Loading...
01.23.17 PRAB PacketPARKS & RECREATION ADVISORY BOARD City Council Chambers, 1777 Broadway, Boulder, CO 5:30 p.m., Jan. 23, 2017 100 Years of Excellence Boulder Parks & Recreation Advisory Board Members 2017 Marty Gorce Tom Klenow Jennifer Kovarik Tyler Romero Kelly Wyatt Valerie Yates Mission Statement BPRD will promote the health and well- being of the entire Boulder community by collaboratively providing high- quality parks, facilities and programs. Vision Statement We envision a community where every member’s health and well- being is founded on unparalleled parks, facilities and programs. Goals of the Master Plan 1. Community Health and Wellness 2. Taking Care of What We Have 3. Financial Sustainability 4. Building Community 5. Youth Engagement 6. Organizational Readiness For more information on BPRD Master Plan visit the City of Boulder web site at: https://bouldercolorado.gov/pages/ parks-recreation-master-plan AGENDA All agenda times are approximate I. APPROVAL OF AGENDA (5:30) II. FUTURE BOARD ITEMS AND TOURS (5:33) III. PUBLIC PARTICIPATION (5:35) This portion of the meeting is for members of the public to communicate ideas or concerns to the Board regarding parks and recreation issues for which a public hearing is not scheduled later in the meeting (this includes consent agenda). The public is encouraged to comment on the need for parks and recreation programs and facilities as they perceive them. All speakers are limited to 3 minutes. Depending on the nature of your matter, you may or may not receive a response from the Board after you deliver your comments. The Board is always listening to and appreciative of community feedback. IV. CONSENT AGENDA (5:45) A. Approval of minutes from November 28, 2016 B. Parks and Recreation Development Update C. Parks and Recreation Operations Update V. ITEMS FOR ACTION (5:50) A. Public Hearing and Consideration of a Motion to Approve the 2017 Concept Plan for the Scott Carpenter Pool Redevelopment B. Public Hearing and Consideration of a Motion to Approve the Final Concept Plan for the Boulder Reservoir Visitor Services Center VI. ITEMS FOR DISCUSSION/INFORMATION VII. MATTERS FROM THE DEPARTMENT (7:45) A. Rules Regarding Slacklining and Permitting Slacklining Only in Designated Places B. 2016/17 Neighborhood Park Renovations (Arapahoe Ridge, Howard Heuston and Tantra Parks) B. 2018-2023 Capital Improvement Program (verbal update) VIII. MATTERS FROM BOARD MEMBERS (8:15) A. Finalize 2017 PRAB Work Plan (verbal update) B. PLAY Foundation Update (verbal update) C. PRAB Community Engagement Updates (verbal update) IX. ADJOURN PARKS & RECREATION ADVISORY BOARD 100 Years of Excellence Future Board Items 2017 (prepared Jan. 17, 2016) January 23 • Scott Carpenter Pool Development (a) • Boulder Reservoir Visitor Services Center Development (a) • 2016/17 Neighborhood Park Renovations (md) • 2018-2023 CIP (First Touch) (md) • Slackline Regulations Update (md) • PRAB Work Plan (mb) • PLAY Foundatoin Update (mb) • PRAB Community Engagement (mb) February 27 • Joint Board Meeting – Camps (p) • CIP Tour/Study Session? (p) • Boulder Reservoir Boating Contract (c) • 2018-2023 CIP (Second Touch) (d/i) • 2017 Master Plan Implementation Update (md) • Invite DBI (SM) • PRAB Community Engagement (mb) March 27 • Last meeting for outgoing PRAB members (p) • 2018-2023 CIP (Third Touch) (a) • Review Draft Boulder Valley Comprehensive Plan (Caitlin Zacharias) (d) • Civic Area Hard Hat Tour • PRAB Community Engagement (mb) April 24 • Board appointments (p) • Election of officers (p) • New Board member orientation (p) • First meeting for new Board members (p) • PRAB Community Engagement (mb) May 22 • Parks and Recreation Fees (d/i) • PRAB Community Engagement (mb) June 26 • Operating Budget Update (md) • PRAB Community Engagement (mb) July 24 • PRAB Community Engagement (mb) August 28 • Recreation Access Update (md) • CIP 2017-2022 Update (md) • PRAB Community Engagement (mb) September 25 • PRAB Retreat (p) • PRAB Community Engagement (mb) October 23 • PRAB Retreat Follow Up (mb) • PRAB Community Engagement (mb) November 27 • PRAB Goals for City Council Work Session (mb) • PRAB Community Engagement (mb) December 18 • Finalize 2017 PRAB Work Plan (mb) • PRAB Community Engagement (mb) PARKS & RECREATION ADVISORY BOARD 100 Years of Excellence LEGEND Procedural Item: (p): An item requiring procedural attention Consent Item (c): An item provided in written form for consent, not discussion by the Board; any consent item may be called up by any Board member for discussion during the matters from the department Action Item (a): A public hearing item to be voted on by the Board (public comment period provided) Disc/Info Item(d/i): An item likely to become a future action item (or council item) and/or that benefits from an in-depth presentation of background, financial/social/environmental impacts, public process, staff analysis and next steps (e.g., presentation of major project initiative) Matters from Dept (md): Items that will be reviewed and discussed during the meeting but not requiring the level of in-depth analysis of an action or discussion/information item Matters from the Bd (mb): Items initiated by the Board that will be reviewed and discussed during the meeting but not requiring the level of in-depth analysis of an action or discussion/information item Community Touches - To see a full calendar and details go to www.BoulderParks-Rec.org Dec - Feb Snow Much Fun @ Civic Area Feb 11 Sweethearts Dance @ NBRC Mar 9 Urbsn Forest Strategic Plan Public Workshop @ Rayback Collective CITY OF BOULDER BOULDER, COLORADO BOARDS AND COMMISSIONS MEETING MINUTES To listen to the Parks and Recreation Advisory Board meetings in their entirety, please go to the following link: www.boulderparks-rec.org Name of Board/Commission: Parks and Recreation Advisory Board Date of Meeting: November 28, 2016 Contact Information Preparing Summary: Sarah DeSouza, 303-413-7223 Board Members Present: Tom Klenow, Kelly Wyatt, Marty Gorce, Valerie Yates, Jennifer Kovarik, Tyler Romero Board Members Absent: All Board members were present. Staff Present: Yvette Bowden, Ali Rhodes, Jeff Haley, Doug Godfrey, Dean Rummel, Keith Williams, Sarah DeSouza, Alexis Moreno, Lori Goldman, Kathleen Alexander, Amanda Bevis, Stacy Cole Guests Present: No guests attended the meeting. Type of Meeting: Advisory/Regular Agenda Item 1: PRAB Work Session The PRAB met at 5 p.m. to begin to develop the Board’s 2017 priorities for City Council review and consideration at their Annual Retreat. The letter will be completed off-line and shared with the PRAB for their review and approval prior to it being submitted to Council. Agenda Item 2: Call to Order The meeting was called to order at 6:00 p.m. and the Board was asked to amend the agenda. The amended agenda was approved by the Board. Agenda Item 3: Future Board Items and Tours Bowden reviewed upcoming community touch opportunities. These events can be found at www.boulderparks-rec.org Agenda Item 4: Public Participation Josh Agenbroad, city resident, spoke on behalf of revitalizing skate boarding facilities in Boulder. He thanked the Board for allowing his group to be involved in discussions about the future of skateboarding facilities at various locations in Boulder. Theresa Szeliga, city resident, spoke on behalf of Colorado Junior Crew, Boulder Community Rowing and Friends of CU Crew in support of partnering with the city to build a boat house at the Boulder Reservoir to accommodate the growing crew population using the Reservoir and the number of boats and equipment that is used to support the sport. Agenda Item 5: Consent Agenda A. Approval of Minutes from October 24, 2016 Minutes from October 24, 2016 were approved as amended. B. Parks and Recreation Development Update PRAB members did not have any comments on this item C. Parks and Recreation Operations Update PRAB members did not have any comments on this item. Agenda Item 6: Items for Action There were no Action Items this month. Agenda Item 7: Items for Discussion/Information A. Boulder Reservoir Visitor Services Center Development Harding presented this item to the Board. PRAB members shared the following comments/questions about this item:  How will the administrative building be used?  Review the functionality of Building A so that the first priority of space extends to the user experience.  Ensure that all playground spaces have accessible features.  Review placement of playgrounds to ensure best and safest location.  Review bathroom locations to maximize sight lines.  Review vehicle access routes as they relate to pedestrian crossings.  Pay attention to grading, location of amenities and sight lines.  How does this concept plan compare to other local Reservoirs?  How will any capacity issues be addressed with neighbors?  Pursue interested partners to maximize investments. B. Boulder Reservoir Business Plan Update: Boat Rentals Williams presented this item to the Board. PRAB members shared the following comments about this item:  Importance of accessibility for everyone.  Liked RFP boating requirements listed in the RFP.  How should off season costs at the Reservoir be addressed?  How do other local Reservoirs address the issue of multiple access points to the site?  Address unintended consequences of new or expanded usage patterns at the Reservoir. Agenda Item 8: Matters from the Department A. EXPAND/YSI Presentation Goldman and Moreno presented this item to the Board. PRAB members shared the following questions and comments/questions about this item:  Can YSI program costs be calculated on a per person basis?  What percentage of the entire eligible population is the EXPAND program serving?  Is it possible to reach out to eligible people who do not currently use the city’s EXPAND services?  Does the program have the capacity to support additional patrons?  Support the connection between homelessness and mental illness/addictions/substance abuse B. Urban Forest Strategic Plan (UFSP) Update Alexander presented this item to the Board. PRAB members shared the following questions and comments about this item:  Information is very interesting and is important that it is shared with the community. Agenda Item 9: Matters from the Board A. Guidelines for Community and Inter-Departmental Interaction with the Board  Board members appreciated the work done by Yates.  PRAB would like the information to be posted on the web.  An FAQ will also be developed that provides the information to the public in a more user friendly way.  City staff asking to appear before the Board will be provided the information regarding Board presentations.  The section of the PRAB agenda that describes the purpose of public comment and read at the beginning of the meeting, will be amended to address “what happens next”. B. PRAB Community Engagement Updates  Board members reported on their community engagement activities from the last month.  Board members reported having attended being involved in TreeOpp# programming and outreach, Colorado Gives Day and enjoying the holiday lights in the Civic Area. Next Board Meeting: December 19, 2016 Adjourn: There being no further business to come before the Board at this time; the meeting was adjourned at 8:18 p.m. Approved by: Attested: _________________________ ________________________ Tom Klenow Sarah DeSouza Board Chair Board Secretary Date _____________________ Date ____________________ 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 TO: Parks and Recreation Advisory Board FROM: Yvette Bowden, Director, Parks and Recreation Department Ali Rhodes, Deputy Director Jeff Haley, Planning, Design and Community Engagement Manager SUBJECT: Consent Agenda DATE: January 23, 2017 A. Approval of Minutes from December 19, 2016 B. Parks and Recreation Development Update The following information is intended to provide the PRAB with relevant updates on specific projects as they reach major milestones. This section is not all inclusive of all current projects and only illustrates major project updates. For a complete list of all current projects and details, please visit www.BoulderParkNews.org. Planning and Design The following projects are currently in the planning and design process that involves research, alternatives analysis, public involvement and development of planning documents and design plans to guide decision making and future capital improvements.  Holiday Park Shelter As part of the 2014 Construction and Maintenance License Agreement for Holiday Neighborhood Park, the department will install a shade sail structure within the park, adjacent to existing playground amenities. Staff presented the concept plan to the community at the annual Holiday Neighborhood Master HOA meeting on January 11 and was received with enthusiastic support from the attendees and board members.  Urban Forest Strategic Plan In response to recent and potential impacts to Boulder’s urban tree canopy including, but not limited to, the current Emerald Ash Borer (EAB) infestation, climate change and individual severe weather events such as the 2002 drought and extreme temperature fluctuations, staff will develop a broad scope Urban Forest Strategic Plan (UFSP) beginning in 2017. The plan will capitalize on the recently completed public tree inventory and make recommendations for urban tree management for city parks and street rights-of-way. 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 Branching Out Boulder is an initiative to get the community involved in the development of the UFSP. The first step of the community outreach process began with a survey, tree story submissions and pop-up chats at recreation centers and the library. Some of the tree stories told can be found on the Branching Out Boulder web page.  Planning Projects Underway: Staff or contractors continue to work on the following projects and will update the PRAB as major milestones are achieved:  Arapahoe Ridge “Rock” Park Renovation (see update in this month’s Matters from the Department);  Boulder Reservoir South Shore Concept Plan;  Boulder Reservoir Visitor Services Center (addressed in this month’s Items for Action);  Central Park and Civic Area Design;  Chautauqua Park Pedestrian Safety, Access and Lighting Improvements;  Howard Heuston Park Renovation (see update in this month’s Matters from the Department);  Scott Carpenter Pool Concept Development Update (addressed in this month’s Items for Action); and  Tantra Park Renovation (see update in this month’s Matters from the Department). Construction The following projects are scheduled for construction, under construction or have been recently completed. For additional details please visit www.BoulderParkNews.org.  Civic Area Ice Rink: Staff completed construction of the ice rink including the rink, lighting, railings and decorating services. The community has been enjoying the new amenity since its opening on December 3. More information about the Civic Area Ice Rink can be found in the Operations Update, below.  Construction Projects Underway: Staff or contractors continue to work on the following projects and will update the PRAB as major milestones are achieved: o Admiral Arleigh A. Burke Park Improvements o Christensen Park Renovation; o Elks Park Arbor; and o North Boulder Recreation Center Aquatics Facility Renovations. Urban Resources The following projects, focused on habitat and wildlife management in an urban environment, are currently being managed by the Urban Resources staff:  Integrated Pest Management: Staff is working on data management, report writing and 2017 planning. Solutions to wetland permitting issues for prescribed burns are being evaluated. 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200  Urban Wildlife Management: Prairie Dogs – Staff has been working with other departments to structure and implement the council directed prairie dog working group. More information on the working group can be found at https://bouldercolorado.gov/osmp/prairie-dog-working-group. Species of Concern – Volunteer recruitment has begun for the Boulder Reservoir and Coot Lake wildlife closure monitors and the annual Birds of Concern training has been set for April 8, 2017. Similar closures as last year will go into effect in March 2017.  Natural Lands Projects Underway: Staff or contractors continue to work on the following projects and will update the PRAB as major milestones are achieved: o Natural Lands Volunteer Recruitment and Training; and o Regulations and Seasonal Wildlife Closures. C. Operations Update Downtown Boulder Ice Rink Open for the Snow Much Fun Season WinterSkate in Boulder is officially open for the season. Skaters first laced-up their skates and took to the ice on December 3, 2016. A highlight to this year's Snow Much Fun celebration, the rink is adorned with additional lighting and décor created from downed ash trees as part of the #TreeOpp project. The rink, sponsored by the City of Boulder and presented by Boulder Creek Events, is located at the Civic Plaza on 13th Street next door to the Dushanbe Teahouse. On Saturday, December 10, the community celebrated the return of an outdoor ice rink to the downtown Civic Area with a packed free public skate from noon to 4 p.m. The skating was followed by a free showing of The Polar Express from 5 to 8 p.m. in Central Park to approximately 100 people in attendance. The evening activity also included a holiday sing-a- long hosted by Jeff and Paige, as well as free hot chocolate, chai tea and train rides. Dushanbe Teahouse provided 20 gallons of hot drinks for the crowd. The park will continue to be illuminated with more than 200,000 LED lights through Monday, February 20, 2017. Visitors can also find hidden lights to learn more about the trees in Central Park on a self-guided scavenger hunt app. 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 Youth Service Initiative’s 5th Annual Holiday Toy Drive and Holiday Parties The 2016 Youth Service Initiative (YSI) toy drive concluded on December 15, 2016 with the final Holiday Party. In a collaborative effort with the Boulder Fire Department’s IAFF Local 900 Union, YSI participants and family members received nearly 500 gifts donated directly by community members or purchased with firefighter donations. The partnership reached over 150 families who participate through YSI and Boulder Housing Partners services. Community members donated to the toy drive by dropping off gifts at the three recreation centers and Kinesis Dance. YSI hosted two holiday parties at city recreation centers for the program’s families, providing dinner, entertainment while the firefighters helped Santa pass out presents. 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 AGENDA ITEM #___V-A___PAGE___1____ C I T Y O F B O U L D E R PARKS AND RECREATION ADVISORY BOARD AGENDA ITEM MEETING DATE: January 23, 2017 AGENDA TITLE: Public Hearing and Consideration of a Motion to Approve the 2017 Concept Plan for the Scott Carpenter Pool Redevelopment. PRESENTERS: Yvette Bowden, Director, Parks and Recreation Department Ali Rhodes, Deputy Director Jeff Haley, Planning, Design, and Community Engagement Manager Doug Godfrey, Parks Planner EXECUTIVE SUMMARY: The purpose of this item is for the Parks and Recreation Advisory Board (PRAB) to conduct a public hearing and consider a motion to approve the 2017 Concept Plan for the Scott Carpenter Pool (SCP) Redevelopment. SCP is a unique amenity in Boulder. It is the city’s only 50-meter outdoor pool, supporting a variety of recreation and fitness opportunities. In 2015, the Parks and Recreation Department (department) completed the Aquatics Feasibility Plan (AFP) outlining opportunities related to aquatics facilities and programs throughout the city. The AFP identified SP as being in poor condition with approximately $2 million in deferred maintenance. This plan was developed with extensive input from the community and provides specific recommendations for the redevelopment of SCP in order to address deficiencies while addressing unmet swimming and aquatic needs in the community. Based on the recommendations of the AFP and the capital investment strategy, staff has been working with a multi-disciplinary consultant team to develop a concept design for the redevelopment of the pool and addition of new water features within the park. The planning process for this project has built upon the outreach from the recent AFP and included input from a diverse cross section of Boulder residents to refine the plans. The team has incorporated all of the input into one final Concept Plan for review and consideration by the PRAB. The concept plan is intended to give staff an opportunity to solicit feedback from the PRAB early in the development process by determining a long-term plan for the site that meets the goals of the project while balancing multiple objectives of community involvement. Upon approval of the plan, staff will have the confidence of the PRAB’s support to proceed with more detailed design, cost estimating and exploring leveraged funding opportunities to implement as much as possible in the initial phase of construction. Recognizing the plan outlines a long-term strategy for redevelopment, phasing will likely occur. The initial AGENDA ITEM #___V-A___PAGE___2____ phase of construction will be refined through the final design process as more specific information and costs are determined. This process typically includes permitting and floodplain requirements, detailed site access requirements and subsurface soil conditions. Based upon the goals of the project and feedback from the community, the first phase will replace the existing ap pool with ten lanes, include a renovated bathhouse to support the pool, provide leisure amenities to serve all ages and abilities as well as general park improvements. The PRAB will be updated in 2017 as cost estimates are refined and a final scope is determined based on funding. As with any major facility renovation, staff must carefully program limited capital and operational funding to balance multiple community goals to accommodate a wide range of uses and provide flexibility for all members of the community. STAFF RECOMMENDATION: Suggested Motion Language: Staff requests PRAB’s consideration of this matter and action in the form of the following motion: Motion to approve the 2017 Concept Plan for the Scott Carpenter Pool Redevelopment. BACKGROUND: The redevelopment of the SCP aligns with the recommendations of the 2015 AFP while also supporting and promoting the policies and direction of the department’s master plan. The AFP identified that the redevelopment of the SCP and provides the opportunity to address the facility’s approximately $2 million in deferred maintenance and other deficiencies. Further, there is the potential to provide a facility that responds to many of the expressed aquatic needs of the community such as increased access to lap lanes, multi- generational family-friendly features, 50-meter swimming and sustainable and environmentally sensitive design. The redevelopment of SCP is also consistent with and advances the direction of the department master plan. A redevelopment of the facility focuses on ‘building better’ at an existing facility or site before investing in new. This theme of ‘taking care of what we have’ was a critical finding from the extensive community outreach during development of the plan. Renovation of SCP also allows the department to develop a facility that is multi-functional and flexible and can continue to accommodate a variety recreation uses, trends and anticipated needs over time. Planning Given the current condition of the SCP, as well as the opportunity to address unmet aquatic needs of the community, staff initiated a planning project to develop a comprehensive concept plan for the redevelopment of the facility in May 2016. The approved 2016 Capital Improvement Program (CIP) allocated $100,000 to work with a consultant team. In March 2016, the PRAB recommended that $8 million in funds be allocated to the redevelopment of the facility as part of the 2017-2022 Capital Investment Program (CIP). Pending approval by City Council, $1 million is allocated in 2017 to proceed with final design and permitting. The remaining $7 million is anticipated in 2018 to begin construction of the new facility. AGENDA ITEM #___V-A___PAGE___3____ Between May and December 2016, the consultant team led by Essenza Architecture and consisting of experienced pool designers, landscape architects, engineers and cost estimators, worked with staff to develop a final concept plan to allow for the redevelopment of the facility in the coming years. Staff participation in the coordination meetings included workgroups from Planning, Pool Operations, Park Operations, Forestry, Expand, Youth Services Initiative (YSI) and Athletics as well as a representative from the Boulder Valley School District (BVSD). Representatives from the University of Colorado (CU) and several ditch companies as stakeholders in the pool redevelopment were also engaged in the process. The team determined the needs and program elements for the facility, developed the plans and facilitated community outreach events to review the options. The team also provided detailed information related to the trade-offs for new amenities and the opportunities and constraints related to the project. Community Engagement Community input was integral to ensuring that the correct program elements were identified by the design team and that the proper balance of features had been achieved both in the development of the initial concept alternatives and the final concept plan for SCP. This input was gathered at a series of outreach events from September through November 2016. During this time, the department sought and obtained feedback from a wide range of user groups in the community. Outreach efforts have included:  Two public open houses: September 14 and November 2, 2016  Two library story-time hours: September 29, 2016;  North Boulder Recreation Center swim classes: September 30, 2016;  East Boulder Recreation Center swim classes: October 3, 2016; and  Youth Opportunities Advisory Board (YOAB) discussion: October 9, 2016. A summary of the community engagement feedback from all project outreach events can be found here. In addition to the outreach listed about, the team facilitated an informal, online survey to further gather input on the importance of different pool amenities and invited residents to comment on various aspects of the plans. This informal survey was made available to the public for two weeks after the September 14, 2016 open house and solicited over 500 responses. The full comments from the informal, online survey can be found here. The surveys were not meant to be statistically valid nor used as a quantitative justification for selecting designs. The list of amenities and features identified in the surveys were developed based on the findings and needs identified in the AFP. AGENDA ITEM #___V-A___PAGE___4____ Key Outcomes of Community Engagement In addition to the information that was available through the AFP, much more detail was obtained through the afore mentioned community engagement events. Some of the feedback substantiated the findings and recommendations of the AFP and other data provided new insights and thoughts on how the final concept plan should develop. Through all of the outreach undertaken as part of this project, the most supported feedback included the following:  A 50-meter lap pool is essential;  A year-round facility is highly desirable;  The provision of pool lanes should take precedence over other improvements;  The existing east-west pool orientation is desirable from a cost savings and swimming perspective;  There should be a focus on deep water activities;  The facility should be multi-generational and include amenities for young children, teens, adults and seniors;  Bathhouse renovations or a new facility should not be done at the expense of other improvements;  The existing mature tree canopy is an asset to the park and the aquatics facility;  Relatively small improvements to the existing skate park facility can go a long way; and  Eco-friendly, sustainable design solutions are desirable. Design Development Prior to the first public open house on September 14, 2016, staff and the consultant team determined the needs and initial program elements for the facility redevelopment. The recommendations of the 2015 AFP and the opportunities and constraints identified at the site provided the foundation for this initial work, that informed the three concept alternatives that shown at the September open house. The team analyzed feedback from the first open house and subsequent survey and targeted outreach and then synthesized the information into one ‘preferred concept plan’ for the redevelopment of SCP. This preferred concept plan was shown to the PRAB at the October 2016 business meeting and to the community at the second public open house on November 2, 2016. Feedback from the October PRAB meeting and the November open house have informed the final concept plan for the SCP redevelopment. ANALYSIS: Developing a final concept plan for the redevelopment of SCP that addresses the key community input findings from the AFP is difficult to achieve. Attempting to so is not wholly in alignment with the department master plan which seeks a balanced approach that does not singularly favor AGENDA ITEM #___V-A___PAGE___5____ a particular interest or group. The presented final concept plan achieves multiple outcomes by carefully balancing competing demands for space within a very limited site. The goals at the start of this project were developed based on the findings and recommendations of the AFP and the direction of the department master plan.  Balance lap swimming needs with open swim availability;  Provide amenities that are multi-generational and multi-use;  Upgrading existing facilities;  Illustrate partnership opportunities to leverage current funding; and  Incorporate sustainable and environmentally friendly measures where possible While there were several areas of community input that received significant feedback, generally most affirmed that the goals of the project were correct and that the plan achieved the goals. Site Opportunities and Constraints Scott Carpenter Park, as a whole, is highly utilized. The park accommodates many recreation activities such as large turf fields, a children’s playground, a skate board park and the Boulder Creek multi-use path. Similarly, the park is home to the department’s only 50-meter pool and the city’s only premier legion baseball facility. In addition to all the existing features of the park, a number of constraints limit future redevelopment for the pool including:  Limitations as to where and how development can occur in the 100-year floodplain;  Portions of the site are built on an old landfill. Historically, Scott Carpenter Park was also the site of a sewerage treatment facility;  An irrigation ditch is currently located where future pool redevelopment will likely occur;  The current layout of the parking lot is inefficient and presents many operational problems; and  The different amenities of the park are somewhat disconnected without any unifying themes, physical connections or architectural character. The site also has many opportunities that will greatly benefit and compliment the redevelopment of the pool including:  The park is centrally located within Boulder and served by many modes of transportation. It is readily accessible by multiple bus routes, the Boulder Creek multi-use path and roadways;  There are beautiful views of the Flatirons throughout the site and access to natural amenities like Boulder Creek; and  There is a dense, mature existing tree canopy. AGENDA ITEM #___V-A___PAGE___6____ Balancing the Feedback The final concept shared with the PRAB reflects the project team’s efforts to balance community engagement with the master plan, including policy direction and community values approved by the Board and City Council. With the SCP redevelopment, staff is proposing a balanced slate of amenities that will meet as many community demands as possible on the constrained site and with limited funds. As it relates to a few areas, this balance may not reflect the expressed wishes of a particular user group or community member. Warm Water Therapy Pool As a result of uncertainty related to operation of the Mapleton Therapy Pool (currently operating as the YMCA Sanitas Warm Water Pool), staff have received comments that express concern about investments in the SCP that do not include a therapy pool or concern with funding improvements at SCP over the development of a therapy pool. The department continues to provide a strong menu of warm water wellness opportunities at the East Boulder Community Center. The schedule has responded to the changing needs in the community and today includes 15 drop-in classes per week where anyone may join in the instructor-led exercises geared towards varying levels of fitness and ability and 13 hours a week of dedicated Adult Warm Water Wellness time, where adults can access the wellness pool for self-directed exercise. While not as warm nor as deep as a therapy pool, the current design of this pool allows for the flexible and balanced use that aligns with the department’s mission. In 2019, the department has allocated funding to enhance the EBCC leisure/wellness pool to provide additional space for warm water wellness. In addition, the proposed leisure pool features in the SCP concept plan include an area for deep water exercise. Lap Pool Lanes Several user groups and community members have expressed a desire for a 75ft. by 50m pool. This size would accommodate 10, 50m lanes or 21 cross-course lanes. The final concept reflects this option and anticipates implementing this in the initial construction phase. Staff proposes that this reflects a balanced solution, while also including leisure amenities which will achieve the desire for an outdoor family aquatics center and amenities for older youth and seniors. The incremental increase in lap lanes will contribute to a net increased in lap swimming lanes during the summer months. Year – Round Covered Pool Throughout several planning processes, the community has expressed a desire for additional, year-round lap swimming. The supply and demand analysis included in the AFP confirmed that in the months of October through May, demand for lap lanes exceeds supply in prime times and access to open lap swimming is limited to less than 50% during prime time. A retractable roof over the 50m pool would allow for year-round access while also providing the outdoor AGENDA ITEM #___V-A___PAGE___7____ swimming experience community members strongly supported during the community engagement process. Concept Plan The overall concept plan for the redevelopment of SCP (Attachment A) incorporates community, staff and stakeholder feedback. In its entirety, the plan for the pool facility represents what is desired most by the community, user groups and stakeholders. Phasing will need to occur in order not to exceed the anticipated $8 million budget identified in the 2017-2022 CIP. The overall concept plan includes a renovated bathhouse with additional area to fully support the use of the pool, administrative needs and other community functions. The overall plan would also accommodate a 21,000 sf retractable roof that would allow for year-round use by the community, thus allowing for greater access to lap lanes. The concept plan also includes a 10- lane, 50m lap pool, an element supported by a large segment of the community, user groups and stakeholders such as the BVSD. Additionally, this overall design illustrates a number of leisure elements that appeal to a wide cross-section of the community and include an area for deep water diving and exercise and children and youth activities such as climbing walls, a splash pad, and a zero-depth pool with play structures. A lazy river is also included as a leisure pool element. Select improvements covering other areas of the larger park are also considered as part of the overall concept plan including renovations to the existing skate park, playground, and parking lot. To accomplish as many of the project goals as possible within the anticipated budget, phasing will be necessary. The following sections identify the areas of the overall plan that can be developed as part of an initial phase and other areas of the plan that need to be considered as future phases as funding is identified. Unique to this type of project is that there are also elements of the overall concept plan that will require more immediate decisions. These parts of the design will need to be decided early in the detailed design process as they cannot be phased in at later points. AGENDA ITEM #___V-A___PAGE___8____ Initial Construction Phase The initial phase of construction plan incorporates as many of the findings of the AFP as possible within the budget that has been included in the department’s current capital program. It accomplishes the goals of the project without significant trade-offs or compromising the ability of the department to continue to provide high quality services and facilities in other areas of the parks and recreation system. A – Bathhouse: The bath house is the combination of a renovation of the existing 6,000 sf facility and the construction of a 1,000 sf addition to the existing structure. The renovation of the existing building includes upgrades to the locker rooms to meet current building codes and standards for accessibility. The additional 1,000 sf will accommodate new family locker rooms with ADA accessibility. It will also allow for a dual-facing concessions (concessions available to paid customers and general park users), maintenance space and administration rooms. Through the use of entry focal points, a concessions area that serves general park users as well as swimmers, and a unifying architectural theme, the bathhouse will be one of the main structures in the park. B – Lap Pool: The proposed pool is an 10-lane, 75ft x 50m pool with an east-west orientation. The pool will be programmed to facilitate dedicated lap swim, open lap swim, and open swim. Water depths for this pool are a consistent 6 to 7 feet to accommodate activities such as water polo and synchronized swimming. Diving boards are not included in the main pool. Diving boards are, however, accommodated as part of the leisure pool features. C – Leisure Elements: The overall concept plan illustrates proposed leisure pool features designed to accommodate a wide range of age groups. For children and youth these leisure elements include a zero-depth pool entry with play structures. Space theming is proposed to align with the park’s homage to Astronaut/Aquanaut Scott Carpenter and as reinforcement of Boulder’s unique history with the space sciences. For older youth, leisure features include an area for diving boards, climbing walls, log rolls and one tower slide. There are also elements that have a multi-generational appeal such as a deep water area for exercising, diving boards and a lazy river. Leisure elements in the initial phase of construction total approximately $2.3 million. The goal is still to achieve a balance of amenities across the design within this budget. Remaining items will be considered for future phases of the design as funds become available. D – General Park Elements: The preferred concept plan provides the opportunity to accommodate improvements to other areas of the pool or surrounding park such as providing improvements to the existing skate park including replacing the picnic table area, removing an existing graffiti wall, removal of some existing fencing and providing some new skate features. Other improvements include fencing, landscaping, lighting, and shade structures around the pool deck or leisure pool. AGENDA ITEM #___V-A___PAGE___9____ Future Construction Phases As with most capital projects, the long-term site redevelopment may need to occur in a phased approach depending on a variety of factors that could influence the project budget. The ultimate selection and phasing for SCP is conceptual and is based on project goals, community input, available funding, operations and maintenance costs and considering potential site constraints that will be determined through more detailed design. As mentioned, the initial construction phase will replace the lap pool increasing capacity from six to ten lanes, a renovated bathhouse with some additional building area to support the pool, leisure pool amenities to accommodate all ages and abilities, and some general park improvements. Below is a more detailed list outlining costs of project elements that will be explored in the final design as funding is available. C – Leisure Elements: The overall concept plan illustrates a variety of leisure pool features to accommodate a wide range of age groups and interests and amounts to approximately $2.3 million. Leisure pool elements such as the splash pad and the additional tower slide that are not installed as part of the initial construction phase can be phased in with other funding opportunities. D – General Park Elements: Additional site elements or improvements that can be phased in include additional structures to provide shade for pool users. Phased improvements to the existing playground include updates to existing structures (with the rocket ship to remain) and new safety surfacing. Others improvements that can be phased in include the complete renovation of the existing parking lot to accommodate more efficient flow of cars and increased parking. Future construction phases also include key elements that will need to be determined early in the detailed design of the facility and prior to the first phase of construction based on funding availability. The department will continue to have conversations with the community and relevant stakeholders going into detailed design. A – Bathhouse and Associated Retractable Roof: Additional opportunities that currently fall outside of the scope for the project include the provision of a 21,000 sf retractable roof that would allow year-round operation of the facility. Feedback from the community and other stakeholders indicated that a retractable roof is most viable with a 10 lane pool. A retractable roof is an element that could be phased in over time based on available funding. Accommodation for some components such as mechanical, electrical, and other building systems need to be accommodated early in the design phase. Additional Cost: approx. – $2.5 million Sustainable Design Approaches / Environmental Best Practices AGENDA ITEM #___V-A___PAGE___10____ The design of SCP and bathhouse considers a number of sustainable approaches and environmental best practices including the reuse and repurposing of existing buildings and building materials and specifying architectural features (i.e. solar photo voltaic, natural ventilation, natural daylighting, use of natural materials and plants) that take advantage of the site’s geographical location and local climate. Use of materials with low or no VOCs as well as highly recycled content and local distribution will also be considered when specifying products for the building and site. It also includes sustainable elements for the aquatics features and exploring the use of new technologies that can reduce the amount of chloramines. The use of water saving techniques and technologies are also considered in the design. All pool water features will be recirculating systems. Architectural building fixtures and landscape irrigation systems will incorporate low-flow/low-water use technologies. The site design will add connections to existing trails and bike parking that will encourage pedestrian access. Electric car charging stations and compact car parking will also be reviewed as options. Total Cost of Facility Operations Total cost of operation for a newly renovated pool facility, operated for a 4-month period (full summer period) are estimated to be approximately $850,000 and includes costs associated with staffing, utilities, pool chemicals and maintenance. Year-round operation and maintenance costs are estimated to be $1.7 million. NEXT STEPS: With the PRAB’s approval of the 2017 Concept Plan for the Scott Carpenter Pool Redevelopment, the team will make any necessary revisions to the concept plan and move forward with the development of detailed construction drawings. The development of detailed drawings will require the selection of an experienced consultant team through a Request for Qualifications (RFQ) or Request for Proposal (RFP) process consistent with the city’s purchasing and procurement requirements and is expected to be completed within the first quarter of 2017. Design and engineering for the renovation of the pool facility is expected to last for the majority of 2017. The department will update the PRAB on the progress of the plans development at strategic points in the process. While detailed schedules will be developed with the selected consultant, it is expected that full detailed drawings and plans will be completed in the fourth quarter of 2017 to allow for bidding in early 2018, with construction anticipated to begin with the closure of the pool in 2018. The department is also currently trying to determine what, if any, other purchasing methods may be available if an accelerated design and construction schedule is desired. The department will continue to have an open dialogue with the community, the PRAB, the BVSD, the PLAY Foundation, and other interested stakeholders to identify potential partnership AGENDA ITEM #___V-A___PAGE___11____ and alternative funding opportunities to help realize concept plan elements such as additional lap lanes, a covered pool and other park amenities that may not be able to be achieved in the initial construction phasing. ATTACHMENTS: Attachment A: Final Concept Plan for Scott Carpenter Pool Redevelopment OVERALL CONCEPT PLAN * Plans and drawings are conceptual only and represents general sizes and amenity options for prioritization. SITE PLAN SCALE: 1” = 60’-0” LEGEND POOL DECK POOLS GRASS AREA ILLUSTRATIVE ELEVATION SKETCH SCALE: NTS Amenity A - Building B - Lap Pool C - Family Elements D - Site Elements A B C D D D C EXISTING TREE NEW TREE PROJECT GOALS MET Balance Lap Swimming Needs with Open Swim Availability - 10 lane 50m converts to 21 lane, 25yd lap swim with bulk head allowing for flexible use Provide Multi-Generational Amenities that are Multi-Use - Deep water exercise areas - Tower slide, climbing walls, log rolls - Lap swimming and open swimming alternatives Upgrade Existing Facilities - Renovations and additions to the existing bathhouse to accommodate locker rooms, pool equipment, and administrative functions Illustrate Partnership Opportunities - Possible addition of 2 diving boards - Possible addition of retractable roof Incorporate Sustainable and Environmentally Friendly Design - Plan allows for inclusion of a variety of sustainable and environmental design opportunities 50 METER LAP POOL WITH BULK HEAD LAZY RIVER WITH NATURAL ROCK FEATURES SLIDE FROM BUILDING OPEN BREEZEWAY SHADE STRUCTURE PHASED ENLARGED CONCEPT PLAN * Plans and drawings are conceptual only and represents general sizes and amenity options for prioritization. SCALE: 1” = 30’-0” ENLARGED SITE PLAN LEGEND POOL DECK POOLS BATH HOUSE EXISTING TREE NEW TREE GRASS AREA FUTURE PHASES PROPOSED FEATURES Amenity Description of Initial Phase Elements Description of Future Phase Elements A - Building  6,000 SF Remodel of existing bathhouse and  1,500 SF Addition building addition  New ADA locker rooms/changing areas  Dual facing concession (open to paying customers and general park users)  pool and administration spaces  21,000 SF Retractable Roof B - Lap Pool  10 lane, 75ft x 50m lap swim (East-West Orientation)  21 lane, 25yd lap swim (North-South Orientation)  6ft to 7ft water depth  Diving boards in main pool (main pool depth increase to 12’) C - Leisure Elements  Deep water area for exercising, diving boards, climbing wall, log rolls  1 large tower slide  Multi-generational lazy river  Shallow water, zero-depth with play structures  Splash pad with interactive water jets  Second tower slide D - Site Elements  Improvements to existing park  Shade structures  Fencing and landscape  Renovations to existing parking lot  Updates to existing playground structures (rocket ship to remain) and safety surfacing  Additional shade structures VISIONING ZERO DEPTH ENTRY INTERACTIVE FEATURES DIVING EDUCATIONAL GROUND FEATURE SPACE SHIP CLIMBING WALL WATER FEATURE BUILT INTO NATURAL AND ARCHITECTURAL ELEMENTS 50 METER LAP POOL WITH BULK HEAD LAZY RIVER WITH NATURAL ROCK FEATURES LOG ROLL RETRACTABLE ROOF FOR FULL YEAR OPERATIONS WOOD WALL WITH METAL AND GREEN DETAILS GREEN SPACES SOFT EDGES WITH USABLE GREEN SPACE SHADE STRUCTURE CONNECTED TO THE BUILDING MASSAGE FOUNTAIN & FOCAL POINT SHADE STRUCTURE COVERED BIKE PARKING FAMILY BIKE PARKING SLIDE FROM BUILDING EXISTING PLAY GROUND AQUATICS INSPIRATIONAL IMAGES SCREENING AND SHADE STRUCTURES OPEN BREEZEWAY FOCAL POINT ENTRY ELEMENT MASSAGE FOUNTAIN & FOCAL POINT ROCKET WILL REMAIN SITE AND BUILDING INSPIRATIONAL IMAGES NATURAL DAYLIGHTING IN BLOCK WALL PATTERNED DAYLIGHTING NATURAL MATERIALS WITH TEXTURE WOOD AND CONCRETE AGENDA ITEM V-B_ PAGE 1__ C I T Y O F B O U L D E R PARKS AND RECREATION ADVISORY BOARD AGENDA ITEM MEETING DATE: January 23, 2017 AGENDA TITLE: Public Hearing and Consideration of a Motion to Approve the Final Concept Plan for the Boulder Reservoir Visitor Services Center PRESENTERS: Yvette Bowden, Director, Parks and Recreation Alison Rhodes, Deputy Director Jeff Haley, Planning, Design, and Community Engagement Manager Bryan Harding, Parks Planner EXECUTIVE SUMMARY: The purpose of this item is for the Parks and Recreation Advisory Board (PRAB) to conduct a public hearing and consider a motion to approve the final Boulder Reservoir Visitor Services Center Concept Plan (Concept Plan). The final Concept Plan can be found at the following link. The Boulder Reservoir (Reservoir) is one of the city’s premier recreation destinations and one of only eight reservoirs and lakes offering significant water-based recreation and boating opportunities along the Front Range corridor. The Reservoir sees roughly 300,000 visitors per year and hosts 35 large scale events with up to 25,000 participants annually. The most critical facility serving these visitors is the existing bath house and administration building, a building completed in 1983 that has reached the end of its useful life cycle. Staff has been working with the Farnsworth Group to develop a conceptual design for the replacement of the existing bath house and administration building as well as redevelopment of the surrounding landscape and associated guest amenities. The planning process for this project has been based upon public and staff engagement and has included input from a cross section of Boulder residents, Reservoir user groups, and the PRAB. The project team has incorporated this feedback into the final Visitor Services Center Concept Plan for review and approval by the PRAB. Upon PRAB approval of the plan, staff will move forward with detailed design, cost estimating and exploration of leveraged funding opportunities to implement the project. AGENDA ITEM V-B_ PAGE 2__ STAFF RECOMMENDATION: Suggested Motion Language: Staff requests the PRAB’s consideration of this matter and action in the form of the following motion: Motion to approve the final Boulder Reservoir Visitor Services Center Concept Plan. BACKGROUND: Planning Given the poor condition of the existing Administration and Bath House Facility as identified by the 2016 Facilities Strategic Plan, as well as opportunities to follow recommendations of the 2016 Boulder Reservoir Business Plan and achieve goals of the 2012 Boulder Reservoir Master Plan, staff initiated a planning and conceptual design project to develop a comprehensive concept plan for the replacement of the facility. Staff engaged the Farnsworth Group in the spring of 2016 to assist with project design, planning and stakeholder outreach for the development of a new Visitor Services Center. In May and June 2016, the Farnsworth Group conducted a series of interviews with city staff, ranging from design and planning staff to Reservoir operations and maintenance staff, with the goal of better understanding constraints and opportunities of the existing facility as well understanding desired program elements for a new facility. A programming meeting was held with department staff in June 2016 that established a project timeline, overall project requirements and a list of desired site improvements. Specifically, overall project requirements included: • Extending shoulder season use opportunities of the Boulder Reservoir Regional Park; • Establishing partnerships with various groups to expand programming and offset construction and operating costs; • Expanding concessions offerings with possibilities of obtaining a liquor license for the site and for exploring a partnership with a larger scale concessionaire; • Creating a “welcoming” and “family oriented” design character, promoting a healthy and athletic lifestyle, and focusing on sustainability of the facility; and • Creating multi-use spaces serving a variety of events across all generations of user groups. During this meeting, primary (required) and secondary (optional) program elements were determined including: Primary Program Elements  Staff offices;  Community meeting space;  Public locker rooms, rest rooms, showers and storage;  Concession area with kitchen and dining area;  Entry/reception space;  Breakout/training space; AGENDA ITEM V-B_ PAGE 3__  Service and maintenance area;  Pedestrian and city/emergency vehicle beach access; and  Life guard station. Secondary Program Elements  Promenade or boardwalk walkway;  Activity and event patio with shade structures;  Recreation activity area(s);  Overlook(s) to the beach;  Children’s play area; and  Overflow and event parking. Community and Staff Engagement Following the June meeting, the Farnsworth Group prepared three design concept alternatives for the new Visitor Services Center and surrounding landscape and amenity areas. Each concept included the same primary and secondary design elements, but presented the design elements in varying architectural styles, building program layouts and spatial arrangements of site amenities. These design concepts were presented at a public Open House in September and were posted online for public review and comment. The online comment period generated 94 submissions providing comments and feedback regarding the design alternatives. In October, the design alternatives were also presented to the Boulder Youth Opportunities Advisory Board (YOAB), a group of sixteen Boulder area high school students appointed by the City Manager who represent the city’s youth community. There were several recurring themes derived from public comments including:  An acknowledgement that existing facilities at the Reservoir are in poor condition and in need of replacement;  Relatively similar preference between each of the three design concepts indicating that each had individual merit;  A preference for a combination of the best aspects of each design concept into the final design;  A high priority preference design elements including the activity/event patio with shade structures, children’s play areas, recreation activity areas (fields or sport courts), and the promenade/boardwalk;  Preference for a family-friendly facility;  A need for alternative transportation options including public transit, bike racks and electric vehicle charging stations;  A desire for weather and sun protection;  A desire for nighttime and shoulder season hours and programming;  A desire for more direct access from parking areas; and  A desire to see an architectural style that respects the natural surroundings of the Reservoir while updating the aesthetic of the facilities. AGENDA ITEM V-B_ PAGE 4__ In October and November 2016, department staff, including Reservoir management and operations staff, held design charrette meetings with the Farnsworth Group to review the design alternatives, provide design feedback and provide direction for a Preferred Concept Plan. The Preferred Concept Plan was presented to the PRAB at its November 28, 2016 Business Meeting. PRAB comments on the plan included:  General support for the Preferred Concept Plan;  Concerns about the size and location of the staff offices, specifically that the staff offices appeared to be occupying a location that is better suited for public use;  A desire to ensure that sight lines to the play features ensure visibility and safety from multiple levels and areas of the facility;  A concern that wind loads are properly addressed through the design;  A desire to see renewable energy sources incorporated into the design;  A request to ensure that all facilities are ADA compliant and accessible;  Concerns about bathroom quantity and accessibility; and  A desire to see how the proposed facility compares to other similar regional facilities. Following the November 28 PRAB meeting, the Preferred Concept Plan was posted to the Reservoir webpage with an option to provide public comment on the plan. Additionally, an email notification of the website posting was sent to over 8,000 emails in the department database. The public comment period closed on January 5, 2017 and yielded sixteen responses. The majority of comments spoke positively of the new design noting the need for updating the facility. Several comments stated concerns that the new facility would result in fee increases that some already felt were high compared to other facilities. Other comments also spoke of a desire to see overall site improvements at the Reservoir such as boating facility access, the need for picnic shelters or additional bathroom locations. Such requests will be addressed in the upcoming South Shore Site Planning effort for the 76-acre area surrounding the Visitor Services Center. ANALYSIS Design Response to Feedback Received Given the primarily positive feedback regarding the Preferred Concept Plan by the PRAB and the public, the final Concept Plan bears many resemblances to its predecessor. However, some key alterations were made to the design in response to comments received and to the financial realities of the project. In response to PRAB comments about the prioritization of public space over staff facilities, all staff office spaces were moved to the west side of the structure, prioritizing the east side of the facility with reservoir views and direct access to the public plaza entirely for public use. This design change also results in a more efficient and welcoming visitor experience allowing guests to access the dining and concessions space directly from the entry vestibule or from the plaza without passing through staff spaces. It also provides the added benefits of providing opportunities for close interaction between staff and the public and allows for shared bathroom and meeting room spaces, resulting in added space efficiency and construction cost reduction. AGENDA ITEM V-B_ PAGE 5__ Regarding concerns about the high wind potential near the Reservoir, the buildings, site walls and landscaping have been placed to create public areas that are protected from the prevailing winds. Specific wind loads will be addressed through the upcoming design development and construction document preparation processes and all design features will be engineered to respond to the area’s high wind potential. Sustainability will also be a key aspect of the facility and will be addressed not only through the addition of solar power to the facility, but also through the use of sustainable building products and construction methods, where possible. Wind turbines will not be used on site out of concern for area bird populations. Regarding accessibility, the site includes a roughly 10-foot grade change between the plaza level and the beach level with access between levels provided by two access ramps offering direct routes from level to level. The first originates near the south overlook and is incorporated into the children’s play area at the beach level. The second access ramp is near the north overlook and lifeguard station. An additional family and ADA accessible restroom will be added to the lifeguard station for convenient beach level access. Throughout the design, access and circulation is designed to accommodate “loop circulation” for pedestrians and wheel chairs alike with a ¼ mile distance for one lap around the facility. The current design also includes the addition of a beach level public restroom at the lifeguard station responding to desires for ADA access and for additional restroom locations. Regarding the PRAB’s desire to better understand how the existing and proposed facilities at the Reservoir compare with other similar regional facilities, staff has prepared a summary exhibit illustrating base facilities and services at eight Front Range water- based recreation and boating facilities including the Reservoir (Attachment A). The comparison reveals that though the Reservoir is the smallest of the region’s facilities, it offers a comparable or greater range of facilities and services than most other locations. It is important to note that while the proposed facility seeks to extend the use of the Reservoir into the shoulder seasons of spring and fall, it is not intended to greatly increase existing activity and visitor numbers. Rather, this design aims to respond to existing use levels with a modern facility that better reflects the expectations of the public and user groups. Final Concept Plan The final Visitor Services Center Concept Plan features a 7,500 sq. ft. facility including a bath house building, an administration/dining/concessions building, a future flexible event and meeting space and a new lifeguard station. The architectural character of the facility is designed to reflect the forms established by the recently constructed entry gate structures of the facility that in turn mimic the Flatirons to the west. The facades of the structures will utilize native materials such as wood and stone, while also reflecting a more modern aesthetic in the use of colored concrete and glass walls providing views west to the Flatirons and east to the reservoir. The new Visitor Services Center structures will be located on an arc that envelopes a large outdoor dining and events plaza while also providing a more secluded private event AGENDA ITEM V-B_ PAGE 6__ and rental patio on the north end. The buildings are separated from one another by a central entry vestibule creating the ability to operate together at high season capacity, or to be operated independently during low season months. The separated design option also serves to reduce maintenance costs and increase long term durability by isolating sand and mud from the changing areas to the bath house structure. Guests at the Reservoir will enter the facility from the west via the existing parking lot or a newly created drop-off area. A central walkway provides direct access from the parking lots to the bath house and administration/dining/concessions buildings. These structures are connected by an enclosed vestibule offering protection from the wind, a location for the posting of Reservoir information and serving as a gateway from the parking area to the facility. Upon entering the vestibule, guests have the option to enter the bath house, which is proposed to include storage, locker rooms and restrooms, the main administration building or proceed directly through to the main plaza or beach area. The administration building is proposed to be the center of guest and staff services, providing staff office spaces, a public dining area with both indoor and outdoor dining options, a concessions kitchen and bathroom and meeting spaces shared between staff and the public. On the north end of the building a future revenue generating, flexible space will be capable of hosting large group meetings and events. This space could be complimented by roof deck area that could be utilized as a secondary event or rental space. Staff is currently exploring possibilities for a long-term partnership to share construction and operational costs of these spaces. Surrounding the administration and bath house buildings will be an entirely redeveloped site and landscape designed to improve the guest experience, offer enhanced opportunities for events and partnerships and extend the season of the Reservoir facilities into the spring and fall. At the center of this redevelopment is the main plaza and event space on the east side of the new facility. This space is designed to maximize views of the Reservoir while offering space for outdoor dining and relaxation, a children’s play area and a plaza for hosting events. On the north end of the plaza, a more secluded flexible patio space could be provided for event and gathering use. This patio area is located to maximize views from the Flatirons to the Reservoir and to take advantage of nearby parking and service access for events. Between the plaza and the beach level below, low walls will retain the grade while “stepping down” to the beach level to create an amphitheater-like space that could be used for outdoor movies, music or general seating. At the mid-level terrace between the patio and the beach, the design is highlighted by a boardwalk/promenade that meanders from south to north providing beach views, beach access and seating areas along the way. ADA access is provided via walking paths on the north and south ends of the main plaza that combine to double as a measured circuit walking path around the facility. At the beach level, a new playground area will be added allowing for direct access to and from the beach area as well as from the main plaza. A new lifeguard station on the north end of the facility will provide for lifeguard office and storage space and will include a new beach level family restroom. Finally, at the south end of the facility, existing event AGENDA ITEM V-B_ PAGE 7__ staging areas will benefit from closer proximity to the new facility compared with the more distant location of the existing facility. Project Phasing The Visitor Services Center Conceptual Plan includes a depiction of the potential long- term full-build of the facility. Implementation will occur in phases based on available funding. Throughout the process, cost estimates for the facility will be refined to provide the best range of services as funding becomes available. Essential guest and staff services will be prioritized for early phases of construction. The current 2017-2022 Capital Investment Program (CIP) allocates a total of $3 million for construction of the new facility and associated features. Staff is currently reviewing options to increase available funding through the CIP process and leveraged partnerships. Construction of the facility is anticipated to take place in two phases, the first of which prioritizes design elements that provide essential visitor and staff services, and the second of which will be dependent upon future partnerships for completion. Preliminary project costs are being developed and will be presented at the January 23, 2017 PRAB meeting. Phase 1 Construction The first phase of construction is intended to continue to provide all essential Reservoir services including the bathhouse, dining and concessions area, and staff offices in new, modern spaces that reflect the Reservoir’s unique position as a regional recreation facility and that better reflect the community’s pride in its recreation amenities. In addition to essential facilities, this initial investment allows for the construction of a central plaza for outdoor enjoyment of the facility as well as outdoor dining space, events space, shade structures, children’s play areas, a boardwalk/promenade, an amphitheater, an enhanced beachfront area, and a new life guard station with public restroom at the beach level. Because future phases of construction are not guaranteed, Phase 1 work will be undertaken as a cohesive, completed project that will operate independently and be aesthetically independent from any future phases of work. The Phase 1 scope has also been designed to integrate with future phases of work and infrastructure to allow for seamless connections to any future facilities. Phase 2 Construction The second phase of work includes the construction of a roughly 2,250 sq. ft. flexible event and meeting space and is dependent upon a mutual agreement with a third party vendor for sharing of construction and operational costs. This space is intended to include a commercial concessions kitchen that could be operated daily serving Reservoir guests or as an events space for occasions such as meetings, weddings, and other large gatherings. The events space has been sited on the north side of the Phase 1 facility construction to allow for independent phasing and operation of the facility with minimal impacts to daily visitor services and staff operations. This location also provides a more private space for events and will include a private west facing patio to serve group gatherings and an extension of the main plaza on the east side of the facility to serve as a public gathering and dining space. The events space will be supported by existing nearby parking and service access that is separate from the main daily visitor parking lot. AGENDA ITEM V-B_ PAGE 8__ The Parks and Recreation Department is actively exploring possibilities for partnerships to develop this phase of work. Final design details for this space will be explored if a viable partnership is identified, but will be designed to seamlessly integrate with the Phase 1 facility while allowing opportunities for vendor customization. Future South Shore Management Area Planning In addition to planning for the Visitor Services Center, staff recognizes the need for a comprehensive site plan to address the entire South Shore area of the Reservoir as recommended by the Boulder Reservoir Master Plan. South Shore planning efforts will begin in 2017, but the Visitor Services Center is a critical facility for daily operations of the Reservoir and staff has proceeded with the design of this facility ahead of the South Shore planning to minimize interruptions to the visitor experience and to maintain essential guest services. Seamless integration of the Visitor Services Center design into plans for the South Shore will be a primary goal of that planning effort. NEXT STEPS: With the PRAB’s approval of the Conceptual Plan for the facility, the project team will make any necessary revisions to the concept plan and move forward with the development of detailed construction drawings. The development of detailed drawings will require the selection of an experienced consultant team. Selection of a consultant team will be through a Request for Qualifications (RFQ) or Request for Proposals (RFP) process consistent with the city’s purchasing and procurement requirements. This process is expected to start and be completed within the first quarter of 2017. Design and engineering of the structures and surrounding landscape is expected to commence in the spring of 2017 and continue through the fall of 2017. Detailed schedules will be developed with the project consultant team, though it is anticipated that detailed drawings and plans will be completed in third quarter 2017 to allow for bidding in late 2017. Construction is anticipated to begin in early 2018 with opening of the facility proposed for the start of the 2018 Reservoir summer season. The department will update the PRAB on the progress of the design development and future construction at strategic points in the process. The department will continue to promote an open dialogue with the community, Reservoir user groups, the PRAB and other interested stakeholders to identify potential partnerships and alternative funding opportunities to help realize the full build-out of the facility that may not be possible in the initial construction phasing. Attachments: Attachment A: Front Range Water-Based Recreation and Boating Facility Comparison ATTACHMENT A Facility Location Water Body Area Surrounding Public Land Annual Visitors Entrance Fee Full Service Marina Event Facility Motorized Boat Rentals Non-Motorized Rentals Mooring Slips Concessions Restaurant Camping Clubs and Camps Additional Activities Advertised Other Barr Lake (State Park) Brighton 1937 acres 778 acres 120,000 $7/vehicle daily fee No No No No No No No No No Yes boating, fishing, hunting, biking, horseback riding, bird watching nature center on site, no motorized boating, managed for water storage and wildlife Boulder Reservoir Boulder 700 acres 735 acres 300,000 $7/person daily fee Yes No No Yes Yes No Yes No No Yes boating, picnicking, water skiing, swimming 35 special events per year Boyd Lake (State Park) Loveland 1700 acres 361 acres 400,000 $8/vehicle daily fee Yes No Yes Yes Yes Yes Yes No Yes Yes boating, nature activities, swimming, fishing, picnicking Carter Lake Larimer County 1100 acres 1000 acres No data available $7/ vehicle daily, $75 annual pass Yes No Yes Yes Yes Yes No Nearby Yes Yes fishing, boating, camping, picnicking, swimming, water skiing, rock climbing, hiking, diving Chatfield Reservoir (State Park) Littleton 1500 acres 1479 acres 1.5 million $8/vehicle daily fee Yes No Yes Yes Yes Yes Yes On site Yes Yes model air park, hot air balloon port, stables, fishing, swimming, camping Cherry Creek Reservoir (State Park) Aurora 850 acres 4200 acres 1.7 million $9/vehicle daily fee Yes Yes Yes Yes Yes Yes Yes No Yes Yes model air park, nature study, horseback riding, camping, boating, fishing, swim beach amphitheater, shooting range, stables, trails Horsetooth Reservoir Larimer County 2040 acres 1900 acres 500,000+ $7 daily/ vehicle, $75 annual pass Yes No Yes Yes Yes Yes No Nearby Yes Yes fishing, boating, camping, picnicking, swimming, water skiing, rock climbing Standley Lake Westminster 1063 acres 1937 acres 75,000 $7/vehicle daily fee No No No Yes No No No No Yes Yes 500 powerboat permits per year, no swimming, managed for water quality and storage nature center on site Union Reservoir Longmont 736 acres Minimal 170,000 $8/vehicle daily fee No No No Yes No No No No Yes Yes boating, fishing, picnicking, swimming, volleyball FRONT RANGE WATER-BASED RECREATION AND BOATING FACILITY COMPARISON 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 TO: Parks and Recreation Advisory Board FROM: Yvette Bowden, Director, Parks and Recreation Department Ali Rhodes, Deputy Director Jeff Haley, Planning, Design and Community Engagement Manager SUBJECT: Matters from the Department DATE: January 23, 2016 A. Rules Regarding Slacklining and Permitting Slacklining Only in Designated Locations. Slacklining is a sport that has gained popularity in recent years and is enjoyed by people of all ages and demographics. The sport involves affixing a wide piece of nylon webbing between two points and the participant walking across the line by balancing. It is a sport that can be practiced virtually anywhere there is a sturdy post or tree upon which to affix a line and builds strength, flexibility and balance in addition to just being fun. Currently, the activity is illegal in the City of Boulder simply because existing ordinances prevent items from being attached to trees. Slacklining, however, can be done in a manner that is not only safe, but also does not harm trees. In 2016, staff worked closely with a community group of slackliners. By working with the community and exploring rules and protocol from other communities, the city has developed a proposed rule change that will allow safe slacklining in designated park locations. A notice regarding the proposed ruling allowed the public to provide feedback comment through December 22, 2016. Pending final approval by the City Manager, slacklining would be available in Scott Carpenter, Martin, Howard Hueston, North Boulder and Bear Creek parks on trees selected by the City Forester and participants would be required to use proper gear to ensure protection of the tree. In January, the ordinance will be updated depending on the outcome of the ruling. A city-developed slackline course is currently under consideration at Tantra Park in south Boulder. The park development will consist of an area that contains a small area with posts that can be used in place of trees. This approach is currently used in other communities and provides an opportunity for community members to practice and build their slacklining skills. 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 B. 2016/17 Neighborhood Park Renovations (Arapahoe Ridge, Howard Heuston and Tantra Parks) The department’s 2016-17 annual Capital Improvement Program (CIP) identified Arapahoe Ridge, Howard Heuston and Tantra Parks as priorities for funding. All three parks were originally constructed in the early 1970s with two constructed in part through a grant from the Land and Water Conservation Fund. Although some minor improvements and repairs have been made over the last forty years, the playgrounds and surrounding areas are in need of major renovation to meet current industry standards. The main improvements identified were:  Replacement of aging playground equipment;  Upgrading play area surfaces;  Improving accessibility;  Renovating or adding shade structures; and  Full or partial irrigation replacement. Public meetings held in June and July 2016 gave community members the opportunity to comment and provide feedback on the three concept design alternatives developed for each park. Additionally, each design was posted on the department’s website for further on-line review and comment. Based on feedback received from the public, a preferred hybrid concept plan was developed for each sited using various elements of the original alternatives. The preferred plans were presented to the community for review and comment at community meetings held in August and October, 2016. All three preferred hybrid plans received support from the surrounding neighbors in attendance and online. Arapahoe Ridge Park An initial analysis of the Arapahoe Ridge Park indicated how iconic the rock feature is to the neighborhood. Feedback from the community meeting in June 2016, as well as emails received from neighbors, confirmed this assessment. The planning process presented an opportunity to make a comprehensive evaluation of the unique amenity by a structural engineer, landscape architect, staff certified playground safety inspector and risk management staff. The consultants recommend that, based on the elements age and the variance in construction standards regarding the types of concrete and load bearing minimums from the 1970s to today, some modifications to the existing structure would provide an opportunity to extend the life of the amenity by reinforcing and refurbishing the existing structure. Additional play elements shown on the Arapahoe Ridge Park Plan are intended to build upon the play style of the beloved rock structure. 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 Howard Heuston Park Howard Heuston Park renovation discussions created a unique opportunity to work with a large population of underserved neighbors and a high concentration of residents in multi- family units. Since traditional community meetings and digital outreach were less effective outreach methods in this neighborhood, a new outreach strategy was developed whereby community partner, FC Boulder, a local youth soccer organization, teamed up with staff to build community through soccer-related events. Free soccer clinics, games and food were provided on a Saturday afternoon along with an interpreter-supported presentation of park renovation plans. The effort proved to be more successful than previous outreach strategies and provided support and interest for the Howard Heuston Park Plan. 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 Tantra Park Tantra Park renovation includes a unique opportunity to work with the community in a fundraising capacity. Along with indicating an interest in potential changes to local slacklining regulations regarding public trees, the community has expressed interest in establishing a small slackline course at Tantra Park. The idea of a slackline course, consisting of approximately four steel poles, was accepted by the neighbors while community partner, Slackline Industries, is in the process of developing a fundraising campaign in 2017 to help support the installation in conjunction with other Tantra Park Plan construction. 3198 Broadway, Boulder, CO 80304 | www.boulderparks-rec.org | O: 303-413-7200 The consultant team is currently working on combined construction drawings for the three park renovations. The intent is to bid the parks together to take advantage of common construction details, bid efficiency and economies of scale related to construction. One general contractor will be retained to construct all three parks. Bidding is expected to occur in February 2017 with construction beginning in spring 2017 and project completion occurring by spring 2018. PRAB 2017 Action Plan The primary purpose is to enhance the ability of PRAB to provide leadership to the department, engage the community and build a strong, healthy parks and recreation and parks level of service that meets the community’s goals. Category PRAB Goal Action Items Notes 1) Building Community and Relationships • Enhance PRAB Community Outreach and Accessibility • Enhance and Reinforce Opportunities in P&R • Attend on average two P&R community activities per quarter • Promote P&R through social media of your choice • Attend site tours as scheduled in advanced of PRAB discussions/decisions • Support the department in an advisory capacity on partnership initiatives • Continue report out at monthly business meetings • Staff to share communication methods (such as social media accounts and hashtags) 2) Community Engagement • Providing Welcoming and Accessible Community Involvement • Continue annual information sessions on service reach and access (e.g. related to services for youth, underserved, etc.). • Identify ways for PRAB to support engagement and outreach efforts • Implement best practices for communication materials to reach a broad audience. 3) Organizational Readiness • Capacity Building of PRAB Members • Assign new PRAB members a PRAB mentor to help them understand board culture, working agreements, etc. • Onboard new PRAB members (department structure, CIP funding/process) • Communicate clear understanding of “charge” of the PRAB and responsibilities of Board membership • Appreciation of PRAB’s role related to Council communication, joint board conversations, and citywide initiatives.