Loading...
4 - Call Up Item, Floodplain Development Permit, 2121 4th Street, Sunshine Creek Conveyance ZoneMEMORANDUM TO: Mayor Will Toor and Members of City Council FROM: Ronald A. Secrist, City Manager Maureen Rait, Director of Public Works for Development and Support Services Robert E. Williams, Director of Public Works for Utilities Alan Taylor, Floodplain and Wetlands Coordinator Bruce Johnson, Civil Engineer (~.~~ • ~~ DATE: October 9, 2001 SUBJECT: Call Up Item: Floodplain Development Permit - 2121 4'h Street Sunshine Creek Conveyance Zone Applicant: Jeff Bosboom Floodplain Development Permit #LUR2001-00058 was issued on October 8, 2001 for construction of a concrete patio and in-ground hot tub. The concrete patio will be located partially in the conveyance zone, constructed 4" above existing grade, and the hot tub will ba constructed in the conveyance zone but completely below grade. The new patio will replace an existing raised wood deck (approximately 12" high), with wooden railings, built-in wooden benches, and an above- ground hot tub. The existing deck to be removed is located partially in the conveyance zone. Construction of physical improvements that do not adversely impact flood elevations in the comeyance zone are allowed under local floodplain regulations, as set forth under Sections 9-9-4, 9-9-6 and 9-9-7, B.R.C., 1981, The proposed improvements are located to ensure equivalent conveyance of flood waters that will not cause any increase in 100-year flood elevations. Based on design information provided by the applicant, staff has concluded that the proposed conshuction with grading modifications to provide conveyance will not result in any rise in the 100- year flood level. In addition to removal of the raised wooden deck, the applicant is proposing to grade the backyard area adjacent to the deck in order to provide a defined swale to cany flood flows and provide flood conveyance mitigation. This swale will be appropriately transitioned to match existing grades downstream of the patio in order to maintain existing flow pattems at the property boundary. This decision may be called up before City Council on or before October 29, 2001. There is one scheduled City Council meeting during the 21-day call-up period on October 16, 2001. ~' '~+'~ ~l 1 Datelssued: Permit Number: Contact Information Project Information Location: Legal Description: Description of Work: Type of Floodplain Permit: Creek Name: Flood Protection Elevation: Conditions of Approval October 8, 2001 LUR2001-00058 FOURTH 2121 2121 4TH ST BOULDER, CO 80302 2121 4TH ST Expiration Date: October 8, 2004 (Pursuant to Subsection 9-9-9(e), B.R.C. 1981) TR 235-B & E 1/2 VAC STREET BOULDER PER DEED 819567 01/14/87 BCR Floodplain development in the conveyance zone. Remove existing deck, replace with new concrete patio, install inground hot tub (Installation of tubby a later PMT case) Floodplain Review W/O Analysis Sunshine 5,425.90 The proposed project/activity is approved on the basis that it satisfies applicable requirements of Chapter 9-9, "Floodplain Regulations," Boulder Revised Code 1981. Other Floodplain requirements as setforth in Chapter 9-9 which are not specifically outlined in the conditions of approval below remain applicable to this projecUactivity. , Improvements shall be constructed in accordance with plans submitted as part of the Floodplain Development Permitapplication, as revised on Oct. 2, 2001. The applicant shall provide written confirmation from the landscape architectthat all improvements have been completed in conformance with this Floodplain Development Permit The applicant shall obtain a site inspection and final City approval upon completion of the improvements. This permit is subject to call-up for review by the City Counal and is not effective for 21 days from the date of issuance. In the event the permit is not called up the effective date shall be October 29, 2001. CITY OF BOULDER Building Services Center 1739 Broadway, Third Floor • P.O. Box 791 • Boulder, Colorado 8030fi-0791 Phone 303-441•t880 • Fax 303.4413241 • www.ci.boulder.cc.us/buildingservices Land Use Review Floodplain Development Permit Inspections To schedule an inspection, call 303-441-3280 and refer to your permit number (LUR2001-00058).