HomeMy WebLinkAbout6 - Discussion about water budgetsCITY OF BOULDER
WATER RESOURCES ADVLSORY BOARD
AGENDAITEM
MEETING DATE: ~uly 16, 2007
AGENDA TITLE: Discussion about water budgets.
PRESENTER/S: WRAB members
At its June 28 meeting, the WRAB members decided to include a discussion about water
budgets at the July 16~ meeting. Attachment A was developed and provided by 7im
Knopf as a way to focus the discussion.
Jim will provide an update about the meeting on July 9 that included Deputy Mayor
Ageton, Jim Knopf, Bill DeOreo, Frank Bruno, Stephanie Grainger and Ned Williams.
At the July 16`~ WRAB meeting, Ned Williams, Paul Lander (Water Conservation
Specialist) and Britt Faulkner ('I'emporary Water Conservation Technician) will be in
attendance to answer questions.
Attachment:
A- The Boulder Water Budget Program - MAKING TI' WORK WELL, 7/8/07
AGENDA ITEM #~~PAGE ~
ATTACHMENT A
The Boulder Water Budget Program
MAKING IT WORK WELL
11 July '07
There have been a lot of reactions to the water budget
program since it started on January First, and it's clear
that there are a number of relatively small "doable" things
that will help it work well. The following concerns and
requests come from an array of sources including WRAB
members, irrigation professionals, Boulder Tomorrow
representatives, and more.
1. Coimnercial -Industrial Customars...
A. 12 identical monthly budgets vs. historic use...In
Dec 2004, WRAB encouraged a so-called "classic water budget
program" which included use of historic water consumption as
the basis for commercial-industrial customers, including
those doing limited outdoor irrigation via the same meter
used for indoor water.
The current policy of dividing the total annual water use by
12, totally ignores the reality of legitimately using some
water outside to maintain landscaping, including some on
city ROW property.
To force smaller businesses to spend thousands of dollars to
install outside meters for very small landscapes is
completely unreasonable.
As soon as possible, this policy of 12 equal water budgets
needs to be changed to reflect historic use patterns more
accurately.
B. Problems with chaage in occupaacy, vacant space,
etc.
Boulder Tomorrow reported a number of situations where
budgets were based on a time when pr.operties were not fully
occupied. This needs to be considered, and timely
adjustments made.
2. Budget Adjustments...
A. Refunds for incorrect bi11s...The current city
policy of NOT refunding money collected from adjusted
inaccurate water budgets, should be corrected immediately.
All collections based on adjusted water budgets should be
retroacti~e to 1 January '07, when the program started.
8. City R.O.W. laadscaping. ..People need to be
notified that the initial budgets did NOT include an
~
allocation for the city right of way that adjacent property
owners are required to maintain. There should be some
public information (especially on water bills) that
encourages people to request adjustments to provide for
maintaining these landscapes, which include nearly all the
street trees in the city. -
C. Ti.mely Adjustments...Boulder Tomorrow reported at
the May WRAB meeting, that it was taking too long to get
appropriate adjustments to water budgets. This needs
immediate attention.
3, Multi-family -HOA issues...
A. Indoor laundry & other co~non indoor
facilities...There need to be timely adjustments for
problems related to legitimate use of water in common
indoor facilities. Appropriate parties need to be notified
that such adjustments are available.
8. Iaaccurate counts of uait occupancy, siagle-family
vs. duplexes, etc...
Boulder Tomorrow reported the need to make timely
adjustments with these problems.
C. Teanaxit/Owner/ City commuaications...Too often the
wrong party is getting the information from the city. This
needs to be consciously addressed.
4. Parks aad Transportatioa...There should be a report on
how both parks and transportation are doing regarding their
water budgets. Undeveloped park land and medians should NOT
be included, because it will "mask" whether irrigated areas
are being over-watered.
Four parks were studied last year, and it was found that
rotor heads were given the same time as spray heads. This
means the spray areas got too much water, and the rotor
areas got too little. This can easily be corrected by
adjusting the controllers, but it has been reported that no
controller reprogramming has been done.
Baseline median irrigation from 30th to Foothills Parkway
was redone last year, but there appears to be no irrigation
this year so far. The medians should have been regraded so
the new heads could be set below the curb for protection
from snow plows. Last winter nearly all the heads were
"mowed off" by snow plows.
5. Discuss water consumption chracteristics...by customer
class, rate blocks, and revenue generated.
~
6. Raport oa computar program capabilities...There has been
a suggestion that staff persons who are responsible for
implementing the system from a billing and customer service
perspective introduce themselves to WRAB, and explain what
they do. There is interest in hearing their ideas for
making things work as well as possible.
7. Coaservation budget Lina Item...There is interest in
discussing what is included in the conservation budget.
B. water Bi11s...It would be very good to include the price
of water in all blocks on the bill, so that people can be
aware of the higher costs for excessive use, BEFORE they use
too much.
9. Reguired landscapes that waste water...It has been
reported that some city regulations require landscapes that
cannot be maintained on the assigned water budgets. This
should be reviewed, and corrected if true. We would like to
see examples of cases where this was found to occur.
10. Need for "current" mater readiags ...Brent Mecham
(Northern Water Conservation District) recently wrote in
Colorado Green, that in order for water budget programs to
work~smoothly, everyone needs to be able to read their
meters. This is true. The Badger Orion remote readers are
ideally suited to providing this information, but few people
_. are aware that they exist.
A. Meter reading policy...BOUlder needs to review its
policies about meter reading, and like most cities, it
should encourage meter reading to detect leaks, and irrigate
efficiently.
B. Remote meter readers...free remote meter readers
should be provided to all WRAB, Planning Board, Parks Board,
and City council members so they can become fully aware of
how this technology works. Each reader should include a
table that people can use to record their water use and
compare it to their monthly water budgets.
11. Customer Service...
A. Water Budget "Eact Sheat°, °Iaformation Notes",
Newsletter, or ... Regular communication via inserts in the
bills and on the website can help keep customers informed,
especially as new considerations emerge. This will be
especially helpful if always available for easy access in
the same format and in the same places.
B. Budget Number Confusion...Water budget numbers on
the monthly bills never exactly match the budget numbers
based on each month's percent of the annual total, or the
~~
amount predicted the previous month. Apparently, this
happens because meters are often measured on a different day
each month, resulting in a fewer or more days in the billing
period, and rarely match the calendar month.
It would help to explain this to customers in a water budget
"fact sheet" (possibly included in the water bill mailings),
and on the website.
C. Solicit Customer Suggestions...there should be an
initiative to solicit suggestions from customers asking for
ideas that will help make the program go better, and help -
customers use water more wisely. This should NOT be worded
as "what's wrong". It should be aimed at getting helpful
suggestions for improvements.
12. Water Sudgets & PIF fees...Discuss how this can be
coordinated and made as fair as possible.
13. Drought Response P1an...Discuss how water budgets can
be integrated with the drought response plan. In times of
drought the concept has been to reduce budgets enforced with
meter reading, instead of issuing detailed restrictions
enforced with water cops. There should be discussion of how
best to do this to avoid unnecessary economic, landscape and
public relations damage.
14. Future plans for the mater budget program...discuss
ideas for the next several years.
WRAB Water Sudget Study Session...
Several WRAB members have suggested a study session focused
entirely on the water budget program...as soon as possible.
~41