Loading...
HomeMy WebLinkAbout5.21.2018 WRAB Full PacketWATER RESOURCES ADVISORY BOARD MEETING MEETING DATE: Monday, May 21, 2018 MEETING TIME: 6:00 p.m. MEETING LOCATION: Municipal Services Center, 5050 Pearl St., Boulder, CO 80301 Agenda Highlights: Agenda 1. Call to Order (6:00 p.m.) 2. Approval of previous meeting minutes (6:01 p.m.) 3. *Public Comment (6:05 p.m.) 4. Information Item – Capital Improvements Program (6:15 p.m.) 5. Matters from the Board (7:15 p.m.) 6. Matters from Staff (7:25 p.m.) 7. Discussion of Future Schedule (7:35 p.m.) 8. Adjourn (7:45 p.m.) *Public Hearing Items Agenda item times are approximate. For additional Information: • Please contact the WRAB Secretary email group at: WRABSecretary@bouldercolorado.gov • Packets are available on-line at: http://www.bouldercolorado.gov – A to Z, Water Resources Advisory Board (WRAB), Next Water Resources Advisory Board Meeting WRAB Minutes 4/16/2018 Page No. 1 CITY OF BOULDER, COLORADO BOARDS AND COMMISSIONS MEETING MINUTES Name of Board / Commission: Water Resources Advisory Board Date of Meeting: 16 April, 2018 Contact Information for Person Preparing Minutes: Kaaren Davis, 303-441-3233 Board Members Present: Kate Ryan, Kirk Vincent, Lesley Smith, Ted Rose, Trisha Oeth Board Members Absent: none Staff Present: Jeff Arthur, Director of Public Works for Utilities Ken Baird, Financial Manager, Public Works Ward Bauscher, Utilities Maintenance Manager Joe Taddeucci, Water Resources Manager Douglas Sullivan, Utilities Principal Engineer Kevin Clark, Engineering Project Manager Chris Douville, Wastewater Treatment Manager Steve Buckbee, Engineering Project Manager Pieter Beyer, Senior Civil Engineer Katie Knapp, Engineering Project Manager Kurt Bauer, Engineering Project Manager Kaaren Davis, Board Secretary Agenda Item 1 – Call to Order [6:00 p.m.] Agenda Item 2 – Approval of the 19 March, 2018 Meeting Minutes [6:01 p.m.] Motion to approve minutes from 19 March 2018 as amended. Moved by: Rose Seconded by: Vincent Vote: 4:1:0 (Oeth abstains) Agenda Item 3– Swearing in of new WRAB Member [6:06 p.m.] Trisha Oeth read her oath of office into the record. Agenda Item 4– Election of Officers [6:07 p.m.] Chair: Ryan nominates Smith, seconded by Vincent. Vote: 5:0 Vice Chair: Rose nominates Ryan, seconded by Vincent Vote: 5:0 Secretary: Smith nominates Vincent, seconded by Oeth. Vote: 5:0 Agenda Item 5 – Public Participation and Comment [6:10 p.m.] Public Comment: • Kathy Joyner: Thanks to board for past support on South Boulder Creek mitigation project. The board has been a significant part of how we’ve come this far today, and we appreciate your concern. So many living downstream, where the floodwaters overtopped US 36 in 2013, are grateful for the board’s support. We understand that in the coming weeks and months, staff will be presenting several conceptual flood mitigation alternatives for consideration. All concepts will have met a set of baseline criteria not the least of which, and of most interest to us, is the prevention of flood waters overtopping US 36, while also taking into consideration environmental concerns. We appreciate your support in getting this project completed as soon as possible. Please keep we, the “down-streamers,” in mind as so many continue to live in harm’s way. • Laura Tyler: South Boulder Creek action group. Here to compliment and support what her neighbor Kathy said. Thanks to the board for past support. The 2013 flood was devastating in their neighborhood. When the flood waters overtop US 36, it is life threatening to the residents WRAB Minutes 4/16/2018 Page No. 2 in this neighborhood. (Presented a photo to the board of several feet of water on a local street in the 2013 flood). This project is very important. At this point in the meeting (6:14 p.m.), the board made the decision to move the discussion of the South Boulder Creek Mitigation Project updates forward from Agenda 9 – Matters from Staff. This was to accommodate the interest of members of the public who attended for this issue. Regular agenda was resumed with Agenda 6 – Capital Improvements Program, at 7:02 p.m. The remainder of Matters from Staff was addressed in its scheduled order on the agenda. Agenda Item 6 – Information Item – Capital Improvements Program [7:02 p.m.] Ken Baird, Kevin Clark, Steve Buckbee, Pieter Beyer, Chris Douville and Joe Taddeucci presented this item. EXECUTIVE SUMMARY: As part of the city’s annual budget process, Utilities develops a six-year planning budget, this year for the time period of 2019 through 2024. The Water Resources Advisory Board (WRAB) role in this process is defined in the Boulder Revised Code: “. . . to review all environmental assessments and capital improvements conducted or proposed by the utilities division.” Within the budget process, City Council approves and appropriates funds only for the first year, 2019. This agenda item provides an opportunity for the WRAB to understand and discuss the CIP process. Last year’s CIP is included for reference as Attachment A. WRAB will be asked to make a recommendation to City Council regarding the 2019-2024 CIP and associated rate increases at its June meeting. The Planning Board will review the complete city CIP, including utilities, in July. City Council generally plans for two study sessions in September, prior to adopting the 2019 budget in October. WRAB Board Discussion Included: • Questions regarding how Boulder fees relate to the size and complexity of its infrastructure and how this compares to other communities along the Front Range. • Questions regarding Barker outlet gate rehabilitation. • Questions regarding the purpose of the Phosphorous Removal program. Whether it is motivated by regulatory concerns, community benefit, etc. • Questions about the technologies used for storm and flood sewer rehabilitation. • Questions around where changes are shown in the materials presented to the board. • Questions about changes in pipeline, syphon and penstock rehabilitation scheduling. • Questions about where Carter Lake Pipeline appears in the CIP program and where it is in the project process. • Question about Albion Reservoir rehabilitation in 2015 and 2017 and how it relates to the rehabilitation project being moved further out. • Questions about the rate increase projections. How this compares to the General Fund condition, and whether pushback on the utility rate increases from council is expected. • Questions about the cost of emergency repairs, as opposed to cost of normal rehabilitation. Agenda Item 7 – Information Item – Water Supply Update [8:14 p.m.] Joe Taddeucci presented this item. EXECUTIVE SUMMARY: This memo provides an update on 2018 water supply conditions and the city’s drought stage determination procedures as set forth in the Drought Plan (Attachment A). WRAB Board Discussion Included: • Questions about whether the “good” water status of the northern part of the state could augment the lower levels in the southern part of the state later in the year. WRAB Minutes 4/16/2018 Page No. 3 • Suggestion for updating the Drought Plan. This seems like a good year to get low pressure public input and update the plan. • Suggestion to work water sharing into the Drought Plan during the next update. • Questions about how the information on water supply will be disseminated to the public in May. Agenda Item 8 – Matters from the Board [8:36 p.m.] • Rose: Request for elaboration on the direction of the South Boulder Creek Flood Mitigation Plan: when the meetings are, and how materials will be released beforehand. Recommends more opportunities for large community meetings in addition to the small group meetings. Recommendations to be very clear what the goal is in all public meetings. What are the tradeoffs? • Smith: Suggestions for a way, such as a clicker system, to let people see how the small group meeting votes go. • Vincent: Felt that at the open house and meeting in March, there was not a good chance for the WRAB to have adequate conversation and input on the Twomile and Upper Goose Creek flood mitigation items. Twomile is an alluvial plain all the way through. Suggestions for two smaller channels instead of one to deal with downstream branching that is natural to alluvial plains. Expressed support for the concept of using roads as potential flood channels. • Vincent: Greenways Advisory Committee meeting is coming up this summer. He is happy to go as the WRAB’s representative but wants to check to see if anyone else on the WRAB would like to attend. He would like to recognize Annie Noble at that meeting for organizing the formation of the GAC. • Vincent: Went to the Water Now Alliance meeting and will talk about it at a later date. Agenda Item 9 – Matters from Staff • South Boulder Creek Flood Mitigation: [6:14 p.m.] Current variants for South Boulder Creek Flood mitigation were presented. Handouts for draft evaluation criteria were distributed. Next steps in public process concerning the variants and evaluation criteria were discussed. Board input was received. o Board Discussion Included:  Questions regarding specifics around the 72-hour retention limit.  Feedback that the “worst, better, best” evaluation method feels subjective. There may be ways to make it less so.  Questions on the “perceived level of importance” and it’s function within the evaluation system.  Concerns about the “perceived level of importance” criteria, based on who tends to participate in public process and when. Concerns that this might produce a result that does not actually reflect community perspective, or the best result for the community.  Questions regarding how the open house for April 23 is being advertised. Related concerns that the advertising provide a large and broad enough participant base to allow for accurate representation of the position of the broader community, rather than small, limited, or special interest perspective.  Questions regarding how much and in what ways CU has been in the loop in the process to date and will be kept in the loop going forward.  Questions about the format of the first open house.  Questions regarding reasons behind the pacing/length of the preliminary design phase.  Concerns regarding whether the initial evaluation phase is long enough to draw in an adequate representation of the community and take their input into account.  Request to make sure that when public outreach events, like open houses, are done, that the WRAB gets updated. WRAB Minutes 4/16/2018 Page No. 4 Agenda Item 10 – Discussion of Future Schedule [9:08 p.m.] May: Further discussion of the CIP, asset management implementation (tentative), other items that can be shifted earlier to make room for the flood studies to come back at a later date. Adjournment [9:08 p.m.] There being no further business to come before the Board at this time, by motion regularly adopted, the meeting was adjourned at 9:08 p.m. Motion to adjourn by: Smith Seconded by: Vincent Motion Passes 5:0 Date, Time, and Location of Next Meeting: The next WRAB meeting will be Monday, May 21, 2018 at 6:00 p.m., at the City's Municipal Services Center, 5050 Pearl St., Boulder, CO 80301 APPROVED BY: ATTESTED BY: Board Chair: _________________________ Board Secretary: ____________________________ Date: _______________________________ Date:______________________________________ An audio recording of the full meeting for which these minutes are a summary is available on the Water Resources Advisory Board web page. https://bouldercolorado.gov/boards-commissions/water-resources-advisory-board-next-meeting-agenda-and-packet WRAB 5/21/18 1 CITY OF BOULDER WATER RESOURCES ADVISORY BOARD AGENDA ITEM MEETING DATE: May 21, 2018 AGENDA TITLE: Information Item - Draft Proposed 2019 Utilities Budget (Water, Wastewater and Stormwater/ Flood Management) including the 6-year Capital Improvement Program (CIP) PRESENTERS: Jeff Arthur, Director of Public Works for Utilities Douglas Sullivan, Utilities Principal Engineer Ken Baird, Utilities Financial Manager EXECUTIVE SUMMARY: As part of the city’s annual budget process, Utilities develops a six-year planning budget, this year for the time period of 2019 through 2024. The Water Resources Advisory Board (WRAB) role in this process is defined in the Boulder Revised Code: “. . . to review all environmental assessments and capital improvements conducted or proposed by the utilities division.” Utilities staff has formulated initial revenue and expenditure projections for each of the three utility funds through the year 2024. Within the budget process, City Council approves and appropriates funds only for the first year, 2019. WRAB will be asked to make a recommendation to City Council regarding the 2019-2024 CIP at its June meeting. The Planning Board will review the complete city CIP, including utilities, in July. City Council will discuss the CIP in August at a study session, and the overall budget is scheduled to be adopted by City Council in October. This packet contains the draft proposed 2019 Utilities Budget and 2019-2024 Utilities CIP. The fund financials (Attachment A) have been updated to reflect actual revenues and expenditures for 2017, and the revised budget for 2018. At this point 2017 financial information is unaudited and may have some adjustments as fiscal year 2017 is closed out. The operating budget is in its early stages of development so related revisions are also anticipated. The draft proposed CIP spreadsheets for Water, Wastewater and Stormwater/Flood Management are included in Attachment B. FISCAL IMPACTS: Based on updates to the CIP and updated Fund Financials, staff is recommending revenue increases funded by rates of $2.1 million in the Water Fund, $1.1 million in Wastewater, and $600,000 in Stormwater/Flood Management. To achieve these revenue increases, the billed rate increases are estimated to be 7% in the Water Fund, 5% in the Wastewater Fund, and 5% in Stormwater/Flood Management. These were the anticipated rate increases for 2019 based on the six-year CIP presented through the 2018 budget process. WRAB 5/21/18 2 BOARD AND PUBLIC FEEDBACK: A public hearing and recommendation is scheduled for the June WRAB meeting. At the June meeting, staff will request that the WRAB provide a final recommendation to City Council regarding the proposed 2019-2024 CIP and associated rates changes. BACKGROUND and ANALYSIS: The preliminary draft 2019 budget provided with this memorandum reflects the following billed revenue increases: 7% Water, 5% Wastewater, and 5% Stormwater/Flood Management. The following table summarizes the 2018 adopted increase and preliminary projections for 2019- 2020. Table 1 – Proposed Rate Increases 2018 2019 2020 2021 Water 8% 7% 7% 7% Wastewater 5% 5% 5% 5% Stormwater/Flood Management 7% 5% 5% 5% Billed revenue increases are evaluated annually as part of the budget process to ensure that projected revenues match proposed expenditures. The expenses the utility incurs, ranging from electric bills to the cost of pipe, generally increase due to inflation. Another important factor considered in evaluating rate increases is the amount of infrastructure at or beyond the end of its useful life. Some of the infrastructure in the utilities is over 100 years old. Replacing aging infrastructure before it fails avoids impacts to the public and is more cost effective. The impact of a 1% increase in revenue varies across the three funds: Water $290,000 Wastewater $210,000 Stormwater / Flood Mgmt $115,000 Single Family Residential Customer Bill Impact Taking all these adjustments into account, the proposed preliminary 2019 revenue increases would increase a typical residential customer’s monthly utility bill by $5.34 or an increase of $64.11 annually. Additional information about cost comparisons will be provided as part of the staff presentation. WRAB 5/21/18 3 Table 2 – Typical Monthly Bill Impacts Monthly Bill 2018 Rates Monthly Bill 2019 Rates Monthly Difference Water $36.46 $39.01 $2.55 Wastewater $33.95 $35.65 $1.70 Stormwater/ Flood Mgmt $15.61 $16.39 $0.78 Total $86.02 $91.36 $5.03 ANTICIPATED REVENUE BONDS: The current 2019-2024 utility fund financials reflect several bond issuances (and associated debt payments) to fund the following capital projects. Utility revenue bonds are typically issued for a 20-year repayment. As a point of reference, $100,000 provides for debt service coverage on a bond of approximately $1,000,000. Water: 1. Barker Dam Outlet and Albion Dam Repair ($19 million in 2022) to fund aging dam infrastructure Wastewater: 1. Interceptor Sewer Realignment ($10 million in 2019) to fund replacement sewer 2. WWTF Biogas Project ($4 million in 2019) to replace co-generation system 3. Arapahoe Trunk Sewer ($13 million in 2022) to fund replacement sewer 4. WWTF Phosphorus Improvements ($18 million in 2022) to fund WWTF regulatory compliance upgrades. Stormwater and Flood Management: 1. South Boulder Creek Improvements Phase 1 project ($30 million in 2020) to fund improvements designed to mitigate flood hazards in the South Boulder Creek West Valley area. 2. Upper Goose Creek Stormwater and Flood Projects ($24 million in 2023) to fund improvements to both the stormwater and flood drainageway systems in Upper Goose Creek. The following table summarizes the debt obligations of the utilities, the year the debt is retired and the average annual debt payment. Items shown in italics are projects that are anticipated to be funded by issuing bonds. The decision to debt finance versus cash finance capital projects is generally determined by the total project cost and the timeline for completing the improvements. A major improvement project at a treatment facility would generally be very difficult to cash finance without a significant rate increase and is more practical to pay for over a 20-year period. Improvements to the distribution system (water pipes) are on an annual replacement program where cash funding is more cost effective. Planning for issuing debt for projects includes consideration of maintaining coverage ratios as required by bond covenants and maintaining strong bond ratings to keep interest costs low. It is also important to not use up all bonding WRAB 5/21/18 4 capacity within the utilities since new needs can develop from regulatory requirements or updates to asset condition. Table 4 – Debt Obligations Utility Projects Year Debt is Retired Approximate Annual Debt Payment Water Multiple Projects including Silver Lake Pipeline, Barker Purchase 2019 $2,524,000 Lakewood Pipeline 2021 $2,081,000 Betasso WTP Imp. 2036 $2,259,000 Carter Lake Pipeline and 63rd WTP Solar Project 2038 $2,590,000 Barker and Albion Dam Improvements (2022) 2042 $1,723,000 Wastewater WWTF Improvements 2025 $3,124,000 WWTF Improvements 2030 $674,000 Interceptor Sewer Realignment – 1 2035 $677,000 Interceptor Sewer Realignment – 2 and WWTF Biogas (2019) 2039 $1,141,000 WWTP Improvements – Reg 85 and Arapahoe Trunk Sewer (2022) 2042 $2,758,000 Storm/Flood Multiple projects including Goose Creek Improvements 2018 $383,000 Wonderland Creek and Four Mile Canyon Creek Imp. (2015) 2035 $1,590,000 South Boulder Creek Imp. (2020) 2040 $2,920,000 Upper Goose Creek Imp. (2023) 2043 $2,313,000 The utility continues to maintain a high credit rating, most recently Aa1 from Moody’s and AAA from Standard and Poor’s. The recent ratings report for the 2018 Water and Sewer Bonds stated this is due in part to “strong fiscal management” and maintaining sufficient reserves. Highlights of the 2019-2024 CIP Water Utility The Water Utility CIP will address a combination of source water and treated water needs focusing on the rehabilitation and replacement of existing assets. The source water system is comprised of numerous reservoirs, dams, gravity and pressure pipelines, and hydroelectric facilities that deliver water to the city’s two water treatment plants. The treated water system is comprised of two water treatment plants, six storage tanks, 460 miles of water main, and four hydroelectric facilities. WRAB 5/21/18 5 Much of the source water system infrastructure is approaching the end of its useful life. Water Fund capital investment over the next decade will focus on the Barker Gravity system which is 100+ years old. Utilities staff is recommending funding the complete replacement of this system over a 12-year period. This accelerated schedule (previously 15 years) is intended to minimize the water supply risk associated with the Barker Gravity system which provides approximately one third of the city’s total water supply. This work will involve replacement of the Barker Gravity pipeline including its seven siphons, and the Boulder Canyon penstock. Major improvements to the Barker Dam outlet works ($10M) and Albion Dam ($11M) are scheduled for 2022. There are several components of the treated water system that will continue to receive improvements in the upcoming years. The Betasso WTP Improvements project began in 2016 and will continue through early 2019. The Devils Thumb storage tank ($1.5M) is scheduled for rehabilitation in 2022. The treated waterline replacement program continues to replace approximately four miles (1% of the system) of waterline annually at a cost of approximately $3.5M. Lastly, Utilities staff will begin an assessment of the treated water transmission system (14-inch pipe and larger) in the upcoming years to evaluate the needs of that system. Wastewater Utility The Wastewater Utility CIP will address a combination of wastewater collection system and wastewater treatment needs focusing on the rehabilitation and replacement of existing assets. Utilities staff will continue with the annual wastewater collection system condition assessment and rehabilitation programs that address the city’s aging infrastructure. Utilities staff will also begin design and construction of several of the Wastewater Collection System Master Plan’s (WWCSMP) high priority (Tier 1) projects to address the system’s hydraulic limitations. Two of the four Tier 1 projects (Goose Creek Trunk sewer and the Foothills & Baseline Trunk sewer) were funded in last year’s CIP. The other two Tier 1 projects are funded in the 6-year CIP. These projects include the Interceptor Sewer Realignment project (2019 - $20M), and the Arapahoe Trunk Sewer project (2022 - $13M). There are several projects identified for the wastewater treatment facility (WWTF) in the six-year CIP. The largest project is the upcoming Regulation 85 CDPHE permit driven nutrient improvements project to address more stringent phosphorus regulations. Other projects include major electrical improvements (2018), the WWTF Biogas project (2019) secondary digester cover replacement (2020), the secondary clarifiers rehabilitation project (2021), the primary clarifiers rehabilitation project (2022), and the Phase 2 (2019) and Phase 3 (2024) instrumentation and controls (I&C) projects. Stormwater and Flood Management Utility The Stormwater and Flood Management Utility CIP will address a combination of major drainageway and storm sewer improvements focusing primarily on the development and construction of new assets. The focus for flood mitigation projects in the near-term is on Fourmile Canyon Creek upstream of 19th Street and South Boulder Creek detention upstream of Hwy US 36. These projects have been through an WRAB 5/21/18 6 extensive planning process and are intended to address areas with a high flood risk. Funding is also included for the design of improvements along Gregory Canyon Creek upstream of the Highland Bridge to address flooding up to a 10-year storm event. Funding is included for the Upper Goose Creek drainageway 19th street and Folsom, as well as storm sewer improvements between 4th street and 19th Street. There is also funding shown for Boulder Creek/Boulder Slough in anticipation of improvements in the Civic Area and development downstream of 30th Street. Capital improvements for the stormwater collection system will focus on expansion of the system into underserved areas and capacity improvements to address hydraulic bottlenecks identified in the 2017 Stormwater Master Plan (SMP). Underserved areas refer to locations that do not have existing storm sewer infrastructure or roadside ditch capacity to convey the 2-yr or 5-yr s torm event for residential and commercial areas respectively. Specific projects will include an expansion of the storm sewer system in the vicinity of Pearl Street from 17th Street to 21st Street. Major drainageway flood mitigation plans are underway in 2018 for Upper Goose Creek, Twomile Creek, Skunk Creek, King’s Gulch and Bluebell Creek. These plans will help identify future flood mitigation projects. In addition to these mitigation plans, an update to the Comprehensive Flood and Stormwater Utility Master Plan is planned. The master plan update will address policy level issues addressing the balance between major drainageway and storm sewer infrastructure needs. This master plan update will include a prioritization of the major drainageway programs as well as the need to add new, and rehabilitate existing, storm sewer infrastructure to help inform future CIP planning. Over $170 million of major drainageway improvements have been identified along Boulder Creek and the 14 tributaries. At current funding levels, it will take approximately 100 years to complete these improvements and most identified needs are not funded in the 6-year CIP. The prioritization study will identify the most critical needs and evaluate appropriate funding levels. Changes From the 2018-2023 CIP See Attachment B for the proposed 2019-2024 Water, Wastewater, and Stormwater/Flood Utility CIP’s, with changes indicated in red. Key changes from last year’s plan are highlighted below. Water Utility • The Barker Gravity System rehabilitation program funding has been increased for the next decade. The changes from last year’s CIP include the following: a. A 12-yr (instead of 15-yr) pipeline replacement schedule ($43M) b. Dedicated funding for the pipeline’s siphons ($3.4M over 6 years) c. Dedicated funding for the Boulder Canyon Penstock repairs ($14M over 12 years) • The Albion Dam rehabilitation funding ($11M) was moved from 2019 to 2022 • The Barker Dam Outlet works ($10M) rehabilitation funding was moved from 2020 to 2022 WRAB 5/21/18 7 • Maxwell, Orodell and Sunshine Hydros O&M funding was added ($535,000) in 2019, 2020, and 2021 respectively • Green Lake Dam funding ($6M) was postponed from 2022 to 2025 • Wittemyer Ponds funding ($6.5M) was postponed from 2021 to 2025 Wastewater Utility • The Interceptor Sewer Realignment project bond ($10M) was moved from 2018 to 2019. • The WWTF Biogas project has been added to the 6-year CIP in 2019. This project will replace the aging cogeneration system and is estimated at $4M. The cogeneration system is beyond its useful life and additional investment in the system is not recommended. • The WWTF primary clarifiers rehabilitation project funding been greatly reduced after a 2017 inspection indicated that minor repairs, rather than complete replacement, will be adequate to ensure the facility’s continued operation. The anticipated replacement funding has been moved from 2022 to 2029 and reduced from $9M to $3M. Funding of $500,000 has been identified in 2022 for repairs. • Secondary Clarifiers funding of $500,000 has been identified in 2021 for repairs • WWTF Regulation 31 funding was postponed from 2029 to 2043 Stormwater and Flood Management Utility • South Boulder Creek bond funding of $30M was moved from 2019 to 2020 to better align with the Boulder Valley Comprehensive Plan Update and associated land use decision on the CU South property. • The Upper Goose Creek area remains a high priority for both major drainageway improvements and storm sewer improvements. The Upper Goose major drainageway (open channel) and the Upper Goose Creek storm sewer (pipes) funding has been combined into a single project to address both components. Additional funding for property acquisition may be required to purchase various existing structures to accommodate drainageway improvements. a. Previous CIP’s identified major drainageway funding of $5.5M in year’s 2019-2023 to schedule the major drainageway work between 19th Street & Folsom Avenue before the upstream storm sewer improvements b. Previous CIP’s identified storm sewer improvements bond funding of $13M in 2023 to follow the competed major drainageway work. c. The Upper Goose Creek project funding is now identified in 2023 at $24M to cover both project components. It is anticipated the channel improvements between 19th Street and Folsom Avenue will be completed in collaboration with the recommended storm sewer improvements between 4th Street and 19th Street. • A new line item has been identified for Drainageway Maintenance and Enhancement that will be funded at $500,000 per year. This line item is to fund routine maintenance and minor enhancements on existing improved and unimproved drainageways. BUDGET SCHEDULE: The current schedule of major budget milestones is provided below. Elements involving the WRAB are highlighted in bold italics. WRAB 5/21/18 8 Milestone Date WRAB meeting – review Draft CIP May 21, 2018 Proposed Budget Submittal to City Manager June 4, 2018 WRAB Recommendation on CIP/Budget June 18, 2018 Planning Board CIP Hearing July 19, 2018 City Council Study Session on Budget (CIP) Aug. 14, 2018 City Council Study Session on Budget Sept. 11, 2018 City Council Study Session on Budget (if needed) Sept. 25, 2018 City Council Consideration/Adoption of Budget Oct. 2 and Oct. 16, 2018 NEXT STEPS: Staff will present additional information to the WRAB at the May 21 meeting and staff is seeking feedback on the draft proposed CIP, updated financial information, and potential rate impacts. This feedback will be considered in finalizing the proposed budget that will be presented at the June 18, 2018 WRAB meeting. At that meeting, staff will request that WRAB provide a final recommendation concerning the proposed 2019-2024 CIP to Planning Board and City Council. Attachments: A: Fund Financials – Water, Wastewater, Stormwater/Flood Management B: Draft Proposed 2019-2024 CIP, Water, Wastewater, Stormwater/Flood Management Attachment A - Water Fund Financial DRAFT PROPOSED CITY OF BOULDER 2018 WATER FUND FINANCIAL 13 5678910 1112131415162021222425262728303132333435363738394041434546 A B H J L N P R T V 2017 2018 2019 2020 2021 2022 2023 2024ActualRevisedProposedProjectedProjectedProjectedProjectedProjected Beginning of Year Fund Balance 69,600,453$ 48,070,323$ 28,987,276$ 29,208,544$ 29,203,500$ 28,979,136$ 28,340,292$ 28,920,060$ Sources of Funds Operating-8.0%8.0%7.0%7.0%7.0%5.0%5.0%4.0% Sale of Water to General Cust 26,379,588$ 27,553,185$ 29,312,698$ 30,895,738$ 32,564,184$ 34,322,641$ 35,499,812$ 36,717,300$ Projected Rate Increase 2,204,255 2,051,889 2,162,702 2,279,493 1,716,132 1,774,991 1,468,692 Bulk/Irrigation Water Sales 308,418 143,050 143,050 143,050 143,050 143,050 143,050 143,050 Hydroelectric Revenue 1,922,643 1,847,009 1,924,000 1,847,009 1,847,009 1,847,009 1,847,009 1,847,009 Miscellaneous Operating Revenues 29,202 25,000 25,000 25,000 25,000 25,000 25,000 25,000 Plant Investment Fees 2,726,168 2,400,000 2,400,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 Connection Charges 174,766 130,000 130,000 130,000 130,000 130,000 130,000 130,000 Special Assessments 33,347 5,000 5,000 5,000 5,000 5,000 5,000 5,000 Interest on Investments 655,913 381,789 362,341 438,128 438,052 434,687 425,104 433,801 Rent, assessments and other misc revenues 631,465 20,500 20,500 20,500 20,500 20,500 20,500 20,500 Sale of Real Estate - - - - - - - Transfer from General Fund - Fire Training Center 106,573 92,785 92,785 92,785 92,785 92,785 92,785 - Projected Bond Proceeds - 34,800,000 - - - 19,154,373 - - Total Sources of Funds $32,968,082 69,602,572$ 36,467,263$ 37,759,912$ 39,545,073$ $59,891,178 41,963,250$ 42,790,352$ Uses of Funds Operating- Administration 1,457,046$ 1,531,408$ 1,577,350$ 1,624,670$ 1,673,410$ 1,723,613$ 1,775,321$ 1,828,581$ Planning and Project Management 521,169 655,669 675,339$ 695,599 716,467 737,961 760,100 782,903 Water Resources and Hydroelectric Operations 2,653,945 3,039,373 3,130,554$ 3,224,471 3,321,205 3,420,841 3,523,467 3,629,171 Water Treatment 4,817,236 4,897,926 4,927,864$ 5,075,700 5,227,971 5,384,810 5,546,355 5,712,745 Water Quality and Environmental Svcs 1,113,653 1,372,649 1,413,828$ 1,456,243 1,499,930 1,544,928 1,591,276 1,639,014 System Maintenance 3,256,940 3,099,407 3,192,389$ 3,288,160 3,386,805 3,488,409 3,593,062 3,700,854 Windy Gap Payment 518,167 518,167 533,712$ 549,724 566,215 583,202 600,698 618,719 Proposed Additions Valves and Roadbase Crushing - - 250,000 257,500 265,225 273,182 281,377 289,819 TOTAL OPERATING USES OF FUNDS $14,338,157 $15,114,598 15,701,036$ $16,172,068 $16,657,230 17,156,946$ $17,671,655 $18,201,804 WATER UTILITY Attachment A - Water Fund Financial DRAFT PROPOSED CITY OF BOULDER 2018 WATER FUND FINANCIAL 13 56 A B H J L N P R T V 2017 2018 2019 2020 2021 2022 2023 2024ActualRevisedProposedProjectedProjectedProjectedProjectedProjected WATER UTILITY 47495051525355565758596061626465666769717374757677787980818283848586878889909192939495 Debt- Refunding of the 1999 and 2000 Revenue Bonds 2,524,233$ 2,524,650$ 1,375,102$ -$ -$ -$ -$ -$ Lakewood 2001 Rev Bond; Refunded in 2012 2,062,925 2,072,083 2,080,817 2,081,367 2,088,883 - - - Projected Bond-Betasso WTP Improvements 2,259,081 2,260,181 2,255,681 2,260,681 2,259,981 2,258,681 2,256,781 2,259,281 Projected Bond-NCWCD Conveyance Line - 3,593,523 2,589,800 2,589,800 2,589,800 2,589,800 2,589,800 2,589,800 Projected Bond - Barker/Albian/Green Lake - -- - - 1,723,894 1,723,894 1,723,894 TOTAL DEBT SERVICE $6,846,239 $10,450,437 $8,301,400 $6,931,848 $6,938,664 $6,572,375 $6,570,475 $6,572,975 Transfers - Cost Allocation 1,517,513$ 1,563,038$ 1,719,342$ 1,891,276$ 2,080,404$ 2,288,444$ 2,517,288$ 2,769,017$ Planning & Development Services 267,989 308,419 317,672 327,202 337,018 347,128 357,542 368,268 Transportation - Admin Support 16,300 16,300 16,789 17,293 17,811 18,346 18,896 19,463 FAM - Municipal Services Center Improvements 80,000 - - - - - - - TOTAL TRANSFERS OUT $1,881,802 $1,887,757 $2,053,802 $2,235,770 $2,435,233 $2,653,918 $2,893,727 $3,156,749 Capital 10,988,419$ 10,834,809.54 10,189,756 12,425,271 13,738,310 14,992,410 14,247,626 15,406,559 Projected Bond - Betasso WTP IMP 20,442,470$ -$ -$ -$ -$ -$ -$ -$ Projected Bond - Carter Lake Pipeline - 31,700,000 - - - - - - Projected Bond - Barker Dam/Albian - -- - - 18,904,373 - - Projected Bond - Issuance Costs 1,125 350,000 - - - 250,000 - - Projected Bond - Betasso Solar - 2,750,000 - - - - - - Encumbrances, Carryover and Adjustments to Base - 15,598,017 - - - - - - Total Uses of Funds $54,498,212 $88,685,619 36,245,995$ $37,764,957 39,769,436$ 60,530,022$ 41,383,482$ 43,338,086$ Ending Fund Balance Before Reserves 48,070,323$ 28,987,276$ 29,208,544$ 29,203,500$ 28,979,136$ 28,340,292$ 28,920,060$ 28,372,325$ Reserves Bond Reserve 2,081,429$ 2,081,429$ 2,081,429$ 2,081,429$ 2,081,429$ -$ -$ -$ Lakewood Pipeline Remediation Reserve 16,453,893 16,919,884 17,385,876 17,851,867 18,317,858 18,317,858 18,317,858 18,317,858 Carter Lake Pipeline Reserve - 1,530,697 1,530,697 1,530,697 - - - - FEMA Deobligation Reserve 87,951 87,951 87,951 87,951 87,951 87,951 87,951 87,951 Sick/Vacation/Bonus Reserve 584,448 601,981 620,041 638,642 657,801 677,535 697,861 718,797 Pay Period 27 Reserve 295,411 320,411 345,411 370,411 395,411 420,411 445,411 470,411 Operating Reserve 4,054,990 4,250,589 4,438,710 4,601,959 4,773,116 4,952,716 5,141,345 5,339,638 Capital Reserve 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 Total Reserves 25,558,122$ 27,792,942$ 28,490,114$ 29,162,956$ 28,313,566$ 26,456,471$ 26,690,427$ 26,934,655$ Ending Fund Balance After Reserves 22,512,201$ 1,194,334$ 718,430$ 40,544$ 665,570$ 1,883,820$ 2,229,633$ 1,437,670$ Note:718,430$ Operating reserve levels are based on industry standards and are maintained for revenue bonds, revenue fluctuations (weather and water usage impacts) and the capital intensive nature of the utility. Attachment A - Wastewater Fund Financial PROPOSED CITY OF BOULDER 2018 WASTEWATER FUND FINANCIAL 2345678 91011131718192021222325272829303132333435364041424344454647485051 A B Q S U W Y AA AC AE 2017 2018 2019 2020 2021 2022 2023 2024 Actual Revised Proposed Projected Projected Projected Projected Projected Beginning Fund Balance 24,191,719$ 23,784,225$ 7,168,005$ 7,423,677$ 6,480,181$ 6,450,990$ 9,191,943$ 8,843,463$ Sources of Funds Operating-5.0%5.0%5.0%5.0%5.0%5.0%5.0%5.0% Sewer Charges to General Customers 19,019,241$ 20,266,497$ 21,067,023$ 21,899,171$ 22,764,188$ 23,663,373$ 24,598,076$ 25,569,700$ Projected Rate Increase 1,013,325 1,053,351 1,094,959 1,138,209 1,183,169 1,229,904 1,278,485 Surcharge/ Pretreatment Fees 185,453 142,353 142,353 142,353 142,353 142,353 142,353 142,353 Plant Investment Fees 801,485 750,000 750,000 750,000 750,000 750,000 750,000 750,000 Connection Charges 7,617 10,000 10,000 10,000 10,000 10,000 10,000 10,000 Special Assessments - 25,000 25,000 25,000 25,000 25,000 25,000 25,000 Federal & State Grants 426,375 - - - - - - - Interest on Investments 198,842 192,788 215,040 222,710 194,405 193,530 275,758 265,304 Rent and other miscellaneous revenue 29,714 1,000 1,000 1,000 1,000 1,000 1,000 1,000 Cogen revenues - - 175,000 350,000 350,000 350,000 350,000 350,000 Bond Proceeds - 3,681,920 14,259,920 - - 34,729,485 - - Total Sources of Funds 20,668,729$ 26,082,882$ 37,698,687$ 24,495,192$ 25,375,156$ 61,047,910$ 27,382,092$ 28,391,842$ Uses of Funds Operating- Administration 872,387$ 971,569$ 1,000,716$ 1,030,738$ 1,061,660$ 1,093,509$ 1,126,315$ 1,160,104$ Planning and Project Management 297,835 394,740 406,582 418,779 431,343 444,283 457,611 471,340 Wastewater Quality & Environmental Svcs 1,418,983 1,283,939 1,322,457 1,362,131 1,402,995 1,445,085 1,488,437 1,533,090 System Maintenance 1,916,927 1,881,206 1,937,642 1,995,771 2,055,644 2,117,314 2,180,833 2,246,258 Wastewater Treatment 5,127,884 4,994,286 5,144,115 5,298,438 5,457,391 5,621,113 5,789,746 5,963,439 TOTAL OPERATING USES OF FUNDS 9,634,016 9,525,740 9,811,512 10,105,857 10,409,033 10,721,304 11,042,943 11,374,231 Debt-- 2012 Refunding of the WWTP 2005 Revenue Bond 3,177,699$ 3,162,250$ 3,154,750$ 3,142,250$ 3,124,750$ 3,127,250$ 3,128,500$ 3,128,500$ WWTP UV, Digester, Headworks Imp 2010 Rev Bond 670,938 673,838 675,188 671,088 671,688 671,838 671,538 669,438 Sanitary Sewer Rehabilitation Bond 2015 675,065 677,731 679,531 676,131 677,631 678,931 680,581 676,781 Foothills Baseline Sewer Bond 2018 - 225,200 230,830 230,830 230,830 230,830 230,830 230,830 Interceptor Sewer Bond 2019 - -1,140,794 1,140,794 1,140,794 1,140,794 1,140,794 1,140,794 WWTP Nutrient Compliance and Trunk SewerBond 2022 2,758,359 2,758,359 2,758,359 TOTAL DEBT SERVICE 4,523,702 4,739,019 5,881,093 5,861,093 5,845,693 8,608,001 8,610,601 8,604,701 - Attachment A - Wastewater Fund Financial PROPOSED CITY OF BOULDER 2018 WASTEWATER FUND FINANCIAL 234 A B Q S U W Y AA AC AE 2017 2018 2019 2020 2021 2022 2023 2024 Actual Revised Proposed Projected Projected Projected Projected Projected52535455565760616364656667686970717273747576777879838485868788899091 Transfers- Cost Allocation 923,144$ 950,838$ 1,045,922$ 1,150,514$ 1,265,565$ 1,392,122$ 1,531,334$ 1,607,901$ Planning & Development Services 265,746 305,838 315,013 324,463 334,197 344,223 354,550 365,187 Transportation - Admin Support 16,300 16,300 16,789 17,293 17,811 18,346 18,896 19,463 FAM - Municipal Services Center Improvements 40,000 - - - - - - - TOTAL TRANSFERS OUT 1,245,190 1,272,976 1,377,724 1,492,270 1,617,573 1,754,691 1,904,780 1,992,551 Capital Improvement Program 3,247,715$ 14,637,217$ 6,112,767$ 7,979,469$ 7,532,047$ 2,493,476$ 6,172,247$ 9,180,809$ Additional CIP - - - - - - - - Projected Bond-Cogeneration - - 4,000,000 - - - - - Sanitary Sewer Rehabilitation Bond 2015 2,425,600 - - - - - - - Projected Bond-Sanitary Sewer Rehab - 3,497,000 10,059,920 - - - - - WWTF Permit Impr. and Sanitary Sewer Bond 2022 - - - - 34,479,485 Bond Issuance Costs - 125,000 200,000 - - 250,000 - - Carryover, Encumbrances and Adjustments to Base - 8,902,151 - - - - - - Total Uses of Funds 21,076,223$ 42,699,102$ 37,443,015$ 25,438,689$ 25,404,346$ 58,306,957$ 27,730,571$ 31,152,293$ Ending Fund Balance Before Reserves 23,784,225$ 7,168,005$ 7,423,677$ 6,480,181$ 6,450,990$ 9,191,943$ 8,843,463$ 6,083,013$ Reserves Bond Reserves 670,139$ 670,139$ 670,139$ 670,139$ 670,139$ 670,139$ 670,139$ 670,139$ FEMA Deobligation Reserve 36,445$ 36,445$ 36,445$ 36,445$ 36,445$ 36,445$ 36,445$ 36,445$ Sick/Vacation/Bonus Reserve 287,256 295,873 304,750 313,892 323,309 333,008 342,998 353,288 Pay Period 27 Reserve 233,524 243,524 253,524 263,524 273,524 283,524 293,524 303,524 Operating Reserve 2,719,802 2,699,679 2,797,309 2,899,532 3,006,652 3,118,999 3,236,931 3,341,696 Capital Reserve 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 Total Reserves 4,447,165$ 4,445,660$ 4,562,166$ 4,683,532$ 4,810,068$ 4,942,115$ 5,080,037$ 5,168,647$ Ending Fund Balance After Reserves 19,337,059$ 2,722,344$ 2,861,510$ 1,796,649$ 1,640,922$ 4,249,828$ 3,763,426$ 914,366$ Note: Operating reserve levels are based on industry standards and are maintained for revenue bonds, revenue fluctuations (weather and water usage impacts) and the capital intensive nature of the utility. Attachment A - Stormwater/Flood Fund Financial PROPOSED CITY OF BOULDER 2018 STORMWATER/FLOOD FUND FINANCIAL 23456789101116171819202124262728293031323334353639404143444546474849505152535455 A B M O Q S U W Y AA 2017 2018 2019 2020 2021 2022 2023 2024 Actual Revised Proposed Projected Projected Projected Projected Projected Beginning Fund Balance 39,285,642$ 33,101,516$ 13,879,959$ 17,646,751$ 17,714,078$ 13,515,213$ 14,206,116$ 12,997,071$ Sources of Funds Operating-8%7%5%5%5%5%5%5% Service Charge Fees 10,801,045$ 10,818,587$ 11,599,040$ 12,203,350$ 12,839,145$ 13,508,064$ 14,211,834$ 14,952,271$ Projected Rate Increases 757,301 579,952 610,168 641,957 675,403 710,592 747,614 Plant Investment Fees 876,326 350,000 200,000 200,000 200,000 200,000 200,000 200,000 Urban Drainage District Funds 985,403 947,940 1,000,000 400,000 400,000 400,000 400,000 400,000 State and Federal Grants 2,817,368 - - - - - - - Interest on Investments 430,444 220,922 208,199 176,468 177,141 135,152 142,061 129,971 Intergovernmental Transfers (KICP Program)58,325 152,982 157,571 162,298 167,167 172,182 177,348 182,668 Rent and other miscellaneous revenue 25,306 9,000 9,000 9,000 9,000 9,000 9,000 9,000 Projected Bonds 0 0 - 30,741,000 0 0 24,594,738 - Total Sources of Funds 15,994,216$ 13,256,732$ 13,753,763$ 44,502,284$ 14,434,410$ 15,099,802$ 40,445,573$ 16,621,523$ Uses of Funds Operating- Administration 578,815$ 571,909$ 589,066$ 606,738$ 624,940$ 643,688$ 662,999$ 682,889$ Planning and Project Management 1,236,834 1,284,220 1,322,746 1,362,429 1,403,302 1,445,401 1,488,763 1,533,426 Stormwater Contract Management 91,389 96,775 99,678 102,669 105,749 108,921 112,189 115,554 Stormwater Quality and Education 776,082 991,243 1,020,980 1,051,610 1,083,158 1,115,653 1,149,122 1,183,596 System Maintenance 1,657,408 1,520,902 1,566,529 1,613,525 1,661,931 1,711,789 1,763,143 1,816,037 Proposed Additions Homeless Camps/Bucket Machine - - 310,000 164,800 169,744 174,836 180,081 185,484 TOTAL OPERATING USES OF FUNDS 4,340,528 4,465,049 4,909,000 4,901,770 5,048,823 5,200,288 5,356,297 5,516,986 Debt-- Refunding of the Goose Creek 1998 Revenue Bond 386,138$ 381,100$ -$ -$ -$ -$ -$ -$ Projected Bond - South Boulder Creek 2020 - - - 2,920,395 2,920,395 2,920,395 2,920,395 2,920,395 Wonderland Creek 2015 Revenue Bond 1,590,875 1,589,588 1,591,088 1,591,688 1,591,388 1,590,188 1,588,088 1,590,088 Projected Bond - Goose Creek 2023 - - - - - - 2,312,750 2,312,750 TOTAL DEBT SERVICE 1,977,013 1,970,688 1,591,088 4,512,083 4,511,783 4,510,583 6,821,233 9,135,983 Transfers- Cost Allocation 339,247$ 349,424$ 384,366$ 422,803$ 465,083$ 511,592$ 537,171$ 564,030$ Planning & Development Services 161,235 185,560 191,127 196,861 202,767 208,850 215,115 221,569 Transportation - Admin Support 8,149 8,149 8,149 8,149 8,149 8,149 8,149 8,149 FAM - Municipal Services Center Improvements 40,000 0 0 0 0 0 0 0 TOTAL TRANSFERS OUT 548,631 543,133 583,642 627,813 675,999 728,590 760,435 793,747 Attachment A - Stormwater/Flood Fund Financial PROPOSED CITY OF BOULDER 2018 STORMWATER/FLOOD FUND FINANCIAL 234 A B M O Q S U W Y AA 2017 2018 2019 2020 2021 2022 2023 2024 Actual Revised Proposed Projected Projected Projected Projected Projected5657585961626364656667686970717273747879808182 Capital $15,312,170 $7,056,155 $2,903,241 $3,652,290 $8,396,670 $3,969,437 $4,121,915 $4,289,691 Projected Bond - Goose Creek - - - - - - 24,344,738 Projected Bond - South Boulder Creek - - - 30,416,000 - - - - Projected Bond Issuance Costs - - - 325,000 - - 250,000 - Encumbrances, Carryover and Adjustments to Base - 18,443,265 - - - - - - Total Uses of Funds 22,178,342$ 32,478,289$ 9,986,971$ 44,434,956$ 18,633,275$ 14,408,898$ 41,654,618$ 19,736,407$ Ending Fund Balance Before Reserves 33,101,516$ 13,879,959$ 17,646,751$ 17,714,078$ 13,515,213$ 14,206,116$ 12,997,071$ 9,882,187$ Reserves Bond Reserves 2,312,552$ 1,987,568$ 1,987,568$ 1,987,568$ 1,987,568$ 1,987,568$ 4,300,318$ 4,300,318$ Post Flood Property Acquisition 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 1,050,000 FEMA Deobligation Reserve 41,750 41,750 41,750 41,750 41,750 41,750 41,750 41,750 Sick/Vacation/Bonus Reserve 125,157 128,912 132,779 136,763 140,866 145,092 149,444 153,928 Pay Period 27 Reserve 86,602 102,602 118,602 134,602 150,602 166,602 182,602 198,602 Operating Reserve 1,222,290 1,252,045 1,373,161 1,382,396 1,431,206 1,482,220 1,529,183 1,577,683 Capital Reserve 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 Total Reserves 5,038,351$ 4,762,878$ 4,903,860$ 4,933,079$ 5,001,991$ 5,073,231$ 7,453,298$ 7,522,281$ Ending Fund Balance After Reserves $28,063,165 $9,117,082 $12,742,891 $12,780,999 8,513,221$ $9,132,885 5,543,774$ $2,359,906 Attachment B - Draft Proposed 2019-2024 Water Fund CIP 1234567891011121314151617182122242532363841424346474849535455565758596263646566676869767778 A N O P Q R S CITY OF BOULDER 2019-2024 CAPITAL IMPROVEMENT PROGRAM WATER UTILITY FUND 2019 2020 2021 2022 2023 2024 PROJECT NAME PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED Treated Water Pressure Reducing and Hydroelectric Facilities Kohler Hydro/PRV Facility $100,000 $0 $0 $0 $0 $0 Maxwell Hydro/PRV Facility $100,000 $185,000 $100,000 $0 $0 $0 Orodell Hydro/PRV Facility $100,000 $100,000 $0 $0 $0 $0 Sunshine Hydro/PRV Facility $0 $0 $150,000 $150,000 $0 $0 Pearl Street Hydro/PRV Facility $243,331 $0 $0 $0 $0 $0 Subtotal - Treated Water PRV and Hydro $543,331 $285,000 $250,000 $150,000 $0 $0 Water Treatment Facilities Equipment Replacement $100,000 $100,000 $50,000 $52,000 $54,080 $56,243 Bond Issuance Costs $0 $0 $0 $250,000 $0 $125,000 Boulder Reservoir WTF $0 $600,000 $0 $0 $0 $0 Subtotal - Water Treatment Facilities $100,000 $700,000 $50,000 $302,000 $54,080 $181,243 Treated Water Storage Tanks Devil's Thumb Storage Tank $0 $0 $0 $1,486,874 $0 $0 Chautauqua Storage Tank $0 $0 $0 $0 $848,546 $0 Subtotal - Treated Water Storage Tanks $0 $0 $0 $1,486,874 $848,546 $0 Treated Water Distribution System Waterline Replacement $3,771,624 $3,922,489 $4,079,389 $4,242,564 $4,412,267 $4,588,757 Subtotal - Treated Water Distribution System $3,771,624 $3,922,489 $4,079,389 $4,242,564 $4,412,267 $4,588,757 Treated Water Transmission System Zone 1 Transmission Pipes $0 $626,601 $651,665 $677,732 $704,841 $733,035 Zone 2 Transmission Pipes $0 $909,016 $945,377 $983,192 $1,022,519 $1,063,420 Zone 3 Transmission Pipes 0 $467,460 $486,158 $505,605 $525,829 $546,862 Subtotal - Treated Water Transmission System $0 $2,003,077 $2,083,200 $2,166,528 $2,253,189 $2,343,317 Source Water Transmission System Lakewood Pipeline $0 $0 $0 $0 $0 $384,864 Subtotal - Source Water Transmission System $0 $0 $0 $0 $0 $384,864 Barker Water System Barker Gravity Pipeline Repair $3,191,674 $3,309,341 $3,431,715 $4,558,983 $3,691,342 $3,828,996 Barker Gravity Pipeline - Siphon Replacement $951,808 $449,946 $187,177 $778,658 $506,128 $526,373 Barker-Kossler Penstock Repair $100,000 $937,012 $974,492 $1,013,472 $1,054,011 $1,096,171 Barker Dam Outlet $200,000 $0 $903,732 $0 $0 $0 Barker Dam Outlet - Bond Proceeds $0 $0 $0 $9,037,318 $0 $0 Kossler Dam $0 0 0 $50,000 $300,000 $100,000 Subtotal - Barker Water System $4,443,482 $4,696,298 $5,497,116 $15,438,431 $5,551,481 $5,551,540 Attachment B - Draft Proposed 2019-2024 Water Fund CIP 12345678 A N O P Q R S CITY OF BOULDER 2019-2024 CAPITAL IMPROVEMENT PROGRAM WATER UTILITY FUND 2019 2020 2021 2022 2023 2024 PROJECT NAME PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED 7980848890919293 94959798100104107 108 109110111113114115117120121122123 124 129130132133138139140141 Raw Water Storage Reservoirs Albion Dam - Bond Proceeds $0 $0 $986,706 $9,867,055 $0 $0 Green Lake 2 Dam $0 $0 $0 $0 $75,000 $547,553 Boulder Reservoir $0 $118,434 $0 $0 $0 $0 Skyscraper Dam $0 $0 $171,071 $0 $0 $0 Wittemyer Ponds $0 $0 $0 $0 $100,000 $576,372 Subtotal - Raw Water Storage Reservoirs $0 $118,434 $1,157,777 $9,867,055 $175,000 $1,123,925 Other Raw Water Facilities Farmer's Ditch $0 $0 $136,857 $0 $0 $0 Source Water Facilities Rehab Program $162,240 $168,730 $175,479 $182,498 $189,798 $197,390 Watershed Improvements $200,000 $30,000 $30,000 $30,000 $30,000 $30,000 Instream Flow Structures and Gaging $50,000 $10,000 $10,000 $10,000 $10,000 $10,000 NCWCD Conveyance - CLP Maintenance $0 $160,000 $160,000 $160,000 $160,000 $160,000 Subtotal - Other Raw Water Facilities $412,240 $368,730 $512,336 $382,498 $389,798 $397,390 Source Water Pressure Reducing, Pumping and Hydroelectric Lakewood Hydroelectric/PRV $300,000 $0 $50,000 $0 $0 $0 Silver Lake Hydroelectric/PRV $200,000 $0 $0 $0 $250,000 $0 Hydroelectric Facilities Rehabilitiation Program $54,080 $56,243 $58,493 $60,833 $63,266 $65,797 Betasso Hydroelectric / Pressure Reducing Facility $200,000 $150,000 $0 $0 $0 $0 Barker Dam Hydroelectric $0 $0 $0 $50,000 $0 $0 Boulder Canyon Hydroelectric $75,000 $0 $0 $0 $250,000 $0 Carter Lake Hydroelectric $0 $0 $0 $0 $0 $0 Carter Lake Hydro $0 $0 $0 $0 $0 $0 Source Water Pressure Reducing, Pumping and Hy $0 $0 $0 $0 $0 $0 Subtotal - Source Water PRV, Pumping and Hydro $829,080 $206,243 $108,493 $110,833 $563,266 $65,797 Water System Monitoring and Metering Automated Meter Reading $0 $0 $0 $0 $0 $769,727 Water System Security/Quality Improvements $90,000 $0 $0 $0 $0 $0 Source Water Monitoring and Protection $0 $0 $0 $0 $0 $0 Utility Billing Computer System $0 $125,000 $0 $0 $0 $0 Subtotal - Water System Monitoring and Metering $90,000 $125,000 $0 $0 $0 $769,727 TOTAL CAPITAL USES OF FUNDS $10,189,756 $12,425,271 $13,738,310 $34,146,783 $14,247,626 $15,406,559 Attachment B - Draft Proposed Wastewater 2019-2024 CIP 1 2 345678910111417181920212325262931323337384243444546474851585960646566 A N O P Q R S CITY OF BOULDER DRAFT RECOMMENDED 2019 - 2024 CAPITAL IMPROVEMENT PROGRAM WASTEWATER UTILITY FUND 2019 2020 2021 2022 2023 2024 PROJECT NAME PROJECTED PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED Wastewater Treatment WWTF Pumps $75,000 $75,000 $0 $150,000 $0 $0 WWTF Permit Improvements $100,000 $919,232 $1,838,463 $0 $71,166 $0 WWTF Permit Improvements - Proj. Bond $0 $0 $0 $18,384,634 $0 $0 WWTF Instrumentation/Control $1,012,255 $151,838 $0 $0 $292,496 $2,924,963 WWTF Electrical $0 $0 $0 $0 $0 $0 WWTF Activated Sludge $189,798 $0 $0 $0 $0 $230,918 WWTF Primary Clarifiers $115,000 $0 $50,000 $500,000 $0 $0 WWTF Secondary Clarifiers $0 $50,000 $500,000 $0 $0 $0 WWTF Rehabilitation $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 WWTF Cogeneration $4,000,000 $0 $0 $0 $0 $0 WWTF Digester Complex $200,000 $2,000,000 $0 $0 $0 $0 WWTF Digester Cleaning $0 $136,857 $0 $0 $0 $0 Bond Issuance Costs $200,000 $0 $0 $250,000 $0 $0 Subtotal - Wastewater Treatment Plant $6,142,053 $3,582,927 $2,638,463 $19,534,634 $613,662 $3,405,881 Wastewater System Monitoring and Metering Utility Billing Computer System $0 $65,000 $0 $0 $0 $0 Subtotal - Monitoring and Metering $0 $65,000 $0 $0 $0 $0 Collection and Conveyance System Rehabilitation Collection System Monitoring $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 Condition Assessment Program $674,918 $701,915 $729,992 $759,191 $1,067,484 $1,110,183 Sanitary Sewer Rehabilitation $3,102,465 $3,226,563 $3,355,626 $3,489,851 $3,629,445 $3,774,623 Sanitary Sewer Manhole Rehabilitation $243,331 $253,064 $657,966 $684,285 $711,656 $740,122 Arapahoe Trunk Sewer Replacement $0 $0 $0 $12,605,000 0 $0 Subtotal - Sewer System Rehabilitation $4,170,714 $4,331,542 $4,893,584 $17,688,327 $5,558,585 $5,774,928 TOTAL CAPITAL USES OF FUNDS $10,312,767 $7,979,469 $7,532,047 $37,222,961 $6,172,247 $9,180,809 Attachment B - Draft Proposed Stormwater/Flood Management 2019-2024 CIP 1 2 3456789111314202426333537383940474849505557585965666768697071 A L M N O P Q CITY OF BOULDER DRAFT 2019-2024 CAPITAL IMPROVEMENT PROGRAM STORMWATER AND FLOOD MANAGEMENT UTILITY FUND 2019 2020 2021 2022 2023 2024 PROJECT NAME PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED Major Drainageways Goose Creek $0 $0 $0 $0 $0 $0 South Boulder Creek - Bond Proceeds $0 $30,416,000 $0 $0 $0 $0 Bond Issuance Costs $0 $325,000 $0 $0 $250,000 $0 Four Mile Canyon Creek $0 $0 $0 $0 $0 $0 Gregory Canyon Creek $0 $0 $0 $0 $0 $0 Boulder Creek $0 $0 $0 $0 $0 $0 Drainageway Maintenance/Enhancements $500,000 $520,000 $540,000 $560,000 $580,000 $610,000 Preflood Acquisition $633,000 $660,000 $684,285 $711,656 $740,122 $769,727 Greenways Program Transfer $97,500 $97,500 $97,500 $97,500 $97,500 $97,500 Subtotal - Major Drainageway Improvements $1,230,500 $32,018,500 $1,321,785 $1,369,156 $1,667,622 $1,477,227 Miscellaneous Utility Billing Computer System $0 $65,000 $0 $0 $0 $0 Subtotal - Miscellaneous Drainage Improvements $0 $65,000 $0 $0 $0 $0 Stormwater Management Upper Goose Creek Storm and Flood Projects $0 $0 $0 $0 $24,344,738 $0 2016 Master Plan - Middle Boulder Creek - 2 $0 $0 $3,862,873 $0 $0 $0 2016 Master Plan - Wonderland Creek - 1 $0 $0 $386,896 $0 $0 $0 2016 Master Plan - Bear Canyon Creek - 5 $0 $0 $324,846 $0 $0 $0 Local Drainage Improvements $821,241 $854,090 $986,949 $1,026,427 $1,067,484 $1,110,183 Stormwater Quality Improvements $182,500 $190,000 $197,390 $205,285 $213,497 $222,037 Storm Sewer Rehabilitation $304,000 $632,700 $657,966 $684,285 $711,656 $740,122 Transportation Coordination $365,000 $633,000 $657,966 $684,285 $711,656 $740,122 Subtotal - Localized Drainage Improvements $1,672,741 $2,309,790 $7,074,885 $2,600,281 $27,049,030 $2,812,464 TOTAL CAPITAL USES OF FUNDS $2,903,241 $34,393,290 $8,396,670 $3,969,437 $28,716,653 $4,289,691