HomeMy WebLinkAboutWIP of 03/16/00WEEKLY INFORMATION PACKET
~"
~
TO: Mayor Will Toor and Members of City Council
FROM: Ronald A Secnst, City Manager
Dave Rhodes, Director of Pubhc Works
Ned Wilhams, Assistant Director of Public Works for Uhhues
Bob Hazberg, Utihnes Project Coordinator
Anne Noble, Interim Greenways Coordmator
Alan Taylor, Floodplazn and Wetlands Coordmator
`r.~
DATE: Mazch 16, 2000
SUBJECT: Information Item: Fournule Canyon Creek Master Plan and Wonderland
Cteek Floodplain Mapping Study
The c~ry and the Urban Dramage and Flood Control Dtstnct (UDFCD) are m the process of updatmg
the master plan for the Fourm~le Canyon Creek through the city of Boulder. The purpose of this
mformahon ~tem ts to provide a status report on the master plamm~g process and associated
Wonderland Creek floodplam mappmg study.
BACKGROUND:
Please refer to the attached September 29, 1999 weekly mformation items concernmg the Fourmile
Canyon Creek Master Plan for background mformat~on
CURRENT STATUS:
The city's engmeenng consultant, Love & Associates, has completed us analysis work and has
developed a draft alternahves analysis (Phase A) master plan report. T6e master plan document will
be ava~lable next week m the City Council office and the Mumcipal Government Reference Center
of the Boulder Public Library for review
Last fall, the city hosted three public meeangs to discuss the master plan and preliminary analysis
results The meeUngs were well attended, and citizen mput has been documented and considered m
the draft master plan report Also, mput from city staff mcluding representatives of utilihes,
transportat~on, planning, parks and recreahon, open space, housmg and library has been cons~dered.
Results of an addmonal floodplam mappmg study for Wonderland Creek aze also ava~lable. This
study was comm~ss~oned ~n cons~deration of the existing sigmficant spill of flood waters from Fourmile
Canyon Creek basm mto the Wonderland Creek basm. It ~s ant~cipated that information concernmg the
ram~fications of the spill w~ll be needed for decis~on makmg regardmg flood mrt~gahon alternahves for
Fourmile. C~ty staff w~ll summanze the ram~fications of the spill and prov~de this mformahon m a
sepazate memo report in the neaz future.
A~omt public / cihzen adv~sory boazd meering ~s scheduled for the evemng of Monday, Apnl 10
from 6:00-9•00 p m. at the Elks I.odge No. 566, located at 3975 28th St. The Water Resource,
Transportauon, Pazks and Recreation and Open Space advisory boazds w~ll be mvited to attend.
Recommendations from each advisory boazd will be requested prior to schedulmg a public heanng
with [he city's Plamm~g Boazd dunng the second quarter of 2000. A final Phase A master plan """""
report will be completed, and City staff anticipates retuming to Council w~th flood miugat~on
recommendations m the third quarter of 2000. Prev~ously, staff had expected to bnng ttus issue to
Council m the first quarter of 2000 but we ttunk more ttme is needed to sohcit and address public
comment from residents and the various citizen advisory boazds.
An mdependent review panel has been formed to review the analysis and recommendations.
Members of the panel mclude G~lbert White and Mary Fran Myers of the CU Natural Hazards
Center, Ken Wnght of Wnght Water Engmeers, Bnan Hyde of the Colorado Water Conservat~on
Boazd, Rich Madole, a retired Umted States Geologic Survey geologis[, Bill Bradley retued geology
professor ementus at the Umversity of Colorado, and John Rold former D~rector of the State
Geologic Survey The panel has met on several occasions and has viewed Fournule Canyon Creek
and the associated floodplazn m the field It is antic~pated comments from the mdependent review
panel will be ava~lable m mid-Apnl
If Council has any questions, mput or would hke addihonal mformahon concemmg the master plan
update, please coatact Bob Harberg at telephone (303) 441-3124 or e-mazl
HazbergB @ci.boulder co.us.
Attachments
1. Weekly Informahon Item concemmg Fournule Canyon Creek Master Plan dated September 29,
1999
,.»,~
~
ATTACHMENT 1
~""' WEEKLY INFORMATION PACKET
~,..-
TO: Mayor Will Toor and Members of City Council
FROM: Ronald A. Secnst, City Manager
Dave Rhodes, Director of Pubhc Works
Ned Wilhams, Assistant Dtrector of Pubhc Works for Uhhhes
Bob Hazberg, Udhdes Pro~ect Coordmator
Anne Noble, Intenm Greenways Coordmator
Alan Taylor, Floodplam and Wetlands Coordmator
DATE: September 29, 1999
SUBJECT: Information Item: Fournule Canyon Creek Master Plan
The c~ty and the Urban Dramage and F7ood Control Dismct (UDFCD) are m the process of updanng
the master plan for the Fourmile Canyon Creek through the city of Boulder. The purpose of this
informahon ~tem is to prov~de a status report on the master plamm~g process.
BACKGROUND:
!" Please refer to the attached July 15, 1999 weekly mformat~on rtem concernmg the Fourmile Canyon
°'~"' Creek Master Plan for backgound mformation.
CURRENT STATUS:
Several analysis components aze nearing complehon mcluding basin hydrology, flood roudng and
floodplazn mappmg, and were discussed at two recent public meehngs which were hosted on August 2
and September 13. The first of these meetmgs presented background mformanon on the C~ty's
floodplam regulations, the master planmng process and the eazlier floodplam mappmg study. This
information was summanzed m the attached fact sheets 1-4. The second publ~c meetmg focused on the
underlymg basm hydrology, floodplam chazactensncs, and issues related to the master plannmg
process mcludmg water quality, envvonment, and the North Boulder Subcommumty Plan These
~ssues are summarized in the attached fact sheets 5-9
The analysis of damage potential and flood muigat~on alternatives has begun and prehmmary
mformation w~il be ava~lable m mid-October A third public meehng has been scheduled for October
18 to solicit feedback and mput on potenhal alternahves. City staff recommendahons regardmg the
flood mingahon alternahves will then be formulated and presented to the vanous c~hzen advisory
boazds mcludmg the Water Resource, Pazks and Reaeahon, Open Space, and Plamm~g.
The city has comm~ssioned an addu~onal floodplazn mappmg study for Wonderland Creek m
cons~derahon of the exishng s~gnificant spill of flood waters from Fourmile. Work on this pro~ect by
Boyle Engmeenng Corporation ~s underway and prehmmary results should also be available m m~d-
,~, October. It ~s anncipated that mformation concernmg the ramificanons of the spill will be needed for
,,M, decision makmg regardmg flood mingation alternahves for Fourmile.
3
Ciry staff anhcipates retummg to CouncIl with recommendations for flood [rut~gatton m the fast
quarter of 2000. '""'
If Council has any questions, mput or would hke addidonal mformation concemmg the master plan
update, please contact Bob Hazberg at telephone (303) 441-3124 or e-mail
HazbergB @ci.boulder.co.us
Attachments (see City's web srte at:
www.ci.boulder.co.us/pubhcworks/depts/utilities/projects/fourm~le
1. Weekly Informauon Item concemmg Foumule Canyon Creek Master Plan dated July 15, 1999
2. Fact Sheet No. 1 dated August 2, 1999 concernmg Ihe floodplam mappmg pro~ect
3 Fact Sheet No. 2 dated August 2, 1999 concemmg the master plamm~g process
4. Fact Sheet No 3 dated August 2, 1999 concernmg the public input process
5 Fact Sheet No. 4 dated August 2, 1999 concemmg the city's floodplam regulations
6. Fac[ Sheet No. 5 dated September, 1999 concernmg hydrology and flood rouung
7 Fact Sheet No. 6 dated September 13, 1999 concemmg floodplam analysis issues
8. Fact Sheet No. 7 da[ed September 13, 1999 concemmg water qualiry issues
9. Fact Sheet No. 8 dated September 13, 1999 concernmg environmental issues
10 Fact Sheet No. 9 da[ed September 13, 1999 concerning the North Boulder Subcommumty Plan
~
4