HomeMy WebLinkAbout3C - 2003-2008 Greenways Capital Improvement ProgramDO NOT REMOVE -
pRAB File Material
CITY OF BOULDER
INFORMATION ITEM FOR:
TRAN5PORTATION ADVISORY BOARD
WATER R~SOURCES ADVISORY BOARD
PLANNING BOARD
PARKS AND RECREATION ADVISORY BOARD
OPEN SPACE BOARD OF TRUSTEES
ENVIRONMENTAL ADVISORY BOARD
GREENWAYS ADVISORY CONIIVIITTEE AGENDA ITEM
MEETING DATE: June 5, 2002
SUBJECT:
2003-2008 Crreenwa s Ca ital Im rovement Pro am
REQUESTING DEPARTMENT:
Anne Noble-Greenwa s Coordinator
~. _.
,,...
BOARD ACTION REQUESTED:
A recommendation to the City's Planning Board and CiTy Council conceming the proposed
Greenwa s Ca ital Im rovement Pro am is re uested.
Attached is mformahon concexning the proposed 2003-2008 Crreenways Caprtal Improvement
Program (CII') for review and considerahon. A recommendation to the City's Planning Boazd
and Council is requested.
Attachment A Greenways 2003-2008 Capital Improvement Program Overview
Attachment B• Greenways 2003-2008 Capital Improvement Program Summary Sheet and Map
Attachment C: Greenways 2003-2008 Project Descriptions
Av^'~
rr..
Attachment A ,w~
GREENWAYS
2003 - 2008 CAPITAL IMPROVEMENTS PROGRAM
OVERVIEW
The 2003 Crreenways Capital Improvements Program (CIP) budget is $450,000. The Greenways
CIP has been developed within the context of, and is consistent with, the Boulder Valley
Comprehensive Plan (BVCP), the Transportation Master Plan (TMP), the Comprehensive Drainage
Utility Master Plan (CDUMF), and the Greenways Master Plan.
The city of Boulder Greenways System is comprised of a series of corridors along riparian azeas
including Boulder Creek and 6 designated tributaries, which provide an opportunity to integrate
multiple objectives, including habitat protection, water quality enhancement, storm drainage and
floodplain management, alternative transportation routes for pedestrians and bicyclists, recreation
and cultural resources. In order to maxunize the overlap of objectives and to coorduiate projects
along the Greenways, identification of projects for the 2003-2008 Crreenways CIP was done as a
team effort, combining input from Public Works (Utilities and Transportation groups), Pazks and
Recreation, Water Quality and Environmental Services, and Open SpacelReal Estate.
Transportation and flood utility projects were identified from the Transportation Master Plan, the
Comprehensive Drainage Utility Master Plan, and infra-departmental meetings to detennine project
priorities and tuning. Environmental projects were identified during the Master Plan update process ,~
and were prioritized based on recent environmental studies, the overlap with other projects, and the „•a
feasibility and effectiveness of the project m meeting environmental goals. Maintenance of the
Greenways system was reviewed as part of the Master Plan update process To address the
identified deficiencies in maintenance and weed control, the 2002-2007 Greenways CIP specified
$150,000 to be used for maintenance each yeaz. This allocation was continued m the 2003-2008
C1P.
POLICY ISSUES
All prolects in the 2003-2008 C1P will go through the CEAP process either as part of a bigger Flood
or Transportation project or as a separate project as indicated on the project status reports.
HIGHLIGHTS
Highlights of Greenways projects included in the 2003 CIP are
• The Iris Avenue Underpass at Elmer's Two-Mile Creek involves the construction of an
underpass to increase flood capacity and improve access for pedestrians and bicyclists
This project is being coordinated with the Pazks Department m conjunction with the
development of Ehner's Two-Mile Pazk and with the Transportation Division
• The Founnile Improvements from Pleasantview Soccer Fields to 28a' Street includes
improvements to the creek, environmental restoration and water quality best management
practices. This project is being done in conjunction with flood improvements along
Fourmile Canyon Creek. This work will be coordinated with the Stormwater and Flood
Management Utility and Open Space Department
• The Fourmile project from Broadway to 19`s Street includes a trazl connection, ~'
unprovements to the creek, environmental restoration and water quality best management "~
practices This project is being done in conjunction with flood unprovements along
1
,,-,. Fourmile Canyon Creek This work will be coordinated with the Stormwater and Flood
~„•„ Management Utility and Parks and Recreation Department.
• Maintenance concerns and weed control have been identified as a line item in the
Greenways budget, with salaries associated with this effort shown as a separate line item.
• The administration of the Greenways Program and Miscellaneous projects are shown as
line items in the budget.
FINANCING
Crreenways projects are funded from the Transportation Fund, Stormwater and Flood
Management Utility Fund, and the Lottery Fund. Existing CIP expenditures aze estimated at
$450,000 per year for the next six years. Annual funding distribution for the Crreenways
Program for 2003-2008 is as follows.
Transportation - $150,000
F1oodUtilrty - $150,000
Lottery Fund - $150,000
RELATIONSIIIP TO OPERATING BUDGET
The Greenways corridors are currently maintained by several work groups within the city, as
well as outside orgamza6ons Tasks are divided up by geographical location as well as by
function The responsibility of each work group is described below:
„ _ Boulder County Pazks and Open Space maintains the Boulder Creek path from the mouth
~ of Boulder Canyon to Fournule Canyon
• The Pazks Department maintenance staff is responsible for maintenance of Greenways
that traverse a city park, as well as the Boulder Creek Path from Eben Fine Park to SSs'
Street.
• Street Maintenance is responsible for snow removal and general path maintenance (debris
removal and sweeping) along all of the Greenways paths, except those portions of path
maintained by the Parks Department
• The Open Space and Mountain Parks Department is responsible for maintenance of
natural, enviromnentally sensitive, or revegetated areas on open space land and
easements. Currently this includes portions of Boulder Creek east of 38a' Street and
Arapahoe Avenue and portions of South Boulder Creek from KOA Lake to Marshall
Road.
• Flood Utility Maintenance is responsible for maintaining the flood carrying capacity of
all of the Greenways channels, which primarily involves removing tree limbs and
downed trees from obstructing the flow in the channels, removal of channel sediment,
and bank stabilization
• Urban Drainage and Flood Control District (UDFCD) performs maintenance on sections
of Boulder Creek and all tributaries included in the Greenways Program.
• City Forestry, University of Colorado (CU), ditch companies, and Xcel Energy are also
involved in maintenance along the Greenways.
m..,
2
Attachment B
CITY OF BOULD ER
CAPITAL IMPROVEMENT S PROGRA M
GREENWAYS PROGRAM 2003-200 8 SUMMAR Y SHEET
Protect Loados Tohl Protect Cam 2002 2003 2004 2005 2006 2007 2008
Eatrmate Over Budget Projected Protected Protected Protected Protected Protected
Fourmde 26N fo 28th (FC3) • 5300,250 SI50,000 §50,000
Ins Aveuue Underpass (ETCI) • 17P funded 51,152,000 566,000 $125,000 5125,000
Founnde Lnprovements Pleasantvrew to 28th (FC2) • 5320,000 545,000 595,000
Bear Creek Reach 1 (BCCI) • 5440,000 $75,000
Wonderland Creek Foodulls to Dmgonal(WC3)• 5602,100 SI95,000 5195,000 5195,000
Forumtle Broadway to 19th St 5437,189 525,000 5100,000 5195,000
Greeaways Maintenance SI50,000 5130,000 5130,000 5130,000 5130,000 5130,000 5130,000
salenea Szo,ooo Sza,aoo 520,000 §20,000 szo,ooo §zo,ooo
Saltines for edmmrshatian of protpam/prolecis 560,000 560,000 560,000 560,000 560,000 560,000
Miscellaneous - Greenways Opetaung e K 550,000 545,000 545,000 545,000 545,000 545,000 545,000
Rest Areas end SrpraRe
Habr~t Survey and Comdor Assessment
Mtsc Tmtl Coocecis and kntnovemems
Mtsc Stream Restoration & Water Quality
TOTAL GREENWAYS CiP 5216,000 5450,000 5450,000 5450,000 5450,000 5450,000 5450,000 5450,000
* addrdosal fandra g from other departmeet al badt{eb
Breakdown of Coat By O hleeMe
(does not in clude maj or flood Improv ements or underpasse s)
Oblecdve Trans/Recreadoa Habit at tauter Qudrty
Protect Tnd Rra[onUoa Rea/Prea BMPa 7ota1
Fommde 26th to 28th (FC3) SI85,250 50 5115,000 SO 5300,250
Fommrle Imtnovemrnts Pieasaotnew m 26th (FC2) 50 5220,000 SO SI00,000 5320,000
BnrCrakReechl(BCC1) SO 50 5340,000 SI00,000 5440,000
Wonderland Creek Foothills to Dmt;onal(WC3) $376,100 SO §76,000 §150,000 5602,100
Fourmde Broedwa to 19th St. 5258,900 §0 5128,289 550,000 5437 189
09123/N02
CIP20032009 x1s
~) (~ c~
2003 - 2008 CIP
Greenways Program
1 0 1 2 3 Mdes
~- --~~
N
W E
S
City of Boulder
GREENWAYS
I FOREST AVE
~ ~ S N
~~
~_
r N
v
~F ~~
l
7
Z
S~
N
Vi~AG ~ ~sH i `"
Ci
J
d
GZ
z
w
N
O
GT
City of Boulder
Utilities Division
GREENWAYS
~~
DIAGONN-
~i n
r3i
n
FOURMILE IMPROVEMENTS
PLEASANTVIEW TO 28TH
Hayden
i r~kr
ay
t '} n
.. cr ,~~ <
;:4
City of Boulder
Unities Division
Greenways
taii
t SJ
%~'
~:~
P
VAli4T ^i
\~~~
_`~_~':
lv_
D
v
N °t.4T
[" p
x 4
4
a.abit n{ ~hA7
Cree ~ IP~< fi
r P
fK ~~~
~~~ < ~ e.
4i
D \
;,
W r
,. b
WONDERLAND CREEK
FOOTHILLS TO DIAGONAL
~-
Ut ,: = }x vY~. n,. mi.~. e
'lLJ
iy~,,d ~~
YARMOUTFt
P
X00
VOGADO
T AVE
T AVE
UNION AVE
°~ >- AVE
n
UPLAND
J
rn
AVE
TA P4nn n i'{r~
City of Boulder Fourmile Broadway to 19th Street
Utilities Division
GREENWAYS
AVE
~,~
1~
~~~
~n
~~; Proposed enhancements to maintenance practices along the Greenways wdi include weed control and
w° maintaining the stream corndor for habitat Specific tasks include retaining a weed consultant and
~~`; summer crew, purchase of equipment, control and removal of noxious weeds, and planting of natives to
~ ~~ discourage re establishment of weeds
~„
~"
~'°~iMamtenance and weed control are important components of the Greenways
;Y,.
on
z
it 4
der County Initial weed control efforts will be pertormed on City owned properties, therefore the protects will be coordinated
the managing department
2003 I 2004 2005 I 2008 I 2007 I 2008 I COMPLETION I F LADING
1
150.0001 1
',, ~J