HomeMy WebLinkAbout6-22-2015 Complete WRAB PacketWATER RESOURCES ADVISORY BOARD MEETING MEETING DATE: Monday, 22 June 2015 MEETING TIME: 7:00 p.m. MEETING LOCATION: Municipal Services Center, 5050 Pearl St., Boulder, CO 80301 Agenda Highlights: 1. Call to Order (7:00 p.m.) 2. Approval of 18 May Meeting Minutes (7:01 p.m.) 3. *Public comment (7:05 p.m.) 4. *Public Hearing and Consideration of a Recommendation to City Council Regarding the 2016 Utilities (Water, Wastewater, and Stormwater /Flood Management) 6 -year Capital Improvement Program (CIP) (7:15 p.m.) 5. *Public Hearing and Consideration of a Motion Regarding the Utility Rates Study Guiding Principles, Issues, and Key Questions (7:45 p.m.) 6. Matters (8:45 p.m.) • From Board • From Staff 7. Discussion of Future Schedule (8:55 p.m.) 8. Adjournment (9:00 p.m.) * Public Comment Item Agenda item times are approximate. Information: • Please contact the WRAB Secretary email group at: WRABSecretary @bouldercolorado.gov • Packets are available on -line at: http : / /www.bouldercolorado.gov —A to Z. Water Resources Advisory Board (WRAB), Next Water Resources Advisory Board Meeting CITY OF BOULDER, COLORADO BOARDS AND COMMISSIONS MEETING MINUTES Name of Board / Commission: Water Resources Advisory Board Date of Meeting: 18 May 2015 Contact Information of Person Preparing Minutes: Andrea Flanagan 303.413.7372 Board Members Present: Vicki Scharnhorst, Dan Johnson, Lesley Smith Board Members Absent: Ed Clancy, Mark Squillace Staff Present: Jeff Arthur, Director of Public Works for Utilities Joe Taddeucci, Water Resources Manager Bob Harberg, Principal Engineer Douglas Sullivan, Acting Principal Engineer for Water, Wastewater and Stormwater Russ Sands, Watershed Sustainability & Outreach Supervisor Kurt Bauer, Engineering Project Manager Annie Noble, Flood and Greenways Engineering Program Coordinator Katie Knapp, Engineering Project Manager Kristin Dean, Utilities Planner Ken Baird, Utilities Financial Manager Andrea Flanagan, Board Secretary Cooperating Agencies Present: Craig Jacobson, Consultant with ICON Engineering, Inc. Alan Turner, Senior Project Manager, CH2M HILL Shea Thomas, Urban Drainage and Flood Control District Meeting Type: Regular Agenda Item 1— Call to Order [7:00 .m.] Agenda Item 2 — Approval of the 27 April 2115 Meeting Minutes [7:01 p.m.] Motion to approve minutes from April 27 as presented. Vote: Tabled until a quorum is met (Ed Clancy & Mark Squillace absent; Leslie Smith absent at April 27 meeting.) Agenda Item 3 — Public Participation and Comment [7:02 p.m.] Public Comment: None Agenda Item 4 — [7:04 p.m.] Public Hearing and Consideration of a Recommendation to City Council Regarding the Skunk Creek, Bluebell Canyon Creek and King's Gulch Floodplain Mapping Update Katie Knapp and Utilities staff presented the item to the board. Executive Summary from the Packet Materials: Agenda Item 4— [7:04 p.m.] Public Hearing and Consideration of a Recommendation to City Council Regarding the Skunk Creek, Bluebell Canyon Creek and King's Gulch Floodplain Mapping Update Katie Knapp and Utilities staff presented the item to the board. Executive Summary from the Packet Materials: Floodplain mapping provides the basis for flood management by identifying the areas at the highest risk of flooding. This information is essential for determining areas where life safety is threatened and property damage is likely and is the basis for floodplain regulations and the National Flood Insurance Program (NFIP). The city's floodplain maps need to be periodically updated to reflect changes in the floodplain resulting from land development, flood mitigation improvements, new topographic mapping information and new mapping study technologies. The Skunk Creek Floodplain Mapping Update includes the King's Gulch, Skunk and Bluebell Canyon Creek floodplains between the city limits to east of Foothills Parkway where Skunk Creek confluences into Bear Canyon Creek. WRAB Minutes 18 May 2015 Page No. 1 Engineering consultants provided hydraulic modeling to update the existing Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) and City of Boulder floodplains, water surface elevations, conveyance and high hazard zones. Engineering consultants provided hydraulic modeling to update the existing Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) and City of Boulder floodplains, water surface elevations, conveyance and high hazard zones. The proposed mapping of the Skunk Creek Floodplain would result in a net: • Increase of 38 structures identified in the 100 -year floodplain; • Decrease of 22 structures identified in the conveyance zone and; • Decrease of 19 structures identified in the high hazard zone. WRAB Discussion Included: • Question about ICON report. Stated there seems that there inconsistencies in the report. • Request for further clarification regarding Anderson report, "approximate studies" means in the peer review summary c • Question regarding additional hydraulic modeling regardin; • Question regarding the difference in the number of structur • Question regarding adjustments done by ICON and if there after the peer review. • Question about grade changes on Mariposa and how they d how much the flood event actually moved. • Question about whether the peer - reviewed comments made Anderson in order to help answer questions proposed by co Public Comment: sere a.lot of comments about iot quite understood what this report, software for culvert analysis program. ; that were in the floodblain. ✓ere differences quite fit with comments about ICON have been reviewed by Christina Jurgens Concerned that too much of the water from Bluebell Canyon Creek is mapped that it flowed down Columbine, rather than where it was actually observed during flood. Concern that there are errors in proposed flood map that misrepresent the risk to her property and possibly other properties. Regarding item 53, which points out in the peer review that flood maps need to follow topography, question of syntheses of two kinds of mapping and worried about errors in representation of potential risk. Worried that proposed map represents inaccuracies that present risk. Residents have not heard of any structures that were flooded in this particular section. Asks why the proposed floods from Bluebell Canyon Creek to Mariposa, from 16 to 17 smaller than the northward flows at 18 and 19 t h? Seems by looking at it, they should be more similar to each other. Feels this is a mistake. What method was used to determine the split at 20 and Columbine? Beth Robinson Noticed big difference this time in the conveyance zone on her block. Several people are constructing drainage pipes from the back conveyance zones to the front of the street from the easement at the back of the property. This will impact at least one property owner on the block, who is not able to rebuild without extensive regrading. Kris Miller Home has been in 100 year flood zone since moved in 2006 and has contacted the city multiple times to state that they should not be. Was told by city that all studies were approximate at that time and no official mapping was done. Was told in 2012 that a "real study" would be conducted and in April 2013, was informed by city that they were going to be taken out of the flood zone with this study, but it is a long process. She and neighbor were not flooded during the 2013 event. Lives on the corner and the flood jumped the banks and flooded south on Mariposa instead and flood didn't even go near her property. When she called again she was told that she was still in the floodplain. Concerned about the study. The flood actually occurred south of her property. Would like to know what happened and why she is still in the flood zone when the flood didn't affect her property? WRAB Minutes 18 May 2015 Page No. 2 R Chris Roark Asked whether it was taken into account that there is a bridge at lower McClintock that significantly diverted water during the flood event, which washed out and ended up on his property. Bridge is no longer there and is not going to be replaced. Will this be considered in the flood mapping? Ali Yager Lives at the corner of 20 and Mariposa. All the water at 15 came down Mariposa and wants to know what the city can or should do to deal with the water that jumps onto Mariposa? Maintenance of Bluebell Creek between Mariposa and Columbine, which theoretically is where the water should go. Question is about maintenance of the systems that should be carrying water, which are not working properly. Motion by: Scharnhorst; Seconded by: Johnson Vote: 3:0 (Ed Clancy, Mark Squillace absent) Motion Passes as amended Staff requests Water Resources Advisory Board consideration of following motion: Based upon concurrence from Anderson regarding recommend that City Council adopt the Skunk Cre floodplain mapping update. Agenda Item 5 - Public Hearing and Consideration of a Boulder Creek Floodplain Mitigation I Kristin Dean, Kurt Bauer and Utilities staff Executive Summary from the Packet Materials A Recommended Plan for flood mitigation along Resources Advisory Board (WRAB), Open Space Session in 2014. The Recommended Plan was co Phase L Regional detention facility at US 3 Phase IL West Vallev improvements. and. detention. to is matter and action in the form of the muses to the peer review, we move to Canyon Creek and King's Gulch [7:42 p.m.] Regarding the South ) ulder Creek was presented to the public, Water if Trustees (OSBT) and City Council at a Study of three phases: In 2014, the WRAB and City Council were generally supportive of the mitigation proposed under Phases II and 111. The OSBT also indicated their support for Phases II and III as it was not seen to have effects on city open space properties. However, significant concern was voiced by both boards and by City Council regarding potential environmental impacts, including those to Open Space and Mountain Parks (OSMP) lands from the proposed US 36 regional stormwater detention facility (Phase 1). As a result, staff was directed to evaluate other options, including potential use of a larger portion of the University of Colorado's CU South property to shift impacts away from environmentally sensitive areas. Since then, six additional options were developed for US 36 detention, all designed to prevent the overtopping of US 36 during a 100 -year design storm and reduce flooding impacts downstream and each with fewer impacts to OSMP than the original proposal. This memorandum presents the US 36 regional detention options, a comparison of potential impacts to OSMP and CU lands and a summary of potential next steps. Staff is recommending that the Phases II and III concepts remain unchanged in the mitigation master plan and that Phase I be accomplished using Colorado Department of Transportation (CDOT) Right of Way (ROW) and CU Campus South (Option D) for construction of a regional stormwater detention facility at US 36. In this alternative, the berm would be located within the existing CDOT right of way, and, with the exception of potential temporary impacts from construction of the berm, OSMP lands would only be affected when stormwaters are retained. Each of the additional options have a greater impact on CU's land than the plan that was presented in 2014. However, while CU prefers the 2014 plan, they have also indicated they are willing to discuss use of their land to facilitate the implementation of Option D for regional detention. WRAB Minutes 18 May 2015 Page No. 3 WRAB Discussion Included: • Question about cost estimates of property acquisition and property access rights and if they are included in the study? • Statement that this seems to be a lot of embankment, which probably makes for significant cost relative to storage. • Questioned how many acre feet is the storage for the proposed alternative and what are differences between the options? • Stated that most of the concerns were about open space and possibly may hit a brick wall. Stated that pleased with the many options that came forward and that the resources were protected. • Questioned if counts were taken of population of prebble mice in open space? • Questioned how option D compares to the flood event in 2013? • Commented that pleased with the engagement between CU and the city to discuss this topic. • Stated that option D will require working with CU and CDOT. Asks what neat steps are after voting on this item. • Asked about timeline for CEAP projects? • Asked for more information about liability concerns presented by public comment. • Questioned level of confidence by staff that option D can be successful in the environmental planning process. Public Comment: Pete Palmer Retired professor of geology and has lived in Boulder for almost 35 years. As an earth scientist, he recognizes global warming and the associated increase in the frequency of extreme weather events. As global temperatures rise, so does probability of these extreme weather events. Entering El Nino period, where warming is a known consequence. Likelihood of repeat of 2013 flood event is significantly higher than the 100 -year to 500 -year events anticipated in earlier planning. Supports South Boulder Creek Action Group and urges that we speed up Highway 36 flood mitigation efforts. Karl Anuta Map is disarming, appears that Cr Represents Frasier Meadows resik system south of US 36. Option D about the process taking 5 years, i as fast as possible and please ask i Dick to south side of US 36 to keep f chair during flood n such positive out urrd. Encourages prevent this from in her wheel not have bee fatalities occ a structure to support of his for area is really bad, but what is really bad is Foothills Parkway. again asks that Board support some kind of flood retention to be really good. Lives must be considered. Very concerned 1 worry residents for another 5 years. Urges that we move ahead rasier Meadows Retirement Community. Supports efforts to add berm I waters out of neighborhood. Wife was pushed through 2 feet of mud t. If it weren't for a series of miraculous events that night, there might e. People would have drowned in parking garage. Fortunate that no ird to approve the South Boulder Creek Action Group's motion to build erring in the future. Asks residents of Frasier Meadows to stand in did). Bob Ritzen Director of Care at Frasier Meadows. Series of miraculous events happened that day. Flooding happened in the afternoon and staff stayed to assist. Evacuated skilled nursing area, which housed memory care residents, many of whom have low beds. Water rose quickly in this area and residents were evacuated very quickly. Staff and others pulled together to move residents to safety, without injuries. Residents move there thinking they are secure. Recent visitor from disaster relief visited and asked how many residents died after the event. Encourages as much haste as possible from the Board to make a decision for flood mitigation. Does not want to worry about the safety of residents every time it rains. Peter Baston Company runs programs for large insurance companies that insure projects like this. Spoke with CDOT and asked what mitigation upgrades are being proposed for US 36, without which Boulder cannot be a resilient city? Was told that it was going to be left up to the City of Boulder on the South Boulder Creek WRAB Minutes 18 May 2015 Page No. 4 Project, which means that CDOT has dumped liability on the city. If anything happens with any flood mitigation, the city will be held liable. Encourages as part of due diligence to understand the liabilities involved in what is being accepted and how this effects the city's resiliency. Jeff McWhirter President of Southeast Boulder Neighborhood Association. Ironic that his community did not get hit as badly as Frasier Meadows. Lucky in that respect. South Boulder Creek did not overtop, just many sewage back -up issues. Should be noted that this is not even the big 100 -year flood. This was unique because there were 36 hours of notice. Also concerned with long -term impacts. Supports overall mitigation efforts. Continues to bring up questions about west valley improvements. What is going to happen with the piping of dry creek ditch and detention pond? Under impression that specific details of the plan will be considered during this EAR Wants to make sure that everyone is on the same plan as we move into the future. Tim Johnson CEO at Frasier meadows. Can't speak to how many Prebble (mice) lives were lost. Can speak to lives that were not lost at Frasier. Speaks to importance of human life, which he would love for the Board to talk about, along with the mice and plant life. Appreciates the Board listening to this community. Makes an emotional plea that any consideration be made be done so on an expedited time frame. Residents are living in fear of a repeat flood. Residents are concerned with recent rain events. Staff have been checking around the clock and have begun plamung for evacuation, should the need arise. The thought of doing this for the neat five years is beyond comprehension. For the sake and safety of Frasier and nearby residents, please act with dispatch Rick Mahon Represents South Boulder Creek Action Group. Thanks staff for responding to 99% of these issues. States that the berm height is a non - issue. Life - safety factor is beyond measurable. CU is interested in alternatives. Please speed this along. Kathie Joyner With South Boulder Creek Action Gro edge and worried that a future rain eve responsible for providing relief. Encoi quickly as possible to ensure safety of of hands from all people in audience Steve Kar akitsios The plan has been sti over and need to just CU and CDOT. Enc Weather makes everyone very, very nervous. Everyone is on ire going to overtop US 36. Needs to know that the city is -s Board to recommend to Council that we move forward as - sidents in the South Boulder Creek floodplain. Asks for a show oncur with this tvpe of reccomendation. 1 asks that a recommendation be made. "Analysis paralysis" is a reccomendation. Option D looks like the best resolution with pedite as much as possible. David McGuire Impact potential for construction, encourages staff to compare scope and duration of impacts with some of the other impacts on Open Space. Not a very big difference. No one bought into the area knowing they were going to be flooded when homes were bought 30 years ago. Home wasn't mapped in until 2012. Water goes over US 36 and we need to figure out how to stop it as quickly as possible. Peter Ornstein Everyone on street experienced sanitary sewer backups. System was overcharged, mostly from water that was building up because of so much rain. The new proposal does deal with stormwater overflow predictions and does address the floodplain issues, but does not know if it addresses sanitary sewer system back -up issues that residents actually experienced. All systems were overcharged. Recommends that we move forward and take a hard look at sanitary system. Bob Matthias Echoes all comments from tonight. Based on meeting attended four years ago, he understood that the reason for flooding is due to the overtopping of US 36, which is caused by the fact that the cross section of the bridge is too small to retain flood waters. In the process of rebuilding US 36, why was the cross section of that bridge not increased? If they had done this, a lot of the damages could have been avoided during WRAB Minutes 18 May 2015 Page No. 5 this event. Kathleen Motylenski Speaks on behalf of South Boulder Creek Action Group. Videos and photos are available to show the level of damages. On September 13 th , it went from a lot of rain to about 4 feet of water in 20 minutes. Flood sirens couldn't even be heard. Absolutely miraculous that no lives were lost. We can't let this happen twice. Appreciates all the studies and alternatives, but timing is critical. This can happen again in the coming months. Residents are scared. Encourages Board to forge ahead as soon as possible. Terri Walters Thanks Board and staff for working really hard with all the competing issues. This situation is terrifying. Lives with family in a home that is dead in the way of the flood path Lost everything in 2013. River of rock went through home and ruined antique furniture. This was a 50 -year event. Could only afford to rebuild a structure about half the size. Please hurry. Motion by: Smith; Seconded by: Scharnhorst Vote: 3:0 (Ed Clancy, Mark Squillace absent) Motion Passes as presented Staff requests Water Resources Advisory Board form of the following motion: Motion to recommend that City Council accept the South E Mitigation Plan including Option D (single berm using Coil (CDOT) Right of Way) for `Regional Detention at US 36' a as the recommended comprehensive alternative to mitigate Creek. Agenda Item 6 — Information Item — Ken Baird, Joe Tad to the board. this matter and Utilities As part of the city's time period of 2016 defined in the Soul( and expenditure proje process. Citv Council WRAB will be asked to make meeting. The Planning Board July. City Council will discus be adopted by City Council in action in the reek Major Drainageway Flood iartment of Transportation the Downstream Improvements ;s associated with South Boulder [9:00 p.m.] presented the information item ocess, Utilities develops a six -year planning budget, this year for the ie Water resources Advisory Board (WRAB) role in this process is ... to review all environmental assessments and capital I by the utilities division." Utilities staff has formulated initial revenue of the three utility funds through the year 2021. Within the budget ppropriates funds only for the first year, 2016. nendation to City Council regarding the 2016 -2021 CIP at its June w the complete city CIP, including utilities, in in August at a study session, and the overall budget is scheduled to WRAB Discussion Included: • Requested that presentation slides be sent to Board for further review. • Asked about areas that are underseived and if there is a way to add a storm drainage system there, which would require ripping up streets? • Asked if feedback was provided from open houses regarding rate study increases? • Asked about potential to save revenue based on the fact that we pay $300 an acre foot whether it is used or not? • Asked for clarification on outcome goal of the rate study and whether or not it would be revenue neutral, positive, or negative? • Asked if there would be some benefit to having a revenue generating rate structure change? • Requested additional information about financial reserves and how it is programmed. • Asked if staff have received an increased volume of calls by residents since the rate increase WRAB Minutes 18 May 2015 Page No. 6 proposal? Agenda Item 8 — Matters from the Board: [9:54 p.m.] Board Member Smith brought up the below matter(s): • Acknowledges that residents are traumatized by the 2013 flood event. • Asks if there is anything further the city can do to reduce the level of anxiety that residents feel with future weather events? Board Member Scharnhorst brought up the below matter(s): • Asked if there are any plans for the next few days' impending storms. Board Member Johnson brought up the below matter(s): • Asked what we are doing as of result of the 2013 flood event? Concerned with rising creeks during recent rain events. • Requested confirmation about length of interceptor pipe. Agenda Item 8 — Matters from Staff: [10:00 p.m.] • Boulder Civic Area Update • Boulder Creek Mitigation Plan • GAC (Greenways) CIP • Bob Harberg presented a history book to the Board about Boulder's Wastewater, written by Silvia Pettem. Agenda Item 9 — Future Schedule [10:15 p.m.] • Recommendation on 2016 Capital Improvements Program (CIP) • Recommendation on Rate Study Guiding Principles Adjournment [10:16 p.m.] There being no further business to come before the Board at this time, by motion regularly adopted, the meeting was adjourned at 10:16 p.m. Motion to adjourn by: Smith; Seconded by: Johnson Motion Passes 3:0 (Ed Clancy & Mark S uillce absent) Date, Time, and Location of Next Meeting: The next WRAB meeting will be Monday, 22 June 2015 at 7:00 p.m., at the City's Municipal Services Center, 5050 Pearl St., Boulder, CO 80301 APPROVED BY: ATTESTED BY: Board Chair Board Secretary Date Date An audio recording of the full meeting for which these minutes are a summary, is available on the Water Resources Advisory Board web page. WRAB Minutes 18 May 2015 Page No. 7 CITY OF BOULDER WATER RESOURCES ADVISORY BOARD AGENDA ITEM MEETING DATE: June 22, 2015 AGENDA TITLE: Public hearing and consideration of a recommendation regarding the 2016 Utilities (Water, Wastewater and Stormwater/ Flood Management) 6 -year Capital Improvement Program (CIP) PRESENTERS: Jeff Arthur, Director of Public Works for Utilities Ken Baird, Utilities Financial Manager Douglas Sullivan, Acting Principal Engineer — Water, Wastewater, and Stormwater Annie Noble, Acting Principal Engineer — Flood and Greenways EXECUTIVE SUMMARY: As part of the city's annual budget process, Utilities staff develops a six -year planning budget, this year for the time period of 2016 through 2021. The Water Resources Advisory Board (WRAB) role in this process is defined in the Boulder Revised Code: ". . . to review all environmental assessments and capital improvements conducted or proposed by the utilities division." Utilities staff has formulated revenue and expenditure projections for each of the three utility funds through the year 2021. Within the budget process council approves and appropriates funds only for the first year, 2016. At the April 27 and May 18, 2015 WRAB meetings, staff presented the preliminary 2016 Utilities budget including the six -year capital improvement program. Since the May 18 meeting, the following change within the Water Utility CIP has been incorporated into the Capital budget: $150,000 was added in 2016 for the Boulder Reservoir Water Treatment Facility for replacement of failing filter valve actuators. This packet contains information concerning the Recommended 2016 Utilities Budget and the 2016 -2021 Utilities CIP. The attached fund financials and CIP spreadsheets (Attachment A — Water Utility, Attachment B — Wastewater Utility and Attachment C - Stormwater / Flood Management Utility) reflect actual revenues and expenditures for 2014, updated revenue projections /rate increases for the planning period and updated CIP. Staff requests a recommendation from the WRAB concerning the 2016 Utilities Budget including the 6 -year Capital Improvement Program (CIP) and associated Monthly Utility Rates. Staff will submit the CIP to the Planning Board which will meet to discuss the citywide CIP and make a recommendation to City Council on August 6. City Council study sessions are scheduled for August 11, 2015 concerning the proposed city -wide 2016 -2021 CIP and on September 8 and September 22 on the preliminary 2016 city -wide budget. City Council is scheduled to hold first and second readings on adoption of the budget on October 6 and October 20 respectively. Page 1 Agenda Item IV STAFF RECOMMENDATION Staff recommends that WRAB make the following motion related to the 2016 -2021 CIP: The Water Resources Advisory Board recommends approval of the 2016 -2021 CIP for the Water, Wastewater, and Flood / Stormwater Utilities including proposed rate adjustments to support 2016 revenue increases of 8% in the water utility, 5% in the wastewater utility, and 4% in the stormwater and flood control utility. FISCAL IMPACTS The following percentage increases in additional revenue from the monthly utility fees are currently being recommended by Utilities staff for 2016 to fund the preliminary Utilities budget and capital improvements program. These increases are consistent with projections provided during the budget process in 2014. Water 8% Wastewater 5% Stormwater/ Flood Management 4% BOARD FEEDBACK The preliminary 2016 Utilities budget and 2016 -2021 CIP were presented to the WRAB on April 27 and May 18, 2015. The Board provided comments as documented in the meeting minutes including discussion of rates, water conservation, key projects, and questions regarding the Colorado -Big Thompson (C -BT) water supply. PUBLIC FEEDBACK Board input and a public hearing is scheduled for this meeting. BACKGROUND: The Utilities Division provides quality water services, as desired by the community, in a manner which emphasizes efficient management of fiscal and natural resources, and protects human and environmental health. Each of the city's three utilities (water, wastewater and stormwater /flood management) is a separate enterprise fund established to finance and account for the acquisition, operation and maintenance of each utility's facilities and services while maintaining designated reserves and meeting debt service requirements. Revenues generated from monthly utility bills are the largest revenue source for each utility. Other significant sources of funds include development fees (plant investment fees), hydroelectric revenues, funding from the Urban Drainage and Flood Control District (UDFCD) and interest earnings. The majority of the utilities expenditures are for rehabilitating and improving the capital infrastructure either through the capital improvements program (cash financed) or through annual debt payments for revenue bonds that have been issued to fund capital improvements. WRAB is responsible for making a recommendation to City Council on the 6 -year CIP. The Page 2 Agenda Item IV following operating adjustments are not part of the CIP, but are provided for reference. Within the Water Fund, an increase to appropriations of $90,000 from Fund Balance is recommended for costs associated with residual hauling at the Betasso Water Treatment Plant. The prior contract for this service expired, and new bids were solicited for 2015 and beyond, and the unit cost for disposal increased by 50 %. The 2016 Betasso Water Treatment Plant CIP project is planned to include an on -site residuals processing system. Within the Water Fund in the Water Resources workgroup, additional funds are requested due to increased rates for source water delivered from C -BT. In the Water Fund, $35,000 is requested to provide funds for electric standby charges at the Boulder Canyon Hydro (BCH) Facility. An agreement with an electric utility is needed to supply power to the facility (lights, heat, etc.) when hydroelectric equipment is not generating. The City is party to a standard agreement for standby electric service with Xcel (BCH is connected to Xcel's transmission line). This agreement was needed after the BCH Modernization Project and anew power purchase agreement with Tri- State. As a result of these updates, annual revenue has increased roughly $400,000 per year, which more than offsets this standby charge. Also within the Water Fund, $17,300 is requested to meet the terms of an agreement with the City of Nederland. The City of Boulder is reimbursing Nederland for the ongoing costs of enhanced wastewater treatment processes that meet phosphorus limit requirements. This agreement was made to improve source water quality. ANALYSIS: The preliminary 2016 budget reflects the following revenue increases: 8% Water, 5% Wastewater, and 4% Stormwater/Flood Management. The following table summarizes the 2015 adopted revenue increase and proposed revenue increase projections for 2016 -2018. The proposed 2016 increases are in bold. Table 1 — Proposed Rate Increases Customer Bill Impact The proposed 2016 revenue increases (8 %- 5 % -4 %) would increase a typical residential customer's total monthly utility bill by approximately $5.00, or an increase of approximately $60 annually. The following table shows the estimated monthly impact for single- family residential and example commercial /industrial /institutional customers. Page 3 Agenda Item IV 2015 2016 2017 2018 Water 5% 8% 8% 8% Wastewater 30% 5% 5% 5% Stormwater/Flood Management 75% 4% 8% 8% Customer Bill Impact The proposed 2016 revenue increases (8 %- 5 % -4 %) would increase a typical residential customer's total monthly utility bill by approximately $5.00, or an increase of approximately $60 annually. The following table shows the estimated monthly impact for single- family residential and example commercial /industrial /institutional customers. Page 3 Agenda Item IV Table 2 — Estimated Monthly Bill Impacts Customer Combined Monthly Bill 2015 Rates Combined Monthly Bill 2016 Rates Monthly Bill Increase Percent Change Single - Family Residential $80 $85 $5 6% Hotel $3,452 $3,657 $205 6% Grocery Store $8,006 $8,502 $497 6% Large Format Retailer $3,066 $3,224 $158 5% Pearl Street Retail $120 $127 7 6% Industrial /Institutional $6,677 $7,063 $387 6% Downtown Restaurant $333 $353 $20 6% Downtown Restaurant /Brewery $763 $809 $45 6% ANTICIPATED REVENUE BONDS: The current 2016 -2021 utility fund financials reflect several bond issuances (and associated debt payments) to fund the following capital projects: Water 1. Betasso Water Treatment Plant Improvements ($24 million in 2016) to fund improvements to maintain compliance with federal Safe Drinking Water Act regulations 2. Southern Water Supply Pipeline II (Carter Lake Pipeline) and the 2018 Waterline Replacement budget ($37.6 million in 2018) 3. Barker Dam Outlet and Boulder Reservoir Water Treatment Facility ($10.3 million in 2020) to fund repairs to the outlet works Wastewater: 1. Sanitary Sewer Bond ($10 million in 2015) to fund replacement of large diameter interceptor pipe 2. WWTF Improvements ($18.5 million in 2020) to fund phosphorus treatment to meet Regulation 85 requirements Stormwater and Flood Management: 1. Wonderland Creek and Four Mile Canyon Creek projects ($23 million in 2015) 2. South Boulder Creek Improvements ($25 million in 2018) to fund improvements designed to mitigate flood hazards in the South Boulder Creek West Valley area The following table summarizes the debt obligations of the utilities, the year the debt is retired and the average annual debt payment. Items shown in italics are projects that are anticipated to be funded by issuing bonds. Page 4 Agenda Item IV Table 3 - Debt Obligations Utility Projects Year Debt is Retired Approximate Annual Debt Payment Water Boulder Reservoir WTF Improvements 2016 $858,000 Multiple Projects including Silver Lake Pipeline, Barker Purchase 2019 $2,522,000 Lakewood Pipeline 2021 $2,066,000 Betasso WTP Imp. (2016) 2036 $2,160,000 Carter Lake Pipeline and Waterline Replacement (2018) 2038 $3,568,700 Barker Dam Improvements and Boulder Reservoir WTP Imp. (2020) 2040 $983,773 Wastewater WWTP Improvements 2025 $3,500,000 WWTP Improvements 2030 $674,000 Sanitary Sewer Pipe (2015) 2035 $800,000 WWTP Improvements Reg 85 (2020) 2040 $1,757,500 Storm/Flood Multiple projects including Goose Creek Improvements 2018 $385,000 Wonderland Creek and Four Mile Canyon Creek Imp. (2015) 2035 $1,725,000 South Boulder Creek Imp. (2018) 2038 $2,150,000 South Boulder Creek Imp. (2021) 2041 $1,425,000 *Projects shown in italics are proposed bonds The Water Utility also pays a portion of the Northern Colorado Water Conservancy District's debt related to the Windy Gap project. This debt will be retired in 2017 and Boulder's annual debt payment is approximately $1,650,000. In early June the City was informed of the credit rating for the upcoming Wonderland Creek and Four Mile Canyon Creek Improvement bonds -- Aal from Moody's and AAA from Standard and Poor's (S &P) which is the same as recent bond issues. According to a recent S &P report, only around 6% of their rated water and sewer issuers receive the AAA rating. This high rating is due to strengths such as "a prolonged trend of strong financial operations," a "manageable capital program with additional debt needs," and a "robust and diverse local economy," S &P's recent rating report is included in Attachment D. Page 5 Agenda Item IV NEXT STEPS: The current schedule of major budget milestones is provided below. Elements involving the WRAB are highlighted in bold italics. Milestone Date WRAB Recommendation on CIPBudget June 22, 2015 Departmental Budget Review by City Manager May /June 2015 Planning Board Recommendation on CIP August 6, 2015 City Council Study Session on CIP August 11, 2015 City Council Study Session on Budget September 8 and 22, 2015 City Council Consideration /Adoption of Budget October 6 and 20, 2015 Attachments: A: Water - Fund Financial and Capital Improvement Program B: Wastewater - Fund Financial and Capital Improvement Program C: Stormwater/ Flood Management - Fund Financial and Capital Improvement Program D: Standard and Poor's Rating Report Page 6 Agenda Item IV J �a W U LU a U) Z O m CL LL° O a L CD U 0 N SO C E L U co CO N m O O O 000 r O 0 ' h-. ffl CO O CO V N 0 m M I- V -0 Cl) V I- M 0 0 0 O V r 0 0 0 O O O O O O O O L() CO r :L0 C7 -0 I1- V CO M m CO V m N V co r O) L() V Ln c) V O) M . O) M I- 0 O O 0 r CO O O O O O V' CO LO M M o I- O) V r N O O o O M o O CO N N O) h--. co O O o M O N o N O N N I- V LO O) CO M O) N CO I- M r- r CO 'Cf" CO N co co Ln N O O o O M („) N t O) M N M N - N L() N G) V CO. as CO r r M r I- r o r V I- N M M L() - M CO M O ' M M " 0 M N r N ( co N r CO Ln r CO 69 Pte. cm L a` 69 69 69 69 .. CO CO 0 0 0 0 69 w N O O m r o O co O) p r co O O O O O O I: o m 0. O N N O o o CO O V N r O r co M N r O N co V CO M M CO co co I� 0 . C O CO V L() O O Q N CO O O O C D C D C D O O O : o O Lc) Ln CO O r Ln N. [J': �••� O I- m CO M o CO m Ln CO O co O) CO CO CO CO V Ln Ln CO M V I� N V O r r O M Ln N M CO r V ;1". r O c', V N co co Ln ID V N O O Lo O M Ln O O N N Ln O) Ln d'. 0. N O) co co co M N CO N N N O O) CO N CO N CO r O) N V- M N CO N O N M N Ln O) V I- O M r V CO N CO '^ V/ Cfl N N O W M 0 M •O M M CA 69 .... 69. 69 J �a W U LU a U) Z O m CL LL° O a L CD U 0 N SO C E L U co Efl 69 >59. ffl 53. Efl Q N V 0 0000 O O O ' M O ' 0 ;t0 V I- V CO O V CO M I- -0 I . O) M I- 0 O O 0 r CO O O O 000 O 00 r O O Ln co r N N M Co Ln Ln M I- r co r N [I- Ln r r r II- N CO co C V co M o O O o M O N o N 'Cf" CO N co co Ln N O O o O M V O O N N M N.. CO co co LO o O r co m m �.. m co O O m o o O N 00 V N Ln N M O M Ln N M Ln r O) V r CO r r M Ln r M O r O CO O N O V Ln N r 01 c6 " 0 M N r N N co N r CO Ln r CO 69 ffl ffl >59. ffl Q N 0 0 0 0 0 CO 0 0 0 0 000 M O 0 M 000 M O coo CC3 CO 0 O N O O M O) CO O O V V O O) CO -0 I ® r N 0 0 0 O O O N LO I- N ;(.+) r O) co O I- N ON d co C V co M o O O o M O N o ;L V CO r M M II- V r CO O �•+ M 00 V N Ln N M O M Ln N M Ln r O) lO (D CO CO N o CO M o O co O_ CO O) O O V V N O) C D O r N N N r c6 N Ln - M V N O co N co Pte. L a 69 69 EG 69 CO CO 0 0 0 0 O O O I-- O o w N O O m r o O co CO V ® co o M O V O) O I- O O O O O O co O O O r Ln r N. O N N O o o CO O V N r O r co M N r O N 0 O c1 r CO co I� Lo O O Ln N O N T < M CO Co CO N V o V M V �••� CO CO M V I� N V O r r O M Ln N M CO r V ;1". r M V M O M N O O CO CO O) O V M M r CO Z 0 d O LO N N N co N V- M N CO N O co N sco L 69 a CA 69 69. 69 CO N I-- O O O O O O o O o O ;O m o co CO CO N V co O co Ln CO 0 m co o O O Ln N O CO O O O O O O co O O O O CO Ln r O c4 q! O N co I o m o O r CO V I- r O) CO O) O Ln N O O� CO N co CO Ln O O Ln N O N O ({). M m M M N r co co O N Y y 0 co CO N CO V N N Ln co r N O M Ln N O) V CO r N N V. r O N o CO O O O O_ CO I- r O V N O r Ln CL N 0 co M co N- N N N LLo Lo N V- co N CO a` ffl ffl ffl ffl N N M 0 0 0 O O O I-- O O o k-�. I- CO I- co N o m V O co O ;t CO CO LO O O 0 CO r 0 CO O O O O O LO co O O O V Ln r r v.. 453.. [I- LO co I: O CO CO O O LO co co I-- O) r V 0 0 I� d M CO l(7 co CO co I: Ln V CO N O O Ln CO O V N O M O CO N O) S€3. - a) O Ln N LO N V V V O O) M N M Ln V M O V N N r M r N Ln � Ln � O M O) CO CO CO O V r CO C •> r N N co N M N V- co N CO N 0 co N :m Efl Efl Efl Efl N o CO CO Ln CO V O N CO V co Ln v- CO I� V I� CO CO V O CO I- V r r co O Q CO r co O CO CO O) LD N CO O) O M I� CO r co CO. I- Ln r O r r M LO O r O O) co CO co CO O N CO r V d" N co Ln N co CO V CO co N N KY. V O V CO co co CO M V R M co co M Ln M M N co CO m m V CO O V N N m O) O / n co N N co I- N" N LL7. O) CO N V m M O O I- v C V N a V co O N N CO 1 M. N V co N V Efl Efl 69. Efl Efl N N L C C O t/1 () . LL o O N m O Q a' O z U ~ O In a D w N E a m m LL E 9 1 O n > Y N N N m D N C L - O F m 0` E W V N o - O 0 2 (n O I U N > (D R N U (6 N N D w N 00 U W C U C Q Z a o a V y o D O E m E O ° C7 d m m �.o > E w Z m m LL m o E O o E o o o E y o a o w .� C O m E to R to R O 110 •O c O (6 - c O > m ` N- VI O U U R 2 in N N O U LL m. C F CJ (� E Q c 'E > O C O N ' `� U O C C N C N C .N C (6 C O ` 2 R O . t/1 0 R O Q N N (6 (6 O N 2, R R R R R O c 'o Q�nam =� oaO�na �a�) a_ m Qaa�����n�cn~ N O Z 7 0 c Q m J �a W U LU a U) Z O 0 CL ... LL° O a L CD U 0 N SO E U co u w L O w C o Q U L_ 65 w Ul C U w a m O O m (D V I- co co LO ' ' ' V. r O O m r m 0 CO O la -a O O O LO N O) O r r CO O I- CO O V N m O CO O O I� 0 CO O r- r m O) N N V O V c V V O) [77. N < N d) N. O_ O LO N O V O W co o) O) V V O Q <. M r r CO O N O � co O O LO O r N LO _ CO O CO co co V O co W N O V r CO I- V CO LO V V m O) N r O) m. LO fn CO I� co O m O O V CO N N O O O) O 0) („) w 65 O O o O) O N N m CO m N O m N LO O o m. N d) c o 0. m r I- Lo Lo O I- N V N 0 co O O ' O N I-- r r V O m m co o o O O 69 Efl V LO O O LO m N V cY. N m M1. a` r I- N O m r o O (D O d> m w N N N m O 0 m m ea F o o � 6s coo V I� O N w (D Z O N O 69 6s 0 U 69 -6 M -o (D O ( ;�. I- O O m o LO m O O j 65 O O O CY< �! O tO O r r N O r 0 N m Z m In w O LL w 0 U) . O O O r V m O I� r co CO r I- I- r CO N N O O O o O >O N LO o co 41' O O) Ln O O r o co d) d) O V N O Q w w D O co m m CO V o CO I� O co CO N o o o I� m V o O LO O I`-. m. N 0. 0. CO o I- r m o O d) m CO O CO CO O d O J -° 0 0 0 Q O m J �' Q .� m Q V O O Ln d) CO N N LO N m r KY. ea V. m o II- V in o 0 65 m m O w r Lo O O N N m CO ' ' d) O O V m r r m O N O r- V N R F • Q O LO o r W N O N N Ln K m J LL (n a 0 0 EflY. C7}. O O co N u w L O w C o Q U L_ 65 w Ul C U w a 'o 69: 69 CO N I� O O d) N O O m O ' ' 't m O):. O) N r 0 0 0 0 la O O O LO N O) O r r CO O I- CO O V N m O (`'?. r (`'?. N Sfl N LO CO O O O Sfl r CO d) O V N O v CO r CO O) y LO O O CO V O O O m O I- W V O O d) V O O d) V O) CSI. O O O N I-- r W m 0 N. m CO CO CO m O Q <. M r r CO O N O V co O O LO O r N LO _ r r N.. I� O) CO V N O m V LO V V m O) N r O) w _ r N N m O) r e; 1`-. ,m CD r d) V N :co u w L O w C o Q U L_ 65 w Ul C U w a CO >s9'. ffl 69' ffl O m 0 0 co v CO r CO O) m O W O Q <. M r r CO O N O O -a LO CO O O O O O r m V LO V V m O) N r O) N m O N O O (+I. N' O) O 0) N m Ln CO O O O r O) O O V m 0 65 . 0 O w (D > o U w �+ V N O CO N I- V O LO O m O) m O m m O m N d) 0 O O Lo 0 co O O Ni iO O N I-- r r V O m m co o o O O V LO O O LO N N V r LO m M1. r I- N O m r o O (D O d> m w N N N m O 0 m m ea F o o � 6s coo V I� O N w (D Z O N O 6s 0 U -6 M -o (D O ( ;�. >� C m w m N '" > ( �-' � Q Q T j 65 O Q �! O W w d' a) (6 Q N m Z m In w O LL w 0 U) 69 a w d' w w w r w (D O O O O m 0) g 0 Q a` Q N (6 m w O w D °Nmmmp m - O m U 06 LL F w O O O O U p w Q.m� u, Z Z a Q p N w w v > a w d O J -° 0 0 0 Q O m J �' Q .� m Q m m 0] 0] C - o - o - o - o R w p -p ( °� °� ea 69 ea (D(D Q 0 65 m m O O r Lo O O Lo ' ' y U U U U E w w w w Q ' ' ' 'O U M O V m r r m O N O L Ul N 7 R F m m o N m O O LO o r W N O N N Ln o Ln K m J LL (n a 0 0 0) c m C7}. O O N f- . N W Ln m O V o V d) d) O V O O w V LO O O O N r m O (o co N I- r (O o O C C� N O V LO O O N CO I- co CO I- O_ N m_ r CO O). N. O r m r N CO V d) O N N CO m V O Z 0 d N N N CO CO c6 6 V CO V N N O 69 m. m'. L co a ffl f{3 '. ffl CO O O O O O) N O O O). O co o o O N O co LO O LO m O O O co m o co r Lo Lo O O Ln N O O O O 0. C{3. O O co qi m m LO I- O r o r- r m r V CO O w CO I- Lo O co o co N O) O O (o O 0. V m I- co o m O Y U) O LO O V co n O O CO V N N LO O_ N m O N O O V N ea VT P- r r I- N co N o o O O N O N V O CL N N N r- m- O LO I- V N N O Efl N 69 Lip. ea a` 69 69 ea CO V m ' ' ' Lo co r Lo V o ( o co o r r o m o O o m I- O r O V N V O m Il d) O m O O O O o5 t0 O O to 4fl O O LO O O r O I� Lo d) V V N O r N Lo Lo O W O O O Lo CI). O O. V N r- O V N O w LO N O V N LO O CO V O CO m o CO o O N CO LO O V O N N_ I- co :O CO. O N CO N m o C> N N o e» O V 1`-- co m O V N N 0 69 m co fR. ea 0 ea O r o ' ' ' O r V CO m o ' ' f --. o N o m r r o CO o (D N O V LO O O o) N O co r N LO CO O r O Lo >co O O 0. vi m m m o O d) O r r d) CO V r O R CO m I- LO N LO co m Lo N N O LO LO N r LO [7 N. O m Co V N I- N m o O m o CO m (O o O '^ CO LO O V N N LO O N. N O CO LO O O LJ N N N co V (V Q N. M. 69. 69 69 69 u w L O w C o Q U L_ 65 w Ul C U w El a CO 0 O m N w O m0 LL W O - p E J d R 65 . 0 O w (D > o U w w E 7 a) C Z w d' Q 65 Ul C w t O E w 0 U> o F E - o c4 d 0 E F (D O d> m w E ? 0 y � m `00 F o o � 6s y w w (D Z O m o o� U m Y 6s 0 U -6 -o (D O ( a G! >� C m w m N '" > ( �-' � Q Q T j 65 O Q �! O W w d' a) (6 Q N m Z m In w O LL w 0 U) N U w W m Z m `m w d' w w w r w (D O O O O m 0) g 0 Q - O - O - O - O t/1 Q N (6 m w O w D °Nmmmp m - O m U 06 LL F w O O O O U p w Q.m� u, Z Z a Q p N w w v > a w d O J -° 0 0 0 Q O m J �' Q .� m Q m m 0] 0] C - o - o - o - o R w p -p ( °� °� R w Z 3 w w w F w C w F (D(D Q 0 65 a0 w w O U . � O 0 65 ro w 0 w y ' ' 'O Q 07 d' J d d d w m C 0 O w F U d (D y U U U U E w w w w Q ' ' ' 'O U > U L C 7 3 Q d 65 y6 w 'O w N C Y U > Q Q L Ul N 7 R F (� d d d d W (n L c K m J LL (n a 0 0 0) c m El Attachment A - PROPOSED WATER CIP A H I J K L M N O 1...... 15- Jun -15 CITY OF BOULDER 2 DRAFT 2016 -2021 CAPITAL IMPROVEMENT PROGRAM WATER UTILITY FUND Assumed Inflation Rate 2014 2015 2016 2017 2018 2019 2020 2021 PROJECT NAME ACTUAL REVISED PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED Treated Water Pressure Reducing and Hydroelectric Facilities Kohler Hydro /PRV Facility $0 $50,000 $0 $0 $0 $0 $0 $0 Maxwell H dro /PRV Facility $0 $50,000 $0 $0 $0 $0 $0 $0 12 Orodell H dro /PRV Facility $0 $0 $75,000 $0 $0 $0 $0 $0 Sunshine Hydro /PRV Facility $0 $0 $0 $271,875 $0 $0 $0 $0 Pearl Street H dro /PRV Facility $0 $0 $0 1 $0 1 $24,333 1 $243,331 1 $0 1 $0 Subtotal - Treated Water PRV and Hydro $0 $100,000 $75,000 $271,875 $24,333 $243,331 $0 $0 Water Treatment Facilities IT Betasso WTF $413,974 $1,108,318 $900,000 $0 Betasso WTF - Bond Proceeds $0 $0 $24,000,000 $0 Bond Issuance Costs $0 $0 $240,000 $0 Boulder Reservoir WTF $203,296 $7,100 $314,000 $0 Boulder Res WTF - Bond Proceeds $0 $0 $0 $0 $0 $0 $0 $0', $0 $0 $350,000 $0 $100,000 $0', $0 $2,000,000 $0', $0 $0 0 $0 J $0 $0' $0' Subtotal -Water Treatment Facilities $617,270 $1,115,418 $25,454,000 $0 $350,000 $0 $2,100,000 $0 25 Treated Water Pump Stations Cherryvale Pump Station $0 $0 $0 $0 $0 $0 $0 $0 Boulder Reservoir WTF High Service Pump $0 $84,289 $0 $0 $0 $0 $0 $0 Iris Pump Stations $0 $0 $0 $0 $0 $0 $0 $0 Subtotal - Treated Water Pump Stations $0 $84,289 $0 $0 $0 $0 $0 $0 Treated Water Storage Tanks Gunbarrel Storage Tank $644,449 $39,746 $0 $0 $0 $0 $0 $0 Maxwell Storage Tank $0 $0 $0 $0 $0 $0 $0 $0 IT Booten Storage Tank $0 $0 $0 $0 $0 $0 $0 $0 Devil's Thumb Storage Tank $0 $50,000 $0 $0 $0 $0 $0 $0 Kohler Storage Tank $64 $103,487 $799,875 $0 $0 $0 $0 $0 Chautauqua Storage Tank $0 $0 $0 $0 $0 $0 1 $0 $0 IT Betasso Storage Tank $0 $0 $0 $292,465 $0 $0 $0 $0 Boulder Reservoir Storage Tank $0 $0 $0 $0 $0 $0 $0 $0 Subtotal - Treated Water Storage Tanks $644,513 $193,233 $799,875 $292,465 $0 $0 $0 $0 Treated Water Distribution System Zone Isolation Valves $0 $0 $0 $0 $0 $0 $0 $0 Cathodic Protection $0 $0 $0 $0 $0 $0 $0 $0 Waterline Replacement $3,293,113 $3,522,017 $3,352,960 1 $3,487,078 $0 $3,771,624 $3,922,489 $4,079,389 Subtotal - Treated Water Distribution System $3,293,113 $3,522,017 $3,352,960 $3,487,078 ($0) $3,771,624 $3,922,489 $4,079,389 Treated Water Transmission System Sunshine Transmission Pie $568,313 $2,259,938 $0 $0 $0 $0 $0 $0 Boulder Canyon - Orodell to Fourmile Pipe $0 $0 $0 $0 $0 $0 $0 $0 Mountain Transmission Pipes $0 $0 $0 $0 $0 $0 $0 $0 Zone 1 Transmission Pipes $0 $0 $0 $0 $250,000 $0 $0 $250,000 Zone 2 Transmission Pipes $0 $0 $0 $250,000 $0 $0 $250,000 $0 Zone 3 Transmission Pipes $0 $0 $1,200,000 $0 $0 $250,000 $0 $0 Subtotal - Treated Water Transmission S ste $568,313 $2,259,938 $1,200,000 $250,000 $250,000 $250,000 $250,000 $250,000 Source Water Transmission System Lakewood Pipeline $0 $530,400 $0 $0 $0 $316,330 $0 $0 Silver Lake Pipeline $0 $0 $0 $0 $0 $0 $0 $0 Source Water Transmission Pipe Inspection $0 $73,653 $0 $0 $0 $0 $0 $0 Subtotal - Source Water Transmission S ste $0 $604,053 $0 $0 $0 $316,330 $0 $0 Barker Water System Barker Gravity Pipeline Repair $305,389 $475,882 $667,416 $1,169,859 $1,216,653 $1,265,319 $1,315,932 $1,368,569 Barker - Kossler Penstock Repair $0 $0 $0 $116,986 $0 $0 $0 $0 Barker Dam Outlet Barker Dam Outlet - Bond Proceeds Barker Dam and Reservoir $0 $0 $2,625 0 $0 $495,174 $100,000 $0 $65,000 $175,000 $0 $50,000 $0 $0', $0 $835,551 $0 $0 $0 $8,355,509 $0 $0 $0' $0 Barker H dro System Integration $0 $0 $0 $0 $0 $0 $0 $0 Barker Relicensing $25,377 $0 $0 $0 $0 $0 $0 $0 Barker Instream Flow Release $0 $6,052 $0 $0 $0 $0 $0 $0 Barker Residence $78,481 $214,799 $0 $0 $0 $0 $0 Betasso Penstock $0 $0 $0 $0 $0 $0 $0 $0 Kossler Dam $56,204 $135,738 1 $75,000 $0 $0 $0 $0 $0 Subtotal - Barker Water System $468,076 $1,327,645 $907,416 $1,511,844 $1,216,653 $2,100,870 $9,671,441 $1,368,569 77 lRaw Water Storage Reservoirs Albion Dam $0 $80,000 $125,000 $0 $341,636 $3,416,361 $0 $0 Silver Lake Dam $0 $75,000 $0 $0 $100,000 $0 $0 $0 Island Lake Dam $0 $0 $0 $0 $50,000 $0 $0 $0 Green Lake 1 Dam Green Lake 2 Dam - Bond Proceeds Green Lake 2 Dam $0 $0 $0 $0 $0 $24,719 $0 $0 $0 $0 $0 $0 $0 $0', $0 $0 $0 $0 $0 $0 $75,000 $0 $0 J $486,773 Green Lake 3 Dam $0 $0 $0 $0 $0 $0 $0 $0 Goose Lake Dam $0 $20,000 $0 I $0 1 $75,000 1 $0 1 $0 $0 Boulder Reservoir $0 $0 $50 1 $0 1 $0 1 $0 1 $118 $0 Attachment A - PROPOSED WATER CIP A H I J K L M N O 1...... 15- Jun -15 CITY OF BOULDER 2 DRAFT 2016 -2021 CAPITAL IMPROVEMENT PROGRAM WATER UTILITY FUND Assumed Inflation Rate 2014 2015 2016 2017 2018 2019 2020 2021 PROJECT NAME ACTUAL REVISED PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED 87 Lakewood Dam $0 $0 $0 $0 $124,707 $0 $0 $0 Skyscraper Dam $0 $0 $0 $0 $0 $0 $0 $171,071 ST Wittem er Ponds $0 $0 $0 $0 $0 $100,000 $492,685 $4,926,849 90 Subtotal - Raw Water Storage Reservoirs $0 $199,719 $175,000 $0 $691,343 $3,516,361 $686,119 $5,584,692 92 Other Raw Water Facilities Farmers Ditch $0 $0 $0 $0 $0 $108,160 $0 $0 Anderson Ditch $0 $0 $0 $0 $0 $0 $0 $0 Source Water Facilities Rehab Program $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 Watershed Improvements $78,886 $146,357 $80,000 $0 $0 $0 $100,000 $0 Nederland WWTP $0 $0 $0 $0 $0 $0 $0 $0 Instream Flow Structures and Gaging $0 $48,428 $0 $0 $0 $0 $0 $0 Como Creek Diversion Structure $0 $0 $0 $0 $0 $0 $0 $0 Lakewood Diversion Structure $0 $0 $0 $0 $0 $0 $0 $0 Silver Lake Diversion Structure $0 $0 $0 $0 $0 $0 $0 $0 NCWCD Conveyance - Boulder Feeder Can $25 $61,271 $0 $0 $0 $0 $0 $0 103 NCWCD Conveyance - Carter Lake PipelinE NCWCD Conveyance/Waterline re lacemer $250,000 $0 $500,000 $0 $850,000 $0 $2,036,322 $0 $0 $37,565,263 $0 $0 $0 $0 $0 $0' i 1051Subtotal - Other Raw Water Facilities $328,910 $756,056 $1,080,000 $2,186,322 $37,715,263 1 $258,160 $250,000 $150,000 106 107 Source Water Pressure Reducing, Pumping and Hydroelectric Lakewood Hydroelectric /PRV $0 $0 $130,000 $0 $0 $300,000 $0 $0 Silver Lake H droelectric /PRV $0 $150,000 $25,000 $50,000 $80,000 $0 $0 $0 Boulder Reservoir Intake and Pumping $0 $0 $0 $0 $0 $0 $0 $0 Betasso Hydroelectric / Pressure Reducing $134,404 $0 $0 $380,000 $480,000 $0 $0 $0 Barker Dam Hydroelectric $0 $0 0 $0 $0 $0 $0 $0 Barker Dam Hydro $0 $0 $0 $0 $0 $0 $0 $0 Boulder Canyon Hydroelectric $100,755 $33,641 $0 $0 $0 $0 $0 $0 Boulder Canyon Hydro - Grant $0 $0 $0 $0 $0 $0 $0 $0 Boulder Canyon Hydro - Grant $0 $0 $0 $0 $0 $0 $0 $0 Carter Lake Hydroelectric $0 $0 $0 $0 $50,000 $250,000 $0 $0 Carter Lake Hydro $0 $0 $0 $0 $0 $0 $2,500,000 $0 Source Water Pressure Reducing, Pumping $0 $0 $0 $0 $0 $0 $193,472 $201,210 Subtotal - Source Water PRV, Pumping and $235,159 $183,641 $155,000 $430,000 $610,000 $550,000 $2,693,472 $201,210 121 122 Water Distribution System Expansion Annexation Related Waters stem Expansic $0 $2,551,700 $0 $0 $0 $0 $0 $0 Subtotal - Water Distribution System Expans $0 $2,551,700 $0 $0 $0 $0 $0 $0 125 126 Water System Monitoring and Metering Automated Meter Reading $0 $0 $0 $0 $0 $0 $0 $684,285 Water System Security /Quality Improverneni $13,996 $150,000 $150,000 $150,000 $150,000 $90,000 $0 $0 Source Water Monitoring and Protection $0 $100,000 $100,000 $100,000 $100,000 $100,000 $0 $0 Distribution System Water Quality $14,100 $0 $0 $0 $0 $0 $0 $0 Data Communications System $0 $0 $0 $0 $0 $0 $0 $0 September 2013 Flood Disaster Recovery $860,072 $304,301 $0 $0 $0 $0 $0 $0 Yards Master Plan Implementation $13,553 $86,321 $0 1 $0 $0 I $0 $0 1 $0 Utility Billing Computer System $0 $100,000 $0 $0 $0 $0 $125,000 $0 Subtotal - Water System Monitoring and Met $901,722 $740,622 $250,000 $250,000 $250,000 $190,000 $125,000 $684,285 TOTAL CAPITAL USES OF FUNDS $7 $13 $33 $8,679,585 $41 $11 $19,698 $12 ,y Q LL _ W U 0 Q U Z_ 0 m LL CL LL 0 W 0 :3 CL LL _ co U Q 0 N m C (D C U fB i I- o O_ O O O O ' M O ' ' M V M 00 M M O M O o0 O O o0 "a 00 ® 01 0000 1- O 1* O V A 1- N V N LO CO O O M w O d) 00 V O O O O O lO (C) m N w O O N N oc 00 N r- N O r 01 lO M O 0 0 (O M r- (q to O 01 V 1- O M o (0 O V V : O M o0 C\ r M LO N; M M V N M 00 1- V O d) 01 r- N r V O V O 01 0) O N O^ V N A.: N; In O M - (O a V o 0 0 0 0 0 0 ' 1- O ' O (O: 00 O M N N M O o0 00 O O (O "a 0) 00 V (O O O O O (O O O O O to O O O O 01 lO O �: ( V V 1: N_ M V 00 r V V LO 00 O O V V o0 to O o0 O aa+ 00 ® 0 V w O O to CO - to 00 (O M N M V M N 0) 1-0 0) ` V 01 N e- V In : O O N n C\ r- M (O (0 L (O (O M In M (O V n o0 r- V M (O O V (0 01 0) (O S O a N O N N O N O M (O Q^ N N IL V o LO 0) O O O O ' V O ' ' GO lO N w 00 00 N N to M O 00 a o0 00 00000 O O O V 0 ® V O O O O (o to 00 r: lO m (O N O N N lO 01 lO r O o0 M O O M T aa+ V L(7 d) 00 O O to 00 � M M N O 0 V LO V O c U to 01 N I- : O 0) V O r- N M. tR d) to N M Co 00 O O V lO 00 to � V 1- O (O 0) 1� O ' d) M:. to O M V N O N N. a 00 0 �_ O O O O ' N O ' ' P+. 0 M M �_ N M N 0 O N lO d O O O O O O O n+. 00 LO lO 00 (O to 0) O O m -a N N O V C C C C 00 to V') 00 00 00 O O to m P+< O: 01 01 d) 00 to V O m 00 (O N m 00 N r- O 01 M N 0 to 00 U (O (O (O - O In (M O 1- N 00; V : I- M r r N r (O (O V V r- V o0 In r O N (O 0) 1� O .a N p 00 O LO 0) M V a` 00 0 1- m O O O O ' r O ' ' M N M O (O V O LO CO O M - (O O 00 (O O O O O r O p (M 01 O O O O V lO M Q V M O lO M 0 N N 01 C\ O N M O (O 01 O O N 0) (f7 m r o0 O O N V (O: 1- N N V r r O O 00 U I- LO In (O O M 0) 1- N A: M: lO N M N (0 1- 00 (O V V r- N In I� r O V (O 0) 1� �( v O a 00 0) LO 0) M V N . p — tV IL` (O c O_ O O O O O ' (O O ' ' M M M (O O N O M O M_ co N I- O O O O O r- to cr3 V O O M 01 lO O 01 V o0 O M N LO U 00 o0 O O N N r- N V M V 0 0) M O M ap y M O N O lO O M m r r O d r O r O O Q- O r- V 0) r- 00 M O (O V (M ( M LO 0) � (O 0) 1� M V N a a` » » 09 U) I� c O N O O O O o0 V 0 0 0 0 M w N w (O O r N 00 00 0) M V V 0 0 0 0 0 O 1 O ® 00 O O O O O r to M O N (O 1- M O O V I� r M r O O (O M O O V O O a (O ® (O r M O O N (O M- r N d< 0 (O N M (O N m 0) N O N O a 0) CO N M : O- M d) N N (O w 00 m N O r N M r O c A lO N 1- V M Cl LO M M 01 - lO V (O 0) O C O > V O LO 0) M LO N N MI 00 \ d) V 1- M to N N M ' ' 0:: N V m 00 r r r (O 0) LO V ® 00 I- M (O m 00 N N N 01 N r- V (O N (D : M N N : 1- M M N M N 00 01 1� V N 1- O In In _ U7 O r- d) M 0 M r O N r M M (O R 00 to N cO:: Y a V o0 N O 4}a O N O 00 V V (D O V N fO V CO M V N Q ER ER d3. ER a v! a o c o 00 > m IL a LL O O N n U U) a 0 In a) > 0 N O 1 R 2 7 U) Z m Q C o , c E > N M LL o a O o N R o a) LL E E O w O N° m O U o F o w a m o m W - o m U) a m w w m w } w _ .=° U a w w WMEW W, _ z - a) C- 0 2 m � E m o 0 o �1 U E� w� o r� �a) O U o E. O E m _ U H o R m U ° w ° w U U) E w a r w o S ° ~ a) o a > a`) a ma EU °- oa W o Nin � m a LL r o a °° U v � % R m O ��.� ° ai o O U N °) > '- Q a') O a LL' O` r � 7 N O �-p ip U J I> U) N Z) z J v � L 'v R o LL SE := o o Z a a m H o a o a N N N R 2 2 N O Q a) . a) N O N 2 ' > T > (Yj 0 a) i 0 R 0 ® R 7 Q U) d U) d U U) LL m U) m a) Q d > (n > U) N (n U) O O o C 7 LL rn Q C C v m i LU z LU Z U) 0 LL — 0 CL co 0 LL a z 0 :3 CL LL Q 04 m C: (D E .r_ C-) cu El r- C\l 0 0) M (0 04 M 0 (0 0 0 (D CR C\l r- 0) , C\l (0 al It N C� IT Cli 0 01 "r LO .0 0 �; �2 "t "t "t (0 0 0 f- C6 C4 C6 co C'4 0) (0 LO - M1 (0 o 0 & (�i C4 U r- (D LO 0) C\l C It C N 0a: co co 't M 'It 0 r- V O LO 0 ci 04 r- LO 04 m m co 0) 0) 'It 'It 0 0 11 m 0 0 0 m 0 (0 co m M1 LO cl� r- 0 0 C\! C� C� 07 co C� "r m w "r 0 'It oc� 'It 'It C� to ot 0 -: - u (6 V C4 "r 'T o Lo m 1- (0 w (0 w 0 0 co 04 Fl In N o 0) N C\! m o 01 co R co w O M r- 0 m LO M C� 0 ct 0 04 Q (0 0 M C\l 0 ce) C\l M1 m r- m r . . . . . . m LO 0) LO 0 N 0 N N M �� m 0 (0 0 al (D oc� co cq LO Cli 0) oc� �2 IT co 0 0 'It cl! V! - C� f- (R C4 Ct a) t; C4 r-: C4 00 "r N Lo m m m - 0(0 r- r- m 0 r- m m m " 0 IT m -0 w co C\l cr� Ot LQ ( M oc� 0 C) q 04 co 0 C\l to -e O U!.* 1- 0 1- It 0 . . . . . co co 0 1- It C\l (q 01 q oc� N 't co (q (0 N R �2 "r C\l co (0 0 - 't (q 't LQ C� cq 0 Ct O 00 0 0) IT m �� E; i r- w 0) r- L O 0) m 0 (0 r- co C\l 0 r- r- It 0 OD co w 19 t; 00 C', N C 07 V� (D " r-.� LO r-. to N 2 LO Ni C\l et IL 00 0 0) . . . . . .V 0 CO 0) LO (0 0 N 0 r- 0 M1 m co �; N 01 't 01 't 0) V LO C\! "r 00 00 LO 0 't oc� Vi r C� to ri 0 13 i O 0 C\l 0 m 0 m C\l LO r- 00 O r- 0(0 0) 00 0 1- m r- LO LO LO 0 to v t� U co C\l C� Ci co V� ( N( LO tR to Ct O. W 04 p - LO NU C\l 0 0 Va � Va (» 6rt LO LO It It 0 . . . . . 01 0 co m 0 It 0 It 0 t- LO "r 0) 't (q q o (q - 0 C� w Ci "r " w (0 0 'It r 'It LQ C� 0 C! w O W C\l (0 co (D N 0 LO LO 03 Cl) LO r- 03 p- 0 (0 w 0 1-0 r- m m r- 0 w 0 N r� 0 0 C, CL r- N C� cr� LQ co N (0 N 0 C\l Lr! U) q 0 04 2 IL 09, U) (» U). W, r- CO (0 CO CO 00 0 0 (0 m 0 0 0 m 0 m C', M1 0 co (0 (0 (0 CO - r- 0) 00 0) - 00 (0 �T p- 0 0 co 04 m It w 0 0 It It It 0 m - 0 0 O (6 d d (6 06 1- & L6 C6 (6 L6 L6 (6 - - & vi a to N 0 M N (0 0 (0 03 r- m r- m N o0 m 0 0 0 A 1- N 0) r C� Cli q (q LQ ( (q 0 (r! ":, O> (0 O "r P- I- N U') N C co 0 O 0) 0) �: CO . . . . 0 r- MOMO(OOV 0 M (0 C\l C\l 't - (q C\! i M w Cli m fli "r 0 w (0 0 C� 't C\! C� v o) w 't 0 M r- M L (D 0 (0 N N 1- 0 le M 0-- M 1- (D r- m 0 V w 0 Q m 0) C\l C� LR (0 (0 C LO Ct C-4 C\l tfa M C\l U- E m w 15 E 0 a) 3: > < U) F) E 0 , 2 E m CL a) E U) o (n < E 2D CL m 0 6 . 5 w a LU - 2 LL 2 > U) cm OW-0 U H o w 0 z < E E a a U < m >> C) 0 2 = C L 0 L 0 'E C) < C , 5 5 0 > m > M C) M EL (9 2 2 0 u r_ < u r_ m 0- 0 m i7) 0 Lu m CL m m 0 C\l .2 m m LL U) 0- 0 0 m < LL LL W w El Attachment B - DRAFT WASTEWATER CIP A H I I J I K L M N O 1 15- Jun -15 CITY OF BOULDER 2 DRAFT 2016 - 2021 CAPITAL IMPROVEMENT PROGRAM 3 WASTEWATER UTILITY FUND Assumed Inflation Rate 2014 2015 2016 2017 2018 2019 2020 2021 PROJECT NAME ACTUAL REVISED PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED Wastewater Treatment WVVTF Pumps $0 $0 $150,000 $0 $0 $0 $0 $0 11 WVVTF Permit Improvements $438,080 $4,194,112 $150,000 $0 $750,000 $1,500,000 $0 $136,857 WVVTF Nutrient Management Grant VVWTF'Permit Improvements - Proj. Bond WVVTF Laboratory $144,485 $0 $25,163 $0 $0 $0 $50,000 $0 $0 $0 $0 $0 $0 $18,500,000 $0 $0,' $0 Lower Boulder Creek Enhancement $0 $0 $0 $0 $0 $0 $0 $0 WVVTF Headworks $0 $0 $0 $0 $0 $0 $0 $0 WVVTF Headworks - Pro'. Bond $0 $0 $0 $0 $0 $0 $0 $0 IT WVVTF Instrumentation /Control $0 $1,127,477 $0 $674,918 $701,915 $729,992 $759,191 $0 WVVTF Electrical $0 $0 $120,000 $1,200,000 $0 $0 $0 $0 WVVTF Activated Sludge $0 $389,376 $0 $175,479 $0 $0 $0 $0 WVVTF Primary Clarifiers $0 $0 $0 $0 $0 $0 $0 $0 WVVTF Secondary Clarifiers $0 $0 $0 $0 $0 $0 $0 $0 WVVTF UV Disinfection $2,356 $2,998 $0 $0 $0 $0 $0 $0 WVVTF UV Disinfection - Proj. Bond $0 $0 $0 $0 $0 $0 $0 $0 WVVTF Permit Improvements - 2010 Bond $15,148 $1,198 $0 $0 $0 $0 $0 $0 WVVTF Rehabilitation $0 $0 $0 $0 $0 $0 $150,000 $375,000 Valmont Butte $0 $0 $0 $0 $0 $0 $0 $0 Biosolids Processing & Dewatering $110,044 $0 $0 $0 $0 $0 $0 $0 WVVTF Biosolids Digester $20,000 $0 $0 $0 $0 $0 $0 $0 WVVTF Biosolids Digester - Proj. Bond $0 $0 $0 $0 $0 $0 $0 $0 WVVTF Cogeneration $0 $39,995 $0 $0 $0 $0 $184,481 $0 WVVTF Digester Complex $0 $0 $0 $0 $0 $200,000 $2,000,000 $0 September 2013 Flood Disaster Recovery $453,442 $606,987 $0 $0 $0 $0 $0 $0 WVVTF Digester Cleaning Bond Issuance Casts Subtotal - Wastewater Treatment Plant $0 $0 $0 $0 $125,000 $0 $0 $0 $0 $0 $0 $0' $0 $0 $125,000 $0 $1,208,718 $6,487,143 $470,000 $2,050,397 $1,451,915 $2,429,992 $21,718,672 $511,857 37 1 Marshall Landfill 39 1 Marshall Landfill $0 $0 $100,000 $0 $0 $0 $0 $0 Subtotal - Marshall Landfill $0 $0 $100,000 $0 $0 $0 $0 $0 41 1 Wastewater System Monitoring and Metering 43 1 Yards Master Plan Implementation $6,777 $36,046 $0 $0 $0 $0 $0 $0 44 1 Automated Meter Reading $0 $0 $0 $0 $0 $0 $0 $0 Utility Billin g Computer System $0 $50,000 $0 $0 $0 $0 $65,000 $0 Subtotal - Monitoring and Metering $6,777 $86,046 $0 $0 $0 $0 $65,000 $0 Collection and Conveyance System Rehabilitation Collection System Monitoring $338,636 $3,426 $0 $0 $0 $0 $0 $0 Condition Assessment Program $780,000 $811,200 $843,648 $877,394 $912,490 $948,989 $986,949 Sanitary Sewer Rehabilitation Sanitary Sewer Rehabilitation - Bond' Sanitary Sewer Manhole Rehabilitation $403,808 - $51,186 $3,000,161 10,000,000 $208,000 $2,758,080 - $216,320 $2,868,403 - $224,973 $2,983,139 - $233,972 $3,102,465 - $243,331 $3,226,563 - $253,064 $3,355,626 - $657,966 IBM Pump Station $79,395 $1,235,402 $0 $0 $0 $0 $0 $0 Tier 1 Boulder Creek 2 Master Plan Project $0 $0 $0 $0 $0 $0 $0 $0 Tier 1 Goose Creek 1/1A Master Plan Proje $0 $0 $0 $0 $0 $0 $0 $329,278 Tier 1 Goose Creek 3 Master Plan Project $0 $0 $0 $0 $0 $0 $0 $0 Tier 1 Goose Creek 5 Master Plan Project $0 $0 $0 $0 $25,000 $647,590 $1,346,988 $1,400,867 Tier 2 Boulder Creek 1 Master Plan Project $0 $0 $0 1 0 1 0 1 $0 $0 $0 Tier 2 Boulder Creek 3 Master Plan Project $0 $0 $0 $0 $0 $0 $0 $0 Tier 2 Boulder Creek 4 Master Plan Project $0 $0 $0 $0 $0 $0 $0 $0 Tier 2 Goose Creek 4 Master Plan Project $0 $0 $0 $0 $0 $0 $0 $0 Tier 2 Gunbarrel 1 Master Plan Project $0 $0 $0 $0 $0 $0 $0 $0 Tier 2 Gunbarrel 2 Master Plan Project $0 $0 $0 $0 $0 $0 $0 $0 Tier 2 South Boulder Creek 1 Master Plan F $0 $0 $0 $0 $0 $0 $0 $0 Subtotal - Sewer System Rehabilitation $873,024 $15,226,990 $3,785,600 $3,937,024 $4,119,505 $4,905,875 $5,775,604 $6,730,686 Wastewater System Expansion Annexation Related WVV System Ex ansio $0 $0 $0 1 $0 1 $0 1 $0 $0 $0 Subtotal - Wastewater System Expansion $0 $0 $0 I $0 I $0 1 $0 $0 $0 TOTAL CAPITAL USES OF FUNDS $2,088,519 1 $21,800,178 1 $4,355,600 1 $5,987,421 1 $5,571,420 1 $7,335,867 $27,559,277 $7,242,543 J � Q W U W 0 Q O m LL CL LL 0 O Z CL LL U c N LN C N E U (B N O \ I- to (0 to 00 (0 N O ' ' ' 0 00 to o0 O M 0. (D I- M r M 0 V M (0 0 N r (0 r ' ' 000 000 In M M O M to V M - 0 (M N O O 0 O O ( (p 01 M (p (p 01 N O O O r- O V N N V (0 V O N O O N N O In O O V I� V In ((y 00. V I- M O r In 0) In N 0 to o0 to (D N to o0 (p 0 M 0 to N 0 In M V O (D to V 0) � (0 r M V Imo.. Vi � V N - M 0 � a` In M o \ to N CO 00 to r O ' ' ' N 00 O (0 O r 00 h- . 0) 01 I r 01 In 0 0 V V (0 V r- 00 ' ' 000 000 N O O N to to (0 (0 -p N O O O o0 O 01 In V (0 0 (M N O O O (0 V r- 0 0 0) m I- O 00 r O 0 00 to (0 V In 0) M`. In N N V (0 (0 M In N 01 V 0 M In (0 N In o0 M N r O to N r '^ N N N N M O V a-_ In 00 � (p - M V vJ 0 I� � V LQ V N - M a` 0 \ r O 00 01 0 O ' ' ' r V 0 V I- M w (0 w ' ' 000 0 O r to - M 01 ® In (0 0 00 r 0 O r O O N N O to M Iq 0 r N N (0 M N 01 O M (0 M 000 O O O 0 0 0) (0 N 01 O M M O 00 In N O r M 0 0 V w 0 V In to (0 r 0 N 0 U (0 I� M N r o0 O O In (0 V In M V O 0. (0 O In to 01 In 01 In (O N In o0 - (0 r 0 V N In N V r- M.. V Nt V N - M 0 r R a` » » rn (» In o V o0 00 ' 0) O ' ' O M V O M N I- to ' to O O to r r to - p r- 01 N � N N 00 0 r O 0 00 O O N In O O o0 0 N M N 0 0 V I� 0 � V (M (0 O to r O O r A C C �_ O(o V 0) (0 (0 N V V O I- V (0 O O (0 r O to 0 O M N In V N I (£kk. 00 V w N V N M w O (0 N N N N N O to (0 O N to (0 M V O 0) r V N M ; M 0 0 M 0) N M 01 fit In to M (0 N V O LO (0 co Nt V N- V N N V3 M. a » » U9, va o O I- O to ' V N O ' ' ' IXk 0 N N N w O r ' 0 ' O o0 0 00 O (0 -p _ (0 � I- c N (M O M 0 O M O 0 M 01 O R. V w N V 0 0 0 N 01 (0 N to r M_ O M O r N M M In V V V I- 0 r O O r O N O O N 0 to V V 0Y LO O M O M N 01 N In 0 to N (0 (0 N 0 to V 000 (0 V N N C U (0 O o0 M 0) (0 it V � O"r V M (0 O N V Z O N r O r R V N a` In O \ 0 0 o O O O to ' (0 (0 O ' ' ' r O M N N 0 0 co 0 M V N I� V O O r 0 V V M O 0 ' In ' O to r O r O 0 V N r M V to (0 r to O 0 (0 to O 01 N 0 to V 0 O 0 (0 O (0 M (0 W N (0 N V r 0 O N 0 w O O O 0 N V V O 0d. m N 0 0 0 N O (0 I - 00 V In r N 0 (0 r 00 to M CO (0 0 V V M O Y O 0 (0 M M o0 to r VC\ Ocr� N M (0 O a 0 �2 o) V N IL 0 \ N 0 o O N w 00 O O ' mom (0. V I� N O N O w ' 0 ' O 0 CO r (0 0 O Lo O In r ' O M (0 O O r O V O r V M N O M O (0. (0 r- V (0 (0 O In V In V M- O 0) M O M O In to 0 (0 0 V N M 0) (0 N O In N-7 M O O In r V O r- to O O O N 0 V V In r r M t0 M M 0 M 0 O r M In V V In V r N 0 0 (0 V (0 N 0 0 V M 0) y V V (0 00 (0 M O r- M V N m (0 M M o0 N N M _ LO )n V N M I- P+. V N N co ER ER (fl. ER (0 o M 0) O M (0 O ' ' ' 0) N.. 00 r- (0 M (0 In o0 CO (0 (0 O O M 0 (D M O to 01 O In M_ ((1 O N V (0 In N M N 01 r- O M V to N 0 V In (0 to R In 0 N 0) 02 O V N V co In 01 I� V o0 V h-.. o) (0 N N V M M (0 (0 00 M o0 N N 00 00 d) 00 I� N N (0 r I� In o0 r r (*) V O I- O M M M N M v U (O to V In - - M Q C O U) y m z LL C a O C LL O Q a R O y z Y Q Z) co U d C ) 0 U a) a) LL C 0 U U T Y m w .0 E E 6 O m o U w y o 2 to o o 1) Y o a a Z o a) y O }a m m a w o U) H m LL � y C . ` a (n p N Nw OUm a) w EaZ) a) v 2 H R v z 0 °- m 0 o o w (7 H LL Q E w A �.w :_ E O O ° mow ii � o m .I �� 00(DU)3: _ c a) °? a) a a> as a`1 w w Lou a` o a� w m o° a R R � �� r o mm O O =UU �_ Oa Y 0 C)o°pw m ® R LL L .� y (` Cc O a) a) C (` R N N (4 O d 0 p 0 �' LL m Ua o a�aC�aZ > C O �R w a m m c as U S o0_ ~ O o o > C R o R ° o o q o J o'� C E E o Z H w a a H w Q ~ LL u (� O 0 R .�R. a) a) V) O Q y` - M O O T U O i p O O O ~ w O R a) o Q(n a` oaZ) (n E m2 U)0 -~O < H Qa:U)U) n(n 0 O ® E y z o a� c Q w m LU Z W _ < :3 Z U) 0 — 0 M LL CL LL 0 0 Z M) CL LL Q 04 LN C: (D E .r_ C-) cu " . . r- It co OOOMO(OOV I* C\l Cli N 47 (0 Ci 0) Ca 0 0 0 " w [— 0 C_ C� r Ci Nt cc� C� 0 C� w O) M 0 V w r- LO Z� �; 0 :� 0 M 0 LO r- (00 Q m W N t; 0 C� C'� N cq r- O. W L6 , C-4 O V M1 cm) (0 LO CA 0 0 0 " 0 0 v w M V� c c� co q r— C ! 0 q OOM(OW 00 C� C r- o c 'It 0 � C� ( q 0 r- cq (D cq 0 :; : M M 0 M N u , It LO b' LO (0 LO N 0 M N m CO CO U) 0 L6 (6 0 N 2 IL M M (0 m Ln m 000(OOMOC:) 0 0 LO LO 00 N a C\! R q R - � r O'l "t co M r- It 0 0 :� (0 'It M 0 u 0 0) m cq LO m LQ LO (0 � w 0 C� N N co t- 0 z N V CL LO 0 0 LO LO co 0 0 0 m 0 0 ID C LO 0 � C� C� 07 07 t''7 It C� co 07 0 0 LO 0 co 0 C� C� r Ci Vi V� C� LO ( R w Oi (00 LO 0 m co 0 'It 0 M 0 : f- W O co u 0 0 C\l co 0 m 07 (O co rll � M (O (0 0) It 0 0 C� N N " R to R jA 2 U) C\l r- It (D CL E cm m M co It (0 0 0 LO r, 'It 0 0 0 M 0 co 0 LO r c0 0 0 .0 M R LQ C� (3 i C� r-� "r 1 00 - C� C� OL a) m �; V 00 M (0 ;: 0 :� V 0 u 0) 0) co R Co. co LO (0 r- 0 (3 i C� C\l C4 N (R m Q� N O 0 r— 0 "r 0 0 M 0 0 "0 0 co :: ( q co 0 w w (0 0 (3 i C 0 � r-� 'It 0 0 (Q 0 C6 0 r- 00 N 0 0 w W 0 co C� C4 co LO co ( Q co LO (0 0 (3) C� N ;z U) .2 0 CL r4 2 LO 6% U). IL 0 00 0 00 C\l U') 0 0 0 0 0 womowmo( 0 C2 It > 2 0) CL C� C4 0 LO C\[ r- C — C� 0 ( q " (3) C� r N t N t ( q C� 0 0 :� M W (0 8 C"! 1- Vi A 0 r- N O U — (q 0 03 LO (0 03 00 LO LO 'It 01 C� r N to () 0 0 0 > Cl) Cl) r— 0) 04 r r th 06 -0 N U) C\l M U). r, w (0 co 'It 0 0 0 (D 0 w 0) OCL m q N c co 0 LO M1 co LO 0 (3 i C� r ( q N t r C� V ( R W) Wi -0 Cl) 'T "i o "i o r- "i co o r- C4 N co LO N LO V LO Cl) Cl) 0 IT 0 01 V M C� 0) C\l (R R E 2 U9. 6% U). 6% U). W). U) U) - 2 0 LL a) N fA E E < > 0 o 0 0 < - 0 0 M 1) w W a) 2 > 0 0 0 < m 0 U) < W Mn . aaa u w 2 cm - i� r- u > C) 0 0 C) C > C) a) aaa -0 c 0 0) m .= a) - Fz '5 E > 0 Do = M F 0 0 = a) a) a) = -0 < C , 2 2 2 2 U) = V5 .2 Q) CL 0- w U) LL 0 0 LU 0) 12 m 0- LL (T) 0 LL 0) S S 2 < a) 0 CL w w zo� ❑ w 000 00000000900000000 Vb ooLo 00 00 0650(0(06) (O eY Et) E9 6 €fJ ER 64 E9} ER EF? 0 €fJ 69 0 69 6d Et) 69 69 ER ER M NU)1- 0 00 69 Et) 64 ER It 0 (O 0 M N 0 Z rU w O O 000) 000M00v cvoornU)Lo o N O o � v� L d w ❑ 00000''00000000000000000000 00 00 r-OOOOr- r- F ER ER ER ER K). ER ER ER ER ER O ER K). ER O ER ER ER ER ER ER EH. 6P . 0 Olf')lf') O O ER ER 00 OO V 0 lf')OO�OM O O O M M W Nw O 0 lf') lf') lf') VON M U) NO L0 N (()(3)0 O (D 6 (D 61) (O U')OMMr- V - �ER�� M lf') w 33333 IL OO OO O�Ooo� v ❑ w 0000000000000000000000000 ER ER ER ER ER ER ER ER ER E9,0 06g E»E»E»E»E»E»E» ER'Er ,000 00 O U) U) ER E» E»E» 0 ONLD 000 OOI- N J O U W 00 (M I-O O N V ON M NO lf')lf') NN M(3)M '.(O ERN ON O W MM(O O 0 fR fR N fR fR fR ERN V � ER ER ER ER ER a ❑ 00000 '.. 0 0 000000000 0 0 0 0 00000 0 0 00 O L D O O O L 0 L D w ER ER ER 0 0 O ER O O ER O O ER ER ER 0 ER ER ER ER ER Ef) 0 O O ER ER ER ER O LD O O O 0 - 0 - OO OO 0 OLDLD O(CiLQLQ q (o ❑ aoU 0LD0 00 00 o OI- N OOLDN W Y w ONO M Lo OO Lo Lo OO Lo U') 0 N 0d)r- (O ER r- Lo W r- r- 0U)U) N M M M LL N O ER ER ER ER ER ER ER O ER ER ER ER ER N M IL a O V) E R CL W 000 ER 0100000000'. ER O ° ER ER. O 6 O O ER 00000000 ER O ER. ER ER O ER ER 000 ER ER ER. 000 00 ER ER 00 ER ER OMOOOM O W O O O W M W F F O O 00 O O O U) U) O N O N U) Cl V F h U O '.O O O O O '.0V- 0001- 0 V Z F W L0 O_ O_ O_ O O L0 (3) (3) U) 0 W M 0 0 W Z N r- lf') L Lo ER (O r N M N 0 c� W O ER ER ER ER ER N ffl V V) ER ER ER ERN (O ER ER ER ER IL Q ❑ OOOO ER ER O ER ER ER ER ER ER ER O ER. 0 O Vd ER ER ER ER ER 000 OO ER ER OO ER ER 000000 O W O O O W O W d Z w O O 00 OLDLD OOO V LDO v m Cd 0 0 0 0 0 0 V — LLo L I- r- 0 LL N 6 Lo Lo 6 6 Lo 6 U) 6 ER W V) fR - N fR fR M N fR O O F O N N L0 E O a ❑ OOM0000000000000OOO C'O'ON U U LL ❑ (MON0LD 0 Lo (O I� 00 V C Z w ER ER 00 ER ER ER 0 ER ER ER ER ER ER 0 0 0000 0 0 ER ER M N 0 O N r"' 00LDN 00 V V N O NO(0000 r- O 0 O O O V r- L) (O�ON V 00 U) Q 0.000 00000. LD Lo 00 MO V OI- Lo V V (ON 0 N 10 Lo 0O_O_O 0N01 -0 N V O0L000 tor- 00 W O W V ER 0.. ER (O ER ER h- (0 0. 6-. M ` 64 i r- ER V) N ER V ER ER r ER � ER ER N V ER ER M 0 ER V N N.. M O _ M N W ER. ER ER LL >Q > d Q ❑ 00(0 O O O O 0000010001D O 00 N O'. O RD V I-O I-OL0 O N V NOD 0) 0 J ER 6c . ER U) ER fR ER W ER ER ER ER ER ER O. ER 0 ER ER (O ER � W O fR ER 00 (O N W 00 O 0 W lf') r- ER � V ER V U) N ER N M �� O M � 0 W Q N 00 Oa) � O (O V V (O N M CJ 7 r- 00 0 0 M ER N ER 0 M M W c N F U ER ER' r- d) (O M O N M U) M U) d) V (O d) d) 0 r- Q O ER M ER E M ER N m C O C O > p a) E a) O. a) d a) 0 O N N O O p cm O p U (� '0 p M O O� N n a O o E E N E (a E z m n 2 w w a) a) c w 7 o Y : 5 o E M n T E o o o 0 01 YYY O W O O (a 3 a) OL❑M❑ a N N LL j Y W Y Y a) a) a) Y N m N a) ~ OL E Cr E '0 w 7 > O E _ .� '0 R O Q a0+ N Y Y Y a) N N O U U U Y YYYY D C E a) 0 7 p E Y Q a) S N O❑ 0 W ' U y} U U a) C C C p U 0 O 0 0 0 N (� C 0)W m o O-O E c a) a) E w - 0 N >1 a) U U U yi C c O O O U C N N 0) E a m M_ N OI N a) U ,0 W 3 E Y a) N U C 0 5. a) A �• — ( C C A Y 0) U U U U O 7 d LO `0 O U a) a) `0 - 0 C c (a (a (a 0 0 2-0-0-0.0 C . - ) a) N 0) U N ( u C Z � o�3��UUU�UUU>U N N N U ���c3Q (n (a (a (a (a �Na to O (a F C ~ U o ° p m N.0 C N —_ L a) O.� a) a) a) @ $ O O N s= E m (� ❑ C() $ p J d Q vU F o ❑ w o c O D w E o 0 o 2. U `m o a) 05—° a) —° O c a a) mom Y m . 3 a) CL m E W E O O O O Y (DU) 7 o - m O O O a) mU O O 0 0 0 0 �,� O O a) 0 U(AD� ° =. a) +-' O E Q p D 0 o ...... mw O J Q tn0 • O W ED.(n MH � LL LL LL co co .in U) n (nH� F O Q IL En En U) En �N(7 k F Attachment D - Standard and Poor's Rating Report Credit Profile Attachment D - Standard and Poor's Rating Report F A w l awr. o. • i ins ' a r i� t'. + 7 I _ - r 4 i • z. �� . ' a M r • rti r Attachment D - Standard and Poor's Rating Report 6 CITY OF BOULDER WATER RESOURCES ADVISORY BOARD AGENDA ITEM MEETING DATE: June 22, 2015 AGENDA TITLE: Public Hearing and Consideration of a Motion Regarding the Utility Rates Study Guiding Principles, Issues, and Key Questions PRESENTERS Jeff Arthur, Director of Public Works for Utilities Joe Taddeucci, Water Resources Manager Bret Linenfelser, Water Quality Environmental Services Manager Joanna Crean, Public Works Senior Project Manager Ken Baird, Utilities Financial Manager Russ Sands, Watershed Sustainability and Outreach Supervisor Joanna Bloom, Source Water Administrator Bronwyn Weygandt, Billing Services Supervisor Annie Noble, Acting Principal Engineer for Flood and Greenways Eric M. Ameigh, Public Works Projects Coordinator PURPOSE The purpose of this item is to secure a recommendation from the Water Resources Advisory Board (WRAB) on the issues, key questions, guiding principles, and workplan for the utility rates study. QUESTIONS FOR THE BOARD 1. What questions does WRAB have about the public engagement process? 2. What feedback does WRAB have on the recommended guiding principles? 3. What feedback does WRAB have on the potential areas of study? STAFF RECOMMENDATION Staff recommends that WRAB discuss and vote on one or more motions that support: 1. A recommended set of utility rate structure guiding principles; and 2. A recommended draft plan of work for studying key questions and issues. BACKGROUND In late 2014, Utilities staff met with customers to better understand the impacts of utility rate increases approved by council in the fall of 2014. Many customers indicated they did not understand utility rate structures and /or had questions and concerns about the calculation of the charges on their utility bills. It is also best practice to periodically review rate setting methodology to assure the rates are meeting community goals and are aligned with fee -based principles. These findings led staff to propose evaluation of the rate structure and associated calculations for water, wastewater, and stormwater /flood Agenda Item V Page 1 management utilities as part of the 2015 work plan. As a first step, a public engagement process was implemented to solicit broader feedback across all customer classes. Public Engagement and Feedback The initial public engagement process took place in April and May 2015 and consisted of three open houses and an online survey. The open houses were held on April 29 and 30. Each open house was tailored to a specific customer class though all events were open to all customers. The three events had the following attendance: Commercial, Industrial and Institutional Customers (CII) (11 attendees) Multifamily Customers (6 attendees) Single Family Customers (11 attendees) The online survey was open for five weeks and received 123 responses, of which 77 percent were single family customers, 11 percent were multifamily, and the remaining were primarily CII customers. The public engagement opportunities were publicized via the Daily Camera (press release and News from City Hall), the city's website, the city's social media outlets, and most importantly through a post card mailed to each utility customer (approximately 26,000 in total). Despite limited participation, the open houses and online survey revealed some key themes as follows: • Concern still exists about the 2015 rate increases amongst the customers who responded. • There seems to be a general lack of understanding by many customers who responded about how current utility charges work. While stability and predictability of revenue is critical for operating the utilities, respondents also said stability and predictability in their bills is important to them. Approximately 80% of survey respondents said it is extremely or somewhat important. Open house attendees had an opportunity to weigh in on possible goals for the rate structures and also supported this goal as a top choice. Feedback indicated that predictability in their bills on a monthly and yearly basis would be beneficial to them. • Amongst the customers who responded, there is support for the stormwater rate structure to encourage improvements that decrease stormwater impact. Examples might include incentives for removal of impervious surface or installation of detention facilities. 68% of survey respondents said it is either extremely or somewhat important. Both the open houses and the survey show support for a stormwater structure that varies by location within the city. Over 60% of survey respondents said it is either extremely or somewhat important. Open house attendees also supported this as a top choice amongst possible goals for the stormwater /flood management utility rate structure. Agenda Item V Page 2 A summary of the results from the survey and open house goal voting exercise can be found in Attachment A. The complete results of the survey can be found here GUIDING PRINCIPLES In 2003 and 2004, WRAB, staff, and City Council engaged in a process to analyze the existing rate structure, to develop alternative structures that could meet the city's goals, and to ultimately choose a new approach. Staff and consultants developed and analyzed over 20 alternatives for their ability to meet the following water utility rate structure principles: • Discourage wasteful use, while promoting all justified types and amounts of use; • Be effective in yielding total revenue requirements; • Provide revenue stability and predictability; • Fairly allocate the total cost of service among the customer classes of service to attain equity; and • Be dynamic in its ability to respond to changing supply and demand conditions and /or environmental concerns. The utility rates study project provides a potential opportunity to both reaffirm the existing principles and to formally establish principles for wastewater and stormwater /flood management. The guiding principles are high level goals and speak to what the rate structures should be designed to accomplish. They are not necessarily intended to address each and every thing that the utilities do. For instance, there are certain "givens" such as meeting regulatory and legal requirements that are not reflected in the guiding principles. The public engagement process did not indicate a strong need or desire to change to the five guiding principles for water. A number of the principles also appear to apply to wastewater and stormwater /flood management. Therefore, staff believes the list could be slightly amended and organized in such a way that it not only represents a general set of principles across the three utilities, but that it also works in a customized way for each utility. Toward that end, staff has identified the following addition to the list that would specifically relate to the stormwater /flood management utility: "Encourage effective onsite management of stormwater." This is a reflection of existing policy and practice that recognize the importance of onsite best management practices in reducing impacts to public infrastructure and natural drainageways. As a result of the addition, the list of utilities rate structure guiding principles would be organized as follows: Agenda Item V Page 3 Principle Water Utility Wastewater Utility Stormwater/Flood Management Utility Discourage wasteful use, while promoting all justified types and amounts of use. X Be effective in yielding total revenue requirements. X X X Provide revenue stability and predictability for the utilities. X X X Fairly allocate the total cost of service across customer classes to attain equity. X X X Be dynamic in its ability to respond to changing supply and demand conditions and /or environmental concerns. X Encourage effective onsite management of stormwater. X Over time, the guiding principles for all utilities should be referenced regularly and guide decision making at the policy level. For the utility rates study, the guiding principles will be used as a contextual framework for all analyses and will be used to shape any recommendations that may emerge. To aid in WRAB's conversation, a Draft Interpretations Matrix can be found in Attachment B. POTENTIAL AREAS OF STUDY The purpose of the public engagement effort was to make sure staff did not proceed with analysis of rate structures without input from customers. The engagement process did not indicate a need for large -scale changes to existing rate structures. There are, however, a handful of issues and key questions that staff may pursue subject to input from WRAB. Attachment C illustrates how the potential areas of study relate to the guiding principles. Effectiveness of Water Budgets When water budgets were established, the rate structure was designed to adhere to the aforementioned principles. With the data from seven years of water budgets, staff believes now may be a good time to determine how well the water rate structure and water budgets are accomplishing those stated goals. Some analysis has already been completed along these lines. For example, the CII Water Budgets study has provided insights into equity within the CII customer class. A new analysis could focus on the equity between all customer classes. In addition, the Water Conservation Futures Study is currently being updated and will provide information about the progress on water conservation as well as possible goals for the future. Cost of Service Cost of service analyses are important to conduct on a routine basis. The analysis will determine the true costs of providing different utility services to each customer class. All three utilities would be analyzed. Agenda Item V Page 4 Fixed vs. Variable Charges In the water and wastewater utilities, customers pay both a fixed service charge based on meter size, and a variable quantity charge based on water consumption. Along with cost of service, this is another issue that should be revisited on a regular basis to make sure the relationship between fixed and variable charges accurately reflects the utilities' costs to provide services and conforms to industry standards. Outside City vs. Inside City Charges In the water and wastewater utilities, customers pay different amounts based on whether they are inside the city or outside the city. Along with cost of service and fixed and variable charges, the difference in these charges should be revisited on a regular basis to make sure the relationship accurately reflects the utilities' costs to provide services and conforms to industry standards. Stormwater /Flood Management Calculation Methodology A few issues have arisen in recent years about the fee calculation methodology that may be worth exploring. First, the current stormwater monthly fee calculation uses the same basic methodology across all customer classes. Customers other than single family residential are assessed stormwater charges based on the ratios of their lot size and impervious area to a typical single family residential lot. Some large customers have questioned whether a more complex methodology might better account for unique characteristics of their properties. For example, the fee for a large agricultural property is largely driven by lot size even though the runoff impacts may not be proportionally larger than those of a single family residential lot. Second, while revenue is collected based on a formula that compares the stormwater runoff impact of individual properties, different properties benefit from the utility in different ways. A property at the top of hill benefits from having downstream infrastructure to mitigate its runoff impacts. A downstream property benefits from having those impacts mitigated. A property in a floodplain might benefit from a capital project that alleviates the needs for flood insurance. A property already outside the floodplain still benefits from projects that mitigate impacts to access and utility service and may have already benefited from previous mitigation projects. The public engagement process and other recent input indicate some desire to look into a different rate structure that would vary fees based on location within the city. Despite the above mentioned rationale, some customers do not believe they should pay the regular stormwater /flood management fee if their neighborhoods lack stormwater infrastructure or do not have flood risks that necessitate flood management projects. Although existing policy and practice recognize stormwater and flood management services as a city -wide benefit, staff could analyze potential changes that might allocate costs based on more localized benefits. NEXT STEPS Following WRAB input on the guiding principles and a proposed approach to studying issues and key questions, next steps will be as follows: Agenda Item V Page 5 • July 2015: Staff will organize the issues and key questions into individual scopes of work and further organize those scopes into a larger project workplan. At that point, staff will determine which analyses, if any, can be completed in -house and which are likely to require consulting resources. In the cases where consulting help will be needed, staff will begin to draft requests for proposals. • August 18, 2015: Staff will update City Council and seek any additional guidance on the direction of the project. • Late August, 2015: Post requests for proposal. • September 2015: Select consultants, sign contracts, and begin work. • November 2015: Staff update to WRAB on preliminary findings and project progress. • December 2015: Staff update to council on preliminary findings and project progress. ATTACHMENTS Attachment A — Results from Open Houses and Online Survey Attachment B — Draft Principles Interpretations Matrix Attachment C — Relation of Issues and Key Questions to Guiding Principles Agenda Item V Page 6 Attachment A Total Results of Dot Voting Exercise from Open Houses aterlastewater Goal Ranking Provide stable and predictable monthly costs for customers. I St (tie) Yield sufficient funding to cover the costs of operating the utilities. I St (tie) Fairly allocate the total cost of service among different customer types to attain equity. I St (tie) Discourage wasteful water use, while promoting all justified types and amounts of use 4 Be dynamic in its ability to respond to changing supply and demand conditions and/or environmental concerns. 5 Provide stable and predictable revenue for the utilities. 6 (tie) Give thought to senior citizens (write in). 6 (tie) Attachment A Total Results of Dot Voting Exercise from Open Houses Stormwater/Flood Management Goals Ranking Account for the differences in flood risk and flood mitigation needs across different parts of the city Ist Provide stable and predictable monthly costs for customers. 2 nd Fairly allocate the total cost of service among different customer types to attain equity. 37 Discourage impervious surfaces that create stormwater runoff. 4 Be dynamic in its ability to respond to changing supply and demand conditions and/or environmental concerns. 5 Provide stable and predictable revenue for the utility. 6 Encourage stormwater improvements that lessen the impact of stormwater runoff. 7 V JU2l. goejjb V JUE)Wqz)ellv 9 0 CL 7@ 4-1 0 LO C) N L6 Q- cu _0 (1) a) C: 0 a) a) -]�-j cu a) a) -P-0 cu 0 C) C/) (1) C/) C: 0 a) a) - a E 0 m t 1..... 1 •... i • is i i i •.:... t i !r •.... t • : Yt........ t 1.' t • f • i • Cy i, I a i V luawgz)ellb e e X ° m e e ° m N v In u N r 0 e Y Y E � Y � a ■ C 111 IJ d « CL \ CL C 6 d S 4 : � CL : � 4 : w d � 6 6 d � 0 . � d a y d: 4� d : � I m B Vluaw q]B v � » - - \ Vluaw q]B v 4- 0 CL 0 L- CL 0 0 75 CN Lrl rw rw V JUE)Wqz)ellv M ............ ............ 11 • • 11 I V JUE)W gz)elly I }� M V JUE)Wqz)ellv Lrl rw rw E r � r x x x a v ° E ff C ',,. ME E CL LO ° Y Q o Y U7 co d V JUE)Wgz)elly I • • • • r- I I M V JUE)Wqz)ellv Lrl rw E rn Ln w rw E L � o u ■ � j Q Y a � Y cr Y r 0 Y w — U7 r -a a� d V JUE)Wgz)elly I W I M V JUE)Wqz)ellv Lrl rw rw 1 : I LL: 00 0 1-C I iL x w e c ol TO I W I V JUE)Wqz)ellv ry VL VL Z3 13 k- LL. ic -M, u f � \ u VL V JUE)Wqz)ellv a • • s i • M 0 • • • i m z w M V luawgz)elly 0 e 0 m 0 e X 0 m 0 0 v 0 0 rw 0 0 Y V, Y • V, Y k Y .0 �J i CE i E x E° ° c w w ■ 9 a • • CD M # • • # # # M # # ■ #. m 1 2 1 In I ry I ry x x x x x n ry u n i iai vi ni wi u < b luawpejjv u u u u a u u w a u w O ■ o E 4 E o 4- X17 M Z U Y7 rn U} < b luawpejjv •, • • • CD m s, ! • s • ! ! • 0 ! !,, m z -�1 V luawgz)elly 0 e 0 m 0 e e 0 m 0 0 v 0 0 rw 0 0 Y Y • C Y Y i �J i � i E x E° ° � w w ■ •, • • • s , # s # # # s • # # # • # # s # # # r I ry I ry I� I ry � � � ti ti rt � M n wi � n � w w w < b JUE)W gz)elly u u u u � u u a u w O ■ 4- X17 n 2 Y7 rn U3 < b JUE)W gz)elly � � � � � � ri rm � � � � } : � < . � . : : i> 0 : $> CL .. � . , . . < c y 0 CL V JUE)Wqz)ellv B '� -- �� -: B ;` -C| -Ci 1-C i : _| -- -. I f ' ` IL _ _ F in _ _ m _ � : - _ _ m _ w : _ : _ : : r- n ' M� _ m Lrl _ § _ < } ? \ i> 0 � : \ � } ■ � . r > 3 . . co , } 4- \ : \ C 4 0 : § f v F - - v m • - o 2 ■ ME Ll : u 3 v ■ M Ll ■ u � v A a ■ E B _ lz ■ v ° t - � u f E � v m ° 2 � E o ■ % • o M M E EL § U N - : - M V JUE)Wqz)ellv I m B § _ < } ? \ i> 0 � : \ � } � . r > . . co , } 4- \ : \ C 4 0 : V JUE)Wqz)ellv I m B P P ■ As m c M E .0 ' m -0 c E I IL W u Y c c 0 0 0 0 U) 0 CL U) o E U (D 0 U) CL V luawqz)ellv CY 3: m m r- m LA -it rl F.7 M I e, I m - 0 I YI rt LA ■1 w7 LA N YI +p M1 Ri ° M ° � M1 LA ° N M N Ln -& M1 M1 M M1 M1 M1 M1 M1 M1 M1 M1 M1 r N r ° N n ° r ui n r ui M ° ■i ° I ti r M ° ■i ■I ° ■i M ° ti r ■I u A r N n i n N r M y 1 r i u ti i r M I i °° n 6i r F- N i °° M ti ° N ■I A N u N M i r r i ! ! ! it ° r r ° u Ir � ° ui ■I n ui r A it ° r r w u ui N M M ■i M M ■i LA M rw m M w L11 r !Y r N r N r n i ■1 wi r r r r ■I ■i r ■I i M ■i N r r r r vi N 0 ry ■i r ■1 r r N i r !r r r ■1 r r i ■I ui pq M i r YI ti Sew r S� r X ° SG ° X° X g° n n ° N N N n r n M r M r ■I I` r ■I AI r ■I AI r ■I ui r ui r r r r vi SG ° SG T X SG '^ SR ° n r N ti rt ti n r ° ■1 i r M i r M ■i N N i ■I i ■1 r r r m ■1 r r ul ti r i n it r i N r ti rw u i r n A r A M ■i M ■i g u :x r - M m N ° r ry ■1 wi r n r ri ■I u A r M ° i n n A n wa i r r ti r ° i i Y r r Y C C C C C } Y - E 3 w D d E C Y S ■ } u w ■ w G a u ■ C } DJ w Y DI ■ Y DI D } ■ Y __ Y S f 01 e °- e 71 `u DI a °- ■ � `Y o i E u ■ w ■ ti Si i e :1 E ■ w■ :1 w } E i p W d u' d u - a - a d W u L, u u t m V u! 7 V luawgz)ellb M 0 • m y ., ! ! i y 1 ! ! ! y ! • 0 V luawgz)ellb M 0 • m y ., • • • • • �. , • • s Lril i, ii 1 52 I m r"i K a I V JUE)W gz)elly i� 0 0 0 m 0 a 0 0 0 w 0 0 �n 0 rw 0 0 E i a E c 52 7 I m 0 i I M V JUE)Wqz)ellv • • • i s 52 I m I V JUE)W gz)elly 0 e 0 m 0 e e 0 m 0 Lrl 0 v 0 0 rw 0 0 ■ a ■ � x � E c ■ ■ w : : : : : : : Nil ; ( m m B VJUQWq]B v w LU + � Lc 0 6� � 6 . . m 6 : d d > t d� 6 � : w <« 6 � ■ : u ■ : : � ■ ■ C v . � §� I A J ® V JU@Wqjejjv _ - - ri- - Ln - 2 _ - w LU + � 6� m 6 : d LC 0 : � : 6 � : w <« 6 I m B V JUE)Wqz)ellv � � F m w - w & w « « « « « rl r m r r- : F- u ° « « � ° m r : : : n u 14 ru r m rw m g m rw w rw � ru � � ri k rm rl rw n - n n r Ln m m V. r pq § % • O E § ■ u3 v § v � � §� § _ IL Vu I L / u o f ■ � u � 2 v % a V JUE)Wqz)ellv rw rw o rw Lrl r r m r -d- M E All !; n r 4 i ui i pi ■i is ri �F L^ :F v n :it rw ° n s , ■1 IV r r i • V ■1 ■1 ■1 r • ri ■i r ■1 I` r r r r lit N !W n r n 0 n IV n r ti • i ! 0 IV r r r M RI A ti rl w N Ir M r n ■1 r rl ■1 rw r ■i IV V rl 1-i rl i VI ry V 0 l ry i VI n ry VI ■1 ■1 F4 r r 6 M M r w - a `u - a -a -a ° n w G .LU Y u 7 `t d 7 L ■ w a E L 01 w L w L P ■ w L w C w■ L D w u Y Y M u Y p Y C C Y Y a G a o Y 'V01 y V V C L E■ w■ '�1 w N . o E■ ■ -U .L ri o 'S i. : u� v '� Y � n y o u `u o v E ■ mo w r. 7ii n e Y o a Y � f Y Y■ Y u ` a Y ■- E u E Et e v Y u■ 7i1 u u u u `u Y o u_ u u — w 7i1 ui u u o u u L w w w o L Y 0 d 'F* u o L n n L w 7 Q o u Y L Y Y C C 0 ■■ u L d n V luawgz)elly w w y • r • !; 0)0 4 i s , i • • s �r •......: • i ! 0 m V luawgz)elly w w y e e e e ME l e xM1 x' x m M1 x 1° x m n r Ir u n r rt u •4 rt r r vi ri m ri w CD ! i x x ry x r x x x m x° u rl r u r r u m r ti ti n F m u ■l T YI rt M1 n M! u Fl: n u ti u vi � �i ui i ui ■i m y ti rt r' n � u u ti N rr rr rr r n m III Ir ru A ti m M A m m r4 r M N Yl Fl ti N v 4 F-: r ■ ■ L 7 Y ■ ■ 3 o u■ 13 C 7 w ° p u ■ Y p 7 ■ w ■ 7 p p w p Y 7 Y C ■ 1 w ■ Y 7 C ■ p Y ■ Y G 7 . C p . Y r i ° a - G 7 7 Y Y 7 1 Y .E w ° w u �r D a E Ti 7 a 7 E u a e t uu t � a ? Y Y Tir .E ° Y Y p 7 Y ■ d tii Y ■ S'i Y ■ Y u .w 7 ■ Y . Y v 7 `d p Mr T 3 u p ■ G w p ° 01 C p Y w p 7 Y Y Y C Y p_ Y Y Y _ 7 Y Y Y w S L 'v ■ 7ir n L C E i u L F-- n n! L a s L ti 7 Q o u u L Y C ■ E 'v L Y p C u V luawgz)elly w 0 1 I El # l !. • ■F • •4 • • LL CD ! • • c o E • E lw 4a 0 CD • • M !u wo ! V luawgz)elly w 0 1 I El It C%- \« :�� � w . � . ? °d 4 . � d CL dm 4 : w : CL .\ . � : � « 4 . � � 6 wo B Vluaw q]B v � 0 � ■ � ■ � 0 � � � LN � � � ■ � � � 0 � 0 v z � 0 0 4 - - 0 CL a C;) a 0 o CL 42 (1) 0 0 .2 75 CL 0 0 CY o I M V luawqz)ellv O U Q :d cl Cli � O N -0 Q O U O CA CA O N O v CA O O C�j bA cd CIJ r U O CJ O. E � N O � O p N C�j N O N 4 N C�j O O O N z CA� j 0 CA o CA o �CA CA ��� U N > O �. N U C�j r� CA cd O c H y U N C�j 4� N O N z z j o C C,j CA � CA �. �. O CA_ U O o O N C�j . cd C A CA p O p cd p O N Cj N O a y • ^. w� eC � � � � � � i i � � � • � O �" � _ "� O � � O � +" t.' • � "� ice. •.. +� ^� O i. U U b�A 'C O U a O O R U cl on o .� � U O Cj 'C Cl �. to V V •� O .� O H O N CIJ N O V �bA O 0 a cd U bA . cl V U 0 cl ^� Q N U ,s." w O U U }• to cl 7- cl �+" U to U cl cl U 1 4 1 1 ) O N �. U cl cn cl O U U cn c 4 cl cn U U • Ga C 0 cl V] N 4 C H • �r N to N 7 — o �. U cl cl U s•. �" +' O U �, U U cn cd cl U cd N O �. rn S•. � .T"'. O �, O •+� O U v� p� 0 cn U U O p V U 0�� O C4 r3 c n cn S f. v� cH cn cl cn U +' O U 4-i U U cn cl cn 'o U •+' U rn N Cam. U N 0 O to �-0 ° wx•�-� cl o wx ° w¢ w� � ¢ ��° w� • U � rn �, � � � � ` � • bA � O • S. •'9' i. ,� V .. U Ste. +1 Id • A CL CC W E �Q s W CL w vi O �Q s •'� G�