HomeMy WebLinkAboutItem VIII-A
C I T Y O F B O U L D E R
INFORMATION ITEM FOR:
TRANSPORTATION ADVISORY BOARD –May 12, 2014
ENVIRONMENTAL ADVISORY BOARD –May 14, 2014
OPEN SPACE BOARD OF TRUSTEES –May 14, 2014
PLANNING BOARD –May 15, 2014
WATER RESOURCES ADVISORY BOARD –May 19, 2014
PARKS AND RECREATION ADVISORY BOARD –May 19, 2014
GREENWAYS ADVISORY COMMITTEE AGENDA ITEM
MEETING DATE:May 22, 2014
SUBJECT:
Pennsylvania Avenue Flood Repair/Improvement Project
REQUESTING DEPARTMENT:
Anne Noble –Flood and Greenways Engineering Coordinator
Katie Knapp –Utilities Project Manager
Bill Cowern –Traffic Engineer
PURPOSE:
The Pennsylvania Avenue flood repair/improvement project is being provided to
board members as an information item. If you have any comments or concerns regarding the
project, please pass them along to your Greenways Advisory Committee representative. If
you have questions on this material, please contact Katie Knapp at 303-441-4077 or
knappk@bouldercolorado.gov
GREENWAYS ADVISORY COMMITTEE ACTION REQUESTED:
Staff requests arecommendation from the Greenways Advisory Committee concerning the
proposed repair/improvements of Pennsylvania Ave.
EXECUTIVE SUMMARY:
During the flood events of September 2013, Gregory Canyon Creek overtopped and severely
damaged the Pennsylvania Avenue roadway. The roadway was not immediately repaired
because it looked like there was an opportunity to increase the flood conveyance capacity and
improve the riparian habitat for what was initially considered to be a similar cost to replace the
culvert pipe and repair the roadway. Therefore, prior to making repairs to the roadway, three
different alternatives were assessed:
Alternative 1: Replace the existing culvert and rebuild the roadway.
Alternative 2: Remove the culvert and damaged roadway above the creek, close the road to
through traffic, and build a pedestrian bridge over the creek.
1
Alternative 3: Remove the culvert and construct a new roadway with a significantly larger
culvert or a vehicular bridge over the creek.
The following table summarizes the findings:
Comparison of Alternatives
CriteriaAlternate 1Alternate 2Alternate 3
Flood ConveyanceNo EffectPositivePositive
Wetlands and Wildlife HabitatNo EffectPositiveNo Effect
Vehicular/Emergency AccessNo EffectNegativeNo Effect
Pedestrian AccessNo EffectPositiveNo Effect
Estimated Construction Start2 Weeks4-6 Months4-6 Months
Cost$4,000$95,000$225,000
STAFF RECOMMENDATION:
After evaluation of the three alternatives, the utilities department recommends immediate
implementation of Alternative 1: replace the damaged culvert and rebuild the roadway to pre-
flood condition, while further evaluating Alternative 2:remove the culvert and damaged
roadway above the creek, close the road to through traffic, and build a pedestrian bridge over
the creek. This approach was selected for the following reasons:
Repairing the roadway to pre-flood conditions is cost effective and can be done quickly.
It can be completed while school is out for summer break.
The initial repair work will allow the damaged roadway and creek area to be stabilized
to prevent further erosion and the accumulation of trash in the area.
Once the roadway is repaired,the blockades can be removed, clearing the area of
additional obstructions to flood waters and eliminating the rental and maintenance costs
associated with the blockades.
There are many positive benefits associated with Alternative 2 and a high level of
public support for the construction of a pedestrian bridge in this location.
A flood mitigation study for Gregory Canyon Creek is currently underway to explore
mitigation opportunities along the entire creek corridor. Alternative 2 can be assessed
as partof the mitigation study so that improvements in this area can be coordinated with
other mitigation projects along Gregory Canyon Creek, maximizing the benefits.
Attached is information concerning the proposed repair/improvements of Pennsylvania Ave.for
review and consideration.
Attachment A: Pennsylvania Avenue Flood Repair/Improvement AlternativesAnalysis
2
PA
VENUE
FR/I
EPAIRMPROVEMENT
AA
NALYSIS
A2014
EXECUTIVE SUMMARY
During the flood events of September 2013, Gregory Canyon Creek overtopped and severely damaged
the Pennsylvania Avenueroadway.The roadway was not immediately repaired because it looked like
there was an opportunity to increase the flood conveyance capacity and improve the riparian habitat for
what was initially considered to be a similar cost to replace the culvert pipe and repair the roadway.
Therefore, prior to making repairs to the roadway, three different alternatives were assessed:
Alternative 1: Replace the existing culvert and rebuild the roadway.
Alternative 2: Remove the culvert and damaged roadway above the creek, close the road to through
traffic, and build a pedestrian bridge over the creek.
Alternative 3: Remove the culvert and construct a new roadway with a significantly larger culvert or a
vehicularbridge over the creek.
The following table summarizes the findings:
Comparison of Alternatives
CriteriaAlternate 1Alternate 2Alternate 3
Flood ConveyanceNo EffectPositivePositive
Wetlands and Wildlife HabitatNo EffectPositiveNo Effect
Vehicular/Emergency AccessNo EffectNegativeNo Effect
Pedestrian AccessNo EffectPositiveNo Effect
Estimated Construction Start2 Weeks4-6 Months4-6 Months
Cost$4,000$95,000$225,000
After evaluation of the three alternatives, the utilities department recommends immediate implementation
of Alternative 1: replace the damaged culvert and rebuild the roadway to pre-flood condition, while further
evaluatingAlternative 2:remove the culvert and damaged roadway above the creek, close the road to
through traffic, and build a pedestrian bridge over the creek.This approach was selected for the following
reasons:
Repairing the roadway to pre-flood conditions is cost effective and can be done quickly. It can
be completed while school is out for summer break.
The initial repair work will allow the damaged roadway and creek area to be stabilized to
prevent further erosion and the accumulation of trash in the area.
Once the roadway is repaired,the blockades can be removed, clearing the area of additional
obstructions to flood waters and eliminating the rental and maintenance costs associated with
the blockades.
There are many positive benefits associated with Alternative 2 and a high level of public
supportfor the construction of a pedestrian bridge in this location.
A flood mitigation study for Gregory Canyon Creek is currently underway to explore mitigation
opportunities along the entire creek corridor. Alternative 2 can be assessed as partof the
mitigation study so that improvements in this area can be coordinated with other mitigation
projectsalong Gregory Canyon Creek, maximizing the benefits.
2
BACKGROUND:
Gregory Canyon Creek crossesunder Pennsylvania Avenue between 6Streetand 7Street,east of the
thth
Flatirons Elementary School.
Project Site
Site Location
During the flood events of September 2013, Gregory Canyon Creek overtopped and severely damaged
the Pennsylvania Avenueroadway.The roadway was not immediately repaired because it looked like
there was an opportunity to increase the flood conveyance capacity and improve the riparian habitat for
what was initially considered to be a similar cost to replace the culvert pipe and repair the roadway.
3
When the damaged asphalt pavement
was removed,the existing culvert pipe
was assessed. The pipe was
determined to be in poor condition and
therefore could not be reused.
Remnants of old bridge abutments
were also revealed. The city’s Historic
Preservation Planners visited the site
and determined that the old bridge
abutments were not significantly intact
and did not require preservation. It was
recommended that salvaged stones
from the abutments be used in the
repair project, if possible.
Different options for repairs andimprovements to the area were suggested by city staff and residents in
the area. Prior to making repairs to the roadway it was decided that the different alternatives would be
assessed.
4
ALTERNATIVE ANALYSIS:
Three alternatives for repairing the flood damaged roadway were evaluated:
Alternative 1: Replace the existing culvert and rebuild the roadway.
The first alternative would involve replacing the existing culvert pipe and repairing the roadway back to
pre-flood conditions. This is the most economical solution and could be completed for approximately
$4,000. It would also be the quickest to implement because it would not require a floodplain analysis or
any flood or wetland permits.If selected, this alternative could be implemented in early June, once the
school is out for summer break.
Alternative1
This alternative would not increase the flood conveyance or include flood mitigation improvements, but it
would allow the area to be stabilized the fastest. Future flood mitigation options for the area would be
assessed as part of the Gregory Canyon Creek Flood Mitigation Study, a separate projectcurrently
underway to identify flood mitigation opportunities along Gregory Canyon Creek between Flagstaff Road
and Boulder Creek.
Repairing the roadway to the pre-flood conditions would restore the historic traffic patternsand
emergency access, and allow the existing traffic barricades and safety fencing to be removedin the
shortest timeframe.
5
Alternative 2: Remove the culvert and damaged roadway above the creek, close the road to
through traffic, and build a pedestrian bridge over the creek.
The second alternative would involve removing the existing culvert pipe and adjacent asphalt roadway,
and building a multi-use trail with a bridge across the creek. This alternative would costapproximately
$95,000. This alternative would change the geometry and the flow characteristics of the creek and would
therefore require a floodplain analysis and flood and wetland permits.Permanent closureof the roadway
would also require Planning Board approvalin accordance with the City Street Closure/Traffic Restrain
Policy (Appendix A).The floodplain analysis, design work, approval process and permitting would take
approximately four to six months before construction could begin.
Alternative2
Installing a pedestrian bridge would provide additional flood capacity at this location which could decrease
the flooding risks for properties in the area. This option provides the greatestwildlife and wetland habitat
benefits by minimizing the impervious area above and adjacent to the creek and increasing thelength of
open channel and riparian area.
Permanently closing the roadway to vehicular trafficwould change the historic traffic patterns.Residents
in the area reported that prior to the flood, there was high speed and dangerous traffic on Pennsylvania
Ave. in the morning and afternoon when students were dropped-off and picked-up from the Flatirons
Elementary School. Pedestrian access would be improved by eliminating the through traffic and installing
a pedestrian bridge.A traffic study(Appendix B)was conducted to evaluate the impactsof closing the
-
road. The conclusions of the study are as follows:
This narrow discontinuous oneblock segment of Pennsylvania Avenue, a local access roadway,
does not play a large role in the overall connectivity of the grid of streets in this part of Boulder.
Local access traffic that is diverted as a result of this closure is being easily accommodated by
the surrounding grid of streets.
6
-
This block of Pennsylvania Avenue will still provide bicycle and pedestrian connectivity in the
area, and will still provide onstreet parking for parents who are picking up their children from
Flatirons Elementary School.
It was determined that the road closure would not create adverse impactsrelated to noiseor
safety.
The proposedclosure meets the “extraordinary circumstances” traffic related criteria of the City’s
street closure policy.
Alternative 3: Remove the culvert and construct a new roadway with a significantly larger culvert
or a vehicular bridge over the creek.
The third alternative would involve removing the existing culvert pipe and rebuilding the roadway with a
vehicular bridge or a larger box-style culvert across the creek. This alternative would cost approximately
$225,000. This alternative would change the geometry and the flow characteristics of the creek and
would therefore require a floodplain analysis and flood and wetland permits. The floodplain analysis,
design work and permitting would take approximately four to six months before construction couldbegin.
Alternative 3
Installing a vehicular bridge or larger culvert would provide additional flood capacity at this location which
could decrease the flooding risks for properties in the area. Historic traffic patterns would also be
restored.
7
Comparison of Alternatives:
The following table summarizes the findings:
Comparison of Alternatives
CriteriaAlternate 1Alternate 2Alternate 3
Flood ConveyanceNo EffectPositivePositive
Wetlands and Wildlife HabitatNo EffectPositiveNo Effect
Vehicular/Emergency AccessNo EffectNegativeNo Effect
Pedestrian AccessNo EffectPositiveNo Effect
Estimated Construction Start2 Weeks4-6 Months4-6 Months
Cost$4,000$95,000$225,000
Alternative 1: Replace the existing culvert and rebuild the roadway.
Alternative 2: Remove the culvert and damaged roadway above the creek, close the road to through
traffic, and build a pedestrian bridge over the creek.
Alternative 3: Remove the culvert and construct a new roadway with a significantly larger culvert or a
vehicularbridge over the creek.
PUBLIC COMMENT:
To gather public input, an open house was held on Feb. 6, 2014 and a project website was developed
with an online survey form. The firsttwo alternatives were initially considered because the costs were
originally estimated to be of similarmagnitude.A few people requested that a third alternative,
construction of a vehicular bridge, be evaluated. The third alternative was included in the analysis and
the project website was updated to provide an opportunity for additional comments on all three
alternatives.
The majority of the local residents showed a high level of support for Alternative 2, closure of the road and
installation of a pedestrian bridge. There was a concern raised that improving the natural habitat along the
creek, Alternative 2 would encourage additional bear and mountain lion activity along the creek and near
the elementary school.
A compilation of the public input received from the open house and online surveysis included in
Appendix C.
STAFF FINDINGS AND RECOMMENDATIONS
Floodrecoverywork has been ongoing since the September flood event with several different contractors
working on various repairs. Repairing Pennsylvania Avenue to pre-flood conditions was included in a
flood repair bid in order to get a cost for the repair work and give the city the option to quickly move
forward with the repairs. The $4,000 cost to repair the roadway wasless than initially anticipated.After
evaluation of the three alternatives, the utilities department recommends immediate implementation of
Alternative 1while further evaluatingAlternative 2.This approachwas selected for the following reasons:
Repairing the roadway to pre-flood conditions is cost effective and can be done quickly. It can
be completed while school is out for summer break.
8
The initial repair work will allow the damaged roadway and creek area to be stabilized to
prevent further erosion and the accumulation of trash in the area.
Once the roadway is repaired, the blockades can be removed, clearing the area of additional
obstructions to flood waters and eliminating the rental and maintenance costs associated with
the blockades.
There are many positive benefits associated with Alternative 2 and a high level of public
support for the construction ofa pedestrian bridge in this location.
A flood mitigation study for Gregory Canyon Creek is currently underway to explore mitigation
opportunities along the entire creek corridor. Alternative 2 can be assessed as part of the
mitigation study so that improvements in this area can be coordinated with other mitigation
projects along Gregory Canyon Creek, maximizing the benefits.
APPENDICIES:
Appendix A: City Street Closure/Traffic Restraint Policy
Appendix B:Traffic Analysis
AppendixC:Public Input Summary
9
April4,2014
Mr.BillCowern
TrafficOperationsEngineer
TransportationDivision
CityofBoulder
thth
Re:TrafficStudyReportforPennsylvaniaAvenueClosureʹ6Streetto7Street
DearBill,
AtyourrequestIhavecompletedatransportationevaluationfortheproposedpermanentclosureof
thth
PennsylvaniaAvenuebetween6Streetand7StreetonthewestedgeofBoulder.ThisblockofPennsylvania
Avenuewaseffectivelyclosedtothroughtrafficwhenaportionoftheroadwaywashedawayduringlast
^ĞƉƚĞŵďĞƌ͛Ɛflooding.ItismyunderstandingthattheproposalisforthisoneblocksegmentofPennsylvania
Avenuetoremainclosedtoautomobiletrafficwhereitwaswashedout,andthatapedestrianbridgewillbe
installedtomaintainconnectivityforpedestriansandbicyclists.
Thistransportationevaluationisintendedtoaddressapplicable͞ĞdžƚƌĂŽƌĚŝŶĂƌLJĐŝƌĐƵŵƐƚĂŶĐĞƐ͟criteriaaslisted
intheŝƚLJ͛ƐstreetclosurepolicystatementdatedJune29,1984(copyattached).
InmakingthisevaluationIhave:
conductedasitevisitandtouredtheroadwaygridinthispartofBoulder;
observedtrafficpatternsintheareaduringtheafternoonstudentpickupperiodattheadjacent
FlatironsElementarySchool;
closure;
determinedthenumberofhomesdirectlyimpactedbytheroad
estimatedtheamountoftrafficthatisbeingdivertedontoadjacentroadways;
andcommentedonthepotentialofthesurroundingroadwaygridtoaccommodatetheredirected
traffic.
OnthisbasisIofferthefollowingobservationsandfindings:
ExistingandHistoricRoadwayConditions:
1.ThisportionofwestBoulderisservedbyagridofstreetsasillustratedonFigure1.
2.Figure2providesacloserviewoftheroadwaysintheimmediatearea.
th
3.PennsylvaniaAvenueisdiscontinuousinthispartofBoulder.Itdoesnotextendwestof6Street,and
th
doesnotextendeastof7Street,whereitisblockedbytheFlatironsElementarySchoolsiteandthe
th
PioneerGatewayCemetery.PennsylvaniaAvenuedoesnotcontinueagainuntileastof9Street.
P.O. BOX 19768, BOULDER, COLORADO 80308-2768
PHONE: 303.652.3571 | WWW.FOXTUTTLE.COM
Mr.BillCowern
thth
Streetto7Street
TrafficStudyReportforPennsylvaniaAvenueClosureʹ6
April4,2014Page2
thth
4.TheoneblocklongsegmentofPennsylvaniaAvenue(between6Streetand7Street)thatisbeing
consideredforpermanentclosureprimarilyservesasalocalaccessroadwayforadjacentresidences.It
isunlikelythatthisblockservedanysignificant͞ƚŚƌŽƵŐŚƚƌĂĨĨŝĐ͟aspartofŽƵůĚĞƌ͛Ɛgridofstreets.
thth
5.Thesurroundinggridofstreetsisstillintact,with6Streetand7Streetprovidingnorthsouthaccess,
andCollegeAvenue,PleasantStreet,andUniversityAvenueprovidingeastwestaccess.
6.ThisblockofPennsylvaniaAvenueisnarrow(20feetofasphalt+/withnocurbandgutter)andabit
crookedfromendtoend(seeattachedphotographs).
7.Thereisatemporarypedestrianpathwaythroughtheroadclosurearea.
8.CurrentlyPennsylvaniaAvenueisusedbyparentsofschoolchildrenforparkingduringtheafternoon
pickupperiod,withparentvehiclesparkedonbothsidesoftheroadclosure.
th
9.DeanPlaceprovidesa͞ĚŽŐůĞŐ͟connectionto7StreetonthenorthsideofPennsylvaniaAvenue(see
Figure2).Thisconnectionisnarrowandfeelsmorelikeanalleythanathroughstreet.
10.BothDeanPlaceandPennsylvaniaAvenuearelowspeednarrowroadwayswhoseprimarypurposeis
residentialaccess.
TrafficAccessandDiversionCausedbytheClosure:
11.DeanPlaceandPennsylvaniaAvenueprovideaccesstoapproximately20residentialproperties.Of
these,approximately15dwellingsmayhavetheiraccessrouteaffectedbytheroadclosure.These15
dwellingslikelygeneratelessthan150onewayautomobileaccesstripsperday.
12.WiththePennsylvaniaAvenueclosureinplace,itisestimatedthatthefollowingdailytrafficvolume
changesareoccurring(relativetohistorictrafficlevels):
th
6StreetnorthofPennsylvania:+75vehicletripsperday
th
6StreetsouthofPennsylvania:+75vehicletripsperday
th
Street,CollegetoPennsylvania:75vehicletripsperday
7
th
7Street,PleasanttoPennsylvania:75vehicletripsperday
thth
CollegeAvenue,6to7:+75vehicletripsperday
thth
PleasantStreet,6to7:+30vehicletripsperday
thth
UniversityAvenue,6to7:+45vehicletripsperday
13.Thetrafficdiversionslistedabovearerelativelylowandarebeingeasilyaccommodatedbythe
surroundingroadwaygrid.Itisunlikelythatthisleveloftrafficdiversionisverynoticeable(5to10
vehiclesperhourduringthehighesthouroftheday)toresidentsalongthoseroadways.
Conclusion:
ThisnarrowdiscontinuousoneblocksegmentofPennsylvaniaAvenue,alocalaccessroadway,
doesnotplayalargeroleintheoverallconnectivityofthegridofstreetsinthispartofBoulder.
Localaccesstrafficthatisdivertedasaresultofthisclosureisbeingeasilyaccommodatedby
thesurroundinggridofstreets.
ThisblockofPennsylvaniaAvenuewillstillprovidebicycleandpedestrianconnectivityinthe
area,andwillstillprovideonstreetparkingforparentswhoarepickinguptheirchildrenfrom
FlatironsElementarySchool.
Iamnotawareofanypriororcurrenttrafficissuesrelatedtonoise,safety,oraccidenthistory
thatwouldbeadverselyaffectedbytheproposedclosureofthisoneblocktothrough
automobiletraffic.
InthiscontextIbelievethattheproposedclosuremeetsthe͞ĞdžƚƌĂŽƌĚŝŶĂƌLJĐŝƌĐƵŵƐƚĂŶĐĞƐ͟
trafficrelatedcriteriaoftheŝƚLJ͛Ɛstreetclosurepolicy.
Mr.BillCowern
thth
Streetto7Street
TrafficStudyReportforPennsylvaniaAvenueClosureʹ6
April4,2014Page3
Ihopethisinformationishelpful.Pleaseletmeknowifyouhaveanyquestions.
Sincerely,
FOXTUTTLETRANSPORTATIONGROUP,LLC
WilliamC.Fox,P.E.
Principal
Attachments:AreaPhotographsandFigures
Mr.BillCowern
thth
Streetto7Street
TrafficStudyReportforPennsylvaniaAvenueClosureʹ6
April4,2014Page4
AreaPhotographs:
EastboundonPennsylvania
WestboundonPennsylvania
NorthboundonDeanPlace
Mr.BillCowern
thth
Streetto7Street
TrafficStudyReportforPennsylvaniaAvenueClosureʹ6
April4,2014Page5
EastboundonCollegeat6th
Southboundon6th
WestboundonPleasant
St.77
th
St.66
th
Pennsylvania Avenue Flood Repair
Public Comments
05.12.2014
Purpose
Pennsylvania Avenue was damaged during the September 2013 flood and the City of
th
Boulder is evaluating different options for repairs of the section of road between 6 and
th
7 streets, where Gregory Canyon Creek crosses the roadway. We asked members of the
community to choose one of three alternatives or share another alternative with us.
Alternative 1: Replace the existing culvert (drainage pipe) and rebuild the
o
roadway to pre-flood conditions.
Alternative 2: Remove the culvert and roadway above the creek, close the road to
o
through traffic and build a pedestrian bridge over the creek.
Alternative 3: Remove the culvert and construct a new roadway with a
o
significantly larger culvert or a vehicular bridge over the creek.
Summary of Public Comments
General Comments
Alternative 1: 4 in favor
Traffic on the road and school access is better mitigated on option 1. Option 2
o
looks like it would cause more blockage.
There would be through traffic, less congestion, a paved road, and less mud.
o
School parking traffic will be decreased if back to pre-flood conditions. There
would be less speeding traffic to suddenly stop at the closed road and dead end
to turn around.
Alternative 2: 114in favor
Alternative two is much better for our neighborhood.
o
The culvert will continue to get clogged and spill over.
o
This has the greatest opportunity to mitigate future property damage from
o
structure blockage and volume.
The culvert narrowing the creek bed at Pennsylvania caused the flooding west of
o
the creek; Therefore if it is restored as it was there will be a problem of liability.
It also seems that option two is less expensive.
Regardless of the alternative, the type of maintenance upstream to the head
o
waters is critical for safety. The flood in September 2013 highlighted the
limitations of culverts. Alternative two is consistent with City Council’s goals of
encouraging pedestrian traffic as opposed to vehicular traffic.
I would like the peaceful space and green belt. There would be calmer traffic
o
during school when kids are walking and a significant water flow improvement
during flood episodes.
It’s very nice to see the creek again from the bridge. We can manage very well
o
without this street and have been doing so since mid-September. Thank you for
finding some funding to get started on the Gregory Creek flood plain mitigation.
We know there are lots of mitigation needs elsewhere, but please don’t forget
that Gregory Creek needs more attention sometime in the future.
Adequate access exists without Pennsylvania. Why rebuild it?
o
The chance of the road washing out again will be lessened. A pedestrian bridge
o
would be nice for the neighborhood. We walk our dog in the neighborhood a lot.
Option two is a safer alternative. The children at Flatiron Elementary will have to
contend with less traffic on Pennsylvania. Option one would risk rocks getting
caught in the culvert again.
If option two is selected, please move the west-side cul-de-sac further west.
o
Great for habitat/wildlife restoration and a safe route for bikes, pedestrians and
o
flood mitigation.
Use the east side of the bridge area as a family meeting area for walking and
o
thth
cycling families. Pennsylvania can be a riding route to 6. 6 should be a marked
bike route to University and down to the Boulder Creek Path. Benches and bike
racks should be provided. Thanks!
th
This will not eliminate future flooding. The culvert under 7gets blocked every
o
time we have a severe thunderstorm. The grate catches debris and blocks very
quickly.
Pedestrian friendly.
o
Better neighborhoods.
o
This street hardly has any traffic to begin with. The pedestrian bridge close to
o
the school would be a great addition!
Option #2 sounds like a much better fit for the neighborhood!
o
This would be so nice for walking my kids to school!
o
This culvert caused my house to flood! Rebuilding it the same way is just plain
o
stupid! Having a pedestrian bridge and cul-de-sac is the best idea I have heard
from the city in years!
I think a pedestrian bridge here would be a great addition for no extra cost!
o
These kinds of options continue to make Boulder the special place it is.
It seems like option 2 is clearly the right solution. Why rebuild something that
o
will be blown out again? Let the stream run naturally as it was intended. Thanks
for the opportunity to provide this input.
I visit the neighborhood often and would enjoy walking over the foot bridge and
o
seeing the stream below. There doesn't seem to be enough traffic to warrant
rebuilding the road/culvert.
Having seen firsthand the devastation that the clogged culverts caused
o
throughout Boulder with the floods in September, I'm inclined to say where
there is an opportunity to allow water to flow in a more natural manner and still
allow access to communities, this is the appropriate way to proceed.
I am a fan of anything to improve pedestrian access to our beautiful creek.
o
As someone who grew up in the neighborhood and still lives in town I like the
o
second idea. Seems to be a much better idea for flood control and the idea of an
open creek bed through there seems kind ofnice. If it floods again you’re going
to have the exact same problem if you build it back.
Let the stream flow!
o
The pedestrian bridge option is a great one for this neighborhood!
o
Pennsylvania Ave has a number of issues that make for an accident waiting to
o
happen. These issues include: Icy conditions - due to lack of snow removal and
direct sunlight, steep grades - west side, blind corners - Dean Pl. Reducing the
amount of traffic by replacing the culvert with a foot bridge would lessen the risk
of an accident on this street.
I live on Pennsylvania and Gregory Creek goes under my deck. I would LOVE
o
Option 2 with a pedestrian bridge. I think it offers a safe route to school for
students walking or biking as well as slows down and/or lessens the traffic
impact before and after school. In terms of emergency vehicles, since
Pennsylvania only runs between 6th and 7th, it is already confusing and difficult
to find so improved mapping and signage could effectively bring attention as to
how to reach us on the West side via 6th or Dean Place. I also really like that this
option allows for better wildlife and habitat restoration along with flood
mitigation, in particular for the folks downstream.
I am a big proponent of Alternative Two. I think any chance to restore a stream
o
corridor should be capitalized on. There are ecological/habitat benefits, safety
benefits regarding flood control and aesthetic benefits for those living there. I'm
all for number 2!
Very hopeful that we can begin a small step of prioritizing people traffic over car
o
traffic.
This is a really great opportunity to decrease flood risk while re-building! The
o
extra cost of a pedestrian bridge is absolutely worth it for the downstream flood
reduction.
This seems like a great opportunity to increase multi-use pathways in Boulder. I
o
have been in this area often and agree that drivers often speed through, even
though there is a school nearby. It is such a beautiful area, would love to see it
become more pedestrian friendly.
I live at 637 Pennsylvania Ave and would like the pedestrian bridge please
o
Given the proximity to the school building I think it makes sense to reduce some
o
traffic in this area.
Option #2 would improve the pedestrian character of the neighborhood and
o
provide important flood relief that could not easily be obtained by a culvert.
It seems like an option to take into account future flooding would be a good
o
idea. Does local traffic require a bridge?
Option 2 is a nice compromise. Flood improvements for future storms but at
o
more than half the cost of a vehicular bridge.
#2 has the most positive attributes.
o
great job with some good alternatives --thanks staff
o
Versus option 1, Option 2 seems like the better long-term compromise that's
o
potentially a good investment capable of preventing damage otherwise in the
future. With flooding though, it's a zero-sum game---every link of the chain
would need to be more robust in order to prevent problems. Making one link
stronger may have little net positive effect to the city. If this is one of the
weakest links, then by all means, please treat as such.
As a parent of students at Flatirons Elementary, I love the idea of closing this
o
dangerous street to vehicles and walking my kids to school over a pedestrian
bridge.
It is imperative to our neighborhood that Alternative TWO is implemented, since
o
the pre-flood condition is the one which enabled the flooding in the first place.
The cost to restore our home is now close to $50,000, and we know that others
in our area have spent as much or more. We are asking the city in good
conscience and good faith to help us to keep this from happening again.
It is option number two which is most beneficial to our neighborhood, as it
o
would allow more flood conveyance AND, very importantly, would interrupt the
speeding and dangerous driving on Pennsylvania. The school already has good
access on nearby streets, and the pedestrian bridge would be available for
everyone. Thanks for your work on this.
I live adjacent to the existing culvert and am in strong support of increasing the
o
flood conveyance capacity. Option 2 is the most reasonable cost option that
accomplishes this.
Alt. 2 has, by far, the strongest support from those effected by this problem -
o
those who were directly flooded by the breech of Penn. Ave. It does feel like the
estimate for this repair could be greatly reduced by looking at simpler options
for the bridge. Perhaps a use of pressure treated lumber beams instead of metal.
The city cannot really choose Alt. 1 since that would put it in the position of
intentionally creating a greater risk of flood and the possible liability. And since it
is 7 months since the flood and nothing has been done, I see no value at this
point of its being the fastest fix. That time is long past. It also seems the estimate
for this job is way too low. Alt. 3 is too expensive and there is no good reason to
do it. A final cheapest alternative would be to simply remove the ton of gravel
that the city dumped in the hole, which raised the likelyhood of further flooding,
and fence the whole creek gap off on both sides at Penn. Ave. and have no
access.
Yes to a pedestrian bridge!
o
Pedestrian Bridge seems wonderful!
o
I hope this can still be received. I live on Pennsylvania and think this option is the
o
best solution; for pedestrian/bike safety and access, wildlife habitat and flood
mitigation.
Alternative 3: 7 in favor
Car bridge or better yet, a draw bridge.
o
Square opening (rock wall exposed in flood) with roadway over (open to cars).
o
Build a vehicular/pedestrian bridgeor street and keep flow way open.
o
Car bridge.
o
Re-engineer the culvert to convey flow consistent with expected flow from
o
culverts above and open street to vehicle traffic as well as pedestrian traffic.
Flatirons Elementary School has been open well over 50 years and will be most
affected by the decision. It is considered by Flatirons staff that closing the street
would have a negative effect on the traffic flow relative to school operations.
The biggest push to close the street thus far has come from a resident who
o
moved in to the neighborhood 8 months ago and has stated he was "tired of
having cars from the school park on Pennsylvania" and was going to try to get
the street shut down.
I actually prefer alternative 2 EXCEPT the fact that Flatirons Elementary School is
o
located in the area. Students with special needs, combined with the occasional
presence of bears and mountain lions, makes it critical for fast emergency
response times.
I support alternative 3 because it is the most comprehensive and it is the best for
o
the nearby elementary school due to the access for emergency vehicles (which is
negatively impacted by alter #2). This culvert was supposed to be replaced in
1996, but the project ran out of money. It is long overdue. Also, given that
mountain lions have begun to hunt around gregory creek in town, it is a bad idea
to create an ""attractive"" environment for wildlife as suggested by alter. 2. Due
to the school and the number of small children, we must put public safety first
and select option 3. The price is commensurate with the benefits.
Otheroptions: 4 in favor
Reduce parking on east side of stream. Turn that area into a gathering place for
o
kids and parents. Allow residents to access their drives, but reduce traffic and
parking.
I'm not advocating for any particular solution, but do have the following concern:
o
if the capacity at Pennsylvania is increased, does that just mean that the flooding
as the Creek goes under 7th will be that much worse? Or further down, as it goes
under Pleasant? Or University? Or Eighth? It seems to me that having the creek
top over and go sluicing down broad streets during a flood is not the worst
solution -- it keeps the flood shallow enough not to drown anyone, or to cause
major structural damage (just wet basements, which one can recover from.)
alternative 2 is probably best, but i would like a draw bridge.
o
alternative two or alternative 3 with a drawbridge.
o