Loading...
HomeMy WebLinkAbout5 - Staff presentation & WRAB discussion on city staff's water quality treatment goals for drinkingCITY OF BOULDER WATER RESOURCES ADVISORY BOARD INFORMATION ITEM MEETING DATE: Oct. 17, 2005 AGENDA TITLE: Review of Water Utility Internal Goals PREPARING DEPARTMENT: Robert E. Williams - Director of Public Work for Utilities Chris Rudkin - Water Quality Coordinator Randy Crittenden - Water Treatment Coordinator PURPOSE: This memorandum provides a review of the Internal Goals and Goal Setting Process developed and used by Water Utility staff. EXECUTIVE SUMMARY: Utility projects and programs are developed to meet objectives which are derived both from the broad regulations governing public water systems and specific policies implemented to address regional and local needs. Prior to 2001, goals were articulated independently for specific needs in each of the functional areas of the Water Utility (Water Resources, Water Treatment, Water Distribution, Water Quality and Conservation and Engineering). This approach kept each project focused to a few staff inembers and worked well for many years, allowing for e~cient decision making and project implementation. However, over time the increasing complexity of demands on the Utility required a more integrated approach. In 2001, staff efforts led to a new process for identifying and coordinating goals among the staff groups, and for resolving potential conflicts between goals. BACKGROUND: Regulations Drinking water is regulated at the federal level under the 1974 Safe Drinking Water Act (SDWA) and subsequent amendments. Regulations are developed on an ongoing basis to address new (emerging) contaminants and to modify existing contaminant limits. The State of Colorado promulgates both primary (required) and secondary (recommended) drinking water regulations based on the federal requirements. Local Policies The Boulder Valley Comprehensive Plan (Comp Plan) incorporates a wide range of drinking water-related policies and practices. The Comp Plan addresses source water management, water treatment and quality of finished drinking water. It is updated periodically through staff and public input to incorporate changing expectations and needs. The Utilities Division's Mission and Guiding Principles statement provides additional internal goals for the Water Utility, addressing reliability of service, efficient use of fiscal and natural resources, and protection of human and environmental health. l l~liNA IIEM A `5 PACE ` Master Plans Master Plans addressing operational goals and needs of the Water Utility include the Raw Water Master Plan (1988) and Treated Water Master Plan (2000). These serve as the basis for near- and long-term capital improvements and related programs to meet the Utility's objectives. A Water Quality Strategic Plan is currently under development to support and highlight quality- related aspects ofthe Utility's Master Plans. DISCUSSION: Historically, Master Planning has been the primary mechanism for defining utility goals. Master Plans for both Raw Water and Treated Water have provided a process for reviewing the background and current conditions affecting utility operations, and developing plans for future improvements. Master Plans bring together staff and consultant expertise and provide a process for public input and board review and adoption by City Council. This process is essential for the development of long range capital projects and infrastructure improvements. Day to day operations of the source water, water treatment and water distribution facilities are managed within the larger framework provided by master plans, and at a level of detail that master plans do not address. The water utility by its nature is dynamic, with seasonal, weekly and daily changes requiring constant review and decision making at each level. Source management is affected by snow and rainfall pattems and daily weather conditions in addition to the legal and operational constraints of managing the city's water portfolio. Water treatment is affected in turn by changing quality of raw water, which requires ongoing adjustment of chemical feeds and other processes to optimize treatment effectiveness. For this reason source selection can have a significant impact on treatment operations. Treatment is also influenced by demand, which is dynamic and changes on both a daily and seasonal basis. In addition to fluctuating demand, the distribution system itself can cause impacts to the water treatment plants. The operation of valves and hydroelectric generation, the need to maintain appropriate storage volumes and quality in all parts of the system and the effects of ongoing maintenance activities change the overall patterns of water distribution on any given day. The Utility operates two treahnent plants, each of which can draw on more than one water source, both having the capability to supply the city with water individually or in combination. This gives the system an inherent flexibility which many cities do not enjoy. These multiple options also increase the complexity of operation and the need for coordination within the various utility work groups. The 2001 staff goals identification was initiated to assist the planning for improvements to the Boulder Reservoir Water Treatment Plant. Operational goals and expectations for each work group were discussed and compared. This process led to agreement that greater understanding of overall goals and daily decision processes faced by each work group would have benefits beyond the Reservoir Plant project and could increase the utility's effectiveness in many areas . Existing master plans were reviewed and discussed in relation to each other and in relation to daily decision making by the various staff groups. AfllNDA ITEM i ~ PAGE 2- The staff evaluation led to a general grouping of existing goals into areas of Public Health and Safety, Reliability, Customer Expectations, Optimization and Security. Internal targets were then developed to help meet each of the goal areas, with discussion of how decisions involving more than one goal could be considered and resolved. This process is ongoing. "Quantit}~' and "Qualit}~' emerged as two broad descriptors identifying different goals that could benefit from further coordination. For example, the most efficient operarion of the raw water system may not always provide the most desirable water for treatment, and operation of a treatment plant at a certain volume may need to be adjusted to maintain quality levels in the distribution system. CONCLUSION: A staff level goals review process has been successful in providing greater understanding of the interrelationship of work goups within the Utility. It has led to the development of additional internal guidelines, particulazly at the water treatment plants, to better track and modify treahnent based on changing conditions and to maintain compliance with quality standards while optimizing overall efficiency of the city's drinking water system. ATTACHMENT: A. Goal Directory AGENDII REM i S PAGE 3__ ATTACHMENT A Goals Directory - Summary of Drinking Water Goals GOAL DIRECTORY GOAL AREA ATER QUALITY GOALS ATER QUANTITY GOALS Comply with Federal & State Regulations nsure System-wide Potable Water Delivery ~ onitor Emer in Contaminants alance Source Selection Public Health and Safety ntegrate Source Water Protection & Treatment m rovement Supply Suffcient Raw Water mprove Pathogen Removal and Inactivation einforce Distribution S stem Inte ri rovide Consistent Water Quality nsure Reliable operation of the Water Treatment lant nsure Source Water Protection rovide sufficient finished water storage without com romisin water uali eliability Continuously improve Water Treatment ractices ncourage conservation through Demand ana ement Practices rovide Consistent Finished Water Quali aintain Consistent Distribution System Water Qualit Customer Expectations eet user ex ectations Coordinate water uality and uanti to become more efficient atch utilit rates with user ex ectations ducate staff and ublic ptimization and Fiscal Responsibility Security ~SE~'fl-, IY~M ~_ ~ PAGE / -