Loading...
Item 4A 250 and 260 Pearl Subdivision TEC2019-00027 250 and 260 PearlMEMORANDUM TO: Planning Board FROM: Shannon Moeller, Case Manager DATE: February 14, 2020 SUBJECT: Call Up Item: 250 and 260 Pearl Subdivision (TEC2019-00027): Final Plat to combine unplatted tracts at 250 and 260 Pearl as one 43,914 square-foot lot, dedicate right-of-way for 3rd Street, and dedicate public access and flood control easements. The call up period expires on February 27, 2020. Attached is the disposition for the conditional approval (see Attachment A) of the Final Plat for the proposed 250 and 260 Pearl Subdivision within the BT-2 (Business – Transitional 2) zoning district. As indicated in Attachment B, this approval will result in one 43,914 square-foot lot. No modifications to the development code or minimim lot standards have been requested as a part of this application. Process. Pursuant to Chapter 9-12, B.R.C. 1981, a proposal to combine parcels which are not conforming platted lots in the same subdivision or are not considered merged pursuant to subsection 9-9-2(c), B.R.C. 1981 requires approval of a Preliminary and Final Plat. The Preliminary Plat (Attachment C) was approved on February 4, 2020 and is a staff-level decision not subject to call-up pursuant to section 9-4-2, Development Review Procedures, B.R.C. 1981. Pursuant to section 9-4-2 and section 9-12-10, B.R.C. 1981, approval of a final plat is subject to planning board call-up and to appeal by any person aggrieved by the decision. If the decision is not called up or appealed, then it will become final fourteen days after the date of the initial approval. Background. The property (250 and 260 Pearl Street) consists of unplatted parcels in the Central Boulder subcommunity, located southwest of the intersection of Pearl and 3rd Street. As shown in Figure 1, the site includes Boulder Auto Detail at 250 Pearl and the former Meyers Heating and Air Conditioning location at 260 Pearl. Sunshine Canyon Creek passes through the northwest corner of the property. Nearby residential uses include attached and detached dwelling units to the west, north, and east, and nearby non- residential uses include a three-story office building to the southwest, a car wash to the south, and a dispensary to the east. As shown in Figure 2, the property is zoned BT-2 (Business – Transitional 2), which is described in section 9-5-2(c)(2)(E), B.R.C. Figure 2 – Zoning Districts Figure 1 – Aerial Photo 250 Pearl 260 Pearl Agenda Item 4A Page 1 of 14 1981, as “Transitional business areas which generally buffer a residential area from a major street and are primarily used for commercial and complementary residential uses, including without limitation, temporary lodging and office uses.” Pursuant to section 9-8-1, Table 8-1, “Intensity Standards,” the minimum lot area for the zone district is 6,000 square feet. As shown in Figure 3, portions of the site are impacted by high hazard, conveyance, 100- year floodplain, and wetlands areas, and the final plat includes dedication of a flood control easement over the flood conveyance zone surrounding Sunshine Canyon Creek. Additionally, the final plat includes dedication of approximately five feet of additional right-of- way for 3rd Street and a public access easement along 3rd Street. As indicated above, the proposed subdivision will result in one lot. The applicant has received approval to redevelop the property as ten residential dwelling units through the by- right technical document review process (case number TEC2019-00016). A Subdivision Agreement (Attachment D) has been signed for the required improvements at the time of construction. Analysis / Conclusion. Staff finds that this application is consistent with the intent of the Subdivision standards found in Chapter 9-12, B.R.C. 1981 and meets the applicable Final Plat criteria set forth in section 9-12-8(b), B.R.C. 1981. The proposed lot will exceed the minimum lot size required by the BT-2 zone district (6,000 square feet). Public Comment and Process: Public notice is required for Preliminary Plats pursuant to section 9-12-7, B.R.C. 1981. Notice was given in the form of written notification mailed to all adjacent property owners and a sign posted on the property for at least 10 days. All notice requirements of Section 9-4-3, B.R.C. 1981 have been met. Staff has not received any public comments or questions on the proposal. This Final Plat proposal was approved by Planning and Development Services staff on February 13, 2020, and the decision may be called up before Planning Board on or before February 27, 2020. There is one Planning Board meeting within the 14-day call up period on February 27, 2020. Questions about the project or decision should be directed to the Case Manager, Shannon Moeller at (303) 441- 3137 or at moellers@bouldercolorado.gov. Attachments: A. Signed Disposition B. Approved Final Plat C. Approved Preliminary Plat D. Subdivision Agreement Figure 3 – Regulatory Floodplain, Proposed Lot, and Dedications Flood Control Easement Conveyance/High Hazard 100-year Floodplain 500-year Floodplain ROW Dedication and Access Easement Agenda Item 4A Page 2 of 14 ATTACHMENT A Agenda Item 4A Page 3 of 14 ATTACHMENT A Agenda Item 4A Page 4 of 14 ATTACHMENT BAgenda Item 4A Page 5 of 14 ATTACHMENT CAgenda Item 4A Page 6 of 14 ATTACHMENT CAgenda Item 4A Page 7 of 14 ATTACHMENT CAgenda Item 4A Page 8 of 14 ATTACHMENT D Agenda Item 4A Page 9 of 14 ATTACHMENT D Agenda Item 4A Page 10 of 14 ATTACHMENT D Agenda Item 4A Page 11 of 14 ATTACHMENT D Agenda Item 4A Page 12 of 14 ATTACHMENT D Agenda Item 4A Page 13 of 14 ATTACHMENT D Agenda Item 4A Page 14 of 14