HomeMy WebLinkAboutMinutes - Water Resources - 8/19/2002WATER RESOURCES ADVTSORY BOARD
FINAL MEETING MINUTES
August 19, 2002
BOARD MEMBERSPRES~NT
Robert Fiehweg, Vicki Naber, Ken Wilson, Gil Barth; Jeannette Hillery was absent
STAFF MEMBERS PRESENT
Ned Williams, Carol Ellinghouse, Lee Rozaklis (Hydrosphere Resource Consultants, Inc.), Brad
Segal, Robin Madel, secretary
AGENDA IT~M 1
Call to Order
Bob Fiehweg called the meeting to order at 7:12 p.m.
AGENDA ITEM 2
Approval of July 15, 2002 Meeting Minutes
Vicki Naber motioned to approve the minutes.
Ken Wilson seconded.
The vote was 3-0 in favor of the motion. Gil Barth did not vote on the minutes because he
did not attend that meeting.
AGENDA ITEM 3
General Citizen Participation
There was none.
General Citizen Participation was closed.
Water Resources Advisory Board
Full Mtnutes
August 19, 2002
Page 1
AG~NDA ITEM 4
Staff update and WRAB discussion on the development of the Long Term Drought
Response Plan.
Ned Williams introduced the topia Williams said that because there were citizens there that
might not be familiar with the board he asked everyone to introduce himself or herself.
Ned Williams discussed the Drought Response Plan that the staff is developing and said that the
staff is not looking for a WRAB recommendation or final approval at this time. The intent of the
meeting is to have a chance for open dialogue. Williams introduced Carol Ellinghouse, who is
managing production of the plan.
Carol Ellin hg ouse acknowledged that the city is in a severe drought and said that the city has
been working toward development of a Drought Response Plan (DRP) since the 1990's, which
coincidentally was the wettest decade since the 1800's. Ellinghouse said that this experience has
made it clear that the staff needs Co geC the plan Yogether in a timely manner. She reviewed the
timeline for development of the plan so far. Previous discussions were theoretical but given the
physical aspects and effects of Che drought, iY is clear Yhat the discussion is no longer theoretical.
Ellinghouse presented the outline for the DRP and the staff ideas for what should be included in
the plan. The plan will address the drought from two positions, the supply side and the demand
side. The intent is to gain public input and have the plan developed to a point where it can be
distributed to the public for discussion.
Lee Rozaklis, of Hydrosphere Consultants, Inc. discussed the drought in both a national and a
historical context. Rozaklis presented information that indicated that the drought is prevalent
throughout the U.S. This drought has been more severe than any recorded in terms of stream
flow. The drought is likely to persist over the next several months; however, conditions are only
forecasted three months at a time.
Rozaklis pointed out a stream flow graph for Middle Boulder Creek that indicated flows at
present that are typical for December. He also said that North Boulder Creek has had a greater
impact from the drought this year than Middle Boulder Creek. Rozaklis provided data that
correlated tree ring growth with stream flows. The data indicate that this is the worst drought on
record in the last 300 years. Rozaklis pointed out that in a drought our water supply would
diminish more than proportionately with stream flow because of how senior water rights are
configured.
Vicki Naber asked whether the severity of the drought would last. Rozaklis presented data that
indicated that the chances are low of having as severe a drought next year (approximately 3 to 1).
Rozaklis said that this is probably an unparalleled drought.
Rozaklis discussed the state of Boulder's water system with respect to systems from the
surrounding communities. He rated the water system by storage volume versus demand. At 3 to
Water Resaurces Advisary Board
Pull Minute,s
August 19, 2002
Page 2
1, Boulder's system is more reliable than those of the surrounding communities are. The ratio for
the city and county of Denver is 2 to 1.
Rozaklis discussed potential and existing triggers within the system that indicate that the city is
in a drought. The city's trigger system is complicated bacause the city relies on water from the
Colarado-Big Thompson (CBT) project, the availability of which changes when the water
supplies are low. During wet years the reservoirs are filled from junior water rights. During dry
years the balance is gained from CBT water, but CBT is in a totally constrained mode this year
because their supplies are so low.
Drought planning actually started in July 2000. Rozaklis said that the city staff waited this year
until they knew for sure that we are in a drought until they asked the citizens to begin watering
restrictions. Sometimes, the heaviest snowfalls are in April and May. Storage and snow pack
levels as of May 1 seem to be the most reliable triggers so the city waited until the May 1 reading
until it asked people to conserve. He said Boulder has done very well at meeting and exceeding
the target expectations. Although he said some people have argued that the targets were set too
low, Rozaklis said the city is in a good position to meet necessary storage levels.
Vicki Naber said that she got a citizen complaint that said that our watering restrictions don't
seem equitable with those of Longmont. Naber also asked if the historical data still has meaning
if we are going through a climate change. Rozaklis said that water rights are based on who has
senior rights and not on equity. Longmont has enough water rights for double its current
population. Rozaklis also said that it is difficult to predict whether or not we are going through a
climatic change, especially along the Front Range because this area is difficult to model.
Carol Ellinghouse discussed the city's water rights with respect to exchanging water between the
upper and lower part of the storage system, use of gray water and re-use of treated water.
Ellinghouse said that some senior water rights holders are letting some of their water rights go to
downstream users. She also said that reusing gray water is not an option to a large extent because
Boulder's water rights will not allow it. The water that flows downstream from the city is reused
seven times before it enters into the Platte River. Downstream users are dependent on having
water in the creek. Reuse of water would take that water away.
Ken Wilson said thaY the city needs better triggers. Rozaklis said that there is a limit to how
useful triggers are and the only reliable triggers are snowpack and reservoir storage. Wilson
asked how often the reservoirs fail to fill. Rozaklis said that it happens about every 50 years.
Wilson asked what could be done in a dry year when the reservoir is full, because then it is hard
to justify restrictions. Rozaklis said that it becomes a policy question about whether to
inconvenience people more frequently to be safe or to heavily inconvenience people only once in
a while. Ellinghouse said that it is an on-going evaluation.
Ellinghouse said that most summer days we typically draw on direct flows and not storage. This
summer we drew mainly on storage. Naber asked if the city is going to build more storage.
Rozaklis said that the city has a reservoir, Green Lake Reservoir that needs to be rebuilt.
Williams added that the city might participate in a Windy Gap storage project with a larger group
of users.
Warer Resources Advdsory Baard
Full Minutes
August 19, 2002
Page 3
Ellinghouse discussed the DRP and the sections contained in the outline. Bllinghouse said that
the document should provide guidance to the city during the next big drought but should also
provide flexibility to use judgement in how the city will proceed. The report will include a
decision support tool. Major points of discussion in the outline included supply management,
demand management and reliability criteria.
Ellinghouse said that the ciYy would try to establish a system that would provide enough water
for all indoor demands even in a 1000-year drought. She also said that the discussion about
demand management and reliability criteria needs to happen without any extreme feelings from
the current drought. Brad Segal asked how the comprehensive water conservation plan that the
city has in place fits into the Drought Response Plan. Rozaklis said that water conservation helps
a system remain reliable but the DRP evaluates conditions that exist when the system has to be
operated out of the norm. He said the single most effecYive thing the city can do is to operate the
63`d St. Water Treatment Plant but it is costly to operate.
Ellinghouse said that the city is evaluating demand management through planning. She spoke
about the different scenarios being evaluated in the Jobs-to-Population study being performed by
the city.
Ken Wilson said that in order for public forums to be valuable, the staff might need to limit the
number of options presented to the public. He added that two years from now public opinion
would change about how the city should respond to a drought. Carol Ellinghouse said that the
main item of concern for the public is whether or not there will be watering restrictions next
year. She said that this would be the topic at two public forums that will be held this fall. The
staff intention for presenting the DRP at the September 2002 WRAB meeting is to scope options
for water restriction scenarios and obtain feedback about the plan and not to use the meeting as
an opportunity to vent frustrations about the watering restrictions.
Bob Fiehweg asked Jim Knopf, a member of the public who is a xeriscape architect, about the
effect of the watering restrictions on mature trees. Knopf said that the main concern is that the
trees will start a decline from which they will not recover. Trees need to be watered two times
per month with soaker hoses. Fiehweg asked if these are the most severe restrictions and if the
ciry could change to a system of absolute amounts. Williams said that the most severe
restrictions would include not allowing any lawn watering.
Rozaklis said that the gross household data for 2000-2002 will be evaluated this winter to
determine compliance. The volumetric date for June, July and August will be compared by
account and user types. The system is not set up to provide users with absolute amount
information but the city is working with a consultant to be able to provide historical user
information on water bills. Ellinghouse said that changing to a block rate structure with higher
rates for higher use would be the least costly way Yo control water demand. Ellinghouse said the
city would be evaluating its own watering practices. Rozaklis said that whatever system is
employed, if the cost is high, then it may not be useful to the city because the city wili only need
tbe sysYem for a limited time, unless we are headed into a period of climatic change.
Water Resources Advisory Board
Full Minutes
August 19, 2002
Page 4
Bob Fiehweg asked if there was a spike in usage for the August tree watering day. Ellinghouse
said that she didn't have the data yet.
Wilson asked if the public forums would be advertised heavily. Bob Fiehweg asked to have it put
on the Web page. Williams said that it would receive plenty of advertising.
AGENDA IT~M 5
A. Matters from the Board
. There were none.
B. Matters from Staff
• Ned Williams discussed a study session with the city council on Aug. 27, 2002 in which he
would discuss the utility portion of the 2003 budget, including utility rate increases.
• Ned Williams provided a handout of information that was sent to the Planning Board
regarding minor revisions to floodplain regulations that deal with requirements from FEMA.
• Ned Williams said that full road closures on Lakewood Pipeline during the daytime would
end this week but that there will still be single lane closures. Williams said that traffic control
has been the most challenging aspect of the project. Williams said he would organize a tour
of the project for the WRAB.
. Ned Williams said that the staff has begun discussing the possibility of imposing a city sales
tax on water as a commodity. He said the staff is not ready to present the item to the board
but they are discussing it.
. Ned Williams asked Ken Wilson to give an update on the symposium he attended regarding
chronic wasting disease. Wilson said that while it is a very serious disease for elk and deer it
is not certain whether it is infectious for people. Although Colorado has been a focus of the
problem area, Boulder is on the edge of the area of concern.
Adjournment
The meeting was adjourned at 9:32 p.m.
Water Resources Advisory Board
Ful! Minutes
August 19, 2002
Page S
Date, Time, and Location of Next Meeting:
The next meeting will include a public hearing on the Drought Response Plan.
The next regular meeting will be September 16, 2002, 7:00 p.m., at the City Municipal Services
Center, 5050 East Pearl.
Minutes approved by (,(~ ""'~
Date '9 ~
Water Resources Advisory Board
Full Minutes
August /9, 2002
Page 6
WATER RESOURCES ADVISORY BOARD MEETING
Monday, September 16, 2002, 7:00 p.m.
The Municipal Services Center
Conference Room
5050 ~ast Pearl
Agenda Highlights:
I. Call to order.
II. Approval of August ] 9, 2002 meeting minutes.
III. Citizen participation and comment period.
IV. *Public hearing and WRAB recommendation on the development of the L,ong Term
Drought Response Plan (Carol Ellinghouse).
V. *Staff update and WRAB discussion on the draft Wastewater Collection System
Masterplan (final approval at October 2002 meeting) (Randy Earley).
VI. A. Matters from the Board.
B. Matters from staff.
VII. Discussion of future meeting dates and agenda.
VIII. Adjournment.
* Public Comment Item
Telephone the WRAB Secretary Robin Madel at (303) 441-4073. Packets can be accessed on-
line at http://www.ci.boulder.co.us/publicworks/depts/uw8.html
Central Records
CITY Or 130ULDER, COLORADO
BOARDS AND COMMISSIONS MEETING SUMMARY FORM
NAME OF BOARD/COMMISSION: Wa[er Resources Advisory Board
DATE OF MEETING: August ] 9, 2002
NAME/TELEPHONE OF PERSON PREPARING SUMMARY: Robin Madel, 303-441-4073
NAMES OF M~MBERS, COUNCIL, STAFF AND INVITED GUESTS PRESENT:
BOARD MEMBERS - Robert Fichweg, Vicki Nabcr and Kcn Wilson, Gil Bar[h; Jeannette HiQery was absenf
STAFF - Ned Williams, Carol EIlinghouse, Lee Rozaklis (Hydrosphere Resource Consultants, Inc.), Brad Segal,
Robin Madel, secretary
WHAT TYPE OF MEETING (BOLD ONE) [REGULAR] [SPECIAL] [QUASI-JUDICIAL]
Agenda Item 1- Call to Order
The meeting was called to order at 7:12 p.m.
Agenda Item 2- Approval of July 15, 2002 Meeting Minutes
Vicki Naber motioned to approve the minutes from July 15, 2002.
Ken Wilson seconded.
The vote was 3-0 in favor of the motion. Gil Barth did not vofe on the minutes because he was
absent From that meetin~.
Agenda Item 3- General Citizen Participation
There was none.
General Citizen Participation was closed.
Agenda Item 4- Staff update and WRAB discussion on the development of the Long Term Drought
Response Plan (Carol Ellinghouse).
Ned Williams introduced the topic and said that the staff was not looking for a WRAB recommandation or final
approval at this time. He said [he infent of thc meeting was to have a chance for open dialogue.
Carol Ellin house said that the city has been wotking toward development of a Drought Response Plan (DRP)
since the 1990's, which was the wettest decade since the 1800's. Ellinghouse presented [he outline for tha DRP,
which included staff ideas oP wfiat should be developed. The intent is to gain public input and have the plan
developed to a point whare it can be disfributed fo the public for discussion.
Lee Rozaklis discussed [he drought in bo[h a national and a historical context Rozaklis presenled informa[ion that
indicated that this is the worst droughC on record in the last 300 years. Rozaklis also provided dafa that indicate
that the chances of having as sevare a drought next year are low.
Rozaklis diseussed the state of Bouldec's water system wiCh respect to systems from the surrounding communities.
He rated the water system by storage volume versus demand. At 3 to 1, Boulder's systam is more reliable than
those of the surrounding communities are inctuding that of the city and county of Denver.
Rozaklis discussed potential and existing triggers wiChin the system that indicate that the ciry is in a drough~
Storage und snow pnck levels ns of Mny 1 seem to be the most reliable triggers. Rozaklis sAid that the eity stafF
waited until they knew for sura that we are in a drought un61 they asked the citizens w begin watering restrictions.
He said Boulder has done very well at meeting and exceeding [he target expectations. Although he said somc
people have argued that the targets were set too low, Roznklis said the city is in a good position Yo meet necessary
storage levels.
Caro! Ellinghovse discussed the city's water rights with respect to exchanging water batween the upper and lower
part of the s[orage system, use of gray water and re-use of heated water.
Sllinghouse discussed the DRP and the secCions contained in the out]ine. Sllinghouse said that the document
should provide guidanca to the city during the next big droughC but should also provide flexibility to use
iud~ement in how the ciri will nroceed. Maior noints of discussion in [he outline included supplv mana~ement,
Water Resourees Advisory Board
Summary Minutes
August 19, 2002
Page 1
demand management and reliability cxiCeria. Lee Rozaklis said that water conservafion is a good cool because it
makes the system more reliable buC ic doesdt address all operating issucs during severe droughts.
Carol Ellinghousa said Chat the main item oP concern for the public is whether or not there will be waCeeing
restricuons nexC year. She said that this would be the topic at two public forums that will be held this fatl. The
staff intenCion for presendng the DRP ac Che Septamber 2002 WRAB meeting is to scope options for water
restric6ion scanarios and obtain feedback about the plan and not to use the meeting as an opportunity to vent
frustrations about lhe watering resuie6ons.
Agenda Item 5 -
Matters from the Board
There were none.
Matters from Staff
• Ned Williams diswssed a s[udy session with the city council on Aug. 27, 2002 in which he would discuss the
utiliry portion of the 2003 budget, including udlity rate ineceases.
• Ned Williams provided a handout of information that was sent to the Planning Board regarding minor
revisions to floodplain regulafions that deal with requiremenls from FEMA.
. Ned Williams said that full road closures on Lakewood Pipeline during the daytime would end this week but
that there will atill be single lane closures. Williams said that traffic control has been the moet challenging
aspect oP the pcoject. Williams said he would organize a tour of the project for the WRAB,
. Ned V/illiams said that the staff has begun discussing the possibility oP imposing a eiry sales tax on water as a
wmmodiry. He eaid the staff is not ready to presenC Che ifem to the board but they aze discussing it.
. Ned Williams asked Ken Wilson to give an update on the symposium he attended regarding chronic wasting
disease. Wilson said thaC while it is a vary serious disease for elk and deer it is not ce~tain whether ic is
infectious for people. Although Colorado has been a focus of the problem area, Boulder is on fhe edge of the
area of concern.
Next meeting agenda
The next mee[ing will include a public hearing on thc Drought Response Plan.
. ~---------`
The mee[ing was adjourned at 9:32 p.m.
Date, Time, and LocaGon of Next Meeting:
Monday, Sep[amber 16, 2002, 7:00 p.m., regular meeting, at Ihe City Municipal Scrvices Center conference
Water Xe.sources Advisory Baard
Summary Minutes
August 19, 2002
Page 2
CITY OF BOULDER
WATER RESOURCES ADVISORY BOARD
MEETING DATE: September 11, 2002
SUBJECT: Public Hearing on the scope of topics to be addressed in the development of a
Drought Response Plan and recommandation on the continuation of the process for
completion of the plan
REQUESTING DEPARTMENT:
Public Works Department:
Robert E. Williams, Director of Public Works for Utilities
Carol Ellinghouse, Water Resources Coordinator
BOARD ACTION R~QUESTED:
Public Hearing to obtain public comment on the items and Yhe scope of evaluadon to be
addressed in the development of the Drought Response Plan. Recommendation on scope,
process and timeline for completion of the Drought Response Plan based on public comment
and WRAB discussion and evaluation.
FISCAL IMPACT: None at this time.
PURPOSE
The severity of this year's drought has increased interest in the completion of a Drought
Response Plan for Boulder's municipal water supply system. Based on the many instances of
mulYi-year droughts in the Boulder Creek basin in the past; it is prudent to prepare for the
possibility of the continuation of the drought into next year. A Drought Response Plan can hoth
address the potential near-term options and longer-term goals for drought management.
On August 19, 2002, WRAB discussed the development of a Drought Response Plan, the scope
of elements and topics to be addressed in the plan, and a process for completion of the plan and
receipt of public input on water conservation measures. The Public Hearing will provide
opportunity for public input on the scope of the Drought Response Plan to facilitate inclusion in
the plan of items of public interest. Based on this input and its previous discussions, the WRAB
may make recommendations for the continued development of the Drought Response Plan.
AGENDA ITEM # Pa e 1
BACKGROUND
Since Colorado has a semi-arid climate, the need for management and planning for available
water supplies is critical. Given Boulder's location so near the continenCal divide, the city's water
supplies are almost entirely dependent on mountain snowmelt. Almost all of Boulder's water
supplies for the entire year are captured in reservoirs during the spring snowmelt in May and
June. A low winter snowpack in the mountains can lead to a shortage of water supplies for the
next year. The occurrence of periods of drought is a certainty and must be prepared for even
though the timing of droughts cannot be predicted. A drought can be severe for a single year with
a return to average precipitation levels immediately afterward ar it can continue for several
years.
On May i, 2002, snowcourse readings indicated that this year's spring runoff from mountain
snowmelt would be significantly below average. Therefore, the city's water supplies for the next
year until the next spring runoff would be greatly reduced from the average. On May 8, 2002,
the city requested that its citizens and water users follow a strong voluntary water conservation
effort in response to the drought.
By mid-May, it was evident that streamflows were even lower than predicted and drought
conditions were severe. In addition, after two weeks of voluntary water use restrictions, there
had been no success in reducing water consumption. On May 21, 2002, it was determined that
mandatory water use restricYions would be required to assure sufficient water supplies were
available Yo meet the city's needs until the following spring snowmelt.
On June 4, 2002, City Council adopted Ordinance No. 7215, by emergency to amend the Cify
Code to set forth measures for water conservation implementation, including restrictions on
water use. On June 5, 2002, the "Regulations Concerning Water Conservation and Water Waste"
were approved by the Ciry Manager, and the city began active enforcement of water use
restrictions. To date, the water restrictions have been successful in meeting Boulder's water use
reduction target by successfully reducing water use by over 25% compared to levels of water use
in 2000 and 2001.
At iYs July 9, 2002, meeting, City Council discussed issues related to the city's water use
restrictions this year and long term drought planning. City Council requested that a Drought
Response Plan be completed to review drought planning issues and potential elements of future
water conservation efforts during drought periods. The plan would provide the city with options
to follow in the event of a severe drought and guidelines for recognizing when a drought year
might significantly impact the city's ability to deliver water.
AGENDA ITEM # ~ Paee 2
DROUGHT RESPONS~ PLAN DEVELOPMENT
Much of the information to support development of a drought plan has previously been
developed through the Raw Water Master Plan, the Treated Water Master Plan, the Boulder
Creek basin watershed model, Boulder Creek tree ring studies, and the Water Conservation
Futures Study. A Drought Response Plan was in the process of being prepared prior to the 2002
drought. The preliminary information developed for this plan will need to be updated and
revised to contain information developed as a result of this year's experiences.
At the August 19, 2002, WRAB meeYing, staff proposed that a Drought Response Plan be
completed that contains an evaluation of the water resources available to the ciYy during drought
periods, a review of water supply management options, and consideration of various water
demand management options. WRAB provided comments on the scope of the plan at this
meeting. Since that time a Framework Document (Attachment A) has been developed that
includes elements addressing previous comments of the WRAB.
A Public Hearing is scheduled for this WRAB meeting to obtain public comment on the Drought
Response Plan scope. Public meetings to obtain public comment on specific issues related to the
city's drought response this year or suggestions for the response in subsequent drought years
have been scheduled for September 18 and October 16. Both public meetings are to be held
from 5:30 to 7:00 PM in the City Council Chambers. Similar staff and consultant presentations
will be made at each of the two meetings, and an opportunity will be offered for answering any
questions the public may have and for providing comment.
STAFF RECOMMENDATION
Staff recommends that a Drought Response Plan be completed based on the attached Framework
Document. Staff recommends modification of the Framewark as necessary to incorporate issues
identified through the Public Hearing held at this WRAB meeting regarding the scope of the
Drought Response Plan. The comments from the two separate upcoming public meetings can be
evaluated and incorporated into the plan development and a final draft Drought Response Plan
presented at the October WRAB meeting. Staff is pursuing the presentation of a WRAB-
recommended Drought Response Plan to City Council in November 2002 and wiil be discussing
various options for achieving this timeline to the WRAB at this meeting for WRAB approval.
ACTION REOU~STED
Public hearing on the scope of the Drought Response Plan and WRAB recommendation on the
process for continuation of the plan development.
ATTACHM~NTS
Attachment A--Draft Framework Document for Boulder Drought Management Plan
AG~NDA ITEM # Pa e 3
DRAFT FRAMEWORK DOCUMENT
BOULDER DROUGHT MANAGEMENT PLAN
Introduction
As the spring of 2002 began, there was no particular indication that a drought of unprecedented
intensity was unfolding throughout Colorado. While snowpack had been below normal on New
Year's Day and remained so through March, the heavy snow and rain months of April and May
had yet to come. The previous two years had been similarly dry, but had not caused any
significant problems for Boulder's municipal water supply.
However as April came and went, air temperatures rose rapidly, snowpack levels declined
drastically and spring rains did not materialize. On May 8 of 2002, Boulder requested voluntary
watering restrictions and, on May 21, 2002, imposed a drought response program that included a
mandatory watering restrictions. This is the first time mandatory restrictions have been
implemented in Boulder since the 1950's.
While watering restrictions significantly reduced Boulder's water use, they also caused impacts
to landscaping within the city. The extent of any permanent landscaping damage will not be
fully known until next year's growing season. Questions have arisen about the timeliness and
effectiveness of the city's response to the drought earlier, and if water demand could be reduced
by the necessary amount in a more flexible manner.
The current drought is not over. Stream flows have dropped to levels not seen in 300 years
Water supplies might be below average next year. Boulder must therefore plan for the
possibility of continuing its drought response program over the next year or more. Even if the
current drought abates this winter, a defined drought response plan will improve the ability to
respond to the inevitable droughts in the future. The purpose of this document is twofold:
• to develop a general plan for recognizing and responding appropriately to future droughts
that may significantly impact Boulder's water supply system; and
• to identify Boulder's specific water demand and supply management options for
responding to the ongoing drought of 2000-2003.
Background Information on Droughts
Definitions
There is no single universally accepted definition of drought. From a purely meteorological
perspective, drought is defined as an extended period of low precipitation relative to the
statistical average for a given region. However, most definitions recognize drought as extended
period o£ relatively low precipitaYion that results in a water shorta eg to a particular human
Hydrosphere Resource Consultants, Inc. Page 1
AquacrafY, Inc.
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
activitv or environmental function (e.g. municipal water supply, agriculture, stream fisheries,
forest health). Thus, drought is an interplay between climate and water-dependent processes.
Drought is a normal and regular aspect of climate variability that periodically occurs virtually
everywhere on earth. However, drought is a particularly complex and insidious form of natural
hazard. The severity of a drought depends on the degree, duration and geographical extent of
precipitation deficiency and the sensitivity of affected water uses. Because drought is not a
single event, its onset cannot be easily recognized and its magnitude cannot be determined while
it is unfolding. Only after a drought is past can its severity be gauged.
There are four perspectives that are wmmonly applied to definition of drought:
Meteorological - a measure of departure of precipitation from normal. Due to climatic
differences what is considered a drought in one location may not be a drought in another
location.
• A¢ricultural- refers to a situation when the amount of moisture in the soil no longer
meets the needs of a particular crop.
• Hvdrolo.~ic - occurs when stream flows are below normal.
• Socioeconomio- refers to droughts of sufficient magnitude to cause physical water
shortages that affect people.
The hydrologic and socioeconomic perspectives of drought are the most relevant to Boulder's
water supply system (explain why).
Direct Historical Evidence of Droughts
Stream gage records provide direct evidence of historical droughts. From the perspective of
Boulder's water supply system, the stream gage on Boulder Creek near Orodell is the most
suitable gage for this purpose because of its long period of record and because its measures the
combined stream flow from North and Middle Boulder Creeks, which comprise Boulder's main
sources of water supply. Records at this gage have been compiled from "x" to the present.
The measured flows at the Orodell gage are not natural or virgin flows; they are reduced by the
amount of upstream diversions by the city at Barker Reservoir, the Silver Lake Watershed, and
Lakewood Reservoir, as well as a few smaller diversions by others. However, records of these
diversions are readily available and the virgin flow at Orodell can be easily reconstructed, as
shown in Figure _ below.
Hydrosphere Resource Consultants, Inc. Page 2
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
140,000
7 20,000
LL 100,000
a
~
e
~ 80,000
0
>
3
0
LL 60,000
m
~
c
c
a ao,ooo
20,000
0
Figure 1: Reconstructed Virgin Flow, Boulder Creek Near Orodell
Points illustrated by figure:
September 10, 2002
• Boulder Creek stream flow volumes are highly variable
• Significant hydrologic droughts occur regularly
• From a hydrologic perspective, the current drought in Boulder Creek began in 2000 and
includes the lowest stream flow year (2002) of the last century.
The three most important characteristics of hydrologic droughts are their duration, their single-
year flow deficit and their cumulative flow deficit. (Discussion the relevance of these factors to
Boulder's water supply. Hydrologic drought may or may not mean socioeconomic drought for
Boulder).
Hydrosphere Resource Consultants, Inc. Page 3
Aquacraft,
1910 7920 1930 1940 1950 1960 1970 1980 1990 2000
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
Drou ht Period Duration Sin le Year Deficit Cumulative Deficit
1910-1911 2 ears 32,300 AF 54,000 AF
1913 1 ear 18,500 AF 18,500 AF
1925 1 ear 21,700 AF 21,700 AF
1930-1934 5 ears 31,100 AF 79,200 AF
1939-1941 3 ears 18,000 AF 43,100 AF
1943-1946 4 ears 22,400 AF 34,500 AF
1950 1 ear 19,000 AF 19,000 AF
1953-1956 4 ears 34,700 AF 64,600 AF
1963-1964 2 ears 19,500 AF 35,900 AF
1966-1968 3 ears 32,900 AF 48,400 AF
1976-1977 2 ears 27,500 AF 48,000 AF
1981-1982 2 ears 26,200 AF 26,700 AF
1987-1994 8 ears 19,300 AF 63,100 AF
2000 -???? 3 ears + 41,000 AF 72,000 AF +
Table _: Comparison of Significant Historical Droughts, Boulder Creek Near Orodell.
Points illustrated by table:
• Define "significanY' as used in table
• The current drought is the worst within the period of record in terms of single year flow
deficit and the second worst (so far) in terms of cumulative flow deficit.
• Boulder Creek experienced an eight-year drought with a cumulative deficit nearly as
large as the 1950's drought with no adverse effects on Boulder's water supply system.
Boulder's water supply system is dependent on stream flows in both the Boulder Creek basin and
the Colorado River basin because of Boulder's reliance on supplemental suppiies from the CBT
and Windy Gap projects. (explain further)
Hydrosphere Resource Consultants, Inc. Page 4
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
900,000
800,000
~oo,ooo
~
a soo,ooo
a
E
0 500,000
>
3
LL 400,000
m
~
a 300,000
200,000
100,000
0
1910
September 10, 2002
Figure _: Reconstructed Virgin Flow, Colorado River at Hot Sulphur Springs
Points illustrated by figure:
• Drought occurrences at this location are significant because they are indicative of CBT
and Windy Gap supplies.
• Stream flows in the Colorado River exhibit the same high degree of variability as those in
Boulder Creek
Hydrosphere Resource Consultants, Inc. Page 5
Aquacraft,
1920 1930 1940 1950 t960 1970 1980 7990
Draft Framework Document
Boulder Drought Management Plan
200%
September 10, 2002
180%
a 160%
LL
~ 140%
c
a 120%
a
rn
~ 100°Jo
~
a 80%
0
d 60%
~
p~, 40%
- -~ - - R2=070- - - - - -- ~ - ~ - - nI- - - - -- - - - - - - - - - - -'""~° - - -
;
11
20%
0%
1910 1920 7930 1940 1950 1960 7970 1980 1990
-~COlorado River at Hot Sulphur Sqrinqs -~-Boulder Creek Near Orodell
Figure: _: Comparison of Virgin Flows, Boulder Creek vs. Colorado River
Points illustrated by figure:
• Droughts on Boulder Creek and the Colorado River are highly correlated (Drought
conditions here usually mean drought conditions there.)
• To a certain extent, the large storage volume (730,000 AF) of the CBT project allows it to
act as a supplemental supply during droughts.
Evidence of Historical Droughts Provided by Tree Rings
While stream flows records are limited to the past century, tree rings provide another source of
evidence of historical droughts. Tree rings have proven to be useful in extending our records of
stream flows back in time and providing valuable insights on the long-term variability of stream
flows. This is possible because the growth rings of properly selected trees adequately reflect the
year-to-year variation in flows in nearby streams.
Scientists at NOAA and Hydrosphere have recently developed several records of tree rings that
are well correlated to Boulder Creek flows. We have used these data to generate estimates of
Boulder Creek flows that extend back as far as the early 1700's. These data show that Boulder
Hydrosphere Resource Consultants, Inc. Page 6
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
Creek has experienced droughts that were more severe than those that have occurred in the last
90 years. These data have also provided us with an enhanced perspective on the current drought.
This year's stream flows are probably the lowest that have occurred during the last 200 to 300
years.
180,000
7 60,000
140,000
120,000
~ 100,000
LL
~
~
Q 80.00~
60~~00
4~~~~~
20,000
Figure notes:
Flows for 1703-] 987 based on tree ring reconstructions (Dr. Connie Woodhouse and Hydrosphere)
Flows for 1988-2001 recons[ructed from gage ilows (Hydrosphere).
Flow for 2002 expressed as the mean [ree ring-based flow for 1907-1987 minus 214 standard deviations. This is
based upon the number oP standard deviations between [he actual projected 2002 flow and the mean reconstrucfed
gage flow for 1907-1987. The actual projected na[ural flow for 2002 is expected to be less lhan 31,000 AF,
Figure _: Natural Flow, Boulder Creek Near Orodell, Based on Tree Ring Evidence
Points illustrated by figure:
• Over the past 300 years, there have been more significantly more severe droughts that
what we have seen in the 20`" century
• The current drought is within the range of historica] variation
• Stream flows in 2002 have an approximate 1-in-300 year recurrence interval
Hydrosphere Resource Consultants, Inc. Page 7
Aquacraft,
1700 1725 1750 1775 1800 1825 7850 7875 7900 1925 1950 1975 2000
Draft Framework Document September 10, 2002
Boulder Drought Management Plan
Potential Effects of Climate Change
• Summarize resuits of climate change research: no clear trend for northeast Colorado
• The relationship between reduction in stream flows and reduction in the yields of
Boulder's water rights is nonlinear.
• Reduction in long-term average flow in the Colorado Basin could affect reliability of
CBT project, which comprises a major portion of Boulder's water supply.
• Recent climate is well within the range of historical climate variaYion as evidenced by
tree rings
Drought Recognition Considerations
• Snow pack accumulation is a reliable indicator of runoff only by May 1.
• Global factors (El Nino Southern Oscillation, Pacific Decadal Oscillation, etc.) have
basically no predictive skill with respect to droughts in Boulder Creek or the CBT
drainage area (so far).
• Multi-year persistence of droughts is evident only in the years following extremely low
flow (<50% of average) years.
• Modeling studies have suggest that, under historical and tree ring-based climate regime,
Boulder's water supply system very infrequently impacted by droughts, only 1-in-50 year
droughts or worse.
• Problems with "crying wolf' too early and often.
• May and June are the months when Boulder has the most foreknowledge about its water
supply system and Boulder Creek stream flows.
Hydrosphere Resource Consultants, Inc. Page 8
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
S
September 10, 2002
iooio
so~io
0
~ ~ eo°io
~~
~~
~ 9 ~o~io
N o
L ~ 6O%
~ LL 50%
v E
m
,~ ~ 40%
m C
a ~ 30%
~ T
~ ~
V T 20%
m
~
10%
--~------------------------~--------~-----
0%
1-Feb 1-Mar 1-Apr t-May
Date of Snowpack Reading
Figure _: Seasonal Value of Boulder Creek Snowpack Data in Predicting Boulder Creek
Runoff Volume
Drought Response Considerations
Boulder's Wafer Supply Reliability Criteria
During the development of Boulder's Raw Water Master Plan, Boulder adopted water supply
reliability criteria that struck a balance between the costs and environmental impacts of increased
reliability and the consequences of temporary water supply restrictions. These criteria were the
subject of extensive public meetings and reflected the near-consensus of public opinion.
~ For those uses of water deemed essential to the maintenance of basic public health, safety
and welfare such as indoor domestic, commercial and industrial uses and fire fighting
uses, Boulder shall make every effort to ensure reliability of supply against droughts with
recurrence intervals of up to 1,000 years.
• For that increment of water use needed to provide continued viability of outdoor lawns
and gardens, Boulder shall make every effort to ensure reliability of supply against
droughts with recurrence intervals of up to 100 years.
Hydrosphere Resource Consultants, Inc. Page 9
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
• For that increment of water needed to fully satisfy all municipal water needs, Boulder
shall make every effort to ensure reliability of supply against droughts with recurrence
intervals of up to 20 years.
Given the extremely severe nature of the current drought, especially this year's 1-in-300 year
low stream flows, Boulder's current watering restrictions are consistent with the city's water
supply reliability criteria.
Drought Response Triggers
The most appropriate time for evaluating drought response triggers and planning droughf
responses late April to early May because snowpack then provides a relatively high degree
foreknowledge of runoff, Boulder's final CBT quota is known, and nearly all of the irrigation
season still lies ahead. However, in order to deploy a drought response plan in a timely manner,
responses must be formulated in advance.
The three most important factors to consider when deciding on a drought response in April and
May are:
• Boulder's projected mountain storage contenYs
• CBT project system storage contents
• Boulder's CBT quota for the upcoming year
Suggested drought response triggers.
Drought
Alert
Level Boulder Upper
System Storage CBT Storage CBT Quota
3 Not Full Below Avera e
2 Not Full Above Avera e
1 Full Below Avera e
0 Full Full
Hydrosphere Resource Consultants, Inc. Page 10
Aquacraft,
Draft Framework Document September 10, 2002
Boulder Drought Management Plan
Current Situation
]. Origin and magnitude of the current drought
a. In terms of precipitation, the current drought began in 1999 for Boulder Creek, _ for
CBT system. In terms of hydrologic drought, (check when last spilled).
b. current year, run sum, compared to historical and tree ring stats, come up with a return
period
2. Current stream flow conditions
a. graph of Orodell, Nederland, imputed NBC daily gage flows
b. graph of Orodell natural flows 1954 vs. 2002
3. Status of Boulder's water supply system as of 8/31/02
a. Waterin storage
b. Current and expected yield of direct flow rights
a CBT supplies: how much left in current year quota, next year's quota prospects
4. Boulder's water use and the effects of this year's response program
a. Year-to-date water use in 2002 is 11% lower than 2000/2001 average
b. Since restrictions were announced on May 21st, Boulder's water use has been
30% lower than 2000/2001 average
c. Effects of this year's restrictions on Boulder's starage and CBT supplies
with/without restrieYions
d. degree of compliance: results of database analysis
Near-Term Future Prospects
1. What is the likelihood that this drought will persist into next year?
a. What we know from historical droughts
dry yeartest
very dry year test
tree ring data don't help because tree rings show bio, not hydro persistence
b. What do large-scale predictors suggest?
EI Nino forming, but ENSO doesn't correlate well with Boulder's watersheds
Pacific Decadal Oscillation (PDO) flipped into dry mode a few years ago
2. What will next year's CBT Quota be? Most likely 30% to 50%, unless a very wet year
occurs.
Scenario Analysis
1. SelecYed scenarios for 2003
a. Normal runoff, 50% CBT quota
b. 90%-of-average runoff, 40% CBT quota
c. 75%-of-average runoff, 40% CBT quota
a 50%-of-average runoff, 30% CBT quota
2. Results of analysis
a. Water restrictions should be continued through Apri12003, including fall/winter
indoor restricdons targeted at a 5% savings.
b. The Boulder Reservoir WTP should be operated at maximum safe capacity through
the fall and winter.
Hydrosphere Resource Consultants, Inc. Page 11
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
c. Restrictions may be needed again next year if runoff is severely below average
d. Discussion of trade-offs
Comparison of Projected Scenarios for 2002-2004,
City of Boulder Water Supply System
20,000
~
d ia,ooo
~
C~i 16,000
r
c
~ 14,000
9 12,000
c
w
~ 10,000
~
° 8,000
y
c
~ 6,000
~
0
~ 4,000
w
a
y Z,OOO
~
0
-----~-~------~-~ ------~-i-----~
Jul-02 Oct-02 Jan-03 Apr-03 Jul-03 Oct-03 Jan-04 Apr-04
-+-700% Flows, 50%Quota, Full Use ~--100% Flows, 50%Quota, Restrictions
-+-90°/a Flows, 40% Quota, Full Use --•-~-90% Flows, 40°/a Quota, Hestrictions
-+-75%Flows, 40%Quota, Full Use +75°/, Flows, 40%Quota, Restrictlons
-+-50% Flows, 30% ~uota, Full Use -~-50% Flows, 30% Quote, Restrictlons
Supply Management
In response to the current drought, Boulder has employed the following supply-side strategies:
• Increased fall/winter season use of the Boulder Reservoir treatment plant
• Elimination of CBT leasing programs to local farmers
• Exercise of drought reservation ciauses in Boulder's instream flow agreements
• Exercise of interruptible supply arrangements with local ditch companies
• Water trades with Baseline Reservoir.
• Exchange of CBT water for water released from Jasper Reseivoir
If the current drought continues or intensifies, Boulder could consider the following options
• Drawdown of reserve pools in Boulder's reseivoirs
• Temporary use of Open Space irrigation rights (e.g. Farmers Ditch) for municipal
purposes
Hydrosphere Resource Consultants, Inc. Page 12
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
• Operation of Skyscraper Reservoir
~ Lease of additional CBT supplies
• Emptying of dead pool storage in Boulder's reservoirs
• Out-of-priority diversion of water under the "municipal priority" clause of the Colorado
Constitution, with condemnation-based compensation to injured farmers.
Demand Management
Restrictions and Response
In Apri12002, it quickly became apparent that the City had to acC quickly to curtail water
demand over the summer to ensure for adequate supplies through the winter and into 2003.
Although the City has been working to develop a more comprehensive drought management plan
over the past year, this plan was not in place. As a result the City used existing legal mechanisms
to enact strict watering restrictions in May. These restrictions were amended once over the
summer of 2002 to permit tree watering on designated days. A timeline of restrictions is shown
in Table 1.
Table 1: 2002 Drought Restriction Timeline
Date
5/8/2002 Voluntary watering restrictions approved
5/22/2002 Mandatory watering restrictions approved
6/5/2002 Mandatory water restrictions take effect.
8/2/2002 Monthly tree watering days announced
Description of 2002 watering restrictions
The mandatory restrictions enacted by Che City applied to all residents and businesses in Boulder,
Gunbarrel, Falo Park and Hoover Hills as well as anyone else receiving city of Boulder water.
Restrictions
Spray irrigation or hand watering of lawns, gardens, or other landscapes was restricted to the
following days:
• Street addresses ending in 00-30 may water on Thursday and Sunday.
• Street addresses ending in 31-60 may water on Wednesday and Saturday.
• Street addresses ending in 61-99 may water on Tuesday and Friday.
Properties without specific addresses, such as street medians, or any other properfy that has no
numeric address, were permitted to water on Tuesday and Friday. No outdoor watering was
allowed on Monday.
Hydrosphere Resource Consultants, Inc. Page 13
Aquacraft,
Draft Framework Document September 10, 2002
Boulder Drought Management Plan
Watering Hours
Restricted to before 9 a.m. and after 6 p.m. on designated watering day.
Watering Duration
Hand or sprinkler outdoor watering was limited to 15 minutes to each area or zone, one time on
each watering day.
Exemption for Drip Irrigation Systems
Drip irrigation systems, bubbler or soaker hoses were permitted to be used for up to two hours
for each area on the sama days and hours designated for hand or sprinkler outdoor watering.
Other Restrictions
• Washing of sidewalks, drivaways, patios or similar hardscapes was prohibited.
• Water waste caused by runoff of water onto streets or into drainage facilities was
declared illegal.
~ Failure to shut off or repair a leaking irrigation system within 1 hour could result in a
violation.
• Vehicles washing was permitted any time. Washing could only occur with a bucket or a
hose fitted with an automatic shut-off nozzle. People were encouraged to park vehicles on
their lawns while washing but remove immediately after. Commercial vehicle washing
facilities were exempted from restrictions.
Penalties
The following penalties were established for violations of City watering restrictions:
• First violation -$50 water waste charge.
• Second violation -$100 water waste charge.
• Third violation -$300 water waste charge.
• Failure to pay resulted in the water misuse charge plus a$15 administrative processing
fee, being added ko the next regular water bill.
• Subsequent violations could result in turning off water service and Municipal Court
prosecution.
Customer Response
The citizens of Boulder responded quickly and substantially to the mandatory watering
restrictions. From June through August, water demand in Boulder was about 30 percent lower
than previous years and was below established targets for each week from June - mid-August.
Boulder citizens reduced their outdoor consumption by approximately 50 percent and their
indoor consump[ion by about 10 percent. The week of August 13-19 the targets were exceeded
for the first time since mandatory restrictions were imposed but only by 1 percent. Figure 2
shows the cumutative citywide daily water use in Boulder and the water use targets for the entire
summer of 2002. Figure 3 shows daily water use in comparison with the 2000-2001 average and
the targets established by the City.
Hydrosphere Resource Consultants, Ina Page 14
AquacrafC,
Draft Framework Document
Boulder Drought Management Plan
a2oo
3000
September 1Q 2002
3600
N
C
O
~ 2400
~
C
O 1800
~
1200
600
0
5/14/02 5/28/02 6/11/02 6/25/02 7/9/02 7/23/02 8/6/02 8/20/02 9/3/02 9/17/02
-2002 Target Water Use -2002 Actual Water Use ~2000-2001 Water Use
Figure 2: City of Boulder actual and target daily water use, May - August 2002
Hydrosphere Resource Consultants, Inc. Page 15
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
ra
40
c 35
0
m
~ 30
e
0
~ 25
ai
~ 20
~
d
3 is
T
p 10
5
0
September 10, 2002
1-Jan 1•Feb 1~Mer 1-Apr t-May 7JUn 1-JUl 1-AUg 1-Sep 1•OCt 1-Nov 1-Dec
-2000-2001 Average
-2002 Actual Use
-2002 Water Use Conservatlon Targets
Figure 3: Comparison of Boulder's treated water use, 2000-O1 avg. vs. 2002 actual vs.
targets
Over the course of the summer of 2002, citizens of Boulder saved 1,005.2 million gallons (3,086
acre feet) of water on their way to a savings target of 1,190.8 million gallons (3,654 acre feet)
from May 2002 - May 2003. Figure 4 shows the progress to date toward the annual water
savings target.
Hydrosphere Resource Consultants, Inc. Page 16
Aquacraft,
Draft Framework Document September 10, 2002
Boulder Drought Management Plan
,~: ~ ~ ~_
~ y;; I ",, 3 ~;~
~ ~
,
,
, , a
~< < ; t , ,` ~ t , ~ ~ . ~
~
y~ t '
~t~
~ ;` 1k1Q&;3
y ~i
.
~
~ i;
' 7 t
: 02002 Water
~ i
,
.
,
;
~ ~ t ~
~ '
~ Savings to Date
~ , , , ,
,
,
~ y
~ ° ~
„} .Y : , 3 , E
5..
~
~ ~
m ~
`
~' ~ ~ ~
~
~
~ ;~
;
-
s - ~ 2002 Water
~
~
r
,
`
o "
y ~ ~~; Savings Goal
._ °~
~ ,
~
~
~'
a u~
,~1 +
~ '
4
~ .
u*. .~ ~~ # ~ ~~' :i
1 ~ ~ @~ 'iE;,i
EF
Figure 4: Progress toward annual water savings goal
Discussion of Restrictions (Preliminary)
The discussion in this section is preliminary and is based on comments published in the
newspaper, internal departmental discussions, and one public comment meeting (8/14). As more
discussion ensues, especially the forthcoming public comment meetings on 9/18 and 10/16, this
section will be updated and revised accordingly.
Successes and Benefits of 2002 Water Restrictions:
- The water saving targets were met and exceeded.
- Restrictions were simple and relatively "easy" to communicate and understand.
- Generally good response by the citizens with relatively few violations.
- Implementation was quick as was the response to mandatory restrictions.
- City made sensible and appropriate changes to accommodate concerns by increasing the
time allotted for drip irrigation and allowing increased watering time of trees.
- Program of restrictions was relatively inexpensive to implement.
Problems with 2002 Water Restrictions:
Hydrosphere Resource Consultants, Inc. Page 17
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
- The mandated restrictions were often seen as onerous and inequitable. (What do you
mean by "often"? The v1sC majoriCy of cusComers did noC complain. How can 125%
ceduction be anyti~ing other t.han onerous? "uiequitable" needs further elaboration.)
- Coupled with Boulder's current rate sYructure, the drought cutbacks resulted in a utility
revenue shortfall of more than $2,000,000. (Cou~led with Boulder's currenf rate
structure, a~ demanci red~ictions wauld have resulled in revenue shorlfalls.)
- The severe day/time restrictions made it nearly impossible for parks, schools, and other
larger irrigators to manage irrigation without incurring violations. This resulted in
reductions to large irrigated areas such as parks and schools that were far greater (60%
and up) than the desired 25%o.
- Opportunity for input (both within City departments and from the public) prior to
implementation was minimal at best.
- The system of restrictions directed personnel resources more reactively towards violation
enforcement rather than proactively towards providing customer understanding and
assistance in responding to the situation's challenges.
- Enforcement of restrictions cost $??, and only about $9,000 was collected through fines.
- No opportunity for community prioritization of public landscapes.
- Trees suffered disproportionately. Compaced to whaf? Cei~tainly no[ lawns.
- The absence of sufficient warning resulted in the "Green Industry" being severely
impacted and not properly prepared to better serve the customer's new drought restriction
driven needs.
- No exemption was provided for vegetable gardens.
- Some citizens may water more because they don't want to miss their watering day.
- Prohibiting water meter access is seen as unreasonable and counter productive.
- To work within limitations and gain greater application volumes, there was some
replacement of lower flow to higher volume sprinkler heads that is counter productive to
long term system demand management interests.
Demand Management Options
Barring quick and severe regional climate change, droughts in Boulder will be infrequent
occurrences. However, the severity of the drought of 2002 has put the City in a position where
some type of demand management may be required in the fall and winter and through the 2003
irrigation season. The demand management options discussed below are designed to help the
City respond to the continuing drought situation in Boulder, and can be implemented on fairly
short notice. More long-term options are discussed in the next section.
Indoor Water Conservation
Importance of winter water savings
Indoor water savings are critical if Boulder is to store additional waYer through the winter and
spring in preparation for continuing shortages and drought conditions in 2003. Because of
anticipated low allocations of CBT water in 2003 Boulder's supply may be under stress without
sufficient winter snow pack. Indoor water efficiency programs enacted now can oniy help "bank"
Hydrosphere Resource Consultants, Inc. Page 18
Aquacraft,
Draft Framework Document September 1Q 2002
Boulder Drought Management Plan
water over the winter as well and can also maintain some measure of reduced demand during the
summer of 2003 and for years to come. Regardless of the snow pack this year, it makes sense for
the City to implement indoor conservation soon to inoculate against potential shartfalls.
Furthermore, most of the water savings achieved from indoor measures will be permanent and
will assist in future years.
Expectation of 5% reduction, but more possible
Water use data from the summer of 2002 suggest that the citizens of Boulder curtailed their
indoor use as well as outdoor use in response to the drought. While the exact magnitude of these
savings is not known, it was estimated to be about a 5 percent reduction. Water demand
projections for the coming months assume that this 5 percent reduction will continue, but even
more savings are possible. As the irrigation season winds down, efforts must be focused on
indoor water savings and reducing demand through the winter to ensure adequate supplies for
2003 and beyond.
Indoor Conservatiorc Program ideas
The following is a list of indoor water conservation programs for the City to consider
implementing.
• Public Education and InFormation
The City greatly increased its conservation public education effort during the summer of
2002. This campaign should be continued and expanded. Public education and
information support and promote all other efficiency programs the City implements. The
City needs to get the message out that indoor water savings are critical and reduce the
likelihood of required restrictions in 2003. Bill stuffers, pamphlets, the City web site,
newspaper articles and advertisements, radio and television public service
announcements, and other information opportunities should be considered.
Specific water saving information that should be conveyed to customers includes:
• Toilets and clothes washers are typically the largest indoor users of water in a
single-family home.
• Only wash full loads of clothes. Avoid using the extra-rinse setting on your
clothes washer if possible.
• Reducing flushing frequency saves water. Never dispose of trash down the toilet.
• Replacing older toilets with a new 1.6 gallon per flush model saves an average of
1Q000 gallons per year per household.
• Repair leaks. Leakage typically accounts for 13 percent of indoor water use.
• Toilet leaks are the most common form of household leakage. Toilet leaks are
usually caused by a faulty flapper valve. Some toilet cieaning products that are
put into the tank actually damage and degrade the flapper valve. When replacing a
flapper valve, be sure to bring the old one to the store with you to be sure you get
one that is compatible with your toilet. Fiappers are noC standardized.
• Replacing older toilets with new a new 1.6 gallons per flush model is the best way
to eliminate leakage.
Hydrosphere Resource Consultants, Inc. Page 19
Aquacraft,
Draft Framework Dort zrnent
Boulder Drought Ma~agement Plan
September 10, 2002
~ Replac mg an older clothes washer with a high efficiency model saves an average
of 7,0(0) gallons per year. New clothes washers also use substantially less energy.
Estimated comt of program: Unknown
Estimated w~ver savings: 0- 5 percent of indoor use.
• Ultra Low FLLw (ULF) toilet distribution/rebate
Research has : hown that replacing old inefficient toilets with a standard 1,6 gallons per
flush Coilet (th t only type of new toilet sold in the U.S.) is one of the most cost-effective
water conservntion measures available. Although more expensive models are available, a
good quality to;ilet costs around $100 plus installation,. Replacing all the toilets in a house
saves an aver2l;e of 10.5 gaAons per capita per day. ~ For a household of 4, this equates to
more than 15,Q100 gallons of savings over a year and the payback period from water
savings is typ'~:ally 2 to 4 years.~
Many utilitiesa~ffer a rebaYe of $50 to $100 Por replacing an old Yoilet with an efficiettt
model. Anothor option is to offer a complete purchase and installation service with or
without rebatatto customers. Customers could select a toilet from using an on-line web
interface, inst~tdl the toilet themselves, or schedule an installation time with a
professional.
At a minimur~i the City could provide educational materials promoCing toilet
replacement, aicplaining the anticipated water savings, and providing installation
instructions otccontacts for professional plumbers.
Estimated cosi of toilet rebate program ($25 per toilet): $75,000 -$100,Q00 (assumes
between 2,506,:and 3,500 toilets replaced)
Estimated wau.er savings: 43 - 60 acre-feet (permanent savings).
Cost per Acri ~Foot of Savings: $1,700
• Faucet Aerat rs
Low flow fauaet aerators are inexpensive and coald be purchased in kits by the city and
distributed alchg with conservation literature to customers. Research has shown that the
water savings'acom faucet aerators can be larger when they replace high flow fixtures. A
kit with two a~ rators and installation information would cost about $5. Research indicaYes
that showarhelai replacement offers very small water savings and is usually not cost
effective.
Estimated coa~t of program: $15,000 (includes distribution of 3,000 kits)
Estimated waeer savings: 10 acre-feet (permanent savings)
Cost per Acri ~Foot of Savings: $1,500
'"Residential End Uses o",Water", 1999, American Water Works Association.
z"Seattle Home Watar Cciaserva6on Study", 20Q0, Aquacraft, Ine.
Hydrosphere Resourese Consultants, Inc. Page 20
AquaarafY,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
• Clothes Washer rebate promotion
Clothes washers are the second largest user of water in residences a$er toilets. High
efficiency models use about 40 percent less water and electricity than standard washers.
The City Office of Water Conservation currently offers a$75 rebate for the purchase of a
high-efficiency clothes washer. However the program is under-funded and has received
little public promotion. In 2001, the City gave out approximately 325 rebates at cost of
$24,375. The water savings from this effort are estimated at 7 acre-feet for a cost per
acre-foot of savings of $3,482.
Without much effort the City could promote and expand the current rebate program and
encourage more citizens to purchase a high efficiency clothes washer.
Estimated cost of expanded program: $30,000 (assumes doubling of 2001 rebate rate)
Estimated water savings: 7 acre-feet (permanent savings)
Cost per Acre-Foot of 5avings: $4,286
Point oF property sale retro~t ordinance
An ordinance requiring the updating of existing plumbing fixtures to current efficiency
standards as a condition of the sale of residential and commercial property could increase
the rate of penetration of these devices. Under such an ordinance, the City would require
the seller of improved real property ensure that all standard plumbing fixtures (toilets,
showers, and faucets) complied with the flow rates estabiished in the 1994 Energy Policy
Act before the title could be transferred to a new owner. Buildings constructed after 1994
would be exempt (presumably they already have these fixtures), and properties updated
since 1994 would not be required to do so again.
The pros and cons of this type or regulation aze fairly obvious. Such an ordinance would
put an additional burden on the sellers of real estate and it is not clear how compliance
could be enforced. On the other hand, if properly implemented, this ordinance could
rapidly increase the conversion of old inefficient fixtures to new models.
~stimated cost of program: Minimal to the City
Estimated water savings: Unknown. Depends upon the number of properties sold.
Estimated water savings per house soid is: 11,000 gallons per year.
Cost per Acre-Foot of Savings: $0
~ Commercial , industrial, & institutional (CII) conservation program
Large commercial and industrial customers are among the largest uses of water in
Boulder. A water efficiency partnership program between the City and these customers
could result in substantial water savings both indoors and outdoors. Under such a
program, the City would offer a free water use consultation wiCh CII customers to
determine where water is used on the site and opportunities for savings exist. A water
efficiency management plan for each customer would be developed. Implementation of
the plan would remain the responsibility of the customer, but the City could offer
financial incentives to increase implementation rates.
Hydrosphere Resource Consultants, Inc. Page 21
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
Estimated cost of program: $30,000 per year for staff and consulting time.
Estimated water savings: Varies depending upon the level of cooperation and the
measures implemented.
Cost per Acre-Foot of Savings: Unknown.
~ Pool and Spa covers
This is not exclusively an indoor conservation measure but studies haue shown that
swimming pool and spa covers greatly reduce evaporation losses. The City could
promote or require pool and spa covers on all public and private outdoor pools and spas.
~stimated cost of program: Nothing.
Estimated water savings: Unknown.
Cost per Acre-Foot of Savings: $0
• Leak detection - Systematic and Customer
Water lost to leakage is a problem in the City's distribution system and within residences
and businesses across the City. The City could initiate a leak detection and repair
program targeted at system and storage reservoir leaks and get extra bang for the buck by
coupling the program with educational materials designed to assist residents in tracking
down and repairing leaks in their homes and businesses.
System: About 8.5 percent of the water leaving Boulder's water treatment plants is lost
on the way to the end user. The City of Boulder Water Conservation Futures Study
(Hydroshpere and Aquacraft, 2000) has a detailed analysis of these losses and potential
causes. A distribution system leak detection and repair program would probably
necessitate the purchase or lease or new equipment along with additional staff time to
track down leaks. Each percent reduction savings in unaccounted water represents about
225 acre-feet. If the City valued this water at $2,500 per acre-foot (10% of current market
value) it would be justified in spending $562,500 for each percentage decrease in
unaccounted water.
Customer: Leaks in homes and businesses are most typically caused by faulty toilet
flappers, although there are many other culprits. A 1999 American Water Works
Association study found that leaks accounted for nearly 13 percent of indoor use in
single-family residences. An effective toilet rebate/replacement program will likely
reduce leakage because presumably many older leaking toilets will be replaced. A
targeted leak audit program could be an excellent service to Boulder water customers.
When leaks are found they could be repaired (if possible) or a professional plumber could
be referred to the customer.
Estimated cost of program:
System wide leak detection -$100,000 -$150,000 per year (1 F"I'E plus equipment).
Residential leak detection - Unknown
Hydrosphere Resource Consultants, Inc. Page 22
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
Estimated water savings: 225 acre-feet for each percentage reduction in unaccounted
water.
Cost per Acre-Foot of Savings: $1,000 -$2,500 (rough estimate)
• Other ideas
Repeal the regulation that makes gaining access to one's water meter illegal.
Greywater Reuse and Rain Barre/s - Not Viable for Boulder
Over the summer of 2002, many Boulder citizens informally re-used water from showers, baths,
sinks, and even clothes washers to water their landscapes. Although there wasn't much rain, the
topic of rain barrels was frequently discussed as another possibility for getting water to plants.
Greywater Reuse
Although technically feasible, greywater reuse systems are not a realistic option for Boulder to
consider. Here's why: Boulder does not own the reuse rights to most of its municipal water
supply. Encouraging greywater systems could have the unintended effect of decreasing the city's
water supplies instead of conserving them.
Extensive use of greywater systems would cause an increase in the consumed amount of
Boulder's municipal water and a decrease in the historic return flows to other users. 3 A
greywater promotion program by the City has the potential to trigger a reopening of many of the
City's water decrees with imposition of new terms and conditions.
Boulder has an extensive reuse system and de facto greywater system already in place in the
form of downstream users who take Boulder's wastewater and put it to use and who have a legal
claim to the reused water that trumps the reuse rights of Boulder's users. In addition, this existing
reuse system is based on discharges of treated wastewater from the treatment plant delivered to
downstream users and meets all state permitting requirements.
Rain Barrels
It is the current opinion of the state engineer that rain barrels represent an unlawful diversion of
water that is a part of the stream system and that should be administered according to the priority
system. The City is unable to authorize or promote rain barrels for this reason.
Even if rain barrels were legal in Boulder, [he amount and frequency of rain in the summer make
them an iffy proposition at best when a cost benefit analysis is performed.
~ Consumed water is water that is not sent to the water treatment plant, teeated, and then put back into Boulder
Creek for o[hers downstream to usc.
Hydrosphere Resource Consultants, Inc. Page 23
Aquacraft,
Draft Framework Document September 10, 2002
Boulder Drought Management Plan
Outdoor Use - Restriction Options
If faced with future shortages and droughts, the City has a wide variety of resCriction options it
could choose to implement. A number of diffarent of options are listed below along with the
anticipated annual water use reductions anticipated with each option.
Full Ban on Outdoor Use
45% annual reduction esYimated.
Without sufficient rain, a full ban on outdoor use would cause severe loss of trees, lawns, bushes,
shrubs, and other landscape plantings across the City.
Current Restriction Program - IS minutes per zone, 2 times per week
20% annual reduction estimated (similar to 2002)
See discussion of current system above.
Potential modi~cations to current program4:
Exemptions and changes
• Vegetable gardens
~ City parks and ball fields
• New plantings
• Expanded customer information & education
~ Individual water management plans
Individual Water Management Plans
The City could allow customer to submit an individual water management plan that
would then exempt them from the restriction program. The individual management plan
would essentially create a water budget for the customer that they would agree to adhere
to. Once approved, the management plan customer could use water any day of the week
(during designated hours i.e. 6 p.m. - 9 a.m.) and would place a sign on their property to
alert neighbors and code enforcement officers. Individual management plans could be
used as a way to transition to a water budget rate and billing system or could be used
when restrictions are imposed in lieu of such a system.
The water management plan would be based on the theoretical requirements for the
property (lot size, landscaping, etc.) and historic water use at the site and would fix a
target maximum volume of water to be used each month. If the customer exceeded their
plan's budget, they would automatically receive a fine (no warning, just a fine).
Exceeding the budget twice could result in a fine, cancellation of the plan, and possibly
installation of a flow restrictor.
4 Modifications could be applied to any of the outdooi use restric6on options listed.
Hydrosphere Resource Consultants, Inc. Page 24
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
Samnle water mana eg ment plan
Here is a hypothetical water managament plan for a single-family customer in Boulder:
Customer Information
Name: Mork and Mindy
Address: 1511 Spruce St., Boulder, CO
Residents: 2 adults, no kids
Irrigable area: 8,000 square feet (sfj
Irrigable area calculaYionS:
Lot size (from tax assessor) = 14,000 sf
House footprint = 2,000 sf
Patio area = 2,000 sf
Driveway area = 1,000 sf
Walks and other impervious areas = 1,000 sf
Normal Year Consumption
Avg. annual water use 2000 - 2001 (pre drought) = 200,000 gal.
Avg. winYer monthly consumption (AWC) = 5,000 gal.
Estimated annual indoor use = 60,000 gal.
Estimated annual outdoor use = 140,000 gal.
Est. annual gal. per square foot outdoor = 17.5 gal/sf
Water Budget Calculations
Reduction in water use required by City of Boulder = 30%
Reduced annual consumption = 140,000 gal. per year (200,000 x 0.7)
Proposed Monthly Water Budget:
Month Indoor Outdoor Total Use
Use (gal.) Use (gal) (gaL)
January 5,000 0 5,000
February 5,000 0 5,000
March 5,000 0 5,000
5 Including a dcawing of the site plan, or ob[ainiug fhe information from the Ciry dIS could be used Co verify
accuracy.
Hydrosphere Resource Consultants, Inc. Page 25
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
April 5,000 5,000 10,000
May 5,000 10,000 15,000
June 5,000 15,000 20,000
July 5,000 20,000 25,000
August 5,000 15,000 20,000
September 5,000 1Q000 15,000
October 5,000 5,000 10,000
November 5,000 0 5,000
December 5,000 0 5,000
TOTAL 60,000 80,000 140,000
September 10, 2002
Two Days Per Week - 2 hours total watering tirrce per day, 2 times per week, no limiC on time
per zone
15% annual reduction estimated
Voluntary Restrictions - l5 minutes per zone, 2 tirizes per week
10% annual reductions estimated.
Outdoor Use - Water Budget Approaches
Overview and History
Simply defined, a water budget rate system is a tiered (block) rate structure with higher rates for
higher use that is used in conjunction with customer-specific water budgets based on available
water supplies and the indoor and outdoor requirements of each customer. The water budget rate
system can be viewed as an information Yool that assisCs the utility to communicate with the
customer. The water bill becomes a valuable source of information that tells the customer if they
are over-watering or if they might have a large leak by comparing their monthly use to a monthly
budget created specifically for their property.
In response to California's prolonged drought of the early nineties, uvine Ranch Water District
(IRWD), located near Los Angeles, conceived a unique water budget based billing approach
initially as a landscape conservation tool. Over time, this water management system has evolved
to make the water bill more closely reflect a customer's actual water use and tl~eir water needs
and has been adopted by several communities. As described in City of Boulder Water
Conservation Futures Study (Hydrosphere and Aquacraft, Inc., 2000, page 64), a water budget
based rate system (also known as an "Allocation Rate") "is designed to benefit accounts Chat
practice conservation with lower water bills and send a strong message to accounts which waste
water through high bills".
Hydrosphere Resource Consultants, Inc. Page 26
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
A 1997 study determined IRWD had lowered its average annual service area irrigation rate from
57.2" to 32.8" (or 35.7 to 20.44 ga]/SF) a 37°~o drop. Several otl~er California communities have
adopted this budget-based strucCure with similar demonstrated success and a reported high
degree of customer satisfaction. One major benefit to this program is that these reductions occur
every yearratherjustin droughtemergencies.
In 2001, to better control its irrigation water use, the City of Cary, NorCh Carolina adopted a
water budget rate structure. Site specific water budgets were developed for its largest non-
residential customers to reduce excessive irrigation use. To serve as a deterrent, progressively
priced aggressive tiers were added to the existing residential and non-residential tiered rate
structures. A water budget rate system has also been put in place in Otay California and West
Jordan Utah.
The greatest strength of a budgeted rate structure is its fairness both to the customer as well as to
the utility. Customers are rewarded for saving water both financially and/or as an opportunity for
using the saved water at a later time. They appreciate the fact they have much more latitude to
make decisions in their own behalf about when and how to use the budgeYed water. A key utility
benefit is that this cost-effective program also provides a stabilized revenue stream regardless of
volume use and climatic conditions. Another utility benefit is its oppoxtunity to serve mare in a
customer service/educator capacity since the need for enforcement involvement is greatly
reduced. For all concerned, water budgets are a more fair and reliable way to adjust water use in
appropriate response to changing water supplies than by imposing mandatory restrictions which
rely greatly on inflexible irrigation schedules.
How it works
Bud~et Factors Indoors: The indoor water budget is typically set for each customer based on the
average winter consumption (AWC)6 or fixed for all using the AWC class average. For
residential customers in Boulder, the class average is 5,000 gallons per month per house or
apartment unit. The advantage of using the AWC for each customer is that the indoor budget can
be tailored to each customer's real use. On the other hand, it is possible to artificially inflate
one's AWC by using mare water in the winter (although the customer is charged for this use).
Currently in Bouider, customers whose AWC is less than 5,000 gallons are bumped up to 5,000
gallons of use in block 1. Customers whose AWC is more than 5,000 gallons have a block 1
amount fixed at their higher AWC volume. Fixing an indoor budget of 5,000 gallons per month
for residential customers is a simpler solution, but it would be important to offer variances for
large families and other extenuating circumstances.
Commercial, industrial, municipal and other users would be initially be assigned an indoor water
budget based on their individual average winter consumption from water billing years 2000 -
2001. Ideally the indoor budget for non-residential customers should be tailored for each
customer however this will take time to implement.
~ Average win[er consumption is the average monthly use during December, January, and February. This usually is a
good estimate of monthly indoor use for each customer.
Hydrosphere Resource Consultants, Inc. Page 27
Aquacraft,
Draft Framework Document September 10, 2002
Boulder Drought Management Plan
Budget Factors Outdoors: The outdoor water budget is typically based on lot size (square feet)
associated with each billing accounY or if possible the irrigable area (lot size minus all
impervious areas).~ The area data for each property is multiplied by a volume of water, typically
between 10 and 20 gallons per square foot, to arrive at the outdoor volumecric budget. The
volumetric multiplier can be adjusted up or down in times of surplus or drought and a maximum
monthly cap could be established in severe drought years. The outdoor water budget should
provide ample supply to each customer in a normal year, and can be scaled back to meet utility
needs during time of drought. Customers who exceed their budget in a normal year will pay a
premium price for the extra water. In a drought year customers who exceed their budget could
face a fine and possibly a flow restrictor for repeated violations.
The water budget is set for an entire year, but it differs from month to month based on average
historic climate. During the winter months, November - March the budget only includes indoor
use. From April - October the water budget increases to accommodate outdoor use. The highest
monthly allocation will occur in July and then decrease through October. Water budget variances
could be made available via an application and review process. Figure 4 shows the monthly
adjustments used by the City of Otay, CA for their budget rate system.
Water Budget with Monthly Adjustment
Figure 5: Sample water budget monthly adjustment curve
Rate Structure: The water budget is then paired with a tiered rate structure that ties basic rates
with base line water use and accelerated rates aimed at penalizing overuse. An example of a
potential rate structure for Boulder, modified from IRWD is shown in Table 2 below.
Table 2: Example of a Modified IRWD Budget Based Rate Structure
Tier Rate Water Use
~ The City's Geographic Informadon System (GIS) has advanced to the point where it can be used to obtain lot size
informadon that ean be linked Co each watee meter and wate~ billing account. It may also be possible to obtain some
measures of impervious area including building footprint, driveway, and patio areas.
Hydrosphere Resource Consultants, Inc. Page 28
Aquacraft,
Jan Feb Mar Apr May June July Aug Sept Oct Nov ~ec
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
(per kgal) (% of water budget)
Low Volume Benefit '/a x Base Rate 0- 40%
Conservation Base Rate Base Rate 41 - 100%o
Inefficient 2 x Base Rate 101 - 150%
Excessive 3 x Base Rate 151- 200%
Wasteful 5 x Base Rate 201%+
For the short-term, the City of Boulder might opt to adapt the current three-tiered block rate
structure to function with a customized water budget for each customer. The could enable the
City to continue using iYs current water billing software until a full five tier system could be
implemented.
Service Fee/Commoditv Fee: Using IRWD's example, their monthly service fee is determined
and charged on the premise of fully covering the agency's annual fixed operating costs. A
separate "commodity" charge is used for the variable costs associated with water treatment and
delivery. This method protects the utiIity's revenue requirements from usage fluctuation in
situations such as drought. In Boulder, it might make sense to have the service fee and part of
Block 1 charges set to cover annual fixed operating costs rather than the monthly service fee
alone.
To acknowledge those that conserve and maka sure that they aren't perceived as subsidizing the
system's "water wasters", typically revenue obtained from the upper "wasteful" tier is earmarked
for funding furCher agency/community conservation programs/acYivities. This is in keeping with
Boulder's current program of using Block 3 revenues to fund water conservation.
Drought year versus normal vear: In response to drought conditions, a customer's budget can be
lowered proportionately to the system's demand reduction needs. This approach recognizes that
what may be acceptable use during normal times is wasteful in times of shortage. It aiso provides
the customer with greater freedom than would be provided under the system of prescriptive
schedules to decide how to best adapt to their new lowered budget. The motivation would be to
avoid the excessive use charges rather than to compiy with an arbifrary schedule. In the process
of lowering the budget, there may also be a corresponding price increase that serves as an added
consarvation incentive.
In a drought, the utility may also wish to set a maximum limit on water use for each customer
based on the individual budget or on the customer class. Lafayette instituted a monthly
maximum per account use in 2002. Customers that exceed the maximum during any given
billing period would be given a warning. Customers that exceed the maximum during any two
consacutive billing periods could receive a flow restrictor on their water line.
If the City desired to have more rapid response to violators it could read customer's water meters
more frequently - every two weeks for example. Billing would remain monthly, but customers
whose use over a two-week period exceeded their drought allocation would be sent a warning. A
fine would follow with their monthly bill if thair full monthly allocation were exceeded. Two
weeks later, those customers that were still exceeding their budget could receive a flow restrictor.
Hydrosphere Resource Consultants, Inc. Page 29
AquacrafC,
Draft Framework Document September 10, 2002
Boulder Drought Management Plan
Other Water Budget Rate System Features
The City of Boulder already has a three tiered rate structure with a monthly service fee so
adjusting to a modified tiered system with a service and commodity fee should be relatively easy
for customers. The main difference would be that in the new system, the economic message sent
by the higher tiers would be much stronger than the present system.
There are variations on the basic rate theme amongst the several communities using this type of
water budget approach. Boulder will need to consider these in tailoring the elements of a water
budget rate structure that will best serve iYs community own unique needs. Some examples are:
"Water Bankine": To reward conservation and to provide fairness, an important
consideration for inclusion in this rate system is a"water banking" feature. As described
in the monthly budgeting process above, if a customer uses less than their monthly
allotment, that amount is electronically "banked". Banked units are available for times
when extra water may be necessary (hot periods, landscape rehabilitation, fertilization,
etc.), to offset an overage before surcharges are assessed, and carried over for use at some
future date. Similarly, this feature would allow users who conserve indoor water use
through retrofits and/or upgrades to fixtures and appiiances to bank this water for use
outdoors during the summer. Natural rainfall is not subtracted from the budgeted amount
so that water is "free" falling into one's water bank (providing they aren't irrigating
during the rain.)
Overuse Penalties and "Grace" Periods: If no water bank units a1•e available, using more
water than the monthiy budget amount results in the surcharges being assessed only after
the customer has been given a one (or two) month "grace" period to make-up or offset the
overage of the prior month.
Providing Education and Timely Customer Information:
Education, combined with timely and easily accessible customer water use information is critical
to the success of a water budget rate system. If the expectations are that a customer adhere to a
water budget, then the utility has the responsibility Co work closely with the customer by
providing appropriate and timely water use information to help the customer best manage their
budget. The following items could be implemented by the City of Boulder to facilitate better
customer understanding of their water use.
Imnroved Water Bill - The water bill itself is critical to the success of a water budget rate
program. The water bill is the primary communication tool that informs the customer how much
water she has used and if that water use is over or under the budget. The following information
could be included on Boulder's monthly water billing statements:
• Consumption in current month - total consumption and the amount billed in each of
the billing rate blocks.
~ Budgeted consumption in the current month - amount of water for indoor use and for
outdoor use in the budget.
Hydrosphere Resource Consultants, Inc. Page 30
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
• Amount under or over the budget. Volumes exceeding the monthly budget should be
highlighted in red so that customers understand they have exceeded their budget.
Customers who exceed their budget should be provided phone numbers and web
addresses for information on reducing water use, finding leaks, customer questions,
etc.
• Water budget for the next month - how much water is budgeted for the customer in
the coming month. This will help the customer plan water use for the upcoming
month. During the summer months, recommended irrigation schedules, amounts, etc.
could be provided along with the water bill as a customer service.
• Water budget and water consumption for year to date. The budget to date (indoor and
outdoor) should be shown along with the total amount used in the year so far. This
again will help the customer to understand how they are doing overalL The total
annual budget should also be shown along with an explanation of how the budget is
calculated.
• Amount used during same period last year. Give the customer the ability to compare
their consumption against what was used last year (or over an average of the past few
years).
• Information should be provided in a graphical as well as a numerical format if
possible.
Web and telephone customer billin~ information - Imagine going to your home computer,
logging on to the City web site, entering your water billing account number and a password and
getting access to your most recent water bill (including all the information listed above) and your
water billing history. On the site one could see how much water you used during the last billing
period, how much water was used over the last 12 months, how water use compares with the
previous 12 months, and how current use compares with your water budget. New data would be
uploaded every time the City reads meters and providing customers with timely feedback. A
similarly featured automated telephone system, much like banks offer their customers, could be
offered for those without web access. Such a system may not be as expensive as it might seem to
implement and would provide a tremendous value to the customer. The web site could serve as
an information center providing information such as how each water budget is calculated, how a
variance can be obtained, as well as tips on numerous water efficiency opportunities.
Water Meter TrackinE: Tn addition to the above-mentioned electronic access, for customers who
wish to track their own water use more closely, additional information services could be
considered. These could include remote meter read out devices or simply encourage customers to
track their use by allowing access to their own water meters rather than prohibiting this activity.
A simple option would be to encourage customers to install their own water meter inside where
the water line comes into the house. The cost for purchasing a meter and hiring a plumber to do
the job is about $200. This is a way for customers who wish to track their own water use to have
regular information without disturbing the City meter.
Benefits artd Challenges
Hydrosphere Resource Consultants, Inc. Page 31
AquacraPt,
Draft Framework Document
Boulder Drought Management Plan
September ] 0, 2002
Benefits - Key benefits of the proposed water budget based billing system include:
• Fairness/Equity for both customer and agency
• Cost-effective program for the utility
• Revenue stability even during drought
• Customer oriented - provides management flexibility at account level
~ Accountability - targets excessive water use/users without relying on costly city
enforcement
• Promoteshewards those that conseroe
• Utility partners with customers in water conservation
• Flexible in responding to drought or system limitations
• Provides incentive for accounY conservation investment - especially landscape adaptation
and/or irrigation system efficiencies
• Compliments Boulder's water conservation implementation plans - even provides
funding source from "wasters" tier proceeds
~ Provides a highly accurate, reliable, and quick method to adjust water use.
• Better for overali horticultural health
Challenges - Some challenges that face the City as it proceeds with this project include:
• Program preparatiou and public education
• InformaYion needs
• Customer information - ways of access, ease of access, water use, historical use, budget
basis, budget amount, etc.
• Data integration (cross departmental & interdepaztmental)
• Data needs versus data availability
• Implementation timing - full implementation may be difficult for 2003
• Will require specialized programming for billing purposes
• Water use data timeliness & providing ease of customer access
• Water budgef variance review process
• Commercial, institutional, industrial and irrigation only customers may require
individualized budgets
Water Budget Imp/ementation Options
Full Implementat~on
A full implementation of the water budget rate system described above including a customized
budget for each customer, web and phone-based customer consumption information system, and
a 3 or more tier rate structure would likely require the City to purchase new water billing
software. It is unlikely that a full implementation including a migration to new billing software
could be accomplished in time for the 2003 irrigation season. Research suggests that ic is best for
implementation to occur in the winter months thus giving customers (especially residential)
opportunity to familiarize themselves with the new system before the more critical summer
months arrive.
Hydrosphere Resource Consultants, Ina Page 32
Aquacraft,
Draft Framework Document September 10, 2002
Boulder Drought Management Plan
Estimated time to implement: 1- 2 years
Estimated cost: $? New billing system software and migration8
$? Create water budgets for each customer
$? Set new rates
$? Create web and telephone customer billing access
$? TOTAL
Full Implerrtentation Using Current Billing Systein
A full implementation of the water budget rate system implemented by modifying the current
billing system could be accomplished with some programming effort on behalf of City staff and
consultants. Many of the tasks and costs would remain the same even if the current billing
system is not replaced. Water budgets for each customer must be created, rates must be set, and
customers must be provided up-to-date information on their water use.
Using the current three-tiered or three block billing system, Block 1 could be for indoor use,
Block 2 could be for outdoor use within the defined budget for each customer, and Block 3 could
be for excessive outdoor use above the established budgeL The amount of water provided in
Block 2 would change (go down) in a drought year to reflect a required water savings. During a
severe drought, any customer whose monthly use goes into Block 3 would be subject to a
warning or fine. Repeated violations could be punished by installation of a flow restrictor.
Estimated time to implement: 4-8 months?
~stimated wst: $? Programming changes to current system
$? Create water budgets for each customer
$? Set new rates
$? Create web and telephone customer billing access
$? TOTAL
Partial or Phased Implementatiore
A water budget rate system could be implemented for a select set of customers in Boulder by
May 2003 and then expanded to the entire City for 2004. Some options for consideration:
- Create a water budget rate system for commercial, industrial, institutional, and municipal
accounts for 2003 and then add the larger residential sector for 2004.
- Create a water budget rate system for a select portion (the top 25 largest outside water
users for example) of commercial, industrial, institutional, and municipal accounts for
2003 and then add the remainder, including residential, in 2004.
- Address the residential sector (either Single Family and Multi-Family or Single Family
alone) by May 2003 and bring the remaining customers into the system for 2004.
- Implement a pilot water budget rate system for 2003 and proceed based on the results of
the pilot program.
e Irvine Ranch Water District used two in-housc programmers (1 full-time and 1 temp) to develop their water budget
bi]ling system and to migrate to the new system. It took Chem approarimately 1 year to complete the andre project.
Hydrosphere Resource Consultants, Inc. Page 33
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
The cost of these partial or phased implementations would depend entirely on the scope of the
project selected.
Estimated time to implement: 3- 6 months?
Estimated cost: $? Programming changes to current system (or manual billing)
$? Create water budgets for selected customers
$? Set new rates (or use current rates)
$? Create web and telephone customer billing access (or simply allow
customers to read their own water meter)
$? TOTAL
Financing for Demand Managemenf
All of the conservation measures discussed above cost money. If the City hopes to implement
any of these programs it must find a way to pay for them. A drought poses many challenges for a
water utility. On the one hand a drought requires reduction in demand which results in reduced
revenue. On the other hand, during a drought a utility needs to spend additional money on
demand management - such as the indoor conservation measures discussed in this report.
One approach is to impose a drought surcharge, such as Denver Water has implemented. A
drought surcharge can be a flat fee assessed to all customers based on meter size ar customer
category, or can be based on actual consumption. Typically the surcharge is imposed for a
limited period or time or until some end-of-drought triggers have been satisfied. For example,
Denver Water's drought surcharge will remain in place until the reseivoir system reaches 80
percent of capacity.
Another approach is to tap into reserve funds. To date the City has never used this money to pay
for demand management programs.
A third possibility would be to create a loan program where the utility offers small low or no-
interest loans to customers for the purpose of implementing conservation. The loans could be
paid back over a number of months or years as part of the customer's water bill. A preliminary
proposal for a zero/low interest "Residential Water Saver Pilot Program" (Aquacraft and City of
Boulder Office of Water) was drafted earlier in 2002 and was temporarily sidelined due to the
drought's precedence.
R@COIIIlYlelldatlOt7S - these should be added after the WRAB and public meetings.
References
A Primer on Individualized Water Rates: Designing and Implementing Water Buclget-based
Rates, A&N Technical Services, 2002
City of Boulder - Water Conservation Futures Study, Hydrosphere and Aquacraft, Inc., 2000
Hydrosphere Resource Consultants, Inc. Page 34
Aquacraft,
Draft Framework Document
Boulder Drought Management Plan
September 10, 2002
Correspondence and Conversations with Tom Ash and Dale Lessick, Irvine Ranch Water
District, Irvine, CA
Landscape Water Conservation Programs: Evaluation of Water Budget Based Rate Structures,
A&N Technical Services, 1997
The More You Use, The More you Pay - ESPECIALLY if its for Irrigation!, Cary, North
Carolina, 2002
Residential End Uses of Water. Mayer and DeOreo, et.al. 1999. American Water Works
Association.
Seattle Home Water Conservation Study. Aquacraft, Ina 2000. Boulder, Colorado.
Water-Efficient Landscape Irrigation Program - Synopsis, Otay Water District, Otay, CA
Hydrosphere Resource Consultants, Inc. Page 35
Aquacraft,
CITY OF BOULDER
WATER RESOURCES ADVISORY BOARD
MEETING DATE: September 16, 2002
SUBJECT: Presentation and Staff Update on the Wastewater Collection
System Master Plan
REQUESTING DEPARTMENT: Utilities Project Engineering
BOARD ACTION R~QUESTED: IniCial Review of the Draft Wastewater Collection
System Master Plan
FISCAL IMPACT: The Draft Collection System Master Plan includes recommendations
for capital improvements that may require future rate increases.
PURPOSE
This draft master plan is being presented to the Board as part of the public review, comment and
approval process.
BACKGROUND
Since the last Wastewater Collection System Master Plan update in 1983, radevelopment and
growth patterns have changed significanUy. The Boulder Valley Comprehensive plan was
recently updated, and the 2000 census data and the 2001 Planning Data Sourcebook are now
available. These planning documents project future changes to the service area. Along with
these changes, the wastewater volume and distribution will change too.
The city's redevelopment, the updated planning documents, and an anticipated federal regulation
directed at wastewater collection system operation and maintenance make this an appropriate
time to update the ColIection System Master Plan. An engineering consultant, Brown and
Caldwell, has worked with city staff to complete t6is draft update to the Master Plan.
ANALYSIS OF ALTERNATIVES
Significant flow increases are projected over the next 20 years. The Denver Regional Council of
Governments (DRCOG) projects population increases that will result in a corresponding
wastewater flow increase of 17 percent to 23 percent by 2025. The Boulder Valley
Comprehensive Plan projects the increase to occur sooner, within the next 13 years. Either of
these projections represents significandy higher flows in the wastewater collection system.
AGENDA ITEM # ~ Paee 1
Brown and Caldwell point out this developing problem in this draft Master Plan.
The city of Boulder's Utilities Division needs a comprehensive approach to meeting these
increased system loads. The utiliYy can confinue with the existing approach and current level of
funding or increase the effort and set more aggressive schedules to remove anticipated capacity
limitations. With the existing approach, we will complete needed capacity expansion in 2023.
This may be too late depending upon the growth pattern. On the other hand, the evaluation may
be too conservative. The city is not having continual complaints or sewage backups and
overflows that would necessitate immediata action.
The draft plan recommands completion of the ongoing detailed survey of pipes and manholes to
further define problem areas. With that information we can make a decision on the best
approach and the impacts of correcting existing and future system deficiencies.
STAFF RECOMMENDATION
Staff recommends that the Board review the draft and consider recommending approval of the
Wastewater Collection System Master Plan to the Planning Board and the City Council.
ACTION REOUESTED
No action is requested at this time. A recommendation to the Planning Board and City Council
will be requested at the next meeting.
ATTACHMENTS
Executive Summary
The complete draft Wastewater Collection System Master Plan will be handed out at the
meeting.
AGENDA ITEM # J/ Paae 2
DRAFT
CHAPTER 1
EXECUTIVE SUMMARY
INTRODUCTION
The City of Boulder completed its most recent Wastewater Collection System Master Plan
(WWCSMP) in 1983. Prior collection system master plans were completed in 1972 and 1978.
This report serves as an update to the City of Boulder 1983 WWCSMP.
The City's wastewater collection system contains gravity sewer lines ranging from 4-inches to
60-inches in diameter. These pipelines collect and convey wastewater from residential,
commercial, and industrial sources to the wastewater treatment plant (WWTP). There is one
pumping station and force main in the City's collection system.
In 1994, the City purchased the "Hydra" hydraulic model and incorporated wastewater
collection system pipelines with diameters greater than or equal to 10 inches into the model.
As part of this WWCSMP the model was updated to incorporate selected 8-inch diameter
pipelines. Due to the number of 8-inch pipes within the City's collection system, only
selected lines were incorporated into the model as part of this project. The pipeline selection
criteria for the 8-inch pipes is discussed in Chapter 5. Prior to updating the model, it included
approximately 1,600 pipe sections. With the addition of selected 8-inch lines, the updated
model contains approximately 3,900 pipe sections.
Wastewater collection system capital improvement projects are handled by the Public Works
Department Project Management staff, however the Utility Maintenance staff works with the
Project Management staff to identify needed projects and to review facility designs.
OBJECTIVES OP THE WWCSMP
This WWCSMP (including the updated hydraulic model) identifies the upgrade requirements
needed to accommodate growth and redevelopment. It also provides a roadmap that identifies
the general program modifications necessary for compliance with the anticipated Capacity,
Management, Operations, and Maintenance (CMOM) regulations. These modifications will
also enhance customer service and value while minimizing negative health and environmental
impacts.
\\COBCLUSTER USER SERVER\USER~PW~IADERI~PWIIDSEC\WRAB\memos\CHAPTER 1 rev.doc 1-1
DRAFT
SUMMARY OF TASKS PERFORMED
This WWCSMP update includes:
1. A review of existing planning documents,
2. Evaluation of the wastewater collection system,
3. Population, employment, and flow projections,
4. A review of City operation and maintenance practices,
5. Expansion of the City's Hydra model,
6. Identification of hydraulic deficiencies in the collection system,
7. Cost estimates for identified capital improvement needs, and
8. Recommended priorities for identified capital improvement needs.
PROJECTIONS AND ASSUMPTIONS
WWCSMP Population and Employment Values
The population and employment projections used to develop wastewater collection system
service needs are presented in Table 1-1.
Table 1-1. DRCOG TAZ Analysis Projected Population and Employment Values
Year Po ulation Em lo ment
2001 106,614 106,407
2005 109,412 111,062
2010 112,341 119,656
2015 116,121 125,228
2020 119,500 130,721
2025 121,000 132,942
The values shown in Table 1-1 are based on the 2000 census values and DRCOG growth
projections, Actual population and employment numbers should be monitored closely. If
actual population and employment values are found to exceed the projected values shown in
Table 1-1, capital improvement schedules should be revised accordingly. This primarily
impacts wastewater treatment capacity requirements, which are not a part of this master plan.
Annual Average (Dry Weather) Flow Projections
Annual average flow projections shown in Table 1-2 were based on the 2001 DRCOG
Transportation Analysis Zones (TAZ) population and employment values for 2001, 2005,
2010, 2015, 2020, and 2025. The flow projections were calculated by multiplying the
population numbers by 102 gallons per capita per day (g/c/d) and the employment numbers
\\COIICLUSTER USER SERVER\USER~I'W~tvIADERIV'WIIDSEC\WRAB\memos\CHAPTER 1 rev.doc 1-Z
DRAFT
by 50 gallons per employee per day (g/e/d~. The 2001 DRCOG TAZ Analysis population
and employment values were used since the DRCOG TAZ model breaks down the
population and employment in small areas for analysis. This breakdown facilitates routing
flows more accurately through the collection system model and helps to identify wastewater
collection system capacity shortfalls. In addition, the City of Boulder population projections
described in the BVCP are currently being challenged. The census undercount challenge has
not been finalized. If actual population values are found to exceed the DRCOG-based
projected values, flow projections should be revised accordingly.
Table 1-2. Flow Projections
Year Plow Projections Based on
2001 DRCOG Po ulation and Em lo ment TAZ Anal sis'
2001 17.2
2005 17.8
2010 18.5
2015 19.3
2020 19.9
2025 20.2
' Projections are based on population multiplied by 102 g/c/d and employment multiplied by 50 g/e/d and
induscrial flows at 6% of the total flow.
Peak dry-weather flow inputs are calculated by applying a peaking factor to the average dry-
weather flows. Throughout the wastewater industry, hydraulic peaking factors ranging from
1.2 to 5.0 are commonly used. A sampling of 2000 data in June and October revealed the
peaking factor at the wastewater treatment plant ranged from 1.26 to 1,34. Table 1-3 displays
the peaking factors used for the hydraulic modeling performed for the WWCSMP based on
pipeline diameters. These peaking factors are consistent with the values listed in the City's
Design and Construction Standards and measured flows, however they vary slightly due to
the broader range of pipe diameters selected for the modeling effort.
Table 1-3. Peaking Factor by Pipe Diameter
Pi e Diameter, inches Hourl Plow Peakin Factor
8-15 4.0
18-36 2.7
42-60 134
Peak Dry-Weather Pipe Capacity Criteria. Based on discussions with the City, peak dry-
weather flow pipe capacity criteria were established at 90% full for all pipe sizes.
Peak-Wet Weather Flows (Storm Events)
Flows in the Boulder wastewater collection system increase as a result of significant
precipitation events. During an August 1992 storm event, the influent daily auerage flow at
\\COBCLUSTER USER SERVER\USERU'WLiv1ADERIV'WBDSEC\WRABimemos\CHAPTERIrev.doc 1-3
DRAFT
the Boulder WWTP increased by approximately 7.0 mgd from the day before the storm to the
day of the storm. This change in flow was estimated to be the volume of wastewater
contributed to the system as a direct result of the storm event. This storm flow volume
resulted from 0.83 inches of rainfall in the Boulder area, which represents approximately a"2-
year" storm. For planning purposes, this value of 7.0 mgd was added to the peak dry-weather
flow to simulate a peak wet-weather value for the 2-year storm, thus combining the effects of
hourly peaking factor with the increased flow from the storm event. The rainfall was
assumed to be distributed evenly over the entire service area. Wet weather flow contributions
for other size storm events were then extrapolated from the 1992 storm event experience.
Peak Wet-Weather Pipe Capacity Criteria. Based on discussions with the City, peak wet-
weather flow pipe capacity criteria were established at 100% full for all pipe sizes. As the
model is further verified based on additional data this value can be changed.
SUMMARY OF RESULTS
Peak Dry-Weather Modeling Results (2001 and 2025)
The pipes that exceed the limiting dry weather capacity criteria in 2001 and in 2025 total
approximately 90 and 138 pipes, respectively. These pipes range from 10 inches to 42 inches
in diameter and are displayed in Appendix W. Planning-level costs for the pipes (pipe
replacement based on $13 per inch diameter per linear foot) are included in Chapter 6.
Costing information was based on historical data from recent City projects. Model results
and cost estimates presented in the report do not include the 8-inch pipes since the model data
for many of these pipes included assumed invert elevations. There may be significant
additional costs associated with correcting hydraulic limitation in these 8-inch diameter pipes.
Upon completion of the survey of the system components currently underway, it is
recommended that the City update the S-inch pipe data in the GIS database and run the
hydraulic model to check for capacity problems in the 8-inch diameter pipes. Collection of
flow data to determine actual peaking factors would also be beneficial in verifying pipeline
capacities.
Peak Wet-Weather Modeling Results
The 2, 5, 10, 25, 50, and 100-year storm event model results identify pipes that have exceeded
the capacity limitations outlined in the above-described modeling assumptions. The number
of pipes that are projected to exceed the limiting capacity criteria in 2025 during the storm
events total from 237 to 348 pipes, depending on the size of the storm event. The pipes
identified as having insufficient wet-weather capacity range from 10 inches to 60 inches in
diameter and are listed in Appendix X. The 8-inches pipes are not included in the results.
Planning-level costs for the pipes (pipe replacement based on $13 per inch diameter per linear
foot~ are included in Chapter 6.
\\COBCLUSTER USER SERVER\USER~PW\MADERI~PV7BDSEC\WRAB~memos\CHAPTER 1 rev.doc 1-4
DRAFT
SUMMARY OF RECOMMENDATIONS
Model Specific Recommendations
Model specific recommendations related to model-input parameters, calibration, data
inventory and content, and model analysis capability are presented in Chapter 5. These
recommendations are directed toward increasing the accuracy and reliability of the modeling
results.
CMOM COMPLIANCE
The Boulder wastewater collection system management program is quite comprehensive and
appears to comply with most of the anticipated CMOM management practice requirements.
Specific recommendations to enhance collection sqstem management are as follows:
1. Improve £ormal documentation of procedures such as the emergency response
procedure and the sanitary sewer overflow response procedure.
2. Maintain a fully staffed maintenance group to allow more proactive maintenance
activities and minimize blockages and overflows.
Collect the additional information required to complete the Geographic
Information System (GIS) database for all collection system lines 8 inches in
diameter and larger.
4. Implement a City standard for grease control devices for new and existing food
service facilities to reduce grease related Sanitary Sewer Overflows (SSOs).
5. Expand maintenance records to include information on history (i.e. feet jetted,
rodded, chemical treatment, CCTV)
Capital Improvement Recommendations
Capital improvement needs have been identified based primarily on the results of the
hydraulic model analysis. The needs have been categorized into four separate categories, or
tiers, based on how the need was identified.
\\COBCLUSI`ER USER SERVER\USER\PWVVIADERIV'WBDSEC\WRAB\memos\CHAI'TER 1 rev.doc 1-5
DRAFT
PROPOSED SCHEDULE
An implementation schedule for the recommended activities is shown in Figure 1-1.
Capital improvements required to correct structural deficiencies ('Tier 1 improvements)
should be on-going to address these neecls as soon as they are identified. Specific
improvements have not been identified and consequently no costs have been assigned to this
category of improvements.
The recommendations regarding updating and verifying GIS database information should be
completed before any of the Tier 2, 3, or 4 activities are undertaken. The resulting changes to
the GIS database and subsequent revisions to the Hydra Model are expected to reduce the
number of projects required for Tier 2 and therefore no Tier 2 activities should be undertaken
until the GIS database update and the model re-runs are complete. All replacement pipelines,
whether they are categorized as Tier 2, Tier 3, or Tier 4 projects, should be design for the
2025 peak dry weather flows plus the 10-year recurrence interval storm event wet weather
flows.
Tier 3 and Tier 4 activities should be performed in order respectively, after all Tier 2 activities
are complete.
Due to the time frame required to implement Tier 1 and Tier 2 improvements under current
capital improvement funding levels, it is recommended that consideration should be given to
increasing the annual wastewater collection system capital improvement budget. Such a
change would allow Tier 1 and Tier 2 improvements to be completed in a shorter period of
time.
Wastewater collection system management program modifications can begin immediately.
The deadline for compliance with the CMOM regulations will depend on the timing of
regulation implementation.
\\COBCLUSTER USER SERVER\USER~I'W~bIADERI\PWBDSEC\WRAB\memoslCHAPTER t rev.doc 1-~i
DRAFT
Figure 1-1. Implementation Schedule
Total
Ranking Category Scenario Fstimated 2003 2008 2013 2018 2023 2028 2033 2038 2043 2048
Capital Costs
1 GIS/Model Verify GIS Data, Perform Flow *
Monitoring, Misc. Model
Recommeadacions
~ ~ ~ ~ ~ ~
2 CMOM Capacity, Management and Operations ° ~ ~ ~
Recommendations
Tier 1 Ho2 Spots Struc[ural Deficiencies ^
Tier 2 E~sting 2001 Peak Dry-Weather $8,374,000 -
Deficiency
Tier 3 Growth 2025 Peak Dry-Weacher $2,77Q000 -
Deficiency
~ ~ ~
Tier 4 Enhancement 10-Year Storm (2025 Flows) $13,692,000
* Costs were not de[ermined for these items. Actual costs for these items will depend on implemen[ation mechods adopted by the City.
Noce: The implementation schedule is based on the City's annual wastewater collection system capital improvemeacs budget of $500,000 per yeaz.
\\COBCLUSTER USER SERVER\USER~PW~MADERI~PWBDSEC\WRAB~memos\CHAPT'ERirev.doc 1-6