CITY OF BOULDER
WATER RESOURCE ADVISORY BOARD AGENDA ITEM
MEETING DATE: July 15, 2002
July 11, 2002
SUBJECT: Stormwater and Flood Management Utility Master Plan Update
REQUESTING DEPARTMENT:
Ned Williams, Director of Public Works for Utilities
Bob Harberg, Utilities Project Coordinator
Alan Taylor, Floodplain and Wetland Coordinator
Douglas Sullivan, Utilities Project Manager
Donna Scott, Stormwater Specialist
BOARD ACTION REQUESTED: Recommendations to staff regarding the adequacy of the
policy objectives and action items to be completed as part of the update to the Storm Water
and Flood Management Utility Master Plan.
FISCAL IMPACT: None
PURPOSE
To determine the adequacy of the policy objectives and action items to be completed as
part of the update to the Storm Water and Flood Management Utility Master Plan.
BACKGROUND
The city's first and only Comprehensive Drainage Utility Master Plan (CDUMP) was
adopted in 1989. The 1989 CDUMP addressed flood utility problems and needs in the
area of capital improvements, hazard mitigation and stormwater quality.
Recommendations were developed to deal with the following major problems:
• Inadequate revenues for capital improvements identified in adopted master
plans for the major drainageways and storm sewer collection systems;
• Lack of a complete, fully integrated flood hazard mitigation program; and
• Lack of a stormwater quality program that assesses and mitigates
stormwater impacts to Boulder Creek and its tributaries.
The master plan has not been updated in over 10 years, and staff has identified three
major issue categories as follows:
• Stormwater Quality
• Stormwater Drainage
• Floodplain Management
ANALYSIS
Stormwater Ouality
During 1999 - 2002, Boulder's Public Works staff has participated in a regional approach to
stormwater quality planning through the WASH program (Watershed Approach to Stream
Health). Boulder County Health Department has provided coordination for the program, with
active participation by Boulder County, the cities of Boulder and Longmont, and the towns
of Superior and Erie. The cities of Louisville and Lafayette have also expressed interest in
the program.
A major factor in development of the WASH project is future compliance with the new federal
stormwater regulations that take effect in March 2003. These regulations require implementation of six
programs to manage and improve stormwater runoff quality discharge from a city's stormwater system
to surface waters. Boulder has an obligation to address stormwater quality issues under these regulations
and is working in a collaborative fashion with other communities in the region to reduce pollutants to
surface waters. The WASH project seeks to protect water quality through regulatory compliance and
cooperative, regional management of stormwater issues.
The project has successfully proceeded and has produced a number of work products, including the
following:
• Drafted a proposal for WASH Stormwater Quality Programs that included the six management
programs required under the Phase U Stormwater Regulations.
• Completed a Memorandum of Understanding (approved by all WASH participants)
• Participated in state of Colorado stormwater regulation and guidance development
It is anticipated that the city will enter into a permitting arrangement with the other
WASH participants. This arrangement will outline implementation of a stormwater
management program and joint agreement covered under a Colorado General Stormwater
Discharge Permit.
The primary stormwater quality issues to be addressed in the master plan would include
the following:
1. "Comply with Water Quality Regulations"
2. " Reduce the Amount of Runoff'
3. "Improve Quality of Runoff'
4. "Save our Streams"
i
Stormwater Drainage
The last stormwater collection system master plan was completed in 1984 and is out of
date. The city will address updating the collection system master plan as part of the
Stormwater and Flood Management Utility Master Plan. Many of the study's
recommendations have not been implemented and will need to be reviewed to assess their
current priority. In recent years, Utility's focus has been on stormwater quality measures
rather than replacing existing infrastructure. There are several stormwater drainage issues
that should be addressed as part of the master plan update.
1. "Maintain and preserve existing and natural drainage systems"
2. "Reduce and manage developed runoff'
3. "Eliminate drainage problems and nuisances"
Floodnlain Management
A study session on floodplain policies was presented to City Council on January 29,
2002. The study session provided Council with background information on local
floodplain policies, an analysis of floodplain policy trends and philosophies, and staff-
recommended floodplain policy objectives to update and adjust the Storm Water and
Flood Management Utility Master Plan. Council members generally supported the
recommended guiding principals outlined by staff that included:
1. "Preserve Floodplains"
2. "Be Prepared for Floods"
3. "Help People Protect Themselves from Flood Hazards"
4. "Prevent Adverse Impacts and Unwise Uses in the Floodplain"
5. "Seek to Accommodate Floods, Not Control Them"
Council approved the study session summary at its agenda meeting on March 5, 2002. In
addition, Council members agreed that greater emphasis be placed on nonstructural
measures (that offer direct and immediate services to residents citywide) to better balance
the city's floodplain management program. Updated floodplain regulations to address
redevelopment, critical facilities and storms exceeding 100-year levels were also
supported and subject to the consideration of the results of additional analysis. The
following questions needed to be addressed:
• What would be defined as critical facilities?
• What is the impact of the 500-year floodplain compared with the 100-year
floodplain?
• How would the regulations be revised to address redevelopment concerns?
• What impacts would the revised floodplain regulations create?
Council further recommended that a public hearing on floodplain policies be held to
obtain citizen input. Given the outcome of a public process, Council acknowledged that
II
recommended policy revisions could change to reflect citizens concerns and community
values. Council also requested that budget impacts associated with increased activities in
nonstructural measures be identified and evaluated in context with the current capital
improvement program (CIP) schedule and components. Council also offered
recommendations to enhance public outreach and education with the posting of flood
warning signage where appropriate in public rights of way.
RECOMMENDATIONS
The attached documents summarize the policy objectives and action items to be
completed as part of the update to the Storm Water and Flood Management Utility
Master Plan. It is requested that the WRAB review this information and determine the
adequacy of these policy objectives and action items.
ATTACHMENTS:
Attachment A: Stormwater Quality Policy Objectives and Action Items
Attachment B: Stormwater Drainage Policy Objectives and Action Items
Attachment C: Floodplain Management Policy Objectives and Action Items
Attachment D: Boulder Floodplain Properties Mapping
L
APPENDIX A
STORMWATER AND FLOOD MANAGEMENT UTILITY
MASTER PLAN UPDATE
STORMWATER QUALITY POLICY OBJECTIVES
AND ACTION ITEMS
July 11, 2002
The following is a list of policy objectives and action items to be evaluated as part of the update
to the Stormwater and Flood Management Utility Master Plan Update.
1. "Comply with Water Quality Regulations"
(Regulatory Compliance)
• Implement a stormwater management program that meets the requirement of Phase II
Stormwater Regulations. These requirements can be met in part through participation in
the Watershed Approach to Stream Health (WASH) regional stormwater management
program as outlined in the WASH Plan.
Action Item: Determine resource needs for WASH program implementation.
Ensure adequate funding and staffing of each of the six minimum control
measure.
• To implement a number of the minimum control measures (MCM) required under Phase II
Stormwater Regulations, the city must have adequate legal authority. This authority is
primarily focused on the city's codes and ordinances. In addition, specific MCMs require
ordinance language to implement programs and provide basis for enforcement.
Action Item: Evaluate adequacy of legal authority to implement Phase II
MCMs and identify appropriate code and ordinance changes required.
2. " Reduce the Amount of Runoff'
(Sub-basin Management)
• Implement an integrated sub-basin master planning process to provide overall direction for
basin and corridor developments and CIP program. Process should integrate flood, drainage,
and water quality benefits and the costs associated with capital construction, land acquisition,
and ongoing maintenance/operation.
Action Item: Develop criteria to prioritize various objectives within each sub-
basin. Criteria may include flood management priority (e.g. high hazard
areas), water quality pollutant loading, cost-effectiveness, environmental
impacts and ability to coordinate with other city projects. Develop a sub-
A.doc 07/11/02 Page I of3
basin classification system for water quality, flood management and drainage
using GIS. Evaluate cost and resource needs to develop GIS capabilities to
support this level of sub-basin master planning efforts.
• Provide adequate groundwater recharge and reduce runoff in basins by addressing
impervious cover. Strategies to reduce impervious surfaces include undeveloped lands
through land acquisition, and Non-Structural BMPs, porous paving, landscape standards,
preservation of rural zoning designations
Action Item: Develop information needed to assess cost of implementing the
various elements of an impervious surface reduction program. This may
include the development of a public lands inventory and GIS and assessing
the impact of requiring BMP to reduce impervious areas.
3. "Improve Quality of Runoff"
(Stormwater Treatment and Pollution Prevention)
• (Regulatory) Implement design and development standards, construction erosion and
sediment control, which require BMPs to minimize the impact of runoff on water quality. In
addition, incorporate water quality protection in flood control design, construction, and
maintenance projects.
Action Item: Evaluate the use of design standards such as "Better Site
Design" and other protection strategies to address construction and post
construction development impacts. Evaluate the impact to the development
community of various BMP and runoff reduction strategies. This may
include the requirement that post and/or redevelopment peak discharge rate
cannot exceed the predevelopment discharge rate for a single design storm
event (two-year). In addition, define what type of standards to protect water
quality and type of construction activities must comply with the standards.
Define thresholds and standards for different types of construction activities
(e.g. single-family residential, large residential or commercial/industrial sites,
redevelopment sites, mitigate for downstream impacts). Evaluate resource
needed to provide for design review, inspection, and enforcement
• Develop runoff conveyance performance criteria and storm sewer treatment standards. These
may include the use of open swales, pocket wetlands, biofiltrations, outfall buffers, in-line
stormwater treatment, and detention.
Action Item: Evaluate cost of pollution reduction strategies in various basins
using pollutant-loading estimates from the Boulder Creek Watershed Study.
• (Regulatory) Implement a comprehensive stormwater pollution prevention/inspection and
enforcement program. Program should address illicit connections, illegal dumping,
A.doc 07111/02 Paae 2 of 3
L
municipal operations, household hazardous waste, and commercial/industrial pollution
prevention.
Action Item: Evaluate effectiveness of existing program including
implementation of programs elements implemented by other departments
and agencies (Boulder County, Boulder Partners for a Clean Environment
(PACE) program, Boulder Fire Department).
• (Regulatory) Implement a maintenance program to prevent and reduce pollutant runoff from
the municipal storm sewer system. This may include storm sewer inlet and catch basin
cleaning, street sweeping, winter road maintenance, flood control structure maintenance, and
structural BMPs maintenance. Phase II regulations require operation and maintenance
program for all stormwater facilities discharging to a regulated storm sewer system. To
comply, the city must provide adequate maintenance of both public system and private
system, which are connected to the public system.
Action Item: Evaluate effectiveness of current maintenance practices
including development of record keeping system for major maintenance
activities.
4. "Save our Streams" (Stream Protection)
• Implement design standards and guidelines to provide protection and enhancement of
riparian and aquatic habitat and water quality.
Action Item: Determine effectiveness of existing design standards and
guidelines in addressing stream bank erosion, functioning channel
conditions, terrestrial habitat, groundwater/surface water interface, and
aquatic species movement. Greenways Design Guidelines may be
appropriate document to assess.
• Provide monitoring and evaluation to assess the impact of stormwater runoff on receiving
waters and evaluate pollutant loading from various land uses and pollutant sources.
Identification of High Quality Water Resources: Currently, there is no method for identifying
these resources.
Action Item: Evaluation the effectiveness of existing chemical and biological
water quality monitoring of Boulder Creek and major outfalls and
tributaries in Boulder Creek. Developed criteria to identify surface waters of
high quality to prioritize application of protective and enhancement
measures.
A.doc 07/11/02 Pac 3 of 3
i
APPENDIX B
STORMWATER AND FLOOD MANAGEMENT UTILITY
MASTER PLAN UPDATE
STORMWATER DRAINAGE POLICY OBJECTIVES
AND ACTION ITEMS
July 11, 2002
The following is a list of stormwater drainage policy objectives and action items to be evaluated
as part of the update to the Stormwater and Flood Management Utility Master Plan Update.
1. "Maintain and preserve existing and natural drainage systems"
(Preservation and Maintenance)
• Implement a maintenance program that clearly defines efforts to maintain gutters and
pans, storm inlets and catch basins, storm sewers, open drainage swales, culverts and
bridges, irrigation ditch interfaces, sediment and debris traps and detention facilities.
Action Item: Assess existing maintenance program in light of this policy
objective.
• The long-term management and maintenance of detention facilities should be considered
to assure the long-term effectiveness of detention facilities. Detention facilities are
required for all new development consistent with regional urban drainage criteria.
However, the city does not typically own, manage, or maintain these facilities
Action Item: Determine locations and easements for all existing detention
facilities. Use this information to assess the cost of long-term management
and maintenance of these facilities. Specifically consider city maintenance of
detention facilities in existing residential areas that have detention ponds that
serve multiple properties or receive runoff from public rights-of-way.
• Acquire public rights-of-way and easements for all natural and existing drainage systems
such as creeks, swales, detention facilities, and storm water improvements.
Action Item: The city has recently comprehensively assessed the status of all
easements. A GIS layer was developed to capture this information and can be
used to assess the cost of acquiring additional easements to meet this policy
objective.
• Protect the natural features and functions of the existing drainage systems and care for
their health to improve the effectiveness of these systems.
Action Item: The Greenways Master Plan was recently completed for
Boulder Creek and six major tributaries. This plan considered the natural
features and function of these tributaries as well as other objectives related to
drainage, transportation, recreation, and culture. This approach can be used
to assure this policy objective is met for other major drainageways.
2. "Reduce and manage developed runoff"
(Regulation)
• Update drainage regulations and design standards to improve detention pond facilities
and features to better attenuate runoff. For example: requiring lengthened flow paths,
pervious separations between impervious surfaces, increased numbers of storage
elements (widened swales, incidental ponding on roofs, landscaping and paved areas, and
underground storage devices), multiple stage detention ponds, regional detention ponds,
and reduction in impervious ground cover (reduced building footprints, alternative
surface paving, increased tree cover, and pervious landscaping).
Action Item: Assess existing regulations and design standards in light of this
policy objective. For example, the city uses the two-year storm for residential
areas and the five-year storm for commercial areas consistent with regional
urban drainage criteria. The city should consider the selected design storm,
balancing the benefits of drainage improvement with the impacts and costs of
constructing the associated storm sewer system. Resolution of this issue will
be required prior to beginning work on the general drainage (storm sewer)
plan.
• Require development activities addressing drainage to propose multi-objective drainage
systems and corridors to provide for storm water quality, open space, recreational area,
water conservation, and other possible functions.
Action Item: Assess existing regulations and design standards in light of this
policy objective. For example, site drainage designs could be required to
convey runoff to landscaped areas prior to discharging to a collection system
to reduce runoff volumes and landscape irrigation demands. Natural
drainage paths could be reserved on developing lands to recognize natural
conveyance corridors having natural erosion features and environmental
benefits.
• Require developed runoff system evaluation and design based on multiple storm
frequencies to ensure that any newly planned system is optimized to be effective,
adequate, and functional for multiple storm events.
Action Item: Assess existing regulations and design standards in light of this
policy objective. For example, the city currently requires detention based on
maintaining the 10-year historic release, but requires storm sewers be
designed based on the two-year and rive-year events. Three-stage outlet
structures (2/10/100) or detaining the volume required to release the 10-Year
storm at the 2/5-year rate should be considered. Resolution of this issue will
be required prior to beginning work on the general drainage (storm sewer)
plan.
3. "Eliminate drainage problems and nuisances"
(Mitigation)
• Reduce or eliminate nuisance drainage to public rights-of-way from the discharge of
groundwater and sump systems and constant flow conditions that may create an icing or
slipping hazard or street and sidewalk puddling.
Action Item: Consider standards and plans to address how to best eliminate
these nuisance waters and prioritize this work with other stormwater and
flood management utility work. For example, the city currently requires a
minimum 18-inch diameter for storm sewers, but in areas where a pipe is
only needed for groundwater, a smaller size pipe might be more appropriate.
Another problem is that the development engineer may indicate that
groundwater discharge is not a problem. Under our current code, it isn't a
problem until it is a problem, so we don't have an efficient way to require
improvements at the time of initial construction. Once a structure is built
and occupied, it is a much bigger headache both technically and politically to
get the situation resolved. Should we go as far as to require all structures
with subsurface improvements to be adjacent to storm sewers? Is there a
more reasonable way to address this? Resolution of this issue will be required
prior to beginning work on the general drainage (storm sewer) plan.
• Develop basin area plans to retrofit drainage systems where no systems have been provided
and inadequate drainage is present. This should include runoff flows from public rights of
way crossing private lands, runoff obstructions resulting from public improvements,
improving public convenience, managing frequent flow conditions, and avoiding the transfer
of drainage problems from one area to another.
Action Item: These issues would be considered as part of an update to the
general drainage plan. The city is currently collecting information
concerning the existing storm sewer including invert elevations of all pipes.
This work should be completed in 2003. It is anticipated that this and other
currently available information will serve as the basis for the update the he
general drainage plan. As part of this work, the opportunity for regional
detention facilities should be evaluated to identify potential locations for
creating regional detention ponds and developing options for implementing
improvements. Also, should this plan depict improvements for problem areas
so that improvements by various property owners could be intelligently
coordinated?
_ i
• Provide a clear point of contact for drainage questions and complaints, education for
individual responsibilities with respect to drainage and runoff, and a proactive and responsive
organizational framework for addressing community drainage problems and nuisances.
Action Item: Assess existing procedures in light of this policy objective.
Attachment C
STORM WATER AND FLOOD MANAGEMENT UTILITY
MASTER PLAN UPDATE
FLOODPLAIN MANAGEMENT POLICY OBJECTIVES
AND ACTION ITEMS
July 11, 2002
The following is a list of floodplain management policy objectives and action items to be evaluated as
part of the update to the Storm Water and Flood Management Utility Master Plan Update
1. "Preserve Floodplains"
(Preservation)
• Implement a policy that recognizes a prescriptive floodplain easement that offers "beneficial
functions" for flood hazard reduction, water quality enhancement, wetland protection, wildlife
habitat, riparian corridors, recreation, alternate modes travel, environmental relief, aesthetics,
and urban open lands. Recommended implementation tools include public land acquisition,
private land dedication, and integration with multiple program activities.
a) Public Land Acquisition: Continue with the high hazard property acquisition and building
removal program we currently implement and enhance this activity to pursue undeveloped
floodplain lands or creek corridors that offer "beneficial functions" and other community goals.
Action Item: Review the current floodplain acquisition program and funding
allocation and assess opportunities to be more effective and proactive in preserving
floodplain areas.
b) Private Land Dedication: Development applicants are already required to dedicate lands
impacted by major drainageways to provide a corridor for storm water conveyance under
Chapter 10-5, B.R.C. 1981. This requirement could be expanded to include dedication and
preservation of floodplain areas for both conveyance and flood storage, and where "beneficial
functions" currently exist.
Action Item: Evaluate options with the Planning and Development Services to
encourage private floodplain dedications as part of development activities without
restricting land use potential, and revising land use regulations to require
dedication of floodplain areas serving beneficial functions in addition to the
currently required dedication of conveyance zone areas.
c) Integrate Multiple Program Activities: Current programs, such as wetland protection, water
quality and greenways, should be integrated with floodplain preservation to best achieve
multiple goals through centralized coordination and oversight to ensure effectiveness.
Attachment C 1
Action Item: Assess opportunities to integrate multiple program activities for
wetland protection, water quality, greenways and floodplain management to more
effectively preserve stream corridors and floodplain areas.
2. "Be Prepared for Floods"
(Preparedness)
• Implement a program to update hydrology and hydraulic floodplain studies, perform multiple-
frequency storm analysis and detailed risk assessments, enhance early warning systems and
multiple emergency notification measures, develop understandable response plans and
workable recovery plans, and expand ongoing storm monitoring. Recommended
implementation tools include developing state of the art hydrology and hydraulic models,
designing detailed risk assessment processes, increasing coordination with the Emergency
Management Office, enhancing the early warning system, installing multiple emergency
notification measures, and enhancing the flood response and flood recovery plans.
a) Develop "State of the Art" Hydrology and Hydraulic Models: Use modem and advanced
models to study updated hydrology and hydraulic flood conditions. Develop a citywide
floodplain model combining the 13 separate floodplain models for each creek to permit
analysis of multiple-frequency and multiple-storm event scenarios that may occur over more
than one drainage basin at a time (we cannot do this with existing models). This would allow
staff to study the reaction of local floodplains based on varying storm conditions and how the
storm drainage system responds to the impacts.
Action Item: Evaluate the costs and resources required for updating the floodplain
studies for all major drainageways using modern and advanced study models, and
identify program options for funding ongoing study activities and updates on an
annual or periodic basis.
b) Perform a Detailed Risk Assessment: Using existing and/or updated flood information,
prepare a detailed analysis of risk to structures and people. Estimates of financial losses and
risk to life may be quantified and the greatest risks may be identified for flood preparedness
and mitigation measures.
Action Item: Evaluate the costs and resources needed to prepare and assemble
detailed risk assessments for all floodplain areas to be used in determining the
greatest hazard reducing and cost-effective flood preparedness and mitigation
measures.
c) Improve Coordination with Emergency Management Office: A focused effort to coordinate
flood emergency preparedness activities with the city/county Emergency Management Office
(Larry Stem, Emergency Management Director) should be initiated to compliment and
integrate floodplain management activities and implement updated plans and actions.
Action Item: Consult with the Emergency Management Office to outline options
and alternatives that may improve coordination between the two programs.
Attachment C 2
d) Enhance the Early Warning System: The early warning system is currently most effective
for mountain canyon generated flooding on Boulder Creek, Four Mile Canyon Creek and South
Boulder Creek. The system should be expanded to provide additional rainfall gauges, stream
gauges, and weather stations throughout the Boulder area to provide flood monitoring in all 13
basins. Also, new developments in radar forecasting and satellite imagery may be incorporated
to provide more effective and immediate monitoring and forecasting. Early warning monitoring
stations could also be provided at additional locations to allow system redundancy and greater
personnel access to current information.
Action Item: Consult with the Emergency Management Office and evaluate the
costs and alternatives for expanding flood monitoring gages and devices.
e) Install Multiple Emergency Notification Measures: There are many systems available for
disseminating emergency warnings. Currently we rely heavily on sirens and have access to a
"reverse 911" calling system. Other types of warning systems include telephone auto-dialers,
cable override, radio, tone-activated alert radios, and the Internet. The system needs to be
effective in reaching people inside homes, businesses, and automobiles, in addition to people
who are outdoors. A survey is currently being conducted by the University of Colorado at
Colorado Springs in connection with the Emergency Management Office and UDFCD to study
how people perceive the flood threat and how they would respond to warnings. The outcome of
this research may provide additional alternatives and options in improving warning notification
and emergency planning.
Action Item: Consult with the Emergency Management Office to review
alternative notification measures and evaluate the costs associated with multiple
systems.
f) Update and Enhance the Flood Response Plan: The current flood response plan may be
updated and enhanced to better educate citizens in how to respond to a flood emergency. An
enhanced plan that provides clear and concise direction to public officials as well as citizens
will be more effective in protecting lives and making appropriate decisions during a flood
event.
Action Item: Assess the existing flood response plans and evaluate enhancements
and costs for updating and developing improved plans.
g) Update and Enhance the Flood Recovery Plan: The flood recovery plan should be updated
to incorporate current procedures and practices to meet community needs following a flood.
The plan must address necessary recovery elements such as identifying early actions and
decisions that must be made, meeting victim's immediate needs, performing building and
infrastructure damage assessments, re-establishing critical community services, acquiring or
preserving post-flood properties to avoid future losses, issuing building permits for allowed
reconstruction, and restoring normal city operations.
Action Item: Evaluate the costs for updating and enhancing the flood recovery
plan.
Attachment C 3
3. "Help People Protect Themselves from Flood Hazards"
(Education)
• Improve and enhance public interaction and involvement, available floodplain information,
community outreach and education, self-help measures, flood proofing options, affordable
flood insurance, and emergency preparedness. Recommended implementation tools included
making a commitment to the Community Rating System (CRS), creating a Floodplain
Management Office with dedicated staffing, developing a comprehensive Web site, and
considering a flood-proofing program.
a) Make a Commitment to the Community Rating System to reduce premiums for flood
insurance and encourage policy purchases, expand community outreach and education
activities and implement technical support services to citizens. The city is currently involved in
the CRS but has not pursued the best possible rating. The CRS provides numerous benefits to
the community beyond reductions in flood insurance premiums, such as: (a) enhanced local
floodplain management, (b) benchmark assessments, (c) federal technical assistance, (d)
incentive based program maintenance, and (e) qualification for federal assistance programs.
Primary credit categories include public information activities, mapping and regulations, flood
damage reduction activities, and flood preparedness activities. Greater commitment to
improving the local CRS rating is resource dependent and may require additional human
resources support (such as added staffing and/or outside contractual/consulting services). While
Boulder provides numerous activities that would earn CRS credit, we have not taken full
advantage of this program because of resources needed to request or maintain a higher rating.
Action Item: Evaluate resource allocation needs to provide further focus on the
CRS program, assess CRS activities that may be most beneficial and cost-effective
to implement and assign a floodplain manager to coordinate this effort.
b) Create a Floodplain Management Office to establish a source location identifiable to the
public, provide adequate resources to implement and maintain required CRS elements,
maintain required records for floodplain development, manage and utilize flood models for risk
assessment, and offer direct community services and assistance for providing floodplain
information, education and self-help flood protection consultations. A floodplain management
office could directly coordinate with and compliment the activities of the Emergency
Management Office (EMO) by providing educational and planning services for floodplain
preparedness in advance of flooding. Such an office could also be coordinated with Boulder
County floodplain management efforts to recognize the interface between the two local
governments.
Action Item: Evaluate resource allocation needs to implement activities that better
support community information and customer service programs without creating
a new and separate program office group. Identified activities may be distributed
to appropriate departments and work groups.
c) Implement a Comprehensive Internet Web Site for floodplain information and e-business.
With the high level of Internet access and usage in Boulder, this tool could provide direct
public access to important floodplain information, such as floodplain maps, letters of map
revision, flood insurance information and a record of elevation certificates for buildings. Staff
Attachment C 4
released an interactive floodplain map that allows a citizen to search for a specific address to be
shown on the GIS-based floodplain map over the Internet. The Web site may also provide
valuable links to other floodplain agencies such as FEMA.
Action Item: Evaluate existing information sources that may be cost-effectively
converted to an Internet format and identify resource needs to create additional
and enhanced Web site information.
d) Create a Flood Proofing Program to help citizens protect their property through onsite staff
consultation, the provision of self-help information and possible low-interest loan programs to
construct flood proofing.
Action Item: Evaluate opportunities and possible costs and funding mechanisms to
create a flood-proofing program that may assist property owners in protecting
flood prone structures.
4. "Prevent Adverse Impacts and Unwise Uses in the Floodplain"
(Regulation)
• Update and develop appropriate regulation and land zoning, open land preservation and
acquisition, multi-objective planning, acquisition and relocation of high hazard structures, and
prohibiting unacceptable encroachments. Recommended implementation tools included
adopting revised floodplain regulations (to avoid unacceptable floodplain impacts, create
standards for critical facilities and improve life safety factors), consider guiding principals,
expand property acquisition and urban open land preservation, and enhance storm water
management activities.
a) Consider Recommended Floodplain Regulation Revisions that include:
• Maintaining the current high hazard zone standards prohibiting new structures intended for
human occupancy.
• 500-year protection for critical facilities (consistent with development of the new Boulder
Community Hospital and Foothills Housing development). Critical facilities would include
among others publicly owned buildings, hospitals, managed care facilities, and schools.
• Prohibiting adverse floodplain encroachments and impacts that would increase flood depths
(consistent with the conveyance zone restrictions) or velocities, or reduce flood storage, to
maintain the current carrying capacity of the floodplain, prevent creating high hazard
conditions or increasing downstream flooding.
• Requiring safe emergency access routes to buildings during floods and ensuring that
functional emergency exits during flooding are provided from flood proofed buildings.
• Requiring multiple storm level protection measures to account for flooding from storms
greater than 100-year magnitude
■ Lowering zoning densities in floodplains and offering possible transfer of development
rights to avoid new floodplain encroachments
• Adopting a floodplain buffer to address mapping uncertainties and avoid future flood
impacts.
Attachment C 5
Action Item: Prepare a detailed framework and benefits analysis of recommended
floodplain regulation revisions to improve local floodplain management and initiate
public and board review process.
b) Consider Guiding Principles to apply to floodplain mitigation planning that support multiple
objectives, community goals and public involvement. Such guiding principles are emerging
from the Greenways master plan, and the IRP and CAG efforts on the Fourmile Canyon Creek
and South Boulder Creek master plan studies.
Action Item: Develop a compilation of guiding principles to consider for floodplain
management based on IRP and CAG recommendations, the Greenways program
master plan and other community and environmental objectives.
c) Expand Property Acquisition and Urban Open Lands Preservation activities for the most
hazardous floodplain areas and areas with beneficial floodplain functions. Such acquisition
applications would be for non-structural floodplain management and would not involve land
purchases for structural mitigation (such as excavating channels).
Action Item: Review the current floodplain acquisition program and funding
allocation and assess opportunities to be more effective and proactive in preserving
floodplain areas.
d) Enhance Storm Water Management Activities to ensure ongoing monitoring and
maintenance of drainage systems and.flood areas by clarifying specific maintenance practices
for designated locations to ensure that Open Space and open lands preserving floodplains are
maintained differently from improved drainage facilities.
Action Item: In connection with general stormwater drainage maintenance policy
recommendations, assess existing maintenance program activities and priorities
and adjust as necessary to address this policy objective.
5. "Seek to Accommodate Floods, Not Control Them"
(Mitigation)
• Assess and implement planned and monitored system maintenance, nonstructural flood
proofing, opening non-containment corridors, overbank land shaping to train flood waters, and
limited structural (channelization) measures at constrained locations. Recommended
implementation tools include updating mitigation master plans, reevaluating priorities for
mitigation efforts to focus on high hazard mitigation and citywide efforts, and carefully
considering the need for structural improvements.
a) Develop Updated Mitigation Master Plans that emphasize nonstructural measures, increase
opportunities to realize beneficial functions in floodplains and seek cost-effective solutions that
minimize major construction efforts.
Action Item: Evaluate the costs and resources required for updating mitigation
master plans to increase a focus on cost-effective non-structural efforts.
Attachment C 6
b) Reevaluate Priorities for Mitigation Efforts by:
• Addressing bottlenecks (bridges, culverts and roads) at critical locations.
■ Acquiring floodplain lands to avoid channel improvements and eliminate hazardous uses.
• Performing non-structural overbank grading to increase conveyance and flood storage. The
1992 Boulder Creek Project at Boulder High School involved acquisition and removal of
169 residential units in the high hazard zone and non-structural overbank grading north of
Boulder Creek to create the current open recreational fields. The $3 million project also
removed the Goss-Grove neighborhood from the high hazard zone by increasing
conveyance near the creek and opened up the community-valued Boulder Creek greenway
corridor.
■ Targeting limited flood protection improvements for specific locations and working on
restricted drainageway reaches to eliminate high hazards zone conditions and satisfy
multiple objectives.
■ Researching alternative mitigation approaches and improvements that may be completed
for mid-stream reaches that don't require extensive downstream drainageway construction
first to avoid adverse impacts from upstream modifications.
Action Item: Evaluate the costs and resources required for updating mitigation
master plans considering these policy objectives in conjunction with non-structural
efforts.
c) Carefully Consider the Need for Structural Improvements by adequately assessing the
alternatives that may be applied to avoid and minimize structural improvements, such as flood
proofing, acquisition and relocation, and obtaining or supplementing flood insurance. These
alternatives may involve acquisition and removal of structures, possibly affecting and
relocating residents. Relocation of residents is a sensitive matter and concern must always be
considered for the emotional distress such activities may create. However, in some cases,
acquisition and relocation of high hazard structures may offer greater long-term benefits,
immediately eliminates the hazard to people and may be more cost-effective (thereby offering
greater opportunities for relocation compensation) than constructing very structural and narrow
channel improvements to avoid existing structures.
Action Item: Implement planning guidelines to include analyses of non-structural
alternatives as part of all floodplain mitigation planning and design activities.
d) Focus on High Hazard Mitigation by primarily pursuing improvements in citywide locations
that will reduce high hazard areas to the greatest extent possible.
Action Item: Identify locations to consider floodplain mitigation where high hazard
conditions exist and prioritize by locations subject to the greatest risk levels.
e) Implement Mitigation Efforts Citywide to ensure that the most high-risk floodplain
occupants are given priority and avoid putting all efforts into one or two drainage systems that
consume significant funds for long periods.
Action Item: As outlined above, identify locations to consider floodplain mitigation
where high hazard conditions exist and prioritize by locations subject to the greatest
risk levels.
Attachment C 7
it
APPENDIX D
STORMWATER AND FLOOD MANAGEMENT UTILITY
MASTER PLAN UPDATE
BOULDER FLOODPLAIN PROPERTIES MAPPING
July 11, 2002
The Boulder Floodplain Properties Mapping project was completed to assess the
vulnerability of properties to floods that lie in and around the city of Boulder. A list of
properties that would be affected by flooding was complied and several analyses were
completed. The levels of flooding that were assessed were the FEMA 100-year and
FEMA 500-year levels. In addition, the city 100-year flood plain was assessed along
with the Shallow Zone, High Hazard Zone, and Conveyance Zone. This was compiled
into a master list, which contained the property and information about the property used
to evaluate the possible damage in the event of a flood. Several assumptions and notes
that pertain to the project are as follows:
1. Shallow Zone, High Hazard Zone, and Conveyance Zone properties are
included in City 100 and FEMA 100 Zones
2. Properties that were included in the study, not contained within the city limits
are located within the boundary from the northernmost city limits to the
southernmost city limits and from the westernmost city limits to 751h Street.
These are the "county" properties.
3. ENCLAVE Properties are included in County Properties
4. County properties do not have a city zone associated with them in the
MapLink GIS assessors database. In this case, they were considered in the
"county" zone.
5. All properties assessed were in the FEMA 500-year flood plain. Therefore,
the total amount values for each zone could be found in the FEMA 500
category.
6. The Boulder County assessor's data used to create the list was obtained from
MapLink software last modified June 18, 2002.
The results of the study were then tabulated and the major trends and points of interest
are as follows:
1. In total, there are 6082 properties contained in the study covering 15055 acres.
These properties are home to $1,414,277,100 in buildings.
2. Residential zoned properties contain the most property value and in most
cases are nearly equal to the sum of the property value of the business and
industrial zones.
3. The city of Boulder owns 321 parcels of land in the study area. These
properties cover 7545 acres and contain buildings worth $16,754,900.
2
i
a~a~a aco~ Off` ^oo~ hoo~~
.A~ o~ ate`°~ ~P
Zone Information G Q~ 5r Q40
Number Properties with structures 648 840 2361 2650 143 3840
Residential Acres of flooded area 586 626 1002 1046 167 1383
Assessed Building Value $148,713,600 $165,545,200 $365,532,200 $420,119,300 $47,636,100 $619,441,200
Number Properties with structures 81 108 231 305 15 549
Business Acres of flooded area 212 244 346 478 85 526
Assessed Building Value $78,271,600 $91,618,700 $157,397,700 $210,457,100 $23,884,300 $310,188,500
Number Properties with structures 37 47 128 182 5 234
Industrial Acres of flooded area 225 260 441 900 46 1013
Assessed Building Value $47,347,400 $55,821,300 $164,467,500 $213,996,700 $12,314,900 $310,649,800
Number Properties with structures 1 0 2 2 0 2
Agricultural Acres of flooded area 17 15 40 40 0 40
Assessed Building Value $139,200 $0 $141,600 $141,600 $0 $141,600
Number Properties with structures 81 101 425 425 17 649
County Acres of flooded area 1547 1595 5192 2497 907 10586
Assessed Building Value $15,167,800 $17,318,800 $110,463,600 $106,766,800 $3,011,100 $134,410,100
Number Properties with structures 11 12 18 18 4 21
Public Acres of flooded area 1087 1100 1157 1460 716 1509
Assessed Building Value $19,467,800 $20,271,300 $37,215,300 $37,215,300 $15,287,100 $39,445,900
Number Properties with structures 859 1108 3165 3582 184 5295
Total Acres of flooded area 3674 3840 8179 6420 1922 15055
Assessed Building Value $309,107,400 $350,575,300 $835,217,900 $988,696,800 $102,133,500 $1,414,277,100