Loading...
6B - Site Review #SI-2000-16, St. John's Episcopal Church, 1419 Pine StreetCITY OF BOULDER PLANNING BOARD AGENDA ITEM MEETING DATE: July 19, 2001 Agenda Item Preparation Date: July 3, 2001 AGENDA TITLE: Public hearing and consideration of Site Review #SI-2000-16 (LUR2000-SI016) to expand St. John's Episcopal Church located at 1419 Pine Street. The request includes an expansion of existing church offices, classrooms and parish hall. The total square foot addition proposed is approximately 8,000 square feet and 3,800 square feet of underground parking. The request includes a height of up to 46 feet for the new addition and a parking reduction request of 73 percent. Setback variations include a proposed sideyard (south) setback for a stairwell of 20 feet where 25 feet is required, and a proposed frontyard (east) setback for parking of 6 feet where 25 feet is required. The applicant is seeking creation of vested property rights in accordance with Section 9-4-12 "Creation of Vested Rights," B.R.C. 1981 for a two phase project. Phase I consists of an addition of 8,000 square feet of office, meeting and religious education space, and 3,800 square feet of underground parking to be completed within three years. Phase II consists of a colonnade structure to be completed within six years. Applicant: St. John's Episcopal Church REQUESTING DEPARTMENT: Planning Department Peter Pollock, Planning Director Bob Cole, Director of Project Review Don Durso, Case Manager s:\plan\pb-itemsUnemos\ddstjohns.wpd AGENDA ITEM # lU~ Page 1 OVERVIEW: The Planning Board is being asked to consider a request for a Site Review to permit an expansion of the St. John's Episcopal Church located at 1419 Pine Street. The request includes a demolition of the brick house located on the east end of the site (already demolished), as well as removal of the parking area along Pine Street. The applicants propose to construct an addition to the east of the existing historic church. The new building will be connected to the existing church and offices. Parking will be located to the east and under the new addition. The existing parking lot will be turned into a landscaped area for the church and public, and the two curbcuts along Pine will be eliminated. The new parking lot will accommodate 20 parking spaces resulting in an 73 percent parking reduction from the required number of 73 parking spaces. Staff recommends approval of the proposal. STATISTICS: Proposal: Site Review for the expansion of an existing church located at 1419 Pine Street for office, meeting and religious education space. Requested variations to the land use regulations: 1. Height of up to 46 feet for the new addition 2. Parking reduction of 73 percent 3. Setback variations include: A. Sideyazd (south) setback of 20 feet where 25 feet is required for a stairwell; B. Frontyard (east) setback of 6 feet where 25 feet is required for parking; Project Name: St. John's Episcopal Church Location: 1419 Pine Street Size of Tract: 0.96 acres (42,000 square feet) Zoning: MXR-E (Mixed Density Residential - Established) Comprehensive Plan: Mixed Density Residential s:\plan\pb-items~memos\ddstjohns.wpd AGENDA ITEM #~~J Paee 2 KEY ISSUES: Does the proposal utilize site design techniques which enhance the quality of the project? 2. Is the addition compatible with the existing character of the surrounding area? 3. Is the requested height exception appropriate for this site? 4. Is the requested 73 percent parking reduction justified? Will adequate parking be provided for use of the site? BACKGROUND: Process Planning Boaxd consideration of this request is required because the applicant has requested a parking reduction of greater than 20 percent (73 percent reduction requested) and a height over 35 feet. The proposed addition will be approximately 45 feet tall. The existing bell tower exceed the permitted building height but is considered a grandfathered height of approximately 74 feet tall. History The existing St. John's Episcopal Church, which is an individually landmarked structure within the city of Boulder, was built around 1902-1904, with additions in 1965 (chapel, sacristy and support space), 1969 (offices), and in 1987 (classrooms). The site undenvent a non-conforming review in 1981 to expand the Sunday school classrooms & church facilities, and a second non- conforming review in 1987 to add classrooms. The second review required an additional eight spaces rented from the YWCA to the north for Sunday parking needs. Existing Site The current site is the half block area north of Pine between 14'h and 15'h, and south of the alley between Pine and Mapleton. The site contains the historic St. John's Episcopal Church, with related uses, including the parish hall. On the east side of the site there was an existing two story residence with three apartments. This building has been demolished in anticipation of the planned expansion. The site contains 26 parking spaces adjacent to Pine. Many of these parking spaces do not meet the city requirements for parking, either because they do not meet the size requirements, backing distances, or are within the required Pine Street setback. An additional gravel parking area is located on the northeast corner of the site adjacent to the alley, which can park about 4 cars. North of the church, across the alley, is the YWCA on the west and a residence on the east. Northeast of the site are residential uses. Across Pine to the south is the First Methodist Church. A mix of offices and residences are to the west, and Pearl Street Mall begins a block south and west of the site. A private parking garage is located on the corner of Spruce and 15`", approximately 500 feet from the site (one block). s:\plan\pb-items~nemos\ddstjohns.wpd AGENDA ITEM #~~ Paee 3 In addition to leasing parking spaces at the YWCA, the church also uses 10 classrooms on Sunday to house its Sunday school classes which are attended by approximately 190 children, and supported by 20 adults. In addition to the space at the YWCA, the church also utilizes the rector's office, conference room, and a basement area for the Sunday school classes. Each class has anywhere from five to 30 children per class. Project Description The primary reason for this request is to consolidate the Sunday school facilities into one building attached to the sanctuary and locate all these uses on-site. Currently, the use of the YWCA requires that the children cross back and forth across the alley between the two sites. The existing building area on-site is 16,634 square feet including the house. The proposal is to demolish the existing house (2,700 square feet, which has already been demolished, housed three rental units) and rebuild approximately 11,000 square feet of building, which will result in a net increase of approximately 8,000 square feet, for a total of 21,900 square feet of building area. Elimination of the current parking area along Pine Street, closure of both curbcuts on Pine, and relocation of 15 parking spaces underground with access from 15`h Street are aiso proposed. The existing gravel parking lot located of£the alley will be upgraded and paved, and the existing curbcut from 15t° Street will also be eliminated. The alley parking will have five spaces and be accessible from the alley only. When this application was first reviewed, staff was concerned with the proposal, as it eliminated three residential units in a residential zone and instead, proposed office square footage on the site. The first proposal, in staff s opinion, included a unsubstantiated amount of additiona] space for church uses but did not attempt to retain the residential uses. Since the first submittal, the addition has been scaled back by approximately 5,000 square feet and a number of phases eliminated. The new addition to the church will be approximately 46 feet in height, based upon the low point of grade, which will be the surface of the new underground parking area. The applicant is proposing two setback variations. One is locate a skairwe115 feet into the south sideyard setback of the building. The proposed setback will be 20 feet where 25 feet is required. The second variance is to locate parking 7 feet from 15"' Street where 25 feet is required. A parking reduction of 73 percent has been requested. The applicant has completed a detailed parking analysis showing that the majority of its parking needs are on Sunday only. Weekday parking needs will be accommodated by the 20 on-site spaces. Additional Sunday parking wili be available at the YWCA, where the applicant has a]ease for eight spaces. An additiona130 spaces will be leased from the owners of the parking gazage located at the southwest corner of 15`h and Spruce. Landscaping and site improvements will buffer and screen the new parking lot from view from I S`h Street. A new courtyard south of the existing structure will be developed where the parking azea along Pine Street exists today. s:\plan\pb-items~nemos\ddstjohns.wpd AGENDA ITEM # lD ~ Paee 4 ANALYSIS: 1. Does the proposal utilize site design techniques which enhance the quality of the project? Twenty percent of the site is required to be open space. Over 37 percent of the site will be open space under the proposed plan. A large court yard has been proposed where a parking lot currently exists. New trees and ]andscaping will be added along Pine Street and will be an improvement to the existing poorly designed parking lot. Open space and landscaping on-site will provide buffers to the adjacent land uses by providing screening of the parking lot and adding landscaping to the site that will serve to buffer the height of the existing and proposed buildings. Exterior open space areas are proposed that wili increase accessibility to the site. Two of the existing curbcuts will be closed, leaving one curbcut and an alley access, instead of four vehicle accesses. The refurbished parking lot along the alley and 15"' Street will be screened from view. 2. Is the addition compatible with the existing character of the surrounding area? The new addition is in keeping with the scale and character of the existing development, and the building massing blends with the overall site characteristics. The new addition is in the approximate location and oF the approximate massing of the house that was recently demolished. The architecture and materials will reflect the style and materials used elsewhere on the site. As noted in the background information above, the applicant has eliminated three residential units from the site, with which staff was concerned. Staff has since reviewed the commitment that St. John's has made to affordable housing within the community in the past and in the future. (see staff DRC comments, Attachment D) After much discussion with the applicants staff had decided that it is willing to accept the loss of these residential units. Further, St. John's has stated that in the future, if any further expansion is contemplated on the site, it will be a priority to include residential uses as part of the plan. 3. Is the requested 6eight exception appropriate for this site? The new addition will have a height of approximately 46 feet from the low point (surface of the underground parking level). The building will have a visual height of approximately 42 feet from Pine Street. The addition is set back approximately 30 feet from the sidewalk along Pine Street and 50 feet from the flow line of traffic. This addition will be masked by two lazge existing trees along Pine and the addition of two proposed trees in front of the building. s:\plan\pb-itemsUnemos\ddstjohns.wpd AGENDA ITEM #~~ Pase 5 The addition is set back 50 feet from the sidewalk along 15`h Street and 80 feet from the flow line of traffia The addition will be masked by a number of large existing street trees along 15`h. The structure to the east of the site is a three story office building, approximately 35 feet in height. Because of the existing use to the east and the distance that the addition is set back from 15'h Street, the addition should not adversely affect the 15'h Street or Pine Street streetSCape or the property to the east. This addition will have to most impact on the property to the north, across the aliey. The location of the proposed addition is approximately 5344 feet in elevation at the bottom of the underground parking area. The elevation at the north property line is 5352, eight feet higher, and the residential unit to the north's elavation is approximately 5353 feet. Therefore, the addition will have a visual height of approximately 37 feet from that property. The 46 foot portion of the addition is approximately 40 feet from the north property line, and 65 feet from the house to the north. The combination of the setback and the fact that the church addition is sat into the topography as it rises to the north will result in no more impact than a typica135 foot tall structure. The addition will have very little if any impact to the properties to thE west, as it is buffered by the existing church structure, and will not be visible. 4. Is the requested 73 percent parking reduction justified? Wi11 adequate parking be provided for use of the site? To support a parking reduction, the applicant must show that the parking neads of the use will be adequately served: Weekdays: The applicant has provided a detailed parking use analysis of the church, which indicates that the proposed 20 spaces located on-site will accommodate iYs weekday needs (see applicant's parking analysis, attachments B and E-I, as part of ApplicanYs Written Statement, Attacluuent E). The church has been operating with the existing 30 spaces located in the non-conforming parking lots for the past 15 years or more. Of those spaces, 21 of them are currently leased out far weekday uses, leaving only nine spaces for church uses during the weekday. The applicant is not proposing to increase its weekday activities. Based upon the written statement and staff observations the proposed 20 car pazking lot should adequately meat its needs. Sundays: As with most churches located in the city, it is not possible to accommodate its Sunday parking needs. The applicants have proposed to lease 30 spaces at a near-by parking structure (15'h and Spruce) and they will maintain use of eight spaces at the YWCA on Sundays as well. This amount of parking, including the on-site parking, is equivalent to providing 80 percent of the required parking for this use, based upon providing one space for each 300 square feet of floor area. Because the church is located in the downtown s:\plan\pb-itemslmemos\ddstjolws.wpd AGENDA ITEM # Pa e 6 azea adjacent to many commercial uses, ample on-street parking is available during their peak parking times on Sunday morning. PUBLIC COMMENT AND PROCESS: Three phone calls from neighbors were received by the staff. Two people did not express a concern over the project. One person, who lives to the north of the church, was opposed to the proposal. She expressed concern about the lack of parking in the area and the impact that increasing commercial development in residential zones is having upon the residential component of the downtown area. Required public notice was given in the form of written notification mailed to all property owners within 600 feet of the subject property and a sign was posted on the property for at least 10 days. All notice requirements of Section 9-4-2, B.R.C. 1981 have been met. STAFF FINDINGS AND RECOMMENDATION: Planning staff finds that this request for Site Review, a parking reduction of 73 percent and height exception to 45 feet meets all the review criteria: Parking will be available to this site for Sunday use at the YWCA and the private parking lots on Spruce. On-site parking has been shown to meet the weekday needs of this use. 2. The height exception to 45 feet is appropriate in that no impacts will occur to adjacent properties from shadows created by the new building. The proposed mass and bulk o£the building are compatible with the existing structure and the surrounding uses. The application is consistent with the site review criteria (Attachment C). Therefore, staff recommends that Planning Board approve Site Review SI-2000-16 and the request for vested rights, incorporating this staff inemorandum and the attached Site Review Criteria Checklist as findings of fact and using the recommended conditions of approval in Attachment A. Approved By: ~'-e~i'eter Pollock, Planning~ to~ s:\plan\pb-items~nemos\ddsyohns.wpd AGENDA ITEM #[DQ Paee 7 ATTACHMENTS: Attachment A: Attachment B: Attachxnent C: Attachment D: Attachment E: Recommended Conditions of Approval Vicinity Map 5ite Review Checklist Development Review Committee Comments ApplicanC's Written Statement and Proposed P1ans, including Vested Rights Form AGENDA ITEM # Pa e $ s:\plan~pb-items~snemos\ddstjohns.wpd ATTACHMENT A RECOMMENDED CONDITIONS OF APPROVAL 1419 Pine Street--LUR2000-SI016 The applicant shall be responsible for ensuring that the development shall be in compliance with all approved plans and the applicants written statement dated May 7, 2001, on file in the City of Boulder Planning Department. Prior to a building permit application, the applicant shall submit the following items fore the review, and subject to the approval, of the Planning Department: A. Final architectural plans, including materials and colors, to ensure compiiance with the intent of this approval: B. A detailed landscape plan, including size, quantity, and type of plants existing and proposed; type and quality of nonliving landscaping materials; any site grading proposed; and any irrigation system proposed, to ensure compliance with this approval and the city's landscaping requirements. C. A tree removal plan. Removal of trees on the site, as well as the removal of any tree in the city right-of-way must also receive prior approval of the City Forester. 2. Prior to building permit application the appiicant shall revise and complete their Lot Line Elimination application (LE 2000-2). 3. Prior to building permit application the applicant must submit an executed lease with the garage located at 15`h and Spruce for thirty pazking spaces to be used on Sundays, as set forth in its written statement. s:\plan\pb-itemsUnemos\ddstjohns.wpd AGENDA ITEM #~O~ Paee 9 ATTACHMENT B - LOCATION: 1419 Pine Street - APPUCATION TYPE: Site Review - Planning Board Level - ZONINc3: MXR-E - APPLICANTS: Hartronft Fauri Architects ~~ Q "'' ~ tl"",~ N Agenda Item #~Page # ~ ATTACHMENT C SITE REVIEW CRITERIA: I. Boulder Valley Comprehensive Plan: (A) The proposed site plan is consistent with the purposes and policies of the Boulder Valley Comprehensive Plan. The elements of this plan are consistent with the puiposes and policies of the Boulder Valley Comprehensive Plan. Use of the site is for a religious institution that provides a community service to the surrounding area and the city of Boulder. The site plan respects the sunounding neighborhood and has placed the new building such that adjacent uses will not be impacted by building height and location. (B) The proposed development shall not exceed the maximum density associated with the Boulder Valley Comprehensive Plan residenti~l land use designation. Additionally, if the density of existing residential development within a 300 foot area surrounding the site is at or exceeds the density permitted in the Boulder Valley Comprehensive Plan, then the maximum density permitted on the site shall not exceed the lesser of: (i) the density permitted in the Boulder Valley Comprehensive Plan, or, (ii) the maximum number of units that could be placed on the site without waiving or varying any of the requirements of Chapter 9-3.2, "Bulk Requirements," B.R.C. 1981. Not applicable to this request for a religious assembly. II. Site Desien: It utilizes site design techniques which enhance the quality of the project. In determining whether this subsection is met, the approving agency will consider the following factors: A. Open space, including without limitation, parks, recreation areas, and playgrounds: 1. Useable open space is arranged to be accessible and functional; 20 percent of the site is required to be open spaca. There is 15,404 square feet oFopen space provided where 8,443 square feet is required. A large court yard has been proposed where today there exists a parking lot. Exterior openspace areas have been proposed to be developed to increase accessibility to the site and screening of the parking lot. 2. Private open space is provided for each detached residential unit; Not applicable to a place of religious assembly. 3. The project provides for the preservation of natural features, including without limitation healthy long-lived trees, terrain, and drainage areas; The site plan is consistent with this criteria, through the preservation of existing street trees, and trees on site where possible. s:\plan\pb-items~nemos\ddstjohns.wpd AGENDA ITEM #~~ Paee 11 4. The open space-provides a relief to the density, both within the project and from surrounding development; Open space and landscaping on site will provide good buffers to adjacent land uses by providing screening of the parking ]ot and adding landscaping to the site that serve to buffer the height of the existing and proposed buildings on site. 5. If possible, open space is linked to an area- or City-wide system. No open space links exist in this part of the downtown area. B. Landscapina: 1. The project provides for a variety of plant and hard surface materials, and the selection of materials provides a variety of colors and contrasts; The provision of the courtyard and exterior landscaping will provided a variety of materials, height and colar to this site. 2. The project provides significant amounts of plant material sized in excess of the landscaping requirements of Sections 9-3.3-2 and 9-3.3-3, "Landscaping and Screening Requirements," and "Landscape Design Standards," B.R.C.1981; and This site has perimeter ]andscaping that will be retained. The new landscape plans for the site exceed the requirements for the amount, size and type of materials proposed. 3. The setbacks, yards, and useable open space along public rights-of- way are landscaped to provide attractive streetscapes, to enhance architectural features, and to contribute to the development of au attractive site plan. New trees and landscaping added along Pine will be an improvement to the existing poarly designed parking lot. The parking lot along the alley and 15"' Street wili be screened from view. C. Circulation, including without limitation Yhe transportation system that serves the property, whether public or private and whether constructed by the developer or not: 1. High speeds are discouraged or a physical separation between streets and the project is provided; Not applicable to this property. 2. Potential cont]icts with vehicles are minimized; Two curbcuts along Pine have been eliminated, as well as one access from Pine, adjacent to the alley. 3. Safe and convenient connections accessible to the public within the project and between the project and existing and proposed transportation systems are provided, inciuding without limitation streets, bikeways, pedestrian ways and trails; This site is within the downtown grid, which make pedestrian and traffic access to this site very easy. Internal site access has been improved through the new landscaped azea. The courtyard serves as a drop-off and gathering place for the site. 4. On-site facilities for external linkage are provided with other modes of transportation, where applicable; n/a s:\plan\pb-items~nemos\ddstjohns.wpd AGENDA ITEM # la~ Pa2e 12 5. The amount of land devoted to the street system is minimized; No new streets or right-of-way are required for this request. 6. The project is designed for the types of traffic expected, including without limitation automobiles, bicycles, and pedestrians, and provides safety, separation from living areas, and control of noise and exhaust; and This is an existing downtown site and the existing street and sidewalk structure support the redevelopment of the site. 7. City construction standards are met, and emergency vehicle use is facilitated. City construction standards will be met with the redevelopment of this site. The standard city grided system in this area provides easy access to all buildings existing and proposed for this site. D. Parkin~: 1. The project incorporates into the design of parking areas measures to provide safety, convenience, and separation of pedestrian movements from vehicular movements; Access to the parking lots is by way of the alley and 15"' Street. This will separate vehicular movements from pedestrians accessing the site from Pine. 2. The design of parking areas makes ef~cieut use of the land and uses the minimum amount of land necessary to meet the parking needs of the project; Because the parking is being partially located below the addition, the surface are devoted to parking is being reduced. 3. Parlcing areas and lighting are designed to reduce the visual impact on the project, adjacent properties, and adjacent streets; and All lighting will be directed internal to the site. 4. Parking areas utilize landscaping materials to provide shade in excess oS the requirements in Section 9-3.3-12, "Parking Area Design Standards," B.R.C. 1981. Additional landscaping has been added to the perimeters of the parking lot. The edges of the parking lot will be shaded by the addition of new trees along the perimeter of thelot. E. Buildine Desian. Livabilitv, and Relationship to the Existine or Proaosed Surrounding Area: 1. The building height, mass, scale, orientation, and con~guration are compatible with the existing character of the area or the character established by an adopted plan for the area; The new addition is in keeping with the scale and character of the existing development, and the building massing blends with the overall site characteristics. 2. The height of buildings is in general proportion to the height of existing buildings and the proposed or projected heights of approved buildings or approved plans for the immediate area; The new addition is in the approximate location of an existing house. The proportions of the proposed addition approximate the existing structure. s:\plan\pb-items~nemos\ddstjohns.wpd AGENDA ITEM #!O~ Paee 13 3. The orientation of buildings minimizes shadows on and blocking of views from adjacent properties; The tallest areas of the addition will be set closer to Pine Street (south side of the property). Therefore, the addition will result in no impacts to adjacent buildings or uses to the north. 4. If the character of t6e area is identifiable, the project is made compatible by the appropriate use of color, materials, landscaping, signs, and lighting; the site is in the downtown area, and the architecture will reflect materials used elsewhere on the site. 5. Buildings present an attractive streetscape, incorporate architectural and site design elements appropriate to a pedestrian scale, and provide for the safety and convenience of pedestrians. Planned improvements to this site support improved pedestrian use of the site. 6. For residential projects, noise is minimized between units, between buildings, and from either on-site or off-site external sources through spacing, laadscaping, and building materiais; Not applicable to this site plan. 7. A lighting plan is provided which augments security, energy conservation, safety, and aesthetics; Final lighting plans will be reviewed at the time of building permit application. 8. Cut and fill are minimized on the site, and the design of buildings conforms to the natural contours of the land. The proposed changes to grade are minimal. F. Solar Siting and Construction: For the purpose of ensuring the maximum potential for utilization of solar energy in the city, all applicants for residential site reviews shall place street, lots, open spaces, and buildings so as to maximize the potentiat for the use of solar energy in accordance with the following solar siting criteria: 1. Placement of Ouen Space and Streets. Open space areas are located wherever practical to protect buildings from shading by other buiidings within the development or from buildings on adjacent properties. Topography and other natural features and constraints may justify deviations from this criterion. This site is in the historic downtown area, where buildings have been placed on a north/south orientation. The taller portions of the new building will be on the southern portions of the site. 2. Lot Layout and.Buildin~Sitin~. Lots are oriented and buildings are sited in a way which maximizes the solar potential of each principal buiiding. Lots are designed to facilitate siting a structure which is unshaded by other nearby structures. Wherever practical, buildings are sited close to the north lot line to increase yard space to the south for better owner control of shading. Proposed plan meets this criteria, see 1 above. s:\plan\pb-items~memos\ddstjohns.wpd AGENDA ITEM # lOQ Paee 14 Buildin~Form. The shapes of buildings are designed to maximize utilization of solar energy. Buildings shall meet the solar access protection and solar siting requirements of Chapter 9-8, "Solar Access," B.R.C. 1981. The buildings will not shadow properties to the north across the alley. 4. Landscapina. The shading effects of proposed landscaping on adjacent buildings are minimized. Primary landscaping has been added to the south portions of the site, such that properties to the north will not be impacted. New landscaping will have minimal shading on adjacent . buildings. s:\plan\pb-items~cnemos\ddstjohns.wpd AGENDA ITEM #~DQ Paee 15 ATTACHMENT D Track #32 DRC Meeting: 8/24/00 CITY OF BOULDER DEVELOPMENT REVIEW RESULTS AND COMMENTS DATE OF COMMENTS CASE MANAGER: PROJECT NAME: LOCATION: COORDINATES: REQUEST TYPE AND NUMBER: APPLICANT: DESCRIPTION: August 25, 2000 Don Durso St. John's Episcopal Church 1419 Pine Street N3W6 Site Review, SI-2000-16 Hartronft-Fauri Architects Expansion of existing church offices, classrooms, and parish hall. Total square foot addition proposed is 13,825 square feet, including 5,000 square feet of undergroand parking. REQUESTED VARIATIONS FROM THE LAND USE REGULATIONS: 1. Parking reduction of approximately 80% required. 3. Height approximately 47'. 4. Parking located in a required front-yard landscaped setback (adjacent to 15th Street). 2. North property line setback-3'4" where 5' is REVIEW FINDINGS Application does not meet criteria; a revision Is necessary or a decision will be issued based upon the provided materlals. Staff finds that the applicant has not demonstrated that the application meets the review criteria relating to: 1. Parking reduction 2. Height measurement 3. Vested right form 4. Square footage numbers don't add up 5. 15th Street access impact to Ciry trees The city review team for this application are available to meet with you to discuss the findings, assist in resolving outstanding issues, and discuss the next steps for the application. Please contact your case manager to set an appointment. Agenda Item A~~ Page ri_1~_ II. CITY REQUIREMENTS Access/Circulation Underground Parking Area 1. The grade change between the driveway and the cross slope on 15'h Street must comply with Table 2-2 of the Design and Construction Standards. Additionally, provisions must be applied to keep drainage along 15'h Street out of the parking garage. Please prov'rde a profile showing how the parking garage would connect to the street and keep drainage from entering the parking garage. 2. The median shown in the center of the driveway cannot conflict with turning movements of the largest vehicle that will enter the site. Please analyze this driveway with the appropriate turning template tb identify any conflicts. 3. It is not clear how vehicles can access several of the parking spaces shown in the parking garage plan without conflicting with walls and curbs. Please analyze this parking layout with turning templates for the largest vehicle that would use each space to determine which parking spaces would have to be modified or removed. The proposed grading and cutting of the area around the existing ash tree in the City ROW to provide the 15th Street curbcut is not acceptable. Leaving a 6 by i0 area for a 2-1/2 foot diameter tree is not large enough to ensure survival, and additionally, too many feeder roots would be cut by the work. Other drive accesses and site layouts should be examined, such as: A. locating the curbcut further north between the two ash trees, and removing the smaller tree in between them on the applicanYs property. reexamining the curbcut off the alley. This alignment would require some type of landscaping adjacent to the sidewalk on the east, to screen the parking area sufficiently. C Use the existing curbcut on the Pine Street side (the further east one) to access the underground parking from the west side. It might then be possible to move the proposed addition to the east slightfy to utilize the site better. This access and layout is the preferred choice of City staff. Don Durso, Steve Durian, Ellie Bussi- Sottile (City Forester). Other Access issues: A traffic impact study is required for any addition that increases the expected trip generation by 15% compared to existing trip generation. This increase in trips generated is based on floor space for churches, therefore an increased number of trips can be expected to produce more trips to the site. Please coordinate with Steve purian for Traffic Impact Study criteria for this site. The curb south of the driveway accessing 15'" Street does not provide enough length for a parallel parking space. The curb line must be at the same offset from the property line as is existing at the Pine Street intersection. 3. The handicapped parking space shown is not permitted along Pine Street. The handicapped parking spaces in the underground parking structure do not meet City requirements of 12'x19', with a 3'x19' striped area adjacent to the passenger door area. See 9-3.3-11(c) for details. Agende ltem N~~ Page H` 4. The curb cut along Pine Street shouid be narrower than what is shown on the plan. A sidewalk ramp (see detail 2.07 in chapter 11 of the Design and Construction Standards) is sufficient for this type of curb-side loading and unloading. Steve Durian, (303) 441-4493 Bicycle Parking An additional bicycle parking area, with a total number of racks equal to 10% of total vehicular parking spaces should be provided adjacent to the assembly-area side of the site. All bicycle racks shall be in accordanc~ with the City of Boulder Design and Construction Standards. Building Codes, Design and Housing Codes The multi purpose room on second floor does not have adjacent exit access. The school addition was built as a type V-N construction. There is no record of main sanctuary. The existing structure and the new exceed all limitations in Table 5-B for type of construction. Area separation walls may be required. Steve Brown, Inspection Services, 303-441-3172. The height of the new addition, as indicated on sheet 4 is not measured consistently with the City's height definition. See 9-13: "HeighP' means the vertical distance from the lowest point within twenty-five feet of the tallest side of the structure to the uppermost point of the roof. The lowest point shall be calculated using the existing grade. The tallest side shall be that side whose lowest exposed exterior point is lower in elevation than the lowest exposed exterior point of any other side of the building. But if substantial evidence indicates a change in grade has occurred since 1958, the 1958 contours (as extrapolated by the city manager) control. It is unclear how the gable end qualifies as an appurtenance to screen the mechanical beyond. This area of the church already exceeds 35' in height, and so the appurtenance section of the code does not have to be met for approval. Rather, staff is looking at whether the pitch of the roof, and the architectural features of the addition are designed to be consistent with the existing buildings on the site. This reference to "appurtenance" should be removed from the plans. The gable end "false fronP' should not be used to screen mechanical, as it would be ineffective screening from an east or west view of the building (as is evident from the aerial perspective on sheet 6). Either the pitched roof should just be extended up and the mechanical housed within, or it should re relocated to one of the flat-roofed areas of the addition. Don Durso, 441-3273. W hile not required, staff suggests taking this project to DDAB (Downtown Design Advisory Board) for feedback on the architectural design of the addition prior to Planning Board review. DDAB meets the second Wednesday of the month. Fire Protection Prior to final inspection, appiicant will insta~l automatic fire sprinkler protection in all new construction. Sprinkler protected new construction must be separated from existing non-sprinklered construction by one-hour separation wall. Automatic sprinkler system must be supervised by an approved monitoring agency. Land Uses A lot line elimination and conditional use review (religious assembly in a residential zone) will also be required prior to building permit, and can be filed and processed concurrently with this site review. Contact Don Durso for more information. Agendeltemq_r c, Page# ~~ Legal Documents Please provide a copy of a current title commitment or attorneys memorandum on the property along with the response to these DRC comments. Also, please provide authorization of the person signing on all documents required by this application. 2. It does not appear that a vested rights form was completed in this application. 3. PVease submit a copy of the agreements for parking both on the 15th and Spruce site and with the YWCA. Miscellaneous Any increase in patronage, parking, and traffic will have a direct impact on calls for police service. Consideration for proper lighting (existing) in open lawn area. Shrubs should be kept away from ground level window. Proper security, lighting and locks on all doors and windows. Underground parking should be well illuminated. Benches should be square 2' X 2' as to not create an area to sleep on benches. Lighting under all overhangs, illuminating windows and walkways. Larry Wieda, Police Department, 303-441-3327. 2. The applicant should define more clearly the phasing on this project as such things as public improvements can not be phased. The plans should show what is planned to be built as part of Phase I, and what elements are Iikely to be deferred until later phases. Parking Reduction Criteria The current site is non-conforming because parking available on site does not meet the current parking requirement based upon sanctuary seating. The applicant is proposing to expand the existing building area by approximately 13,825 square feet for a totai of 27,791 square feet, plus two dwelling units which would result in a requirement of 95 parking spaces. Nineteen spaces are represented on the site plan submitted for review, resulting in a parking reduction of approximately 80%. Because of the parking reduction and proposed structures in excess of 35 feet, the approvai authority is the Planning Department. If the parking reduction is not approved making the use a conforming use, under the provisions of a non-conforming use, the site can only be expanded by 10% or to a maximum area of 18,322 square feet. The church has made a statement in the information provided, that the primary activities of the church will occur on Sunday, when parking demands in the neighborhood area are at their lowest. The parking statement indicates full-time employees, and meeting usage, but does not address the uses for which space is indicated on the site plan, such as the nursery, two preschool areas, a kindergarden, 5 classrooms, a multi-purpose area and a youth room. Additional information needs to be provide on the operational characteristics of the church on other days of the week such as how will the classrooms, daycare, and meeting elements of the church operate during the remainder of the week. When and how often do these activities occur? How many children/adults attend classes here? W hy will the impact not change? Where do the people who wiil use the daycare and other classes park now? What is the attendance for these classes? If St. John's no Ionger uses space at YWCA, will the YWCA use the space for other classes at the same time as St. John's, which will increase the impact to the area? If the YW CA intends to have simiVar classes at the same time that St. John's is conducting classes, the shared parking spaces between the two cannot be considered as a basis for a parking reduction. How will the 19 spaces provided on site meet the needs of the activities at this site? The applicant should provide additional evidence supporting the parking reduction proposed. The staff Agenda Item R~~ Page ri~ has made a recommendation to the Planning Board that "places of religious assembiy" within 300' of the CAGID parking district be allowed to expand the primary place of assembly, but the expansion of other space (Christian education) was eliminated by the Planning Board in their consideration of this amendment. As a result, this request will require the applicant to substantiate very clearly how the parking reduction criteria, as set forth in 9-3.3-9, is met. (attached is the parking analysis that First Congregational Church provided to staff for their proposal, which is very similar to St. John's proposal). Written statement The square footage numbers in the written statement and the site review fact sheet do not appear to be consistent. The written statement indicates additions of 3245, 2800, and 4000 for offices, Parrish hall, and classrooms respectively, which adds to 10,045 square feet. The existing house is being demolished (2690 square feet), and the lwo new residentiai units total 1600 square feet. However, the written statement indicates fhat a total of 16,515 is being added including 5000 parking, which would yield a net total of 13,955 being added to the site, for a total square footage of between 25,648 and 27,921 square feet, depending upon whether the numbers from the fact sheet or the written statement are begun with. The fact sheet indicates, under (IIi.) that a total of 30,668 nonresidential square feet and 1637 square feet of residential is being proposed, for a total of 32,305. Please verify the accuracy of these numbers. Drainage Detention - Staff is in agreement that detention ponding is not appropriate in this instance. However, the applicant is required to address storm water quality mitigation on the site. Storm water quality mitigation should include minimization of directly connected impervious areas in accordance with the Urban Drainage and Flood Control DistricYs Drainage Criteria Manual Volume 3. Please address this issue in the next submittal. 2. Parking Garage Drainage - The proposed drainage from inside the parking garage cannot be discharged to the storm system as shown. Water collected inside the garage must be directed to the sanitary sewer system, after being discharged to a sand and oil separator. Stormwater from outside the garage entrance must be intercepted by a trench drain and can be directed to the storm system. Please revise plan. Bruce Johnson, 303-652-8116 Utilities Abandoned Water Meters - The Master Utility Plan (MUP) shows three 3/4" meters to be abandoned. Add a note to the plan requiring that the abandoned services be cut-off at the water main in accordance with City standards, the meter lids removed, and the pits removed or filled with rock or sand. Bruce Johnson, 303-441-3206. III. INFORMATIONAL COMMENTS Fire Protection Fire Department recommends that the existing structure be sprinklered during construction of the addition. 2. Please install Knox box for Fire Department access at the time of final inspection. Flood Control: 1. The subject property does not lie within any mapped 100-year floodplains. However, the applicant is required to continue conveying drainage in a manner which does not adversely affect neighboring properties. 2. Any appiicable Storm Water Plant Investment Fee for this project will be determined at the time Agenda Item A ~~ Page #,~_ of building permit application. Bruce L, Johnson, 303-441-3206. Utilities: Sewer Service - The capacity of the existing 4" sewer service is subject to review at the time of building permit based on fixture counts supplied by the applicant. DDStJohn.DRC Agendaltem # ~~ Page 4 ~ CITY OF BOULDER LAND USE REVIEW RESULTS AND COMMENTS DATE OF COMMENTS: April 9, 2007 CASE MANAGER: Don Durso PROJECT NAME: ST. JOHN'S EPISCOPAL CHURCH LOCATION: 1419 PINE ST COORDINATES: N03W06 REVIEW TYPE: Slte Review REVIEW NUMBER: LUR2000-SI016 APPLICANT: HARTRONFT FAURI ARCHITECTS DESCRIPTION: Expansion of existing church offices, classrooms, and parish hall. Total square foot addition proposed is 8,825 square feet, plus 5,000 square feet of underground parking. REQUESTED VARIAT IONS FROM THE LANp USE REGULATIONS: Stairwell projection into sideyard setback (south): 20'10" provided where 25" is required Parking located in a frontyard setback: 6'2" provided where 25" is required. Building located in a sideyard setback (alley on the north): 3"11" where 5 feet is required. Parking reduction of approximately 80%. Height of addition approximately 45 feet. I. REVIEW FINDINGS Application does not meet criteria; a revision is necessary. Staff finds that the applicant has not demonstrated that the application meets the review criteria relating to: Parking reduction and parking study, vested rights form, square footage numbers don't add up per phase, elimination of residential units, phasing specifics and parking reduction per phase. Overall, the "concepY' proposed is not supported by staff: eliminating all housing units while maintaining the same square footage as the first submittal be converting the housing to non-assembly classroom areas. Staff advises the applicant to look at the overall concept of this site before proceeding further. The applicant is allowed only one more revision prior to scheduling this item for Planning Board. If the above issues are not resolved to staffs satisfaction, a recommendation of denial will be part of the staff's memoradum to the Board. The city review team for this application is available to meet with you to discuss the findings, assist in resolving outstanding issues, and discuss the next steps for the application. Please contact your case manager to set an appointment. tl. CITY REQUIREMENTS AccesslCirculation 1. The sidewalk along Pine Street transitions from 5 feet wide along the western portion of the site to 4 feet wide along the eastern portion. The sidewalk is required to be reconstructed to 5 feet in width along the entire site, if not impeded by existing trees. Fire Protection 1. Project wili require addition of one new fire hydrant, mid-block, north side of Pine Street to bring the building c~oser to compliance with the requirement that all parts of the building be within 175 feet of a fire hydrant. Adrian Hise, 303-441- 3350. 2. Required fire sprinkier system and required fire alarm system(s) must be supervised by an approved monitoring agency. Housing & Human Services Address: 1419 PINE ST Agenda Item N~'~ Pago ~~ ApplicanYs original proposal included reducing 3 dwelling units to 2 dweiling units. The current proposal indicates plans to eliminate all 3 dweiling units, and replace them with a number of additional classrooms in one of the later phases of development. Per applicanfs original proposal, dwelling units have been made available for staff earning modest incomes, indlviduafs with medical needs (AIDS), or for visiting ciergy or ciergy in training, who have difficulty in affording housing In Boulder. A proposed new policy in the Boulder Valley Comprehensive Plan calls for: "The preservation of existing residential uses. Existing legally established residenJial uses in non residential zones shall be preserved or replaced in kind; non-residential conversions in residential zoning districts shall be discouraged except where there is a clear benefit or service to the neighborhood." Rationale for this policy is that the community supports the preservation of existing housing whenever possible. Any reduction in the supply of housing worsens the jobs to housing balance, and exacerbates the housing affordablity issue. As such, applicant is asked to reconsider if development plans necessitate the loss of all ihree existing dweiling unils, describe any plans to mitigate the housing loss, and address the alternative community benefit to be provided in lieu of the housing units. The applicant has not stated why the housing units are being eliminated in favor of more classroom area. Staff does not support the proposed elimination of residential units at this site, while increasing commercial square footage. Linda Hill-Blakley, Housing & Human Services, 441-3140; Don Durso, 441-3270. Land Uses In the last round of reviewer comments, staff questioned the necessity of 5 classrooms, a nursery, two preschool areas, a kindergarden, multi-purpose room and a youth room, if no additional activities are being proposed on the site. Staff asked for information regarding these rooms, and what the current uses were at the YWCA next door, to determine if adding 11 such rooms is likely to add to programmed use of the site, or whether they are necessary to provide space for current programs . These questions have not been answered. The parking study provided does not indicate that 11 rooms are necessary for Sunday activities. The new submittal indicates that at buildout, there will be a kindergarden, nursery, preschool, and 9 other rooms called "classrooms". This shows more classrooms than the initial application. Staff again requests information on the programming of these rooms, and the necessity of them, if no additional uses are proposed on site. The parking study indicates that Sunday School is divided by age group, yet the study does not indicate how many different classes are take place, the number of children involved, and the amount of time these rooms are being utilized. It appears that the Sunday school only takes place from 10:00-11:15am, and providing 12 individual rooms for an hour class one day a week does not justify eliminating housing units, in staff's opinion. Staff will only support the addition of rooms necessary to accommodate existing uses on-site or currently being accommodated at the YWCA. LandSCaping No requirements at this time. Bev Johnson, 303-441-3272. Parking 1. The method of structural support for the parking garage is unclear from these drawings. Columns used for support must be spaced so as not to conflict with vehicle doors. 2. One of the full-size parking spaces at the end of the garage must be designated as "no-parking" so it can operate as a vehicle turn-around area. The "17" spaces indicated does not match the number of spaces shown. W ith the required turn-around, only 15 spaces are shown in the garage area. Also, it appears that the alley spaces, which are being eliminated at a future phase, are being counted as parking spaces. The Development Review Fact Sheet indicates 21 parking spaces on site, which appears to be incorrect. The applicant shouid submit a phasing table which indicates floor areas for each phase (including existing and proposed, as weil as subtracting any floor area demolished with each phase), parking provided for each phase, and the requested parking reduction for each phase, to fully assess the parking reductions requested at each phase. 3. Handicap spaces are required to be striped as according to the City of Boulder Design and Construction Standards, Standard Drawing 2.54. This is shown correctly in the plans but is inconsistent with the written proposal. 4. The 5 spaces located off the alley are unclear as to their future. It appears that these spaces are part of Phase I, but that they are removed as part of a later phase which would reduce parking, while adding additional square footage to the site. 5. Parking Study p~~~t0m# ~~ Page# ~~~3 Address: 1419 PINE ST a) The previous submittal stated that 19 spaces were to be located on-site. According to the current plan set, 12 spaces are shown (not including the required turn-around area) in addition to three handicap spaces. The number of usable on-site parking spaces needs to 6e identified in the parking study, While a lease agreement with the private parking garage is not necessary until construction, a letter of intent from the owners of that garage should be provided, if staff and the Planning Board is to consider the additional 30 parking spaces as justification for a parking reduction. A building permit will be contingent upon providing these agreements to staff, if this project is approved. b) The five parking spaces near the alley must be present in all phases of this proposal in order to be counted toward the available parking. It appears that in one of the later phases, these parking spaces wili be eliminated, although this is not addressed in the written statement. c) The section titled "St. John's Parking/Usage Response" states that 225 people attend the 10:00 AM service in the Summer of 2000. Later in the document in a memo to Hartronft & Fauri, it is stated that 192 people attended a service which created a parking demand of 68 cars. Also, the parking study indicates that the Sunday communion service has 350+ people attending. Staff requires further explanation why three numbers are presented and what the vehicular impact of 350, 225, and 192 likely is on the parking demand. d) The chart titles "Boulder Land Use Regulation Requirements Review Summary" indicates that a 20% parking reduction is requested, where 48 spaces are provided where 67 are required. The written statement indicated 73 spaces are required, and 59 provided. Further, the "Review Summary' indicates that only a 20°/o parking reduction is requested. Only on-site parking counts towards required parking, unless the requirements of 9-4-9-11(n) are met. Otherwise, parking provided should be calculated on on-site parking only, not including street parking or leased parking. Also, the fact sheet indicates that only a 20% parking reduction is requested. e) The parking study is incomplete. Please correct information such as "Don't have numbers", "Ask Pam White" "Tom Morgan, music director, could give you this information", etc. 6. The "St. John's Parking/Useage Response" states that the church would retain 9 of the 21 proposed spaces for church uses during the week. Staff will recommend that, as a condition of approval, that the continued leasing of spaces to off-site users be subject to review of the City, if, after the expansion is completed, weekday parking issues arise. In other words, staff wishes the ability to require all on-site spaces to be retained for church uses, should parking needs increase in the future. Phasing Plans 1. The applicanYs written statement indicates the square footage proposed in Phase I. No information is provided on any future phases. As requested above, a chart which clearly indicates what is included in each phase should be provided. 2. A phase for reroofing is not required, as long as it is replacing the existing roof with the same type of roof. Only a building permit is required for reroofing. Don Durso, Planning, 441-3273. Site Plans The applicant should submit a perspective of the parking garage area as shown from 15'h and Pine Street, looking west. The perspectives submitted do not show this side of the site, which is where most of the work is being done. Additionally, a massing model or architectural model should be considered for the Planning Board phase of the review. Don Durso, Planning, 441-3273. Fact Sheet: The fact sheet indicates a variance of 6'2" requested for parking along the west side. This appears to be in error, as parking is not located on the west side, but the east. Vested Rights The vested rights form is not sufficient. Each phase (and what is included in each) must be clearly indicated on the form, and the time requested for each phase. No phase may be requested to be vested for more than 3 years beyond the previous phase. It is unlikely that staff will support a phasi~g plan longer than 6 years, as it becomes speculative (and the written statement appears to indicate that some of the future phases are speculative) and community needs may have changed by that time. Address: 1419 PINE ST Agenda Item N~~ Pa92 ~-~ CITY OF BOULDER LAND USE REVIEW RESULTS AND COMMENTS DATE OF COMMENTS: May 25, 2001 CASE MANAGER: Don Durso PROJEC7 NAME: ST. JOHN'S EPISCOPAL CHURCH LOCATION: 1419 PINE ST COORDINATES: N03W06 REVIEW TYPE: Site Review REVIEW NUMBER: LUR2006-SI016 APPLICANT: HARTRONFT FAURI ARCHITECTS DESCRIPTION: Expansion of existing church offices, classrooms, and parish hall. Total square foot additio~ proposed is approximately 8,000 square feet, and 3,800 square feet of underground parking, in two phases of development. REQUESTED VARIATIONS FROM THE LAND USE REGULATIONS: Stairwell projection into sideyard setback (south): 20'10" provided where 25" is required Parking located in a frontyard setback (east): 6'2" provided where 25" is required. Building located in a sideyard setback (alley on the north): 3"11"where 5 feet is required. Parking reduction of approximately 75%. Height of addition approximately 45 feet. I. REVIEW FINDINGS The application meets all criteria; minor documentation corrections must be submitted prior to Planning Board hearing, including: Clarification of deferral of landscaping. Correction to Vested Rights form Letter of intent to provide leased spaces at parking garage. See below for details on these requirements. II. CITY REQUIREMENTS Housing and Human Services Housing and Human Services ApplicanYs original proposal included reducing 3 dwelling units to 2 dwelling units. Subsequent proposals indicated plans to eliminate a113 dweNing units, and replace them with a number of additionaf classrooms. Per appficant's original proposal, dwelling units have been made available for staff earning modest incomes, individuals with medical needs (AIDS), or for visiting clergy or clergy in training, who have difficuity in affording housing In Boulder. Staff expressed serious concern about the loss of all 3 residential units, given the Boulder Valley Comprehensive Plan policy to preserve existing residential units, as well as the loss of affordable housing. Appiicant was asked to reconsidar if development plans necessitated the loss of all three existing dwelling units, to describe any plans to mitigate the housing loss, and to address the alternative communiry benefit to be provided in lieu of the housing units. Based on the last submittal, staff did not support the proposed elimination of all residential units at this site while increasing commercial square footage. Applicant responded to staff concerns. They stated their reluctance to eliminate the apartments given St.John's church's iongstanding commitment to housing in the community, in terms of past efforts, as well as current and on-going efforts. Information provided by the applicant cited a number of community benefits provided by the church which offset the elimination of the housing units. The church was involved in the creation of the San Juan dei Centro low-income housing projeCt, and has been very involved with the homeless population for many years. They recently committed $100,000 of their capital campaign funds to Project Start for "bricks and mortar' for their work with the homeless. Additionally, a church affiliated foundation (with funding derived from the earnings of a trust corpus) has provided and continues to provide grants Address: 1419 PINE ST Agenda Item # ~~ Page # ~3? 5 to housing and human service organizations in the community, including Emergency Family Assistance, Bouider County Safe House, the Boulder Shelter for the Homeless, and Boulder County AIDS Project. Based on these efforts, staff considers the community benefit being provided by,the church to be strong, and is now willing to accept the loss of the 3 residential units. Applicant has expressed a desire to include some dweiling units when they proceed with future phases of their plan, which staff strongly encourages. Linda Hill-Blakley, Housing & Human, 4413140. Landscaping The landscaping proposed to screen the parking area lacated adjacent to 15~h street must meet all regulations in 9-3.3, including a 6' wide landscape bed, and tree and shrubs located within this area. As shown, it does not appear to meet these requirements. At the time of building permit, this requirement must be met as part of their building permit package. The written statement states that benches and some trees and landscaping may be deferred until a future time at which funds are available. The site plan must show all landscaping that will be installed as part of Phase I, and staff will review this plan to determine whether it meets the site review criteria related to landscaping. The applicant may add additional landscaping to their site above and beyond that approved as part of this approval at any time they wish in the future without review. Legal Documents The vested rights form must state the time of request for each phase. The written statement indicates that Phase II may be built sometime in the next 10 years. Due to the 3 year time limit of vested rights, Phase I must be completed within the first three years, and Phase II within three years after that. Please correct the vested riglit form to indicate these time limits, Don Durso, 4413273. Miscellaneous The previously submitted lot line adjustment will need to be completed prior to applying for building permits on this site. Please see previous reviewer comments and plat corrections for required changes to that application. Don Durso, 441- 3273; Melissa K. Rickson - CAO. Parking While a lease agreement with the private parking garage is not necessary until construction, a letter of intent from the owners of that garage must be provided prior to the Planning Board hearing, if the Board is to consider the additional 30 parking spaces as justification for a parking reduction. A building permit will be contingent upon providing these agreements to staff, if this project is approved. The applicant must provide sufficient parking spaces on-site during the week to adequately address their weekday needs. Complaints related to not providing adequate parking may result in an enforcement action. III. INFORMATIONAL COMMENTS Building and Housing Codes No additional requirements, piease be aware that it appear that the structure exceeds the building size limit of that allowed for the type of construction of the existing structure. An area separation wall may be required to limit the building size per the building code. Steve Brown Fire Protection Required fire sprinkler system and required fire alarm system(s) must be supervised by an approved monitoring agency. Parking In preparation for Planning Board discussions, the largest number of patrons attending services should be addressed when considering the parking supply for weekend services. The largest number listed in the parking study is currently not used in the parking assessment. Steve Durian, Public Works, 303-441-4493. Address: 1419 PINE ST Agenda Item #~~__.Page # a~ ~~ ~•- Department of Community Design, Planning and Developme~,t 1739 Broadway, Third Floor • P.O. Box 791 • Boulder, Co~orado 80306 303-441-3270 ~ FAX 303-441-3241 DEVEL4PM~NT REVI~W ~ APPLICATION F~RIVI L APPLICATION DEADLINE IS 12;00 NOON THE PIRST AND 7HIRD MONDAY OF EACH MON7H This application form contains several sections. Please provide generai data be~ow. 7he types ot reviews for which i~ form is used and a fee schedule are listed on page 2. A list of the application requiremants for each review type is fo~ on page 3. On page 4, the names of aA owners (and lessees, etc.) Of the subject property must be listed and signatuF: provided. Also, there are separate attachments to this applicalion form for each review type (on page 3). Sub itt ~ ~paccurate or incomalete information will resuit in reiECtion of the aoalication GENERALDATA (To be completed by the applicant) • NAME OF DEVELOPMENT: St. ,Tohn's Episcopal Church • Existing Zoning: MxR.:~ • Lot Area (in square feet or acres): 42 ~ _ _ ;. Street Address or General Locaiion of Property:1419 P in e s c. ~.,.; . Legal Description: Lot ~-12 Block 14 ~ Subdivision (or astach descNption) • EXIStlflg Use Of PfOpefty: Church & accessory uses • Description of proposal, (include proposed use and summarize number antl size oF ~nitslbuildings~lols, as aNpl,ftable~'; Proposed use is expansion of existing church accessory uses such as chuYCh offices, Sunday School classrooms, Parish Hall, etc. The -=--~n o j e~ t~ _ ~ building addition to accommodate a small park on the church. . • 7ype of ReVieW Request(s): (see page 2 tor list) • NAME OF APPLICANT: xartronft Fauri •Address:8o1 Main Street, Suite 300 campus. git'~,a` Review Archite Telephon~6~3-9304 •Clly: Louisville State: co ZIPCOdC: 80027 FaXb~3-9319 •NAMEOFCONTACTPERSON(ifotFierthanappticant): J• Erik xartronft, AIA or w.B, Hi1L/ sAdd1'es3: Same as nto~e Teleph~ne: s City: State; Zip Code: FRY,; . • AATE APPl.ICATION FILED: ~ ~lication received by: ~.ase Manager: Subcommunity; Fes: _ I STAFF USE ONLY DatelTime: _ Track #: #: FINAL REVIEV Review ~ _ ^ staff File Name: ^.. ' ~ Planning erc ~ COOfd.: ^ City Counci Check #: _._ Agenda Bem N~, uy,; „,~ 7~~ ATTACHMENT E , DEVELOPMENT REVIEW APPLICATION FAC7 SHEET v/ _~L u`"~ (Revised 5/07/O1j ~ Aecurate end eomplele information ~bout a project for ihe City's initial review is iMeor21 lo a timely ~nd Ihorouch reviev: orocess. In order for your 2pplic2tion to be considered compfele, all appiic~bte informalion must be provided on this shee 1Nhile sorne oi this inform~iion m2y be incluoed on the project site plans or discussed in 1he wrillen statement, plezse als ~nter it here. ,, Existinca Condition Property address(es) or iocalion 1419 P ine S TofalloUparcel size 42 Legclpescr'rption(orsif~chcopy)Lots 7 throuQh 12, Block 147, Boulder located in the. SW•.1/4 of Sect'ion 30, township 1 nortn, rang~ 7u" we~t of tl» Pie2se oescribe the existing use of fhe property: 6t h PM; City and Caunt y o f ~ Boulder, State of Col'orado. Church and accessory uses Existing Zon(noMX -~if rezoning or annex2fion epalic2lion, proposed zoning: ) 6oulder Valley Comprehensive Pl~n (BVCP) Lznd Use Desionotion MXR Are any existino I a1 r~rbnildin s non-at^ndrion~~ c n oic2f nn or"an Xstting5e no consormino~ Yes (If yas, descrit~ non~ co ~~~or~nP X~exstg~ -`~ y~~.~gng~ g ~~acnlc b Does lhis 2pplic~tion amend a previous de~elopment revie~v 2p~rov~l?Y e s If yes, specify projecl n~me, teview type, ~nd review number (if knov+n) St. John's Episcopal Church previous non-conforming review' approval r~tvc-ai- II. Residential Uses (complete this sec4ion if your project eontains existin.g or proposed resiqential land use~,~; Exisiing Proposed Toi21 = of dveelling uniis 3 p To121 n of lots 1 1 ' Toisl ~ of buildinos 1 .L Ftoor area (in sq. it.) 0 of each buitding Z, 6 7 4 s. f. Totalbuildinocoveraoe 1,724sfl' 0 ("footprinf' in sq. ft.j I.42xinum building heioht ~~ -a ~' 't~f;PiA (NOte: Height musl be ctlcubled based on Ihe City cotle Cefinition ot heiQhl founq in Seca~on 4-1•3(a): provide Cocumeniationj ~ Existing Propo sed Unit type/bedrooms (specify 4 BR 4 6R the numberofeachiype-of 3 BR 3 BR- ~.. unit) _,_ 2 BR' 2 BR , ~_ t BR , 1 BR ELU ELU (eNciency living unit) oiher other . ~ (specitY) lSPe~N) - - . For developmeM in HR-X or HZ-E zoning, specify the total, iloor area of each dwelling unit, (calculale floor area based ort 5ection 9-3.2-9 i ): . Existing Proposed ~ ~ Project density: Average lot area/unit Z, 333 N/A ~ (or tlwelling units/acre) 7, 000 N/A Average lot size ~_ _ ... _,_ _ _ Totai useable open.space •.-~~_ N;~,~+'~ _ ` ' Useable open space/unit ~ ~~~~ Is open space reduction requested? n° If yes, specity %` -- For a proposed group residence use (e.g. frafernity), specify n occupanls For development in RB-1E, RB-2E, RB-3E, RB-1X, RB-2X, RB-3X, and MU-X: Is a density increase requested? Proposed F.A.R. III. Nonresidential Uses (complete this section if your project contains existing or proposed nonresl¢entiei la~:; uses) Existing Proposed Total ~ of lols 5 1 7ota1 ~ buildinos 1 1 Floor aiea (in sq. ft.) 13 , 9 6 0 7,934 sf (new less removed) of each building _ w/ 3,766 sf pazking Toial iloor area 1 g q tip _?1,894 sf (incl, Existing) To1al building coverage " " 12 ~ 8~~~ 18,614 sf (incl. Existing) in-sq, ft.) ( foofprin! ~~4zximumbuildingheigh4 ~ 71.75' ~4".-;4" (new const) (NOte: Hei9M'musl be calculated based on the Ciry code qefintlion~l.ne19M tound in Seclion 9•1•3(a); provide documentation) Total usesble open space 12,351 sf Is open space reduction requested? RO If yes, specify % For development in RB-X, RB=E, or MU-X: . Is a density increase requesled? Proposed F.A.R. _~ For a hotel or motel use, specify n df proposetl guest rooms For a restaurant or the2ler use, speeify number of proposed seats IV. Parkina and Setbacks To1al ~ off-street parking spaces provided ~ 0 Enter number ot each type of parking sp2ce: ~ 5 stand2rd size 1 small car 3" handicap accessible I ~ bicycle Total ~ parking spaces required by City code_7 4_ For nornreSidential uses, specify the ralio of total non=residential building square footage to pzrking spaces per 300 sG. ft.): 1/ 3 0 0 s f Perking Variations ~s a parking reduction requested7 ~_ Qf yes, specify'/o ? 3 ') Is a parking deferral requested? ., ~ (H yes, specify number of deferred spaces_~ Are any variations requesled related to lhe size or location of the required pkg. spaces? N~, (!f yes, describe ' Selbacks ~ Are any setback va~iations requested? YeS ~ s i t e r ev i ew If yes, specify wliether as part oi~a s e review or variance application: Ii yes, descri equ t v~riatiog(s~ notino the ~ropo5~d seibackfs) pa~lci~{g ~Se~f~ac va i nce east= si e, ~.y~_Z~r ro c requirement(s) . - required); ron~ yarcl setba'~k for exterior stair (20'-10" V. Other Land Use Issues 25' -0" required)~ (e.g. one sp~.,-: and th8 setb~•_ ~ed, 25 ' -~" propos ed For use review applications, briefly describe lhe proposed use of the property and specify which,land use category(ies) in ih Schedule of Permilfed Land Uses (Section 8-3.1-1) the proposed use falls: ~~: ~•Doe`s the proposal include any conditional uses (e.g. bed and breakiast , Please note whether your property is afiecled by the iollowing: Welland area Alrport Influ.ence Zone . Hisioric disirict or landmark desrgnation * X CAGID parking disirict UHGID parking dislrict Boulder Vzlley Regional Center (Crossroads urban eenewal area) no 10o year flood zones: (loodplzin high haz2rd zone conveyance zone For new construdion, is your propos2l in compliance with the Solar Access Ordinance,~e ,_,? * Existing 1405/1921 Charch arid 1966 Chapel Addition (Lots 7-9) are included in Ci:ty of Boulder Landmark Designat~ion (Ord. 4Z89-Z977). ~'~ Demolition Permit for existing.residential structure at 1445 Pine Street (over 50 years old) has been reviewed and approved by the Landmarks Preservation Advisory Board. DIO\F C7SHT.DI ST. JOHN'S EPISCOPAL CHURCH SITE R[VIEW FOR PROPOSED RENOVATION AND ADDITION WRITTEN STAT[MENT DESCRI6ING PROPOSAL 07 MAY 2001 ExHlalT "B" - REVISeD JuNE 18 2001 A. Statement of Current Ownership As indicated on the Development for Review Application Form, the Owner of the property is St. lohn's Episcopal Church. The property consists of Lots 7, 8, 9, 10, 11 & 12, Block 147, Original Town of Boulder. The property is being replatted for the elimination of lot lines between Lots 7& 12, and is to be known as lot 7A, Block 147, A Subdivision in the City and County of Boulder, State of Colorado. B. Project Objectives The objectives of the project are basically to provide additional space on-site to accommodate the functions which are currently not all accommodated in the existing facilities, as well as relocation of the existing parking from the front yard of fhe Church to space creafed under the new addition. Backeround St. John's Episcopal Church was originally constructed around 1902 to 1904. Major additions to the church were constructed in 1965 (Chapel, Sacristy and support space); 1969 (Offices and Parish Hall); and 1987 (Three Classrooms at Lower Level). The existing Sanctuary seating area is approximately 2700 SF with an additiona! 730 SF in the balcony. In 1987, a special use review (#NC-87-17) was approved to allow construction of the three- classroom addition. Total on-site parking provided at the time of approval was 30 spaces, plus 8 spaces which were provided on the YWCA site, by lease agreement, just northwest of the church. The existing parking lot, in the front yard of the church, is not in conformance with City of Boulder parking standards (see attached layout for number of conforming spaces - Exhibit F) and actually would only accommodate 1 S spaces including 6 of which are in the front yard setback. Proposal Summarv The Church's needs for on-site classroom space, a larger Parish Hall and reorganization of clergy and staff offices have prompted a major fundraising effort and the current proposed renovation and expansion. To meet the requirements of the Church for the next 5-10 years, it is proposed that in Phase I, the Church offices be renovated and expanded by approximately 500 SF and the Parish Hall be expanded by approximately 21 SO SF (including lobby and accessible restrooms). Classrooms which are currently housed at the YWCA would be consolidated on-site in a 4220 SF addition to allow for specialized programs not adequately accommodated off-site. This is also important from a security standpoint as children now have to travel off of the Church grounds to attend Sunday school and supervision is a concern. It is important to note that all of the functions which are proposed to be expanded are accessory to the main church facility and all of these functions currently are accommodated on the Church site or at the YWCA, adjacent to the Church. Therefore, the proposed addition will not increase the intensity of use on-site, nor will it increase the number of people who will use the site on a regular basis. Three dwelling units which are currently on-site are to be demolished. The Phase I building addition is approximately 11,863 SF including approximately 3,766 SF of parking/service area (or a net gain of 8,097 SF with the demolition of an existing (2,674 SF) residential structure at 1445 Pine and the partial demolition of existing Parish Halt basement (163 SF)). The addition of a colonnade structure over the walkway connecting the foyer of the addition with the existing Church is proposed as Phase II and it's completion is dependent on the Church's ability to fund its construction. The parking requirement for religious assembly may be calculated by three different methods per Section 9-3.4-5, as follows: 1. Religious assembly use created prior to 9/02/93 shall meet parking requirement of one space per 300 s.f. of floor area. By this method, 73 spaces are required with the new addition. 2. After 9/02/93, off-street parking is provided at a ratio of one parking space per four seats in the assembly area. The fixed pews in the Choir, Sanctuary and Balcony have 290 seats. Therefore, 73 spaces are required. 3. Or, after 9/02/93, off-street parking is provided at a ratio of one parking space for each 50 s.f. of floor area used for assembly if there are no fixed seats. Since there are fixed seats, this method does not apply. Regarding parking, we have approached this proposal with the concept of providing an equal or greater number of conforming parking spaces than can be accommodated in the existing parking area which is to be removed. The lot would be replaced with a landscaped courtyard which is seen as a neighborhood amenity or pocket park, open to all residents and visitors to this area. New parking would be provided under the new addition and off the alley. Thus, we would maintain 20 on-site spaces, will add 2 parallel spaces on the street, plus a loading/drop- off zone. Sunday morning parking needs are supplemental by the leasing of 8 spaces at the neighboring YWCA. We also have been negotiating with ). Midyette and Don Rieder regarding a long-term agreement for the Sunday parking usage of 30 parking spaces in the new parking structure at 15'h and Spruce. A copy of the final agreement will be forwarded to the City. This proposal would provide 20 total on-site off-street spaces equal to the required space p3) with a 72.6% parking reduction. The religious assembly requires 6,332 Sf of usable open space. This is based on 15% of the 42,215 SF lot area. We have proposed 12,351 SF of usable open space including 10,267 SF in open landscaped areas and 8,334 SF in pedestrian areas (of which 25% or 2,084 SF inay be counted toward the required usable open space). The site landscaping requires 13 trees and 65 shrubs be provided. We propose an ample amount of landscaping including 18 trees and 172 shrubs to be provided. Regarding the streetscape, we propose the required amount of 16 trees for the south and west sides of the property. The building architecture is designed to compliment the existing Historic Stone Church. A complete description of the architecture is provided on the building elevations (sheet 4& 4.1) and perspectives (sheets 5, 5.1, 6& 6.1). C. Development Schedule It is the Owner's intent to continue with the current fundraising efforts through the Simmer of 2001 with the intention of starting construction in the fall of 2001 with completion approximately 12 months later. The outcome of the fundraising effort will affect the ultimate building and budget for the Phase I construction project. Therefore, the Owner may elect to defer certain improvements and add them to the project, or complete these improvements once additional fundraising is complete. Items which may be deferred until future phases include: 1. Landscaping elements (trees, benches, etc.) in excess of minimum required 2. Stone site walls in courtyard area 3. New colonnade connecting new and existing buildings (Phase Iq Phase II may be completed within the next ten years. D. N/A E. Attached Boulder Land-use requirements review summary (2 Pages) (Revised 05/07/O7) Dt~dala\~doa\PROI-NET\2000proj\0051 \application\xhi60618.doc Boulde -d Use-Regulation (Title 9) Requirementc Review Summary REQUIRED 9-3.2-1 (c~ SCHEDULE OF BULK NEQUIREMEMS - ESTABLISHED DISTRICT MXR-E t Minimum lot area (sq ft) 6,000 2 Minimum lot area par dwelling unit ~sq.ftl 6,000 4 Minimum number ot offstreet parking spaces per rasidential unit 7 bedroom raquires ona space Minimum fmnt yard landscaped setback for all principal 6uildings 6 and uses 25 Minimum side yard landscaped sethack irom a streeY for aIl B buildings and uses 12.5 (25' for religious~ Minimum total side yard setback an the~sama lot for both side ~ 7 yards - 75 Minimum rear yard setback for all principal buildings {or ali 12 principal buildings 25 75 Maximum height for all principal uses ~ft.l 35 18 Maximum numbar of stories 3 Lot Area Building, Parking & Driveway Open Area Open Space Requirement for Buildings over forty-five Faet but 9-3.2-~ (d~ Less Than fiHy-fiva FeaS . 20% of 42,215 =~8,443 sf Setback Encroachmants No structure or building shall be constructed or laminated in the required setback axcept tor ~7 ~ a balcony, patio, or deck lass than thirty inehes in height ~4~ a maximum of thirty inehas of roof overhang; or ~5~ the outer four . feat of completely open, ~ncovered centilevered balconies that ~ have a minimvm o4 eight teet vertical clearance below, which - may project into any raquired yard axcept an interior side yard of 931-74 iess than ten feat in wiEth. Park'no reductien: The city managar may grant a parking reduction of commercial developments, and mixed use deveiopments not ta excead twenty percent of the required parking. The off-street parkin9 ~equirements for projects which would require five or more parking spacas under the raquirements 93.3-9(al of Section 93-2-7 may be modified pursuant to Mis section. Small Car Stallr A proportion oi the total spaces in each parking area may be designed and shall be signed for small car use 93.3-7 7 ~b) according to the foliowing table: Park'na Soaces fer tha Disabled: A pmportion of spares in any parking facility provided to sarv businass, industrial, or publie uses shall be raservad as parking tor tha disabled according to tha 93.3-11 ~c~ following table: A pmportion of spaces in any parking heility pmvided to sarve attached tesidential units shall be reserved as parking for ffie disablad according to the following: Reau'red Park'na Spaces' At least ffiree bicycle parking spaces oi ten parcent of tha required offstreet parking spaeas are required 9-3.3-7 7(c~ in all districts except MXR-E - Min overall site landscaping 7 trea, antl 5 bushas for evary 1.500 93.3-2 ~h~ sf 9-3.3-3 Id Streatsca0e repuiremants detached sidawalk 05/0]/O1 Totsl spaces required 50d00-Allawable Small Car Stalls = 50% Total Parking in 51 to 75 - Required Minimum Number of Accessible Spacas = 3 Number of Units 7- Hequired Minimum Number ot Accassible $paeas = 0 No parking spaces are required 13 treas and fi5 bushes required .~a t at z ACTUAL 42.215 N/A N/A 25 1.98' existing ~d west side, 444F new @ east side 46'+/- 3.H4' axisting 36'3" wiM top of 9abie end wall @ 44'-4" 3 42,215 sf 22,227 sf = 53% 18,607 sf = 44% 78,607 st (44%1 Existing encroacFment on west side; 6cisting encroachment on north sida; Hequested encroachment on south sida for ezterior stair 4'-6" in haight. 72.6 % reduction requested; 73 spacas ~equired; 20 spaces pmvidad onsita. 1 3 spacas providad 0 10 provided 6 existing & 70 new; 77 trees & 155 bushas provided 172 zoning0425.x1s Bouldei ~ Use Regulation (Title 9) Requirements Review Summary Planting strip 8' or more buried utilNas, iarge tre~ typa, min tree planting interval 30'40' Planting strip 8' or more ovarhead utilities, small hee type, min tree planting interval 15' - 20' 933.4 Parking IoS landscaping Any religious assembly use created on or priorto Septem6er 2, 7993, shall meet a parking fequirament of one spaea per 300 square feet ot floor area, and a twenty-five foot setback from all 93.45 property lines for all principal buildings. 93.45fb1 f-street parking is provided at a ratio of one spaee per four ats in fia assembly area, or if there are no fxed seats, then one rking space for each 50 squara {~t ef floor area used for :embly purposes. The floor aree for assembly purposes shall the area of the largast room in the structure which couid ba sd for assembly, plus the area of adjoining rooms that eould ba :ommodate setting which coutd be used as part of the >embly in the main assembly area. The ciN manager may mi a parking reduction m permit additional floor area within the :embly are of a religious assemb~y which is located within 300 ot tFe central area general improvement distriei it the applicant n demonstrate that it has made arren9emen4 to use public rking within close proximiry ot tha usa and that the ~difications proposed are primarily for the weekend and evening tivitias when there is less demand for use of public parking Useable open space is pmvided consistant with ffie percentage of open space raquired in tha zoning district for single~family 93.4-5~d~ Require parking is no< locatad in fie front yard setback. The lot meess the minimum loi requiramants of Section &3.2-1, 9-3.451e~ 'Schaduie o£ Bulk Requirements," B.fl.C. 1981. Geneal Notes South side, 3001f, 940 traes required West side, 740Ifi, 7 small treas raquired Not required if vndar 5 parking spaces 21,894 sf (13,960 sf axisting + 8,097 sf new rret -7 63 sf = 73 spaces 290 fized seats ~26 @ Choir, 160 @ SanMUary + 104 @ Baiconyl = 73 spaces 6,332 sf 7 existing - 2 new 3zofz 4 existing - 3 new 6 spaces aff 75th St. & 5 spaces off alley 73 spaces requirad 73 spaces raquited 12,357 sf Variance requestad for parking in 15th Street setback. OK e~rsiq parkinq areas to be removed ~19~ in front yard setbaek and ~2~ in side yard setback curb cuts removed on Pine Sheet. 1 curb cut at 75th Street relocated and enlatqed Due to streat trea locetions with respect m parkinq IaVout ~net 2 aEditoinal parallel street parkinp sapcas and 1 OS/07/01 zoning0425.x1s _ __ EXHIBtT ?~ __ F `in~ On-Site Parking ' ~ED 5~ John's Episcopal Churd~ vCRETE ~ ~ I - ' `''^~ :~ r a ~ :, ~ ~ _ :~TE~ ~ ~.5~53u. ~~~LOIN~'~Mf Per Current City of Boulder __ ,_., Standards: ~zS,BZ. mr ~ I s.s ~oP< 18 spaces maximum: COV. CDNCRETE Indudes 6 spaces in Top ~----- 4 I ~ f i ~ ;!~ `F= , AN,TI front yard setback ~s _ ar ~-~p i I t STGR ~~ p ~~TI ;I m I ' - ~ ~4 - ;1 S5.!' ., . ~ A ,Vj~14.C • '~ CS~ `350.6~~ q ' - '~ ~Ot/ ~ ~ i . . ~~ ~'` ~~}~4+~- `:q<.: . ~ ~e~ .,w~ 51.0' ~ ~ ` J T/ti~iy$ ~ 1 I ~ ~e'/ 2 ., . ~ k 35] ` Fp _ `~ ' 1 ~ ~ . ~ . .SC oF. _ ' _ _ ~ . ~ SJ. . ~\\~ ~ 7 8 ~ ~. i --- 1 ._... . _ s . . t~--~~ 2 ~ - _'v ~I J ~ r~ N:1 ~ II , ,~/~. .- t f ~^C/^~ RV 535` ~~ ~ l. ~ c I e -- - - ~ hRA~fE .~,,.9~- Npi ~S ~ ' ' `.3y . c3~ 534;.83' ~ 53qJ~. - ' ~ ~ E ~V~ rN . ,, i ~ i I ~t ~ . / ~~F~' i ~ I i~, j<8.>z. / ~ L.f.? i 1 O ASPH4LT PARKING " `~-'~ ~ i I ~ ~ ! ° ~ I ~ ~=o~ ~ ~F ~~- ,. 3{7 1 i ~ -..~.~~ I ~ i ~ 53a€.56' SS8` ~ I ~ '~ ~ j:~~/Du I ~ / 4$' ~ ~.• ~ . • '~• l 116~ O ~I ~ i ' ~ " ~' : ~aAC a .aC~ ~ ~ ~ ~~I.S%.~~. ~ ~~ a6Ja a'n.. ~ ~ ~ I ' ~ / ~ ~ / :•~~' ~ I ~ 53a.~ . ~~ I :\~ ~ rtl,Y [ r' t I ~ y ~ ,~ ~--s,sz~ ~ ~ ^' ~ ~~ :~~ ~ ~ -- `n . ~~ I .~5351~`~ ~ ~ ~ '\ ~ I.. ~l~ ' - _5~0 ~ , . - ~ -- -~e1 ~'~ ~. ~ J« il_ i ~ i i ----~ .. ~ _~ Z \~ ,_m~~~.~ , ~ ASPHAL~ r^ARKING .:~.:~ ~ W ~ ~ ~ ~ ~ I \ `~ f i _0 I Z . ' y~-", "~S~ 3~6.31' 336.OB' /~ T. `~ , .,,_~1 ~ -4., . ` \ S3a6<"9, i ~_( / ~~5.95' ~ / \ \ lV 5349 ~ •. I ~ ~ `Ja~. ,~~~. I _ ~ S~ ' . , ' /~ i~~~ =T~ ~ti-a~K' S75°00' 0"W 300'(P 3 1. '(qM . - ,~oucnE-~'y,; ~~r- ; ~ _ ~~.. ~ ,I , ~ 'LS~ , 7 E ~ ~ " ~ -~ \ ~uHS ar I~~ ~uud wi t s' ~~zr. aRe a~u+ ~~ ~ ~ w _ w w w w 4~, w w w w w. ~~. w ~ ~ w ~ . .. _ . - Riy . "'v 3'k3. ~U~ 534 ~ EXtST7NG ON-StTE PARKWG i » > ~ ~ ] / ~ 5 ~ Attachment "A" ST JOHN'S EPISCOPAL CHURCH - ADDITION / RENOVATION Summary of Building Square Footages & Parking Requirements 7-May-01 Existina Floor Areas (UBC) Flaor Area 1904 Church building 6,788 s.f. 1965 Chapel addition 2,835 s.f. 1969 & 1987 Office/Parish Hall/Classrm 4.337 s.f. Subtotal 13,960 s.f. House 2,674 s.f. Total Existing Floor Area 16,634 s.f. Less Floor Areas demolished Portion of basement @ 1987 addition (163 s.f.) House (2,674 s.f.) Subtotal 13,797 s.f. Addition Floor Areas Proposed Addition 5.097 s.f. Subtotal 27,894 s.f. Proposed Covered Parkine Structure 3.766 s.f Total Building Area (incl. Parking) 25,660 s.f. Current Off•Site Floor Area Utilized YWCA Classroom space 2,530 s.f. ~ YWCA Restrooms/ Circulation 500 s.f. Subtotal 3,030 s.f. Parking provided on-site 20 spaces Parking Required -21,894 s.f./300 s.f. per space 73 spaces Parking Reduction Requested - 54/73= 72.6°/a 05a7sqlbum.xls Attachment "B" 7-May-Ol Memo to: Don Durso - Boulder City Planning Dept. From: Ron Kubec - St. John's Episcopal Church Subject: Areal Comparison of Existing and Proposed Space for the Sunday School and Youth Programs. It is difficult to present an "apples to apples" comparison as much of the current space is shared. However, we have made a good faith effort io provide a true comparison. Note that we have included all space, including corridors, assembly space and rest rooms in both compilations. The data for the YWCA usage is presented as two areas. The first is the actuat interior room measurements. The second number is a ZO% gross-up to represent corridor, rest room, etc. space. This comparison supports our position that, with Phase ], we are only providing for our current youth programs on our own site and alleviating the need to double up activities in such spaces as the Rector's office. For your information, there ate 190 children in Sunday School supported by 20 adults with a'/z time director. There 50 youths in our youth program supported by a full time direcior. We currently use 6 spaces totaling 10 rooms at the YWCA. (Note: ] space -"Children's Alley" is 5 rooms and is used as a Nursery). We also use'/2 ofthe Rector's office, the conference room, ]/4 ofthe old building, and a basement area to support these activities. For Sunday School there are anyv/here from 5 to 30 chitdren per class. AREAL COMPARISON Existing Sq.. Ft. Proposed Sq.. Ft: YWCA 2530 -0- 20% Gross-Up 506 -0- 1/4th 1445 Pine 669 -0- Youth Room (Basement) 612 510 'h Rector's office ] 40 -0- Conference Room 442 -0- Naw Classroom Area -0. 4179 New Support Office. -0- 336 TOTAL 4899 5025 Attachment "C" 7-May-O1 Memo to: Don Durso - Boulder City PJanning Dept. From: Ron Kubec - St. John's Episcopa] Church To: Mr. Don Durso - Boulder City Planning Department Subject: Response to Site-Review comments by Housing and Human Services Dept. Due to fisca- constraints St. John's can not buitd al1 that we originally desired. The apartments were eliminated in Phase ] so that we could meet our primary objective of being able to conduct Sunday School and other Chrisiian education activities on our own premises. ~'he possibility exists of putting the apartments in Phase 2, if and when it is built. It is suggested that a determination as to what is best for al] parties be made at that time. The decision to eliminate the apanments was not an easy one as St. John's is very dedicated to supporting those with AIDS and low income housing in general. We hope that you will reconsider your position in light of all the contributions lhat have been and are being made by the St. John's community to Boulder's low income housing issue. For instance, we have committed $] 00,000 of our capital campaign funds to Project Start for "bricks and mortar" for their work with the homeless. This commitment is a key reason for our inability to build both phases at this time. While we had to eliminate the AIDS apt. we have continued our support ofBCAP in other ways. We are sure you would receive a positive response from them with regard to our continuing efforts. Historically, St. John's has always supported low-income housing. Evidence'ofthis is San 7uan del Centro which was created by the church and has led the creation of the St. 7ohn's Foundation which is dedicated to low income housing issues. We are attaching a brief history ofthe Foundation for your perusal. While wa have no control over the actions ofthe Foundation as it is a completely separate entity, we believe it's presence is indicative of the Church's long term commitment to $oulder's housing issues. ln summary, we believe that our past, present, and future efforts on behalf of ]ow income housing far outweigh the removal of ]] 00 sq. ft. of apartment space. Attachment "D" 7-May-Ol ST. JOHN'S FOUNDATION In 1971, St. John's Church built the San Juan del Centso low-income housing project, the first such project in Boulder. The money tc build came from the U. S. Department of Housirig and Urban Development (HUD), in the form of a long-term mortg~ge loan. It provided (and provides) homes to the poor of this community. It was decided that the church had been landlord for long enough, that the project's life of at least twenty years was assured by HUD rules, and that additional capital was needed for m ajor repairs. in December, 1984, the project was sold to a partnership which specialized in syndicating ownership but retaining r esponsibility for managing the property. A foundation, recognized as a tax-exempt entity by the Internal Revenue Service and acceptable to HUD as a means of channeling sales proceeds, was organized by St. John's Church rep resentatives. The controlling articles of incorporation and bylaw s mandate the composition of the Board of Directors of the Foundation: Five members from St. John's parish and two members from the public at large, all elected by St. John's Church vestry. The incumbent members are: Rolland Hoverstock, President Robert Elmore, Secretary and Treasurer Charles Squier Ruth Cprrell Phoebe Norton Jan Snooks Gail Tate. The focus of giving (of the earnings of the trust corpus) is to addrese the housing needs of disadvantaged Soulder County residents. The directors were pleased to approve grants to these organizations in the year 2000: Family Learriing Center Emergency Family Assistance The Boulder Shelter for the Homeless Boulder County AIDS Project San Juan People's Clinic START: Homeless Day Resource Center Boulder County Safe House -, Aging Services Foundation. Attachment "E" ST. jOHN'S EPISCOPAL CHURCH Membership Growth and Sunday Attendance Data 7-May-O 1 St. John's Episcopal Church is proposin' to ezpand its administrative and fellowship space in order to accommodate the growth that has occurred over the last ten years. The . expansion also allows us to conduct Sunday school in our own facility instead of the YWCA where it is currently held. The proposal also "builds out" the church's avai]able space and therefore represents a very lon;-term plan. The original idea was a"100 yr. Plan" in keeping with the 100th anniversary of the Sanctuary (1902). While the growth over the last ten years has been significant, the future growth is projected at 3 to 5%/yr for the next three years and then at 0 to 3% thereafter. The primary limitin~ factor is the recenY esfablishment of a new Episcopal church in Lafayette. 20% of our current members live in the eastern azea. Another issue is the relatively lower growth expected in the immediate Boulder area. We expect that most of the projected growth will come from the north Boulder area. Some recent growth information is provided below. ~""' '~ NUMBER OF PARISHIONERS '' 1998 1027 1999 ]]62 2000 ]248 SUNDAY SERVICE ATTENDANCE (Typica} Sunday). SERVICE SUMMER FALL 1998 1999 2000 1998. 1999 2000 7:30 72 89 86 95 75 75 8:30 --- --- 34 --- 40 35 10:00 166 I51 225 249 216 220 TOTAL 238 240 351 344 340 326 Attachment "F" 7-May-Ol ST. JOHN'S EPISCOPAL CHURCH Parking Counts from Friday, 10/20/00 through Thursday, 10/26/00 Memo to: Don Durso - Boulder City Planning Dept. From: Ron Kubec - St. John's Episcopal Church Our attempt at determining lot usage by automatically counting cars in and out failed. The data is seriously flawed as it indicates very few cars in the lot on Sunday and a lot of cars there at midnight on a week night. We therefore did a manual count for a one week period. This data is pesented below. The maximum number of cars observed on the site was 28. Twenty One (21) of the spaces are committed (19 rented, 2 for YWCA). This supports our plans for 19 spaces with 9 being reserved for church usage. Tl~is is also in-line with the fact that we have only 5 full time employees requiring a permanent space. PARICING DATA (Number of cars parked on-site) TIME FRI. SAT. SUN. MON. TUE. WF.D. THR. ~ ~ 10/20 10/21 10/22 10/23 10/24 10/25 10/26 8AM IO 7 28 12 13 10 8 lOAM 18 11 35 16 27 27 13 NOON 22 10 28 19 22 24 23 2PM 22 13 12 20 24 28 22 4PM 20 21 6 16 24 22 20 1 a ~ Attachment "G" 7-May-01 ST. JOHN'S EPISCOPAL CHURCH Parking Survey Point of Origin for Sunday Attendees at 10 AM Service Central Boulder Uni Hill Chatauqua Whittier Mapleton South Boulder Devil's Thumb Table Mesa Martin Acres North Boulder Mountains East County Cities Lafayette Longmont Louisville Superior Westminster Lyons Broomfield Erie Subdivisions Palo Park Gunbarrel/ Niwot Arapahoe Ridge Wonderland Hill Keywaden Paragon Estates Park East Crestview Pinebrook Hil~s Others Total 5/21/00 10 AM Service attendance - 176 61 parking survey responses representing 117 people Transportation mode - 54 cars (2.04 people/car) 94% 6 walked 5.1 % i bus 0.8% 6/11 /00 10 AM Service attendance - 192 75 parking survey responses representing 134 people Transportation mode - 68 cars (1.87 people/car) 94.8% 5 walked 7 bus No. of Cars 5/21/00 G/11/00 12 23 13 6 7 13 2 -- 4 -- 3 3 1 2 7 Z ~ -- 2 1 -- 1 -- 3 -- ~ 1 1 2 4 2 1 -- 4 1 1 2 ~ -- ~ -- -- 2 4 65 74 Parkine 58°/a Street 21%Church lot 16% City lot 2 % Pvt, Lot Parkina 54% Street 26% Church lot 16% City lot 3 % Pvt. Lot ana~n_c.,i: Attachment "H" 07 MAY O1 ST JOHN'S EPISCOPAL CHURCH Typical Weekly Usage of Facilities Monday - 12:15 - 1:15 Adult Children of Alcoholics, Parish Hall. About 6-8 people. 1:30 - 2:30 AA, Conference Room, Conference Room. About 6-8 people. 6:00 pm Evensong, Chapel. From 6-15 people. Tuesday - 9:00 - 1 1 :00 9:00- 10:30 9:30 2:00 7:00 - 8:30 6:30 - 8:30 Wednesday - 10:00 10:30 1:00 5:00 - 6:00 Thursday - 6:00 - 8:00 7:00 - 9:00 7:30 - 10:00 Friday - 10:00 12 :00 12:30 - 3:00 Centering Prayer, Conference Room. About 8-10 people. Counters for Sunday contributions, Parish Hall. 3 people. Staff Meeting, Rebecca's Office. 6-7 people (very crowded). Coda Meeting, Conference Room. 6-8 people. Senior EYC (Youth Group), Scott's office (White House). 6-8 people. Centering Prayer, Conference Room. About 8-10 people. Communion Service, Chapel. About 15 people. Bible Study, Conference Room. About 15 people. Clergy Meeting, Rol's office. 4 people. Choristers Rehearsal, Choir Room. About 25-30 kids. Middle School EYC, Parish Hall and Kitchen. About 20 kids. EFM (Education for Ministry), Conference Room. About 8 people. ARS Nova Rehearsal, Church, Chapel and Choir Room. Mom's Group, Conference Room, Babysitting in Atrium. About 10-12 people. Communion Service, Chapel. About 3-10 people. EFM, Canference Room. About 8 people. Saturday - Weddings, meetings as scheduled. Sunday - 7:30 Communion Service, Chapel. About 75 + people. 8:30 Communion Service, Chapel. About 40 + people. 9:15 Choir Rehearsal, Choir Room. About 20 people. 10:00 Communion Service, Chapel. About 225 + people. 10:00 - 11:15 Nursery in Children's Alley. About 8-10 kids. 10:00 - 11 :15 Sunday School. Classes in atrium and YWCA. About 195 children. 1 7:15 - 12:00 Youth Confirmation Class, Rol's Office. 20-25 people. 11 :15 - 12:00 Adult Confirmation Class, Conference Room. About 15 people. 11 :15 - 12:00 Children's Communion C{ass, YWCA. About 10-20 children. 11 :1 S- 12:00 Coffee Hour, Parish Hall. From 25-100 people. 11 :30 - 12:00 Choir Rehearsal, Church. About 20 people. D:\databdocs\FROJ-NET\20a0proj\0051 \applicaiion\MtachH,doc Attachment "I" 7-May-01 ST. JOHN'S EPISCOPAL CHURCH Actual Weekday Usage of Parking Lot from 9/OS/00 - 9/19/00 Day of Week- pATE GROUP CARS TIMS Tues . 9/5 ARS NOVA 20 7-10 PM wed. 9/6 Holy Eucharist & Bible Study 10 10 AM START Meeting - 6~~ ] 2 Noon ~ Clergy Meeting 2 . 1 PM . ~ . Choir Practice 12 4:30 PM Thurs. 9/7 ~ ARSNOVA ~ 20 7-IOPM Fri . 9/8 Mom's Grp. ~. 5 IO AM ~ Holy Eucharist 2 , 12 Nuon Education for Ministry ~ 6 1 P1v1 • S~~~l 9/9 HemlockSociety - 15 70AM Capital Camp. Training ~ 30 8;30-1 ]:30 AM Sun. 9/]0 SundayServices 300+ 7:30-]1:30 Mon . 9/11 . EVensong 6 6 PM Altar Guild Meetin~ 20 7;30 PM Tue . 9/12 Centering Prayer ~ 6- 9-I 1 AM . . Centering Prayer 6 ' 6-8 PM wed . 9/13 Holy Euc6azist & Bible Study 10 ] 0 AM Clergy Mee[ing ~ ~ 5 1 PM ChoirPractice 12 4:30PM ~ Special Eucharist 30+ 7 piy mhurs . 9/14 Budget & Review Meeting 5 _ 4 PM AFiSNOVA 20 7-IOPM Fri.,i 9/15 Mom'sGrp. 5 ]0AM Holy Eucharist 2 12 Noon - Education for Ministry 6 ~ 12:30-3 PM Wedding Reheazsal 6 5 PM sat. 9/16 Wedding ~ 30+ 4 PM ~ Boulder County Aids Project 25 6-10 PM Sun. 9/17 Services Offsite Baptism ~ 5 ~ 12 Noon Mon. 9/18 Holy Eucharistic 7 ~. 6 PM Acolqte Training ~ 5 7-9 PM . Inteority 12 7 PM '1'ues. 9/19 CenteringPrayer 5 '9-11 AM ~ StaffMee[in~ ~ 9 9:30AM Youth Ministries 4 ll AM Vestry Meetin~ ]0 - 6-8 PM ~ ~I Episcopal Youth Club 3 7-8:30 PM- Attachment "J" ~-M~y-oi i D"~': . ~l ~'~~"'~ 17o~vntown anri Univer~sity Hill ~f ~ae~~+d~r 2~inagement llivision and Parking ~ervices ^ownlrn+al Po1;In3yenlE~it (:umrtliASioO May 4, 2001 Mr. pan 17uisc~ Bcyuldcr planning De~:u[ment Ciry of Bouldcr P.O. Box 791 8ouider, Ct~ &0306 ]~ear Ltay~: • Univcr;~ity Hiff Cenar~l lropso~ement Disinet • Pnrking Servlces A representaGive from St. John's Episcopal Charch ~sked th~t I conununicat~ thP cunent city parking policiea effeccing parkin~ on Sundays. As you kn.~w, St..Tohn's is in fhe procea;: of an expunsi<~n of their Pacilities. Parking, both on streat and in our dow~.itt~Wn lots ttnd sti~tctures, is free on Suuday. Wliile it is diFficult w project furure palicies, it is safe to auy that in al1 HkelihPOd ic wiJl rem~in ~n, This is based on nduced demand since mowt businesses are closed Suncidys, partiaularly Sunciay mrnnings within tl~e d~wntown are~. The Closest cicy structur0 is 1~'h arid Peazl, twe blucks From $t. 7ohn';~ Site. lt ha~ bS6 parking spaces and very tow utiliz:~uon on Sunday moraings. Parking is also availa6ie un street, bath at the m~tars und wiehin che rasidantia! ItiPp area sin~a the NT'P regul2tions a~•e not in effect Sundays. P1ea5a let me know if yau have dn~ questions. Sineerely, OF BOULDLlt Director ~„_,,/ Downto~vn and University Hill blanagement Departmant Paz~kin~; Scrviaes 1 S00 Pcwrl, Su i~a 31Y2 I'linnec (3U:j) A 13-730U BuiJAer, CnWrnd08010? Nnx; (3(17)A~I1.7301 Vested Riahts Option Form and/or Waiver Site Review Type of Review St. John's Episcopal Church Property Owner's Name 1419 Pine St.. Boulder CO 80302 Address of Property (Lots 7 - 12, Block 147) St. John's Episcopal Church ApplicanYs Name Kevin F. Richey, Senior Warden OPTION #1 I, St John's E~iscopal Church , intend to pursue the creation of a vested properry right as provided for in Section 9-4 12, B.R.C. 1981. In orderto accomplish that, 1 am requesting that my application ba referred to the Planning Board for a pubiic hearing pursuant to Section 9-4-3(b)(1), B.R.C. 1981. I understand that if my development is approved by the Board, I shall ceuse a notice advising the general public of the Planning Board's approval and the creation of a vested property right to be published in a newspaper of general circulation no later than fourteen days following final approval and shell provide the Planning Director with the newspaper's official notice of pubfication no later than ten days following the date of publication, in order to perfect my vested right. Said right will be vested for three years from the date of final approval and will cover the following elements of the approval: [rype of use; number of units; building footprint; building square footage; etc.~ Per Site Review submittal package d ted 5/07/01. Phase I addition of office. meeting and religious education spaces totalling 7.934 s.f. with 3.766 s.f. of covered parking. Phase II to consist of covered I understand and acknowledge that certain delays in my projecYs approval time may result in order to meet the hearing and notice requirements of state law for the creation of a vested property right. Property Owner St. John's Episcopal Church gy. ;:~! µ` ~ ~~~w~ ~ -~ - u I Witness:,!~~,~ ~~~~-'`~ .~~~ ~ ~ Date Date rtr****,r*r*,r,rx,r**rtnr**tr****twW w*wr*+t,r***s***x*****+*+rw **~+r***,t**,tt**,txr*,t+rtntttr:r**s***~rtr*+tw,rs*,tx*,t** OPTION #2 I, , understand that I may pursue the creation of e vested property right as provided for in Section 9-4-2, B.R.C. 1981, and Section 24-68-103, C.R.S. 1973, and I choose to voluntarily waive this right. I have been advised by the City to consuit an attorney prior to signing this waiver. Further, I understand that this waiver does not abridge any common law vested rights which I may acquire nor does it diminish any right which may exist under the City's land use regulations, except for Section 9-4-12, B.R.C. 1981. Property Owner ~~`~--~~°~ i~_ o~ By: `~--~~ ~ "° Date -~-- Date ~ ~ ~ F-- o Z° N / ~ ~ ~nuai ARCHITECTS 5t )ohn's Episcopa) Church ~~~~ 1419 Pris street, eculder, co~oralo PRO~CT I OOS1 ~A7e auMra * ~ ~I^ W \M "/ ~I^ W ~i N N ~ ~ ~ 0 0 N \ N N ~ ~ 0 ~ ~ ~ 0 ~ g 0 ~ ~ N * C_ ~_.~~ ~~~ ~ . ~~~~ ~ ~r~._^ ~.~~~~ ~~~_~.-^ ~..~ . ~ ~r?^~~~~~_~__~~-~ . . .., . : .; . ,, ~.. .:. ~ . . , , . ~' . . . , t;. . .. . .. . . . .. . ` . .. ..... . . . . . ., . . . . : ...~.. ~ ~•,.. .: : .. . •. ,_.. ..:.' ~. . ~. ~~ , .. . . . . . .. . ..: . . . . :.. . .~ ~:'• . .., ... . . ,. ' . . . . . .. . _ . . , ~ . .; ~ . . . • : ~.,..• 1 ~ • ,. .., . ~ . . ~.. . . . .+. • . , `r , M1 ~ , : . , . .:~ ~ ,' . . . . . e . . . . • ', ~ 1' . . . . , , . . ^~I-I ~y~ . .. . ~ . . . . . . . , •~~nVW`'~ L7+: , . . ~.. .. . . . ', ~,;,;. '~ . . .. . . ~d A °:~ ;. ';...r...•.... . , ... .:.:. \. . .. , . . . . . ", . .I. R~~;•:~';,.:. - . .. .. . :. ' ~. ` •..: : ` ' ~, .. . . . • • • ; ' ~ . . . . . . I, . . . . . • Y . . . • . . ~ . . ~ , ~.~~'. . .. ... .~~h:~~ .. x . ... .+t.~ ",, ....... . . _ ___ ___ _ .:. _ _ _ _ _ _ ___ _ __ ____ ,. . . ~ . . . • ~ . . ~ .. :~r~~~r~r~'.~Y~.~~a~~~~~~~r~~ ~ '-~ • . . . ~ 1 ~S! +f.~.~~T. ~~TJ~ ~n ~ T.~.~ T ~~ . .. .. . . ... .. ..: . ., ,. . . . . .. . . -. . ... . . .. ,.: .. . .. .. \, ~ . .~~i . . . . .. . . ''':~. - ': . .. . . :1 ' . . , . . .i ,~ . \ , 'i : f'1:,;'a ` . `•r . . ~y _-.:_.;.„-:,. . ,: • . ~, . ~ . ~'i :: '}•.~:.~ '<~~'.=::.::.:.>..,,~:,~.:.., . .. ~I...• ~ . 4..J~~.'~ .. . .. . . . . . .nY~ ~ n.T'YM.::n..'Yw.i . • ~ ~; "..,.. ';~.. . .d;' '.a~rr `:1. ....- . . . oo :,::: < =~' " ~ ~, ~~,\~~ ~, ~:a`:.: ~ ~ ~. . . . :; •.~;1,x° ;S~ ;. . v , . ~~' a .r-1 , ~,~ r :., . . ~.' .:. `h; ;~r,:.;,s•:a;y,: . ... . . • • ~ ~ . 1 . . . . .. M •M . . . . v . ."1 . . .. ~ M1 , . . ~'~e .. , . ~~/ ~ .,:^s^'^c .~'~ :;~ . , ~~.~ . ~Y.r~ • ~Y ~N C...~~:.:. . ., , ,~'.~ ;\. ..t' ~p n:tYl•ny ~~ ~ ' ,.. ... . . .: . . :. ..: ~. • . . , . . . ~t• . . ,;5 F :~'iY;,n,':2•r;'. ,.w.,; . `•~:• ., . .. y '`'1:q;r:., .,is..,,~1~•~• { ;.': . .4. .... . . . . ~ . l~• .. . '~!;'E~" , ,,.,. ~,:. 1: ~ ... .. . . . . ... . :. . `y " •' . . . ''i' ~„k:.:e;>..: :. . . . .. . . ''/ ' Sq,S.':•• f.:. v.:~..~.;.4: ``~'•~ ~ .. . ;. .. ~.. , . I'. . ..~..~.M.. ''.~.~,~~.~~~ if+~~.n •~~ ..4. • l . . .. .. : ~ ., :. , ••~ . .y~ • +. p .yl. r~.~ ~. p1~ °~~.~'~\S. ~ :. .' R , . . .. . . ~ ii.v::y.,. ~ c . . . .. . . . \.: . • . t'.``k: ~•a. ~ ~ '/ 'i:. w:~~';:'.', ~'a:~'~'r ~~~. `.~ ~~~. :~::~.: . ..~~:,~ ::~.~::. :::.:.;: ,r.. .. ... ........,. .. . .. ~:: ,. . .. t,,,.s ~~~p~; ,.,,. .. .. , ; \ ~ ~,t.• . A 1. >>\..Y~'•; ~;•a•~ ~ •`. ~ / . •%' . . . , . . . ... . !~•:':.A:y t"':S,?"nr~,m•. ~ ~+',.,'~ . . . • ~ / Y. ~:~ . . . . . Y. ` .:.>.. ~ iA ~~~ . 1.. .'•/ } ',;. .,,~. , ;. ~...: : 'i....''F % it~:l^• i .. .,~. ~ , ~. . '~ . .1.,~ ;: ~~... :r 1, ` ` •~ v .4'.l~) .~LV .i,+iN ~J~ '~~' . . . . .,;. .. .. . '~+e?:;'i' X.'' 's'.•~ .~.~ {.`. C : . :;:;..1~~; • ...k;~;... 'i ''h:`k:';~:~ ,•M~~'., ,z,i 'i • «.-i+~.^:+i •:.ti'.~~ •~Ira~t :+4- y :;t..r . . .a .~.. .% ~'~'' . '. ' ~ •~.r~.~:-~ ~~,.~':.: .7Yt~. .slYy:~ ~'~~:....:~'~ 1 y , . `C j.' ..~__-.~~~~r.'".u'~~.~~:r~~~,~••~.~ ~-~~~..~ v"~:iu' ~'tia6`ile:° t...,~..~%•~'r~>'~~~.., '~'.ti.'~':~...\;'Y: " '•+;1~ _- ~ `.' i•~•'' ,' % ~!'7,in±. .r ,,,,.`b . . . pl.,'.!? '~:f~.. ' .'fi{.~y. .'SN~ags:'y1"~\'.I+'~ ` ~ ~: ~ ~ ~ ` '• : , ~ _ ~ ~/ ~4::_~%ii~:~,''S. ,'i::~.f: v~•, ;c::::..'~.', : .ra•~'~.;'i;;:,:~•.:;:+"C^."~ IZ~OOPM :.~~.~; ~,ti::~:;°~ :,...:,;~,:=~~k ~a..,y~;.~.,~.~A~:,.~~;.,~.,;>.:<;,r. / ~,,~_ ~,.oT ~ir~ o~ .;;..,!],,. :;~.; .:.'~ ::>,.t:Z\.;} '~. ~~ ~: ~~:::, J{ ,..; t-.,.. ,~^ IA' ~y~~p/~~I ~, ~':f~fQ~.~ I`9^n :~<,^r~,~l..>S.n'Y?{.~'n~.1~r a~.1';F~.n.n.~ ~fi'SfWtYi:~ \ TT. ^RT'^~~^t. . A~'1.~*,,}~u.~'.'~~,\.J.y/;~~ I'WWW4~Y~ ~-I~N1-1nl~l ~ ~.• n . . ~ \ (~::i'rt ~.C` ~1~:;'^'y. '!~'...._~ ~...K~ 1 F n ~+~ I-I' I~ ~~/~ ~\~/~ ~'~ Y>~^ [•'V<~.3~~,'•:S~A:~~:~y~'~: t}~!", ~.~::1:~~~.~.~'T".l~a;~^J.F~si.~~:l1 ~;H.v~..`:."l~~u:~:ni.eywt '.I ~V /~~ 71~/L~~VI~VT . ~^~~ ':4~ ~Yn..~N'~ ~rS.W~yJA1~~h\~. 4Y5,~„Y.."'',f,Y~~...~~. wy~t{'lY~ysu•tY.µ•:r~.l ~.\1^?S~,Y.'~J~t~~,"~`~.~.~.i ~ Z:.~~ • ~.Ll•.. • ~. `~_fY.~i~~s. ~_ a.~ve•!\i u~ .I~~^.....n..i<"n .t • ._. uJR.I i~~~• If ..nn.y. ~ .V~.< M1• 1.'YI PM _ ~i~ ,,, ----.~ ._ ii ~I~21 __..._ _ ~'1 ~~'~~ 1 T ~~i~~~~~ii~~~~ ~~ ~ ~'. ~~ WI~MY ii;j~,'~~ u'a" `~ ~~ -. ~ ~ ~ .. ~ I I ~ I I ~ ---" ~ J ~ ~~ ,~' ,, v `. ~ ° V / \ 1 \ I I I I I I~I I I I~i ' A i ~ SOLAR SHADOVV ANALYS~S 1"=30' .~,.-- 7,~i ~' , ~/~/ yt' ~'~~ '~. Y~~ ...,~~~ ~~ _~/..r // . ~ _•[i ,_i: ~~ zi _~ ~ I1 ~~ ~ vECe~+e~ si lacm - sp~ _ ,~ MARGW~~EPT. 21(9cm - 9prtJ .L41E s~ (qae - 9q^1 ~ DEGEMB~ 41(9an - 3pm) ~i:~~~:;i~. HARTRONFT FAU~ ARC~r Ecrs w~+s.,w+~,na,4, 801.MAIN $TREET S U I T E 3 0 0 ~aa,u~, co eoov V01~ 303.673.9304 FA%: 103.673.931 9 O ~ •o•1 ~ + w ~ ~ O 3 . .~ > Q=j ;~ OC ~Wy~ y ~ =~ O` ~ s 4 ~' ~ ~ ~ ~aerwprt ~qt N~ EMMA ME TM61 IAIOIAqIIM duPBmMi d~mcd w Mhnfea appe~imo heren shd not 6e ' used Wdfio~t w~len Eaarnl of Na~m~ - Fawi Mthi~ZC6~ P.c. O ' 8 O ~o~ ~ ~• r}vi 0~3~ ~ ~ ~ ~y , ~ ~ ~ ~I~I~~ II I I I~~~