HomeMy WebLinkAbout4 - Utility Plan Amendment - Wastewater Treatment Plant Master PlanCITYOFBOULDER
WATER RESOURCES ADVISORY BOARD
AGENDAITEM
MEETING DATE: September 20, 2004
AGENDA TITLE: Utility Plan Amendment- Wastewater Treatment Plant
Master Plan
PRESENTERS:
Randy W. Earley, Utilities Project Manager
Robert Harberg, Utilities Planning and Project Management Coordinator
Floyd Bebler, Wastewater Treatment Plant Coordinator
Ned Williams, Director of Public Works for Utilities
EXECUTIVE SUMMARY:
The Denver Regional Counal of Governments (DRCOG) reqwred local utilities m
the region to provide Utdity Plans documenting wastewater systems by 2003 The city of
Boulder submitted a Utdity Plan in late 2002 These Utility Plans were mcorporated into
the Metro Vision 2020 Clean Water Plan The intent of the Metro Vision 2020 Clean
Water Plan is to increase the effectiveness and effiaency of wastewater management
and plannmg in the nine county region of DRCOG Also, the Utdity Plan is used by the
Water Quality Control Diwsion of the Colorado Department of Public Health and
Environment (WQCD) for site reviews
Boulder's plan combmed information from the Boulder Valley Comprehensive
Plan, Boulder's Wastewater Collection System Master Plan and the old 201 Faalities
Plan including service area, collect~on system and treatment plant data The Utdity Plan
must now be amended with information from the new 1041 Permit and proposed
treatment plant improvements from the Wastewater Treatment Plant (WWTP) Upgrades
Pro~ect preliminary design The amended plan wdl be submitted to the WQCD for
review
Since the Utdity Plan has all the elements of a master plan for the wastewater
treatment plant, the Utdities division would like to have this amended Utility Plan adopted
as a wastewater treatment plant master plan The adoption addresses state
reqwrements and city planning needs, achievmg both sets of goals with a single
planning document This document does not contain new information, it combines
information from the Wastewater Collection System Master Plan and the Wastewater
Treatment Plant Upgrade Pro~ect Preliminary Design report
Fiscal Impacts:
Budgetary Approving the UUlity Plan Amendment and using it as the
Wastewater Treatment Plant Master Plan would save money and effort by using the
AGENDA ITEM #_4 PAGE 1_
Utdity Plan for dual purposes The Utdity Plan and its contnbuting documents have cost
thousands of dollars to develop Utilizing this document as the Wastewater Master Plan
could save substantial amounts of resources by avoiding duplicate costs Other costs
assoaated with the Wastewater Treatment Plant Upgrade do not change as a result of
submitting this plan These costs have been identified and rewewed as part of the 2005
budgetprocess
Staff Time: The recommended action would save staff time now and reduce
future needs by combining the two planning efforts
Other Impacts:
The additional impacts have been considered in the Wastewater Treatment Plant
Upgrade pro~ect Community Environmental Assessment Process (CEAP) and no other
impacts are anticipated from adoption of ihis document
Other Board and Commission feedback:
No additional board or commission feedback is avadable at this time.
Public feedback:
No public feedback has been received at this time The WRAB meeting,
which was publicly announced, is one of three opportunities to obtain public
feedback The item will then go to the Planning Board for recommendation and
the City Councd for acceptance There wdl be opportunity for public mput at
each meeting. It should be noted that no public input was received on the
Wastewater Collection System Master Plan during the approval process
Additionally, the Wastewater Treatment Plant (WWTP) Upgrades pro~ect,
which contains all the alternative analysis and process selection information, has
prewously gone through the City of Boulder CEAP and a Boulder County '1041
Matters of State InteresY review
Staff recommendation:
Staff recommends that the WRAB accept the rewsions to the Utdity Plan
and recommend its acceptance by city councd as the Wastewater Treatment
Facility Master Plan.
Analysis:
At the time the onginal plan was submitted to DRCOG, the city had not
received a rewsed National Pollution Discharge Elimination System (NPDES)
permit Much of the information in the plan was based upon mformation in the
existmg permit until the rewsed permit was issued. The rewsed NPDES permit
has smce been issued and reqwres construction of treatment plant
improvements The Utdity Plan must be amendment to include information from
the new permit and the proposed improvements
The Water Resources Advisory Board should consider accepting this
Utdity Plan Amendment and recommending its use as a wastewater treatment
plant master plan to city council It prowdes documentation of future loads and
anticipated future discharge limitations as well as a plan to handle those
AGENDA ITEM #_4 PAGE_2_
increases. Staff feels it provides all the information required in a master plan
document
Attachments:
Executive Summary, City of Boulder, Wastewater Utdity Plan, Amendment 1 and
Site Application Report, September 3, 2004
AGENDA ITEM #_4_PAGE_3_
DRAFT
CHAPTERI
EXECUTIVE SUMMARY
INTRODUCTION
The Ciry of Boulder (City) is amending the Wastewater Ualtry Plan (CJtiliry Plan) dated
November 15, 2002 to provide updated mformation on permttang issues and proposed
unptovements to the City's 75'" Street wastewatet tteatment plant (~X/VV'IP)
The key components included m thts amendment to the Uulity Plan axe an altexnauves analysis for
the WWTP Upgrade and capacity expansion from 20 5 to 25 0 mtllion gallons per day (mgd) and the
completed Site Apphcauon form, unth the xeqwred attachments
The Uuliry Plan itself has been xefined and pxovides suppomng mformation on curxent condarons
and ptoposed upgrades to the City of Bouldet's 75`~ Street WWTP The C1ty cutrently provldes
wastewater service to the follounng mne subcommumttes
' Centxal Bouldec
• Crosszoads
• East Bouldet
' Gunbarrel/Heatherwood
~ Nozth Boulder
• Palo Park
' South Bouldez
~ Southeast Boulder
• Univecsity of Coloxado (Ci~
The Uahty Plan is pxovided to sansfy Denvex Regional Council of Govexnments (DRCOG)
cequ~ements as well as address the wastewater components of the City's Wastewater Master
Plancung process An amendment to the Uulity Plan ts requtred for the City of Boulder's W W"1P
upgrade and expansion
Tkus UaLry Plan Amendment addxesses two prunary axeas mcludtng (1) the collecuon system
contatned witlun the WWTP service azea and potenual axeas fox future unprovements idenafied in
the City of Boulder Wastewatet Collecnon System Mastet Plan (WWCSMP), and (2) treatment
upgrades for mtrogen removal and WWTI' capacity expansion
~~~~
~
~
The City's 75~' Street l'V~X/'IP is cuxtendy opexaung under a Coloxado Discharge Pemut System
(CDPS) pexnut, wluch expixes on January 31, 2008 An ammocua total maaumum duly load
(TMDL) assessment was developed for the Tn-Basm area m 2002 and was appxoved by the
Envixonxnental Protecrion Agency, Region VIII, m 2004 The TMDL mcludes Bouldec Creek
Segment 9, wluch receives tceated wastewatex fxom the 75~' St WWTI' It is anacipated that the
P\Data\GEN\Bouldes\22054\Ocro6es 2004WUP dmendment\CHAI'1'EA 1 d«
1-1
~~°'~
DR.AFT
~~~
~
cuxrent CDPS pemut will be amended by the end of 2004 to incoxpotate acsunonta allocanons
(pemut lumts) defined in the TMDL assessment An altemanves analysis has been completed to
evaluate xequu~ed treatment upgrades to meet ammonia TMDL requ~ements and capauty expansion
requirements
Based on Elow pxo~ecuons through 2025, a WW'IT' expansion will be necessary to accommodate the
cunent subcommwuty populahon gxowth as well as some new development and cedevelopment
Based on DRCOG populaaon and employment pco)ecuons, the WW'IP needs to be expanded from
the 20 5 mgd capacity Lsted m the curxent CDP~ pemut to 25 0 mgd A site apphcauon fox the
expansion to meet pxo~ected flows and regulatory xequtrements idenufied m the pemut is mcluded in
Appendix C
POPULATION AND FLOW PROJECTIONS
Popularion and flow pro~ecuons did not change from the November 2002 Utility Plan.
DRCOG esttmates that the 2025 populanon for the Ciry of Boulder unll be 121,OOQ wkuch
represents an addiuonal 14,000 people ovex the next 20 yeazs Although DRCOG's Traffic Analysis
Zone (TAZ) Model is a very rehable method fox pro~ecnng populatton gcowth, the Boulder Valley
Compxehenstve Plan (BVCP) pro~ecaons aze presented to venfy expected gxowth and the ttnung of
the grourth ovex the next 20 yeaxs The BVCP census-based pro~ecuons esumate an adcLuonal
15,000 people by 202Q wluch corresponds reasonably well with the DRCOG eshmates Both sets
of pro~ecuons aze pcesented m ttus Uulity Plan, but DRCOG's pro~ecnons pxovide the basis for the
pxo~ected Elows and loaduigs to the WW'IP
The Ciry of Boulder Plamm~g Department is challenguig the 2000 census populanon The proposed
census undercount (appxo~umately 8,000 people) alleged m the challenge is curcendy under zeview by
the State of Colocado The State has unhl 2010 to accept or deny the challenge If the challenge is
accepted, the populahon and flow pto~ecuons ptesented tn ttus report will be ad)usted when the
report is revised m the futuxe
Average annual flow pro~ecuons aze based on the above-two descnbed populaaon and employment
forecasts (not mcludtng the addiaonal 8,000 people assonated unth the census challenge populaaon)
Pro~ected avexage annual flows for populahon and employment are based on lustoncal values of
102 gallons per capita per day (g/c/d) and 50 gallons per employee per day (g/e/d), xespectrvely
Indusmal flow pro~ecnons aze esumated to be 6 percent of the total annual flow based on the 2000
through 2001 sigiuficant industnal users flows of approxunately 0 97 mgd Pro~ected 2020 annual
avexage flow to the WW'IP is estunated to xange from 19 9 mgd and 20 7 mgd, based on the two
sets of populanon focecasts fxom DRCOG and the BVCP, iespecnvely The pro~ected 2025
ma~uxnum month flow is appzo~umately 25 mgd foc both sources
P\Uara\GhN\Boulder\22054\Ocrobet 2004WUP Amendment\CHAPTER 1 d«
1-2
DRAFT
EXISTING SYSTEMS
Cuxrent txeatment pxocesses at the W~~'I1~ uiclude
• Screemng
• Gnt removal
~~~
~,,.~.~'~~
~
• Pnmary sedunentauon
' Secondary treatment employing tncklmg filters and sohds contact bastns (TF/SC)
• Nitnficauon in a nimfying mckhng filtex
• Chlonnaaon and dechlonnaaon
An on-site labotatory enables the City to analyze tnfluent and effluent watet quality on-stte
Approaumately 90 pexcent of the tlvckened biosohds from the W W'I'P are trucked to farm sites m
Eastem Adams County and apphed to the land as a ferhhzer and soil amendment The apphcaaon
sites ace located appto~umately GO xntles from the WWTP Appxoxunately 10 petcent of the annual
biosoLds pxoducrion is composted m Golden, Colorado A new composung faciltty is cutrendy
under considecauon by the City and a final deasion on whethec to move forwazd wtth the
composung faciliry is antiupated m mid-2005 If a decision is made to move forwaxd unth the
composnng pro~ect, u could be completed by the end of 2007
The Ciry of Boulder updated their Wastewatex Collecaon Systexn Master Plan (WWCSMP) m July
2003 Pnor collecuon system mastec plans were completed m 1972 and 1978, and 1983
The City's wastewatex collecaon system contuns pnmanly gxavity sewexs xanging from 4uiches to
60-inches m dtametex These sewets collect and convey wastewater from tesidennal, commerual,
and mdusmal sources to the WW 1'P There is one pumpmg stauon and force mazn in the Ciry's
collecnon system
The City curcendy has two service agreements unth non-Ciry wastewateT sezcnce providers These
agreements are wtth the Sombxero Ranch (also known as the Reserve), dated Septembei 1976, and
the Hoover Hills Sanltauon Distnct, dated October 1968
RECOMMENDEDIMPROVEMENTS
WWTP Upgrades
At the ume of the uuual Boulder Wastewater UnLty Plan subnuttal (November 2002), the City was
not proposing a ma~ox treatment plant expansion The City wanted to watt far the final Tn-Basin
aininoma TMDL and issuance of the new dischazge pemut before mmanng plamung for system
upgrade and expansion
P\Data\GEN\Boulder\22054\October 2004WOP Amendment\CHAP1'ER 1 d«
1-3
DR.AFT
~~~
~
A new WW'1'1' CDPS dischaxge permit was issued m 2003, wtth an effecave date of February 1,
2003, but it did not include the TMDL ammoma luxuts The proposed upgxades hezem ace based on
the TMDL denved aminoma pemut Lmits, curcent CDPS peznut xequtxements, and addiuonal
capaary to address future grourth pxo~ecnons
Design of the pxoposed WWTP upgcades ts cutrendy in progress An analysis of upgrade
altemaaves is pxescnbed m Chapter G Tlus analysis addresses the pcoposed WW'IP upgrades and
capacity expansion to 25 0 mgd A Site Apphcauon for tl~e proposed W W'IP upgxades and
expansion, along unth the xequ~ed attachments, is also included
Recommended System Improvements
As part of the alternauves analysis, iune imual ptocess alternauves were considexed for upgradtng
the City of Boulder 75th Street WWTP to meet cuxtent and annupated future loadmgs and effluent
lunlts
The altemanves weie evaluated based on two phases of unplementaaon Tlvs phasmg approach
allows the City to balance capital expenditures by construcung only necessary components m the
near-texm, such as those to addxess mmficauon reqmrements and plant capacity needs, wtule
plannmg to accommodate addtuonal pxocess facilmes that may be xequtred to meet more smngent
futute efEluent hmtts and potenaal addiuonal regulatory requ~sements
Construcnon of the Phase 1 tmptovements 1s expected to begin 1n 2005 These unpxovexnents aze
the basts fot the \X/VV'TP upgtades proposed m tlus Uttltty Plan Amendment Phase 2
unpxovements, tf xequtred, axe expected to occur m 2010 or 2015 The phasmg is dnven by capacity
xequtxements and anuctpated efEluent Lmits The Phase 1 unpcovements will lay the fraznework foc
the potennal futuxe Phase 2 addmons Phase 1 and 2 unprovements aze as follows
Phase 1(begui tn 2005) Phase 1 genetally includes neaz-term unprovements such as
those tequtred to addtess capaaty constraznts and hydtaulic botdenecks, and process
changes necessary to meet estabhshed TMDL ainmonia limits The faahues
included m Phase 1 unll meet e~usung effluent luruts, including total suspended sohds
(TSS) and biochemtcal o~cygen demand (BODS) and TIvIDL denved aimnocua limtts
as well as pxovide 25 mgd of treatment capacity based on average daily flow for the
maa~mum 30-day flow penod The Phase 1 design also considexs the footpnnt
requuements for future xegulatory dnven unprovements anaapated foc Phase 2
Phase 2(begln tn 2010 or 2015) Phase 2 includes conttnued treatrnent at the Phase
1 level plus the addtaon of pcocesses and/or chemical addtaon facilmes requtred to
meet potenual future effluent Lmits for mteate or total moxgamc nitrogen ('I'IN) and
phosphorus Although these future Lmits ace not defined at tlus nme, it is
anaupated that lmvts for mtrate or TIN and phosphorus could occur wttkun the next
two pexrrut cycles
P\Data\GEN\Boulde[\22054\October2004Vf/UPAmendment\CFiAP7'ERid« 1-4
DRAFT
o~"' ~
'.~~~=:~~
~
Based on the evaluauon suminanzed m Chapter 6, convexsion of the e~usnng FF/SC process to
acavated sludge (Altemauve 7) is the preferxed wastewatec tzeaunent system to meet Boulder's
curxent and anuupated wastewater treaanent needs Acuvated sludge has a lower pcesent worth
cost and is also moce appealuig fxom a non-economical standpoint than any of the other altexnaaves
available The cecommended unpzovements genexally include
• Construcaon of acttvated sludge aexauon basms and ur supply faciliaes
• Construcnon of one addthonal secondary clanfier wtth return acuvated sludge
pumping upgrades
' Demohuon of one e~sung mckl~ng filtec
• Constcucnon of UV dismfecaon facilmes
• Construcaon of sohds tluckenmg facility to handle waste acnvated sludge
• Other miscellaneous system unpxovements
These unprovements are bneIly descnbed below
Construct~on of Aecauon Basms and ?ur Supply Facilities (Acuvated Sludge).
Aeration Basins - Phase 1. Two 100' x 180' x 24' aeraaon basins are assumed for Phase 1
The two basms have a combined volume of 6 5 milhon gallons Tnckling Fdter (TF) 4 wtll
be demohshed and the Phase 1 aerauon basms will be constructed m its place In Phase 2,
TF 3 would be demol~shed and one addiaonal aexatton basui would be constructed
Dewatenng, excavanon, shonng, backfill, and concrete wotk wtll be xequtted Anttupated
eqiupment includes staznless steel aexauon ptpmg, dtffusers, xruxers and shde gates The
e~usung secondary puxnpmg staaon will be modtfied to pump to the aexauon basm mEluent
channel Replacement mEluent hft pumps and pipmg unll be zequtted An efEluent channel
to caxry aerauon basm effluent to the e~usung soLds contact tank influent channel will also
be required
Aeration Basins - Phase 2.. One new aeraaon basin would be constcucted foz Phase 2
wFuch would be idenucal in size to those constructed m Phase 1(each tank @ 3 25 MG)
Constcucuon of tlus future basin will reqwre the demoLnon ofTF 3
Blower Buildtng. A new blower builduig with dunensions of 80' x 55' and sized for thxee or four
blowexs will be xeqwxed fox Phase 1 No expansion of the builcLng or mstallaaon of addmonal
blowers will be requtred for Phase 2
Secondary C1anSer/Return Activated Sludge Pumping Upgrade. One addmonal 110-foot
diameter secondary clanfier wtll be requtxed fox Phase 1 along with modificatton to the e~ctsung RAS
pumping facilmes The five e~usung 4 4mgd puxnps unll be xemoved and replaced wtth 6 new
6 25-mgd puxnps In addtaon, a scum pump, WAS pumps, and mixed hquor and RAS piping will be
requ~ed
P\Data\GEN\Boulder\22054\Ocrohei200¢WUPAmendment\CHAPTCRidoc 1-rJ
DRAFT
~~ °' ~+~,
~
~
Demolition. The aeraaon basms for Phase 1 will be constcucted where TF 4 ts curxently located
In addinon, the e~sttng scmbber building located between T'F 2 and TF 4 unll be demohshed to
accommodate aeraaon basin construcaon m Phase 1 Construcuon of the Phase 2 aexanon basm
will xequtxe the demohaon of TF 3
iJV Dismfection. Phase 1 mcludes installanon of an LTV dismfecuon system m the e~usung
chlonne contact basin An enclosuxe for the iIV dtsmfecuon system will be provided to make
xouane muntenance moxe convenient, espectally dunng mclement weather A back-up genexatox ox
othex secondary power supply will also be provtded The UV system will be designed to treat a peak
flow of 56 6 mgd at a dose of 35 mJ/cmZ
Sohds Thickening Facility Improvements. Phase 1 will include construcuon of two cLssolved air
flotauon ttuckeners (DAFTs) to co-tkucken pntnary sludge and WAS fcom the secondary clanfiecs
The e~sung gravity tkuckeners will be converted to DAFT ucuts A new builduig will house the
recycle/saturaaon system, polymer system, pipmg, and sludge pumping faciliues
Other Treatment System Improvements. Other system unpcovements may include laboratory
unpxovements and other items such as lab equtpment, etc
Additional Near-Term Improvements. Neax term unprovements idenafied in the Novembex
2002 Unltty Plan axe presented below unth updated pxo~ect status The City of Boulder Caprtal
Improvement Program (CIP) covers a 6-year ume penod and is updated annually Improvements
hsted in the CIP, and proposed unprovements foc 2002-2004, are as follows
Conversion from chlonne cLsinfecuon to ultraviolet Lght dismfecaon Tlus pxocess
change is mcluded m the WWTP upgxades cucrendy undenvay An alternauves
analysis fox tlus pxocess change is presented m Chapter 6
Relocanon of the 75`~ Stteet W~X/'IP's effluent outfall ~pehne The eausttng W~~1TP
outfall was relocated downstreaxn ftom tts cutrent locahon to a new locanon dtrecdy
below 75~' Stceet The outfall was relocated m accordance wtth the Interlocal
Agreement betcveen the City of Boulder and the City oELaEayette to allow Lafayette
to wtthdxaw water from Bouldex Creek above the City of Bouldex's 75`~ Street
l'VW'IP point of dischaxge Construcuon was completed in spnng 2003
Construcuon of a Class A biosohds composung facilitv The City's Uulihes
Department purchased approac~xnately 35 acres of land for construcnon of the
composnng and othex facilittes and is m the process of anne~ung the site A final
deasion on whether to move fotward unth construcaon of tkus facility will occur m
nud-2005 If approved the pxo~ect may be completed by the end of 2007 The
prehinmary plan is to eithex truck tkuckened biosohds or pipe untluckened biosohds
to the composnng facility site and compost the matenal wtth wood wastes collected
fxom City residents
P\Data\GEIY\Boulder\22054\October2004WUP Amendment\CHAPT'ER 1 d« 1-6
DRAFT
~~'~~
.,- ~~
`4~
Imocove the biosoLds handhngand dewatenng~rocess at the W\X/"IP One
unpxovement will entatl etthex zettofithng the e~usting biosohds cenmfuge faciliry
with lazger, kugh sohds cenmfuges ox bwldtng a new cenmfuge facility at the srte of
the planned biosohds compost faciliry Tumng for the pro~ect, in pazt, will depend
on the schedule for composnng facility constcucuon
P\Datn\GEN\Boulder\22054\Octobei 2004WUP Amendment\CHAP7'ER 1 dw
1-7