HomeMy WebLinkAbout1-26-2015 Complete WRAB PacketWATER RESOURCES ADVISORY BOARD MEETING
MEETING DATE: Monday, 26 January 2015
MEETING TIME: 7:00 p.m.
MEETING LOCATION: Municipal Services Center, 5050 Pearl St., Boulder, CO 80301
Agenda Highlights:
1. Call to Order (7:00 p.m.)
2. Approval of 15 December Meeting Minutes (7:01 p.m.)
3. *Public comment (7:05 p.m.)
4. Information Item - Presentation by Silvia Pettem and Carol Ellinghouse — "Boulder's Waterworks
Past & Present" (7:10 p.m.)
5. Information Item - 2014 Year in Review (7:50 p.m.)
6. Matters from Board and Staff (8:30 p.m.)
• Utility Rate Study Kickoff
• Update on State Water Plan
7. Discussion of Future Schedule (9:25 p.m.)
8. Adjournment (9:30 p.m.)
* Public Comment Item
Agenda item times are approximate.
Information:
• Please contact the WRAB Secretary email group at:
WRABSecretary @bouldercolorado.gov
• Packets are available on -line at: http : / /www.bouldercolorado.gov —A to Z. Water
Resources Advisory Board (WRAB), Next Water Resources Advisory Board Meeting
CITY OF BOULDER, COLORADO
BOARDS AND COMMISSIONS MEETING MINUTES
Name of Board / Commission: Water Resources Advisory Board
Date of Meeting: 15 December 2014
Contact Information of Person Preparing Minutes: Andrea Flanagan 303.413.7372
Board Members Present: Vicki Scharnhorst, Mark Squillace, Lesley Smith, Ed Clancy
Board Members Absent: Dan Johnson
Staff Present: Jeff Arthur, Director of Public Works for Utilities
Bob Harberg, Principal Engineer, Utilities
Tom Settle, Water Treatment Manager
Steve Buckbee, Engineering Project Manager
Joe Taddeucci, Water Resources Manager
Steve Folle, Water Treatment Plant Supervisor
Jake Gesner, Hydroelectric Program Manager
Bret Linenfelser, Water Quality and Environmental Services Manager
Andrea Flanagan, Board Secretary
Cooperating Agencies Present:
Gary Fuller, Project Manager, HDR Engineering
Brian Daw, Project Engineer, HDR Engineerin
Meeting Type: Regular
Agenda Item 1— Call to Order [6:00 .m.]
Agenda Item 2 — Approval of the 17 November 2014 Meeting Minutes: [6:01 p.m.]
Motion to approve minutes as amended from November 17 as presented.
Moved by: Squillace
Vote: 4:0 (Dan Johnson absent)
Agenda Item 3 — Public Participation and Comment [6:05 p.m.]
Public Comment: None
Board follow up: None
Agenda Item 4 — [6:07p.m.]
Matters From the Board:
WRAB Response to City Council Retreat Questions
Motion to approve this letter as amended.
Moved by: Squillace
Seconded by: Clancy
Vote: 4:0 (Dan Johnson absent)
Board Member Clancy brought up the below matter(s):
• Discussed CIP with regard to major changes with funding for storm drain upgrades and
improvements.
• Suggested more lobbying to tell people that flood mapping is the first step towards mitigation,
which there seems to be f a lot of effort and funding towards. There is a distance between when
the maps and mitigation actually start. Suggests using caution due to the fact that these
decisions will continue to have a substantial impact to high risk neighborhoods.
• Cautions against saying that mitigation is coming soon, which is not necessarily the case.
• States that there seems to be a rush to do mapping, and questions what the urgency is to get
more people inside areas with higher insurance rates?
• Suggests tailoring mapping with mitigation instead of spending more money on mapping.
• Provided handouts and discussed report on phosphorous removal in wastewater treatment
process. Discussed the potential of using retrofitting in the trickling filter process to manage
phosphorous, which would result in a huge cost savings
• Questions right -hand turn at 7' and Iris in mapping study.
Board member Squillace brought up the below matter(s):
WRAB Minutes
15 December 2014
Page No. 1
• Suggest using caution when using the word "resilience" as it can be a slippery slope for water
management and suggests using care when using this language.
• Questioned what it would take to study existing trickling filtration process for phosphorous
removal?
• Asked for clarification on deadline for residents to submit their surveys to the city for
consideration in study before sending to FEMA.
• Expressed concerns about areas that flooded during the 2013 event that did not show up on the
recent flood mapping studies, as well as areas that did not flood, but are now classified as being
in the floodplain.
Board Member Johnson brought up the below matter(s):
• Provided written comments and edits regarding letter to Council.
Board member Scharnhorst brought up the below matter(s):
• Questions if alum or ferric chloride are being used in trickling filter process to reduce
phosphorus.
• Suggests adding topic of using trickling filters as a future agenda information item.
Board Member Smith brought up the below matter(s):
• Discussed recent training with Association of State Floodplain Management, which addressed
FEMA's underwriting of flood insurance.
• Discussed a study on headwaters at South Platte showing record levels of drugs and genetic
fragments. Questioned if this was also the case at city of boulder wastewater facility, post -
flood.
• Asked for further clarification on whether spiny waterfleas are primarily a nuisance for people
fishing in Boulder Reservoir and how that affects cross - contamination?
Matters From Staff: [6:48p.m.]
• Jeff Arthur noted that an updated FAQ on the city's website, which will provide answers to many
complicated questions about Two -mile Canyon.
• Noted information item memo on aquatic nuisance species.
• Noted that an item will be presented to City Council on December 16 regarding imminent domain
for Wonderland Creek Project.
Agenda Item 5 — Future Schedule [7:06 p.m.]
January:
• Rate Study Overview
• Council retreat update
• Review of 2014 operations across Utilities
• Possible Action Item Stormwater & Flood Management Monthly Fee
Agenda Item 6 — [7:09 p.m.]
Information Item —
Betasso Preliminary Capital Improvement Project Design Alternatives
Tom Settle and Steve Buckbee presented the item to the board, which included a PowerPoint
presentation.
This agenda item is intended to provide updated Betasso Water Treatment Facility, (BWTF),
assessment, design and design alternative information ahead of the preliminary design and design
alternative selection by providing:
❖ Background information
❖ Equipment and process assessment
❖ Listing of alternatives
❖ Schedule of key milestones
No formal action by the WRAB is requested at this time. Staff is seeking general feedback from WRAB
on the project direction, the evaluation criteria and the list of alternatives being considered.
A tour of the facility will be provided following the meeting. Staff will return to the April 20, 2015
meeting with a preliminary design and an updated cost estimate.
WRAB Minutes
15 December 2014
Page No. 2
WRAB Discussion Included:
• Question whether residuals are sold to farmers or being landfilled?
• Question about redundancy around plant and alternative ways to get power if the grid goes
down? How does a backup generator serve as be a viable solution?
• Question about sustainability of plant in the future?
• Question about where the pay -back is with some of the ideas for improvement found in the
alternative analysis.
• Board member states that she is very impressed that staff has done their due diligence,
considering every component possible and feels that $20,000,000.00 is not an extreme figure
considering the age of the existing infrastructure.
Adjournment [8:10 p.m.]
There being no further business to come before the Board at this time, by motion regularly adopted, the
meeting was adjourned at 8:10 p.m.
Motion to adjourn by: Squillace; Seconded by: Clancy
Motion Passes 4:0
Date, Time, and Location of Next Meeting:
The next WRAB meeting will be Monday, 26 January 2015 at 7:00 p.m., at the City's Municipal
Services Center, 5050 Pearl St., Boulder, CO 80301
APPROVED BY:
ATTESTED B3
Board Secretary
Board Chair
Date
An audio recording of the full meeting for which these minutes are a summary, is available on the Water
Resources Advisory Board web page.
WRAB Minutes
15 December 2014
Page No. 3
CITY OF BOULDER
WATER RESOURCES ADVISORY BOARD
INFORMATION ITEM
MEETING DATE: January 26, 2015
AGENDA TITLE: Information Item — 2014 Year in Review
PRESENTERS:
Jeff Arthur, Director of Public Works for Utilities
Bob Harberg, Utilities - Principal Engineer
Joe Taddeucci, Water Resources Manager
Bret Linenfelser, Water Quality Environmental Services Manager
Ken Baird, Utilities Financial Manager
Tom Settle, Water Treatment Manager
Chris Douville, Wastewater Treatment Manager
Greg Izzo, Public Works Maintenance Manager
Eric M. Ameigh, Public Works Project Coordinator
L PURPOSE
A significant portion of the work performed by the Utilities Division relates to the day -to -day
operations and maintenance of existing infrastructure. While the WRAB has a very limited role
in these activities, recommendations on capital improvements, master plans, and policy issues
have a significant impact on operations. This memorandum provides an overview of 2014
operations to provide the WRAB with additional context for upcoming agenda items where the
board will be asked to make recommendations as well as highlights of the 2014 capital
improvements program.
IL OVERALL MISSION
The mission of the Utilities Division of the Public Works Department is to provide quality water
services, as desired by the community, in a manner which protects human and environmental
health and emphasizes sound management of fiscal and natural resources. This includes the
following services:
• Potable Water Treatment and Distribution
• Water Resources and Hydroelectric Management
• Wastewater Collection and Treatment
• Stormwater Collection and Conveyance
• Water Quality Protection and Enhancement
• Infrastructure Planning, Construction and Maintenance
AGENDA ITEM #_V PAGE,
• Administration and Emergency Planning/Response
III. TOP STORIES OF 2014
Each year brings new developments, anomalies, and notable events. 2014 was no exception. The
following items are some of the key stories of note from this past year.
Significant Precipitation
Boulder experienced higher than average snowfall during 2014. Total snowfall was 106 inches,
compared to an average of 90.7 inches. Since 1893, Boulder has experienced only 18 years with
greater than 100 inches of snow. Total Boulder precipitation for the year was 23.57 inches,
compared to an average of 20.69 inches. Boulder's reservoirs were fuller than normal at the start
of the year, primarily due to the heavy rainfall during September 2013. Reservoir storage levels
ranged from 80 to 90 percent of capacity, compared to averages for the same period of 50 to 80
percent of capacity. In addition, the snow water equivalent (SWE) at the University Camp Snotel
site was well above average throughout the early part of the year, reaching about 170 percent of
average at the beginning of the snowmelt run -off in mid - March. Boulder's reservoirs filled and
spilled, and no drought stage declarations were needed during 2014. On a state -wide basis,
drought conditions improved significantly during 2014. At the beginning of the year, only 32
percent of the state was classified as drought free, but by the end of the year, almost 70 percent
of the state was considered drought free. The good availability of water this year also allowed
water conservation staff to dedicate more time to strategic and longer range projects.
Additional 2014 Impacts of 2013 Flood
The immediate impacts of the flood were clear, but there were follow -on effects into 2014.
Wastewater Treatment Facility: Infiltration of additional water into the sanitary sewer
system as result of the flood and high groundwater throughout the year meant higher than
normal flows into the Wastewater Treatment Facility during 2014.
Boulder Reservoir: The flood caused the Boulder Reservoir Water Treatment Facility to
shut down due to extreme reservoir turbidity. It is estimated that the flood created a
sediment load to Boulder Reservoir twice the annual average. Boulder Reservoir water
quality indicators remained well above normal levels into early 2014. Those levels
decreased over the winter months and returned to normal by the end of 2014.
Staffing Needs: The flood necessitated new or accelerated capital projects which in turn
required new staff positions to manage them. Two new positions were budgeted in the
Flood and Greenways work program (Utilities Planner and Flood and Greenways Project
Manager). The Utilities Planner position was hired in July as a fixed term position
pending approval of the 2015 budget and the Flood and Greenways Project Manager
position was hired in December. A Flood and Greenways Civil Engineer I was hired in
December to fill a vacant GIS position.
AGENDA ITEM #_V PAGE 2
First Year of Many for Flood Response
A number of efforts took place to restore or improve the function of the water, wastewater, and
stormwater systems impacted by the flood.
• The city comprehensively inspected over 140,000 feet of sanitary sewer pipe and added
new lining to nearly 10,000 feet of sanitary sewer pipe. A multi -year program to identify
deficiencies and repair the wastewater collections system will ramp up significantly in
2015. Similar efforts to identify and repair or replace sections of the city's stormwater
collection system began in 2014 and will continue into 2015.
The flooding that occurred on Boulder Creek and its 14 tributaries resulted in the
deposition of large amounts of sediment and debris within the waterways. As a result,
720 tons of debris and 46,000 cubic yards of sediment needed to be removed from the
major drainageways in order to restore drainage capacity. Significant effort was also
expended in repairing drop structures, areas of erosion, and channel infrastructure. It is
anticipated that this work will be complete later in 2015.
Phase 1 of the Pre and Post Wildfire Planning project focused on refining a small -scale
watershed analysis and hazard ranking (e.g., wildfire hazard, flooding /debris flow hazard
and soil erodibility) for the Boulder Creek watershed. A hazard analysis of water supply
infrastructure in the Boulder Canyon area was also completed. A WRAB update on these
efforts is scheduled for July 2015.
Increased Public Engagement
2014 work efforts related to flood response and preparation were significantly influenced by
increased public enagement and awareness.. The debris and sediment removal project required
extensive communication with property owners during the spring runoff when property owners
were under heightened awareness following the September 2013 flood.
The Utilities Division played a key role in outreach and education on flood - related matters in
2014. Efforts included open houses, door to door contacts, informational inserts for utility bills,
and a new Community Guide to Flood Safety. Staff also held numerous public open houses and
other meetings to talk with the public about floodplain mapping, flood mitigation planning, and
upcoming capital improvements. This level of engagement is very likely to continue into 2015
and beyond as the community works together toward recovery and resilience goals.
Funding Increase for Utilities
City Council approved the 2015 budget which included rate increases of 5 percent in the water
fund, 30 percent in the wastewater fund, and 75 percent in the stormwater and flood management
fund. The budget includes significant additional investment in utilities infrastructure, with an
emphasis on the wastewater collection system and flood mitigation projects, as well as increased
staffing in all three funds.
Succession Planning
Improving economic conditions contributed to a large number of anticipated workforce changes
materializing in 2014. Three of four supervisors retired at the Wastewater Treatment Facility in
AGENDA ITEM #_V PAGE 3
2014. In Water Treatment, 2015 will see one third of operations staff with less than a year of
experience working for the city. In the Utilities Maintenance group, 20 of 40 employees have
different jobs from the ones they had at the beginning of 2014. Across all workgroups, attracting
and retaining employees has been a challenge. The pools of qualified candidates seem to be
smaller than in years past and many qualified candidates have been unwilling to accept current
wages and /or shift schedules. The Utilities management team and the Human Resources
Department are working together to evaluate job descriptions and pay scales to insure the city
remains a competitive employer into the future. Previous succession planning efforts have
allowed for smooth transitions and helped avoid impacts to service delivery. At the same time,
the influx of fresh ideas and new energy have supported substantial progress on establishing a
strong culture of continous improvement across the division.
Irrigation Ditch Demands Intensify
In addition to managing and operating the city's source water supply, the Utilities Division's
Water Resources workgroup has a role supporting irrigation ditch matters. The associated
demand on staff time has been increasing for a number of years, and has further intensified since
the 2013 flood due to saturated ground water levels, changed drainage patterns and heightened
awareness in the community. Irrigation Ditch work dominated Water Resource's work load in
2014, and as a result, an additional position was approved for Water Resources through the 2014
budgeting process.
IV. FINANCIAL OVERVIEW
Water Use Based on Billed Consumption
Billed water consumption in 2014 was the lowest in over 20 years. Compared to 2013,
consumption decreased by 3.5 percent. There are a few reasons for such low usage, including
weather and the effect of rainfall on outdoor watering. Boulder saw 23.5 inches of precipitation
in 2014, which was the second highest in 10 years. As Figure 1 shows on the next page, the
relative decrease in consumption was most pronounced August through October. This was due
not only to higher than average total precipitation during those months, but also the frequency of
rainfall and a freeze and snowfall coming relatively early in September. Another factor
contributing to lower consumption is indoor usage as measured by Average Winter Consumption
(AWC). AWC represents average consumption from December through February, when most
usage takes place indoors. For single - family residential, AWC decreased by nearly 4 percent
compared to 2013, which continues a long -term downward trend. Indoor use has been decreasing
due to water conservation measures such as more efficient fixtures.
AGENDA ITEM #_V PAGE 4
Fi ure 1: Billed Monthly Water Usage in 2014
Billed Monthly Water Usage - inarousaedsofgaAtms
900,000
800,000
700,000
12014
600,000
t 2013
500,000 —� 2012
400,000 2011
300,000 --*-2010
200,000
100,000
0
Jan Feb Mar April May June July Aug Sept Oct Nov Dec
Revenues
The decreased billed consumption resulted in revenue for water use coming in around
$2,100,000 less than anticipated. Fortunately, Plant Investment Fees (PIFs) were at about
$4,500,000 more than projected. This was primarily due to several large private development
projects that had been deferred due to financing difficulties during the recession moving forward
with construction. Both the Wastewater and Stormwater/Flood Management Funds were also
helped by the higher than expected PIFs, and all the utilities funds ended the year slightly above
revenue projections. Plant Investment Fees represent "one time" revenues and staff will continue
to carefully track trends in billed consumption which have a stronger correlation to the financial
health of the utility.
Flood Recovery Grant Funding
In addition to continuing to work with the Federal Emergency Management Agency (FEMA) for
reimbursement of flood costs, city staff has been successful in seeking other grant funding
related to flood recovery. One award from the Colorado Department of Public Health and
Environment provides approximately $1,600,000. About $600,000 will be used for design and
construction of the re -route of the wastewater interceptor at 61s street, and the other $1,000,000
will support design and construction of the extension and installation of city water lines for the
Githen Acres neighborhood for annexation to the city. Another grant award was from the
Community Development Block Grant — Disaster Recovery program, which provided $500,000
to contribute to the required FEMA local match for sediment and debris removal in
drainageways.
V. OVERVIEW: WATER RESOURCES
Water Abundance
The city relies upon snowmelt runoff to fill and store water in its upper Boulder Creek basin
reservoirs each year. While the snowpack at the beginning of the year was slightly below
average, the snow water equivalent in the city's watershed had risen to over 160 percent of
average by the middle of February.
AGENDA ITEM # V PAGE 5
Owing to the greater than average snowpack, the 2014 peak snowmelt runoff season greatly
exceeded the historical average. Figure 2 includes 2014 and historical average stream flow
conditions upstream of Barker Reservoir. Except for May, prior to peak snowmelt, the basin
experienced frequent and /or prolonged "free river" conditions throughout the year. This means
that water availability exceeded active water rights diversions. As a result, the city was able to
lease about 7,300 acre -feet of water for agricultural uses and no drought - related curtailment was
required in the leasing program.
2: 2014 Middle Boulder Creek Streamflows at Nederland
�4n
6
2
L
Ci
6
0
'fie 4 4
— a114 • Ffemcl�� � m y��s d �� 7t I��a�a�
Water Sources Summary
The snowfall and runoff from the 2013 -2014 winter allowed the city to fill its mountain storage
reservoirs during the spring. The city used a total of 2,838 acre -feet of Colorado Big Thompson
(CBT) water in water year 2014 (November 1, 2013 to October 31, 2014). This represents a
greater than 70 percent reduction from the 10,307 acre -feet used in 2013 and reflects the
abundant water supply in the city's native basins during 2014. CBT water is intended to
supplement native basin supplies. Figure 3 on the next page shows a summary of historic water
supply composition.
AGENDA ITEM # V PAGE 6
3: Historical Source Water SuDDly Composition
City of Boulder Water Sources
30,000
25,000
20,000
v
v
15,000
ra
10,000
5,000
0
Year
Native Boulder Creek Water (Direct Flow) n Native Boulder Creek Water (Storage) BC Direct Flow by Exchange 11 BC Storage by Exchange ® CBT /W6 Boulder Res WTP
BaulderCreekSupply Northern Supply
Hydropower
The city received $2,435,000 in hydropower revenue for 2014 compared to projected revenue of
$2,406,000. Total generation for 2014 was about 51,000,000 kilowatt hours (kWh) or enough to
meet the average annual needs of approximately 8,000 households. Hydroelectric power
generation during 2014 displaced the need to burn approximately 25,000 tons of coal at a
traditional, coal -fired power plant.
The high reservoir storage levels and increased stream flow above Barker Reservoir prior to the
2014 snowmelt provided a somewhat unique opportunity to increase generation at Boulder
Canyon Hydroelectric (BCH) during a time of year when the city is normally using its stored
water for municipal supply. Because Barker Reservoir levels were still high following the
September 2013 flood and because runoff would be greater than average, the city increased
production at BCH during February through May.
The city met its projected hydroelectric revenue for 2014 despite significant outages at several
hydroelectric facilities. Betasso Hydro was offline for approximately 8 months due to
unscheduled outages for mechanical and gravity pipe repairs. BCH was out of service for
approximately 8 weeks due to Barker Gravity Pipeline repair needs.
AGENDA ITEM # V PAGE 7
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Irrigation Ditches
The Water Utility is a shareholder in several irrigation ditch companies. Sections of many of the
irrigation ditches in and around the city were damaged or compromised as a result of the
September 2013 flooding.
Irrigation ditches intercept stormwater from the upslope areas above the ditches due to their
alignment along a line perpendicular to the slope of the land. The 2013 flood had a significant
impact on most of the contributing natural drainages and city stormwater facilities. The net result
of those impacts was increased stormwater contribution to the ditches. During 2014, Water
Resources staff responded to an increasingly large number of residential complaints related to
irrigation ditch and stormwater interaction, especially during spring and summer thunderstorms.
Water Conservation, Resilience, and Regional Collaboration
Water Conservation is a part of long -term utility goals and while key aspects of the programs
remain constant, in wetter years additional resources can often be placed into longer term
planning goals and regional collaboration. In 2014 the Water Conservation Program not only
worked towards completing the Water Conservation Futures Study and the Commercial,
Industrial and Institutional Study but it also coordinated on resilience, climate and local food
efforts. Some of the efforts noted also have regional implications which not only involve the
Boulder Valley Comprehensive Plan update but also tied back to a four year effort with the
Boulder County Consortium of Cities. A key recommendation of the Consortium's Water
Stewardship Task Force was to hold a water users meeting in Boulder County and the city's
Water Conservation Program has worked to help make this a reality. The event, scheduled for
January 21, 2015, includes a presentation on the State Water Plan followed by panels on topics
ranging from water conservation to watershed planning and from in- stream flows to agriculture.
Capital Improvements
In 2014, notable capital improvements projects in the source water system included the
following:
• Flood restoration projects for Wittemyer Ponds as well as Anderson and Farmers Ditches.
The ditch restoration projects were actually ditch company projects but still required
considerable staff time due to staff s leadership role as board members of those
companies.
• Unplanned replacement of 60 feet of the Barker Gravity Pipeline as a result of a leak that
was discovered in August 2014.
• Preparation of construction documents and bidding for the Kossler Southeast Dam
refacing project, which is planned for construction in 2015.
• Though not a capital project, obtaining a Forest Service Special Use permit for the Barker
Gravity Pipeline to occupy national forest land was a significant undertaking. By
obtaining this permit, the conditional license exemption previously granted by the
Federal Energy Regulatory Commission (FERC) for the Boulder Canyon Hydroelectric
Project (BCH) went into full effect. The exemption replaced the previous project
AGENDA ITEM #_V PAGE 8
license, and removed Barker Dam and Reservoir, the Barker Gravity Pipeline, Kossler
Reservoir and the Boulder Canyon Penstock from FERC jurisdiction. Only the Boulder
Canyon Hydro power plant and adjacent appurtenant facilities remain under FERC
jurisdiction similar to the city's other seven license- exempt hydroelectric facilities.
Upcoming Key Issues
• Internal inspection of Lakewood Pipeline. Results of the inspection should provide
information on the extent to which construction defects may impact the useful life of the
pipeline.
• Completion of the Kossler Southeast Dam refacing project (postponed in 2014 due to
licensing work and County repair work on Flagstaff Road).
• Completion of the Albion Dam and Silver Lake Dam outlet works inspection (Albion
postponed in 2014 due to high reservoir levels).
• Renewal or replacement of the city's existing power purchase agreements (PPAs), which
will expire between 2015 and 2017, requiring negotiation of new agreements.
• Continued work on irrigation ditch matters such as ditch/stormwater issues for various
ditches and support of major maintenance projects for Anderson and Farmers Ditch
Companies.
• Evaluation of climate change on the city's water supply and water conservation program
through continued work on the Water Conservation Futures Study.
VI. OVERVIEW: WATER TREATMENT & DISTRIBUTION
Operations
The city's two water treatment plants (WTP), Betasso and Boulder Reservoir, produced 5.695
billion gallons in 2014, which was 0.5 percent less than 2013 and 5 percent below the 5 -year
average. As mentioned previously, above normal precipitation lessened the demand for water.
Betasso WTP produced 82 percent and Boulder Reservoir WTP produced 18 percent of the total
volume. Boulder Reservoir WTP production was limited by Boulder Feeder Canal operations
and an abundance of "free river" water in the Boulder Creek Watershed to the Betasso facility.
Boulder Reservoir WTP also operated at much lower production rates in 2014 due to the
curtailed demand for treated water.
The drinking water system met all regulatory compliance requirements during 2014. The
Colorado Department of Public Health and Environment (CDPHE) conducted their tri- annual
inspection of the potable water system, including both plants, distribution system and operational
records. No significant deficiencies were noted in the inspection.
Capital Improvements
In 2014, notable capital improvements projects in the water treatment and distribution system
included the following:
AGENDA ITEM #_V PAGE 9
Preliminary inspection of the Sunshine transmission line between the Betasso WTP and
the Sunshine Hydroelectric Facility was started in the fall of 2013. This portion of the
pipe appeared to be in good shape and a new effluent meter was installed on the line at
Betasso. In December, work was initiated to replace the 2,000 feet of Sunshine
transmission line below Sunshine Hydroelectric Facility that is in poor condition.
• The distribution main replacement budget was expanded by 50 percent in 2014 and over
22,000 feet of water main was replaced.
• At the Betasso WTP, work was completed on a residuals pilot study and analysis of the
filters. HDR was selected as the Betasso Capital Improvement Project design consultant.
They are building on the completed studies and have completed a facility assessment in
preparation for the alternatives analysis, cost estimate and preliminary design.
• At the Boulder Reservoir WTP, a new flash mixing system was installed and an analysis
of electrical system and backup power feasibility was completed.
• Critical valves and pumps in the system were tested and upgraded to increase system
resiliency and provide for better water system redundancy.
Upcoming Key Issues
• HDR's initial facility assessment at the Betasso WTP has identified over $20,000,000
worth of needs. Currently, a little over $12,000,000 is budgeted for the project.
• Continued disposal of Betasso WTP water treatment residuals efficiently and quickly
enough to prevent impact to plant operations is an ongoing challenge.
The water transmission inspection and rehabilitation budget over the next 6 years has
been established based on known problems and inspection of other large diameter mains
throughout the city. The condition assessments will allow the city to budget for
replacement and rehabilitation in the future. This program will be separate from the
smaller diameter distribution main replacement program that is funded with over
$3,000,000 annually.
• Continued implementation of the Safety program and making budget requests for
addressing safety- oriented, physical plant deficiencies noted during 2014 inspections at
both water treatment facilities
• Training two new water treatment operations staff members. One third of the operations
staff will have one year or less experience in the two plants.
• Annexations of various residential enclaves will require the construction of water main
extensions.
AGENDA ITEM # V PAGE 10
• Review previous problems and identify solutions to address failures of the dissolved air
flotation (DAF) recycle line at Boulder Reservoir WTP. This component has a single -
point-of- failure criticality in the operation of the DAY clarification system.
VII. OVERVIEW: WASTEWATER TREATMENT & COLLECTIONS
Operations
The Wastewater Treatment Facility (WWTF) operated with no effluent permit violations in
2014, treating an average of 15,000,000 gallons per day of wastewater. Flows in 2014 were
higher than recent years due to excess infiltration entering the sanitary sewer system from the
residual effect of the September 2013 flood event and associated higher than normal
groundwater conditions. Wastewater treatment staff continued to successfully operate the
ultraviolet disinfection system that went online in 2013. The fourth full year of using electric
power generated from solar photovoltaic occurred during 2014 at the WWTF, with the overall
system production to date exceeding 6,500,000 kilowatt hours. When combining solar power
with power generated by the cogeneration system, approximately one third of the electrical
power needs for the WWTF were generated by renewable technology in 2014.
In 2014, significant work was also completed in the wastewater collection system. Utilities hired
Redzone Robotics to inspect 31,189 feet of the city's large diameter sanitary sewer interceptor
sewer at a cost of $172,185. This project was a comprehensive condition assessment process that
utilized TV inspection, laser and sonar technologies for the section of interceptor sewer from
South Boulder Rd to the WWTF. This section of sewer is comprised of 30 -inch through 42 -inch
diameter reinforced concrete pipe (RCP). This project was initiated to identify and quantify the
volume of debris remaining in the system from the September 2013 flood event. Contractors also
performed standard CCTV inspection of 113,000 feet of 8" to 12" sewers in areas which had
severe wastewater backups during the 2013 flood event at a cost $170,101. No significant
quantity of flood debris was identified in either the interceptor or upstream collection system;
however, the contractors did identify several stretches of sewer with severe structural and
corrosion problems.
The city also contracted with Stantec to conduct an extensive flow monitoring study. The study
utilized 60 flow meters installed throughout the collection system at a cost of $338,722. The
purpose of the study was to identify sewersheds with excessive rates of inflow and infiltration
(I &I) to advise the location of future rehabilitation efforts. The flow monitoring study was able
to capture the impact of the elevated groundwater table from the September 2013 flooding and
the impact of rainfall- induced I &I on wastewater flows. The study concluded that 70 percent of
the collection system is in Fair to Good condition, 29 percent of the system is in Poor condition,
and 1 percent of the system is in critical condition.
Utilities staff continued the annual cured in place pipe (CIPP) lining program and lined
approximately 9,875 feet of 8 ", 10 ", and 15" mains at a cost of $282,885. This represented a
decrease in lining over previous years because part of the funding for this program was
reallocated to the inspection and flow monitoring projects to more effectively prioritize future
efforts.
AGENDA ITEM # V PAGE 11
Water Quality and Regulatory Issues
In 2014, staff led a Front Range utility effort to receive a $160,000 grant from the Water
Environment Research Foundation (WERF) to perform a nutrient study on Boulder Creek in
order to determine what impact, if any, nutrients discharged from the city's 75 St. wastewater
treatment facility have on algae growth in Boulder Creek. Extensive water quality and algae
monitoring was conducted in 2014 to support the effort. Results will be presented to WERF in
final report due June 2015.
Utilities staff were actively involved in multiple state -level regulatory efforts as well. Primary
areas of focus for the Wastewater and Stormwater/Flood Utilities included preparation for the
June 2015 South Platte Basin water quality standards hearing and June 2016 state -wide water
quality standards hearing. Primary issues of concern for both hearings include:
Water temperature standards for Boulder Creek to protect aquatic life.
Nutrient (phosphorus and nitrogen) and periphyton (algae) standards for Boulder Creek
to protect aquatic life and recreational uses.
Arsenic standards to protect human health and evaluation of existing treatment
technologies.
Additional water quality studies will be conducted in 2015 focusing on sources of arsenic, fate
and transport of nutrients in Boulder Creek and evaluation of ammonia toxicity in Boulder
Creek. These efforts are necessary to support future compliance requirements of the WWTF
integrated into state - directed regulatory work groups.
Capital Improvements
While 2014 did not include any construction activities at the WWTF, important design efforts
were conducted. The most significant project of the year was the design for the Nitrogen
Upgrades Project. Once constructed, the improvements will increase the ability of the WWTF to
remove nitrogen in accordance with CDPBE Regulation 85 which adds nitrogen and
phosphorous considerations to future effluent permitting. This project will include the
construction of a carbon addition facility that will store both acetic acid and also weak wort
(sugar water from a local brewery) to assist with the facility's nitrogen removal process. This
project will also include modifications to the existing aeration basins to change the biological
process from an Modified Lutzack Ettinger (MLE) process to a 4 -Stage Bardenpho process.
MLE uses only two process zones (anoxic and aerobic), while the 4 -stage Bardenpho process
essentially adds a second anoxic and second aerobic zone to the MLE system.
Other improvements will include primary sedimentation basin bypass, diffuser replacement in
the solids contract tanks, and a new post aerobic digestion process which will aid in the removal
of nitrogen and phosphorous. The design was 100 percent complete and approved by the State of
Colorado Water Quality Control Division (WQCD) in December. The Engineer's Opinion of
Probable Cost for the project's construction is approximately $3,500,000.
A second important design project was initiated in 2014 for upgrades to the IBM Lift Station, the
city's only major raw wastewater lift station that serves a portion of the Gunbarrel area.
Upgrades to the station are needed to address several key issues, including Colorado WQCD-
AGENDA ITEM # V PAGE 12
mandated overflow protection, mitigation of rags and other debris, improved reliability of the
pumps, and various mechanical and electrical aging infrastructure concerns. The station was
originally constructed in 1965, and was last upgraded in 2000.
Upcoming Key Issues
• The WWTF Nitrogen Upgrades Improvements project will be bid in early 2015.
• IBM Lift Station Improvements project will be bid in mid 2015.
• Determining the path forward for the aging cogeneration system.
• Implementation of the organizational changes and associated technology to support
unattended operation at night as a departure from 24/7 coverage.
• Development and implementation of a more aggressive, proactive wastewater collection
system operations, maintenance, and renewal plan. Typically, such a condition
assessment is scheduled with a five -year recurrence interval. However, due to the
September 2013 flood, staff suspects damage is widespread and therefore the assessment
cycle will need to be expedited to three to four years in order to assess flood damage.
Significant increase in sanitary sewer rehabilitation efforts in 2015. The city intends to
use CIPP lining to rehabilitate 100,000 ft of sewer in the Frasier Meadows, Keewaydin
Meadows, and Martin Acres neighborhoods at a cost of approximately $2,000,000. This
effort will rehabilitate all remaining vitrified clay and concrete sewers in these
neighborhoods.
• Staff will place approximately 5 -10 flow meters in the collections system over an
extended period of three to five years in order to identify sewer basins with excessive I &I
and quantify any reductions in I &I that the rehabilitation program may achieve.
VIII. OVERVIEW: STORMWATER & FLOOD MANAGEMENT
Operations
The city's stormwater and flood management utility prepares the city for significant rainfall
events through floodplain mapping, risk assessments, floodplain regulations, public education,
flood insurance, flood preparedness, master planning, stormwater quality programs, and
maintenance.
Flood control maintenance operations include vegetation control in and around waterways,
mowing of native grass channels and embankments, as well as cleaning and inspection of trash
racks for ditch company agreements and culverts under roadways. This work includes both
planned and responses to calls from the community.
In the past year, staff continued clean -up efforts from the 2013 flood by removing sediment and
debris from water ways. Primary areas of focus for 2014 were:
AGENDA ITEM # V PAGE 13
Sand removal from sumps.
Clean trash grates after every storm event.
Keep waterways clear of debris.
624 tons of sand and 260 cubic yards of debris (brush/trash) were removed by city crews.
Contractors working on behalf of the city removed approximately 720 tons of debris and 46,000
cubic yards of sediment from the major drainageways, in addition to repairing drop structures,
areas of erosion and channel infrastructure. This effort required significant coordination with
FEMA and substantial monitoring and documentation. This also required a significant public
engagement effort, particularly prior and during spring runoff when property owners were under
heightened awareness following the September 2013 flood.
Floodplain Mapping Updates
• Bear Canyon Creek (from Colorado Avenue to Boulder Creek): An Open House was held
on July 1 to present the mapping to the public. The mapping was reviewed and
recommended for approval by WRAB on July 21 and was approved by City Council and
submitted to FEMA for adoption in December.
• Boulder Slough (Broadway to 30 St.): An Open House was held on July 9 to present the
mapping to the public. The mapping was presented and recommended for approval by
WRAB in a public hearing on July 21and is awaiting final construction of modifications
at the 30 St. Underpass prior to review and consideration by Council.
• Upper Goose and Twomile: An Open House was held on Nov. 13 and an update was
presented to WRAB on Nov. 17. A follow -up WRAB meeting to request a
recommendation is scheduled for March 2015.
• Skunk, King's Gulch and Bluebell: An Open House was held followed by a WRAB
meeting on Aug. 18. A follow -up WRAB meeting to request a recommendation is
scheduled for Apr. 2015. WRAB recommended adoption of the mapping at the Sept. 15
meeting pending consultant evaluation of the spill flow from Bluebell Canyon creek
downstream of 15 St.
Fourmile Canyon Creek: The Fourmile Canyon Creek mapping was reviewed to evaluate
the spill flows to Wonderland Creek based on the flood extents of the September 2013
flood. The analysis did not identify a need to update current mapping.
Capital Improvements
In 2014 the City focused on the repair of existing storm sewers and expansion of existing storm
sewers to address localized drainage issues. The City utilized contractors to repair or replace
damaged storm sewers at 30 St. & Colorado, Baseline Rd. & 10 St., 4 th St. & Kalmia, 4 th St.
& Juniper, 6 th St. & College Ave., Ithaca Dr. & Wildwood Rd., Goose Creek along Edgewood
Dr., Bear Creek at Wildwood Dr., and Two Mile Creek at Spring Valley Dr. A contractor also
excavated the detention basins at the intersection of Foothills Hwy. and Baseline Rd. to restore
their design capacity and establish a low -flow channel. Approximately 800 feet of storm sewer
on 14 St. from College Ave. to Euclid Ave. was also lined using cured in place pipe.
AGENDA ITEM # V PAGE 14
Staff held an open house on Aug. 25 to update the public on the design elements of the
Wonderland Creek Greenways project. Agreements with the Burlington Northern Railroad and
Boulder and Whiterock Ditch Company have been drafted and are in negotiations, Colorado
Department of Transportation (CDOT) has approved the Right of Way plans for the project,
easements and permits are being secured and the final design plan sets finalized. An ordinance
approving the use of eminent domain for property acquisition for this project was approved by
Council on Dec. 16, 2014.
Upcoming Key Issues
The September 2013 flood will continue to influence both operations and capital efforts for
2015. Significant sediment and debris removal will be required to restore capacity of both local
and major drainage systems. Longer term efforts will be required to restore habitat and features
such as drop structures and sediment traps. Additional key issues will include prioritization and
funding of mitigation projects, consideration of property acquisition to reduce hazards and /or
allow mitigation, and consideration of changes to regulations and design standards to provide a
higher level of protection from future flood.
Wonderland Creek Greenways Project: Eminent domain proceedings will begin to secure the
remaining necessary easements by the June 30, 2015 deadline for advertising for construction bid
as required by the federal grants for this project. This project will be bonded and will go to bid in
June 2015.
South Boulder Creek Flood Mitigation Planning: An Open House followed by a WRAB meeting
was held on Aug. 18, and an Open Space Board of Trustees meeting was held Aug. 20 and Sept.
10 to present mitigation alternatives including regional detention at US 36. Information was also
presented to Council at the Sept. 30 flood study session. City staff is working to identify US 36
detention alternatives that would be less impactful to Open Space land. An information update to
WRAB is scheduled for March 2015.
Other Flood Mitigation Planning: The following three mitigation planning efforts were added to
the work program as a result of the September 2013 flood:
• Gregory Creek: An Open House was held June 12 and a second Open House followed by
a WRAB meeting was held on Oct. 20. A follow -up information item is scheduled for
WRAB in April 2015.
Bear Canyon Creek: An Open House was held July 1. A follow -up information item is
scheduled for WRAB in April 2015 and again in August 2015.
• Boulder Creek: A watershed wide plan was initiated at the end of 2014 with Urban
Drainage and Flood Control District taking the lead on the study and city staff conducting
the public engagement process. An information item is scheduled for WRAB in May
2015.
AGENDA ITEM # V PAGE 15
IX. NEXT STEPS
Staff will present the 2014 Year in Review, with an emphasis on the year's highlights, at the Jan.
26 WRAB meeting. Staff will answer questions from the board about operational and capital
issues from 2014 as well as any questions about upcoming issues in 2015.
AGENDA ITEM # V PAGE 16