11.05.14 EAB PacketCITY OF BOULDER
ENVIRONMENTAL ADVISORY BOARD MEETING AGENDA
DATE: November 5, 2014
TIME: 6 p.m.
PLACE: 1777 Broadway, 1 st floor, 1777 W. Conference Room
1. CALL TO ORDER
2. APPROVAL OF MINUTES
A. The October 1, 2014 Environmental Advisory Board minutes are scheduled for
approval.
3. PUBLIC PARTICIPATION
4. PUBLIC HEARING ITEMS
5. DISCUSSION ITEMS
A. Smoking Ban Proposal (Eric Ameigh, City Manager's Office)
B. Environmental Effects from Flood Update (Chris Meschuk, Community Planning
& Sustainability)
C. Climate Commitment (Brett KenCairn, Community Planning & Sustainability)
6. OLD BUSINESS/UPDATES
A. Priorities/Letter to Council Discussion
7. MATTERS FROM THE ENVIRONMENTAL ADVISORY BOARD, CITY
MANAGER, AND CITY ATTORNEY
8. DEBRIEF MEETING /CALENDAR CHECK
9. ADJOURNMENT
For more information call (303) 441 -1880. Board packets are available after 4 p.m. Friday prior to the meeting, online at
www.bouldercolorado.gov
CITY OF BOULDER ENVIRONMENTAL ADVISORY BOARD
MEETING GUIDELINES
CALL TO ORDER
The board must have a quorum (three members present) before the meeting can be called to order.
AGENDA
The board may rearrange the order of the agenda or delete items for good cause. The board may not add items requiring public notice
PUBLIC PARTICIPATION
The public is welcome to address the board (three minutes* maximum per speaker) during the Public Participation portion of the
meeting regarding any item not scheduled for a public hearing. The only items scheduled for a public hearing are those listed under
the category PUBLIC HEARING ITEMS on the agenda. Any exhibits introduced into the record at this time must be provided in
quantities of eight to the Board Secretary for distribution to the board and admission into the record.
DISCUSSION AND STUDY SESSION ITEMS
Discussion and study session items do not require motions of approval or recommendation.
PUBLIC HEARING ITEMS
A Public Hearing item requires a motion and a vote. The general format for hearing of an action item is as follows:
1. Presentations
• Staff presentation (15 minutes maximum *) Any exhibits introduced into the record at this time must be provided in
quantities of eight to the Board Secretary for distribution to the board and admission into the record.
• Environmental Advisory Board questioning of staff for information only.
2. Public Hearing
Each speaker will be allowed an oral presentation (three minutes maximum *). All speakers wishing to pool their time must
be present, and time allotted will be determined by the Chair. Two minutes will be added to the pooled speaker for each such
speaker's allotted time up to a maximum of 10 minutes total.
• Time remaining is presented by a green blinking light that means one minute remains, a yellow light means 30 seconds
remain, and a red light and beep means time has expired.
• Speakers should introduce themselves, giving name and address. If officially representing a group please state that for
the record as well.
• Speakers are requested not to repeat items addressed by previous speakers other than to express points of agreement or
disagreement. Refrain from reading long documents, and summarize comments wherever possible. Long documents
may be submitted and will become a part of the official record.
• Any exhibits introduced into the record at the hearing must be provided in quantities of eight to the Board Secretary for
distribution to the board and admission into the record.
• Interested persons can send a letter to the Community Planning and Sustainability staff at 1739 Broadway, Boulder, CO
80302, two weeks before the Environmental Advisory Board meeting, to be included in the board packet.
Correspondence received after this time will be distributed at the board meeting.
3. Board Action
Board motion. Motions may take any number of forms. Motions are generally used to approve (with or without conditions),
deny, or continue agenda item to a later date (generally in order to obtain additional information).
• Board discussion. This is undertaken entirely by members of the board. Members of the public or city staff participate
only if called upon by the Chair.
• Board action (the vote). An affirmative vote of at least three members of the board is required to pass a motion
approving any action.
MATTERS FROM THE ENVIRONMENTAL ADVISORYBOARD, CITY MANAGER, AND CITY ATTORNEY
Any Environmental Advisory Board member, City Manager, or the City Attorney may introduce before the board matters which are
not included in the formal agenda.
ADJOURNMENT
The board's goal is that regular meetings adjourn by 8 p.m. Agenda items will not be commenced after 8 p.m. except by majority vote
of board members present.
*The Chair may lengthen or shorten the time allotted as appropriate. If the allotted time is exceeded, the Chair may request that the speaker conclude
his or her comments.
CITY OF BOULDER, COLORADO
BOARDS AND COMMISSIONS MEETING SUMMARY
NAME OF BOARD /COMMISSION: Environmental Advisory Board
DATE OF MEETING: October 1, 2014
NAME/TELEPHONE OF PERSON PREPARING SUMMARY: Juliet Bonnell,
303-441-1931
NAMES OF MEMBERS, STAFF AND INVITED GUESTS PRESENT:
Environmental Advisory Board Members Present: Mara Abbott, Tim Hillman, Morgan
Lommele and Brad Queen.
Environmental Advisory Board Members Absent: Stephen Morgan
Staff Members Present: Brett KenCairn, Greg Guibert and Juliet Bonnell
MEETING SUMMARY:
• The board indicated that the Boulder Valley Comprehensive Plan is a high -level vision
document that includes the community's sometimes - conflicting values, but lacks strategic
structure and fails to address where Boulder is headed as a city in terms of growth and
sustainability.
• Instead of requesting community feedback on the Comprehensive Plan, the board
suggested holding facilitated community meetings to discuss specific topics such as the
vision of Boulder, energy, resilience, housing and more. It was believed that people may
be more inclined to discuss specific issues instead of the entire framework of the plan.
• While gathering community feedback the board suggested using questions that will result
in measurable, concrete answers that are not ideologic in nature.
• The main questions that should be addressed are questions around sustainability of
resources and growth and how to balance the two as well as resilience and how our
community should respond to anticipated and unanticipated stressors.
• The board noted the importance of integrating resilience into our sustainability efforts
and developing terminology that is more widely understood. The board suggested using
the flood to illustrate the importance of resilience and as a way to build awareness of the
impacts of less concrete issues like climate change.
• The board recommended actively utilizing organizations like Better Boulder, Open
Boulder, Plan Boulder, etc. to convene community engagement events through which the
city could gather valuable feedback on issues, values and priorities. BVSD could be a
valuable resource to encourage the next generation to discuss these issues.
• Consider using scenario planning as a way to help make the future options more tangible
and provide more concrete alternatives for the community to consider and use to create
recommendations.
1. CALL TO ORDER
The Environmental Advisory Board Chair M. Abbott declared a quorum and the meeting was
called to order at 6:05 p.m.
2. APPROVAL OF MINUTES
On a motion by M. Lommele, seconded by B. Queen, the Environmental Advisory Board
approved (4 -0, S. Morgan absent) the September 3, 2014 meeting minutes.
3. PUBLIC PARTICIPATION
4. PUBLIC HEARING ITEMS
5. DISCUSSION ITEMS
A. Comprehensive Plan/Resilience Scope of Work (Brett KenCairn and Greg Guibert,
Comprehensive Planning & Sustainability)
6. OLD BUSINESS/UPDATES
A. Addition of EAB Work Plan Items/Letter to Council
7. MATTERS FROM THE ENVIRONMENTAL ADVISORY BOARD, CITY
MANAGER, AND CITY ATTORNEY
8. DEBRIEF MEETING /CALENDAR
9. ADJOURNMENT
Environmental Advisory Board adjourned at 7:24 p.
Approved:
Chair Date
To: Environmental Advisory Board Members
From: Sandra Llanes, Senior Assistant City Attorney
Lisa Martin, Urban Parks Manager
Eric Ameigh, Public Works Projects Coordinator
Subject: Information Item - Proposal to Ban Smoking on Selected Public Properties
EXECUTIVE SUMMARY
The purpose of this memo is to inform the members of the Environmental Advisory Board about
the current proposal to ban smoking on selected public properties. The purpose of the discussion
is to solicit the board's comments on the proposed ban. The proposed ban was requested by City
Council in January, developed by staff during the second quarter of the year, shared with
selected boards and commissions, and discussed at a council study session on Sept. 23. The
Environmental Advisory Board was not initially consulted but council requested its input. Staff
is now seeking the board's comments on the proposal in advance of a first reading of an
ordinance that would put the proposed ban into effect.
QUESTIONS FOR THE BOARD
1. Does the board have any feedback on the original proposal or on council's desired changes?
2. Does the board have any questions about the process and timeline going forward?
BACKGROUND
In early 2014, City Council directed city staff to develop a proposal that would eliminate the
possibility of outdoor second hand smoke in nearly all of the city's heavily used gathering spaces
and recreational facilities. An interdepartmental staff team from the City Manager's Office,
Parks and Recreation, Communications, Public Works, Human Services, City Attorney's Office,
Police, Downtown and University Hill Management Division and Parking Services, and Open
Space and Mountain Parks was formed to work on the issue. The team has been led by Lisa
Martin, Urban Parks Manager and Eric Ameigh, Public Works Projects Coordinator.
The staff team responded to council's direction with a proposed ordinance that would ban
smoking in city parks, recreation facilities, on city open space and mountain parks, along all
multi -use paths, and in much of downtown Boulder. Feedback was sought from boards and
commissions in the areas affected by the proposed ordinance (see the memo to boards and
commissions here In the time between the gathering of board and commission comments and
the Sept. 23 council study session, a few issues developed which drove changes to the original
proposal.
First, after numerous questions from boards and commissions, and following additional staff
research, staff added electronic cigarettes to the ban. This change occurred in advance of the
study session (see the study session memo here Second, in the days leading up to the study
session, staff determined that the Chautauqua leasehold area and the Flatirons golf course, which
were originally excluded, should be added to the ban. Finally, also in the days leading up to the
study session, council and staff became aware of the fact that many smokers who had been
displaced from the municipal campus by the city manager's no- smoking rule, implemented in
early 2014, had relocated onto or near Boulder High School property. Understandably, this
increase in smoking on or near school property was a cause for concern. In response, staff
developed a short term solution to ban smoking by city manager rule in a defined area around
Boulder High and also committed to adding the area to the ordinance which would ban smoking
permanently.
These desired changes, along with others, were confirmed by council at the study session (see
the full study session summary here item 3A). In summary, they were:
• Include the entirety of Chautauqua;
• Include Flatirons Golf Course;
• Include the area around Boulder High School;
• Increase the smoke free area around transit stops from 15 to 25 feet; and
• Include the alleys within the boundaries of the downtown Business Improvement District
NEXT STEPS
The proposed city manager rule to prohibit smoking on public property in the area from
Broadway to 17 Street, and from Arapahoe to University avenues was published for public
comment on Oct. 3, 2014. The public comment period will end on Oct. 24, 2014 and it is
anticipated that the city manager will approve the rule shortly thereafter.
The ordinance will be amended per council's direction. A first reading will take place at council
on Nov. 18, 2014. Second reading and a public hearing are scheduled for Dec. 16, 2014.
ATTACHMENTS
Exhibit A: Map depicting the effective area for the city manager's rule banning smoking near
Boulder High School
�� �
t
�" �I
�.�
��
I
�'
sy
��
i`.
��
a
t
�. _ _ � ...
.
s
� .
i,
�4
'��
J•
'1 } 4
��
_ .. .. _....�:.:.: �': ti::::: _
.....� � L :��.
� ..
. �tk
t�
• � .
5� ��
Environmental Advisory Board's Environmental Impacts of Flood Questions for Staff
1- What are the biggest short and long -term environmental impacts of the flood? Do you think
they are being addressed?
2- From the environmental point of view, did the phasing of staff and resources during the
flood and flood recovery match the actual environmental needs? If there was a mismatch (e.g.
money /time /resources spent on X that should have spent on Y during a certain phase), has this
been communicated to City Council or others who need to know? [This could be a good lesson
learned for future natural disasters.]
3 - In the past year, what did you see as good alignment between the demands /ideas of the
public and what the city government felt was needed? Where were the mismatches (e.g., the
public thought X was very important environmentally, but from a professional's point of view, Y
might have been more important environmentally). [This could be good information to know
about how the flood recovery was communicated to the public, etc.]
4 - How can the EAB help the City review/" process" the flood and flood recovery from the
environmental point of view? Are there any issues where a review, feedback, advocacy, or
public /media support by the EAB could be of help moving forward? How will this inform our
resilience capacity moving forward?
MEMORANDUM
TO: Members of City Council
FROM: Jane S. Brautigam, City Manager
David Driskell, Executive Director of Community Planning and Sustainability
Susan Richstone, Deputy Director of Community Planning and Sustainability
Heather Bailey, Executive Director of Energy Strategy and Electric Utility
Development
Chris Hagelin, Senior Transportation Planner
Sarah Huntley, Media Relations /Communication Manager
Brett KenCairn, Senior Environmental Planner
Jonathan Koehn, Regional Sustainability Coordinator
Yael Gichon, Energy Sustainability Coordinator
Kelly Crandall, Energy Sustainability Specialist
Kendra Tupper, Energy Services Manager/Lead Strategist
Elizabeth Vasatka, Business Sustainability Coordinator
DATE: Nov. 12, 2014
SUBJECT: Study Session: Climate- Energy Framework and Program Updates
I. EXECUTIVE SUMMARY
This study session has four main purposes:
• To provide the results of assessments on the potential emission reduction contributions
through 2050 of existing and planned energy related programs.
• To outline next steps and timeframes for refining goals, strategies, and targets for Boulder's
Climate Commitment.
• To identify key energy - related elements of the 2015 work plan;
• To provide updates about several of the city's current work areas — demand -side
management programs, development of a commercial and industrial energy ordinance, a
local generation analysis— and demonstrate their relationship to this climate- energy focus;
and
• To hear from NRG Energy, Inc. on how utilities are transforming their business model and
offering new services to customers
Council is asked to provide feedback on the following questions:
1. Does council have feedback or questions on the findings related to current and potential
energy related initiatives and their contribution towards reaching an 80% emissions
reduction goal by 2050.
2. Does council have feedback or questions about the proposed next steps and timeframes for
finalizing the Climate Commitment?
3. Does council have any comments or questions on the 2015 work plan, specifically the
proposed process and timeline to develop a commercial energy efficiency ordinance?
4. Are there additional ideas for community engagement related to creating a community
energy vision that staff should consider?
This study session memo provides information and updates on two primary areas of work:
1. Boulder's Climate Commitment: Update and Next Steps
2. 2015 Integrated Energy Workplan
Climate Commitment
Over the past year, staff has conducted a series of assessments and analyses to determine the
viability of achieving an 80% emissions reduction by 2050. This has included development of
analytic models capable of projecting the emissions reduction potential of existing and planned
energy efficiency initiatives in both buildings and transportation as well as estimated emissions
reductions for different levels of clean electricity depending on future utility configurations.
Initial findings suggest that it is possible for Boulder to achieve deep emissions reductions within
this timeframe and possibly achieve an 80% emissions reduction goal. However, it is also clear that
achieving reductions of this magnitude will require broad energy system changes that include but
are larger than switching electricity sources. It is also evident that the scale of action will require
broad participation of all sectors of the community and a comprehensive community energy vision
that aligns an energy system transition with core community values, benefits and aspirations. Based
on the analysis of existing programs just completed, staff is currently developing a proposed
pathway for next stage climate action that will include a new goal framing, integrated strategies,
specific targets set in decadal timeframes. Staff proposes to present this to Council by early in the
second quarter of 2015. As part of the broader community energy vision development, staff has
initiated efforts to convene a gathering of leading energy experts, researchers and other cities to
jointly take the next steps in developing an energy system "blueprint" for transitioning to a
predominantly clean energy system. The blueprint would identify the steps necessary to address the
impacts of all energy sectors, including natural gas and transportation - related fuels. The first stages
of this process are described as part of this memo.
2015 Integrated Energy Workplan
The existing energy related programs and initiatives are providing a solid foundation of emissions
reductions and many associated social and economic co- benefits. This memo provides updates on
programs including 2014 achievements and 2015 budget allocations. Additionally, it outlines the
proposed process and timeline related to developing a commercial and industrial energy efficiency
ordinance.
Updates include:
• Demand Side Management (DSM) strategy
• Commercial and Industrial (C &I) Energy Efficiency Ordinance
• SmartRegs
• EnergySmart
• Pilots and cross - cutting efforts (such as the Boulder Energy Challenge)
• Municipalization
• Local generation options analysis
4
II. BOULDER'S CLIMATE COMMITMENT: UPDATE AND NEXT STEPS
A. Past Year's Actions
In the July 2013 Study Session on Boulder's Climate Commitment, Council gave staff provisional
guidance to evaluate the viability of a goal to reduce greenhouse gases by 80% by 2050. Over the
past 15 months - -as the city has continued to implement a wide range of programs and initiatives to
achieve significant greenhouse gas reduction —staff also conducted a series of assessments to verify
the reduction capacity of existing programs and assess the potential of several additional measures.
Key focus areas during 2014 have included:
• The creation of a new municipal and community GHG inventory system. This system is
being used to complete a 2012 emissions inventory for the city organization. This inventory
is nearly complete. A final report will be available for the community by January of 2015.
• An extensive analysis of Boulder community transportation emissions including reduction
potentials associated with the recently approved Transportation Master Plan update.
• Development of a projection model to estimate emissions reductions associated with current
and predicted new energy efficiency and demand side management programs coordinated by
the city.
• Initiation of a local generation analysis process that will begin by conducting a solar
capacity analysis of every structure within city limits. This analysis is the next phase of the
localization report completed in 2011.
• The first stages of analysis and coordination around electric vehicle infrastructure
development and adoption issues and opportunities.
• Solicitation and selection of six pilot projects, as part of the Boulder Energy Challenge that
address emissions reduction challenges in transportation, energy efficiency, manufacturing,
and household -scale clean energy development.
• Continued operations of existing energy efficiency programs including significant
refinements and expansions outlined later in this document.
• Coordination of clean energy and emissions reduction innovations within the city
organization, including assessments of biogas and solar energy development employee
energy efficiency electric vehicle commuting options and on -site solar energy storage and
management initiatives.
These actions are already helping to reduce greenhouse gas emissions and saving money. They are
also providing valuable information to improve and focus existing and potential new programs and
actions. The next section provides a summary of key findings that have emerged from the city's
climate action efforts over this past year.
B. Major Findings Shaping Next Stage Efforts
Over the past year, a series of new assessments and analyses have been published highlighting the
increasingly urgent imperative to dramatically reduce greenhouse gases in order to stabilize the
global climate and reduce the likelihood of associated local impacts. A number of these
assessments, including a recent Colorado Climate Change report, are summarized and linked for
reference in Attachment A. A clear and consistent theme across all of these assessments is the
finding that climate change is in now already taking place. These reports also agree that the
timeframes within which actions can be taken to avoid severe impacts are now likely to be shorter
than previously projected.
While these assessments outline a potentially daunting call to action, there are positive elements to
the challenge we now face. Boulder and communities that choose to be in the forefront of
addressing this issue have unique opportunities – not just in mitigating risk but also in positioning
themselves to prosper socially and economically. These leading -edge communities will create the
solutions that can be shared and implemented regionally, nationally and internationally.
1. Energy as The Core Focus of Climate Action
A common theme emerging through these reports is the central role that energy plays in climate
change. Attachment B shows a representation of US greenhouse gas (GHG) emissions and the
predominant share ( >85 %) of those emissions attributed to energy related activities. In the 2012
Boulder greenhouse gas emissions inventory currently being finalized this significant role played by
energy is even more pronounced. As Figure 1 displays, energy- related emissions represent more
than 95% of Boulder's emissions, encompassing three energy related emissions sources: electricity
(coal and natural gas), natural gas for heating and other processes /uses, and petroleum. Achieving
deep emissions reductions related to energy will require coordinated action in three areas:
reduction of energy usage through conservation (using less) and efficiency (reducing waste);
replacing fossil fuel energy sources with clean, renewable energy; and redesigning /redeveloping
core elements of our energy system to accelerate and support both reduction and replacement
initiatives.
Figure 1 – 2012 GHG Emissions by Source
While other aspects of non - energy resource use and
management— water, waste, land management —all
have important connections to emissions, deep GHG
emissions reduction will require the primary focus of
Boulder's climate action to be on strategies that address
emissions arising from energy —its production,
distribution, management and use. Each of the three
core areas of action are described in more detail below.
2. Reduction Potentials from Known or Anticipated Efficiency and Conservation Programs
Buildings and Related Enery Uses (about 76% of total missions Table 1 below summarizes total
estimated emission reductions from Boulder's existing and proposed building - related energy
efficiency efforts.
The table reflects a number of assumptions regarding program reach, level of public and private
investment, regulatory requirements, and rate of property redevelopment and investment. The
M
projection tool also includes the significant efficiency -based reductions projected by CU Boulder as
part of its Climate Action Plan. It should be noted that the findings are preliminary. The projection
model is being refined to include all of the available information on existing and anticipated
programs. However the analysis does create the first synthesis of all existing and planned programs
and reasonable estimates for the levels of reduction that could be achieved by each program through
2050.
As shown, the analysis indicates that close to 25% of an 80% emissions reduction goal by 2050
could be achieved through continued implementation of the existing and planned energy efficiency
efforts. These include the implementation of a 2030 net zero energy building codes', the ongoing
implementation of Boulder's Energy Smart and Smart Regs programs, and the development and
implementation of a commercial and industrial energy efficiency ordinance. It is important to note
that these projections assume the continued funding of Energy Smart and Smart Regs programs
through the existing CAP Tax funding stream or similar mechanisms.
Transportation Related (about 20 percent of total emissions) Table I also provides estimates for
the levels of transportation emissions reduction achieved through two primary areas
implementation of the recently approved direction for the community Transportation Master Plan,
and the emissions reductions anticipated through ongoing implementation of the federal CAFE
vehicle fuel efficiency standards (Corporate Average Fleet Efficiency). Together these measures
are projected to contribute an additional 10 -11% in overall emissions reductions.
In summary, the total anticipated emissions reduction potential by 2050 for existing and anticipated
programs in buildings and transportation is around 35 %. This is consistent with similar analysis
conducted by RMI for the city of Fort Collins as part of its current Climate Action Plan update
2
process.
' Projections included both new construction and the anticipated proportion of property redevelopment that will come
under the "path to net zero" code changes.
2 "Stepping Up: Benefits and Costs of Accelerating Fort Collins' Energy and Climate Goals" Rocky Mountain Institute
2014
The emission reductions outlined in Table 1 are based on achievable but ambitious objectives. A
significant portion of the remaining reductions needed to achieve Boulder's overall Climate
Commitment goal will need to come from energy source replacement in both the building and
transportation sectors.
Figure 2 illustrates the total contributions of existing efficiency programs in relation to the overall
reductions necessary to achieve an 80% reduction in emissions by 2050. The potential additional
contributions that could be achieved through changes in energy source are discussed in more detail
below.
on
Table 1— Emissions Reduction Projections for Efficiency and Conservation Programs by
Sector
Figure 2 — Proportion of Climate Goal Achieved through Existing Efficiency & Conservation
Programs
3. Replacement — Emissions Reduction Potential from Energy Source Replacement Strategies
As noted above, there are three primary emission sources based on energy usage—electricity (coal
and natural gas), natural gas for other uses, and petroleum. The following summarizes efforts
associated with each of these three emission sources.
Electricity (about 60 percent of emissions the three energy sources and their associated
emissions, electricity is the area in which the most substantive analysis, strategy development and
action have taken place. One of the core objectives of the municipalization initiative has been to
7
create a pathway to significantly replace the heavily coal and natural gas dominant electricity with a
significantly higher percentage of clean, renewable energy. The initial analysis conducted to satisfy
the Charter metrics determined that there was a high probability of achieving the metrics even while
shifting to approximately 50 percent of electricity from non - fossil fuel sources. Additional analysis
to determine the opportunities and constraints around development of a significantly larger
proportion of renewable electricity sources will need to take place once the current uncertainties
around acquisition costs and timeframes are resolved.
Figure 3 shows the potential emissions reductions by 2050 for three scenarios of electric utility
portfolio in combination with the existing and planned energy efficiency and conservation efforts
described earlier:
• Status Quo— Projected emissions levels under existing utility resource plans
• 50% Renewable Energy Utility
• 100% Renewable Energy Utility
N .
0
x.
x.
W
x.
H
x.
0
0
W
0
0
cv
M
i.
bA
W
W
Based on the analysis conducted to -date, it appears that Boulder could reach an 80% emissions reduction
goal by 2050 through a combination of its existing efficiency and conservation programs (in both
buildings and transportation) and an electric utility drawing 100% of its energy from clean, renewable
energy sources. To either accelerate goal accomplishment (before 2050) or allow for the possibility that
the electric utility may not achieve full 100% renewable energy, additional reductions in both natural gas
and transportation energy source replacements can also provide significant additional reductions
potential. A brief summary of efforts to date in these two areas are described below.
Transportation (about 20 percent of emissions)— part of the extensive transportation emissions
analysis, staff identified transportation energy source change as an important area for additional
consideration. Additional work is now underway to develop new metrics to track progress in this
transportation characteristic. The transportation emissions assessment also identified the importance of
continued improvements in the transit fleet fuel efficiency or alternative fuels development, an area
transportation staff has been working on with Boulder's regional transit provider RTD. A consortium
organized by the city and including Boulder County, CU, BVSD and UCAR has also begun to analyze
the infrastructure issues associated with promotion of electric vehicle adoption. The city's own facilities
and fleet department is actively modeling this strategy through exploration of continued expansion of the
city's electric vehicle fleet, including the introduction of electric bicycles.
Natural Gas other than Electricity (about 18 percent of emissions During 2014, staff worked with a
community -based Natural Gas Working Group to examine issues associated with natural gas, primarily
associated with the sourcing of lower environmental impact natural gas for electricity generation. This
group acknowledged the importance of exploring strategies for building "the other half of the bridge"
strategies for ultimately retiring natural gas as a "bridge" fuel. This would include identifying additional
natural gas efficiency opportunities as well as substitution options for replacing natural gas in its current
uses—largely heating and industrial processes. However, this topic was largely outside the scope of this
working group, and additional staff work has not yet taken place on this topic.
The preceding analysis indicates that it may be possible for Boulder to reach an 80% emissions
reduction goal with a combination of existing and planned initiatives and our current efforts related to
electric utility redevelopment. An important additional insight gained over the past year has been the
importance of redesigning key elements of our energy system to support and accelerate these reduction
and replacement initiatives. System design is especially significant as a determining factor in the scale
and impact of developing local renewable energy resources like solar. It is also a significant factor in
the capacity and pace of fostering adoption of clean energy transportation alternatives like electric
vehicles, and developing viable replacement options for current non - electricity related natural gas uses.
The next section describes proposed efforts to extend current initiatives already underway to explore
these aspects of energy system redesign.
4. Energy System Redesign— Creating an Integrated All - Sectors Energy System
A key finding over the past year has been the recognition that the current energy system will have to be
strategically redesigned to accommodate a significant expansion of local renewable energy generation
and facilitate a rapid conversion of existing natural gas and transportation uses to electricity. This
significant energy system transformation intersects with the discussion already underway regarding "the
electric utility of the future," encompassing a much broader range of system redesign issues and
10
opportunities. It will also be necessary to facilitate and support significant efficiency efforts —from the
challenges of implementing aggressive new net zero building codes, to the effective implementation of
commercial and industrial energy management systems.
A central consideration that will shape this energy system redesign are the choices that will need to be
made regarding how new clean energy sources will be developed and implemented. Current utility
interests and momentum are pushing for this to take place through large, off -site, privately owned
energy development. Conversely, there are potentially significant local economic benefits as well as
resilience, capacity building and community development opportunities associated with prioritizing and
incenting a more distributed, decentralized approach to renewable energy development. These two
paths represent very different sets of choices in how the existing energy infrastructure— electricity,
natural gas and transportation energy—is configured, owned, invested in, and managed.
4. A New Energy Systems "Blueprint"
To establish clean energy replacement targets across all energy uses and sources, a comprehensive
evaluation and design of the desired energy system will be needed. The design of this system will need
to be driven not only by technical and logistical considerations but also by community values and
priorities. Through Boulder's participation in both national and international forums it is clear that
many cities on the leading edge of climate action are coming to a similar conclusion: existing strategies
and systems are insufficient to achieve the levels of reduction now being called for, and in many cases
are no longer congruent with core community values.
Fundamental energy system transformation is needed for which there are few if any functional,
comprehensive examples at the present time. As part of the 2015 work plan, staff is working with
partner cities and potential funders to lead a first step `Breakthrough Convening" of leading energy
system specialists, energy experts and other vanguard communities to begin laying the groundwork for
this transition blueprint which will then be refined through an extensive community engagement and co-
development process. More detail is provided in the next steps section below.
C. Next Steps – 2015 Climate Commitment Focus Areas
Three core focus areas for Boulder's Climate Commitment initiative in 2015 are described below.
1. Coordinate and Optimize Existing Initiatives
As the previous sections illustrate, Boulder's existing program of work is making important
advancements toward deep greenhouse gas emissions reductions. Specific efforts for 2015 include:
Complete and Publish the 2012 Community -wide GHG Emissions Inventory —Staff are in the final
stages of reviewing and refining the data reporting necessary to publish the updated community -wide
GHG emissions inventory based on the newly developed GHG inventory tool and protocol. Completion
and publication is expected in January 2015.
Complete Target Setting Around Conservation and Efficiency Programs —The detailed analysis of
building and transportation efficiency initiatives provides the foundation for setting specific targets and
11
timeframes, and will enable ongoing monitoring of progress and effectiveness. Finalization of target
setting will be completed in the first quarter of 2015.
Monitoring and Integration of 2014 Pilot Proiects Several pilot projects were implemented in 2014
that will provide important information and insights into additional efficiency and energy source change
opportunities. These include the Community Power Partnership and the six projects funded through the
Boulder Energy Challenge. An ongoing priority is the integration of critical lessons learned in order to
scale larger emissions reductions actions.
2. Coordinate Analysis and Development of Energy Source Targets
The development of clean energy replacement targets will take place through the coordination of three
related initiatives in 2015. Two of these —the municipalization Resource Planning process and a related
Local Energy Generation Analysis —were initiated in 2014. The third critical action that will support
both energy source target setting and energy system design is the energy system "blueprint" convening
noted above. A brief summary of each area of work is included below.
Municipalization Resource Planning An essential step in the development of Boulder's municipal
utility will be the development of a long -term energy resource plan that will outline the anticipated
balance of different energy sources for a 20 year period. This will provide the first detailed assessment
of the options for accelerating the integration of renewable energy sources into the Boulder energy grid.
Local Generation Analysis core recommendation of the Solar Working Group was to conduct a
community -wide assessment of the solar generation potential for the city. Staff is currently working on
an implementation plan to conduct this solar capacity analysis as part of a larger local generation
capacity assessment that will also inform the municipalization Resource Plan mentioned above. The
first steps were taken during 2014 in identifying resources to conduct the solar analysis including the
creation of a partnership with NREL to assist in the synthesis and processing of the city's satellite data
that will be used in this analysis. A more detailed description of this work plan item is included as part
of the Integrated Energy Plan described below.
Drawing on this analysis of energy source targets and the refinement and coordination of energy
efficiency program capabilities described in the next section, staff proposes returning to Council in early
second Quarter 2015 with a final proposal for Boulder's next generation Climate Commitment
vision/goal, strategies, targets and timeframes.
Enemy `Blueprint Development" To further refine the initial strategies that will be presented in early
2015, the city has applied for a USDN Innovation Grant to support a 'Breakthrough Convening" which
would focus on a deep analysis of local energy system transitions. The proposed convening will bring
together urban sustainability directors from leading -edge cities with thought leaders and energy systems
specialists already engaged in energy systems change and "utility of the future" conversations. The
purpose will be to develop a shared vocabulary, understanding and vision for the coming (and
3 T he Urban Sustainability Directors Network (USDN) is a peer -to -peer network of local government professionals from
cities across the United States and Canada dedicated to creating a healthier environment, economic prosperity, and increased
social equity.
12
necessary) energy system transformation as well as a strategic framework for making that vision locally
relevant and achievable in light of differing city - specific constraints and opportunities.
The policy and program recommendations that staff anticipates emerging from this process will form
the basis for a "blueprint" that Boulder and other participating communities can work from and adapt
as their own. It is envisioned that the blueprint will be a comprehensive approach that guides local
energy decisions, and includes short-term "no regret" strategies along with longer term initiatives that
build on the success of existing efforts. It is envisioned that these outcome will be captured in both a
detailed report as well as in a more accessible and compelling summary format, such as an
infographic or motion - graphic video that presents the feasibility and desirability of a fundamental
energy system transformation to a wide audience.
Additionally, Boulder is one of a handful of cities worldwide that have been invited to be in the first -tier
of vanguard cities in the Carbon Neutral Cities Network. This new initaitive, linked to USDN as well as
C40 Cities, had a launch workshop in Copenhagen in 2014. The initaitive is currently seeking funding
for its first three years of operation, including technical assistance and research grants that could
similarly support work on the energy transformation blueprint. Initiative members to date include
Boston, Copenhagen, London, New York, Melbourne, Minneapolis, Oslo, Portland, San Francisco,
Seattle, Stockholm, Sydney, Vancouver, Washington DC, and Yokohama, in addition to Boulder.
3. Community Energy Vision Development
The significant energy system changes and related actions required to reduce GhG emissions 80 percent
(or more) by 2050 (or sooner) will require broad collaboration across public institutions, private sector
businesses, civic associations and individual households. This will depend on both a significant
dialogue and information sharing between the city and larger community, and development of new ways
to understand and portray the larger vision and motivation for this change. This community energy
vision will need to be tangible and connect to the personal experience and priorities of community
members. A brief summary of the strategy for coordinating this community energy vision development
is provided in the closing section of this memo.
The next segment of the memo provides updates on a number of major energy related program areas
integral to achieving both the city's Climate Commitment and other important community values and
objectives.
13
III. 2015 INTEGRATED ENERGY WORK PLAN
Consistent with the framework of the climate commitment, the city's Integrated Energy Work Plan is
organized into four functional work areas:
• Demand Side Management programs
• Pilots and cross - cutting efforts
• Municipalization
• Local generation options and analyses
These efforts are primarily funded by the Climate Action Plan (CAP) tax and the Energy Future budget.
For more information on the 2015 Energy Future budget, please see the Sept. 9, 2014 City Council
memo The 2013 and 2014 budget for CAP tax energy efficiency initiatives allocate programmatic funds
by the approximate percentages council agreed to in 2012.
The annual estimated CAP tax revenue for 2015 is $1.8 million, and will be allocated as follows:
Figure 4: 2015 CAP Tax Allocation
Program
Tracking,
Repor
an(
Evaula
115
Commercial Demand Side Management (DSM)
• Commercial EnergySmart: provides
business and commercial building owners
energy advising services and rebates
• Commercial & Industrial Energy Efficiency
Ordinance
Residential DSM
SmartRegs: licensed rental housing energy
efficiency requirement and energy advising
services and rebates through EnergySmart
Stimulate Market Innovation
• Boulder Energy Challenge — grant program
funding innovative solutions from the
community to reduce emissions
Program Tracking, Reporting and Evaluation
• A database warehouse to track and display
energy and GhG emission reductions,
showing progress toward the climate goal
These efforts are primarily funded by the Climate Action Plan (CAP) tax and the Energy Future budget.
For more information on the 2015 Energy Future budget, please see the Sept. 9, 2014 City Council
memo The 2013 and 2014 budget for CAP tax energy efficiency initiatives allocate programmatic funds
by the approximate percentages council agreed to in 2012.
14
Table 2: Summary of 2015 Integrated Energy Work Plan
I | | Programs and Projects (detailed update to follow)
Local Generation Options and Analyses * Update tn Solar Grants program and evaluation process
Involves understanding theoretic and * Project any significant changes tnannual load from DG and DSM
real limitations, and the type nfresource for resource planning purposes (contract needs)
(solar, storage, CHP, etc) available for * Local generation analyses to understand solar capacity, potential
local, distributed generation (DG). solar incentive structures and key regulatory/legislative issues.
These efforts will identify challenges tn * Finalize recommendations for natural gas replacement options
DG adoption and projected generation * Continue efforts in community local generation projects (ie.
capacity nf various technologies. | Western Disposal, VVVVTP,FAMprojects)
15
• Initiate development nf Energy System Transformation Blueprint
• Create/maintain data systems tn support energy efforts
• Community GHG Inventory Reporting
• Sustainabi|ity Dashboard: online, interactive, visual representation
Pilots and Cross-Cutting Efforts
nf energy and climate goals and metrics
• Community Power Partnership (CPP): Pilot w/ Pecan St. Institute
Includes pilot projects as well as
to understand the value of circuit level energy and water data.
programs and strategies that span
* Administer Boulder Energy Challenge grants and track progress nf
multiple work areas and departments.
the six chosen innovation projects
• Update Green Building Green Points Code
• Coordinate with Transportation Master Plan (TMP)
• Non-Muni PUC efforts and filings around a number nf issues, such
| as improved data access for governments and b|d0owners
Local Generation Options and Analyses * Update tn Solar Grants program and evaluation process
Involves understanding theoretic and * Project any significant changes tnannual load from DG and DSM
real limitations, and the type nfresource for resource planning purposes (contract needs)
(solar, storage, CHP, etc) available for * Local generation analyses to understand solar capacity, potential
local, distributed generation (DG). solar incentive structures and key regulatory/legislative issues.
These efforts will identify challenges tn * Finalize recommendations for natural gas replacement options
DG adoption and projected generation * Continue efforts in community local generation projects (ie.
capacity nf various technologies. | Western Disposal, VVVVTP,FAMprojects)
15
IV. KEY PROGRAM UPDATES
A. DSM Programs: EnergySmart and SmartRegs
1. EnergySmart
As the city and Boulder County continue to partner on the successful implementation of the
EnergySmart programs, a few updates are worth noting.
• EnergySmart has enrolled more than 12,000 homes and provided advising services to more than
3,200 businesses countywide. Over 60 percent of the homes (more than 7,000) and 64 percent
(over 2,000) business are being served in Boulder.
• In customer satisfaction surveys, 98 percent of participants would recommend the service to their
neighbor and they are doing so, as word of mouth is the leading way people enroll in the
program. Additionally, advisors are consistently rated five out of five on the surveys.
• Advising to action (or upgrade) conversion rates continue to be much higher than the traditional
utility demand side management programs. In Boulder, owner occupied units are experiencing
an advising to action rate of more than 75 percent and businesses have over a 45 percent rate.
For more detail, third quarter reports can be viewed at Residential Eneru�ySmart and Commercial
EnergySmart.
In 2010, Boulder County awarded Populus (a local Boulder company) the contract for the residential
EnergySmart program administrator. Over the years, Populus has been recognized as an innovator in the
energy services industry. In August, the company announced it has been acquired by a national energy
efficiency firm, CLEAResult a leading provider of energy efficiency programs and services to electric
and gas utilities, governments, schools and businesses. The EnergySmart advisor model of delivering
energy efficiency services was created in Boulder and is now integrated in energy efficiency programs
all over the country. This is a great example of Boulder exporting energy innovation.
In February 2015, due to the county's contracting requirements, it will be issuing a new Request for
Proposals (RFP) for residential EnergySmart services. Since a SmartRegs compliance path is offered
through the county's EnergySmart contracted services as well as city SmartRegs assistance and rebate
services, the city will join the county and combine EnergySmart and SmartRegs assistance in one RFP.
A contractor for residential EnergySmart and SmartRegs assistance services will be selected by April.
Staff will update council on the outcome of this process in the second quarter of 2015.
16
2 SmartRegs
SmartRegs, the city's rental housing energy efficiency requirement, is halfway through the eight -year
implementation phase, with approximately one quarter of the city's licensed rental housing units
certified as compliant with the requirements. City staff has been implementing recommendations from
the 2013 Cadmus Report to improve the city's residential energy efficiency strategies, including
streamlining the compliance elements of the program. The city's SmartRegs progress report can be
viewed on the city's website.
Additionally, staff is moving to better integrate SmartRegs into the city's Rental Housing Licensing
(RHL) program. The ordinance language provides that, "...if the energy efficiency requirements are not
met at the time of applying for a new or renewal rental license, the license will be issued at a reduced
term." Since rental licenses are issued for a four -year timeframe, from January 2015 and beyond, any
new or renewal rental licenses that are not SmartRegs compliant will receive a reduced -term license
with a Dec. 31, 2018, expiration date, the predetermined SmartRegs deadline. If SmartRegs compliance
is demonstrated prior to the deadline, the term will be extended to the full four -year term from the date
of issuance.
A large number of rental licenses are due for renewal in 2015 (see Table 3 below) and staff is both
coordinating with CLEAResult to increase the capacity to assist a larger number of SmartRegs
customers as well as increasing outreach and program marketing to encourage compliance with rental
license renewals.
The goal is to move rental property owners through the SmartRegs compliance process parallel to a new
or renewal rental license application. Streamlining SmartRegs and RHL administration is key to ongoing
program success, especially after 2019. A comprehensive review of the RHL and SmartRegs program
will be presented to council in 2015 to address a multitude of topics around the full cost of implementing
both programs together.
4 The report is found on page 27 of the linked memo packet.
17
Table 3: SmartRegs Progress to Date and Goals to 2019
Year
Approx. # of Rental
Units Renewed or
Newly Licensed
Units
Inspected
in Year
Units
Compliant
in Year
Compliant by
Exemption
(Cumulative) * **
Units
Compliant
(Cumulative)
% Units
Compliant
(Cumulative) **
2011
Not available
2,135
917
Not available
917
4%
2012
4,630
2,906
1,702
128
2,619
13%
2013
4,274
1,300
1,314
135
3,933
19 %
*2014
3,687
1,257
1,514
547
5,447
26%
2015
7,100
2016
4,000
2017
3,500
2018
4,800
*2014 progress to date (as of Q3 Reports)
* *Based on 20,652 licensed rental properties in Landlink
** *These units are included in the total compliant number
Anticipated rental units licensed for2015 -2019 are estimates based on expected renewals.
B. DSM Programs: Evolution of Demand Side Management Strategy
Due to the significant level of engagement with the business community around flood recovery efforts
and the exploration of municipalization, last year the city refrained from launching new energy
efficiency requirements targeted at the commercial and industrial (C &I) sector. During that time, the city
focused its C &I efforts on delivering existing programs, data collection, analysis of the market and
energy use of that sector, and piloting new programs and approaches.
With the development of the municipal utility in progress and the
recent hiring of a new Energy Services Manager, staff is now
moving forward to develop a comprehensive demand side
management strategy that includes the development of new
programs targeted at the commercial and industrial sector. Demand
side management (DSM) is broader than just energy efficiency and
refers to anything that modifies consumer demand for energy. It
includes energy efficiency, demand response and combined heat
and power (CHP) it does not include local generation (e.g.,
rooftop solar).
This broader strategy will encompass future DSM energy services
under the Electric Utility of the Future, as well as future mandatory
requirements for commercial and industrial buildings (referred to
as the Commercial and Industrial Energy Ordinance).
5 CHP refers to recovering and reusing waste heat, typically in industrial facilities
IN
Goal and Objectives of DSM Strategy
Staff proposes the following goal for this DSM strategy. This goal is consistent with the climate
commitment, as well as the sustainability framework.
GOAL: To create demand side management programs that accelerate the widespread
reduction of greenhouse gas (GHG) emissions, foster economic vitality, and have the
flexibility to adapt to changes in community needs and external influences.
This goal will guide evaluation of existing efforts and development of future DSM programs. This will
also inform the allocation of resources according to potential impact on climate commitment goals. With
this in mind, staff proposes the following framework (see Figure 5). This framework reflects the need
for voluntary and mandatory programs, as well as future energy services offered by the utility. It also
illustrates which sectors are impacted by each program; for instance, public sector buildings would be
exempt any future ordinance, but would still benefit from future utility energy services.
In Boulder's residential sector, voluntary energy efficiency programs have been in place for over a
decade, and a mandatory energy efficiency requirement (SmartRegs) has been in motion for rental
housing for four years. In this next generation of private sector C &I programs, staff will develop options
for a C &I energy efficiency ordinance that would potentially make rating and reporting, as well as some
energy efficiency, mandatory.
The next steps are to fully develop a three -year DSM Strategy concurrently with key efforts such as the
development of a C &I energy ordinance and the implementation and enforcement of SmartRegs.
19
Figure 5: Existing and New DSM Programs
Table 4: Timeline for Development of DSM Strategy
Key Efforts Description
Oct 2014 — Develop 3 -year DSM • Scope
Dec 2015 Strategy • Goals and Objectives
• Budget/ Staffing/ Detailed work plan
C. DSM Programs: Commercial and Industrial Energy Ordinance
City Council identified a commercial and industrial energy ordinance as a high priority at its 2014
retreat.
1. Proposed Approach and Scope
The intent is to continue with the three -phase approach last discussed at council's May 22, 2012 Study
Session modified to reflect the integration with the municipalization effort:
A Commercial and Industrial (C &I) Energy Ordinance would move beyond voluntary programs,
requiring actions that would reduce energy use and improve the quality of the building stock. This
follows the model of what has been done in the residential sector, with successful voluntary programs
(EnergySmart) leading up to energy efficiency regulation on the rental housing stock (SmartRegs).
Options for the ordinance are anticipated to include rating and reporting (or "benchmarking and
disclosure ") and possibly some efficiency measures, such as the phasing out of old, inefficient lighting
technologies, or requiring energy audits or retro- commissioning at regular time intervals.
6 Retro- commissioning is a process that seeks to improve how building equipment and systems function together. Depending
on the age of the building, retro- commissioning can often resolve problems that occurred during design or construction, or
address problems that have developed throughout the building's life. In all, retro - commissioning improves a building's
operations and maintenance (O &M) procedures to enhance overall building performance.
20
Develop "Day 1" DSM
2014 - Energy Services As part of the municipalization transition plan, staff will develop a
Oct
Oct through the city's plan for offering energy services to utility customers. The new
Utility of the Future DSM services will be coordinated as part of the overall strategy.
For each DSM program /project, the following will be provided:
2 Proposed Objectives and Timeline
The proposed objectives of the ordinance include:
U
Pq
M
El
RJ
Improve the quality of the city's nonresidential* building stock
Realize the cost-effective energy savings in the city's nonresidential building stock
h- d
Enable building owners to better understand and manage energy use of their buildings
Gather valuable data to inform future program design and energy service offerings
F -1
Increase overall awareness and understanding of efficiency opportunities with key
stakeholders (building owners, property managers, business associations, etc)
* Nonresidential refers to commercial and industrial buildings (does not include multi family)
In order to achieve these objectives, staff is dedicating resources to research, ordinance development,
and community engagement. The major efforts are described below.
21
Table 5: 2015 Draft Timeline for Development of C &I Energy Efficiency Ordinance
Key Efforts Description
Prior to any compliance date, the city will develop:
Develop systems and � A website for the ordinance
Aug 2015 - tools for • Implementation guides for owners and tenants
2016 implementing the .
Ordinance Educational and training opportunities
• Administration and enforcement systems and procedure
Based on lessons learned from other communities and the creation of SmartRegs, staff is currently
estimating a year and a half to develop systems, processes and tools to administer and enforce the
ordinance. The preliminary thinking is to have a goal of adopting the ordinance in August of 2015, it
wouldn't go into effect until early 2017. Staff is working with the Department of Energy and other
municipalities with similar ordinances to better understand the processes that may work best for the City
of Boulder.
22
Will include options and recommendations for:
Develop options and • Covered buildings and exemptions
Dec 2014 — recommendations • Timing /Phasing of ordinance
June 2015 for a C &I Energy • Public disclosure
Ordinance • Enforcement and administration
• Recognition and incentives
Targeted compliance date for the first buildings that will have to comply
Early 2017 First compliance date (e.g. commercial and industrial buildings > 50,000 sf).
* MILESTONE: First Compliance Date, 2017
D. Pilots and Cross - Cutting Efforts: Boulder Energy Challenge
The Boulder Energy Challenge was launched in June with the main objective of supporting the
development and commercialization of innovative GHG emission reducing technologies and strategies
in Boulder. Thirty projects applied and were evaluated by a team of community experts and staff The
evaluation process concluded with six finalists presenting their ideas at a Community Pitch Night held
on Aug. 7 at Impact Hub Boulder. The event included public polling of favorite projects and the
announcement that the Challenge would fund all six finalist projects, totaling $337,500.
The 2014 -2015 Boulder Energy Challenge projects are:
• Boulder Housing Partners: Affordable Energy Empowerment. This project will use a
combination of energy feedback hardware /software and a resident empowerment program to
reduce electricity consumption in two low- income housing complexes. Currently energy is
"invisible" in these complexes due to consumption data only being available at the building level
and the fact that residents do not pay their electric bill.
• eGo Carshare: TripSmart Pilot Project. eGo Carshare will assess the ability to impact the mode
choice of residents through targeted transportation advising. eGo staff and partners will conduct
free individual transportation audits in person and online, then recommend customized solutions
tailored to the individual's needs in an effort to reduce the use of single occupancy vehicles.
• Evolution Labs: Solar- Plus - Storage Demonstration Project. This project will construct two
residential and one commercial demonstration sites for premises -based solar -plus- storage
installations. The sites will include an advanced Transverter inverter /charger, solar arrays,
batteries, and electric car charger, and smart appliances integrated using the on -site PowerStation
energy management gateway and application platform.
• Lightning Hybrids: Hydraulic Hybrid Pilot Project. Lightning Hybrids will install one of their
hydraulic hybrid systems onto a shuttle bus owned and operated by Via Mobility Services.
Following installation the system will be assessed over time to measure the effectiveness of the
system in reducing fossil fuel consumption and GHG emissions.
• Snugg Home: Bundling Electric Vehicles with Solar PV and Energy Efficiency. Snugg Home
recently performed a study to determine the financial benefits of combining home energy
efficiency retrofits, solar photovoltaic's, and electric vehicles under one financing mechanism
with fast payback periods. For this project Snugg Home will develop a user - friendly calculator to
demonstrate the idea, and then build a business model to market and sell the bundling of these
upgrades through partnerships with manufacturers, distributors, local installers, and local
financiers.
Superior Ecotech: Algae Greenhouse for CO2 Capture. Superior Ecotech will build a pilot 1,000
square foot algae greenhouse at their partner brewery, Upslope Brewing. This first of its kind
greenhouse will use waste CO2 from the fermentation process and convert it to healthy, valuable
omega -3 oils via the growth of algae.
More information about the projects is available on the program website BoulderEnergyChallen ,eg com
The projects will be tracked over the next year with the assistance of technical advisors facilitated by the
Colorado Clean Energy Cluster and the Rocky Mountain Innosphere Updates on the projects will be
posted on the website, and after the conclusion of the one year grant period the program will be
evaluated and improved upon before launching for a second cycle in early 2016.
23
E. Pilots and Cross - Cutting Efforts: Coordination with Transportation Master Plan (TMP)
In one of the first initiatives to integrate climate action into a master plan, a cross - departmental team and
consultants worked with transportation staff to conduct an extensive analysis of Boulder's
transportation - related GHG emissions as part of the recent Transportation Master Plan update. This
work significantly updated and refined previous analyses that were largely based on regional
transportation models by utilizing the city's extensive travel survey data as well as new traffic count
information using more refined counting technology (infrared counters vs. air hose counters). The
analysis also integrated the new ICLEI US community GHG protocols, which call for taking
responsibility for half of all trips originating from or heading to Boulder. For example, only half of a
non - resident employee's round trip commute distance is included in the inventory.
Seven major travel sectors were analyzed: residents, non - resident employees, students, visitors, transit,
freight and the Boulder airport. A detailed summary of emissions from each group is included as part of
"Attachment C: Projected Transportation GHG Reductions by Action Area ".
This data was then used to conduct projections for future transportation emissions and the anticipated
emissions reductions that could be achieved through the extensive travel demand management, transit
expansion and multi -modal transportation system development proposed in the TMP. This analysis,
conducted by the Southwest Energy Efficiency Project, is presented in Figure below.
Three of the major findings discussed in "Attachment A: Summary of Recent Climate Change
Assessments" are summarized below.
From Southwest Energv Efficiency Project 2014 Analysis
24
Figure 6: Projected GHG Reductions by Action Areal
1. New transportation GHG reduction metrics are needed
Building on the foundation of the updated TMP measurable objectives, additional metrics are needed to
further track progress in the area of transportation related GHG analysis.
Finding -- Existing GHG metrics are based exclusively on tracking vehicle miles travelled. This can
underestimate and undervalue the efforts to create other non - vehicle related travel options. Existing
VMT metrics also make it difficult to track changes in vehicle fleet change effort s— expanded use of
high efficiency vehicles and electric vehicles.
Action -- -Based on these issues, staff are exploring the development of a "personal miles travelled"
(PMT) metric as a way to monitor overall system mobility. Staff is also examining the potential use
of a whole fleet "miles per gallon equivalent (MPGe) that would enable more specific target setting
for efforts to induce or encourage low or no- carbon vehicle usage.
2. Existing travel demand management, transit and multi -modal efforts are critical elements of a
GHG reduction strategy
Finding Existing strategies that maintained the pattern of no VMT growth over the past 20 years
have been critical to controlling transportation GHG emissions growth. Still, the much more
ambitious goal now being considered will require additional transportation measures to reduce
VMT below current levels over the next two to three decades.
Action —Staff are directing additional attention and effort to increasing efforts to reduce both
resident and non - resident employee Single Occupancy Vehicle usage. Efforts in transportation can
have significantly greater effects if they are supported by land use and policy changes. Two
examples were demonstrated in the sensitivity analysis related to expanded Eco Pass access and
managed parking conducted as part of the TMP and AMPS processes.
3. Additional energy source change initiatives and other innovations are essential
Finding There will need to be an additional share of GHG reductions in addition to the reductions
provided by both TMP- related mode shift actions and the vehicle efficiency improvements resulting
from the implementation of Federal CAFE standards.
Action A number of initiatives are now in development that will provide valuable information and
experience to shape program strategies to reduce GHG emissions through transportation energy
source change and other approaches such as land use changes that support both transit and other
forms of non - vehicular mobility. These efforts, described in more detail in "Attachment C:
Projected Transportation GHG Reductions by Action Area," include:
• EV Infrastructure and Adoption Assessment
• Employee EV Commute Pilot
• Boulder Energy Challenge Pilots
• City Fleet EV Expansion
F. Municipalization Transition Plan
The Municipalization Exploration Project has provided recent updates to council related to the transition
plan and the recommended 2015 budget At the time this memo was written, the city was awaiting the
outcome of three cases at Boulder district court and one case at the Federal Energy Regulatory
Commission related to municipalization. The outcomes of these cases could shift the schedule and
25
priorities of the municipalization work plan. Staff will provide regular updates on work plan priorities
and schedule.
At its April 24, 2014 Study Session, council discussed the fundamental need to overhaul the existing
utility business model in favor of one that accommodates a different energy system and relies on a
different revenue model. This transition is vital for Boulder to achieve its climate and energy goals, as
the utility plays a central role in ensuring a safe, resilient energy supply while prioritizing a rapid
transition from fossil fuels.
The business model associated with the "utility of the future" is a different in that that provides "energy
as a service." It sells or facilitates the provision of services that electricity provides health, comfort,
safety, and economic vitality —while reducing its impact on our natural environment and rapidly
transitioning from fossil fuels to clean, renewable energy. It will also have a different relationship with
customers as it helps them use less energy, manage energy more efficiently, and self - generate where
possible. Boulder is looking at a fundamental shift in thinking about the purpose of the utility: how it
measures success, how it is organized and operates, how it engages with customers, and how it is
financed and made economically viable.
As part of this study session, staff has arranged a presentation by NRG Energy, Inc. NRG is one of the
largest independent producers and retail electric companies in the US. While the utility currently
generates a significant portion of its energy from fossil fuels, it has developed an aggressive vision that
is embracing the energy-as-a- service concept. The utility is implementing an increasingly diverse suite
of energy sources, empowering its consumers with real choices and value, and developing and
implementing leading -edge efficiency and demand - response initiatives. As Boulder continues to refine
its vision of what its own electric utility could look like, hearing from progressive utilities helps define
what's possible – and what is already happening.
In addition to discussions with entities outside Boulder like NRG, municipalization staff recently
conducted, in conjunction with Rocky Mountain Institute, a six -hour planning workshop with key
customers and community leaders to help demonstrate the power of public - private partnerships in
designing and operating the Electric Utility of the Future. A diverse representation of the community
were invited to participate in conversations that will help shape the types of services, rate - setting
approaches, and innovation priorities the utility sets, both in the short and long terms.
Lastly, over the next several months, the municipalization project staff will begin seeking participants
for a series of working groups designed to assist with implementation of the transition plan. The
working groups include Energy Services; Resource Acquisition; Customer Experience; Rates; and
Reliability /Safety. As a change from the last round of Energy Future working groups, these working
groups will be selected through an application process that will seek specific expertise in these areas.
Separate outreach will be conducted for a broader group of stakeholders. The application and working
group scopes are available on the Energy Future website: www.BoulderEnergyFuture.com
G. Local Generation Options and Analyses
The development of local energy generation has become a cornerstone of Boulder's short- and long -term
energy strategy. It supports the city's existing energy services, promotes a resilient energy supply and
provides a basis for a local resource portfolio should the city create a local electric utility.
26
Local, state and federal policy on renewable and low- carbon energy is moving fast to take into account
emerging technologies and targets. In parallel, there has been growing recognition of the qualitative
benefit associated with low- carbon, decentralized generation. Many of these benefits were identified in
the city's Qualitative Analysis ( Attachment E of the July 23, 2013 Study Session memo to City
Council).
These facts come together to present a dynamic backdrop for the local planning of distributed generation
and how essential it is that Boulder has a robust understanding of its renewable energy potential.
Building on the recommendation from the Solar Working Group staff has begun efforts associated with
a three -phase local generation analysis process. The project provides the data required for on -going
renewable energy deployment and will also assist in developing policy to support local energy
development.
The overall objective of the study is to provide an in -depth assessment of the potential of local
generation technologies to meet a significant share of Boulder's electricity demand. The analysis is also
intended to explore the implications of achieving significant local generation levels both in terms of
potential benefits as well as potential challenges. The project focuses on renewable electricity and heat,
including both residential and commercial scale renewables (on -site and building- integrated
renewables). Some of the specific objectives include:
• Highlight the potential for solar electricity to significantly impact the electricity generation
portfolio and to explore the challenges likely to be encountered as the industry grows;
• Produce energy planning guidance by setting out generation potential, providing guidance on
how this should be aligned with economic development, climate and community energy goals;
• Evaluate the upper technical and theoretic bound of the electricity market share that can be
captured by solar electricity;
• Identify high value or high reliability locations on the grid, that may strongly benefit from on -site
generation for back -up or redundancy;
• Provide the analysis and insights that could help design and implement solar - friendly policies;
• Inform the development of local - generation financing or incentive programs;
• Provide a full resource assessment for low carbon and renewables technology capacity,
constraints and opportunities for Boulder; and
• Develop an electricity distribution network capacity assessment to enhance understanding of the
areas of the network that have capacity, and those that do not, to connect and accommodate
electricity generated from renewable sources.
The specific phases and example work plan components are listed below:
Phase 1: Solar Data Collection and Analysis (September 2014 to July 2015)
The first phase of the local generation analysis is intended to identify overall capacity of solar electricity
potential in Boulder. This phase utilizes existing and new data sets to calculate an overall rooftop
capacity in megawatts as well as provides the data necessary for future analyses for decision - making.
• Contractor extracts building footprints from Boulder's 2013 Light Detection and Ranging
(LIDAR) data
27
LIDAR and building footprint data sets sent to NREL for analysis
NREL processes Boulder data using their custom built Python script to identify solar site
suitability based on NREL assumptions (ft solar irradiance, slope & orientation).GIS output
data from NREL overlaid with existing GIS resources associated with historic preservation,
leased space, etc
Staff has also selected three CU RASEI' student team project to inform the overall local generation
analysis. These projects are anticipated to be completed by December 2014. They include:
Evaluation of existing local, state and federal regulatory barriers, and utility requirements for
an investor -owned utility and a municipal utility.
Analysis of potential incentive structures including pros and cons of various approaches
Research on Solarize programs and options for collective purchasing efforts for Boulder
businesses and neighborhoods.
Phase 2. Advanced Solar Analysis (2015 to 2016)
Phase 2 is intended to utilize the research and data set from "Phase I " in a number of key decisions.
The secondphase will also focus on identifying sites that might strongly benefit from on -site generation.
Community solar capacity data used to inform:
• Local generation capacity associated with a local utility resource plan
• Existing and future solar incentive structures
• Existing & potential financing structures for solar investment
• Updates to existing policies and programs
• Grid capacity for solar expansion
• High - reliability zones and critical energy users mapped; specific sites identified as strong
candidates for on -site generation and /or storage technology.
Phase 3. Full Local Generation Analysis (2015 to 2016)
Phase 3 builds on the first two phases and identifies "non- solar " resources that support Boulder's
energy goals. This phase would include issues such as site - suitability, economic feasibility and long-
term resource planning impacts.
V. COMMUNITY ENGAGEMENT AND COLLABORATION
The Boulder community is aware of the issue of climate change and committed to addressing it, as
demonstrated by voters' continued support for the Climate Action Plan tax and other environmental
initiatives. As shown previously in this memo, the city has a number of significant efforts underway and
more planned for the future. The challenge, however, is helping the community understand the
relationships between these — and how they will help achieve the Climate Commitment vision. This will
be the primary focus of the city's communication and outreach efforts from now through the end of
2015.
s RASEI is a joint institute between the University of Colorado Boulder (CU- Boulder) and the National Renewable Energy
Laboratory (NREL) addressing important, complex problems in energy that require a multidisciplinary, multi - institutional
approach. Its mission is to expedite solutions that transform energy by advancing renewable energy science, engineering, and
analysis through research, education, and industry partnerships.
9 Solarize is a Department of Energy supported grassroots campaign effort to increase the number of solar electric (PV)
installations in a focused neighborhood or community.
Building on the framework presented in this memo, city staff plan to work with Vermilion, a Boulder -
based communications firm, to develop compelling materials (likely in the form of a motion graphic,
slide show or video) that tell the evolving story of Boulder's climate commitment.
These materials will be shared widely and made available to staff and community members as they
engage with stakeholders and community members about any of the initiatives that fall under this
framework, including Energy Future or more specifically, municipalization; the development to of a
commercial and industrial energy efficiency ordinance; the Boulder Energy Challenge; the Community
Power Partnership; SmartRegs implementation and others. The goal is to create a common
understanding about the impetus for the city's efforts and a shared language around the possible
solutions.
A key message will be that the community's efforts, right here at home, will make a positive difference
both today and for the generations to come in a whole range of ways. Some are environmental, but there
are other benefits as well. Some of these include:
• Forging a distinctly Boulder energy economy;
• Supporting a healthy and joyful quality of life;
• Building resilience; and
• Continuing to attract students and visitors to the community.
At the same time, we realize that Boulder is not alone in facing this challenge — nor in finding possible
solutions. In recognition of this, the city has initiated efforts to convene the energy systems
transformation blueprint development process described earlier in this memo. The results of this work
would serve as the basis for the start of a public process in Boulder, likely in the second half of 2015 or
2016, to apply the shared language and principles locally, given our community's priorities and
objectives. More details about this will be presented to council as the results of the USDN convening
become clear.
In addition to these efforts to bridge the variety of city initiatives with a viable and meaningful long-
term framework, many of the current programs have communication and engagement plans that will be
carried out at the program level. These will leverage the city's many resources — social media, Channel 8
programs, positive relationships with media outlets — and utilize best practices around stakeholder
engagement to seek feedback and keep the community informed about their progress.
VL ATTACHMENTS
Attachment A: Summary of Recent Climate Change Assessments
Attachment B: US Sources of GHG Emissions
Attachment C: Projected Transportation GHG Reductions by Action Area
29
Attachment A: Summary of Recent Climate Change Assessments
Over the last six months, a number of major climate assessments have been released. These assessments,
conducted by scientists working across academic and political boundaries, indicate that human - caused
climate change is happening and poses unprecedented risks. The research demonstrates that global
average temperatures are increasing and extreme events are becoming more prevalent. A number of
these assessments suggest there may be only 15 to 20 years to achieve the deep reductions necessary to
stabilize the climate at sustainable conditions for many regions of the world.
At a local level, temperatures have risen in Colorado by 2.5 degrees F in the last 50 years (over 1
degrees Celsius), and some studies project average temperature increases of an additional 2 to 6 degrees
Fahrenheit in our state between now and 2067 (1 -3 degrees Celsius).
Summaries of a number of these key assessments and link to their full reports are included below
American Academv of Advanced Sciences —What We Know
(SUMMARY TO FOLLOW)
Climate Change in Colorado 2014
(SUMMARY TO FOLLOW)
Intergovernmental Panel on Climate Change (IPCCI Working Group 3 Report
(SUMMARY TO FOLLOW)
International Energy Administration Paper on Energy Technology and Climate
(SUMMARY TO FOLLOW)
Kepler -Ross Financial Analysis of Fossil Fuel Investment Risks
(SUMMARY TO FOLLOW)
■
30
Attachment B: US Sources of GHG Emissions
flow -chart
31
From World Resources Institute 2008 http: / /www.wri.org/ resources / charts - graphs /us- greenhouse - gas - emissions-
Attachment C: Projected Transportation GHG Reductions by Action Area
The following summarizes a set of additional efforts in development that are targeting emissions
reduction through vehicle efficiency and energy source modification.
Electric Vehicle Charging Infrastructure and Adoption Assessment
Drawing from this analysis, the city has partnered with Boulder County, University of Colorado (CU)
Boulder, Boulder Valley School District (BVSD) and UCAR to coordinate a County wide analysis of
electric vehicle charging infrastructure issues as well as other key factors in electric vehicle adoption.
The Southwest Energy Efficiency Project will be conducting this analysis for this consortium. The
study was initiated October 1 st with a projected completion date of February 1 st, 2015.
The study has three major focus areas:
• Charging Infrastructure – A critical factor in support of broader adoption of electric vehicles
is the availability of charging infrastructure. SWEEP conducted a preliminary analysis of
County wide charging infrastructure in 2011. This study will update both the public charging
station analysis and add analysis of home, workplace and public charging infrastructure.
• Multi Modal Linkages -- In the public infrastructure analysis we will give special attention to
the potential for creating multi -modal linkages by examining the possibilities of charging
infrastructure at park- and -rides and "edge" parking facilities with "last- mile" mode options.
• Workplace EV Adoption – One of the strategies for accelerating adoption of EVs in sectors
with the greatest GhG emissions reduction impacts is in the potential for workplace
commuting. This is also one of the travel categories most difficult to move out of single
occupancy vehicles. As part of the analysis, SWEEP will identify issues and opportunities
for the city of Boulder to implement an EV commuting pilot project with its own employees.
Boulder County, CU, BVSD and UCAR are interested in similar opportunities. This sort of
group adoption could create a much more rapid expansion of EV usage, particularly in the
longer travel categories with the most emissions reduction potential.
Employee EV Commute Pilot Project
As noted above, the SWEEP assessment will help the study partners evaluate the potential for
implementing electric vehicle commuting opportunities for its employees. Given the high proportion of
each organization's employees that commute in to Boulder for work, employee commuting represents
one of the largest sectors of GhG emissions for each of these organizations. The Boulder employee EV
commute pilot will examine both the potential for alternatively - fueled vehicle options along with other
currently used other trip reduction strategies such as vanpooling (including the potential for electric
vans), telework options, and other employee commute options that reduce the use of single occupant,
low efficiency vehicles.
Boulder Energy Challenge Transportation Pilot Projects
As part of the Boulder Energy Challenge, three projects were selected that have a focus on
transportation emissions.
eGo Car Share highly successful Energy Smart Program has become a national
model for effective adoption of energy efficiency measures based in large part on the energy
advisor element of its approach. Similar ideas of more personalized assistance in travel
planning have been considered or tested on a limited scale in other areas. In the project
funded by the Energy Challenge, eGo Care Share will implement a pilot advisory model that
32
includes both direct person -to- person support, enhanced web and personal device
applications, and a gamification element to incent new and more efficient behavior.
Lightning Hybrids— Lightning Hybrids has developed an after - market regenerative braking
system for medium -to -heavy duty transit and freight vehicles that can cut energy usage by as
much as 30 %. In this funded pilot, they will install one of their systems on a VIA transit
vehicle and assess the overall energy savings over the course of a year of operations. Given
the significant contributions of both transit and freight to the city's overall transportation
GhG emissions, this is an exciting opportunity to test new technology that could have a
substantial impact on emissions in this category.
Snugg HomeSnugg Home has developed a financing package for homeowners that enables
them to bundle the purchase of a photovoltaic electric system, an electric vehicle and a home
retrofit at a cost comparable to what they would pay for a car payment and energy costs
(including gasoline) and pay off the entire package within 5 years. If successful, this could
offer local residents a significant opportunity to both save money and make a major
contribution to local GhG emissions reductions in both electricity, natural gas, and petroleum
usage reduction.
City Fleet EV Expansion
The cities Facilities, Fleet and Maintenance Division is in discussions with firms offering new
opportunities for significant expansion of the city's hybrid and electric vehicle fleet through an energy
services contract similar to those used for other facilities projects. Full implementation may require
creating additional partnerships with the County and other municipalities to create an economy of scale
sufficient to make this opportunity viable. If successful, this approach could more than triple the
number of electric city vehicles,
Transit Fleet Improvements
As part of the GhG emissions analysis conducted during the TMP update, Nelson Nygaard conducted an
extensive assessment of the GhG impacts of different transit scenarios being considered in the TMP.
These assessments demonstrated the importance of an enhanced focus on improvement of transit fleet
efficiency and alternative fuel option development in order to maximize the benefits that the doubling of
transit ridership anticipated through implementation of the TMP will create. Transportation staff is
working on a range of efforts to improve transit efficiency including both work with RTD and
identification of opportunities for piloting new transit options with Via.
33
To: Boulder City Council
From: Environmental Advisory Board
Date: January 3, 2014
Thank you for this opportunity to provide the Environmental Advisory Board's (EAB) input on
the proposed Council work plan for 2014. The board's feedback on the requested questions is as
follows:
(1) What are your top priorities within the framework of the council work plan?
We are excited to see that the top tier of Council priorities for 2014 falls directly in line with
those of the EAR We are particularly interested to see progress on your items 1 -3:
1. Boulder's Energy Future- The pursuit of a city -wide sustainable energy system has
been a top priority of the EAB for several years. The City's ability to integrate sustainable
and renewable energy choices into our energy input mix will be a primary factor in our
future ability to collectively reduce greenhouse gas emissions.
2. Climate Commitment- Climate Commitment is another longstanding EAB priority,
and one with an inherently broad scope. In 2014, the EAB would like to see particular
emphasis on commercial energy use reductions and market innovation. Our second tier
of priorities includes more specific projects such as green building, residential solar
capacity and community food resiliency.
3. Affordable Housing- Housing does not fall under the traditional scope of EAB
interests, but we believe that the creation of new affordable housing options within
Boulder offers an opportunity to enhance the opportunity for low- carbon living in our
city. We would like to see this matter considered with regards to transportation
(reduction of in- commuters and creation of public transit options), sustainable building
practices and as a potential opportunity to reduce waste and energy consumption through
increased density and multi - family dwellings.
(2) What would you like to see done that would advance the Council goals?
The EAB believes that the pursuit of the Council goals will be best supported by clear and
reliable reporting to the community, scrupulous transparency and a commitment to specific and
actionable mid -range markers. An informed and engaged public will be a long -term key to the
success of the prioritized programs. We wish to highlight the following recommendations:
Conscientious and consistent goal setting- The projects prioritized by Council will be
best served by creation of specific and actionable goal plans that contain short, medium
and long -term components. The reporting metrics should be specific, utilize timelines
and adhere to regular check -ins. Council frequently already operates in this manner, but
we wish to emphasize our interest in continuing and expanding these practices to all
relevant projects. We further recommend that provision of reliable and accessible
updates on these goals to the public will create better mutual understanding and ease
dissent.
Clear reporting- Creation and utilization of relevant and measurable metrics that clearly
describe progress is critical to the maintenance of public support. The metrics chosen
should be reported on clearly at regular defined intervals. The diverse public should be
engaged through various formats, potentially including means such as increased use of
social media or exploration of alternative meeting locations to discuss locally relevant
topics.
Transparency- The more that timely information on progress and procedure can be
clearly relayed to the public, the more support proposals and decisions will find, both in
the short term and for years to come. We see this as particularly critical with regard to
far - reaching or controversial projects such as Boulder's Energy Future.
(3) How can your board help reach the council goals?
We wish to continue to provide feedback and remain actively engaged with staff and Council on
projects in our priority areas. We have also identified several other areas and projects we would
like to further develop as a board in the upcoming year.
• We want to focus our feedback to improve messaging to facilitate public understanding
and engagement in our projects.
• We will seek out opportunities for inter -board cooperation. We were inspired by the
potential for positive action we saw at the j oint boards retreat last summer. We want to
actively engage with other boards and commissions to provide them with resources and
motivation that will advance our sustainability goals holistically across city policy.
• We have great resources and expertise in our current member makeup to contribute to the
market innovation project in the Climate Commitment. We want to actively pursue these
opportunities ourselves as well as remind staff and Council to reach out to us as a strong
resource on this matter.
• We wish to proactively research and remain up -to -date on carbon reduction projects in
other municipalities, particularly with regard to successes and failures and how these
lessons may be applicable or instructive to our process. We want to continue to increase
the body of knowledge and expertise available as Boulder moves forward in making
energy future decisions.
• We want to challenge ourselves to consider alternate meeting locations for locally
relevant topics in order to make our discussions more accessible to those directly
impacted.
(4) Other matters we would like to see considered and prioritized in the 2014 work plan:
Environmental matters related to the flood- We would like to be involved in
promoting environmental interests as opportunities arise in the clean -up from the
September flood. This will include decisions on rebuilding and revisioning infrastructure
as well as observation of lessons learned. In some ways, the flood offers the City a great
opportunity to rethink the status quo and set new standards for sustainability.
Consideration of commercial recycling regulations- In line with our CAP priority of
reducing commercial energy consumption, we would also like to voice our support for
the review of a commercial recycling ordinance. The commercial sector represents the
largest single impact on both waste creation and energy use, and we feel that by targeting
this area in 2014, the City can make large and efficient improvements. Commercial
energy use is already targeted as a priority, and reduction of waste from the same source
seems to follow easily as an important corollary. A partnership with Eco -Cycle to draft
effective regulations and incentives on this matter is critical to our package of
commercial sustainability strategies.
Thank you to Council for your request for feedback. We, as the EAB, are honored to be a part of
the Council process and look forward to greater opportunities and communication in the future!
T
I
I Lin I
I I F I'—
I
I m ai n W. I m7
P L W L
0 or
4
1 61
I F L-
rA
r.
m
hajai -S tKeL
ILI
OIL-
I
I I
I
I
C - I r C: �� 1 � _ I ■ _ li ■
■ � I
� I I • C ,f �� '� • 1 ■ i � � � _ -
I
I _ I
r ■ �' ■ f 111 j f 1 I r i
— n
L -- — - �� ■ i _ ■� _
, � I I _ I I ■ J 1 I I I
OF I
I Fl
JL
1 ■
' ; 1 M E
'i _ EEL
j — i ! i! .'� i i
_ L I YJi r
■ I I J.
i -. i ■ +. L co on w tter
■ '' 1 17 r , J _ia �; 5 i ".• _ t 1. • snd
I _
I
_
_
L
I or1
I J
! 3
■ ■
T r
_
■
ze
I
L
-. Lim I -
1 •...' ■
E!m
IN No IIIIIII
III
4!4
- �� '' �i 1'1 - #!�
■ ■
\' iii, '. ■ 1 I' :.I {: K
'. ■, f� �'. 1 1 1 / � • '.
•� I
NP
1 I 1 • '� 111 ~-~ � � - � ~ I • '. I, C� - � • '.
• ' • _ i
3 7
• i , • ur minill • •
l
-
r - II '
1 1 r 1
I dW
I
I _
-O --
•
I I __ I I
- I T i
�' ' I + I --� ' ':
:.' ;.. '. ::
I : �:..,. � + I
-.` 1 -.,.:. it - �� .■
r
J
A 1
J y..
"i it
� � � I� �
� -.., ■ -
� 1
`
■
1 11_ _.
PA
L_1 17 1 41 y
1 _
1
C l
L = ■
F
',
= L
i
. 1
I 1 I
II
" I I
• = 1 I_ I J � � I I I I � I I
qq �, : _
W061 _ ■
■ I ■
�-
■
Community Planning and Sustainability /Planning and Development Services Department Calendar
N ovember 2014 Amended: October 31, 2014
Last Planning Board Meeting: October 30, 2014
Thu Fri
Tue ..........' . ....................................................'................. ...............................
................................................................................. ...............................
................................................................................ ...............................
...............................
.................... .........
&i < < i ::: i.
...:.:.:.:.:.:.:.:....
• .................. ............::::::::::::::::X3i C�� .........? s.2riy........ .
....................... ............................... .. ...................... ...............................
•:•: E:�E:E: Ail' •E:E�:E:�`•E:E�:E:E�`•E:E:�`E: :•:•:E: EPEE: E•' i `•E:E� •:•:•:•:•:•:•:•:•:•:•:•:•:•:• :•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:
ss �'•i i'•i i3 .... .
.•.•.•.•. .•.•.•.•. .....1..2..3..... .... .
....................... ............................... .. ...................... ...............................
:• Epi�pip: �i�i�i7 ::i�i$'•i�i��i�ili3i�iiili�i :':': i�ihEi�i$'• i�i4i�i1� 1'•i�E7;'•i�l�'•i�i3'•i� •:•:•:•:•:•:•:•:•:•:•:•:•:•:• :•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:
............
. E� . �1 3' •i�i%i:i�i��i�a�i�ilE3i�iii4i�i :':': i�il5i�i 1�Ei1.�.Ei�E$'•i�li3�i�i�i�
:::1�.:ti•:• E1.:.it E:.:.$:.:25:.:...:.3 :.:.:23::�$.:.:fi.:.Y:. . .
:.......3i3.3E < : {: { ::::::::::::::::::
3 4 S 6 7
DMC Mtg, 5:30 Election Day BJAD, 9 am., CC CC Meeting, 6 p.m. in CC
P.M., CC LB, 6 m. in CC '2nd reading Landmark Designation
p• Ordinance for 1919 14th St. (J. Hawaii
EAB 6 -8pm, 1777 West *2nd reading Short -term Parking code
Conference Room Changes & Bike Parking (K. Guiler)
*Environmental Effects from Flood '2nd reading Concept Plan Review for City
Update (C. Meschuk) Council (K. Guiler)
*Add EmeraldAsh Bore r (K. Alexander) '2nd reading Ordinance for vacation of
public access easements at 28th St. and
Canyon Redevelopment (J. Woodward)
*Climate Comnitbnent(B. KenCairn)
*Smoking Ban Proposal (E. Pmeigh) PB Meeting, 6pm in WBSC
'Flood - related mnexations (B.Joh nson)
'PB Discussion: Annul Le tier to CC
10 11 12 13 14
City Holiday BDAB, 4 p.m. in 1777 West BOZA Meeting, 5 p.m. in CC
Conference Room
CC SS, 6 p.m. in CC
*Boulder's Energy Challenge
Reception, 5 -6 p.m., Municipal
Building Lobby (J. Harkins)
*Climate Commitment Update (B.
KenCairn)
17 18 19 20 21
CC Meeting, 6 p.m. in CC UHCAMC, 9am, 1777 West PB Meeting, 6pm in CC
Conf Rm
*Study Session Summary for 10/14 *PB Discussion: Annual Letter to CC
BVCP (L. Ellis)
*IP: Update on Uni. Hill Moratorium
Project (K. Guiler)
24 25 26 27 28
CC SS Cancelled City Holiday
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
................................................................................ ...............................
................................................................................. ...............................
December 2014
:1
2
3
4
5
DMC Mtg, 5:30
CC Meeting, 6 p.m. in CC
BJAD, 9 am., CC
PB Meeting, 5pm in CC
P.M., CC
*1st reading Flood Related Annexations
LB, 6 p.m. in CC
*5675Pra P aloe exlension E.
(B. Johnson)
McLaughlin)
*1st reading Valuation Land Use Code
EAB 6 - 8pm, 1777 West
Conference Room
*Pearl Place Site Review (E.
Change (K. Guiler)
McLaughlin)
*2nd reading Ordinance Rezoning 5400
'Resilience (B. KenCairn)
Spine Rd. (E. McLaughlin)
'ZWSP Work Plan (Harkins & Mertz)
8
9
10
11
12
PBIBDAB Session
CC SS, 6 p.m. in CC
BDAB, 4 p.m. in 1777 West
BOZA Meeting, 5 p.m. in CC
with Victor Dover,
Conference Room
5 -8pm, Location
Design Excellence Study Session
TBD
with Victor Dover (S. Assefa)
Public Workshop and
Discussion with Victor Dover,
6 -8pm at the Library Theater
15
16
17
18
19
CC Meeting, 6 p.m. in CC
UHCAMC, 9am, CC
PB Meeting, 6pm in CC
*Study Session Summary for 11/12
*PB Discussion: Amual Letter to CC
Climate Commitment Update (B.
KenCairn)
*2nd reading Valuation Land Use Code
Change (K. Guiler)
22
23
24
25
26
CC SS Cancelled
City Holiday
City Holiday
1 - 5 p.m.
29
30
CC SS Cancelled
31
City Holiday
...... ...............................
€ EEae�3EE €€
`'�` ` `'�`" ` ' ' SNO ` :
1 -5p.m.
SE1 FElla?lS ;:;tE1Ed5E3E
::
:• : i�Z��: t$$ 9. �E? �t :22:.;.::t8:t�:2�:t�2�323::•:•
•' �332d��28SxSS2x: '•':25��2?^z.8�13t33ti� •'•'
•: E3RE'• E'• E'•E'•E'•E'•E'•E'•E'•E'•E'•E'•E :•: E'• E'• E'• E'• E'• •:'•:'•:'•:'•:'•:'•:'•:'•:'•:'• ':':
January 2015
..........•..................... ...............................
............................................
............ :::::::::::::.....:::::::::::::
�............
...............................
1
2
. . . . . . . . . . . .::::::::::::::::.:.:::::::.:.::::
�......................
:: E:r�:`•Ea S:E:E:E:E:E:E:EE:E:rE: :::
E: E:E:E:E:E:E EpE rE;EpREE$E ;;;;;;;;;;;;;;;;;;;;;;;;
CITY HOLIDAY
E'•E7'•E'•E 4'•EEgE:' EEi::':i::::�:::::E
° EE ° EE; ° E ° ; ° E ° ° E °° E ::::::::::::::::::::::::
i il#3i iiJi iL &'•i'•L Ei 1S i 19 i0 •:•:''•i
i5'•i i'•Bi i il$i ii'�i i2 '•i�L :i . •
E:fE:EE:E3:Ea:E:E:E:EE :::E;i:E:E:?�E:SE:EE:E?
Ea &'•E •:•:•:•:•:•:•:•:•:•:•:•:
E$$E?4E3RE iEEEEEEEEEEE ::EEEEEEEEEEEEEEEEEEEEEEE
:...........
S
6
7
8
9
CC Meeting CANCELLED
BJAD, 9 am., CC
PEI Meeting, 5pm in CC
LB, 6 p.m. in CC
J. Putnam absent
EAB 6 -8pm, 1777 West
029 Broadway Siteand
Conference Room
Nonconforming Use Review(E.
McLaughlin)
*310 Linden Anne xationAgreement
Amendment (Wal bert)
*2030 Vassar Site Review
(VanSchaack)
*1900 Folsom Concept Plan &
Rezoning (VanSchaack)
12
13
14
15
16
CC SS, 6 p.m. in CC
BDAB, 4 p.m. in 1777 West
BOZA Meeting, 5 p.m. in CC
Conference Room
*Council Pre - retreat& Financial Update
19
20
21
22
23
CITYHOLIDAY
CC Meeting, 6 p.m. in CC
UHCAMC, 9am, 1777 West
PEI Meeting, 6pm in CC
City
Conf Rm
Council
*2nd Reading Flood Related Amexafons
*Draft ordinance to change BMS
Retreat,
(B.Johnson)
zone /University Hill Moratorium (K.
January
Guiler)
23 8,24
26
27
28
29
30
CC SS, 6 p.m. in CC
*Civic Area Irnplemeltaticn (P Leef)
February 2015
2
3
4
5
6
CC Meeting, 6 p.m. in CC
BJAD, 9 am., CC
PB Meeting, 6pm in CC
LB, 6 p.m. in CC
EAB 6 -8pm, 1777 West
Conference Room
9
10
11
12
13
CC SS, 6 p.m. in CC
BDAB, 4 p.m. in 1777 West
BOZA Meeting, 5 p.m. in CC
*Comprehensive Housing Strategy Council
Conference ROOM
Hearing (Jay S)
16
17
18
19
20
CITY HOLIDAY
CC Meeting, 6 p.m. in CC
UHCAMC, 9am, 1777 West
PB Meeting, 6pm in CC
*Study Session Summary for 1/27 Civic
Conf Rm
Area Implementaton (P. Leef)
*1st reading proposed zoning changes -
University Hill Moratorium project (K.
Guiler)
23
24
25
26
27
CC SS, 6 p.m. in CC
.................................................................................. ...............................
................................................................................. ...............................
............................... ... ...............................
:: E:SE:E]uE:E:E� E :`:i:E:E:E:EEE:ES:E :: E :E:E:?[E:E F:E:EIE:E:� E:E:E:E:E: ::::::::::::::::::::::::::::::
" EiE :`•E2 :`•E3 :`• ::: E EiE :`•E2 E E3 `: :.` "�:.` ` : •:•:•:•:•:•:• :•:.....•:•:•:•:• ::......:::::: :
•;•;• p:p' :p:p' :p: : ' 'p:p'p'p:p'p'':p:::E E4 i ::::::::::::::::::::::::::::::
¢ Y. ..... .. p q q
'•E�:IE EIS <F s1A siS s�sE :::: �5 s�:E1 EIE EIEEE ESE E
E 35E :SSE7E :E E :E3€i E3ti :E '•'•' E :E3€i E3f :E E :E E :E E :E E :E E :E E :E •'•'