NOTICE IS HEREBY GIVEN THAT A PUBLIC HEARING WILL BE GIVEN BY THE CITY OF BOULDER, BOARD OF BUILDING APPEALS, AT THE TIME AND PLACE SPECIFIED ABOVE. ALL PERSONS,
IN FAVOR OF OR OPPOSED TO OR IN ANY MANNER INTERESTED IN ANY OF THE FOLLOWING VARIANCES FROM THE LAND USE REGULATIONS, TITLE 9, BOULDER REVISED CODE 1981; MAY
ATTEND SUCH HEARING AND BE HEARD IF THEY SO DESIRE. (APPLICANT OR REPRESENTATIVE MUST APPEAR AT THE MEETING.)
1. CALL TO ORDER
2. BOARD HEARINGS
A. Docket No.: BOZ2019-05
Address: 516 Mapleton
Applicant: Claudius Jaeger
Fire Code Appeal to the Board of Building Appeals: Requesting an appeal from the detached ADU
Fire-Sprinkler requirement. Seeking relief to the "house behind a house rule" since fire apparatus access
to ADU is within 75' via the alley.
3. GENERAL DISCUSSION
A. Matters from the Board
B. Matters from the City Attorney
C. Matters from Planning and Development Services
4. ADJOURNMENT
For more information call Brian Holmes or Cindy Spence at 303-441-1880 or via e-mail holmesb@bouldercolorado.gov. Board packets are available after 4 p.m. Friday
prior to the meeting, online at www.bouldercolorado.gov, or at the Planning & Development Services Center, located at 1739 Broadway, third floor.
* * * SEE REVERSED SIDE FOR MEETING GUIDELINES * * *
CITY OF BOULDER
BOARD OF BUILDING APPEALS
MEETING AGENDA
DATE: Thursday, April 11, 2019
TIME: Meeting to begin at 5 p.m.
PLACE: Council Chambers, 1777 Broadway, 2nd Floor
04.11.2019 BOZA Packet Page 1 of 37
CITY OF BOULDER
BOARD OF BUILDING APPEALS
MEETING GUIDELINES
CALL TO ORDER
The board must have a quorum (three members present) before the meeting can be called to order.
AGENDA
The board may rearrange the order of the agenda or delete items for good cause. The board may not add items requiring
public notice.
ACTION ITEMS
An action item requires a motion and a vote. The general format for hearing of an action item is as follows:
1. Presentations
• Staff presentation.*
• Applicant presentation.*Any exhibits introduced into the record at this time must be provided in quantities of
seven to the Board Secretary for distribution to the board and admission into the record.
• Board questioning of staff or applicant for information only.
2. Public Hearing
Each speaker will be allowed an oral presentation.*
• Speakers should introduce themselves, giving name and address. If officially representing a group, homeowners'
association, etc., please state that for the record as well.
• Speakers are requested not to repeat items addressed by previous speakers other than to express points of
agreement or disagreement. Refrain from reading long documents, and summarize comments wherever possible.
Long documents may be submitted and will become a part of the official record. When possible, these documents
should be submitted in advance so staff and the board can review them before the meeting.
• Speakers should address the Land Use Regulation criteria and, if possible, reference the rules that the board uses
to decide a case.
• Any exhibits introduced into the record at the hearing must be provided in quantities of seven to the Board
Secretary for distribution to the board and admission into the record.
• Citizens can send a letter to Planning and Development Services staff at 1739 Broadway, Boulder, CO 80302, two
weeks before the board meeting, to be included in the Board packet. Correspondence received after this time will
be distributed at the board meeting.
3. Board Action
• Board motion. Motions may take any number of forms. With regard to a specific development proposal, the
motion generally is to either approve the project (with or without conditions), to deny it, or to continue the matter
to a date certain (generally in order to obtain additional information).
• Board discussion. This is undertaken entirely by members of the board. The applicant, members of the public or
city staff participate only if called upon by the Chairperson.
• Board action (the vote). An affirmative vote of at least three members of the board is required to pass a motion
approving any action. If the vote taken results in a tie, a vote of two to two, two to one, or one to two, the
applicant shall be automatically allowed a rehearing. A tie vote on any subsequent motion to approve or deny
shall result in defeat of the motion and denial of the application.
MATTERS FROM THE BOARD, CITY STAFF, AND CITY ATTORNEY
Any board member, Planning and Development Services staff, or the City Attorney may introduce before the board
matters, which are not included in the formal agenda.
*The Chairperson, subject to the board approval, may place a reasonable time limitation on presentations.
04.11.2019 BOZA Packet Page 2 of 37
04.11.2019 BOZA Packet Page 3 of 37
Pending -Accessory Dwelling Unit Application -516 Mapleton Ave –AUR2019-00008 -Building and
Housing Codes 2-16-2019
BOARD OF ZONING ADJUSTMENT (BOZA)
VARIANCE APPLICATION
March 9th, 2019
Subject:
Accessory Dwelling Unit Application -516 Mapleton Ave –AUR2019-00008 –request to be
exempt from sprinkler system requirements per “The specifications of the 2012 International Fire
Code in particular 502.1; 503.1; 503.2; 903.2.8; the local amendments, etc.”:
Two whom it may concern,
We seek to be exempt from the sprinkler system requirement reg. the ADU application no.
AUR2019-00008 for the following reasons:
1.The alley is 20’ wide and is serviced by city utility /garbage trucks. The ADU is easily
accessible by Fire Apparatuses form 5th street through the 20’ wide alley.
2.The ADU is within 75’ of an emergency vehicle access streets / 5th Street–see Exhibit H.
3.The specifications of the 2012 International Fire Code in particular 502.1; 503.1; 503.2;
903.2.8; the local amendments, etc.:
a.The alley on the South side of the lots 10 & 11 of Mapleton Zoning RL-1 is
serviced by city utility trucks like garbage trucks and others.It can be easily
accessed by Fire Apparatuses as well.We access the garage from the alley to
park SUVs in the garage, etc.A fire sprinkler systems should not be required.
b.The comment by Fire Chief David Lowrey –see Exhibit D: The Fire and Rescue
Dept. has ..”no control over parked cars, trash trucks and other items in the alley
the same as a maintained city street. ..”–
Boulder City Ordinance No. 8101 (2016):
•7-6-13.-Stopping or Parking Prohibited in Specified Places.
(a)
No vehicle may be stopped or parked:
….
On a roadway in such a manner or under such conditions as to leave available
fewer than ten feet of width of the roadway of an alley or seven feet from the
centerline of a street with no double center line for the free movement of vehicular
traffic or on a roadway that has a marked double yellow centerline, unless ten feet
of clearance between the parked vehicle and the centerline exists;
(5)
Above City of Boulder Ordinance No. 8101 (2016): 7-6-13.-Stopping or Parking
Prohibited in Specified Places applies the same way for alleys as it does for
04.11.2019 BOZA Packet Page 4 of 37
streets /emergency vehicle access street. So there should no vehicles being
parked in alley as there shouldn’t in streets blocking traffic, etc.
4.The ADU can be easily accessed by Fire Apparatuses. The fire sprinkler system
requirement of the local amendments to 903.2.8 inflicts undue burden and cost to home
owners. They also undermines the affordable housing objective of the latest ADU City of
Boulder ordinance.
a.See Exhibit G current studio interior finish and F floor plan: A majority of the
interior finishes, drywall, etc. would have to be demolished in order to install
sprinkler heads and pipes. The current studio / ADU has tile floor and mostly
non-flammable finishes.
5.Local amendments the fire code are provided below.(33)
Section 903.2.8 is amended by the addition of the following:
(a)
Exception 1: Detached and two-unit attached dwelling units are not required to have an automatic fire
sprinkler system if they are not used as residential board and care occupancies, and the distance,
unobstructed by any structure above grade, landscaping, or topographical obstruction, from the curb
face of the emergency vehicle access street on which the structure is addressed, to a face of the unit
containing an entrance, is not greater than one hundred feet.
(b)
Exception 2: A detached dwelling unit is not required to have an automatic fire sprinkler system if it is
not used as a residential board and care occupancy, and is located on a lot larger than 14,500 square
feet, in which the driveway meets the requirements of a fire department accessible private drive, and
extends without interruption from the nearest emergency vehicle access street on which the structure
is addressed, to the side of the building which contains the main entrance.
(c)
If more than one principal building is constructed on a lot pursuant to the exceptions listed in Section
9-7-12, "Two Detached Dwelling Units on a Single Lot," B.R.C. 1981, then each building other than
the building closest to an emergency vehicle access street on which the structure is addressed, shall
be protected by an approved and supervised automatic sprinkler system in accordance with Section
903.3.
Exception:If a lot has frontage on two streets and each street is an
emergency vehicle access street, then two buildings, each closest to their
respective streets, shall not be required to be so protected by this
subsection.
See comparable ADU / potential garage and or studio conversions:550
Mapleton Ave.and 541 Highland Ave. 541 –“Local amendments the fire code.(33)
Section 903.2.8 is amended by the addition of the following” would exempt these form
the sprinkler requirements since both lots have frontage two streets and both streets are
emergency vehicle access streets. However Fire Apparatuses would access both ADUs
through the alley for a potential fire & rescue mission. Both ADUs are with a 100’ radius
form the nearest emergency vehicle access streets accessible through the alley as is the
ADU at 516 Mapleton Ave.
See also attachments H, I, & J
04.11.2019 BOZA Packet Page 5 of 37
04.11.2019 BOZA Packet Page 6 of 37
Exhibits:
A: Location Improvement Certificate 516 Mapleton
B: Current Studio -JAEGER (PERMIT REV 1) PMT2013-05902 approved Dec 2013
C: Feb 1st 2019 ADU filing fee receipt
D: Email City of Boulder Fire-Rescue David Lowrey Feb 25 2019
E:Lot -buildings area calculations
F: 516 Mapleton ADU layout -floor plan
G: Interior pictures current Studio
H -Emergency vehicle accessibility 516 Mapleton Ave Rev -Feb 23 2019
I -Emergency vehicle access street 516 Mapleton vs 550 Mapleton & 541 Highland
J -Comparison 516 Mapleton vs 541 Highland Ave & 550 Mapleton Ave
04.11.2019 BOZA Packet Page 7 of 37
04.11.2019 BOZA Packet Page 8 of 37
04.11.2019 BOZA Packet Page 9 of 37
WALL TYPES KEYEXISTING WALLHIDDEN/OVERHEADNEW WALLEXISTINGGARAGE25'-2 1/2"+/-5'-6"22'-3 1/2"+/-EXISTING GARAGE PLANScale: 1/4" = 1'-0"2UP14R2A3.04A3.01A3.03A3.01A4.02A4.0A1.0SITE PLAN,GARAGE PLAN &NOTESREMOVE EXIST'G UTILITY SINK. TIE IN NEW WATER & SEWER LINESFLAGSTONE "LANDING" & PATH TBD4'-4"EQ.EQ.NEW BOILER, HWH2'-6"7'-0"EQ.EQ.D61EXISTING ELECTRICAL SUB-PANEL1JVA INC. STRUCTURAL ENGINEERS1319 Spruce StreetBoulder CO 80302T: (303) 444-1951CONTACT: Mike HopeEMAIL: mhope@jvajva.comJAEGER GARAGESTUDIO REMODEL516 MAPLETON AVENUEBOULDER, COOWNER:PROJECT DESIGNER:FRESH SPACE STUDIO1266 Lee Hill DriveBoulder, CO, 80302T: (303) 997-7241CONTACT: Steve VosperEMAIL: Steve@FreshSpaceStudio.comPROJECT ENGINEER:PROJECT CONTRACTOR:DATEDESCRIPTION10/25/13 PERMIT SETANDREA & CLAUDIUS JAEGER516 Mapleton AvenueBoulder, CO, 80304T (Andrea CEL): (303) 570-5742T (Claudius CEL): (720) 771-9398EMAIL: andrea1jaeger@cs.comEMAIL: claudius_jaeger@artemisrubber.com12/5/13#1-PERMIT COMMENTS+/-8'-0"+/-6'-0"+/- 5'-0"EXISTING 2STORYRESIDENCE W/BASEMENT516 MAPLETONAVENUE(N.I.C.)EXISTINGFRAMEGARAGE+/- 26'-0"LOT 10LOT 11M A P L E T O N A V E N U EPROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINEEXISTING OVERHEAD UTILITY LINESEXISTING DECKEXISTING FLAGSTONE PAVINGSIDEWALKCURBCONCRETE PAVINGEXISTING OVERHEAD UTILITY LINEEXISTING FLAGSTONE PAVINGCHAINLINK FENCEWOOD PRIVACY FENCEA L L E YSITE PLANScale: 1/16" = 1'-0"1NORTHPROPOSED GARAGE STUDIO REMODELNEW FLAGSTONE PATHEXIST'G SETBACKEXIST'G SETBACKEXISTING ELECTRICAL SUB-PANEL1TIE NEW WATER AND SEWER TO EX. UTILITY SINK & DRAIN. REF. EX. GARAGE PLAN.Exhibit B - JAEGER (PERMIT REV 1) PMT2013-05902 approved Dec 201304.11.2019 BOZA Packet Page 10 of 37
ROOF PLANScale: 1/4" = 1'-0"2NEW WALL DIRECTLY OVER EXIST. STRUCTURAL FRAMING BELOWA2.0PLANSSTUDIOHALFBATHDOWN13R25'-2 1/2"+/-5'-6"22'-3 1/2"+/-STUDIO PLANScale: 1/4" = 1'-0"1EQ.3'-4"+/-3'-4"+/-12'-8 1/2"+/-6'-3"6'-3"4'-4"13 TREADS @ 10"3'-6"2'-0"DOWN14RSTORAGEEQ.4'-0"2A3.04A3.01A3.03A3.01A4.02A4.02A3.04A3.01A3.03A3.01A4.02A4.0EQ.EQ.EQ.8'-6"EQ.EQ.EQ.EQ.EQ.D1D2D3D4D5WALL TYPES KEYEXISTING WALLHIDDEN/OVERHEADNEW WALLMAINTAIN EXIST. GUTTER, D.S. & EAVE IF POSSIBLENEW ASPHALT SHINGLES THROUGHOUT TO MATCH EXIST'G4:12 SLOPE 4:12 SLOPEEXIST'G RIDGE LINEMAINTAIN EXIST. GUTTER, D.S. & EAVE IF POSSIBLEREMOVE EXIST. EAVE, GUTTER, D.S. AS REQ'D FOR LANDINGTREX OR EQ. @ LANDING & TREADSW2W1W3(390 HABITABLE SQ. FT.)NEW BUILT-IN CAB W/ UPPERSLG MINI SPLIT LS091HSV 3/4 TON, 20 SEER HEAT PUMP ABV.1JVA INC. STRUCTURAL ENGINEERS1319 Spruce StreetBoulder CO 80302T: (303) 444-1951CONTACT: Mike HopeEMAIL: mhope@jvajva.comJAEGER GARAGESTUDIO REMODEL516 MAPLETON AVENUEBOULDER, COOWNER:PROJECT DESIGNER:FRESH SPACE STUDIO1266 Lee Hill DriveBoulder, CO, 80302T: (303) 997-7241CONTACT: Steve VosperEMAIL: Steve@FreshSpaceStudio.comPROJECT ENGINEER:PROJECT CONTRACTOR:DATEDESCRIPTION10/25/13 PERMIT SETANDREA & CLAUDIUS JAEGER516 Mapleton AvenueBoulder, CO, 80304T (Andrea CEL): (303) 570-5742T (Claudius CEL): (720) 771-9398EMAIL: andrea1jaeger@cs.comEMAIL: claudius_jaeger@artemisrubber.com12/5/13#1-PERMIT COMMENTS04.11.2019 BOZA Packet Page 11 of 37
2 LAYERS OF 5/8" TYPE X GYPSUM, W/ STAGGERED, TAPED SEAMS ON THE UNDERSIDE OF THE WESTERN EAVEWEST ELEVATIONScale: 1/4" = 1'-0"4NORTH ELEVATIONScale: 1/4" = 1'-0"35,489.3' T.O. EXIST'G RIDGE5,470.0' T.O. EXIST'G SLAB412412A3.0ELEVATIONSEAST ELEVATIONScale: 1/4" = 1'-0"2NEW GAMBREL ROOF FORMPTD. SHINGLESNEW STAIRSMAINTAIN EXIST'G EAVE IF POSSIBLEEXISTING PTD. SIDINGMAINTAIN EXISTING RIDGE LINENEW GAMBREL ROOF FORMPTD. SHINGLESNEW STAIRSMAINTAIN EXIST'G EAVE IF POSSIBLEEXISTING PTD. SIDINGSOUTH ELEVATIONScale: 1/4" = 1'-0"15,489.3' T.O. EXIST'G RIDGE5,470.0' T.O. EXIST'G SLAB412412W2W1NOTE: ALL TRIM DETAILS, COLORS &MTLS TO MATCH EXIST'G HOUSE &GARAGETREX OR EQ. FOR ALL TREADS & DECK'GMAINTAIN EXISTING RIDGE LINENOTE: PAINT ALL STAIRS & LANDING FRAMING & TRIM TO MATCH EXIST'GW312 LAYERS OF 5/8" TYPE X GYPSUM, W/ STAGGERED, TAPED SEAMS ON THE UNDERSIDE OF THE WESTERN EAVE1JVA INC. STRUCTURAL ENGINEERS1319 Spruce StreetBoulder CO 80302T: (303) 444-1951CONTACT: Mike HopeEMAIL: mhope@jvajva.comJAEGER GARAGESTUDIO REMODEL516 MAPLETON AVENUEBOULDER, COOWNER:PROJECT DESIGNER:FRESH SPACE STUDIO1266 Lee Hill DriveBoulder, CO, 80302T: (303) 997-7241CONTACT: Steve VosperEMAIL: Steve@FreshSpaceStudio.comPROJECT ENGINEER:PROJECT CONTRACTOR:DATEDESCRIPTION10/25/13 PERMIT SETANDREA & CLAUDIUS JAEGER516 Mapleton AvenueBoulder, CO, 80304T (Andrea CEL): (303) 570-5742T (Claudius CEL): (720) 771-9398EMAIL: andrea1jaeger@cs.comEMAIL: claudius_jaeger@artemisrubber.com12/5/13#1-PERMIT COMMENTS04.11.2019 BOZA Packet Page 12 of 37
12Step 1Elevation of Building Element (x)(relative to USGS or datum) 10:00 AM 12:00 PM 2:00 PM 10:00 AM 12:00 PM 2:00 PM 10:00 AM 12:00 PM 2:00 PMA5489.3 5470.3 5470.3 5470.3 19 19 19 18.6 14. 18.6B5486.3 5470.3 5470.3 5470.3 16 16 16 10.6 8. 10.6C * Elevation in USGS or relative to survey datum where the building element's shadow would cross the property line.** The relative height of the building element is the elevation of the building element (step 1), minus the elevation of grade at the property line (step 2).*** The length of the shadow is determined by using the "Adjusted Solar Shadow Lengths" of Table 1, for Solar Access Area 1, of the Solar Access Guide.SOLAR ANALYSIS WORKSHEETRoof ElementStep 2Step 3Step 4Elevation of Grade at Property Line (y)* Relative Height of Building Element (h)**Length of Shadow (L)***Property Zone District:Solar Fence HeightSSOLAR ANALYSISDOOR SCHEDULENO. STYLE WIDTH HEIGHT THICKNESS FRAMETYPEMATERIAL GLAZING TRIMREMARKSNOTE: IT IS THE RESPONSBILITY OF THE DOOR SUPPLIER TO MAKE FINAL DETERMINATION OF TEMPERED GLAZING ISSUES .D1D2ABD3 BD4 CD5 C2'-6" 6'-8" 1 3/4" WOOD ENTRY WOOD/GLASS 1/2 LITEWOOD 1/2 LITE ENTRY DOOR. REF NOTE BELOW*D6 D+/-5'-0" +/-6'-0"TBDCLOSETTBDN/A N/ABI-PASS SLIDERS"" """" "" "" "" """ """ """" """" """ "+/-7'-0" """" """" """ "+/-5'-0" """" """" ""BI-PART BI-FOLD""""""TBD""""""""DOOR & WINDOW NOTES:WINDOW SCHEDULENO. STYLE WIDTH HEIGHT HEAD HT. FRAMETYPEMATERIAL GLAZING TRIMREMARKSNOTE: IT IS THE RESPONSBILITY OF THE WINDOW SUPPLIER TO MAKE FINAL DETERMINATION OF EGRESS & TEMPERED GLAZING ISSUES .W1W2W3A 6'-8" WOOD WOOD+/-6'-0" " " " """ "" ""BC2-2'-6"3-2'-0"5-2'-0"4'-0"3'-6"3'-6"DOUBLE HUNG""""TBD""""ALL WINDOWS TO BE MARVIN LOW E-272 ARGON SERIES W/ U VALUE 0.28 (EQUAL OR BETTER SPEC PER CONTRACTOR/CLIENT DISCRETION.)DOOR D1 TO BE SIMPSON 7444 U-VALUE 0.44 (EQUAL OR BETTER SPEC PER CONTRACTOR/CLIENT DISCRETION.)A4.0SECTIONSSCHEDULES &NOTESSTUDIOGARAGE5,489.3' T.O. EXISTING RIDGE412412EXISTING 2X10 FLOOR JOISTSEXISTING EAVE PROFILEEAST-WEST SECTION @ CLOSETSScale: 1/4" = 1'-0"1CLOSED CEL INSUL. (R38 MIN.)ALL FRAMING PERSTRUCTURAL ENGINEERSTUDIOGARAGE412412EXISTING 2X10 FLOOR JOISTSEXISTING EAVE PROFILEEAST-WEST SECTION @ WINDOWSScale: 1/4" = 1'-0"2PTD. SHINGLES AND TRIM5,489.3' T.O. EXISTING RIDGEEXISTING ROOFPROFILEEXISTING ROOFPROFILE6'-8"6'-8"5/8" TYPE "X" GYP. BD. W/ R30 BATT INSUL5/8" TYPE "X" GYP. BD. W/ R30 BATT INSUL5,470.0' T.O. EXIST'G SLAB5,470.0' T.O. EXIST'G SLABCLOSED CEL INSUL. (R38 MIN.)CLOSED CEL INSUL. (+/-R30)12 LAYERS OF 5/8" TYPE X GYPSUM, W/ STAGGERED, TAPED SEAMS ON THE UNDERSIDE OF THE WESTERN EAVE12 LAYERS OF 5/8" TYPE X GYPSUM, W/ STAGGERED, TAPED SEAMS ON THE UNDERSIDE OF THE WESTERN EAVE111+/-6'-0"+/- 5'-0"EXISTINGFRAMEGARAGEPROPERTY LINEA L L E YSOLAR PLANScale: 1/16" = 1'-0"3NORTHRENOVATED 2ND FLOOR STUDIOPROPERTY LINEPROPERTY LINEABBBBB2PMB2PMANOONA2PMA10AMB10AMB10AMJVA INC. STRUCTURAL ENGINEERS1319 Spruce StreetBoulder CO 80302T: (303) 444-1951CONTACT: Mike HopeEMAIL: mhope@jvajva.comJAEGER GARAGESTUDIO REMODEL516 MAPLETON AVENUEBOULDER, COOWNER:PROJECT DESIGNER:FRESH SPACE STUDIO1266 Lee Hill DriveBoulder, CO, 80302T: (303) 997-7241CONTACT: Steve VosperEMAIL: Steve@FreshSpaceStudio.comPROJECT ENGINEER:PROJECT CONTRACTOR:DATEDESCRIPTION10/25/13 PERMIT SETANDREA & CLAUDIUS JAEGER516 Mapleton AvenueBoulder, CO, 80304T (Andrea CEL): (303) 570-5742T (Claudius CEL): (720) 771-9398EMAIL: andrea1jaeger@cs.comEMAIL: claudius_jaeger@artemisrubber.com12/5/13#1-PERMIT COMMENTS04.11.2019 BOZA Packet Page 13 of 37
04.11.2019 BOZA Packet Page 14 of 37
04.11.2019 BOZA Packet Page 15 of 37
Exhibit D Email City of Boulder Fire-Rescue David Lowrey Feb 25 2019
From:Lowrey, David <LOWREYD@bouldercolorado.gov>
Sent:Monday, February 25, 2019 12:21 PM
To:English, Matt <Englishm@bouldercolorado.gov>; Gery, Jim <GeryJ@bouldercolorado.gov>
Subject:RE: Accessory Dwelling Unit Application -516 Mapleton Ave -Answer to Review Comments
Building and Housing Codes 2-16-2019
Looking at this address the applicant meets what we consider a house behind house and if the structure
is changing use (into a dwelling unit) than it would be required to have a fire sprinkler installed the same
as if it were built new.We (Boulder Fire Rescue) do not consider an alley as acceptabl e fire access, we
never have.There is no reliability if we would be able to access it when needed.We can and we would
if possible drive an apparatus into the alley however, we have no control over parked cars, trash trucks
and other items in the alley the same as a maintained city street.I understand what he is stating but we
have never counted an alley as fire access.
The applicant has every right to take this to the Appeals Board, which is the same board of appeals as
you all use in the building department (I think the board is actually the Board of Zoning
Adjustments?).In our amendments it’s section 108 and in the amendments to the IBC its section 113.I
thought you all had a pamphlet that you can or do hand out to people.They will need to file and pay
the fee and get on the schedule.
This maybe something we want done so a precedence can be set.
David Lowrey
Chief Fire Marshal
O:303.441.4356
lowreyd@bouldercolorado.gov
Community Risk Reduction Division
3065 Center Green Drive | Boulder, CO 80301
Bouldercolorado.gov
04.11.2019 BOZA Packet Page 16 of 37
Building coverage
ADU:450 SF
140'[42.7<>m]
50'[15.2<>m]
7,000 SF
NEWWALLDIRECTLYOVEREXIST.STRUCTURALFRAMINGBELOWSTUDIOHALFBATHDOWN13R4'-4"13TREADS@10"3'-6"2'-0"DOWN14RSTORAGEEQ.4'-0"EQ.EQ.EQ.
EQ.EQ.D1D2D3D4D5TREXOREQ.@LANDING&TREADSHDR.ABV.W2W1W3(390HABITABLESQ.FT.)NEWBUILT-INCABW/UPPERS(48Landing&Stairwayhigher30"SQ.FT.)140'[42.7<>m]50'[15.2<>m]
Building coverage principal
structure:1,075.5 SF
Floor coverage calculations
Area of lot:7,000 SF
Floor coverage
ADU:610 SF
Floor coverageprincipal structure:1,780 SF
Building coverage calculations
ExhibitEAreaRatiosJan.14th,2019516MapletonAve,Boulder,CO80304JAEGERGarage/AccessoryDwellingUnit(ADU)04.11.2019 BOZA Packet Page 17 of 37
NEW WALL DIRECTLY
OVER EXIST.STRUCTURAL
FRAMING BELOW
A2.0
PLANS
STUDIO
Full BATH
DOWN
13R
25'-21/2"+/-5'-6"22'-3 1/2"+/-
STUDIO PLANScale:1/4"=1'-0"1
EQ.3'-4"+/-3'-4"+/-12'-81/2"+/-6'-3"6'-3"4'-4"13 TREADS @ 10"3'-6"2'-0"DOWN
14R
STORAGE
EQ.3'-6"
2A3.04A3.0
1A3.0
3A3.0
1A4.0
2A4.0
EQ.
EQ.EQ.EQ.EQ.EQ.EQ.EQ.D1
D2
D3
D4 D5
WALL TYPES KEY
EXISTING WALL
HIDDEN/OVERHEAD
NEW WALL
MAINTAIN EXIST.GUTTER,
D.S.&EAVE IF POSSIBLE
REMOVE EXIST.EAVE,GUTTER,
D.S.AS REQ'D FOR LANDING
TREX OR EQ.@ LANDING
&TREADS
HDR.ABV.
W2
W1W3(390 HABITABLE SQ.FT.)
NEW BUILT-IN
CAB W/UPPERS
Toilet
Bathtub -Shower Combo
Kitchen sink
Existing Garage PLANScale:1/4"=1'-0"2
2A3.04A3.0
1A3.0
3A3.0
1A4.0
2A4.0
Electrical Cooling +
Heating -Wall Mounted Air
Conditioning &Heating unit
Electrical Boiler
Electrical Sub-Panel
22'-3 1/2"+/-
2'-5 1/4"1'-3"2'-47/8"D3
S3
S4
S3
Rectangular sink wall haning1'-101/8"1'-71/8"97/8"2'-5"1'-5"Electrical
Baseboard Radiator
1'-9"ExhibitGRevADAU-floorplan-planviewFeb.17th,2019516MapletonAve,Boulder,CO80304JAEGERGarage/AccessoryDwellingUnit(ADU)04.11.2019 BOZA Packet Page 18 of 37
NEW WALL DIRECTLY
OVER EXIST.STRUCTURAL
FRAMING BELOW
STUDIO
Full BATH
DOWN
13R
25'-21/2"+/-5'-6"12'-81/2"+/-6'-3"6'-3"4'-4"13 TREADS @ 10"3'-6"2'-0"DOWN
14R
STORAGE
EQ.3'-6"
2A3.0
3A3.0
1A4.0
2A4.0
EQ.EQ.EQ.EQ.EQ.EQ.EQ.D1
D2
D3
MAINTAIN EXIST.GUTTER,
D.S.&EAVE IF POSSIBLE
REMOVE EXIST.EAVE,GUTTER,
D.S.AS REQ'D FOR LANDING
TREX OR EQ.@ LANDING
&TREADS
HDR.ABV.
W1W3(390 HABITABLE SQ.FT.)
NEW BUILT-IN
CAB W/UPPERS
Toilet
Bathtub -Shower Combo
Kitchen sink
Electrical Cooling +
Heating -Wall Mounted Air
Conditioning &Heating unit
2'-5 1/4"1'-3"2'-47/8"D3
S3
S4
S3
Rectangular sink wall haning1'-101/8"1'-71/8"97/8"2'-5"1'-5"Electrical
Baseboard Radiator
1'-9"ExhibitG-2Rev-ADU-S3toS4BathsinkoptionsFeb.23rd,2019516MapletonAve,Boulder,CO80304JAEGERGarage/AccessoryDwellingUnit(ADU)04.11.2019 BOZA Packet Page 19 of 37
04.11.2019 BOZA Packet Page 20 of 37
04.11.2019 BOZA Packet Page 21 of 37
04.11.2019 BOZA Packet Page 22 of 37
04.11.2019 BOZA Packet Page 23 of 37
140'[42.7<>m]
50'[15.2<>m]1,075.5SF562SF7,000SF74'-9"[22.8<>m]
R100'[R30.5<>m]
R100'[R30.5<>m]ADU20'[6.1<>m]5thStreetAlley
ExhibitG-1Rev-ADU-accessemergencyvechiclesFeb.23rd,2019516MapletonAve,Boulder,CO80304JAEGERGarage/AccessoryDwellingUnit(ADU)04.11.2019 BOZA Packet Page 24 of 37
140'[42.7<>m]
50'[15.2<>m]1,075.5SF562SF7,000SF74'-9"[22.8<>m]
R100'[R30.5<>m]
R100'[R30.5<>m]ADU20'[6.1<>m]5thStreetAlley
ExhibitG-1Rev-ADU-accessemergencyvechiclesFeb.23rd,2019516MapletonAve,Boulder,CO80304JAEGERGarage/AccessoryDwellingUnit(ADU)04.11.2019 BOZA Packet Page 25 of 37
Exhibit I-Emergency vehicle access street 516 Mapleton vs550 Mapleton & 541 Highland Ave04.11.2019 BOZA Packet Page 26 of 37
Approx.80’5th StreetExhibit I-Emergency vehicle access street 516 Mapleton vs550 Mapleton & 541 Highland Ave04.11.2019 BOZA Packet Page 27 of 37
Exhibit I-Emergency vehicle access street 516 Mapleton vs550 Mapleton & 541 Highland Ave04.11.2019 BOZA Packet Page 28 of 37
Comparison # 1 / Studio / ADU
(actual or hypothetical) @ 541
Highland Ave.
Comparison #
2 / Studio /
ADU (actual or
hypothetical)
@ 550
Mapleton Ave.Exhibit I-Emergency vehicle access street 516 Mapleton vs550 Mapleton & 541 Highland Ave04.11.2019 BOZA Packet Page 29 of 37
Approx. 72’6th StreetExhibit I-Emergency vehicle access street 516 Mapleton vs550 Mapleton & 541 Highland Ave04.11.2019 BOZA Packet Page 30 of 37
Approx. 89’6th StreetExhibit I-Emergency vehicle access street 516 Mapleton vs550 Mapleton & 541 Highland Ave04.11.2019 BOZA Packet Page 31 of 37
Comparison # 2 / Studio / ADU
(actual or hypothetical) @ 550
Mapleton Ave.
Comparison # 1 / Studio / ADU
(actual or hypothetical) @ 541
Highland Ave.
541 Highland
550 Mapleton
04.11.2019 BOZA Packet Page 32 of 37
Comparison # 1 / Studio / ADU
(actual or hypothetical) @ 541
Highland Ave.
Comparison # 2 / Studio / ADU
(actual or hypothetical) @ 550
Mapleton Ave.
04.11.2019 BOZA Packet Page 33 of 37
140'[42.7<>m]
50'[15.2<>m]1,075.5SF562SF7,000SF74'-9"[22.8<>m]
R100'[R30.5<>m]
R100'[R30.5<>m]ADU20'[6.1<>m]5thStreetAlley 6thStreetHighland Ave.
Mapleton Ave
R100'[R30.5<>m]
approx.
13,369 SF
550 Mapleton Ave.
541 Highland Ave.
516 Mapleton Ave.ExhibitI-Comparison516Mapletonvs541HighlandAve&550MapletonAveFeb.23rd,2019516MapletonAve,Boulder,CO80304JAEGERGarage/AccessoryDwellingUnit(ADU)ADU-accessemergencyvechicles04.11.2019 BOZA Packet Page 34 of 37
04.11.2019 BOZA Packet Page 35 of 37
04.11.2019 BOZA Packet Page 36 of 37
04.11.2019 BOZA Packet Page 37 of 37