Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Item 4B - Floodplain Development Permit Call Up - FLD2018-00039 - 1855 Folsom Street
M E M O R A N D U M TO: Planning Board FROM: Christin Shepherd, Senior Civil Engineer DATE: August 21, 2019 SUBJECT: Call Up Item: 1855 Folsom St Floodplain Development Permit (FLD2018-00039) Channel Work in the North Boulder Farmers Ditch This decision may be called up before Planning Board on or before September 5, 2019 The project is located on the portion of North Boulder Farmers Ditch that traverses the property at 1855 Folsom Street. Please see Attachment A for a Vicinity Map. The ditch was overgrown with dense vegetation that prohibited water flow. In 2018, the property owner at 1855 Folsom Street performed maintenance on the portion of the ditch that crossed their property without applying for a floodplain development permit. Maintenance activities included dredging and clearing the channel bottom and stabilizing the banks with rocks and non-grouted rip rap. The property owner was not fully aware that, although there was an agreement with the ditch company to perform maintenance, they also needed a floodplain development permit from the City for this type of work performed the 100-year floodplain and Conveyance Zone. In order to retro-actively approve the work performed on the ditch, the flood permit was submitted and reviewed. While it is not standard practice to review floodplain development permits after the fact, it is important to ensure that the channel work did not adversely impact any neighboring properties or cause a rise in the water surface elevations. The applicant has demonstrated compliance with the City’s floodplain regulations, including no-rise in water surface elevations. The project will not adversely impact nearby properties. A Floodplain Development Permit was approved by Planning and Development staff on August 21, 2019, and the decision may be called up before Planning Board on or before September 5, 2019. There is one Planning Board meeting within the 14 day call up period on September 5, 2018. A copy of the floodplain development permit and application materials is attached for reference. Agenda Item 4B Page 1 of 27 Questions regarding this project should be directed to Christin Shepherd in Planning and Development Services at 303-441-3425 or ShepherdC2@bouldercolorado.gov. Attachments: A. Vicinity Map B. Floodplain Development Permit & Report Agenda Item 4B Page 2 of 27 © 2016 City of Boulder, Colorado S U B J E C T T O R E V I S I O N All rights reserved. The map information contained hereon is intended for the sole use of the purchaser and may not be copied, duplicated or redistributed in any way, in whole or in part, without the expressed written consent of the City of Boulder. The information depicted is provided as a graphical representation only. While source documents were developed in compliance with National Map Accuracy Standards, the City of Boulder provides no guarantee, express or Implied, as to the accuracy and/or completeness of the information contained hereon. Map produced by the City of Boulder Planning & Developement Services DepartmentFor information call (303) 441-3266 or visit us on the web at http://www.bouldercolorado.gov/pwplan ¸ Boulder MapLink 0 270 540135Feet Print Date: 8/21/2019 Legend City Limits Parcels ATTACHMENT A Agenda Item 4B Page 3 of 27 ATTACHMENT B Agenda Item 4B Page 4 of 27 ATTACHMENT B Agenda Item 4B Page 5 of 27 ATTACHMENT B Agenda Item 4B Page 6 of 27 POST CONSTRUCTION ANALYSIS OF FLOODPLAIN IMPACTS DUE TO MAINTENANCE OF THE IRRIGATION DITCH/BOULDER SLOUGH AS IT TRANSITS THE PROPERTY AT 1855 FOLSOM BOULDER,COLORADO Prepared For: Left Hand Design Group LLC 1526 Spruce St Suite 201 Boulder, CO 80302 Prepared By: Hurst and Associates, Inc. 1265 S. Public Rd Suite B Lafayette, Colorado 80026 Job Number 2397-04 July 16, 2019 ATTACHMENT B Agenda Item 4B Page 7 of 27 ATTACHMENT BAgenda Item 4B Page 8 of 27 ATTACHMENT BAgenda Item 4B Page 9 of 27 ATTACHMENT BAgenda Item 4B Page 10 of 27 ATTACHMENT BAgenda Item 4B Page 11 of 27 ATTACHMENT BAgenda Item 4B Page 12 of 27 ATTACHMENT BAgenda Item 4B Page 13 of 27 ATTACHMENT BAgenda Item 4B Page 14 of 27 ATTACHMENT BAgenda Item 4B Page 15 of 27 ATTACHMENT BAgenda Item 4B Page 16 of 27 ATTACHMENT BAgenda Item 4B Page 17 of 27 ATTACHMENT BAgenda Item 4B Page 18 of 27 ATTACHMENT BAgenda Item 4B Page 19 of 27 ATTACHMENT BAgenda Item 4B Page 20 of 27 ATTACHMENT BAgenda Item 4B Page 21 of 27 ATTACHMENT BAgenda Item 4B Page 22 of 27 ATTACHMENT BAgenda Item 4B Page 23 of 27 ATTACHMENT BAgenda Item 4B Page 24 of 27 Folsom Street10'SCALE: 1" = 10'020'HURSTCIVIL ENGINEERINGPLANNINGSURVEYINGATTACHMENT BAgenda Item 4B Page 25 of 27 ATTACHMENT BAgenda Item 4B Page 26 of 27 ATTACHMENT BAgenda Item 4B Page 27 of 27