HomeMy WebLinkAbout2.26.2018 WRAB IP Flood-Greenways Maintenance and WQ UpdatePage 1
INFORMATION PACKET
MEMORANDUM
To: Water Resources Advisory Board
From: Jeff Arthur, Director of Public Works for Utilities
Annie Noble, Acting Principal Engineer
Ward Bauscher, Utilities Maintenance Manager
Bret Linenfelser, Water Quality and Environmental Services Manager
Candice Owen, Stormwater Program Supervisor
Date: February 26, 2018
Subject: Information Item – Flood/Greenways Maintenance and Water Quality Update
EXECUTIVE SUMMARY:
At the December 2017 Water Resources Advisory Board (WRAB) meeting, staff presented an
update on water quality monitoring and regulatory requirements which impact the three city
utilities. One of the regulatory requirements discussed was the E. coli bacteria total maximum
daily load (TMDL) and compliance requirement under the City of Boulder’s (city’s ) Municipal
Separate Storm Sewer System (MS4) permit. Since the December 2017 meeting, WRAB
members have been contacted about bacteria levels in Boulder Creek, bacteria sources and the
possible impacts from encampments along Boulder Creek and its tributaries. WRAB expressed
an interest in additional information about outfall locations, possible bacteria sources, and in
better understanding the city’s current maintenance practices.
This Information Item is not scheduled as an agenda item and is intended to inform WRAB of
flood/greenways maintenance efforts and water quality monitoring that impact the Capital
Improvement Program (CIP) and operations budget. Staff will be available to answer questions
at the Feb. 26 meeting.
BACKGROUND
The city Utilities Division has been monitoring Boulder Creek water quality for many years with
a specific focus on bacteria to comply with the State-issued E. coli TMDL. Background on the
basis of the E. coli TMDL, bacteria monitoring, and efforts to identify and eliminate bacteria
sources, were presented to WRAB in December 2017.
Page 2
Bacteria monitoring to date has not focused on potential impacts from encampments since the
TMDL is based on lower creek flows, typically related to dryer weather conditions, when
potential runoff from encampment areas would not occur. In addition, it is difficult to define
impacts from homeless populations due to elevated bacteria levels in Boulder Creek from
stormwater outfalls that, at times, discharge bacteria laden water during dry weather conditions.
Studies to date have indicated wildlife, primarily raccoons, are contributing bacteria while
inhabiting the stormsewer system (see Attachment A).
TMDL Implementation Plan. After approval of the E. coli TMDL, city staff initiated the next
step in the TMDL process, which is to develop an Implementation Plan. An Implementation Plan
outlines options for evaluating sources of E. coli, identifies options to achieve E. coli reduction
requirements, and prioritizes stormsewer outfalls that need to be addressed. The Implementation
Plan was completed in December 2011 and is currently being updated to reflect work completed
since that time. Part of the Implementation Plan update includes developing a comprehensive
“roadmap” to define a path forward to achieve TMDL compliance through strategic projects and
actions including special studies to further understand bacteria contributions.
Enhanced E. coli Bacteria Evaluation. To help inform the update to the Implementation Plan,
the city initiated a microbial source tracking study in June of 2017 to further determine any
human sources of E. coli to the stormsewer, such as a sanitary sewer leak to the stormsewer
system. The study included sampling at eight stormwater outfalls from the TMDL (See Table 1)
once per month over the course of five months. Samples were analyzed for a human-specific
bacteria, Bacteroidetes. Microbial source tracking is a widely accepted method of water sample
analysis that relies on the ability to determine specific sources of fecal pollution (Ex: human,
dog, bird) based on the identification of DNA from bacteria that are host specific. Using this
analysis to relatively quantify the amount of the human specific bacteria in water samples can
indicate areas where sources of human fecal pollution may exist and thus help prioritize further
city sampling and study efforts to those areas that pose potential risk to Boulder Creek’s
beneficial uses.
Table 1 – Boulder Creek E.coli TMDL Outfall Location Descriptions
TMDL OUTFALL # Location
1 Arapahoe and 13th Street, north side of stream.
2 Arapahoe and 13th Street, south side of stream.
3 West of 17th Street, south side of stream.
4 Between 19th Street and Grandview Ave., located on the south side
of stream.
5 Between Grandview Ave. and Folsom Street, located on the south
side of the stream near CU‐walkway.
6 Immediately west of Folsom Street, located on south side of stream.
7 Immediately east of 28th Street, located on south side of stream.
8 Immediately east of 30th Street, located on north side of stream.
Results from the analysis are quantitative and can be categorized into low, moderate and high
concentration results, as shown in Table 2. Results from each sampling location for each
sampling event were assigned these classifications based on information provided by the
laboratory and were informed by the body of literature using this method. Low results
correspond to the lowest amount of fecal contamination, while moderate and high classifications
Page 3
indicate higher levels of potential contamination. Prioritizing these results, the city plans to
investigate those outfalls with the greatest number of High or Moderate results. These data will
be utilized in the Implementation Plan update to help develop a progressive schedule of
additional actions/studies to continue to understand and reduce sources of E.coli to Boulder
Creek and meet MS4 permit requirements.
Table 2 - 2017 Boulder Creek Outfalls - Human Microbial Source Tracking Concentration
Levels Outfall 1 Outfall 2 Outfall 3 Outfall 4 Outfall 5 Outfall 6 Outfall 7 Outfall 8
June ND Low Low Low Low High Low Low
July ND High Low Moderate ND High Low Low
August ND Moderate Low Moderate ND High Moderate Low
Early October ND Low Low Moderate ND Low Low Low
Late October ND High Low Moderate ND Low Low ND
ND = Non-Detect
The city maintains portions of Boulder Creek and its 14 tributaries, which comprise the
Greenways System, to meet a variety of objectives including:
• providing year-round transportation and recreation
• preserving and enhancing habitat
• maintaining stormwater conveyance and
• preserving and improving water quality
Within City-owned property or easements, the Greenways system is maintained by the following
city maintenance groups: Transportation, Parks and Recreation, Open Space and Mountain
Parks, and Utilities, as well as public property managers including Boulder Valley School
District, University of Colorado, Boulder County Transportation and the Colorado Department
of Transportation. Maintenance activities include weed control, mowing, removal of snow and
sweeping of trails, tree removal and pruning and sediment and debris removal. The UDFCD
provides support to the city with routine maintenance, which includes mowing and debris
removal and major maintenance projects, which involve reconstruction of existing infrastructure.
Utilities Maintenance Program
The responsibilities of the Stormwater and Flood Management Utility consist of three main
components: stormwater conveyance, stormwater drainage quality and floodplain management.
The service area is about 25 square miles and consists of approximately 150 miles of storm sewers
and 45 miles of major drainageways. The city’s Stormwater and Flood Management Utility
provides services to the properties within the city limits. Within the city, there are 12 sub basins
and 15 major drainageways that generally flow from west to east as they converge on Boulder
Creek, which is the main tributary flowing through the city. Runoff from within the city is
conveyed to these major drainageways by the city’s collector storm drain system.
Based on the 2018-2023 CIP, the average total budget (Operating and Capital) for the
Stormwater and Flood fund is $15 million/year. The average Stormwater and Flood operating
budget over this period is approximately $5.5 million/year. In 2018, the Stormwater and Flood
Operating budget is $5.06 million with approximately $1.5M allocated to system maintenance.
Page 4
The system maintenance portion of the 2018 budget is distributed as follows:
Stormwater Collection Maintenance $ 1,046,649 69%
Flood Management Maintenance $ 433,715 29%
Greenways Maintenance $ 40,538 3%
1,520,902
Stormwater collection and flood management maintenance operations include cleaning,
inspection and repair of storm sewers, sediment and vegetation control in and around waterways,
mowing of native grass channels and embankments, maintaining culvert capacity for natural
channels and maintaining irrigation ditch infrastructure that conveys stormwater under contracts
and agreements with irrigation ditch companies. Increasingly, the group has also been tasked
with monitoring and cleaning transient camps in culverts to maintain conveyance capacity and
water quality in the waterways.
As shown above, the Stormwater/Flood Utility fund also helps support Greenways habitat
maintenance. Each year the city hires a seasonal crew to remove noxious weeds and revegetate
with native plants along the Greenways corridors. This crew is managed through the
Transportation Maintenance work group. The operating budget for habitat maintenance is
approximately $80,000/year, with 50% of the budget funded through the stormwater fund.
Encampments
Issues associated with transient camps throughout the city have become an on-going concern and
have caused un-planned expenditures impacting the city’s budget in many areas. An inter-
departmental group has been formed to help address these issues. A Council Study Session was
held in February 2017 to discuss how to address these issues, with follow-up information
provided in April and May.
The Flood Maintenance group has been tasked with cleaning up camps along the drainageways
and irrigation ditches due to potential concerns associated with impacts to water quality and
conveyance capacity. While elevated bacteria levels in Boulder Creek have not been tied to
camps, human waste from encampments has the potential to be washed into Boulder Creek
during precipitation events, and also poses a threat to human health if the waste remains on the
ground. Encampment clean ups have also included the removal of items such as shopping carts,
blankets, cardboard boxes and other materials that can cause blockages in a flood event and
potentially reduce the conveyance capacity of the drainageway.
In the last several years, expenditures for clean-up of camps along the Greenways have been
contracted out and charged to the Flood Maintenance budget. In 2017, camp clean up accounted
for $101,000 of the $570,000 total expenditures from this budget. This is approximately
equivalent to a 1% rate increase (a 1% rate increase=$110,000). This number only reflects costs
expended out of the Flood Maintenance budget. Additional costs have been incurred through
other departmental budgets.
Page 5
Staff is currently in the process of identifying levels of service for maintaining the drainageways.
To better refine priorities, the city is in the process of implementing Beehive asset management
software that will better record work completed, as well as help plan future routine maintenance.
Once baseline data has been established through Beehive, service standard goals can be
reevaluated.
NEXT STEPS:
Staff anticipates that encampment clean up along drainageways will remain an issue for the
foreseeable future. Projected expenditures will be reflected in the rate proposals presented to
WRAB through the Capital Improvements Program process.
ATTACHMENTS:
Attachment A Picture of Stormsewer System Animal Habitation
Page 6
Attachment A – Picture of Stormsewer System Animal Habitation