Loading...
IGA; Boulder County; temporary construction easement; Exp 6/30/2016 81?12016 C ontr act Tracking>Thank You ✓/CEp�jy�C/�A/Tp STANDARD Contract Routing Cover Sheet \ Please print and attach to your document You can view the status of your contract using the Contract Tracking Status Page. Routing Number 20160602-1839 10rlginating Dept Open Space/Mtn Parks Contact Person Luke McKay Phone Number 303-413-7626 Project Manager/ Contract Luke McKay E-mail mckayl@bouldercolorado.gov ; Administrator Counter l Counter Parties Boulder County Contract Tltle / Type Temporary Construction Easement Number Description Temporary Construction Easement granted by the City to the County in order for the County to drill a geotech boring on City Open Space for the design of support structures for the Boulder 3 - Canyon Trail Extension bridge over Boulder Creek--a joint project between the City and the County. ?Special Instructions Please expedite and return to Luke McKay by Thursday,June 9th. The County would like to 1 Ibegin work next week. Amount Expense Type Dept. Head Signature NOTE;Originating Department: Identify . ith a check mark all areas document needs to be routed. • Purchasing • Budget • Sales Tax • CAO,/ / 4--r (ox -((a • City Manager✓ • Central Records/ �r1nY 1`v 0 n c^, r-tKn 1 fit? https:lhvork.6ouldercoloratlo.gov/C ontractTrackingrservlet!Controller cc 1/1 rrt TEMPORARY CONSTRUCTION EASEMENT: BOULDER CANYON TRAIL EXTENSION This TEMPORARY CONSTRUCTION EASEMENT (the"Easement") is made as of the day of 2016,by and between the City of Boulder, Colorado, a Colorado home rule city(the"City"),and the County of Boulder, a body corporate and politic(the"County") (collectively"the Parties"). RECITALS WHEREAS, the Parties entered into an Intergovernmental Agreement for Design and Construction of the Boulder Canyon Trail(the "IGA") dated March 31, 2015 to extend the Boulder Canyon Trail (the "Trail") from its existing terminus to the SH 119 tunnel; and WHEREAS, some segments of the Trail will be located on City owned parcels; and WHEREAS, the Parties have discussed access routes, the location of the geotech boring, schedules and protocols to limit impacts to the Property and adjacent City properties or rights of way during the County's access and use; and WHEREAS, the County and its contractor(s)have started designing and constructing the Trail and are requesting access to a City owned parcel in order to drill a geotech boring for the design of support structures for the Trail's bike and pedestrian bridge over Boulder Creek(the "Project"); NOW,THEREFORE, in consideration of the promises and obligations set forth below, the Parties agree to the following: TERMS AND CONDITIONS 1. The Recitals set forth above are incorporated herein and made a part of this Easement. 2. The City agrees to provide the County and its contractor(s) temporary access and use for the purposes of ingress and egress and to drill a geotech boring for the design of the Trail's bike and pedestrian bridge, as shown on Exhibit A attached to this Easement (the "Property"). 3. The County and its contactor(s) shall take all necessary precautions during the Project and coordinate with the City as to not disrupt the City and the public's access and use of the Property and adjacent City properties or rights of way. The County and its contractor(s) shall be responsible for any signage and personnel necessary to protect the public during the Project. 4. The County and its contractor(s) shall not store, use, manufacture, generate, transport, discharge or dispose of any hazardous or toxic substance,material or waste on the Property. 5. The County shall require its contractor(s) to exercise due care and best management practices in accordance with all applicable federal, state and local laws to minimize the disturbance of the Property and shall pay for or repair any damages resulting from the failure to exercise due care as requested by the City. This shall include taking all necessary precautions to avoid any unnecessary damage to both the Property and adjacent City properties or rights of way, including but not limited to damage to any vegetation, soil, surface water, fences, roads and trails. The County and its contractor(s) shall not enter the Property with equipment or vehicles when the ground is muddy or when such equipment will damage the Property and any other City property or right of way. 6. Upon completion of the Project, the County shall restore all of the impacted Property and any other City property or right of way impacted by this Easement to a level comparable to its original condition. The County agrees to take Pre- and Post-Project photographs of the Property and provide those photographs to the City. The Parties will do a Post-Project site visit to evaluate any restoration or repair needs. 7. Before entering the Property, the County shall notify the City of the expected time of its entry and of the expected duration of the Project. Whenever notice to the City is required to be given hereunder, it shall be provided to Kelly Wasserbach, Engineering and Project Management Supervisor, (720) 564-2064, wasserbachk@bouldercolorado.gov. 8. Neither party is required to indemnify the other in connection with this Easement.However,each party assumes responsibility for its actions and omissions in the performance or failure to perform work under this Easement, as well as the actions and omissions of its agents and employees. Neither party waives or intends to waive the limitations on liability which are provided to the Parties, their officers, and employees under the Colorado Governmental Immunity Act, Section. 24-10-101 et. seq., C.R.S. 9. The County agrees to cause its contractors, consultants or agents performing any of the work related to the Project to indemnify and hold the City harmless from and against all losses, claims, demands, liabilities, injuries, damages and expenses, including, without limitation, attorneys' fees and court costs the City may suffer or incur which may arise from negligent or wrongful performance of the contractors, consultants or agents while completing the Project. 10. The County agrees to cause its contractors, consultants or agents performing any of the work related to the Project to procure and maintain in force during the term of this Easement, at its own cost, the following minimum coverages: a. Workers' Compensation and Employers' Liability i. State of Colorado: Statutory b. General Liability 2 i. General Aggregate Limit: $2,000,000 ii. Per Occurrence: $1,000,000 Coverage provided should beat least as broad as found in Insurance Services Office(ISO) form CG0001. c. Automobile Liability Limits i. Bodily Injury&Property Damage Combined Single Limit: $1,000,000 Coverage provided should be at least as broad as found in ISO form CA0001 (BAP) including coverage for owned, non-owned and hired autos. d. Insurance shall: i. Provide primary coverage; ii. Include the City and its officials and employees as additional insureds as their interest may appear (except for Worker's Compensation and Professional Liability). Additional insured endorsement should be at least as broad as ISO form CG2010 for General Liability coverage and similar forms for auto liability; iii. Include a waiver of subrogation for General Liability coverage; iv. Issue from a company licensed to do business in Colorado having an AM Best rating of at least A-VI; and V. Be procured and maintained in fall force and effect for the duration of the Project. e. Certificates of Insurance evidencing the coverages described herein shall be forwarded to the Engineering and Project Management Supervisor. Certificate Holder shall be: City of Boulder, 1777 Broadway, Boulder, CO 80306. f. Within seven days after receiving insurer's notice of cancellation or reduction in coverage, the County, and its contractors, consultants, and agents, or its insurance broker(s), shall notify the City. In either such case, the County, and its contractors, consultants, and agents, shall promptly obtain and submit proof of substitute insurance complying with the City's insurance requirements. 11. The Easement is in addition to, and does not supersede, the terms and conditions of the IGA. 12. If the City visits the Property and discovers noncompliance with the agreed upon terms of this Easement or the IGA,the City can request a halt to operations. If operations are halted, they may not resume until the City determines that the County and their contractor(s) are compliant with this Easement and the IGA. 3 13. The Easement shall expire on June 30, 2016, or at the Project's completion, whichever occurs earlier.The County shall notify the City once the Project is completed in accordance with Paragraph 7 hereunder. IN WITNESS WHEREOF,the Parties have set their hands to this Easement on the day and year above first written. BOULDER40 NTY, a body corporate and politic By: _ Title: STATE OF COLORADO ) ss. COUNTY OF BOULDER ) Acknowledged before me,a notary public,this day of OLLLUI`^2016, by as Witness my hand and official seal. My commission expires: Notary Public �— (SEAL) MONICA ORTIZ NOTARY PUBLIC STATE OF COLORADO = NOTARY ID#20114074268 CITY OF BOULDER, a Colorado home rule City 'y^OM AISSION EXPIRS81112912019 Jane. Br tigam, City Manage ATTEST; Cit - APPROVED AS TO FORM: City ttomey's Office (-0_c3- l to 4 TEMPORARY CONSTRUCTION EASEMENT BOULDER CANYON TRAIL EXTENSION EXHIBIT A T'7 r- e SCHNELL Ilb i' �• •�is � - * rte, a• Legend Man Oil �• Perennial Stream _ - -- Ephemeral Btreaml Intermittent Stream e—e Aqueduct 6 F1001esIB OSMP Land OS P Ownership t OSMP Joint Ownership OSMP Conservation Easement OSMP Joint Conservator,Easement OGeotech Boring Location(Ira"Property^) Hiking Trail o MUIt W se Trail,Paved PaN •-•• Clint,mg Access •••• Gliding Access Feet Prepared by Luke McKay City of Boulder OSMP 49 0 15 30 60 90 120 May 20,2016