)(ft) (ft)(cfs) 1 Orifice1-1 5.00 5327.80 0.00 5327.70 0.00 0.10 2.0000 Trapezoidal 2.000 45.000 0.0300 0.0000 0.0000 0.0000 0.00 No The Sanitas Group Page 11 of 18 3/27/2020Agenda Item 5A Page 163 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Channel Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs)(ft/sec) (min) (ft)(min) 1 Orifice1-1 2.38 0 00:05 374.63 0.01 1.92 0.04 0.18 0.09 0.00 The Sanitas Group Page 12 of 18 3/27/2020Agenda Item 5A Page 164 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Storage Nodes Storage Node : RG_A1 Input Data 5328.00 5331.00 3.00 5328.00 0.00 0.00 0.00 Storage Area Volume Curves Storage Curve : RG_A1 Stage Storage Storage Area Volume (ft) (ft²) (ft³) 0 193 0.000 3 193 579.00 Evaporation Loss ..................................................................... Invert Elevation (ft) ................................................................... Max (Rim) Elevation (ft) ........................................................... Max (Rim) Offset (ft) ................................................................. Initial Water Elevation (ft) ......................................................... Initial Water Depth (ft) .............................................................. Ponded Area (ft²) ...................................................................... The Sanitas Group Page 13 of 18 3/27/2020Agenda Item 5A Page 165 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm The Sanitas Group Page 14 of 18 3/27/2020Agenda Item 5A Page 166 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Storage Node : RG_A1 (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 RG_A1_Weir Trapezoidal No 5329.08 1.08 3.25 0.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 RG_A1_Orifice Side CIRCULAR No 0.44 5328.00 0.61 Output Summary Results 1.71 1.71 1.50 0.00 5329.34 1.34 5328.99 0.99 0 00:06 0.000 0 0 0.00 Total Time Flooded (min) ......................................................... Total Retention Time (sec) ....................................................... Max HGL Depth Attained (ft) .................................................... Average HGL Elevation Attained (ft) ........................................ Average HGL Depth Attained (ft) ............................................. Time of Max HGL Occurrence (days hh:mm) ........................... Total Exfiltration Volume (1000-ft³) .......................................... Total Flooded Volume (ac-in) ................................................... Peak Inflow (cfs) ....................................................................... Peak Lateral Inflow (cfs) ........................................................... Peak Outflow (cfs) .................................................................... Peak Exfiltration Flow Rate (cfm) ............................................. Max HGL Elevation Attained (ft) ............................................... The Sanitas Group Page 15 of 18 3/27/2020Agenda Item 5A Page 167 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Storage Node : RG_A2 Input Data 5328.00 5331.00 3.00 5328.00 0.00 0.00 0.00 Storage Area Volume Curves Storage Curve : RG_A2 Stage Storage Storage Area Volume (ft) (ft²) (ft³) 0 84 0.000 3 84 252.00 Initial Water Depth (ft) .............................................................. Ponded Area (ft²) ...................................................................... Evaporation Loss ..................................................................... Invert Elevation (ft) ................................................................... Max (Rim) Elevation (ft) ........................................................... Max (Rim) Offset (ft) ................................................................. Initial Water Elevation (ft) ......................................................... The Sanitas Group Page 16 of 18 3/27/2020Agenda Item 5A Page 168 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm The Sanitas Group Page 17 of 18 3/27/2020Agenda Item 5A Page 169 of 360 B1256 - NAVY Proposed Conditions 100-Year Storm Storage Node : RG_A2 (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 RG_A2_Weir Trapezoidal No 5329.00 1.00 3.25 0.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 RG_A2_Orifice Side CIRCULAR No 0.44 5328.00 0.61 Output Summary Results 0.73 0.73 0.69 0.00 5329.16 1.16 5328.82 0.82 0 00:05 0.000 0 0 0.00 Total Exfiltration Volume (1000-ft³) .......................................... Total Flooded Volume (ac-in) ................................................... Total Time Flooded (min) ......................................................... Total Retention Time (sec) ....................................................... Peak Exfiltration Flow Rate (cfm) ............................................. Max HGL Elevation Attained (ft) ............................................... Max HGL Depth Attained (ft) .................................................... Average HGL Elevation Attained (ft) ........................................ Average HGL Depth Attained (ft) ............................................. Time of Max HGL Occurrence (days hh:mm) ........................... Peak Inflow (cfs) ....................................................................... Peak Lateral Inflow (cfs) ........................................................... Peak Outflow (cfs) .................................................................... The Sanitas Group Page 18 of 18 3/27/2020Agenda Item 5A Page 170 of 360 LEGENDEX. ASPHALT PAVEMENTEX. MAJOR CONTOUREX. MINOR CONTOUREX. SPOT ELEVATIONDRAINAGE BASIN BOUNDARYSTORM WATER FLOW DIRECTIONDRAINAGE BASIN DESIGNATORDRAINAGE BASIN IDBASIN AREA [AC]TIME OF CONCENTRATION [MIN]RUNOFFCOEFFICIENTSPROPERTY BOUNDARYEX. FENCEADJACENT PROPERTY BOUNDARYEX. UTILITY POLEEX. OVERHEAD UTILITIESEX. TREESDESIGN POINT1Q5 [CFS] Q100 [CFS]1.940.82EXISTING CONDITIONSRUNOFF SUMMARY TABLEDESIGN POINT20.870.43DRAINAGE BASIN STORM RUNOFF [CFS]MAJOR STORM RUNOFFMINOR STORM RUNOFFEX. CONCRETE PAVEMENT2.811.25OVERALL SITEEX. GRAVELCOPYRIGHTCSheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionSanitasTheGroup801 MAIN STREET, SUITE 225LOUISVILLE, CO 80027 303.981.9238PROJECT CONTACT: CURTIS STEVENS, P.E.4913 Valkyrie Dr.BW Sons & Daughters LLCBoulder, Colorado 80301720.938.6918NAVY1737 PEARL ST. BOULDER, CO 80302STUDIO Project No:FOR REFERENCE ONLY18_009_0012/03/18 SITE REVIEW07/08/19 SITE REVIEW REVISION #109/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4EXISTING CONDITIONSDRAINAGE PLANSR-C4.00SITE REVIEWNOT FOR CONSTRUCTIONAgenda Item 5A Page 171 of 360 UPUPUPUPLEGENDEX. ASPHALT PAVEMENTEX. MAJOR CONTOUREX. MINOR CONTOUREX. SPOT ELEVATIONDRAINAGE BASIN BOUNDARYSTORM WATER FLOW DIRECTIONDRAINAGE BASIN DESIGNATORDRAINAGE BASIN IDBASIN AREA [AC]TIME OF CONCENTRATION [MIN]RUNOFFCOEFFICIENTSPROPERTY BOUNDARYEX. FENCEADJACENT PROPERTY BOUNDARYEX. UTILITY POLEEX. OVERHEAD UTILITIESEX. TREESDESIGN POINT1Q5 [CFS] Q100 [CFS]2.380.65PROPOSED CONDITIONSRUNOFF SUMMARY TABLEDESIGN POINT20.420.21DRAINAGE BASIN STORM RUNOFF [CFS]MAJOR STORM RUNOFFMINOR STORM RUNOFFEXISTING ASPHALT ALLEY SECTION TO BE RECONSTRUCTEDWITH CONCRETE PAVEMENT.PROPOSED CONCRETE DRIVE & LOADING AREA.EXISTING CONCRETE WALK TO BE REPLACED DURINGCONSTRUCTION AS REQUIRED.EXISTING TREE GRATE AND STREET TREE TO BE MAINTAINED.EXISTING ADJACENT WALL TO REMAIN.(NOT ON PROJECT SITE)EXISTING UTILITY POLE TO BE REMOVED.EXISTING OVERHEAD UTILITIES TO BE BURIED.EXISTING SIDEWALK CHASE DRAIN TO BE RELOCATED.RELOCATED SIDEWALK CHASE DRAIN.EXISTING PARKING METER KIOSK AND SIGNAGE TO BERELOCATED.PROPOSED 6" TRENCH DRAIN WITH DECORATIVE COVER.PROPOSED RAINGARDEN. SEE TYP. SECTION ON SHEET C3.01.REFER TO PRELIMINARY DRAINAGE REPORT FOR PRELIMINARYSIZING REQUIREMENTS. SEE SHEET C3.01 FOR PRELIMINARYCROSS SECTION.PROPOSED 220 S.F. FULL-INFILTRATION PERMEABLE PAVERBAND. REFER TO PRELIMINARY DRAINAGE REPORT FORPRELIMINARY SIZING REQUIREMENTS. SEE C3.01 FORPRELIMINARY CROSS SECTION.KEY NOTESEX. CONCRETE PAVEMENTPROPOSED MAJOR CONTOURPROPOSED MINOR CONTOURPROPOSED CONCRETE PAVEMENTOVERALL SITE2.800.86PROPOSED RAIN GARDENRETAIL SPACEMAIN LVL F.F.=5328.85'RETAIL SPACEMAIN LVL F.F.=5328.40'MAIN LVL F.F.=5329.20'MAIN LVLF.F.=5329.20'MAIN LVL F.F.=5328.90'PROPOSED MULTI-USEBUILDINGPROPOSED OPENCOURTYARDPROPOSED MULTI-USEBUILDINGPROPOSE D C O V E R E D CORRIDO R T O C O U R T Y A R D COPYRIGHTCSheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionSanitasTheGroup801 MAIN STREET, SUITE 225LOUISVILLE, CO 80027 303.981.9238PROJECT CONTACT: CURTIS STEVENS, P.E.4913 Valkyrie Dr.BW Sons & Daughters LLCBoulder, Colorado 80301720.938.6918NAVY1737 PEARL ST. BOULDER, CO 80302STUDIO Project No:FOR REFERENCE ONLY18_009_0012/03/18 SITE REVIEW07/08/19 SITE REVIEW REVISION #109/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4PROPOSED CONDITIONSDRAINAGE PLANSR-C4.01SITE REVIEWNOT FOR CONSTRUCTIONAgenda Item 5A Page 172 of 360 TYPICAL RAISED RAINGARDENPLANTER CROSS SECTIONNO SCALENO SCALEPERMEABLE PAVER SYSTEM (PICP)FULL-INFILTRATION TYPICAL SECTIONCOPYRIGHTCSheet Issue & Revision LogIt is the client's responsibility prior to or during construction to notify the architect inwriting of any perceived errors or omissions in the plans and specifications ofwhich a contractor thoroughly knowledgeable with the building codes and methodsof construction should reasonably be aware. Written instructions addressing suchperceived errors or omissions shall be received from the architect prior to the clientor client's subcontractors proceeding with the work. The client shall be responsiblefor any defects in construction if these procedures are not followed.NoDate DescriptionSanitasTheGroup801 MAIN STREET, SUITE 225LOUISVILLE, CO 80027 303.981.9238PROJECT CONTACT: CURTIS STEVENS, P.E.4913 Valkyrie Dr.BW Sons & Daughters LLCBoulder, Colorado 80301720.938.6918NAVY1737 PEARL ST. BOULDER, CO 80302STUDIO Project No:FOR REFERENCE ONLY18_009_0012/03/18 SITE REVIEW07/08/19 SITE REVIEW REVISION #109/30/19 SITE REVIEW REVISION #211/11/19 SITE REVIEW REVISION #303/30/20 SITE REVIEW REVISION #4SITE REVIEWNOT FOR CONSTRUCTIONPRELIMINARYWQ SECTIONSSR-C3.01Agenda Item 5A Page 173 of 360 2016-2018 Agenda Item 5A Page 174 of 360 About MEI Since 1971, MEI has specialized in the manufacture, installation, modernization, and servicing of various types of elevators. Our manufactured equipment is found in every US state as well as several foreign countries. In addition, we install, modernize, and service equipment within the Midwest. MEI is a licensed, insured, and bonded elevator contractor and a member of the National Association of Elevator Contractors. Our equipment meets the requirements of the ASME A17.1 code / CSA B44. Customer Focus We provide several packages for standard applications, however, we specialize in adapting our product to customer requirements. Each elevator produced by MEI is individually engineered. This process allows us to customize each application without costly fees or extensive lead times. Examples of our work include passenger cars with front and side openings, elevators with unusual platform shapes, automobile lifts, 40,000# capacity freight cars, and 80,000# capacity semi truck lifts. Currently, MEI manufactures about 500 elevators annually at their Mankato, MN headquarters location. A variety of passenger, freight, and service applications are built and shipped to locations in both the public and private sectors. Job sites include churches, schools, convention centers, hotel complexes, airport expansions, transit stations, stadiums, hospitals, industrial plants, and shopping centers. Many of our customers are independent contractors, but we also provide equipment to major elevator companies. Installation Experience MEI installs approximately 100 cars per year within the Midwest. Since we receive direct feedback from the mechanics working with our equipment, we are able to continually fine-tune our designs for easier installation. MEI engineers also visit various jobsites for valuable hands-on experience. Our expertise in this area results in dependable, practical equipment and smooth installation. At MEI, we pride ourselves on delivering expert engineering, quality equipment, and excellent customer service. We look forward to hearing from you.MEI Story Video Headquarters 19336 607th AvenueMankato, MN 56001Phone: 800-450-3060Email: mei@meiusa.com MEI - Minneapolis/St. Paul Office Service/Repair, Modernization2333 Waters DrMendota Heights, MN 55120Phone: 612-338-3774Email: mn@meiusa.com MEI - Duluth Office Service/Repair, Modernization4504 Grand Ave, Suite 5Duluth, MN 55807Phone: 218-722-9600Email: mn@meiusa.com MEI - Badger Elevator - Fox Valley Service/Repair, Modernization1223 Appleton RoadMenasha, WI 54952Phone: 888-281-4062Website: www.badgerelevator.comEmail: wi@meiusa.com MEI - Badger Elevator - Milwaukee Service/Repair, ModernizationN50 W13740 Overview Drive - Suite CMenomonee Falls, WI 53051Phone: 888-281-4062Website: www.badgerelevator.comEmail: wi@meiusa.com MEI - Michigan Office Service/Repair, Modernization12499 Belden CtLivonia, MI 48150Phone: 248-486-4017Email: mi@meiusa.comWebsite: www.mi-elevator.com MEI - Northeast Office 2061 Potshop LaneNorristown, PA 19403Phone: 610-635-1150Email: Mike.Hogan@meiusa.com MEI - Colorado Office Service/Repair, Modernization833 Parfet St, Unit ELakewood, CO 80215Phone: 303-933-0100Email: co@meiusa.com MEI - Kansas City Office Service/Repair, Modernization1144 Booth StreetKansas City, KS 66103Phone: 816-221-3778Email: ks@meiusa.com MEI - Springfield Office Service/Repair, Modernization3107 L-3 E. ChestnutSpringfield, MO 65802Phone: 417-450-4617Email: mo@meiusa.com G Your business enables MEI to donate a portion of our profits to help make a positive difference in lives locally, nationally and abroad. About MEI C D A A B H I E D E G H I F F B Manufacturing Manufacturing, Engineering, and Field OperationsField Operations C Agenda Item 5A Page 175 of 360 Elevator Application Overview Custom Elevators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 Complete Elevator Packages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 Elevator Applications Provided by MEI . . . . . . . . . . . . . . . . . . . .10 Adding Value to Every Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12 In House Installation Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 MEI Value Through Project Timeline . . . . . . . . . . . . . . . . . . . . . . .14 Passenger Elevators MEI Group 1 Packages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 In-Ground . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 In-Ground, Rear/Side Slung . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18 Twin Jack Holeless, 1 & 2 Stage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 Twin Jack Holeless, 3 Stage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20 Cantilever Holeless, Rear/Side Slung . . . . . . . . . . . . . . . . . . . . . . .21 Twin Jack Roped . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 Cantilever Roped, Rear/Side Slung . . . . . . . . . . . . . . . . . . . . . . . . . . .23 Traction, MRL - Pocket Mounted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24 Traction, MRL - Rail Mounted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25 Traction, Low-Rise Geared . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26 Entrances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27 Entrance/Cab Replacement Doors . . . . . . . . . . . . . . . . . . . . . . . . . . .29 Passenger Cabs Service & Plastic Laminate Cabs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30 Raised Panel & Glass Wall Cabs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31 Custom Cab Interiors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32 Ceilings & Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34 Handrails & Bumpers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35 Car Operating Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36 Front, Door, & Sill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37 Freight Elevators In-Ground . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38 In-Ground, Rear/Side Slung . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39 Twin Jack Holeless, 1 & 2 Stage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40 Twin Jack Holeless, 3 Stage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41 Twin Jack Roped . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42 Traction, Low-Rise Geared . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .43 Automobile Lifts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44 Freight Cabs Freight Cabs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45 Power Units Submersible Power Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46 Dry/Belt-Driven Power Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47 Power Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48 Parts & Tools Power Unit Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49 Power Unit Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50 Oil Cooler - AOC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52 Oil Cooler - BOL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53 Oil Cooler Replacement Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54 Silencer/Muffler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55 Piping Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56 Limit Switches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59 Submersible Pully Bully . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60 Dry Pully Bully . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .61 Pit Equipment & Car Top Station . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .62 Installation & Maintenance Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . .63 Miscellaneous Elevator Accessories . . . . . . . . . . . . . . . . . . . . . . . .66 Rails & Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67 Rail Guides . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .68 VMI Control Systems Controller & Power Unit Mod Package . . . . . . . . . . . . . . . . . . . .70 Hydraulic Controls & Solid State Starters . . . . . . . . . . . . . . . .71 Remote Control Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72 Reflex 3.14 Leveling System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .73 History of MEI MEI History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74 Through the Years (Photos) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 Table of Contents Agenda Item 5A Page 176 of 360 AIRPORT ELEVATORS MEI has provided custom elevators to many major airports, including large projects with dozens of cars. PUBLIC TRANSIT SYSTEMS MEI manufactures equipment for public transportation systems throughout the United States and Canada. We promote transit through membership in the American Public Transportation Association (APTA). We actively participate in creation of APTA elevator design guidelines. ◊ Public Transit ◊ ◊ Airports ◊ 4 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Custom Elevators Agenda Item 5A Page 177 of 360 SCIENCE MUSEUM In-Ground Hydraulic, Circular Glass Open Hoistway ◊ Museums ◊ SEMI LIFTS In-Ground Hydraulic, 80,000 lb. Capacity See Elevator in Action ◊ Semi Lifts ◊ SMITHSONIAN - National Museum African American History and Culture, Washington D.C. In-Ground, 4 Corner Rails Allowing Full View of Glass on All Sides 21,500 lb. Capacity PETERSEN AUTOMOTIVE MUSEUM - Los Angeles, CA Roped Hydraulic Elevator 14,250 lb. Capacity 5MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Custom Elevators Agenda Item 5A Page 178 of 360 ◊ Office ◊ 4 WORLD TRADE CENTER (2) Geared Traction Elevators 10,000 lb. Capacity (1) In-Ground Elevator 3,500 lb. Capacity, 70 ft. Travel, Full Glass on Back Half of Cab. Under-Car Door Operator 2 WORLD TRADE CENTER (2) Geared Traction Elevators 10,000 lb. Capacity ONE WORLD TRADE CENTER (1) Roped Hydraulic Elevator 5,000 lb. Capacity 3 WORLD TRADE CENTER (6) Geared Traction Elevators (2) 3,500 lb. Capacity (2) 4,500 lb. Capacity (Full Glass Cab, Glass Flooring) (2) 10,000 lb. Capacity (1) Roped Hydraulic Elevator 2,500 lb. Capacity 6 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Custom Elevators Agenda Item 5A Page 179 of 360 OLYMPIC VENUES, Glass Twin Jack Holeless 2-Stage 3,500 lb. & 17,000 lb. Capacity ◊ Sports Stadiums ◊ WRIGLEY FIELD - Chicago, IL (2) Passenger Cars, Single Stage Holeless 2,500 lb. Capacity, Reflex Landing System VIKINGS US BANK STADIUM (3) Geared Traction Freight 10,000 lb. & 12,000 lb. Capacity 7MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Custom Elevators Agenda Item 5A Page 180 of 360 Retail, Glass Oceanside Setting Roped Hydraulic Elevator COSMOPOLITAN CASINO - Las Vegas Round, Glass Cab Elevator Cantilever Roped Hydraulic Elevator 3,500 lb. Capacity ◊ Malls & Retail ◊ LIBERTY CENTER - Liberty Township, OH Twin Jack Holeless 2-Stage 6,000 lb. Capacity, Reflex Landing System MALL OF AMERICA - Bloomington, MN In-Ground Rear Slung 10,000 lb. Capacity, 175 FPM Reflex Landing System 8 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Custom Elevators Agenda Item 5A Page 181 of 360 MEI is a North American leader in the design and production of elevator systems for the hydraulic and geared traction market. Below is an overview of MEI’s capabilities. Passenger2,100 lb - 4,500 lb P P P P P P P P P Standard & Custom Cabs P P P P P P P P P Front & Rear Openings P P P P P P P P P Maximum Travel (ft)75 20 40 60 40 75 75 350 200 Maximum Car Speed (FPM)200 200 200 200 200 200 200 350 500 Class A, C1 & C3 Loading P P P P Class A P Class A P P 5,000 lb - 20,000 lb P P P P O P O P O Standard & Custom Cabs P P P P O P O P O Front & Rear Openings P P P P O P O P O Maximum Travel (ft)75 20 30 45 O 100 O 350 O Maximum Car Speed (FPM)200 200 200 200 O 175 O 100-350 O Class A, C1 & C3 Loading P P P P O P O P O Freight4,000 lb - 6,000 lb P P P P O P O P O Class A, B, C1, C2, C3 Loading P P P P O P O P O Front & Rear Openings P P P P O P O P O Maximum Travel (ft)75 20 40 60 O 100 O 350 O Maximum Car Speed (FPM)200 200 200 200 O 200 O 350 O 6,500 lb - 20,000 lb P P P P O P O P O Class A, B, C1, C2, C3 Loading P P P P O P O P O Front & Rear Openings P P P P O P O P O Maximum Travel (ft)75 20 30 45 O 100 O 350 O Maximum Car Speed (FPM)200 175 175 175 O 175 O 150-350 O 25,000 lb - 40,000 lb P O O O O Contact MEI O Contact MEI O Class A, B, C1, C2, C3 Loading P O O O O Contact MEI O Contact MEI O Front & Rear Openings P O O O O Contact MEI O Contact MEI O Maximum Travel (ft)50 O O O O Contact MEI O Contact MEI O Maximum Car Speed (FPM)100 O O O O Contact MEI O Contact MEI O 40,000 lb - 80,000 lb P O O O O O O O O Class A, B, C1, C2, C3 Loading P O O O O O O O O Front & Rear Openings P O O O O O O O O Maximum Travel (ft)50 O O O O O O O O Maximum Car Speed (FPM)30-60 O O O O O O O OIn-GroundTractionGearedTraction MRLMachine-Room LessHolelessTwin Jack - Single StageHolelessTwin Jack - Two StageHolelessTwin Jack - Three StageHolelessSingle Jack - CantileveredRoped HydroTwin JackRoped HydroCantileveredENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES 9MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Complete Elevator Packages Agenda Item 5A Page 182 of 360 Inside Net Platform Area, Square FeetCapacity10 20 30 40 50 75 100 150 200 250 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 Passenger Elevator Minimum Capacity Rating 10 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com In-Ground Twin Jack Holeless (1, 2, or 3 Stage) Roped Hydraulic Elevator Applications Provided by MEI Agenda Item 5A Page 183 of 360 Travel (ft.) 10 20 30 40 50 60 70 80 90 100Installed CostTypical Installed Cost vs. Car Type & Travel In-Ground Twin Jack Holeless, 1 Stage Twin Jack Holeless, 2 Stage Twin Jack Holeless, 3 Stage Roped Hydraulic Twin Jack Traction, Geared MRL 11MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Traction MRL - Rail Mounted MRL - Pocket Mounted Elevator Applications Provided by MEI Agenda Item 5A Page 184 of 360 VALUEOutstanding Customer Service and Communication • Specialized teams include Salespeople, Project Managers and Engineers • Timely communication and attention to detail • Bids are completed per specification • Optional In House Training (contact for availability) • Value engineering options available Project Management Process • We sweat the details so you don’t have to • Designed to support our customers start to finish • Early review of the order to ensure project timeline integrity • Detailed approval process • Follow up e-mails and calls to ensure that the project remains on schedule • Final job site “Super Pack” verification list • MEI Product Support team is available for any needs after the product has shipped Equipment Design and Manufacturing • Made in the USA • Non-proprietary equipment • ISO 9001-2000 compliant Quality Management System • 24 month package warranty • All designs are built from a field mechanic perspective Hoistway Equipment Packages • Custom Engineered to Order- all jobs reviewed by Certified Professional Engineer • Freight platforms factory drilled to accept MEI freight cabs • Passenger platforms drilled to accept hidden fastener sills • Toe guard connections are factory drilled • COP cutouts provided in platform • Pick & Pack- boxes labeled with photos and list of contents • Fasteners labeled for Point of Use Power Units • Dry Power Units with bolt together frame making it easier to fit through openings • Submersible Top Mounted Valve permits easy access for adjusting (optional) • Custom Sizes and Tandem options available Piping Packages • Packaged for ease of handling and reduced installation time • Piping package includes pre-cut 10’-6” pipe sections with factory-grooved ends • Piping quantity is configured to the project Wiring Packages • Complete wiring package are customized to your project needs Cabs/Entrances • Designed job specific to meet your cab needs • Installation enhancements to minimize field assembly labor • All cabs are powder coated 12 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Adding Value to Every Project Agenda Item 5A Page 185 of 360 Optional Installation Training for Your Mechanics • Save time on your installation • Review of the installation manual with the Engineering team and MEI Installation Mechanic • Controller training by vendor • Freight Door training by vendor as applicable • Shop tour and mockup viewing • Jobsite visits • Contact your Project Manager to schedule training. Training is offered based on availability. What our customers are saying... “MEI did an excellent job of scheduling meetings that meet Excelsior’s needs… constructive meetings. Met or exceeded my expectations.” - Bill Bradley, Project Manager Excelsior Elevator - “Excellent presentation. I really enjoyed the tour of the plant, especially the new passenger elevator valve adjustment procedure/encoder system.” - Vincent Andries, Installer - 13MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com In House Installation Training Agenda Item 5A Page 186 of 360 Engineering / Ordering MaterialsBidDrawings 2-8 Weeks 9-16 Weeks Approval Approval Drawing Reminders Information Packet to Superintendent • Layout Drawings • Rail Brackets • Oil Line Quote • Mix & Match Components • Complete or Partial Packages • Detailed Notes and Clarification Engineering Approval Drawings Interface Compatibility Checks Specs & Drawings Takeoff Sheets (Optional) Customer P.O. Factory Audits 14 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com MEI Value Through Project Timeline Agenda Item 5A Page 187 of 360 Installation / Manufacturing / Packaging Notice of Shipment E-Mail Notice of Delivery E-Mail In-House Training (Optional) Installation Manual Shipment Product Support 1-800-944-1811 Inspection & Turnover Boxes Labeled with Photos & List of Contents Fasteners Labeled for Point of Use Phosphate Free Wash Powder Paint Precision Manufacturing Fixture Pre-Wiring Controller Pre-Mounting On Power Unit 15MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com MEI Value Through Project Timeline Agenda Item 5A Page 188 of 360 MEI Group 1 Packages! MEI Group 1 packages are perfect for the customer that is looking to piece together their own specific solution. Every application in the MEI catalog can be provided as a Group 1 package. Typical Group 1 Hoistway Package 16 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com MEI Group 1 Packages Agenda Item 5A Page 189 of 360 Capacity (lbs) Platform x Hoistway x Front/ Rear Laminate Clear Inside W x D Door Type Door Width Low Capacity2100 6’-0” x 5’-1” 7’-4” x 5’-9”F 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 2100 6’-0” x 5’-8” 7’-4” x 6’-8 1⁄2” F/R 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 2500 7’-0” x 5’-1” 8’-4” x 5’-9”F 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 2500 7’-0” x 5’-8” 8’-4” x 6’-8 1⁄2” F/R 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 3000 7’-0” x 5’-6” 8’-4” x 6’-2”F 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 3000 7’-0” x 6’-1” 8’-4” x 7’-1 1⁄2” F/R 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 3500 7’-0” x 6’-2” 8’-4” x 6’-10”F 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 3500 7’-0” x 6’-9” 8’-4” x 7’-9 1⁄2” F/R 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 4000 8’-0” x 6’-2” 9’-4” x 7’-0”F 7’-9” x 5’-3” 2-SP 4’-0” 4000 8’-0” x 6’-8” 9’-4” x 7’-11 1⁄2” F/R 7’-9” x 5’-0 1⁄2” 2-SP 4’-0”Hospital3500H 5’-4” x 8’-4” 6’-8” x 9’-2”F 5’-1” x 7’-5” 2-SP 3’-6” 3500H 5’-4” x 9’-0 1⁄2” 6’-8” x 10’-4” F/R 5’-1” x 7’-5” 2-SP 3’-6” 4000H 6’-0” x 8’-5” 7’-4” x 9’-3”F 5’-9” x 7’-6” 2-SP 4’-0” 4000H 6’-0” x 9’-1 1⁄2” 7’-4” x 10’-5” F/R 5’-9” x 7’-6” 2-SP 4’-0” 4500H 6’-0” x 9’-2” 7’-4” x 10’-0”F 5’-9” x 8’-3” 2-SP 4’-0” 4500H 6’-0” x 9’-10 1⁄2” 7’-4” x 11’-2” F/R 5’-9” x 8’-3” 2-SP 4’-0” 5000H 6’-0” x 9’-7 1⁄2” 7’-6” x 10’-5 1⁄2” F 5’-9” x 8’-8” 2-SP 4’-0” 5000H 6’-0” x 10’-3 1⁄2” 7’-6” x 11’-7” F/R 5’-9” x 8’-8” 2-SP 4’-0”High Capacity6000 7’-0” x 8’-6” 8’-6” x 9’-4”F 6’-9” x 7’-7” 2-SP 4’-0” 6000 7’-0” x 9’-2 1⁄2” 8’-6” x 10’-6” F/R 6’-9” x 7’-7” 2-SP 4’-0” 8000 8’-4” x 10’-0” 9’-10” x 10’-10” F 8’-1” x 9’-1” 2-SP 4’-0” 8000 8’-4” x 10’-8 1⁄2” 9’-10” x 12’-0” F/R 8’-1” x 9’-1” 2-SP 4’-0” 10000 8’-4” x 11’-8 1⁄2” 9’-10” x 12’-6 1⁄2” F 8’-1” x 10’-9 1⁄2” 2-SP 4’-0” 10000 8’-4” x 12’-5” 9’-10” x 13’-8 1⁄2” F/R 8’-1” x 10’-9 1⁄2” 2-SP 4’-0” 12000 10’-4” x 11’-6” 11’-10” x 12’-4” F 10’-1” x 10’-7” 2-SP 4’-0” 12000 10’-4” x 12’-2 1⁄2” 11’-10” x 13’-6” F/R 10’-1” x 10’-7” 2-SP 4’-0” 15000 12’-0” x 11’-5” 13’-6” x 12’-3” F 11’-9” x 10’-6” 2-SP 4’-0” 15000 12’-0” x 12’-1 1⁄2” 13’-6” x 13’-5” F/R 11’-9” x 10’-6” 2-SP 4’-0” Pit Depth = 4’-0” • Minimum Overhead = 12’-0” • Cab Height = 8’-0” = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Overhead = Pit Depth Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. Application Summary This is the traditional design used for decades. It utilizes a single-stage hydraulic jack installed in the ground. The jack is located directly under the car, near the center of the platform. Advantages • Usually the lowest material cost application. • Accommodates front and rear openings in any configuration. • No extensive pit or overhead is required. • Available for both low and high capacity cars. • Of all the application types, this equipment package is the easiest to install. Recommended Options ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES Dry Power Unit(high capacity, heavy usage) see page 47 Low Pressure Switchsee page 50Oil Cooler(heavy usage)see page 52 Single Opening (F)Double Opening (F/R) EOCA BDP1 or 2-Speed DoorsSide or Center Opening 7'-0"TRAVEL7'-0" EO CA BDP7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening 17MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com In-GroundPassenger Agenda Item 5A Page 190 of 360 Application Summary This application is used when a side opening is required in addition to a front opening. The rails and brackets are located on one wall of the hoistway. Please note that the dimensions shown are only examples of applications possible. Please call MEI for job-specific dimensions. Advantages • Accommodates front and side openings. • No extensive pit or overhead is required. • Available for both low and high capacity cars. EFC A BSDOP7'-0"TRAVEL7'-0" Double Opening (F/S) - Rear Slung Shown Rear Slung Capacity (lbs) Platform x Hoistway x Laminate Clear Inside W x D Front Door Side Door Type Width Type Width Low Capacity2100 6’-5 1⁄2” x 5’-1 1⁄4” 7’-8” x 6’-8 1⁄2” 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 2-SP 3’-0” 2500 7’-5 1⁄2” x 5’-1 1⁄4” 8’-8” x 6’-8 1⁄2” 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 2-SP 3’-0” 3000 7’-5 1⁄2” x 5’-6 1⁄4” 8’-8” x 7’-1 1⁄2” 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 2-SP 3’-6” 3500 7’-5 1⁄2” x 6’-2 1⁄4” 8’-8” x 7’-9 1⁄2” 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 2-SP 3’-6” 4000 8’-5 1⁄2” x 6’-0 3⁄4” 9’-8” x 7’-8”7’-9” x 5’-3”1-SP 4’-0” 2-SP 3’-6” 4500 8’-0” x 6’-11 1⁄4” 9’-2” x 8’-6 1⁄2 7’-3 1⁄2” x 6’-1 1⁄2” 1-SP 3’-6” 2-SP 4’-0” 5000 8’-0” x 7’-11 1⁄4” 9’-2” x 9’-6 1⁄2” 7’-3 1⁄2” x 7’-1 1⁄2” 1-SP 3’-6” 2-SP 4’-0” 6000 8’-0” x 8’-11 1⁄4” 9’-1” x 10’-6 1⁄2” 7’-5” x 8’-1 1⁄2” 1-SP 3’-6” 1-SP 4’-0” 7000 9’-0” x 8’-11 1⁄4” 10’-1” x 10’-6 1⁄2” 8’-5” x 8’-1 1⁄2” 1-SP 4’-0” 1-SP 4’-0” 8000 10’-0” x 8’-11 1⁄4” 11’-1” x 10’-6 1⁄2” 9’-5” x 8’-1 1⁄2” 1-SP 4’-0” 1-SP 4’-0” Pit Depth = 4’-0” • Minimum Overhead = 12’-5” • Cab Height = 8’-0” • Platform to Wall = 13” Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Clear Door Opening = Overhead = Pit Depth = Platform to Wall ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES Recommended Options Dry Power Unit(high capacity, heavy usage) see page 47 Low Pressure Switchsee page 50Oil Cooler(heavy usage)see page 52 18 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com In-Ground, Rear/Side SlungPassenger Agenda Item 5A Page 191 of 360 Application Summary This design utilizes two hydraulic jacks and provides maximum structural stability. The jacks, located on each side of the car, are either single-stage or telescopic. The appropriate jack type is determined by the amount of travel and the project conditions. The single-stage jacks are popular for two-stop arrangements, while telescopic jacks are generally used for three- and four-stop projects. Advantages • No jack hole is required. This eliminates the cost of drilling and the risk of oil contamination. • Accommodates front and rear openings in any configuration. • Available for both low and high capacity cars. Capacity (lbs) Platform x Hoistway (1-stage) x Hoistway (2-stage) x Front/ Rear Laminate Clear Inside W x D Door Type Door Width Low Capacity2100 6’-0” x 5’-1” 7’-4” x 5’-9” 7’-9” x 5’-9” F 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 2100 6’-0” x 5’-8” 7’-4” x 6’-8 1⁄2” 7’-9” x 6’-8 1⁄2” F/R 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 2500 7’-0” x 5’-1” 8’-4” x 5’-9” 8’-9” x 5’-9” F 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 2500 7’-0” x 5’-8” 8’-4” x 6’-8 1⁄2” 8’-9” x 6’-8 1⁄2” F/R 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 3000 7’-0” x 5’-6” 8’-4” x 6’-2” 8’-9” x 6’-2” F 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 3000 7’-0” x 6’-1” 8’-4” x 7’-1 1⁄2” 8’-9” x 7’-1 1⁄2” F/R 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 3500 7’-0” x 6’-2” 8’-6” x 6’-10” unchanged F 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 3500 7’-0” x 6’-9” 8’-6” x 7’-9 1⁄2” unchanged F/R 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 4000 8’-0” x 6’-2” 9’-6” x 7’-0” 9’-9” x 7’-0” F 7’-9” x 5’-3” 2-SP 4’-0” 4000 8’-0” x 6’-8” 9’-6” x 7’-11 1⁄2” 9’-9” x 7’-11 1⁄2” F/R 7’-9” x 5’-0 1⁄2” 2-SP 4’-0”Hospital3500H 5’-4” x 8’-4” 6’-10” x 9’-2” 7’-1” x 9’-2” F 5’-1” x 7’-5” 2-SP 3’-6” 3500H 5’-4” x 9’-0 1⁄2” 6’-10” x 10’-4” 7’-1” x 10’-4” F/R 5’-1” x 7’-5” 2-SP 3’-6” 4000H 6’-0” x 8’-5” 7’-7” x 9’-3” 7’-9” x 9’-3” F 5’-9” x 7’-6” 2-SP 4’-0” 4000H 6’-0” x 9’-1 1⁄2” 7’-7” x 10’-5” 7’-9” x 10’-5” F/R 5’-9” x 7’-6” 2-SP 4’-0” 4500H 6’-0” x 9’-2” 7’-7” x 10’-0” 7’-9” x 10’-0” F 5’-9” x 8’-3” 2-SP 4’-0” 4500H 6’-0” x 9’-10 1⁄2” 7’-7” x 11’-2” 7’-9” x 11’-2” F/R 5’-9” x 8’-3” 2-SP 4’-0” 5000H 6’-0” x 9’-7 1⁄2” 7’-8” x 10’-5 1⁄2” 7’-9” x 10’-5 1⁄2” F 5’-9” x 8’-8” 2-SP 4’-0” 5000H 6’-0” x 10’-3 1⁄2” 7’-8” x 11’-7” 7’-9” x 11’-7” F/R 5’-9” x 8’-8” 2-SP 4’-0”High Capacity6000 7’-0” x 8’-6” 8’-8” x 9’-4” 8’-10” x 9’-4” F 6’-9” x 7’-7” 2-SP 4’-0” 6000 7’-0” x 9’-2 1⁄2” 8’-8” x 10’-6” 8’-10” x 10’-6” F/R 6’-9” x 7’-7” 2-SP 4’-0” 8000 8’-4” x 10’-0” 10’-2” x 10’-10” unchanged F 8’-1” x 9’-1” 2-SP 4’-0” 8000 8’-4” x 10’-8 1⁄2” 10’-2” x 12’-0” unchanged F/R 8’-1” x 9’-1” 2-SP 4’-0” 10000 8’-4” x 11’-8 1⁄2” 10’-4” x 12’-6 1⁄2” unchanged F 8’-1” x 10’-9 1⁄2” 2-SP 4’-0” 10000 8’-4” x 12’-5” 10’-4” x 13’-8 1⁄2” unchanged F/R 8’-1” x 10’-9 1⁄2” 2-SP 4’-0” 12000 * 10’-4” x 11’-6” 12’-6” x 12’-4” unchanged F 10’-1” x 10’-7” 2-SP 4’-0” 12000 * 10’-4” x 12’-2 1⁄2” 12’-6” x 13’-6” unchanged F/R 10’-1” x 10’-7” 2-SP 4’-0” 15000 * 12’-0” x 11’-5” 14’-4” x 12’-3” unchanged F 11’-9” x 10’-6” 2-SP 4’-0” 15000 * 12’-0” x 12’-1 1⁄2” 14’-4” x 13’-5” unchanged F/R 11’-9” x 10’-6” 2-SP 4’-0” Pit Depth = 4’-0” • Minimum Overhead (See Below) , * Denotes Minimum Overhead = 12’-5” • Cab Height = 8’-0” Guidelines for determining overhead required: For 1 Stage Jack A) Car Speed = Up to 150 FPM B) Top Overtravel = 5” C) Bottom Overtravel = 12” D) Pit Depth = 4’-0” E) Cab Height = 8’-0” For 2 Stage Jack A) Car Speed = Up to 150 FPM B) Top Overtravel = 12” C) Bottom Overtravel = 10” D) Pit Depth = 4’-0” E) Cab Height = 8’-0” One Stage Jack Overhead Requirement: Minimum of 12’-0” overhead required for 12’-0” of travel and under. If over 12’-0” travel, overhead must equal or be greater than total travel. Two Stage Jack Overhead Requirement: Minimum of 12’-8” overhead required for 20’ of travel and under. Add 1⁄2” to 12’-8” for every additional 1” of travel over 20’-0”. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Overhead = Pit Depth ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. Single Opening (F)Double Opening (F/R) EOCA BDP7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening EO CA BDP7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening Recommended Options Dry Power Unit(high capacity, heavy usage) see page 47 Low Oil Level Switchsee page 50Oil Cooler(heavy usage)see page 52 19MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Twin Jack Holeless, 1 & 2 StagePassenger Agenda Item 5A Page 192 of 360 Application Summary This design utilizes two hydraulic jacks and provides maximum structural stability. The telescopic jacks are located on each side of the car. Advantages • No jack hole is required. This eliminates the cost of drilling and the risk of oil contamination. • Accommodates front and rear openings in any configuration. • Available for both low and high capacity cars. • Less overhead required than 2 stage holeless. Capacity (lbs) Platform x Hoistway x Front/ Rear Laminate Clear Inside W x D Door Type Door Width Low Capacity2100 6’-0” x 5’-1” 7’-11” x 5’-9”F 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 2100 6’-0” x 5’-8” 7’-11” x 6’-8 1⁄2”F/R 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 2500 7’-0” x 5’-1” 8’-11” x 5’-9”F 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 2500 7’-0” x 5’-8” 8’-11” x 6’-8 1⁄2”F/R 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 3000 7’-0” x 5’-6” 8’-11” x 6’-2”F 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 3000 7’-0” x 6’-1” 8’-11” x 7’-1 1⁄2”F/R 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 3500 7’-0” x 6’-2” 8’-11” x 6’-10”F 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 3500 7’-0” x 6’-9” 8’-11” x 7’-9 1⁄2”F/R 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 4000 8’-0” x 6’-2” 9’-11” x 7’-0”F 7’-9” x 5’-3” 2-SP 4’-0” 4000 8’-0” x 6’-8” 9’-11” x 7’-11 1⁄2” F/R 7’-9” x 5’-0 1⁄2” 2-SP 4’-0”Hospital3500H 5’-4” x 8’-4” 7’-3” x 9’-2”F 5’-1” x 7’-5” 2-SP 3’-6” 3500H 5’-4” x 9’-0 1⁄2” 7’-3” x 10’-4”F/R 5’-1” x 7’-5” 2-SP 3’-6” 4000H 6’-0” x 8’-5” 7’-11” x 9’-3”F 5’-9” x 7’-6” 2-SP 4’-0” 4000H 6’-0” x 9’-1 1⁄2” 7’-11” x 10’-5”F/R 5’-9” x 7’-6” 2-SP 4’-0” 4500H 6’-0” x 9’-2” 7’-11” x 10’-0”F 5’-9” x 8’-3” 2-SP 4’-0” 4500H 6’-0” x 9’-10 1⁄2” 7’-11” x 11’-2”F/R 5’-9” x 8’-3” 2-SP 4’-0” 5000H 6’-0” x 9’-7” 7’-11” x 10’-5”F 5’-9” x 8’-8” 2-SP 4’-0” 5000H 6’-0” x 10’-3 1⁄2” 7’-11” x 11’-7”F/R 5’-9” x 8’-8” 2-SP 4’-0”High Capacity6000 7’-0” x 8’-6” 8’-11” x 9’-4”F 6’-9” x 7’-7” 2-SP 4’-0” 6000 7’-0” x 9’-2 1⁄2” 8’-11” x 10’-6”F/R 6’-9” x 7’-7” 2-SP 4’-0” 8000 8’-4” x 10’-0” 10’-6” x 10’-10”F 8’-1” x 9’-1” 2-SP 4’-0” 8000 8’-4” x 10’-8 1⁄2” 10’-6” x 12’-0”F/R 8’-1” x 9’-1” 2-SP 4’-0” 10000 8’-4” x 11’-8 1⁄2” 10’-6” x 12’-6 1⁄2”F 8’-1” x 10’-9 1⁄2” 2-SP 4’-0” 10000 8’-4” x 12’-5” 10’-6” x 13’-8 1⁄2” F/R 8’-1” x 10’-9 1⁄2” 2-SP 4’-0” Pit Depth = 4’-0” • Minimum Overhead (See Below) • Cab Height = 8’-0” Guidelines for determining overhead required: For 3 Stage Jack A) Car Speed = Up to 150 FPM B) Top Overtravel = 12” C) Bottom Overtravel = 8” D) Pit Depth = 4’-0” E) Cab Height = 8’-0” 3 Stage Jack Overhead Requirement: Minimum of 12’-8” overhead required for 30’-6” of travel and under. Add 11⁄32” to 12’-8” for every additional 1” of travel over 30’-6”. Single Opening (F)Double Opening (F/R) Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Overhead = Pit Depth ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES EOCA BDP7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening EO CA BDP7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening Recommended Options Dry Power Unit(high capacity, heavy usage) see page 47 Low Oil Level Switchsee page 50Oil Cooler(heavy usage)see page 52 20 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Twin Jack Holeless, 3 StagePassenger Agenda Item 5A Page 193 of 360 Application Summary This application is used when a side opening is required in addition to a front opening. The rails and brackets are located on one wall of the hoistway. Please note that the dimensions shown are only examples of applications possible. Please call MEI for job-specific dimensions. Advantages • No jack hole is required. • Accommodates front and side openings. Guidelines for determining overhead required: For 1 Stage Jack A) Car Speed = Up to 150 FPM B) Top Overtravel = 5” C) Bottom Overtravel = 12” D) Pit Depth = 4’-0” E) Cab Height = 8’-0” For 2 Stage Jack A) Car Speed = Up to 150 FPM B) Top Overtravel = 12” C) Bottom Overtravel = 10” D) Pit Depth = 4’-0” E) Cab Height = 8’-0” One Stage Jack Overhead Requirement: Minimum of 12’-5” overhead required for 11’-0” of travel and under. If over 11’-0” travel, overhead must be 18” greater than total travel. Two Stage Jack Overhead Requirement: Minimum of 13’-3” overhead required for 20’ of travel and under. Add 1⁄2” to 13’-3” for every additional 1” of travel over 20’-0”. Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES EFC A BSDOP7'-0"TRAVEL7'-0" Double Opening (F/S) - Rear Slung Shown = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Clear Door Opening = Overhead = Pit Depth = Platform to Wall Rear Slung Capacity (lbs) Platform x Hoistway x Laminate Clear Inside W x D Front Door Side Door Type Width Type Width Low Capacity2100 6’-5 1⁄2” x 5’-1 1⁄4” 7’-8” x 6’-11 1⁄2” 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 2-SP 3’-0” 2500 7’-5 1⁄2” x 5’-1 1⁄4” 8’-8” x 6’-11 1⁄2” 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 2-SP 3’-0” 3000 7’-5 1⁄2” x 5’-6 1⁄4” 8’-8” x 7’-4 1⁄2” 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 2-SP 3’-6” 3500 7’-5 1⁄2” x 6’-2 1⁄4” 8’-8” x 8’-0 1⁄2” 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 2-SP 3’-6” 4000 8’-5 1⁄2” x 6’-0 3⁄4” 9’-8” x 7’-11” 7’-9” x 5’-3”1-SP 4’-0” 2-SP 4’-0” Pit Depth = 4’-0” • Minimum Overhead (See Below) • Cab Height = 8’-0” • Platform to Wall = 16” Recommended Options Load Weigh Switchsee page 50Low Oil Level Switchsee page 50Oil Cooler(heavy usage)see page 52 21MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Cantilever Holeless, Rear/Side SlungPassenger Agenda Item 5A Page 194 of 360 Application Summary This design utilizes wire ropes in conjunction with two hydraulic jacks to lift the car at a 1:2 ratio. For every foot that the jacks rise, the car rises two feet. The use of two jacks, one on each side of the car, provides maximum structural stability. Advantages • No jack hole is required and with that there is no risk of oil contamination in the ground. • Accommodates front and rear openings in any configuration. • No extensive pit or overhead is required. • Large platform designs and high capacity projects can be accommodated. Capacity (lbs) Platform x Hoistway x Front/ Rear Laminate Clear Inside W x D Door Type Door Width Low Capacity2100 6’-0” x 5’-1” 8’-0” x 5’-9” F 5’-9” x 4’-3 1⁄2” 1-SP 3 ’-0” 2100 6’-0” x 5’-8” 8’-0” x 6’-8 1⁄2” F/R 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 2500 7’-0” x 5’-1” 9’-0” x 5’-9”F 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 2500 7’-0” x 5’-8” 9’-0” x 6’-8 1⁄2” F/R 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 3000 7’-0” x 5’-6” 9’-0” x 6’-2”F 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 3000 7’-0” x 6’-1” 9’-0” x 7’-1 1⁄2” F/R 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 3500 7’-0” x 6’-2” 9’-0” x 6’-10”F 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 3500 7’-0” x 6’-9” 9’-0” x 7’-9 1⁄2” F/R 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 4000 8’-0” x 6’-2” 10’-0” x 7’-0”F 7’-9” x 5’-3” 2-SP 4’-0” 4000 8’-0” x 6’-8” 10’-0” x 7’-11 1⁄2” F/R 7’-9” x 5’-0 1⁄2” 2-SP 4’-0”Hospital3500H 5’-4” x 8’-4” 7’-4” x 9’-2”F 5’-1” x 7’-5” 2-SP 3’-6” 3500H 5’-4” x 9’-0 1⁄2” 7’-4” x 10’-4” F/R 5’-1” x 7’-5” 2-SP 3’-6” 4000H 6’-0” x 8’-5” 8’-0” x 9’-3”F 5’-9” x 7’-6” 2-SP 4’-0” 4000H 6’-0” x 9’-1 1⁄2” 8’-0” x 10’-5” F/R 5’-9” x 7’-6” 2-SP 4’-0” 4500H * 6’-0” x 9’-2” 8’-2” x 10’-0”F 5’-9” x 8’-3” 2-SP 4’-0” 4500H * 6’-0” x 9’-10 1⁄2” 8’-2” x 11’-2” F/R 5’-9” x 8’-3” 2-SP 4’-0” 5000H * 6’-0” x 9’-7 1⁄2” 8’-2” x 10’-5 1⁄2” F 5’-9” x 8’-8” 2-SP 4’-0” 5000H * 6’-0” x 10’-3 1⁄2” 8’-2” x 11’-7” F/R 5’-9” x 8’-8” 2-SP 4’-0”High Capacity6000 * 7’-0” x 8’-6” 9’-2” x 9’-4”F 6’-9” x 7’-7” 2-SP 4’-0” 6000 * 7’-0” x 9’-2 1⁄2” 9’-2” x 10’-6” F/R 6’-9” x 7’-7” 2-SP 4’-0” 8000 * 8’-4” x 10’-0” 10’-10” x 10’-10” F 8’-1” x 9’-1” 2-SP 4’-0” 8000 * 8’-4” x 10’-8 1⁄2” 10’-10” x 12’-0” F/R 8’-1” x 9’-1” 2-SP 4’-0” 10000 * 8’-4” x 11’-8 1⁄2” 11’-0” x 12’-6 1⁄2” F 8’-1” x 10’-9 1⁄2” 2-SP 4’-0” 10000 * 8’-4” x 12’-5” 11’-0” x 13’-8 1⁄2” F/R 8’-1” x 10’-9 1⁄2” 2-SP 4’-0” 12000 * 10’-4” x 11’-6” 13’-8” x 12’-4” F 10’-1” x 10’-7” 2-SP 4’-0” 12000 * 10’-4” x 12’-2 1⁄2” 13’-8” x 13’-6” F/R 10’-1” x 10’-7” 2-SP 4’-0” 15000 * 12’-0” x 11’-5” 15’-8” x 12’-3” F 11’-9” x 10’-6” 2-SP 4’-0” 15000 * 12’-0” x 12’-1 1⁄2” 15’-8” x 13’-5” F/R 11’-9” x 10’-6” 2-SP 4’-0” Pit Depth = 4’-0” • Minimum Overhead = 12’-0” , * Denotes Minimum Overhead = 12’-5” • Cab Height = 8’-0” Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Overhead = Pit Depth = Gov. Access Door ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES Single Opening (F)Double Opening (F/R) EOCA BDPGovernorAccessDoor 7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening EO CA BDPGovernorAccessDoor 7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening Required in New York Cityand possibly other jurisdictions Recommended Options Dry Power Unit(high capacity, heavy usage) see page 47 Low Oil Level Switchsee page 50Oil Cooler(heavy usage)see page 52 22 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Twin Jack RopedPassenger Agenda Item 5A Page 195 of 360 Application Summary This is a holeless design limited to low capacity applications. Wire ropes are utilized in conjunction with a hydraulic jack to lift the car at a 1:2 ratio. For every foot that the jack rises, the car rises two feet. The jack and rail equipment is mounted either to the side or to the rear of the car, depending upon the opening configuration. Advantages • No jack hole is required and with that there is no risk of oil contamination in the ground. • Front & side openings can be easily accommodated. • No extensive pit or overhead is required. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Clear Door Opening = Overhead = Pit Depth = Platform to Wall = Gov. Access Door GovernorAccessDoor OP7'-0"TRAVEL7'-0" C A B SDE GovernorAccessDoor OP7'-0"TRAVEL7'-0" EFC A B SDSingle Opening (F) - Rear Slung Shown Double Opening (F/S) - Rear Slung Shown Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. Required in New York Cityand possibly other jurisdictions Rear Slung Cap. (lbs) Platform x Hoistway x Laminate Clear Inside W x D Front/ Side Front Door Side Door Type Width Type Width Low Capacity2100 6’-0” x 5’-1” 7’-4” x 7’-3 1⁄4” 5’-9” x 4’-3 1⁄2” F 1-SP 3’-0” - - 2100 6’-5 1⁄2” x 5’-1 1⁄4” 7’-8” x 7’-3 1⁄2” 5’-9” x 4’-3 1⁄2”F/S 1-SP 3’-0” 2-SP 3’-0” 2500 7’-0” x 5’-1” 8’-4” x 7’-3 1⁄4” 6’-9” x 4’-3 1⁄2” F 1-SP 3’-6” - - 2500 7’-5 1⁄2” x 5’-1 1⁄4” 8’-8” x 7’-3 1⁄2” 6’-9” x 4’-3 1⁄2”F/S 1-SP 3’-6” 2-SP 3’-6” 3000 7’-0” x 5’-6” 8’-4” x 7’-8 1⁄4” 6’-9” x 4’-8 1⁄2” F 1-SP 3’-6” - - 3000 7’-5 1⁄2” x 5’-6 1⁄4” 8’-8” x 7’-8 1⁄2” 6’-9” x 4’-8 1⁄2”F/S 1-SP 3’-6” 2-SP 3’-6” 3500 7’-0” x 6’-2” 8’-4” x 8’-4 1⁄4” 6’-9” x 5’-4 1⁄2” F 1-SP 3’-6” - - 3500 7’-5 1⁄2” x 6’-2 1⁄4” 8’-8” x 8’-4 1⁄2” 6’-9” x 5’-4 1⁄2”F/S 1-SP 3’-6” 2-SP 3’-6” 4000 8’-0” x 6’-2” 9’-4” x 8’-5 3⁄4” 7’-9” x 5’-3” F 2-SP 4’-0” - - 4000 8’-5 1⁄2” x 6’-0 3⁄4” 9’-8” x 8’-3” 7’-9” x 5’-3”F/S 1-SP 4’-0” 2-SP 4’-0” Pit Depth = 4’-0” • Minimum Overhead = 12’-5” • Cab Height = 8’-0” • Platform to Wall = 20” ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES Recommended Options Load Weigh Switchsee page 50Low Oil Level Switchsee page 50Oil Cooler(heavy usage)see page 52 23MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Cantilever Roped, Rear/Side SlungPassenger Agenda Item 5A Page 196 of 360 Application Summary This design utilizes a gearless machine, ropes, and counterweights instead of hydraulic equipment. The main guide rails are mounted on each side of the car and an additional pair of counterweight rails is located on one side. The gearless machine, along with the related drive equipment is all installed inside the hoistway eliminating the need for a machine room saving you valuable floor space. Advantages • Requires a smaller control room rather than a full size machine room • Reduces height of rooftop projection versus Traction applications • Shorter minimum overhead than Rail Mounted MRL application • Advantages over hydraulic applications: • Lower power requirements • Greater energy efficiency • Allows significantly higher car speeds Under Slung Single Opening (F) (CWT at Side) Access DoorRequired42” x 42” Under Slung Double Opening (F/R) (CWT at Side) E CA BDOP7'-0"TRAVEL7'-0"Disconnect(by others)6'-0" MIN. CONTROL ROOM 5'-0"OPNG.3'-0"MIN.1 or 2-Speed DoorsSide or Center Opening CA BDEOP7'-0"TRAVEL7'-0"Disconnect(by others)6'-0" MIN. CONTROL ROOM 5'-0"OPNG.3'-0"MIN.1 or 2-Speed DoorsSide or Center Opening Pocket Mounted Machine - Side CWT Cap. (lbs) Platform x Hoistway x Front/ Rear Laminate Clear Door Type Door Width Max Speed Mach. Mount Min OH Min Pit Low Capacity2100 6'-0" x 5'-1" 8'-9" x 6'-9" F 5'-9" x 4'-3 ½" 1-SP 3'-0" 500 Pocket 13'-8" 5'-8" 2500 7'-0" x 5'-1" 9'-9" x 6'-9" F 6'-9" x 4'-3 ½" 1-SP 3'-6" 500 Pocket 13'-8" 5'-8" 3000 7'-0" x 5'-6" 9’-9" x 6'-9" F 6'-9" x 4'-8 ½" 1-SP 3'-6" 500 Pocket 13'-8" 5'-8" 3000 7'-0" x 6'-1" 9’-11" x 7'-1 ½"F/R 6'-9" x 4'-8 ½" 1-SP 3'-6" 500 Pocket 13'-8" 5'-8" 3500 7'-0" x 6'-2" 9’-9" x 6'-10" F 6'-9" x 5'-4 ½" 1-SP 3'-6" 500 Pocket 13'-8" 5'-8" 3500 7'-0" x 6'-9" 9’-11" x 7'-9 ½"F/R 6'-9" x 5'-4 ½" 1-SP 3'-6" 500 Pocket 13'-8" 5'-8" 4000 8'-0" x 6'-2" 10'-9" x 6'-11 ½" F 7'-9" x 5'-3" 2-SP 4'-0" 350 Pocket 13'-8" 5'-8" 4000 8'-0" x 6'-8" 10'-11" x 7'-11 ½"F/R 7'-9" x 5'-0 ½" 2-SP 4'-0" 350 Pocket 13'-8" 5'-8"Hospital4000H 6'-0" x 8'-5" 8'-9" x 9'-2 ½" F 5'-9" x 7'-6" 2-SP 4'-0" 350 Pocket 13'-8" 5'-8" 4000H 6'-0" x 9'-1 ½" 8'-11" x 10'-5"F/R 5'-9" x 7'-6" 2-SP 4'-0" 350 Pocket 13'-8" 5'-8" 4500H 6'-0" x 9'-2" 9'-8" x 9'-11 ½" F 5'-9" x 8'-3" 2-SP 4'-0" 350 Pocket 13'-8" 5'-8" 4500H 6'-0" x 9'-10 ½" 9'-8" x 11'-2"F/R 5'-9" x 8'-3" 2-SP 4'-0" 350 Pocket 13'-8" 5'-8" 5000H 6'-0" x 9'-7 ½" 9'-8" x 10'-5" F 5'-9" x 8'-8" 2-SP 4'-0" 350 Pocket 13'-8" 5'-8" 5000H 6'-0" x 10'-3 ½" 9'-8" x 11'-7"F/R 5'-9" x 8'-8" 2-SP 4'-0" 350 Pocket 13'-8" 5'-8" Based on car speed of 350 FPM • Cab Height = 8’-0” 500 FPM = add 13” of overhead and 8” of pit depth Depending on job specifics, the overhead or pit on pocket mounted machines may need to be increased. Note: Counterweight safeties also available. Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Overhead = Pit Depth = Access Door 42” x 42” ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES 24 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Traction, MRL - Pocket MountedPassenger Agenda Item 5A Page 197 of 360 Application Summary This design utilizes a gearless machine, ropes, and counterweights instead of hydraulic equipment. The main guide rails are mounted on each side of the car and an additional pair of counterweight rails is located on one side. The gearless machine, along with the related drive equipment is all installed inside the hoistway eliminating the need for a machine room saving you valuable floor space. Advantages • Requires a smaller control room rather than a full size machine room • Reduces height of rooftop projection versus Traction applications • Building structure not required to support the weight of the elevator • Advantages over hydraulic applications: • Lower power requirements • Greater energy efficiency • Allows significantly higher car speeds Rail Mounted Machine - Side CWT Cap. (lbs) Platform x Hoistway x Front/ Rear Laminate Clear Door Type Door Width Max Speed Mach. Mount Min OH Min Pit Low Capacity2100 6'-0" x 5'-1" 8’-2" x 6'-9" F 5'-9" x 4'-3 ½" 1-SP 3'-0" 500 Rail 18'-0" 5'-8" 2500 7'-0" x 5'-1" 9'-2" x 6'-9" F 6'-9" x 4'-3 ½" 1-SP 3'-6" 500 Rail 18’-0” 5'-8" 3000 7'-0" x 5'-6" 9'-2" x 6'-9" F 6'-9" x 4'-8 ½" 1-SP 3'-6" 500 Rail 18’-0” 5'-8" 3000 7'-0" x 6'-1" 9'-2" x 7'-1 ½"F/R 6'-9" x 4'-8 ½" 1-SP 3'-6" 500 Rail 18’-0” 5'-8" 3500 7'-0" x 6'-2" 9'-2" x 6'-10" F 6'-9" x 5'-4 ½" 1-SP 3'-6" 500 Rail 18’-0” 5'-8" 3500 7'-0" x 6'-9" 9'-2" x 7'-9 ½"F/R 6'-9" x 5'-4 ½" 1-SP 3'-6" 500 Rail 18’-0” 5'-8" 4000 8'-0" x 6'-2" 10'-2" x 6'-11 ½" F 7'-9" x 5'-3" 2-SP 4'-0" 350 Rail 18’-0” 5'-8" 4000 8'-0" x 6'-8" 10'-2" x 7'-11 ½"F/R 7'-9" x 5'-0 ½" 2-SP 4'-0" 350 Rail 18’-0” 5'-8"Hospital4000H 6'-0" x 8'-5" 8'-2" x 9'-2 ½" F 5'-9" x 7'-6" 2-SP 4'-0" 350 Rail 18’-0” 5'-8" 4000H 6'-0" x 9'-1 ½" 8'-2" x 10'-5"F/R 5'-9" x 7'-6" 2-SP 4'-0" 350 Rail 18’-0” 5'-8" 4500H 6'-0" x 9'-2" 8'-3 ½" x 9'-11 ½" F 5'-9" x 8'-3" 2-SP 4'-0" 350 Rail 18’-0” 5'-8" 4500H 6'-0" x 9'-10 ½" 8'-3 ½" x 11'-2"F/R 5'-9" x 8'-3" 2-SP 4'-0" 350 Rail 18’-0” 5'-8" 5000H 6'-0" x 9'-7 ½" 8'-3 ½" x 10'-5" F 5'-9" x 8'-8" 2-SP 4'-0" 350 Rail 18’-0” 5'-8" 5000H 6'-0" x 10'-3 ½" 8'-3 ½" x 11'-7"F/R 5'-9" x 8'-8" 2-SP 4'-0" 350 Rail 18’-0” 5'-8" Based on car speed of 350 FPM • Cab Height = 8’-0” 500 FPM = add 13” of overhead and 8” of pit depth Depending on job specifics, the overhead or pit on pocket mounted machines may need to be increased. Note: Counterweight safeties also available. Rear counterweight design also available. Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Overhead = Pit Depth Under Slung Single Opening (F) (CWT at Side) Under Slung Double Opening (F/R) (CWT at Side) E CA BD1 or 2-Speed DoorsSide or Center OpeningOP7'-0"TRAVEL7'-0"Disconnect(by others)6'-0" MIN. CONTROL ROOM 5'-0"OPNG.3'-0"MIN.CA BDEOP7'-0"TRAVEL7'-0"Disconnect(by others)6'-0" MIN. CONTROL ROOM 5'-0"OPNG.3'-0"MIN.1 or 2-Speed DoorsSide or Center Opening 25MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Traction, MRL - Rail MountedPassenger Agenda Item 5A Page 198 of 360 Note: Visit our website for downloadable elevation and plan view drawings. Application Summary This design utilizes a geared machine, ropes, and counterweights instead of hydraulic equipment. The main guide rails are mounted on each side of the car and an additional pair of counterweight rails is located on one side or at the rear. The geared machine, along with the related drive equipment, is generally located above the hoistway in a penthouse machine room. In some limited situations, it can be located next to the hoistway at a lower landing. This latter arrangement is referred to as a basement traction. Advantages • No risk of oil contamination to the ground. • Accommodates front and rear openings in any configuration. • Available for both low and high capacity cars. • Nearly unlimited floor travel is possible. • Has greater power efficiency than hydraulic applications. • Allows significantly higher car speeds than hydraulic designs.OCA BDPE 7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening EO CA BDP7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening EO CA BDP7'-0"TRAVEL7'-0" 1 or 2-Speed DoorsSide or Center Opening Single Opening (F) (CWT at Side)Double Opening (F/R) (CWT at Side)Single Opening (F) (CWT at Rear) Cap. (lbs) Platform x Hoistway x Front/ Rear Cwt. Loca- tion Laminate Clear Inside W x D Door Type Door Width Max Speed FPM Minimum Overhead Minimum Pit Depth Low Capacity2100 6’-0” x 5’-1” 7’-4” x 6’-7 1⁄2” F Rear 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 350 16’-0” * 5’-2” * 2500 7’-0” x 5’-1” 8’-4” x 6’-7 1⁄2” F Rear 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 350 16’-0” * 5’-2” * 3000 7’-0” x 5’-6” 8’-4” x 7’-0 1⁄2” F Rear 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 350 16’-0” * 5’-2” * 3500 7’-0” x 6’-2” 8’-4” x 7’-8 1⁄2” F Rear 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 350 16’-0” * 5’-2” * 4000 8’-0” x 6’-2” 9’-4” x 7’-8 1⁄2” F Rear 7’-9” x 5’-4 1⁄2” 1-SP 4’-0” 350 16’-0” * 5’-2” * 2100 6’-0” x 5’-1” 7’-10” x 5’-9”F Side 5’-9” x 4’-3 1⁄2” 1-SP 3’-0” 350 16’-0” * 5’-2” * 2500 7’-0” x 5’-1” 8’-10” x 5’-9”F Side 6’-9” x 4’-3 1⁄2” 1-SP 3’-6” 350 16’-0” * 5’-2” * 3000 7’-0” x 5’-6” 8’-10” x 6’-2”F Side 6’-9” x 4’-8 1⁄2” 1-SP 3’-6” 350 16’-0” * 5’-2” * 3500 7’-0” x 6’-2” 8’-10” x 6’-10” F Side 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 350 16’-0” * 5’-2” * 3500 7’-0” x 6’-9” 8’-10” x 7’-9 1⁄2” F/R Side 6’-9” x 5’-4 1⁄2” 1-SP 3’-6” 350 16’-0” * 5’-2” * 4000 8’-0” x 6’-2” 9’-10” x 6’-10” F Side 7’-9” x 5’-4 1⁄2” 1-SP 4’-0” 350 16’-0” * 5’-2” * 4000 8’-0” x 6’-8” 9’-10” x 7’-8 1⁄2” F/R Side 7’-9” x 5’-3 1⁄2” 1-SP 4’-0” 350 16’-0” * 5’-2” *Hospital3500H 5’-4” x 8’-4” 7’-2” x 9’-2”F Side 5’-1” x 7’-5”2-SP 3’-6” 350 16’-0” * 5’-2” * 3500H 5’-4” x 9’-0 1⁄2” 7’-2” x 10’-4” F/R Side 5’-1” x 7’-5”2-SP 3’-6” 350 16’-0” * 5’-2” * 4000H 6’-0” x 8’-5” 7’-10” x 9’-3”F Side 5’-9” x 7’-6”2-SP 4’-0” 350 16’-0” * 5’-2” * 4000H 6’-0” x 9’-1 1⁄2” 7’-10” x 10’-5” F/R Side 5’-9” x 7’-6”2-SP 4’-0” 350 16’-0” * 5’-2” * 4500H 6’-0” x 9’-2” 7’-10” x 10’-0” F Side 5’-9” x 8’-3”2-SP 4’-0” 350 16’-0” * 5’-2” * 4500H 6’-0” x 9’-10 1⁄2” 7’-10” x 11’-2” F/R Side 5’-9” x 8’-3”2-SP 4’-0” 350 16’-0” * 5’-2” * 5000H 6’-0” x 9’-7 1⁄2” 7’-10” x 10’-5 1⁄2” F Side 5’-9” x 8’-8”2-SP 4’-0” 350 16’-6” * 5’-2” * 5000H 6’-0” x 10’-3 1⁄2” 7’-10” x 11’-7” F/R Side 5’-9” x 8’-8”2-SP 4’-0” 350 16’-6” * 5’-2” *High Capacity6000 7’-0” x 8’-6” 8’-10” x 9’-4”F Side 6’-9” x 7’-7”2-SP 4’-0” 350 16’-6” * 5’-2” * 6000 7’-0” x 9’-2 1⁄2” 8’-10” x 10’-6” F/R Side 6’-9” x 7’-7”2-SP 4’-0” 350 16’-6” * 5’-2” * 8000 8’-4” x 10’-0” 10’-2” x 10’-8 1⁄2” F Side 8’-1” x 9’-2 1⁄2” 1-SP 4’-0” 350 16’-6” * 5’-2” * 8000 8’-4” x 10’-8 1⁄2” 10’-2” x 11’-9” F/R Side 8’-1” x 9’-4”1-SP 4’-0” 350 16’-6” * 5’-2” * 10000 8’-4” x 11’-8 1⁄2” 10’-8” x 12’-5” F Side 8’-1” x 10’-11” 1-SP 4’-6” 225 16’-6” * 6’-0” * 10000 8’-4” x 12’-5” 10’-8” x 13’-5 1⁄2” F/R Side 8’-1” x 11’-0 1⁄2” 1-SP 4’-6” 225 16’-6” * 6’-0” * 12000 10’-3” x 11’-6” 12’-7 1⁄2” x 12’-2 1⁄2” F Side 10’-1” x 10’-8 1⁄2” 1-SP 5’-0” 200 16’-6” * 6’-0” * 12000 10’-3” x 12’-0” 12’-7 1⁄2” x 13’-0 1⁄2” F/R Side 10’-1” x 10’-7 1⁄2” 1-SP 5’-0” 200 16’-6” * 6’-0” * 15000 12’-0” x 11’-6” 14’-6” x 12’-2 1⁄2” F Side 11’-9” x 10’-8 1⁄2” 1-SP 6’-0” 150 17’-0” * 6’-0” * 15000 12’-0” x 12’-1 1⁄2” 14’-6” x 13’-2” F/R Side 11’-9” x 10’-9” 1-SP 6’-0” 150 17’-0” * 6’-0” * Based on car speed of 200 fpm • Cab Height = 8’-0” • For seismic applications add 3” to hoistway width and 1” to hoistway depth * Speeds exceeding 200 FPM require additional overhead and pit depth. Minimum pit depth is based on the use of spring buffers. Add 5” to pit depth if oil buffers are required or car speed exceeds 200 FPM. 225 FPM = add 6” of overhead & 5” of pit depth 250 FPM = add 7” of overhead & 5” of pit depth 300 FPM = add 8” of overhead & 5” of pit depth 350 FPM = add 10” of overhead & 5” of pit depth Contact us for your next custom Gearless elevator package. MEI provides gearless cars up to 11,000 lb. capacity at 500 FPM. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Opening = Overhead = Pit Depth ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. 26 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Traction, Low-Rise GearedPassenger Agenda Item 5A Page 199 of 360 Universal Opening Strike jambs can be reversed for a universal right or left hand fit. INSTALLATION ADVANTAGES Groutless Adjustable Sill Option The sill angle brackets can accommodate imperfections in the hoistway allowing quick and easy levelling of the sill. Traditional grouted option available. Compatible with Masonry and Gypsum Walls Frames are constructed the same, and mount easily regardless of wall construction material. Mitered & welded frame option available. Innovative Mounting Attachments Fastening is easy and simple because the fasteners are on the front side of mounting brackets. Raised Frame Attachment Designed with 1/2” clearance, these attachments eliminate the need to chisel away masonry for a correct fit. FRAME • Bolted Frame Construction • Mitered and Welded Construction MATERIAL Painted or stainless frames and doors SILL - GROUTLESS DESIGN Loading Maximum 10,000 class A loading Maximum 6,000 class C1 loading SILL MATERIAL Aluminum (Standard) Nickel Silver (Optional) Stainless (Optional) FRAME CONSTRUCTION • Bolted construction or mitered and welded • 16ga. stainless or sheet steel standard - 14ga. optional • Accommodates any wall thickness • UL labeled for Gypsum construction • 2” wide return, strike, and header perimeter • Sheet steel is powder painted • Bolted entrance frames are for either right or left hand use • For Gypsum wall construction, front of frames attach using frame clips. STRUT CONSTRUCTION • 10ga. sheet steel • Strut extensions may be needed for gypsum construction SILL SUPPORT CONSTRUCTION • Groutless design ◦10,000 class A loading ◦6,000 class C1 loading • Grouted design ◦No loading limit • Fully adjustable for easy leveling • Sill angles are 7ga. sheet steel with 1/4” wall mounting feet and 10ga. gussets • 1/2” stud mounting anchors included HEADER CONSTRUCTION • 10ga. sheet steel • Drilled for GAL mounting (contact MEI for other drilling) DOOR CONSTRUCTION • 1.5 hour fire rating UL label • Doors are right- left-hand specific - can be drilled to switch • Standard doors are clad in 20ga. stainless -16ga. optional • Painted doors have no cladding - gloss paint requires sheet steel skin • Use (2) Nylube slide door guides (gibs) with (1) 14ga. safety retainer gib (per door panel) • Drilled for GAL door operator. (contact MEI for other drilling) • Sight guard finish matches door finish • See page 29 for stand alone doors and accessories. FASCIA CONSTRUCTION • 14ga. galvannealed • 48” maximum height per section GENERAL SPECIFICATIONS FOR ALL ENTRANCES A A B B CC D D E E 27MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com EntrancesPassenger Agenda Item 5A Page 200 of 360 2-Speed Side Opening Maximum Width: 84” | Maximum Height: 96” 2-Speed Center Opening Maximum Width: 100” | Maximum Height: 96” 1-Speed Side Opening Maximum Width: 42” | Maximum Height: 96” 1-Speed Center Opening Maximum Width: 50” | Maximum Height: 96” SIDE OPENING ENTRANCES Offered as Full Entrance Packages or Doors Only CENTER OPENING ENTRANCES Offered as Full Entrance Packages or Doors Only 28 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com EntrancesPassenger Agenda Item 5A Page 201 of 360 Powder Coating or Stainless Finish! Quality Crating Keeps the Doors Straight! Entrance Allowable Information Max Width Max Height Single Speed Side Opening 42” 96” Two Speed Side Opening 84” 96” Single Speed Center Opening 50” 96” Two Speed Center Opening 100” 96” Front Back • Quickest Lead Time in the Industry • Competitive Pricing • Entrance Doors are UL Labeled • 1 or 2 Speed • Side or Center Opening Standard Equipment • Door Gibs • Sight Guards • Astragals • Bumpers MEI offers both Entrance and Cab Doors What our customers are saying... “The doors we’ve received from MEI have far exceeded our lead time expectations. MEI has provided a solution to our two largest problems with doors by providing quick lead times and sturdy packaging. On top of that the doors provided are straight and provide all the correct drillings needed.” - James Snider Jr, Quality Elevator - “MEI is very impressive with the speed, craftsmanship, and care in which they design, build and ship their doors! When I see that crate with neatly stacked doors arrive from MEI, I am confident I am getting a product that will impress my customers!” - Eric Crowley, Pincus Elevator Co., Inc. - Let us make a difference in your next project! Contact MEI today for a quote! 1-800-450-3060 Email: replacementdoors@meiusa.com Optional Enforcer Gibs available. Can handle over 18,000 lbs. of force! 29MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Entrance/Cab Replacement DoorsPassenger Agenda Item 5A Page 202 of 360 MEI’s Plastic Laminate Cab is our most economical cab and features flush walls with laminate finish. Walls - The walls are wood core with laminate finish (shown in Green Legacy). Choose from our standard laminate colors or define your own. Door - The door can be skinned in plastic laminate, brushed stainless steel, polished stainless steel, patterned stainless steel, or brushed bronze. Sill - The sill incorporates hidden fasteners and is available in aluminum, nickel-silver, stainless steel, or bronze. Front - The front features 16 gauge stainless steel. The front is also available in 14 gauge or 12 gauge material, polished or patterned stainless steel, and brushed bronze finishes. Canopy - The canopy is available in 14 gauge or 12 gauge painted steel. Ceiling - The drop ceiling features an aluminum frame with eggcrate diffusers. See page 34 for additional ceiling options. Lighting - Fluorescent lights are bolted to the canopy above the eggcrate panels. See page 34 for additional lighting options. Handrail - The handrail is round (1 ½” diameter) with returned ends and brushed stainless steel finish. See page 35 for additional handrail options. Also Available Sound Deadening for walls, door, or canopy Brushed stainless or painted steel wall base MEI’s Service Cab is our most robust passenger cab and features a painted steel shell. Walls - The walls are 16 gauge formed steel (shown in Light Ivory). Choose from our standard paint colors or define your own. The walls are also available in 14 gauge or 12 gauge steel and brushed stainless steel finish. Door - The door can be skinned in painted steel, brushed stainless steel, polished stainless steel, or patterned stainless steel. Sill - The sill incorporates hidden fasteners and is available in aluminum, nickel-silver, stainless steel, or bronze. Front - The front features 16 gauge stainless steel. The front is also available in 14 gauge or 12 gauge material, polished or patterned stainless steel, brushed bronze finishes, or painted steel to match the walls. Canopy - The canopy is 14 gauge painted steel (shown here in white). Additional options include 12 gauge steel and any of the standard ceilings shown on page 34. Lighting - Fluorescent lights are recessed into the canopy for maximum space inside the cab. Handrail - The handrail is a hollow bar (½” x 1 ½”) with returned ends and brushed stainless steel finish. See page 35 for additional handrail options. Also Available Sound Deadening for walls, door, or canopy Light-proof joints Plastic Laminate Cab Standard Service Cab 30 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Service & Plastic Laminate CabsPassenger Cabs Agenda Item 5A Page 203 of 360 MEI’s Glass Panel Cab is our most luxurious passenger cab. It features a 9/16” laminated glass rear wall with stainless mullions and a support beam for the handrail. Walls - The glass rear wall complements all of our other cab styles. The side walls are available in flush laminate, raised panel, steel shell, or glass wall. The glass can either be above the handrail or full height. The framing is available in 4 ½” x 1 ¾” aluminum tube with 1” sash or formed 16 gauge stainless steel. The handrail support beam is an integral part of this design and is included even if handrails are not needed. Door - The door can be skinned in brushed stainless steel, polished stainless steel, patterned stainless steel, painted steel, brushed bronze, or it can incorporate 9/16” safety glass. Sill - The sill incorporates hidden fasteners and is available in aluminum, nickel-silver, stainless steel, or bronze. Front - The front features 16 gauge stainless steel. The front is also available in 14 gauge or 12 gauge material, polished or patterned stainless steel, and brushed bronze finishes. Canopy - The canopy is available in 14 gauge or 12 gauge painted steel. Ceiling - The island ceiling features a brushed stainless frame with high-voltage downlights. See page 34 for additional ceiling options. Lighting - The LED downlights are integrated with the stainless frame. See page 34 for additional lighting options. Handrail - The handrail is round (1 ½” diameter) with returned ends and brushed stainless steel finish. See page 35 for additional handrail options. MEI’s Raised Panel Cab is our most popular passenger cab. It features a steel shell with raised panels. Walls - The walls are 16 gauge formed steel (shown in Flat Black). Choose from our standard paint colors or define your own. The walls are also available in 14 gauge or 12 gauge steel and brushed bronze or stainless steel finish. Panels - The panels are finished with plastic laminate (shown above in Wild Cherry), stainless mesh, textured stainless steel, or patterned stainless steel. Sill - The sill incorporates hidden fasteners and is available in aluminum, nickel-silver, stainless steel, or bronze. Door - The door can be skinned in brushed stainless steel, polished stainless steel, patterned stainless steel, brushed bronze, or painted steel. Sill - The sill incorporates hidden fasteners and is available in aluminum, nickel-silver, stainless steel, or bronze. Front - The front features 16 gauge stainless steel. The front is also available in 14 gauge or 12 gauge material, polished or patterned stainless steel, and brushed bronze finishes. Canopy - The canopy is available in 14 gauge or 12 gauge painted steel. Ceiling - The island ceiling features a brushed stainless frame with high-voltage downlights. See page 34 for additional ceiling options. Lighting - The incandescent downlights are integrated with the stainless frame. See page 34 for additional lighting options. Handrail - The handrail is a hollow bar (½” x 1 ½”) with returned ends and brushed stainless steel finish. See page 35 for additional handrail options. Also Available Sound Deadening for walls, door, or canopy Light-proof joints Various reveal width between panels Horizontal panel configurations Vertical panels with wainscot below Brushed stainless or painted steel wall base Concealed vents behind panels Glass Wall Cab Raised Panel Cab 31MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Raised Panel & Glass Wall CabsPassenger Cabs Agenda Item 5A Page 204 of 360 C l a s s u p your Cab If you are looking for an upscale cab design, MEI offers many options for custom cab interiors. Options vary from cost effective laminate that upgrade the look and feel of the cab to pre-fabricated cab interiors that are installed into the cab shell at the end of the construction project helping eliminate damages that can occur during the construction phase. Many materials can be used together for a great look...glass, wood, bronze, etc. There are many interior feature options from cab walls, ceilings, handrails and more. We will work with you to review all of your options and here are a few to get you started. 32 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Custom Cab InteriorsPassenger Cabs Agenda Item 5A Page 205 of 360 33MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Custom Cab InteriorsPassenger Cabs Agenda Item 5A Page 206 of 360 Drop Ceilings A. Fluorescent lights above aluminum T-bar with polycarbonate diffusers B. Fluorescent lights above aluminum T-bar with aluminum eggcrate diffusers C. High voltage LED downlights with decorative trim D. Low voltage LED downlights with decorative trim *Perimeter LED lighting can be added to option C or D Decorative trim options for downlights: painted steel, laminate, brushed stainless steel, polished stainless steel, brushed bronze. Canopy Standard Specifications: 14 gauge reinforced steel canopy with combination single-speed/two-speed fan. Emergency exit panel includes electrical contact switch. Also Available: 12 gauge material Man-D-Tec AA or OE blower 5-pin lock in emergency exit (seismic) Lights in Canopy J. Recessed fluorescent lights K. High voltage LED downlights L. Low voltage LED downlights M. Cove/trough fluorescent lighting Canopy Standard Specifications: 14 gauge reinforced steel canopy with combination single-speed/two-speed fan. Emergency exit panel includes electrical contact switch. Also Available: 12 gauge material Brushed stainless steel finish Man-D-Tec AA or OE blower 5-pin lock in emergency exit (seismic) For standalone orders all MEI needs to know is the outside dimensions and escape hatch location. A. B. *C. *D. J. K. L. M. 34 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Ceilings & LightingPassenger Cabs Agenda Item 5A Page 207 of 360 Solid Flat Bar Handrail with Returned or Straight Ends Hollow Flat Bar Handrail with Returned Ends Solid Flat Bar Bumper with Returned or Straight Ends Round Handrail with Returned or Straight Ends Wood Handrail or Bumper Thickness Height Finishes 1/2” 1-1/2” Brushed Stainless Steel or Brushed Bronze 3/8” 2” Brushed Stainless Steel or Brushed Bronze 3/8” 3” Brushed Stainless Steel or Brushed Bronze 3/8” 4” Brushed Stainless Steel or Brushed Bronze 3/8” 6” Brushed Stainless Steel or Brushed Bronze 1/4” 4” Brushed Stainless Steel or Brushed Bronze 1/4” 6” Brushed Stainless Steel or Brushed Bronze Thickness Height Finishes 1/2” 1-1/2” Brushed Stainless Steel Only Thickness Height Finishes 3/8” 8” Brushed Stainless Steel Only 1/4” 8” Brushed Stainless Steel Only Diameter Finishes 1-1/2” Brushed Stainless Steel or Brushed Bronze 2” Brushed Stainless Steel or Brushed Bronze Thickness Height Finishes 1-1/2” 5-1/2” Hardwood Maple or Oak with Clear Coat Finish 1-1/2” 7-1/2” Hardwood Maple or Oak with Clear Coat Finish 1-1/2” 9-1/2” Hardwood Maple or Oak with Clear Coat Finish 1-1/2” 11-1/2” Hardwood Maple or Oak with Clear Coat Finish 35MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Handrails & BumpersPassenger Cabs Agenda Item 5A Page 208 of 360 Car Stations All MEI COP designs include removable flush-mounted plates for the Capacity/No Smoking signs and the Phase II Fire Instructions. This feature makes wording changes convenient and inexpensive. VMI Digital Position Indicator Each VMI PI is equipped with two alphanumeric characters. The VMI PI is field-programmable. Emergency Light Capacity/No Smoking Plate This is a stud-mounted removable plate with laser-cut joints and etched signage. Phase II Fire Instructions This is a stud-mounted plate with laser-cut joints and engraved signage. Key Switches All standard key switches are included. Additional key switches for unique circumstances are also available. Factory Wired COP All key switch and pushbutton modules can be wired into a terminal strip in our factory. Fastening points are clearly identified. Buttons With Braille All required pushbuttons are included with the corresponding Braille. Push to Talk Phone The ADA hands-free phone includes battery backup. Swing Panel Illustration Swing Panel Size: 13” W x 84” H Full Swing Return Size: varies by cab Applied Size: 10” W x 65 1⁄2” H Available DesignsTilt Size: 10” W x 84” H Factory Pre-Wired 36 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Car Operating PanelPassenger Cabs Agenda Item 5A Page 209 of 360 Cab Fronts • The transom, jambs, and return filler are available in either 16 gauge or 14 gauge material. • Brushed stainless steel, polished stainless steel, patterned stainless steel, painted steel, or brushed bronze finishes are available. • Auxiliary COP designs are also available. Cab Sill • The sill incorporates hidden fasteners and is available in aluminum, stainless steel, nickel-silver, or bronze. Cab Doors • Doors are available in single-speed side slide, two-speed side slide, center-opening, and two- speed center-opening configurations. • Various door widths and heights are available to accommodate your project’s needs. • Brushed stainless steel, polished stainless steel, patterned stainless steel, painted steel, laminated steel (with stainless leading edge), or brushed bronze finishes are available. • Door cladding is available in 20 gauge or 16 gauge material. Two-Speed Side OpenSingle-Speed Side Open Single-Speed Center Open Two-Speed Center Open Single-Speed Sill Aluminum Single-Speed Sill Stainless Steel Two-Speed Sill Nickel-Silver Two-Speed Sill Bronze 37MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Front, Door, & SillPassenger Cabs Agenda Item 5A Page 210 of 360 Application Summary This is the traditional design used for decades. It utilizes a hydraulic jack installed in the ground. The jack is located directly under the car, near the center of the platform. Advantages • Usually the lowest material cost application. • Accommodates front and rear openings in any configuration. • No extensive pit or overhead is required. • Available for both low and high capacity cars. • Of all the application types, this equipment package is the easiest to install. Cap. Platform x Hoistway With Power Regular Doors x Hoistway With Power Pass Doors x Pit Depth Front (F) Rear (R) Clear Inside With Single Section Clear Inside With Two Section Door Width And Height x 4000 7’-0” x 8’-0” 8’-8” x 8’-8” 8’-8” x 8’-9 3⁄4” 4’-6” F 6’-8” x 7’-7” 6’-8” x 7’-4 1⁄2” 6’-8” x 8’-0” 4000 7’-0” x 8’-0” 8’-8” x 8’-10” 8’-8” x 9’-1 1⁄2” 4’-6” F/R 6’-8” x 7’-6” 6’-8” x 7’-1” 6’-8” x 8’-0” 5000 8’-0” x 9’-0” 9’-10” x 9’-8” 9’-10” x 9’-9 3⁄4” 4’-6” F 7’-8” x 8’-7” 7’-8” x 8’-4 1⁄2” 7’-8” x 8’-0” 5000 8’-0” x 9’-0” 9’-10” x 9’-10” 9’-10” x 10’-1 1⁄2” 4’-6” F/R 7’-8” x 8’-6” 7’-8” x 8’-1” 7’-8” x 8’-0” 6000 10’-4” x 10’-0” 12’-2” x 10’-8” 12’-2” x 10’-9 3⁄4” 4’-6” F 10’-0” x 9’-7” 10’-0” x 9’-4 1⁄2” 10’-0” x 8’-0” 6000 10’-4” x 10’-0” 12’-2” x 10’-10” 12’-2” x 11’-1 1⁄2” 4’-6” F/R 10’-0” x 9’-6” 10’-0” x 9’-1” 10’-0” x 8’-0” 8000 10’-4” x 12’-0” 12’-4” x 12’-8” 12’-4” x 12’-9 3⁄4” 4’-6” F 10’-0” x 11’-7” 10’-0” x 11’-4 1⁄2” 10’-0” x 8’-0” 8000 10’-4” x 12’-0” 12’-4” x 12’-10” 12’-4” x 13’-1 1⁄2” 4’-6” F/R 10’-0” x 11’-6” 10’-0” x 11’-1” 10’-0” x 8’-0” 10000 10’-4” x 14’-0” 12’-4” x 14’-8” 12’-4” x 14’-9 3⁄4” 4’-6” F 10’-0” x 13’-7” 10’-0” x 13’-4 1⁄2” 10’-0” x 8’-0” 10000 10’-4” x 14’-0” 12’-4” x 14’-10” 12’-4” x 15’-1 1⁄2” 4’-6” F/R 10’-0” x 13’-6” 10’-0” x 13’-1” 10’-0” x 8’-0” 12000 12’-4” x 12’-0” 14’-4” x 12’-8” 14’-4” x 12’-9 3⁄4” 4’-6” F 12’-0” x 11’-7” 12’-0” x 11’-4 1⁄2” 12’-0” x 8’-0” 12000 12’-4” x 12’-0” 14’-4” x 12’-10” 14’-4” x 13’-1 1⁄2” 4’-6” F/R 12’-0” x 11’-6” 12’-0” x 11’-1” 12’-0” x 8’-0” 15000 12’-4” x 16’-0” 14’-4” x 16’-8” 14’-4” x 16’-9 3⁄4” 5’-0” F 12’-0” x 15’-7” 12’-0” x 15’-4 1⁄2” 12’-0” x 8’-0” 15000 12’-4” x 16’-0” 14’-4” x 16’-10” 14’-4” x 17’-1 1⁄2” 5’-0” F/R 12’-0” x 15’-6” 12’-0” x 15’-1” 12’-0” x 8’-0” 20000 12’-4” x 20’-0” 14’-4” x 20’-8” 14’-4” x 20’-9 3⁄4” 5’-0” F 12’-0” x 19’-7” 12’-0” x 19’-4 1⁄2” 12’-0” x 8’-0” 20000 12’-4” x 20’-0” 14’-4” x 20’-10” 14’-4” x 21’-1 1⁄2” 5’-0” F/R 12’-0” x 19’-6” 12’-0” x 19’-1” 12’-0” x 8’-0” 25000 14’-4” x 20’-0” 16’-4” x 20’-8” 16’-4” x 20’-9 3⁄4” 5’-6” F 14’-0” x 19’-5 1⁄2” 14’-0” x 19’-3” 14’-0” x 8’-0” 25000 14’-4” x 20’-0” 16’-4” x 20’-10” 16’-4” x 21’-1 1⁄2” 5’-6” F/R 14’-0” x 19’-3” 14’-0” x 18’-10” 14’-0” x 8’-0” Notes: • Overhead dimensions are based on 6 foot high car gate. • Two section car gates are not recommended for high usage installations or wide openings. • For extra high door opening requirements, or special conditions, consult your representative. • Standard Cab Height H = 8’-0” • Minimum Overhead for Single Section Gates: = 14’-6” • Minimum Overhead for Two Section Gates: = 12’-4” Single Opening (F)Double Opening (F/R) Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. EOCA BDPFTRAVEL15" Over 10,000 lbs. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Width = Clear Door Height = Overhead = Pit Depth = Door Clearance = 5” for Regular Type Doors = 6 3⁄4” for Pass Type Doors Over 10,000 lbs. For capacities over 10,000 lbs., rail bracket fastening may require beam support as shown. Hoistway width on each side will need to increase by the width of the rail support beam.FEOCA BDPTRAVEL15" Over 10,000 lbs. Recommended Options Dry Power Unit(high capacity, heavy usage) see page 47 Low Pressure Switchsee page 50Oil Cooler(heavy usage)see page 52 ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES 38 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com In-GroundFreight Agenda Item 5A Page 211 of 360 Application Summary This application is used when a side opening is required in addition to a front opening. The rails and brackets are located on one wall of the hoistway. Please note that the dimensions shown are only examples of applications possible. Please call MEI for job-specific dimensions. Advantages • Accommodates front and side openings. • No extensive pit or overhead is required. • Available for both low and high capacity cars. Rear Slung Cap. Platform x Hoistway With Power Regular Doors x Hoistway With Power Pass Doors x Pit Depth Clear Inside With Single Section Gate Clear Inside With Two Section Gate Door Width And Height x 4000 9’-0” x 8’-8 1⁄2” 10’-5” x 10’-3 1⁄2” 10’-6 ¾” x 10’-5 1⁄4” 4’-6” 8’-5 1⁄2” x 8’-2” 8’-3 1⁄2” x 8’-0” 7’-0” x 8’-0” 6000 10’-0” x 9’-8 1⁄2” 11’-5” x 11’-3 1⁄2” 11’-6 ¾” x 11’-5 1⁄4” 4’-6” 9’-5 1⁄2” x 9’-2” 9’-3 1⁄2” x 9’-0” 8’-0” x 8’-0” 8000 11’-0” x 10’-8 1⁄2” 12’-5” x 12’-3 1⁄2” 12’-6 ¾” x 12’-5 1⁄4” 4’-6” 10’-5 1⁄2” x 10’-2” 10’-3 1⁄2” x 10’-0” 9’-0” x 8’-0” 10000 12’-0” x 11’-8 1⁄2” 13’-5” x 13’-3 1⁄2” 13’-6 ¾” x 13’-5 1⁄4” 4’-6” 11’-5 1⁄2” x 11’-2” 11’-3 1⁄2” x 11’-0” 10’-0” x 8’-0” = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Width = Clear Door Height = Overhead = Pit Depth = Door Clearance = 5” for Regular Type Doors = 6 3⁄4” for Pass Type Doors = Platform to Wall Notes: • Overhead dimensions are based on 6 foot high car gate. • Two section car gates are not recommended for high usage installations or wide openings. • For extra high door opening requirements, or special conditions, consult your representative. • Standard Cab Height H = 8’-0” • Minimum Overhead for Single Section Gates: = 14’-6” • Minimum Overhead for Two Section Gates: = 12’-4” • Platform to Wall: = 14” Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. Recommended Options Dry Power Unit(high capacity, heavy usage) see page 47 Low Pressure Switchsee page 50Oil Cooler(heavy usage)see page 52 Double Opening (F/S) - Rear Slung Shown FOPTRAVEL12”22” 18½” EECA DBR RSENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES 39MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com In-Ground, Rear/Side SlungFreight Agenda Item 5A Page 212 of 360 Cap. Platform x Hoistway With Power Regular Doors x Hoistway With Power Pass Doors x Pit Depth Front (F) Rear (R) Clear Inside With Single Section Clear Inside With Two Section Door Width And Height x 4000 7’-0” x 8’-0” 8’-8” x 8’-8” 8’-8” x 8’-9 3⁄4” 4’-6” F 6’-8” x 7’-7” 6’-8” x 7’-4 1⁄2” 6’-8” x 8’-0” 4000 7’-0” x 8’-0” 8’-8” x 8’-10” 8’-8” x 9’-1 1⁄2” 4’-6” F/R 6’-8” x 7’-6” 6’-8” x 7’-1” 6’-8” x 8’-0” 5000 8’-0” x 9’-0” 9’-10” x 9’-8” 9’-10” x 9’-9 3⁄4” 4’-6” F 7’-8” x 8’-7” 7’-8” x 8’-4 1⁄2” 7’-8” x 8’-0” 5000 8’-0” x 9’-0” 9’-10” x 9’-10” 9’-10” x 10’-1 1⁄2” 4’-6” F/R 7’-8” x 8’-6” 7’-8” x 8’-1” 7’-8” x 8’-0” 6000 10’-4” x 10’-0” 12’-2” x 10’-8” 12’-2” x 10’-9 3⁄4” 4’-6” F 10’-0” x 9’-7” 10’-0” x 9’-4 1⁄2” 10’-0” x 8’-0” 6000 10’-4” x 10’-0” 12’-2” x 10’-10” 12’-2” x 11’-1 1⁄2” 4’-6” F/R 10’-0” x 9’-6” 10’-0” x 9’-1” 10’-0” x 8’-0” 8000 10’-4” x 12’-0” 12’-4” x 12’-8” 12’-4” x 12’-9 3⁄4” 4’-6” F 10’-0” x 11’-7” 10’-0” x 11’-4 1⁄2” 10’-0” x 8’-0” 8000 10’-4” x 12’-0” 12’-4” x 12’-10” 12’-4” x 13’-1 1⁄2” 4’-6” F/R 10’-0” x 11’-6” 10’-0” x 11’-1” 10’-0” x 8’-0” 10000 10’-4” x 14’-0” 12’-4” x 14’-8” 12’-4” x 14’-9 3⁄4” 4’-6” F 10’-0” x 13’-7” 10’-0” x 13’-4 1⁄2” 10’-0” x 8’-0” 10000 10’-4” x 14’-0” 12’-4” x 14’-10” 12’-4” x 15’-1 1⁄2” 4’-6” F/R 10’-0” x 13’-6” 10’-0” x 13’-1” 10’-0” x 8’-0” 12000 12’-4” x 12’-0” 14’-4” x 12’-8” 14’-4” x 12’-9 3⁄4” 4’-6” F 12’-0” x 11’-7” 12’-0” x 11’-4 1⁄2” 12’-0” x 8’-0” 12000 12’-4” x 12’-0” 14’-4” x 12’-10” 14’-4” x 13’-1 1⁄2” 4’-6” F/R 12’-0” x 11’-6” 12’-0” x 11’-1” 12’-0” x 8’-0” Application Summary This design utilizes two hydraulic jacks and provides maximum structural stability. The jacks, located on each side of the car, are either single-stage or telescopic. The appropriate jack type is determined by the amount of travel and the project conditions. The single-stage jacks are popular for two-stop arrangements, while telescopic jacks are generally used for three- and four-stop projects. Advantages • No jack hole is required. This eliminates the cost of drilling and the risk of oil contamination. • Accommodates front and rear openings in any configuration. • Available for both low and high capacity cars. Guidelines for determining overhead required: Overhead Requirements: For 1 Stage Jack A) Car Speed = Up to 150 FPM B) Top Overtravel = 5” C) Bottom Overtravel = 12” D) Pit Depth = 4’-6” E) Cab Height = 8’-0” For 2 Stage Jack A) Car Speed = Up to 150 FPM B) Top Overtravel = 12” C) Bottom Overtravel = 10” D) Pit Depth = 4’-6” E) Cab Height = 8’-0” One Stage Jack with Single Section Gate: Minimum of 14’-6” overhead required for 14’-6” of travel and under. If over 14’-6” travel, overhead must equal or be greater than total travel. One Stage Jack with Two Section Gate: Minimum of 12’-4” overhead required for 12’-4” of travel and under. Add 1” to 12’-4” for every additional 1” of travel over 12’-4”. Two Stage Jack with Single Section Gate: Minimum of 15’-1” overhead required for 26’-8” of travel and under. Add 1⁄2” to 15’-1” for every additional 1” of travel over 26’-8”. Two Stage Jack with Two Section Gate: Minimum of 13’-0” overhead required for 22’-6” of travel and under. Add 1⁄2” to 13’-0” for every additional 1” of travel over 22’-6”. Notes: • Overhead dimensions are based on 6 foot high car gate. • Two section car gates are not recommended for high usage installations or wide openings. • For extra high door opening requirements, or special conditions, consult your representative. • Standard Cab Height H = 8’-0” Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. Single Opening (F)Double Opening (F/R) EOCA BDPFTRAVEL15" Over 10,000 lbs. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Width = Clear Door Height = Overhead = Pit Depth = Door Clearance = 5” for Regular Type Doors = 6 3⁄4” for Pass Type Doors Over 10,000 lbs. For capacities over 10,000 lbs., rail bracket fastening may require beam support as shown. Hoistway width on each side will need to increase by the width of the rail support beam.FEOCA BDPTRAVEL15" Over 10,000 lbs. Recommended Options Dry Power Unit(high capacity, heavy usage) see page 47 Low Oil Level Switchsee page 50Oil Cooler(heavy usage)see page 52 ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES 40 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Twin Jack Holeless, 1 & 2 StageFreight Agenda Item 5A Page 213 of 360 Cap. Platform x Hoistway With Power Regular Doors x Hoistway With Power Pass Doors x Pit Depth Front (F) Rear (R) Clear Inside With Single Section Clear Inside With Two Section Door Width And Height x 4000 7’-0” x 8’-0” 8’-11” x 8’-8” 8’-11” x 8’-9 3⁄4” 4’-6” F 6’-8” x 7’-7” 6’-8” x 7’-4 1⁄2” 6’-8” x 8’-0” 4000 7’-0” x 8’-0” 8’-11” x 8’-10” 8’-11” x 9’-1 1⁄2” 4’-6” F/R 6’-8” x 7’-6” 6’-8” x 7’-1” 6’-8” x 8’-0” 5000 8’-0” x 9’-0” 9’-11” x 9’-8” 9’-11” x 9’-9 3⁄4” 4’-6” F 7’-8” x 8’-7” 7’-8” x 8’-4 1⁄2” 7’-8” x 8’-0” 5000 8’-0” x 9’-0” 9’-11” x 9’-10” 9’-11” x 10’-1 1⁄2” 4’-6” F/R 7’-8” x 8’-6” 7’-8” x 8’-1” 7’-8” x 8’-0” 6000 10’-4” x 10’-0” 12’-6” x 10’-8” 12’-6” x 10’-9 3⁄4” 4’-6” F 10’-0” x 9’-7” 10’-0” x 9’-4 1⁄2” 10’-0” x 8’-0” 6000 10’-4” x 10’-0” 12’-6” x 10’-10” 12’-6” x 11’-1 1⁄2” 4’-6” F/R 10’-0” x 9’-6” 10’-0” x 9’-1” 10’-0” x 8’-0” 8000 10’-4” x 12’-0” 12’-6” x 12’-8” 12’-6” x 12’-9 3⁄4” 4’-6” F 10’-0” x 11’-7” 10’-0” x 11’-4 1⁄2” 10’-0” x 8’-0” 8000 10’-4” x 12’-0” 12’-6” x 12’-10” 12’-6” x 13’-1 1⁄2” 4’-6” F/R 10’-0” x 11’-6” 10’-0” x 11’-1” 10’-0” x 8’-0” 10000 10’-4” x 14’-0” 12’-6” x 14’-8” 12’-6” x 14’-9 3⁄4” 4’-6” F 10’-0” x 13’-7” 10’-0” x 13’-4 1⁄2” 10’-0” x 8’-0” 10000 10’-4” x 14’-0” 12’-6” x 14’-10” 12’-6” x 15’-1 1⁄2” 4’-6” F/R 10’-0” x 13’-6” 10’-0” x 13’-1” 10’-0” x 8’-0” Application Summary This design utilizes two hydraulic jacks and provides maximum structural stability. The telesopic jacks are located on each side of the car. Advantages • No jack hole is required. This eliminates the cost of drilling and the risk of oil contamination. • Accommodates front and rear openings in any configuration. • Available for both low and high capacity cars. • Less overhead required than 2 stage holeless. Guidelines for determining overhead required: Overhead Requirements: For 3 Stage Jack A) Car Speed = Up to 150 FPM B) Top Overtravel = 12” C) Bottom Overtravel = 8” D) Pit Depth = 4’-6” E) Cab Height = 8’-0” 3 Stage Jack with Single Section Gate: Minimum of 15’-1” overhead required for 38’-9” of travel and under. Add 11⁄32” for every additional 1” of travel over 38’-8”. 3 Stage Jack with Two Section Gate: Minimum of 13’-0” overhead required for 32’-0” of travel and under. Add 11⁄32” to 13’-0” for every additional 1” of travel over 32’-9”. Notes: • Overhead dimensions are based on 6 foot high car gate. • Two section car gates are not recommended for high usage installations or wide openings. • For extra high door opening requirements, or special conditions, consult your representative. • Standard Cab Height H = 8’-0”Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. Single Opening (F)Double Opening (F/R) = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Width = Clear Door Height = Overhead = Pit Depth = Door Clearance = 5” for Regular Type Doors = 6 3⁄4” for Pass Type Doors EOCA BDPFTRAVELFEOCA BDPTRAVELRecommended Options Dry Power Unit(high capacity, heavy usage) see page 47 Low Oil Level Switchsee page 50Oil Cooler(heavy usage)see page 52 ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES 41MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Twin Jack Holeless, 3 StageFreight Agenda Item 5A Page 214 of 360 Cap. Platform x Hoistway With Power Regular Doors x Hoistway With Power Pass Doors x Pit Depth Front (F) Rear (R) Clear Inside With Single Section Clear Inside With Two Section Door Width And Height x 4000 7’-0” x 8’-0” 9’-0” x 8’-8” 9’-0” x 8’-9 3⁄4” 4’-6” F 6’-8” x 7’-7” 6’-8” x 7’-4 1⁄2” 6’-8” x 8’-0” 4000 7’-0” x 8’-0” 9’-0” x 8’-10” 9’-0” x 9’-1 1⁄2” 4’-6” F/R 6’-8” x 7’-6” 6’-8” x 7’-1” 6’-8” x 8’-0” 5000 8’-0” x 9’-0” 10’-2” x 9’-8” 10’-2” x 9’-9 3⁄4” 4’-6” F 7’-8” x 8’-7” 7’-8” x 8’-4 1⁄2” 7’-8” x 8’-0” 5000 8’-0” x 9’-0” 10’-2” x 9’-10” 10’-2” x 10’-1 1⁄2” 4’-6” F/R 7’-8” x 8’-6” 7’-8” x 8’-1” 7’-8” x 8’-0” 6000 10’-4” x 10’-0” 12’-6” x 10’-8” 12’-6” x 10’-9 3⁄4” 4’-6” F 10’-0” x 9’-7” 10’-0” x 9’-4 1⁄2” 10’-0” x 8’-0” 6000 10’-4” x 10’-0” 12’-6” x 10’-10” 12’-6” x 11’-1 1⁄2” 4’-6” F/R 10’-0” x 9’-6” 10’-0” x 9’-1” 10’-0” x 8’-0” 8000 10’-4” x 12’-0” 12’-10” x 12’-8” 12’-10” x 12’-9 3⁄4” 4’-6” F 10’-0” x 11’-7” 10’-0” x 11’-4 1⁄2” 10’-0” x 8’-0” 8000 10’-4” x 12’-0” 12’-10” x 12’-10” 12’-10” x 13’-1 1⁄2” 4’-6” F/R 10’-0” x 11’-6” 10’-0” x 11’-1” 10’-0” x 8’-0” 10000 10’-4” x 14’-0” 13’-0” x 14’-8” 13’-0” x 14’-9 3⁄4” 4’-6” F 10’-0” x 13’-7” 10’-0” x 13’-4 1⁄2” 10’-0” x 8’-0” 10000 10’-4” x 14’-0” 13’-0” x 14’-10” 13’-0” x 15’-1 1⁄2” 4’-6” F/R 10’-0” x 13’-6” 10’-0” x 13’-1” 10’-0” x 8’-0” 12000 12’-4” x 12’-0” 15’-8” x 12’-8” 15’-8” x 12’-9 3⁄4” 4’-6” F 12’-0” x 11’-7” 12’-0” x 11’-4 1⁄2” 12’-0” x 8’-0” 12000 12’-4” x 12’-0” 15’-8” x 12’-10” 15’-8” x 13’-1 1⁄2” 4’-6” F/R 12’-0” x 11’-6” 12’-0” x 11’-1” 12’-0” x 8’-0” 15000 12’-4” x 16’-0” 16’-0” x 16’-8” 16’-0” x 16’-9 3⁄4” 5’-0” F 12’-0” x 15’-7” 12’-0” x 15’-4 1⁄2” 12’-0” x 8’-0” 15000 12’-4” x 16’-0” 16’-0” x 16’-10” 16’-0” x 17’-1 1⁄2” 5’-0” F/R 12’-0” x 15’-6” 12’-0” x 15’-1” 12’-0” x 8’-0” 20000 12’-4” x 20’-0” 16’-0” x 20’-8” 16’-0” x 20’-9 3⁄4” 5’-0” F 12’-0” x 19’-7” 12’-0” x 19’-4 1⁄2” 12’-0” x 8’-0” 20000 12’-4” x 20’-0” 16’-0” x 20’-10” 16’-0” x 21’-1 1⁄2” 5’-0” F/R 12’-0” x 19’-6” 12’-0” x 19’-1” 12’-0” x 8’-0” 25000 14’-4” x 20’-0” 18’-0” x 20’-8” 18’-0” x 20’-9 3⁄4” 5’-6” F 14’-0” x 19’-7” 14’-0” x 19’-4 1⁄2” 14’-0” x 8’-0” 25000 14’-4” x 20’-0” 18’-0” x 20’-10” 18’-0” x 21’-1 1⁄2” 5’-6” F/R 14’-0” x 19’-6” 14’-0” x 19’-1” 14’-0” x 8’-0” Application Summary This design utilizes wire ropes in conjunction with two hydraulic jacks to lift the car at a 1:2 ratio. For every foot that the jacks rise, the car rises two feet. The use of two jacks, one on each side of the car, provides maximum structural stability. Advantages • No jack hole is required and with that there is no risk of oil contamination in the ground. • Accommodates front and rear openings in any configuration. • No extensive pit or overhead is required. • Large platform designs and high capacity projects can be accommodated. Notes: • Overhead dimensions are based on 6 foot high car gate. • Two section car gates are not recommended for high usage installations or wide openings. • For extra high door opening requirements, or special conditions, consult your representative. • Standard Cab Height H = 8’-0” • Minimum Overhead for Single Section Gates: = 14’-6” • Minimum Overhead for Two Section Gates: = 12’-4” Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. Required in New York Cityand possibly other jurisdictions Single Opening (F)Double Opening (F/R) GovernorAccessDoor EOCA BDPFTRAVEL15" Over 10,000 lbs. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Width = Clear Door Height = Overhead = Pit Depth = Door Clearance = 5” for Regular Type Doors = 6 3⁄4” for Pass Type Doors = Gov. Access Door Over 10,000 lbs. For capacities over 10,000 lbs., rail bracket fastening may require beam support as shown. Hoistway width on each side will need to increase by the width of the rail support beam. GovernorAccessDoor FEOCA BDPTRAVEL15" Over 10,000 lbs. Recommended Options Dry Power Unit(high capacity, heavy usage) see page 47 Low Oil Level Switchsee page 50Oil Cooler(heavy usage)see page 52 ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES 42 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Twin Jack RopedFreight Agenda Item 5A Page 215 of 360 Cap. (lbs) Platform x Hoistway With Power Regular Type Doors x Hoistway With Power Pass Type Doors x Front/ Rear Pit Depth Minimum Overhead With One Section Gate Clear Inside With Single Section Gate W x D Clear Inside With Two Section Gate W x D Door Width Max. Speed FPM 4000 7’-0” x 8’-0” 9’-2” x 8’-8” 9’-2” x 8’-10 F 5’-2” 16’-0” * 6’-8” x 7’-7” 6’-8” x 7’-4 1⁄2” 6’-8” 350 4000 7’-0” x 8’-0” 9’-7” x 8’-10” 9’-7” x 9’-2” F/R 5’-2” 16’-0” * 6’-8” x 7’-6” 6’-8” x 7’-1” 6’-8” 350 5000 8’-0” x 9’-0” 10’-2” x 9’-8” 10’-2” x 9’-10” F 5’-2” 16’-0” * 7’-8” x 8’-7” 7’-8” x 8’-4 1⁄2” 7’-8” 350 5000 8’-0” x 9’-0” 10’-7” x 9’-10” 10’-7” x 10’-2” F/R 5’-2” 16’-0” * 7’-8” x 8’-6” 7’-8” x 8’-1” 7’-8” 350 6000 10’-4” x 10’-0” 12’-6” x 10’-8” 12’-6” x 10’-10” F 5’-2” 16’-0” * 10’-0” x 9’-7” 10’-0” x 9’-4 1⁄2” 10’-0” 350 6000 10’-4” x 10’-0” 12’-11” x 10’-10” 12’-11” x 11’-2” F/R 5’-2” 16’-0” * 10’-0” x 9’-6” 10’-0” x 9’-1” 10’-0” 350 8000 10’-4” x 12’-0” 12’-6” x 12’-8” 12’-6” x 12’-10” F 5’-2” 16’-0” * 10’-0” x 11’-7” 10’-0” x 11’-4 1⁄2” 10’-0” 350 8000 10’-4” x 12’-0” 13’-1” x 12’-10” 13’-1” x 13’-2” F/R 5’-2” 16’-0” * 10’-0” x 11’-6” 10’-0” x 11’-1” 10’-0” 350 10000 10’-4” x 14’-0” 12’-9” x 14’-8” 12’-9” x 14’-10” F 6’-0” 17’-6” * 10’-0” x 13’-7” 10’-0” x 13’-4 1⁄2” 10’-0” 225 10000 10’-4” x 14’-0” 12’-9” x 14’-10” 12’-9” x 15’-2” F/R 6’-0” 17’-6” * 10’-0” x 13’-6” 10’-0” x 13’-1” 10’-0” 225 12000 12’-4” x 12”-0” 14’-9” x 12’-8” 14’-9” x 12’-10” F 6’-0” 17’-6” * 12’-0” x 11’-7” 12’-0” x 11’-4 1⁄2” 12’-0” 200 12000 12’-4” x 12”-0” 15’-6” x 12’-10” 15’-6” x 13’-2” F/R 6’-0” 17’-6” * 12’-0” x 11’-6” 12’-0” x 11’-1” 12’-0” 200 15000 12’-4” x 16’-0” 14’-10” x 16’-8” 14’-10” x 16’-10” F 6’-0” 18’-0” * 12’-0” x 15’-7” 12’-0” x 15’-4 1⁄2” 12’-0” 150 15000 12’-4” x 16’-0” 14’-10” x 16’-10” 14’-10” x 17’-2” F/R 6’-0” 18’-0” * 12’-0” x 15’-6” 12’-0” x 15’-1” 12’-0” 150 Based on car speed of 200 fpm • = 8’-0” • Cab Height = 8’-0” • For seismic applications add 3” to hoistway width Application Summary This design utilizes a geared machine, ropes, and counterweights instead of hydraulic equipment. The main guide rails are mounted on each side of the car and an additional pair of counterweight rails is located on one side or at the rear. The geared machine, along with the related drive equipment, is generally located above the hoistway in a penthouse machine room. In some limited situations, it can be located next to the hoistway at a lower landing. This latter arrangement is referred to as a basement traction. Advantages • No risk of oil contamination to the ground. • Accommodates front and rear openings in any configuration. • Available for both low and high capacity cars. • Nearly unlimited floor travel is possible. • Has greater power efficiency than hydraulic applications. • Allows significantly higher car speeds than hydraulic designs. Notes: • Overhead dimensions are based on 6 foot high car gate. • Two section car gates are not recommended for high usage installations or wide openings. • For extra high door opening requirements, or special conditions, consult your representative. • Standard Cab Height H = 8’-0” * Speeds exceeding 200 FPM require addional overhead and pit depth. Minimum pit depth is based on the use of spring buffers. Add 5” to pit depth if oil buffers are required or car speed exceeds 200 FPM. 225 FPM = add 6” of overhead & 5” of pit depth 250 FPM = add 7” of overhead & 5” of pit depth 300 FPM = add 8” of overhead & 5” of pit depth 350 FPM = add 10” of overhead & 6” of pit depth Code year adoptions and local code variations may affect the hoistway size. Verify all dimensions with MEI prior to construction. Single Opening (F)Double Opening (F/R) EOCA BDPFTRAVEL15" Over 10,000 lbs.FEOCA BDPTRAVEL15" Over 10,000 lbs. = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Width = Clear Door Height = Overhead = Pit Depth = Door Clearance = 5” for Regular Type Doors = 7” for Pass Type Doors Over 10,000 lbs. For capacities over 10,000 lbs., rail bracket fastening may require beam support as shown. Hoistway width on each side will need to increase by the width of the rail support beam. ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES 43MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Traction, Low-Rise GearedFreight Agenda Item 5A Page 216 of 360 EOCA BDPFTRAVELEOCA BDPFTRAVEL = Platform Width = Platform Depth = Hoistway Width = Hoistway Depth = Clear Door Width = Clear Door Height = Overhead = Pit Depth = Door Clearance = 5” for Regular Type Doors = 7” for Pass Type Doors Single Opening (F) Double Opening (F/R) Cap. (lbs) Platform x Hoistway With Power Regular Doors x Hoistway With Power Pass Doors x Pit Depth Front (F) Rear (R) Clear Inside With Single Section Clear Inside With Two Section Door Width And Height x Min. Overhead With One Section Gate Max. Speed FPM In-Ground 8000 9'-4" x 21'-8" 11'-0" x 22'-4" 11'-0" x 22'-6" 4’-6” F 9'-0" x 21'-3" 9'-0" x 21'-0 1⁄2" 9’ x 9’ 14’-7” 150 8000 9'-4" x 21'-8" 11'-0" x 22'-6" 11'-0" x 22'-10" 4’-6”F/R 9'-0" x 21'-2" 9'-0" x 20'-9" 9’ x 9’ 14’-7” 150 10000 10'-4" x 23'-0" 12'-0" x 23'-8" 12’-0” x 23’-10” 4’-6” F 10'-0" x 22'-7" 10'-0" x 22'-4 1⁄2" 10’ x 9’ 14’-7” 150 10000 10'-4" x 23'-0" 12'-0" x 23'-10" 12’-0” x 24’-2” 4’-6”F/R 10'-0" x 22'-6" 10'-0" x 22'-1" 10’ x 9’ 14’-7” 150 Twin Jack Holeless, 1 & 2-Stage | *For 2-Stage: add 2” to hoistway width and 6” to overhead (see page 40 for more overhead requirements) 8000 9’-4” x 21’-8”*11’-4” x 22’-4”*11'-4" x 22'-6" 4’-6” F 9'-0" x 21'-3" 9'-0" x 21'-0 1⁄2" 9’ x 9’ 14’-7” 150 8000 9'-4" x 21'-8"*11'-4" x 22'-6"*11'-4" x 22'-10" 4’-6”F/R 9'-0" x 21'-2" 9'-0" x 20'-9" 9’ x 9’ 14’-7” 150 10000 10’-4” x 23’-0”*12’-4” x 23’-8”*12’-4” x 23’-10” 4’-6” F 10'-0" x 22'-7" 10'-0" x 22'-4 1⁄2" 10’ x 9’ 14’-7” 150 10000 10'-4" x 23'-0"*12'-4" x 23'-10"*12’-4” x 24’-2” 4’-6”F/R 10'-0" x 22'-6" 10'-0" x 22'-1" 10’ x 9’ 14’-7” 150 Twin Jack Holeless, 3-Stage (see page 41 for more overhead requirements) 8000 9'-4" x 21'-8" 11'-10" x 22'-4" 11'-10" x 22'-6" 4’-6” F 9'-0" x 21'-3" 9'-0" x 21'-0 1⁄2" 9’ x 9’ 15’-1” 150 8000 9'-4" x 21'-8" 11'-10" x 22'-6" 11'-10" x 22'-10" 4’-6”F/R 9'-0" x 21'-2" 9'-0" x 20'-9" 9’ x 9’ 15’-1” 150 10000 10’-4” x 23’-0” 12’-10” x 23’-8” 12’-10” x 23’-10” 4’-6” F 10'-0" x 22'-7" 10'-0" x 22'-4 1⁄2" 10’ x 9’ 15’-1” 150 10000 10’-4” x 23’-0” 12'-10" x 23'-10" 12'-10" x 24’-2” 4’-6”F/R 10'-0" x 22'-6" 10'-0" x 22'-1" 10’ x 9’ 15’-1” 150 Twin Jack Roped 8000 9'-4" x 21'-8" 12'-0" x 22'-4" 12'-0" x 22'-6" 4’-6” F 9'-0" x 21'-3" 9'-0" x 21'-0 1⁄2" 9’ x 9’ 14’-7” 150 8000 9'-4" x 21'-8" 12'-0" x 22'-6" 12'-0" x 22'-10" 4’-6”F/R 9'-0" x 21'-2" 9'-0" x 20'-9" 9’ x 9’ 14’-7” 150 10000 10’-4” x 23’-0” 14'-0" x 23'-8" 14’-0” x 23’-10” 5’-6” F 10'-0" x 22'-7" 10'-0" x 22'-4 1⁄2" 10’ x 9’ 14’-7” 150 10000 10’-4” x 23’-0” 14'-0" x 23'-10" 14’-0” x 24’-2” 5’-6”F/R 10'-0" x 22'-6" 10'-0" x 22'-1" 10’ x 9’ 14’-7” 150 Traction, Low Rise Geared 8000 9'-4" x 21'-8" 11'-9" x 22'-4" 11'-9" x 22'-6" 6’-0” F 9'-0" x 21'-3" 9'-0" x 21'-0 1⁄2" 9’ x 9’ 19’-0” 250 8000 9'-4" x 21'-8" 11'-9" x 22'-6" 11'-9" x 22'-10" 6’-0”F/R 9'-0" x 21'-2" 9'-0" x 20'-9" 9’ x 9’ 19’-0” 250 10000 10’-4” x 23’-0” 12’-9” x 23’-8” 12’-9” x 23’-10” 6’-0” F 10'-0" x 22'-7" 10'-0" x 22'-4 1⁄2" 10’ x 9’ 19’-0” 225 10000 10’-4” x 23’-0” 12'-9" x 23'-10" 12'-9" x 24'-2" 6’-0”F/R 10'-0" x 22'-6" 10'-0" x 22'-1" 10’ x 9’ 19’-0” 225ENGINEERED TO ORDERCONTACT MEI FOR SIZES OR CAPACITIES OUTSIDE LISTED RANGES44 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Automobile LiftsFreight Agenda Item 5A Page 217 of 360 Standard Freight Cab Features • MEI cabs are manufactured using 14-gauge steel. • Standard wall panels are 24” sections for ease of installation. • Powder coat finish is available in a wide range of colors. • #4 Stainless Steel finish is also available upon request. • Wall bumpers are available in wood, steel, or stainless steel. • Fluorescent lights are recessed into the canopy. • Finished floors are available in a variety of materials, including checkerplate steel and hardwood. • Ceiling and wall panel seams match on standard 24” panels. The MEI Freight Cab Advantage • Each cab is custom-built based on project requirements. • Doors and gates from all major suppliers can be accommodated. • Wall panels are interchangeable for ease of installation. • Canopy panels are interchangeable for ease of installation. • Wall and canopy panels are individually replaceable if damaged. ASME A17.1 code requirements for minimum rated capacity are as follows: Class A (General Freight Loading) – 50 lbs. per sq. ft. Class B (Motor Vehicle Loading) – 30 lbs. per sq. ft. Class C-1 (Industrial Truck Loading – truck carried by elevator) – 50 lbs. per sq. ft., but not less than load, including weight of truck. Class C-2 (Industrial Truck Loading – truck is normally used for loading and unloading only, and is not usually carried by elevator) – for elevators of 20,000 lbs. capacity or less capacity shall equal the weight of the loaded truck – maximum load on platform during loading and unloading not exceed 150% of rated load. Class C-3 (Other loading with heavy concentrations where truck is not usually used) – 50 lbs. per sq. ft., but not less than load. Note: • Square feet area of platform is determined by net inside area. General Note: • 1 lb. = 0.454 kg. 1ft² = 9.29 E-2m² Class of Loading Definitions Class A Class B Class C1 Class C2 45MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Freight Cabs Agenda Item 5A Page 218 of 360 Advantages • Cost Effective • Attractive Compact Design • All Components are Located in the Tank • Shortest Lead Times Standard Equipment • Imperial Motor / Maxton Valve / IMO Pump • 80 Starts Per Hour Motor • Compact Silencer with Pneumatic Noise Suppression • Oil Level Dip Stick • Isolation Between the Pump/Motor Assembly and the Tank • Oil Temperature Sensor (ASME 2010 Code Only) Optional Features • Loadweigh Sensor • Tank Heater • Thermostat • Oil Level Sight Gauge with Thermometer (on tank) • Pressure Gauge (mounted on valve) • Low Oil Level Switch (in tank) • Low Pressure Switch (required if jack head is above power unit) • Hot Oil Sensor • Oil Cooler • Vent /Fill Strainer • Down Speed Regulated Valve • 120 Starts Per Hour Available (up to 40 HP) • Drain Valve • Overflow Connection • Extended 3 Year Warranty Available Power Unit Sizes Model Width Depth Height Motors Transferable Oil SS-29 41” 20- 3⁄4” 38”Single 35 gal. SS-88 51” 24- 3⁄4” 47”Single 80 gal. SS-88 Tall 51” 24- 3⁄4” 53”Single 109 gal. ST-109 51” 34” 50- 3⁄8” Single or Tandem 127 gal. ST-109 Tall 51” 34” 56- 3⁄8” Single or Tandem 167 gal. ST-200 63” 34” 55- 5⁄8” Single or Tandem 204 gal. ST-200 Tall 63” 34” 61- 5⁄8” Single or Tandem 255 gal. Custom Tank Sizes Available Standard Lead Time = 7-10 Days Expedited Shipment Available Top Mounted Valve Option 46 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Submersible Power Units Agenda Item 5A Page 219 of 360 Advantages • High Reliability and Longer Motor Life • Cooling of the Motor with Air Rather than Oil • Easy Serviceability • Larger Available Capacities • Higher HP Availability (up to 100 HP) • Accurate Speed Control Standard Equipment • Imperial Motor / Maxton Valve / IMO Pump • Up to 2 Motors Per Tank - 80 Starts Per Hour • Compact Silencer with Pneumatic Noise Suppression • Oil Level Sight Gauge • Drip Pan Included with Each Pump and Motor Assembly • Isolation Between Pump/Motor Assembly and Main Framework • Anchoring Holes for Frame to Floor Attachment • Junction Box • Unit can be Disassembled to Fit Through Small Openings • Oil Temperature Sensor (ASME 2010 Code Only) Optional Features • 120 Starts Per Hour Available (up to 75 HP) • Tank Heater • Loadweigh Sensor • Thermostat • Pressure Gauge (mounted on valve) • Low Oil Level Switch (in tank) • Low Pressure Switch (required if jack head is above power unit) • Hot Oil Sensor • Oil Cooler • Vent /Fill Strainer • Down Speed Regulated Valve • Drain Valve • Over Flow Connection • Panels with Insulation (panels not shown on image) • Extended 3 Year Warranty Available Power Unit Sizes Model Width Depth Height Motors Transferable Oil DS-72 54” 35” 72”Single 72 gal. DS-72 Tall 54” 35” 78”Single 114 gal. DS-96 62” 41” 72”Single 96 gal. DS-96 Tall 62” 41” 78”Single 154 gal. DS-110 62” 47” 72”Single 110 gal. DS-110 Tall 62” 47” 78”Single 177 gal. DT-192 119” 41” 72” Single or Tandem 192 gal. DT-192 Tall 119” 41” 78” Single or Tandem 308 gal. DT-221 119” 47” 72” Single or Tandem 221 gal. DT-221 Tall 119” 47” 78” Single or Tandem 355 gal. Custom Tank Sizes Available Standard Lead Time = 4-6 Weeks Expedited Shipment Available Dry Power Units Can be Shipped Disassembled for Easier Installation Easily maneuver the power unit with Caster Wheels! 47MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Dry/Belt-Driven Power Units Agenda Item 5A Page 220 of 360 Quote Online in Seconds! Our online configurator allows you to generate submersible or dry power unit quotes and order equipment from the convenience of your desktop. Register online today to begin using MEI’s Power Unit Configurator! Registration is free and access is immediate! Visit www.meiusa.com and click on the “Go Configure!” button, then click on the “Sign Up Now” link! Or contact a sales representative for a quote today! Ph: 800-450-3060 Fax: 507-245-4198 or e-mail powerunitsales@meiusa.com Look for the “Go Configure!” button on our website. Go Configure! MEI Power Unit Advantages • Quoting within minutes • Friendly and Responsive Customer Service • Competitive lead time • 24 hour rush delivery - Submersible • Dry Power Units with bolt together frame ◦Can be shipped disassembled making it easier to fit through openings • Many sizes available • Prop open lid for easy access • Submersible Top Mounted Valve ◦Permits easy access for adjusting • Tandem units available • Standard Parts: Imperial Motor, IMO Pump, Maxton Valve • Online quoting option - Go Configure • 2 convenient manufacturing locations- shown below MEI - Mankato, MN MEI - Philadelphia, PA Power Unit Installation Kit Everything you need in one convenient kit Detroit, MI Springfield, MO 48 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Power Units Agenda Item 5A Page 221 of 360 PARTS & TOOLS PARTS & TOOLSAgenda Item 5A Page 222 of 360 Power Unit Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49-51 Oil Coolers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52-54 Silencer/Muffler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55 Piping Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56-58 Limit Switches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59 Pully Bullys . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60-61 Pit Equipment & Car Top Station . . . . . . . . . . . . . . . . . . . . . . . .62 Installation & Maintenance Tools . . . . . . . . . . . . . . . . . .63-65 Miscellaneous Elevator Accessories . . . . . . . . . . . . . . . . . .66 Rails & Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .67 Rail Guides . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .68-69 VMI Control Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70-73PARTS & TOOLSAgenda Item 5A Page 223 of 360 Submersible Motors HP Phase SPH 200 VoltPart No.230/460 VoltPart No.575 VoltPart No. 10 3 80 22033 22033 N/A 15 3 80 20045 20046 20047 20 3 80 20048 20049 20050 25 3 80 20051 20052 20053 30 3 80 20054 20055 20056 40 3 80 20057 20058 20116 50 3 80 20060 20061 20062 Part No. Pump GPM 16945 40 USNP 49 24 15728 80 USNP 36 32 15729 80 USNP 42 38 15730 80 USNP 46 46 22883 A4PIC-187AJ 50 16946 A4PIC-187Y 55 16947 A4PIC-187P 60 16948 A4PIC-187M 66 16949 A4PIC-187 76 16956 A4PIC-217Y 86 Part No. Pump GPM 16950 A4PIC-217P 96 16951 A4PIC-217M 104 16952 A4PIC-217 121 16953 A4PIC-236G 141 16954 A4PIC-236 159 16955 A4PIC-236AS 185 21958 A4PIC-276P 200 21957 A4PIC-276G 230 21956 A4PIC-276 253 Submersible Pumps (IMO) Control Valves (Maxton) Part No. Maxton Valve (without Coils)GRV 21970-001 UC1-A 2 1⁄2” 21970-002 UC2-A 2 1⁄2” 21970-003 UC4 2” 21970-004 UC4-E1 2” 21970-005 UC4-E2 2” 21970-007 UC4M 2” 21970-008 UC4M-E1 2” 21970-009 UC4M-E2 2” 21970-011 UC4MR 2” 21970-012 UC4MR-E1 2” 21970-013 UC4MR-E2 2” Control Valve Coils (Maxton) 4 Needed Per Valve Part No. Description 4558 Coil 115V AC Maxton (Red) 4559 Coil 115V DC Maxton (Black) 4493 Coil 230V AC Maxton (Green) Dry/Belt-Driven Motors (Imperial) HP Phase SPH 200 VoltPart No.230/460 VoltPart No.575 VoltPart No. 20 3 80 21729 21730 21731 25 3 80 21732 21733 21734 30 3 80 21735 21736 21737 40 3 80 21738 21739 21740 50 3 80 21741 21742 21743 60 3 80 21744 21745 21746 75 3 80 21747 21748 21749 100 3 80 N/A 21750 21751 15 3 120 21729 21730 21731 20 3 120 21732 21733 21734 25 3 120 21735 21736 21737 30 3 120 21738 21739 21740 40 3 120 21741 21742 21743 50 3 120 21744 21745 21746 60 3 120 21747 21748 21749 75 3 120 N/A 21750 21751 Dry/Belt-Driven Pumps (IMO) Part No. Pump Description GPM (Max.) 2064 G3D-187 100 2065 G3D-218 148 2066 G3D-250 190 2067 G3D-275 220 2068 G3D-312 295 2069 G3D-350 385 49MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Power Unit Parts Agenda Item 5A Page 224 of 360 Power Unit Accessories Item Part No. Description A 5448 Low Oil Level Switch (in tank) B 12642 Low Pressure Switch (required if jack head is above power unit) C 1889 Tank Heater D 24527 Pressure Gauge - 600 PSI (mounted on control valve) E 1655 Oil Level Sight Gauge with Thermometer (on tank) F 13639 Vent/Fill Strainer G 19475 Thermostat H 23069 Hot Oil Sensor I 22048-001 Loadweigh Switch PSW-807 (130 - 500 PSI) I 22048-002 Loadweigh Switch PSW-808 (250 - 600 PSI) J see below 1972 - Item H with 2” GRV Pipe | 21877 - Item H with 2” THD Pipe J see below 1974 - Item H with 3” GRV Pipe | 21838 - Item H with 3” THD Pipe J see below 1976 - Item H with 4” GRV Pipe A B C D E H F G I J 50 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Power Unit Accessories Agenda Item 5A Page 225 of 360 K J N L M Power Unit Accessories Item Part No. Description J 19709 Frame to Floor Isolation K 10248 Oil Cooler - AOC (see page 52 for more information) L 20856 Oil Cooler - BOL (see page 53 for more information) M 1794 Wagner Oil Return Pump with Flood Control - 100’ Lift - Plastic Tube Check Valve N 17015 Copper Tubing Kit for Oil Return Pump (50’ Tubing with Fittings) O 22371 Controller Field Mounting Kit O Power Unit Installation Kit MEI’s Power Unit installation kit has you covered with everything you will need… oil line fittings to electrical supplies that allows you to successfully complete your power unit installation. • No more trips away from the jobsite to gather materials • One stop shop instead of ordering through multiple vendors • Reduction in elevator downtime • Improves field efficiencies • Improves profitability • All items come conveniently shipped inside your new power unit Simply ask for MEI’s job specific installation kit with your next power unit order. For a complete list of materials, please contact MEI. (kit accommodates 2” or 3” oil lines) 51MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Power Unit Accessories Agenda Item 5A Page 226 of 360 Part No. 10248 Direct MountRemote Mount Extend the Life of your Hydraulic Elevator System! Avoid hot oil problems like nuisance shutdowns, leveling problems, and oil odor by installing the MEI AOC Oil Cooler. Benefits • Smoother stops and starts • Extended component life • Fewer shutdowns • Overall performance improvement • Filters oil Recommended Applications • Twin jack holeless applications with two- or three-stage telescopic jacks. • Heavily used single-stage twin jack holeless projects. • Roped hydraulic applications with moderate usage and travel exceeding 25 feet. • Any hydraulic elevator with high usage. Specifications: • Heat removal: 17,500 BTU/hr @ 40°F temp delta • 3⁄4 HP, 115 VAC, 1 phase, 7.2 FLA pump motor or 208-230 VAC, 1 phase, 3.6 FLA pump motor • 1⁄4 HP, 115VAC, 1 phase, 3.6 FLA 1900 CFM fan motor or 208-230 VAC, 1 phase, 1.4 FLA 1900 CFM fan motor • 8 GPM, 75 PSI cast iron pump • Weighs approximately 140 lbs • Adjustable thermostat control • 80db at 3 ft. • Electrical requirement, 115 or 208 VAC, 1 phase, 20amp separate circuit • 10 micron filter in hydraulic oil line • Filter head with sight gauge to indicate when the filter needs to be changed • Heavy gauge frame construction • Includes all fittings and hardware needed for adjacent-mount installation • Includes instructions for installation How it Works The Oil Cooler can be mounted to the power unit or located in a remote location*. When the oil temperature in the reservoir reaches a preset limit, it is circulated through the radiator. This process reduces the oil temperature by nearly 40°F, depending on site conditions. The oil is also filtered as it runs through the system, which results in enhanced performance and extended component life. The filter head has a sight gauge to indicate when the filter needs to be changed. *Remote location must be within 110 feet horizontally or 55 feet vertically from the power unit. Piping, wiring, and conduit to remote location are not included. • MEI recommends our Cold Weather Kit when your heat exchanger is installed where the temperature gets below 50°F. Overall Dimensions This is MEI’s Standard Oil Cooler 52 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Oil Cooler - AOC Air Flow Replaceable Filter Agenda Item 5A Page 227 of 360 Extend the Life of your Hydraulic Elevator System! Avoid hot oil problems like nuisance shutdowns, leveling problems, and oil odor by installing the MEI BOL Oil Cooler. Designed to be mounted in a remote location in order to connect to the duct/ventilation system of the building. Benefits • Smoother stops and starts • Extended component life • Fewer shutdowns • Overall performance improvement • Filters oil Recommended Applications • Twin jack holeless applications with two- or three-stage telescopic jacks. • Heavily used single-stage twin jack holeless projects. • Roped hydraulic applications with moderate usage and travel exceeding 25 feet. • Any hydraulic elevator with high usage. Specifications • Heat removal: 21,600 BTU/hr @ 40°F temp delta • 3⁄4 HP, 115 VAC, 1 phase, 7.2 FLA pump motor or 208-230 VAC, 1 phase, 3.6 FLA pump motor • 1⁄2 HP, 115 VAC, 1 phase, 3.7 FLA 1425 CFM fan motor or 208-230 VAC, 1 phase, 2.2 FLA 1425 CFM fan motor • 8 GPM, 75 PSI cast iron pump • Weighs approximately 145 lbs • Adjustable thermostat control • 80db at 3 ft. • Electrical requirement, 115 or 208 VAC, 1 phase, 20amp separate circuit • 10 micron filter in hydraulic oil line • Filter head with sight gauge to indicate when the filter needs to be changed • Heavy gauge frame construction • Includes all fittings and hardware needed for ventilation duct mount installation • Includes instructions for installation How it Works This Oil Cooler is designed to be mounted in a remote location* in order to connect to the duct/ventilation system of the building. When the oil temperature in the reservoir reaches a preset limit, it is circulated through the radiator. This process reduces the oil temperature by nearly 40°F, depending on site conditions. The oil is also filtered as it runs through the system, which results in enhanced performance and extended component life. The filter head has a sight gauge to indicate when the filter needs to be changed. *Remote location must be within 110 feet horizontally or 55 feet vertically from the power unit. Piping, wiring, and conduit to remote location are not included. • MEI recommends our Cold Weather Kit when your heat exchanger is installed where the temperature gets below 50°F. Typical Installation Shown Overall Dimensions Part No. 20856 53MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Oil Cooler - BOL Air Flow Replaceable Filter Agenda Item 5A Page 228 of 360 BOL - Oil Cooler Parts Item Part No. Description 20856 Complete Oil Cooler Assembly - BOL 2 20916 Heat Exchanger and Motor Assembly 3 20917 Motor for Heat Exchanger (Motor Only) 4 1890 Motor & Pump Combination with Coupling 5 13412 Oil Pump (Pump Only) 6 13411 Oil Pump Motor (Motor Only) 7 15527 Oil Pump & Motor Coupling (Between Motor & Pump) 8 19475 Thermostat for Oil Cooler 9 19119 Filter Head with Sight Gauge 10 1953 Oil Filter Replacement (10 Micron Filter - Standard) 11 17465 Oil Filter Replacement (3 Micron Filter - Optional) 12 12793 Hose 3⁄4” I.D. x 50’ Long Hydraulic Low Pressure 13 19340 Suction Hose 1” I.D. x 8’-0” Long (U416 1” ID SEA 100R4) 14 20982 Duct Screwing Flange Item Part No. Description - Options 21755 Remote Weather Protection Housing 19919 Cold Weather Kit AOC - Oil Cooler Parts Item Part No. Description 10248 Complete Oil Cooler Assembly - AOC (Direct or Remote Mount) 2 1916 Heat Exchanger and Motor Assembly 3 1463 Motor for Heat Exchanger (Motor Only) 4 1890 Motor & Pump Combination with Coupling 5 13412 Oil Pump (Pump Only) 6 13411 Oil Pump Motor (Motor Only) 7 15527 Oil Pump & Motor Coupling (Between Motor & Pump) 8 13410 Air Filter for Front of Heat Exchanger 9 19475 Thermostat for Oil Cooler 10 19119 Filter Head with Sight Gauge 11 1953 Oil Filter Replacement (10 Micron Filter - Standard) 12 17465 Oil Filter Replacement (3 Micron Filter - Optional) 13 19340 Suction Hose 1” x 8’-0” Long (U416 1” I.D. SEA 100R4) Item Part No. Description - Options 21755 Remote Weather Protection Housing 19919 Cold Weather Kit 54 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Oil Cooler Replacement Parts Agenda Item 5A Page 229 of 360 Extend the Life of your Hydraulic Elevator System! The MEI Silencer is an in-line device that reduces the noise and vibration of any hydraulic power unit (similar to the muffler on an automobile). Reduced Pulsations = Reduced Noise, Leakage, and Component Wear. Pump pulsations cause vibrations. Transmitted by the piping throughout the system, vibrations cause noise, leakage, and early component failure. When the MEI Silencer stops the pulsations, it stops the source of the vibrations. This improves system performance and reduces service calls, pleasing your client and improving your reputation. Benefits • 40-60% reduction in system noise and vibration • Extended component life • Fewer leaks • Lower long-term system maintenance costs • Smoother system operation How it Works Hydraulic pulsations (noise) enter the silencer and go through three different noise baffles or diffusers. After passing through these baffles, the pulsations then strike a rubber tube, or bladder, charged with air to 35% to 50% of the hydraulic operating pressure. Hit by a pulsation, the bladder deflects slightly, reducing the size of the pulsation and therefore, the noise. Recommended Applications • Dry or submersible hydraulic power units for all hydraulic elevator car types. Part No. Description A B C 19316 Silencer 2” GRV x 2” GRV (100 max. GPM) 13 1⁄4”1 1⁄4” TYP 3 7⁄8” 19317 Silencer 2” GRV x 2” GRV (220 max. GPM) 13 1⁄4”1 1⁄4” TYP 4 5⁄8” 19318 Silencer 2 1⁄2” GRV x 2 1⁄2” GRV (325 max. GPM) 13 1⁄4”1 1⁄4” TYP 4 5⁄8” 19319 Silencer 3” GRV x 2 1⁄2” GRV (360 max. GPM) 13 1⁄4”1 1⁄4” TYP 4 5⁄8” 19315 Valve Stem Retrofit Kit Silencer Cross Section View Air Charging Valve Hydraulic Oil 3 Baffle Chamber Diffuser Tube Air Charge Bladder A C B Step-by-Step Silencer Charging Video 55MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Silencer/Muffler Agenda Item 5A Page 230 of 360 Couplings - Grooved Part No. Description (Grooved Victaulic) 23483-001 2” GRV 750 PSI 107H Zero Flex Rigid 3206 2” GRV 1000 PSI 77 Standard Flexible 23483-002 2 1⁄2” GRV 750 PSI 107H Zero Flex Rigid 3205 2 1⁄2” GRV 1000 PSI 77 Standard Flexible 23483-003 3” GRV 750 PSI 107H Zero Flex Rigid 3207 3” GRV 1000 PSI 77 Standard Flexible 23483-004 4” GRV 750 PSI 107H Zero Flex Rigid 3209 4” GRV 1000 PSI 77 Standard Flexible Isolation Couplings Part No. Description (Grooved) 13608 Isolation Coupling 2” 1000 PSI 14390 Isolation Coupling 3” 1000 PSI 3196 Isolation Coupling 4” 1000 PSI Part No. Description (Threaded) 10291 Isolation Coupling 2” 1000 PSI 10316 Isolation Coupling 3” 1000 PSI Elbows Part No. Description (Grooved) 3214 Elbow (90) 2” GRV x 2” GRV 3213 Elbow (90) 2 1⁄2” GRV x 2 1⁄2” GRV 3215 Elbow (90) 3’ GRV x 3” GRV Part No. Description (Threaded) 19602 Elbow (90) 2” THD x 2” THD (ASME B16.11) 19603 Elbow (90) 3” THD x 3” THD (ASME B16.11) “Y” Strainers Part No. Description 2166 “Y” Strainer THD Steel 2” 600 with Magnet 2182 “Y” Strainer THD Steel 3” 600 with Magnet 3180 “Y” Strainer Flanged Steel 4” 300 with Magnet 740 PSI Unions Part No. Description 19611 Union 2” THD (MSS SP83) use with ASME B16.11 19612 Union 3” THD ASME B16.11 Zero Flex RigidStandard Flexible 56 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Piping Accessories Agenda Item 5A Page 231 of 360 Couplings - Threaded Part No. Description (Threaded) 14778 2” THD Class 300 19608 2” THD ASME B16.11 21126 2 1⁄2” THD ASME B16.11 10319 3” THD Class 300 19609 3” THD ASME B16.11 19610 4” THD ASME B16.11 Rupture Valves Part No. Description (Grooved) 21943 Valve Rupture 2" GRV x GRV Maxton OSV STD (OSV STD (100-300 GPM) 21944 Valve Rupture 2" GRV x GRV Maxton OSV E1 (20-100 GPM) 5086 Valve Rupture 3" GRV x GRV with Pilot Port Part No. Description (Threaded) 21945 Valve Rupture 2" THD x THD Maxton OSV STD (100-300 GPM) 21946 Valve Rupture 2" THD x THD Maxton OSV E1 (20-100 GPM) 16558 Valve Rupture 3" THD x THD Tee Fittings Part No. Description (Grooved) 7035 Tee 2” GRV 7034 Tee 2 1⁄2” GRV 7036 Tee 3” GRV 7037 Tee 4” GRV Part No. Description (Threaded) 11474 Tee 2” THD x THD x THD 19605 Tee 2” THD x THD x THD (ASME B16.11) 14394 Tee 3” THD x THD x THD Class 300 19606 Tee 3” THD x THD x THD x (ASME B16.11) Pipe Stands & Clamps Part No. Description 22104-001 Pipe Stand Kit 2" Pipe 22104-002 Pipe Stand Kit 3" Pipe 22104-003 Pipe Stand Kit 4" Pipe 7777 Pipe Assembly Clamp for 2" Pipe (Strut Clamp with Isolation) 7776 Pipe Assembly Clamp for 3" Pipe (Strut Clamp with Isolation) 17316 Pipe Assembly Clamp for 4" Pipe (Strut Clamp with Isolation) 22023 Pipe Stand Base 57MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Piping Accessories Agenda Item 5A Page 232 of 360 Reducers Part No. Description 7028 Reducer 2 1⁄2” GRV x 2” THD 7017 Reducer 2 1⁄2” GRV x 2” GRV 20470 Reducer 2 1⁄2” THD x 2” THD 300# 7018 Reducer 2” GRV x 1 1⁄2” GRV 7027 Reducer 2” GRV x 1 1⁄2” THD 12362 Reducer 3” Female THD x 2 1⁄2” Female 7019 Reducer 3” GRV x 2 1⁄2” GRV 7020 Reducer 3” GRV x 2” GRV 19551 Reducer 3” THD x 2 1⁄2” THD 300# 21125 Reducer 3” THD x 2 1⁄2 THD (B16.11) 7021 Reducer 4” GRV x 2 1⁄2” GRV 7022 Reducer 4” GRV x 3” GRV Pipe (10’-6” Sections Grooved on Both Ends) Part No. Description 3302 2” Schedule 40 ERW A 53 Grade B 3336 2” Schedule 80 ERW A 53 Grade B 3304 3” Schedule 40 ERW A 53 Grade B 3338 3” Schedule 80 ERW A 53 Grade B 3305 4” Schedule 40 ERW A 53 Grade B 3339 4” Schedule 80 ERW A 53 Grade B Shut-Off Valves Part No. Part Description Pipe Size Grooved (GRV) orThreaded Pipe (THD) PSI 11558 Shut-Off Valve - Carbon Steel with Handle 2”GRV 1000 7006 Shut-Off Valve - Carbon Steel with Handle 2”THD 2000 11559 Shut-Off Valve - Carbon Steel with Handle 3”GRV 1000 7004 Shut-Off Valve - Carbon Steel with Handle 3”THD 1000 11560 Shut-Off Valve - Carbon Steel with Handle 4”GRV 750 MEI recommends the use of X-Pando Pipe Sealant on threaded joints. Part No. 22154 58 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Piping Accessories Agenda Item 5A Page 233 of 360 Call Now! A technical representative can provide more information on how easy it is to modernize with new limit switches from MEI. Quality You Can’t Hear MEI’s solid design and manufacturing feature a soft rubber wheel that results in very quiet cam operation. Reliability You Can Count On MEI limit switches come pre-wired from the factory and are CSA certified, meeting ANSI requirements. Built-in contact wiper enhances long-term performance. Don’t Let Our Low Price Fool You Top quality components at competitive pricing make the MEI switch an even better value. Compatible Design for Replacement Application • 2 sets of contacts: 1-NO and 1-NC • Direct replacement for other major manufacturer’s switches • Easy adjustment Part No. Description 22197-001 Cam Assembly 16 GA. Galvanized 72 1⁄4” (5’-0” Face) 22197-002 Cam Assembly 16 GA. Galvanized 119 1⁄2” (8’-0” Face) 22195 Cam Bracket Assembly (Auxiliary) 21150 Limit Switch Bracket Assembly Single 10” (without switch) 13221 Limit Switch Bracket Assembly Single 13” (without switch) 16052 Limit Switch Bracket Assembly Single 16” (without switch) 21149 Limit Switch Bracket Assembly Single 10” (with switch) 14727 Limit Switch Bracket Assembly Single 13” (with switch) 14354 Limit Switch Bracket Assembly Single 16” (with switch) 3088 Limit Switch 59MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Limit Switches Agenda Item 5A Page 234 of 360 Part No. 17936 Submersible Pully Bully MEI’s Pully Bully will make changing a submersible pump or motor a snap! The Pully Bully is a safe, economical method that will save you time and frustration on your next service call. Benefits • Safe Operation • Reduced Labor Hours • Light Weight • Quick & Easy Setup • Easy Clean Up • Portable Cart Specifications • Lifting Capacity: 500 lbs. • Complies with ASME B30.17 - 1998 • Weight: 185 lbs. • Instructions Included How it Works Roll the Pully Bully into the machine room. Detach the hoisting frame from the cart (the cart/drip pan will later serve as a workbench that collects the excess oil). Set up the hoisting frame (see photos below). Use the chain hoist to rig and pull the pump/motor combination out of the power unit. Set the pump/motor combination on the cart/drip pan, and make the necessary repairs. Easy Clean Up The excess oil funnels into a removable container located under the drip pan. Simply remove the container and pour the excess oil back into the tank. How it Works Video! 60 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Submersible Pully Bully Agenda Item 5A Page 235 of 360 28” Min.to47” Max. 17 1⁄2” Min.to34 1⁄4” Max. 6’ - 1 5⁄8” Dry Pully Bully MEI’s NEW! Dry Pully Bully makes changing a dry motor an easy proposition. The Dry Pully Bully is a safer, more streamlined method that will save you time and stress on your next service call. Benefits • Safe Operation • Reduced Labor Hours • Light Weight • Quick & Easy Setup Specifications • Lifting Capacity: 750 lbs. How it Works Roll the Dry Pully Bully into the machine room. Attach the winch hook on the top edge of the tank wall and winch the frame into position (see photos below). Set up the hoisting frame legs for the ideal lifting position. Use the winch to lift motor and trolley out onto the machine room floor. Part No. 22884 How it Works Video! 61MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Dry Pully Bully Agenda Item 5A Page 236 of 360 Custom Sizes Available Car Top Station Part No. Part Description 3022 Nylube Car Top Station Pit Ladders Part No. Part Description 22819 Ladder Pit Assembly 8’-0” Tall w/Brackets & Fasteners 22815 Ladder Pit Assembly 10’-0” Tall w/Brackets & Fasteners 22816 Ladder Pit Assembly 12’-0” Tall w/Brackets & Fasteners Pit Switch Options Part No. Part Description 16055 Pit Switch PS4-Push/Pull 3095 Pit Switch Run/Stop 20 Amp 250 VAC #PS2 Signal Device Part No. Part Description 3082 Signal Device Alarm Bell 6V DC 6” 5035 Signal Device Alarm Bell 120V DC 6” 18678 Signal Device Buzzer 30-120V Warble Adams 4426 Signal Device Chime Two Stroke 40-125V AC/DC Adams Under Car Light Part No. Part Description 11359 Lamp Holder with GFI Outlet Under Car Light 120V Outlet Oil Buffer Stands Part No. Part Description N/A Call MEI for survey form. Stands available to sit below oil buffers to achieve correct runby. Spring Buffer Stands Part No. Part Description N/A Call MEI for survey form. 1 1⁄2” - 4 1⁄4” stroke available. A A B C D E F G B C D E F G Oil Buffer Not Included Nylube 62 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Pit Equipment & Car Top Station Agenda Item 5A Page 237 of 360 Rope Tension Gauge Ensure equal rope tension Proper rope tension is critical to obtaining a quality ride and ensuring the maximum life of ropes and sheaves. Use the simple and effective MEI Rope Tension Gauge to measure relative tension in hoist ropes. Contact MEI for pricing and availability. Part No. 21954 Channel Cart Move jacks, crates, door panels, wall panels and more with ease! This light-weight channel cart has a non-slip surface, an integrated handle at each end for easy carrying, and holes in each corner for rope attachment. The wheels are entirely below the cart frame, which allows for easy maneuvering and handling of cumbersome materials. Contact MEI for pricing and availability. Part No. 22061 Door Track Cleaner Clean up your door tracks for smoother operation! Part No. 22291 Calipers Gather dimensional data on hard-to-measure items! Small - Part No. 22294-001 Large - Part No. 22294-002 Four Wheeled Cart Great for every jobsite! Certified for capacity of up to 2,500 lbs. Part No. 22505 Front Back 63MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Installation & Maintenance Tools Agenda Item 5A Page 238 of 360 Adjustable Piston Stabilizer (2 Required Per Application) Stabilize piston during a cylinder replacement This versatile piston stabilizer is an essential tool for safe and efficient cylinder replacements. Simply attach to the upper portion of the piston to maintain a secure, accurately-aligned piston during retrieval of the car from the overhead. This tool installs in less than 5 minutes! During a cylinder replacement, the elevator is typically hoisted and secured in the top of the hoistway. The old piston and cylinder are then removed and the new piston is installed. To complete the procedure, the new piston is run up and attached to the bottom of the car sling (located in the top of the hoistway). The further the piston is extended out of the cylinder, the more unstable it becomes. MEI’s Adjustable Piston Stabilizer ensures the safe, secure, and plumb travel of the piston to the bottom of the car and eliminates the potential for seal damage caused by excess movement. Save time and money by using this tool instead of building custom stabilizers at each job site! The MEI Adjustable Piston Stabilizer will accommodate a wide range of field situations. Contact MEI for capabilities and pricing. Piston Stabilizers Stabilize pistons while checking for damage prior to seal replacement This fully-adjustable piston stabilizer ensures a safe packing seal replacement and eliminates the possibility of damaging the new packing seal. This simple tool keeps the piston secure during the entire seal replacement process. When changing out a seal, it is necessary to check the entire length of the piston for damage and make any repairs prior to installing the new seal. This is typically done by running the piston from the car top to the upper limit of its travel. The risk when doing this is that the further the piston is extended out of the cylinder, the more unstable it becomes. The excess movement puts considerable pressure and wear on the packing seal, and the piston could also potentially catch a bracket or hoistway obstruction. Use the MEI Piston Stabilizer on your next seal replacement for an easier, safer repair! Contact MEI for pricing and availability. Part No. 22070 - Holeless Hydraulic Part No. 21981 - In-Ground Part No. 22076 - Roped Hydraulic 64 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Installation & Maintenance Tools Agenda Item 5A Page 239 of 360 Top of Hoistway Target Bracket Align rails easily with this versatile bracket Nothing is more reliable and accurate than dropping plumb lines for rail alignment. This efficient bracket attaches easily to the top of the hoistway wall or to the underside of the hoist beam. Secure the music wire for rail alignment. Eliminate the laborious, costly task of building wooden targets on each and every project! Contact MEI for pricing and availability. Pit Target and Plumb Line Tension Device Secure music wire and apply tension easily with this versatile bracket This plumb line tension device is designed to be used in conjunction with the Top of Hoistway Bracket. Simply locate, secure to the pit floor, and run the music wire through the hole in the top of the bracket. Attach to a ratchet and apply tension to the alignment wire. Eliminate the need to build custom, cumbersome targets in the pit! Contact MEI for pricing and availability. Part No. 22083 Part No. 22088 65MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Installation & Maintenance Tools Agenda Item 5A Page 240 of 360 Toe Guards Part No.Part Description (Fasteners Not Included)Length Face Height Support Required 10030-003 Toe Guard 48" x 21" x 16GA Galvannealed 48" 21"23 3⁄4" 10030-001 Toe Guard 60" x 21" x 16GA Galvannealed 60" 21"23 3⁄4" 10030-007 Toe Guard 72" x 21" x 16GA Galvannealed 72" 21"23 3⁄4" 10030-008 Toe Guard 84" x 21" x 16GA Galvannealed 84" 21"23 3⁄4" 10030-009 Toe Guard 96" x 21" x 16GA Galvannealed 96" 21"23 3⁄4" 22142-001 Toe Guard 48" x 48" x 16GA Galvannealed 48" 48" 62" 22142-002 Toe Guard 60" x 48" x 16GA Galvannealed 60" 48" 62" 22142-003 Toe Guard 72" x 48" x 16GA Galvannealed 72" 48" 62" Toe Guard Supports Part No. Part Description 21880 Support Toe Guard Angle 23 3⁄4" 21879 Support Toe Guard Angle 62" Strike Plates Part No. Part Description (Fasteners Not Included) 22184-001 Strike Plate Formed (for more than 2 springs) 22184-002 Strike Plate Formed (for up to 2 springs) 22184-003 Strike Plate Formed (for oil buffers) 22184-005 Strike Plate Formed (for more than 2 springs, 1⁄2” material) Sill Support Angles Part No. Part Description (Fasteners Not Included) 21885-001 Sill Support Angle Hoistway 1SP Light Formed 72" 21885-002 Sill Support Angle Hoistway 1SP Light Formed 84" 21885-003 Sill Support Angle Hoistway 1SP Light Formed 96" 21904-001 Sill Support Angle Hoistway 1SP Medium Structural 72" 21904-002 Sill Support Angle Hoistway 1SP Medium Structural 84" 21904-003 Sill Support Angle Hoistway 1SP Medium Structural 96" 21922-001 Sill Support Angle Hoistway 1SP Heavy Formed 72" 21922-002 Sill Support Angle Hoistway 1SP Heavy Formed 84" 21922-003 Sill Support Angle Hoistway 1SP Heavy Formed 96" 21885-004 Sill Support Angle Hoistway 2SP Light Formed 72" 21885-005 Sill Support Angle Hoistway 2SP Light Formed 84" 21885-006 Sill Support Angle Hoistway 2SP Light Formed 96" 21904-004 Sill Support Angle Hoistway 2SP Medium Structural 72" 21904-005 Sill Support Angle Hoistway 2SP Medium Structural 84" 21904-006 Sill Support Angle Hoistway 2SP Medium Structural 96" 21922-004 Sill Support Angle Hoistway 2SP Heavy Formed 72" 21922-005 Sill Support Angle Hoistway 2SP Heavy Formed 84" 21922-006 Sill Support Angle Hoistway 2SP Heavy Formed 96" Platen Plates Part No. Part Description (Fasteners Not Included) 9651 Platen Plate Channel (for jacks up to 10 5⁄8” with a single bolt attachment, bolt up to 1 1⁄4”) Wall Inserts Part No. Part Description 21988-001 Drywall Insert 24” 21988-002 Drywall Insert 48” 1808 Masonry Insert 24” 21827 Masonry Insert 48” D D C C C C B B A A E E F F F Light F o r m e d Med i u m S t r u c t u r a l Dryw a l l I n s e r t Mas o n r y I n s e r t Heav y F o r m e d 66 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Miscellaneous Elevator Accessories Agenda Item 5A Page 241 of 360 Rail Lubricators Item Part No. Part Description Fastening A 1740 Rail Lubricator 8-15 lb.Rail Mount A 1739 Rail Lubricator 18.5, 22.5, & 30 lb.Rail Mount B 21659 Rail Lubricator, Mounts to 16ST or 18ST Guide Mount B 21692 Rail Lubricator, Mounts to 22ST or 30ST Guide Mount Rail Clips Part No. Part Description 2773 Clip Forged 8 lb. (C-161) Steel 2770 Clip Forged 12 lb. 15 Lb. 18 lb. (C-160) Steel 2771 Clip Forged 22 (C-169) Steel 2772 Clip Forged 30 (C-162) Steel 2424 Clip Rail Steel Sliding 8 lb. Rail (CB08-S) 5118 Clip Rail Steel Sliding 15 lb. & 18.5 lb. Rail (CB15-S) Rail Splice Plates with Hardware Part No. Part Description Plate Design 19746 Plate Splice Non Seismic 8 lb. Kit (2 per kit)Non Seismic 19747 Plate Splice Non-Seismic 15 lb. Kit (2 per kit)Non Seismic 19748 Plate Splice Non-Seismic 18.5 lb./ 22.5 lb. Kit (2 per kit)Non Seismic 19750 Plate Splice Non-Seismic 30 lb. Kit (2 per kit)Non Seismic 19615 Plate Splice Seismic 8 lb. (Each)STD Seismic 19616 Plate Splice Seismic 15 lb. (Each)STD Seismic 19617 Plate Splice Seismic 18.5 lb. (Each)STDSeismic 19618 Plate Splice Seismic 22.5 lb. (Each)STD Seismic 19619 Plate Splice Seismic 30 lb. (Each)STD Seismic 19751 Plate Splice Seismic 8 lb. (Each)Low Clear Seismic 19752 Plate Splice Seismic 15 lb. (Each)Low Clear Seismic 19753 Plate Splice Seismic 18.5 lb. (Each)Low Clear Seismic 19754 Plate Splice Seismic 22.5 lb. (Each)Low Clear Seismic 19755 Plate Splice Seismic 30 lb. (Each)Low Clear Seismic Rails Part No. Part Description 11382 Rail 8 lb. 16’-0” Stick ISO7465 11378 Rail 15 lb. 16’-0” Stick ISO 7465 11379 Rail 18.5 lb. 16’-0” Stick ISO7465 11380 Rail 22.5 lb. 16’-0” Stick ISO7465 11381 Rail 30 lb. 16’-0” Stick ISO7465 A B Rail Brackets MEI offers rail brackets to accommodate a wide range of field conditions. The following project-specific information is required for pricing purposes: existing rail bracket span, rail size, and capacity rating of the elevator. Please contact MEI for pricing and availability. 67MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Rails & Accessories Agenda Item 5A Page 242 of 360 816DS Call MEI for Maximum Guide Capacity & Guide Specifications Item Part No. Part Description Mount Type Guide Type Rail Size (lbs.)Replacement Type Part No. A 21394 Guide 16FR (UHMW Polyethylene Gib)Top Slide 15 A 21395 Guide 18FR (UHMW Polyethylene Gib)Top Slide 18.5 A 21396 Guide 22FR (UHMW Polyethylene Gib)Top Slide 22.5 A 21397 Guide 30FR (UHMW Polyethylene Gib)Top Slide 30 B 21055 Guide 381 (Polyethylene)Top Slide 22.5 B 20951 Guide 381 (Polyethylene)Top Slide 30 C 1672 Guide 8ST (UHMW Polyethylene Gib)Stile Slide 8, 15 Gib 11637 D 1663 Guide 16ST (UHMW Polyethylene Gib)Stile Slide 15 Gib 4016 D 19275 Guide 16ST Seismic (UHMW Polyethylene Gib)Stile Slide 15 Gib 4016 D 1664 Guide 18ST (UHMW Polyethylene Gib)Stile Slide 18.5 Gib 4848 D 19278 Guide 18ST Seismic (UHMW Polyethylene Gib)Stile Slide 18.5 Gib 4848 D 1665 Guide 22ST (UHMW Polyethylene Gib)Stile Slide 22.5 Gib 10623 D 19281 Guide 22ST Seismic (UHMW Polyethylene Gib)Stile Slide 22.5 Gib 10623 D 1668 Guide 30ST (UHMW Polyethylene Gib)Stile Slide 30 Gib 11532 D 19284 Guide 30ST Seismic (UHMW Polyethylene Gib)Stile Slide 30 Gib 11532 E 16842 Guide 16SS (UHMW Polyethylene Gib)Top Swivel Slide 15 E 16843 Guide 18SS (UHMW Polyethylene Gib)Top Swivel Slide 18.5 E 21701 Guide 22SS (UHMW Polyethylene Gib)Top Swivel Slide 22.5 E 1667 Guide 30SS (UHMW Polyethylene Gib)Top Swivel Slide 30 F 1671 Guide 816SS (UHMW Polyethylene Gib)Top Spring Swivel Slide 8, 15 Gib 11637 F 19565 Guide 816SS No Spring (UHMW Polyethylene Gib)Top Swivel Slide 8, 15 Gib 11637 F 9599 Guide 816SS (UHMW Polyethylene Gib)Top Spring Swivel Slide 18.5 Gib G 1670 Guide 816DS (UHMW Polyethylene Gib)Top Spring Double Swivel Slide 8, 15 Gib 4015 16-30SS 16-30FR 381 8ST C A B F G E 16-30ST D Guide Shoe Dust Covers (Contact MEI for Details) Part # Part Description 21949-001 Cover Guide Shoe HW 377 & 379 (Set of 2) 21949-002 Cover Guide Shoe HW 378 & 380 (Set of 2) 21949-003 Cover Guide Shoe Elsco Model A 21949-004 Cover Guide Shoe Elsco Model B 21949-005 Cover Guide Shoe Elsco Model C 21949-006 Cover Guide Shoe Elsco Model D 21949-007 Cover Guide Shoe Elpro 815RG 816SS Contact us for Custom Slide Guides 68 MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Rail Guides Agenda Item 5A Page 243 of 360 Call MEI for Maximum Guide Capacity & Guide Specifications Item Part No. Part Description Mount Type Guide Type Rail Size (lbs.) Replacement Type Part No. N 1673 Guide 36SRG (Neoprene)Top Spring Roller 8, 15 Roller 21765-003 O 12245 Guide 377 (Polyethylene)Top Spring Roller 8, 15 P 5447 Guide 378 (Polyethylene)Top Spring Roller 8, 15, 18.5 Q 12146 Guide 379 (Polyethylene)Top Spring Roller 8, 15, 18.5 R 5456 Guide 380 (Polyethylene)Top Spring Roller 8, 15, 18.5 S 5011 Guide 803RG (Neoprene)Top Solid Roller 8, 15 T 1662 Guide 815RG (Neoprene)Top Solid Roller 8, 15 Roller 21765-007 T 8968 Guide 815RGU (Polyethylene)Top Solid Roller 8, 15 Roller 21765-008 U 17072 Guide ACLA AR3 142-380 Top Spring Roller 8, 15, 18.5, 22.5, 30 V 14853 Guide Elsco Model A (Polyethylene)Top Spring Roller 8, 15, 18.5 V 14852 Guide Elsco Model A (Polyethylene)Top Spring Roller 22.5, 30 V 9500 Guide Elsco Model A (Neoprene)Top Spring Roller 8, 15, 18.5 W 5363 Guide Elsco Model B w/Adj Stops (Neoprene)Top Spring Roller 8, 15, 18.5 W 21245 Guide Elsco Model B w/Adj Stops (Neoprene)Top Spring Roller 22.5, 30 W 19122 Guide Elsco Model B w/Adj Stops (Polyethylene)Top Spring Roller 8, 15, 18.5 W 21244 Guide Elsco Model B w/Adj Stops (Polyethylene) Top Spring Roller 22.5, 30 X 6536 Guide Elsco Model C w/Adj Stops (Neoprene)Top Spring Roller 8, 15 X 17385 Guide Elsco Model C w/Adj Stops (Polyethylene)Top Spring Roller 8, 15 Y 6535 Guide Elsco Model D (Neoprene)Top Spring Roller 8, 15 803RG S 815RG T ACLA Model A Model B Model C Model D U V W X Y 377 379 380 378 36SRG N O P Q R 69MEI-Total Elevator Solutions 19336 607th Ave • Mankato, MN 56001 Ph: 800-450-3060 • www.meiusa.com Email: mei@meiusa.com Rail Guides Agenda Item 5A Page 244 of 360 Reflex Benefits Save Mechanic’s Time on Installation and Setup Eliminates traditional tape and magnets Provides absolute position Maximizes Performance of the Elevator Reduced leveling times to 1.5 seconds or less Reduced wear and tear on pump motor Building Owner Benefits Reduced oil temperature by up to 15 degrees Quicker floor-to-floor times Energy savings Controller and Power Unit Quote Request Online Quote Request FormOrder Efficiency • One call saves time • Lower shipping costs • Increases accuracy on order data between Power Unit and Control Controller can be Pre-Mounted Controller & Power Unit Quote Request www.vertitron.com/html/quote.asp 70 Vertitron Midwest, Inc. 19336 607th Ave • Mankato, MN 56001 Ph: 888-864-3683 • www.vertitron.com Email: sales@vertitron.com Controller & Power Unit Mod Package Agenda Item 5A Page 245 of 360 VMI / EMSVMI / Peelle VHC-102 Hydraulic Passenger Controller Non-Proprietary Field Programmable On-Board Diagnostics Serial Communication Expedited Delivery! 5 Year Extended Warranty (includes all boards, power supply, transformer, and solid state starter) Stand Alone Starters Sprecher+Schuh PCEC Siemens Class 72 Competitive Pricing Interface Drawing Included VHC-102 (Integrated) Hydraulic Freight Controller VMI/Peelle VMI/EMS Integrated Panel Reduces Field Labor by 8-12 hours Single Disconnect Required - Reduces Building Costs and Increases Safety VHC-102 Hydraulic Freight Controller interfaces to the following freight doors. Peelle & Peelle Wireless EMS Courion Single or Multi-Motor Starter Panels UL Label Branch Fusing on multi-motor units Fused for 120 Volt Supply Nema 1 or 4 enclosure Starter Savings Video Online Quote Request Solid State Starters Hydraulic Controls A B B A multi-motor panel shown above 71Vertitron Midwest, Inc. 19336 607th Ave • Mankato, MN 56001 Ph: 888-864-3683 • www.vertitron.com Email: sales@vertitron.com Hydraulic Controls & Solid State Starters Agenda Item 5A Page 246 of 360 Online Quote Form VMI Vandal Proof Replacement Buttons Direct replacement for Schindler MPH & TAC20 style button. Changing buttons only takes minutes and the finished product and durability of the new button is something your customer will really appreciate. Every VMI Vandal Proof replacement button comes with a 3 Year Warranty. Optional LED colors and button finishes available. Elevator Keyfob Place call as you appr o a c h e l e v a t o r w i t h k e y f o b r e m o t e Schindler MPH TAC20 VMI Replacement VMI Replacement For your convenience Vertitron has created a library of instructional product videos on YouTube. Quote Request Online Quote Request LOADED ELEVATOR? CAR POSITION OPEN / CLOSE Placing calls to the elevator is easier than ever... Control your elevator from your PHONE! Place calls Hold doors View status Position Car loaded or empty Indicator shows if elevator is loaded. Open/Close Doors and Hold door options Compatible with iOS, Android, Mac, PC and other smart devices Remote Control Systems / Replacement Buttons 72 Vertitron Midwest, Inc. 19336 607th Ave • Mankato, MN 56001 Ph: 888-864-3683 • www.vertitron.com Email: sales@vertitron.com Agenda Item 5A Page 247 of 360 Reflex 3.14 Integrated with VHC-102 Control Serial Communication to Reflex 3.14 Serial Communication to COP Fast. Smart. Green. Valve Setup Feature Acceleration, Transition & Speed Feedback saves adjusting time and ensures consistent PERFORMANCE! Machine Room Feedback & Adjusting Speed Feedback, Setup & Floor Adjustments are done from the Car Top or Machine Room. All setup information is saved in both locations. “Hydraulic elevator leveling system shall utilize an absolute position multi-turn encoder to minimize the stabilized leveling. System shall adapt slowdown distances to the current load in the elevator and compensate for cold oil conditions.” Annual Energy, Time Savings, and Oil Temperature reduction based on actual job site results. Reflex Time Saved per Trip (sec.)4 Average Up Trips per Day 325 Motor HP 40 kW 29.8 Annual kW Saved 3928 kWh Rate $0.15 Employee Rate per Hour $30 $ Annual Energy Savings $$589 Annual Motor Run Hours Saved 132 Total Annual Elevator Running Hours Saved (Up & Down) 264 Annual Employee Cost Savings (Based on 1 employee per elevator trip) $7,908 Oil Temperature Reduced by 14°F 73Vertitron Midwest, Inc. 19336 607th Ave • Mankato, MN 56001 Ph: 888-864-3683 • www.vertitron.com Email: sales@vertitron.com Reflex 3.14 Leveling System Agenda Item 5A Page 248 of 360 Founded in 1971, MEI was born of the dreams and aspirations of John Romnes. What started as a one-man operation in a rented farmhouse has now grown to a multi-million dollar company with more than 200 employees. Before starting MEI, John had nine-and-a-half years of industry experience. He was the only full-time employee of MEI for the first seven months. In the early ‘70s, with two full-time employees, including John himself and a part-time employee, John began to expand his business splitting MEI time between service, repair, modernizing and installing elevators. MEI built and installed its first freight elevator in 1973 and its first passenger elevator in 1975 in Mankato; both were new elevators, built from scratch. From 1971 - 1981, MEI’s service base grew to 110 service contracts, consisting of approximately 330 elevators serviced by two technicians. “During the first decade of MEI, I feel we were blessed in many ways and experienced God’s favor, which helped lay the groundwork for our future success,” John said. MEI experienced rapid growth in the ‘80s, adding more employees, building more elevators, acquiring more service contracts and constructing its first factory building. From 10 employees in 1981 the company grew to employing 59 workers by 1990. In 1989, as a result of the company’s growth, John purchased Vertitron and renamed it to Vertitron Midwest. From 1982 - 1991, MEI’s service base continued to grow to 409 contracts, more than 1,200 elevators and 8 service technicians. In the ‘90s, MEI’s service department sold nearly 500 new service contracts. A major effort was made to start diversifying the company’s customer base for National Sales and carve out MEI’s niche for custom work. MEI grew from 59 employees in the early ‘90s to 178 in 2001. In 2001, MEI’s service base had grown to 765 contracts, 2,300 elevators and approximately 14 service technicians. After experiencing hard times from 2004 - 2006, John turned to Rick Lowenberg, a lead turnaround consultant. MEI was armed with a new business plan and in 2007; MEI won the Turnaround of the Year Award from the Upper Midwest chapter of the Turnaround Management Association and Rick was named President of MEI. In February 2008, Twin Cities Business magazine featured MEI in an article “Going Back Up,” which underscored that MEI did all the right things to achieve a turnaround. Later in 2008, MEI purchased Highland Electric which offers electrical contracting for residential and commercial properties. The Highland Electric office and warehouse is now the central location for MEI’s field operations in the Twin Cities. The following year, MEI purchased Badger Elevator in Milwaukee which expanded its elevator contracting business to Milwaukee and throughout eastern Wisconsin. In November 2010, MEI purchased Dynatron Elevator in Kansas City, Kansas. Even in a down economy, MEI’s prospects were still rising thanks to the dedication of the ownership, leadership and employees toward continuous improvement. In 2011, MEI purchased Lagerquist in Duluth, Minnesota and in 2012 purchased the backlog of CEMCO elevator from Otis. In 2013, MEI expanded its office locations and opened a plant in Pennsylvania to better serve the USA’s northeast region. In February 2015, MEI purchased Precision Elevator Service in Denver, CO which expands our elevator contracting business. In 2015, MEI headquarters in Mankato, MN also added 20,000 sq ft to their manufacturing facility. Don Jacobson painting a power unit drive assembly, before MEI had a shop building. Don Jacobson winching a “used power unit” out of the pickup box in 1972 MEI gets rolling. The red truck bears MEI’s first logo. This structure is currently part of the main entry, front office. Second additon of shop/ warehouse space in 1986. 1995 shop expansion In 1974, MEI built its first building - a 32ft. x 54 ft. structure that served as a shop and warehouse and was heated with a wood stove. The office and bathroom were still in the family home. MEI History Agenda Item 5A Page 249 of 360 19901979Original Farm Site Through the Years 20021998 2015 2011 Agenda Item 5A Page 250 of 360 MEI-Total Elevator Solutions 19336 607th Ave. Mankato, MN 56001 Ph: 1-800-450-3060 Email: mei@ meiusa.com www.meiusa.com An EOE/AA Employer MEI-Total Elevator Solutions - all of our equipment is engineered to order but we also pride ourselves in providing complete elevator solutions. Agenda Item 5A Page 251 of 360 Specification for Holeless Freight Elevators Part 1 General 1.01 Description A. This specification is intended to cover the complete furnishing and installing of one holeless freight elevator as manufactured by Minnesota Elevator, Incorporated or approved equal. All work shall be performed in a professional manner and is to include all work and material in accordance with the drawings and as specified herein. In all cases where a device or part of the equipment is herein referred to in the singular number, it is intended that such reference shall apply to as many such devices as are required to complete the installation. 1.02 Work not included A. To complete this installation, the following items must be performed or furnished by other than the elevator contractor in accordance with governing codes: 1. A properly framed and enclosed legal hoistway, including venting as required by the governing code or authority. Temperature in hoistway to be maintained between 40o F. and 90o F. 2. Suitable machine room with legal access and ventilation, with concrete floor. Temperature in machine room to be maintained between 55o F. and 90o F. 3. Adequate rail bracket supports, bracket spacing as required by governing code. Separator beams and machine beams where required. 4. Dry pit reinforced to sustain normal vertical forces from rails where required and impact loads from buffer. 5. Any cutting, including cutouts to accommodate hall signal fixtures, patching and painting of walls, floors or partition is together with finish painting of doors and frames. 6. Mechanical requirements as follows: a. Machine room venting. 7. Electrical requirements as follows: a. All electric power for lights, tools, hoists, etc. during erection as well as electric current for starting, testing and adjusting the elevator. b. A fused disconnect switch for each elevator per the National Electrical Code with feeder or branch wiring to controller. Size by elevator contractor. Agenda Item 5A Page 252 of 360 c. A 120 volt, AC, 15 amp, single phase power supply with fused SPST disconnect switch for each elevator, with feeder wiring to each controller for car lights. d. Suitable light and convenience outlets in machine room with light switches located within 18 inches of lock jamb side of machine room door. e. Convenience outlet and light fixture in pit with switch located adjacent to the access door. 8. Guarding and protecting the hoistway during construction. The protection of the hoistway shall include solid panels surrounding each hoistway opening at each floor, a minimum of 48 inches high. Hoistway guards to be erected, maintained and removed by others. 9. Provide and install freight door frames plumb to each other. 1.03 Quality A. All work shall be performed in accordance with (the edition adopted by the governing authority as of the date bids are taken) of the American National Standard Safety Code for Elevators, Dumbwaiters, Escalators and Moving Walks (ASME A17.1), the National Electrical Code and/or such State and local codes as may be applicable. 1.04 Submittals A. Shop Drawings: The elevator contractor shall prepare drawings showing the general arrangement of the elevator equipment and cab. These drawings shall be approved and the hoistway size guaranteed before proceeding with fabrication and installation of the elevator. 1.05 Permits taxes and licenses A. All applicable sales and use taxes, permit fees and licenses, of the date bids are taken, shall be paid for by the elevator contractor. 1.06 Warranty A. Minnesota Elevator, Inc. products are guaranteed for 24 months from the date of shipment from our plant against any manufacturing defects in material and workmanship, which may develop in service for which they were intended or recommended. 1.07 Maintenance A. A quality maintenance service consisting of regular examinations, adjustments and lubrication of the elevator equipment shall be provided by the elevator contractor for a period of three (3) months after the elevator has been turned over for the customer's use. All work shall be performed by competent employees during regular working hours Agenda Item 5A Page 253 of 360 of regular working days and shall include emergency 24 hour callback service. This callback service shall not cover adjustments, repairs or replacement of parts due to negligence, misuse, abuse or accidents caused by persons other than the elevator contractor. Only genuine parts and supplies as used in the manufacture and installation of the original equipment shall be provided. 1.08 Job conditions A. Temporary Use of Elevator: Should any elevator be required for use before final completion, others shall provide without expense to elevator contractor, if required, temporary car enclosures, requisite guards or other protection for elevator hoistway openings, main line switch with wiring, necessary power, signaling devices, lights in car and elevator operators together with any other special labor or equipment needed to permit this temporary usage. The elevator contractor shall be reimbursed for any labor and materials which is not part of the permanent elevator installation and which is required to provide temporary elevator service. In addition, the elevator contractor's temporary acceptance form shall be executed before any elevator is placed in temporary service, and the cost of power and operation, maintenance or the equipment and rehabilitation of equipment shall be paid for by others. Part 2 Products 2.01 Elevator Equipment A. Description of equipment: 1. Capacity: ______ lbs. 2. Speed: _____ FPM 3. Operation: Simplex Selective/Collective 4. Car Platform Size: ___’-___” wide by ___’-___” deep 5. Clear Hoistway Size: ___’-___” wide by ___’-___” deep 6. Pit depth _______________ 7. Overhead __________________ 8. Travel (verify): _____’-___” 9. Power Supply: ______ VAC (verify), 3 phase, 60 cycle 10. Stops: _______ Agenda Item 5A Page 254 of 360 11. Openings front ____________ 12. Openings rear _____________ B. Rails Steel elevator guide rails shall be furnished to guide the car, erected plumb and securely fastened to the building structure. C. Wiring All wiring and electrical connections shall comply with the governing codes. Insulated wiring shall have flame retardant and moisture-proof outer covering, and shall be run in conduit tubing or electrical wireways. Traveling cables shall be flexible and suspended to relieve strain on individual conductors. D. Leveling device The elevator shall be provided with an automatic leveling device which will bring the car to a stop within 1/4" of the landing level regardless of load or direction of travel. Landing level will be maintained within the leveling zone irrespective of the hoistway doors being open or closed. E. Pit switch An emergency stop switch shall be located in the pit. F. Controller: Microprocessor based, non-proprietary, VMI controller. G. Platform The car platform shall be of steel construction with a fire rated plywood subflooring and painted steel diamond plate floor. Steel, code compliant, toe guard. Diagonal braces from toe guard bottom to platform stringers. H. Car frame A suitable car frame fabricated from formed or structural steel members shall be provided with adequate bracing to support the platform and car enclosure. Buffers as specified by code to stop car. Guides shall be mounted on top and bottom of the car frame to engage the guide rails. I. Cylinder The cylinder shall be constructed of steel pipe of sufficient thickness and suitable for the operating pressure per current ASME 17.1 Code. The top of the cylinder shall be equipped with a cylinder head with drip ring and self-adjusting packing. The plunger shall be constructed of selected steel tubing or pipe of proper diameter machined true and smooth with a fine polished finish. The plunger shall be provided with a stop ring electrically welded to it to prevent the plunger from leaving the cylinder. The plunger and cylinder shall be installed plumb and must operate freely with minimum friction. Agenda Item 5A Page 255 of 360 J. Oil line Schedule 40 ASTM A-53 Grade B pipe shall be installed between the pumping unit and the cylinder. K. Oil line fittings Fittings shall be of the grooved type. Shut-off valves shall be provided in the machine room and in the elevator pit for maintenance and adjusting purposes. L. Oil line support stands Oil line shall be supported with an adequate number of support stands. Stands shall be anchored to the floor or wall and adjustable in height. Isolation clamps shall secure the oil line to the stand around the full 360 degree circumference. M. Pumping unit tank The storage tank shall be constructed of steel and shall be provided with a removable cover containing a removable oil dip stick. The pump and submersible motor shall be mounted on reinforced isolation. The control valve shall be mounted in the discharge line above the oil level and easily accessible from the top of the tank. An air-bladder silencer shall be provided at the control valve discharge. N. Pumping unit motor The motor shall be of the submersible alternating current, squirrel cage induction type and shall be of a design adapted to electro-hydraulic requirements. O. Pumping unit pump The pump shall be a positive displacement screw type to give smooth operation and shall be designed and manufactured for elevator service. P. Pumping unit control valve The control valve shall be manifold with up, down and check valve sections. A control section including solenoid valves will direct the main valve and control up and down starting, transition from full speed to leveling speed, up and down stops, pressure relief and manual lowering. Down speed and up and down leveling shall be controlled at the main valve sections. All of these functions shall be fully adjustable for maximum smoothness and to meet contract conditions. The manual lowering feature will permit lowering the elevator at slow speed in the event of power failure or for adjusting purposes. Q. Oil cooler (optional for low use elevators) 1. Oil cooler with heat rejection of 18,000 BTU/hr, based on ambient temperature 40 deg F cooler than oil out. Cooler may be mounted adjacent on pumping unit storage tank or remote up to 110 ft. horizontally and 55 ft. vertically. 2. To include: a. Single fan radiator b. Adjustable thermostat control c. Isolated radiator mounts Agenda Item 5A Page 256 of 360 d. 10 micron easily changeable filter e. Restriction sight glass with bypass in case of plugged filter f. Single plug for 115 VAC 20 amp separate circuit g. Fittings, hardware, and instructions 2.02 Car and hall fixture A. Car operating panel: 1. Applied car operating panel shall be furnished inside the cab. Panel will contain a bank of mechanical illuminated buttons marked to correspond to the landings served, an emergency stop button, door stop, door open and door close buttons. 2. The emergency call button shall be connected to a bell that serves as an emergency signal. Light switch shall also be located in the car-operating panel. 3. Car operating panel shall contain all necessary operating components, buttons, and switches as required by ANSI A.17. B. Phase II fire operating instructions are to be displayed according to code on the car operating panel. C. Elevator number and “No Smoking” are to be on an inlaid plate on the car operating panel, capacity in pounds will be engraved. D. Top and bottom access switches included in hall stations. E. Hall stations: 1. At each landing a single call button shall be provided. 2. Door open, door close, and an in-use light shall be provided in each hall station. 3. When a call is registered by momentary pressure on a landing button, that button shall become illuminated and remain illuminated until the call is answered. 4. The designated fire return floor shall include a fireman’s emergency key switch that meets state and local code requirements. F. Phase I firefighters’ operating instructions are to be engraved or silk screened on the designated fire return hall station faceplate. 2.03 Car Enclosure A. Walls and canopy shall be 14 gauge steel panels. Wall panels shall be 24” width maximum. B. Canopy panels shall be 24” width maximum. C. Wall panel seams shall line up with canopy panel seams. D. Gate post shall be adjustable to accommodate variation in wall panels. Agenda Item 5A Page 257 of 360 E. Wall panels shall be interchangeable. F. Canopy panels shall be interchangeable. G. Lights to be (2) tube by 4' long fluorescent with top guards. H. Finish to be powder coat. I. Infrared curtain unit (ICU) door protection. Part 3 Execution 3.01 Inspection A. Prior to beginning the installation of elevator equipment, examine the following and verify that no irregularities are existing that would affect quality or execution of work as specified. B. Hoistway condition: 1. Hoistway size and plumbness 2. Sill pockets 3. Sill supports C. Do not proceed with installation until previous work conforms to project requirements. 3.02 Installation A. Install the elevator in accordance with accepted manufacturer's directions and ANSI A17.1. B. Install machine room equipment with clearances, hoists or other means for each maintenance. C. Install items so that they may be removed by portable hoists or other means for maintenance. 3.03 Field quality control A. Provide all personnel, equipment and instruments required for inspection and testing. B. Have acceptance inspection as required by local authority performed by enforcing agency. Agenda Item 5A Page 258 of 360 3.04 Adjust and clean A. Adjustments Adjust brackets, controllers, leveling switches, generators, limit switches, stopping switches and safety governors to operate to within accepted design tolerances. Adjust car leveling devices so car stops within 1/4" of finished floor. Lubricate all equipment in accordance with accepted manufacturer's instructions. B. Clean Up Removal from hoistway surfaces all loose materials and filings resulting from this work. Clean machine room floor of dirt, oil and grease. Remove crating and packing materials from premises. End of section   Agenda Item 5A Page 259 of 360 Agenda Item 5A Page 260 of 360 Agenda Item 5A Page 261 of 360 Agenda Item 5A Page 262 of 360 Agenda Item 5A Page 263 of 360 Agenda Item 5A Page 264 of 360 Agenda Item 5A Page 265 of 360 Agenda Item 5A Page 266 of 360 Agenda Item 5A Page 267 of 360 Agenda Item 5A Page 268 of 360 Agenda Item 5A Page 269 of 360 Agenda Item 5A Page 270 of 360 Agenda Item 5A Page 271 of 360 Agenda Item 5A Page 272 of 360 Agenda Item 5A Page 273 of 360 Agenda Item 5A Page 274 of 360 Agenda Item 5A Page 275 of 360 Agenda Item 5A Page 276 of 360 Agenda Item 5A Page 277 of 360 Agenda Item 5A Page 278 of 360 Agenda Item 5A Page 279 of 360 Agenda Item 5A Page 280 of 360 Agenda Item 5A Page 281 of 360 Agenda Item 5A Page 282 of 360 CRITERIA FOR REVIEW Section 9-2-14, B.R.C. 1981, “Site Review” (a)Purpose: The purpose of site review is to allow flexibility and encourage innovation in land use development. Review criteria are established to promote the most appropriate use of land, improve the character and quality of new development, to facilitate the adequate and economical provision of streets and utilities, to preserve the natural and scenic features of open space, to assure consistency with the purposes and policies of the Boulder Valley Comprehensive Plan and other adopted plans of the community, to ensure compatibility with existing structures and established districts, to assure that the height of new buildings is in general proportion to the height of existing, approved, and known to be planned or projected buildings in the immediate area, to assure that the project incorporates, through site design, elements which provide for the safety and convenience of the pedestrian, to assure that the project is designed in an environmentally sensitive manner, to assure that the building is of a bulk appropriate to the area and the amenities provided and of a scale appropriate to pedestrians, and to set requirements for additional height, density, and intensity that provide additional benefits to the community beyond the underlying zoning. (h)Criteria for Review: No site review application shall be approved unless the approving agency finds that: (1) Boulder Valley Comprehensive Plan:  (A) The proposed site plan is consistent with the land use map and the service area map and, on balance, the policies of the Boulder Valley Comprehensive Plan. The site is currently designated as Regional Business on the land use map of the Boulder Valley Comprehensive Plan (BVCP). There is no maximum residential density under this designation. The description from the BVCP is below. The proposal meets the intent of the land use designation with a mix of uses and a design that will activate the street. The current proposal is consistent with the following BVCP goals and policies: •2.03 Compact Development Pattern •2.16 Mixed Use & Higher Density Development •2.20 Role of the Central Area •2.33 Sensitive Infill and Redevelopment ATTACHMENT B Agenda Item 5A Page 283 of 360 • 2.36 Physical Design for People • 2.41 Enhanced Design for All Projects  (B) The proposed development shall not exceed the maximum density associated with the Boulder Valley Comprehensive Plan residential land use designation. Additionally, if the density of existing residential development within a three-hundred-foot area surrounding the site is at or exceeds the density permitted in the Boulder Valley Comprehensive Plan, then the maximum density permitted on the site shall not exceed the lesser of: There is no maximum residential density for the Regional Business land use designation. N/A (i) The density permitted in the Boulder Valley Comprehensive Plan, or, Not applicable; the density of the existing residential development within 300 feet does not exceed the density permitted in the BVCP. N/A (ii) The maximum number of units that could be placed on the site without waiving or varying any of the requirements of Chapter 9-8, "Intensity Standards," B.R.C. 1981. Not applicable; see above.  (C) The proposed development’s success in meeting the broad range of BVCP policies considers the economic feasibility of implementation techniques require to meet other site review criteria. The development would not be rendered infeasible in meeting the BVCP policies or the site review criteria based upon the requirements and recommendations made within these comments. (2) Site Design: Projects should preserve and enhance the community's unique sense of place through creative design that respects historic character, relationship to the natural environment, multi-modal transportation connectivity and its physical setting. Projects should utilize site design techniques which are consistent with the purpose of site review in Subsection (a) of this section and enhance the quality of the project. In determining whether this subsection is met, the approving agency will consider the following factors:  (A) Open Space: Open space, including, without limitation, parks, recreation areas, and playgrounds:  (i) Useable open space is arranged to be accessible and functional and incorporates quality landscaping, a mixture of sun and shade and places to gather; The site design is urban in character and has a small on-site open space requirement. The proposed project utilizes urban forms of on-site open space with an open courtyard and private balconies and patios to serve the residences. Agenda Item 5A Page 284 of 360 Outdoor seating for a restaurant use could spill into the interior courtyard or onto Pearl Street, with a revocable permit from the city. All open spaces will receive a mixture of sun and shade based on the building orientation. The open spaces are appropriate considering the urban context and proximity to the pedestrian mall.  (ii) Private open space is provided for each detached residential unit; Each residential unit would have a private balcony, some on the exterior of the building and some facing the interior courtyard.  (iii) The project provides for the preservation of or mitigation of adverse impacts to natural features, including, without limitation, healthy long-lived trees, significant plant communities, ground and surface water, wetlands, riparian areas, drainage areas and species on the federal Endangered Species List, "Species of Special Concern in Boulder County" designated by Boulder County, or prairie dogs (Cynomys ludiovicianus), which is a species of local concern, and their habitat; A detailed tree inventory was provided. There are no healthy long-lived trees, special status species, or other natural features present on the site.  (iv) The open space provides a relief to the density, both within the project and from surrounding development; The public courtyard, private balconies, and rooftop decks on the setback third story will provide a relief to the density. The interior court on the ground level will be a place for people to gather along East Pearl Street. The courtyard contains an ornamental tree to anchor the center of the court and provide shade and an enhanced “feature wall”. The main façade element along Pearl Street is broken up by a paseo that provides a visual connection through the building to an open interior court in the center of the building that is open to the sky. The 15 foot landscaped setback on the alley will also provide relief to the residential neighborhood to the north.  (v) Open space designed for active recreational purposes is of a size that it will be functionally useable and located in a safe and convenient proximity to the uses to which it is meant to serve; Not applicable; no spaces are designed for active recreational purposes. Active programming is not appropriate considering the urban context and proximity to the pedestrian mall. Outdoor seating for a restaurant use could spill into the interior courtyard or onto Pearl Street, with a revocable permit from the city. Each residential unit would have a private balcony or patio. N/A (vi) The open space provides a buffer to protect sensitive environmental features and natural areas; and Agenda Item 5A Page 285 of 360 Not applicable; there are no known sensitive environmental features or natural areas within this developed urban site.  (vii) If possible, open space is linked to an area- or city-wide system. The existing walkways along Pearl, 17th, and 18th streets are all part of a city- wide, interconnected network of sidewalks that connect to the larger multi-modal system.  (B) Open Space in Mixed Use Developments (Developments That Contain a Mix of Residential and Nonresidential Uses):  (i) The open space provides for a balance of private and shared areas for the residential uses and common open space that is available for use by both the residential and nonresidential uses that will meet the needs of the anticipated residents, occupants, tenants and visitors of the property; and Both private open spaces (balconies and decks) and common open space (interior courtyard) has been provided. The courtyard will be open to residents, employees, and visitors to the site. The proposed courtyard will be a flexible space with movable seating that will allow for small gatherings, etc. that will be enjoyed by the residents and occupants, as well as the larger neighborhood. The spaces meet the anticipated needs of the development.  (ii) The open space provides active areas and passive areas that will meet the needs of the anticipated residents, occupants, tenants and visitors of the property and are compatible with the surrounding area or an adopted plan for the area. Passive areas are provided for residents on private balconies and decks. The interior courtyard will be programmed for passive use but could also be utilized for active purposes for residents, occupants, tenants, and visitors to the site. Outdoor seating for a restaurant use could spill into the interior courtyard or onto Pearl Street, with a revocable permit from the city.  (C) Landscaping  (i) The project provides for aesthetic enhancement and a variety of plant and hard surface materials, and the selection of materials provides for a variety of colors and contrasts and the preservation or use of local native vegetation where appropriate; Landscaping is planned to be installed according to the Landscape Plan (see Attachment A). The project includes planting areas within the courtyard and in the alley. The selection of plants and their relationship to the surrounding developments are aesthetically attractive and provide a relief to the proposed density. The proposed landscaping includes three ornamental trees, shrubs, and Agenda Item 5A Page 286 of 360 a variety of understory planting appropriate to the surrounding use and ecological niche. Mature street trees will remain on Pearl Street. Patterned concrete in the courtyard will give the space a more human scale.  (ii) Landscape design attempts to avoid, minimize or mitigate impacts on and off site to important native species, healthy, long lived trees, plant communities of special concern, threatened and endangered species and habitat by integrating the existing natural environment into the project; Landscape materials will be incorporated in the stormwater and water quality facilities. No important native species, plant communities of special concern, threatened and endangered species, or habitat would be impacted on this project. A tree will anchor the center of the public court and provide shade when needed, while thoughtful lighting and a unique “feature wall” will provide comfort and interest to the space.  (iii) The project provides significant amounts of plant material sized in excess of the landscaping requirements of sections 9-9-12, "Landscaping and Screening Standards," and 9-9-13, "Streetscape Design Standards," B.R.C. 1981; and The applicant intends to preserve the existing, healthy public street trees along both Pearl Street and provide additional landscaping that will be in excess of the requirements. N/A (iv) The setbacks, yards and useable open space along public rights of way are landscaped to provide attractive streetscapes, to enhance architectural features and to contribute to the development of an attractive site plan. Not applicable; the code requirements and design guidelines within the downtown is for buildings to address the street, particularly along the first floor where zero setbacks are desired. Landscape is not provided or desired in the front yard in this context.  (D) Circulation: Circulation, including, without limitation, the transportation system that serves the property, whether public or private and whether constructed by the developer or not:  (i) High speeds are discouraged or a physical separation between streets and the project is provided; High speeds are generally discouraged in the existing urban context, with narrow right of way and on-street parking. There is a relatively wide sidewalk area from face of curb to the building to accommodate the pedestrian. Existing mature street trees will be preserved and will provide a strong physical separation between Pearl Street and the proposed building.  (ii) Potential conflicts with vehicles are minimized; Agenda Item 5A Page 287 of 360 The existing context limits vehicular conflicts. Vehicular access to the site is via the alley, with an auto lift to the parking garage. Defined street crossings are provided on Pearl, 17th, and 18th streets. The proposed auto lift will allow cars to safely enter the alley with minimal potential conflicts with pedestrians or cyclists  (iii) Safe and convenient connections are provided that support multi-modal mobility through and between properties, accessible to the public within the project and between the project and the existing and proposed transportation systems, including, without limitation, streets, bikeways, pedestrianways and trails; A detached walkway and trees in grates will remain along Pearl Street. This provides a certain pedestrian travel way that helps to channel pedestrians along the building frontages, while removing them from vehicular travel along the streets. The proposed building will have two new public entrances on Pearl Street. Private building entrances will be located on the alley for use by residents and employees.  (iv) Alternatives to the automobile are promoted by incorporating site design techniques, land use patterns, and supporting infrastructure that supports and encourages walking, biking, and other alternatives to the single-occupant vehicle; The site design and infrastructure support and encourage walking, biking, and other alternatives to the SOV. The proposal includes 40 long-term secure bike parking spaces for residents, guests, and employees of the commercial uses in the secured parking garage, where 24 spaces are required. Twelve short-term bike spaces will be provided adjacent to the site along Pearl Street on inverted "u" bicycle racks. The site is located within the urban fabric of downtown and is well connected to the larger transit and multi-modal network. The applicant is providing only the required minimum of one parking space per dwelling unit. The “horizontal mix” of uses within downtown Boulder, with residential and commercial uses, encourages alternatives to single occupant vehicles.  (v) Where practical and beneficial, a significant shift away from single-occupant vehicle use to alternate modes is promoted through the use of travel demand management techniques; As described above, the applicant has submitted a Transportation Demand Management (TDM) plan. The proposal includes 40 long-term secure bike parking spaces for residents, guests, and employees of the commercial uses in the secured parking garage, where 24 spaces are required. Twelve short-term bike spaces will be provided adjacent to the site along Pearl Street on inverted "u" bicycle racks. The short-term parking will offer a convenient and accessible area to park bicycles for customers and other visitors. Since the property is located in CAGID employees of the commercial uses will be eligible for the Agenda Item 5A Page 288 of 360 downtown employee EcoPass program. In addition, an alternative transportation fund will be established for the residential units for a period of three years to cover the costs of EcoPasses or other programs that support and encourage alternatives to the single-occupant vehicle. The site is highly accessible, with transportation facilities and a large number of destinations that can be reached within a 15-minute walk (grocery stores, parks, restaurants, and transit stops). There are existing bus stops on Pearl Street near the intersection with 18th Street. The Downtown Boulder Bus Transit Station is less than half a mile to the southwest. This regional transit center is served by at least 15 local and regional transit lines. The site is well connected to the larger multi-modal network with detached sidewalks, designated bike routes, and bike lanes. The applicant is providing only the required minimum of one parking space per dwelling unit.  (vi) On-site facilities for external linkage are provided with other modes of transportation, where applicable; See (iv) above.  (vii) The amount of land devoted to the street system is minimized; and The amount of land devoted to the street system is the minimum necessary to provide access to the parking areas, a drop-off / pick-up area, and a service area.  (viii) The project is designed for the types of traffic expected, including, without limitation, automobiles, bicycles, and pedestrians, and provides safety, separation from living areas, and control of noise and exhaust. The proposed project is an urban configuration of the building adjacent to the pedestrian walkway, which enhances the pedestrian experience. Bicycles and vehicles will be accommodated on the surrounding street system and in the alley. A submitted traffic impact analysis concludes that the proposed development can be accommodated by the existing roadway network without significant impacts to service levels.  (E) Parking  (i) The project incorporates into the design of parking areas measures to provide safety, convenience, and separation of pedestrian movements from vehicular movements; Parking is provided in a below grade parking garage. An auto elevator is proposed to provide access to the garage. Removal of surface parking lots in the alley will help with the safety and convenience of pedestrians and cyclists traveling through the alley. A delivery/auto queueing area is provided next to Agenda Item 5A Page 289 of 360 the elevator entry for vehicles waiting for the elevator in the event that it is occupied.  (ii) The design of parking areas makes efficient use of the land and uses the minimum amount of land necessary to meet the parking needs of the project; The proposed below grade parking and auto elevator makes efficient use of the land. The applicant is providing the minimum number of one parking space per dwelling unit. The site is located within the Central Area General Improvement District (CAGID), with approximately 4,000 parking spaces included in the district. The provision of parking is the minimum amount necessary. The parking is designed to provide covered, secure bike parking as well as vehicular parking.  (iii) Parking areas and lighting are designed to reduce the visual impact on the project, adjacent properties, and adjacent streets; and The parking is located below grade with a single door to the auto elevator, reducing the visual impact on the project, adjacent properties, and adjacent streets. No lighting is expected to create adverse visual impacts. Any lighting installations will be subject to the Outdoor Lighting requirements of Section 9-9-16, B.R.C. N/A (iv) Parking areas utilize landscaping materials to provide shade in excess of the requirements in subsection 9-9-6(d), and section 9-9-14, "Parking Lot Landscaping Standards," B.R.C. 1981. Not applicable; It is not possible to provide landscaped areas within the underground parking.  (F) Building Design, Livability, and Relationship to the Existing or Proposed Surrounding Area  (i) The building height, mass, scale, orientation, architecture and configuration are compatible with the existing character of the area or the character established by adopted design guidelines or plans for the area; The urban orientation of the planned three-story, 38-foot high building is compatible with the character of the area where two- and three-story buildings occur to the east and west along Pearl Street in the DT-2 district. There are several buildings within a two-block radius of the subject site that are three stories, both within the DT-2 zoning district as well as the adjacent MU-3 zoning district. The proposed project was found to be consistent the Downtown Urban Design Guidelines for the interface zone. Agenda Item 5A Page 290 of 360  (ii) The height of buildings is in general proportion to the height of existing buildings and the proposed or projected heights of approved buildings or approved plans or design guidelines for the immediate area; The height of the proposed building is in general proportion to the height of existing buildings in the immediate area. The design guidelines for the interface zone state: “Buildings should appear similar in height, mass, and scale to other buildings in the area. At the same time, it is important to maintain a variety of heights. While the actual heights of buildings are of concern, the perceived heights of buildings are equally important. One, two and three story buildings make up the primary architectural fabric of the Downtown, with taller buildings located at key intersections.” The proposed height of 38 feet is in general proportion to the height of existing buildings to the south and west and is consistent with the intent described above.  (iii) The orientation of buildings minimizes shadows on and blocking of views from adjacent properties; The location of the site is within the established urban context, where the BVCP identifies the area as the “highest intensity” of land use. Similarly, there is an established grid pattern of streets and an urban street face with buildings built to the public right of way. Given the established land use typology, some degree of shading during deep winter months, along with constrained views toward the Flatirons is typical for the downtown and has been since the town was established. Further, the adjacent buildings to the east and west are not subject to the Solar Access standards since the DT-2 district is within Solar Access Area III, where because of planned densities, topography or lot configurations or orientations, uniform solar access protection for south yards and walls or for rooftops may unduly restrict permissible development. The applicant has submitted a solar access study demonstrating that shadows will not unduly impact residential properties to the north in the RMX-1 district.  (iv) If the character of the area is identifiable, the project is made compatible by the appropriate use of color, materials, landscaping, signs, and lighting; The building height, mass, scale, orientation, architecture and configuration are compatible with the existing character of the area and the character envisioned by the Downtown Development Guidelines. See analysis for criteria (ii) and (ii) above. The building design is contemporary with traditional references. The base of the structure is emphasized with added wood details around the storefront window openings. Per the applicant, more modern storefront proportions like a tall and open first floor and large display windows are married with more traditional elements like wood column detailing at the retail level and goose-neck light fixtures and signage.  (v) Projects are designed to a human scale and promote a safe and vibrant pedestrian experience through the location of building frontages along public Agenda Item 5A Page 291 of 360 streets, plazas, sidewalks and paths, and through the use of building elements, design details and landscape materials that include, without limitation, the location of entrances and windows, and the creation of transparency and activity at the pedestrian level; The use of ground floor storefront windows, wood column detailing, and traditional proportions in the building layout and fenestration helps to establish continuity in the established human scale along Pearl Street. The commercial spaces open directly onto Pearl Street. The public paseo also provides a visual connection through the building to an open public court in the center of the building. As stated above, the project will promote a safe and vibrant pedestrian experience with a relatively wide sidewalk area to accommodate the pedestrian.  (vi) To the extent practical, the project provides public amenities and planned public facilities; The project provides enhanced facilities along Pearl Street, with additional short term bike parking. There are no planned public facilities that impact the site.  (vii) For residential projects, the project assists the community in producing a variety of housing types, such as multifamily, townhouses and detached single family units, as well as mixed lot sizes, number of bedrooms and sizes of units; The attached residential units contribute to the variety of housing types in the community. The units range from 562 to 2,424 square feet in area.  (viii) For residential projects, noise is minimized between units, between buildings, and from either on-site or off-site external sources through spacing, landscaping, and building materials; The residential units are proposed above the street level, which will help to minimize noise from off-site external sources. The applicant states that the cast in place concrete construction will reduce the transfer of sound vertically between the commercial spaces and residential units. Double stud demising walls will help with horizontal noise movement between units on upper levels. Exterior walls on the east and west will be built out of CMU and will greatly reduce any noise impacts between buildings.  (ix) A lighting plan is provided which augments security, energy conservation, safety, and aesthetics; A preliminary lighting plan shows outdoor lighting that provides for security, safety and aesthetics. Pedestrian scale fixtures are used where possible. Lighting design will activate the courtyard as usable open space. Final lighting Agenda Item 5A Page 292 of 360 will be evaluated at the Technical Documents review process. All proposed lighting fixtures must comply with the Outdoor Lighting Ordinance.  (x) The project incorporates the natural environment into the design and avoids, minimizes, or mitigates impacts to natural systems; The project site is a redevelopment of developed property and does not include any significant elements of the natural environment that could be incorporated into the design. Necessary water quality improvements in the form of rain garden planters will be provided.  (xi) Buildings minimize or mitigate energy use; support on-site renewable energy generation and/or energy management systems; construction wastes are minimized; the project mitigates urban heat island effects; and the project reasonably mitigates or minimizes water use and impacts on water quality. The project will be required to meet the 2020 City of Boulder Energy Conservation Code, which is a localized version of the 2018 International Energy Conservation Code that is 20% more efficient than the national code. The structure will be designed to be “solar ready” to support the additional loads of a photo voltaic solar array.  (xii) Exteriors or buildings present a sense of permanence through the use of authentic materials such as stone, brick, wood, metal or similar products and building material detailing; The materials proposed include cast in place concrete, stucco (three coat system), CMU, wood look laminate cladding, cement board siding, and aluminum storefront windows. The concrete will present a stone-like quality or depth. These materials are considered authentic and in character with that of the interface of downtown. The proposed building uses a simple palette of materials that emphasize the base of the structure with added wood details around the storefront window openings.  (xiii) Cut and fill are minimized on the site, the design of buildings conforms to the natural contours of the land, and the site design minimizes erosion, slope instability, landslide, mudflow or subsidence, and minimizes the potential threat to property caused by geological hazards; The site is generally level. The overall slope will be maintained. There will be some excavation necessary to create the basement area of the proposed building. N/A (xiv) In the urbanizing areas along the Boulder Valley Comprehensive Plan boundaries between Area II and Area III, the building and site design provide for a well-defined urban edge; and Agenda Item 5A Page 293 of 360 N/A (xv) In the urbanizing areas located on the major streets shown on the map in Appendix A of this title near the Boulder Valley Comprehensive Plan boundaries between Area II and Area III, the buildings and site design establish a sense of entry and arrival to the City by creating a defined urban edge and a transition between rural and urban areas.  (G) Solar Siting and Construction: For the purpose of ensuring the maximum potential for utilization of solar energy in the City, all applicants for residential site reviews shall place streets, lots, open spaces, and buildings so as to maximize the potential for the use of solar energy in accordance with the following solar siting criteria:  (i) Placement of Open Space and Streets: Open space areas are located wherever practical to protect buildings from shading by other buildings within the development or from buildings on adjacent properties. Topography and other natural features and constraints may justify deviations from this criterion. The site is in an urban context and the new building will reflect that context and traditional urban design pattern by building up to the public right of way on Pearl Street. The building is oriented to take advantage of solar energy systems and can accommodate PV systems. The adjacent buildings to the east and west are not subject to the Solar Access standards since the DT-2 district is within Solar Access Area III, where because of planned densities, topography or lot configurations or orientations, uniform solar access protection for south yards and walls or for rooftops may unduly restrict permissible development. The applicant has submitted a solar access study demonstrating that shadows will not unduly impact residential properties to the north in the RMX-1 district.  (ii) Layout and Building Siting: Lots are oriented and buildings are sited in a way which maximizes the solar potential of each principal building. Lots are designed to facilitate siting a structure which is unshaded by other nearby structures. Wherever practical, buildings are sited close to the north lot line to increase yard space to the south for better owner control of shading. See above. The positioning of building on the site is conducive to solar access. The proposed project is part of a developed urban context and the orientation of the lots will not be modified by the proposal.  (iii) Building Form: The shapes of buildings are designed to maximize utilization of solar energy. Buildings shall meet the solar access protection and solar siting requirements of section 9-9-17, "Solar Access," B.R.C. 1981. The building is designed with a flat roof that will not be shaded by adjacent structures. The building is setback from the alley 15’ to allow the properties to the north better solar access. Agenda Item 5A Page 294 of 360  (iv) Landscaping: The shading effects of proposed landscaping on adjacent buildings are minimized. There are no identified conditions where proposed plantings could negatively affect solar access of buildings in the future. Proposed alley trees are ornamental and will not unduly affect adjacent properties. N/A (H) Additional Criteria for Poles Above the Permitted Height: No site review application for a pole above the permitted height will be approved unless the approving agency finds all of the following: N/A (I) Land Use Intensity Modifications N/A (J) Additional Criteria for Floor Area Ratio Increase for Buildings in the BR-1 District N/A (K) Additional Criteria for Parking Reductions: The off-street parking requirements of section 9-7-1, “Schedule of Form and Bulk Standards,” B.R.C. 1981, may be modified as follows: N/A (L) Additional Criteria for Off-Site Parking: The parking required under section 9-9-6, "Parking Standards," B.R.C. 1981, may be located on a separate lot if the following conditions are met: Agenda Item 5A Page 295 of 360 1 Design Advisory Board (DAB) Design Review Summary DAB reviewed the design proposal for The Navy at 1737 Pearl St on two occasions, March 6, 2019 and September 11, 2019. The project review occurred twice due to the change in scope of the September 11, 2019 proposal to include an additional parcel and increased building square footage. The March 6, 2019 review included 3 board members and the PB liaison. 6 members of the public attended the review and spoke during open comment. The September 11, 2019 review included 5 board members and the PB liaison. 1 member of the public attended and spoke during the open comment. The full DAB information packets, board minutes and public participation comments are available in the links referenced above. March 6, 2019 Fig. 1 Perspective of Pearl Street Elevation March 6, 2019 DAB focused their review and recommendations on each façade. •Front façade – The board said there is not a clear consensus on how to do the third floor (“two over one” vs. the “one over two”). The board had mixed feelings regarding the ATTACHMENT C Agenda Item 5A Page 296 of 360 2 historic pattering but agreed it could go more contemporary. The first floor could use some adjustments. More open space is not necessary nor appropriate but a great first floor will be necessary because that will represent the public open space. Most of the board approved of the third floor stepping back on the front facade. They agreed the second- floor parapet could be extra tall on the front and back of the structure. There was a split regarding a natural looking material vs. stark white. The masonry material and detailing are appreciated. There was division on the board regarding materiality. Suggestions included more detailed contemporary treatments, modern durable materials, less wood, possibly steel and painted masonry. • Back Façade – The board was split regarding the proposed setback. The board was comfortable with the eight-foot upper level setback. They would like the applicant to hold to the fifteen feet setback in the alley. The agreed the rear eyebrow element should to be adjusted. The board was in favor of screening the upper level but not strongly required. The board suggested pushing the first floor back and bringing the second floor out to help with congestion in the alley. They suggested being creative on this façade given the visibility. They did not want to see stucco used on the second floor. • Sides – The board agreed the sides could be fairly blank, however it would be nice to see some art, decorated or something paint related. How the corners are treated will be important. • Parking – All board members were in support of the proposed parking solution. • The board would like this project to come back to DAB after being reviewed by Planning Board and more details are in place. September 11, 2019 Fig. 2 Perspective of Pearl Street Elevation September 11, 2019 Agenda Item 5A Page 297 of 360 3 Fig. 3 Current Perspective of Pearl Street Elevation dated 3/30/2020 The following tables include the summary DAB recommendations from September 11, 2019 organized into review topics and the staff comments of the current design proposal analyzing conformance to those recommendations. URBAN DESIGN CHARACTERISTICS: DAB Comments Staff Analysis of Current Proposal • The board was in favor of the proportions and front façade and the addition of the extra floor. The proportions are consistent with the board recommendations. • Regarding the upper floor, the board approved of the stepping back and the proportions. The step back of the third floor is consistent with the board recommendations. • The board was in favor of the reduction to a ten- foot setback on the third floor in the proposed areas. The setback of the third floor on the Pearl Street elevation is consistent with the board recommendation and varies between 10-15’. ARCHITECTURAL COMPOSITION AND PATTERNING: DAB Comments Staff Analysis of Current Proposal • The board leaned toward keeping the left side of the arch as proposed. The entry arch is consistent with the board recommendation and design presented on Sept 11, 2019. • The board approved of the sides of the building. The sides of the building are consistent with the board recommendations and include Agenda Item 5A Page 298 of 360 4 illustrating a possible mural on the east side. • The board asked that more thought be put into the alley design especially regarding privacy for the neighbors, and the patio setbacks and widths of patios. The board agreed that frosted glass for the patio railings would be acceptable but not clear. Stepping the upper floor back in the rear of the building would be preferred. Large trees in the rear would help mitigate privacy. The rear elevation has been revised to include a redesign of the balconies to include frosted glass. The building does not include setting back the upper floor of the rear elevation. 2 Trees are indicated in the plans for the rear elevation. ARCHITECTURAL DETAILS: DAB Comments Staff Analysis of Current Proposal • The proposed archway had the approval of the board, but there was some concern regarding the detailing of the interior material. The material needs to be more thought out, substantial, and durable. The material composing the arched entry is two layers of materials built up in a casing fashion around the entry tunnel. This detail includes several levels of reveal working back to the wall material lining the tunnel. • The arcade at the retail level, clad with wood on the inside, also had the board divided. It may be dependent on how the inside of the arch is treated. The design includes wood-like material on the inside of the arch entry to the courtyard. • The focal feature in the courtyard needs work. Focal feature will be further designed further in the Technical Document phase. • The interior courtyard plinth should wrap around inside the courtyard. The interior courtyard plinth does not extend. Instead the concrete and wood archway is a built up casing element around the wood entry portico that terminates on the feature wall with the same wood material and an feature element. • Darker doors in the rear on the first level to match the darker cladding would be preferred. The rear door and entry area have been expressed with dark paint and wood cladding to accentuate this area. Agenda Item 5A Page 299 of 360 From:Arrone Appel To:Walbert, Sloane Subject:1727 and 1737 Pearl Street Date:Tuesday, January 21, 2020 5:59:29 AM External Sender Dear Sloan, I am a long time resident of Boulder and a CPA who has practiced in Boulder for more than 30 years. I have lived on Balsam Drive since 1993. I am writing to you since I have reviewed the plans and renderings of the project listed above. I support the project in every way and believe it would add to the city of Boulder. It is a beautiful plan and would serve our community well. Best regards, Arrone Appel Thank you,   Arrone Appel CPA  | Principal | Arkose Tax & Consulting 2425 Balsam Drive, Boulder, CO 80304 p: 303-545-5755 e: aappel@arkosetax.com Unless otherwise stated herein any advice contained in this communication (including any attachments) related to a Federal tax issue is not intended or written to be used, and cannot be used, for the purposes of (1) avoiding penalties under the Internal Revenue Code or (2) promoting, marketing, or recommending to another party any transaction or matter addressed herein. NOTICE: This E-mail message contains privileged and confidential information intended only for the use of the individual or entity name above. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by return e-mail, or by calling the sender at 303.545.5755. Thank you. ATTACHMENT D Agenda Item 5A Page 300 of 360 From:Paul Arnold To:Walbert, Sloane Cc:Angela Topel Subject:Support for 1727 and 1737 Pearl St. Project Date:Friday, December 20, 2019 10:28:16 AM Attachments:1727 Pearl St. Letter of Support.pdf External Sender Sloan, Please accept the attached letter as an expression of my support for the proposed development of 1727 and 1737 Pearl St. As a local business owner, I believe this project and others like it represent progress in our City. Happy Holidays! Thanks, Paul Arnold LEED AP BD+C, M.S. 3109 28th St. Boulder, CO 80301 303.818.3042 Cell 720.485.5792 Office 720.749.6927 Fax www.pgarnold.com Agenda Item 5A Page 301 of 360 720.485.5792 paul.arnold@pgarnold.com www.pgarnold.com December 20, 2019 Sloan Walbert City of Boulder Planner II 1777 Broadway Boulder, CO 80302 Re: Letter of support for 1727 and 1737 Pearl St. Proposed Project Dear Sloan: Please accept this letter as an expression of full support for the proposed development of a mixed use building at 1727 and 1737 Pearl St. As a business owner in the City of Boulder I feel that this proposed development will have overwhelming positive impact on the City as a whole. I understand that there are a few neighbors in opposition of the project and thus it is in jeopardy. I would hope that City Staff will take the global view of the project and realize its net positive impacts on our community and the vibrancy of business in Boulder. As a construction professional I know all too well that no matter what the project there will always be impacts on the surrounding areas. Our trade creates noise, traffic and dust. This is unpleasant during the construction process, but the end result is an improvement from the previous situation almost without exception. Please take the long view of this situation and realize that the neighbors will be happier in the long run with a vibrant mixed-use facility next door. Please feel free to contact me if you have any questions at 720.485.5792 or paul.arnold@pgarnold.com. Thanks, Paul Arnold LEED AP BD+C, M.S. Cc: n/a Agenda Item 5A Page 302 of 360 From:Bruce Borowsky To:Walbert, Sloane Subject:Collective on Canyon Date:Thursday, February 14, 2019 12:01:44 PM Hi Sloane - if you could please send me updates regarding this project it would be much appreciated. My wife, myself, and many others in our neighborhood are quite concerned about the extremely large number of people that the landowners are hoping to fill the space with. I understand their thirst for profit, but it must be balanced with the actual neighborhood and community needs, since we have to live with it each and every day. Thanks!, Bruce ---- Bruce Borowsky 1716 Grove St. Boulder, CO 80302 Agenda Item 5A Page 303 of 360 From:Chris Boyd To:Walbert, Sloane Subject:1727 and 1737 Pearl Street - favorable review Date:Thursday, December 19, 2019 11:53:24 PM Attachments:image001.png External Sender Sloan,   I am reaching out to share my support of the project for 1727 and 1737 Pearl Street.  I recently reviewed the plans and mockups and as an owner of commercial office space in Boulder I found it to be a very considerate improvement and in keeping with the look and feel I value in Boulder. The elevation is an attractive addition to 17th street block.  With Retail on the first floor, residential on the 2nd and 3rd floors and the open interior offer the right mix of amenities and thoughtfully look to meet the needs of those living in or visiting Boulder.  The third floor open decks provide a visually appealing look and are very much appreciated in keeping the buildings feel ‘soft on the street’.   Improvements like this project are ones I welcome to my Boulder and I am happy to provide my support for the project.   Keep Smiling, Chris ________________________________ Chris Boyd 720.504.0999 x700 Book time with me (click here) boyd@technologyhelpers.com Submit a support request: help@technologyhelpers.com or 720-504-0999 For normal hours support: extension 0 For emergency support: extension 1   Agenda Item 5A Page 304 of 360 From:AJ Chamberlin To:Walbert, Sloane Subject:Pearl Street at 1727 and 1737 Pearl Date:Friday, December 20, 2019 1:33:15 PM External Sender Sloan, I believe this project is creative, interesting, fresh and unique. It is great to have a courtyard for all people involved. This creates more of a sense of community. The patrons, businesses and residents can use the courtyard. Perhaps bands and community functions can happen there? The city can possibly host outdoor meetings there. I do not see that the building should be set back further than the 15' in the alley as that would detract from the courtyard. Diversity is a good thing. The massing can be visually pleasing with some easy local artwork, but I do not think that needs to be spelled out. It would be fun to have a contest or something. Plus once the trees grow in the ally that will change the overall visual simplicity. -- Best Regards! AJChamberlin Attitude Homes, LLC 2245 Broadway Boulder, CO 80302 Cell: 303-588-8999 Fax: 303-261-8288 AJ@AttitudeHomes.com www.AttitudeHomes.com Helping you to invest wisely in this real estate market. Interest rates are in the Low 4's depending on your financials and credit scores! Prices and interest rates will be increasing soon! Lock in great values before it is too late! We won't ask you for your social security number, bank account or other highly confidential information over email. *Wire Fraud is Real*. Before wiring ANY money, call the intended recipient at a number you know is valid to confirm the instructions. Additionally, please note that the sender does not have the authority to bind a third party to a real estate contract via written or verbal communication. http://www.realestateshows.com/106539 Agenda Item 5A Page 305 of 360 Boulder Living Blog http://chamberlinteam.blogspot.com This communication is for use by the intended recipient(s) only and may contain information that is privileged, confidential and exempt from disclosure under applicable law. If you are not an intended recipient of this communication, you are hereby notified that any dissemination, distribution or copying hereof is strictly prohibited.If you have received this communication in error, please notify me by reply e-mail, permanently delete this communication from your system and destroy and hard-copies you may have printed. This communication is covered by the Electronic Communications Privacy Act, 18 U.S.C. 2510-2521 Agenda Item 5A Page 306 of 360 From:Scott Crabtree To:Walbert, Sloane Subject:1727 and 1737 Pearl St project support Date:Friday, January 03, 2020 3:02:14 PM External Sender Sloan- I wanted to send my support for the project at 1727-1737 Pearl as this block is in need of great projects like this on to connect the east end of Pearl and increase the shopping experience. Thanks, Scott Crabtree, MBA LEED® AP | Broker Associate The Colorado Group, Inc. | 1539 Pearl St | Boulder, CO 80302 C (208) 720-6215 | P (303) 449-2131 x125  crabtree@coloradogroup.com   Head to crabtreeboulder.com for more insights.   Agenda Item 5A Page 307 of 360 From:Bruce Dierking To:Walbert, Sloane Subject:1727-37 Pearl Street Date:Friday, December 20, 2019 4:28:38 PM External Sender Sloan,   Among other Boulder properties, we own 1945-65 28th Street just off of 26th and Pearl Street, and accordingly, we frequent many businesses along East Pearl.  I have reviewed the proposal for the 1727-37 Pearl Street property and am writing to express my support.   In particular, I think the proposal does a nice job of fitting into the existing neighborhood while also adding something that is unique but still harmonious.  I was glad to see that the third level of the building is set back, and I really like the pass-through from the street into the courtyard. The single biggest thing that can be done to make a development fit in on East Pearl is to get the pedestrian experience right.  This proposal does a great job of that by activating the street at the ground floor with commercial space, keeping the pedestrian feel to two-stories with the third-floor setback and providing the unique pass-through into the courtyard, which really creates a unique permeability.  The proposed coloration will also create something that is unique but not in conflict with surrounding properties.   For these reasons, I enthusiastically encourage the City to approve this project.   Best regards, Bruce Dierking     Agenda Item 5A Page 308 of 360 From:Kevin Eggleston To:Walbert, Sloane Subject:Proposed project at 1737 Walnut Date:Thursday, January 31, 2019 4:01:35 PM Sloane, I'm writing in support of the condo development at the above address. My wife and I are thrilled to see that the project includes two floors of condos on top of the first floor of retail space. We also like the proposed ample open living space. We're crossing our fingers that this project goes through successfully. Kevin Eggleston 1655 Walnut St. #306 Agenda Item 5A Page 309 of 360 From:David Foster To:Walbert, Sloane Subject:1737 Pearl: LUR2018-00073 Date:Friday, December 28, 2018 11:13:08 AM Hi Sloane, We received the development notice for 1737 Pearl St. Our home is an alley house at 1722 Spruce St, which is between Pearl and Spruce. The project sounds like an upgrade, our only concern is construction vehicles / equipment impeding access to our home via the alley (which is our only access point for our garage and carport). Will this be adequately managed to ensure residents like us aren’t negatively impacted? Thanks, David Foster Agenda Item 5A Page 310 of 360 From:Ashley Foster To:Walbert, Sloane Subject:1737 Pearl Redevelopment Date:Tuesday, January 29, 2019 7:34:15 AM Hi Sloane, Thank you for your presence at last night's 1737 pearl redevelopment meeting. This morning I stood in our kitchen watching the sunrise. Though I was reassured that this new development won't take away from our direct light, it truly will. This is disheartening for us. It was very clear that we have no say in the height and development because they're entitled to 38'. Can you please guide me to where in the plans show the north facing shadows and shading of the alley? As I mentioned last night, there needs to be a weight restriction of trucks for the alley to ensure the residential homes sewer lines aren't compromised by heavy concrete mixing trucks. An alternative to weight restrictions would be to repave the alley before the construction begins to create a thicker barrier, protecting the residential sewer lines. Please let me know your thoughts on this. I would like to be present at the design meeting, so as soon as you have a date please let me know. Cheers, Ashley Foster 1722 Spruce St Agenda Item 5A Page 311 of 360 From:Crystal Gray To:Walbert, Sloane Cc:Ray Wrigley; Lori Hunter; John Spitzer; Pannewig, Hella; Murphy, Norman; Toby Tenenbaum Subject:1737 Pearl Building questions and comments Date:Wednesday, October 30, 2019 7:22:12 PM External Sender Hi Sloane, I had an Eco-Cycle meeting the night of the neighborhood meeting so I was not able to attend the neighborhood meeting for 1737 Pearl. I live within 600’ of the proposed project and received notice of the meeting. Please consider my comments and questions. The city Development review page has old plans and new plans for this project. Is there anyway to differentiate between the current plans and the older ones? Will this project be scheduled for a site review or a call up? This sentence from the design guidelines would be a good one to measure the project success by - “Consideration should be given to creating an appropriate interface to the residential development and minimizing impacts.” I do support the mix of residential and retail and the applicant should be aware that the porches/balconies on the north facade abut an established Residential Mixed Density zone. Lights and noise from porches should be mitigated. It would be less intrusive on the north side residences if a third story was stepped back from the required alley set back. Many Boulderites enjoy walking the alleys so making them pleasant, with green, and art would be much appreciated. I attached a photo of some recent art on this very alley. Maybe even a place to sit for the weary restaurant/retail workers taking a break. Just an idea. This area of Pearl Street has closing hours for restaurant/retail and I was glad to see mention of this in the staff review notes. The area is a thriving retail/restaurant area and the closing hours have worked well for the neighborhood - who are patrons too. The applicant’s written statement says they want their residents to avoid the exhaust from the cars in the alley and that is why they have residents on the upper floors. Maybe they can do an all electric car project as part of their TDM to mitigate the exhaust issues for adjacent neighbors from this project. It would be a win-win and be trend setting. I though this sentence in the staff review was very appropriate and I hope the applicant will use this comment to help guide design revisions: “.... by encouraging architectural solutions that are visually pleasing, reflective of contemporary times yet stylistically appropriate to the context, and compatible in scale and character with their street”. There are several areas of the code that address design and compatibility and even though the owner says they want to avoid the ‘monotonous red brick’, which is found up and down East Pearl, the dark blue and white pallet seems too artificial and out of place - it looks like ‘coastal nautical’. This will be a building with a long facade spanning several lots and will be very prominent. It would be interesting to see it divided into several sections like other buildings on the street have done. A material besides stucco would look more permanent and more in character with this area. Quite frankly, the stucco buildings are the least successful in this area. I would suggest taking walk up and down east Pearl where there are some good examples of brick with metal that harken back to the commercial and light manufacturing uses - yet they have a contemporary twist. The building should not be given set back modifications along the north where it abuts the RMX-1 zone. The solar Agenda Item 5A Page 312 of 360 access shadow should not encroach on the northern properties as this would limit their potential for solar access. The mechanical on the roof should be calculated into this height. Society is changing and individuals are taking responsibility for their carbon foot print. This includes those who want to transition off fracked gas and on to electricity supported by solar in their own yards. Please make sure this possibility is preserved. Has the applicant considered PV panels on the roof? It could mitigate the need for some of the mechanical roof top structures. I believe there are a few buildings in the 1500 and 1600 block of Pearl (north side) that do not have mechanical on the roof. They are mixed use also. Hopefully they are not using gas for mechanical functions. There is high ground water in this area and with underground parking I would want to make sure any pumping, and discharge, does not flood the alley or the properties to the north. The Nature Conservancy property on Spruce near Folsom in a high ground water area, with pumping, is closed due to mold. Groundwater and discharge is a real concern in the neighborhood. Thanks for taking my comments into consideration. Best, Crystal Gray 303-906-5509 Sent from my iPad Agenda Item 5A Page 313 of 360 From:Peter Hoglund To:Walbert, Sloane Subject:Support for 1737 Pearl Project Date:Thursday, December 12, 2019 3:08:03 PM External Sender Hello Sloan, My name is Peter Hoglund and I'm an owner of Frasca Food and Wine and Pizzeria Locale at 1738 and 1730 Pearl. I wanted to take the time to write to you in support of the development of 1737 Pearl Street. We have been an anchor of East Pearl for 15 years and we welcome the development as long overdue. We have reviewed the design with Adam Wertz and believe that it would be a beautiful addition to East Pearl. The addition of the updated design aesthetic to the neighborhood, professional looking retail/restaurant space and knowing Adam make me confident that his vision for this block is beneficial to the city, neighborhood and business community. I am available for any questions or additional letters of support. We have been a tenant of East Pearl long before most of the current businesses were located here. We take our responsibility as stewards seriously and after careful review, we agree that the development presents tremendous positive benefit for the city. Thank you for your time. Best, Peter -- Peter Hoglund Partner Frasca Food and Wine, Inc. peter@frascafoodandwine.com c: 303.956.7416 Agenda Item 5A Page 314 of 360 From:Chris Hulse To:Walbert, Sloane Subject:1737 Pearl Street Project Date:Monday, March 04, 2019 5:40:31 PM Dear Sloane, As I may have mentioned to you previously, my family and I own 1836 & 1844 Pearl Street, and I'd like to reach out and provide my approval and support for the project that has recently been proposed at 1737 Pearl St. I believe the project will establish a much needed landmark for the east end of Pearl Street, and is a good fit for the surrounding neighborhood and community. Currently, there are several buildings on East Pearl that are old and dilapidated, many of which sit vacant and divert both locals and tourists from this part of town. I believe this project will serve as a catalyst for additional redevelopment of neighboring properties, which will serve to bolster the economic vitality of this area and provide an overall benefit to the community as a whole. I'm pleased to see a 3 story concept designed within the current height limitations, and feel that the residential units inclusive of large decks and outdoor gathering space fill a significant void in the current downtown housing market. I may not be able to make it to all the meetings, but want to express my support and approval for this project. Please feel free to contact me with any questions or comments. Sincerely, Chris Hulse Chris Hulse RBC Builders LLC chrishulse@hotmail.com 720.556.3043 PO Box 18114 Boulder, CO 80308 Agenda Item 5A Page 315 of 360 From:Lori Hunter To:boulderplanningboard Cc:designadvisoryboard@bouldercolorado.gov; "Ray Wrigley"; "David Davis"; "Jill Vidas"; Murphy, Norman; "Ashley Foster"; "David Foster"; "Cynthia Sass"; "Sandee Cirian"; spike@indra.com; kolivia@hotmail.com; "John Spitzer"; "Wallace Steve"; "Karen Sperry"; Walbert, Sloane; "Lori Hunter" Subject:Resident input on Navy Redevelopment Date:Saturday, March 09, 2019 8:18:07 AM Attachments:Planning Board Letter Hunter.pdf Planning Board, Attached please find input on the Navy Redevelopment. I am an immediately adjacent neighbor to the development, which is located in a DT-2 transitional zone between downtown and surrounding residential districts. Thank you for your consideration, Lori Hunter 1734 Spruce Street Agenda Item 5A Page 316 of 360   Lori Hunter  1734 Spruce Street  Boulder, CO 80302  lorimaehunter@comcast.net  720‐595‐9674  March 9, 2019    Planning Board Members,  This week I attended, along with several of my neighbors, the DAB meeting on the development at 1737  Pearl Street – the “Navy Redevelopment” (LUR2018‐00073). While the meeting’s discussion  demonstrated the design prowess of its members, it entirely neglected the fact that this development  is in a “transitional” zone between commercial and residential. I respectfully request that the Planning  Board broaden its consideration to include these critical impacts on residential areas as this  development sets an important precedent for these transition blocks along east Pearl. Below are  details from the meeting’s dialogue.  During the public comment period, neighbors expressed concern with mass, scale, design, privacy and  alley congestion. All such comments were guided by the hope that Boulder’s urban design guidelines  regarding transition zones might be considered since the development is immediately adjacent to  residential alley access and backyards and is explicitly in a transition zone.   Many Board members spoke in favor of maximizing density, some believed the building’s 3‐story façade  offered a unique break in the parade of 15‐foot setbacks – an opportunity for something unique. Some  expressed concern with alley congestion while others noted such congestion is simply a characteristic of  alleys. The issue of privacy for neighbors was a non‐starter and one Board member even noted that  contemporary trends are such that urban residential buildings often have large windows, reducing  privacy but increasing solar.    These comments aren’t necessarily wrong and some certainly align with Boulder’s broader urban  development goals – but they entirely neglect the fact that this development is proposed for a  transitional zone, zones which receive particular attention in the urban design guidelines. Below are  excerpts from these guidelines, with the development design’s entire neglect subsequently noted.   Transitional zone guideline: Encourage sensitive design along the edge where the Downtown  commercial area abuts residential neighborhoods.  o The building virtually maximizes mass through requests for exceptions and by including  a reduced set‐back. It also includes a front façade which increases perceived height and  a rear façade that encroaches on privacy and offers no architectural interest. The  request for an exception on the alley setback would intensify congestion in an area that  provides residential access and is already highly congested. On the set‐back, the original  design’s is only 8 feet, while guidelines request that designs “maintain the historic or  predominant building set back line” … and “For new structures that are significantly  taller than adjacent buildings, upper floors should be set‐back a minimum of 15 feet  Agenda Item 5A Page 317 of 360 from the front façade to reduce perceived height.” These guidelines are even outside of  transitional zones.   Transitional zone guideline: Emphasize a clear distinction between the commercial and  residential interface areas.  o Simply put, there is absolutely nothing about this design that offers a distinction – it is a  continuation of mass and scale from the downtown core, even with a reduced setback.   Please consider carefully.   Transitional zone guideline: Maintain the diversity in building type and size and respect the  adjoining residential character.  o Again, no sense of “respect” for adjoining residential character. None.   Transitional zone guideline:  Discourage adverse impacts from noise, night lighting, poor  building design, and commercial service areas on adjacent residential neighborhoods.  o The request for an exception at the alley demonstrates lack of concern. The loss of alley  space will intensify the challenge of commercial service areas on the immediately  adjacent neighbors and access to their homes.  Open space is also lost – a 75% reduction is requested. The Board members appeared to agree that  open space is simply a challenge for urban developers to provide – intriguing to me as a Boulder  resident since our urban design guidelines explicitly note:   Consider the quality of open space incorporated into new and renovated buildings … Well  programmed plazas, courtyards, outdoor seating and dining areas on or adjacent to open  spaces and pedestrian routes are encouraged.  o These are the guidelines even outside of the transitional zone – and yet they were  entirely neglected – in fact, countered – in the Board’s dialogue!  I would argue that in a  transitional zone, open space is actually a key pathway through which design can be  sensitive to, and respectful of, the adjoining residential character. Simply look across the  street from this development to see a public plaza adjacent to Frasca.  In all, at issue for the Planning Board, the requested modifications have important impact on the  adjoining neighboring areas, which per the guidelines, are supposed to be considered with in  development plans.   ASK: additional setback in alley.    o IMPACT: increased congestion in alley that provides access to adjoining homes.   ASK: three stories instead of two.   o IMPACT: additional housing unit with views to neighboring windows and yards.   ASK: open space reduction.  o IMPACT: maximized mass with lack of plaza, courtyard, seating would help with scaling  down to the residential area, offering a more “clear distinction” between commercial  and residential interface areas.     ASK: four parking places instead of required six.  o IMPACT: the surrounding residential blocks do not have paid parking and congestion is  already intense.  Agenda Item 5A Page 318 of 360 Finally, I also balk at the contention that the development will provide “much needed housing” in  Boulder.  Indeed, housing is in short supply, but not this type of housing. The wealthy have options.  This is a precedent‐setting redevelopment within this transition zone and I respectfully request that the  Planning Board consider Boulder’s wisdom in development of this guideline:    Encourage sensitive design along the edge where the Downtown commercial area abuts  residential neighborhoods.  In so many ways, this development simply does not.                Agenda Item 5A Page 319 of 360 From:Lori Mae Hunter To:Ray Wrigley; Walbert, Sloane Cc:Crystal Gray; Pannewig, Hella; Murphy, Norman; Toby Tenenbaum; Ferro, Charles; Chris Russell; Karen Sperry; spike@indra.com; Sandee Cirian; Ashley Foster; David Foster; David Davis; John Spitzer Subject:RE: 1737 Pearl Building questions and comments/ PROPOSED CALLUP Date:Friday, November 22, 2019 8:04:15 AM Sloane,   My comments can probably be summarized in the request for an answer to one question.   · What about this design is responsive to the fact that it is in a transitional zone?   In other words, in what way(s) is this design *different* than if the building had been designed for an area that wasn’t a transitional zone?  I can think of two potential answers: 1) the proposed opaque balcony railings, and 2) the setback of the third story although that may have been required for other reasons.   I can imagine, however, that both of these would also be common in non-transition buildings given implications for in-building resident privacy and also the building shadow. It’s also important to note that the shadow from this proposed development still has tremendous impact on alley neighbors and, therefore, hasn’t even offered a workable “transition” from the perspective of the neighboring residences.   In all, I wonder if there are sufficient design considerations to meet the city’s thoughtful designation of transition zones?  Additionally, is it not necessary to consider other aspects of the design (e.g. front façade)?   Thank you,   Lori Hunter 1734 Spruce Street     From: Ray Wrigley <rtwrig@gmail.com>  Sent: Monday, November 18, 2019 9:09 AM To: Walbert, Sloane <walberts@bouldercolorado.gov> Cc: Crystal Gray <graycrystal@comcast.net>; Lori Mae Hunter <Lori.Hunter@colorado.edu>; Pannewig, Hella <Pannewigh@bouldercolorado.gov>; Norm Murphy <normanmurphy@gmail.com>; Toby Tenenbaum <tobiastenenbaum@gmail.com>; Charles Ferro <FerroC@bouldercolorado.gov>; Chris Russell <chris@thestudioarchitecture.com>; Karen Sperry <karensperrydesign@gmail.com>; spike@indra.com; Sandee Cirian <sandee.starlite@gmail.com>; Ashley Foster <thisisashleyfoster@gmail.com>; David Foster <davidfoster23@gmail.com>; David Davis <vidasdavis@gmail.com>; John Spitzer <jspitzer011@comcast.net> Subject: Re: 1737 Pearl Building questions and comments/ PROPOSED CALLUP Agenda Item 5A Page 320 of 360 From:Tom martini To:Walbert, Sloane Subject:1737 Pearl St. Date:Friday, December 06, 2019 1:14:52 PM External Sender Hi Sloan - I am writing to express my strong support for the 1737 Pearl St. Project. I have looked at and been interested in many downtown condo and/or mixed use projects, and believe this one is definitely at the top. This east end of Pearl is slowly being revamped, and the 1737 Pearl St. Project will stand out as a premier addition to the neighborhood. Obviously much thought has gone into the project design. This is evidenced in the attractive exterior design as shown in the renderings, the three-story building fits well with the other buildings on both sides of this block, the enticing and useful central courtyard provides useable ground floor space for everyone and allows ample light into the second and third floor residences, and the elimination of the alley utility lines and the inclusion of extra landscaping/trees are pluses and improvements to the neighborhood. Also, the existing alley parking areas behind the current buildings are an eyesore and this new development will clean all of this up. I trust the City will approve this wonderful, thoughtful project. Thank you, Tom Martini 3737 Spring Valley Rd. Boulder Agenda Item 5A Page 321 of 360 From:Paul Baryames To:Walbert, Sloane Subject:Re: Proposal at 1737 Pearl St. Date:Friday, February 01, 2019 5:39:45 AM I talked to the Architect. A little concerned on granting a variance on a back alley as cars are big and need a turning radius. So the variance is beneficial to the developer but what does it offer the property owner directly north? And, what is the benefit to the city of Boulder? IF and it's an IF you said no variance and it required the developer to move the northern edge towards Pearl to meet the requirements what would that do? He has less "space in his building to sell/ rent" BUT, he meets the code. Interesting thoughts.... Is granting that variance a precedent or are they asking for a variance that is a consistently granted variance for that area? Is the code incorrect and that is what actually needs to be changed? Now, I would say a LOT of the code is poor and is hinders logical development. But that argument will never be won by a citizen. You all in the planning department are way off on what you let happen and what you restrict.I'm not political at all but I do own property and overall I am very unhappy with every and all planning discussions, meetings, and decisions that I attend and eventually see the results of. Recently the Berkeley Model has been thrown at me on a project. My response. If I wanted to live in Berkeley I would move there! Their model stinks (if you call it a model at all), and, if you spend any time there you will see a city that is a mess. The discussion went nowhere with your planners On Thu, Jan 31, 2019 at 5:21 PM Walbert, Sloane <WalbertS@bouldercolorado.gov> wrote: Paul, My sincere apologies. Unfortunately your emails keep getting caught in our email security before they are released to me so there has been a delay. I have added you to my contact list and it shouldn’t happen again. I want to assure you that there is plenty of opportunities for comment. Please review the plans and let me know if you have any comments or questions. Thank you, Agenda Item 5A Page 322 of 360 From:John Spitzer To:Walbert, Sloane; Ferro, Charles Cc:Spitzer John Subject:1739 Pearl Site Review Date:Thursday, January 03, 2019 11:07:35 AM Jan 3, 2019 Dear Sloan, Thank you for notifying the Whittier Neighborhood of this project. I have spoken to a number of residents and wanted to get preliminary comments into you by the January 4, 2019 deadline although I plan to contact residents that live on Spruce Street directly north of the project along the alley for additional comments. If it is possible I would like to set up a meeting between you and those residents so you can explain the project and answer questions. Following are some initial comments: The Downtown Design Guidelines (attached below) apply to this project since it is in the Interface zone and abuts a residential zone. The objectives of the Interface zone, page 25, seem appropriate and should be followed as well as guidelines (p. 26) 2.1 and 2.2. This residential area of the Whittier Neighborhood was surveyed, by Landmarks, and found to be eligible for an Historic District so extra care of the alley treatment is warranted. Although the residential area is not an Historic District many of the structures were build around the turn of the 19th century and trigger a Landmarks review of alterations to the facade and to older alley structures. Having the six residential units, on the 2nd and 3rd floors, is preferable to offices on the upper floors as the impacts will be less and they will provide much desired housing and ‘eyes on the alley’. Housing also contributes to a vibrant downtown neighborhood so it is appreciated and it would be good to have the developer consider meeting their affordable housing requirement (20%) on site. If the retail space, on Pearl, is to be used for a restaurant/cafe/bar, it should close by 11 pm as the other restaurants in this area do. I believe that there are criteria that require a use review, to set size and hours of restaurants, if they are larger than 1500 square feet or will stay open after 11 pm. Can you clarify if the retail will be a restaurant please? It is unfortunate that the neighborhood will lose two local businesses, so hopefully the owners will try to attract other local businesses by having smaller retail spaces. The applicant is requesting to have the rear set back (abutting the residential zone) reduced from 15’ to 12’8”. It is preferable to keep the setback at 15’ to minimize the shadows cast from onto the residential properties to the north. It would be helpful to have a shadow analysis of both the 15’ and 12’8” set backs. A larger set back will also help with space for deliveries to the first floor retail without blocking the entire alley. Please see the mixed use building at 1637 Pearl which has a 33’ set back from the alley -they also have alley landscaping which would be nice to see on this site. Many people use the downtown alleys for biking and walking and the alleys should be more attractive. Agenda Item 5A Page 323 of 360 Does the requested open space reduction, from 15% to 4%, cause the building to be pushed closer to the alley? If your staff analysis can address this that would be appreciated. The third floor should also be stepped back from the alley setback - this includes the balconies The plans show the 3rd floor directly above the second floor further impacting the shading of the properties north of the alley. The closed ends of the alley balconies give the impression of a continuous wall. Stepping the building back on the alley side will also make for a more interesting alley facade. The Design guideline 2.1 (C) address “Design all sides of the building including the alley elevations” - of course the building is designed on the alley side but it could be improved. Additionally, reading the guidelines they discuss a 15 foot set back to the third story on the front facade. I don’t believe the plans show that is occurring. The Transportation Demand Management (TDM) Plan that the applicant submitted does not address if Eco-passes will be provided to the 6 residential units. Can you please clarify if that is correct? It would be desirable for them to have Eco-passes since this area has great bus connections. Hopefully the building will be wired for rooftop solar as well as for electric vehicles. Thank you for considering these comments. Respectfully, John Spitzer 303-345-4004 Downtown Design Guidelines: https://www-static.bouldercolorado.gov/docs/5B_ATTACHMENT_A_- _2016_Downtown_Urban_Design_Guidelines-1-201602111727.pdf From the Downtown Design Guidelines ( p. 25) for the Non-Historic and Interface areas: The important design elements are .......3) new building design can reflect the character of its own time and have meaningful juxtapositions, while respecting the integrity, scale, and massing of historic buildings in the surrounding areas; and 4) minimizing impacts to the surrounding residential through careful design in the Interface Area which respects the scale and quality of adjacent residential uses and thoughtfully transitions the commercial and P. 25 -The urban design objectives for the Non-Historic and Interface Areas are to: • Reinforce the character of Downtown as a pedestrian place by encouraging architectural solutions that are visually pleasing, reflective of contemporary times yet stylistically appropriate to the context, and compatible in scale and character with their street. • Encourage sensitive design along the edge where the Downtown commercial area abuts residential neighborhoods. • Emphasize a clear distinction between the commercial and residential interface areas. • Maintain the diversity in building type and size, and respect the adjoining residential character. • Discourage adverse impacts from noise, night lighting, poor building design, and commercial service areas on adjacent residential neighborhoods. Agenda Item 5A Page 324 of 360 Since the adjoining Whittier Neighborhood is eligible as a National Historic District, I believe the historic interface guidelines should also be applied! Agenda Item 5A Page 325 of 360 From:John Spitzer To:Walbert, Sloane; Ferro, Charles Cc:John Spitzer; Wrigley Ray; Lori Hunter; Murphy, Norman; David Foster; sandee.starlite@gmail.com; Karen Sperry; spike@indra.com; Ashley Foster; David Davis; Whitacre Janice; Wallace Steve; boulderplanningboard; Council Subject:Demolition/ construction at 1737 Pearl Site Review/ DAB/ Date:Thursday, February 07, 2019 8:43:12 AM Sloane — Thanks for having the neighborhood meeting on Jan 29, 2019 for the above project. I believe that this project is contingent on a substantial "open space" reduction — based on a large monetary “contribution” in years past to the downtown Pearl St. Mall (not to CAGID). But at the neighborhood meeting, Jeff Dawson, the architect, said to me that he was unable to find any such contribution, although, he thought it might be there “somewhere” in the records. This project should not go forward unless and until this issue is resolved. Please note that the existing zoning adjacent to an interface zone specifies a “two story building.” I think it is important for the architect to supply a street rendering of the 17th-18th block (north side) to show that the buildings there now are almost completely one and two-story buildings. The only exception is the Coburn Building, one building east of 17th — and this building only has a small gable end, setback, at the 38’ height. Since there may be major changes in the project, is still a good idea to go to DAB in early March? What is the possibility of the Planing Board calling this up for a concept review? Also, a number of us were put off by "threats” from the architect and developer that they would just go ahead and build (an admitedlly ugly!) 2-story building at the full “allowed” height of 38 feet. Can they do this? Note that the proposed “filled” in third story setback is completely inappropriate — this creates at “wall” along Pearl Street, and cuts against any third story setback advantages. The proposed “elevator” parking will create a hazard for cars and pedestrians in the alley. With a proposed building setback of only 11 feet from the alley, a driver of a car exiting the elevator will in most cases be unable to see passing cross traffic behind. Of course a flashing light or small siren might help — but this would only make things much worse for residential neighbors to the north of the alley. Agenda Item 5A Page 326 of 360 Let me know your thoughts, John Spitzer 303 345 4004 See application for 1737 Pearl Street at: https://maps.bouldercolorado.gov/development- review/ Agenda Item 5A Page 327 of 360 From:John Spitzer To:Walbert, Sloane Cc:Wrigley Ray; John Spitzer; Wallace Steve; Murphy, Norman; David Foster; Sandee Cirian; Karen Sperry; spike@indra.com; Ashley Foster; David Davis; Whitacre Janice; Lori.Hunter@colorado.edu; boulderplanningboard; DAB Subject:Demolition/ construction at 1737 Pearl Date:Sunday, February 24, 2019 7:35:14 PM Sloane – Thanks for holding the recent developer’s neighborhood meeting. The proposed third floor balconies on the north side will eliminate backyard privacy for the four residential properties closest to the development. The solar shading analysis, while maybe technically correct, is almost certainly very misleading to citizens: it assumes that there is a 25’ tall “solar fence” around the property -- and only shadows going above this fence are shown. Put another way, it assumes that all properties to the north have a 25’ tall yard “plateau” above the alley! One of the recurrent points that was brought up is that 38’ tall proposed building -- up to the maximum permitted height -- and going from Pearl St. almost to the alley in the rear. The building is just too large. Not only will it block important views (and the sun!) to the south, but it will also create icy and snowy alley conditions in the winter -- making the alley hazardous to both pedestrians and vehicles. In addition, with the “elevator” parking system, and only 11’ to the alley, drivers backing out of the elevator will in most cases not be able to see passing vehicles and pedestrians in the alley. This could be alleviated somewhat with a small “siren” or flashing red light, but this would make things much worse for Agenda Item 5A Page 328 of 360 the historic neighborhood to the north of the alley. Please note that the existing zoning adjacent to an interface zone specifies a “two story building.” I think it is important for the architect to supply a street rendering of the 17th-18th block (north side) to show that the buildings there now are almost completely one and two-story buildings. The only exception is the Coburn Building, one building east of 17th — and this building only has a small gable end, setback, at the 38’ height. Significantly, the developer provided no street elevations of this block to the north side of Pearl. Note that the proposed “filled” in third story setback is completely inappropriate — this creates at “wall” along Pearl Street, and cuts against any third story setback advantages. Furthermore, we believe that this project is contingent on a substantial "open space" reduction — based on a large monetary “contribution” in years past to the downtown Pearl St. Mall (not to CAGID). But at the neighborhood meeting, Jeff Dawson, the architect, said to me that he was unable to find any such contribution, although, he thought it might be there “somewhere” in the records. This project should not go forward unless and until this issue is resolved. Since there may be major changes in the project, is still a good idea to go to DAB in early March? When can we call up this project for a Planning Board concept review? Also, a number of us were put off by "threats” from the architect and developer that they would just go ahead and build (an admitedly ugly!) 2-story building at Agenda Item 5A Page 329 of 360 the full “allowed” height of 38 feet. Can they do this? Let us know your thoughts, John Spitzer, for the Whittier Neighborhood Association, working with close- by affected citizens Ray Wrigley Lori Hunter Ashley Foster Agenda Item 5A Page 330 of 360 From:jim thomas To:Walbert, Sloane Subject:1737 Pearl St Date:Monday, December 23, 2019 3:03:06 PM External Sender Ms Walbert I just wanted to send a quick email in support of the subject property. I value having newer modern, energy efficient buildings in our city and I think this will be a good addition. Jim Thomas Boulder, Co 720-317-9621 Agenda Item 5A Page 331 of 360 From:Krista Torvik To:Walbert, Sloane Subject:1727 and 1737 Pearl St Date:Friday, December 20, 2019 10:35:22 AM External Sender Hi Sloan, A quick not to send my support of the project at 1727 and 1737 Pearl. I have seen renderings of the building and think it's beautiful - an updated and elevated Boulder. I love the look of the outdoor decks and think the whole building looks airy and appealing. Thanks, Krista Agenda Item 5A Page 332 of 360 From:Ray Wrigley To:Walbert, Sloane Subject:Application review LUR2018-00073 Date:Saturday, December 22, 2018 11:15:13 PM Ms. Walbert - This concerns the site review of the application for the redevelopment of 1737 Pearl Street (Navy Redevelopment). I am the homeowner at 1728 Spruce Street, across the alley from the north side proposed redevelopment. First, I’d like to commend the City of Boulder development review web site for the completeness of the information available. It was very helpful. Looking at the architectural plans, it appears that the north balconies of the two residential units on the 3rd floor will have a view down into my backyard, and of the rear bedroom windows of my house. It is understood that in the higher-density areas of the city, privacy is often compromised. But I am curious to learn what planning regulations exist that constrain the creation of new lines of sight into existing properties, and if a consideration of any such guidelines has been applied to this proposed development. I appreciate your time and look forward to hearing from you. Best regards, Ray ***************************** Ray Wrigley 303 886 7825 rtwrig@gmail.com Agenda Item 5A Page 333 of 360 From:Ray Wrigley To:Walbert, Sloane Cc:Crystal Gray; Lori Hunter; John Spitzer; Pannewig, Hella; Murphy, Norman; Toby Tenenbaum; Ferro, Charles Subject:Re: 1737 Pearl Building questions and comments Date:Thursday, November 07, 2019 12:35:20 PM Sloane - Like Crystal, I was unable to make it to the discussion at the library on the 1737 Pearl development. My interest is still very high and I appreciate the continued communication. I spoke to a neighbor who attended, Fran Bagenal, and I am encouraged by what she had to say about the developer responding to concerns about privacy and perceived height. My main concern with the proposed building remains having an alley setback that is in line with being in an interface zone. This email is to let you know that I have the same question as Crystal concerning site review or a call up. Perhaps naively, I have assumed that a project of this magnitude would automatically need to go before the Planning Board as a gateway to its continuation. When you respond to Crystal, I'd appreciate being copied. Hopefully you can elucidate (briefly) the upcoming approval checkpoints for this project and how the affected local residents can participate. Best regards, Ray ********************** Ray Wrigley 303 886 7825 rtwrig@gmail.com On Tue, Nov 5, 2019 at 4:51 PM Walbert, Sloane <WalbertS@bouldercolorado.gov> wrote: Hi Crystal, Thank you for the email. I will take a closer look at your questions/requests and get back to you shortly. Sloane Walbert, AICP Senior Planner O: 303-441-4231 walberts@bouldercolorado.gov Planning & Development Services 1739 Broadway, 3rd Floor P.O. Box 791 Boulder, CO 80306-0791 Bouldercolorado.gov -----Original Message----- From: Crystal Gray <graycrystal@comcast.net> Sent: Wednesday, October 30, 2019 7:21 PM Agenda Item 5A Page 334 of 360 CITY OF BOULDER LAND USE REVIEW RESULTS AND COMMENTS DATE OF COMMENTS: January 7, 2019 CASE MANAGER: Sloane Walbert PROJECT NAME: LOCATION: NAVY REDEVELOPMENT 1737 PEARL ST REVIEW TYPE: Site Review REVIEW NUMBER: LUR2018-00073 APPLICANT: CHRIS RUSSELL, STUDIO ARCHITECTURE DESCRIPTION: New, three-story mixed-use building with 14,112 sq. ft. of total floor area. Approximately 3,000 sq. ft. retail space on the first floor with enclosed vertical parking system. Four residential units with private courtyards on the second floor, and two residential units on the third floor. I. REVIEW FINDINGS Additional information and revisions to the plan documents are required as indicated below. Revised plans must be submitted by 3/8/2019 for this application to remain active. Refer to ‘Next Steps’ comments below for resubmittal instructions. Requested Modifications • Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 to allow a 12.7’ rear yard setback where 15’ is required. • Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 to allow three stories for the building, where two are permitted. • Section 9-8-1, "Schedule of Intensity Standards" and Section 9-9-11, "Useable Open Space," B.R.C. 1981 to allow an open space reduction for a mixed-use development in the DT-2 district. • Section 9-9-6, "Parking Standards," B.R.C. 1981 to allow 4 parking spaces that meet the standards of the land use code, where 6 are required (33.3% parking reduction). • Section 9-9-9, "Off-Street Loading Standards,” B.R.C. 1981 to allow the delivery/loading space to block the parking area. II. CITY REQUIREMENTS The section below addresses issues that must be resolved prior to project approval. Access/Circulation David Thompson, 303-441-4417 In accordance with Section 2.02(A) of the City's Design and Construction Manual at time of resubmittal please submit a Traffic Assessment Letter to include a recommendation from the traffic consultant if a traffic study is warranted in conjunction with the proposed project. Building and Housing Codes Kirk Moors, 303-441-3172 1. BALCONY FIRE SEPARATION DISTANCE The balconies must meet the fire separation distance requirements of IBC sec. 705.2. 2. EXTERIOR WALL OPENING FIRE SEPARATION DISTANCE The openings in the exterior walls must comply with the fire separation distance requirements of IBC section 705.8. ATTACHMENT E Agenda Item 5A Page 335 of 360 1737 PEARL ST Page 2 of 10 Building Design Sloane Walbert, 303-441-4231 1. The site is located within the Interface Area of Downtown. The urban design objectives for the Non-Historic and Interface Areas, among others, are to reinforce the character of Downtown as a pedestrian place by encouraging architectural solutions that are visually pleasing, reflective of contemporary times yet stylistically appropriate to the context, and compatible in scale and character with their street. Consideration should be given to a less traditional approach to the design, which is contemporary yet stylistically appropriate. The guidelines contain several examples of contemporary infill development envisioned for the Non-Historic and Interface Areas. 2. In support of the site review criteria and Downtown Urban Design Guidelines the building entrances on the ground floor facing Pearl Street should be fully visible with primary entry features. 3. In support of the Downtown Urban Design Guidelines consideration should be given to emphasizing the rear building entrance on the alley. Refer to guideline 2.1-E below. E. Design all sides of the building including alley elevations. 1. Well designed rear building entrances, windows, balconies, and planting areas are encouraged. 2. Improve rear or side alley elevations to enhance public access from parking lots and alleys. 3. Where buildings are built to the alley edge, consider opportunities for alley display windows and secondary customer or employee entries. 4. Materials utilized on the primary elevation are to extend, or wrap, around building corners onto the secondary elevations extending back at least the width of a structural bay. 5. Screening for service equipment, trash, or any other rear-of-building elements should be designed as an integral part of the overall design. Where intact, historic alley facades should be preserved along with original features and materials. 4. All mechanical equipment must be screened from view, unless such screening conflicts with the function of the mechanical equipment. The screening must be consistent with the building design, colors, and materials (Section 9- 7-7(a), B.R.C. 1981). Ensure that the railing on the rooftop is the minimum amount necessary. In addition, refer to guideline 2.1-D below. D. Minimize the visibility of mechanical, structural, or electrical appurtenances. Use low-profile mechanical units and elevator shafts that are not visible from the street. If this is not possible, set back or screen rooftop equipment from view. Corrective Action: Revise plans accordingly. 5. Consideration should be given to utilizing metal railings rather than architectural block walls for the individual roof-top decks on the west and east elevations to reduce the perceived bulk / mass of the building. 6. Site review criterion (2)(F)(xii): “Exteriors of buildings present a sense of permanence through the use of authentic materials such as stone, brick, wood, metal or similar products and building material detailing.” Corrective Action: Please provide details on the proposed stucco siding, including coat system, finish, etc., to demonstrate that the building material meets this criterion. 7. The guidelines for the Interface Area focus on sensitive design of development that abuts residential neighborhoods. Refer to guidelines below. Consideration should be given to creating an appropriate interface to the residential development and minimizing impacts. Urban design objectives for the Non-Historic and Interface Areas: Encourage sensitive design along the edge where the Downtown commercial area abuts residential neighborhoods. Urban design objectives for the Non-Historic and Interface Areas: Maintain the diversity in building type and size, and respect the adjoining residential character. 2.1-B.4. For projects located in the Interface Area, construct buildings three floors or less and consider the adjacent residential height, mass, and scale. 8. Provide digital and hard copies of color building elevations with a legend or key indicating materials. Label the CMU on the elevations. Agenda Item 5A Page 336 of 360 1737 PEARL ST Page 3 of 10 9. The final selection of building materials and finishes, including paint, windows, doors, exterior cladding, and other architectural features are to be noted on plans. Submit material samples and indicate the finish for the cast-in-place concrete. For projects with a unified material palette, submit a materials board that is no larger than 24” x 36”. Securely mount and label small-sized samples of all the exterior building materials and finishes, e.g. paint chips, cladding, window finish, etc. Clearly label the project name, address, case number and building (if applicable) on the board. 10. Provide a full wall section and schedule for the Pearl Street and rear alley elevations, including information from any below grade construction to roof transition details. Provide window section / profiling details within the Pearl St. section. 11. Provide details indicating the construction of the storefront window system. 12. Provide color perspective renderings or sketches illustrating views of the building, street character, and the relationship of the project to surrounding buildings from Pearl Street. All sketches or renderings should accurately reflect the scale and materiality of the proposed building. 13. Provide a site section to illustrate grade changes across the site, including private streets, public right-of-way improvements, structured parking, and landscape. 14. Retractable awnings are proposed to extend into the public right-of-way. Staff recommends removing these from the plans or identifying them as future elements so that they are not part of the site review approval. A revocable permit will be necessary for any encroachments in the public right-of-way (refer to Chapter 6, B.R.C. 1981) . The revocable permit for awnings that contain signage require tenant signatures and proof of insurance. Drainage Will Johnson, 303-441-3273 1. Per 7.13 (C)(2) of the City of Boulder Design and Construction Standards "Projects and developments that disturb less than 1 acre of land and do not increase the impervious area or runoff shall provide storm water quality facilities to the extent practable." Per the provided Preliminary Drainage Report no storm water quality facilities are being provided. Some form of storm water quality shall be provided to meet this requirement, and may be address through the following considerations: • Water quality for surface runoff using "Best Management Practices" • Minimize Directly Connected Impervious Areas (MDCIA) • Detention ponding facilities • Localized facilities for roof drain downspouts and parking lots (raingardens, swales, etc.) 2. City policy seeks to limit the use of sidewalk chase drains and allow their use only in situations where no other reasonable alternative exists. Chase drains are generally not desirable due to associated maintenance burden and adverse effects on pedestrian safety. Please investigate routing all stormwater runoff from the site towards the alley, and/or other alternatives that eliminate the use of the sidewalk chase. Use of a sidewalk chase must meet all the following criteria, which must be addressed in the Drainage Report: a. All reasonable on-site modifications which could reduce or eliminate the need for a chase drain have been determined to be ineffective or unreasonable, and b. The property is not located adjacent to a storm sewer or similar conveyance or cannot reasonably extend a storm drainage facility to abut the property, and c. Any groundwater discharge must conform with Section 8-2-8, "Discharging Water Prohibited" B.R.C., 1981. Per Section 8-2-8(a), no owner, lessee, or occupant of property shall cause or permit water to flow upon any sidewalk, street, alley, or other public right of way so as to impair the use of such place, when the weather is such that the water may be frozen into ice, where the drainage is such that it may create a hazard to persons or property, or where it may cause damage to any public property or facility. d. Discharge from the chase drain will not adversely affect downstream properties. Agenda Item 5A Page 337 of 360 1737 PEARL ST Page 4 of 10 Engineering David Thompson, 303-441-4417 1. Please revise the demolition and preliminary grading plan sheets to show the limits of the Pearl Street sidewalk to which must be replaced in order for the removal of the existing fence and for the installation of the utilities shown on the preliminary utility plan. Will Johnson, 303-441-3273 2. The proposed canopies shown on sheet SR-A1.01 cannot be approved as shown. Please ensure the plans call out the requirement for a revocable permit for these improvements. An attachment detail will be required to be provided at the time of building permit. Please reference Section 8-6-6, "Requirements for Revocable Permits". Land Use – Addressing BrieAnna Simon, 303-441-1896 Please pick one of the two existing addresses. The proposed building will only have one street number. Landscape Elizabeth Judd, 303-441-3138 Landscape is met with preservation and protection of existing public street trees and associated infrastructure. Care is needed to avoid any damage to the city irrigation system. Please review and correct typos in the written statement regarding the number of proposed units (8 vs 6). Also review and correct the open space summary table on sheet SR-A1.01. It is not clear how any of the open space numbers are reached. Open space per table 8-1 indicates that the greater of the residential or nonresidential standards shall be met; Section 9-9-11 states that for buildings at 38 feet in height 15% open space is required (vs. the residential private open space only). Parking David Thompson, 303-441-4417 1. In accordance with Section 9-2-14(c) B.R.C. 1981 please revise the development review application to request a modification to the "off-street loading standards" contained in Section 9-9-9 B.R.C. 1981. A modification is necessary because the proposed loading zone blocks the parking area / parking area circulation of the site. Please revise the project's written statement to discuss the design vehicle (truck) that will serve the site and how the loading space will operate and managed in conjunction with the site's parking area for staff's review and concurrence. 2. In order to verify the design criteria for long-term bicycle parking is being met per Section 9-9-6(g) B.R.C. please revise the site plan to show how the bicycles will be parked in the bike storage area and how the design criteria for covered and lighting are being met. 3. Staff appreciates the three (3) short-term bicycle racks shown to be installed in the public right-of-way adjacent to the site. However, in order to maintain the areas for pedestrian circulation between the on-street parking, the parking kiosk and the business it is staff's preference to install the bike racks in the northwest quadrant of the Pearl Street & 18th Street intersection. As such, please revise the site plan to include a note stating 3 inverted "u" bicycle racks will be installed in the public right-of-way at the northwest quadrant of the Pearl Street & 18th Street intersection which is approximately fifty-feet from the site. Installing the bicycle racks will require the relocation of the existing bicycle racks and removing the existing bench which will be picked-up by Community Vitality. This work will be required to be shown on the future technical documents for the site. 4. Please revise the site plan to show the required vehicle backing distance is being provided for the vehicle parking per Section 9-9-6(d)(2) B.R.C. 1981. The useable width of the alley can be used in meeting the required vehicle backing distance. 5. Staff appreciates the data sheet that was submitted for the proposed automated car parking system, but additional information is needed for staff's review. Please revise the written statement to: (1) include a maintenance and repair plan for the system; (2) how funds will be set aside or collected for the maintenance and repair of the system; (3) for vehicles that can't be accommodated by the system where do those vehicles park and (4) where will the switch cabinet be located and will it be necessary to provide heat to the switch cabinet. The applicant can expect additional comments from staff once the additional information is provided for staff's review. Agenda Item 5A Page 338 of 360 1737 PEARL ST Page 5 of 10 Sloane Walbert, 303-441-4231 6. Parking spaces located above and below grade in the parking system are considered tandem parking, which do not meet the city’s parking standards. Therefore, a 33.3% parking reduction is necessary to allow four spaces, where six are required. Staff supports the mechanical parking system; However, additional information is necessary regarding the operation and maintenance of such system and possible noise impacts. Plan Documents Sloane Walbert, 303-441-4231 1. Provide the building and parking setbacks, dimensioned from property lines on the Site Development Plan. 2. Site review criterion (2)(F)(xi): “Buildings minimize or mitigate energy use; support on-site renewable energy generation and/or energy management systems; construction wastes are minimized; the project mitigates urban heat island effects; and the project reasonably mitigates or minimizes water use and impacts on water quality.” Corrective Action: Please submit an energy efficiency plan that demonstrates how the proposed building meets this criterion. Is it possible to incorporate EV charging into the mechanical parking system? What are the plans for rooftop PV? 3. Revise the site plan to include topographic contours and include the uppermost point of the roof and the low point within 25 feet. 4. Revise the written statement to address the criteria for parking reductions in Sections 9-2-14(h)(2)(K) and 9-9-6(f), B.R.C. 1981. 5. It appears that the trash enclosure and bike storage areas meet the definition of “floor area” in Section 9-16-1, B.R.C. 1981. Please correct or explain how these areas meet the definition of “uninhabitable space.” In addition, please add any walkways required for primary or secondary egress by Chapter 10-5, "Building Code," B.R.C. 1981 to the rear portion of the building as floor area. Site Design Sloane Walbert, 303-441-4231 1. Per Table 8-1, B.R.C. 1981, the required usable open space for mixed use developments is the greater of either the residential or nonresidential standards that result in the greatest amount of open space. In this case the greater amount would be fifteen percent of the total land area for the nonresidential use (1,058 square feet). Per Section 9-9-11(f)(1), B.R.C. 1981, individual balconies for the residential use may count toward the requirement up to twenty- five percent of the required open space (264 square feet). It is not possible to modify the 25% limitation for individual balconies in the DT zone districts. Please add an asterisk or footnote to the Land Use Summary Table and Open Space Summary Table explaining why only 264 square feet is counted as usable open space for the site. In addition, update all plan documents to reflect the correct open space reduction (refer to comments below). 2. Pursuant to Subsection 9-2-14(h)(2)(I)(i)(a), B.R.C. 1981 the density of a project may be increased in the Downtown (DT) districts with a reduction in the open space requirements in site review. Subsection (b) expands on this allowance to state that the open space requirements in all Downtown (DT) districts may be reduced up to one hundred percent through site review. Any land use intensity modification must meet all criteria of Subsections 9-2-14(h)(2)(I)(ii)(a) to (c). Criterion (c) specifies allowable site design features for open space reductions and the associated allowable reduction percentages. It appears that the proposal does not meet site design feature (1) for a 100% reduction. Based on city records, the property was not specially assessed for the Pearl Street Mall (1737 Pearl was not in the initial assessment district established in 1977). In addition, it does not contribute funding to capital improvements on the Pearl Street Mall. Please clarify whether the property made assessments or other contributions to another public park in close proximity to meet this criterion. The only other applicable site design feature is #2, which allows for a 5% reduction for “architectural treatment that results in reducing the apparent bulk and mass of the structure or structures and site planning which increases the openness of the site”. Please update proposal accordingly. Agenda Item 5A Page 339 of 360 1737 PEARL ST Page 6 of 10 3. Consideration should be given to the site and open space design and how the proposal meets design guideline 2.1-I (below). Refinement to the design is necessary to ensure that the proposal meets the site review criteria on open space (criteria in (h)(2)(A) and (B)), the open space standards in Section 9-9-11, B.R.C. 1981, and the Downtown Urban Design Guidelines. 2.1-I. Consider the quality of open space incorporated into new and renovated buildings. When appropriate to the context, integrate the surrounding open spaces into the building design. Well programmed plazas, courtyards, outdoor seating and dining areas on or adjacent to open spaces and pedestrian routes are encouraged. Transportation Demand Management David Thompson, 303-441-4417 Staff does not concur with the project's TDM Plan because: (1) it doesn't include a TDM Plan for the residential units; (2) the pedestrian enhancements discussed in Table 2 do not enhance the pedestrian experience and therefore are not considered pedestrian enhancements; (3) as discussed Via is not considered a TDM strategy and (4) it doesn't commit to TDM strategies for the commercial space. To address this comment please revise the TDM Plan to (1) separate the residential TDM Plan from the non-residential TDM Plan; (2) discuss the additional TDM strategies being implemented by the project for the non-residential use from what is provided by CAGID; (3) discuss the two tables in the text of the TDM Plan; (4) provide a legend for figure 2 or substitute the figure for a detailed discussion in the text of the TDM Plan and (5) submit a TDM Plan that commits to implement strategies rather than a consideration or where appropriate. The applicant can expect additional comments from staff with the resubmittal of the TDM Plan. Zoning – Outdoor Lighting Sloane Walbert, 303-441-4231 1. Note, the lighting plan is reviewed at Site Review to evaluate compliance with the site review criteria. The following comments are directed at compliance with the Outdoor Lighting Standards in Section 9-9-16, B.R.C. 1981. Staff will evaluate the lighting plan against the site review criteria once these comments have been addressed. 2. Please change the line width/color to clearly show the property lines on the photometric plan. 3. Revise the lighting fixture schedule to include the color rendering index; the general style of the light fixture such as cutoff, lantern, coach light, etc.; shielding information such as house side shields, internal, and/or external shields; control descriptions including type of controls (timer, motion sensor, time clock, etc.). Note, dimming or shut off are recommended for lighting after close of business. Refer to the definitions below: Full cutoff light fixture means a light fixture with a light distribution pattern that results in no light being projected at or above a horizontal plane located at the bottom of the fixture. Fully shielded from view means that the light emitted by a light fixture is not visible from adjacent streets and properties. Fully shielded light fixture means a light fixture that provides internal or external shields or louvers that prevents light being emitted by the fixture from causing glare or light trespass impacts. 4. Revise the photometric plan to show the location of light fixtures in the street right-of-way within ten feet of the subject property (Section 9-9-16(g), B.R.C. 1981). 5. Revise the photometric plan to provide the maximum light levels on the east and west property lines at the rear of the property to demonstrate that light levels emitted by ES1 fixtures do not exceed 0.2 at property line (Section 9-9-16(d) (1), B.R.C. 1981). 6. Revise the photometric plan to include all exterior areas with lighting, including areas under canopies, balconies, or other nonenclosed or partially enclosed areas (definition of maximum allowable light level in Section 9-16-1, B.R.C. 1981). Note, light levels may not exceed 2.0 in outdoor storage areas (Section 9-9-16(e), B.R.C. 1981). 7. Please expand on the note about the light loss assumptions on the photometric plan. For example: “The light levels depicted are the maximum initial horizontal illuminance for exterior areas measured at one hundred hours of operation, in foot-candles at grade level.” 8. Per Section 9-9-16(d)(1), B.R.C. 1981, the maximum light level at any point on a property line shall not exceed 0.1 footcandles adjacent to a residential zone. This level is exceeded on the north, property line. Please correct. Agenda Item 5A Page 340 of 360 1737 PEARL ST Page 7 of 10 9. Pursuant to Section 9-9-16(d)(1), B.R.C. 1981, the maximum light level on a property line shall not exceed 0.2 footcandles in nonresidential zones. This level is greatly exceeded on the south property line. Per Subsection 9-9-16(d)(1)(A), B.R.C. 1981, the light emitted by light fixtures mounted on a structure built within five feet of a public street right-of-way or sidewalk shall not exceed the maximum allowable light levels for "pedestrian areas" (3.0 footcandles). The maximum allowable light level shall include any existing or proposed street or pedestrian lighting located within the right-of-way. If the applicant would like to use this provision of the code a separate photometric plan must be submitted for this portion of the site to include light emitted from street lighting and to demonstrate compliance with this section. The plans must demonstrate that the levels diffuse at the curb line of the Pearl Street right-of-way to 0.2 footcandles. Note, any lighting located within the public right-of-way requires a revocable permit and may not be supported by the city. 10. Please include the color temperate for all fixtures on the fixture schedule and remove the note regarding temperature. Per Section 9-9-16(d), B.R.C. 1981 all new exterior lighting must have a correlated color temperature (CCT) below 3,001 degrees Kelvin. 11. The maximum allowable light level for building entries is 5.0 footcandles. There are several readings on the property adjacent to Pearl Street that exceed this limit. Please correct. 12. The maximum uniformity ratio (maximum to minimum) for this zone district is 10:1. The area defined as “front of building” greatly exceeds this amount. In addition, please provide the uniformity ratio for the area defined as “back of building”. 13. It appears that fixture EW1 is considered architectural lighting. Please note the IESNA classification for fixture EW1. Building facade lighting exceeding 900 lumens shall be fully shielded, aimed downward, and mounted as flush to a wall as possible (Section 9-9-16(d)(4)(B), B.R.C. 1981). Any building facade lighting that is measurable at the ground level shall be included in the maximum allowable light levels. 14. For clarity, please revise the keynote that states that the height of the building is 41’-4”. The proposed building height is 38’-0”. Zoning – Solar Access Sloane Walbert, 303-441-4231 The Residential - Mixed 1 (RMX-1) zone district is located to the north, across the alley. When the adjacent lot is located in another solar access area, that lot is protected by the solar fence that corresponds with its zoning district. Properties within the RMX-1 zone district are within Solar Access Area II, which is designed to protect solar access principally for rooftops in areas. The submitted shadow analysis shows shadows from the proposed building exceeding those defined as “extent of shadows from 25’ solar fence,” within the rear yards of the adjacent properties. The rear yard in considered a protected area, since solar collectors can be located on accessory buildings. Per Section 9-9-17(d), B.R.C. 1981, no person shall erect an object or structure on any other lot that would shade a protected lot in SA Area II to a greater degree than the lot would be shaded by a solar fence twenty-five feet in height, between two hours before and two hours after local solar noon on a clear winter solstice day. Public streets and alleyways are not protected by solar access regulations. Please revise the shadow analysis so that the hypothetical shadows to be cast by the 25’ solar fence are measured from the lot lines of the adjacent properties located in SA Area II NOT the subject property. Each solar fence completely encloses the lot in question. Note that per Section 9-9-17(d)(2), BRC 1981 , the solar access regulations do not prevent the principal building on a lot in Solar Access Area III from being erected within the building envelope up to a height of thirty-five feet. III. INFORMATIONAL COMMENTS 1. Addressing, BrieAnna Simon, 303-441-1896 Once this application has been approved, a Notice of Address Assignment will be prepared, that will include the Final Address Plat, and sent to the organizations mentioned above. After a 10-day wait period, the addresses will be finalized if no issues arise. Building permit for new development on the site should be submitted under the new addresses. 2. Architectural Inspections, Sloane Walbert, 303-441-4231 The "rough and final architecture" inspection for buildings with discretionary approvals such as site and use reviews will require that building architecture, materials and window details are consistent with approvals. The inspection would occur as a part of the regular building permit inspection process. Agenda Item 5A Page 341 of 360 1737 PEARL ST Page 8 of 10 3. Area Characteristics and Zoning History, Sloane Walbert, 303-441-4231 The property is located approximately 2.5 blocks east of the Pearl Street Mall. It sits on Lot 11, Block 91 of the Boulder subdivision, originally platted in 1868. The property was annexed to the city in 1946. The site currently contains a single-story structure built ca. 1966. The original use was office; today the building contains retail (Red Letter Books) and restaurant (L’Atelier) uses. The property is not within a historic district but is located within the Central Area General Improvement District (CAGID) and Downtown Boulder Business Improvement District (BID). The site is within the Interface Area of Downtown Boulder and is subject to the Downtown Urban Design Guidelines. The Interface Area is located on the northern, western, and eastern borders of Downtown. The Interface Areas includes a wide variety of residential buildings. The area is composed of the blocks that link the core of the Downtown to the surrounding residential neighborhoods. This area requires special design sensitivities that must be addressed when commercial buildings are located adjacent to residential areas. 4. Drainage, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 A Final Storm Water Report and Plan will be required as part of the Technical Document Review process. All plans and reports shall be prepared in accordance with the City of Boulder Design and Construction Standards. 5. Drainage, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 Floor drains internal to covered parking structures, that collect drainage from rain and ice drippings from parked cars or water used to wash-down internal floors, shall be connected to the wastewater service using appropriate grease and sediment traps. 6. Groundwater, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 At time of Technical Document Review, the applicant shall submit information (geotechnical report, soil borings, etc.) regarding the groundwater conditions on the property, and all discharge points for perimeter drainage systems must be shown on the plan. The applicant is notified that any proposed groundwater discharge to the city’s storm sewer system will require both a state permit and a city agreement. 7. Inclusionary Housing, Michelle Allen, 303-441-4076 a. Each new residential unit developed on the property is subject to 9-13 B.R.C., 1981, “Inclusionary Housing” which requires is that all residential developments with 5 or more dwelling units contribute 25 percent (25%) of the total dwelling units as permanently affordable housing affordable to low/moderate and middle-income households. The means for satisfying the inclusionary requirement will be reviewed by staff concurrent with any land use review or for those projects not subject to any land use review, prior to application for a residential building permit. b. Due to the small number of for-sale units, the entire development will be treated as rental for IH purposes. Rental developments may satisfy the inclusionary requirement through the provision of on-site affordable rental units or comparable existing or newly built off-site permanently affordable rental units or through the dedication of land appropriate for affordable housing or by payment of a cash-in-lieu contribution. c. A Unit and Cash-in-lieu Calculator for estimating the Inclusionary requirement for your development may be found on the city website at www.boulderaffordablehomes.com. d. Any applicable cash-in-lieu contribution must be made prior to receipt of a residential building permit. e. Provide unit information consistent with your submittal by filling out and emailing the Affordable Housing Unit Data Spread Sheet to allenm@bouldercolorado.gov in the unlocked excel format. The spreadsheet may be found on-line at www.boulderaffordablehomes.com. 8. Land Uses, Sloane Walbert, 303-441-4231 The current proposal is for retail space on the ground floor facing Pearl St., which is a permitted use in the DT -2 zone district. However, note the restrictions on restaurants, brewpubs, and taverns and financial institutions in the DT-2 district in Sections 9-6-5(b)(1), 9-6-5(b)(4), and 9-6-7(a)(4), B.R.C. 1981. Agenda Item 5A Page 342 of 360 1737 PEARL ST Page 9 of 10 9. Legal Documents, Julia Chase, 303-441-3052 The Applicant will be required to sign a Development Agreement, if approved. When staff requests, the Applicant shall provide the following: a. an updated title commitment current within 30 days; and b. any additional documentation pertaining to signature authority, as may be necessary. 10. Neighborhood Comments, Sloane Walbert, 303-441-4231 Staff has received comments from several neighboring property owners and residents, which have been forwarded to the applicant. Depending on the progress of the proposal the applicant may want to consider hosting a neighborhood meeting. 11. Next Steps, Sloane Walbert, 303-441-4231 Revisions to the plan documents are required. Please address the comments herein and resubmit five (5) hard copies (only one (1) copy of the drainage and utility reports) and one (1) digital copy of the revised plans to the front counter of the at the Planning and Development Services Center. The application deadline is 10:00 a.m. on the first and third Monday of each month to be included in the following review track. Staff is happy to meet with you to discuss these comments in detail at your convenience. 12. Residential Growth Management System, Sloane Walbert, 303-441-4231 The City of Boulder’s Residential Growth Management System (RGMS) caps annual residential growth at 1% per year and is managed through an allocation process. The adopted code language can be found in Section 9-14, “Residential Growth Management System”, B.R.C. 1981. All projects that include residential units, including those that meet the exemption criteria, must apply for and receive growth management allocations prior to building permit application. Note: Starting Apr. 9, 2018 the RGMS process will no longer include approval of the project from the Housing Division, which is required to submit for building permit. A separate Affordable Housing Case (AHC) is required. If you not have an AHC case number when you submit for permit, please contact Michelle Allen at 303-441-4076. 13. Review Process, Sloane Walbert, 303-441-4231 Per Table 2-2 of the land use code a concept plan and site review are not required for the project. However, the proposal meets the thresholds for voluntary site review. The proposal includes modifications to the development standards, including a modification to the minimum rear yard setback and a 75% open space reduction, which is considered a land use intensity modification. Per Section 9 2 14(h)(2)(I) of the Land Use Code, the open space requirements in all Downtown (DT) districts may be reduced by up to one hundred percent pursuant to site review approval. The site review requires approval by the Planning Board at a public hearing. The property is subject to the Downtown Urban Design Guidelines and requires review by the Design Advisory Board (DAB). DAB reviews and applies the guidelines on all projects with a construction value over $25,000 in the Non-Historic and Interface Areas. The Planning Board applies these guidelines as part of the site review process. The Design Advisory Board typically meets on the second Wednesday of each month at 4 p.m. in the Municipal Building Lobby, 1777 Broadway. Please submit the application materials with a project specialist (4 sets of detailed plans, including elevations, and a CD or thumb drive containing all electronic files, all pages sized 11x17) no later than 4 p.m. the last Wednesday of the month, two weeks prior to the desired meeting date. 14. Signage, Sloane Walbert, 303-441-4231 Please either remove all signs from the Site Review plan sets or include a notation that all signage will be reviewed and approved under a separate permit to avoid any potential future confusion. Please note that illustration of a sign on the plan set does not grant a modification. Please refer to Section 9-9-21 B.R.C. 1981 for sign related requirements and signage guidelines in the Downtown Urban Design Guidelines. 15. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 A Final Utility Connection Plan will be required as part of the Technical Document Review process (which must be completed prior to building permit application). The Final Master Utility Plan (Utility Connection Plan) will be required to show all existing water service lines and fire lines. Agenda Item 5A Page 343 of 360 1737 PEARL ST Page 10 of 10 16. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 All water meters are to be placed in city R.O.W. or a public utility easement, but meters are not to be placed in driveways, sidewalks or behind fences. 17. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 Maintenance of sand/oil interceptors and all private wastewater and storm sewer lines and structures shall remain the responsibility of the owner. 18. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 No portion of any structure, including footings and eaves, may encroach into any public right-of-way or easement. 19. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 The applicant is advised that at the time of building permit application the following requirements will apply: a. The applicant will be required to provide an accurate proposed plumbing fixture count to determine if the proposed meters and services are adequate for the proposed use. b. Water and wastewater Plant Investment Fees and service line sizing will be evaluated. c. If the existing water and/or wastewater services are required to be abandoned and upsized, all new service taps to existing mains shall be made by city crews at the developer's expense. The water service must be excavated and turned off at the corporation stop, per city standards. The sewer service must be excavated and capped at the property line, per city standards. d. If the building is to be sprinklered, fire line plans must accompany the fire sprinkler service line connection permit application 20. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 Trees proposed to be planted shall be located at least 10 feet away from existing or future utility mains and services. 21. Zoning, Sloane Walbert, 303-441-4231 The property is in the Downtown 2 (DT-2) zoning district, defined as, "A transition area between the downtown and the surrounding residential areas where a wide range of retail, office, residential, and public uses are permitted. A balance of new development with the maintenance and renovation of existing buildings is anticipated, and where development and redevelopment consistent with the established historic and urban design character is encouraged" (Section 9-5- 2(c)(3)(A), B.R.C. 1981). IV. FEES Please note that current development review fees include a $131 hourly rate for reviewer services following the initial city response (these written comments). Please see the P&DS Questions and Answers brochure for more information about the hourly billing system. Agenda Item 5A Page 344 of 360 CITY OF BOULDER LAND USE REVIEW RESULTS AND COMMENTS DATE OF COMMENTS: July 26, 2019 CASE MANAGER: Sloane Walbert PROJECT NAME: NAVY REDEVELOPMENT LOCATION: 1737 PEARL ST, 1727 PEARL ST REVIEW TYPE: Site Review REVIEW NUMBER: LUR2018-00073 APPLICANT: STUDIO ARCHITECTURE DESCRIPTION: Proposal to redevelop the properties at 1727 and 1737 Pearl Street with a 28,222 sq. ft. three-story mixed-use building. Proposal includes 7,600 sq. ft. of commercial space on the first floor, ten residential units on the second floor, and four residential units on the third floor. Development would include one level of underground parking with 14 spaces. Requested Modifications • Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 to allow three stories for the building, where two are permitted. I. REVIEW FINDINGS Additional information and revisions to the plan documents are required as indicated below. Revised plans must be submitted by 9/24/2019 for this application to remain active. Refer to ‘Next Steps’ comments below. Please contact staff with any questions or concerns. II. CITY REQUIREMENTS The section below addresses issues that must be resolved prior to project approval. Access/Circulation David Thompson, 303-441-4417 Per staff's previous comment, please revise the project Trip Generation and Assignment Letter to include a recommendation from the traffic consultant if a traffic study is warranted in conjunction with the proposed project for staff's review. Building Design Sloane Walbert, 303-441-4231 1. Generally, the revised proposal is an improved design that meets many of staff’s previous comments. The design works well comprehensively. The entrances on the ground floor facing Pearl Street are fully visible with primary entry features. Active storefronts engage the street. Quality public and private open space is provided, including an appropriate buffer to the residential uses to the north with alley trees. The proposal includes a good mix of residential unit types and sizes. Agenda Item 5A Page 345 of 360 1737 PEARL ST Page 2 of 8 2. In support of the Downtown Urban Design Guidelines consideration should be given to emphasizing the rear building entrances on the alley. Refer to guideline 2.1-E below. Clarify whether these entrances would serve as access points for employees or customers of commercial space. Awnings or material changes would help to meet this guideline and provide a relief to the proposed stucco cladding. E. Design all sides of the building including alley elevations. 1. Well designed rear building entrances, windows, balconies, and planting areas are encouraged. 2. Improve rear or side alley elevations to enhance public access from parking lots and alleys. 3. Where buildings are built to the alley edge, consider opportunities for alley display windows and secondary customer or employee entries. 4. Materials utilized on the primary elevation are to extend, or wrap, around building corners onto the secondary elevations extending back at least the width of a structural bay. 5. Screening for service equipment, trash, or any other rear-of-building elements should be designed as an integral part of the overall design. Where intact, historic alley facades should be preserved along with original features and materials. 3. Submit material samples and indicate the finish for the cast-in-place concrete on a materials board that is no larger than 24” x 36”. Securely mount and label small-sized samples of all the exterior building materials and finishes, e.g. paint chips, cladding, window finish, etc. Clearly label the project name, address, case number and building (if applicable) on the board. Include the stucco details including coat system, finish, etc. 4. Metal guardrails are shown in the public right-of-way. Staff recommends removing these from the plans or identifying them as future elements so that they are not part of the site review approval. A revocable permit will be necessary for any encroachments in the public right-of-way (refer to Chapter 6, B.R.C. 1981) . Note, a separate use review will be required for any restaurant, brewpub, or tavern uses within the commercial space. The review would be either a conditional use review (administrative) or full use review (public process) depending on the size, hours of operation, outdoor patio, etc. 5. Consideration should be given to the treatment of the exposed side walls (west and east façades) to make these appear more interesting while they remain visible. 6. Per the building design requirements for the DT-2 zone district a minimum of 60% of ground floor street frontage must be window area (Table 7-1, B.R.C. 1981). The window areas must meet the criteria of Section 9-9-3, including being made of transparent materials, meaning glass, or other similar materials that possess a minimum sixty percent transmittance factor and a reflectance factor of not greater than 0.25, or otherwise designed to allow pedestrians to view activities inside the buildings. In applying this requirement, the columns between window areas cannot be counted in the required 60% window frontage. Thus, it does not appear that the proposal meets these standards. Please revise as necessary. Drainage Will Johnson, 303-441-3273 1. City policy seeks to limit the use of sidewalk chase drains and allow their use only in situations where no other reasonable alternative exists. Chase drains are generally not desirable due to associated maintenance burden and adverse effects on pedestrian safety. Please investigate routing all stormwater runoff from the site towards the alley, and/or other alternatives that eliminate the use of the sidewalk chase. Use of a sidewalk chase must meet all the following criteria, which must be addressed in the Drainage Report: a. All reasonable on-site modifications which could reduce or eliminate the need for a chase drain have been determined to be ineffective or unreasonable, and b. The property is not located adjacent to a storm sewer or similar conveyance or cannot reasonably extend a storm drainage facility to abut the property, and Agenda Item 5A Page 346 of 360 1737 PEARL ST Page 3 of 8 c. Any groundwater discharge must conform with Section 8-2-8, "Discharging Water Prohibited" B.R.C., 1981. Per Section 8-2-8(a), no owner, lessee, or occupant of property shall cause or permit water to flow upon any sidewalk, street, alley, or other public right of way so as to impair the use of such place, when the weather is such that the water may be frozen into ice, where the drainage is such that it may create a hazard to persons or property, or where it may cause damage to any public property or facility. d. Discharge from the chase drain will not adversely affect downstream properties. Review v2 7/26/2019: Please address these points in the Drainage Report. If the City deems that a chase drain is necessary, it will need to be located on the property line. Please revise the plans as necessary. 2. Trees in rain gardens can reduce effectiveness. Roots can clog underdrains and trunks lower effective area. Per the Urban Drainage and Flood Control District (UCFCD) Criteria Manual trees in bioretention areas should be avoided. If these trees are proposed to meet a landscaping requirement, they must be planted outside of the rain garden water quality growing medium or a cutoff wall must be used to ensure that roots do not grow into the underdrain. Please increase the rain garden area a minimum of the anticipated area of mature tree trunk cross section. Revise plans as necessary. 3. Per UCFCD the rain garden filter material must be a minimum of 6", while only 4" is proposed. Please revise the plans to meet all requirements for bioretention put forth by UCFCD. 4. Based on the provided drainage report the site is currently approx. 72% detained. Per DCS 7.12(C)(4) a maximum of 5% of the site may be undetained. Consider adding detention and water quality in the proposed courtyard, as this is the source of the majority of the undetained releases. Revise the plans and drainage report as necessary. Engineering Will Johnson, 303-441-3273 The proposed metal railings shown on sheet SR-A1.01 cannot be approved as shown. Please ensure the plans call out the requirement for a revocable permit for these improvements. An attachment detail will be required to be provided at the time of building permit. Please reference Section 8-6-6, "Requirements for Revocable Permits". Landscape Elizabeth Judd, 303-441-3138 Please use the native river birch (B. fontinalis) instead of the B. nigra specified. Miscellaneous David Thompson, 303-441-4417 Staff appreciates the revisions that were made to the project's TDM Plan. That said, staff will not concur with a TDM Plan that doesn't include the applicant funding and providing the residential units with either Eco-Passes or with an Alternative Transportation Fund at $200/ dwelling unit for a period of three to five years in meeting the site review criteria for circulation discussed in section 9-2-14(h)(2)(D)(v) of the Boulder Revised Code, 1981. Please revise the TDM Plan accordingly. Parking David Thompson, 303-441-4417 1. This is a follow-up on staff's previous comment regarding the bike storage room in the basement. The architectural plans do not include the design details of the bike storage room to confirm it meets the design criteria contained in the Boulder Revised Code or how the bicycles will be parked in the storage room. Pursuant to section 9-9-6(g) BRC 1981 please revise the site plan to show how the bicycles will be parked in the bike storage area and how the design criteria for security and lighting are being met. Please revise the TDM Plan to state employees will have access to the residential garage to access the bike locker. Agenda Item 5A Page 347 of 360 1737 PEARL ST Page 4 of 8 2. Please revise the site plans to show where the remaining 10 short-term bicycle parking spaces will be provided on the site. The short-term bicycle parking must meet the parking standards contained in Section 9-9-6(g)(3) B.R.C. 1981. Per staff's previous comment, staff will support six of the sixteen short-term bicycle parking spaces being installed in the public right-of-way at the northwest quadrant of the Pearl Street & 18th Street intersection. Please revise the site plan accordingly 3. Staff would like additional information on the auto elevator prior to concurring with its use on the site. At time of resubmittal please include the specification / data sheet for the proposed elevator for staff's review and comment. The applicant can expect additional comments from staff once the additional information is provided for staff's review. 4. The proposed loading zone is not large enough to accommodate the trucks which will make deliveries to the two restaurants. Pursuant to section 9-9-9 B.R.C. 1981 please revise the site plans to increase the area of the loading zone to accommodate the larger trucks expected to make deliveries to the restaurants. The applicant can expect additional comments from staff once this information is provided and reviewed by staff. 5. Staff is unable to locate the dedicated space for the long-term bicycle parking within the individual units on the second and third floor architectural plan sheets. Please revise the architectural sheets to show the location of the dedicated space for long-term bicycle parking. Staff will support the storage area and storage units being permitted for long-term bicycle parking. 6. Staff would like additional information on the management of the auto elevator prior to concurring with the location of the auto elevator. Staff has concerns that the location and operations of the auto elevator will require waiting vehicles to queue into the alley right-of-way and obstruct vehicle circulation within the alley. At time of site review resubmittal please include a management for the auto elevator that addresses staff's concerns. The applicant can expect additional comments from staff once this information is provided and reviewed by staff. 7. Please submit a parking management plans that: (i) includes a maintenance and repair plan for the auto elevator; (ii) describes how funds will be set aside or collected for the maintenance and repair of the auto elevator; (iii) includes a discussion for vehicles that can't be accommodated by the elevator and where those vehicles will park on the site and (iv) details the necessary supporting equipment or cabinets and where the supporting equipment will be located on the site. Plan Documents Sloane Walbert, 303-441-4231 1. Provide the USGS elevation of the low point on the site plan. Additionally, please indicate where the topography provided is from (City data, NAVD 88 or 29; or survey information, including survey date). Provide a topographic map if available. If this is not available, a letter may be necessary from the surveyor confirming the low point and points identified in the solar analysis. 2. Please submit a separate solar analysis showing the adjusted shadow lengths to ensure that there is not an encroachment onto the RMX-1 zoned properties to the north. 3. Consideration should be given to updating the perspectives to include the façade improvements that have been made to the adjacent building to the west (1715 Pearl St.) 4. Revise all sheets of the plans to indicate that the uppermost point of the roof is the highest point for the purposes of calculating height. A parapet wall may exceed the height requirements of this title by up to eighteen inches if the parapet is necessary to accommodate rooftop drainage or to provide fire protection. Please indicate that this is the case. 5. Since the project appears to be at the maximum allowable 2.0 FAR please submit a floor area analysis with supporting floor plan diagrams clearly showing areas counted toward the floor area totals as well as those that are excluded from the floor area totals, including uninhabitable space. Floor area must be measured to the outside surface of the exterior framing, or to the outside surface of the exterior walls if there is no exterior framing. , Agenda Item 5A Page 348 of 360 1737 PEARL ST Page 5 of 8 Review Process Sloane Walbert, 303-441-4231 The design, particularly the façade changes, appear consistent with the Design Advisory Board (DAB) recommendations. However, review of the project by DAB is required since the proposal has been modified to include the adjacent property. DAB reviews are held starting at 4 p.m. on the second Wednesday of every month. Applications and materials must be submitted in person to a Project Specialist no later than the last Wednesday of the month at 4 p.m., two weeks prior to the meeting. Site Design Sloane Walbert, 303-441-4231 Provide additional information about the proposed public courtyard. How will this be managed? Is it possible a gate could be installed to restrict access? Zoning Sloane Walbert, 303-441-4231 The submitted lighting plan appears to meet the applicable site review criteria. A more detailed analysis of the Outdoor Lighting Standards in Section 9-9-16, B.R.C. 1981 will be done at the tec. Staff will evaluate the lighting plan against the site review criteria once these comments have been addressed. Please ensure that no light fixtures extend more than 15 inches into the public right of way. III. INFORMATIONAL COMMENTS 1. Addressing, Sarah Shaffer, Address Administrator, 303-4137128, shaffers@bouldercolorado.gov Each new building is required to be assigned a street address following the city’s addressing policy. However, because the proposed building will be replacing an existing structure on the property, the current address of 1737 Pearl Street can me maintained for the new building. 2. Architectural Inspections, Sloane Walbert, 303-441-4231 The "rough and final architecture" inspection for buildings with discretionary approvals such as site and use reviews will require that building architecture, materials and window details are consistent with approvals. The inspection would occur as a part of the regular building permit inspection process. 3. Area Characteristics and Zoning History, Sloane Walbert, 303-441-4231 The site is located approximately 2.5 blocks east of the Pearl Street Mall. The properties consist of Lots 10 and 11, Block 91 of the Boulder Original Town subdivision, originally platted in 1868. The properties were annexed to the city in 1946. The property is not within a historic district but is located within the Central Area General Improvement District (CAGID) and Downtown Boulder Business Improvement District (BID). The site is within the Interface Area of Downtown Boulder and is subject to the Downtown Urban Design Guidelines. The Interface Area is located on the northern, western, and eastern borders of Downtown. The Interface Areas includes a wide variety of residential buildings. The area is composed of the blocks that link the core of the Downtown to the surrounding residential neighborhoods. This area requires special design sensitivities that must be addressed when commercial buildings are located adjacent to residential areas. The property at 1727 Pearl St. contains 1 one-story structure and 1 two-story structure built ca. 1952. The buildings contain retail and office uses. The property at 1737 Pearl St. contains a single-story structure built ca. 1966. The original use was office; today the building contains retail (Red Letter Books) and restaurant (Strade Bianche) uses. 4. Drainage, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 A Final Storm Water Report and Plan will be required as part of the Technical Document Review process. All plans and reports shall be prepared in accordance with the City of Boulder Design and Construction Standards. Agenda Item 5A Page 349 of 360 1737 PEARL ST Page 6 of 8 5. Drainage, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 Floor drains internal to covered parking structures, that collect drainage from rain and ice drippings from parked cars or water used to wash-down internal floors, shall be connected to the wastewater service using appropriate grease and sediment traps. 6. Groundwater, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 At time of Technical Document Review, the applicant shall submit information (geotechnical report, soil borings, etc.) regarding the groundwater conditions on the property, and all discharge points for perimeter drainage systems must be shown on the plan. The applicant is notified that any proposed groundwater discharge to the city’s storm sewer system will require both a state permit and a city agreement. 7. Inclusionary Housing, Michelle Allen, 303-441-4076 a. Each new residential unit developed on the property is subject to 9-13 B.R.C., 1981, “Inclusionary Housing” which requires is that all residential developments with 5 or more dwelling units contribute 25 percent (25%) of the total dwelling units as permanently affordable housing affordable to low/moderate and middle-income households. The means for satisfying the inclusionary requirement will be reviewed by staff concurrent with any land use review or for those projects not subject to any land use review, prior to application for a residential building permit. b. Due to the small number of for-sale units, the entire development will be treated as rental for IH purposes. Rental developments may satisfy the inclusionary requirement through the provision of on-site affordable rental units or comparable existing or newly built off-site permanently affordable rental units or through the dedication of land appropriate for affordable housing or by payment of a cash-in-lieu contribution. c. A Unit and Cash-in-lieu Calculator for estimating the Inclusionary requirement for your development may be found on the city website at www.boulderaffordablehomes.com. d. Any applicable cash-in-lieu contribution must be made prior to receipt of a residential building permit. e. Provide unit information consistent with your submittal by filling out and emailing the Affordable Housing Unit Data Spread Sheet to allenm@bouldercolorado.gov in the unlocked excel format. The spreadsheet may be found on-line at www.boulderaffordablehomes.com. 8. Land Uses, Sloane Walbert, 303-441-4231 The current proposal is for retail space on the ground floor facing Pearl St., which is a permitted use in the DT -2 zone district. However, note the restrictions on restaurants, brewpubs, and taverns and financial institutions in the DT-2 district in Sections 9-6-5(b)(1), 9-6-5(b)(4), and 9-6-7(a)(4), B.R.C. 1981. 9. Legal Documents, Julia Chase, 303-441-3052 The Applicant will be required to sign a Development Agreement, if approved. When staff requests, the Applicant shall provide the following: a. an updated title commitment current within 30 days; and b. any additional documentation pertaining to signature authority, as may be necessary. 10. Next Steps, Sloane Walbert, 303-441-4231 Revisions to the plan documents are required. Please address the comments herein and resubmit five (5) hard copies (only one (1) copy of the drainage and utility reports) and one (1) digital copy of the revised plans to the front counter of the at the Planning and Development Services Center. The application deadline is 10:00 a.m. on the first and third Monday of each month to be included in the following review track. Staff is happy to meet with you to discuss these comments in detail at your convenience. 11. Fire No issues with site plan or concept of the building. Applicant should be fully aware that the building will require to be fully sprinklered and alarmed. Please check with Boulder Fire Rescue - David Lowrey 303.441.4356 if you have any questions regarding the fire protection requirements. Fire encourages the applicant to set up a meeting about the "Auto Elevator" to make sure everyone understands how that will operate and any requirements that maybe associated with that elevator. Agenda Item 5A Page 350 of 360 1737 PEARL ST Page 7 of 8 12. Residential Growth Management System, Sloane Walbert, 303-441-4231 The City of Boulder’s Residential Growth Management System (RGMS) caps annual residential growth at 1% per year and is managed through an allocation process. The adopted code language can be found in Section 9-14, “Residential Growth Management System”, B.R.C. 1981. All projects that include residential units, including those that meet the exemption criteria, must apply for and receive growth management allocations prior to building permit application. 13. Review Process, Sloane Walbert, 303-441-4231 Per Section 9-12-4, “Elimination of Lot Lines,” B.R.C. 1981 a lot line elimination plat is required to create one buildable lot. A lot line elimination is a Techncial Document Review application, which should be submitted at the tec. doc. review stage. 14. Review Process, Sloane Walbert, 303-441-4231 Per Table 2-2 of the land use code a concept plan and site review are not required for the project. However, the proposal meets the thresholds for voluntary site review. A decision on this application (an approval, denial, or approval with conditions) will be made by the Planning Department. Any decision by the Planning Department is subject to call-up by the Planning Board within 14 days after a decision. The property is subject to the Downtown Urban Design Guidelines and requires review by the Design Advisory Board (DAB). DAB reviews and applies the guidelines on all projects with a construction value over $25,000 in the Non-Historic and Interface Areas. The Planning Board applies these guidelines as part of the site review process. 15. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 A Final Utility Connection Plan will be required as part of the Technical Document Review process (which must be completed prior to building permit application). The Final Master Utility Plan (Utility Connection Plan) will be required to show all existing water service lines and fire lines. 16. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 All water meters are to be placed in city R.O.W. or a public utility easement, but meters are not to be placed in driveways, sidewalks or behind fences. 17. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 Maintenance of sand/oil interceptors and all private wastewater and storm sewer lines and structures shall remain the responsibility of the owner. 18. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 No portion of any structure, including footings and eaves, may encroach into any public right-of-way or easement. 19. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 The applicant is advised that at the time of building permit application the following requirements will apply: a. The applicant will be required to provide an accurate proposed plumbing fixture count to determine if the proposed meters and services are adequate for the proposed use. b. Water and wastewater Plant Investment Fees and service line sizing will be evaluated. c. If the existing water and/or wastewater services are required to be abandoned and upsized, all new service taps to existing mains shall be made by city crews at the developer's expense. The water service must be excavated and turned off at the corporation stop, per city standards. The sewer service must be excavated and capped at the property line, per city standards. d. If the building is to be sprinklered, fire line plans must accompany the fire sprinkler service line connection permit application 20. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 Trees proposed to be planted shall be located at least 10 feet away from existing or future utility mains and services. Agenda Item 5A Page 351 of 360 1737 PEARL ST Page 8 of 8 21. Zoning, Sloane Walbert, 303-441-4231 The property is in the Downtown 2 (DT-2) zoning district, defined as, "A transition area between the downtown and the surrounding residential areas where a wide range of retail, office, residential, and public uses are permitted. A balance of new development with the maintenance and renovation of existing buildings is anticipated, and where development and redevelopment consistent with the established historic and urban design character is encouraged" (Section 9-5-2(c)(3)(A), B.R.C. 1981). IV. FEES Please note that current development review fees include a $131 hourly rate for reviewer services following the initial city response (these written comments). Please see the P&DS Questions and Answers brochure for more information about the hourly billing system. Agenda Item 5A Page 352 of 360 CITY OF BOULDER LAND USE REVIEW RESULTS AND COMMENTS DATE OF COMMENTS: October 18, 2019 CASE MANAGER: Sloane Walbert PROJECT NAME: LOCATION: NAVY REDEVELOPMENT 1727 AND 1737 PEARL ST REVIEW TYPE: Site Review REVIEW NUMBER: LUR2018-00073 APPLICANT: STUDIO ARCHITECTURE STUDIO ARCHITECTURE, STUDIO ARCHITECTURE DESCRIPTION: Proposal to redevelop the properties at 1727 and 1737 Pearl Street with a 28,222 sq. ft. three-story mixed-use building. Proposal includes 7,600 sq. ft. of commercial space on the first floor, ten residential units on the second floor, and four residential units on the third floor. Development would include one level of underground parking with 14 spaces. I.REVIEW FINDINGS Additional information and revisions to the plan documents are required as indicated below. Revised plans must be submitted by 12/18/2019 for this application to remain active. Refer to ‘Next Steps’ comments below. Please contact staff with any questions or concerns. Requested Modifications: •Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 to allow three stories for the building, where two are permitted. •Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 and Section 9-9-3, “Building Design”, B.R.C. 1981 to allow 50% of the ground floor façade facing a public street to be transparent materials, where 60% is required. •Section 9-7-1, "Schedule of Form and Bulk Standards," B.R.C. 1981 to allow a 10-foot front yard setback from the street for the third story, where 15-feet is required. II. CITY REQUIREMENTS The section below addresses issues that must be resolved prior to project approval. Building Design Sloane Walbert, 303-441-4231 Include a detail or indicate on the plans the proposed material at the feature wall in the courtyard. The elevation shows CMU, but the renderings show stone or laminate cladding. Drainage Will Johnson, 303-441-3273 Mile High Flood District requires a minimum infiltration rate of 2 times the rate needed to drain the WQCV over 12 hours for full infiltration sections. Please update the drainage report to address this requirement for the proposed porous pavers along the alley. Agenda Item 5A Page 353 of 360 1737 PEARL ST Page 2 of 6 Landscape Sloane Walbert, 303-441-4231 Staff does not agree with the modification to eliminate alley trees, which are intended to act as a buffer to the residential zone district and activate the alley as a pedestrian space. The site review criteria state that: “(iii) The project provides significant amounts of plant material sized in excess of the landscaping requirements of Sections 9-9-12, "Landscaping and Screening Standards," and 9-9-13, "Streetscape Design Standards," B.R.C. 1981” “(iv) The setbacks, yards and useable open space along public rights of way are landscaped to provide attractive streetscapes, to enhance architectural features and to contribute to the development of an attractive site plan.” Consideration needs to be given to reworking the side plan to accommodate alley trees, even if they are to be located within the rain gardens. Parking David Thompson, 303-441-4417 1. Per staff's previous comment please revise the TDM Plan to state employees will have access to the residential garage to access the bike locker and how access will be achieved. 2. This is a follow-up to staff's previous comment regarding the site's off-street delivery / loading area. Whereas staff appreciates the design revisions that have been made to the loading area staff still doesn't concur with the proposed length of the loading area given the frequency of delivery vehicles of a SU-40 design. To address this comment please revise the site development plan to show the length of the off-street delivery / loading area at 40-feet. Staff understands this comment will impact the proposed rain garden. 3. The applicant's draft parking management plan does not address staff's concerns regarding the frequency that vehicles will queue in the public right-of-way (alley) due to conflicts with other vehicles either waiting or in the process of entering or leaving the underground parking area. To address this comment the applicant needs to have a consultant with experience in vehicle parking and auto elevators do an analysis which determines the frequency, the number of vehicles and time of day when auto vehicles from the site will queue in the alley for staff's review and comment. The analysis must consider the trip generation letter prepared by LSC, the type of residential land use being proposed, the time it takes for the auto elevator to complete a cycle, if one auto elevator is sufficient for the proposed land use and that 40-feet of off-street parking is available. The applicant can expect additional comments on the queueing analysis and the parking management plan once the analysis is reviewed by staff. The analysis must include recommendations on eliminating the potential of vehicle queueing in the alley. Staff is available to discuss the scope of the analysis with the consultant prior to the consultant starting the work. 4. Per section 9-9-6(c)(1) B.R.C. 1981 with respect to rounding please revise Bicycle Parking Summary Chart to show the required number of bicycle parking spaces for the retail use from "10" to "9" and revise the required number of short-term bicycle parking spaces from "8" to "7". Revise the totals of the summary chart accordingly. 5. On Sheet SR-A1.01 - Please revise the sheet to remove the existing footnote (*) under the Bicycle Parking Summary Chart because staff actually requested the short-term bicycle parking spaces be provided on the site. Staff will support a footnote indicating where the inverted "u" bicycle racks will be installed in the Pearl Street streetscape. 6. On Sheet SR-A2.B1 - Please revise the sheet to revise the label for the resident long-term bicycle parking spaces to include their guest. 7. Please revise the project's TDM Plan to indicate the residential long-term bicycle parking area will be available for residents and their guests. 8. Staff appreciates the applicant's willingness to install additional short-term bicycle racks along the Pearl Street streetscape and will forward additional locations along Pearl Street where the applicant can install bike racks in meeting to project's short-term bicycle parking requirements. Staff will forward this information to the applicant by Friday, October 25th. Please ensure the project's TDM Plan is revised accordingly. Agenda Item 5A Page 354 of 360 1737 PEARL ST Page 3 of 6 Plan Documents Sloane Walbert, 303-441-4231 1. Please add a note to the floor area analysis sheet stating that below grade floor area is not counted toward the total floor area per Row 5 of Table 8-2, B.R.C. 1981. 2. Please add the proposed residential and commercial floor area to the land use summary table under floor area. 3. Please correct the site development plan to remove the bike racks erroneously shown adjacent to the northeast entry. III. INFORMATIONAL COMMENTS 1. Addressing, Sarah Shaffer, Address Administrator, 303-4137128, shaffers@bouldercolorado.gov Each new building is required to be assigned a street address following the city’s addressing policy. However, because the proposed building will be replacing an existing structure on the property, any of the existing addresses off of Pearl Street can me maintained for the new building. Please submit an address plat indicating the proposed address at Tec Docs. Once the address plat has been prepared and the Final Plat has been recorded, a Notice of Address assignment (which includes the Address Plat prepared by the applicant) shall be sent by the City to utility companies, USPS, emergency services, the County Assessor etc. for review and approval. After a 10-day wait period, the addresses will be finalized if no issues arise. 2. Architectural Inspections, Sloane Walbert, 303-441-4231 The "rough and final architecture" inspection for buildings with discretionary approvals such as site and use reviews will require that building architecture, materials and window details are consistent with approvals. The inspection would occur as a part of the regular building permit inspection process. 3. Area Characteristics and Zoning History, Sloane Walbert, 303-441-4231 The site is located approximately 2.5 blocks east of the Pearl Street Mall. The properties consist of Lots 10 and 11, Block 91 of the Boulder Original Town subdivision, originally platted in 1868. The properties were annexed to the city in 1946. The property is not within a historic district but is located within the Central Area General Improvement District (CAGID) and Downtown Boulder Business Improvement District (BID). The site is within the Interface Area of Downtown Boulder and is subject to the Downtown Urban Design Guidelines. The Interface Area is located on the northern, western, and eastern borders of Downtown. The Interface Areas includes a wide variety of residential buildings. The area is composed of the blocks that link the core of the Downtown to the surrounding residential neighborhoods. This area requires special design sensitivities that must be addressed when commercial buildings are located adjacent to residential areas. The property at 1727 Pearl St. contains 1 one-story structure and 1 two-story structure built ca. 1952. The buildings contain retail and office uses. The property at 1737 Pearl St. contains a single-story structure built ca. 1966. The original use was office; today the building contains retail (Red Letter Books) and restaurant (Strade Bianche) uses. 4. Drainage, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 A Final Storm Water Report and Plan will be required as part of the Technical Document Review process. All plans and reports shall be prepared in accordance with the City of Boulder Design and Construction Standards. 5. Drainage, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 Floor drains internal to covered parking structures, that collect drainage from rain and ice drippings from parked cars or water used to wash-down internal floors, shall be connected to the wastewater service using appropriate grease and sediment traps. 6. Groundwater, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 At time of Technical Document Review, the applicant shall submit information (geotechnical report, soil borings, etc.) regarding the groundwater conditions on the property, and all discharge points for perimeter drainage systems must be shown on the plan. The applicant is notified that any proposed groundwater discharge to the city’s storm sewer system will require both a state permit and a city agreement. Agenda Item 5A Page 355 of 360 1737 PEARL ST Page 4 of 6 7. Inclusionary Housing, Michelle Allen, 303-441-4076 a. Each new residential unit developed on the property is subject to 9-13 B.R.C., 1981, “Inclusionary Housing” which requires is that all residential developments with 5 or more dwelling units contribute 25 percent (25%) of the total dwelling units as permanently affordable housing affordable to low/moderate and middle-income households. The means for satisfying the inclusionary requirement will be reviewed by staff concurrent with any land use review or for those projects not subject to any land use review, prior to application for a residential building permit. b. Due to the small number of for-sale units, the entire development will be treated as rental for IH purposes. Rental developments may satisfy the inclusionary requirement through the provision of on-site affordable rental units or comparable existing or newly built off-site permanently affordable rental units or through the dedication of land appropriate for affordable housing or by payment of a cash-in-lieu contribution. c. A Unit and Cash-in-lieu Calculator for estimating the Inclusionary requirement for your development may be found on the city website at www.boulderaffordablehomes.com. d. Any applicable cash-in-lieu contribution must be made prior to receipt of a residential building permit. e. Provide unit information consistent with your submittal by filling out and emailing the Affordable Housing Unit Data Spread Sheet to allenm@bouldercolorado.gov in the unlocked excel format. The spreadsheet may be found on-line at www.boulderaffordablehomes.com. 8. Land Uses, Sloane Walbert, 303-441-4231 The current proposal is for retail space on the ground floor facing Pearl St., which is a permitted use in the DT -2 zone district. However, note the restrictions on restaurants, brewpubs, and taverns and financial institutions in the DT-2 district in Sections 9-6-5(b)(1), 9-6-5(b)(4), and 9-6-7(a)(4), B.R.C. 1981. 9. Legal Documents, Julia Chase, 303-441-3052 The Applicant will be required to sign a Development Agreement, if approved. When staff requests, the Applicant shall provide the following: a. an updated title commitment current within 30 days; and b. any additional documentation pertaining to signature authority, as may be necessary. 10. Neighborhood Comments, Sloane Walbert, 303-441-4231 Staff has received comments from several neighboring property owners and residents, which have been forwarded to the applicant. 11. Next Steps, Sloane Walbert, 303-441-4231 Revisions to the plan documents are required. Please address the comments herein and resubmit five (5) hard copies (only one (1) copy of the drainage and utility reports) and one (1) digital copy of the revised plans to the front counter of the at the Planning and Development Services Center. The application deadline is 10:00 a.m. on the first and third Monday of each month to be included in the following review track. Staff is happy to meet with you to discuss these comments in detail at your convenience. 12. Fire No issues with site plan or concept of the building. Applicant should be fully aware that the building will require to be fully sprinklered and alarmed. Please check with Boulder Fire Rescue - David Lowrey 303.441.4356 if you have any questions regarding the fire protection requirements. Fire encourages the applicant to set up a meeting about the "Auto Elevator" to make sure everyone understands how that will operate and any requirements that maybe associated with that elevator. Agenda Item 5A Page 356 of 360 1737 PEARL ST Page 5 of 6 13. Residential Growth Management System, Sloane Walbert, 303-441-4231 The City of Boulder’s Residential Growth Management System (RGMS) caps annual residential growth at 1% per year and is managed through an allocation process. The adopted code language can be found in Section 9- 14, “Residential Growth Management System”, B.R.C. 1981. All projects that include residential units, including those that meet the exemption criteria, must apply for and receive growth management allocations prior to building permit application. 14. Review Process, Sloane Walbert, 303-441-4231 Per Table 2-2 of the land use code a concept plan and site review are not required for the project. However, the proposal meets the thresholds for voluntary site review. The proposal includes modifications to the development standards, including an allowance for three stories, a reduction to the minimum front yard setback for the third story, and the street facing window requirements. A decision on this application (an approval, denial, or approval with conditions) can be made by the Planning Department, subject to call-up by the Planning Board within 14 days after a decision. However, staff may want to refer the application to Planning Board for decision considering the amount of public interest. 15. Review Process, Sloane Walbert, 303-441-4231 Per Section 9-12-4, “Elimination of Lot Lines,” B.R.C. 1981 a lot line elimination plat is required to create one buildable lot. A lot line elimination is a Techncial Document Review application, which should be submitted at the tec. doc. review stage. 16. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 A Final Utility Connection Plan will be required as part of the Technical Document Review process (which must be completed prior to building permit application). The Final Master Utility Plan (Utility Connection Plan) will be required to show all existing water service lines and fire lines. 17. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 All water meters are to be placed in city R.O.W. or a public utility easement, but meters are not to be placed in driveways, sidewalks or behind fences. 18. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 Maintenance of sand/oil interceptors and all private wastewater and storm sewer lines and structures shall remain the responsibility of the owner. 19. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 No portion of any structure, including footings and eaves, may encroach into any public right-of-way or easement. 20. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 The applicant is advised that at the time of building permit application the following requirements will apply: a. The applicant will be required to provide an accurate proposed plumbing fixture count to determine if the proposed meters and services are adequate for the proposed use. b. Water and wastewater Plant Investment Fees and service line sizing will be evaluated. c. If the existing water and/or wastewater services are required to be abandoned and upsized, all new service taps to existing mains shall be made by city crews at the developer's expense. The water service must be excavated and turned off at the corporation stop, per city standards. The sewer service must be excavated and capped at the property line, per city standards. d. If the building is to be sprinklered, fire line plans must accompany the fire sprinkler service line connection permit application Agenda Item 5A Page 357 of 360 1737 PEARL ST Page 6 of 6 21. Utilities, Will Johnson, Johnsonw@Bouldercolorado.gov, 303-441-3273 Trees proposed to be planted shall be located at least 10 feet away from existing or future utility mains and services. 22. Zoning, Sloane Walbert, 303-441-4231 The property is in the Downtown 2 (DT-2) zoning district, defined as: "A transition area between the downtown and the surrounding residential areas where a wide range of retail, office, residential, and public uses are permitted. A balance of new development with the maintenance and renovation of existing buildings is anticipated, and where development and redevelopment consistent with the established historic and urban design character is encouraged" (Section 9-5-2(c)(3)(A), B.R.C. 1981). IV. FEES Please note that current development review fees include a $131 hourly rate for reviewer services following the initial city response (these written comments). Please see the P&DS Questions and Answers brochure for more information about the hourly billing system. Agenda Item 5A Page 358 of 360 CITY OF BOULDER LAND USE REVIEW RESULTS AND COMMENTS DATE OF COMMENTS: December 20, 2019 CASE MANAGER: Sloane Walbert PROJECT NAME: LOCATION: NAVY REDEVELOPMENT 1737 PEARL ST REVIEW TYPE: Site Review REVIEW NUMBER: LUR2018-00073 APPLICANT: STUDIO ARCHITECTURE DESCRIPTION: Proposal to redevelop the properties at 1727 and 1737 Pearl Street with a 28,222 sq. ft. three-story mixed-use building. Proposal includes 9,439 sq. ft. of commercial space on the first floor, ten residential units on the second floor, and four residential units on the third floor. Development would include one level of underground parking with 14 spaces. I. REVIEW FINDINGS Minor plan set corrections are required before staff can approve the application and schedule the item for a Planning Board hearing. Refer to the review comments below. Please feel free to contact staff with any questions or concerns. II. CITY REQUIREMENTS The section below addresses issues that must be resolved prior to project approval. Building Design Sloane Walbert, 303-441-4231 Thank you for the information on the feature wall in the courtyard. Please update the elevations/renderings/ perspectives to show the feature wall or a note indicating the proposed materials/intent. Drainage Will Johnson, 303-441-3273 The proposed overhangs over the detention facilities cannot be approved. The detention facilities will be required to be placed in drainage easements. Building/balcony cannot encroach into these required easements. Please update the plans as necessary. Parking David Thompson, 303-441-4417 Please revise both the project's written statement and parking management plan to say residents will be required to use the delivery / auto queue area when waiting to use the auto elevator to access the vehicle parking spaces. Also describe how this requirement will be communicated to the residents. III. INFORMATIONAL COMMENTS Refer to prior review comments. Agenda Item 5A Page 359 of 360 1737 PEARL ST Page 2 of 2 IV. FEES Please note that current development review fees include a $131 hourly rate for reviewer services following the initial city response. Please see the P&DS Questions and Answers brochure for more information about the hourly billing system. There are currently $2,652.75 in overdue fees (Inv# 00030120). Please remit as soon as possible. Staff is unable to review the corrected plans until overdue fees have been paid. Agenda Item 5A Page 360 of 360