PMP TAB June 2020 LATESTPavement
Management
Program
Transportation Advisory Board
June 8, 2020
Background
▫Maintain a 300 -mile street system
▫Overall Condition Index (OCI)
▫1 -100 scale (goal of 75 or higher)
▫Types of pavement maintenance
▫Crack sealing
▫Chip sealing
▫Asphalt resurfacing
▫Street reconstruction
Background
▫Essential vs. enhancement
▫Coordination with city plans
▫TMP
▫Vision Zero
▫Low -Stress Walk and Bike Network Plan
▫Scale of improvements
▫Proactive review
2020 Striping Improvements
•Folsom Street
•(Valmont to Iris)
•Pine Street
•(Folsom to 28 th )
•Table Mesa
•(Broadway to Vassar)
•Reduce travel lanes to 10’
•Decrease traffic stress for walking
and biking
•Buffered bike lanes
•Reduced speed limits (30 to
25mph)
•Folsom Street and Pine
Street only
Summary of Improvements
Folsom, Pine, Table Mesa
Ex. Spruce Street
Folsom Street (Pine to Valmont) 2021
Existing Conditions
Folsom Street (Pine to Valmont) 2021
Separation Treatment Alternatives
Armadillos Pre-Cast Curb Cast-in-Place Curb
Staff Recommendation
Community Engagement
“Inform” Level
▫Promises to the public:
▫We will provide you with balanced and objective
information to assist in understanding the problem,
alternatives, opportunities and/or solutions.
▫We will keep you informed on the proposed
improvements and installation timeline.
▫We will listen to and acknowledge your concerns.
Engagement Goals
▫Provide a dynamic engagement platform
▫Note longer-term corridor studies and future projects
▫Explain considerations that led to chosen designs
▫Solicit general feedback on:
▫Coordinated approach between PMP/Low-Stress Network
▫Chosen 2020 striping enhancements to key corridors
▫Outline where staff will solicit more in -depth feedback (2021+)
Be Heard Boulder
Vision Zero Page
▫Relevant PMP & Plans links
▫“Who’s Listening” tool
▫Stay Informed button
▫Info sheets with corridor renderings
▫FAQs
▫Questionnaire
Next Steps/Timeline
TAB Input
▫Does TAB have any questions and/or comments
regarding the Pavement Management Program
and associated 2020 street enhancements?
▫What is TAB’s preference regarding the
separation treatment for the Folsom Street bike
lane between Pine Street and Valmont Road?
Thanks!
Dave “DK” Kemp
Senior Transportation Planner
dk@bouldercolorado.gov
720.376.0890
Jenny Godwin
Associate Transportation Planner
GodwinJ@bouldercolorado.gov
720.607.8368