September 3, 2004
Ms Molly Wmter
Uwversity Hill General Impmvement Distnct
City of Boulder
1500 Peazl Street, Ste 302
Baulder, CO 80302
RE: UHGID Parking Study
Deaz Ms Wmter
SEH has prepazed a draft scope of work and fee esumate to develop a Pazkmg Study for the Umversity
Hill General Improvement Distnct (LJHGID) The goal of the pro~ect is to quanhfy the availability of
parkmg m the commercial distnct and to idenhfy any constramts parkmg availabihty may have on
commercial uses m the study azea The assessment will compaze parlang uuLzahon numbers from
previous studies and will idenhfy pazlung demand based on current land use and mode spht of both
employees and customers
In addihon, the Pazkwg Study will idenhfy parlung util~zauon and use dunng a typ~cal Saturday evenmg
to gauge pazkmg charactenstics dunng tius tune of peak demand
SEH will complete this pro~ect m four tasks
1. Update the December 1998 UHGID Park:ng Uttl~zat:on Studv and compare to past uhl~zahon reports.
2 Develop an estunate of parkmg demand through tnp generahon calculahon and
3. Mode splu survey
4. Summanze fmdmgs and make muiai recommendations for feasibility of purswng addirional pazkmg
supply
SEH understands the importance of workmg closely with you and UHGID members throughout the
process of completmg this pro~ect The pro~ect will be managed by Tim Swope, AICP wrth oversight by
Phil Weisbach, PE Anhcipated work tasks and eshmated SEH staff tune per task aze as follows
TASK 1: Update Parking Inventory
SEH will update the parlung supply as ~dentified by the Dec 98 study Any changes m the number of
parkmg spaces or parkmg resmchons will be noted and mcorporated mto the new pazkmg supply
numbers Non-metered parkmg widun the srudy azea will not be mcluded m the mventory as availabihty
is close to zero
Informat~on on parkmg supply wili be consol~dated onto a base maps m either AutoCAD or GIS platform,
accordmg to the wishes of UHGID StafF will meet with the UHGID Director to review the base maps,
review the pro~ect methodology and refine the pro~ect srudy azea and scope if needed
Short Elliott Hendrickaon Inc , 1375 Walnut Street Swte 211, Boultler, CO 80302-5263
SEH is an equal opportumty employer I w~"M %ehinc com ~ 303 442 3130 ~ 303 442 3139 faa
Pazkmg and Access Study
September 3, 2004
Page 2
SEH will conduct an mventory of pazlung avadabiliry based on the methodologies used on the
Neighborhood Peraut Parkmg Program and in past LJHGID parkmg studies The mventory will track
hourly park~ng availabiliry for pnvate lots, on-street pazkmg, and public lots on an hourly basis for a
smgle weekday from 8 AM to 7 PM and on a Saturday from S AM to 7 PM
Saturday Evening Inventory
SEH will conduct a special wventory of parkmg availabihty dunng a typical Sahuday evemng dunng
restaurant / entertainment hours The mventory will mclude the same area as the daytune surveys m
addition to the unmetered spots on 14~', 12'~, 11`~, College, Pennsylvama, Pleasant, and Umversity The
survey will offer a"snapshoP' of parkmg util~zahon and will take place between 9 pm - 11 pm
TASK 2: Demand Analysis
SEH will develop a demand analysis for the study azea in order to estunate a total potenrial demand for
parkmg grven the exishng commercial land uses w~thm the study area The analysis will be based on the
existmg commercial land use as supphed by UHGID and on mode-split eshmates from either the 1998
Report or from new survey responses The analysis will mcorporate vehicle tnp reductions due to mode
splrt and shared-pazkuig within the distnct
This analysis will allow the UHGID to compare the current pazkmg supply with an estunated demand for
pazkmg spaces, based on exishng land use This analysis w~ll be particularly useful if UHGID were to
exanune future pazkmg needs based on revised land use alternahves
TASK 3: User Survey
SEH feels that the most effecnve way to idenhfy mode-use and tnp purpose dismbuhons is to survey a
random selechon of UHGID users to ascertam tnp purpose and travel mode Informahon on pazkmg
locahon and durahon could also be collected The survey would need to be of adequate sample size (85-
90 responses) and from multiple locations dunng peak hours to ensure accurate results. The survey would
requue staff tune to develop the queshons and review them with UHGID staff SEH estunates the survey
to require a two-person survey team two four-hour tune penods to complete
The survey will be formulated to yield mformahon on
1 Tnp purpose (work, shop, or schoal)
2 Mode of travel
3 Parkmg location
4 Destmahon locahon
5 Duranon of stay
SEH will survey Hill users on a typical Saturday evenmg usmg the same survey as the daytvne use.
Survey results will be combmed wtth the mp generanon esnmates to develop an est~mate of parking
demand for current land uses and provide a base for any fuhue calculahons of demand pro~ecnons
Results can also be combmed w~th an employer survey cLsmbuted by UHGID
TASK 4: Report
SEH will summanze the results of both the mventory and demand analys~s Parkmg avazlability will be
compazed to past studtes ro ident~fy uhlizano~ trends Parkmg demand will be compared to the
Parlung and Access Study
September 3, 2004
Page 3
avazlabihty and an evaluahon of potenrial latent demand will be completed The summary w~ll mclude a
recommendation as to further pwsumg addihonal pazkuig supply
Fee Estimate
We anticipate these work tasks to requve a total of apprmcunately 124 hours of staff tune (mcludmg 2
meetmgs with iJHGID staf~ and a fee of $ 9,570 Requests to complete tasks m addihon to those outlmed
m the above scope of work will be undertaken on a tune and matenals bas~s accordmg to the rates
contamed m our current on-call sernces contract with the CiTy of Boulder
Project Deliverables
• updated mventory of LTHGID park~ng spaces and space utrhzahon inventory for one weekday and one
Saturday and one Saturday evenmg/mght
• tnp generahon estunate for existmg UHGID land uses
• personai mternew survey results for mp purpose, travel mode, and duraUOn of stay
• two meetmgs with LJHGID staff
• ten copies of final report
Project Schedule
SEH is ready to begm work on this pro~ect. We anhcipate completion of the above work tasks withm 30
days of nohce to proceed. If this proposal meets your needs, please call or email me and let me lmow
what fiuther paperwork, if any, we need to do We Look fonvazd to workmg wuh you.
Smcerely,
SHORT ELLIOTT HENDRICKSON, INC
Plul Weisbach, PE
Associate
303 441 5411
pweisbach@sehmacom
\\BOULD\0502\proposalltr doc
If the proposed work scope and fee estunate detazled above are acceptable, please sign below and
return a fa~ced copy to SEH as our authonzarion to proceed with the study
By