HomeMy WebLinkAbout06.17.2019 WRAB Full PacketWATER RESOURCES ADVISORY BOARD MEETING
MEETING DATE: Monday June 17, 2019
MEETING TIME: 6:00 p.m.
MEETING LOCATION: Municipal Services Center, 5050 Pearl St., Boulder, CO 80301
Agenda Highlights:
1. Call to Order (6:00 p.m.)
2. Approval of May 20 meeting minutes (6:01 p.m.)
3. *Public Comment (6:05 p.m.)
4. Information Item – Capital Improvements Program (6:15 p.m.)
5. Matters from the Board (7:15 p.m.)
• Greenways Advisory Committee/Greenways CIP
6. Matters from Staff (7:30 p.m.)
7. Discussion of Future Schedule (7:50 p.m.)
8. Adjourn (8:00 p.m.)
* Public Comment Item
Agenda item times are approximate
Information:
• Please contact the WRAB Secretary email group at: WRABSecretary@bouldercolorado.gov
• Packets are available on-line at: http://www.bouldercolorado.gov – A to Z, Water Resources
Advisory Board (WRAB), Next Water Resources Advisory Board Meeting
WRAB Minutes
5/20/2019
Page No. 1
CITY OF BOULDER, COLORADO
BOARDS AND COMMISSIONS MEETING MINUTES
Name of Board / Commission: Water Resources Advisory Board
Date of Meeting: 20 May, 2019
Contact Information for Person Preparing Minutes: Erika Lowe, 303-441-4257
Board Members Present: Kate Ryan, Kirk Vincent, Ted Rose, Trisha Oeth, Gordon McCurry
Board Members Absent: None
Staff Present: Jeff Arthur, Director of Public Works for Utilities
Candice Owens, Program Supervisor – Stormwater Quality
Douglas Sullivan, Project Manager/Principal Engineer - Utilities
Ken Baird, Senior Finance Manager
Joe Taddeucci, Water Resources Manager
Stephen Grooters, Engineering Project Manager
Katie Knapp, Engineering Project Manager-Flood Management
Ward Bauscher, Utilities Maintenance Manager
Kevin Clark, Engineering Project Manager
Tom Settle, Water Treatment Manager
Chris Douville, Wastewater Treatment Manager
Erika Lowe, Board Secretary
Agenda Item 1 – Call to Order [6:00 p.m.]
Agenda Item 2 – Approval of the 15 April 2019 Meeting Minutes [6:02 p.m.]
Approved with amendment
Moved by: Vincent Seconded by: Oeth
Vote: 5:0
Agenda Item 3 – Public Participation and Comment [6:04 p.m.]
Public Comment:
• Jon File: Lives on Oakhurst Drive in Broomfield. I represent several companies: I am the
President of the Boulder and Weld County Ditch and the President of the Shores of Plum Creek
Metropolitan District and manager of Green River Holdings LLC. We have a lot of water rights
in Boulder Creek from Lower Boulder shares to Boulder and Weld County shares, Boulder and
White Rock Ditch Shares, Panama Reservoir Shares, Karr and Tyler Ditch, Philly Lake, and
Coyote Pond. We have quite a bit of water rights. We are a gravel mining company and a
development company, so we have concerns about water quality, but also want to work with
the City of Boulder. All of us that are opposers to what you are doing made a big deal about the
water quality and all we want is what you guys want. It may seem a bit different, but we want
the same standards you want for your intake, for our intake. Your system is almost like a car,
there is an intake system and an exhaust and the ideal thing for us is for you to take your
exhaust and run it back into your intake. If that quality is good for you, then it is good for us.
Even if that seems unrealistic, why should we expect anything less than what you are
expecting? There is a large amount of ditch water getting ready to be changed for a number of
different uses. I worry about the value of water and you affecting that value. Quality is what
affects the value. A share of Big Thompson is $48,000 a share, so for acre foot you are looking
at $77,000 per acre foot, so what we would like to do is keep our value up so when we sell our
shares to either a metropolitan district or to other cities or entities we can get the same value we
had when the ditch was first started when the water quality was clean. So we would like to have
the water quality as clean as possible, yet be reasonable as good citizens.
[Answer to a follow up question from a Board member]: Water is used for fracking. We filed
for ponds for municipal use for own development, and then, because we were not tied in with
City, we were planning on using our own water for our sources. In order to get water rights
finalized for Philly Lake Reservoir and Rockard Lake, we had to drop the municipal use, but
we do have right to use for augmentation and if used for augmentation, then we have the rights
to use water for drinking and if we are using the water to charge the ground we are worried
about that quality coming back to that drinking system.
WRAB Minutes
5/20/2019
Page No. 2
• Jeff Kahn: Lawyer with the firm Lyon Gaddis in Longmont, and I am here tonight for purposes
similar to Mr. File. I represent the Lower Boulder Ditch Company. Lower Boulder diverts from
Boulder Creek at 95th Street approximately a mile below the City of Boulder 75th Street plant. I
am here tonight to advise you of the company’s interest in the quality and the cleanup that the
City does of water after it uses the water. Lower Boulder has the senior water right in South
Platte. It has an 1859 priority for 25 CFS. It also has an 1870 priority for 97 CFS of water.
When Lower Boulder made those appropriations, we had clean water being diverted into the
ditch. As I stand here now, we do not have clean water. City of Boulder zealously protects
water quality in its watershed. I can’t even go up there to hike. The ditch companies that divert
from Boulder Creek below the City of Boulder discharge of effluent have not in the past
zealously protected the quality of the water we get. That includes Lower Boulder, the
companies Mr. File represents, and other ditch companies on Lower Boulder Creek that are
below. I am here to advise we are going to zealously protect our rights moving forward. The
City has reduced its nitrogen discharge in the past, but phosphorous discharge has increased to
the extent that if your discharge permit was renewed, you would not meet the Reg 85 standards
that would be included in the discharge. Also, you need to plan on meeting Reg 31 standards in
2027. Those are going to be stricter, and we are going to do our part to see that those are
enforced.
• Henry Adamsky: I was here last year to talk about utility rate increases, and I prepared a chart
that compared utility rate increases to inflation and to social security cost of living increases.
Here are the numbers for this year: Social Security cost of living was a 2% increase and
inflation was 2.44% increase. You got 7% on water, 5% on waste and 5% on storm for 2019. I
also calculated averages for the period of 2001 through 2019 and the inflations and Social
Security cost of living increases come out pretty close with 2.14 for Social Security and 2.13
for inflation for that period. Relative to either of those indicators water rates go up by 230%,
wastewater 385% and stormwater 358 % and that is year after year, compounded for 19 years.
• John Gerstle: John Gerstle, here to inform the board, in the past I have served as liaison from
Planning Board. Planning Board has decided to end formal liaison program with other advisory
boards due to demand on various folks’ time, so there will be no Planning Board liaison to
WRAB. Planning Board continues to be interested in what WRAB does and has a desire to help
out when possible.
• Carl Norby: Recently I shared thoughts about flooding and sewer backups throughout the City,
including 1,500 basements which were flooded with sewage. Council is interested in creating a
double underpass at 30th and Colorado for CU students, increasing arts and culture funding by a
boatload of bucks, and the community hospital kind of got an oops recently when Council
realized they forgot to tear down the building before building a new one. Then they came up
with an idea to help middle income home buyers buy a home in Boulder. The example they
gave was a $600,000 home they would help to buy. And more recently, they have really been
involved with prairie dogs the past few months. Helping people buy a home is good, protecting
homeowners who already have a home at risk of being damaged by a flood would be even
better idea. The main factor in not proceeding with almost all of the mitigation projects has
been ‘the emperor has no funds.’ Several people have met with Boulder Finance department
and asked what the City could do to come up with funds for flood mitigation. The answer was
the City does not know where to obtain funds for mitigation projects. Here are six examples of
how creative the City can be when they want to buy $600,000 homes for middle income
people: One was use general fund reserves. Two was establish an annual budget allocation
from housing and general fund. Third was use voter approved debt. The fourth was issue
certificates of participation. The fifth is create a line of credit. And the sixth is use guaranteed
loss reserved funds. Have you ever thought of using those for flood mitigation? W RAB tried to
advise Council in December, but that did not get far. Residents continue to persuade Council.
Someone needs to advise Council on the critical urgency of flood mitigation. Who better than
WRAB? Please follow up on December letter, the next flood is coming.
Agenda Item 4 – Public Hearing – Boulder Creek Water Quality/E.coli TMDL [6:15 p.m.]
Candice Owen, Program Supervisor – Stormwater Quality, presented this item.
EXECUTIVE SUMMARY:
The City has implemented a stormwater quality program since the 1990s. During that time the
WRAB Minutes
5/20/2019
Page No. 3
federal Clean Water Act has advanced state and federal stormwater regulation to include
municipal separate storm system (MS4) Phase II permitting and Total Maximum Daily Load
(TMDL) regulations. Throughout these regulatory changes the city has continued to implement
water quality efforts, many of which go above and beyond the minimum requirements. The
program has been guided by policies laid out in various City master plans that the Water
Resources Advisory Board (WRAB) has recommended through a formal public input and
acceptance process including the Water Quality Strategic Plan, Stormwater Master Plan and the
Comprehensive Flood and Stormwater Utility Master Plan. These plans include overarch ing
guidance related to looking at the stream and pollution in a comprehensive and holistic way,
addressing pollutants at their source first, and broad education and outreach strategies that have
an emphasis on how the public can help.
The April 2019 WRAB meeting included specific information on the Boulder Creek E.coli
TMDL and a pending update to the associated voluntary TMDL Implementation Plan that is
provided as an attachment to this memo. The TMDL Implementation Plan update is a technical
and detailed operations plan that provides a path for future City TMDL implementation efforts
based on evolutions in state of the science best practices to address E.coli in urban environments.
The plan itself is just one aspect of larger and more comprehensive effort s to address E.coli that
include actions such as cleaning and inspection the storm sewer system, requiring secured trash
containers to reduce available sources of food for wildlife, and education on pet waste clean -up.
Based on feedback received during this meeting, further background on the current stormwater
program, state environmental and public health purview, and various additional monitoring and
implementation efforts that could be undertaken are presented here for WRAB’s consideration
and feedback.
This Public Hearing does not require WRAB action but is intended to provide additional
information on the city’s current Stormwater Quality Program and an opportunity for the board
to share guidance and feedback on potential future efforts and activities.
WRAB Board Discussion Included:
• Question if any of the sources of E. coli are also sources of Phosphorous or are they different
• Comment on not clear how WRAB can provide direction, since there is not yet a clear sense of
what the major sources are, and it is challenging to provide guidance and input
• Question if the City has been able to narrow down the best guesses on what the sources are
since 1990’s
• Question if they are narrowing in on priority sewer sheds and ranking them
• Question if the City feels there was a good audit of cross connections, or are they continuing to
discover them. Question if that part is completed, are they now shifting focus to the sewer
sheds
• Question how much is being done to mitigate E. coli containing runoff along the banks, or
areas that would be non-point source discharge into Boulder Creek
• Question regarding Table 1-7 listing nine outfalls and talks about the percent reduction required
to meet the overall instream standards. Do those calculated reductions take into account any
additional mass loading that come in as non-point source run off and/or also amelioration of E.
coli that occurs between those outfall locations
• Request for explanation regarding the City and CU both being listed as owners of outfalls 7 and
9 on Table 1-7
• Question if there were any key findings on a 2017 study, highlighted in section 2.23, done at
selected outfall locations to identify human sources of bacteria
• Question if the City has done any kind of cost benefit analysis to the benefits of increasing the
wastewater treatment so it decreases the waste load from the wastewater treatment plant
Public Hearing:
• Arthur Hirsch: Boulder Water Keeper would like to give comments on E.coli implementation
plan. Boulder Water Keeper would like to thank the City for proactively developing E.coli
implementation plan. Glad to see that the City has developed an approach to address and reduce
E. coli loadings into Boulder Creek. Over all we agree with strategic approach in the
implementation plan using a tiered set of investigations in sewer sheds, in an effort to
investigate and mitigate E. coli sources. Our understanding that implementation plan was not
developed in coordination with CU or BVSD. It is recognized that this implementation plan
tried to be specific to the City jurisdictional area, however, e ventual coordination and
WRAB Minutes
5/20/2019
Page No. 4
communication between the City and CU will be important, since 30% of the nine priority
outfalls are shared between CU and the City. It seems like both parties need to buy off in this
approach and work together. The ultimate ownership and responsibility of E. coli discharges
into Boulder Creek from these shared outfalls need to be determined by both parties. In regard
to public education and outreach actions there is little or no discussion in the implementation
plan of actions that will be taken by the City. We concur with the Executive Summary that
mentions educating the public, taking the form of posting E.coli signage on City owned
property for greater public understanding about E.coli and what the public can do about it is
important. We believe there are additional outreach options the City can explore. We recognize
this implementation plan is Not a regulatory requirement and it represents a proactive approach
by the City to reduce E. coli loadings and stream concentrations within a jurisdiction. We hope
this implementation plan will be approved with modifications, funded and hopefully initiated in
2019.
WRAB Feedback:
• Supportive of instream sampling at 55th. Along with 75th sampling, it gives a good snapshot of
diluted concentrations going downstream. Strongly encourage this being part of the plan.
• Not yet to the step where WRAB has clear information about what the major sources are, so
there is no clear plan of action to address those sources. Support what needs to be done to
figure out what those areas are, so efforts can be focused. Support that it being an
implementation plan and not being part of the permitting requirements, so it can remain as
adaptive, so you can respond to information as it comes in and adapt accordingly.
• Process is sound and looks forward to hearing updates along the way, particularly when it
comes to the end of the Tier One prioritization process where decisions need to be mad e
Agenda Item 5 – Information Item – Capital Improvement Program [8:00 p.m.]
Douglas Sullivan, Utilities Supervisor, and Ken Baird , Senior Financial Manager, presented this item.
EXECUTIVE SUMMARY:
As part of the city’s annual budget process, Utilities develops a six-year planning budget, this
year for the time period of 2020 through 2025. The Water Resources Advisory Board (WRAB)
role in this process is defined in the Boulder Revised Code: “. . . to review all environmen tal
assessments and capital improvements conducted or proposed by the utilities division.” Within
the budget process, City Council approves and appropriates funds only for the first year, 2020.
This agenda item provides an opportunity for the WRAB to understand and discuss the CIP
process. Last year’s CIP is included for reference as Attachment A. WRAB will be asked to
make a recommendation to City Council regarding the 2020 -2025 CIP and associated rate
increases at its July meeting. The Planning Board will review the complete city CIP, including
utilities, in August. City Council plans for a study session in September, prior to adopting the
2020 budget in October.
Fiscal Impacts: Last year’s budget process resulted in increased investment in Utilities
infrastructure with 2019 rate increases of 7% in Water, 5% in Wastewater and 5% in
Stormwater/Flood Management. Future rate increases were also identified to maintain this level
of service, and for 2020 the projected rate increases were 7% in Water, 5% in Wastewater and
5% in Stormwater/Flood Management.
Public Feedback: A public hearing and recommendation is scheduled for the July WRAB
meeting. At the July meeting, staff will request that the WRAB provide a final recommendation
to City Council on the proposed 2020-2025 CIP and associated rates changes.
WRAB Board Discussion Included:
• Clarification question if the monthly water bill is just the water component or combined water,
wastewater and stormwater
• Question on if the fund summary shows what the Penstock repair will cost
• Question on what the timing is for the Barker Dam Anchor program and what brought the need
for this about
• Question if there is the requirement to review by X date and if so, what is that date
• Question if there is a regulatory hook or requirement for the Barker Dam Anchor program
• Question if the State has to sign off on the Dam every year
WRAB Minutes
5/20/2019
Page No. 5
• Question on how old the breach is on Green Lake No. 2 Dam
• Clarification on what caused the breach on Green Lake No. 2 Dam
• Question on what the loss in volume does and what makes it a priority
• Clarification on the Green Lake project being listed in previous years’ CIP with costs starting
in 2023, but most costs are in 2024, so is this being shifted up in time
• Comment that a WRAB tour of 63rd is in this year’s tentative agenda
• Question on the new federal lead and copper rule and if this project should be updated now, or
if the City wants to wait for the new requirements
• Question if there is any concern or reason to think that there might be a need to switch to
another corrosion control technique
• Concern about the thought of wildfire sweeping into town and the possibility that the fire
department could run out of pressure in one spot. Question on previous discussion of putting in
isolation valves to be able to maintain pressure in a crisis, would those isolation valves be in the
transmission system
• Question on where the 25 year I&I basis came from and if that was a CDPHE requirement
• Clarification to meet Reg 85 limits and if the City is anticipating on doing better than Reg 85
limits
• Question on how these improvements relate to City’s current deliberations on hospital
• Comment that Daily Camera in reporting on council’s most recent conversation on Alpine
Balsam noted that Council has taken the detention structure in North Boulder Park off the
agenda
• Question if there is any movement with the CDOT agreement
• Question on what the scale of cost is for the phosphorous treatment
• Question on the study in Uni Hill that is currently going on and how the City will estimate a
need in 2020 if the study is just occurring now
• Comment the SBC flood mitigation is a cautiously optimistic number for a project that might
not even happen. Discuss how WRAB and the City can manage the CIP to be able to seize an
opportunity if things get delayed or avoid cutting into capital maintenance if the South Boulder
Creek goes way up
• Comment that this is the first meeting that the timeline is being acknowledged to be two years
later, which is now four years later. Question if other mitigation that can be done in watershed
is a CIP issue. Put a strong recommendation for all of it, including something for more money
for education and notification. Impressed by City staff and they are not held responsible for
this, and we cannot be held to this timeline. Would like to see in June actions that are being
taken this year or 2020 for South Boulder Creek, so all the people living there can see
something being done
• Comment that the CFS masterplan should not get lost in shuffle for any longer than need be.
That is something this board has expressed strong interest in weighing on and without support
from City Council and staff to be able to work on that has wasted a lot of time
• Comment on agreeing with sentiment above. Spent whole term participating and weighing in
on the masterplan. Purposefully spent time trying to understand watersheds in the hopes of
having input on masterplan.
• General question if there is a formalized process where a multi-objective evaluation is done to
decide which projects are important enough to make the list and once on the list, how soon in
the six-year timeframe do they get funded.
• Question on what the income would be if we charged the City for the water they use. How big
of a gift is this buried in utility bills
• Question if other City departments have a budget and if there is any pressure on them?
Agenda Item 6 – Matters from the Board [9:03 p.m.]
• During community volunteer appreciation month there was a tour at 75th and the tour guide,
Brad, did a fantastic job
• Regarding the value of smart meters so people can know their usage in real time. Insurance
companies are beginning to require a smart meter in order to get homeowner insurance. Not
sure how the City fits in now, but it goes into the discussion on how the C ity’s meters are aging
Agenda Item 7 – Matters from Staff [9:10 p.m.]
• There was a speaker last month that had concerns about Wellman Ditch maintenance and City
staff are actively working with him
WRAB Minutes
5/20/2019
Page No. 6
• The snowpack mentioned in April is still there
Agenda Item 8 – Discussion of Future Schedule [9:15 p.m.]
• June meeting – CIP Discussion
• July meeting – Asset Management System
• August – Tentatively planning on drought, climate change
• September – Plan to have meeting at 63rd Street Water Facility – Carter Lake Pipeline
Agenda Item 9 - Adjournment [ 9:25 p.m.]
Motion to adjourn by: Rose Seconded by: Vincent
Motion Passes 5:0
Date, Time, and Location of Next Meeting:
The next WRAB meeting will be Monday, June 17, 2019 at 6:00 p.m., at the City's Municipal
Services Center, 5050 Pearl St., Boulder, CO 80301
APPROVED BY: ATTESTED BY:
Board Chair: _________________________ Board Secretary: ____________________________
Date: _______________________________ Date:______________________________________
An audio recording of the full meeting for which these minutes are a summary is available on the Water
Resources Advisory Board web page.
https://bouldercolorado.gov/boards-commissions/water-resources-advisory-board-next-meeting-agenda-and-packet
CITY OF BOULDER
WATER RESOURCES ADVISORY BOARD
AGENDA ITEM
MEETING DATE: June 17, 2019
AGENDA TITLE: Information Item - Draft Proposed 2020 6-year Capital Improvement
Program (CIP) Water, Wastewater and Stormwater/ Flood Management
PRESENTERS:
Jeff Arthur, Director of Public Works for Utilities
Douglas Sullivan, Utilities Principal Engineer
Ken Baird, Utilities Financial Manager
EXECUTIVE SUMMARY:
As part of the city’s annual budget process, Utilities develops a six-year planning budget, this
year for the time period of 2020 through 2025. The Water Resources Advisory Board (WRAB)
role in this process is defined in the Boulder Revised Code: “. . . to review all environmental
assessments and capital improvements conducted or proposed by the utilities division.” Utilities
staff has formulated initial revenue and expenditure projections for each of the three utility funds
through the year 2025. Within the budget process, City Council approves and appropriates funds
only for the first year, 2020.
The focus of the Utilities CIP continues to be on rehabilitation or replacement of aging
infrastructure and meeting regulatory requirements. Deferring maintenance can result in higher
costs when emergency repairs are needed and could have an impact on providing services to
customers. WRAB will be asked to make a recommendation to City Council regarding the 2020-
2025 CIP at its July meeting. The Planning Board will review the complete city CIP, including
utilities, in August. City Council will discuss the recommended budget in September at a study
session, and the overall budget is scheduled to be adopted by City Council in October.
This packet contains the draft proposed 2020-2025 Utilities CIP. The fund financials
(Attachment A) have been updated to reflect actual revenues and expenditures for 2018. At this
point 2018 financial information is unaudited and may have some adjustments as fiscal year 2018
is closed out. The draft proposed CIP spreadsheets for Water, Wastewater and Stormwater/Flood
Management are included in Attachment B. This memo provides information about the
financial outlook of the three Utility funds, including rate and bill impact implications and
anticipated bonds. An overview of the three Utility CIPs is also included, with discussion of
changes from the previous CIP. More detailed information about new projects was provided in
the May 20, 2019 CIP agenda item and presentation.
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 1 of 21
FISCAL IMPACTS:
Based on updates to the CIP and updated Fund Financials, staff is recommending revenue
increases of $2.2 million in the Water Fund, $1.1 million in Wastewater, and $600,000 in
Stormwater/Flood Management. To achieve these revenue increases, the billed rate increases are
estimated to be 7% in the Water Fund, 5% in the Wastewater Fund, and 5% in Stormwater/Flood
Management. These were the anticipated rate increases for 2019 based on the six-year CIP
presented through the 2018 budget process.
BOARD AND PUBLIC FEEDBACK:
A public hearing and recommendation is scheduled for the July WRAB meeting. At the July
meeting, staff will request that the WRAB provide a final recommendation to City Council
regarding the proposed 2020-2025 CIP and associated rates changes.
BACKGROUND and ANALYSIS:
The preliminary draft 2020-2025 fund financials provided with this memorandum reflects the
following billed revenue increases: 7% Water, 5% Wastewater, and 5% Stormwater/Flood
Management. The following table summarizes the 2019 adopted increase and preliminary
projections for 2020-2022. In 2021 the Water Rate increase is anticipated at 10%, where last
year’s fiscal planning had that year’s increase at 7%. This change is primarily due to the addition
of projects at Betasso and the Boulder Reservoir Water Treatment Plants that will be designed in
2021 and start construction in 2022 and are further discussed below. The funding plan for 2021
anticipates a moderate decrease in the capital reserve that was set aside for the Lakewood
Pipeline. This reserve was established using funds from a settlement with the contractor that the
utility received due to sub-standard work on the pipeline. Subsequent inspections of the pipeline
have concluded that extensive remediation measures are not needed at this time. The pipeline
will continue to be inspected at five-year intervals to monitor its condition. A moderate decrease
in this reserve is warranted to help fund greater resilience and redundancy within the overall
water system.
Table 1 – Proposed Rate Increases
2019 2020 2021 2022
Water 7% 7% 10% 6%
Wastewater 5% 5% 5% 5%
Stormwater/Flood Management 5% 5% 5% 15%
Billed revenue increases are evaluated annually as part of the budget process to ensure that
projected revenues match proposed expenditures. The expenses the utility incurs, ranging from
electric bills to the cost of pipe, generally increase due to inflation. Another important factor
considered in evaluating rate increases is the amount of infrastructure at or beyond the end of its
useful life. Some of the infrastructure in the utilities is over 100 years old. Replacing aging
infrastructure before it fails avoids impacts to the public and is more cost effective. It has
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 2 of 21
generally been the strategy to smooth out rate increases over multiple years rather than have low
annual rates with periodic rate spikes. In recent years and in the current funding plan there are
some exceptions to this. In 2015, the Wastewater rate increase was 30%, which was primarily in
response to WRAB and City Council being supportive of increasing the replacement cycle of the
sanitary sewer system. The 15% increase in the Stormwater/Flood fund in 2022 is due to the
increased scope of the South Boulder Creek Flood Mitigation project.
As discussed at the April 15, 2020 WRAB meeting, the rate structure changes implemented in
2018 decreased the indoor water budget for single-family residential customers from 7,000 to
6,000 gallons per month. The most recent average winter consumption, which is assumed to be
indoor use, was below 4,000 gallons per month. Reducing the single-family residential water
budget down to 5,000 gallons per month may be warranted. This would result in greater equity
between customer classes and would leave some additional water budget available for residential
customers that may water outdoors during the winter. Reducing this indoor budget to 5,000
gallons per month would result in around $300,000 in additional annual water fund revenue.
This could reduce the water rate increase from 7% to 6% for 2020 or reduce the larger 10%
increase anticipated in 2021.
The impact of a 1% increase in revenue varies across the three funds and is shown below. For
context, electric and gas costs at just the water treatment plants cost over $450,000 and over
$700,000 at the Water Resource Recovery Facility.
Water $310,000
Wastewater $220,000
Stormwater / Flood Mgmt $120,000
Single Family Residential Customer Bill Impact
Taking all these adjustments into account, the proposed preliminary 2020 revenue increases
would increase a typical residential customer’s monthly utility bill by $5.21 or a total increase of
$62.52 annually for all three services. The assumptions for the typical single-family customer
represent 90,000 gallons a year, with winter usage being 4,000 gallons a month, which is similar
to the current customer class average winter consumption. Actual bill impact will vary due to
differences in consumption due to weather and other individual customer characteristics.
Additional information about cost comparisons will be provided as part of the staff presentation.
Table 2 – Typical Single-Family Monthly Bill Impacts
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 3 of 21
ANTICIPATED REVENUE BONDS:
The current 2020-2025 utility fund financials reflect several bond issuances (and associated debt
payments) to fund the following capital projects. Utility revenue bonds are typically issued for a
20-year repayment. As a point of reference, $100,000 annually for 20-years provides for debt
service coverage on a bond of approximately $1,000,000.
Water:
1. Barker Dam Outlet, Albion Dam Repair, and Boulder Reservoir and Betasso Water
Treatment Plant Improvements ($40 million in 2022)
2. Betasso Water Treatment Plant Supply System and Backwash System Reliability
Improvements and Green Lake Dam Rehabilitation ($17 million in 2025)
Wastewater:
1. Interceptor Sewer Realignment, and Water Resource Recovery Facility (WRRF) Digester
Improvements ($24 million in 2021)
2. Lower Goose Trunk Sewer Replacement, and WRRF Phosphorus Improvements ($22
million in 2022)
Stormwater and Flood Management:
1. South Boulder Creek Improvements Phase 1 project and Gregory Canyon Creek
Improvements ($49 million in 2022)
2. Upper Goose Creek Stormwater and Flood Projects ($25 million in 2023) to fund
improvements to both the stormwater and flood drainageway systems in Upper Goose
Creek
The following table summarizes the debt obligations of the utilities, the year the debt is retired
and the average annual debt payment. Items shown in italics are projects that are anticipated to
be funded by issuing bonds. The decision to debt finance versus cash finance capital projects is
generally determined by the total project cost and the timeline for completing the improvements.
A major improvement project at a treatment facility would generally be very difficult to cash
finance without a significant rate increase and is more practical to pay for over a 20-year period.
Improvements to the distribution system (water pipes) are on an annual replacement program
where cash funding is more cost effective. Planning for issuing debt for projects includes
consideration of maintaining coverage ratios as required by bond covenants and maintaining
strong bond ratings to keep interest costs low.
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 4 of 21
Table 4 – Debt Obligations
Utility
Projects
Year Debt
is Retired
Approximate Annual
Debt Payment
Water Multiple Projects including Silver
Lake Pipeline, Barker Purchase
2019 $2,524,000
Lakewood Pipeline 2021 $2,089,000
Betasso WTP Imp. 2036 $2,261,000
Carter Lake Pipeline and 63rd WTP
Solar Project
2038 $2,406,000
Barker and Albion Dam and WTP
Improvements (2022)
2042 $3,590,000
Green Lake Dam and WTP Supply
and Backwash Improvements
(2025)
2045 $1,600,000
Wastewater WRRF Improvements 2025 $3,142,000
WRRF Improvements 2030 $671,000
Foothills-Baseline Sewer 2038 $676,000
Interceptor Sewer Realignment and
WRRF Improvements (2021)
2041 $2,168,000
WRRF Improvements – Reg 85 and
Trunk Sewer Replacement (2022)
2042 $1,908,000
Storm/Flood
Wonderland Creek and Four Mile
Canyon Creek Imp. (2015)
2035 $1,592,000
South Boulder Creek Imp. and
Gregory Canyon Creek (2022)
2042 $4,381,000
Upper Goose Creek Stormwater &
Flood Imp. (2023)
2043 $2,314,000
The utility continues to maintain a high bond rating, most recently Aa1 from Moody’s and AAA
from Standard and Poor’s. The ratings report for the 2018 Water and Sewer Bonds stated this is
due in part to “strong fiscal management” and maintaining sufficient reserves.
Highlights of the 2020-2025 CIP
Water Utility
The Water Utility CIP will address a combination of source water and treated water needs
focusing on the rehabilitation and replacement of existing assets. The source water system is
comprised of numerous reservoirs, dams, gravity and pressure pipelines, and hydroelectric
facilities that deliver water to the city’s two water treatment plants. The treated water system is
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 5 of 21
comprised of two water treatment plants, six storage tanks, 460 miles of water main, and four
hydroelectric facilities.
Much of the source water system infrastructure is approaching the end of its useful life. Water
Fund capital investment over the next decade will focus on the Barker Gravity system which is
100+ years old. Utilities staff is on schedule to replace the Barker supply system over a 12-year
period. This work will involve rehabilitation of the Barker Gravity pipeline including its seven
siphons, and an inspection/repair of the Boulder Canyon penstock. Major improvements to the
Barker Dam outlet works ($10M) and Albion Dam ($11M) are scheduled for 2022.
Reconstruction of Green Lake Dam No. 2 ($6M) is scheduled in 2025
Improvements to the treated water system will continue to focus on major rehabilitation projects
that involve the replacement of aging/failing assets to provide necessary system treatment
redundancy. Both the Boulder Reservoir and the Betasso Water Treatment Plants will require
significant investment in the 6-yr CIP. Two Boulder Reservoir WTP projects have been
identified including the high service pump station replacement ($7M) in 2022 and the major
electrical upgrades ($7M) in 2025. Four Betasso WTP projects have been identified including
disinfection system upgrades ($5M) and corrosion control improvements ($2M) in 2022. Other
Betasso WTP project improvements include backwash system upgrades ($5M) and supply
system upgrades (($6M) in 2025.
The treated waterline replacement program continues to replace approximately four miles (1% of
the system) of waterline annually at a cost of approximately $3.5M. In 2019, Utilities staff will
begin a comprehensive assessment of the treated water transmission system (14-inch pipe and
larger) to determine upcoming system needs.
Wastewater Utility
The Wastewater Utility CIP will address a combination of wastewater collection system and
wastewater treatment needs focusing on the rehabilitation and replacement of existing assets, and
meeting Federal, State and local regulatory requirements. Utilities staff will continue with the
annual wastewater collection system condition assessment and rehabilitation programs that
address the city’s aging infrastructure. Utilities staff is in the design phase for two of the four
Wastewater Collection System Master Plan’s (WWCSMP) high priority (Tier 1) projects to
address the system’s hydraulic limitations. These include Goose Creek Trunk sewer and the
Foothills & Baseline Trunk sewer projects. Thes Interceptor Sewer Realignment project cost is
estimated at $30M in 2022. The Arapahoe Trunk Sewer project (4th Tier 1 MP project) is outside
the 6-year CIP with funding identified in 2026.
There are two Water Resource Recovery Facility (WRRF) projects identified in the 6-yr CIP.
The primary project is the upcoming Regulation 85 CDPHE permit driven nutrient improvements
project to address more stringent phosphorus regulations. The second project includes the
secondary digester cover replacement estimated at $2M in 2021.
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 6 of 21
Stormwater and Flood Management Utility
The Stormwater and Flood Management Utility CIP will address a combination of
major drainageway and storm sewer improvements focusing primarily on the
development and construction of new assets to mitigate flood risks. The major
drainageway projects are intended to address life and safety issues throughout the
community along the drainageways. The storm sewer infrastructure projects are
intended to build a more comprehensive pipe network to convey stormwater runoff to
the major drainageways to reduce localized flooding. Not all Boulder neighborhoods
have storm sewer infrastructure to convey runoff. Some neighborhoods are served with
roadside ditches while other neighborhoods rely on street conveyance for the smaller
storm events.
The focus for flood mitigation projects in the near-term is on South Boulder Creek
detention upstream of Hwy US 36. This project has been through an extensive planning
process and is intended to address flooding in the west valley area. Funding is also
included for construction improvements along Gregory Canyon Creek from Arapahoe
Ave. to Pennsylvania Ave. to provide capacity for a 10-year storm event. Gregory
Canyon Creek is a steep, narrow drainageway with mature vegetation that has limited
capacity to convey flood waters from the Chautauqua area north down to Boulder
Creek. Funding is included for the Upper Goose Creek drainageway between 19th
street and Folsom, as well as storm sewer improvements between 4th street and 19th
Street. There is also funding shown for Bluebell Canyon Creek and King’s Gulch in
anticipation of starting design work on improvements that will be identified in the
mitigation master plan currently underway.
Capital improvements for the stormwater collection system will focus on expansion of
the system into underserved areas and capacity improvements to address hydraulic
bottlenecks identified in the 2017 Stormwater Master Plan (SMP). Underserved areas
refer to locations that do not have existing storm sewer infrastructure or roadside ditch
capacity to convey the 2-yr or 5-yr storm event for residential and commercial areas
respectively. Specific projects will include an expansion of the storm sewer system in
the vicinity of Pearl Street from 17th Street to 21st Street.
Major drainageway flood mitigation plans are underway in 2019 for Upper Goose
Creek, Twomile Creek, Skunk Creek, King’s Gulch and Bluebell Creek. These plans
will help identify future flood mitigation projects. In addition to these mitigation plans,
an update to the Comprehensive Flood and Stormwater Utility Master Plan is planned.
The master plan update will address policy level issues addressing the balance between
major drainageway and storm sewer infrastructure needs. This master plan update will
include a prioritization of the major drainageway programs as well as the need to add
new, and rehabilitate existing, storm sewer infrastructure to help inform future CIP
planning.
Major drainageway improvements have been identified along Boulder Creek and the 14
tributaries throughout the city. At current funding levels, it will require over 100 years
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 7 of 21
to complete these improvements. Most of these projects are not listed or funded in the
6-year CIP. An update to the Comprehensive Flood & Stormwater (CFS) Master Plan
will be completed in the next few years to help prioritize Stormwater & Flood
Management Utility needs. The master plan update will address an approach to funding
these projects.
Changes From the 2019-2024 CIP
See Attachment B for the proposed 2020-2025 Water, Wastewater, and Stormwater/Flood
Utility CIP’s, with changes indicated in red. Projects where bond funding is anticipated have the
cell highlighted yellow. Key changes from last year’s plan are discussed below.
Water Utility
Utilities staff has initiated a comprehensive evaluation of the treated water system assets. The
goal of this project, the 2019 Asset Inventory and Maintenance (AIM) Project, is intended to
identify the remaining useful life, criticality, and relative risk of every capital asset in the treated
water system. These assets have been categorized into eight (8) Utility Areas (UAs) listed below.
1. Boulder Reservoir Treatment Facility
2. Betasso Water Treatment Facility
3. Storage Tanks & Yard Piping
4. Meters and Meter Shop
5. Hydroelectric, Pump & Pressure Reducing Stations
6. Water Distribution System
7. Water Transmission System
8. Water Quality Capital Assets
UAs are subdivided areas of the system that provide a specific role in the utility, address unique
challenges, and/or are necessary for compliance with regulations. The AIM Project will be
completed late summer/early fall of 2019, and staff will provide an update to the WRAB on the
project findings this fall. Work completed to date on the 2019 AIM Project has identified
various needs in the treated water system. Highlights include the following:
1. Boulder Reservoir WTP High Service Pump Station Replacement
a. All of the treated water from the Boulder Reservoir Treatment Plant is pumped to
City customers through this six-pump station. These aging pumps are part of the
original plant construction (1969), at their end of useful life, and require
replacement to maintain reliable service. Addressing this vulnerability is a high
priority as this facility provides critical backup supply during times when BWTF
is offline for repairs or emergencies.
2. Betasso WTP Corrosion Control System Improvements
a. Lime and carbon dioxide (CO2) are essential chemical feed systems at the plant
conditioning treated water to prevent corrosion of pipes in the distribution system
and control lead and copper levels for regulatory com pliance. Current lime and
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 8 of 21
CO2 equipment was installed in 1992 and 2006 respectively and has been in
continuous service ever since. These harsh-duty systems have reached their end of
useful lifespan and currently require significant operational intervention to
maintain plant operations. Repair or replacement is necessary near-term to prevent
emergencies and maintain reliable service to City customers.
3. Betasso WTP Disinfection Improvements
a. All treated water at the Betasso plant is disinfected to meet regulations for safe
drinking water. Disinfection is currently accomplished with two tanks known as
clearwells. Clearwell #1 contains numerous baffles and therefore accomplishes
the vast majority of plant disinfection. Clearwell #2 is not baffled and has low
disinfection capacity. This project involves two phases of work. The first phase is
to increase disinfection capacity/redundancy by baffling Clearwell #2 or building
an additional tank. The plant can then provide sufficient capacity during the next
phase, which involves planned repairs to Clearwell #1 to address corroded
structural members and interior and exterior coatings. In addition to addressing
essential near-term repairs, the project improves reliability and reduces risk during
future planned or unplanned outages at the plant.
4. Betasso WTP Supply and Backwash Systems Upgrades
a. Currently the BWTF relies on a single tank and pipe for supply of water to the
facility. This supply system is original construction (1968). Similarly, the plant
relies on a single tank to backwash and clean the eight water treatment filters. The
existing backwash tank was built in 1976. This project will be implemented in
phases to add necessary redundancy to these systems to allow for near-term
planned major repairs. The project will also improve reliability and reduce risk
during future planned or unplanned outages at the plant.
5. Boulder Reservoir WTP Electrical Repairs and Upgrades
a. This project involves replacement of major electrical components including motor
control centers (MCCs), load centers, and major power supply centers, etc. Many
of these components are original construction (1971) and are now due for
replacement due to their age and condition. The project includes adding
redundancy to critical electrical systems to reduce risk during future planned or
unplanned outages at the plant.
An additional project has been added to the water fund CIP for meter replacement. There are
currently over 28,000 meters in the system, and most of them are reaching the end of their useful
life. This project provides funding for a large meter (greater than 2 inch) replacement program
on an ongoing basis. These meters are tested annually and will be repaired or replaced as needed.
The small meter (less than 2 inch) program will begin in 2022 and aim to replace small meters
within 10 years.
Anticipated changes to the Wastewater Fund and the Stormwater & Flood Management Fund
CIP’s are less significant than the changes to the Water Fund but include estimated cost and
schedule changes to a single large project in each utility.
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 9 of 21
Wastewater Utility
1. Interceptor Sewer Replacement
a. In 2015, following the 2013 flood event, Utilities bonded $10 million for this
project. This funding has been carried over annually since that time. The initial
project approach was to rehabilitate the interceptor sewer in its current location.
After the May 2015 floods, Utilities staff changed the project’s direction to design
and construct a new pipeline with an alignment that would not be as susceptible
Boulder Creek flooding. In 2018, Utilities staff identified additional funding
would be necessary as the estimated construction cost escalated. Current
engineering consultant cost estimates identify the total project cost at
approximately $30 million. This project has significant alignment and regulatory
challenges that have contributed to an increased project cost and schedule delays.
The 2020-2025 CIP identifies a $20 million bond for the project’s construction in
2022.
Stormwater and Flood Management Utility
1. South Boulder Creek Flood Mitigation
a. Last year’s CIP showed $30.4 million for the SBC project construction in year
2020. At the February 5, 2019 City Council meeting, Council provided direction
for staff to proceed with the preliminary design of the selected alternative –
Variant 1, 500-yr option. In this year’s CIP, Utilities staff has updated the
estimated cost and schedule and identified a $40 million bond for the project’s
construction in 2022.
2. Gregory Canyon Creek Flood Improvements
a. Funding for the Gregory Canyon Creek Phase I flood improvements is identified
in the 6-yr CIP in 2022. This project will involve 10-yr flood mitigation
improvements between Arapahoe Avenue and Pennsylvania Avenue. The
project’s construction cost is estimated at $8M. The project is currently in the
design phase.
Shifting major projects and programs within the CIP is typical to address the highest priority
projects with updated estimated cost information while minimizing the impact to the utility rates.
BUDGET SCHEDULE:
The current schedule of major budget milestones is provided below. Elements involving the
WRAB are highlighted in bold italics.
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 10 of 21
Milestone Date
WRAB meeting – review Draft CIP June 17, 2019
WRAB Recommendation on CIP/Budget July 15, 2019
Planning Board CIP Hearing Aug 15, 2019
City Council Study Session on Budget Sept. 10, 2019
City Council Consideration/Adoption of Budget Oct. 1 and Oct. 15, 2019
NEXT STEPS:
Staff will present additional information to the WRAB at the June 17 meeting and staff is
seeking feedback on the draft proposed CIP, updated financial information, and potential rate
impacts. This feedback will be considered in finalizing the proposed budget that will be
presented at the July 15, 2019 WRAB meeting. At that meeting, staff will request that WRAB
provide a final recommendation concerning the proposed 2020-2025 CIP to Planning Board and
City Council.
Attachments:
A: Fund Financials – Water, Wastewater, Stormwater/Flood Management
B: Draft Proposed 2020-2025 CIP, Water, Wastewater, Stormwater/Flood Management
06-17-2019 WRAB Agenda 4 - Capital Improvements Program
Page 11 of 21
Attachment A: Draft Fund FinancialsWATER UTILITY 2020 FUND FINANCIAL20182019202020212022202320242025Actual Revised Draft Projected Projected Projected Projected ProjectedBeginning of Year Fund Balance48,193,661$ 40,223,708$ 28,706,673$ 28,653,970$ 26,791,868$ $26,967,124 27,532,398$ 26,761,743$ Sources of FundsOperating8.0%7.0%7.0%10.0%6.0%5.0%5.0%Sale of Water to General Cust27,667,049$ 29,312,698$ 30,895,738$ 32,564,184$ 35,284,913$ 36,842,598$ 38,106,077$ 39,412,830$ Projected Rate Increase 2,051,889 2,162,702 3,256,418 2,117,095 1,842,130 1,905,304 1,970,641 Bulk/Irrigation Water Sales416,046 143,050 143,050 143,050 143,050 143,050 143,050 143,050 Hydroelectric Revenue1,539,027 1,700,000 1,700,000 1,750,850 1,803,226 1,857,172 1,912,737 1,969,970 Miscellaneous Operating Revenues -30,00030,000 30,000 30,000 30,000 30,000 30,000Plant Investment Fees1,327,485 3,000,000 2,000,000 2,000,000 1,800,000 1,800,000 1,600,000 1,600,000 Connection Charges277,987 130,000 130,000 130,000 130,000 130,000 130,000 130,000 Federal, State, County Grants(123,339) --- - - - - Interest on Investments744,105 367,220 574,133 573,079 803,756 809,014 825,972 802,852 Rent, assessments and other misc revenues350,736 20,500 20,500 20,500 20,500 20,500 20,500 20,500Transfer from General Fund - Fire Training Center92,785 92,785 92,785 92,785 92,785 92,785 - - Projected Bond Proceeds35,241,874 --- 39,889,385 - - 17,013,401 Total Sources of Funds 67,533,754$ 36,848,142$ 37,748,909$ 40,560,866$ $82,114,709 43,567,248$ $44,673,640 63,093,244$ Uses of FundsOperatingAdministration1,502,070$ 1,601,450$ 1,659,155$ 1,708,930$ 1,760,198$ 1,813,003$ 1,867,394$ 1,923,415$ Planning and Project Management543,795.11 571,737.00 603,290 621,389 640,030 659,231 679,008 699,378 Water Resources and Hydroelectric Operations 3,138,730.82 2,981,972.00 3,047,795 3,139,229 3,233,406 3,330,408 3,430,320 3,533,230 Water Treatment4,640,304.35 4,899,396.00 5,066,138 5,218,122 5,374,666 5,535,906 5,701,983 5,873,042 Water Quality and Environmental Svcs1,175,095.03 1,451,605.00 1,440,941 1,484,169 1,528,694 1,574,555 1,621,792 1,670,446 System Maintenance3,370,704.48 3,407,594.00 3,443,560 3,546,867 3,653,273 3,762,871 3,875,757 3,992,030 Windy Gap Payment614,838.99 615,000.00 1,307,000 1,346,210 200,000 206,000 212,180 218,545 TOTAL OPERATING USES OF FUNDS 14,985,539$ 15,528,754$ 16,567,879$ 17,064,915$ $16,390,267 16,881,975$ $17,388,434 17,910,087$ DebtRefunding of the 1999 and 2000 Revenue Bonds 2,524,650$ 1,379,656$ -$-$ -$ -$ -$ - Lakewood 2001 Rev Bond; Refunded in 20122,072,083 2,087,000 2,087,800 2,095,600 - - - - Betasso WTP Improvements - 20152,257,723 2,255,681 2,260,681 2,259,981 2,258,681 2,256,781 2,259,281 2,256,081 Carter Lake Pipeline - 20182,402,570 2,406,044 2,401,909 2,405,771 2,403,726 2,405,999 2,404,908 Projected Bond - Barker/Albian Dam - 2022---- 3,590,045 3,590,045 3,590,045 3,590,045 Projected Bond - Green Lake 2/WTP Imp- - - --- - 1,616,273 TOTAL DEBT SERVICE 6,854,456$ 8,124,907$ 6,754,525$ 6,757,490$ $8,254,497 8,250,552$ $8,255,325 9,867,307$ TransfersCost Allocation1,563,038$ 1,692,757$ 1,717,381$ 1,889,119$ 2,078,031$ 2,285,834$ 2,514,418$ 2,765,859 Planning & Development Services308,418.96 317,672 353,690 364,301 375,230 386,487 398,081 410,024 Transportation - Admin Support 16,299.96 16,300 16,300 16,789 17,293 17,811 18,346 18,896 TOTAL TRANSFERS OUT1,887,757$ 2,026,729$ 2,087,371$ 2,270,209$ $2,470,554 2,690,132$ $2,930,845 3,194,779$ Attachment A06-17-2019 WRAB Agenda 4 - Capital Improvements Program Page 12 of 21
Attachment A: Draft Fund FinancialsWATER UTILITY 2020 FUND FINANCIAL20182019202020212022202320242025Actual Revised Draft Projected Projected Projected Projected ProjectedCONTINUEDCapital7,697,731$ 10,189,756$ 12,391,837$ 16,330,354$ 14,934,752$ 15,179,316$ 16,869,692$ 16,702,255$ Projected Bond - Betasso WTP IMP8,836,291.19 - - - - - - - 2018 Bond - NCWCD Conveyance Line34,900,000.00 - - - - - - - Projected Bond - Barker&Albian Dam/WTP Imp- - - - 39,489,385 - - - Projected Bond - Green Lake 2/WTP Imp16,863,401 Projected Bond - Issuance Costs341,933.72 - - - 400,000 - - 150,000 Encumbrances, Carryover and Adjustments to Base12,495,031 - - - - - - Total Uses of Funds 75,503,708$ 48,365,177$ 37,801,612$ 42,422,968$ $81,939,453 43,001,974$ 45,444,295$ 64,687,830$ Ending Fund Balance Before Reserves 40,223,708$ 28,706,673$ 28,653,970$ 26,791,868$ $26,967,124 27,532,398$ $26,761,743 25,167,157$ ReservesBond Reserve2,081,429$ 2,081,429$ 2,081,429$ 2,081,429$ -$ -$ -$ -$ Lakewood Pipeline Remediation Reserve16,919,884 17,385,876 17,851,867 15,400,000 15,400,000 15,400,000 15,400,000 15,400,000 Carter Lake Pipeline Reserve1,530,697 1,530,697 1,530,697 1,530,697 1,530,697 1,530,697 1,530,697 1,530,697 FEMA Deobligation Reserve87,951 87,951 87,951 87,951 87,951 87,951 87,951 87,951 Sick/Vacation/Bonus Reserve601,981 620,041 65,040 66,991 69,001 71,071 73,203 75,399 PERA Legislative Contingency- 6,933 - - - - - Pay Period 27 Reserve 286,357 287,303 288,249 289,195 290,141 291,087 292,033 317,033 Operating Reserve 4,218,324 4,388,871 4,663,813 4,833,781 4,715,205 4,893,027 5,079,820 5,276,217 Capital Reserve 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 Total Reserves 27,726,624$ 28,389,100$ 28,569,045$ 26,290,044$ 24,092,995$ 24,273,833$ 24,463,704$ 24,687,297$ Ending Fund Balance After Reserves 12,497,085$ 317,574$ 84,925$ 501,824$ $2,874,129 3,258,565$ $2,298,039 479,861$ Attachment A06-17-2019 WRAB Agenda 4 - Capital Improvements Program Page 13 of 21
Attachment A: Draft Fund FinancialsWASTEWATER UTILITY 2020 FUND FINANCIAL20182019202020212022202320242025Actual Revised Proposed Projected Projected Projected Projected ProjectedBeginning Fund Balance23,945,036$ 30,280,286$ 5,453,089$ 4,422,562$ 6,378,867$ 5,253,948$ 5,378,060$ 5,839,909$ Sources of FundsOperating5.0%5.0%5.0%$0$0$0$0$0Sewer Charges to General Customers21,232,937$ 21,067,023$ 21,899,171$ 22,764,188$ 23,663,373$ 24,598,076$ 25,569,700$ 26,579,704$ Projected Rate Increase - 1,053,351 1,094,959 1,138,209 1,183,169 1,229,904 1,278,485 797,391 Surcharge/ Pretreatment Fees149,798 142,353 142,353 142,353 142,353 142,353 142,353 142,353 Plant Investment Fees307,145 750,000 750,000 750,000 250,000 250,000 250,000 250,000 Connection Charges10,620 10,000 10,000 10,000 10,000 10,000 10,000 10,000 Special Assessments- 25,000 25,000 25,000 25,000 25,000 25,000 25,000 Federal & State Grants(13,788) - - - - - - - Interest on Investments381,282 224,823 229,030 185,748 267,912 220,666 225,879 245,276 Rent and other miscellaneous revenue123,799 176,000 351,000 351,000 351,000 351,000 351,000 351,000 Bond Proceeds3,534,463 - - 24,088,463 22,442,992 - - - Total Sources of Funds $25,726,257 23,448,550$ 24,501,512 49,454,961$ 48,335,800$ 26,826,999$ 27,852,417$ 28,400,724$ Uses of FundsOperatingAdministration919,619$ 1,035,185$ 1,079,237$ 1,111,614$ 1,144,963$ 1,179,311$ 1,214,691$ 1,251,131$ Planning and Project Management581,692 421,895 436,291 449,380 462,861 476,747 491,049 505,781 Wastewater Quality & Environmental Svcs- 1,238,833 1,317,679 1,357,209 1,397,926 1,439,863 1,483,059 1,527,551 System Maintenance1,958,761 1,741,544 1,732,942 1,784,930 1,838,478 1,893,633 1,950,441 2,008,955 Wastewater Treatment5,226,997 5,090,201 5,131,031 5,284,962 5,443,511 5,606,816 5,775,021 5,948,271 TOTAL OPERATING USES OF FUNDS $8,687,070 9,527,658$ 9,697,180$ 9,988,095$ 10,287,738$ 10,596,370$ 10,914,262$ 11,241,689$ Debt2012 Refunding of the WWTP 2005 Revenue Bond 3,162,250 3,154,750 3,142,250 3,124,750 3,127,250 3,128,500 3,128,500 3,128,500 WWTP UV, Digester, Headworks Imp 2010 Rev Bond673,838 675,188 671,088 671,688 671,838 671,538 669,438 673,188 Sanitary Sewer Rehabilitation Bond 2015666,952 679,531 676,131 677,631 678,931 680,581 676,781 677,681 Foothills Baseline Sewer Bond 2018- 240,945 241,306 240,880 241,268 241,063 241,190 241,181 WWTP Nutrient Compliance and Trunk Sewer Bond 2022- - - - 1,907,654 1,907,654 1,907,654 1,907,654 Anticipated Bond - Interceptor Replacement- - - 2,167,962 2,167,962 2,167,962 2,167,962 2,167,962 TOTAL DEBT SERVICE 4,563,726 4,750,414$ 4,730,775 6,882,911$ 8,794,903$ 8,797,298$ 8,791,525$ 8,796,166$ TransfersCost Allocation950,838$ 1,029,260 1,044,444 1,148,888 1,263,777 1,390,155 1,459,663 1,532,646 Planning & Development Services305,838 315,013 350,952 361,481 372,325 383,495 395,000 406,850 Transportation - Admin Support - 16,300 16,300 16,789 17,293 17,812 18,346 18,896 TOTAL TRANSFERS OUT$1,256,676 1,360,573$ $1,411,696 1,527,158$ 1,653,395$ 1,791,462$ 1,873,009$ 1,958,392$ Attachment A06-17-2019 WRAB Agenda 4 - Capital Improvements Program Page 14 of 21
Attachment A: Draft Fund FinancialsWASTEWATER UTILITY 2020 FUND FINANCIAL20182019202020212022202320242025Actual Revised Proposed Projected Projected Projected Projected ProjectedCONTINUEDCapital Improvement Program4,854,842$ 9,912,767$ 9,692,389$ 5,012,028$ 6,281,690$ 5,517,757$ 5,811,773$ 6,036,784 Projected Bond-Interceptor/Digester- - - 23,838,463 - - - - WWTF Permit Impr. and Sanitary Sewer Bond 2022- - - - 22,192,992 - - Bond Issuance Costs28,694 200,000 - 250,000 250,000 - - - Carryover, Encumbrances and Adjustments to Base22,524,335 - - - - - - Total Uses of Funds $19,391,007 48,275,747$ $25,532,040 47,498,656$ 49,460,718$ 26,702,887$ 27,390,569$ 28,033,031$ Ending Fund Balance Before Reserves 30,280,286$ 5,453,089$ $4,422,562 6,378,867$ 5,253,948$ 5,378,060$ 5,839,909$ 6,207,601$ ReservesBond Reserves670,139$ 670,139$ 670,139$ 670,139$ 670,139$ 670,139$ 670,139$ 670,139$ FEMA Deobligation Reserve36,445 36,445 36,445 36,445 36,445 36,445 36,445 Sick/Vacation/Bonus Reserve295,873 304,750 62,004 63,864 65,780 67,753 69,786 71,880 PERA Legislative Contingency- 4,859 - - - - - Pay Period 27 Reserve226,024 226,024 226,024 226,024 226,024 226,024 226,024 27,774 Operating Reserve 2,485,936 2,722,058 2,777,219 2,878,813 2,985,283 3,096,958 3,196,818 3,300,020 Capital Reserve 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 Total Reserves 4,214,418$ 4,464,274$ 4,271,831$ 4,375,285$ 4,483,671$ 4,597,320$ 4,699,212$ 4,569,813$ Ending Fund Balance After Reserves 26,065,869$ 988,815$ 150,731$ 2,003,581$ 770,277$ 780,741$ 1,140,697$ 1,637,788$ Attachment A06-17-2019 WRAB Agenda 4 - Capital Improvements Program Page 15 of 21
Attachment A: Draft Fund FinancialsSTORMWATER/FLOOD MANAGEMENT UTILITY 2020 FUND FINANCIAL20182019202020212022202320242025Actual Revised Recommended Projected Projected Projected Projected ProjectedBeginning Fund Balance33,142,719$ 31,623,875$ 16,919,877$ 16,090,757$ 16,440,321$ 17,156,391$ 15,466,041$ 14,292,998$ Sources of FundsOperatingService Charge Fees11,438,641$ 11,599,040$ 12,203,350$ 12,839,145$ 13,508,064$ 15,565,342$ 16,376,297$ 17,229,502$ Projected Rate Increases579,952 610,168 641,957 2,026,210 778,267 818,815 861,475 Plant Investment Fees517,829$ 200,000$ 200,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000 Urban Drainage District Funds- 600,000 250,000 2,200,000 1,000,000 400,000 400,000 400,000 State and Federal Grants(571,375) - - - - - - - Interest on Investments493,258 208,817 253,798 241,361 246,605 257,346 231,991 214,395 Intergovernmental Transfers (KICP Program)3,769 157,571 162,298 167,167 172,182 177,348 182,668 188,148 Rent and other miscellaneous revenue40,682 9,000 9,000 9,000 9,000 9,000 9,000 9,000 Projected Bonds- - - - 48,674,574 24,594,738 - - Total Sources of Funds 11,922,804$ 13,354,381$ $13,688,614 16,198,631$ $65,736,635 41,882,041$ 18,118,770$ 19,002,520$ Uses of FundsOperatingAdministration571,149$ 653,093$ 695,300$ 716,159$ 737,644$ 759,773$ 782,566$ 806,043$ Planning and Project Management955,519 1,320,870 1,244,555 1,281,892 1,320,348 1,359,959 1,400,758 1,442,780 Stormwater Contract Management94,722 96,775 96,775 99,678 102,669 105,749 108,921 112,189 Stormwater Quality and Education634,898 1,000,137 1,002,061 1,032,123 1,063,087 1,094,979 1,127,828 1,161,663 System Maintenance1,911,937 1,711,151 2,270,906 2,339,033 2,409,204 2,481,480 2,555,925 2,632,602 TOTAL OPERATING USES OF FUNDS 4,168,224$ 4,782,026$ $5,309,597 5,468,885$ $5,632,951 5,801,940$ 5,975,998$ 6,155,278$ Debt--Refunding of the Goose Creek 1998 Revenue Bond381,100$ - - - - - - - Projected Bond - South Boulder Creek/Gregory 2022- - - - 4,380,712 4,380,712 4,380,712 4,380,712 Wonderland Creek 2015 Revenue Bond1,587,166 1,591,088 1,591,688 1,591,388 1,590,188 1,588,088 1,590,088 1,591,038 Projected Bond - Goose Creek 2023- - - - - 2,213,526 2,213,526 2,213,526 TOTAL DEBT SERVICE 1,968,266$ 1,591,088$ $1,591,688 1,591,388$ 5,970,900 8,182,326$ 8,184,326$ 8,185,276$ Transfers- Cost Allocation 349,424$ 441,284$ 447,648$ 492,413$ 541,654$ 568,737$ 597,174$ 627,032 Planning & Development Services185,560 191,127 210,105 216,408 222,900 229,587 236,475 243,569 Transportation - Admin Support 8,149 8,149 8,149 8,149 8,149 8,149 8,149 8,149 TOTAL TRANSFERS OUT543,133$ 640,560$ $665,902 716,970$ $772,703 806,473$ 841,797$ 878,750$ Attachment A06-17-2019 WRAB Agenda 4 - Capital Improvements Program Page 16 of 21
Attachment A: Draft Fund FinancialsSTORMWATER/FLOOD MANAGEMENT UTILITY 2020 FUND FINANCIAL20182019202020212022202320242025Actual Revised Recommended Projected Projected Projected Projected ProjectedCONTINUEDCapital6,762,024$ $3,540,290 $6,950,548 $8,071,823 $3,969,437 $4,186,915 $4,289,691 4,655,754 Projected Bond - Goose Creek - - - - - 24,344,738 Projected Bond - South Boulder Creek- - - - 48,224,574 - - - Projected Bond Issuance Costs- - - - 450,000 250,000 - - Encumbrances, Carryover and Adjustments to Base17,504,415 - - - - - - Total Uses of Funds 13,441,647$ 28,058,379$ $14,517,734 15,849,066$ $65,020,565 43,572,391$ 19,291,813$ 19,875,059$ Ending Fund Balance Before Reserves 31,623,875$ 16,919,877$ $16,090,757 16,440,321$ $17,156,391 15,466,041$ 14,292,998$ 13,420,459$ ReservesBond Reserves1,987,568$ 1,987,568$ 1,987,568$ 1,987,568$ 6,368,280$ 8,581,806$ 8,581,806$ 8,581,806$ Post Flood Property Acquisition1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 FEMA Deobligation Reserve41,750 41,750 41,750 41,750 41,750 41,750 41,750 41,750 PERA Legislative Contingency- 2,672 - - - - - - Sick/Vacation/Bonus Reserve128,912 132,779 11,060 11,392 11,734 12,086 12,448 12,822 Pay Period 27 Reserve81,384 84,165 86,946 89,727 92,508 95,289 98,070 114,070 Operating Reserve1,177,839 1,355,646 1,493,875 1,546,464 1,601,414 1,652,103 1,704,449 1,758,507 Capital Reserve 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 Total Reserves 4,667,453$ 4,854,581$ 4,871,199$ 4,926,900$ 9,365,685$ 11,633,034$ 11,688,523$ 11,758,955$ Ending Fund Balance After Reserves 26,956,422$ 12,065,296$ $11,219,558 11,513,421$ $7,790,706 3,833,007$ 2,604,475$ 1,661,505$ Attachment A06-17-2019 WRAB Agenda 4 - Capital Improvements Program Page 17 of 21
Attachment B - Draft Capital Improvement ProgramsCITY OF BOULDERDRAFT 2020-2025 CAPITAL IMPROVEMENT PROGRAMWATER UTILITY FUND20202021 2022 2023 20242025PROJECT NAMERECOMMENDED PROJECTED PROJECTED PROJECTED PROJECTEDPROJECTEDTreated Water Pressure Reducing and Hydroelectric Facilities Kohler Hydro/PRV Facility$0$0$0$0$0$50,000 Maxwell Hydro/PRV Facility$185,000$100,000$0$0$0$50,000 Orodell Hydro/PRV Facility $100,000 $0 $0 $0 $0$0 Sunshine Hydro/PRV Facility$0$0$150,000$0$0$0 Pearl Street Hydro/PRV Facility$0$0$0$0$0$0Subtotal - Treated Water PRV and Hydro$285,000 $100,000 $150,000$0$0$100,000Water Treatment Facilities Equipment Replacement$208,000 $216,320 $224,973 $233,972 $243,331 $253,064 Supply System Reliability$0$0$0$0$632,660 $6,326,595 Betasso Backwash System Reliability$0$0$0$0$506,128 $5,061,276 63rd WTF Campus Power Reliability & Campus Electrical R&R$0$674,918 $6,749,184$0$0$0 BWTF Corrosion Control Systems Improvements and R&R$0$202,476 $2,024,755$0$0$0 BWTF Disinfection Capacity and Reliability Improvements$0$506,189 $5,061,888$0$0$0 Bond Issuance Costs$0$0$400,000$0$0$150,000Subtotal - Water Treatment Facilities$208,000 $1,599,903 $14,460,800 $233,972 $1,382,118$11,790,935Treated Water Pump Stations Equipment Rehabilitation$52,000 $54,080 $56,243 $58,493 $60,833 $63,266 Boulder Reservoir WTF High Service Pump Station$0$674,918 $6,749,1840$0$0Subtotal - Treated Water Pump Stations$52,000 $728,998 $6,805,427 $58,493 $60,833$63,266Treated Water Storage Tanks Devil's Thumb Storage Tank$0$0$0$0$0$0 Chautauqua Storage Tank$0$0$0 $100,000$0$0Subtotal - Treated Water Storage Tanks$0$0$0 $100,000$0$0Treated Water Distribution System Zone Isolation Valves$0$0$0$0$0$0 Cathodic Protection$0$0$0$0$0$0 Waterline Replacement$3,922,489 $4,079,389 $4,242,564 $4,412,267 $4,588,757$4,772,308Subtotal - Treated Water Distribution System$3,922,489 $4,079,389 $4,242,564 $4,412,267 $4,588,757$4,772,308Treated Water Transmission System Zone 1 Transmission Pipes$626,601$651,665 $677,732 $704,841$733,035$762,356 Zone 2 Transmission Pipes$909,016$945,377 $983,192$1,022,519 $1,063,420$1,105,957 Zone 3 Transmission Pipes$467,460$486,158 $505,605 $525,829$546,862$568,737Subtotal - Treated Water Transmission System$2,003,077 $2,083,200 $2,166,528 $2,253,189 $2,343,317$2,437,049Source Water Transmission System Lakewood Pipeline$0$0$0$0 $384,864$0Subtotal - Source Water Transmission System$0$0$0$0 $384,864$0Barker Water System Barker Gravity Pipeline Repair$3,309,341 $3,431,715 $4,558,983 $3,691,342 $3,828,996$3,972,156 Barker Gravity Pipeline - Siphon Replacement$449,946 $187,177 $778,658 $506,128 $526,373$0 Barker-Kossler Penstock Repair$637,012 $1,274,492 $1,013,472 $1,054,011 $1,096,171$1,140,018 Barker Dam Outlet$0 $903,732$0$0$0$0Attachment B06-17-2019 WRAB Agenda 4 - Capital Improvements ProgramPage 18 of 21
Attachment B - Draft Capital Improvement ProgramsCITY OF BOULDERDRAFT 2020-2025 CAPITAL IMPROVEMENT PROGRAMWATER UTILITY FUND20202021 2022 2023 20242025PROJECT NAMERECOMMENDED PROJECTED PROJECTED PROJECTED PROJECTEDPROJECTED Barker Dam Outlet - Bond Proceeds$0 $0 $9,037,318 $0 $0$0 Barker Dam and Reservoir$100,000 $0$0 $0 $0$0 Kossler Dam$0 $0 $50,000 $300,000 $100,000$750,000Subtotal - Barker Water System$4,496,298 $5,797,116 $15,438,431 $5,551,481 $5,551,540$5,862,174Raw Water Storage Reservoirs Source Systems Condition Assessment$350,000$0 $0 $0 $0$425,829 Albion Dam$0 $986,706 $9,867,055 $0 $0$0 Silver Lake Dam$200,000$0 $0 $0 $0$0 Green Lake 2 Dam$0 $0 $0 $75,000 $547,553$5,475,530 Skyscraper Dam$0 $171,071 $0 $0 $0$0 Wittemyer Ponds$0 $0 $0 $0$100,000 $599,426Subtotal - Raw Water Storage Reservoirs$550,000 $1,157,777 $9,867,055 $75,000 $647,553$6,500,785Other Raw Water Facilities Source Water Facilities Rehab Program$168,730 $175,479 $182,498 $189,798 $197,390$205,285 Watershed Improvements$30,000 $30,000 $30,000 $30,000 $30,000$0 Instream Flow Structures and Gaging$10,000 $10,000 $10,000 $10,000 $10,000$0 NCWCD Conveyance - Carter Lake Pipeline160,000$160,000 $160,000 $160,000 $160,000$160,000Subtotal - Other Raw Water Facilities$368,730 $375,479 $382,498 $389,798 $397,390$365,285Source Water Pressure Reducing, Pumping and Hydroelectric Lakewood Hydroelectric/PRV$0 $50,000$0$0$0$0 Silver Lake Hydroelectric/PRV$0$0$0 $250,000$0$0 Hydroelectric Facilities Rehabilitiation Program$56,243 $58,493 $60,833 $63,266 $65,797$68,428 Betasso Hydroelectric / Pressure Reducing Facility$150,000$0$0 $0$0$0 Barker Dam Hydroelectric$0$0 $50,000$0$0$0 Boulder Canyon Hydroelectric$0$0$0 $250,000$0$0 Carter Lake Hydroelectric$0$0$0$0$0$250,000Subtotal - Source Water PRV, Pumping and Hydro$206,243 $108,493 $110,833 $563,266 $65,797$318,428Water System Monitoring and Metering Meter Replacement Program$300,000 $300,000 $1,200,000 $1,391,851 $1,447,525 $1,505,426 Utility Billing Computer System$0$0$0$150,000$0$0Subtotal - Water System Monitoring and Metering$300,000 $300,000 $1,200,000 $1,541,851 $1,447,525$1,505,426TOTAL CAPITAL USES OF FUNDS$12,391,837 $16,330,354 $54,824,136 $15,179,316 $16,869,692$33,715,657Attachment B06-17-2019 WRAB Agenda 4 - Capital Improvements ProgramPage 19 of 21
Attachment B - DRAFT CAPITAL IMPROVEMENT PROGRAMSCITY OF BOULDERDRAFT 2020 - 2025 CAPITAL IMPROVEMENT PROGRAMWASTEWATER UTILITY FUND2020 2021 2022 2023 20242025PROJECT NAME RECOMMENDED PROJECTED PROJECTED PROJECTED PROJECTEDPROJECTEDWastewater Treatment WWTF Pumps $75,000 $0 $150,000 $0 $0$150,000 WWTF Permit Improvements $919,232 $1,838,463 $0 $71,166 $0$0 WWTF Permit Improvements - Bond $0 $0 $18,384,634 $0 $0$0 WWTF Laboratory$0$0$0$0$0$0 WWTF Instrumentation/Control$1,594,415$0$0$0$0 $98,695 WWTF Activated Sludge$0$0$0$0 $230,918$0 WWTF Primary Clarifiers$0$70,893 $708,934$0$0$0 WWTF Secondary Clarifiers$0 $50,000 $500,000$0$0$0 WWTF Rehabilitation$250,000 $250,000 $250,000 $250,000 $250,000$250,000 WRRF Biogas$1,100,000$0$0$0$0$0 WWTF Digester Complex$0$2,000,000$0 $0 $0$0 WWTF Digester Cleaning $0$142,331$0 $0 $0$0 Bond Issuance Costs $0 $250,000 $250,000 $0 $0$0Subtotal - Wastewater Treatment Plant$3,938,647 $4,601,688 $20,243,568 $321,166 $480,918$498,695Wastewater System Monitoring and Metering Utility Billing Computer System$0$0 $0$65,000$0$0Subtotal - Monitoring and Metering$0 $0 $0 $65,000 $0$0Collection and Conveyance System Rehabilitation Collection System Monitoring $150,000 $150,000 $150,000 $150,000 $150,000$150,000 Condition Assessment Program $701,915 $729,991 $759,191 $1,067,484 $1,110,183$1,154,591 Sanitary Sewer Rehabilitation $3,226,563 $3,355,626 $3,489,851 $3,629,445 $3,774,623$3,925,608 Sanitary Sewer Manhole Rehabilitation $253,064$263,186 $273,714 $284,662 $296,049 $307,891 Main Interceptor Realignment$0 $20,000,000$0 $0 $0$0 Lower Goose Creek Trunk Sewer Replacement $0 $0$3,808,358$0$0 Foothills & Baseline Trunk Sewer Replacement $1,422,200 $0 $0$0$0$0 Arapahoe Trunk Sewer Replacement$0$0$00$0$0Subtotal - Sewer System Rehabilitation$5,753,742 $24,498,804 $8,481,114 $5,131,591 $5,330,855$5,538,089TOTAL CAPITAL USES OF FUNDS$9,692,389 $29,100,492 $28,724,683 $5,517,757 $5,811,773$6,036,784Attachment B06-17-2019 WRAB Agenda 4 - Capital Improvements ProgramPage 20 of 21
Attachment B - DRAFT CAPITAL IMPROVEMENT PROGRAMSCITY OF BOULDERDRAFT 2020-2025 CAPITAL IMPROVEMENT PROGRAMSTORMWATER AND FLOOD MANAGEMENT UTILITY FUND2020 2021 2022 2023 20242025PROJECT NAME PROJECTED PROJECTED PROJECTED PROJECTED PROJECTEDPROJECTEDMajor Drainageways South Boulder Creek$2,000,000$0 $0 $0 $0$0 South Boulder Creek - Bond Proceeds $0 $0$40,000,000$0 $0$0 Bond Issuance Costs $0 $0$450,000$250,000 $0$0 Bluebell Canyon Creek - King's Gulch$540,800$0 $0 $0 $0$0 Four Mile Canyon Creek $0 $0 $0 $0 $0$202,775 Gregory Canyon Creek$822,457$0$8,224,574$0$0$0 Drainageway Maintenance/Enhancements$520,000 $540,000 $560,000 $580,000 $610,000$630,000 Preflood Acquisition$660,000 $684,285 $711,656 $740,122 $769,727$800,516 Greenways Program Transfer$97,500 $97,500 $97,500 $97,500 $97,500$97,500Subtotal - Major Drainageway Improvements$4,640,757 $1,321,785 $50,043,730 $1,667,622 $1,477,227$1,730,792Miscellaneous Utility Billing Computer System $0 $0 $0$65,000$0$0Subtotal - Miscellaneous Drainage Improvements$0 $0 $0 $65,000 $0$0Stormwater Management Upper Goose Creek Storm and Flood Projects $0 $0 $0 $24,344,738 $0$0 E Pearl Storm Sewers (2016 Master Plan - Middle Boulder Creek - 2) $0 $3,862,873 $0 $0 $0$0 N Broadway Storm Sewers (2016 Master Plan - Wonderland Creek - 1) $0 $386,896 $0 $0 $0$0 Ithaca & Wildwood (2016 Master Plan - Bear Canyon Creek - 5) $0$0$0 $0 $0$0 Local Drainage Improvements $854,090 $986,949 $1,026,427 $1,067,484 $1,110,183$1,154,591 Stormwater Quality Improvements $190,000 $197,390 $205,285 $213,497 $222,037$230,918 Storm Sewer Rehabilitation $632,700 $657,966 $684,285 $711,656 $740,122$769,727 Transportation Coordination $633,000 $657,966 $684,285 $711,656 $740,122$769,727Subtotal - Localized Drainage Improvements$2,309,790 $6,750,039 $2,600,281 $27,049,030 $2,812,464$2,924,963TOTAL CAPITAL USES OF FUNDS$6,950,548 $8,071,823 $52,644,011 $28,781,653 $4,289,691$4,655,754Attachment B06-17-2019 WRAB Agenda 4 - Capital Improvements ProgramPage 21 of 21
C I T Y O F B O U L D E R
INFORMATION ITEM FOR:
ENVIRONMENTAL ADVISORY BOARD – July 3, 2019
TRANSPORTATION ADVISORY BOARD – June 10, 2019
OPEN SPACE BOARD OF TRUSTEES – June 12, 2019
PLANNING BOARD – June 20, 2019
WATER RESOURCES ADVISORY BOARD – June 17, 2019
PARKS AND RECREATION ADVISORY BOARD – June 24, 2019
GREENWAYS ADVISORY COMMITTEE AGENDA ITEM
MEETING DATE: To be scheduled in July/August
SUBJECT:
2020-2025 Greenways Capital Improvement Program
REQUESTING DEPARTMENT:
Katie Knapp – Greenways Coordinator/Engineering Project Manager
PURPOSE: The 2020-2025 Greenways Capital Improvement Program is being provided to
board members as an information item. If you have any comments or concerns regarding the
2020-2025 Greenways Capital Improvement Program, please pass them along to your
Greenways Advisory Committee representative. If you have questions on this material, please
contact Katie Knapp at 303-441-4077 or knappk@bouldercolorado.gov.
GREENWAYS ADVISORY COMMITTEE ACTION REQUESTED:
A recommendation from the Greenways Advisory Committee to the Planning Board and City
Council concerning the proposed Greenways Capital Improvement Program is requested.
Attached is information concerning the proposed 2020-2025 Greenways Capital Improvement
Program (CIP) for review and consideration. A recommendation by the Greenways Advisory
Committee to Planning Board and City Council will be requested at the 2019 GAC meeting.
For more information about the Greenways Program, please visit the webpage:
https://bouldercolorado.gov/flood/greenways-program
Attachment A: Greenways 2020-2025 Capital Improvement Program Overview
Attachment B: Potential Restoration, Water Quality & Trail Improvement Projects
Attachment C: 2020-2025 Capital Improvement Program Summary Spreadsheet
Attachment D: Greenways CIP & Proposed Project Map
06-17-2019 WRAB Agenda 5 - Greenways CIP
Page 1 of 7
GREENWAYS 2020-2025 CIP Overview
Overview of Greenways Mission
The City of Boulder Greenways System is comprised of a series of corridors along riparian areas
including Boulder Creek and its 14 tributaries, which provide an opportunity to integrate
multiple objectives, including habitat protection, water quality enhancement, storm drainage
and floodplain management, alternative transportation routes for pedestrians and bicyclists,
recreation and protection of cultural resources.
The Greenways CIP follows an opportunistic approach, contributing funding toward projects that
are being completed by other departments or private development to meet the various
objectives of the Greenways Program. The Greenways CIP also looks to leverage funds with
outside agencies to move projects forward that meet more than one objective of the Greenways
Program but may not be the highest priority when evaluating any one particular objective.
Projects included in the Greenways CIP are typically called out in the Greenways Master Plan and
are projects that Greenways staff can take the lead in coordinating.
Funding Overview
The 2020 annual funding distribution for the Greenways capital program is as follows:
Transportation Fund $97,500
Stormwater & Flood Management Utility Fund $97,500
Lottery Fund $151,100
In 2019, $57,489 was added to the budget from excess lottery funds received the past two years.
The total 2019 Greenways capital budget is $403,589, with an additional $105,000 in the
operating budget. The Lottery contribution is calculated as 15-percent of the total Lottery funds
allotted to the city and will change each year. The 2019 Lottery fund amount was used for the
2020-2025 CIP.
The Lottery Fund is based on proceeds from the Conservation Trust Fund that is distributed by
the State of Colorado on a per capita basis to local governmental entities. Funding can be used
for the acquisition, development and maintenance of new conservation sites and capital
improvements for recreational purposes.
Current Focus for Capital Planning and Projects in 2020
The primary focus of the Greenways CIP in 2020 is on flood mitigation, bicycle and pedestrian
multi-use paths and underpasses, and habitat and water quality improvements along the
Attachment A
06-17-2019 WRAB Agenda 5 - Greenways CIP
Page 2 of 7
Fourmile Canyon Creek corridor. These improvements are being coordinated with roadway
improvements at Broadway, 19th St. and 26th St. as well as the development of the North Library
site and the Violet Park site. The Greenways program also secured additional funding through
the city’s community, culture and safety tax program to help fund these improvements.
In 2021-2025, funding is shown for Gregory Canyon, Skunk, Twomile Canyon and Goose Creek in
anticipation of future major drainageway improvements along these corridors. For more
information about the timing and details of these projects, please see the Utilities -
Stormwater/Flood web page: https://bouldercolorado.gov/flood/creek-projects
A secondary focus for the 2020-2025 Greenways CIP is for habitat restoration and streambank
stabilization projects along the Greenways corridors. Many streambank areas are degraded,
eroding and in need of restoration. The loss of ash trees due to the Emerald Ash Borer (EAB) has
exacerbated this situation. Restoring the degraded streambanks also improves water quality,
helps restore the urban tree canopy and supports pollinators and other native species. A list of
additional potential restoration, water quality and trail improvement projects that meet more
than one Greenways objective during the next few years are included as Attachment B. See
Attachment D for a map of these potential projects.
Recent Accomplishments
-The Wonderland Creek project construction began in January 2016. The project extends
from Foothills Parkway in the south to Winding Trail Drive in the north. The project
includes 100-year channel improvements, three new underpasses and replanting 1,884
trees and shrubs. The Wonderland Project was completed in the spring of 2019.
2020 Capital Projects
-Fourmile Canyon Creek: multi-use path and flood conveyance improvements. These
projects are a collaborative effort with flood mitigation, transportation, library and parks.
-See Attachment C for projects in the 2020-2025 CIP and Attachment D for a map of
project locations.
Operating and Maintenance Impacts
$105,000 is budgeted each year for Greenways operations and maintenance, including the
required monitoring of conservation easements and recently constructed projects. In 2019,
Greenways staff is performing a comprehensive assessment to document the ecological
condition of the current Greenways system, determine needs for habitat
maintenance/restoration and develop a workplan to address those needs.
Greenways habitat maintenance is routinely coordinated with Parks and Open Space
Attachment A
06-17-2019 WRAB Agenda 5 - Greenways CIP
Page 3 of 7
maintenance staff. Major drainageway improvements are maintained by the flood maintenance
staff and multi-use paths and underpasses are maintained by either Transportation or Parks
maintenance, depending upon jurisdiction.
Unfunded Projects and Emerging Needs
There are many factors currently impacting the health and condition of the Greenways system
such as tree loss due to EAB, pollinator and native species decline, spread of noxious weeds,
contamination from pesticide use, and soil erosion. Significant environmental changes are taking
place due to climate change compounding these factors and impacting natural ecosystems. Staff
believe a collaborative approach across the city and community is needed to better face these
challenges. The Greenways Program will work towards this as well as possible by continuing to
partner on projects funded through other departments and incorporating the objectives of the
Greenways Program.
CEAP Projects
-None
Board Action
The Greenways Advisory Committee meeting will be scheduled in late July/August to review the
2020-2025 Greenways Program CIP and provide a recommendation to City Council.
Attachment A
06-17-2019 WRAB Agenda 5 - Greenways CIP
Page 4 of 7
Attachment B: Potential Greenways Projects
Map ID Name of Project
Funding from
more than 1
source
Protects and/or
Restores Habitat
Enhances Water
Quality
Mitigates Flood
Risk
Improves Storm
Drainage
Provides
pedestrian/bicycle
transportation
route
Provides
Recreation
Opportunities
Preserves Cultural
Resources
A Underpass at 26th St & Fourmile Canyon Creek x x x
B Boulder Creek Streambank Restoration x x x
C Restoration Foothills to Valmont at Boulder Creek x x
D Park Construction at Violet Park & Fourmile Canyon Creek x x x x x
E Pedestrian Bridge & 800' of Creek Restoration at Fourmile Canyon Creek x x x x
F Park Construction at 744 University & Gregory Canyon Creek x x x
G Restoration at Boulder Junction & Goose Creek x x x x x x
Citywide Greenways Master Plan Update x x x x x x x
Citywide EAB Restoration (Evaluation and implementation)x x x
Citywide Contract for growing native cottonwood trees x x
Citywide Fire/flood risk assessment along greenways x x x x
Greenways Objectives
Attachment B
06-17-2019 WRAB Agenda 5 - Greenways CIP
Page 5 of 7
Attachment C: 2020-2025 Capital Improvement Program Summary Spreadsheet
Carry Over $
From Previous
Years
2019 Lottery
610SW63100
2019 Flood
610SW63000
2019 Trans
310TR630OC 2019 Budget
2019 Budget
+
Carry Overs 2020 2021 2022 2023 2024 2025
1 Fourmile 19th-22nd 718,828$ -$ -$ -$ -$ 718,828$
2 Skunk/Gregory/Twomile/Goose Creeks -$ -$ -$ -$ -$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$
3 Fourmile Upland to Violet 840,800$ 129,600$ 85,200$ 85,200$ 300,000$ 1,140,800$ 300,000$
Excess Lottery Funds from 2018 and 2017 57,489$ 57,489$ *Restoration, Water Quality & Trail Improvements 393,198$ 21,500$ 12,300$ 12,300$ 46,100$ 439,298$ 46,100$ 46,100$ 46,100$ 46,100$ 46,100$ 46,100$
1,952,826$ 208,589$ 97,500$ 97,500$ 403,589$ 2,298,926$ 346,100$ 346,100$ 346,100$ 346,100$ 346,100$ 346,100$
2020-2025 Greenways CIP2019 Greenways Budget
Projected Funding based on $151,100 Lottery Fund
Projects and Map ID
Total
Attachment C
06-17-2019 WRAB Agenda 5 - Greenways CIP
Page 6 of 7
!
!
"
"
"
"
"
"
!
!
"
!
!
Jay Rd 75th St47th St19th StUS H
w
y
3
6
Monarch Rd
30th StPine St
Canyon Bv
Iris Av
Pearl Py Spine Rd63rd StValmont Rd
Arapahoe Av
9th StMineral Rd
26th StOlde Stage Rd76th StLi
n
d
e
n
D
r Diagonal Hy61st StMo
o
r
h
e
a
d
A
v 57th StViolet Av
S
B
r
o
a
d
w
a
yN Foothills HwLookout
R
d
State
H
w
y
1
1
9
Gil
l
a
s
p
i
e
D
r
Colorado Av 55th StCherryvale RdFoothi
l
ls
HyFoothills PyMapleton Av
Balsam Av
Tabl
e
M
e
s
a
D
r
Linden Av
Marshall Rd
Yarmouth Av
S Foothills HwyPearl StLehi
g
h
S
t 71st StSioux Dr
Valmont
R
d
Baseline RdFoothills PyTable Mesa Dr
Arapahoe AvFolsom StBaseline Rd
Lookout RdDiagonal HyBroadwayB
r
o
a
dw
a
y
75th St28th St63rd St63rd StArapahoe Av
55th StValmont Rd
South
B
o
u
l
d
e
r
R
d
3
2
E
2
G
F
D
C
B
A
2
1
Legend
!Currently in CIP
"Proposed Projects
City Limits ¯
Attachment D: Greenways CIP & Proposed Projects 2020-2025Attachment D
06-17-2019 WRAB Agenda 5 - Greenways CIP Page 7 of 7